~ Nos. 91-261 and 91-274
IN THE
Supreme Court of the Anited States.
OCTOBER TERM, 1992
BUILDING AND CONSTRUCTION TRADES COUNCIL
OF THE METROPOLITAN DISTRICT,
Petitioner,
Vv.
ASSOCIATED BUILDERS AND CONTRACTORS
OF MASSACHUSETTS/RHODE ISLAND, INC., et al,
Respondents.
MASSACHUSETTS WATER RESOURCES
AUTHORITY AND KAISER ENGINEERS, INC.,
Petitioners,
v.
ASSOCIATED BUILDERS AND CONTRACTORS
OF MASSACHUSETTS/RHODE ISLAND, INC., et al,
Respondents.
On Writs of Certiorari to the United States
Court of Appeals for the First Circuit
BRIEF FOR THE ASSOCIATED GENERAL
CONTRACTORS OF AMERICA AS AMICUS CURIAE
IN SUPPORT OF RESPONDENTS
Of Counsel GLEN D. NAGER
MICHAEL E. KENNEDY (Counsel of Record)
THE ASSOCIATED GENERAL RICHARD F. SHAW
CONTRACTORS OF AMERICA DAVID A. YALOF
1957 E Street, N.W. JONES, DAY, REAVIS
Washington, D.C. 20006 & POGUE
(202) 393-2040 1450 G Street, N.W.
Washington, D.C. 20005
(202) 879-3939
Attorneys for the Associated
General Contractors of America
QUESTION PRESENTED
Whether the National Labor Relations Act preempts a state agency
that is not in the construction industry from entering into and
enforcing an agreement with a union that does not represent (or
seek to represent) the agency's employees to require private
construction employers to recognize that union and abide by the
terms of a labor agreement between the union and another
employer, under penalty of debarment from a $6.1 billion market
TABLE OF CONTENTS
Page
QUESTION PRESENTED
TABLE OF AUTHORITIES \
INTEREST OF THE AMICUS CURIAE 2
STATEMENT OF THE CASE 2
SUMMARY OF ARGUMENT 5
ARGUMENT 8
THE NLRA PREEMPTS THE STATE’S EFFORT TO IM
POSE A COLLECTIVE BARGAINING RELATIONSHIP
ON PRIVATE CONSTRUCTION INDUSTRY
EMPLOYERS AND, FURTHER, TO DICTATE THE
TERMS OF THAT RELATIONSHIP 9
PETTTIONERS AND THEIR AMICI] PROVIDE NO
PERSUASIVE REASONS FOR’ READING’ THE
CONSTRUCTION INDUSTRY PROVISIONS OF THE
NLRA TO INSULATE PUBLIC PURCHASERS OF
CONSTRUCTION FROM FEDERAL PREEMPTION 16
A. The First Proviso To Section 8(e) And Section 8(f)
Only Apply To Employers In The Construction
Industry And To Agreements That Result From A
Collective Bargaining Relationship
(111)
CONCLUSION
(1V)
TABLE OF CONTENTS - Continued
Page
B. Sections 8(e) And (f) Of The NLRA Do Not Allow
Third-Party Purchasers Of Construction To Enter
[Into Agreements With Construction Industry Unions
lo Limit Competition Among Construction Industry
Employers
4
(v)
TABLE OF AUTHORITIES
Cases
A.L. Adams Constr. Co. v. Georgia Power Co..
733 F.2d 853 (11th Cir. 1984), cert. denied,
471 U.S. 1075 (1985) | er 17, 18
Carpenters Local 1149 (American President Lines,
Ltd.), 221 N.L.R.B. 456 (1975), enf’d., 81 Lab
Cas. (CCH) ¢ 13,137 (D.C. Cir. 1977) 18
Clark v. Ryan, 818 F.2d 1102 (4th Cir. 1987) 17
Columbus Bldg. & Constr. Trades Council
(Kroger Co.), 149 N.L.R.B. 1224 (1964) 18
Connell Constr. Co., Inc. v. Plumbers & Steamfitters
Local Union No. 100, 421 U.S. 616 (1975) . passim
Donald Schriver, Inc. v. NLRB, 635 F.2d 859
(D.C. Cir. 1980), cert. denied, 451 U.S. 976 (1981) 18
Forest City/Dillon-Tecon Pac. , 209 N.L.R.B. 867 (1974),
enf'd in part, 522 F.2d 1107 (9th Cir. 1975) 18
Fort Halifax Packing Co. v. Coyne, 482 U.S. 1 (1987) 12
Frick Co., 141 N.L.R.B. 1204 (1963) 18
Golden State Transit Corp. v. Los Angeles,
475 U.S. 608 (1986) 9, 12, 15, 16
Golden State Transit Corp. v. Los Angeles,
493 U.S. 103 (1989) 9. 10
Jim McNeff, Inc. v. Todd, 461 U.S. 260 (1983) 9
Larry V. Muko, Inc. v. Southwestern Pennsylvania Bldg.
and Constr. Trades Council, 609 F.2d 1368 (3d Cir
1979) (en banc), cert. denied, 459 U.S. 916 (1982) 20, 22
Limbach Co. v. Sheet Metal Workers Int’l Ass’n..
949 F.2d 1241 (3d Cir. 1991) 22
Local 1937, Painters and Glaziers Dist. Council
No. 51 (Prince George’s Center, Inc.), 183
N.L.R.B. 37 (1970) , 18
Machinists v. Wisconsin Employment Relations
Comm'n, 427 U.S. 132 (1976) 6, 10
(V1)
TABLE OF AUTHORITIES - Continued
Metropolitan Life Ins. Co. v. Massachusetts,
471 U.S. 724 (1985) )
NLRB y. Iron Workers, 434 U.S. 335 (1978) .
NLRB vy. Nash-Finch Co., 404 U.S. 138 (1971)
NLRB vy. W.L. Rives Co., 328 F.2d 464 (Sth Cir
Operating Eng’rs Pension Trust v. Beck Engg
& Survevinge, 746 F.2d 557 (9th Cir. 1984)
San Diego Bldg. Trades Council v. Garmon,
359 U.S. 236 (1959)
1964)
South Prairie Constr. Co. v. Operating Eng’rs Local
627, 425 U.S. 800 (1976)
Wisconsin Dep’t. of Industry v. Gould, Inc.,
475 U.S. 282 (1986) 6. 9,
Woelke & Romero Framing, Inc. v. NLRB,
456 U.S. 645 (1982) 2.
Statutes
10, 12,
18, 20,
National Labor Relations Act, 29 U.S.C. § 151 ef seq.
29 U.S.C. § 157
29 U.S.C. § 158(a)
29 U.S.C. § 158(b)
29 U.S.C. § 158(e)
29 U.S.C. § 158(d)
29 U.S.C. § 158(f)
29 U.S.C. § 159
Railway Labor Act, 45 U.S.C. § 151 ef seq.
Page
10, 12
9
10
18
18
1O, 1]
15. 16
24, 26
lO
10
10. 11
passim
1]
passim
10
ole.
~~
(V11)
TABLE OF AUTHORITIES - Continued
Page
Miscellaneous
D. Q. Mills, Industrial Relations and Manpower
in Construction (1972) 25
[. Campbell, Labor Law and Economics,
38 Stan. L. Rev. 991 (1986) 13, 20, 22
l. St. Antoine, Connell: Antitrust Law at the Expense
of Labor Law, 62 Va. L. Rev. 603 (1976) 26
U.S. Department of Labor, Labor Management
Services Administration, 7he Bargaining Structure
in Construction: Problems and Prospects (1980) 25
IN THE
Supreme Court of the Gnited States
OCTOBER TERM, 1992
Nos. 91-261 and 91-274
BUILDING AND CONSTRUCTION TRADES COUNCLI
OF THE METROPOLITAN DISTRICT,
Petitioner
ASSOCIATED BUILDERS AND CONTRACTORS
OF MASSACHUSETTS/RHODE ISLAND, INC., ef ai..,
Respondents.
MASSACHUSETTS WATER RESOURCES AUTHORITY
AND KAISER ENGINEERS, INC.,
Petitioners.
ASSOCIATED BUILDERS AND CONTRACTORS
OF MASSACHUSETTS/RHODE ISLAND, INC., et al.
Respondents.
On Writs of Certiorari to the United States Court of Appeals
for the First Circuit
BRIEF FOR THE ASSOCIATED GENERAI
CONTRACTORS OF AMERICA AS AMICUS CURIAE IN
SUPPORT OF RESPONDENTS
INTEREST OF THE AMICUS CURIAE
The Associated General Contractors of America, Inc. ("AGC")
is a private, nonprofit trade association founded in 1918 to
represent the national interests of general construction contractors.
AGC members perform work on both private and public
construction projects
AGC has 100 state and local chapters, with at least one chapter
for each State and one chapter in Puerto Rico. Many of AGC’s
chapters have been and remain the vehicle for collective
bargaining with unions that represent construction craft workers.
At the same time, AGC and its chapters have represented and
continue to represent the interests of construction contractors that
are not signatories to collective bargaining agreements.
Because of the breadth and diversity of its membership, AGC
iS iN a unique position to inform the Court about the important
construction industry labor law and preemption issues raised by
this case. Indeed, AGC has participated in other cases before this
Court raising similar questions concerning the construction in-
dustry provisions of the National Labor Relations Act. See, e.g.,
Woelke & Romero Framing, Inc. v. NLRB, 456 U.S. 645 (1982);
Connell Constr. Co., Inc. v. Plumbers & Steamfitters Local Union
No. 100, 421 U.S. 616 (1975). The parties have consented to the
filing of this brief.’
STATEMENT OF THE CASE
|. The Massachusetts Water Resources Authority ("MWRA")
iS a governmental agency created by the Massachusetts legislature
The parties’ letters of consent have been filed with the Clerk pursuant
275
to Rule 37.3 of the Court
3
Pet. App. 3a.” MWRA is authorized to provide water supply
services, sewage collection, and treatment and disposal services
for the eastern half of Massachusetts, and is charged with
effecting a ten-year, $6.1 billion series of projects for a
court-ordered clean-up of the Boston Harbor. /d. To this end,
the MWRA furnishes funds for construction (assisted by state and
federal grants), owns the property upon which building will
occur, establishes bid conditions, and makes all contract awards
to contractors performing construction on the project. /d. at 3a,
74a
In April 1988, the MWRA retained Kaiser Engineers, Inc
("Kaiser") as its program/construction manager for the Boston
Harbor clean-up project. Pet. App. 3a-4a, 74a. Kaiser’s primary
function as program manager is to manage and supervise the
construction activity on the project. /d. at 4a, 74a. Kaiser is also
responsible for advising the MWRA about the development of
labor relations policy on the project. /d.
2. When work in Boston Harbor began, the MWRA allowed
both collective bargaining and open shop contractors to perform
the work. J.A. 72-74. In November 1988, however, two
member unions of the Building and Construction Trades Council
("Trades Council"), a coalition of 34 different unions in the local
building and construction trades, picketed the project in order to
protest the use of non-union labor by a contractor and, as a result,
precipitated a brief work stoppage. Pet. App. 4a; J.A. 73. In
response, Kaiser and the MWRA set up a reserve gate system,
and thereby established separate entrances to the job site for
employees of other contractors. Pet. App. 4a. Shortly thereafter,
the work stoppage ended. /d.
The MWRA thereafter determined that Kaiser should negotiate
a master labor agreement with the Trades Council. Pet. App. 5a,
' Unless otherwise specified, "Pet. App.” refers to the appendix to the
petition for a writ of certiorari in No. 91-274
4
_
75a. Kaiser and the Union understood that no agreement could
be implemented without the MWRA’s express approval. /d. On
May 22, 1989, the Trades Council and Kaiser, "on behalf of" the
MWRA, entered into such an agreement -- the Boston Harbor
Wastewater Treatment Facilities Project Labor Agreement (the
"Master Labor Agreement"). /d. at 107a.
The Master Labor Agreement recognizes the Trades Council
“as the sole and exclusive bargaining representative of all craft
employees" on the project, and makes its hiring halls the initial
and principal source for the project’s labor force. Pet. App. 6a.
It subjects all construction employees on the project to union
security provisions, and requires that they become union members
within seven days of their employment. /d. The Agreement also
provides that employees must seek redress for their grievances
only through the recognized labor organization, and that all con-
tractors will be bound to the Council’s wage, benefit, seniority,
apprenticeship, job classification and other rules. /d. It further
requires that all contractors make couiributions to “union benefit
trust funds." /d. Finally, the Agreement acknowledges that it is
"the policy of the [MWRA] that the construction work covered by
this Agreement shall be contracted to Contractors who agree to
execute and be bound by the terms of this Agreement." /d. at 5a,
109a. The Master Labor Agreement expressly excludes em-
ployees of the MWRA from its coverage, and denies that Kaiser
and the MWRA are "joint employers." /d. at 114a, 116a
On May 28, 1989, the MWRA approved the Agreement. Pet
App. 5a, 75a. On that same day, the MWRA ordered that Bid
Specification 13.1 be added to the specifications applicable to all
construction work in Boston Harbor. /d. Bid Specification 13.1
provides that each contractor, as a condition of being awarded a
contract, will abide by the provisions of the Master Labor
Agreement. /d. at Sa, 72a, 14la. Thus, although MWRA must
award all contracts and subcontracts to the lowest responsible and
"qualified" bidder, to be so “qualified,” a contractor must agree
to follow the provisions of the Master Labor Agreement. /d. at
l4la.
5
3. Following the issuance of Pid Specification 13.1,
respondents filed this suit alleging, among other things, that the
National Labor Relations Act ("NLRA" or "Act"), 29 U.S.C.
§ 151 ef seq., preempts the actions taken by MWRA in entering
into an agreement with the Trades Council to impose the Master
Labor Agreement on private construction employers through Bid
Specification 13.1. Pet. App. 72a; J.A. 15, 22-23. The district
court, however, found that respondents were unlikely to succeed
on the merits and denied a requested injunction. Pet. App
76a-77a.
4. Qn appeal, the First Circuit sitting en banc reversed and
remanded for further proceedings. The court found that "the
State's intrusion into the bargaining process" was "pervasive" and
that, by “mandat[ing] that a labor agreement be reached before a
bid is awarded, ... dictat[ing] with whom that agreement is
going to be entered, and specif[ying] what its contents shall be,"
the MWRA has in fact “eliminate/d]/ the bargaining process
altogether." Pet. App. 17a (emphasis in original). As between
Kaiser and the Trades Council, the court accepted that the Master
Labor Agreement was a valid labor contract under Sections 8(e)
and (f) of the Act, but found that the validity of that agreement
did not itseif justify Bid Specification 13.1’s interference with the
organizational and collective bargaining processes that are the
subject of the Act. Pet. App. 24a-2S5a.
5. In dissent, Chief Judge Breyer started from the premise
that, were a private party letting these construction contracts, the
NLRA would have permitted it to take the actions that MWRA
had taken here. Pet. App. 32a. Chief Judge Breyer did not
believe that, in such circumstances, an intent to preempt could
reasonably be inferred from the Act. /d. at 41a, 45a.
SUMMARY OF ARGUMENT
[. The NLRA largely displaces all state regulation of
industrial relations. Pursuant to San Diego Bldg. Trades Council
v. Garmon, 359 U.S. 236 (1959), states are preempted from
6
regulating activity that the NLRA protects, prohibits, or arguably
protects or prohibits. Pursuant to Machinists v. Wisconsin
Employment Relations Comm’n, 427 U.S. 132 (1976), states are
preempted from regulating activity that Congress intended to be
unregulated by any governmental authority. Both forms of
preemption are implicated by this case.
By agreeing with the Trades Council to make employment on
the Boston Harbor project the price of an employee vote to
decertify the Trades Council, the MWRA has encumbered
employee rights under Section 8(f) to reject a construction
industry labor union and to cancel union security provisions. By
agreeing to condition bidder eligibility on recognition of the
Trades Council, the MWRA has encumbered the right of private
contractors to compete without coercion from persons outside the
construction industry. And, by imposing the agreement between
Kaiser and the Trades Council on all contractors working in
Boston Harbor, the MWRA has eliminated the free and
uninhibited organizational and collective bargaining processes that
Congress meant to leave unregulated. The former state actions
are preempted by Garmon; the latter state action is preempted by
Machinists.
The MWRA’s actions are not saved from preemption by
recognized exceptions for state minimum employment standards,
see Metropolitan Life Ins. Co. v. Massachusetts, 471 U.S. 724
(1985), or for state actions pursuing wholly “local interests," see
Wisconsin Dep’t. of Industry v. Gould, Inc., 475 U.S. 282
(1986). As the Solicitor General ironically concedes, those
exceptions do not apply to state actions which, like the MWRA’s
actions, directly conflict with the NLRA’s provisions or apply
only to organizational and collective bargaining processes reserved
by the Act to the parties. Nor is it relevant that the MWRA has
acted in an allegedly proprietary capacity through its bidding
regulations rather than pursuant to its police powers. States may
not take actions, in any form, that conflict with the NLRA or
interfere with its policies.
“
II. Petitioners’ argument that the MWRA’s actions are saved
from preemption because Sections 8(e) and (f) of the Act permit
private property ownets or developers to agree with construction
industry unions to impose project labor agreements on
construction industry employers is unfounded. The construction
industry proviso to Section 8(e) and Section 8(f) apply only to
employers “in the construction industry" and to those employers
“engaged primarily in the building and construction industry." A
private owner/developer that hires a general contractor to manage,
coordinate and oversee a construction project, and that does not
itself control the method and manner of construction, is not such
a construction industry employer.
In all events, this Court’s decision in Connell Constr. Co., Inc.
v. Plumbers & Steamfitters Local Union No. 100, 421 U.S. 616
(1975), makes it clear that a mere third-party purchaser of
construction does not fall within the Section 8(e) proviso. A
private third-party purchaser of construction in the same position
as the MWRA has, like the employer in Connell, no present or
expected collective bargaining relationship with the union.
Connell holds that union signatory requirements may not be
enforced in such circumstances since Congress did not intend, in
Sections 8(e) and (f), to allow unions to engage in such
"top-down" organizing through a "stranger" employer, or to allow
unions to extend their limited statutory monopoly power into the
business end-product markets.
Petitioners have provided no persuasive reasons for extending
the protection of the Section 8(e) proviso or Section &(f) to
third-party purchasers of construction. The MWRA is not in a
"joint employer" relationship with Kaiser, and therefore cannot
properly have Kaiser’s shelter under the construction industry
provisions imputed to it. Moreover, the inherent economic power
of such a third-party purchaser, especially on market project of
this size and type, is precisely the concern that led the Court in
Connell to hold that hot cargo agreements with “stranger”
employers are outside the protections of the proviso.
Furthermore, there appears to be no evidence to establish that the
8
pattern of collective bargaining in the construction industry in
1959, which Congress intended to preserve in enacting the
proviso, included restrictive secondary contracting agreements
between construction industry unions and_third-party purchasers.
To the contrary, there is every reason to believe that such
arrangements are novel organizing tactics that were first
developed by unions in the early 1970s, and then extended to
third-party purchasers only in the mid-1980s
ARGUMENT
No one disputes that the NLRA permits a state agency to
negotiate and enter into a collective bargaining agreement with a
union that represents the agency’s own employees. But the
agreement of the MWRA and the Trades Council that is at issue
here does not concern the wages, hours or other terms and
conditions of employment of the MWRA’s public employees. As
the court below expressly noted (Pet. App. 19a-21a, 24a-25a), the
MWRA is not here defending its role as a public employer
entering into such an agreement. MWRA’s employees are not
represented by the Trades Council, and MWRA does not have a
collective bargaining relationship with any of the construction
industry unions in this case.
Nor is there any dispute that the NLRA permits private
construction industry employers to negotiate project labor
agreements that include broad subcontracting clauses and thereby
establish the wages, hours and other terms and conditions of
construction craft employment on public as well as private
construction projects. On the contrary, the court below accepted
(Pet. App. 24a) that Kaiser was free to negotiate such an
agreement on this public construction project.
The court below only held (Pet. App. 17a-21a, 24a-25a) that
the NLRA preempts the construction contract specification that the
MWRA and the Trades Council agreed to use here (1) to mandate
that private construction industry employers establish a bargaining
relationship with a designated union, and (2) to dictate the terms
9
of that relationship, under penalty of debarment from a $6.1
billion market. Contrary to the claim of petitioners and their
amici, this holding is neither startling nor perverse. It prevents
"top-down" organizing in the construction industry "to an extent
not contemplated by Congress." Jim McNeff, Inc. v. Todd, 461
U.S. 260, 268 (1983), citing NLRB v. Iron Workers, 434 U.S
335, 338 (1978) (Higdon). In addition, it ensures that the limited
monopoly power that the Act confers on construction industry
labor unions cannot be extended into the end-product market (so
as to raise consumer prices). See Connell Constr. Co., Inc. v.
Plumbers & Steamfitters Local Union No. 100, 421 U.S. 616,
621-35 (1975).
In short, it is the argument of petitioners and their amici, and
not the decision below, that would, if accepted, turn the NLRA
on its head. Sections 8(e) and (f) of the NLRA do not permit
either a public or a private property owner/developer that is
merely purchasing construction from independent contractors to
enter into a “hot cargo" or "pre-hire"” agreement with a
construction industry union.
I. THE NLRA PREEMPTS THE STATE’S EFFORT TO
IMPOSE A COLLECTIVE BARGAINING RELATION-
SHIP ON PRIVATE CONSTRUCTION INDUSTRY
EMPLOYERS AND, FURTHER, TO DICTATE THE
TERMS OF THAT RELATIONSHIP.
As this Court has long recognized, the NLRA “largely
displaced state regulation of industrial relations." Wisconsin
Dep't. of Industry v. Gould, Inc., 475 U.S. 282, 286 (1986)
While the Act does not define the precise scope of this
displacement, the Court has developed two separate doctrines --
Garmon preemption and Machinists preemption -- that greatly
clarify the extent of implied preemption in the field of
labor-management relations. See Golden State Transit Corp. v.
Los Angeles, 493 U.S. 103, 110 (1989) (Golden State Il); Golden
10
State Transit Corp. v. Los Angeles, 475 U.S. 608, 613 (1986)
(Golden State !).
The Court’s decision in San Diego Bldg. Trades Council v.
Garmon, 359 U.S. 236 (1959), reveals that the NLRA preempts
state regulation of “activity that the NLRA protects, prohibits, or
arguably protects or prohibits." Wisconsin Dep't of Industry v.
Gould, Inc., 475 U.S. at 286. The purpose of Garmon
preemption is to ensure that the Act will be interpreted and
enforced by the congressionally designated federal agency, and
not by the states. Garmon, 359 U.S. at 241-245; see also
Metropolitan Life Ins. Co. v. Massachusetts, 471 U.S. 724, 748
n.26 (1985). Garmon preemption prevents "conflict in its
broadest sense" with the federal scheme. Wisconsin Dep't of
Industry v. Gould, Inc., 475 U.S. at 286.
Concomitantly, the Court’s decision in Machinists v. Wisconsin
Employment Relations Comm'n, 427 U.S. 132 (1976), reveals that
the NLRA also preempts state regulation of activity “that
Congress intended to be ‘unrestricted by amy governmental power
, Id. at 141 (citation omitted) (emphasis in original).
W hile the NLRA established an equitable process for determining
the terms and conditions of employment, the Act generally leaves
the outcome of that process to "'the free play of economic
forces.'" Jd. at 140, quoting NLRB v. Nash-Finch Co., 404 U.S.
138, 144 (1971). Thus, Machinists holds that state attempts to
interfere in conduct that Congress meant to be unregulated “are
as inconsistent with the federal regulatory scheme as are such
attempts by the [National Labor Relations Board]." Machinists,
427 U.S. at 153; id. at 149-50; Golden State Il, 493 U.S. at 110.
As the court below recognized (Pet. App. 15a-21a), both forms
of preemption are implicated by this case. The NLRA protects
the right of employees to decide whether to have a collective
bargaining representative and, if so, who that representative will
be. 29 U.S.C. §§ 157, 158(a), (6), 159 (1988). To be sure, the
Act permits employers "engaged primarily in the building and
construction industry" to negotiate and enter into agreements with
1]
construction industry labor unions before their employees have
had an opportunity to express their preferences. 29 U.S.C.
§ 158(f) (1988). The Act, however, also permits construction
industry employees to petition the National Labor Relations Board
("NLRB") to reject or change the union representative that a "pre-
hire" agreement imposes on such employees, and to cancel the
union security provisions of the agreement. /d. In addition, the
Act prohibits any employer that is not in the construction industry
or that lacks a collective bargaining relationship with a
construction industry union from expressly or impliedly agreeing
with a union that it will cease doing business with any other
person; indeed, the Act prohibits a union from threatening or
coercing such an employer to enter into such an agreement. 29
U.S.C. § 158(b)(4), (e) (1988). Finally, the Act protects the right
of employers to choose in good faith not to enter into collective
bargaining agreements that are unacceptable to them. 29 U.S.C.
§ 158(d) (1988).
In mandating that all private construction employers seeking to
bid on one or more of the projects in Boston Harbor agree to
recognize the Trades Council as the representative of their
employees, the MWRA has encumbered all of these rights.
Specifically, the MWRA has encumbered the employees’ Section
8(f) right to reject the Trades Council as their bargaining
representative. It has made their employment on the project the
price of choosing to decertify the Trades Council. Moreover, by
agreeing with the Trades Council to condition contractor
eligibility upon recognition of the Trades Council, the MWRA has
encumbered the contractors’ Section 8&(e) right to be free of
secondary pressures exerted by third parties outside the
construction industry. And, finally, when it then dictated each
and every term of the collective bargaining relationship that it had
imposed on these private construction employers, the MWRA
interfered with -- indeed, eliminated -- the collective bargaining
processes that Congress envisioned. Under Garmon, the former
State actions are preempted; under Machinists, the latter state
action is preempted.
12
It is true, as petitioners note (Pet. Br. 23-24), that Congress did
not intend the NLRA to create a regime in which employment
policies in the private sector would be wholly insulated from all
State actions. Thus, where states have imposed general
employment standards which do not conflict with the NLRA’s
provisions, and which are equally applicable in union and
non-union settings, the Court has held that the states’ actions are
not preempted. See, e.g., Metropolitan Life Ins. Co. Vv.
Massachusetts, 471 U.S. at 753-58; Fort Halifax Packing Co. v.
Coyne, 482 U.S. 1, 22 (1987). But where, as here, the states
have imposed standards which arguably conflict with the NLRA’s
provisions or which apply only to the organizational or collective
bargaining processes fostered by the Act, the Court has
consistently found that those state actions are preempted. See,
e.g., Wisconsin Dep’t of Industry v. Gould, Inc., 475 U.S. at
288-89; Golden State 1, 475 U.S. at 619. Indeed, preemption is
essential here to prevent the MWRA from facilitating the Trades
Council’s patent effort (1) to exceed the congressionally imposed
limits on a union’s power to organize the employees of private
construction employers from the "top down," and (2) to extend
the union’s monopoly power into the end-product market, and
thereby raise prices for consumers. See Connell, 421 U.S. at 621-35.
’ Professor Thomas J. Campbell has lucidly explained the economic
dangers of permitting such an arrangement between a union and a
third-party purchaser such as MWRA:
The firs: is that, in dealing with product market effect, a potential for
a product market cartel effect is created. This could give labor more
of a return than even the maximum value of what labor contributes to
output. It would also implicate the competing regulatory regime of
antitrust. Second, even if labor does not derive any more total return
from such conduct than it could from manipulating elasticities of
substitution or other input supply, there is an incidence issue. The
redistributive intention of the Labor Act was not an unrestricted
license to capture consumer surplus (the benefit consumers enjoy from
having to pay less than they are willing to pay for a certain amount
of goods), but was directed at producer surplus (the profit derived
13
The Act does not preempt the states from pursuing wholly
“local interests" through means that are "peripheral" to the Act.
Thus, as petitioners and the Solicitor General repeatedly argue
(Pet. Br. 4-6, 16, 25-26; U.S. Br. 29), the MWRA may
legitimately attempt to ensure that potential labor disputes and
disruptions do not impede its ability to meet deadlines imposed by
a federal court for cleaning up the Boston Harbor. Time is a
critical component of much construction, and many private as
well as public owners insist upon timely performance by their
contractors. As do many private property owners/developers, the
MWRA may establish deadlines for substantial or final completion
of each contract. It may require bonds or other commitments to
ensure that work will be completed in a timely manner. It may
pay incentives to contractors for completing their performance
ahead of schedule, and it may assess liquidated damages for
from sales revenue in excess of costs, including a normal profit).
Admittedly, both kinds of surplus are diminished when a union
succeeds in increasing the wage bill, but restraints derived from
lowering the elasticity of demand in the product market directly favor
the producer over the consumer. By contrast, manipulation of the
elasticity of substitution and the elasticity of supply of other factors
increases the pressure the union can bring to bear on the employer,
which the employer can then pass along to consumers only according
to the preexisting elasticity of product demand. Thus, over the years,
the Board and courts have restricted the exercise of labor power
precisely where economics indicated the victim was most likely a
consumer not represented at the bargaining table, rather than
management sitting across from the union agreeing to the terms.
Consistent with this trend, the rule I suggest is that, in areas of
ambiguity, the law ought to be construed to deny labor the power to
manipulate the elasticity of final product demand. The statute and its
interpretation by the Board and the courts have, in large part, tended
in this direction.
T. Campbell, Labor Law and Economics, 38 Stan. L. Rev. 991,
1035-36 (1986) (footnote omitted).
14
delay. It may even proceed with the early phases of a project
before it completes the final design, in what is commonly called
"fast track" construction. And, if labor disputes arise, it may
sanction the.use of reserve gates on its property (as the MWRA
initially did here). But, as the court below concluded (Pet. App.
29a-30a), in pursuing its legitimate interest in the timely
completion of work, the MWRA may not interfere with the
construction industry employees’ right to choose whether to
organize and with the construction industry employers’ right to
compete free of secondary pressures exerted by third parties
outside the construction industry .*
Contrary to the rhetoric of petitioners (Pet. Br. 18-19, 21-22,
28-30, 33-36) and, to a lesser extent, their amici (see, e.g., U.S.
Br. 14, 17-20), it is of no moment that, in so intruding into and
interfering with rights conferred by the Act, the MWRA asserts
the role of a proprietor and implements its agreements through bid
specifications. This Court’s preemption decisions make it clear
that "the fact that the [government] acted through franchise
procedures rather than a court order or a general law ... is
irrelevant to our analysis." Golden State 1, 475 U.S. at 614 n.5.
* We therefore have no reason to disagree with petitioners (Pet. Br.
35-36) that the Court’s preemption decisions would not prevent a city
from advising a supplier of taxi services that it will take its business
elsewhere if interruptions in services caused by strikes are not halted.
The city in such a situation is not singling out a business for special
treatment simply because it is or is not unionized, and it is not requiring
the supplier to accede to any union demands (since the supplier may, of
course, elect to ensure uninterrupted services through the use of
permanent replacements or other means). By contrast, the MWRA is
singling out businesses for special treatment on the basis of whether they
will agree to become signatory to a collective bargaining agreement, and
it is requiring them, as a condition of bid eligibility, to accept the
union’s demands and to compel their employees to join the union. As
the Solicitor General concedes (U.S. Br. 19-20 n.14), this Court's
decisions would unquestionably require preemption of such state actions
outside the construction industry -- e.g., in the taxi service industry.
15
In fact, the Court has stated that "[t]o uphold [an otherwise
improper state action] simply because it operates through state
purchasing decisions . . . would make little sense." Wisconsin
Dep't of Industry v. Gould, Inc., 475 U.S. at 289. As the court
below explained: "Allowing a state to impose restrictions upon
all companies from which it purchases goods or services would
effectively permit it to regulate labor relations between private
employers and their employees[,] thus totally displacing the
NLRA, not just in this Project, but also statewide, and, if the
practice were to become generalized, nationally. Indeed, an
anti-union state government could allow only non-union
employers to bid on state projects, if the state-as-employer
argument is to be taken to its extreme." Pet. App. 21a (emphasis
in Original)
It may be, as petitioners and the Solicitor General argue (Pet.
Br. 33-35; U.S. Br. 18-20), that the Court in its prior cases was
"not faced ... with a statute that [could] even plausibly be
defended as a legitimate response to state procurement constraints
or to local economic needs." Wisconsin Dep’t of Industry v.
Gould, Inc. , 475 U.S. at 291. But the Court’s NLRA preemption
cases have consistently stated that "“'judicial concern has
necessarily focused on the nature of the activities which the State
has sought to regulate, rather than on the method of regulation
adopted.'" Golden State I, 475 U.S. at 614 n.5 (citations
omitted). Moreover, as explained above (supra, at 13-14), while
the states are entitled to respond to local procurement constraints
and economic needs, this Court’s preemption decisions make it
clear that the states may not take any actions which conflict with
the provisions of the NLRA or which interfere with the
organizational and collective bargaining processes that are the
subject of the Act. It is precisely for these reasons that the
Solicitor General does "not contend . . . that a State’s actions are
automatically insulated from preemption under the NLRA
whenever it acts as a purchaser of services or other market
participant." U.S. Br. 19-20 n.14. Indeed, the Solicitor General
concedes that the MWRA’s actions here would be preempted if
they had occurred “outside the construction industry" or were
16
otherwise inconsistent with Sections 8(e) or (f) of the NLRA. dd.
Simply put, there is not, and cannot be, an intelligible exception
drawn to NLRA preemption principles merely because the actions
of a state government are proprietary in nature.
fl. PETITIONERS AND THEIR AMICI PROVIDE NO
PERSUASIVE REASONS FOR READING THE
CONSTRUCTION INDUSTRY PROVISIONS OF THE
NLRA TO INSULATE PUBLIC PURCHASERS OF
CONSTRUCTION FROM FEDERAL PREEMPTION.
Just as he did in Golden State I, the Solicitor General joins with
the local government and the relevant unions in arguing (U.S. Br.
14-29: Pet. Br. 18-19, 24-36) that some of a state’s proprietary
actions should nevertheless be immune from NLRA preemption.
Specifically, the Solicitor General joins in the contention that
Sections &(e) and (f) of the NLRA permit private property
owners/developers to enter into and enforce project labor
agreements. From this basic premise, the Solicitor General and
petitioners reason that this Court cannot reasonably interpret the
NLRA to preempt state agencies, in their capacity as third-party
purchasers of construction, from entering into and enforcing such
agreements
The proposition that the states may compel whatever the Act
permits is frankly both troubling and dubious. Indeed, Machinists
preemption is designed precisely to prevent the states from so
dictating the choices of private parties in the labor-management
relations arena. See Wisconsin Dep’t of Industry v. Gould, Inc.,
475 U.S. at 290-91. No less significant, however, is that the
Solicitor General and the petitioners proceed from a false premise:
Sections 8(e) and (f) do not authorize private property
owners/developers, in their capacity as third-party purchasers of
construction, to enter into and enforce project labor agreements
17
A. The First Proviso To Section 8(e) And Section 8(f) Only
Apply To Employers In The Construction Industry And
To Agreements That Result From A Collective Bargain-
ing Relationship.
Section 8(e) makes it an unfair labor practice for “any labor
organization and any employer to enter into any contract or
agreement, express or implied, whereby such employer ceases or
refrains or agrees . . . to cease doing business with any other
person...." 29 U.S.C. § 158(e) (1988). The “construction
industry proviso" to Section 8(e) states, however, “[t]hat nothing
in this subsection shall apply to an agreement between a labor
organization and an employer in the construction industry relating
to the contracting or subcontracting of work to be done at the site
Id. (emphasis added). Section 8(f) provides that "[iJt
shall not be an unfair labor practice . . . for an employer engaged
primarily in the building and construction industry to make an
agreement .. . with a labor organization of which building and
construction employees are members ... because ... the
majority status of such labor organizations has not been
established . . . prior to the making of such agreement... ." 29
U.S.C. § 158(f) (1988) (emphasis added). Thus, a typical
third-party purchaser of construction, like the MWRA, cannot
find any right in Sections 8(e) or (f) to enter into and enforce a
project labor agreement.
To begin with, a third-party purchaser does not normally satisfy
the requirements of being “an employer in the construction
industry" and "an employer engaged primarily in the building and
construction industry." There is a consensus among the courts
and the NLRB that, to satisfy both of these requirements, the
employer's involvement in the construction project must be
substantial and much like the normal involvement of a prime or
general contractor. There must be evidence that the employer is
managing and coordinating the methods, techniques or procedures
of construction through employees that it places at the job site
See, e.g., Clark v. Ryan, 818 F.2d 1102, 1107 (4th Cir. 1987):
A.L. Adams Constr. Co. v. Georgia Power Co., 733 F.2d 853.
18
854 & n.3, 858 (11th Cir. 1984), cert. denied, 471 U.S. 1075
(1985); Operating Eng’rs Pension Trust v. Beck Eng’g &
Surveying, 746 F.2d 557, 562-64 (9th Cir. 1984). Merely
engaging general contractors, providing funding for construction
activity, and periodically visiting the construction site for
purposes of inspection is not enough. See A.L. Adams Constr.
Co. v. Georgia Power Co., 733 F.2d at 854 n.3; see also, e.g.,
NLRB vy. W.L. Rives Co., 328 F.2d 464, 469 (Sth Cir. 1964);
Carpenters Local 1149 (American President Lines, Lid.), 221
N.L.R.B. 456, 460-61 (1975), enfd., 81 Lab. Cas. (CCH)
€ 13,137 (D.C. Cir. 1977); Forest City/Dillon-Tecon Pac. , 209
N.L.R.B. 867, 868, 870-71 (1974), enf’d in part, 522 F.2d 1107
(9th Cir. 1975); Local 1937, Painters and Glaziers Dist. Council
No. 51 (Prince George’s Center, Inc.), 183 N.L.R.B. 37, 38
(1970); Columbus Bldg. & Constr. Trades Council (Kroger Co.)
149 N.L.R.B. 1224, 1225-26 (1964); Frick Co., 141 N.L.R.B.
1204, 1208 (1963). Just as a home owner that engages a general
contractor to build a home or to remodel a kitchen is not “an
employer in the construction industry" and "an employer engaged
primarily in the building and construction industry," neither is the
MWRA.
Indeed, a third-party purchaser of construction which, like the
MWRA, has no bargaining relationship with any construction
industry labor unions cannot plausibly claim the status of a
construction industry employer within the meaning of Sections
&(e) and (f). The text of these statutory provisions does not even
arguably extend to actions by third-party purchasers of
construction. Moreover, this Court has long recognized that the
construction industry proviso to Section 8(e) applies only to
agreements between a construction industry employer and a union
with whom the employer has a collective bargaining relationship.
Connell, 421 U.S. at 621-635. See also Woelke & Romero
Framing, Inc. v. NLRB, 456 U.S. 645, 652-54 (1982); Donald
Schriver, Inc. v. NLRB, 635 F.2d 859, 873-882 (D.C. Cir. 1980),
cert. denied, 451 U.S. 976 (1981).
19
Specifically, in Connell, this Court held that subcontracting
agreements between a construction industry union and "stranger"
contractors -- i.e., contractors with whom the union had no
collective bargaining relationship and whose employees the union
had no interest in representing -- were not sanctioned by the
construction industry proviso and could be challenged under the
NLRA and the antitrust laws. 421 U.S. at 626-35. In Connell.
such a union had picketed certain general contractors with whom
it had (and sought) no collective bargaining relationship in an
ultimately successful effort to obtain the agreement of those
contractors to let subcontracts only to firms that were parties to
the union’s collective bargaining agreement. /d. at 618-19. This
Court determined that "[t}his kind of direct restraint on the
business market has substantial anticompetitive effects, both actual
and potential, that would not follow naturally from the elimination
of competition over wages and working conditions." Jd. at 625.
After finding that "[oJne of the major aims of the 1959 Act was
to limit ‘top-down’ organizing campaigns, in which unions used
economic weapons to force recognition from an employer
regardless of the wishes of his employees," the Court further
determined that the statute’s “careful limits on the economic
pressure unions may use in aid of their organizational campaigns
would be undermined seriously if the proviso to § 8(e) were
construed to allow unions to seek subcontracting agreements, at
large, from any general contractor vulnerable to picketing." /d.
at 632, 633. Accordingly, this Court held that the proviso’s
“authorization extends only to agreements in the context of
collective bargaining relationships" and that the proviso did not
immunize the challenged agreement or, for that matter, the
picketing that preceded it. /d. at 633. See also id. at 637 n.19
The facts of this case are even more extreme than the facts of
Connell, where the employers could at least be said to be "in the
construction industry." The MWRA cannot satisfy even that
threshold requirement. Further, it has no collective bargaining
relationship with any of the construction industry unions that are
members of the Trades Council; and the Master Labor Agreement
expressly excludes MWRA’s employees from its coverage. Pet.
20
App. 114a-116a. Moreover, the Trades Council has no
discernible interest in representing MWRA’s employees in the
future. Rather, the union is seeking to represent those who work
for private construction employers that are bidders on work from
the MWRA. Pet. App. 112a. Indeed, as in Connell, it was prior
picketing and ensuing work stoppages by members of the Trades
Council that led MWRA to agree with the Trades Council to
dictate the terms and conditions of all labor relations on the
Boston Harbor project. Pet. App. 4a.
Even more importantly, the effects of the MWRA’s actions are
at least as pernicious as those decried in Connell. By agreeing
with the Trades Council to require all of the participants in a $6. |
billion market for new construction to recognize the Trades
Council, the MWRA has facilitated a massive effort by the Trades
Council to organize construction employees from the "top down, °
irrespective of their wishes. Moreover, the MWRA has allowed
the Trades Council to use its monopoly power over labor to
prevent open and unrestricted competition by all qualified
contractors, in disregard of the cost of the Boston Harbor project
for the consumers and taxpayers who ultimately will pay for it.
Connell makes it clear that the construction industry proviso does
not authorize such "top-down" organizing through a “stranger”
employer, or any other direct extension of labor's limited
statutory monopoly power into the end-product market. See 421
U.S. at 624-26, 632-33; see also Woelke & Romero Framing, 456
U.S. at 663-64; Larry V. Muko, Inc. v. Southwestern
Pennsylvania Bldg. and Constr. Trades Council, 609 F.2d 1368,
1372-75 (3d Cir. 1979) (en banc), cert. denied, 459 U.S. 916
(1982); T. Campbell, Labor Law and Economics, 38 Stan. L.
Rev. 991, 1033 (1986) (Connell stands for the proposition that a
union may not direct pressure “against a consumer of the services
provided by the employer with whom the union has a bargaining
relationship, unless the union is seeking to organize the employees
of such a consumer" (emphasis in original)).
21
B. Sections 8(e) And (f) Of The NLRA Do Not Allow
Third-Party Purchasers Of Construction To Enter Into
Agreements With Construction Industry Unions To
Limit Competition Among Construction Industry
Employers.
Amazingly, petitioners and their amici do not even discuss the
limitations of the construction industry proviso to Section 8(e) or
the equally express limitations of Section 8(f). Nor do they
mention Connell or its holding that the construction industry
proviso to Section 8(e) does not extend to agreements that lie
outside any collective bargaining relationship. Indeed, they offer
no persuasive reasons for inferring that Congress intended to
allow third-party purchasers of construction, public or private, to
agree with construction industry labor unions to dictate the labor
relations of other employers.
1. Petitioners and their amici principally argue (Pet. Br. 20,
24-26, 28-29; U.S. Br. 17-18, 21-22, 22-24) that, since the
pre-hire agreement between Kaiser and the Trades Council is
lawful, the MWRA’s agreement with the Trades Council to
enforce that agreement must be as well. In the process, however,
they disregard their own frequent admissions that Kaiser is not
deciding what work to contract or to subcontract, or to whom
Rather, it is the MWRA that makes all of the contract awards.
What lies at the heart of this case are the restrictions that the
MWRA has agreed with the Trades Council to impose on the
selection of contractors working in Boston Harbor. Since the
MWRA has no collective bargaining relationship of its own with
the Trades Council and is not a construction industry employer,
the MWRA cannot properly claim that its actions are directly
immunized under the Section 8(e) proviso and Section 8(f).
Moreover, since the Master Labor Agreement makes it clear (Pet.
App. 1 16a) that Kaiser and the MWRA are not "joint employers"
(i.e., employers whose operations, employees and control are so
intermingled that they may legally be treated as one), the MWRA
cannot properly claim that any coverage of Kaiser by the
construction industry proviso or Section 8(f) may be imputed to
>
es
it. See South Prairie Constr. Co. v. Operating Eng’rs Local 627,
425 U.S. 800. 802-804 (1976); Limbach Co. v. Sheet Metal
Workers Int'l Ass’n., 949 F.2d 1241, 1260-63 (3d Cir. 1991)
2. Petitioners and their amici object (Pet. Br. 20, 24-26; U.S
Br. 21-22, 22-23) that the MWRA exerts no economic pressure
on any contractor, subcontractor or employee other than the
pressures that inhere in the Master Labor Agreement itself, and
then argue that it makes no sense to exclude the MWRA’s
agreement with the Trades Council to enforce the Master Labor
Agreement from the intended coverage of the proviso. This
objection ignores the fact that, as a third-party purchaser of
construction, especially on a project of this type.and size, the
MWRA can bring enormous economic pressures to bear on
private construction employers -- far above and beyond any
pressure that an ordinary general contractor in a collective
bargaining relationship with a union can exert. The MWRA has
the power to debar and to accept higher prices at the taxpayers’
Or consumers’ expense. See Larry V. Muko, Inc., 609 F.2d at
1372-76: see generally Campbell, 38 Stan. L. Rev. at 1032-36.
Indeed, it was the potential for excessive secondary pressures that
led the Court in Connell to hold that a restrictive “hot cargo"
agreement with a “stranger” employer is outside the construction
industry proviso to Section 8(e). See Connell, 421 U.S. at
624-26, 632-33.
Contrary to petitioners’ suggestion (Pet. Br. 28-29), it makes no
difference whether there is a source of law that would prohibit persons
subject to the Railway Labor Act ("RLA”), 45 U.S.C. § 151 ef seq.,
from entering into such restrictive third-party arrangements (although,
given the availability of the antitrust laws, we see no reason to concede
the point). This Court made it clear in Machinists and Garmon that,
even though public agencies are not “employers” within the meaning of
NLRA Section 2(2), and thus not directly subject to the NLRA'’s
prohibitions, the Supremacy Clause makes their actions subject to NLRA
preemption. By contrast, RLA employers are not subject to the
Supremacy Clause or, because of NLRA Section 2(2), the prohibitions
23
3. Petitioners and their amici further err in suggesting (Pet.
Br. 20, 24-26, 35-36; U.S. Br. 21-22, 22-23) that, if MWRA’s
actions are held to fall outside the sphere of conduct contemplated
by the proviso to Section 8(e) and Section 8(f), third-party
purchasers will be denied the right to choose to purchase
construction from contractors which have entered into project
labor agreements. The MWRA has not, however, made a
unilateral decision to purchase construction from contractors that
have entered into a project labor agreement. Rather, as
petitioners have acknowledged (see Pet. Br. 25-29; see also J.A.
41), and as the dissent below presumed (see Pet. App. 32a ("In
return for the MWRA’s promise to insist that contractors sign the
agreement, the Council has promised the MWRA labor peace
throughout the 10-year life of the construction project”)), the
MWRA has agreed with the Trades Council to condition contract
awards on recognition of the Trades Council and acceptance of
the labor agreement negotiated by Kaiser and the Council. It is
this agreement to organize construction industry employees from
the “top down" and to exclude from the bidding competition
employers that do not agree to recognize the union that conflicts
with the provisions and policies of the NLRA and is preempted.°
4. Petitioners and their amici protest (Pet. Br. 13-15, 18,
30-33; U.S. Br. 24-28) that Sections 8(e) and (f) were intended
to preserve the status quo regarding agreements between unions
and employers in the construction industry in 1959 and, further,
that project labor agreements between construction industry unions
and public and private property owners/developers were pervasive
at that time. it is clear that Congress wanted to preserve the
of the NLRA.
* Contrary to the argument of petitioners and the Solicitor General (Pet.
Br. 36; U.S. Br. 29), finding preemption here does not mean the end of
project labor agreements on public construction projects. It simply
means that private construction employers will retain the responsibility
for such agreements
24
pattern of collective bargaining that existed in the construction
industry in 1959. See Woelke & Romero Framing, 456 U.S. at
657. But the available evidence does not support the claim that
property owners/developers were routinely entering into “hot
cargo" agreements with unions in 1959.
Petitioners and their amici principally cite to the legislative
history of Sections 8(e) and (f) to support their claim that the
pattern in the industry in 1959 included such third-party
arrangements. See Pet. Br. 30-33; U.S. Br. 24-28. But the
legislative history at most supports only the proposition that
project labor agreements were used on both public and private
construction projects. While there is some evidence that some
public agencies viewed project labor agreements between
construction industry employers and unions as desirable in some
contexts, the legislative history does not provide amy examples of
project labor agreements that were subject to the approval of the
third-party purchaser and were enforced by that purchaser. On
the contrary, as best we can tell from the legislative record, all of
the examples brought to Congress’ attention were classic
subcontracting agreements between a general construction
contractor and a union with whom that contractor had a collective
bargaining relationship.’
Petitioners also cite to two secondary sources and a 1986
Advice Memorandum of the Associate General Counsel of the
NLRB to support their claim that the pattern in the industry in
1959 included third-party arrangements like the one in issue here
See Pet. Br. 13-15, 18. But the secondary sources and the
It is not clear whether any of the agreements described in general
terms in the legislative history cited by petitioners (Pet. Br. 30-33) were
as extensive and detailed as the agreement between Kaiser and the
Trades Council. Thus, petitioners overstate the degree to which the
legislative history supports their assertion that the pattern in the
construction industry in 1959 included agreements like the one between
Kaiser and the Trades Council.
25
Advice Memorandum merely suggest that, in some situations,
property owner/developers may have supported the use of project
labor agreements. These sources do not establish how frequently
property owners/developers have done so, whether the owners
were mere third-party purchasers when they did so (as opposed to
"employers in the construction industry"), or whether the
owners/developers had collective bargaining relationships with the
unions with whom those project labor agreements were
negotiated. These sources thus cannot begin to establish that, in
1959, the accepted industry pattern included agreements that, as
here, were conditioned on a third-party purchaser’s approval and
were to be enforced by a third-party purchaser that had no
collective bargaining relationship with the union.°*
Indeed, the available evidence suggests that such arrangements
were not part of the industry pattern in 1959. The Court in
Connell expressly determined that "stranger" contractor
arrangements did not exist in abundance, if at all, in 1959. See
Connell, 421 U.S. at 627-33. Moreover, both this Court and
industrial relations experts have since sugge. ted that this was a
“novel organizing tactic" that first developed in the early 1970s
The Mills quote (see Pet. Br. 13-14), published in 1972, cites
absolutely no authority for its assertion and gives no indication of the
extent of the purported "involvement" of the owner. See D. Q. Mills,
Industrial Relations and Manpower in Construction 40 (1972). The
Labor Department study (see Pet. Br. 14) expressly states that the
agreements discussed "are multicraft agreements, generally signed by the
local building trades council and/or all local unions involved, and by the
prime contractors on the project." U.S. Department of Labor, Labor
Management Services Administration, The Bargaining Structure in
Construction: Problems and Prospects, at 14 (1980) (emphasis added)
The Advice Memorandum similarly involves a 1980s project labor
agreement between a union and a prime contractor; moreover, no unfair
labor practice charge was filed against the owner and the Advice
Memorandum expresses no opinion about the propriety of the owner's
actions. See Pet. App. in No. 91-261, at 98a-99a, 101a-102a.
26
See Woelke & Romero Framing, 456 U.S. at 653-54 n.8; T. St.
Antoine, Connell: Antitrust Law at the Expense of Labor Law, 62
Va. L. Rev. 603, 628 (1976). And, finally, the fact that no case
concerning the legality of this kind of third-party purchaser
arrangement arose until the mid-1980s reinforces the view that
this practice is, in reality, a relatively recent phenomenon.
5. Finally, petitioners err in suggesting (Pet. Br. 36) that Bid
Specification 13.1 is not preempted because private construction
employers have the option of seeking other work. The fact
remains that Section 8(e) prohibits this kind of secondary coercion
by a third-party purchaser of construction. It was enacted
precisely so that construction industry and other employers would
not be faced with such coercion (and so that their employees
would be protected against this kind of "top-down" organizing
tactic). While the construction industry proviso to Section 8(e)
and Section 8(f) create a limited exception, Connell makes it clear
that the congressional policies against secondary boycotts and
“top-down” organizing require that "stranger" arrangements like
the one in issue here be excluded from the exception. Thus, it is
the petitioners, and not the decision below, who "err[] not, as
may often happen, by nudging congressional enactments or legal
doctrines somewhat too far, but by abruptly and unaccountably
standing them on their head." Pet. Br. 36
CONCLUSION
The judgment of the court of appeals should be affirmed.
Of Counsel
Michael E. Kennedy
THE ASSOCIATED GENERAL
CONTRACTORS OF AMERICA
1957 E Street, N.W
Washington, D.C
(202) 393-2040
September 8, 1992
20006
Respectfully submitted,
Glen D. Nager
(Counsel of Record)
Richard F. Shaw
David A. Yalof
JONES, DAY, REAVIS &
POGUE
1450 G Street, N.W.
Washington, D.C. 20005
(202) 879-3939
Attorneys for the Associated
General Contractors of
America