Amicus Curiae Brief — California v. Federal Energy Regulatory Commission
Supreme Court brief1990
Ask Donna
What actually matters in this document.
Text
v
No. 89-333
In the Supreme Court of the Gnited States
OcToBer TERM, 1989
STATE OF CALIFORNIA, PETITIONER,
_
FEDERAL ENERGY REGULATORY COMMISSION, ET AL.
RESPONDENTS.
ON WRIT OF CERTIORARI TO THE UNITED STATES
COURT OF APPEALS FOR THE NINTH CIRCUIT
BRIEF OF THE MODESTO IRRIGATION DISTRICT
AND TURLOCK IRRIGATION DISTRICT
AS AMICI CURIAE IN SUPPORT OF RESPONDENT, THE FEDERAL
ENERGY REGULATORY COMMISSION
G1BSON, DUNN & CRUTCHER
Joe. S. Moskow!1Tz*
Grecory J. KERWIN
1801 California Street
Suite 4200
Denver, Colorado 80202
(303) 298-7200
Attorneys for Amici Curiae,
the Modesto Irrigation
District and Turlock
Irrigation Distri
*Counsel of Record
Of Counsel:
WARREN F. GANT, General Counsel
Modesto Irrigation District
ROGER K. MASUDA, General Counsel
Turlock Irriga tion District
(i)
QUESTION PRESENTED
Should this Court overrule First lowa Hydro-Electric Coop.
v. Federal Power Comm'n, 328 U.S. 152 (1946), and nearly 45
years of Supreme Court precedents and administrative practice so
that the State of California can assume control over hydroelectric
power projects already constructed or planned for construction?
TABLE OF CONTENTS
INTEREST OF AMICI CURIAE......... 2... 66... cee uee
SUMMARY OF ARGUMENT......... 2... 66. cece ew wen
REGS cocccccccccecccceccescccccesesscesuedeuans
IV.
Vi.
FIRST IOWA HAS BEEN UNIFORMLY FOL-
LOWED BY THIS COURT AND SHOULD NOT BE
QUERIED 0 vc ccccccccccccsesuccsbeneecesees
A. This Court Has Repeatedly Reaffirmed First Jowe .
B. This Court Has Repeatedly Found That The Fed-
eral Power Act Vests Comprehensive Regulatory
Aefipaty Ge GER GG 00ccsesvancendocesecs
C. First Jowa Controls Resolution Of This Case ....
THE STATE'S ARGUMENTS ABOUT THE LEGIS-
LATIVE HISTORY OF THE FEDERAL POWER
ACT OF 1920 ARE NEITHER NEW NOR PER-
SUASIVE; THIS COURT IN FIRST JOWA AD-
DRESSED AND REJECTED THEM .............
CALIFORNIA V. UNITED STATES, CONSTRUING
THE RECLAMATION LAW, OFFERS NO GUID-
ANCE FOR THE DECISION OF THIS CASE .....
THE STATE’S ARGUMENTS ABOUT ADMINIS-
TRATIVE INTERPRETATION ARE NOT RELE-
CALIFORNIA'S POSITION MAKES NO PRACTI-
CAL SENSE AND DOES NOT NECESSARILY
LEAD TO GREATER PROTECTION OF FISH-
Pere
B. State Regulation Of Stream Flows At FERC-
Licensed Projects Will Not Lead To Greater Pro-
tection And Enhancement Of Fish .............
C. California Is Simply Seeking To Expand Its Power
Under The Public Trust Doctrine. .............
VER. CETUS cc cccccccescecéeees 6546nnnEE
14
19
21
23
ill
TABLE OF AUTHORITIES
CASES
California v. United States, 438 U.S. 645 (1978) .......
Chevron, USA, Inc. v. Natural Resources Defense Council,
ED + did ckccwce coeseccececes
Escondido Mutual Water Co. v. La Jolla Band of Mission
Indians, 466 U.S. 765 (1984) ............0000 00 eee
Federal Power Comm'n v. Oregon, 349 U.S. 435 (1955) .
FPC y. Union Electric Co., 381 U.S. 90 (1965) .........
First Iowa Hydro-Electric Coop. v. Federal Power
Comm'n, 328 U.S. 152 (1946) ...........0200 00 ee
Ivanhoe Irrigation District vy. McCracken, 357 U.S. 275
AE ELER ED Co cdececécocccoseccass
Monongahela Power Co. v. Marsh, 809 F.2d 41 (D.C.
Cir.), cert. denied, 484 U.S. 816 (1987) .............
National Audubon Society v. Superior Court, 189 Cal.
Rptr. 346, 33 Cal. 3d 419, 658 P.2d 709 (1983), cert.
Se EE BEE GREED cess icccccccccccsccece
Nebraska v. Wyoming, 325 U.S. 589 (1945) ...........
New England Power Co. v. New Hampshire, 455 U.S. 331
ia kiandeeshenebenesenccccccces
Pacific Gas & Electric Co. v. State Energy Resources Con-
servation & Development Comm'n, 461 U.S. 190
EEE EEE ee
Patterson v. McLean Credit Union, 491 U.S._, 109
EEE EEE TT
Sperry v. Florida, 373 U.S. 379 (1963)..............--
State of California ex rel. State Water Resources Board v.
Federal Energy Regulatory Comm'n, 877 F.2d 743 (9th
ES LEE EEE
Tacoma v. Taxpayers of Tacoma, 357 U.S. 320 (1958) ..
United States v. Gerlach Live Stock Co., 339 U.S. 725
ESSE PPE TET OCCTL TTT ELELEL ETT
Page
3, 14, 15, 16,
17, 19
19
24
17
3, 22
iV
RULES AND STATUTES
ks pda cccweeeddeesaces
Electric Consumer Protection Act of 1986, Pub.L. No.
i aa dies
Federal Trade Commission Act of 1914, 38 Stat. 717
I i ath an a et a a ee
Federal Water Power Act of 1920, 41 Stat. 1063 (1920)
(codified at 16 U.S.C. §§ 791-823).................
Interstate Commerce Act of 1887, 24 Stat. 379 (1887) ..
Reclamation Act of 1902, 32 Stat. 388 (1920) (codified at
scattered sections of 43 U.S.C. §§ 372-1457) ........
a ce Cane eek eeeaces ses
MISCELLANEOUS
2 R. Clark, Waters and Water Rights, §§ 110.1, 110.2
SE a's och ark b Bass y 056s 0080 0rseebss dente cdwect«
4 R. Clark, Waters and Water Rights, § 330 (1970) ....
A. Golze, Reclamation in the United States (1961) .....
R. Walston, Storm in the Desert: The Great Western
Water Wars, 26 Journal of the West 78 (July 1987)...
passim
16
14, 15, 16
l
15
16
15
15
In the Supreme Court of the Gnited States
OCTOBER TERM, 1989
No. 89-333
STATE OF CALIFORNIA, PETITIONER,
v.
FEDERAL ENERGY REGULATORY COMMISSION, ET AL.
RESPONDENTS.
ON WRIT OF CERTIORARI TO THE UNITED STATES
COURT OF APPEALS FOR THE NINTH CIRCUIT
BRIEF OF THE MODESTO IRRIGATION DISTRICT
AND TURLOCK IRRIGATION DISTRICT
AS AMICI CURIAE IN SUPPORT OF RESPONDENT, THE FEDERAL
ENERGY REGULATORY COMMISSION
INTEREST OF AMICI CURIAE
This Brief is filed pursuant to Supreme Court Rule 37 by the
Modesto Irrigation District and Turlock Irrigation District (“the
Districts”) as amici curiae in support of Respondent, the Federal
Energy Regulatory Commission (“FERC”). The Districts are
California irrigation districts organized and operated under the
California Water Code, and are agencies of the State of California
exercising governmental functions, see Cal. Water Code § 20570.
This brief is sponsored by the chief legal representative of each
irrigation district. Consequently, no consents to the filing of this
brief are required under this Court’s Rule 37.5.' These Districts
oppose the position advocated by the State of California in this
case, as ill-advised, unworkable, and contrary to Congress’ intent
and longstanding legal precedent.
‘Nevertheless, the Districts do have the consent of the parties to file this brief.
2
The Districts hold an FERC license for the construction and
operation of a 165 megawatt hydroelectric plant on the Tuolumne
River in California, which became operational in 1971 and was
built at an original cost of about $92.5 million. By amendment to
the license, the FERC recently authorized the addition of a fourth
generating unit at the plant and approved amendments to provide
for additional fish studies agreed upon by the Districts and the
California Department of Fish and Game and the U.S. Fish and
Wildlife Service. Article 37 of the license sets forth the minimum
flow release schedule for the protection and maintenance of fish
below the dam under normal, dry, and critically dry runoff con-
ditions. The normal water year schedule was modified by agree-
ment of the Districts and the California Department of Fish and
Game as authorized by Article 37 and the modified schedule was
approved by the FERC in the above license amendment. The
FERC retains authority to make further changes as may be re-
quired, upon notice and an opportunity for hearing.
From 1971 until 1985, the Districts operated their jointly
owned project, called the ““New Don Pedro Project’ (hereinafter
““New Don Pedro’’) in harmony with the state agency responsible
for administering state water rights, the State Water Resources
Control Board (“State Board”), represented by the Petitioner.
Since 1985, the State Board has taken the position that it has the
power to impose fish water release requirements different from
and more burdensome than the FERC requirements, and the
right—on an after-the-fact basis—in effect to attach conditions to
the outstanding FERC license for New Don Pedro. The State
Board's justification for this position has been the public trust
doctrine, which as interpreted by Petitioner purports to allow
reallocation of water from vested rights to so-called public uses.
As amici curiae in this proceeding, the Districts oppose any
change in the supremacy of FERC hydroelectric power licenses
and support the Ninth Circuit’s determination that the holders
of such licenses, once issued, are free from interference by state
agencies in areas covered by the FERC license.
3
SUMMARY OF ARGUMENT
In the court below, the State of California boldly sought to
usurp through “state preemption”’ the congressionally mandated
powers of the FERC and take over the management of new and
existing hydroelectric projects on the navigable rivers of Califor-
nia. The Ninth Circuit rejected California’s position based on this
Court’s ruling in First lowa Hydro-Electric Coop. v. Federal Power
Comm’n, 328 U.S. 152 (1946), which held that Congress intended
the Federal Power Commission (now FERC) to have exclusive
licensing and supervisory authority over hydroelectric plants on
navigable waterways. In First Jowa, this Court examined the text
of the statute, its structure, purpose and legislative history, and
rejected the claim of the State of Iowa that a state veto and dual
sovereignty were intended by Congress.
California contends that the time has come for this Court to
overrule First Iowa. Yet it cites no persuasive reason for this
Court to do so. The Court has consistently adhered to the view it
expressed in First Iowa. In its Ninth Circuit briefs, the State
purported to find “new” legislative history that justified its view,
but as the Ninth Circuit recognized, 877 F.2d at 749-50; Pet.
App. A-12 to A-13, the very extracts from the congressional
debates the State cited were considered by this Court in 1946 and
found 10t persuasive.
The State claims that California v. United States, 438 U.S. 645
(1978), justifies departure from First Jowa, neglecting to concede
that this Reclamation Act case is now 12 years old and that First
Iowa has been thereafter repeatedly cited as authoritative by this
Court. California v. United States restored to Section 8 of the
Reclamation Act the meaning found in it from 1902 to 1958; the
State would use that case to deprive the Federal Power Act of
the settled meaning it has enjoyed since 1946.
The dual sovereignty that the State seeks in this case is unwork-
able. For example, the FERC established a June bypass flow of
11 cubic feet per second (“cfs”) for the Rock Creek project,
4
thereby simultaneously allocating the remaining flow for hydro-
power generation. The State Board later decreed a June bypass
flow rate of 00 cfs. If the FERC mandated minimum bypass flow
is 11 cfs, it cannot also be 60 cfs because the 60 cfs bypass flow
results in a different allocation of water between the two compet-
ing uses. One agency must decide how much water shall be re-
leased for the protection of fish below a hydroelectric project.
California says it should decide; the statute, this Court’s prece-
dents and nearly 45 years of history say it should not—the FERC
should decide. This Court should reject California’s arguments
and affirm the Ninth Circuit decision because there is no reason
for the Court to reopen the issues settled long ago in First Iowa.
ARGUMENT
I.
INTRODUCTION
This Court is not writing on a clean slate. In 1946 the Court
carefully reviewed the great debate leading to the Federal Power
Act of 1920 (“FPA”) and confirmed that Congress intended for
the Federal Power Commission to exercise the full measure of
federal authority in administering power development of the na-
tion’s rivers. See First lowa Hydro-Electric Coop. v. Federal Power
Comm'n, 328 U.S. 152 (1946). The Court concluded that Con-
gress intended for states to exercise only an advisory role in rec-
ommending to the FPC how to manage power developments
within their borders. First Jowa controls the instant case and
should not be overruled.
Nevertheless, California argues its position here as though the
Court faces an issue of first impression. For example, California
analyzes the legislative history of the Federal Power Act’s adop-
tion in 1920, failing to note that this Court exhaustively analyzed
the same legislative history nearly forty-five years ago in 1946,
when deciding First Jowa. California exhorts this Court with pol-
icy arguments for how best to administer the nation’s hydroelec-
tric projects and power networks. See, e.g., Petitioner's Opening
241 Stat. 1063 (1920).
5
Brief, at 18-22, 45-47. Yet, despite California’s invitation, this
Court is not a super-agency mediating disputes about water uses
at federal power projects and attempting to create by judicial
decree the best or most efficient structure for managing all the
various FERC-licensed power projects. Congress has already
done this and the agency it vested with such authority is the
FERC and not the State of California. This Court has already
exercised its role in First Jowa, which is merely to construe the
Federal Power Act, which Congress adopted in 1920. This Court
then concluded that the Federal Power Commission, not the
states, has authority to regulate stream flows at FPC-licensed
projects. Many hydroelectric projects have been constructed in
reliance on the Court's ruling in First Iowa.’
This case does not involve a dispute concerning the extent of a
state’s authority to allocate consumptive use of surface waters
within its boundaries. This is not a water rights case. Instead, this
case presents the question of whether Congress may vest author-
ity in a federal agency to regulate integral features of federally
licensed energy projects on the nation’s rivers. The answer is that
Congress may vest such authority in a federal agency, that it has
done so in the Federal Power Act, and that conflicting state reg-
ulations must give way to such preemptive federal authority.
Stream flows are not simply an aesthetically pleasing, relatively
flexible feature at FERC-licensed hydroelectric projects; stream
flows and water storage are the soul of a project. Hydroelectric
dams exist for the purpose of storing or diverting water to run
through turbines and generate electricity at times when power is
needed (as well as for irrigation and other consumptive uses).
Water that is required for instream flows for fish is not available
3The massive power projects that Congress envisioned came to fruition and
now dominate the major navigable rivers of the country. The diverse water
works and power networks managed by the FERC transcend state boundaries,
spanning entire river basins and requiring coordination at all levels of stream
flows, water storage, and power generation. In reliance on the administrative
structure that Congress protected from parochial control by the several states,
hydropower project sponsors (and their bondholders) have invested billions of
dollars to create and maintain the massive power system Congress envisioned.
6
for project storage, consumptive uses, or future power generation.
When the FERC issues a license for a project, it carefully consid-
ers, with participation from the states, local governments, envi-
ronmental groups and other interested parties, the multitude of
factors that affect what level of instream flows should be required
at the project.
To fulfill its congressional mandate to administer federal power
projects within its jurisdiction, the FERC must have authority to
determine project flows. This case concerns the meaning of the
statute that gave the FERC plenary authority to regulate hydro-
electric projects within its jurisdiction. This Court construed that
Statute nearly forty-five years ago in First Jowa and concluded
that states may not veto the FERC’s determination of project
flows. Congress has not acted since then to vest such veto author-
ity in the states.* This Court should decline California's invitation
to rewrite the Federal Power Act to suit the state’s agenda.
FIRST IOWA HAS BEEN UNIFORMLY FOLLOWED
BY THIS COURT AND SHOULD NOT BE OVERRULED
A. This Court Has Repeatedly Reaffirmed First Jowa.
This Court has uniformly adhered to First Jowa’s holding that
the Federal Power Act of 1920 preempted all state regulation of
hydroelectric power projects licensed by the FERC. As recently
“Nothing has happened in the forty-four years since this Court's ruling in
First lowa to modify this Court's perspective on what Congress intended when
it adopted the Federal Power Act in 1920. This Court had available then the
same indicia of original legislative intent it has now. Moreover, Congress,
through its decision not to tamper with the balance of federal authority struck
im the FPA, has ratified and concurred in this Court's frequently reiterated
conclusion that Congress intended for the FPC to exercise comprehensive fed-
eral authorit). On questions of statutory interpretation, this Court defers to
Congress to amend a statute to meet perceived changes in the nation’s needs.
See Patterson v. McLean Credit Union, 491 US. , 109 S.Ct. 2363, 2370
(Kennedy, J.) & 2385 (Brennan, J., concurring) (1989) (special justification
required for departure from stare decisis on matters of statutory interpretation).
7
as 1982, in New England Power Co. v. New Hampshire, 455 U.S.
331, 338, n.6 (1982), the Court unanimously noted that, regard-
less of the extent of a state’s proprietary interest in a river that is
the source of power for a FERC-licensed hydroelectric project,
“the pre-eminent authority to regulate the flow of navigable wa-
ters resides with the Federal Government.” Citing First Jowa, the
Court noted that the state’s purported “ ‘ownership’ " of the river
“provides no justification for restricting or conditioning the use
of these federally licensed units.” Jd.
Similarly, in 1983, the Court summarized the First Jowa hold-
ing with respect to the preemptive purpose and sweep of the
Federal Power Act in order to distinguish it from the Atomic
Energy Act which did not give the NRC comprehensive planning
responsibility. See Pacific Gas & Electric Co. v. State Energy Re-
sources Conservation & Development Comm'n, 461 U.S. 190, 223,
n.34 (1983). The Court stated:
In First Iowa, this Court held that compliance with re-
quirements for a state permit under lowa law was not neces-
sary in order to secure a federal license for a hydroelectric
project. Allowing the States to veto federal decisions could
‘destroy the effectiveness of the Federal Act. It would subor-
dinate to the control of the State the “comprehensive” plan-
ning which the Act provides shall depend upon the judgment
of [the Federal Government].’ Id., at 164. In the same man-
ner, requiring compliance with state requirements would
have reduced the project to a size that the Federal Power
Commission had determined was inadequate, and compli-
ance with state engineering requirements could handicap the
financial success of the project.
Id. In addition, in Escondido Mutual Water Co. v. La Jolla
Band of Mission Indians, 466 U.S. 765, 773 (1984), the Court
discussed Congress’ purpose in passing the Federal Power Act
and noted, citing First Jowa, that Congress intended to vest in the
Commission exclusive authority to issue licenses for hydroelectric
aa enter am aie the ineffici oan fusi
caused by the ‘piecemeal, restrictive, negative approach’ to licens-
ing prevailing under prior law.” Thus, very recent Court deci-
ost x
sions have reaffirmed First Jowa’s holding with undiminished
force. Contrary to the claims of California this Court clearly does
not regard First Jowa as being undermined by recent preemption
and reclamation cases.
B. This Court Has Repeatedly Found That The Federal
Power Act Vests Comprehensive Regulatory Authority
In The FERC.
Since First Jowa the Court has revisited on several occasions
the question of Congress’ purpose in passing the FPA. Repeat-
edly, the Court has emphasized Congress’ intent to preempt the
field with federal regulation of hydroelectric projects. For exam-
ple, in FPC v. Union Electric Co., 381 U.S. 90, 97-98 (1965), the
Court explained that Congress intended to exercise “comprehen-
sive control over those uses of the Nation’s water resources in
which the Federal Government had a legitimate interest; these
uses included navigation, irrigation, flood control, and, very
prominently hydroelectric power—uses which, while unregulat-
ed, might well be contradictory rather than harmonious.” Quot-
ing First Jowa, the Court observed that the 1920 Act “ ‘was the
outgrowth of a widely supported effort of the conservationists to
secure enactment of a complete scheme of national regulation
which would promote the comprehensive development of the wa-
ter resources of the Nation, in so far as it was within the reach of
the federal power to do so... . Jd. at 99. In studying the
legislative history, the Court found that “conservationists and
opponents seemed to agree that the Act embodied the full meas-
ure of Congress’ authority under the Commerce Clause to regu-
late hydroelectric projects.” Jd. at 107.
The Court has observed how a state’s licensing requirements
can interfere with a comprehensive scheme of federal regulation.
Citing First Jowa, the Court explained that: “A State may not
enforce licensing requirements which, though valid in the absence
of federal regulation, give ‘the State's licensing board a virtual
power of review over the federal determination’ that a person or
agency 1s qualified and entitled to perform certain functions, or
9
which impose upon the performance of activity sanctioned by
federal license additional conditions not contemplated by Con-
gress.” Sperry v. Florida, 373 U.S. 379, 385 & n.4 (1963). Simi-
larly, the Court has declared: “It is no longer open to question
that the Federal Government under the Commerce Clause of the
Constitution . . . has dominion, to the exclusion of the States, over
navigable waters of the United States (citing, among other cases,
First Iowa) . . . Congress has elected to exercise this power under
the detailed and comprehensive plan for development of the Na-
tion’s water resources, which it prescribed in the Federal Power
Act, to be administered by the Federal Power Commission. [cit-
ing First lowa)” Tacoma v. Taxpayers of Tacoma, 357 U.S. 320,
334 (1958). In addition, in Federal Power Comm. v. Oregon, 349
U.S. 435 (1955), the Court, interpreting § 27 of the Federal Water
Power Act and reaffirming First Jowa, explained:
There thus remains no question as to the constitutional
and statutory authority of the Federal Power Commission to
grant a valid license for a power project on reserved lands of
the United States, provided that, as required by the Act, the
use of the water does not conflict with vested rights of others
[quoting Section 27 in a footnote]. To allow Oregon to veto
such use, by requiring the State's additional permission,
would result in the very duplication of regulatory control
precluded by the First lowa decision. . . . No such duplica-
tion of authority is called for by the Act. [Quoting in a
footnote the portions of the First Jowa decision discussing
the threat of a state veto to comprehensive planning by the
FPC.]
Id. at 444-45 and nn.15, 16.
C. First lowa Controls Resolution Of This Case.
The Court's clear language in First Jowa and subsequent cases
leaves no room for the strained distinctions that the State of
California tries to draw here to distinguish First Jowa. California
is asking this Court to overrule First Jowa and nearly 45 years of
consistent precedents so California can seize control of FERC-au-
thorized hydroelectric projects and dictate the terms under which
they will continue to operate.
10
California advances two arguments to persuade this Court to
depart from the unbroken line of authority following First Jowa:
(1) that First Jowa was not concerned with water rights; and (2)
that the language directed to Section 27 of the FPA was dictum,
unnecessary to the decision. Petitioner's Opening Brief, at 36-38
& n.18. Both points are simply wrong.
According to what the State of Iowa told this Court at the time
First Iowa was decided, the purpose of the state law at issue in
that case was “to conserve and protect as far as possible all public
and riparian rights in the waters of the state . . . Surely, no one
can contend that this language [of the lowa statute] does not refer
to the appropriation, diversion and use of water for power pur-
poses.” See Petition for Rehearing by State of lowa, at 13 (1946)
(filed in First Jowa).’ The lowa law was, in fact, a codification of
the common-law riparian water rights rule forbidding trans-basin
diversions. Thus, contrary to California's suggestion, the issue in
First lowa was the same as that here—the extent to which state
laws concerning water rights are preempted by the FPA. Firsr
Jowa involved more than a state use permit; it involved state-cre-
ated water rights overridden by the FPA.
Similarly, California’s argument that Fir.. Jowa did not turn on
a construction of Section 27 of FPA is also wrong. The Court's
analysis of Section 27 in First Jowa was an integral part of the
conclusions it reached. See 328 U.S. at 175-77. California would
distinguish between a project operator's acquiring a permit prior
to obtaining an FERC license as opposed to a project operator's
acquiring a state water right prior to diverting water under an
FERC license. But that distinction makes no sense in light of the
Court's overriding concern in First Jowa. The Court repeatedly
emphasized that Congress intended to promote hydropower de-
velopment through federal licensing and there is no room for
‘Copies of relevant briefs filed with this Court in the First Jowa case were
appended to Intervenor, Rock Creek Limited Partnership's brief that was filed
with the Ninth Circuit; presumably these First Jowa briefs are also readily
available in this Court's archives. Therefore, they are not separately appended
to this arnici brief.
state control of matters within the federal plan of regulation.
Clearly the diversion of water by a FERC-licensed project is an
integral part of the generation of hydroelectric power. If a state
imposes conditions on such diversion that conflict with conditions
imposed by the FERC—such as the minimum fish flow require-
ments at issue here—it is interfering with the comprehensive
scheme Congress established. First Jowa cannot be neatly distin-
guished on the technical grounds suggested by the State of Cali-
fornia and this Court should not now overrule its longstanding
precedent in First lowa.
THE STATE’S ARGUMENTS ABOUT THE LEGISLATIVE
HISTORY OF THE FEDERAL POWER ACT OF 1920 ARE
NEITHER NEW NOR PERSUASIVE; THIS COURT IN
FIRST IOWA ADDRESSED AND REJECTED THEM
Much of the State’s brief is taken up with a detailed review of
selected portions of the legislative history of the FPA. The state
presents its arguments concerning the legislative history with
great fanfare, implying that it has unearthed previously unnoticed
but controlling authority that mandates overruling First lowa.
According to the State, “The legislative history of the FPA pro-
vide[s] the strongest indication that Congress intended to defer
to state water rights laws.” Petitioner's Opening Brief, at 22.
Unfortunately for the State, its strongest argument is simply a
belated reprise of the same legislative history arguments this
Court rejected nearly forty-five years ago in First Iowa. A few
examples illustrate this point and show why this Court should not
reexamine the informed interpretation of the legislative history
that it reached in 1946 in First.Jowa and has reaffirmed on nu-
merous occasions since then.
The State of California relies heavily on certain statements by
Congressman LaFollette concerning S. 1419 (1918). Petitioner's
Opening Brief, at 31-32 & n.15. California's brief neglects to note
that in First lowa this Court was aware of, considered, and re-
12
jected the State’s interpretation of Mr. LaFollette’s statements.
See First Iowa, 328 U.S. at 173-74; see also Brief For State of
lowa, at 28 (1946) (filed in First Jowa), Brief For The Federal
Power Commission, at 19 (1946) (filed in First Jowa), Brief For
First lowa-Hydro-Electric Cooperative, at 32-33 (1946) (filed in
First Iowa), Petition For Rehearing By State of lowa, at 17-19
(1946) (filed in First Iowa; the petition for rehearing was denied,
328 U.S. 879 (1946)).° The court of appeals in First Jowa had also
relied on Mr. LaFollette’s comments, see 151 F.2d 20, 25.17 &
28 n.36 (D.C. Cir. 1945). Obviously, when this Court decided
First lowa it was not persuaded by California's interpretation of
Congressman Mr. LaFollette’s statements. The Court heard nu-
merous characterizations of Mr. LaFollette’s statements and
chose one interpretation of them. Those statements have not
changed their meaning with the passage of forty-five years.
The State's brief also relies extensively on comments of Con-
gr-ssman Mondell made in a colloquy with Congressman Raker.
See Petitioner's Opening Brief, at 33, n.15. Mondell’s comments
were discussed, quoted and referenced in excruciating detail in
the briefs presented to this Court in First lowa. See FPC’s Brief,
at 20 (filed in First Jowa), First lowa Hydro-Electric’s Brief, at
34-35 & Appendix pp. 40-42 (filed in First Jowa), lowa Rehearing
Petition, at 18-19 (filed in First Jowa).
This Court also was made well aware of the sequence and
language of bills leading up to the final language of the FPA, to
which the State of California imputes great significance here in
its attempt to have First Jowa overruled. See First Iowa, 328 U.S.
at 176 n.20, Petitioner's Opening Brief, at 23-35. The First lowa
Hydro-Electric Cooperative included a detailed chronology of the
legislative history of the Federal Power Act which makes specific
reference to many of the points raised here in the State of
California's brief concerning H.R. 16673 (1914), H.R. 408 (1916),
S. 1419 (1918), and H.R. 3184 (1920). See First lowa-Hydro-
Electric's Brief, at Appendix pp. 37-45 (filed in First lowa). This
detailed summary of the legislative history was presented to the
court of appeals in First Jowa by the Federal Power Commission.
*See supra note §
=
13
See id. For example, Congressman Mondell’s statements concern-
ing section 14 of H.R. 16673 (1914), which according to the State
of California prove that rights to use water at federal power proj-
ects must be acquired from the states under the FPA, see Peti-
tioner’s Opening Brief, at 23-24, was quoted in entirety to both
the court of appeals and this Court in First Jowa. See First lowa
Hydro-Electric’s Brief, at Appendix pp. 44-45 (filed in First Jo-
wa). Obviously, this Court in First Jowa did not find Congressman
Mondell’s states-rights interpretation of the savings language in
section 9 and section 27 of the FPA (as carried forward from
section 14 of H.R. 16673) to be controlling. This Court is not in
any better position now to reassess its conclusion in First Jowa on
this aspect of the FPA's legislative history.
This cursory examination of the materials and arguments pre-
sented to the Court in First Jowa reveals that the Court had full
notice of all of the legislative history arguments about the FPA
raised in this case by the State of California as well as the many
persuasive arguments to the contrary. See lowa’s Brief, at 23-28,
36 (filed in First Iowa); FPC’s Brief, at 19-20, 40, 47-53 (filed in
First Iowa), First lowa Hydro-Electric’s Brief, at 22-23, 32-35,
Appendix pp. 37-45 (filed in First Jowa); lowa’s Petition For Re-
hearing, at 17-19, 24 (filed in First Iowa); see also First Iowa
Hydro-Electric Cooperutive v. FPC, 151 F.2d 20, 25 n.17, 27-28
n.36 (D.C. Cir. 1945), rev'd, 328 U.S. 152 (1946). The parties to
First Iowa recited chapter and verse to the Court for the major
points now raised by the State of California. Consequently, it is
extremely disingenuous for the State of California to argue here
that the legislative history of the FPA conclusively demonstrates
that Congress intended to permit states to dictate minimum flows
at FERC-licensed facilities. As the Ninth Circuit recognized be-
low, California’s revisionist interpretation of the selfsame evi-
dence of legislative history was thoroughly considered and re-
jected by this Court in First Jowa. See 877 F.2d at 749-50; Pet.
App. A-12 to A-13.
Here, the statutory scheme that Congress established is clear.
It is difficult to believe that Congress intended for 48 states, as
we then were, to have dual control over hydroelectric projects on
>» 14
navigable waters of the United States. Ample provision was made
for the states and their responsible agencies (fish and game, state
engineer) to appear and be heard in FPC licensing proceedings.
But the thrust of the statute was that the Commission would
decide on the value of each project and how it would be con-
structed and operated. To allow the Commission’s orders to be
set aside by a state agency is a result so at war with the statutory
scheme as to deny the text of the Act. The statute does not reflect
the ambiguity attributed to it by Petitioner.
IV.
CALIFORNIA V. UNITED STATES, CONSTRUING
THE RECLAMATION LAW, OFFERS NO GUIDANCE
FOR THE DECISION OF THIS CASE
California’s arguments here boil down to one issue: should this
Court overrule First Jowa and nearly 45 years of Supreme Court
precedents and administrative practice so that the State of Cali-
fornia can assume control over hydroelectric power projects al-
ready constructed or planned for construction? In asking this
Court to overrule its decision in First Jowa, California ignores the
vast differences between Congress’ 1902 program for reclamation
of arid lands and its 1920 program for federal administration of
hydroelectric projects.
The State of California places great reliance on the Court's
decision in California v. United States, 438 U.S. 645 (1978) (the
New Melones case), which required the Secretary of the Interior
to conform to state law in administering irrigation projects under
the 1902 Reclamation Act. But the New Melones case is not a
proper guide for the decision of this case. It was governed by the
Reclamation Act of 1902; this case is governed by the Federal
Power Act of 1920. The historical forces that produced the two
acts and the problems they were designed to solve were quite
different.
California’s revisionist interpretation of history carefully
avoids facing the differences between Congress’ reclamation pro-
gram in 1992 and its program to regulate and promote develop-
15
ment of federal power in 1920. See Petitioner's Opening Brief, at
17 (“the similarities of the programs are stronger than their dif-
ferences . . .”). California knows that this is the fundamental
weakness in its argument. For California it is enough to say that
the statutory language is similar, that both statutes created fed-
eral agencies, and that both programs provide for development
of water for economic purposes. /d. California may be persuaded
by such superficial analysis;’ yet this Court was not and should
not be. The Court cannot reverse the course of nearly 45 years of
history of federal power development and regulation without
probing deeper into the differences between federal power pro-
grams and the reclamation programs that California holds out as
an example. Too much is at stake here for that.
The Court’s decision in the New Melones case was influenced
in large part by the history and purposes of the reclamation laws,
which the Court viewed as rooted in and interwoven with state
law. As the Court noted, the reclamation laws reflect a sort of
“cooperative federalism”; in the Reclamation Act of 1902, Con-
gress “merely authorized the expenditure of funds in States whose
citizens were generally anxious to have them expended.” 438 U.S.
at 650-51. Congress’ goal was to help state and local governments
in the western states finance projects to store their water.
The Reclamation Act was originally intended to conquer the
desert by bringing irrigated agriculture to arid western lands. It
created a public works program in which the federal government
supplied the otherwise absent capital for irrigation development.*
The Bureau of Reclamation built and operated the projects within
"Nevertheless, California's representatives clearly know that the reclamation
program was a public works program meant to promote state and local irriga-
tion projects while the federal power program was not. See, e.g., R. Walston,
Storm in the Desert: The Great Western Water Wars, 26 Journal of the West 78
(July 1987) (discussing in detail the history behind and reasons for federal
reclamation projects).
*See generally A. Golze, Reclamation in the United States 19-34 (1961) (cited
in California v. United States, 438 U.S. 645, 649 nn.1-3 (1978)); 2 R. Clark,
Waters and Water Rights, §§ 110.1, 110.2, at 120-21 (1967).
16
the framework of a state legal system that provided the water
rights and authorized the organization of water districts that ob-
ligated themselves to pay construction, operating and mainte-
nance costs.’ In the absence of state law, there was no project.
The Federal Power Act stands in stark contrast to the Recla-
mation Act. The FPA is a regulatory statute, in the tradition of
the Interstate Commerce Act of 1887, 24 Stat. 379 (1887) (which
established the Interstate Commerce Commission) and the Fed-
eral Trade Commission Act of 1914, 38 Stat. 717 (1914) (which
established the Federai Trade Commission) and was a forerunner
of the regulatory agencies of the 1930s. The purposes of the FPA
were three-fold: (1) to promote hydroelectric power on federal
lands and on navigable waterways controlled by the federal gov-
ernment; (2) to give preference to public entities such as munici-
palities in the use of the power; and (3) to capture for the govern-
ment some of the economic rents of water power, first by charges
to licensees and second by recapture provisions upon expiration
of licenses. This pervasive regulatory scheme could and did pro-
vide protection in Section 27 for vested water rights established
under state law. It had no room for supervening regulation of the
projects by state administrative agencies. '°
The State of California would like to persuade this Court, with
“revisionary zeal,” see California v. United States, 438 U.S. 645,
693 (1978) (White, J., dissenting), to change the law, as it pur-
°The Turlock Irrigation District and Modesto Irrigation District do not re-
ceive any Bureau of Reclamation water.
(See generally 4 R. Clark, Waters and Water Rights § 330, at 293-94 (1970).
Theodore Roosevelt recommended in 1908 that “although works for improve-
ment of navigation, power development, irrigation, flood control, and water
supply for domestic and manufacturing purposes should continue, the time had
come to merge local projects and uses of inland waters in a comprehensive plan
designed to benefit the Nation as a whole.” /d. at 293 (citing 42 Cong. Rec. 6988
(1908)). Private and public power interests continued to fight over how to
develop a comprehensive plan for the development of the nation’s waterways.
Id. at 294. The conservationists prevailed, establishing in the FPA a national
policy on the “use and development of water power on public lands and naviga-
ble streams.” /d.
17
portedly did in the New Melones case. But the State’s premise is
wrong. New Melones did not change the law; it restored to Section
8 the meaning it had from 1902 to 1958 and repudiated the ap-
parent departures from that meaning appearing in dicta in the
late 1950s. Until then federal-state relations under the Reclama-
tion Act followed a familiar, well-worn path for more than 50
years from the Act’s adoption in 1902—a path marked by mile-
stones such as Nebraska v. Wyoming and Gerlach, in which the
Court routinely rejected claims of federal supremacy and reaf-
firmed deference to state law mandated by Section 8 of the Rec-
lamation Act.!!
Only when patently insupportable claims under state law were
advanced did this Court—unnecessarily—depart from deference
to state law under Section 8. Thus in /vanhoe Irrigation District
v. McCracken, 357 U.S. 275, 288 (1958), the petitioner, in a bra-
zen attempt to evade acreage restrictions imposed by the 1902
Act, asserted that state law forbade such restrictions. Unfortu-
nately, instead of giving the simple answer that Section 5 of the
1902 Act set forth a specific congressional directive that was
intended to override any contrary provision of state law, the
Court undercut Section 8 and its deference principle. 357 U.S. at
290, 295-97. The achievement of the New Melones case was to
point out the unnecessary deviation from prior decisions repre-
sented by /vanhoe and to restore the principle of deference em-
bodied in Section 8.
''\See United States v. Gerlach Live Stock Co., 339 U.S. 725 (1950); Nebraska
v. Wyoming, 325 U.S. 589 (1945). In Nebraska v. Wyoming, Nebraska chal-
lenged diversions by Wyoming and Colorado of irrigation water from the North
Platte River and sought an equitable apportionment of the waters from that
river. 325 U.S. at 591-92. The Court confirmed that Section 8 of the Reclama-
tion Act of 1902 required the federal government, as a “carrier and distributor”
of feclamation project water, to conform with state law concerning the appro-
priation and use of such water. 325 U.S. at 614-15.
In United States v. Gerlach Live Stock Co., the United States challenged
private parties’ claims for compensation arising from loss of riparian rights
caused by construction of the Central Valley Project in California. 339 U.S. at
727-28. The Court concluded that when Congress instructed that the reclama-
tion law would govern construction of this project, Congress intended the Sec-
retary of Interior to proceed in compliance with state laws concerning appro-
priation and use of such water. 339 U.S. at 734-36, 739-42.
The FPA has no comparable legal history. From the time this
Court first spoke in 1946, in First Jowa, the Act has been charac-
terized as a pervasive licensing and regulatory system adminis-
tered exclusively by a federal agency. There is no occasion for this
Court to re-examine the FPA because, unlike Section 8, its inter-
pretation has been uniform and unbending in respect to the ne-
cessity of federal supremacy. The Reclamation Act did not pre-
empt state law; with reclamation projects Congress directed the
Bureau of Reclamation to proceed in conformity with state law.
In stark contrast, the Federal Power Act was the product of a
heated and bitter debate in which the need for power was bal-
anced against the need for conservation by placing all projects
governed by the act under the exclusive regulatory control of the
Federal Power Commission. The role of conflicting state regula-
tion was specifically addressed in the debate in Congress over the
FPA and Congress deliberately chose to preempt such conflicting
state rules by dividing control by subject matter and giving each
entity final authority within its jurisdiction. See First Iowa, 328
U.S. at 167-68. Congress decided to protect against the risk that
states would veto projects that satisfied federal requirements. See
id. at 164. Thus, the FPA is not an example of legislation where
Congress’ preemptive intent was unclear; Congress clearly chose
for federal authority to preempt overlapping or conflicting state
regulation.'? The states and their agencies have ample opportu-
nity to voice their concerns through appearances before the Com-
'2The evidence of preemption is clear in this case. The Court in First lowa
reviewed the language and legislative history of the Federal Power Act and
concluded that Congress intended “to secure a comprehensive development of
national resources and not merely to prevent obstructions to navigation...”
328 U.S. at 181. The Court thereby distinguished the FPA from the Rivers and
Harbors legislation cited by the State for the proposition that federal and state
authorities have dual authority over matters in navigable waters. See Petitioner's
Opening Brief, at 40, 48. The Court concluded that, “The detailed provisions of
the Act providing for the federal plan of regulation leave no room or need for
conflicting state controls.” First Jowa, 328 U.S. at 181. There is no question that
regulation of project releases—the point of dispute in the instant case—is an
integral part of the FERC’s regulatory task under the FPA. Therefore, it is clear
that California's conflicting proposals must give way under established preemp-
tion doctrine.
19
mission, and through their continuing authority over the propri-
etary matters as discussed by the Court in First Jowa.
The State’s position in this case comes down to a naked assault
on estabushed, heretofore unchallenged law. New Melones offers
ne comfort, for it restored the Reclamation Act’s historical mean-
ing by reaffirming the first 50 years of interpretation of that Act
by this Court. Yet the State would use New Melones to overturn
nearly 45 years of settle 1 interpretation and administration of the
FPA under this Court's rulings. In short, the State would expand
New Melones beyond recognition in order to gain control over
hydroelectric projects—a control that Congress never intended
the states to have and that no court has ever validated.
V.
THE STATE’S ARGUMENTS ABOUT ADMINISTRATIVE
INTERPRETATION ARE NOT RELEVANT HERE
The State of California and the amici States have made passing
reference to the alleged contemporaneous administrative interpre-
tation of the FPA prior to this Court’s definitive ruling in First
Iowa in 1946. See Petitioner’s Opening Brief, at 35, n.17; Brief of
Amici States, at 20-24. An administrative interpretation that may
have been followed more than 45 years ago—and not followed at
any time since—is not relevant to this Court's interpretation of
the legal issues raised by the FPA. If principles of deference to
administrative interpretation are to guide the legal interpretations
made on this appeal, see, e.g, Chevron, USA, Inc. v. Natural
Resources Defense Council, Inc., 467 U.S. 837 (1984), it is the
current interpretation, advanced here by the FERC and followed
and relied on by private parties for nearly 45 years, that is rele-
vant.
Even so, California and the amici States’ summary of the Fed-
eral Power Commission's interpretation of the FPA prior to 1946
is inaccurate. The most reliable summary of the FPC’s position
appears in its brief to this Court in First Jowa. See FPC’s Brief
20
(filed in First Jowa). The FPC’s position then, although problem-
atic now in light of the Court's resolution of matters in First lowa,
clearly does not lead to the position advocated here by the State
of California.
The FPC went to great lengths in 1946 to distinguish the FPA
from the earlier Rivers and Harbors legislation and call the
Court's attention to the unique legislative history of the FPA. See
FPC’s Brief, at pp. 47-57 (filed in First Jowa). The FPC stressed
that the Court should not ignore the “whole chapter of American
history” by which conservationists, after extensive debates, se-
cured “enactment of a complete scheme of national regulation
which would affirmatively encourage and promote the compre-
hensive development and utilization of the water resources of the
Nation, insofar as it was within the reach of the federal power to
do so, instead of the piecemeal, restrictive, negative approach of
the River and Harbor Acts and other federal laws previously
enacted.” Jd. at p. 47. Congress, according to the FPC in 1946,
sought to create “a complete scheme of regulation intended to
secure and promote the comprehensive development of water re-
sources subject to Federal control, in the public interest.” /d. at
p. 53. It is not insignificant that this Court appears to have bor-
rowed and thereby endorsed this language from the FPC’s Brief
in presenting the Court's interpretation of the FPA in First lowa.
See 328 U.S. at 180-81.
Therefore, the State of California's arguments about the FPC’'s
administrative interpretation from 1920 to 1946 are misplaced
and should be rejected. The FPC’s position even prior to 1946
does not lead to the dual control sought here by the State of
Cahfornia.
Vi.
CALIFORNIA'S POSITION MAKES NO PRACTICAL
SENSE AND DOES NOT NECESSARILY LEAD TO
GREATER PROTECTION OF FISHERIES
California argues in this action that it has exclusive authority
to regulate minimum project flows at an FERC-licensed hydro-
21
electric facility in order to impose more stringent requirements
on the operator than the FERC has imposed. California implies
in its Petition that such exclusive regulation of flows by the states
is workable, does not infringe upon the FERC’s prerogative, and
will lead to greater protection of fish. Yet, in fact, California's
proposed “state preemption” makes no practical sense, directly
infringes on the regulatory prerogative that Congress intended
the FERC to exercise, and merely transfers final decisionmaking
authority from the FERC to the states without any assurance that
states will be any more or less protective of fish than the FERC.
A. California’s Interpretation Of The FPA Is Unworkable.
Both Congress and this Court recognized the practical prob-
lems that inhere in a system in which two separate decisionmak-
ing entities have the right independently to set the parameters for
operation of hydroelectric projects. California here is advocating
precisely the veto power and overlapping jurisdiction that Con-
gress sought to eliminate with the comprehensive program of
federal regulation created in the Federal Power Act. The Court
construed the FPA in First Jowa as preemptive of state laws that
conflict or interfere with the FPC’s regulatory authority at FPC-
licensed projects precisely to prevent a state from exercising a
veto: “Such a veto power easily could destroy the effectiveness of
the federal act. It would subordinate to the control of the State
the ‘comprehensive’ planning which the Act provides shall de-
pend upon the judgment of the Federal Power Commission or
other representatives of the Federal Government.” 328 U.S. at
164. The Court stated: “A dual final authority, with a duplicate
system of state permits and federal licenses required for each
project, would be unworkable. ‘Compliance with the require-
ments’ of such a duplicated system of licensing would be nearly
as bad.” Jd. at 168.
California attempts to gloss over the unworkability of state
regulation of FERC project flows by arguing here that it is not
~ | in obtaini FERC.-li per
See, e.g., Petitioner's Opening Brief, at 48-49. The State argues
22
that it is not infringing on the FERC’s prerogative when it sets
more stringent conditions than the FERC, id. at 48-49, an argu-
ment that the Ninth Circuit rejected as, in effect, a veto of the
project. 877 F.2d at 749; Pet. App. A-12. Veto, in the sense of
“forbid,” may not be the State’s usual objective, but displacement
of any other authority certainly is. When the FERC sets 100 cfs
of water for fish, it is simultaneously assuring the availability of
the remaining supply for other uses. When the State Board sets
175 cfs for fish, it is allocating 75 cfs less for other uses than the
FERC ordered. The basic mistake of the State’s thinking is re-
vealed in the statement that the State has set more stringent
conditions and hence there is no conflict between the State
Board’s order and the FERC’s order. The test is not how strin-
gent are the requirements for fish; rather, conflict occurs because
of differences between the State Board and the FERC over
amounts of water allocated for power. The State Board’s more
stringent requirement for fish is an invasion of the FERC’s re-
quirements for power. Each state agency has had the opportunity
to fight out before the FERC the amount of water to be released
for fish. The fight is a charade if, after losing, the state agency
imposes its desires anyway.'?
This Court clearly recognized in First Jowa the same ploy at-
tempted here by the State of California: “Compliance with State
requirements that are in conflict with federal requirements may
well block the federal license.” 328 U.S. at 167. Congress in-
tended for the FERC to draw the line in setting conditions for
operation of hydroelectric facilities, between environmental re-
Amici American Rivers, et al. contend that imposition of state-mandated
minimum flows at FERC-licensed projects is analogous to Army Corps of En-
gineers participation in regulating water pollution at hydroelectric projects.
Brief of Amici Curiae American Rivers et al. in Support of Petitioner, at 29-31.
Such Army Corps participation is the result of Congress’ “radical change in
legislative policy” wrought in the Federal Water Pollution Control Act Amend-
ments of 1972, see Monongahela Power Co. v. Marsh, 809 F.2d 41, 45 (D.C.
Cir.), cert. denied, 484 U.S. 816 (1987), and sheds no additional light on Con-
gress’ intent in the entirely separate legislation at issue in this case—the FPA—
which this Court definitively construed in First lowa.
23
quirements and economic feasibility.'* Yet the position the State
of California is advocating here effectively makes all terms and
conditions of FERC licenses superfluous because the State can
Obviously, neither Congress nor this Court envisioned states
playing such a role at FERC-licensed projects.
Unlike the FERC, the states are not charged with balancing the
need for power against the need for promotion of fisheries. If the
FERC is construed as having exclusive control over power, and
the State has controlling jurisdiction to promote fisheries, no
agency will ever balance these interests.
B. State Regulation Of Stream Flows At FERC-Licensed
Projects Will Not Lead To Greater Protection And En-
hancement Of Fish.
California also tries to make its extreme position palatable by
implying that exclusive state authority over stream flows will lead
to greater protection and enhancement of fish for recreational and
commercial purposes. California suggests in its Brief that the
purpose of its more stringent minimum flow requirements for the
Rock Creek project is to protect trout, a recreational fish. Peti-
tioner’s Opening Brief, at 2-3. Nevertheless, the State’s proposed
interpretation of the FPA will not necessarily operate to advance
greater protection and enhancement of fish either within or out-
side California. '*
“Indeed, the FERC concluded in this case that the state's recommended
minimum flows would jeopardize the economic feasibility of the Rock Creek
project by causing “Rock Creek to suffer an extended span of substantial finan-
cial loss during the license term.” Pet. App. A-20 to A-21.
'‘Amici American Rivers et al. advance a different, result-driven, argument
that ignores the terms of the FPA and Congress’ intent. They contend that the
level of minimum project flows that most promotes fisheres, set either by a siate
or by the FERC, should apply to FERC projects. Brief of Amici Curiae Ameri-
can Rivers et al. in Support of Petitioner, at 8-9. The American Rivers position
fails to balance the need for power with the need to promote fisheries, it would
authorize a state to divert water to fish that the FERC would use for power.
Such state authority could be used to render impracticable any FERC project,
including importantly, all existing FERC-hcensed facilities.
24
The State's interpretation of the FPA would simply shift deci-
sionmaking prerogative from the FERC to the states; yet Con-
gress specifically left the final decision with the FERC in enacting
the Electric Consumer Protection Act of 1986, Pub.L. No.
99.495, 100 Stat. 1243, which amended portions of the FPA.
Such a shift would not necessarily lead to enhanced fishery pro-
tection. The FERC is equally obligated by a host of laws and
regulations to protect fishery resources. Such concerns are an
integral factor in its decision to regulate minimum flows for fish.
The fact that the State is unhappy in this particular instance with
the FERC’s resolution of such issues is not sufficient reason to
upset the entire system of federal regulation.
Thus, the State of California's interpretation of the FPA is
cumbersome and unworkable because of the state veto problems
recognized by Congress and this Court. In addition, the State's
position will not necessarily advance and may well hinder the
protection and enhancement of the nation’s fishery resources. In
short, the State’s position is contrary to Congress’ intent, reflects
bad policy and should be rejected.
C. California Is Simply Seeking To Expand Its Power
Under The Public Trust Doctrine.
The State makes no bones about the broad objectives it has in
seeking to overturn First Jowa in this litigation. Its aims are not
confined to low-head hydroelectric projects. The principal objec-
tive of the State is to oust the FERC from a meaningful role in
the licensing and oversight of all hydroelectric power projects—
proposed and existing—and to replace the federal agency with the
State Board. Once this power play has been effectuated, the State
Board will invoke the public trust as announced by the California
Supreme Court in National Audubon Society v. Superior Court,
189 Cal. Rptr. 346, 33 Cal. 3d 419, 658 P.2d 709 (1983), cert.
denied, 464 U.S. 977 (1983). Relying on the public trust, which
arguably reaches every trickle of water in the state and perhaps
the snowpack as well, the State Board means to rewrite FERC
licenses to its own taste, without regard to bond obligations, fed-
a
25
eral recapture rights, or FERC orders designed to implement a
comprehensive plan for the development of federal waterways. '*
This is not even a “dual” system of control—water cannot be
released at 100 cfs and at 175 cfs at the same time. A single
authority must decide how much water goes to fish, how much
to power and other uses. The State of California claims that au-
thority in this case, but Congress and this Court lodged the power
in the FERC, where it should remain.
VIL
CONCLUSION
The Ninth Circuit’s decision below should be affirmed and the
relief sought by California in this case should be denied.
FEBRUARY 1990. Respectfully submitted,
GiBson, DUNN & CRUTCHER
Joe. S. Moskowrrz*
Greocory J. Kerwin
1801 California Street, Suite 4200
Denver, Colorado 80202
(303) 298-7200
Attorneys for Amici Curiae,
the Modesto Irrigation District
and Turlock Irrigation District
*Counsel of Record
Of Counsel:
WARREN F. Gant, General Counsel
Modesto Irrigation District
RoGcer K. Masupba, General Counsel
Turlock Irriaation Diceri
‘The amici States candidly admit their desire to rewrite FERC licenses to
suit their tastes. For example, the State of Idaho would like retroactively to
subordinate all hydropower water use in favor of “future upstream uses ” Brnef
of Amici States in Support of Petitioner, at 26-27.
_
This is a copy of a public record, reproduced as it was published. It is not legal advice, and it may not be the version a court would rely on. Check the official source before you cite it.