Opposition Brief — City of Angoon v. Hodel
Supreme Court brief1987
Ask Donna
What actually matters in this document.
Text
Sep aie ug
ff FeceD |
No. 86-1627 — : SHOSEPH F SPANIOL, JR,
IN THE
Supreme Court of the United States
OCTOBER TERM, 1986
CITY OF ANGOON, et al.,
Petitioners
V.
DONALD HODEL, et al.,
Respondents
On Petition for Certiorari to the United States
Court of Appeals for the Ninth Circuit
BRIEF IN OPPOSITION OF RESPONDENT
SHEE ATIKA, INC.
RICHARD ANTHONY BAENEN
1735 New York Avenue, N.W.
Washington, D.C. 20006
(202) 783-9294
PIERRE J. LAFORCE *
WILKINSON, BARKER, KNAUER
& QUINN
1735 New York Avenue, N.W.
Washington, D.C. 20006
(202) 783-4141
Counsel for Respondent
Shee Atika, Inc.
* Counsel of Record
ARS TREE TELE TTT EET LR ILIIOS
WILSON - EPES PRINTING Co., INC. - 789-0096 - WASHINGTON, D.C. 20001
TABLE OF CONTENTS
ARSE SF BAA RG TRE RID voceisincensencsescsnonscnsnsccasiverensaces
oe we ky | et! | arr
I eieicisaipiestenanictnieniitantantaaninainsipiacnnitiuaiatahiatsene
I.
II.
III.
THE DECISION OF THE COURT OF AP-
PEALS DOES NO VIOLENCE TO THE FED-
ERAL GOVERNMENT’S NAVIGATIONAL
SERVITUDE, AND DOES NOT CONFLICT
WITH RELEVANT DECISIONS OF THIS
IE Wi dichdhaihcacaiinap eensinbieeacibinnteniccinienscincnsnepciancainanians
CERTIORARI REVIEW OF THE STATU-
TORY INTERPRETATION OF SECTION
503(d) OF ANILCA IS NOT WARRANTED
AS A MATTER OF POLICY OR ON THE
SE is kaia nab lacallielienioions cites ow etliipliaaeiniidaianeemaanaens
THE RULE 56 ISSUE POSITED IN THE PE-
TITION DOES NOT WARRANT REVIEW....
A. Review Is Not Called For Under Certiorari
B. Sierra Club-Angoon Never Properly Pre-
sented, Prosecuted Or Preserved A Viable
I BI -. ctatidlceatdietnaesombnanneincsnstenonse
C. Sierra Club-Angoon Were Not Entitled To
IT os auss enc caecncedintonemendavabasvens
RIE — scaricare nbtecekisntegahsussnictnshoncineationeanibonties
10
12
14
ii
TABLE OF AUTHORITIES
Judicial Decisions: Page
Amoco Prod. Co. v. Village of Gambell, 107 S. Ct.
) |__| SRNR TURN mm OT IEE eae EP ITENE 7,8,9
Bonnelli Cattle Co. v. Arizona, 414 U.S. 313
LL ROOD NT = SEGAL RE VE Ea 8
Burlington Coat Factory Warehouse Corp. v.
Esprit De Corp., 769 F.2d 919 (2d Cir. 1985) .... 13
City of Angoon v. Hodel, 803 F.2d 1016 (9th Cir.
ND inciniarhscninsinnsncneouigpinnesainduneadieemuiamaaaae passim
City of Angoon v. Marsh, 749 F.2d 1413 (9th Cir.
ED hmnetisnevinaiminnnaanea passim
Gieringer v. Silverman, 731 F.2d 1272 (7th Cir.
TID ccecsenssiniinetnsaciases tniccsaessimmmaaia aes 13
Kaiser Aetna v. United States, 444 U.S. 164
PIED :snvinicnssssnneietsntciadiilidesssthulesiaaliiaseaincadeniaaia inna 6
Minnesota v. Block, 660 F.2d 1240 (8th Cir.
TED vicecseinisnsscins hi nliseiaipctidacedsensniaedaemumen ann 9
NLRB v. Pittsburgh S.S. Co., 340 U.S. 498
TED chinw~csnscnssespieiodbsesbcetoiudsiceebanasaiaaatidiaaniauaaaaenann nana 9
Oregon ex rel. State Land Bd. v. Corvallis Sand &
Gravel Co., 429 U.S. 363 (1977) ........222200..200.-..ee 6
Over The Road Driver’s, Inc. v. Transport Ins. Co.,
637 F.2d G16 (ist Cir. 1966) ............................... 13
Paul Kadair, Inc. v. Sony Corp. of America, 694
Fie BOST CO CR. TD vsti, 13
Rice v. Sioux City Memorial Park Cemetary, Inc.,
DEF Tis FO CRD cncininciccemneigamas g
United States v. Bob Stofer Oldsmobile-Cadillac,
Inc., 766 F.2d 1147 (7th Cir. 1985) 2.000000... 13
United States v. California, 332 U.S. 19 (1947)... 6
United States v. Chandler-Dunbar Power Co., 229
it BR | eee emrritg rt, 7
United States v. Cherokee Nation, 107 S. Ct. 1487
RETED sitnisteisnsninansitieensicesbesinianinapnamanmmn ce ian 7
United States v. Kansas City Life Ins. Co., 339
Te TE EID cuslieenscinssteiscnnentncennninssidllictiadeamiuiaamia 6
United States v. Little Al, 712 F.2d 133 (5th Cir.
PD xstseccescniisinmsctitettarariiidaunicicasi ee 13
United States v. Rands, 389 U.S. 121 (1967)........ 8
iii
TABLE OF AUTHORITIES—Continued
Page
United States v. Twin City Power Co., 350 U.S.
Neen iimaniinnesonsacennvancaceve 6
United States v. Virginia Elec. & Power Co., 365
Ee 6
Vermont Yankee Nuclear Power Corp. v. Natural
Resources Defense Council, Inc., 435 U.S. 519
Ne aac menscnaniniennnesunetnscnnsnase 7
Walters v. City of Ocean Springs, 626 F.2d 1317
Tee scctiaaadiinnnconivinsieniunioncsnnacene 13
Statutes:
I EE OID a snnannccessncnenransascecceseseccenccene 8
I I I sn cacncsacnsscevensennccenesencscsceees 8
I BN oo scneecncnscenncenasscesnsnssceensseee 8
oe, we beeen 66 eg. C19G2) ........................-......... 1
Alaska National Interests Lands Conservation Act
Section 503(d), 94 Stat. 2400 -..............2.2.222 passim
A ‘atiol passim
Regulations:
ens eee ce) C1008) ......................-0..-.00-00-2-
ee
nN bo
Miscellaneous:
10A C. Wright, A. Miller, M. Kane, Federal Prac-
tice And Procedure § 2740 (1983) .......................- 12
IN THE
Supreme Court of the United States
OCTOBER TERM, 1986
No. 86-1627
_ CITY OF ANGOON, et al.,
" Petitioners
DONALD HODEL, et al.,
Respondents
On Petition for Certiorari to the United States
Court of Appeals for the Ninth Circuit
BRIEF IN OPPOSITION OF RESPONDENT
SHEE ATIKA, INC.
Respondent Shee Atika, Inc." herewith submits its brief
in opposition to the petition for a writ of certiorari filed
herein by the Sierra Club, the City of Angoon, et al.
(“Sierra Club-Angoon”). The petition seeks review of
City of Angoon v. Hodel, 803 F.2d 1016 (9th Cir. 1986)
(“Angoon II’). (The court of appeals also issued an
earlier opinion herein sub nom. City of Angoon v. Marsh,
749 F.2d 1413 (9th Cir. 1984) (“Angoon I’’).)
1 Shee Atika, Inc. is an Alaska Native corporation formed pur-
suant to the Alaska Native Claims Settlement Act, 43 U.S.C.
§§ 1601 et seq., to represent the interests of the Natives of Sitka,
Alaska.
2
STATEMENT OF THE CASE
For the most part, the statement of facts contained in |
the opinion of the court of appeals in Angoon II, supple-
mented by the statement of facts in Angoon I, adequately
(and more accurately) states the facts. An additional
factual statement is required, however, regarding the so-
called Rule 56 claim because that issue was first raised
by Sierra Club-Angoon on rehearing.”
This litigation, initiated in 1982, involved a multi-
count legal challenge by Sierra Club-Angoon to Shee
Atika’s economic enjoyment of lands conveyed to it pur-
suant to the Alaska Native Claims Settlement Act
(“ANCSA”) and the Alaska National Interest Lands
Conversation Act (“ANILCA”).
In the course of this litigation, upon demand of Sierra
Club-Angoon, the Corps of Engineers prepared an en-
vironmental impact statement for a log transfer facility
proposed to be constructed by Shee Atika on its Admi-
ralty Island lands. The EIS process, commenced in April
1983, culminated with the issuance of a Final Environ-
mental Impact Statement (‘“FEIS”) on November 9,
1984. The FEIS recommended, as the “environmentally
preferred alternative”,* construction of the proposed fa-
cility. The FEIS also found that construction/operation
of the facility would not significantly adversely affect
Native subsistence, and that there would be no adverse
impact on public access to Cube Cove, where the facility
would be located.*
2A copy of the Sierra Club-Angoon petition for rehearing is
reprinted in the Appendix as App. A.
3 NEPA regulations require federal agencies to specify an “en-
vironmentally preferred alternative” during the EIS process. See
40 C.F.R. §§ 1502.14(e), 1505.2(b) (1986).
*Court of Appeals Excerpts of Record (“E.R.”), at 159, 264.
The FEIS was preceded by a Draft Environmental Impact State-
ment, released April 6, 1984, which likewise recommended con-
EE
3
In April 1984, Sierra Club-Angoon obtained a pre-
liminary injunction enjoining Shee Atika from timber
harvesting on its Admirality Island lands on the ground
that such harvesting was barred by section 503(d) of
ANILCA. On appeal, the court of appeals reversed in
Angoon I, and remanded the case to the district court
on December 27, 1984.
On remand, the district court, on March 4, 1985, con-
solidated the four cases comprising the Shee Atika litiga-
tion and ordered Sierra Club-Angoon to file an amended
consolidated complaint. The amended complaint was filed
on April 3, 1985.5 Therein, Sierra Club-Angoon con-
clusorily alleged that the federal permits issued to Shee
Atika and the timber operations proposed by Shee Atika
were violative of NEPA. The complaint made passing
reference to the FEIS, alleging that it was improperly
prepared for failure to study the alternative of an ex-
change of the Cube Cove lands “and otherwise without
complying to the fullest extent possible with NEPA... .”
E.R. 14. The parties filed motions and cross-motions for
summary judgment or dismissal covering every issue
raised by the consolidated complaint.*
In its dispositive motion, Shee Atika sought dismissal
of the NEPA counts, inter alia, on the ground that un-
defined, conclusory allegations of NEPA violations were
legally insufficient under Vermont Yankee.” On May 21,
struction of the facility, and made similar findings concerning sub-
sistence and public access.
5 While Sierra Club-Angoon purported to file a “draft complaint”,
this ploy was rejected by the district court as being without au-
thority.
6In all, some 113 entries (including 35 briefs) were recorded in
the district court docket from the time the case was remanded to
the district court (January 1985) to issuance of the district court’s
NEPA Order (November 27, 1985). E.R. 378-83.
7 See Vermont Yankee Nuclear Power Corp. v. Natural Resources
Defense Council, Inc., 435 U.S. 519, 553-54 (1978).
4
1985, responding to Shee Atika’s dispositive motion,
Sierra Club-Angoon devoted one sentence (out of a 33-
page brief) to their “undeveloped NEPA claims”, as
follows:
Plaintiffs allege that the EIS is inadequate for other
reasons as well, but until they have the opportunity
for further factual development, including discovery,
and further legal analysis, plaintiffs are not pre-
pared to present their case on these points.*®
On that same date, Sierra Club-Angoon filed a motion
for partial summary judgment on the FEIS, seeking in-
validation for failure to study the “exchange alterna-
tive’. No mention was made therein of any reserved
NEPA issues.
Finally, in a June 18 filing, Sierra Club-Angoon per-
functorily opposed dismissal of their “undeveloped NEPA
claims”, citing to an attached affidavit of counsel. That
affidavit alleged (i) that Sierra Club-Angoon were not
then able to “present by affidavit facts essential to
justify their opposition”, (ii) that they had not yet com-
menced any discovery on their “undeveloped NEPA
claims”, (iii) that, believing that success on their “ex-
change alternative” issue would make other NEPA dis-
covery unnecessary, they had opted to defer such dis-
covery. App. A at 27a.
Sierra Club-Angoon did not seek a Rule 56(f) con-
tinuance for discovery on the “undeveloped NEPA
claims’, nor did they formally move that judicial action
be withheld on these claims.? No Rule 56(f) order was
entered by the district court.
8Qn June 10, Shee Atika specifically opposed the Sierra Club-
Angoon attempt to reserve “undefined, unarticulated NEPA argu-
ments until some indeterminate time in the future.”
® During the year-plus period from release of the FEIS (Novem-
ber 1984) to issuance of the district court’s NEPA decision (No-
vember 1985), Sierra Club-Angoon never sought any discovery on
5
On November 27, 1985, the district court issued its
decision on the NEPA issue. The court stated the issue
as follows:
The NEPA aspect of plaintiffs’ second and third
claims may therefore be distilled to the following
pair of allegations: that the Section 404 Permit for
the log transfer facility (LTF) was issued without
compliance with NEPA, and that as a result the log
transfer portion of Shee Atika’s timber operation
may not proceed. The parties have cross-moved for
summary judgment on these allegations. [App. D.
to the Sierra Club-Angoon Petition at D-7.]
Further, the court described Sierra Club-Angoon’s
NEPA argument as follows:
Plaintiffs contend that the EIS is inadequate because
it fails to consider, pursuant to NEPA § 102(2) (c)
(iii), the possibility that as an alternative to build-
ing the log transfer facility Shee Atika could ex-
change its lands for other federal timberlands not
on Admiralty Island. [/d. at D-8.]
The court made no'mention of any “undeveloped NEPA
claims”, or that these claims were reserved for further
litigation.”
In their several briefs to the court of appeals, Sierra
Club-Angoon never contended that there remained to be
litigated “undeveloped NEPA claims.” The existence of
these claims was first noted in Sierra Club-Angoon’s peti-
tion for rehearing. The court of appeals denied that
petition, without requesting Shee Atika or other parties
to respond thereto.
the “undeveloped NEPA claims.” During this same period, Sierra
Club-Angoon sought, and obtained, discovery on other litigation
issues.
10 The district court expressly retained jurisdiction over other
claims.
6
I. THE DECISION OF THE COURT OF APPEALS
DOES NO VIOLENCE TO THE FEDERAL GOV-
ERNMENT’S NAVIGATIONAL SERVITUDE, AND
DOES NOT CONFLICT WITH RELEVANT DECI-
SIONS OF THIS COURT
Fundamentally misconceiving the essence of the fed-
eral navigational servitude, Sierra Club-Angoon posit a
decision entrenching upon federal constitutional powers
and otherwise at odds with controlling precedent. This
case presents no such pernicious elements.
The decision of the court of appeals is fully in accord
with this Court’s pronouncements on the federal naviga-
tional servitude. The navigational servitude—which has
its origin in the Commerce Clause—is an attribute of
federal sovereignty, and not a real property concept.
See, e.g., United States v. Twin City Power Co., 350 U.S.
222, 224-25 (1956) (“That Clause speaks in terms of
power, not of property.’’).
The governmental nature—the sovereignty aspect, if
you will—of the navigational servitude power has been
stressed by the Court. See, e.g., Kaiser Aetna v. United
States, 444 U.S. 164, 177 (1979); Oregon ex rel. State
Land Bd. v. Corvallis Sand & Gravel Co., 429 U.S. 363,
375-76 (1977) ; United States v. Virginia Elec. & Power
Co., 365 U.S. 624, 627-28 (1961); United States v. Kan-
sas City Life Ins. Co., 339 U.S. 799, 808 (1950). The
Court has also emphasized that proprietary concepts are
11 Even where there has been disagreement as to the applica-
bility of the navigational servitude, there has been unanimity as
to its sovereign—as opposed to proprietary—nature. For ex-
ample, in United States v. California, 332 U.S. 19 (1947), Mr.
Justice. Frankfurter, in dissent, distinguished between ownership
rights and exercise of the Commerce Power: “[Rlights of owner-
ship are something else.” Jd. at 44. Similarly, in Kaiser Aetna v.
United States, supra, Mr. Justice Blackmun, dissenting, noted that
what is at issue with respect to the navigational servitude “is a
matter of power, not of property.” Jd. at 187.
7
inapplicable with respect to navigable waters. United
States v. Chandler-Dunbar Water Power Co., 229 U.S.
58, 69 (1913).¥
Specifically, the decision below does not conflict with
this Court’s recent decision in Amoco Prod. Co. v. Village
of Gambell, 107 S. Ct.. 1896 (1987) and United States
v. Cherokee Nation, 107 S. Ct. 1487 (1987). Gambell, to
the extent that it is relevant to the instant case, dealt
with the interest of the United States in OCS lands, and
not the attribute.of sovereignty known as the navigational
servitude. In fact, the navigational servitude power was
not even mentioned in the Gambell opinion. OCS lands
are clearly more susceptible to proprietary concepts, given
that the United States has asserted such ownership in-
terests therein as to command the payment of lease royal-
ties for drilling rights. Such rights are different in kind
from the exercise of regulatory power embodied in the
navigational servitude. Thus, nothing in the decision
below conflicts with Gambell.
Similarly, the decision below is not at odds, either
directly or inferentially, with Cherokee Nation. In Cher-
okee Nation, the Court identified the navigational servi-
tude as “an exercise of the Government’s power to regu-
late navigational uses”. 107 S. Ct. at 1490. The Court
also spoke of the navigational servitude as a matter of
“sovereign authority,” id. at 1492, and stated that a
waiver of same would not be lightly implied. Ibid. The
decision below involved no waiver, no relinquishment, no
diminution of the navigational servitude. The federal
permit approvals reviewed in the litigation represented
an exercise of that governmental power, not frustration
of it.
Finally, the decision below is not in conflict with the
Submerged Lands Act. That Act distinguishes between
“ownership” interests and the governmental power em-
12 This case was most recently cited with approval in United
States v. Cherokee Nation, 107 S. Ct. 1487, 1492 (1987).
8
bodied in the navigational servitude. Compare 43 U.S.C.
§§ 1311, 13813 with 48 U.S.C. § 1814; see also United
States v. Rands, 329 U.S. 121, 127 (1967). In the Sub-
merged Lands Act, the United States quitclaimed its pro-
prietary interests in the beds of navigable waterways,”
while restating the “sovereign authority” of the United
States over navigability, as expressed in the navigational
servitude concept. There is nothing in the decision below
contrary to these policies and concepts.*
II. CERTIORARI REVIEW OF THE STATUTORY IN-
TERPRETATION OF SECTION 503(d) OF ANILCA
IS NOT WARRANTED AS A MATTER OF POLICY
OR ON THE MERITS
On two occasions, the court of appeals has held that
section 503{d) of ANILCA cannot legitimately be inter-
preted to prohibit timber harvesting on Shee Atika’s
Admiralty Island lands because such a construction would
be contrary to congressional intent, and would nullify
another provision of ANILCA. See Angoon I, 749 F.2d
at 1416-18; Angoon II, 803 F.2d at 1022-25.
Further review of this issue is not warranted. Section
503(d) of ANILCA applies only to the Admiralty Island
National Monument and the Misty Fjord National Monu-
13 Bonelli Cattle Co. v. Arizona, 414 U.S. 318, 324 (1973).
14 There is also no merit to the contention of Sierra Club-Angoon
that a regulatory void regarding subsistence will exist absent a
finding that section 810 of ANILCA is applicable to federal per-
mitting activities. The FEIS prepared by the Corps specifically
addressed the subsistence issue, and, in that regard, it was found
that construction/operation of the facility would not significantly
adversely affect subsistence. E.R. 159. (The FEIS also found no
adverse impact on public access (navigability). E.R. 264.) In
Amoco Prod. Co. v. Village of Gambell, 107 S. Ct. 1896, 1400 n.5
(1987), the Court listed no less than six environmental statutes
which were applicable to OCS activities. These same statutes are
applicable to the waters in Cube Cove and other waters within the
three-mile limit.
GROTON TRAY HEP eR Tp
9
ment. There are no inholdings within these Monuments
similar to Shee Atika’s, and the question of the interpre-
tation of section 503(d) will not recur. Under such cir-
cumstances, Supreme Court review is unwarranted as
a matter of policy. See Rice v. Sioux City Memorial Park
Cemetery, Inc., 349 U.S. 70, 74 (1955); NLRB v. Pitts-
burgh S.S. Co., 340 U.S. 498, 502 (1951).
Further, the decision below is not in conflict with ei-
ther Gambell or Minnesota v. Block, 660 F.2d 1240 (8th
Cir. 1981). Gambell involved interpretation of a sepa-
rate statutory phrase, involving a different statutory
framework and a different legislative history. Indeed, the
Court noted that the “plain meaning” rule must give
way when there is evidence “that Congress actually in-
tended another meaning.” 107 S. Ct. at 1406. In the
instant case, there was overwhelming legislative history
to the effect that Congress intended that Shee Atika de-
velop its lands. See Angoon I, 749 F.2d at 1416-18;
Angoon II, 803 F.2d at 1022-25. The statutory interpre-
tation adopted by the court of appeals was thus con-
sonant with Gambell and not contrary to it. In like
fashion, the decision below does not conflict with Minne-
sota v. Block. In that case, the court noted that its
“plain language” interpretation was consistent with “the
purpose and legislative history of the act.” 660 F.2d at
1248 n.15. The interpretive route chosen by the court
of appeals here was ascertainment of the will and intent
of Congress, a methodology fully consistent with the pro-
nouncements of this Court.
Finally, on the merits, the decision of the court of
appeals was both legally correct and equitable. The court
of appeals concluded that to deny Shee Atika harvesting
rights on its Admiralty Island lands would be to deprive
it of the most valuable usufruct of those lands, and that
such an anomalous, indeed bizarre, result could not have
been intended by Congress. The court further held that
the interpretation urged by Sierra Club-Angoon would
effectively nullify section 506(c) of ANILCA which di-
10
rected the conveyance of Admiralty Island lands in set-
tlement of Shee Atika’s ANSCA entitlement, again a
result that could not have been intended by Congress.
Review of the Sierra Club-Angoon’s interpretation of
section 503(d) of ANILCA is clearly unwarranted.
III. THE RULE 56 ISSUE POSITED IN THE PETITION
DOES NOT WARRANT REVIEW
Review of the propriety of entry of summary judg-
ment on the adequacy of the FEIS is not warranted for
the following reasons: (A) the decision below is not in
conflict with the precedents of this Court, nor is it so
extraordinary as to call for exercise of this Court’s su-
pervisory powers; (B) the record facts do not support the
Rule 56 claim alleged by Sierra Club-Angoon; (C) the
action of the court below was fully in accord with the
spirit and letter of the Federal Rules and the adjudica-
tive law.
A. Review Is Not Called For Under Certiorari Policy
Nothing in the opinion of the court of appeals can be
said to be in conflict with the precedents of this Court.
Similarly, the opinion below will not perplex, nor will
it intimidate, future litigants with respect to Rule 56
procedures.
The opinion of the court of appeals does not discuss
Rule 56 standards, does not announce any new interpre-
tation thereof, and it can hardly be considered a radical
departure from orthodoxy. In fact, the Rule 56(f) ques-
tion and the “undeveloped NEPA claims” were a non-
issue until Sierra Club-Angoon raised same in their peti-
tion for rehearing.
B. Sierra Club-Angoon Never Preperly Presented,
Prosecuted Or Preserved A Viable Rule 56(f) Issue
The record facts fail to support the assertion of a
viable Rule 56(f) issue. Instead, that record shows that
il
Sierra Club-Angoon’s allegation of “undeveloped NEPA
claims” was never properly raised and/or that it was
abandoned.
Sierra Club-Angoon’s sole record basis for their “un-
developed NEPA claims” is an affidavit of counsel at-
tached to a legal brief filed with the district court (and
not otherwise brought to the attention of that court), and
two isolated references to these “undeveloped” claims in
the several hundreds of pages of legal and factual argu-
ments submitted. by Sierra Club-Angoon to the district
court.*®
Sierra Club-Angoon never filed a motion, nor other-
wise requested the district court to defer decision on all
NEPA issues, nor did they seek a continuance so that
they could pursue Rule 56(f) discovery on their “un-
developed NEPA claims”. There being no extant request
for Rule 56(f) relief, the district court entered no order.
The record also shows that Sierra Club-Angoon never
pursued any discovery with respect to their “undeveloped
NEPA claims’. There was ample opportunity for dis-
covery from issuance of the FEIS (November 1984) to
the decision of the district court on the NEPA counts
(November 1985). Further, the decision to forego dis-
covery was a tactical one, with Sierra Club-Angoon being
content to rely on their “exchange alternative” argu-
ment with respect to the adequacy of the FEIS. Certio-
rari review does not lie to correct tactical misjudgments
or litigating errors.
In its decision, the district court made clear its under-
standing that all of the NEPA issues had been submitted
to it for determination. Likewise, the absence of mention
15 These two references consist of a one-sentence statement in a
May 21, 1985 filing to the effect that Sierra Club-Angoon wished
to challenge the FEIS on other grounds, but were not prepared to
do so and a footnote reference in a June 18, 1985 filing objecting
to dismissal of Sierra Club-Angoon’s NEPA claims. See App. A
at 21a, 24a n.1.
12
of Sierra Club-Angoon’s “undeveloped NEPA claims” in
their several court of appeals briefs confirms that no
such issue was then extant.’
Thus, the record fails to suppert Sierra Club-Angoon’s
allegations of arbitrary, swa sponte, and unprincipled
action by the court of appeals. To the contrary, the court
of appeals, in directing summary judgment with respect
to the adequacy of the FEIS, acted on the record devel-
oped before the district court, a record devoid of any
unresolved or unlitigated NEPA issues.
There is no basis for Sierra Club-Angoon’s plaints of
procedural unfairness. They had ample opportunity to
seek discovery and otherwise develop all of their NEPA
claims. Sierra Club-Angoon consciously chose not to avail
themselves of the discovery procedures afforded by the
Federal Rules, and otherwise failed to properly utilize
Rule 56 procedures; they cannot now claim a lack of
opportunity to litigate.
In raising their “undeveloped NEPA claims” issue in
their petition for rehearing with the court of appeals,
Sierra Club-Angoon attempted to resuscitate an issue
which was never properly raised or preserved before the
district court, or was abandoned prior to judgment. Un-
der these circumstances, the court of appeals was plainly
correct in denying the petition for rehearing. The Fed-
eral Rules do not permit of in pectore pleading or prac-
tice.
C. Sierra Club-Angoon Were Not Entitled To Rule
56(f) Relief
Sierra Club-Angoon never formally sought Rule 56(f)
relief before the district court. Such relief is not avail-
able for the first time on appeal."*
16 Qn the other hand, Shee Atika’s briefs consistently represented
that the only NEPA issue involved the “exchange alternative.”
See App. at 13a.
17 See 10A C. Wright, A. Miller, M. Kane, Federal Practice And
Procedure § 2740, at 535 (1983).
13
The case law developed by the lower federal courts on
Rule 56(f) leaves no doubt that Sierra Club-Angoon’s
claims of procedural deficiencies are without legal sup-
port. First, the mere filing of a Rule 56(f) motion does
not automatically stay the proceedings on the under-
lying motion for summary judgment.’ A party seeking
Rule 56(f) relief must diligently present and prosecute
a Rule 56(f) application, since such relief is committed
to the discretion of the trial court.’° Second, the lower
federal courts have accorded short shrift to litigants who
fail to adequately apprise the court of their requests for
Rule 56(f) relief.2° Finally, a party who has been dila-
tory in discovery may not obtain Rule 56(f) relief.”
The Rule 56(f) claim raised on rehearing by Sierra
Club-Angoon suffered from each of the deficiencies noted
above. Their claim for Rule 56(f) relief was inade-
quately presented, and was not preserved; they took no
direct action in the district court seeking a Rule 56(f)
continuance or discovery; they made no attempt to obtain
discovery on their “undeveloped NEPA claims”. Thus,
the court of appeals was fully warranted in denying their
petition for rehearing on the ground that a Rule 56(f)
issue had either never been properly raised, or had not
been properly preserved, or had béen abandoned. There
was ample record support for each and all of the fore-
going findings.
18 See Gieringer v. Silverman, 731 F.2d 1272, 1280 (7th Cir.
1984).
19 See United States v. Little Al, 712 F.2d 133, 135 (5th Cir.
1983).
20 See, e.g., Burlington Coat Factory Warehouse Corp. v. Esprit
De Corp., 769 F.2d 919, 926 (2d Cir. 1985); Paul Kadair, Inc. v.
Sony Corp. of America, 694 F.2d 1017 (5th Cir. 1983).
21 See, e.g., United States v. Bob Stofer Oldsmobile-Cadillac, Inc.,
766 F.2d 1147, 1153 (7th Cir. 1985); Walters v. City of Ocean
Springs, 626 F.2d 1317, 1822 (5th Cir. 1980); Over The Road
Driver’s, Inc. v. Transport Ins. Co., 637 F.2d 816, 820-21 (1st Cir.
1980).
14
One final point needs to be made with respect to the
spurious Rule 56(f) claim. As noted in both Angoon I
and Angoon II, Sierra Club-Angoon have been successful
in delaying Shee Atika’s economic development of its
ANSCA lands for several years.” For their own reasons,
Sierra Club-Angoon are unalterably opposed to the policy
decision made by Congress, and they have contested Shee
Atika’s rights in every conceivable forum and on every
conceivable legal ground. Sierra Club-Angoon’s new Rule
56(f) argument is but the latest stratagem in a cam-
paign of opposition now into its twelfth year. Sierra
Club-Angoon have had full opportunity to develop and
present all their legal arguments, and their due process
rights have been fully recognized and protected. The
litigation trail and travails should end here.
CONCLUSION A
For the foregoing reasons, the petition of Sierra Club-
Angoon should be denied.
Respectfully submitted,
RICHARD ANTHONY BAENEN
1735 New York Avenue, N.W.
Washington, D.C. 20006
(202) 783-9294
PIERRE J. LAFORCE *
WILKINSON, BARKER, KNAUER
& QUINN
1735 New York Avenue, N.W.
Washington, D.C. 20006
(202) 783-4141
Counsel for Respondent
Shee Atika, Inc.
June 12, 1987
22 See 749 F.2d at 1414-15; 803 F.2d at 1018-19.
APPENDIX A
la
APPENDIX A
UNITED STATES COURT OF APPEALS
FOR THE NINTH CIRCUIT
Nos. 85-4413, 86-3582, 86-3617, 86-3618,
DC# CV-83-234
Alaska (Anchorage)
CITY OF ANGOON, THE SIERRA CLUB, et al.,
. Plaintiffs-A ppellees,
DONALD HODEL, Secretary of Interior, et al.,
anil Defendants,
SHEE ATIKA, INC.,
Defendant-A ppellant,
and
SEALASKA CORP.,
Defendant-A ppellant.
On Appeal from the United States District Court
for the District of Alaska
[Filed Nov. 22, 1986]
SIERRA CLUB/ANGOON’S PETITION
FOR REHEARING
DuRWOOD J. ZAELKE FREDERICK P. FURTH
SIERRA CLUB LEGAL DEFENSE FUND JEFFREY A. GLICK
1516 P Street, NW FURTH, FAHRNER, BLUEMLE &
Suite 300 MASON
Washington, DC Furth Building, Suite 1000
Attorneys for Appellees 201 Sansome Street
Sierra Club and the San Francisco, CA 94104
Wilderness Society , Attorneys for Appellees
City of Angoon
ee ee
2a
INTRODUCTION
Appellees Sierra Club, The Wilderness Society, and the
City of Angoon (“Sierra Club/Angoon”) respectfully
petition for a rehearing of the appeal in the above-entitled
cause, pursuant to Rule 40, Federal Rules of Appellate
Procedure.
Sierra Club/Angoon believe the Court has overlooked
material points of law in rendering its decision. While
reserving their argued position as to each of the points
of appeal, appellees address themselves in this petition
solely to the issue of the propriety of the panel’s entry of
summary judgment in favor of Shee Atika-Sealaska on
the adequacy of the Environmental Impact Statement
(“EIS”) and the validity of the § 404 permit for the log
transfer facility (“LTF’’). Specifically, appellees believe
the Court erred in concluding that there were no genuine
issues of material fact remaining in sua sponte directing”
summary judgment for Shee Atika-Sealaska.
SUMMARY OF FACTS
The instant controversy involves three consolidated ap-
peals, resulting in turn from the earlier consolidation of
four separate proceedinys before the district court. On
April 7, 1982, the Army Corps of Engineers (“Corps’’)
issued a Department of the Army permit to Shee Atika,
Inc. under § 404 of the Clean Water Act and § 10 of the
Rivers and Harbors Act, authorizing the corporation to
build an LTF at Cube Cove “for development of its pri-
vately-owned lands on western Admiralty Island.” ER
at 145.1 On January 13, 1983 the City of Angoon and
1In this petition, citations to the defendants’ Excerpts of Records
are in the following form: ER . The Sierra Club and the City
of Angoon have filed joint additional Excerpts of Record in two
volumes. Volume I contains excerpts from Angoon v. Marsh, No.
A84-126 Civ. (now part of the instant consolidated action). Ex-
cerpts from Volume I are cited in the following form: Marsh CR
3a
287 individual Natives filed their complaint in Angoon
v. Marsh, alleging, inter alia, that approval of a § 404
permit for Shee Atika’s LTF at Cube Cove without the
preparation of an EIS was in violation of the federal
defendants’ duties pursuant to the National Environ-
mental Policy Act (“NEPA”), 42 U.S.C. § 4821 et seq.
Marsh CR 1. On February 28, 1983, Sierra Club and
The Wilderness Society intervened as plaintiffs, Marsh
CR 138, and on March 21, 1988, Angoon and intervenors
submitted a motion for preliminary injunction against
federal approval of construction of the LTF. Marsh CR
20. On March 30, 19838, the federal government stipu-
lated to suspend its earlier approval of the LTF, and to
prepare an EIS. Marsh CR 28.
On March 22, 1984, Sierra Club/Angoon moved to en-
join construction of the permanent and timber harvest-
ing on 40 acres of the inholding. Marsh CR 109. That
work had begun even though federal approval was still
suspended and the EIS was not yet completed. On March
28, 1984, the court granted a temporary restraining or-
der halting construction of the LTF, but did not enjoin
timber harvesting. Marsh CR 116. On March 28, 1984,
the Corps issued a “Cease and Desist” order directing
Shee Atika to halt its illegal fill activities. Marsh CR
114,
After expedited briefing and argument in April 1984,
the court granted a preliminary injunction against tim-
ber harvesting, based on the statutory prohibition in
§ 503(d) of ANILCA (“[w]ithin the Monument[], the
Secretary shall not permit the . . . harvesting of tim-
ber”). Marsh CR 168.
On December 27, 1984, the Ninth Circuit reversed the
preliminary injunction. Angoon v. Marsh, 749 F.2d 1413
, Tab. Volume II contains excerpts from Angoon v. Hodel,
No. A83-234 Civ., which are cited as follows: Hodel CR
Tab ——.
5
4a
(9th Cir. 1984). The case was remanded to the district
court, where Angoon v. Marsh was consolidated with
Shee Atika v. Sierra Club I, No. A83-209, Shee Atika v.
Sierra Club II, No. A83-234, and Sierra Club v. Watt,
No. A84-001. The case was renamed Angoon v. Hodel,
No. A83-234 Civil. Hodel CR 58. At that time Shee
Atika had pending a motion for summary judgment.
This motion did not address the validity of the Corps’
§ 404 permit or the adequacy of the EIS.
The Corps’ EIS was completed in October, 1984. ER
00136. However, the Corps did not issue its Record of
Decision on the § 404 permit until February 25, 1985.
ER 00325. Soon thereafter, the district court issued an
order requiring Sierra Club/Angoon to file a consolidated
complaint. This complaint incorporated a new claim that
the § 404 permit which was issued, or about to be issued,
pursuant to the Corps’ February 25, 1985 decision was
in violation of Sections 101 and 102 of the NEPA. The
court further ordered that additional briefing on the
existing summary judgment motions be filed within 30
days. (See Minute Order, March 4, 1985, Hodel CR 58,
Exhibit A, attached; ER 00001, 15-16, 19.)
Upon the filing of the consolidated complaint in An-
goon v. Hodel on April 29, 1985, ER 0001, Shee Atika
and the federal defendants moved anew for summary
judgment on all claims. ER 00111, 00113. On May 21,
1985, Sierra Club/Angoon filed a cross-motion for Par-
tial Summary Judgment re: inadequacy of EIS for Fail-
ing to Study Exchange. ER 00116.?
As the foregoing facts demonstrate, the time period
between the Corps’ final decision and the submission of
defendants’ consolidated motions for summary judgment
on all claims was extremely limited. Moreover, during
this time the parties were required to prepare various
2 This cross-motion was subsequently resubmitted by stipulation
on June 18, 1985. Hodel CR 140.
EEE eo EN OR
5a
briefs on subsistence and other issues, pursuant to court
order. Hodel CR 58, CR 83. For this reason, Sierra
Club/Angoon cross-moved for partial summary judgment
on the limited question of the adequacy of the EIS vis-a-
vis its failure to study the alternative of a land ex-
change, while reserving for future consideration other
violations of NEPA set forth in plaintiffs’ consolidated
complaint.
Because of the complicated nature of the case, the
number of issues involved, the limited amount of time |
for discovery following the Corps’ issuance of its deci-
sion, the possibility that success on plaintiffs’ cross-
motion for summary judgment would make a lengthy
and burdensome consideration by the court of other
NEPA issues unnecessary, Sierra Club/Angoon re-
sponded to Shee Atika and the federal defendants’ mo-
tions for summary judgment by stating that complete
resolution of all of plaintiffs’ claims under NEPA was
inappropriate at that time. Sierra Club/Angoon made
clear that the adequacy of the EIS in light of the failure
to study exchange was only one of plaintiffs’ NEPA al-
legations, and that additional time was needed for dis-
covery so that plaintiffs could fully present their case on
these points. (Sierra Club/Angoon’s Reply to Motion to
Dismiss by Shee Atika and Federal Defendants, May 21,
1985, Hodel CR 119. Attached as Exhibit B.) Counsel
for Sierra Club/Angoon also submitted an affidavit pur-
suant to Rule 56(f), Fed.R.Civ.P., requesting additional
time to conduct discovery and thus op osing considera-
tion of all EIS-related claims at that time. In support,
this affidavit cited the numerous affidavits and admis-
sions already on file which demonstrated the existence of
controverted material issues of fact. (Plaintiffs’ Reply
In Support of Cross-Motion Summary Judgment on EIS
Inadequacy Issue. Affidavit of Lewis F. Gordon, June 18,
1985, Hodel CR 143. Attached as Exhibit C.) Because
the district court granted plaintiffs’ cross-motion for par-
6a
tial summary judgment, counsel’s 56(f) affidavit and the
other claims to which it related were never ruled upon
below. See ER 00045, 00053-65; Hodel CR 146.
ARGUMENT
In reviewing the grant or denial of summary judg-
ment, the appellate court is faced with the same task
and governed by the same standard as that before the
district court. Jewel Companies v. Pay Less Drug Stores
Northwest, 741 F.2d 1555, 1559 (9th Cir. 1984). The
court must determine, “on the basis of the pleadings,
affidavits, depositions and other evidence available at the
time the motion was made,” whether there are any
genuine issues of material fact and whether either party
is entitled to prevail as a matter of law. Jewel, 741 F.2d
at 1559; Fed.R.Civ.P. 56(c). The appellate court’s re-
view is to be de novo (State of Alaska v. United States,
754 F.2d 851, 853 (9th Cir. 1985), cert. denied, 016
S.Ct. 3383 (1985); Callahan v. Woods, 736 F.2d 1269,
1272 (9th Cir. 1984)), and all evidence, facts, and in-
ferences that can be drawn from the depositions, admis-
sions, and affidavits on file must be viewed in the light
most favorable to the party opposing summary judgment
(Aronsen v. Crown Zellerbach, 662 F.2d 584, 591 (9th
Cir. 1981), cert. denied, 459 U.S. 1200 (1983); Spec-
trum Financial Companies v. Marconsult, Inc., 608 F.2d
377, 380 (9th Cir. 1979), cert. denied, 466 U.S. 936
(1980) ).
As Judge Sneed has previously noted, the granting of
summary judgment is appropriate only where there is
mo genuine issue as to any material fact. Hutchinson v.
United States, 677 F.2d 1822, 1825 (9th Cir. 1982).
In making this determination, the court has a duty to
consider the record as a whole (John v. State of Lou-
isiana, 757 F.2d 698, 711-712 (5th Cir. 1985)) includ-
ing documentary evidence previously submitted to the
court (Friends of the Earth v. Facet Enterprises, Inc.,
618 F.Supp. 532, 585 (D.N.Y. 1984)). The appellate
Ta
court, like the trial court, is precluded from resolving
factual disputes on motion for summary judgment (New
York Life Insurance Co. v. Baum, 707 F.2d 870, 871-72
(5th Cir. 1983)), and cannot “weigh the evidence, pass
upon credibility, or speculate as to the ultimate findings
of fact” (Aronsen, 662 F.2d at 591). Rather the court
must resolve all doubts in favor of the party opposing
summary judgment (F.S. Smithers & Co., Inc. v. Federal
Insurance Company, 631 F.2d 1364, 1366 (9th Cir.
1980) ), including doubts about the existence of a genu-
ine issue of material fact (Hector v. Wiens, 533 F.2d
429, 432 (9th Cir. 1976) (citing Moore’s Federal Prac-
tice 1 56.15(3) (1974) and citations therein)). See also
Lemelson v. TWR, Inc., 760 F.2d 1254, 1260-61 (Fed.
Cir. 1985).
Under these well-established principles, ithe granting
of summary judgment for Shee Atika-Sealaska on the
adequacy of the EIS and the validity of the § 404 permit
for the Cube Cove LTS was improper. In light of the
procedural posture of the case, as discussed above, it
becomes clear that upon reversing the district court’s
grant of summary judgment for Sierra Club/Angoon,
the appellate court erred in failing to remand the case
for further proceedings necessary to resolve the issues
remaining.
Under 28 U.S.C. § 2106, appellate courts are granted
broad powers to dispose of a case upon appeal. MGPC,
Inc. v. Dept. of Energy, 763 F.2d 422, 433-34 (TECA
1985), cert. denied, 106 S.Ct. 76 (1985). Despite the
fact that a party may have moved for summary judg-
ment in the court below, § 2106’s broad grant of author-
ity allows an appellate court to direct the entry of sum-
mary judgment in favor of a non-moving party when
justice requires. Id.; Martinez v. United States, 669 F.2d
568, 570 (9th Cir. 1982); MGPC, 763 F.2d at 434.
The exercise of this power, however, is appropriate “only
in the rare case” (E. C. Ernst, Inc. v. General Motors
8a
Corp., 587 F.2d 105, 109 (5th Cir. 1976)), “since such
a determination is best left to the trial court... .”
(MGPC, 763 F.2d at 434). Entry of summary judgment
by an appellate court is therefore appropriate only
“when it would be just under the circumstances” (id.),
such as when “it is very clear that all material facts are
before the reviewing court” (Ernst, 5387 F.2d at 109),
and no purpose would be served by remanding the issue
to the district court (Shaw v. FBI, 749 F.2d 58, 63
(D.C.Cir. 1984) ). This is not such a case.
As Judge Sneed has cautioned, “[w]le are mindful too
that summary judgment procedures should be used with
care and restraint.” Hutchinson, 677 F.2d at 1325.
This caution is apt, because “the court must keep in
mind that the entry of summary judgment terminates
the litigation, or an aspect thereof” (Jones v. Howe
Military School, 604 F.Supp. 122, 124 (D.Ind. 1984) ),
and “an improvident grant may deny a party a chance
to prove a worthy case” (Lemelson, 760 F.2d at 1260
(quoting D.L. Auld Co. v. Chroma Graphics Corp., 714
F.2d 1144, 1146 (Fed.Cir. 1983) )).
Thus, entry of summary judgment by the appellate
court should occur only when it is absolutely clear that
there are no genuine issues of fact and the parties have
had a full and fair opportunity to raise disputed issues
of fact, counter the evidence submitted by an adversary,
and present their case. MGPC, 763 F.2d at 434; Calla-
han, 736 F.2d at 1275; Martinez, 669 F.2d at 570; Ithaca
College v. N.L.R.B., 623 F.2d 224, 229 (2nd Cir. 1980)
(quoting 6 Moore’s Federal Practice 956.12 at 334
(1976) ), cert. denied, 449 U.S. 975 (1980); Ernst, 537
F.2d at 109. Where there are issues most properly left
to the trial court, the appropriate course is to reverse
the entry of summary judgment and remand the matter
to the district court for further proceedings. Jewel Com-
panies, 741 F.2d at 1567; Callahan, 736 F.2d at 1269:
Suskind v. North American Life & Casualty Co., 607
9a
F.2d 76, 84 (3rd Cir. 1979). See, e.g., Grazing Fields
Farm v. Goldschmidt, 626 F.2d 1608, 1075 (1st Cir.
1980) (district court is in better position to examine
sufficiency of EIS with aid, if necessary, of further
briefs).
These principles are no less applicable where the
parties have filed cross-motions for summary judgment.
See Smithers, 631 F.2d at 1366 (in case involving cross-
motions for summary judgment, Ninth Circuit states
that moving party must demonstrate absence of issues
of material fact and entitlement to judgment as matter
of law, with evidence and inferences viewed favorably to
opposing party and all doubts resolved in opposing
party’s favor) ; Callahan, 736 F.2d at 1275 (in case in-
volving cross-motions for summary judgment, Ninth Cir-
cuit declines to grant summary judgment for appellate
because appellee would be unfairly deprived of opportu-
nity to present pertinent evidence). Although for pur-
poses of his or her own motion for summary judgment
a party may submit an affidavit stating that there are
no disputed issues of fact and that summary judgment
should be granted, this admission applies only to the legal
theory on which the party has submitted such motion,
but does not constitute a waiver of the party’s right to
raise disputed issues of fact with regard to an adver-
sary’s contentions:
“A party moving for summary judgment ... may
make certain concessions in favor of his adversary
for the purposes of the motion that do not carry over
and support summary judgment for the adversary.”
Ernst, 587 F.2d at 109 (quoting Moore, 6 Federal Prac-
tice 1 56.12 at 56-337 (1976). See also John, 757 F.2d
at 705; 10A Wright, Miller and Kane, Federal Practice
and Procedure, Civil, § 2720 at 20-22 (1983).
Thus, the court, whether at the trial or appellate level,
must review each party’s motion independently and deter-
10a
mine whether that party has met the strict burden of
demonstrating that there are no disputed issues of mate-
rial fact and that judgment is appropriate on those
claims as a matter of law. United States v. Fred A.
Arnold, Inc., 573 F.2d 605, 606 (9th Cir. 1978); Lee v.
Dayton Power and Light Co., 604 F.Supp. 987, 993 (D.
Ohio 1985) ; District 12, United Mine Workers of Amer-
ica v. Peabody Coal Co., 602 F.Supp. 240, 242 (D.IIl.
1985). The court must take care to ensure that in con-
sidering cross-motions for summary judgment, one or
the other of the parties is not deprived of its opportunity
to be heard on other issues. Levine v. Fairleigh Dickin-
son University, 646 F.2d 825 (8rd Cir. 1981). In re-
versing a lower court’s grant of summary judgment, the
appellate court must therefore decline to enter summary
judgment for the opposing party if a genuine issue of
fact exists (John, 757 F.2d at 705; Fred A. Arnold, 573
F.2d at 606), and should instead remand the case for
resolution of those issues which the district court did not
pass upon in its initial determination (Hettleman v.
Bergland, 642 F.2d 638, 68 (4th Cir. 1981); Grazing
Fields, 626 F.2d at 1074-75; Connolly v. Pension Benefit
Guaranty Corp., 581 F.2d 729, 734-35 (9th Cir. 1978),
cert. denied, 440 U.S. 935 (1979) ).
The principles outlined above are particularly appli-
cable here. In moving for partial summary judgment,
plaintiffs Sierra Club/Angoon specifically limited their
motion to consideration of whether the Corps was re-
quired to study a land exchange as a reasonable alterna-
tive to the LTF and related harvesting. If, as eventually
happened, that motion was granted, a complicated trial
on other NEPA issues, requiring the testimony of ex-
pert witnesses, could be avoided, and both the court and
the parties could be saved considerable, and avoidable,
delay and expense.
As stated both in their response to defendants’ con-
solidated motions for summary judgment (see Exhibit B)
lla
and in the affidavit submitted pursuant to Rule 56(f)
(see Exhibit C), plaintiffs believed that substantial
factual disputes relating to their other NEPA claims
existed, but because of the limited time for discovery,
they were unable to fully document these facts in opposi-
tion to defendants’ motions. Plaintiffs also noted that
genuine issues of material fact were raised by the af-
fidavits previously submitted with regard to earlier
stages of the proceeding. As noted above, the court must
make a determination of whether a genuine issue of fact
exists of the basis of the record as a whole (John, 757
F.2d at 711-12), and documentary evidence already in
the record is to be considered (Friends of the Earth,
618 F.Supp. at 535). Plaintiffs’ declarations, together
with the surrounding circumstances, compel the conclu-
sion that genuine issues of fact existed concerning the
validity under NEPA of Shee Atika’s § 404 permit for
reasons other than the EIS’ failure to study the exchange
alternative, and the awarding of summary judgment in
favor of Shee-Atika-Sealaska was therefore inappro-
priate.
As previously discussed, summary judgment proce-
dures must be used cautiously, so as not to deprive a
party of a fair opportunity to be heard. Hutchinson,
677 F.2d at 1325. See Fountain v. Filson, 336 U.S. 681
(1949) (swa sponte entry of summary judgment by court
of appeals was error, because it deprived party against
whom judgment was entered opportunity to dispute facts
material to that claim). For this reason, the Federal
Rules allow for situations, such as that presented here,
where additional time is needed in order to allow the
opposing party a fair opportunity to present its case.
Alghanim v. Boeing Company, 477 F.2d 148, 148 (9th
Cir. 1973); Argus Inc. v. Eastman Kodak Co., 552 F.
Supp. 589, 600 (D.N.Y. 1982).
“The purpose of the rule is to prevent premature
grants of summary judgment in cases where, given
12a
adequate time to obtain discoverable material from
the moving party, the party opposing the motion
might be able to establish genuine issues of fact
which would preclude summary judgment.” (McVan
v. Bolco Athletic Co., 600 F.Supp. 375, 378 (D.Pa.
1984) .)
As with other affidavits submitted in opposition to a mo-
tion for summary judgment, an affidavit submitted pur-
suant to Rule 56(f) “should be treated liberally” (Patiy
Precision v. Brown & Sharpe Manufacturing Co., 742
F.2d 1260, 1264 (10th Cir. 1984)), and appropriate re-
lief (either a continuance or denial of the summary
judgment motion) should be granted “almost as a matter
of course” (McVan, 600 F.Supp. at 878 (quoting Ward
v. United States, 471 F.2d 667, 670 (8rd Cir. 1973) );
Costlow v. United States, 552 F.2d 560, 568-64 (8rd
Cir. 1977) ).
“Further, as an additional precaution against deny-
ing a party its chance to prove a worthy case, any
doubt as to the presence or absence of disputed is-
sues of material fact must be resolved in favor of
the presence of disputed issues, or in other words in
favor of the party opposing summary judgment.”
(Lemelson, 760 F.2d at 1261 (citations omitted) ;
Hector v. Weins, 533 F.2d 429, 482 (9th Cir. 1976) 4
Doff v. Brunswick Corp., 872 F.2d 801, 804 (9th
Cir. 1967), cert. denied, 389 U.S. 820.)
Without an opportunity to gather relevant information
through discovery, or at the very least to submit affida-
vits presenting such disputed facts as can be established
by the information already on hand, Sierra Club/Angoon
will have been deprived of their opportunity to be heard.
It is important to note that plaintiffs were given no no-
tice of the fact that the appellate court intended to issue
a final ruling on all NEPA claims. See Yashon. v. Greg-
ory, 737 F.2d 547, 552 (6th Cir. 1984) (court must
13a
afford party against whom sua sponte summary judg-
ment is to be entered notice and opportunity to respond).
Pertinent facts and legal arguments pertaining to other
defects in the Corps’ EIS and resulting § 404 permit
were neither presented in the parties’ briefs nor argued
before the panel. Both Sealaska and the Federal Defend-
ants stated in their opening briefs that the question
presented was whether the EIS was required to give de-
tailed consideration to the alternative of exchange and
the parties’ NEPA appeals were clearly based only on
that part of the district court’s Nov. 27, 1985 ruling pro-
hibiting issuance of a permit for construction of the
LTF until the exchange alternative was explored. While
Shee Atika’s statement of the issues is somewhat con-
voluted, Shee Atika’s briefs deal only with the exchange
alternative issue. The Court’s misunderstanding about
the existence of disputed facts is perhaps understand-
able, however, because of the misleading statements put
forth by Shee Atika. For instance, in its Opening Brief
at 13 Shee Atika states (erroneously) that “[t]he only
contention advanced by Sierra Club was that the Corps
had violated NEPA by not conducting an in-depth study
of exchange. Sierra Club did not challenge in any man-
ner the environmental findings of the Corps.” Opening
Brief For Shee Atika, Inc., Excerpts Attached as Ex-
hibit D. In its brief, Shee Atika repeatedly refers to
“dispositive motions” submitted by the parties. This mis-
leading characterization of the facts with likewise pre-
sented to the Court in Shee Atika’s December 6, 1985
Motion for Summary Reversal, in which Shee Atika al-
leged to the Court that “the only dispute concerning the
legal adequacy of the EIS is whether it sufficiently ad-
dressed the alternative of an off-island exchange.” At-
tached as Exhibit E.; emphasis in original.
As this Court has noted, “[I]n passing upon requests
for additional time to respond to a motion for summary
judgment . . . the absolute right of a party to respond,
PE i ee ee SS. OR ee A eS ae
l4a
must be taken into consideration.” Alghanim, 477 F.2d
at 148. Here Sierra Club/Angoon have not been granted
a fair opportunity to respond. Because the district court
granted plaintiffs’ cross-motion for summary judgment, \
thus invalidating the Corps’ EIS, the Rule 56(f) motion
was never passed upon. The district court thus never
had the opportunity to exercise the discretion appropri-
ately entrusted to it when a party files an affidavit under
Rule 56(f) (Patty Precision, 742 F.2d at 1264-65), and
plaintiffs were deprived of their entitlement of a ruling
on their objection before the court disposed of the entire
case (Yashon, 737 F.2d at 552-53). “Even if the plain-
tiff were incorrect in arguing that the record was in-
sufficient, he was entitled to be so informed in order
that he might respond to the district court’s proposal to
grant summary judgment with whatever arguments and
evidence in the record he could muster.” Jd. at 552;
Costlow, 552 F.2d at 564. Without the benefit of either
additional evidence that could be presented upon further
discovery or submission of a formal response based on
the evidence the party opposing summary judgment al-
ready has, the court is hampered in its ability to deter-
mine that summary judgment is truly appropriate.
MGPC, 763 F.2d at 428; Sharlitt v. Gorinstein, 535 F.2d
282, 283-84 (5th Cir. 1976) ; Macklin v. Butler, 553 F.2d
525, 528 (7th Cir. 1977).
CONCLUSION
Almost thirty years ago the Supreme Court cautioned
that parties facing a swa sponte grant of summary judg-
ment must be given an opportunity to dispute the facts
and present their case. See Fountain v. Filson, 336 U.S.
681 (1949). In more recent times, the courts of appeal
have noted that a party should not be required “to need- |]
lessly confuse the issues of a case and additional burdens
to the workload of the trial court when the correct dis-
position of the matter merely requires the court to rule
15a
on the motions pending before it.” Patty Precision, 742
F.2d at 1265. Here plaintiffs properly tendered their
objection to final disposition on their NEPA claims with-
out the benefit of further time for discovery. Their al-
legations of disputed issues of facts must be treated
liberally and all doubts must be resolved in their favor.
The court below has neither passed on this objection nor
afforded plaintiffs an opportunity to make such argu-
ments as they might. Evidence already in the record
demonstrates that material issues of fact are disputed
by the parties. Arguments pertaining to other aspects of
the parties’ compliance with NEPA were not briefed or
argued before this Court. For all of the foregoing rea-
sons, the entry of summary judgment for Shee Atika-
Sealaska on the validity of the EIS and the § 404 permit
for the LTF was in error, and the case should be re-
manded to the district court for trial on the issues
remaining.
Respectfully submitted.
FURTH, FAHRNER, BLUEMLE
& MASON
SIERRA CLUB LEGAL
DEFENSE FUND
By /s/ Jeffrey A. Glick
JEFFREY A. GLICK
DATED: November 19, 1986
By /s/ Durwood J. Zaelke
DuRWooD J. ZAELKE
DATED: November 19, 1986
16a
EXHIBIT A
MINUTES OF THE
UNITED STATES DISTRICT COURT
DISTRICT OF ALASKA
. Case No. A83-134 Civ.
The HONORABLE JAMES VON DER HEYDT
SHEE AKITA, INC.
Ve —
SIERRA CLUB, INC., et al.
Deputy Clerk Reporter
—— Jim Meyers — Dolores Runner
X Colleen Cannon —— Janis Roller
—— Ida Romack
APPEARANCES: PLAINTIFF:
DEFENDANT:
PROCEEDINGS: MINUTE ORDER FROM CHAMBERS:
The motion of the City of Angoon, the Angoon Com-
munity Association and the Native residents of the City
of Angoon to intervene is granted. The clerk shall file
the proposed answer lodged with the court. See Docket
#29.
Sierra Club’s motion to join the United States as a
party is granted, and accordingly it is ordered that the
United States be joined as a party to this action. The
17a
motion to join the Angoon Village Association is denied
as moot. See Docket #31.
The United States’ motion to file an amicus brief,
Docket #387, is granted.
Sierra Club’s motion for leave to file a supplemental
brief, Docket #49 is granted.
Sierra Club’s motion to consolidate A83-A234, A84-001,
A84-126 and A83-20 is granted. The court finds all the
eases involve: overlapping issues, but involve different
parties. The court finds it will promote fairness and
judicial economy to allow all interested parties to brief
an issue prior to the court reaching that issue on the
merits. Sierra Club and Angoon shall be aligned as party
plaintiffs; the United States and its agencies and Shee
Atika shall be aligned as party defendants. Plaintiffs
shall file an amended complaint consolidating all issues
within 30 days of the date of this order defendants shall
present all claims in their answer and counterclaim to
the consolidated amended complaint. All subsequent fil-
ings shall be in the above action, A83-234.
Plaintiff’s motion for scheduling of joint oral argument,
Docket # 51, is denied as moot.
The court finds all parties who have not filed briefs
on the issues except the subsistence issues, raised in Shee
Atika’s motion for summer judgment should have an op-
portunity to do so prior to court action on the motion.
Accordingly, it is ordered that any additional primary
briefs on the issues raised in that motion shall be filed
within 30 days of this order; all reply briefs shall be
filed within 15 days thereafter.
However, the court finds that all parties have had an
adequate opportunity to brief the subsistence issues
raised by Shee Atika in A84-126, and argued before this
court April 20, 1984. Unless objection is heard within 15
days from the date of this order, the court will consider
18a
the subsistence issues ripe for decision based on the briefs
currently submitted in A84-126 and A83-234.
DATED March 4, 1985
ec: Middleton, Gordon, Landon
INITIALS: [Illegible]
Deputy Clerk
19a
EXHIBIT B
Frederick P. Furth
FURTH, FAHRNER, BLUEMLE & MASON
201 Sansome Street, Suite 1000
San Francisco, California 94104
(415) 433-2070
Lewis F’. Gordon
BAILY & MASON
1130 West Sixth Avenue, Suite 100
Anchorage, Alaska 99501
(907) 276-4331
Durwood J. Zaelke
SIERRA CLUB LEGAL DEFENSE FUND, INC.
419 Sixth Street, Suite 321
Juneau, Alaska 99801
(907) 586-2751
Attorneys for City of Angoon
and Sierra Club
IN THE UNITED STATES DISTRICT COURT
FOR THE DISTRICT OF ALASKA
Case No. A83-234 Civil
(Consolidated )
SHEE ATIKA, INC.,
ond Plaintiff,
SIERRA CLUB, INC.,
Defendant.
[Filed May 21, 1986]
REPLY TO MOTION TO DISMISS
BY SHEE ATIKA AND FEDERAL DEFENDANTS.
20a
INTRODUCTION
This responsive brief addresses the motions to dismiss
by Shee Atika and Federal Defendants.' It addresses the
issues order raised by Shee Atika. Separate reply briefs
are being filed on § 22(k), and the EIS (the issue that
failure to study the land exchange alternative makes the
EIS inadequate).
ARGUMENT
1. Section 22(k) ANCSA
This issue is addressed in the separate reply brief sub-
mitted this same date.
2. Section 17(b) ANCSA
Angoon/Sierra Club state a claim under §17(b) of
ANCSA, as applied to Shee Atika’s conveyance under
§ 506(c) (2) of ANILCA. Section 17(b) requires the
Secretary of Interior to reserve in any Native conveyance
such easements as the Secretary of Agriculture deter-
mines are necessary “to insure that the larger public in-
terest is protected.” Conf. Com. Rep. No. 746, 92nd
Cong., 1st Sess., reprinted in 1971 U.S. Code Cong. &
Admin. News 2247-49; Solicitor’s Opinion 82 I.D. (No.
7) 325 (July 8, 1975). This mandatory duty includes
but is not limited to, “a full right of public use and
access for recreation, [and] hunting... .” §17(b) (1).
See also Alaska Public Easement Defense Fund v. An-
drus, 435 F. Supp. 664 (D. Alaska 1972).
The scope of the “larger public interest” protected by
the easements was determined by Congress, for Admiralty
1 Although Federal Defendants’ Motion is entitled Motion for
Summary Judgment, most of their arguments focus on whether
plaintiffs’ complaint states claims for which relief may be granted.
The issues whose merits they discuss at greater length have re-
ceived correspondingly more detailed treatment here and in plain-
tiffs’ other briefs filed this same date.
2la
Island and the Cube Cove lands, in § 101 (general pro-
tective policy for wilderness and subsistence), § 503(c)
(mandatory duty to protect Admiralty), § 503(d) (man-
datory duty to prohibit timber harvesting), § 506(a) (2)
(mandatory duty to ensure that nothing
6. Sections 101 and 102 of NEPA
The EIS violates NEPA sections 101 and 102 by, inter
alia, failing to consider the alternative of a land ex-
change. This issue is addressed in one of Angoon/Sierra
Club’s separate reply briefs submitted this same date.
Plaintiffs allege that the EIS is inadequate for other
reasons as well, but until they have the opportunity for
further factual development, including discovery, and
further legal analysis, plaintiffs are not prepared to pre-
sent their case on these points.
7. Due Process Clause
Defendants assert that Angoon/Sierra Club fail to
state a claim that the Secretary’s decision to convey Ad-
miralty lands to Shee Atika violated the due process
clause of the Constitution. They present three bases for
this assertion: 1) the contacts between Shee Atika and
the Secretary of Interior were made pursuant to regula-
tion, Fed. Defendants Brief at 6; 2) even if the ex parte
contacts were improper, Angoon/Sierra Club cannot claim
a due process violation because they were not deprived
of a protected property interest, Fed. Defendants Brief
at 7; and 3) Angoon/Sierra Club’s due process claim
was mooted by § 315 of Public Law 97-394. Shee Atika
Brief at 24. As shown below, each of these arguments
is without merit.
Federal defendants suggest that Shee Atika complied
with the procedure of 43 C.F.R. $4.5 when it urged
then-Secretary of Interior Watt to personally assume
jurisdiction over the Shee Atika conveyance appeal. See
letters of Shee Atika attorney Richard A. Baenen to Sec-
retary James G. Watt, attached
22a
III. CONCLUSION
For the foregoing reasons, defendants’ Motions to Dis-
miss and for Summary Judgment should be denied.
Respectfully submitted,
FURTH, FAHRNER, BLUEMLE &
MASON
BAILY & MASON
SIERRA CLUB LEGAL DEFENSE
FUND, INC.
/s/ Durwood J. Zaelke
By: DuRwoob J. ZAELKE
Attorneys for Plaintiffs
DATE: 5/21/85
The undersigned hereby certifies that on the 21st day
of May, 1985, the attached documents were mailed to the
attorneys of record.
/s/ Debbie Traver
Subscribed and sworn to before me the date last
above written.
/s/ Teresa M. Torres
Notary Public
My Commission expires 3/22/89
23a
EXHIBIT C
Frederick P. Furth
FURTH, FAHRNER, BLUEMLE & MASON
201 Sansome Street, Suite 1000
San Francisco, California 9404
(415) 433-2070
Lewis F. Gorden
BAILY & MASON
1130 West Sixth Avenue, Suite 100
Anchorage, Alaska 99501
(907) 276-4331
Durwood J. Zaelke
SIERRA CLUB LEGAL DEFENSE FUND, INC.
419 Sixth Street, Suite 321
Juneau, Alaska 99801
(907) 586-2751
Attorneys for City of Angoon
and Sierra Club
IN THE UNITED STATES DISTRICT COURT
FOR THE DISTRICT OF ALASKA
Case No. A83-234 Civil
(CONSOLIDATED)
SIERRA CLUB, INC., et al.,
Plaintiffs,
Vv.
SHEE ATIKA, INC., et al.,
Defendants.
PLAINTIFFS’ REPLY IN SUPPORT OF
CROSS MOTION FOR PARTIAL SUMMARY
JUDGMENT ON EIS INADEQUACY ISSUE
24a
INTRODUCTION
This memorandum is a reply to federal defendants’ and
Shee Atika’s responses, filed June 10, 1985, to plaintiffs’
Cross Motion for Partial Summary Judgment re Inade-
quacy of EIS for Failing to Study Exchange Alternative,
originally filed May 21, 1985, and resubmitted by stipu-
lation on June 18, 1985.7
ARGUMENT
1. Defendants Do Not Dispute That the Law Requires
a Broad Definition of the Timber Project, That Al-
ternatives Must Be Addressed to the Larger Proj-
ect, and That the EIS Contains No Such Alterna-
tives.
Federal defendants and Shee Atika (collectively ‘de-
fendants’) do not dispute that the authorities cited by
plaintiff compel both a broad definition of Shee Atika’s
project on Admiralty, and a discussion of reasonable
alternatives to that broadly defined project. Nor do de-
fendants dispute that the EIS contains no such alterna-
tives to the timber harvest operation as a whole.
As discussed in plaintiffs’ memorandum in support of
the cross motion filed May 21 (“EIS Memorandum’’),
Corps regulations require an extremely broad definition
of the public purpose of a project. 33 CFR Part 230,
App. B, 11b(4). If an alternative in this particular
case is “remote and speculative.” However, Shee Atika’s
and the federal defendants’ definition of “remote and
speculative’ would make it unlikely that any alterna-
tive to the proposed timber operation as a whole would
be considered in the EIS. The law requires the Corps to
1 Plaintiffs oppose federal defendants’ attempt to obtain sum-
mary judgment on all potential claims regarding the adequacy of
the Corps’ EIS. Plaintiffs cannot at this time present by affidavit
facts justifying this opposition, since no discovery on additional
inadequacy issues has been conducted. Plaintiffs submit an affi-
davit pursuant to Federal Rules of Civil Procedure 5B(8), attached
hereto, in support of their opposition.
25a
consider alternatives to the broader timber harvesting
project, not just to log transport, and to consider alter-
nate locations for the project. Timber harvesting at an-
other location off-Admiralty is one of the few alterna-
tives plaintiffs know of that would satisfy the project’s
broad purposes of increased timber production in South-
east and increased revenues for Shee Atika shareholders.
Defendants should not be able to use the “remote and
speculative” test to circumvent the explicit requirements
of the Corps regulations and NEPA case law regarding
the scope and.content of the required alternatives. The
Corps must consider alternatives to the entire project,
including alternate locations, and discussing the exchange
option is an obvious, straightforward and reasonable way
to meet this obligation.
Dated: June 18, 1985
Respectfully submitted,
FURTH, FAHRNER, BLUEMLE &
MASON
BAILY & MASON
SIERRA CLUB LEGAL
DEFENSE FUND
/s/ Lewis F. Gordon
LEwIs F.. GORDON
/s/ Durwood Zaelke
DURWOOD ZAELKE
Attorneys for Plaintiffs
The undersigned hereby certifies that on the 18th day
of June, 1985, the attached documents were mailed to
the attorneys of record.
/s/ Debbie Traver
Subscribed and sworn to before me the date last above
written.
/s/ [Illegible]
Notary Public
My Commission expires 7/25/85
26a
Frederick P. Furth
FURTH, FAHRNER, BLUEMLE & MASON
201 Sansome Street, Suite 1000
San Francisco, California 9404
(415) 4383-2070
Lewis F. Gordon
BAILY & MASON
1130 West Sixth Avenue, Suite 100
Anchorage, Alaska 99501
(907) 276-4331
Durwood J. Zaelke
SIERRA CLUB LEGAL DEFENSE FUND, INC.
419 Sixth Street, Suite 321
Juneau, Alaska 99801
(907) 586-2751
Attorneys for City of Angoon
and Sierra Club
IN THE UNITED STATES DISTRICT COURT
FOR THE DISTRICT OF ALASKA
Case No. A83-234 Civil
(CONSOLIDATED)
SIERRA CLUB, INC., et al.,
Plaintiffs,
V.
SHEE ATIKA, INC., et al.,
Defendants.
AFFIDAVIT OF LEWIS F. GORDON
I, Lewis F. Gordon, being duly sworn, depose and say
as follows:
a Ali Py Oa ait Rt
27a
1. I am legal counsel for the Sierra Club and the City
of Angoon in the above-referenced action. I submit this
affidavit pursuant to Federal Rules of Civil Procedure
56(f) in support of Plaintiffs’ Reply in Support of Cross
Motion for Partial Summary Judgment on EIS Inade-
quacy Issue filed this same date.
2. Plaintiffs cannot at this time, for reasons stated
below, present by affidavit facts essential to justify their
opposition to defendants’ motion for summary judgment
on plaintiffs’ -claims regarding the inadequacy of the
Corps’ EIS on the log transfer facility.
3. Plaintiffs have not commenced any discovery on the
issue of tne inadequacy of the EIS for the following
reasons. -
4, First, the Corps did not issue its Record of Decision
on the 404 permit until February 25, 1985, and the con-
solidated complaint, filed pursuant to court order and
raising the issue of the inadequacy of the EIS for the
first time, was not filed until April 29, 1985. In this
short period of time, plaintiffs’ counsel has been extremely
busy on other aspects of this litigation, preparing various
briefs on subsistence and other issues pursuant to the
court’s briefing schedules. There has been very little
time for preparation of discovery requests and for sched-
uling and taking depositions.
5. Second, plaintiffs believe that success on their cross
motion for partial summary judgment on the inadequate
alternatives issue would make further discovery on other
NEPA issues unnecessary. In the interest of avoiding
potentially unnecessary discovery and litigation costs,
plaintiffs have put off discovery until after resolution of
their Cross Motion for Partial Summary Judgment re
Inadequacy of EIS for Failing to Study Exchange Al-
ternative.
6. Plaintiffs’ discovery plan regarding the inadequacy
of the EIS would in part include the following: (1)
28a
request production of all drafts of the EIS, related docu-
ments, and comments submitted; (2) have plaintiffs’ ex-
perts analyze these materials; (3) take depositions of
preparers and commentators, especially representatives
of state and local governments; (4) have plaintiffs’ ex-
perts analyze deposition testimony.
6. Even though formal discovery has not been com-
menced regarding the inadequacy of the EIS, affidavits
previously submitted in this lawsuit by experts and sub-
sistence users regarding ‘the subsistence issues show that
there are contested issues of fact with regard to the
environmental and subsistence effects of the project. De-
fendants have admitted that these issues of fact are in
dispute. See, e.g., Shee Atika’s Supplemental Brief on
Subsistence Issues, filed April 18, 1985, at 2, n.2. These
affidavits suggest potential triable issues of fact regard-
ing the adequacy of the EIS which will be further ex-
plored during the discovery process.
/s/ Lewis F. Gordon
LEWIS F. GORDON
SUBSCRIBED AND SWORN to before me this 18th
day of June, 1985.
/8/ Deborah A. Traver
Notary Public in and for Alaska
My commission expires: 8/17/86
29a
EXHIBIT D
UNITED STATES COURT OF APPEALS
FOR THE NINTH CIRCUIT
Nos. 85-4413, 86-3582, 86-3617, 86-3618
CITY OF ANGOON, et al.,
Plaintiffs-Cross-A ppellants,
V.
DONALD P. HoDEL, SECRETARY OF THE INTERIOR, et al.,
Defendants,
and
SHEE ATIKA, INC.,
Defendant-A ppellant,
and
SEALASKA, INC.,
Defendant-A ppellant.
On Appeal from the United States District Court
for the District of Alaska
OPENING BRIEF FOR SHEE ATIKA, INC.
RICHARD A. BAENEN, ESQ.
PIERRE J. LAFORCE, ESQ.
WILKINSON, BARKER, KNAUER
& QUINN
1735 New York Avenue, N.W.
Washington, D.C. 20006
(202) 783-4141
JACQUELYN R. LUKE, Esq.
MIDDLETON, TIMME & MCKAY
601 West 5th Ave., Ste. 420
Anchorage, Alaska 99501
(907) 276-3390
- Attorneys for Appellant
Shee Atika, Inc.
ll
30a
UNITED STATES COURT OF APPEALS
FOR THE NINTH CIRCUIT
Nos. 85-4413, 86-3582, 86-3617, 86-3618
CITY OF ANGOON, et al.,
Plaintiffs-Cross-A ppellants,
V.
DONALD P. HODEL, SECRETARY OF THE INTERIOR, et al.,
_ Defendants,
SHEE ATIKA, INC.,
Defendant-A ppellant,
and
SEALASKA, INC.,
Defendant-A ppellant.
On Appeal from the United States District Court
for the District of Alaska
OPENING BRIEF FOR SHEE ATIKA, INC.
ISSUES PRESENTED
In satisfaction of the Federal Government’s obliga-
tions under the Alaska Native Claims Settlement Act of
1971, Congress directed the conveyance of specific lands
3la
to Shee Atika. Prior judicial rulings (including one
from this Court) established that this conveyance was
for the economic betterment of Shee Atika and that the
lands could be developed, and that this was clearly in-
tended and provided by Congress. Given the foregoing
background, the controlling questions presented by this
appeal are as follows:
I. Whether the District Court correctly interpreted
and applied NEPA in deciding that NEPA required the
Corps of Engineers, in the course of its EIS review for
a federal permit under Section 404 of the Clean Water
Act, to reexamine the policy decision regarding develop-
ment of the Shee Atika conveyance.
II. Whether NEPA can properly be construed to per-
mit a federal agency or reviewing court to impede or
prohibit development on private lands when it has been
concluded that the federal action under review will have
no adverse environmental effects, and where the sole jus-
tification for permit denial is the view of the federal
agency or reviewing court that the private lands should
not be developed. -
III. Whether NEPA authorizes denial of a federal
permit in an instance where it is established that (i)
the federal action under review will have no significant
adverse effects on the environment, (ii) the related pri-
vate activity (to be conducted on private lands) will like-
wise have no such effects, and (iii) where the sole basis
for denial is the perception of the federal agency (or
reviewing court) that another use should be made of the
private lands.
STATEMENT OF THE CASE
This is an interlocutory appeal of an injunction en-
tered by the United States District Court for the District
of Alaska on November 27, 1985, the injunction becoming
effective on December 11, 1985. Excerpts of Record
(“ER”) 45.
32a
A. Jurisdiction of the District Court
Jurisdiction was properly vested in the District Court
pursuant to 28 U.S.C. § 1881 and 28 U.S.C. § 13861.
B. Jurisdiction of the Court of Appeals
The jurisdiction of this Court is founded upon 28
U.S.C. §1292(a)(1) which confers appellate jurisdic-
tion with respect to “interlocutory orders of the District
Courts of the United States . . . granting, continuing,
modifying, refusing or dissolving injunctions. . . .”
C. Appealability of Order
The Order which is the subject of this appeal is an
injunction. Under the provisions of 28 U.S.C. § 1292
(a) (1), an interlocutory appeal lies with respect to an
order granting an injunction.
D. Timeliness of Appeal
The injunction order was entered on November 27,
1985, with the injunction becoming effective on December
11, 1985. Shee Atika’s notice of appeal was filed on
December 13, 1985. ER 130. The notice was timely
under 28 U.S.C. § 2107.
The Consolidated Complaint herein was filed effective
April 29, 1985. ER 1. Subsequently, the parties filed
dispositive motions and cross-motions on the claims raised
in the Consolidated Complaint. ER 108, 110, 111, 113,
114, 116. The District Court disposed of most of the
issues raised in these dispositive pleadings with a series
of three orders. The first two orders were issued on
October 17, 1985. One-of these orders was captioned
“Memorandum and Order on Subsistence and Trust Re-
sponsibility Issues” (ER 72), and the second was cap-
tioned “Memorandum and Order on Section 22(k)” (ER
93). On November 27, 1985, the District Court entered
an order captioned “Memorandum and Order on Remain-
33a
ing Issues Raised in Consolidated Complaint.” ER 45.
The November 27, 1985 Order is the subject of the
appeal filed by Shee Atika (No. 85-4413). Subsequently,
on December 27, 1985 the District Court issued a Partial
Final Judgement, pursuant to Rule 54(b), in conform-
ance of the three Memoranda/Orders earlier entered by
the District Court. ER 66. Appeals have been taken
from the Partial Final Judgment by the other parties
hereto (Nos. 86-3852, 86-3617, 86-3618). All of the ap-
peals were consolidated by order dated March 31, 1986.
On December 5, 1985, Shee Atika filed a motion in the
District Court seeking reconsideration of the November
27 injunction order. ER 118. That motion was sum-
marily denied by the District Court on December 6.
Clerk’s Record (“CR”) 173. Notice of appeal from the
November 27 injunction was filed by Shee Atika on De-
cember 138. ER 130. On December 17, 1985, Shee Atika
filed a Motion for Summary Reversal of District Court
Order and Injunction with this Court. (U.S.C.A. No. 85-
4413). That motion was denied by the Court by order
dated April 2, 1986.
forcing Shee Atika to accept exchange proposals it
would otherwise refuse cannot be deemed a proper
alternative. An exchange, if implemented, could re-
sult in withdrawal of the requested modification to
the permit by the permittee and no permit would be
issued (Corps Alternative 1). Upland activities
which could occur without a Corps permit would be
unlikely to continue. [ER 152-53.]
After completing its careful environmental review, the
Corps concluded that the construction/operation of Shee
Atika’s log transfer facility would have no significant
adverse effects on the environment. Subsequently, the
Corps of Engineers rendered its decision to issue a Sec-
tion 404 permit to Shee Atika for construction of its log
transfer facility. ER 325. The Corps found that the
proposed work was in the public interest and in accord
34a
with all applicable laws and regulations. The Record of
Decision prepared by the Corps also incorporated a num-
ber of required environmental protection conditions, to
further minimize impacts on the environment. Ibid.
Following issuance of the Record of Decision and issu-
ance of a Section 404 permit to Shee Atika, Sierra Club-
Angoon filed a dispositive motion seeking invalidation
of the permit for alleged violation of NEPA require-
ments. The only contention advanced by Sierra Club-
Angoon was that the Corps had violated NEPA by not
conducting an in-depth study of the land exchange “al-
ternative.” Sierra Club-Angoon did not challenge in any
manner the environmental findings of the Corps.
After the District Court consolidated all of the litiga-
tion relating to the Shee Atika conveyance, the parties
filed a flurry of dispositive motions seeking summary
judgment on most of the claims raised by Sierra Club-
Angoon. On October 17, 1985, the District Court entered
two Memoranda/Orders, ruling on many of the claims.
In one of these Memoranda/Orders, the District Court
dismissed Sierra Club-Angoon’s claim that Shee Atika
was statutorily barred from developing its Admiralty Is-
land lands. ER 72. In dismissing this claim and reject-
ing the Sierra Club-Angoon contention that Congress had
made the conveyance to Shee Atika for exchange purposes
only, the District Court made the following findings:
Congress never intended to force Shee Atika into
an exchange that was not voluntary on both sides.
[ER 78.]
It is not credible to believe that Congress could
intend to deprive Shee Atika of any economic use of
its lands, thereby depriving Shee Atika of much of
its bargaining power and forcing an exchange, with-
out making some mention of that intent in the legis-
lative history. [ER 81.]
35a
Congress .. . intended that any such exchange be
voluntary on both sides. Therefore, Section 506(c)
grants Shee Atika full economic and beneficial use of
its lands, subject of course to the valid existing
rights and easements referred to in that section. [ER
83-84. ]
[T]he court finds that Congress did not intend to
compel any exchange. [ER 84.]
The court declares that the lands conveyed to Shee
Atika on .December 9, 1981, pursuant to Section
506(c) of ANILCA, are “Settlement Act Lands”
that may be developed commercially by [Shee Atika]
.». BR 92.
One month later, the District Court issued a third
Memorandum/Order in which it disposed of the remain-
ing issues raised by the parties. ER 45. One of the
claims ruled on in that Memorandum/Order was Sierra
Club-Angoon’s claim that the EIS was defective for fail-
ure to consider the land exchange alternative. In a sur-
prising turnabout, the District Court ruled in Sierra
Club-Angoon’s favor, holding that NEPA required the
Corps of Engineers to evaluate the merits of the ex-
change alternative.2 The District Court thereupon in-
validated the Section 404 permit issued to Shee Atika
and enjoined Shee Atika “from all use of the Cube Cove
Log Transfer Facility until a valid § 404 permit has
been obtained.” ER 65. The rationale for the District
Court’s holding was expressed as follows:
Because it would be proper for the Corps to deny
a permit on the basis that a fair off-island exchange
would better serve the public interest, it would be
proper for the Corps to evaluate an off-island ex-
change as an alternative in the EIS. [ER 62.]
On December 5, 1985, Shee Atika filed a motion for
reconsideration, with supporting memorandum, with the
12 In each of the several other rulings made by the District Court
on the claims raised by Sierra Club-Angoon, it ruled in favor of
Shee Atika and the other defendants.
36a
District Court. ER 118. In that filing, Shee Atika dem-
onstrated that some basic assumptions made by the Dis-
trict Court were factually erroneous. Specifically, Shee
Atika addressed the District Court’s related assumptions
(i) that a land exchange was feasible (ER 59-61) and
(ii) that any funding appropriations needed for an ex-
change would involve only “minor legislative adjustment
or approval” (ER 59). Specifically, Shee Atika cited to
a recent consultant’s study, financed in part by Sierra
Club, which had made a definitive review of possible land
exchanges.” Shee would ‘have been compelled to rule that
the objections to the EIS were without merit. The Dis-
trict Court’s ruling on the EIS adequacy issue are com-
pletely at odds with the substantive provisions and goals
of the federal statutes mandating the Shee Atika convey-
ance. For that reason alone, the District Court’s ruling
on this issue cannot be allowed to stand.
CONCLUSION
For the foregoing reasons, Shee Atika submits that this
Court should reverse the District Court’s ruling of inade-
quacy of the EIS, vacate its related order invalidating
the Section 404 permit, and vacate the injunction issued
by the District Court.
Respectfully submitted,
RICHARD ANTHONY BAENEN
PIERRE J. LAFORCE
WILKINSON, BARKER, KNAUER
& QUINN
1735 New York Avenue, N.W.
Washington, D.C. 20006
(202) 783-4141
18 This study was completed after the EIS process.
37a
JACQUELYN R. LUKE, Esq.
MIDDLETON, TIMME & McKay
601 West 5th Ave., Ste. 420
Anchorage, Alaska 99501
(907) 276-3390
Attorneys for Shee Atika, Inc.
38a
EXHIBIT E
IN THE UNITED STATES COURT OF APPEALS
FOR THE NINTH CIRCUIT
No.
SHEE ATIKA, INC.,
Appellant,
Vv.
CITY OF ANGOON, et al.,
Appellees.
MOTION FOR SUMMARY REVERSAL OF
DISTRICT COURT ORDER AND INJUNCTION
Shee Atika, Inc., hereby moves the Court for summary
reversal of that part of the District Court’s memoran-
dum and order of November 26, 1985, which held the
permit issued by the Corps of Engineers to Shee Atika,
Inc., to construct a log transfer facility in the navigable
waters of the United States void on the ground that the
environmental impact statement prepared by the Corps
was inadequate and providing
(6) THAT as of December 11, 1985, Shee Atika
shall be enjoined from all use of the Cube Cove Log
Transfer Facility until a valid § 404 permit has been
obtained.
Notice of Appeal was filed on December 13, 1985.
‘This case was before the Court in City of Angoon v.
Marsh, 749 F.2d 1413 (Opinion of December 27, 1984),
wherein this Court reversed the District Court and va-
cated an injunction prohibiting Shee Atika from devel-
oping its lands. The Court was composed of Judges
89a
Sneed, Wright and Alarcon. Shee Atika requests that
its motion be referred to that panel of judges because
of their familiarity with the case.
A memorandum in support of this motion is attached.
Respectfully submitted,
By /s/ Richard Anthony Baenen
RICHARD ANTHONY BAENEN
By /s/ Pierre J. LaForce
PIERRE J. LAFORCE
WILKINSON, BARKER, KNAUER
& QUINN
1735 New York Avenue, N.W.
Washington, D.C. 20006
(202) 783-4141
By /s/ Jacquelyn R. Luke
JACQUELYN R. LUKE
MIDDLETON, TIMME & McKay
601 West Fifth Avenue
Suite 420
Anchorage, Alaska 99501
(907) 276-3390
Attorneys for Appellant
December 16, 1985
40a
IN THE UNITED STATES COURT OF APPEALS
FOR THE NINTH CIRCUIT
No.
SHEE ATIKA, INC.,
Appellant,
a?
CITY OF ANGOON, et al.,
Appellees.
MEMORANDUM OF POINTS AND
AUTHORITIES IN SUPPORT OF MOTION
FOR SUMMARY REVERSAL
RICHARD ANTHONY BAENEN
PIERRE J. LAFORCE
WILKINSON, BARKER, KNAUER
& QUINN
1735 New York Avenue, N.W.
Washington, D.C. 20006
JACQUELYN R. LUKE
MIDDLETON, TIMME & McKay
601 West Fifth Avenue
Suite 420
Anchorage, Alaska 99501
Attorneys for Shee Atika, Inc.
4la
MEMORANDUM IN SUPPORT
OF MOTION FORSUMMARY REVERSAL
REASONS SUPPORTING SUMMARY REVERSAL
1. The District Court’s ruling ignores, and is contrary
to the holding by this Court, vacating an earlier injunc-
tion issued by the District Court, that Congress, by sec-
tion 506(c) of ANILCA, granted Shee Atika Settlement
Act lands on Admiralty Island for economic development.
City of Angoon v. Marsh, 749 F.2d 1413 (1984).
2. The District Court’s ruling is manifestly erroneous,
and reversal is plainly warranted.
8. The effect of the holding and injunction is so dev-
astating to Shee Atika’s precarious financial condition
that unless this Court summarily reverses, Shee Atika
may not survive as a viable entity.
STATEMENT OF THE CASE
This is an interlocutory appeal of an injunction en-
tered by the United States District Court for the District
of Alaska, effective December 11, 1985. (A copy of the
Memorandum/Order entering same is attached as Ap-
pendix A.) Notice of Appeal was timely filed on Deecm-
ber 18, 1985.
In their Consolidated Complaint herein, Sierra Club/
Angoon alleged, inter alia, that the Environmental Im-
pact Statement (“EIS”) prepared by the Corps of Engi-
neers with respect to issuance of a section 404 Clean
Water Act permit to Shee Atika to construct a log trans-
fer facility (“LTF”) on Shee Atika’s Admiralty Island
lands was defective for failure to study as an alternative
the possible exchange by Shee Atika of its lands on Ad-
miralty for off-Island lands.’
1 Sierra Club/Angoon did not challenge the EIS on any substan-
tive grounds, only the alleged failure to study as an alternative the
exchange of Shee Atika’s lands.
42a
Motions and cross-motions for summary judgment were
filed by the parties on all the issues raised in the Com-
plaint. On October 17, 1985, the District Court filed two
memoranda and orders, one on the subsistence and trust
responsibility issues, the other on the section 22(k) issue
(Appendices B and C). On November 27, 1985, the Dis-
trict Court filed its memorandum and order on the re-
maining issues in the complaint, holding against Sierra
Club/Angoon on all issues except that challenging the
adequacy of the EIS and ordered
(7) THAT as of December 11, 1985, Shee Atika
shall be enjoined from all use of the Cube Cove Log
Transfer facility until a valid § 404 permit has been
obtained. [Appendix A, p. 21.]
On the afternoon of December 5, 1985, Shee Atika filed
with the District Court a motion for reconsideration,
which the District Court denied the next morning.
OVERVIEW
This is the second time within 17 months the District
Court has enjoined Shee Atika from productively devel-
oping its Settlement Act lands and the District Court’s
latest injunction issued less than one year from the date
ths Court vacated the * * *
* + * *
STATEMENT OF THE FACTS
A. Preparation of the EIS
Pursuant to stipulation entered into by the federal de-
fendants and Sierra Club/Angoon, it was determined in
March 19838 to prepare an EIS for Shee Atika’s proposed
LTF.* All told, the EIS process consumed some 19
months.’ The final EIS documents, consisting of a basic
2 Shee Atika was not a party to this determination.
3In fact, the decision of the Corps to permit Shee Atika to con-
tinue with the construction of its LTF did not come until almost
two years after the decision to conduct an EIS was made.
43a
statement of some 150 single-spaced pages and appen-
dices of three times that size, reflect that level of effort.
This is the only EIS ever undertaken with respect to
construction/operation of an LTF. The Corps’ environ-
mental review was comprehensive* and addressed every
conceivable facet of the LTF. The only dispute concern-
ing the legal adequacy of the EIS is whether it suffi-
ciently addressed the alternative of an off-Island ex-
change between Shee Atika and the Federal Government.
The Corps did consider the exchange alternative, but
concluded, in accordance with the applicable regulation,°
that in-depth evaluation was not required. The Corps’
consideration of the exchange alternative was described
in the EIS as follows:
A number of commenters have suggested that an ex-
change of Shee Atika lands on * * *
e * * *
Dispositive motions were filed in the District Court
after remand, and all issues were fully submitted by late
June 1985. On October 17, 1985, the District Court filed
two memoranda and orders, denying all of Sierra Club/
Angoon’s issues addressed therein ( Appendices B and
C), and on November 27, 1985, it filed the memorandum
and order that enjoins Shee Atika (Appendix A). In
that memorandum and order the District Court rejected
all of Sierra Club/Angoon’s claims but one—that the
EIS was inadequate because the Corps failed to consider
as an alternative to permitting the long transfer facility
the possible exchange by Shee Atika of its Admiralty
Island lands—and again enjoined Shee Atika.
Shee Atika does not share in the economic benefit of
the Settlement Act. It was, in effect, incorporated on
credit in 1974 and, with minor exception, has existed on
4The Corps commented: “Biological studies in Cube Cove have
been more complete than in any other LTF in Southeast Alaska.”
EIS Appendices at N-148.
5 33 C.F.R. Part 230, App. B, f 11.b.(5) (b) (1985).
|
44a
credit. Its efforts to harvest timber in 1984 and 1985
were thwarted by the District Court’s first injunction
and the pendency of the litigation, and its renewed efforts
thwarted by the most recent injunction. Shee Atika must
generate income now from the development of its lands
if it is to survive. In October 1985, it offered a stumpage
sale, with the bids to be opened on February 28, 1986.
The terms of the sale required the successful bidder to
pay 50% of the sales price at closing. It was anticipated
the sale would generate a minimum of $1.5 million when
the contract was awarded. The sale must now be can-
celled, because no * * *
* * + e
CONCLUSION
For the foregoing reasons, Shee Atika submits that
the Court should summarily reverse the District Court’s
ruling of inadequacy of the EIS, and vacate the injunc-
tion issued by the District Court forthwith.
By ‘/s/ Richard Anthony Baenen
RICHARD ANTHONY BAENEN
By /s/ Pierre J. LaForce
PIERRE J. LAFORCE
WILKINSON, BARKER, KNAUER
& QUINN
1735 New York Avenue, N.W.
Washington, D.C. 20006
(202) 783-4141
By /s/ Jacquelyn R. Luke
JACQUELYN R. LUKE
MIDDLETON, TIMME & McKay
601 West Fifth Avenue
Suite 420
Anchorage, Alaska 99501
(907) 276-3390
Attorneys for Shee Atika, Inc.
45a
PROOF OF SERVICE
I, MATTHEW A. SURPRISE, certify and declare
under penalty of perjury that I: am a citizen of the
United States; am over the age of 18 years; am employed
by Furth, Fahrner, Bluemle & Mason, at the address in-
dicated, whose members are members of the State Bar
of California and at least one of whose members is a
member of the Bar of each Federal District Court within
California; am not a party to or interested in the cause
entitled upon the document to which this Proof of Service
is affixed; and that I served a true and correct copy of
the following document(s) in the manner indicated
below:
SIERRA CLUB/ANGOON’S PETITION
FOR REHEARING
(XX) by today depositing, at San Francisco, California,
the said document(s) in the United States mail in a
sealed envelope, with first-class postage thereon fully pre-
paid, addressed to: (and/or)
() by today ‘personally delivering the said docu-
ment(s) to the person(s) indicated below in a manner
provided by law, by leaving the said document(s) at the
office(s) or usual place(s) of business, during usual busi-
ness hours, of the said person(s) with a cleark or other
person who was apparently in charge thereof and at least
18 years of age, whom I informed of the contents.
[SEE ATTACHMENT A]
Dated: November 19, 1986
/s/ Mathew A. Sawyer
46a
ATTACHMENT A
Stephen Sorenson David Shilton
Jonathan Tillinghast Robert Klarquist
Birch, Horton, Bittner, Department of Justice
Pestinger & Anderson Appellate Section
One Sealaska Plaza, Suite 301
Juneau, Alaska 99801
Richard Baenen
Pierre LaForce
Wilkinson, Barker,
Knauer & Quinn
1735 New York Ave., NW
Washington, D.C. 20006
Jacquelyn Luke
Middleton & Timme
601 W. 5th Avenue, Suite 420
Anchorage, Alaska 99501
Land & Natural Resources Division
9th & Pennsylvania Avenue, NW
Washington, D.C. 20530
Durwood Zaelke
Sierra Club Legal Defense Fund
1516 P Street, NW, Suite 300
Washington, D.C. 20005
This is a copy of a public record, reproduced as it was published. It is not legal advice, and it may not be the version a court would rely on. Check the official source before you cite it.