Petition — Mobil Oil Corp. v. United States Environmental Protection Agency
Supreme Court brief1984
Ask Donna
What actually matters in this document.
Text
Supreme Court, U.S.
FILED
FEB 6 1964
O37 1 2 9
ALEXANDER L. STEVAS
IN THE CLERK
Supreme Court of the United States
OCTOBER TERM, 1983
MOBIL OIL CORPORATION,
Petitioner,
Vv.
UNITED STATES ENVIRONMENTAL PROTECTION AGENCY
and VALDUS ADAMKUS, REGIONAL ADMINISTRATOR,
REGION V,
UNITED STATES ENVIRONMENTAL PROTECTION AGENCY,
Respondents.
PETITION FOR A WRIT OF CERTIORARI TO THE
UNITED STATES COURT OF APPEALS
FOR THE SEVENTH CIRCUIT
Of Counsel
DAVID EDWARD NOVITSKI
Mobil Oil Corporation
8225 Gallows Road
Fairfax, Virginia 22037
Susan R. CsIa
ARTHUR G. HOFMANN
Mobil Oil Corporation
600 Woodfield Drive
Schaumburg, Illinois 60196
THOMAS D. ALLEN
WILDMAN, HARROLD, ALLEN
& DIxon
One IBM Plaza
Chicago, Illinois 60611
February 6, 1984
JOHN J. ADAMS
MICHAEL B. BARR
(Counsel of Record)
MARK G. WEISSHAAR
CHARLES D. OSSOLA
HUNTON & WILLIAMS
P.O. Box 19230
2000 Pennsylvania Ave., N.W.
Washington, D.C. 20086
202/955-1500
Counsel for Petitioner
Mobil Oil Corporation
WILSON - Eres Printing Co.. Inc. - 789-0096 - WasHINGTON. D.C. 20001
QUESTIONS PRESENTED
1. Is the Validity of a Warrant Obtained by EPA
Pursuant to its Alleged Authority Under the Clean
Water Act to be Determined by the Standards for
Demonstrating Probable Cause Set Forth in Ca-
mara v. Municipal Court, 387 U.S. 523 (1967),
and Marshall v. Barlow’s, 436 U.S. 307 (1978),
or by the “Interest-Balancing’” Test Adopted by
the Court of Appeals in this Case?
2. Does an Affidavit Which Refers to an Alleged In-
spection and Sampling Program but Does Not Re-
cite or Incorporate by Reference the Criteria Gov-
erning that Program or Explain the Application of
Those Criteria to the Facility Being Sampled Sat-
isfy the Probable Cause Standards of Camara and
Barlow’s?
3. Does Section 308 of the Clean Water Act Author-
ize EPA to Sample Internal Wastewater Streams
of a Facility When Such Sampling Is Not Required
by the Facility’s NPDES Permit or Agency Regu-
lation, Is Not Necessary to Determine Compliance
With the Act or the Facility’s Permit, and Is Not
Based on an Articulated Administrative Plan for
Gathering Data to Support Developrrent of New
Effluent Limitations?
(i)
TABLE OF CONTENTS
ty By yy |
a I EID nos sacnssentnnzissesinncsnaninntiaieenenscsmntinen
py Nig yt yy | Er
a nal ciectaeieerieiietaninesibahinicnt
SE
CONSTITUTIONAL AND STATUTORY PROVI-
I nas cnhrcogtenniecnteeremnbnasectinneimnenie
REASONS FOR GRANTING CERTIORAR] ..............
A. The Decision Of The Court Of Appeals Con-
flicts With This Court’s Decisions In Camara
And Barlow's
B. This Case Presents Important Questions Of
Law That Deserve Attention By This Court
PPP Pee rrr eee eee ree TTT Tee Ts
C. The Seventh Circuit’s Erroneous Interpretation
of Section 308 of the CWA Raises A Question
Of First Impression And Substantial Federal
Importance
RE AI AE EL
APPENDIX—(Bound Separately)
LIST—Rule 28.1
(iii)
la
1b
iv
TABLE OF AUTHORITIES
CASES: Page
Camara v. Municipal Court, 387 U.S. 523 (1967)....passim
Donovan v. Wollaston Alloys, Inc., 695 F.2d 1 (1st
SITE: III ‘ccccscotuatiteseninnssshnnoannbtisenscaeeiuaasanenanmanbaeetaia 18, 16, 20
Dow Chemical Co. v. EPA, 536 F. Supp. 1855 (E.D.
Bs TD cictniientnnsipadeeinhitcntbinntnizasctbebsansiniaghaaieies 19
E.I. duPont de Nemours & Co. v. Train, 480 U.S.
REPRE RE Acre aver ar rerenene a aN 26
EPA v. National Crushed Stone Ass'n, 449 U.S. 64
NTI. ca ecticsth. herds eaccseidn npaibhaccsst hace haamien akiebesalnmesembannan 21, 26
First Alabama Bank of Montgomery v. Donovan,
602 F.2d 714 (llth Cir. 1962) ............................... 20
In Re Northwest Airlines, Inc., 587 F.2d 12 (7th
Se I cate ne ee eee 13, 16, 20
Marshall v. Barlow's Inc., 486 U.S. 307 (1978)......passim
Marshall v. Chromalloy American Corp., 589 F.2d
1885 (7th Cir.), cert. denied, 444 U.S. 884
INIT. sschstchensesldutseactobeictiapatiacamedcreidatasstdaciatinate Dxphepiaticetmdina 13, 16
Michigan v. Tyler, 486 U.S. 499 (1978) ...0..000000.0.... 15
Mobil Oil v. EPA, 716 F.2d 1187 (7th Cir. 1983)....1, 9,14
Mobil Oil v. EPA, 18 Env’t Rep. Cas. 2031 (N.D.
EINE AE Rs daa 1, 8,18
Stoddard Lumber Co. Inc. v. Marshall, 627 F.2d
en a eee 18, 16, 20
United States v. Mississippi Power and Light Co.,
688 F.2d 899 (5th Cir.), cert. denied, 454 U.S.
RRR Mier Res esa a ares Pe IAM 18
United States v. Prendergast, 585 F.2d 69 (8d Cir.
REARS res MEPS a es BNR ISTio U Nar a a aR 20
United States v. Voorhies, 663 F.2d 30 (6th Cir.
1981), cert. denied, 456 U.S. 929 (1982) ............. 20
Weyerhaeuser v. Marshall, 592 F.2d 373 (7th Cir.
URE Ee Ae rae 9 008s 16
CONSTITUTION:
re ae Eee oe 2
Vv
TABLE OF AUTHORITIES—Continued
STATUTES: Page
Clean Air Act, 42 U.S.C. § 7414 (Supp. V 1981)... 18
Clean Water Act, 38 U.S.C. §§ 1251, et seq. (1976
| _} FDP RRRL OS OnE ar nae: SE ee
83 U.S.C. § 1811 (1976 & Supp. V 1981) ............
33 U.S.C. § 1811(b) (1976 & Supp. V 1981) .....
ge EO Ul, a ee
83 U.S.C. § 1816 (a) (1) (1976) .....0..0... ee
83 U.S.C. § 1818 (1976 & Supp. V 1981) ...........
33 U.S.C. § 1818(a) (1976 & Supp. V 1981) .....
$8 U.S.C. § 1818(a) (A) (1976) ....................0..
83 U.S.C. § 1818 (a) (A) (iv) (1976) ................
83 U.S.C. § 1818(a) (B) (ii) (1976)...
83 U.S.C. § 1819 (1976 & Supp. V 1981) ............
83 U.S.C. § 1842(a) (1976 & Supp. V 1981) .....
$8 U.S.C. § 1842(a) (1) (1976) ........... ee
33 U.S.C. § 1842(b) (1976 & Supp. V 1981) .....
88 U.S.C. § 1842(b) (2) (1976) ..........
88 U.S.C. § 1842(c) (1) (Supp. V 1981) ............
88 U.S.C. § 1863(11) (1976) .......................000000
$3 U.S.C. § 1862(12) (1976) ....................cccec00
$3 U.S.C. § 1862(12) (A) (1976) ......................
33 U.S.C. § 1862(14) (Supp. V 1981) ................ 4,
Comprehensive Environmental Response, Compen-
sation, and Liability Act, 42 U.S.C. § 9604 (e) (1)
OG tee eee ee 19
Resource Conservation and Recovery Act, 42 U.S.C.
§ 6927(a) (1) (Supp. V 1981) ......................cec00 9
Se Rees ee CD ictacescisovenatececenesncinitseninnn 2
8
8
ee a
S
te tw)
ore &
BaBBS Sa
—
28 U.S.C. § 1291 (1976 & Supp. V 1981) ..................
28 U.S.C. § 1881 (Supp. V 1061) ............ccccrccssscccsesss
REGULATIONS:
40 C.F.R. § 122.44(i) (1983) .................... seintichpiation 28
40 C.F.R. § 122.44(i) (1) (iii) (1983) ..................... 28
40 C.F.R. § 122.45 (i) (2) (1988) .............ccecesecseneees 23
GO GPR. § BEB (RGB) cccreceesccrsczsscesseccscescsesecessessece 27
vi
TABLE OF AUTHORITIES—Continued
FEDERAL REGISTER:
47 Fed. Reg. 46434 (1982) ...............cccccscccsseeseseeeeeeees
MISCELLANEOUS:
The Environmental Policy Division of the Con-
gressional Research Service of the Library of
Congress, A Legislative History of the Water
Pollution Control Act Amendments of 1972
a a a ER ee ee
Rothstein, OSHA Inspections After Marshall v.
Barlow’s, Inc., 1979 Duke L.J. 68 .0000 nn.
Environment Reporter (BNA), 41 Federal Laws
Index 2451 (April 11, 1979) ........ccccccccccecceeeeee
19
IN THE
Supreme Court of the United States
OCTOBER TERM, 1983
No. 83-
MOBIL OIL CORPORATION,
. Petitioner,
UNITED STATES ENVIRONMENTAL PROTECTION AGENCY
and VALDUS ADAMKUS, REGIONAL ADMINISTRATOR,
REGION V,
UNITED STATES ENVIRONMENTAL PROTECTION AGENCY,
Respondents.
PETITION FOR A WRIT OF CERTIORARI TO THE
UNITED STATES COURT OF APPEALS
FOR THE SEVENTH CIRCUIT
Mobil Oil Corporation* respectfully petitions for a writ
of certiorari to review the opinion of the United States
Court of Appeals for the Seventh Circuit entered in this
proceeding on September 14, 1983.
OPINIONS BELOW
The opinion of the Court of Appeals in Mobil Oil Cor-
poration v. United States Environmental Protection
Agency is reported at 716 F.2d 1187 (7th Cir. 1983),
and is reproduced in the Appendix to this petition. App.
la. The final order and judgment of the district court
is reported at 18 Env’t Rep. Cas. (BNA) 2031 (N.D.
Ill. 1982), and is also reproduced in the Appendix to this
petition. App. 9a.
*A list of Mobil Oil Corporation’s parent, subsidiaries and
affiliates, as required by Rule 28.1 of the Rules of the Supreme
Court, follows the signature page of this petition. App. 1b.
2
JURISDICTION
The opinion of the Court of Appeals in this case was
entered on September 14, 1983. A petition for rehearing
and suggestion for rehearing en banc were denied on
November 8, 1983. This petition is being filed within the
time specified in Rule 20.2 of the Rules of the Supreme
Court and 28 U.S.C. § 2101(c) (1976).
CONSTITUTIONAL AND STATUTORY
PROVISIONS INVOLVED
The Fourth Amendment to the United States Consti-
tution provides:
The right of the people to be secure in their persons,
houses, papers, and effects, against unreasonable
searches and seizures, shall not be violated, and no
Warrants shall issue but upon probable cause, sup-
ported by Oath or affirmation, and particularly de-
scribing the place to be searched, and the persons or
things to be seized.
U.S. Const., amend. IV.
Section 308 of the Clean Water Act, 33 U.S.C. § 1318
(1976 & Supp. V 1981), provides in pertinent part:
(a) Whenever required to carry out the objective of
this chapter, including but not limited to (1)
developing or assisting in the development of
any effluent limitation, or other limitation, pro-
hibition, or effluent standard, pretreatment
standard or standard of performance under this
chapter; (2) determining whether any person
is in violation of such effluent limitation, or
other limitation, prohibition or effluent standard,
pretreatment standard, or standard of perform-
ance; (3) any requirement established under
this section; or (4) carrying out sections 1315,
1321, 1842, 1344 (relating to State permit pro-
grams), and 1364 of this title—
(A) The Administrator shall require the owner
or operator of any point source to (i) estab-
lish and maintain such records, (ii) make
such reports, (iii) install, use, and maintain
such monitoring equipment or methods (in-
cluding where appropriate, biological moni-
toring methods), (iv) sample such effluents
(in accordance with such methods, at such
locations, at such intervals, and in such
manner as the Administrator shall pre
scribe), and (v) provide such other infor-
mation as he may reasonably require; and
(B) The Administrator or his authorized rep-
resentative, upon presentation of his creden-
tials—
(i) shall have a right of entry to, upon,
or through any premises in which an
effluent source is located or in which
any records required to be maintained
under clause (A) of this subsection
are located, and
(ii) may at reasonable times have access to
and copy any records, inspect any
monitoring equipment or method re-
quired under clause (A), and sample
any effluents which the owner or
operator of such source is required to
sample under such clause.
33 U.S.C. §1318(a) (1976 & Supp. V 1981).
STATEMENT OF THE CASE
Petitioner Mobil Oil Corporation (Mobil) operates a
petroleum refinery near Joliet in Channahon Township,
Will County, Illinois. The Joliet refinery is among the
most modern facilities of its kind in the United States.
The refinery discharges treated wastewater into the
Des Plaines River pursuant to a National Pollutant Dis-
4
charge Elimination System (NPDES) permit issued by
the State of Illinois.' In addition to the compliance moni-
toring which Mobil is required to perform and report to
both EPA and the State of Illinois under the terms of
its NPDES permit, the State of Illinois has inspected
the Joliet refinery on an annual basis for compliance
with the Clean Water Act (CWA).? The refinery has
never been found to be in violation of any environmen-
tal law or regulation. In fact, in 1982, the Joliet re-
finery’s wastewater treatment plant won an award from
the State of Illinois for environmental excellence.
On April 28, 1982, three representatives from EPA’s
Region V office arrived at the Joliet refinery and re-
quested permission to take samples of the refinery’s dis-
charges at the sampling points specified in Mobil’s
NPDES permit.* Those points, which enable sampling
of Mobil’s wastewater after final treatment, are located
near the Des Plaines River and are separate from other
1 Under the Federal Water Pollution Control Act, as amended,
commonly known as the Clean Water Act (CWA or the Act), 33
U.S.C. § 1251 et seq. (1976 & Supp. 1981), individual “point
sources,” defined as “any discernible, confined and discrete convey-
ance... from which pollutants are or may be discharged,” 33 U.S.C.
§ 1262(14) (Supp. V 1981), must obtain a NPDES permit from the
Administrator of the Environmental! Protection Agency (EPA or
the Agency) or from states, such as Illinois, that have approved
permit programs. 33 U.S.C. § 1342(a), (b) (1976 & Supp. V 1981).
The NPDES permit in effect at the time the inspection in this case
took place was issued by the State of Illinois on December 11,
1980. That permit is set forth in the Appendix to this petition.
App. 15a. The Joliet refinery is currently operating under an
NPDES permit issued by the State of Illinois which became effec-
tive on February 9, 1983.
2 See, e.g., App. 4la.
* Mobil did not object to EPA’s sampling of the Joliet refinery’s
discharges at the sampling points specified in Mobil’s NPDES per-
mit. Mobil agrees that EPA has authority to sample at those points.
Thus, this case does not involve any attempt to prevent EPA from
determining whether Mobil was in compliance with the terms of its
NPDES permit. See text pp. 24, 25, infra.
5
parts of the refinery’s operations.* After the EPA rep-
resentatives obtained samples from these points, they
asked to sample wastewater streams and sludges before
final treatment at points which were located inside the
wastewater treatment area of the Joliet refinery.’ Those
points were not designated for sampling in Mobil’s
NPDES permit. EPA’s representatives did not explain
why the Joliet refinery had been chosen for internal
wastewater sampling, nor did they indicate the use to
which the data obtained from that sampling would be
put. Mobil denied the EPA representatives’ request to
take samples of its internal wastewater streams and
sludges because neither section 308 of the CWA nor its
NPDES permit required those streams to be sampled.
Four months later, on August 24, 1982, EPA made an
ex parte application to a federal magistrate for a war-
rant “to enter, inspect and photograph” Mobil’s refinery
and “to take samples of sludge and liquid influents and
effluents of the Mobil Oil Company facility . . . in ac-
cordance with Section 308 of the Clean Water Act, 33
U.S.C. § 1318.” * That provision states, in pertinent part,
that the Administrator or his authorized representative
* Mobil’s NPDES permit required it to sample process wastewater,
sanitary wastewater, non-contact cooling water and storm water “at
a point representative of discharge but prior to mixing with other
effluents.” App. 18a, 20a, 22a, 24a. Since a “discharge” occurs
under the CWA only upon “any addition of any pollutant to naviga-
ble waters from any point source,” 33 U.S.C. § 1862(12) (A) (1976),
the place at which samples “representative of discharge” are taken
is located near the Des Plaines River in order to allow monitoring
of each effluent stream after treatment but before mixing with
other effluent streams.
5 Specifically, the EPA inspectors requested permission to sample
wastewater streams that had not yet entered the aeration basin or
the treated water guard basin located inside the refinery, and
sludge, which is removed from wastewater and is never discharged,
that had not yet been subjected to heat treatment.
* App. 42a.
may “sample any effluents which the owner or operator
of such [point] source is required to sample” under
clause (A) of section 308(a). 33 U.S.C. § 1818(a) (B)
(ii) (1976)." Neither Mobil’s permit, nor EPA’s regula-
tions, required Mobil to perform internal wastewater
sampling.
EPA’s one-page application for a warrant was accom-
panied by affidavits executed by Basim J. Dihu, the EPA
Region V environmental engineer who had been refused
permission to conduct internal wastewater sampling at
the Joliet facility, and Jonathan Barney, another local
EPA employee.* The Dihu affidavit simply recited the
events leading up to Mobil’s refusal to permit EPA’s
representatives to sample internal wastewater streams
and sludges at the Joliet facility.* The Barney affidavit
stated that such sampling was “part of an ongoing ad-
ministrative program to monitor facilities that have some
potential for the discharge of toxic pollutants” and was
intended “to monitor compliance with existing NPDES
permit requirements.” ’® Mr. Barney’s reference to this
monitoring program, however, consisted only of his char-
acterization of it as “extended compliance sampling in-
spections for toxicants (known as CSI-Ts)” which were
designed “to check for compliance with existing effluent
limitations and other permit requirements, and to deter-
mine whether additional toxic pollutants are being dis-
charged that should be limited and otherwise addressed
in the next permit.” '' His affidavit did not describe or
™Clause (A) of section 308(a) authorizes the Administrator
to require the owner or operator of a point source to “sample such
effluents (in accordance with such methods, at such locations, at
such intervals, and in such manner as the Administrator shall pre-
scribe) ... .” 33 U.S.C. §1818(a) (A) (iv) (1976).
5 App. 43a.
* App. 46a.
1° App. 45a.
1 App. 48a-44a.
7
incorporate by reference the administrative plan on which
this alleged program was based. Nor did it articulate
reasons why Mobil’s refinery had been chosen for in-
spection under that program.”
On August 27, 1982, the magistrate issued the warrant
requested by EPA on the basis of his finding that “there
has been a sufficient showing that reasonable legislative
or administrative standards for conducting an inspection
and investigation have been satisfied... .”™
On Monday, August 30, 1982, EPA served the warrant
upon Mobil and began sampling internal wastewater
streams at the Joliet refinery. On the next day, Mobil
filed a motion to quash the warrant which argued, inter
alia, that EPA had failed to meet the standards for prob-
able cause established in Camara v. Municipal Court,
387 U.S. 523 (1967), and Marshall v. Barlow’s, 436 U.S.
307 (1978). On the same day, August 31, 1982, Mobil’s
motion to quash the warrant was denied. EPA’s sam-
pling of internal wastewater streams at the Joliet re-
finery continued until September 2, 1982.
On September 2, 1982, Mobil filed in the District Court
for the Northern District of Illinois an appeal from the
magistrate’s denial of its motion to quash the warrant,
and a complaint which sought injunctive relief against
12 Moreover, the affidavit failed to explain why, after a wait of
four months, the Agency felt compelled to seek an ex parte warrant
rather than to follow the procedures specified in section 309 of the
Clean Water Act which requires the issuance of an administrative
order or a district court action for injunctive relief in the event of
a failure to comply with section 308. 33 U.S.C. § 1819 (1976 & Supp.
V 1981).
‘8 App. 48a. The warrant authorized EPA to “sample and seize”
internal wastewater streams consisting of “combined effluent from
the east and west clarifiers of the activated sludge treatment sys-
tem,” “sludge prior to the heat treatment system,” and “influent to
the east and west aeration basin of the activiated [sic) sludge treat-
ment system (combined raw waste following east equalization basin)
-++” App. 49a.
8
further execution of the warrant and against EPA’s use
of data obtained from the internal wastewater sampling,
and which also requested a declaratory judgment and a
permanent injunction against further sampling at the
Joliet refinery. Jurisdiction of the district court was
invoked pursuant to 28 U.S.C. § 1331 (Supp. V. 1981).
After consolidating these actions, the district court, on
September 7, 1982, issued an order requiring EPA to
retain, and refrain from using for any purpose, the sam-
ples obtained pursuant to the warrant.
Before the district court, Mobil argued that EPA’s
sampling of internal wastewater streams exceeded the
scope of the Agency’s authority under section 308 of the
Clean Water Act and violated Mobil’s rights under the
Fourth Amendment. Rejecting these arguments, the dis-
trict court, on December 28, 1982, issued a final order
and judgment holding that inspection and sampling of
Mobil’s internal wastewater streams were authorized by
a valid warrant and by section 308 of the Act.* On the
same day, the district court granted Mobil’s motion for
a stay pending appeal for a period of twenty days.
On January 10, 1983, Mobil appealed the district
court’s decision to the United States Court of Appeals
for the Seventh Circuit, pursuant to 28 U.S.C. § 1291
(1976 & Supp. V 1981). On the next day, Mobil filed
a motion for stay pending appeal with the Court of Ap-
peals. That court, on January 17, 1983, issued an order
prohibiting EPA from using or transmitting the samples
obtained under the warrant, and from inspecting or sam-
pling Mobil’s wastewater streams in the future at points
other than those specified in the NPDES permit for the
Joliet refinery.
In its appeal to the Seventh Circuit, Mobil argued that
neither section 308 of the CWA nor the NPDES permit
issued for the Joliet refinery authorized EPA to sample
14 App. lla.
9
internal wastewater streams, and that such sampling
was an unreasonable search and seizure of Mobil’s prop-
erty in violation of the Fourth Amendment.” The Court
of Appeals, in an opinion issued on September 14, 1983,
rejected Mobil’s arguments.
Rather than testing the affidavits submitted by EPA
against the standards for demonstrating probable cause
set forth in Barlow’s, the Seventh Circuit engaged in a
balancing of what it viewed as the privacy interests of
Mobil against the government’s interest in sampling in-
ternal wastewater streams at Mobil’s refinery.’* It con-
cluded that Mobil had no interest in preventing internal
sampling of its facility other than “to keep the EPA in
the dark as much as possible about what pollutants are
present in the water it dumps into the Des Plaines River
and about how efficient its treatment processes are at
cleaning its waste water of pollutants.” '’ The Court of
Appeals also found that “[a]ny interest Mobil may have
in frustrating the EPA’s efforts to assess the efficiency
of its treatment processes and to detect trace amounts of
toxic pollutants in waste water it dumps into the Des
Plaines River is not entitled to protection.” ™
18 As noted above, note 3 supra, Mobil did not challenge EPA's
right to conduct discharge sampling at the points specified in Mobil’s
NPDES permit.
16716 F.2d 1190-91, App. 4a. The Court of Appeals in its
opinion never mentioned Camara, Barlow's or this Court’s other
decisions addressing the standards for obtaining ez parte search
warrants by administrative agencies. Indeed, the Seventh Circuit
never even mentioned its own decisions interpreting the probable
cause test set forth in those cases. See note 23, infra.
17716 F.2d at 1190, App. 5a. There was never any allegation by
EPA, or anyone else, during the entire course of this case that
Mobil wanted to “keep EPA in the dark” about its discharges into
the Des Plaines River or about the efficiency of its treatment
processes.
18 Jd., App. 6a.
10
One day after issuance of the Seventh Circuit’s deci-
sion, the Deputy Director of EPA’s Water Division sent
a memorandum to all of the Agency’s regional offices
interpreting that decision as conferring “very broad au-
thority” upon the Agency to sample internal wastewater
streams within an industrial facility.’
Mobil subsequently filed a petition for rehearing and
suggestion for rehearing en banc urging the full Seventh
Circuit to review the panel’s opinion. This petition was
denied on November 8, 1983.”
On November 15, 1983, Mobil petitioned the Court of
Appeals to stay the issuance of its mandate pending
Mobil’s application to this Court for a writ of certiorari.
Two days later, Chief Judge Cummings, author of the
opinion in this case, denied Mobil’s petition for stay of
the mandate “[b]ecause our opinion was clearly right.”
On November 23, 1983, Mobil filed with this Court an
application to stay the mandate of the Seventh Circuit
and to reinstitute the stay entered by that court on Janu-
ary 17, 1983 prohibiting EPA from using or transmitting
the samples obtained under the warrant and from inspect-
ing wastewater streams at points other than those spec-
ified in the NPDES permit. Justice Stevens, acting for
this Court, denied Mobil’s application on November 23,
1983.
REASONS FOR GRANTING CERTIORARI
Certiorari should be granted in this case because the
opinion of the Seventh Circuit directly conflicts with this
Court’s decisions in Marshall v. Barlow’s, 486 U.S. 307
(1978), and Camara v. Municipal Court, 387 U.S. 523
(1967), and with decisions of other circuit courts of ap-
peals which require either evidence of a violation or an
19 App. 5la.
2° App. 14a.
11
articulated administrative plan based on neutral criteria
before finding probable cause for a search and seizure by
an administrative agency. EPA clearly failed to satisfy
these requirements in obtaining the warrant at issue in
this case. However, instead of applying the standards set
forth in Barlow’s to the affidavits EPA submitted to
justify its sampling of Mobil’s internal wastewater
streams, the Seventh Circuit substituted its own “interest-
balancing” analysis in determining the legality of that
sampling. As a result, the Seventh Circuit has effectively
eliminated any requirement that EPA demonstrate prob-
able cause before it obtains warrants to search and seize
the property of those regulated under the Clean Water
Act.
Certiorari should also be granted because this case pre-
sents important questions of law that deserve this Court’s
attention. Thousands of industria] facilities are subject
to regulation under the Clean Water Act. The showing
required of EPA before it can engage in nonconsensual
inspections and sampling of those facilities is of great
concern to those subject to that Act as well as to those
who are subject to other federal environmental statutes.
Particularly as agency activity under those laws moves
into the enforcement stage, there is a compelling need for
this Court to provide more detailed guidance to the lower
courts in the application of the probable cause standards
of Barlow’s. In some instances, the lower courts have
scrupulously required full agency compliance with the
tests for probable cause established by this Court. Other
courts, however, such as the Seventh Circuit in this case,
have upheld the issuance of warrants to administrative
agencies on the basis of nothing more than conclusory,
self-serving affidavits that fail to articulate an adminis-
trative plan on which the desired search is based and fail
to explain how the particular facility is covered by that
plan. The lower courts should not be left free to create
their own interpretations of the Barlow’s standards.
Only a definitive statement from this Court regarding
12
the showing that is necessary to meet those standards
can ensure consistent and proper application of Barlow’s.
Finally, certiorari should be granted in this case of
first impression to correct the erroneous interpretations
by the district court and the Court of Appeals of EPA’s
authority under section 308 of the CWA. The breadth
of EPA’s authority under this section of the CWA is
clearly an important issue of federal law. Neither the
Act nor its legislative history provides any basis for the
sampling of internal wastewater streams carried out by
EPA in this case. Yet with the Seventh Circuit’s opinion
in hand, EPA can now claim probable cause for non-
consensual searches and seizures on the basis of its sup-
posed plenary authority to inspect and seize samples from
anywhere within a facility subject to the Act. That this
is not a hypothetical problem is demonstrated by the
rapidity with which EPA seized upon the Court of Ap-
peal’s decision as justification for a broad program of
internal wastewater sampling.
A. The Decision of the Court of Appeals Conflicts With
This Court’s Decisions in Camara and Barlow’s
This Court held in Camara and Barlow’s that nor-
mally, where consent is not given for a search or seizure
by an administrative agency, the Fourth Amendment
requires the agency to obtain a warrant before proceed-
ing. Camara, 387 U.S. at 528-29; Barlow’s, 436 U.S. at
312-13. The Court also articulated the standards for
demonstrating the probable cause necessary to obtain
such a warrant. Camara, 387 U.S. at 538; Barlow’s, 436
at 320-21.*" Recognizing its obligations under Barlow’s,
21 EPA has acknowledged that, with the possible exception of the
Federal Insecticide, Fungicide, and Rodenticide Act, a warrant is
required for inspections under each of the environmental statutes
administered by the Agency, including the Clean Water Act. Envi-
ronment Reporter (BNA), 41 Federal Laws Index 2451 (April 11.
1979). See also App. 54a.
13
EPA applied for and obtained an ex parte warrant to
perform internal wastewater stream sampling at Mobil’s
Joliet refinery. Yet in reviewing Mobil’s claim that EPA
had not demonstrated probable cause to support issuance
of that warrant, the Seventh Circuit did not examine
EPA’s action in light of the standards set forth in Bar-
low’s.~ Instead, EPA’s failure to demonstrate probable
cause for a warrant to sample Mobil’s internal waste-
water streams was blessed by the Seventh Circuit in an
opinion which effectively eliminates that requirement.
In determining the legality of a search or seizure con-
ducted by an administrative agency pursuant to a war-
rant, other circuit courts of appeals have uniformly tested
the validity of a warrant by the probable cause standards
established by this Court in Barlow’s.** In this case, how-
ever, the Seventh Circuit used its own “interest-balanc-
ing” analysis to determine whether Mobil had any Fourth
Amendment rights which the Court deemed worthy of
protection and whether EPA’s regulatory interest out-
weighed Mobil’s privacy interest. According to the Court
of Appeals, this “interest-balancing” analysis consisted of
identify[ing] what interest Mobil has in preventing
the EPA from sampling untreated waste water, what
22 The district court found that EPA’s inspection and sampling
were authorized by section 308 and consistent with the Fourth
Amendment. 18 Env’t Rep. Cases (BNA) at 3032, App. lla. How-
ever, it did not discuss the basis for these findings.
23 See, e.g., Donovan v. Wollaston Alloys, Inc., 695 F.2d 1 (1st
Cir. 1982); United States v. Mississippi Power & Light Co., 638
F.2d 899 (5th Cir.), cert. denied, 454 U.S. 892 (1981); Stoddard
Lumber Co. Inc. v. Marshall, 627 F.2d 984 (9th Cir. 1980).
Indeed, in the OSHA context, the Seventh Circuit itself has
recognized the applicability of the probable cause standards to
searches by administrative agencies. See Marshall v. Chromalloy
American Corp., 589 F.2d 1335 (7th Cir.), cert. denied, 444 U.S.
844 (1979); In Re Northwest Airlines, Inc., 587 F.2d 12 (7th
Cir. 1978).
14
interest the EPA has in getting those samples,
and... inquirfing] whether Congress somehow
balanced those interests when it enacted Section 308,
or if not, how Congress would likely have balanced
them had it undertaken to do so.*
The Seventh Circuit’s use of this novel analysis con-
flicts directly with the rule established by this Court in
Camara and Barlow’s, Those cases hold that, unless the
government can prove the application of one of the care-
fully defined exceptions to the warrant requirement,
searches of a commercial establishment without a valid
warrant are per se unreasonable and that the owner’s
privacy interest suffers regardless of his motivation for
forcing the government to obtain a warrant or the gov-
ernment’s purpose for the search or seizure of property.
Barlow’s, 436 U.S. at 312-13. If it is not reversed, the
Seventh Circuit’s decision will establish a standard for
testing the legality of searches and seizures of private
property under the Clean Water Act which conflicts di-
rectly with the prior holdings of this Court and other cir-
cuit courts of appeals.*
Had the Seventh Circuit tested EPA’s actions against
the standards set forth in Camara and Barlow’s, it would
have found that there was no probable cause to support
issuance of the warrant. For a warrant to be valid, an
agency has the burden of demonstrating probable cause.
24716 F.2d at 1189, App. 4a.
25 Moreover, as a means of resolving the intended limits of EPA’s
authority under section 308 of the CWA, the Court of Appeals’ “in-
terest-balancing”’ analysis does not comport with recognized tools of
statutory construction. It does not start with the language of the
statute, employ any of the canons of statutory construction, or con-
sider the legislative history of the provision at issue. Rather, it
hypothesizes the potential interests of each litigant and then seeks
to balance those interests through an analysis Congress never con-
templated, much less sanctioned.
15
Barlow’s, 436 U.S. at 320. In the context of a search
and seizure of property by an administrative agency,
probable cause may be based on either “specific evidence
of an existing violation” or on a showing that “reason-
able legislative or administrative standards for conduct-
ing an... inspection are satisfied with respect to a
particular [establishment].” Jd. at 320-21 (quoting
Camara, 387 U.S. at 538). There is no allegation in the
Barney or Dihu affidavits that Mobil was in violation of
the terms of its NPDES permit.* Nor has EPA con-
tended at any time in this litigation that any such facts
exist. Instead, this was a routine inspection and sam-
pling, for which probable cause can be established only if
EPA’s action was the result of a legislative or “adminis-
trative plan containing specific neutral criteria.” Bar-
low’s, 436 U.S. at 328.
To meet this latter test, EPA must, at a minimum,
satisfy two requirements. First, it must be seeking the
warrant pursuant to an administrative plan containing
neutral criteria which specify “the purpose, frequency,
scope, and manner”’ of conducting sampling. Michigan v.
Tyler, 436 U.S. 499, 507 (1978); Barlow’s, 436 U.S. at
323. Second, the Agency must show why the sampling
of Mobil’s facility fits the neutral criteria of the ad-
ministrative plan or program. Barlow’s, 436 U.S. at 320-
21, 323 n.20. Neither requirement was satisfied in this
case,
As the sole justification for obtaining a warrant, EPA
claimed that samples from Mobil’s treatment processes
and internal wastewater streams were necessary to deter-
mine whether Mobil was in compliance with the terms of
its permit and to determine whether “additional pol-
lutants are being discharged which should be limited .. .
in the next permits.”” The Agency claimed these actions
were being taken pursuant to a “CSI-T” program
for monitoring toxic pollutants. The Barney affidavit,
26 See App. 43a-47a.
16
however, failed to describe the specific toxic pollutants or
particular point source categories covered by the “CSI-T”
program or the method used to select facilities for inclu-
sion in it.27 Nor did the affidavit provide information
about the purpose, frequency, scope, and manner of con-
ducting sampling under the program. Finally, EPA
failed to explain why the Joliet refinery was chosen for
inspection under the CSI-T program when it was already
subjected to annual compliance inspections by the State
of Illinois and self-monitoring and reporting to the State
and EPA under the terms of its NPDES permit.”
Rather, EPA relied solely on the type of “bare assertion”
about the existence of this administrative program held
insufficient in Barlow's.”
In fact, it is clear that EPA’s sampling of Mobil’s in-
ternal wastewater streams was not consistent with or au-
thorized by an administrative plan based on neutral cri-
teria. In response to a Freedom of Information Act re-
27 Barlow's, 436 U.S. at 323 n.20. EPA's failure to provide any
meaningful program description in support of its request for a war-
rant stands in marked contrast to the detailed descriptions of OSHA
programs upheld by several courts of appeals. Donovan v. Wollaston
Alloys, Inc., 695 F.2d 1 (1st Cir. 1982) ; Stoddard Lumber Co., Inc.
v. Marshall, 627 F.2d 984 (9th Cir. 1980); Marshall v. Chromalloy
American Corp., 589 F.2d 1835 (7th Cir.), cert. denied, 444 U.S.
884 (1979). In each of these cases, the affidavits showed that the
Secretary of Labor had established an inspection program concen-
trating on a particular industry, the industry had been selected
based on data about injury rates contained in the Secretary’s files,
and the criteria for selection of the industry were directly related
to the Secretary's statutory responsibility for reducing workplace
hazards. Moreover, at least one circuit required a detailed descrip-
tion of the procedure for systematically selecting the target indus-
tries of an inspection in order to demonstrate the regularity of the
program. Wollaston, 695 F.2d at 3, 5.
28 See App. 20a-21a.
2° 486 U.S. 323 n.20. See In Re Northwest Airlines, Inc., 687 F.2d
12 (7th Cir. 1978). See also, Weyerhaeuser v. Marshall, 592 F.2d
873 (7th Cir. 1979).
17
quest, EPA has released documents which demonstrate
that (1) compliance sampling inspections or “ CSIs”
are for the purpose of determining compliance with
NPDES permit limitations and not for the gathering of
data to determine whether additional effluent limitations
should be imposed in an NPDES permit,” (2) during
compliance sampling inspections, samples are to be taken
at “the facility’s discharge and other NPDES permit-
designated monitoring points’,*' (3) when entry is being
sought for the purpose of gathering data to develop new
effluent limitations guidelines, EPA policy requires a
lengthy affidavit detailing the specifics of the administra-
tive program for which the data are being sought and
why the particular facility has been chosen for that pro-
gram,” and (4) that there is no administrative plan or
program based on neutral criteria for sampling internal
wastewater streams and processes at a facility to gather
data for case-by-case additional NPDES permit limita-
tions.
In short, EPA’s affidavits in support of its applica-
tion for a warrant in this case fall far short of meeting
the Barlow’s test for probable cause. By not only affirm-
ing the district court’s ruling but also by establishing an
erroneous new standard for reviewing EPA searches and
seizures under the CWA, the Seventh Circuit has made
the probable cause requirement of the Fourth Amendment
%* App. 86a-87a.
3) App. 93a.
*2 App. 57a, 77a-85a. Even if EPA had submitted such an affidavit
in support of its request for a warrant in this case, probable cause
would not have been established for an inspection and sampling of
internal wastewater streams and treatment facilities at the Joilet
refinery. To be valid, an administrative plan must be consistent
with the agency's statutory authority. Barlow's, 486 U.S. 8323. As
discussed below, see text pp. 21-27, infra, EPA has no authority
under section 308 of the CWA to engage in nonconsensual sampling
of Mobil’s internal wastewater streams.
18
virtually meaningless when applied to EPA warrant ap-
plications. In the future, magistrates will be asked sim-
ply to rubber-stamp EPA assertions of broad statutory
authority justifying seizures of private property. In or-
der to prevent such a result, this Court should correct the
Seventh Circuit’s error.
B. This Case Presents Important Questions of Law That
Deserve Attention By This Court
The constitutional and statutory issues presented by
this case deserve this Court’s prompt attention. The
Clean Water Act is one of the most significant environ-
mental statutes enacted during the past decade. Virtually
all of American industry is subject to its requirements.
Given the alacrity and expansiveness of EPA’s response
to the Seventh Circuit’s decision, the Agency clearly in-
tends to take full advantage of it. The memorandum
issued by EPA the day after the Seventh Circuit’s deci-
sion assumes the Agency has a carte blanche to engage in
inspection and internal sampling of facilities subject to
the CWA. If left undisturbed, the Seventh Circuit’s deci-
sion not only will result in searches and seizures that are
unauthorized by section 308, but also in warrants based
on Agency assertions of virtually unbridled discretion
under the Clean Water Act to inspect and seize private
property of America’s corporate citizens.
The march of intrusive agency sampling will not stop
with the Clean Water Act. It is reasonable to expect that
the authority claimed by EPA for in-plant sampling will
be extended to the other major enviromental statutes
implemented by that Agency. There is, for example, a
pronounced similarity between the sampling authority
granted by section 308 of the Clean Water Act and that
granted by section 114 of the Clean Air Act, 42 U.S.C.
§ 7414 (Supp. V 1981).* Where the statutory limitations
33 EPA has shown no hesitancy to stretch its inspection authority
under section 114 of the Clean Air Act to its full limits and
19
on sampling are less strict,** EPA will likely see no legal
restraint at all upon its seizure of in-plant samples.
Thus, the decision of the Seventh Circuit in this case
points the way for a repetitive series of unconstitutional
searches and seizures under many of the major environ-
mental statutes.
Because of the pervasiveness of the federal environ-
mental laws and the likelihood that EPA will engage in
the future in numerous inspections and sampling of fa-
cilities that are subject to their provisions, this Court
should provide clear guidance to the lower courts on the
application of Barlow’s probable cause requirement to
such inspections and sampling. For the most part, the
environmental statutes have now been implemented
through promulgation of substantive standards, and the
regulatory effort will naturally turn to the enforcement
of these standards through inspections and sampling of
regulated facilities. Without a clearer explanation of the
Barlow’s probable cause standard than this Court has
provided to date, the lower courts may acquiesce in in-
trusive and unjustified enforcement of this federal legis-
lation at the expense of the constitutional rights of those
subject to its reach.
The likelihood of such an occurrence is underscored by
the fact that the lower courts, in the OSHA context, have
demonstrated substantial variance in their application of
what has been termed the “extremely vague” standard
set forth in Barlow’s.* For example, the First and Ninth
Circuits have scrutinized warrant applications and sup-
beyond. Dow Chemical Co. v. EPA, 536 F. Supp. 1355 (E.D. Mich.
1982) (use of surreptitious aerial photography to probe internal
processes of chemical plant found unauthorized under section 114).
34 See Resource Conservation and Recovery Aci, 42 U.S.C.
§ 6927(a) (1) (Supp. V 1981); Comprehensive Environmental Re-
sponse, Compensation, and Liability of Act of 1980, 42 U.S.C.
§ 9604(e)(1)(B) (Supp. V 1981).
85 See Rothstein. OSHA Inspections After Marshall v. Barlow’s,
Inc., 1979 Duke L.J. 68, 90.
20
porting affidavits for detailed information on how tar-
get industries were selected for inspection under an ad-
ministrative plan, while the Third and Sixth Circuits
have not even looked to see whether there was an admin-
istrative plan or any specific neutral criteria but have
instead based their finding of probable cause solely on the
agency’s assertion that the premises had never been
searched before. Compare Donovan v. Wollaston Alloys,
Inc., 695 F.2d 1, 5 (1st Cir. 1982), and Stoddard Lumber
Co., Inc. v. Marshall, 627 F.2d 984, 988 (9th Cir. 1980),
with United States v. Prendergast, 585 F.2d 69, 70 (3d
Cir. 1978), and United States v. Voorhies, 663 F.2d 30,
33 (6th Cir. 1981), cert. denied, 456 U.S. 929 (1982) .*
Moreover, while the First and Ninth Circuits have relied
on conclusory assertions in assessing whether an agency
has adequately shown that a particular company meets
the criteria specified in a valid administrative plan, the
Eleventh and Seventh Circuits have required the agency
to demonstrate, based on specific facts about a particular
facility, that it satisfies each of the neutral criteria of
the administrative plan. Compare Wollaston, 695 F.2d at
6 and Stoddard Lumber, 627 F.2d at 988, with First Ala-
bama Bank of Montgomery v. Donovan, 692 F.2d 714,
716-17, 721-22 (11th Cir. 1982), and Jn Re Matter of
Northwest Airlines, 587 F.2d 12, 15 (7th Cir. 1978).
In sum, the conclusory nature of EPA’s affidavits and
the lower courts’ rubber-stamping of EPA’s warrant ap-
plication demonstrate the need for this Court to articulate
more clearly the probable cause requirement of Barlow’s
in order to prevent agencies in the future from obtaining
36 Despite their general agreement that an agency must be re-
quired to substantiate its decision to inspect certain industries, the
Ninth Circuit has relied upon statistical evidence establishing a
specific threshold for inclusion of a particular industry within an
administrative program, while the First Circuit has not. Compare
Stoddard Lumber, 627 F.2d at 988, with Wollaston, 695 F.2d at 6.
21
warrants predicated on self-serving but baseless asser-
tions such as those made by EPA in this case.
C. The Seventh Circuit’s Erroneous Interpretation of
Section 308 of the CWA Raises a Question of First
Impression And Substantial Federal Importance
It is axiomatic that EPA may only engage in inspec-
tions and sampling authorized by statute, and that the
scope and purposes of an administrative plan for such ac-
tivities must be consistent with the scope and purposes
of that authority. See Barlow’s, 436 U.S. at 323. In this
case, the Seventh Circuit upheld sampling of Mobil’s in-
ternal wastewater streams by EPA which clearly exceeded
the Agency’s statutory authority. By conferring virtu-
ally unbridled discretion upon EPA to inspect and seize
private property, the Court of Appeals has lowered the
threshold for EPA demonstrations of probable cause to a
level that all but eliminates that requirement.”
Any analysis of EPA’s authority to engage in internal
sampling of a facility must begin with the language of
the statute. EPA v. National Crushed Stone Ass’n, 449
U.S. 64, 73-74 (1980). Unlike the sampling authority
conferred upon EPA in some other environmental stat-
utes,** EPA’s authority under the Clean Water Act to in-
spect and sample wastewater streams at industrial facili-
ties is limited to those “efflwents which the owner or
operator of such source is required to sample.”* Al-
though the term “effluent” is not specifically defined in
37 If magistrates believe that EPA has virtually limitless author-
ity under section 308 to enter and sample the internal wastewater
streams of industrial dischargers as the Seventh Circuit has held,
they can be expected to provide little check on arbitrary EPA in-
spections in the future.
88 See note 34, supra.
8° 33 U.S.C. § 1818(a) (B) (ii) (1976) (emphasis added).
22
the CWA, the Act does define the term “effluent limita-
tion.” *° Read in conjunction with the definitions of
“point source” *' and “discharge of a pollutant,” *? an ef-
fluent limitation means a restriction upon the discharge
of pollutants from a discrete and confined conveyance to
navigable waters. To read the term “effluent” as used in
section 308 harmoniously with the remainder of the Act,
effluent must be defined as material which is discharged
from a discrete and confined conveyance to navigable
waters.**
4° Section 502(11) provides:
The term “effluent limitation” means any restriction estab-
lished by a State or the Administrator on quantities, rates, and
concentrations of chemical, physical, biological, and other con-
stituents which are discharged from point sources into naviga-
ble waters, the waters of the contiguous zone, or the ocean,
including schedules of compliance.
33 U.S.C. § 1362(11) (1976).
4! Section 502(14) provides:
The term “point source’ means any discernible, confined and
discrete conveyance, including but not limited to any pipe, ditch,
channel, tunnel, conduit, well, discrete fissure, container, roll-
ing stock, concentrated anima! feeding operation, or vessel or
other floating craft, from which pollutants are or may be dis-
charged. This term does not include return flows from irri-
gated agriculture.
83 U.S.C. § 1362(14) (Supp. V 1981).
«2 Section 502(12) provides:
The term “discharge of a pollutant” and the term “discharge
of pollutants” each means (A) any addition of any pollutant
to navigable waters from any point source, (B) any addition
of any pollutant to the waters of the contiguous zone or the
ocean from any point source other than a vessel or other float-
ing craft.
33 U.S.C. § 1862(12) (1976).
43 See The Environmental Policy Division of the Congressional Re-
search Service of the Library of Congress, A Legislative History
of the Water Pollution Control Act Amendments of 1972, at 800-01,
1274, 1304, 1494-95 (1973).
28
Moreover, even if the term “effluents” contained in sec-
tion 308(a)(B) (ii) can be read to encompass, in limited
circumstances, internal wastewater streams, the addi-
tional restriction contained in section 308(a) (B) (ii)
makes plain that EPA had no authority to engage in such
sampling here. Under that section, EPA is empowered to
sample only those effluents “the owner or operator is re-
quired to sample.” itut Mobil has never been “required”
to sample its internal wastewater streams. EPA has not
acted pursuant to section 308(a) (A) to prescribe by rule
internal sampling for point sources such as Mobil’s petro-
leum refinery.** Moreover, the Illinois NPDES program,
4 Section 308(a) (A) provides:
(A) the Administrator shal] require the owner or operator of
any point source to... (iii) install, use and maintain such
monitoring equipment or methods (including where appropri-
ate, biological monitoring methods), (iv) sample such effluents
(in accordance with such methods, at such locations, at such
intervals, and in such manner as the Administrator shall pre-
scribe), and (v) provide such other information as he may
reasonably require.
33 U.S.C. § 1818(a) (A) (1976).
EPA has promulgated regulations to implement this statutory
authority at 40 C.F.R. § 122.44(i) (1983). Under these regulations,
sampling of internal wastewater streams is only required of an
owner or operator if an effluent limitation is imposed on an internal
wastewater stream, 40 C.F.R. § 122.44(i) (1) (iii) (1983), and such
an effluent limitation can only be imposed under certain specified
“exceptional circumstances.” 40 C.F.R. § 122.45(i)(2) (1983).
Mobil’s permit does not contain any limitations on internal waste-
water streams, and thus the Agency is without authority under the
CWA or its implementing regulations to sample Mobil’s internal
wastewater streams.
In fact, EPA's authority to impose any restrictions at all on in-
ternal wastewater streams is not settled. Because the imposition
of effluent limitations on internal wastewater streams conflicts with
the statutory definition in section 502(11) of the CWA, EPA’s au-
thority to provide for even the limited exception set forth in 40
C.F.R. § 122.45(i) (2) was challenged in a consolidated action en-
titled Natural Resources Defense Council, Inc. v. EPA, No. 80-1607,
in the United States Court of Appeals for the District of Columbia
24
which has been approved by EPA as satisfying the sam-
pling requirements of section 308,*° does not provide for
internal wastewater stream sampling. As a consequence,
Illinois issued an NPDES permit to Mobil, without objec-
tion from EPA, which only required sampling “at a point
representative of discharge.” That point occurs only after
all treatment of Mobil’s wastewater has been completed.*
Thus, the plain meaning of section 308, read in conjunc-
tion with both EPA’s and Illinois’ implementation of the
Act, limits EPA’s sampling at Mobil’s refinery to points
representative of discharge subsequent to all treatment
activities. And this reading of section 308 provides EPA
and the states ample ability to ensure compliance by
dischargers with the terms of their NPDES permits. As
a result, EPA’s attempt to sample wastewater streams
and sludges before final treatment at points which were
located inside the wastewater treatment portions of the
Joliet refinery clearly exceeded the Agency’s statutory
authority.
Moreover, the sampling of internal wastewater streams
and sludges at Mobil’s refinery did not serve any of the
purposes set forth in section 308 and recited in the
Barney affidavit. The Barney affidavit attempts to justify
the seizure of internal wastewater stream samples from
Mobil’s refinery by claiming the sampling data was neces-
sary to determine compliance with permit terms and to
ascertain whether additional discharge limitations should
Circuit. Mobil was one of the many petitioners in that proceeding
in which over fifty issues were raised. EPA, however, chose not to
litigate this issue, among others, and a stipulation was entered
stating that the issue was not ripe for litigation at that time and
would be reserved for litigation at some later date.
45 Before the Illinois program could have been approved, the Ad-
ministrator of EPA was required to determine that the program
contained adequate authority to ensure compliance with all applica-
ble requirements of section 308. 83 U.S.C. 1342(b) (2) (1976).
46 See text pp. 4-5 & note 4, supra.
25
be incorporated into Mobil’s NPDES permit. In fact,
however, it is clear that EPA can determine, and indeed
in the past has determined, whether Mobil is in com-
pliance with its NPDES permit by sampling Mobil’s dis-
charges at the points specified jn that permit. It is
equally clear that EPA could not use the data it obtained
by sampling Mobil’s internal wastewater streams to write
new permit limits for the Joliet refinery or other petro-
leum refineries.
As discussed above, Mobil’s permit requires it to sam-
ple its wastewater streams at points representative of
their discharge to navigable waters. The Illinois Envi-
ronmental Protection Agency, which issued Mobil’s
NPDES permit and has primary enforcement responsi-
bility to monitor compliance with that permit’s terms,
also samples for compliance at those points. Based on
its own sampling of the Joliet refinery, Illinois has con-
sistently found Mobil’s discharges to be in conformance
with its permit.*? And Illinois has never found it neces-
sary to sample Mobil’s internal wastewater streams to
determine the facility’s compliance status. Nor has EPA
ever found such sampling necessary to determine com-
pliance until the incident which is the subject of this
ease.** Against this background, it is clear that the first
justification advanced by Mr. Barney in his affidavit was
totally without basis.
Similarly, there is no basis for Mr. Barney’s claim
that the internal wastewater stream data were needed
‘7 Tllinois sampled Mobil’s discharges at the points specified in
Mobil’s permit during the April 1982 inspection at which EPA was
denied permission to sample Mobil’s internal wastewater streams.
Based on its sampling, the State determined that Mobil was in full
compliance with the terms of its permit. App. 4la.
48 Indeed, EPA’s own documents demonstrate that compliance
inspection sampling is to be performed “at the facility’s discharge
and other NPDES permit-designated monitoring points.” App. 93a.
26
for the purpose of developing additional effluent limita-
tions for Mobil’s permit. EPA can impose technology
based limits in NPDES permits only if they are required
by existing effluent limitations guidelines regulations,‘
or if they are developed pursuant to the Agency’s as-
serted authority to establish case-by-case limits under
section 402(a)(1) of the CWA. EPA’s nationally ap-
plicable BAT limitations and new source standards for
the petroleum refinery point source category, which were
promulgated on October 18, 1982,’ had already been
proposed and the rulemaking record closed substantially
before EPA’s internal sampling of the Joliet refinery
took place."* Thus the data obtained by EPA from Mobil
could not be used for that rulemaking proceeding.
49 Among other things, NPDES permits require point sources to
comply with the applicable effluent limitations or new source per-
formance standards established by rule under sections 301 and 306
of the Act, 33 U.S.C. §§ 1311, 13816 (1976 & Supp. V 1981), for cate-
gories of similar point sources. 33 U.S.C. § 1342(a)(1) (1976).
See EPA v. National Crushed Stone Ass’n, 449 U.S. 64, 71 (1980);
E.I. duPont de Nemours & Co. v. Train, 430 U.S. 112, 121 (1977).
Effluent limitations promulgated under section 301(b) must require
the application of the best practicable control technology currently
available by July 1, 1977, and the application of the best available
technology economically achievable (BAT) by July 1, 1983, 33
U.S.C. §1811(b) (1976 & Supp. V 1981), while those promulgated
under section 306 require new sources to comply with best available
demonstrated control technology at the time they commence dis-
charging. 33 U.S.C. § 1816(a) (1) (1976).
5° Section 402(a)(1) of the CWA authorizes inclusion in an
NPDES permit of “such conditions as the Administrator deter-
mines are necessary to carry out the provisions of this chapter,” but
only when the Administrator retains the authority to issue NPDES
permits and does not delegate that power to the state. 33 U.S.C.
§ 13842(a) (1) (1976).
51 47 Fed. Reg. 46434 (1982).
52 EPA gave no indication during the course of its effluent guide-
lines rulemaking for the oil refinery industry that it was sampling
Mobil’s facility for the purpose of obtaining data for use in that
proceeding.
27
Moreover, since it is Illinois, not EPA, which issued
Mobil’s permit, EPA had no authority under section
402(a) (1) of the Act to impose additional limitations in
that permit. EPA claims limited authority in its regu-
lations to establish case-by-case effluent limitations for
pollutants that are not controlled under applicable efflu-
ent limitations guidelines regulations.*’ However, by its
terms, this regulation allows EPA to establish such limi-
tations only in federally issued permits.** Thus, neither
of the purposes alleged by Mr. Barney justified the sam-
pling of internal wastewater streams at Mobil’s refinery.
It is, therefore, clear that EPA had no authority un-
der section 308 to engage in sampling of Mobil’s internal
wastewater streams. Since the Agency had no statutory
authority to engage in such sampling, there could have
been no probable cause for issuance of the warrant in
this case.
58 See 40 C.F.R. § 125.3 (1983).
4 Td.
28
CONCLUSION
For the reasons set forth above, the petition for a writ
of certiorari to review the opinion of the United States
Court of Appeals for the Seventh Circuit entered in this
proceeding on September 14, 1983 should be granted.
Of Counsel
DAVID EDWARD NOVITSKI
Mobil Oil Corporation
3225 Gallows Road
Fairfax, Virginia 22037
SUSAN R. CSIA
ARTHUR G. HOFMANN
Mobil Oil Corporation
600 Woodfield Drive
Schaumburg, Illinois 60196
THOMAS D. ALLEN
WILDMAN, HARROLD, ALLEN
& DIXON
One IBM Plaza
Chicago, Illinois 60611
February 6, 1984
Respectfully submitted,
JOHN J. ADAMS
MICHAEL B. BARR
(Counsel of Record)
MARK G. WEISSHAAR
CHARLES D. OSSOLA
HUNTON & WILLIAMS
P.O. Box 19230
2000 Pennsylvania Ave., N.W.
Washington, D.C. 20036
202/955-1500
Counsel for Petitioner
Mobil Oil Corporation
lb
CORPORATE LISTING
Mobil Oil Corporation is a wholly owned subsidiary of
Mobil Corporation which is publicly held. Listed below
are the affiliates and subsidiaries of Mobil Corporation,
Mobil Oil Corporation, and their affiliates and subsidiaries
which are or may be publicly held. Only companies in
which a five percent (5% )or greater interest is held are
listed.
NAME OF COMPANY
AB Djurgardsberg
Abu Dhabi Petroleum Company Limited
Adria-Wien Pipeline Gesellschaft m.b.H.
AIMCO (ALPHA) Shipping Company
AIMCO (Blasbjerg) Limited
AIMCO (OMEGA) Shipping Company Ltd.
Aircraft Fuel Supply B.V.
Airtankdienst Koln
AK Chemie GmbH
AK Chemie GmbH & Co. KG
Akauma Rekisei Kogyo Kabushiki Kaisha
Alexandroupolis Petroleum Installation S.A.
Allied Asphalts Limited
Alpa Alet Ve Dayanikli Tuketim Mamulleri Pazarlama
AS.
Altona Petrochemical Company Limited
Alyeska Pipeline Service Company
Ankara Gaz Satis Anonim Sirketi
Arabian American Oil Company
Arabian International Maritime Company Limited
Arabian International Maritime Company
The Arabian Petroleum Supply Company (S.A.)
Arabian Shipping & Trading Company S.A.
Arabian Trading Company S.A.
Aral Aktiengesellschaft
A/S Fijelivegen
A/S Kongena Plass I
2b
A/S Moretral
Ammenn GmbH
The Associated Octel Company Limited
Associated Octel Company (Plant) Limited
ATAS-Anadolu Tasfiyehanesi Anonim Sirketi
Atlas Sahara S.A.
Australian Synthetic Rubber Company Limited
Autobahn-Betriebe Gesellschaft m.b.H.
Aviation Fuel Services Limited
Aygaz Anonim Sirketi
B.V. Beheersmaatschappij MOBEM
Baarah Petroleum Company Limited
Bataan Refining Corporation
Bayerischa Erdgasleitung GmbH
Bin Sulaiman Mobil Towers
Bayerische Mineral Industrie A.G.
Bostadsrattsforeningen Basunan, Malmo
Bostadsrattsforeningen Forarsetet, Orby
Bostadsrattsforeningen Silverskatten, Trelleborg
Bostadsrattsforeningen Skepparegarden, Norrkoping
Braamkey Investments (Proprietary) Limited
Brazos Heights Housing Incorporated
Brussels Airfuels Service S.C.
Buffalo River Improvement Corporation
Canner’s Stem Company, Incorporated
Cansulex Limited
Canyon Reef Carriers, Inc.
Cartoenvases Valencia, S.A.
Carton de Colombia, S.A.
Carton de Venezuela, S.A.
Cartones Nationales, S.A.
Celmisia Shipping Corporation
Celulosa y Papel de Colombia, S.A.
Central African Petroleum Refineries (Pvt) Limited
Central Kagaku Kabushiki Kaisha
Cercera S.A.
Changi Airport Fuel Hydrant Installation Pte. Ltd.
Chuo Nenryo Gas Kabushiki Kaisha
3b
Colombianos Distribuidores de Combustibles, S.A.
(CODI)
Colonial Pipeline Company
Combustibles Colmerauer
Comet-Brennstoffdienst GmbH
Commodore Maritime Company, S.A.
Compagnie Africaine de Transport Cameroun
Compaignie D’FEntreposage Communautaire
Compagnie Immobiliera (Comimmo)
Compagnie Regionale de Distribution de Produits
Petroliers-C.0.R.E. Dis.
Compagnie Rhenane de Raffinage
Compagnie Senegalaise des Lubrifiants (C.S.L.)
Compania Colombiana de Empaques Bates, SSA
Compania Colombiana De Forestacion S.A.
Compania de Lubricants de Chile Limitada
(Copec-Mobil Ltda.)
Compania Mexicana de Especialidades Industriales, S.A.,
de C.V.
Consortium Raymond Duez
Constructura Calle 67, Limitada
Constructora Calle 70, S.A.
Cook Inlet Pipe Line Company
CORCOP
Corrugadora de Carton, S.A.
C.R.C. Lyon Chauffage
CRCP
Cyprus Petroleum Refinery Limited
D. Muhlenbruch GmbH
D. Muhlenbruch GmbH & Co., KG
Dai Nippon Juski K.K.
Dearborn Land Company
De. Ha.—Industria Petrolifero
Depot Petrolier de Mourepiane
Depot Petrolier du Gresivaudan
Depot de Petrole Cotiers
Depots Petroliers de La Corse (DPLC)
Duetche Mobil Oil Exploration Ireland Ltd.
Deutsche Pentosin- Werke GmbH
4b
Deutsche Transalpine Oelleitung GmbH
Dicomi S8.r.].
Dixie Pipeline Company
Drivmedelscentralen AB
Dukhan Services Company
East Japan Oil Development Company Ltd.
Eastern Lease Company Ltd.
East Texas Salt Water Disposal Company
Emoleum (Asphalts) Limited
Entrepot Petrolier de Chambery
Entrepot Petrolier de Dijon
Entrepot Petrolier de Mulhouse (E.P.M.)
Entrepot Petrolier de Nancy
Entreprise Jean Lefebvre
Erdgas-Varkaufs-Gesellschaft mbH
Erdoel-Lagergesellschaft mbH
Erdoel-Raffinerie Neustradt GmbH & Co., oHG
Erdoelbetrieb Reitbrook
Erdoelraffinerie Gesellschaft mbH in Liquidation
Establissements Bouthenet
Establissements Nicol and Cie
Ets. Le Goff
Ets. R. Saillard
Establissements Wagner
Faavang Autoverksted A/S
FACEL
Fairwind Maritime Company, S.A.
Felix Oil Company
Fibil, S.A.
Fibras Internacionales de Puerto Rico, Inc.
Filtroleo-Soviedade Portuguesa de Filtres Ida.
Filtroes De Costa Rica S.A.
Finsbury Printing Limited
First Eastleigh No. 163 (Proprietary) Limited
Fountain Garage (East Park) Ltd.
Fountain Garage (Meadowhead) Ltd.
Fountain Garage (Mercury) Ltd.
5b
Fountain Garage (Newbury Park) Ltd.
Fountain Garage (Stirchley) Ltd.
Frome-Broken Hill Company Proprietary Limited
Fruehmesser Mineraloelhandels GmbH & Co. KG
Fruehmesser GmbH
Guso Operations Kabushiki Kaisha
Futuro Enterprises (Christchurch) Ltd.
Futuro Homes (N.Z.) Ltd.
Gaz Aletleri Anonim Sirketi
Geomines-Caen
Geovexin
Ghana Bunkering Services Limited
Goteborge Banslesortering AB
Groupement Immobilier Petrolier G.I.P.
Groupement Petrolier Aviation G.P.A.
Groupement Petrolier De Breat (GPB)
Handelmaatschappij Hugenholtz & Co. B.V.
H. van der Heijden Service Stations B.V.
Heizoel-Handelsgesellschaft mbH
Hallas Gas Storage Company S.A.
Home Counties Petroleum Products Limited
Hormez Petroleum Company
Hydranten-Betriebs-Gasellschaft, Flughafen Frankfurt
Imperial Gas Co. of P.R., Inc.
Inmunizadoras Unidas, S.A.
Industria Da Carbon Del Valle Cauca, S.A.
Iranian Oil Participants Limited
Iranian Oil Services (Holdings) Limited
Iranian Oil Services Limited
Iraq Petroleum Company, Limited
Iraq Petroleum Pensions Limited
Iraq Petroleum Transport Company Limited
Istanbul Petrol ve Makine Yaglari Limited Sirkati
Japan Airport Fueling Service Co. Limited
Japan Solar Energy Co., Ltd.
J.E.C.0.P.
K. D. Keysers Investments (Proprietary) Limited
K.K. Sankyo Plastics
6b
K.K. Toresen
Kanto Kygnus Sekiyu Hambai K.K.
Kanto Oil Pipeline Co., Ltd.
Kawasaki Kygnus Sekiyu Sambai Kabushiki Kaisha
Keihin Kygnus Sekiyu Hambai Kabushiki Kaisha
Kaiyo Sea-Berth Company, Ltd.
Kettleman North Dome Association
Klaus Koehn GmbH
Klaus Koehn GmbH & Co. Mineraloel KG
Koba Port Service Kabushiki Kaisha
Kurt Ammenn GmbH & Co. K.G.
Kygnus Ekika Gas Kabushiki Kaisha
Kygnus Kosan Kabushiki Kaisha
Kygnus Sakiyu Kabushiki Kaisha
Kyokyto Petroleum Overseas, Ltd.
Kyokyto Sekiyu Kogyo Kabushiki Kaisha
Las Nouveaux Comptoirs Petroliers
Les Supermarches De Cote D’Ivoire
Likit Petrol Gazi ve Yakit Ticaret A.S.
Loba Chemie Gesellschaft mbh
Lubricantes del Sur, S.A.
Marceaux & Cie
Matco Tankers (U.K.) Limited
Maury Manufacturing Company, Inc.
Mediterranean Refining Company
Meentzen & Franke GmbH & Co.
Mobil Ami, S.A.
‘Mobil Atlas Sociedad Anonima de Capital Variable
Mobil Chemie Belgie N.V. (Mobil Chimie Belge S.A.)
Mobil Comercio, Industria & Services Ltda.
Mobil Gaz-Mobil Petrol Gazlari Anonim Sirketi
Mobil Korea Lube Oil Industries Inc.
Mobil Motor Rest AG
Mobil Nile Oil Company
Mobil Oil Cameroun
Mobil Oil Cote d-Ivoire
Mobil Oil Dahomey
Mobil Oil de Mexico, Sociedad Anonima
7b
Mobil Oil Djibouti, S.A.
Mobil Oil Francaise
Mobil Oil Gabon
Mobil Oil Ghana Limited
Mobil Oil Haute Volta
Mobil Oil Holdings, S.A.
Mobil Oil Mali
Mobil Oil Maroc
Mobil Oil Mauritania
Mobil Oil Niger
Mobil Oil Nigeria Limited
Mobil Oil Nord-Africaine
Mobil Oil Phillippines Inc.
Mobil Oil Portuguesa, S.A.R.L.
Mobil Oil Rwanda-Burundi (S.A.R.L.)
Mobil Oil Senegal
Mobil Oil Tchad
Mobil Oil Togo
Mobilrex
Mobil Tunisie
Molinos de Carton y Papel, S.A.
Morem
Mosul Petroleum Company Limited
Motel Rest SA
Mt. Marrow Blue Metal Quarries Pty.
Ndola Oil Storage Company Limited
Near East Development Corporation
New Zealand Refining Company Limited, The
New Zealand Synthetic Fuels Corp. Ltd.
New Zealand Synthetic Fuels (Housing) Corporation
Limited
Nichimo Oil (Bermuda) Co., Ltd.
Nichimo Sekiyu Seisei Kabushiki Kaisha
Nippon Unicar Company Limited
Norddeutsche Erdgas-Aufbereitungs GmbH
Nordic Storage Company Ltd.
Nottingham Gas Limited
N.V. Rotterdam-Rijn Pijpleiding Maatschappij
8b
N.V. Socony-Standard-Vacuum Oil Company
Occidental de Empaques, Ltda.
Octel Associates
Oil Kol (Proprietary) Limited
Oil Service Company of Iran (Private Company)
Oldenburgische Erdoel Gesellschaft mit beschrankter
Haftung
Olympic Pipe Line Company
Osage Pipe Line Company
P.T. Arun Natural Gas Liquefaction Company
P.T. Stanvac Indonesia
Paloma Pipe Line Company
Pars Investment Corporation
Pembalta Gas System No. 1 Ltd.
Pembalta Gas System No. 3 Ltd.
Pembalta Gas System No. 4 Ltd.
Pembalta Gas System No. 5 Ltd.
Pembalta Gas System No. 6 Ltd.
Perretti Petroli S.p.A.
Petrocab
Petrogas Processing Ltd.
Petroleum Development (Cyprus) Limited
Petroleum Refineries (Australia) Proprietary Limited
Petroleum Services (Middle East) Limited
Petroleum Tankship Company Inc.
Petromin Lubricating Oi] Company
Petromin-Mobil Yanbu Refinery Company Ltd.
Pip Line Banal de La Goulette
Flagadizos para la Industria S.A.
Poly Oil Chimie (P.O.C.)
Prespak (Proprietary) Limited
Qatar Petroleum Company Limited
Qualbank, Inc.
Rainbow Pipe Line Company, Ltd.
Randhurst Corporation
Reforestadora Andina, S.A.
Reforestadora del Cauca, S.A.
Rhodes Petroleum Installation S.A.
9b
Rivere Court Estates, Limited
Rohel-Aufsuchunga Gasellschaft mbH
Ruhrgas Aktiengesellschaft
S&M Pipeline Limited
S. A. Ets. Georga DUBOIS
S. A. Mas & Cie
S.A.M. Lebreton
Samarco (Alpha) Shipping Company
Samarco (Beta) Shipping Company
Sanwa Kasei Kogyo Kabuskiki Kaisha
SARL Garage Pineau
Sarni S.p.A.
Saudi Arabian Maritime Company
Saudi Can Company, Ltd., The
Saudi Chemical Industries Company Limited
Saudi Maritime Company Ltd.
Saudi Tankers Limited
Saudi Yanbu Petrochemical Company
Schubert Kommanditgesellschaft
S.C.I. Du Fonds Du Val
Segher de Mexico, S.A. de C.V.
Seibu Kygous Sekiyu Hambai Kabushiki Kaisha
SENERCO
Seram Societa per Azioni (S.p.A.)
Sierra Leone Petroleum Refining Company Limited, The
R. Simonnet & CIR
Societdade Portugal Marrocos SARL
Societa Iatliana per l’Oleodette Transalpino, S.p.A.
Societe Africaine de Raffinage
Societe Agicole Des Entreprises Petroliares (S.A.D.E.P.)
Societe Alfred Ott & Cie
Societe Belge de Transport par Pipeline S.A.
Societe Camerounaise des Depots Petroliers (S.C.D.P.)
Societe Camerounaise Equatoriala De Fabrication De
Lubrifiants “S.C.E.F.L.”
Societe Civile de Mustapha
Societa Civile Immobiliere Courselles-Etoile
10b
Societe Civile Immobiliere de Construction de 34 Avenue
de General Leclerc a Boisay-St-Leger
Societe Civile Immobiliere de Construction ‘‘La Residence
Brune”
Societe Civile Immobiliere de 10 Bd. de la Republique A
La Garenne-Colombes
Societe Civile Immobiliere Klaber-Etoile
Societa Civile Immobiliere La Fontaine Sait Lucien
Societe Civile Immobiliere Mobil
Societe Dahomeenne d’Entraposage de Produits Petroliers
Societe d’Armement Fluvial et Maritime “SOFLUMAR”
Societe de Construction & de Gastion CB 12
Societe de Distribution Gastelroussine (SODICA)
Societe de Gaz D’Oceanic ‘SOGADOC)
Societe de Manutention de Carburants Aviation
(S.M.C.A.)
Societe de Manutention de Carburants Aviation
Dakar-Yoff
Societe de Manutention de Carburants Aviation de Tahiti
(SOMCAT)
Societe de Maperialx d’Etancheite Pour Le Entreprises
(Maple)
Societe d’Entreposage de Bobo-Dioulasso (S.E.B.)
Societe d’Entreposage d’Hydrocarbures de Bingo
(SEHBI)
Societe d’Entreposage de San Pedro (SESP)
Societe d’Entreposage Petrolier au Burundi
Societe de Renovation D’Embaliage Metalliques (REM)
Societe d’Habitations a Loyer Modere de al Seine
Maritime
Societe des Bitumes at Cut-Backs du Cameroun
Societe des Establissements Goux
Societe Des Huiles Lemahieu
Societe de Pipe-Line Sud-European
Societe Francaise Stoner-Mudge
Societe Gabonaise d’Entreposage de Produits Petroliers
Societe Gobanaise‘de Raffinage
11b
Societe Industrielle des Asphaltes at Petroles de Lataquie
(Syria) S.A.
Societe Jean Roussel S.A.
Societe Ivoirienne de Fabrication de Lubrifiante
(S.L.F.A.L.)
Societe Ivoirienne de Raffinage
Societe Mauritanienne d’Entreposage de Produits
Petroliers
Societe Nationale de Raffinage (Sonara)
Societe Nouvelle Raffinerie Meridionale De Ceresines
(RMC)
Societe Novodis
Societe Pizo De Formulation De Lubrifiants (PIZOLUB)
Societe Regionale De Produits Petroliers
Societe Regionale de Produits Energetiques
Societe Rahitienne de Depota Petroliers
Societe Tchadienne D’Entreposage de Produits Petroliers
Societe Togolaise d’Entreposage (STE)
SOMODIP
Sonarep (South Africa) (Proprietary) Limited
SONEX
South African Oil Refinery (Proprietary) Limited
South Saskatchewan Pipe Line Company
South West Africa Road Binders (Proprietary) Limited
Statfjord Transport A.S.
Station-Service Lunas
Sydney Metropolitan Pipeline Pty. Ltd.
Syria Petroleum Company Limited
T.R. Miller Mill Company, Inc.
Tanklagergeselischaft Koln-Bonn
Tecklenburg GmbH
Tecklenburg GmbH & Co. Energiebedarf K.G.
Texoma Pipe Line Company
Thailand Lubricant Products, Limited
Thailand Solvent Products, Ltd.
Thums Long Beach Company
Toa Manryo Kogyo Kabushiki Kaisha
Tohko Plastics Co., Ltd.
12b
Tonen Energy International Corp.
Tonen Sekiyu Kagaku Kabushiki Kaisha
Tonen Kanker Kabushiki Kaisha
Tonen Technology Kabushiki Kaisha
Total Centrafricaine de Gestion (TOCAGES)
Toulouse-Distribution Produits Petroliers
Toyoshina Film Co., Ltd.
Tradewind Film Co., Ltd.
Tradewind Maritime Co., S.A.
Transalpine Finance Holdings S.A.
Transalpine Oelleitung in Ooesterreich Gessellschaft
m.b.H.
Trans-Arabian Pipe Line Company
Transgas Umachlege-Lager-Und Transport Gesellschaft
MbH
Turkish Petroleum Company Limited
Twifo Oil Plantations Ltd.
UBAG Unterflur Betankungsanlega Flughafan Zurich
Union Grafica, S.A.
United Kingdom Oil Pipelines Limited
W.A.G. Pipeline Pry. Ltd.
Wako Kasei Kabushiki Kaisha
Wakohjushi Kabushiki Kaisha
Walton, Gatwick Pipeline Company Limited
Werner Weidemann Mineraloelvertich G.m.b.H.
West Shore Pipe Line Company
Wolverina Pipe Line Company
WSG, Warmeservice Gmbh
Wyco Pipe Line Company
Zaire Mobil Oil
Zaire Services Des Entreprises Petrolieras
This is a copy of a public record, reproduced as it was published. It is not legal advice, and it may not be the version a court would rely on. Check the official source before you cite it.