Petition — Tennessee Water Quality Control Board v. Tennessee Valley Authority
Supreme Court brief1984
Ask Donna
What actually matters in this document.
Text
In THE
Supreme Court of the Bnited States
Octoser Term, 1983
TENNESSEE WATER QuALiTy ConTROL Boarp,
EuGENE FowINKLE, COMMISSIONER, TENNESSEE
DEPARTMENT OF Pusiic HEALTH,
Petitioners,
vs.
Unrrep States Or AMERICA, Ex REL.
TENNESSEE VALLEY AUTHORITY AND
TENNESSEE VALLEY AUTHORITY,
Respondents.
PETITION FOR A WRIT OF CERTIORARI
TO THE UNITED STATES COURT OF APPEALS
FOR THE SIXTH CIRCUIT
WiiuiaM M. Lzecn, Jr.
Attorney General and Reporter
State of Tennessee
WiiuaM B. Hussarp
Chief Deputy Attorney General
Frank J. SCANLON
Deputy Attorney General
Micuast D. PEARIGEN
Assistant Attorney General
450 James Robertson Parkway
Nashville, Tennessee 37219
(615) 741-5861
Attorneys for Petitioners
RAO NE A NE SOT TE EN AI
St. Louis Law Printing Co., Inc., 411 No. Tenth Street 63101 314-231-4477
QUESTIONS PRESENTED
1. Can the State of Tennessee exercise its inherent police
power to regulate water pollution or is its authority limited sole-
ly to an authority to administer the National Pollution
Discharge Elimination System pursuant to section 402(b) of the
Federal Clean Water Act, 33 U.S.C. § 1342(b)?
2. Does the waiver of sovereign immunity with respect to
federal facilities in section 313 of the Federal Clean Water Act,
33 U.S.C. § 1323, subject the TVA’s Ocoee Dam No. 2
Hydroelectric Project to State authority, including the permit-
ting requirements of the Tennessee Water Quality Control Act,
T.C.A. § 69-3-101 ef seg.?
3. Was the administrative proceeding by which the State of
Tennessee would have determined the applicability of its water
quality law to TVA’s Ocoee Dam No. 2 Hydroelectric Project
improperly removed to Federal District Court under section 313
of the Federal Clean Water Act?
This Court Needs To Correct An Erroneous And
Unprecedented Ruling Of The Court Of Appeals
Which Seriously Impedes The Ability Of The State
Of Tennessee And Other States Located Within
The Sixth Circuit To Enforce State Environmental
Laws In General And Specifically Against Federal
Facilities
Appendix A: Opinion of the Sixth Circuit Court of
Appeals dated September 23, 1983 and Order De-
nying Petition for Rehearing dated October 20,
Appendix B: Opinion of the District Court for the
Middle District of Tennessee dated April 9, 1982 ..
Appendix C: Relevant Provisions of the Clean Water
WBC. GEBSIRD .ccccccccccccccccccccccccees
UWB. GERRI 2 nc cccccccccccccccccccccccccs
ao nN N WN
10
12
A-17
iv
RD. Se 6 660 0 bad ceecivnaceveccebbn A-27
Be. Bias cic ctpccadinccdéccctugccendcavess A-32
Appendix D: Relevant Provision of the Tennessee
Water Quality Control Act). ... 6... cece eee eeees A-33
T.C.A, § GB-3-10B(a)(B) 6. ccc cece ee eeees A-33
Appendix E: 48 Fed.Reg. 45,597, chart at 48,498 (1983) A-35
TABLE OF AUTHORITIES
Cases
County of Nassau v. Cost of Living Council, 499
F.2d 1340 (Temp. Emerg: Ct. of App. 1974)...... 10
National Wildlife Federation v. Gorsuch, 693 F.2d 156
GE SA BO oh ec acdewscpucddotitacnsees dc 5
Ohio v. Wyandotte Chemicals Corporation, 401 U.S.
GED, GOO: BAe vc keh cketuvesessdsk ce cates 6
United States v. Darby, 312 U.S. 100, 124(1941) ...... 6
Volkswagen de Puerto Rico, Inc., v. Puerto Rico Labor
Relations Board, 454 F.2d 38 (ist Cir. 1972) ...... 10
Constitutional Provision
U.S. Constitution, Amendment X..............50055 6
Statutes
Federal:
ORRIN penn co spnecehers stboes jess
BB UBC. § 1BSAER) 2. cccccccccccccccqcscvcscovsces 2
Pa
— —
~~
33 U.S.C. § 1251(b) (CWA § 101(D)) .. we eee ees 2,6
33 U.S.C. § 1311(a) (CWA § 301 (a)) ... 26. 5
33 U.S.C. § 1319(a) (CWA § 309(a)) .. 6... cece eee 5
33 U.S.C. § 1323(a) (CWA § 313(a)) ... 6... cece e eens 2
SOU LC: BISGR EC WA BARD «oo ccc cccccccccvcccees 2,4
Be rs SOTA GOURD oo cc cccccsesvccccccees 2
EE cnc cisdcddecoccecescesedocecctoes 9
EUR. skveccctustebevestocccgoccccnsces 9
State:
EPO BORE, occccosveavececccccecececs 3
I vc cn cckccscceccovectscceuscua 7
IES Jocccoceceeesesseesccbesvaces 7
IE ok on. vodeceecsisstvaeccdbabebe 8
EE Wa crn cecocscsunsocccousesctoutas 2,8
NG is Scccncscccddccdceecdebesas 3,8
DEED cs opecocdcccccctisdccesecces 3,8
THA, FESO son cv ccncccccccccccccccccce 3,8
Dterls SOPs fo httdscdceccccnacccccovses 3
Miscellaneous
48 Fed. Reg. 45,597, chart at 45,598 (1983) ........... 7
Juergensmeyer, The Tennessee Water Quality Control
Act of 1971: A Significant New Environmental
Statute, 25 Vand.L.Rev. 323, 328 (1972.......... 8
s~
vi
Maloney, The Tennessee Water Quality Control Act of
1971, 25 Vand.L.Rev. 331, 351 (1972) ........... 8
S. Rep. No. 92-414, 92d Cong., 2d Sess., reprinted in
[1972] U.S. Code Cong. and Ad. News, at 373-34 . 9
S. Rep. No. 95-370, 95th Cong., Ist Sess., reprinted in
[1977] U.S. Code Cong. and Ad. News, at 4392 ... 9
No.
In THE
Supreme Court of the United States
Ocroser TERM, 1983
TENNESSEE WATER QUALITY ConTROL BoarD,
EuGENE FoWINKLE, COMMISSIONER, TENNESSEE
DEPARTMENT OF PusLic HEALTH,
Petitioners,
vs.
Unrtep States Or AMERICA, Ex REL.
TENNESSEE VALLEY AUTHORITY AND
TENNESSEE VALLEY AUTHORITY,
Respondents.
PETITION FOR A WRIT OF CERTIORARI
TO THE UNITED STATES COURT OF APPEALS
FOR THE SIXTH CIRCUIT
The Petitioners, Tennessee Water Quality Control Board, et
al., respectfully request a Writ of Certiorari issue to review the
judgment and opinion of the United States Court of Appeals
for the Sixth Circuit, entered in this proceeding on September
23, 1983, and as to which the Petitioners’ Petition for Rehearing
was denied on October 20, 1983.
The opinion of the Court of Appeals (set forth in the Appen-
dix at A-1) is reported at___F.2d__(6th Cir. 1983). The opi-
nion of the Court of Appeals reviews the District Court opinion
(set forth in the Appendix at A-17) which is reported at ___
F.Supp._t__(M.D. Tenn. 1982).
se Ti
JURISDICTION
The Judgment of the Court of Appeals for the Sixth Circuit
was entered on September 23, 1983, the Court’s Order denying
the Petitioners’ Petition for Rehearing (set forth in the Appen-
dix at A-16) was entered on October 20, 1983, and this Petition
for Certiorari was filed within ninety (90) days of the latter date.
This Court’s jurisdiction is invoked pursuant to 28 U.S.C. §
1254(1).
STATUTORY PROVISIONS INVOLVED
This case involves an interpretation of §§ 101(b) (33 U.S.C. §
1251(b)), 313(a) (33 U.S.C. § 1323(a)), 402 (33 U.S.C. § 1342),
and 510 (33 U.S.C. § 1370) of the Federal Clean Water Act, as
those provisions relate to the scope of the State of Tennessee’s
authority to issue state water quality permits pursuant to
T.C.A. § 69-3-108 (formerly T.C.A. § 70-330). The above-
referenced federal statutes are set forth in the Appendix, begin-
ning at A-25. The above-referenced Tennessee statute is set
forth in the Appendix at A-33.
STATEMENT OF THE CASE
This case involves the authority of the State of Tennessee to
apply state water pollution control requirements to federal
facilities by virtue of the waiver of sovereign immunity clause
provided by § 313(a) of the Federal Clean Water Act (CWA), 33
U.S.C. § 1323(a), which provides, in pertinent part:
Each. . .[entity] of the Federal Government (1) having
jurisdiction over any property or facility, or (2) engaged in
any activity resulting, or which may result, in the discharge
or runoff of pollutants, and each officer, agent, or
employee thereof in the performance of his official duties,
shall be subject to, and comply with, all Federal, State, in-
terstate, and local requirements, administrative authority,
and process and sanctions respecting the control and
jv due
onion
abatement of water pollution in the same manner, and to
the same extent as any nongovernmental entity including
the payment of reasonable service charges.
The Tennessee Valley Authority (TVA) owns the Ocoee Dam
No. 2 Hydroelectric Project, consisting of a diversion dam con-
nected downriver to a powerhouse by a wooden flume approx-
imately four and one-half (4%) miles long.' TVA decided in
1979 to reopen its Ocoee Project following completion of
repairs on the flume which had necessitated its closure in 1976.
The Commissioner of the Tennessee Department of Health and
Environment (TDHE), pursuant to the Tennessee Water Quali-
ty Control Act, T.C.A. § 69-3-101 ef seg. (Tennessee Act), in-
formed TVA that operation of the Ocoee Project consituted an
“alteration of the physical, chemical, radiological, biological,
or bacteriological properties of any waters of the State’’, pur-
suant to T.C.A. § 69-3-108(b)(1). Furthermore, he found that
the project constituted the ‘‘development of a natural resource’’
which would result in the alteration of the properties of waters
of the State, pursuant to T.C.A. § 69-3-108(b)(4). Both of these
activities are unlawful without a valid state water quality permit
under T.C.A. § 69-3-108(b). TVA filed an appeal of this deter-
mination to the Tennessee Water Quality Control Board, pur-
suant to T.C.A. § 69-3-118(a){(2).
This administrative appeal was filed and then removed to
oo
those federal facilities which caused the discharge or runoff of
pollutants. The State argued that § 313(a) makes federal ‘‘ac-
tivities’’ resulting in the discharge or runoff of pollutants sub-
ject to State water pollution laws, but that ail federal
**facilities’’ must comply with such State laws, irrespective of
whether they cause a discharge or runoff of pollutants. Alter-
natively, the State argued, and demonstrated by the only proof
in the record, that a discharge of pollutants could be caused by
the Ocoee Dam No. 2 Hydroelectric Project. The District Court
ruled that CWA § 313 removed federal immunity for com-
pliance with state pollution laws only for those federal facilities
resulting in a discharge or runoff of pollutants. Appendix at
A-24. The District Court granted TVA summary judgment
because, in its opinion, the project would merely result in the
diversion of the river, rather than a discharge or runoff of
pollutants. Jd.
On appeal, the Sixth Circuit affirmed the District Court’s
decision. The Court of Appeals concluded that the State ad-
‘ ministrative proceedings ‘‘were removable for the purpose of
determining the federal question of the extent to which Con-
gress had waived sovereignty’’, Appendix at A-15, and thus
declined to decide whether State administrative proceedings are
removable to Federal District Courts as a general matter. The
Court of Appeals then changed direction and explicitly declined
to decide the issue of ‘‘the extent to which Congress had waived
soverciguty’’ over federal facilities in § 313(a), Appendix at
A-15, which was the basis of the District Court decision and the
basis upon which Tennessee applied its law to the Ocoee Pro-
ject. Instead, the Court of Appeals concluded that the State
lacked power to regulate the pollution of its waters except
through the National Pollution Discharge Eliminarion System
established by CWA § 402, 33 U.S.C. § 1342.’
? Section 402 establishes the National Pollution Discharge Elimina-
tion System and provides for a nationwide system of permits, known
as “NPDES” permits, which are required of all entities which
_— eo
The Sixth Circuit, in reaching its decision, reasoned as
follows:
The “pollution” which the Commissioner of the Ten-
nessee Department of Health identified is not subject to
control or abatement by use of the discharge permit
system. The right of the State to require discharge permits
is derived solely from section 402. EPA has consistently
treated dams as nonpoint sources of pollution which are
not subject to the discharge permit requirements of section
402. We agree with the District of Columbia Circuit [refer-
ring to National Wildlife Federation v. Gorsuch, 693 F.2d
156 (D.C. Cir. 1982)] that this interpretation of the Act by
the agency charged with its administration and enforce-
ment is entitled to deference. Since EPA does not require
discharge permits from dam operators under section
402(a), the states may not do so under section 402(b).
Appendix at A-13. The Court of-Appeals thus concluded that
Tennessee could not require TVA to obtain a permit for the
reconstruction and operation of the Ocoee Project. Appendix at
A-13-14,
discharge pollutants into navigable waters. The discharge of
pollutants without an NPDES permit is illegal and subjects the
discharger to various penalties. CWA § 301(a), 33 U.S.C. § wa
and § 30%a), 33 U.S.C. § 131%a). Initial authority to administer the
aay
REASONS FOR GRANTING THE WRIT
This Court Needs To Correct An Erroneous And Un-
precedented Ruling Of The Court Of Appeals Which Seriously
Impedes The Ability Of The State Of Tennessee And Other
States Located Within The Sixth Circuit To Enforce State En-
vironmental Laws In General And Specifically Against Federal
Facilities.
The issues presented by this petition are significant and
potentially far reaching. The primary issue in this case, left
undecided by the Sixth Circuit, is whether the § 313 waiver of
sovereign immunity with respect to federal facilities allows the
State of Tennessee to exercise its inherent police power to
regulate the pollution of its waters; specifically, whether this in-
herent State power can be exercised to require the Ocoee Project
to comply with the Tennessee Act. However, the Sixth Circuit
ignored the State’s inherent police power to regulate pollution
of its waters and instead cast into doubt whether the State can
enforce its state water pollution control requirements in-
dependently of the federal § 402(b) permit requirements.
There is no doubt that Tennessee has the power to prevent the
pollution of its waters. This power is preserved by the Tenth
Amendment to the U.S. Constitution’ and recognized by Con-
gress in CWA § 101(b), 33 U.S.C. § 1251(b), where it expressed
its intent ‘‘To recognize, preserve, and protect the primary
responsibilities and rights of States to prevent, reduce, and
herent. See U.S. Constitution, Amendment X; United States v. Dar-
by, 312 U.S. 100, 124 (1941). In Ohio v. Wyandotte Chemicals Cor-
poration, 401 U.S. 493, 498 n. 3 (1971), the basic “es
law. mand
—
eliminate pollution. . ..’’ Toward this end, CWA § 510(1), 33
U.S.C. § 1370(a), states that nothing in the CWA precludes or
denies the rights of any state to adopt or enforce not only *‘(A)
any standard or limitation respecting discharges of pollutants”
but also ‘‘(B) any requirement respecting control or abatement
of pollution. . ..’’ In addition, CWA § 510(2) states that the
CWA shall not ‘‘be construed as impairing or in any manner af-
fecting any right or jurisdiction of the States with respect to the
waters (including boundary waters) of such States.’’ This State
authority is made applicable to federal entities by CWA § 313.
However, the Court of Appeals concluded that the State’s
power to regulate water pollution is merely an authority
delegated to it pursuant to § 402(b). The Court of Appeals bas-
ed its conclusion on the mistaken premise that Tennessee was
only trying to enforce the federal discharge permit requirement
of § 402 with respect ot the Ocoee Project. See Appendix at A-
11 and A-14. This premise is in error for two (2) reasons. First,
Tennessee, unlike most states, has never been authorized by
EPA to issue § 402 permits for federal facilities.‘
Second, in the present case, the State of Tennessee was enfor-
Act’s original purposes are stated as establishing the State ci
Tennessee’s obligation to protect the right of its people to un-
Control Act is not a creation of nor a vehicle for implementa-
tion of a federal statutory scheme. Indeed, the Tennessee Act
was passed in 1971, the year before Congress created the
NPDES program. It was only after Congress amended the
CWA in 1972 that current T.C.A. § 69-3-102(c) was added,
which states that ‘‘an additional purpose’’ of the Tennessee Act
is to enable the State to participate in the NPDES program.
The Tennessee Act is not only independent of the federal law
but is much more comprehensive. The State water quality per-
mit provided by T.C.A. § 69-3-108 is much broader in scope
than a permit to discharge from a point source.’ For example, a
permit is required under Tennessee law for ‘‘activities’’ which
may constitute an ‘‘alteration’’ of various properties of the
waters of the State or the development of a natural resource
which may result in the alteration of various properties of
waters of the State. See T.C.A. § 69-3-108(b)(1) & (4). The
TDHE found that these conditions would be created by the
operation of TVA’s Ocoee No. 2 Project.
The clear and devastating inference of the Court of Appeals’
decision is that Tennessee’s power to regulate water pollution is
of federal NPDES permits. In the instant case, the Sixth Cir-
cuit’s decision leaves the State powerless to prevent a violation
* A fact noted by several commentators, including Professor
, the drafter of the 1971 Tennessee Act who states that
T.C.A. § 69-3-108(b) ‘‘is intended to provide an omnibus clause mak-
ing it unlawful for any person. . .to alter in any manner the properties
of the waters of the State without securing. . .a permit. . ..”” .
The Tennessee Water Quality Control Act of 1971, 25 Vand.L.Rev.
331, 351 (1972). (Emphasis added). See also Juergensmeyer, The Ten-
——
ma
of its law by TVA’s Ocoee Dam No. 2 Hydroelectric Project.
This erroneous limitation affects Tennessee and every other
state within the Sixth Circuit which enforce state water pollution
control laws. Furthermore, the Sixth Circuit’s interpretation of
the federal-state relationship under the CWA could apply to
other environmental regulatory schemes in which the states and
the federal government form a regulatory partnership. See, e.g.,
Clean Air Act, 42 U.S.C. § 7401 et seg.; Resource Conservation
and Recovery Act, 42 U.S.C. § 6901 ef seg. —
The narrow but important issue argued before the Court of
Appeals, but left undecided by it, is the extent to which Ten-
nessee can apply its water quality control law to TVA’s Ocoee
Project under the federal government’s waiver of sovereign im-
munity provided in CWA § 313. By failing to decide this issue,
the Sixth Circuit defeated the clear Congressional intent that a//
federal facilities, including the Ocoee Project, be subject to the
full scope of Tennessee’s water quality control law as if they
were private citizens.‘
Equally disturbing is the Court of Appeals’ failure to address
Tennessee’s challenge to the improper removal of ad-
ministrative proceedings from the Tennessee Water Quality
Control Board to Federal District Court. Appendix at A-
14-15. The State argued that the removal provision in § 313(a)’
in no way expands existing rights of removal under 28 U.S.C. §
1441 and that State administrtive proceedings are not removable
under 28 U.S.C. § 1441. The Sixth Circuit discussed but declin-
ed to decide whether State administrative proceedings are
removable under 28 U.S.C. § 1441, an issue upon which the
lower federal courts are split." As a practical matter, the Board
was never given an opportunity to determine if the Ocoee pro-
ject was subject to the State’s regulation under the Tennessee
water quality control law and, if so, whether operation of the
project was permissible. Conceivably, the Board could have
resolved these issues in favor of TVA, thus rendering this litiga-
tion unnecessary.
CONCLUSION
Before the Court of Appeals was the narrow but important
question whether CWA § 313 allows the State to apply its laws
‘*respecting the control and abatement of water pollution’’ only
to those facilities causing a discharge or runoff of pollutants, as
” Section 313(a) provides, in pertinent part:
ject pursuant to this section, and any such proceeding may be
samawedl is caveliinnes ebtaamen tne et seq. of Title 28.
* Compare, e.g., County of Nassau v. Cost of Living Council, 499
F.2d 1340 (Temp. Emerg. Ct. of App. 1974), with Volkswagen de
Puerto Rico, Inc., v. Puerto Rico Labor Relations Board, 454 F.2d 38
(ist Cir. 1972). The Court of Appeals noted these and other conflic-
ting cases on this issue, Appendix at A-14-15.
TVA argued or, as the State and EPA itself argued,’ to any
federal facility which causes pollution by whatever means. The
Court of Appeals’ decision instead painted with a broad brush
to strike against the very source of State power. Its decision not
only calls into question the ability of the states to enforce water
pollution according to their own laws, but fails to clarify which
federal facilities Congress intended to subject to State water
pollution laws. Therefore, the petitioners respectfully request a
Writ of Certiorari issue to review the judgment and opinion of
the Sixth Circuit.
* The Ocoee River Council and the United States, on
Se en aD SmaI OND Op Settee Cinta hn Ge
Respectfully submitted,
William M. Leech, Jr.
Attorney General and Reporter
State of Tennessee
William B. Hubbard
Chief Deputy Attorney General
Frank J. Scanlon
Deputy Attorney General
Michael D. Pearigen
Assistant Attorney General
450 James Robertson Parkway
Nashville, Tennessee 37219
(615) 741-5861
Attorneys for Petitioners
-_ 12 —
CERTIFICATE OF SERVICE
I hereby certify that a true and exact copy of the foregoing
Petition has been mailed this the 17th day of January, 1984, to
the below-referenced counsel:
Honorable Rex E. Lee
United States Solicitor General
Department of Justice
Washington, D.C. 20530
Herbert S. Sanger, Jr.
James E. Fox
Robert C. Glinski
Brent R. Marquand
Tennessee Valley Authority
Office of General Counsel
400 Commerce Street
Knoxville, Tennessee 37902
MICHAEL D. PEARIGEN
Assistant Attorney General
APPENDIX
— So
{-»
APPENDIX A
No. 82-5288
UNITED STATES COURT OF APPEALS
FOR THE SIXTH CIRCUIT
United States of America Ex Rel.
Tennessee Valley Authority and
Tennessee Valley Authority,
Plaintiffs-Appellees,
Vv.
Tennessee Water Quality Control
Board, Et Al.,
Defendants-Appellants.
Appeal from the
United States District
Court for the Middle
District of Tennessee.
Decided and Filed September .23, 1983
Before: Edwaids Chief Judge; Lively, Circuit Judge; and
Guy, District Judge.*
Lively, Circuit Judge. The question in this case is whether the
Tennessee Water Quality Control Board may require the Ten-
nessee Valley Authority (TVA) to acquire a state permit for the
reconstruction and operation of a dam and flume on a navigable
* The Honorable Ralph B. Guy, Jr., Judge, United States District
Court for the Eastern District of Michigan, sitting by designation.
_— so
waterway within the State of Tennessee. The case arises under
the Federal Water Pollution Control Act, as amended, com-
monly referred to as the Clean Water Act (the Act), 33 U.S.C. §
1251 et seq. (1976 ed. and Supp. V).
I.
A.
A private power company built a hydroelectric unit on the
Ocoee River in Tennessee in 1913. Water was diverted to the
power plant by the second in a series of three dams on the river.
This dam is referred to as Ocoee No. 2. TVA acquired all three
dams in 1939 and built an additional dam in 1941. Ocoee No. 2
consists of a rock-filled timber crib dam which can divert water
into a wooden flume that leads to a powerhouse approximately
four and one-half miles downstream. The dam does not im-
pound water, but merely diverts it. From the time the project
was put into operation until 1976 the four and one-half miles of
riverbed between the dam and the powerhouse contained very
little water, consisting primarily of seepage through the dam. In
September 1976 TVA shut down the project in order to repair
the dam and the steel support trestles of the flume. As a result
of the shutdown the Ocoee has been allowed to run its natural
course along the streambed and it has provided excellent rafting
and canoeing. Since the stretch of the river between the dam and
the power plant is adjacent to a U.S. Highway the recreational
area has been accessible to large numbers of visitors.'
TVA determined to reopen the Ocoee No. 2 project after
completion of the repairs without allowing for recreational
releases of water into the riverbed between the dam and
' This statement of facts is derived from the district court’s opinion
in a related case. See Ocoee River Council v. T.V.A., 540 F. Supp.
788, 791 (E.D. Tenn. 1981).
a7 <
powerhouse. The decision was made after Congress rejected a
requested appropriation to provide for the loss of revenue from
electricity sales which would result from providing for 82 days
of recreational release of water annually. Suit was filed by the
Ocoee River Council, a non-profit corporation chartered in part
to promote recreational uses of the Ocoee River, a private in-
dividual who uses the river for recreational purposes and a com-
mercial rafting company to enjoin further work on the project
for alleged violation of a number of federal statutes. The district
court found that TVA had prepared an adequate final en-
vironmental impact statement in connection with its decision to
reconstruct Ocoee No. 2. Ocoee River Council v. T.V.A., 540
F.Supp. 788, 795-96 (E.D. Tenn. 1981). However, the court
also found that the decision to proceed with the reconstruction
without any provision for recreational use of the Ocoee River
between the dam and the powerhouse was deficient under the
National Environmental Policy Act (NEPA) and therefore ‘‘not
in accordance with law.’’ 5 U.S.C. § 706(2)(A). 540 F.Supp. at
798. Rather than granting an injunction, however, the district
court stayed the action in order for TVA to reconsider its deci-
sion in light of the NEPA requirements.
After holding several public hearings TVA ratified its
previous decision to rehabilitate the Ocoee No. 2 hydroelectric
facility and directed that it be operated exclusively for power
generation in the absence of some method for ensuring compen-
sation for power losses associated with recreational releases.
The general manager of TVA was granted authority to provide
for approximately 82 days of recreational releases per year upon
development of appropriate compensation arrangements, which
were not limited to appropriations but could include conces-
sion, license or user fees or other sources of funding. The
district court then found that TVA’s decision had been reached
after evaluation of environmental factors as mandated by
NEPA, along with other proper considerations, and granted
TVA’s motion for summary judgment, dismissing the action.
Id. at 800-02.
ay ae
Cc.
The plaintiffs did not appeal the final judgment of the district
court. However, the Ocoee River Council had filed a complaint
with the Commissioner of the Tennessee Department of Public
Health prior to entry of the final judgment by the district court.
This complaint alleged that the Ocoee No. 2 project would
violate the Tennessee Water Quality Control A~* unless TVA
obtained a water quality permit from the State for diversion of
the Ocoee. The commissioner investigated the complaint and by
a letter dated December 11, 1981 advised TVA that he had con-
cluded ‘‘that TVA’s proposed activity requires a State water
quality permit pursuant to T.C.A. 70-330(b)’’ (Tennessee Code
Annotated, Section 70-330(b)). One of the two items which the
commissioner considered in reaching this conclusion was a writ-
ten opinion of the Attorney General of Tennessee. In this opi-
nion the Attorney General concluded that a state permit was re-
quired for Ocoee No. 2 because the United States Environmen-
tal Protection Agency (EPA) had approved Tennessee’s permit
system as contained in the Tennessee Water Quality Control Act
of 1977. The Attorney General pointed out that the authority
for states ‘‘to create, administer, and enforce state permit
systems’’ under the national pollution discharge elimination
system derived from section 402 of the Act, 33 U.S.C. § 1342.
TVA appealed the commissioner’s decision to the Tennessee
Water Quality Control Board and then filed a petition to
remove the proceedings to the federal district court. On the
same day TVA filed a declaratory judgment action in the same
district court and a motion to consolidate it with the removed
action. In the original district court action TVA sought a
declaration that the Tennessee Water Quality Control Board
and the commissioner had no authority to regulate or interfere
with TVA's projected repair and operation of Ocoee No. 2, “*by
requiring a permit or otherwise.”’
a ao
The Tennessee defendants filed a motion to remand the
removed case and 2 motion to dismiss the declaratory judgment
action. In the alternative, if remand were not granted, it filed a
motion to dismiss the consolidated actions or for summary
judgment. The Ocoee River Council filed a motion to intervene
with a motion to remand. However, the district court did not
act on the motion to intervene. This court permitted the Ocoee
River Council to file a brief and to participate in oral argument
as amicus curiae.
The district court granted the motion to consolidate the ac-
tion, but did not rule on the motion to remand the removed ac-
tion. Following extensive briefing the district court granted
TVA’s motion for summary judgment. The district court and
the parties agreed that decision of the consolidated actions
depended primarily on the proper construction of Section 313
of the Act as amended, 33 U.S.C. § 1323 (1976 ed. and Supp.
V), which provides in pertinent part:
§ 1323. Federal facilities pollution control
(a) Each department, agency, or instrumentality of the
executive, legislative, and judicial branches of the Federal
Government (1) having jurisdiction over any property or
facility, or (2) engaged in any activity resulting, or which
may result, in the discharge or runoff of pollutants, and
each officer, agent, or employee thereof in the perfor-
mance of hi: official duties, shall be subject to, and comp-
ly with, all Federal, State, interstate, and local re-
quirements, administrative authority, and process and
sanctions respecting the control and abatement of water
pollution in the same manner, and to the same extent as
any nongovernmental entity including the payment of
reasonable service charges. The preceding sentence shall
apply (A) to any requirement whether substantive or pro-
cedural (including any recordkeeping or reporting require-
ment, any requirement respecting permits and any other
as Abs
requirement, whatsoever), (B) to the exercise of any
Federal, State, or local administrative authority, and (C)
to any process and sanction, whether enforced in Federal,
State, or local courts or in any other manner. This subsec-
tion shall apply notwithstanding any immunity of such
agencies, officers, agents, or employees under any law or
rule of law. Nothing in this section shall be construed to
prevent any department, agency, or instrumentality of the
Federal Government, or any officer, agent, or employee
thereof in the performance of his official duties, from
removing to the appropriate Federal district court any pro-
ceeding to which the department, agency, or instrumentali-
ty or officer, agent, or employee thereof is subject pur-
suant to this section, and any such proceeding may be
removed in accordance with section 1441 et seq. of title 28.
The district court found that section 313 waives federal
sovereignty over only those activities of federal agencies
resulting in the discharge or runoff of pollutants and that Ocoee
No. 2 merely diverts the water from its bed for a short distance,
resulting in no discharge or runoff of pollutants. In reaching its
conclusion the district court pointed out that Ocoee No. 2 has
been operated for many years as an integral part of a unified
dam and reservoir system over which TVA has been given con-
trol by a series of congressional enactments. The court noted
that Ocoee No. 2 was acquired and operated solely for the pro-
duction of hydroelectric power and that Congress had refused
to appropriate funds to replace lost power revenues if water
releases were made for recreational purposes. The district court
summarized its holding in a sentence near the end of its
memoradum opinion. ‘‘The State cannot under the guise of
regulation of discharge or runoff of pollutants exercise the right
of control over a unified federal navigation, flood control and
power operation, where federal sovereignty has been retained.”’
a Po
The state defendants and amicus Ocoee River Council argue
that the district court misconstrued the impact of the words
‘discharge or runoff of pollutants’’ in section 313(a). They
point out that section 313(a) has two subsections. Subsection (1)
requires every department, agency, or instrumentality of the
federal government having jurisdiction over any property or
facility to comply with all regulations — federal, state, in-
terstate and local — respecting the control and abatement of
water pollution in the same manner as any nongovernmental en-
tity. This duty is not modified, the defendants and amicus say,
by a requirement that there be a discharge or runoff of
pollutants. On the other hand, these parties read subsection (2)
to require compliance by federal entities engaged in activities
only if those activities result in the discharge or runoff of
pollutants. Under this construction ‘‘resulting . . . in the
discharge or runoff of pollutants’’ is a condition requiring com-
pliance only when applied to the second category of federal in-
volvement — ‘‘any activity.’’ The requirement of compliance is
absolute with respect to the first category — ‘‘having jurisdic-
tion over any property or facility.”’
In the alternative the defendants argue that even if the district
court’s construction of section 313 is correct Ocoee No. 2 is a
facility ‘‘resulting’’ in discharge or runoff of pollutants. This
argument is based on the broad definition of ‘‘pollution’’ found
in 33 U.S.C. §1361(19). (The term ‘‘pollution’’ means ‘‘the
man-made or man-induced alteration of the chemical, physical,
biological and radiological integrity of water’’). It is clear that
federal agencies are subject to the procedural as well as the
substantive provisions of programs respecting the control and
abatement of water pollution. Since the Tennessee permit re-
quirement is part of its approved water quality control program,
it follows that TVA must obtain a state permit before pro-
aS an
ceeding with any project which will alter the composition of the
Ocoee River waters, the defendants and Ocoee River Council
argue.
TVA asserts that Congress provided for the unified develop-
ment and control of the Tennessee River System by TVA and
that the State of Tennessee has no authority to regulate its ac-
tivities in the absence of express congressional consent thereto.
TVA finds no such consent in section 313, contending that it ap-
plies only to runoff and ‘‘point source’’ discharge of pollutants.
A dam which merely diverts the water of a river, adding no
foreign substance and creating no runoff, is not subject to any
state requirement, according to TVA. It relies on various defini-
tions contained in section 502 of the Act, 33 U.S.C. § 1362:
(6) The term ‘‘pollutant’’ means dredged spoil, solid
waste, incinerator residue, sewage, garbage, sewage
sludge, munitions, chemical wastes, biological materials,
radioactive materials, heat, wrecked or discarded equip-
ment, rock, sand, cellar dirt and industrial, municipal, and
agricultural waste discharged into water.
(12) The term ‘‘discharge of a pollutant’’ and the term
‘‘discharge of pollutants’’ each means (A) any addition of
any pollutant to navigable waters from any point source,
(B) any addition of any pollutant to the waters of the con-
tiguous zone or the ocean from any point source other than
a vessel or other floating craft.
(14) The term ‘‘point surce’’ means any discernible, con-
fined and discrete conveyance, including but not limited to
any pipe, ditch, channel, tunnel, conduit, well, discrete
fissure, container, rolling stock, concentrated animal
—_*
feeding operation, or vessel or other floating craft, from
which pollutants are or may be discharged. This term does
not include return flows from irrigated agriculture.
(16) The term ‘‘discharge’’ when used without qualifica-
tion includes a discharge of a pollutant, and a discharge of
pollutants.
TVA relies in particular on the use of the word ‘‘addition’’ in
both subsections of 33 U.S.C. § 1362(12), supra, and asserts
there is no claim that the diversion at Ocoee No. 2 adds any
pollutants to the river.
The state defendants also argue that a 1977 amendment to
section 313 made it clear that a broad waiver of sovereign im-
munity was intended by Congress. TVA maintains that the 1977
amendment did not change the extent to which section 313 waiv-
ed immunity from state or local control; it merely made it clear
that where federal agencies are subject to state or local regula-
tion they must comply with state or local procedural as well as
substantive requirements. The qualifying phrase, ‘‘resulting, or
which may result, in the discharge or runoff of pollutants’’ ap-
peared in 1972 version and was unchanged by the 1977 amend-
ment to section 313. We agree with TVA’s interpretation of the
1977 amendment. This amendment was designed to make it
clear that federal agencies are subject to procedural as well as
substantive provisions of state water quality control laws. It was
adopted, at least in part, in response to EPA v. California ex
rel. State Water Resources Control Board, 426 U.S. 200 (1976),
in which the Supreme Court held that federal facilities were re-
quired to comply with state substantive requirements only. See
S. Rep. No. 95-370, p. 67, reprinted in [1977] U.S. Code Cong.
& Adm. News 4392.
—_—~
Cc.
EPA was permitted to file a brief and to participate in oral
argument. Its position is that the district court erred in con-
cluding that section 313 is not applicable to federal dam
operators. It argues, in agreement with the defendants and the
Ocoee River Council, that ‘‘discharge or runoff of pollutants’’
in section 313 modifies ‘‘activities’’ only and that federal pro-
perty and facilities are subject to state regulation without regard
to whether they ‘‘result’”’ in discharge or runoff of pollutants.
However, EPA contends, the Tennessee authorities erred in
treating Ocoee No. 2 as a ‘“‘point source’’ which required a
discharge permit for its continued operation. Instead the State
should have treated the project as a ‘‘nonpoint source’’ of
pollution. It relies on a definition in 33 U.S.C. § 1314(f)(2)(F) of
nonpoint sources of pollution as pollution resulting from —
(F) changes in the movement, flow, or circulation of any
navigable waters or ground waters, including changes caus-
ed by the construction of dams, levees, channels,
causeways, or flow diversion facilities.
EPA argues that the State must deal with nonpoint sources of
pollution under section 208 of the Act, 33 U.S.C. § 1288, a com-
prehensive statutory scheme for identifying areas having
substantial water quality control problems and providing for
federally funded areawide waste treatment management by the
states. EPA acrees with TVA that section 313 does not give the
Tennessee Water Quality Control Board authority to utterly
frustrate the agency’s congressionally mandated hydroelectric
operations by altering the use of Ocoee No. 2 to assure an ade-
quate flow of water for recreational rafting below the dam.
EPA states in its brief, ‘“The State’s authority under Section 313
is limited to establishing reasonable water pollution controls
that are not inconsistent with the purposes for which Ocoee
Dam No. 2 was purchased.”’
— A-ll —
This case must be decided on the basis of the Clean Water Act
in its entirety, not merely on a construction of section 313. The
clear purpose of that section is to make federal agencies subject
to applicable state and local reguirements, procedural as well as
substantive, respecting the control and abatement of water
pollution. However, the authority of the states over navigable
waters is limited by other provisions of the Act.
One of the primary objectives of the Act, as stated in section
101, 33 U.S.C. § 1251(a){1), is to achieve a national goal ‘‘that
the discharge of pollutants into the navigable waters be
eliminated by 1985.’’ The Act seeks to achieve this particular
objective by creating a national pollutant discharge elimination
system (NPDES) based on the issuance of permits for the
discharge of pollutants. Under section 402(a)(2) of the Act, 33
U.S.C. § 1342(a)(2), the Administrator of EPA is required to
prescribe the conditions and other requirements of the Act. Sec-
tion 402(b), 33 U.S.C. § 1342(b), permits a state to administer
its own permit program for discharges into navigable waters
within its jurisdiction upon approval of the program by EPA.
Here Tennessee relied specifically on its permit program ap-
proved by EPA pursuant to § 402 as the basis of its attempt to
regulate the diversion of water at Ocoee No. 2.
EPA has consistently taken the position that the section 402
permit system does not apply to dams because they are ‘‘non-
point sources’’ of pollution, rather than dischargers of
pollutants. In National Wildlife Federation v. Gorsuch, 693
F.2d 156 (D.C. Cir. 1982), an envoronmental group sought a
declaration that the Administrator of EPA had a nondiscre-
tionary duty to require dam operators to apply for pollutant
discharge permits under section 402(a) of the Act. The plaintiff
argued that any adverse change in the quality of reservoir water
from its natural state involves a “‘pollutant,”’ and release of
— A-12 —
such water through a dam into the downstream river is an ‘‘ad-
dition of a pollutant’’ from a point source. EPA contended that
for addition of a pollutant to occur within the definition in sec-
tion 502(12) the point source must introduce the pollutant into
the water. Although alterations in the properties of the water
are ‘‘pllution’’ under the broader definition contained in section
502(19) (‘‘the man-made or man-induced alteration of the
chemical, physical, biological and radiological integrity of the
water’’), all alterations do not fit the narrower definition of
**pollutants’’ contained in section 502(6) (‘‘dredged spoil, solid
waste, incinerator residue, sewage, garbage, sewage sludge,
munitions, chemical wastes, biological materials, radioactive
materials, heat, wrecked or discarded equipment, rock, sand,
cellar dirt and industrial, municipal and agricultural waste
discharged into water’’). Since the section 402 permit system ap-
plies only to the discharge of pollutants EPA argued that it was
not directed by the Act to require dam operators to obtain per-
mits.
The court in National Wildlife Federation concluded that
EPA’s construction of the Act is entitled to considerable
deference. Its treatment of dai~s as nonpoint sources of pollu-
tion was found to represent a considered decision which was
reasonable when the purposes and objects of the Act are con-
sidered. The court agreed with EPA that Congress had treated
‘*pollutants”’ and ‘‘pollution’’ differently and that section 402 is
concerned with the addition of pollutants, not with water pollu-
tion generally. It quoted with approval from Missouri ex. rel.
Ashcroft v. Department of the Army, 672 F.2d 1297, 1304 (8th
Cir. 1982), a case relied on by the district court in the present
case:
**[T)he discharge of a pollutant requires an ‘addition’ of a
pollutant from a ‘point source’ and neither term applie{s}
to soil erosion or the oxygen content of water."
693 F.2d at 175. The court in National Wildlife Federation
pointed out that Congress viewed the NPDES program as the
— A-13 —
most effective weapon against pollution, yet limited its applica-
tion to situations involving the addition of pollutants from
point sources. Water pollution arising from nonpoint sources is
to be dealt with differently, specifically through the device of
areawide waste treatment management by the states. Similar
conclusions were reached in South Carolina Wildlife Federation
v. Alexander, No. 76-2167-2 (D.S.C. April 26,
1982)(unreported decision).
The present case is unusual. The defendants and Ocoee River
Council are not concerned with the operation of the power plant
or the condition of the water returned to the river after it has
been used for the production of electricity. Their only claim is
that the comparatively smali quantity of water which seeps
through the dam is ‘‘polluted’’ by changes in its physical and
chemical properties occurring while it flows through the four
and one-half miles of riverbed between the dam and the power
plant. There is no claim that any pollutants as defined in the Act
are added to the river water by the diversion into or through the
flume.
The ‘‘pollution’’ which the Commissioner of the Tennessee
Department of Health identified is not subject to control or
abatement by use of the discharge permit system. The right of
the State to require discharge permits is derived solely from sec-
tion 402. EPA has consistently treated dams as nonpoint
sources of pollution with are not subject to the discharge permit
requirements of section 402. We agree with the District of Col-
umbia Circuit that this interpretation of the Act by the agency
charged with its administration and enforcement in entitled to
deference. Since EPA does not require discharge permits from
dam operators under section 402(a), the states may not do so
under section 402(b). Accordingly, we affirm the judgment of
the district court ia its holding that Tennessee could not require
TVA to obtain a permit for the reconstruction and operation of
Ocoee No. 2.
= Apt
Our decision does not mean that we adopt the construction of
section 313 urged upon us by TVA and followed by the Eighth
Circuit which held that a federal agency is subject to state water
quality control laws only if it is causing a discharge or runoff of
pollutant. See Missouri ex rel. Ashcroft v. Department of the
Army, supra, 672 F.2d at 1304. We merely hold that a state may
not subject a federal agency to the requirements of its discharge
permit program when the pollution complained or does not
result from the discharge of pollutants from a point source. A
dam, as a nonpoint source, may be subject to some state or local
regulation as part of a section 208 areawide waste treatment
management program. We do not undertake to determine the
limits of such authority in this case since the state sought only to
require a permit under authority derived from section 402.
Cc.
The defendants and amici curiae have argued that, regardless
of our decision in the declaratory judgment action, we should
reman ihe removed proceedings to the Tennessee Water Quali-
ty Control Board to complete its administrative consideration of
the complaint which precipitated this litigation. They argue that
removal under 28 U.S.C. § 1441 applies only to state court ac-
tions, not to administrative proceedings. There is support in
case law for this administrative: proceedings are subject to
removal. Compare County of Nassau v. Cost of Living Council,
499 F.2d 1340 (Temp. Emerg. Ct. of App. 1974)), and Califor-
nia Packing Corp. v. I1.L.W.U. Local 142, 253 F.Supp. 597
(D.Hawaii 1966), with Volkswagen de Puerto Rico, Inc. v.
Puerto Rico Labor Relations Board, 454 F .2d 38 (ist Cir. 1972);
Floeter v. C.W. Transport, Inc., $97 F.2d 1100 (7th Cir. 1979)
(per curiam), and United States v. Pennsylvania Environmental
Hearing Board, 377 F.Supp. 545 (M.D. Pa. 1974).
We do not consider it necessary to decide whether ad-
ministrative proceedings are removable generally. Section 313
expressly preserves to federal agencies the right to remove to an
sip ai aie
appropriate district court “‘any proceeding’’ to which it is sub-
ject thereunder. Since the Tennessee Water Quality Control
Board was relying on section 313 in seeking to require TVA to
obtain a permit we believe its proceedings were removable for
the purpose of determining the federal question of the extent to
which Congress had waived sovereignty. Even if the proceedings
were improperly removed, however, a remand would be
pointless in view of our decision in the declaratory judgment ac-
tion.
The judgment of the district court is affirmed. No costs are
allowed. Each party will pay its own costs on appeal.
— A-16 —
NO. 82-5288
UNITED STATES COURT OF APPEALS
FOR THE SIXTH CIRCUIT
United States Of America Ex Rel. Tennessee
Valley Authority and Tennessee Valley Authority
Plaintiffs-Appellees
v.
Tennessee Water Quality Control Board, Et Al.
Defendants-Appellants
ORDER
(Filed Oct. 20, 1983)
BEFORE: LIVELY, Chief Judge; EDWARDS, Circuit Judge;
and GUY, District Judge.*
Upon consideration of the petition for rehearing filed herein
by the defendants-appellants the court concludes that the issues
raised in the petition were fully considered and correctly decided
upon the original submission and decision of this case and thai
the panel did noi misapprehend the facts or the issues. Accor-
dingly, the petition for rehearing is denied.
ENTERED BY ORDER OF THE COURT
/s/ John P. Hehman
Clerk
* The Honorable Ralph B. Guy, Jr., Judge, U.S. District Court for
the Eastern District of Michigan, sitting by designation.
we Anh? on
APPENDIX B
UNITED STATES DISTRICT COURT FOR THE
MIDDLE DISTRICT OF TENNESSEE
NASHVILLE DIVISION
No. 82-3031
No. 82-3030
United States of America
vs.
Tennessee Water Quality Control Board, Et Al.
MEMORANDUM
(Filed April 9, 1982)
This case involves the application of § 313 of the Clean Water
Act, 33 U.S.C. § 1323, to one of the Tennessee Valley Authority
installations. Jurisdiction is asserted under 28 U.S.C. §§ 1331,
1337 and 1345. The facts are agreed as follows:
Ocoee No. 2 is located on the Ocoee River, a tributary of the
Hiwassee, in southeastern Tennessee. It consists of a rock-filled
and concrete-covered timber crib diversion dam at river mile
24.2, a powerhouse at river mile 19.7, and a 4.6-mile wooden
flume. Water from behind the dam is diverted into the flume, in
which it is carried to a point above, and then down to, the
powerhouse where it is used to generate electric power.
Ocoee No. 2 was built in 1912-13 by the East Tennessee
Power Company, a predecessor of the Tennessee Electric Power
Company (Tennessee Electric Power). In 1939, TVA entered in-
to a contract with the Commonwealth and Southern Corpora-
tion (a holding company which controlled Tennessee Electric
Power) and others, which provided for federal purchase of Ten-
nessee Electric Power’s generating and transmission properties
— A-18 —
including Ocoee No. 2, and the purchase by various
municipalities and cooperatives of its distribution properties.
Consumation of the contract was dependent on congressional
approval. Specific congressional approval was given by the ad-
dition to the TVA Act of section 15c, 53 Stat. 1083 (1939), 16
U.S.C. § 831n-3 (1976). Section 15¢c authorized TVA to use up
to $46 million of proceeds from the sale of government-
guaranteed bonds ‘‘for the purchase of electric utility properties
of the Tennessee Electric Power Company and Southern Ten-
nesee Power Company, as contemplated in the contract between
[TVA] and the Commonwealth and Southern Corporation and
others, dated as of May 12, 1939.’’
As provided by the contract, Ocoee No. 2, like all of the other
real property included in the federal portion of the purchase,
was thereafter conveyed to the United States of America in con-
formity with section 4(h) of the TVA Act, 16 U.S.C. § 83ic(h)
(1976). Section 4(h) provides that ‘‘in the purchase of any real
estate [for the TVA program]. . .the title to such real estate shall
be taken in the name of the United States of America, and
thereupon all such real estate shall be entrusted to [TVA] as the
agent of the United States to accomplish the purposes of this
[Act].””
Following such conveyance, Ocoee No. 2 became and has
been operated as an integral part of the TVA unified dam and
reservoir system. Ocoee No. 2 dam has no storage capacity;' its
purpose is simply to divert water from the stream into the
flume. The amount of water available at Ocoee No. 2 is
regulated by the operation of Blue Ridge Dam and, to a much
lesser extent Ocoee No. 3 dam, upstream. Blue Ridge Dam is
located at river mile 51.3 in the State of Georgia and has 183,000
acre-feet of storage capacity. It was acquired by the United
States under the same 1939 contract and conveyance by which it
' TVA Technical Report No. 5, The Hiwassee Valley Projects, vol.
2, at 40 (1948).
~~ A-19 ~
acquired Ocoee No. 2. Ocoee No. 3 dam is located at river mile
29.2 in Tennessee and has 9,100 acre-feet of storage capacity. It
was built by TVA with money appropriated for that purpose by
Congress, 55 Stat. 597 (1941); 56 Stat. 418 (1942). As in the case
of Ocoee No. 2, the powerhouse at Ocoee No. 3 is located more
than 4 river miles below the dam, and the river waters are
similarly diverted except that the diversion is through a concrete
tunnel rather than a wood flume.
In 1976, operation of Ocoee No. 2 was temporarily suspended
because deterioration of the steel trestles supporting the flume
caused a safety hazard. While it has been so shut down, water
which would ordinarily have been diverted through the flume
has flowed past the dam instead. The resulting stretch of water
immediately below the dam, which is easily accessible from a
nearby highway, has been extensively used during this period
for recreational rafting. This in turn has led to the provision of
commercial raft rentals and related commercial services.
After the shutdown, TVA made extensive studies, including
preparation of an environmental impact statement (EIS),
relating to the cost and desirability of repairing Ocoee No. 2 (in-
cluding rebuilding the flume, which deteriorated during the
shutdown, and some work on the dam) and returning it to
operation. On the basis of these studies, TVA concluded that
Ocoee No. 2 is a valuable power asset which can and should be
repaired and returned to operation as a part of TVA’s power
system.’ TVA also concluded that it was precluded from wholly
* Section 14 of the TVA Act, 16 U.S.C. § 831m (1976), provides for
by a
1945 TVA Ann. Rep. 233-35; 1946 TVA Ann. Rep. 89. The bonds
issued under section 15c of the TVA Act to finance federal purchase
i Ras
or partially diverting a power asset such as Ocoee No. 2 to a
nonpower use such as recreational rafting unless the TVA power
system was compensated for the power lost thereby. The basis
for such preclusion was section 9a of the TVA Act, 16 U.S.C. §
83ih-1 (1976), and a Basic Bond Resolution which TVA
adopted in 1960 under express authority contained in the 1959
revenue bond amendment to the TVA Act, 16 U.S.C. § 831n-4
(1976; Supp. IV, 1980), and which constitutes by its own terms a
contract between TVA and the holders of its bonds. TVA fur-
ther concluded that some recreation releases of water from
behind Ocoee No. 2 dam would be desirable if, but only if, the
power system were so reimbursed, and that a congressional ap-
propriation of the necessary funds would be a practicable
method of providing such reimbursement (if Congress regarded
recreational rafting as warranting an appropriation).
Such an appropriation was sought and denied—first by the
House Appropriations Committee in connection with TVA’s
fiscal year 1981 budget, and again by the Office of Management
and Budget (OMB) in refusing to include a request for such
funds in the overall federal budget submitted by the President
for fiscal year 1982. Both the House Appropriations Committee
and OMB expressed the view that the funds needed to reimburse
the power system for recreation releases should be provided by
recreation users themselves through a system of user fees, and
OMB indicated its willingness to support legislation providing
for such fees if legislation were necessary. See Hearings Before a
Subcom. of Energy and Water Development, 96th Cong., 2d
Sess. 974 (1980); H.R. Rep. No. 96-1093, 96th Cong., 2d Sess.
150 (1980).
On March 6, 1981, the Ocoee River Council, an organization
formed by various commercial rafting interests and noncom-
mercial rafters, and two other parties, one a commercial rafting
company and the other an individual rafter, brought an action
in the United States District Court for the Eastern District of
— A-21 —
Tennessee, Southern Division, No. 1-81-100, seeking an injunc-
tion prohibiting such repair and restoration to service. Plaintiffs
alleged that such repair and restoration would violate the Na-
tional Environmental Policy Act (NEPA), 42 U.S.C. §§ 4321 ef
seq. (1976; Supp. III, 1979); the Federal Water Pollution Con-
trol Act, 33 U.S.C. §§ 1251 et seg. (1976; Supp. III, 1979); por-
tions of the Administrative Procedure Act (APA), 5 U.S.C. §§
701 et seq. (1976); the Fish and Wildlife Coordination Act, 16
U.S.C. §§ 661 ef seg. (1976), and a section of the Outdoor
Recreation Act, 16 U.S.C. § 4601 (1976).
On June 9, 1981 the court (Chief Judge Frank W. Wilson)
issued an order, with an accompanying memorandum, holding
plaintiffs’ contentions as to the Federal Water Pollution Con-
trol Act, the Fish and Wildlife Coordination Act, and the Out-
door Recreation Act to be without merit and granting TVA’s
motion for summary judgment with respect to those conten-
tions. On the NEPA and APA claims, the court held that
TVA’s EIS for Ocoee No. 2 was adequate, but that TVA had
violated NEPA by assuming that recreation releases could not
legally be made from Ocoee No. 2 unless the power program
were reimbursed for resulting losses in power generation. It ac-
cordingly ordered that TVA reconsider its decision in light of
NEPA ‘‘without excluding recreational releases of water absent
separate funding for such releases,’’ and that it report the
results of its reconsideration to the court within 90 days. In so
doing, the court stayed plaintiffs’ request for a preliminary in-
junction restraining TVA’s continued work on Ocoee No. 2,
and noted in the memorandum accompanying its order that:
In reviewing the TVA’s decision ... this Court may not
substitute its judgment for that of the agency... . So long
as the Agency complies with its obligation under NEPA to
incorporate environmental concerns into its decision-
making, the ultimate decision on each project belongs to
the agency.
sti iA i
Turning ... to the issue of the [probability of] the ultimate
success of the plaintiffs in obtaining a full retirement of the
Ocoee No. 2 project, it should be noted that the alternative
of not reconstructing Ocoee No. 2 and of retiring the pro-
ject was rejected by the final EIS. It would appear,
therefore, that when the TVA reconsiders its decision upon
Ocoee No. 2 with due regard for its obligations under
NEPA, it is unlikely that the TVA would adopt this alter-
native. The Court concludes, therefore, that the plaintiffs
have little prospect of ultimately obtaining a complete
cessation of work on the project [memorandum at 15, 18;
emphasis the court’s].
The TVA Board, following reconsideration on the basis
directed by the court, concluded on September 2, 1981, that
Ocoee No. 2 should be restored to service; recreation releases
without reimbursement to the power system would be
undesirable and productive of public detriments which would
outweigh any benefits to recreation; and the project should be
operated for power, with recreation releases for 82 days per year
if, but only if, a method—such as concession, license, or user
fees—could be developed to assure reimbursement to the power
system. TVA so reported to the court, and also asked that the
court reconsider, in the light of section 9a of the TVA Act and
TVA’s Basic Bond Resolution, the portion of its memorandum
which had indicated that total or partial diversion of the project
to recreation at the expense of power would have been proper
had TVA found—as it did not—that such diversion would be
desirable. The issues involved were briefed and, on February 11,
1982, orally argued, after which the court took the matter under
advisement.
Two weeks after TVA’s September 2, 1981, determination,
the Ocoee River Council filed a complaint with the Commis-
sioner, Tennessee Department of Health, alleging that TVA’s
restoration of Ocoee No. 2 to service for generation of power
will violate the Tennessee Water Quality Control Act. The com-
— A-23 —
plaint did not state or suggest that TVA’s plans involve the
discharge of any foreign substance into the waters of the Ocoee
River. Rather, it claimed that diversion of such waters through
the restored flume would itself constitute a ‘‘degradation of
these high quality recreation waters’’; that TVA’s determination
to utilize Ocoee No. 2 for power purposes, unless power is reim-
bursed for generation lost through its partial diversion to recrea-
tion use, represents an ‘‘assert[ion] that it, not the people of
Tennessee, is the owner of the river,’’ in violation of ‘‘that por-
tion of the [Tennessee Water Quality Control] Act which pro-
vides that ‘the waters of Tennessee are the property of the state
and are held in public trust for the use of the people of the
state’’’; and that TVA’s plans to use the water for power
generation violates ‘‘the entire intent of the Act which seeks to
make the fullest use of the water resources of Tennessee.’’
On September 21, 1981, the Commissioner addressed a letter
to TVA which stated that ‘‘the Commissioner will be in-
vestigating this complaint and you will be notified of his deter-
mination as soon as it is made,’’ and that ‘‘[yjour appeal
privileges are to the Water Quality Control Board.”’
Thereafter, on December 11, 1981, the Commissioner sent
TVA a letter with which he enclosed a technical report by his
department’s Division of Water Quality Control and an opinion
by the Tennessee Attorney General. The letter stated that he had
“carefully evaluated both of the enclosed documents and
find[s] that TVA’s proposed activity requires a State water
quality permit.’’ The stated reasons for the finding were that
**TVA’s proposed diversion of the waters of the Ocoee River
will constitute an ‘...alteration of the physical, chemical,
radiological, biological, or bacteriological properties of
.. waters of the State’ ’’; ‘“TVA’s use of the diverted water to
generate electricity at Powerhouse No. 2 constitutes ‘[tJhe
development of a natural resource...’’’; and ‘T.C.A.
70-330(>) makes either of these activities unlawful unless it is
carried out in accordance with the conditions of a valid
permit.’’ The letter further advised that TVA could appeal to
—_ pe
the Tennessee Water Quality Control Board within 30 days
from its receipt of the letter.
During such 30-day period, TVA filed an appeal, removed it
to this court, and filed the separate declaratory judgment action
with which the appeal has been consolidated.
It is TVA’s basic position that (1) the state and its officials
have no authority to regulate or control federal action relating
to the unified development of the Tennessee River system except
to the extent Congress has expressly consented thereto, and (2)
Congress has not consented to the regulation or control here in-
volved.
The defendants submit that § 313 of the Clean Water Act re-
quires the TVA to comply with state requirements respecting
control and abatement of pollution. In other words, does that
section waive the sovereign immunity otherwise possessed by the
United States of America through the TVA. The statutory
language is that each instrumentality of the executive branch of
government engaging in any activity ‘‘resulting, or which may
result, in the discharge or runoff of pollutants’’ shall be subject
to State requirements, etc. The key words are ‘‘discharge or
runoff of pollutants.’’ The State cannot under the guise of
regulation of discharge or runoff of pollutants exercise the right
of control over a unified federal navigation, flood control and
power operation, where federal sovereignty has been retained.
Here there is solely a question of diversion. There is no
discharge nor runoff of pollutants. Regardless of the desirabili-
ty of recreational rafting, that issue is not present. The strained
construction that somehow this diversion of water for a distance
of 4.6 miles, passing through a flume, constitutes a discharge or
runoff of pollutants is not impressive.
The motion of TVA for a summary judgment is sustained.
The motion of the defendant is denied. An order will be
entered.
/s/ L. Clure Morton
Chief Judge
— A-25 —
APPENDIX C
Federal Clean Water Act Provisions
§1251. Congressional declaration of goals and policy
(b) It is the policy of the Congress to recognize, preserve, and
protect the primary responsibilities and rights of States to pre-
vent, reduce, and eliminate pollution, to plan the development
and use (including restoration, preservation, and enhancement)
of land and water resources, and to consult with the Ad-
ministrator in the exercise of his authority under this chapter. It
is the policy of Congress that the States manage the construc-
tion grant program under this chapter and implement the permit
programs under sections 1342 and 1344 of this title. It is further
the policy of the Congress to support and aid research relating
to the prevention, reduction, and elimination of pollution, and
to provide Federal technical services and financial aid to State
and interstate agencies and municipalities in connection with the
prevention, reduction, and elimination of pollution.
§ 1323. Federal facilities pollution control
(a) Each department, agency, or instrumentality of the ex-
ecutive, legislative, and judicial branches of the Federal Govern-
ment (1) having jurisdiction over any property or facility, or (2)
engaged in any activity resulting, or which may result, in the
discharge or runoff of pollutants, and each officer, agent, or
employee thereof in the performance of his official duties, shall
be subject to, and comply with, all Federal, State, interstate,
and local requirements, administrative authority, and process
and sanctions respecting the control and abatement of water
pollution in the same manner, and to the same extent as any
nongovernmental entity including the payment of reasonable
“
— A-26 —
service charges. The preceding sentence shall apply (A) to any
requirement whether substantive or procedural (including any
recordkeeping or reporting requirement, any requirement
respecting permits and any other requirement, whatsoever), (B)
to the exercise of any Federal, State, or local administrative
authority, and (C) to any process and sanction, whether enforc-
ed in Federal, State, or local courts or in any other manner. This
subsection shall apply notwithstanding any immunity of such
agencies, officers, agents or employees under any law or rule of
law. Nothing in this section shall be construed to prevent any
department, agency, or instrumentality of the Federal Govern-
ment, or any officer, agent, or employee thereof in the perfor-
mance of his official duties, from removing to the appropriate
Federal district court any proceeding to which the department,
agency, or instrumentality or officer, agent, or employee
thereof is subject pursuant to this section, and any such pro-
ceeding may be removed in accordance with section 1441 et seq.
of Title 28. No officer, agent, or employee of the United States
shall be personally liable for any civil penalty arising from the
performance of his official duties, for which he is not otherwise
liable, and the United States shall be liable only for those civil
penalties arising under Federal law or imposed by a State or
local court to enforce an order or the process of such court. The
President may exempt any effluent source of any department,
agency, or instrumentality in the executive branch from com-
pliance with any such a requirement if he determines it to be in
the paramount interest of the United States to do so; except that
no exemption may be granted from the requirements of section
1316 or 1317 of this title. No such exemptions shall be granted
due to lack of appropriation unless the President shall have
specifically requested such appropriation as a part of the
budgetary process and the Congress shall have failed to make
available such requested appropriation. Any exemption shall be
for a period not in excess of one year, but additional exemptions
may be granted for periods of not to exceed one year upon the
President’s making a new determination. The President shall
- ll —
report each January to the Congress all exemptious from the re-
quirements of this section granted during the preceding calendar
year, together with his reason for granting such exemption. In
addition to any such exemption of a particular effluent source,
the President may, if he determines it to be in the paramount in-
terest of the United States to do so, issue regulations exempting
from compliance with the requirements of this section any
weaponry, equipment, aircraft, vessels, vehicles, or other
classes or categories of property, and access to such property,
which are owned or operated by the Armed Forces of the United
States (including the Coast Guard) or by the National Guard of
any State, and which are uniquely military in nature. The Presi-
dent shall reconsider the need for such regulations at three-year
intervals.
§ 1342. National pollutant discharge elimination system
Permits for discharge of pollutants
(a1) Except as provided in sections 1328 and 1344 of this ti-
tle, the Administrator may, after opportunity for public hear-
ing, issue a permit for the discharge of any pollutant, or com-
bination of pollutants, notwithstanding section 1311(a) of this
title, upon condition that such discharge will meet either all ap-
plicable requirements under sections 1311, 1312, 1316, 1317,
1318, and 1343 of this title, or prior to the taking of necessary
implementing actions relating to all such requirements, such
conditions as the Administrator determines are necessary to
carry out the provisions of this chapter.
(2) The Administrator shall prescribe conditions for such per-
mits to assure compliance with the requirements of paragraph
(1) of this subsection, including conditions on data and infor-
mation collection, reporting, and such other requirements as he
deems appropriate.
—
(3) The permit program of the Administrator under
paragraph (1) of this subsection, and permits issued thereunder,
shall be subject to the same terms, conditions, and requirements
as apply to a State permit program and permits issued
thereunder under subsection (b) of this section.
(4) All permits for discharges into the navigable waters issued
pursuant to section 407 of this title, shall be deemed to be per-
mits issued under this subchapter, and permits issued under this
subchapter shall be deemed to be permits issued under section
407 of this title, and shall continue in force and effect for their
term unless revoked, modified, or suspended in accordance with
the provisions of this chapter.
(5) No permit for a discharge into the navigable waters shall
be issued under section 407 of this title after October 18, 1972.
Each application for a permit under section 407 of this title,
pending on October 18, 1972, shall be deemed to be an applica-
tion for a permit under this section. The Administrator shall
authorize a State, which he determines has the capability of ad-
ministering a permit program which will carry out the objective
of this chapter, to issue permits for dischages into the navigable
waters within the jurisdiction of such State. The Administrator
may exercise the authority granted him by the preceding
sentence only during the period which begins on October 18,
1972, and ends either on the ninetieth day after the date of the
first promulgation of guidelines required by section 1314(h\(2)
of this title, or the date of approval by the Administrator of a
permit program for such State under subsection (b) of this sec-
tion, whichever date first occurs, and no such authorization to a
State shall extend beyond the last day of such period. Each such
permit shall be subject to such conditions as the Administrator
determines are necessary to carry out the provisions of this
chapter. No such permit shall issue if the Administrator objects
to such issuance.
— A-29 —
State permit programs
(b) At any time after the promulgation of the guidelines re-
quired by subsection (h)(2) of section 1314 of this title, the
Governor of each State desiring to administer its own permit
program for discharges into navigable waters within its jurisdic-
tion may submit to the Administrator a full and complete
description of the program it proposes to establish and ad-
minister under State law or under an interstate compact. In ad-
dition, such State shall submit a statement from the attorney
general (or the attorney for those State water pollution control
agencies which have independent legal counsel), or from the
chief legal officer in the case of an interstate agency, that the
laws of such State, or the interstate compact, as the case may
be, provide adequate authority to carry out the described pro-
gram. The Administrator shall approve each such submitted
program unless he determines that adequate authority does not
exist:
(1) To issue permits which—
(A) apply, and insure compliance with, any applicable
requirements of sections 1311, 1312, 1316, 1317, and 1343
of this title;
(B) are for fixed terms not exceeding five years; and
(C) can be terminated or modified for cause including,
but not limited to, the following:
(i) vioiation of any condition of the permit;
(ii) obtaining a permit by misrepresentation, or
failure to disclose fully all relevant facts;
(iii) change in any condition that requires either a
temporary or permanent reduction or elimination of
the permitted discharge;
(D) control the disposal of pollutants into wells;
ao A390 —
(2A) To issue permits which apply, and insure compliance
with, all applicable requirements of section 1318 of this title, or
(B) To inspect, monitor, enter, and require reports to at least
the same extent as required in section 1318 of this title;
(3) To insure that the public, and any other State the waters
of which may be affected, receive notice of each application for
a permit and to provide an opportunity for public hearing
before a ruling on each such application;
(4) To insure that the Administrator receives notice of each
application (including a copy thereof) for a permit;
(5) To insure that any State (other than the permitting State),
whose waters may be affected by the issuance of a permit may
submit written recommendations to the permitting State (and
the Administrator) with respect to any permit application and,
if any part of such written recommendations are not accepted
by the permitting State, that the permitting State will notify
such affected State (and the Administrator) in writing of its
failure to so accept such recommendations together with its
reasons for so doing;
(6) To insure that no permit will be issued if, in the judgment
of the Secretary of the Army acting through the Chief of
Engineers, after consultation with the Secretary of the depart-
ment in which the Coast Guard is operating, anchorage and
navigation of any of the navigable waters would be substantially
impaired thereby;
(7) To abate violations of the permit or the permit program,
including civil and criminal penalties and other ways and means
of enforcement;
(8) To insure that any permit for a discharge from a publicly
owned treatment works includes conditions to require the iden-
tification in terms of character and volume of pollutants of any
significant source introducing pollutants subject to pretreat-
— A-31 —
ment standards under section 1317(b) of this title into such
works and a program to assure compliance with such pretreat-
ment standards by each such source, in addition to adequate
notice to the permitting agency of (A) new introductions into
such works of pollutants from any source which would be a new
source as defined in section 1316 of this title if such source were
discharging pollutants, (B) new introductions of pollutants into
such works from a source which would be subject to section
1311 of this title if it were discharging such pollutants, or (C) a
substantial change in volume or character of pollutants being in-
troduced into such works by a source introducing pollutants in-
to such works at the time of issuance of the permit. Such notice
shall include information on the quality and quantity of effluent
to be introduced into such treatment works and any anticipated
impact of such change in the quantity or quality of effluent to
be discharged from such publicly owned treatment works; and
(9) To insure that any industrial user of any publicly owned
treatment works will comply with sections 1284(b), 1317, and
1318 of this title.
Suspension of federal program upon submission of State
program; withdrawal of approval of State program
(cM1) Not later than ninety days after the date on which a
State has submitted a program (or revision thereof) pursuant to
subsection (b) of this section, the Administrator shall suspend
the issuance of permits under subsection (a) of this section as to
those navigable waters subject to such program unless he deter-
mines that the State permit program does not meet the re-
quirements of subsection (b) of this section or does not conform
to the guidelines issued under section 1314(h)(2) of this title. If
the Administrator so determines, he shall notify the State of any
revisions or modifications necessary to conform to such re-
quirements or guidelines.
— A-32 —
(2) Any State permit program under this section shall at all
times be in accordance with this section and guidelines pro-
mulgated pursuant to section 1314(h)(2) of this title.
(3) Whenever the Administrator determines after public hear-
ing that a State is not administering a program approved under
this section in accordance with requirements of this section, he
shall so notify the State and, if appropriate corrective action is
not taken within a reasonable time, not to exceed ninety days,
the Administrator shall withdraw approval of such program.
The Administrator shall not withdraw approval of any such
program unless he shall first have notified the State, and made
public, in writing, the reasons for such withdrawal.
§ 1370. State authority.
Except as expressly provided in this chapter, nothing in this
chapter shall (1) preclude or deny the right of any State or
political subdivision thereof or interstate agency to adopt or en-
force (A) any standard or limitation respecting discharges of
pollutants, or (B) any requirement respecting control or abate-
ment of pollution; except that if an effluent limitation, or other
limitation, effluent standard, prohibition, pretreatment stan-
dard, or standard of performance is in effect under this chapter,
such State or political subdivision or interstate agency may not
adopt or enforce any effluent limitation, or other limitation, ef-
fluent standard, prohibition, pretreatment standard, or stan-
dard of performance which is less stringent than the effluent
limitation, or other limitation, effluent standard, prohibition,
pretreatment standard, or standard of performance under this
chapter; or (2) be construed as impairing or in any manner af-
fecting any right or jurisdiction of the States with respect to the
waters (including boundary waters) of such States.
June 30, 1948, c. 758, Title V, § 510, as added Oct. 18, 1972,
Pub.L. 92-500, § 2, 86 Stat. 893.
= Add
APPENDIX D
Tennessee Water Quality Control Act
Provision
69-3-108. Permits.—(a) Every person who is or is planning to
carry on any of the activities outlined in subsection (b) of this
section, other than a person who discharges into a publicly own-
ed treatment works or who is a domestic discharger into a
privately owned treatment works, shall file an application for a
permit with the commissioner or, when necessary, for modifica-
tion of his existing permit.
(b) It shall be unlawful for any person, other than a person
who discharges into a publicly owned treatment works or a per-
son who is a domestic discharger into a privately owned treat-
ment works, to carry out any of the following activities, except
in accordance with the conditions of a valid permit:
(1) The alteration of the physical, chemical, radiological,
biological, or bacteriological properties of any waters of the
state;
(2) The construction, installation, modification, or operation
of any treatment works or part thereof, or any extension or ad-
dition thereto;
(3) The increase in volume or strength of any wastes in excess
of the permissive discharges specified under any existing permit;
(4) The development of a natural resource or the construc-
tion, installation, or operation of any establishment or any ex-
tension or modification thereof or addition thereto; the opera-
tion of which will or is likely to cause an increase in the
discharge of wastes into the waters of the state or would other-
wise alter the physical, chemical, radiological, biological or
bacteriological properties of any waters of the state in any man-
ner not already lawfully authorized;
—>
(5) The construction or use of any new outlet for the
discharge of any wastes into the waters of the state;
(6) The discharge of sewage, industrial wastes or other wastes
into waters, or a location from which it is likely that the
discharged substance will move into waters; or
(7) The discharge of sewage, industrial wastes, or other wastes
into a well or a location that is likely that the discharged
substance will move into a weil.
— A-35 —
APPENDIX E
Federal Register / Vol. 48, No. 195 /
Thursday, October 6, 1983 / Notices 45597-45598
Under the NPDES Permit Regulation (48 FR 14146, April 1,
1983), EPA will provide Federal Register notice of actions by
the Agency approving or modifying a State NPDES program.
The following table will provide the public with an up-to-date
list of the status of NPDES permitting authority throughout
{the country].
| Approved to ey
NPDES | FON | prevest
perma te oe mare
progam program
Aiabere ......... 10/10/78 10/10/78 10/18/79
Catttorme 6/14/73 6/s/7e
. Cotoredo 3/27/76
Connection, ......... 0/26/73 ‘6/3/81
( tewere 4/1/74
SO 6/28/74 12/8/80 3/12/61
Hewe? .............. 11/28/74 e/1/7e 6/12/63
Sroe................ vied 6/20/79 |
ene wi 12/0/78 |.
we 6/10/78 6/10/78 6/3/81
ay 6/28/74
Kentucky 0/30/83 0/30/83 0/30/83
Maryend 0/5/74
Macragen 10/17/73 12/0/78 6/7/63
Merwnercts........... 6/30/74 12/0/78 7/16/78
Meee, ......... 6/1/74 1/28/63 8/13/82
eg sO 10/30/74 6/26/79 6/3/81
Net ests 6/12/74 49/2/78
Nees 0/10/75 6/31/78
i ao odd 4/13/62 4/13/62 4/13/82
New York 10/28.'75 |
North Carcire ... 10/10/76 6/14/82
Mort) Dekote 6/13/78
Oro a/11/74 1/28/83 7/27/63
Qregon. 0/26/73 3/2/79 3/12/81
Pewepvers 6/s0/76
Sou Corctra...... 6/10/76 0/26/80 4/0/82
oo 12/28/77 6/10/83
Veweort a/1i/74 3/16/82
Vegr tetands ..... 6/30/74
Vy 3/31/78 2/0/@2
Weetwgion 11/14/73
west Vwyru: | 6/10/62 6/10/82 6/10/82
wWieconssn 2/asta 1/28/79 12/24/60
wWyorrang. 1/30/78 6/16/81
e.
Me
This is a copy of a public record, reproduced as it was published. It is not legal advice, and it may not be the version a court would rely on. Check the official source before you cite it.