In the
Supreme Court of the United States
OCTOBER TERM, 1983
BAYOU DES FAMILLES
DEVELOPMENT CORPORATION,
PETITIONER,
7
UNITED STATES CORPS OF ENGINEERS,
UNITED STATES DEPARTMENT OF THE
INTERIOR, and UNITED STATES OF AMERICA,
RESPONDENT
PETITION FOR A WRIT OF CERTIORARI TO THE
UNITED STATES COURT OF APPEALS
FOR THE FIFTH CIRCUIT
PETITION FOR WRIT OF CERTIORARI
MOISE S. STEEG, JR.
STEEG & O'CONNOR
1440 Oil & Gas Building
1100 Tulane Avenue
New Orleans, Louisiana 70112
(504) 581-9362
A B Letter Service. Inc., 327 Chartres St., New Orleans, La (504) 581-5555
i
QUESTIONS PRESENTED
This case, we believe, for the first time squarely
presents the issue whether, if in the exercise of its permit
authority pursuant to the Rivers and Harbors Appropria-
tions Act of 1899, § 10, 33 U.S.C. § 403 (hereinafter RHA),
and the Federal Water Pollution Act, § 404, 33 U.S.C. §
1251, renamed Clean Water Act (hereinafter CWA), the
Corps of Engineers completely destroys the economic
usefulness of private property, a Fifth Amendment viola-
tion of ‘due process’ or ‘just compensation’ occurs.
The specific questions presented in this litigation
FIRST: With respect to the permit action of the
Corps of Engineers:
Petitioner is the owner of real property in Jefferson
Parish, Louisiana, and was proceeding with State and
Municipal regulatory approval to develop it by the erection
of a levee and “‘plugging’’ a man-made canal when (a) the
work was halted by the Corps of Engineers and (b) its ‘after
the fact permit’ was denied. With respect to the jurisdic-
tion and action of the Corps of Engineers the following
questions are presented:
(1) Did the Corps of Engineers have initial jurisdic-
tion over Petitioner’s land when it issued its cease and
desist order? If so,
(2) Does the Fifth Amendment provide injunctive
remedy to a property owner where in the execution of its
permit power under the Rivers and Harbors Act (RHA)
and/or the Clean Water Act (CWA), the Corps of Engineers
4
ii
renders the property owner’s land valueless, or does such
action constitute a Fifth Amendment taking without just
compensation?
(3) Did the administrative action of the Corps of
Engineers violate the due process provisions of the Fifth
Amendment where (i) the decision was predicated on
regulations which were issued after the application was
filed; (ii) its decision was delayed for approximately four
years after it was in posture to decide; (iii) both the delay
and the decision were influenced by the efforts of the Corps
to accommodate its own decision on peripheral matters, i.e.
the location of a hurricane protection levee and the needs
of the Department of Interior with respect to Jean Lafitte
Historic Park; (iv) the permit denial was inconsistent with
two other decisions by the Corps of Engineers involving
the same issues and comparable land; and (v) is not sup-
ported by the weight of its own holdings applying its own
criteria? Or, if not a violation of due process
(4) Do these factors constitute grounds for judicial
reversal of the decision of the District Engineer on the
ground that it was arbitrary and capricious so that injunc-
tive relief should issue?
(5) Does this action constitute a taking without just
compensation in contravention of the Fifth Amendment?
(6) Did the United States District Court, having
jurisdiction over the property and the parties and the clear
right and jurisdiction to determine whether the alleged
Fifth Amendment due process violations had occurred and
grant injunctive relief, have the pendent jurisdiction to
determine, if it denied injunction, that the actions com-
plained of constituted a Fifth Amendment taking without
just compensation?
SECOND: With respect to the Jean Lafitte Park:
On November 10, 1978, Congress created the Jean
Lafitte Historical Park, delegating its administration to
the Department of Interior and granting the Department
of Interior the right to create a Core Area containing about
8,000 acres (which constituted the Park itself) and a Park
Protection Zone (PPZ) of about 20,000 acres. Approximate-
ly 151 acres of Petitioner’s property was included in the
Core Area, and 1,800 acres in the Park Protection Zone.
(i) The statute provided that the Department of In-
terior ‘‘shall’’ establish guidelines for the PPZ within six (6)
months after enactment of the statute. Since these guide-
lines were not established within the 6-month period, is
Petitioner entitled to injunctive relief on the ground that
the use of the word ‘‘shall’’ was mandatory and, therefore,
the Department of Interior had no further right to issue
guidelines?
(2) However, if it is determined the Department of In-
terior has the right to issue guidelines, despite the
language of the statute, then does the Park Protection
Zone, as described in the statute and as governed by the
guidelines proposed by the Department of Interior, in fact,
constitute an extension of the Core Area; thus, a Fifth
Amendment violation by the taking of property without
due process?!
! When this suit was instituted, Petitioner further complained it
should recover for the Core Area on the grounds that the delay of taking
had deprived Petitioner of its land without compensation. Meanwhile,
the process of condemnation has commenced, appraisal completed, and
offer to acquire submitted, and this issue dismissed without prejudice.
iv
LIST OF INTERESTED PARTIES
Petitioner is Bayou des Familles Development Cor-
poration, a Louisiana corporation, whose shareholders are
Wilson P. Abraham, George Ackel, Sam J. Gattuso, James
E. Hennessey, Charles Kornman, B. H. Miller, Succession
of Julius Rosenblum represented by his son, Paul
Rosenblum, and James Trotter.
v
TABLE OF CONTENTS
Page
eS. SS ee ts Er i
ue Ce PPUNGEOE. ow. ee ew ee ec das iv
hos. ssw gin dh oieta v ood woe ob tae Vv
ne ka ee caw nese ceebeubene vi
I ere os ow Siw aid ca bon Bw ee CAR me 1
ii rr, ss alee pews) s iawn 9 ae 2
Constitutional and Statutory Provisions Involved ..... 2
ee sede csc Lr sss wel aw ioa'e ub bw eee 3
Basis for Federal Jurisdiction...................... 7
er. ks op Wa ene Wa de wine FOE 7
sis, ila Ca whens «devia vaweh 16
Nee ee ae pw wale ee 18
APPENDIX A—
Jean Lafitte National Historic Park Act,
16 U.S.C. § 230, P.L. 95-625, §§ 901, 902....... A-1
33 C.F.R. §§ 322.4(g), 323.3(a), 323.4-1.......... A-4
eo ee ee A-6
APPENDIX B—
Opinion of the U.S. District Court............ A-10
Judgment of the U.S. Court of Appeals
ee enc c ween A-46
Judgment of the U.S. Court of Appeals for
the Fifth Circuit on Petition For Rehearing... . A-48
Letter from Frederic M. Chatry dated
i es ba ies A-49
Memorandum from Nettles dated
ee iw A-52
Memorandum from James L. Isenogle
I A-54
Opinion of the U.S. District Court, Eastern
District of Louisiana, in Orleans Audubon
Society v. Col. Robert E. Lee ................ A-58
Opinion of the District Counsel for the
Corps of Engineers, Joseph A. Towers ........ A-63
vi
TABLE OF AUTHORITIES
Case: Page
Agins v. City of Tiburon,
I I cies 4 Arddtin Wa Ww Neues he’s e 8
Bradley v. School Board of City of Richmond,
NS gs cd's oid wu ae Mot sales oA 12
Calero-Toledo v. Pearson Yacht Leasing Co.,
I I Gg oc g sa y's ecdhelblei eve abs oe
Cherokee Nation v. Southern Kansas Ry. Co.,
oy ac 0G le cob eS 0 a bt0 oo A @ Ofe 8
Deltona Corp. v. U.S.,
ON A BE eo 8) | eee 9
Jentgen v. U.S.,
657 F.2d 1210 (Ct. Cl. 1981) cert. den.,
0S, Ci ib ais wlle'g ws» veo de les 9
Green v. U.S.,
I oo, cia ak Sine coins sige ow ROWS 12
Kaiser Aetna v. U.S.,
ar a Shes alee wig v ale w O00 0. 9
Manhattan General Equipment Co. v. Commissioner
of Internal Revenue, 297 U.S. 129 (1936)........ 12
Orleans Audubon Society v. Col. Robert E. Lee,
EOS. yes wae bas alee its bb a6 10, 12, 13, 15
Peabody v. U.S.,
ID oS 0's 5's bo ow wir» aN ble wkd 9 9
Penn Central Transportation Co. v. City of New York,
eR Sc Cia 'o..0 0b gycasw'n ba WAL O 8,9
Securities and Exchange Commission v. Chenery Corp.,
I I ol, Se WS aire weak vgtenlo iow o ghee 12
U.S. v. Causby,
I I a, g's GEM ns 0 bm widcp ake dma 9
Constitution, Statutes and Regulations:
United States Constitution, Fifth Amendment........ 2
Rivers and Harbors Act, § 10
pS eae. ee 6, 7, 10, 14
vii
Federal Water Pollution Act, § 404
ee oe 6, 7, 10, 11, 12, 14
Jean Lafitte National Historic Park Act
16 U.S.C. § 230, P.L. 95-625 §§ 901, 902....... 3, 5
33 C.F.R. $8 322.4(g), 323.4-1................ 3, 10, 12
33 C.F.R. §§ 209.260(g)(1), (k) (ii) (2) (1972)
Engineering Regulation 1165-2-302............... 3, 11
The Tucker Act, 28 U.S.C. $ 1401. ....... 0... ccc 6
oot ens sven cata ek kp kis vis aS ORN 7
5 U.S.C. $§ 702, 703, 704 and 706................... 7
1
IN THE
SUPREME COURT OF THE UNITED STATES
OCTOBER TERM, 1983
BAYOU DES FAMILLES
DEVELOPMENT CORPORATION,
Petitioner
Vv.
UNITED STATES CORPS OF ENGINEERS,
UNITED STATES DEPARTMENT OF INTERIOR,
and UNITED STATES OF AMERICA
Respondent
PETITION FOR A WRIT OF CERTIORARI
TO THE UNITED STATES COURT OF APPEALS
FOR THE FIFTH CIRCUIT
Bayou Des Familles Development Corporation,
plaintiff in the District Court and Appellant in the Fifth
Circuit Court of Appeals, prays that a Writ of Certiorari
issue to review the judgment of the United States Court of
Appeal for the Fifth Circuit rendered on June 23, 1983,
rehearing denied on August 8, 1983.
OPINIONS BELOW
The opinion of the District Court is reported under
the caption Bayou Des Familles Development Corporation
v. U.S. Corps of Engineers, et als, was rendered on April 20,
1983, and is reported at 541 Fed. Supp. 1025 (Appendix B,
Item 1).
The United States Court of Appeals for the Fifth
Ss
_—
an
Circuit affirmed the District Court on June 23, 1983. This
opinion is not reported (Appendix B, Item 2).
The Petition for Rehearing was denied on August 8,
1983 (Appendix B, Item 3).
JURISDICTION
The judgment of the U.S. District Court was
rendered on October 23, 1981 and entered October 27,
1981.
The judgment of the Court of Appeals for the Fifth
Circuit was rendered June 23, 1983 and entered August 22,
1983. The Petition for Rehearing was denied on August 8,
1983.
The jurisdiction of this Court is invoked under 28
U.S.C. 1254(F).
CONSTITUTIONAL AND STATUTORY
PROVISIONS INVOLVED
(1) The Fifth Amendment to the United States Con-
stitution provides:
No person shall be held to answer for a capital,
or otherwise infamous crime, unless on a present-
ment or indictment of a Grand Jury, except in
cases arising in the land or naval forces, or in the
Militia, when in actual service in time of War or
public danger; nor shall any person be subject for
the sane offence to be twice put in jeopardy of life
or limb; nor shall be compelled in any criminal
case to be a witness against himself, nor be
deprived of life, liberty, or property, without due
3
process of law; nor shall private property be taken
for public use, without just compensation.
(2) Jean Lafitte National Historic Park Act, 16
U.S.C. § 230, P.L. 95-625 §§ 901, 902 (Appendix A, Item 1).
(3) 33 C.F.R. §§ 322.4(g), 323.3(a), 323.4-1 (Appendix
A, Item 2).
(4) 33 C.F.R. $§ 209.260(g)(1), (k)(ii(2), Engineering
Regulation 1165-2-302 (1972) (now repealed, published at
37 Federal Register 176, pp 18289-18292, September 9,
1972) (Appendix A, Item 3).
STATEMENT
During 1973 Bayou Des Familles Development Cor-
poration, Petitioner, acquired approximately 2,500 acres of
unimproved land in Jefferson Parish, Louisiana, intending
to develop it for residential and commercial uses. Following
well established procedures and practices, it applied for
and obtained the approval of the appropriate local
authorities to levee the property and install a pumping sta-
tion to provide drainage. In the course of its approval pro-
cedure, the Jefferson Parish authorities called the Peti-
tioner’s attention to a levee line which had been proposed
by the Corps of Engineers for a hurricane protection levee
for this area. Engineering and environmental studies had
been completed, and a public hearing scheduled on the
Corps’ levee. Petitioner then relocated its levee line from
the boundary of its property to adopt the line proposed by
the Corps of Engineers, which required Petitioner to obtain
easements from other property owners since the Corps’
location included property of other owners as well as Peti-
tioner’s.
4
In the process of obtaining local approval, the Jeffer-
son Parish authorities on August 12, 1973 transmitted the
plans and specifications for the Petitioner's levee and for
the proposed work to the Corps of Engineers, and on Oc-
tober 9, 1973, received this reply from Frederick M.
Chatry, Acting Chief, Planning Division of the Corps (Ap-
pendix B, Item 4):
“5. The Bavou des Familles levee...if built...as
specified in the construction drawings...and if
properly maintained will provide protection
against hurricane produced stages on the order of
once in a hundred years or better....’’
Nevertheless, on October 29, 1973, 60 days after the
parish letter and 20 days after the Corps’ reply thereto, the
then District Engineer, apparently completely unaware of
his department's receipt of the Petitioner’s plans and their
approval by Chatry, wrote Petitioner that: ‘‘Based on the
definition of navigable waterways published in the Federal
Regulations on 9 September 1972, a permit ... may be re-
quired for this construction..."’ and requested copies of the
plans.” After communications between Petitioner and the
Corps, the District Engineer ordered the work to cease on
the ground that Petitioner had to obtain a permit to plug
the man-made canal which dead-ended on its property (the
Kenta Canal), contending that it was a navigable water-
way; he further subsequently determined that the levee
work also required a permit because Petitioner’s land was
below the level of the extended ‘‘plane of the mean high-
tide’’ measured at a gauge at Barataria Bay seven (7) miles
* Examination of Chatry's letter, will show that a copy of this let-
ter with five enclosures including the plans and specifications were sent
to Mr. Decker. This is the same Charles Decker referred to in the
District Engineer's letter as the person to whom Petitioner should reply.
5
miles away, and was therefore wetlands. The regulations
relied on provided as follows:
‘*...A canal open to navigable waters of the United
States on only one end is itself navigable where it
in fact supports interstate commerce.” (Appendix
A, Item 3)
After cease and desist proceedings were completed,
Petitioner applied for an after the fact permit on April 7,
1975. At this time, the pumping station was finished and
the levee ninety percent completed. The Kenta Canal was
not plugged.® According to the Corps’ records, it was ready
to render a decision on the permit application on December
10, 1975 (Appendix B, Item 5). However, the decision deny-
ing the application was not rendered for about four years,
on September 17, 1979.
The effect of this decision was to render the land ab-
solutely useless for any purpose.
The delay was caused by two unrelated government
matters: (1) The action to create the Hurricane Protection
Levee which had been relied upon by Petitioner in 1973,
had been abruptly halted for fiscal reasons; it was renewed
after the application was filed, and in 1978, the Corps
selected a new levee line different from the 1972 line which
Petitioner followed. (2) Meanwhile, Congress had enacted
the Lafitte Park legislation. The Department of Interior, to
control the area to be included in the PPZ, took an assertive
% Petitioner's plans originally called for plugging Bayou Boeuf, a
small natural body of water. These plans were abandoned and the Corps
so notified, and Bayou Boeuf plays no part in this litigation, although
it is contended that Bayou Boeuf was actually plugged. This is not con-
ceded, but what is established is that Bayou Boeuf on Petitioner's pro-
perty at the most is six inches deep only after flooding rains.
6
and aggressive part in the permit procedure to be certain
the PPZ boundary and the Hurricane Levee Line would
coincide, and that the permit would be denied.4 Both of
these factors weighed heavily (as the District Court deter-
mined) in the Corp’s decision making process, both with
respect to delay and the ultimate result.
Promptly after the denial of the permit, plaintiff in-
stituted this suit in the United States District Court seek-
ing injunctive relief on the ground that, individually and
collectively, the action of the Corps of Engineers and the
Department of Interior deprived Petitioner of its property
without due process of law in violation of the Fifth Amend-
ment, or in the alternative, constituted a taking without
just compensation in violation of the Fifth Amendment.
The Court below, misconstruing plaintiff's constitutional
arguments as an attack on the RHA and CWA per se,
dismissed the due process claim seeking injunction, and
declined to consider the alternate argument of just compen-
sation on jurisdictional grounds, holding jurisdiction was
vested solely in the Court of Claims under the Tucker Act.
While the permit application was pending, the
Department of Interior prepared a final draft of its
guidelines and submitted these to the Parish of Jefferson,
which refused to act on them. The guidelines, when con-
strued in the light of the statute itself, make the PPZ
* Petitioner has contended that the combined action purported to
increase Lafitte Park from 8,000 acres to 28,000 acres, and in so doing,
prevent proper recovery by Petitioner for the property taken in the Core
Area and the PPZ. Although not in the record and having occurred since
this case was decided by the Fifth Circuit, this position is borne out by
the appraisal by the Department of Interior's appraiser, who relied on
the ‘‘uselessness’’ of Petitioner's acreage in the Core Area as a result of
the Core’s permit denial, and found its use ‘‘recreational only’’ and thus
of minimal value.
7
nothing other than an extension of the Park. They effec-
tively prevent any viable use of Petitioner's property.
With respect to the action of the Department of In-
terior, Petitioner has contended that the language of the
statute mandated that guidelines be issued within six (6)
months after the effective date of the Lafitte Park Act, or
if not, then to establish a PPZ, the Department of Interior
was required to acquire the property by exercising the
right of eminent domain. Since six (6) months had elapsed
and the guidelines had not become official, injunctive relief
against their future issuance was sought. In the alter-
native, in the event the guidelines could be issued,
Petitoner contended that the statutory definition of the
PPZ, when construed with the final draft of the guidelines
of the Lafitte Park Statute, clearly deprived Petitioner of
any use of its land whatsoever, and therefore was an un-
constitutional taking.
BASIS FOR FEDERAL JURISDICTION
Jurisdiction in the U.S. District Court was asserted
under 28 U.S.C. § 1331, and 5 U.S.C. §§ 702, 703, 704 and
706.
ARGUMENT
It appears that thus far Petitioner has been unable
effectively to present its constitutional arguments. Peti-
tioner does not contend, as the Court below perceived, that
the RHA and CWA are per se unconstitutional statutes. To
the contrary, Petitioner contends that in the administra-
tion of the permit authority granted the Corps of Engineers
by these statutes, the Corps exceeded its authority in that
its actions were, in effect, confiscatory and, accordingly,
8
constituted a violation of due process for which injunction
is the proper remedy, or constituted a taking of private pro-
perty for public use without just compensation, and Peti-
tioner is therefore entitled to recover ‘‘just compensation”’
for its property.
Nor does Petitioner contend that Congress does not
have the power to create the Jean Lafitte Park and that it
cannot ‘‘take the Core Area’’. However, Petitioner does con-
tend that the Department of Interior does not have the right
to create a Park Protection Zone with such severe restraints
on its use that it is nothing more than an extension of the
Park itself; this action destroys the entire value of Peti-
tioner’s properties, and thus affords Petitioner the relief
sought.°
These contentions are based upon the language of this
court in Calero-Toledo v. Pearson Yacht Leasing Co., 416 U.S.
663, 668 n. 5 (1974) where this time-honored language was
quoted:
“There cannot exist under the American Flag any
governmental authority untrammeled by the re-
quirements of due process of law as guaranteed by
the Constitution of the United States.”’
In 1980, in Agins v. City of Tiburon, 447 U.S. 255
(1986), it was held that a government regulation effected a
taking if it ‘denies an owner economically viable use of his
land " See also Cherokee Nation v. Southern Kansas Ry. Co.,
135 U.S. 641 (1890); Penn Central Transportation Co. v.
5° The Federal defendants did not contest this contention and the
Cneenan ene ae ie Sy ee ee
was completely obliterated by the actions complained of, and the
below so held.
9
City of New York, 438 U.S. 104. Petitioner's property clear-
ly met the test of ‘“‘destruction of its use or economic value”’
as a result of Federal defendant's non-judicial actions.
(Testimony of Isenogle, Department of Interior, pages
110-113, 114-118, 123-127; kxhibit Plaintiff 37, Pages
85-90; Appendix B, Item 6). After declaring that “‘...this
Court has never held that the navigational servitude
creates a blanket exception to the taking clause...,’’ after
reviewing three major factors in the taking evaluation, the
Court held on the facts before it, as we contend in this case,
that the government's action went so far beyond ordinary
regulation as to amount to a taking. See Kaiser Aetna v.
U.S., 444 U.S. 164 (1979).
The pivotal factor which permeates these entire pro-
ceedings has also been overlooked—we are not dealing with
a single instance of the exercise of the authority of either
the Corps of Engineers or the Department of Interior, but
an artificial accumulation of concerted action by these two
administrative agencies to remove Petitioner's property
from private hands and make it a part of the public domain.
This far exceeds the constitutional standards laid
down by this court in Penn Centrai Transportation Co. v.
City of New York, supra, and on the facts is distinguished
from Jentgen v. U.S., 657 F.2d 1210 (Ct. Cl. 1981), cert.
den., 455 U.S. 1017, and Deltona Corp. v. U.S., 657 F.2d
1184 (Ct. Cl. 1981), cert. den, 455 U.S. 1017. The cir-
cumstances in the instant case are analgous to the factual
situations which led to the determination of a Fifth Amend-
ment violation in the avigational easement cases in which
the right to recovery was predicated on the extent of
governmental encroachment. Peabody v. U.S., 231 U.S. 530
(1913); U.S. v. Causby, 328 U.S. 256 (1946). For this reason,
the facts of this case are emphasized to show tLe causation
10
of complete loss by the excesses of the Federal defendants.
Accordingly, petitioner has vehemently and con-
sistently contended that the constitutional questions
presented are real, serious and meritorious; that, therefore,
the court below not only had the right, but the obligation,
to determine whether Petitioner's Fifth Amendment rights
to either due process or just compensation had been
violated.
The threshold issue addressing itself to the exercise
of the permit power, is directed to the means in which it
was enforced, clearly demonstrating an abuse of the ad-
ministrative power. First, it must be kept in mind that this
was the initial instance of enforcement of the RHA or CWA
in Louisiana.® Secondly, we emphasize that the District
Engineer did not know or completely ignored the simple
fact that his planning department had received and ex-
amined the plans and specifications for Petitioner's levee
and pumping station, and advised the parish authorities
that if completed according to these plans and specifica-
tions, the Bavou des Familles levee would meet the Corps’
own requirements for 100-year hurricane protection, and
was being built at a location and meeting requirements
which had been prescribed by the Corps itself.
Not only was the District Engineer not cognizant of
the proceedings in his own department, he didn’t know his
own regulations. It has never been denied that the District
Engineer advised the Petitioner's counsel that the Kenta
© There is annexed the order of the District Court in Orleans
Audubon Society v. Col. Robert E. Lee, not reported, wherein the Court
held that a permit was not necessary because of a “nationwide permit”
created by 33 CFR §§ 322.4(g) and 323.4-1(a), which applied to work com-
menced prior to July 25, 1974 (Appendix B, Item 7).
11
Canali, being a man made body of water, would only be con-
sidered navigable if it connected two navigable bodies of
water, and that, in fact, it did not meet this prerequisite.
The regulation which he cited provided a man-made canal
open on one end was navigable water, if in fact, it was used
in navigation. Once provided evidence that the Kenta
Canal did not connect two navigable bodies of water, and
despite an opinion of district counsel that the canal was not
in fact used in interstate commerce (Appendix B, Item 8),
the District Engineer nevertheless determined that the
Kenta Canal was a navigable body of water for permit pur-
poses in 1973.’ However, the District Engineer determined
in. 1979 that blocking the Kenta Canal would have no effect
on navigation.
The District Engineer was not certain the CWA ap-
plied. If the District Engineer didn’t know, how could the
Petitioner be presumed to know? Applying the principle
that Petitioner's land was below the ‘“‘plane of the mean,
high tide’’, he classified it as ‘wetlands’, subject to CWA
permit regulations. The regulation then in effect did not
say ‘‘reached”’ by the mean high tide, but said ‘‘inundated”’
by it.8 There is nothing in the administrative record to
show that the land is inundated. To the contrary, the
Chatry letter says the tide on the property is from rainfall
"The language of the 1972 regulation referred to by Col. Hunt in
his correspondence and applicable to navigable waters reads as follows:
33 C.F.R. § 209.260(g)(1), E. R. 1165-2-302, “A canal open to
navigable waters of the United States on only one end is itself navigable
where it in fact supports interstate commerce.”
8 33 C.F.R. §209.260(k)(ii(2), E. R. 1165-2-302 says: “Regulatory
jurisdiction extends to the entire surface and bed of ali waterbodies sub-
ject to tidal action...'’ [however] ‘‘ Marsh lands and similar areas are thus
considered ‘navigable in law,’ but only so far as the area is subject to in-
undation by mean high waters.'’ (Emphasis ours)
12
only, and the only tidal data in the administrative record
seeks to establish that, theoretically, the hypothetical
‘plane’ of the level of the mean high tide at a measuring
post seven miles away, if extended from the coastline,
would be above portions of Petitioner's land—it clearly
does not show inundation. Over objection of Petitioner, ex-
pert witnesses were permitted to state that in their opinion
the land was saturated and therefore “‘inundated”.? They
did not find the land covered by the tide. The record shows
that the average tidal variance was only .25 a foot, i.e. three
inches, a fortiori for this land to have been inundated it
would be permanently covered. Nevertheless, none of this
was relevant because in the regulations in effect in 1979,
what has been characterized as a ‘‘nationwide permit”’ pro-
vided that the CWA wetland regulations would not apply
to first offenders who began work before July 25, 1974,
thus clearly exempting Petitioners. }°
9 Subsequent regulations broaden the scope of the jurisdiction of
the Corps of Engineers both with respect to RHA and CWA. In reaching
its decision in 1979, the District Engineer applied the subsequent
regulations. We urge that this was an improper application and that
there was no right to apply subsequent regulations where in fact thev
negatively affected property rights, and that accordingly, retroactiy ity
was not a proper application, and in support of our contention, ciced in-
ter alia Manhattan General Equipment Co. v. Commissioner of Internal
Revenue, 297 U.S. 129 (1936); Securities and Exchange Commission v.
Chenery Corp., 332 U.S. 194 (1947); Green v. U.S., 376 U.S. 149 (1964);
Bradley v. School Board of City of Richmond, 416 U.S. 696 (1974). We
have by no means abandoned this argument, advise the Court of it so
it knows of its existence, and if writs are granted, will urge this «
another element of error in the courts below.
10 35 C.F.R §§322.4(g) and 323.4-1(a) create the nationwide per-
mit exemption and provide that ‘structures or work completed before
18 December 196%, or in waterbodies over which the District Engineer
has not assertea jurisdiction, provided there is no interference with
navigation..."’ and commenced prior to July 25, 1975, are not subject to
the permit requirement. This is the regulation applied by the Corps in
the Orleans Audubon case, supra.
13
On October 30, 1975, General Kenneth E. McIntyre,
Corps of Engineers, in connection with what iz charac-
terized as the ‘‘V”’ levee (which is across the highway and
further south than the property in question) ruled that hur-
ricane protection as more important than the environ-
mental consequences and ordered the permit for the ‘‘V”’
levee issued.!! The District Engineer, even though of the
eight elements considered, five were in favor of Petitioner,
completely ignored the prior decision of General McIntyre,
decided this case upon (a) the environmental issues and (b)
the accommodation of the Department of Interior for the
Park Protection Zone and denied the permit while at the
same time in Orleans Audubon, supra, was granting a per-
mit based on the ‘nationwide permit’ in very similar
circumstances.
Of course we cannot quarrel with the authorities
cited by the Appellee that the interpretation of a regulation
by the administrative authority is entitled to great weight.
We are not attacking the interpretation of the regulations.
We are attacking the application of the regulations, based
upon the basic constitutional concept that they must be ap-
plied uniforraly, without discrimination, and without an
abuse of administrative authority.
By way of summary, therefore we urge that it is
abundantly clear from this record that these are excesses of
administrative procedure and accordingly, Fifth Amend-
ment violations, or at the very least, basis for overturning
the administrative action as arbitrary and capricious:
1) According to its own interpretation of the
regulations, in 1973 the Kenta Canal was not a
11 Administrative record, Exhibit A, Part S, the letter from
McIntyre to Meyers, dated October 30, 1975.
-—*
14
navigable body of water and the action of the
District Engineer in asserting RHA authority .
was in violation of its own regulations.
2) The application of the CWA on the basis that
the land was below the extension of the
hypothetical plane of a mean high tide, in light of
the unequivocal language of the regulation that
the land must be inundated by the high-tide,
clearly demonstrates that in 1974 the Corps did
not have jurisdiction under the Clean Water Act.
This is confirmed and ratified by the Corps’ own
regulations subsequently enacted exempting first
applicants under a nationwide exemption which
ran until July 25, 1975, 12
3) The consideration by the District Engineer of
the needs of the Hurricane Protection Levee and
the Park Protection Zone as factors weighing on
the permit application is an abuse of authority.
The criteria are prescribed by the regulations
themselves, and such considerations are not
among them, 33 CFR §§ 320.4(a)(2), 320.4(b).
12 The relevance of this is further confirmed by the concession of
the Corps of Engineers at the trial that the gauge which was utilized to
determine the level of the high tide was located at Bayou Barataria,
some 7 miles away, and was in error. It appears that the level of the
mean high tide was not 1.5 feet Cairo Datum, but 8.5 feet Cairo Datum.
This would mean that a tide of approximately 10 inches would have to
cover land 7 miles away from the shoreline where the tide fluctuated.
The subsequent findings of the Corps’ expert, admitted into evidence
over the objection that it was not a part of the administrative record,
was that because the water had saline content the land was “inundated”’
was clearly not supported by fact. The land is surrounded on three sides
by heavy concentration of salt water, all of which is from 5 to 7 miles
away; the land itself Consists of, according to the Corps of Engineers’
own testimony (also admitted over objection) land which was built up in
this area from tidal overflow, and the water table itself is extremely high
as it was in New Orleans before drainage was instituted. There is no
evidence that this land is covered by the high tide, except in the rare in-
stances of hurricane or flood.
“4
15
4) Criteria are specified for the determination of
permit approval or rejection. Of the eight stan-
dards considered by the District Engineer, five
were decided in favor of Petitioner and three
against. Frankly, the only one considered was the
environmental factor.)
5) The inconsistent permit rulings by the Corps
of Engineers in the only two instances of record:
The ‘‘V”’ levee across the highway and south of
this property (McIntyre letter, Exhibit A, Part S)
and the pranting of the permit in Orleans
Audubon.!4
With respect to Lafitte Park, we commend the Court
to the broad language of the enabling statute (Appendix A,
Item 1) as to the purpose of the PPZ guidelines.
Pretermitting the issue whether the statute confined
the Department of Interior to six months to promulgate
guidelines, repetitious though it is, we must reiterate our
position that whereas Congress has the right to create a
park, it cannot by the device of a protection zone, do in-
directly what it cannot do directly, and by legislative and
19 There are two interesting points in this connection. First, in
selecting its original line upon which the Petitioners built their levee, the
Corps had already weighed the environmental factors and found that
hurricane protection was more important than the miniscule effect on
the environment of this levee, and now, it appears from the press, that
the Corps is prepared to allow the completion of a levee along this levee
line, provided that the Kenta Canal remains open, with flood gates
which shall be closed in the event of flood or hurricane from the west.
14 The decision rendered in Orleans Audubon was at approximate
ly the same time as the decision rendered in the Bayou des Familles’
case. In his letter dated June 7, 1979, the District Engineer refers to and
bases his conclusion not to require a permit on the fact that there had
been no prior enforcement of these regulations prior to January 1975,
obviousiy referring to the case now before the Court.
16
administrative legerdemain, enlarge the Core Area through
establishing a protection zone which differs in name only
from the park Core Area.
CONCLUSION
We strongly urge that this Court is the last resort to
do what the Fifth Amendment was meant to do, that is pro-
tect private property from predatory actions of the Federal
government and its agencies.
The combined effect of the permit procedure re-
quirements of the hurricane protection levee determination
and its accommodation to the PPZ, and the nature of the
Park Protection Zone statutes and guidelines, pose serious
constitutional issues which the District Court had the
right, if not the obligation to decide: (a) was this a taking
of property without due process subject to injunction? Or,
(b) if not, was this a taking without just compensation in
violation of the Fifth Amendment, and if so, should the
matter be remanded to the Court of Claims to determine
“quantum’’?
The District Court clearly had the authority to deter-
mine some issues with respect to the status of the PPZ, and
we believe that our argument that the word “shall” was
mandatory, was valid and, if not, the PPZ is clearly both a
congressional and administrative taking of property
without due process.
It is respectfully prayed that a Petition for a Writ of
Certiorari issue herein and after due proceedings the deci-
sions of the District Court end the United States Circuit
Court of Appeals for the Fifth Circuit be reversed and
17
Petitioner be granted the relief sought.
Respectfully submitted,
STEEG & O’CONNOR
1440 Oil & Gas Building
1100 Tulane Avenue
New Orleans, Louisiana 70112
(504) 581-9362
( demeee
BY:
MOISE S. STEEG, JR.
18
CERTIFICATE
I hereby certify that a copy of the above and forego-
ing has been served on the Solicitor General of the United
States and all counsel of record in this proceeding by
depositing a copy of same, duly addressed to each of them,
in the — States Mail, First Class, postage prepaid,
this_Z9 day of _YAewlare her, 1983.
/) Mteoreetl~
L
MOISE S. STEEG, JR
STEEG & O’CONNOR
1440 Oil & Gas Building
1100 Tulane Avenue
New Orleans, Louisiana 70112
(504) 581-9362
A-1
APPENDIX “A”
Jean Lafitte National Historic Park Act, 16 U.S.C. §
230, P.L. 95-625, §§ 901, 902
Sec. 901. In order to preserve for the education,
inspiration, and benefit of present and future
generations significant examples of natural and
historical resources of the Mississippi Delta
region and to provide for their interpretation in
such manner as to portray the development of
cultural diversity in the region, there is author-
ized to be established in the State of Louisiana
the Jean Lafitte National Historical Park and
Preserve (hereinafter referred to as the ‘‘park’’).
The park shall consist of (1) the area of approx-
imately twenty thousand acres generally depicted
on the map entitled ‘‘Barataria Marsh Unit-Jean
Lafitte National Historical Park and Preserve’’
numbered 90,000B and dated April 1978, which
shall be on file and available for public inspection
in the office of the National Park Service, Depart-
ment of the Interior; (2) the area known as Big
Oak Island; (3) an area or areas within the French
Quarter section of the city of New Orleans as may
be designated by the Secretary of the Interior for
an interpretive and administrative facility; (4) the
Chalmette National Historical Park; and (5) such
additional natural, cultural, and _ historical
resources in the French Quarter and Garden
District of New Orleans, forts in the delta region,
plantations, and Acadian towns and villages in
the Saint Martinville area and such other areas
and sites as are subject to cooperative agree-
ments in accordance with the provisions of this
title.
Sec. 902. (a) Within the Barataria Marsh Unit
the Secretary is authorized to acquire not to
A-2
exceed eight thousand acres of lands, waters, and
interests therein (hereinafter referred to as the
“core area’’), as depicted on the map referred to in
the first section of this title, by donation, pur-
chase with donated or appropriated funds, or ex-
change. The Secretary may also acquire by any of
the foregoing methods such lands and interests
therein, including leasehold interests, as he may
designate in the French Quarter of New Orleans
for development and operation as an interpretive
and administrative facility. Lands, waters, and
interests therein owned by the State of Louisiana
or any political subdivision thereof may be ac-
quired only by donation. In acquiring property
pursuant to this title, the Secretary may not ac-
quire right, to oil and gas without the consent of
the owner, but the exercise of such rights shall be
subject to such regulations as the Secretary may
promulgate in furtherance of the purposes of this
title.
(b) With respect to the lands, waters, and in-
terests therein generally depicted as the “park
protection zone’”’ on the map referred to in the
first section of this title, the Secretary shall, no
later than six months from the date of enactment
of this Act, in consultation with the affected
State and local units of government, develop a set
of guidelines or criteria applicable to the use and
development of properties within the park protec-
tion zone to be enacted and enforced by the State
or local units of government.
(c) The purpose of any guideline developed pur-
suant to subsection (b) of this section shall be to
preserve and protect the following values within
the core area:
(1) fresh water drainage patterns from the
park protection zone into the core area;
A-3
(2) vegetative cover;
(3) integrity of ecological and biological
systems; and
(4) water and air quality.
(d) Where the State or local units of government
deem it appropriate, they may cede to the
Secretary, and the Secretary is authorized to ac-
cept, the power and authority to confect and en-
force a program or set of rules pursuant to the
guidelines established under subsection (b) of this
section for the purpose of protecting the values
described in subsection (c) of this section.
(e) The Secretary, upon the failure of the State
or local units of government to enact rules pur-
suant to subsection (b) of this section or enforce
such rules so as to protect the values enumerated
in subsection (c) of this section, may acquire such
lands, servitudes, or interests in lands within the
park protection zone as he deems necessary to
protect the values enumerated in subsection (c) of
this section.
(f) The Secretary may revise the boundaries of
the park protection zone, notwithstanding any
other provision of law, to include or exclude pro-
perties, but only with the consent of Jefferson
Parish.
A-4
33 C.F.R. §§ 322.4(g), 323.3(a), 323.4-1
§322.4 Structures and work permitted by this
regulation.
The following structures or work are hereby
permitted for purposes of Section 10 and do not
require separate Department of the Army
permits:
* * *
(g) Structures or work completed before 18
December 1968 or in waterbodies over which the
District Engineer has not asserted jurisdiction
provided there is no interference with navigation.
§323.3 Discharges requiring permits.
(a) General. Department of the Army permits
will be required for the discharge of dredged or fill
material into waters of the United States. Certain
discharges specified in §§ 323.4-1, 323.4-2 and
323.4-3 are permitted by this regulation. If a
discharge of dredged or fill material is not permit-
ted by this regulation, an individual or general
Section 404 permit will be required for the
discharge of dredged or fill material into waters of
the United States in accordance with the follow-
ing phased schedule:
(1) Before July 25, 1975, discharges into
navigable waters of the United States.
(2) After July 25, 1975, discharges into
navigable waters of the United States and adja-
cent wetlands.
(3) After September 1, 1976, discharges into
navigable waters of the United States and their
primary tributaries, including adjacent wetlands,
.
A-5
and into natural iakes, greater than 5 acres in sur-
face area. (See also § 323.4-2 for discharges that are
permitted by this regulation.)
(4) After July 1, 1977, discharges into all waters
of the United States. (See also § 323.4-2 for
discharges that are permitted by this regulation.)
§323.4-1 Discharges prior to effective dates of
phasing.
(a) Discharges of dredged or fill material in waters
of the United States that occur before the phase-
in dates specified in § 323.3(a)(2) through (4) of this
part are hereby permitted for purposes of Section
404, provided the conditions in paragraph (c) of this
section, are met.
(b) Discharges of dredged or fill material of less
than 500 cubic yards into waters other than navi-
gable waters of the United States (see 33 CFR Part
329) that are part of an activity that was commenc-
ed before July 25, 1975, that were completed by
January 25, 1976, and that involve a single and
complete project and not a number of projects
associated wiih a complete development plan are
hereby permitted for purposes of Section 404, pro-
vided the conditions in paragraph (c) of this sec-
tion, are met. The term ‘‘commenced” as used
herein shall be satisfied if there has been, before
July 25, 1975, some discharge of dredged or fill
material as a part of the above activity or an enter-
ing into of a written contractual obligation to have
the dredged or fill material discharged at a
designated disposal site by a contractor.
(c) For the purposes of Section 404, the follow-
ing conditions must have been satisfied for the
discharges occurring before the dates specified in
paragraphs (a) and (b) of this section:
A-6
(1) That the discharge was not located in the
proximity of a public water intake;
(2) That the discharge did not contain unaccep-
table levels of pathogenic organisms in areas used
for recreation involving physical contact with the
water;
(3) That the discharge did not occur in areas of
concentrated shellfish production; and
(4) that the discharge did not destroy or en-
danger the critical habitat or a threatened or en-
dangered species, as identified under the En-
dangered Species Act.
33 C.F.R. 209.260(g), (k)
§209.260 Definition of navigable waters of the
United States.
* * +
(g) Improved or natural condition of the water
body. Determinations are not limited to the
natural or original condition of the water body.
Navigability may also be found where artificial
aids have been or may be used to make the water
body suitable for use in navigation.
(1) Existing improvements: Artificial water
bodies. (i) An artificial channel may often con-
stitute a navigable water of the United States,
even though it has been privately developed and
maintained, or passes through private property.
The test is generally as developed above; that
is, whether the water body is capable of use for
purposes of interstate commerce. Canals which
connect two navigable waters of the United
States and which are used for commerce clearly
fall within the test, and themselves become
A-7
navigable. A canal open to navigable waters of
the United States on only one end is itself
navigable where it in fact supports interstate
commerce.
(ii) The artificial water body may be a major
portion of a river or harbor area or merely a minor
backwash, slip, or turning area.
(iii) Private ownership of the lands underlying
the water body, or of the lands through which it
runs, does not preclude a finding of navigability.
Ownership does become a controlling factor if a
privately constructed and operated canal is not
used for purposes of interstate commerce nor
used by the public; it is then not considered to be
a navigable water of the United States. However,
a private water body, even though not itself
navigable, may so affect the navigable capacity of
nearby waters as to nevertheless be subject to
certain regulatory authorities.
(2) Nonexisting improvements, past or poten-
tial. A water body may also be considered
navigable depending on the feasibility of future
use for interstate commerce after the -onstruc-
tion of whatever ‘reasonable’ improvements
may potentially be made. The improvements need
not exist, be planned, nor even authorized; it is
enough that potentially they could be made.
What is a ‘reasonable’ improvement is always a
matter of degree; there must be a balance between
cost and need at a time when the improvement
would be (or would have been) useful. Thus, if an
improvement was ‘‘reasonable”’ at a time of past
use, the water was therefore navigable in law
from that time forward. The changes in engineer-
ing practices or the coming of new industries with
varying classes of freight may affect the type of
the improvement; those which may be entirely
A-8
reasonable in a _ thickly populated, highly
developed, industrial region may have been en-
tirely too costly for the same region in the days of
the pioneers. The determination of reasonable im-
provement is often similar to the cost analyses
presently made in Corps of Engineers studies.
* * *
(k) Geographic and jurisdictional limits of
oceanic and tidal waters—(1) Ocean and coastal
waters. The navigable waters of the United
States over which Corps of Engineers regulatory
jurisdiction extends include all ocean and coastal
waters within a zone 3 geographic (nautical) miles
seaward from the coast line. Wider zones are
recognized for special regulatory powers, such as
those exercised over the Outer Continental Shelf.
(i) Coast line defined. Generally, where the
shore directly contacts the open sea, the line on
the shore reached by the ordinary low tides com-
prises the coast line from which the distance of 3
geographic miles is measured. On the Pacific
coasts the line of mean lower low water is used.
The line has significance for both domestic and in-
ternational law (in which it is termed the ‘‘base-
line’), and is subject to precise definitions.
Special problems arise when offshore rocks,
islands, or other bodies exist, and the line may
have to be drawn to seaward of such bodies.
(ii) Shoreward limit of jurisdiction. Regulatory
jurisdiction in coastal areas extends to the line on
the shore reached by the plane of the mean
(average) high water. However, on the Pacific
coasts, the line reached by the mean of the higher
high waters is used. Where precise determination
of the actual location of the line becomes
necessary, it must be established by survey with
reference to the available tidal datum, preferably
A-9
averaged over a period of 18.6 years. Less precise
methods, such as observation of the ‘‘apparent
shoreline’ which is determined by reference to
physical markings, lines of vegetation, or changes
in type of vegetation, may be used only where an
estimate is needed of the line reached by the mean
high water.
(2) Bays and estuaries. Regulatory jurisdiction
extends to the entire surface and bed of all water
bodies subject to tidal action. Jurisdiction thus
extends to the edge (as determined by paragraph
(k)(1)(ii) of this section, “‘Shoreward Limit’’) of all
such water bodies, even though portions of the
water body may be extremely shallow, or ob-
structed by shoals, vegetation, or other barriers.
Marshlands and similar areas are thus considered
“navigable in law,’’ but only so far as the area is
subject to innundation by the mean high waters.
The relevant test is therefore the presence of the
mean high tidal waters, and not the general test
described above, which generally applies to in-
land rivers and lakes.
7
A-10
APPENDIX “B”
BAYOU DES FAMILLES
DEVELOPMENT CORPORATION,
Plaintiff,
Vv.
UNITED STATES CORPS OF ENGINEERS,
United States Department of the Interior,
and United States of America,
Defendants.
Civ. A. No. 79-4324
United States District Court,
E.D. Louisiana.
April 20, 1982.
Developer of river front property sought declaratory
and injunctive relief from actions by the federal govern-
ment which had prevented developer from developing its
property. The District Court, Cassibry, J., held that: (1) for
purpose of establishing federal regulatory jurisdiction
under the Rivers and Harbors Appropriations Act of 1899,
the amount of tidal influence is irrelevant as long as a
water body is in fact subject to the ebb and flow of the tide;
(2) where property which developer intended to drain by
means of construction of levee and pumping station was
marshland inundated by mean high tide, Army Corps of
Engineers had jurisdicticn under Rivers and Harbors Ap-
propriations Act of 1899 over property, and developer's
failure to obtain a permit prior to construction of levee con-
stituted a violation of permit requirements of Act; and (3)
where development of area in question and resultant
destruction of almost 2,000 acres of wetlands would result
A-11
in loss of wildlife habitat, loss of water purification and
filtration benefits, and would have significant adverse im-
pact on area fisheries resources due to loss of detritus con-
tribution and habitat, Army Corps of Engineers did not
abuse its discretion in denying developer's after-the-fact
application for a permit to construct a levee and pumping
station to facilitate development.
Order accordingly.
Moise S. Steeg, Jr., Robert M. Steeg, Carl J.
Schumacher, Jr., New Orleans, La., for plaintiff.
Elizabeth Stein, Dept. of Justice, Washington, D.C.,
William F. Baity, Asst. U.S. Atty., New Orleans, La., for
defendants.
CASSIBRY, District Judge:
Plaintiff seeks declaratory and injunctive relief from
actions by the federal government which have prevented
plaintiff from developing its property. Trial in this matter
was held before the court without a jury in October 1981.
After considering the pleadings, the voluminous ad-
ministrative record, the testimony of the witnesses, the
documents in evidence, and the law applicable to this case,
the court finds in favor of the federal defendants on all
claims.
FACTS
Plaintiff Bayou des Familles Development Corpora-
tion (““BDF’’) was formed in August 1972 as a real estate
investment venture by several persons who planned to
A-12
develop and sell approximately 2,000 acres of land located
on the West Bank of the Mississippi River in Jefferson
Parish, about halfway between New Orleans and Barataria,
Louisiana. Much of the property is cypress-tupelo gum
swamp and marsh. BDF'’s development plan called for the
excavation of a canal and construction of a levee and pump-
ing station to drain the area. Portions of the property were
to be filled for streets and construction of residences and
other structures. The plan called for the blocking of Kenta
Canal, a man-made waterway which extends into the sub-
ject property and connects at its southerly end with Bayou
Barataria, a segment of the Gulf Intracoastal Waterway.
\. The development plan also called for the blocking of Bayou
Boeuf, a natural waterway that connects through the
Bayou Segnette Waterway to the Gulf Intracoastal Water-
way. Both Kenta Canal and Bayou Boeuf have direct
hydraulic connections to the Gulf of Mexico and are sub-
ject to tidal influence.
The U.S. Army Corps of Engineers (‘‘the Corps’’) has
been involved in discussions concerning the possible con-
struction of a hurricane protection levee in the vicinity of
plaintiff's property since 1969. BDF designed its levee to
follow the contour of one of the several alternative levee
lines proposed by the Corps in 1972 for the West Bank
flood control and hurricane protection project.
The federal laws authorizing construction of flood
control projects require local assurances of cooperation,
hold harmless agreements, and often require some local
funding. 33 U.S.C. §§ 701c, 701f. While consultation with
appropriate local authorities is important, the sole authori-
ty and responsibility for preparing a report recommending
a specific project to Congress for approval and funding
rests with the Corps. 33 U.S.C. § 701a-1.
A-13
BDF obtained the necessary permits from Jefferson
Parish for construction of its levee and pumping station. In
July 1973, BDF entered into a contract for the construc-
tion of a pumping station and sewage treatment plant. On
August 16, 1973, BDF entered into a contract for the con-
struction of a levee. The plans for the levee included the
digging of a canal to the west of the levee line for fill and
transportation of materials and equipment. Construction
of the levee and canal system began in August 1973.
On August 21, 1973, Raymond Condon, Director of
the Department of Drainage and Sewerage for Jefferson
Parish, wrote a letter to Roy Farmer, an employee of the
Corps of Engineers Planning Division, which referred to
the BDF levee. The letter forwarded information about the
specifications of the BDF levee pursuant to a request from
the Federal Insurance Administration, Department of
Housing and Urban Development. Mr. Farmer advised him
that such a levee would meet certain Corps hurricane pro-
tection requirements.
The Planning Division of the Corps’ New Orleans
District (‘NOD’) has no authority over permitting or
regulatory functions. That authority rests with the Permit
and Statistics Branch, Operations Division, NOD, which
first became aware of BDF’s unauthorized dredge and fill
work when review was requested of a report dated October
9, 1973. That report was being forwarded to the office of
the Chief Engineer by the Planning Division and concerned
reevaluation of base flood elevations for the Harvey
Drainage Area in Jefferson Parish.
On October 10, 1973, the District Engineer wrote to
Mr. Condon that the levee planned for the Bayou des
Familles area might be constructed, in part, in wetlands
A-14
that were navigable waters of the United States, and re-
quested Mr. Condon to furnish the name of the developer
or contractor who was constructing the levee. On October
18, 1973, Mr. Condon advised the Corps to contact Wilson
Abraham. A certified letter was sent the same day to Mr.
Abraham, one of the BDF investors and developers, advis-
ing that work on the levee should cease immediately pen-
ding a determination as to whether a permit was required.
On October 20, 1973, a letter from the District
Engineer was “srwarded to BDF advising that its levee
construction might require a permit based on the definition
of navigable waterways published in the Federal Register
on September 9, 1972, and that BDF should supply
necessary information for use in determining whether 2
permit was in fact needed. Moise Steeg replied by letter
dated November 8, 1973, requesting that all future cor-
respondence be directed to him as legal counsel for BDF.
Also on November 8, Mr. Abraham wrote to the engineer-
ing firm of Harris and Varisco, consulting engineer for the
levee project, to comment on progress of the levee. He
noted that the levee had sunk in many spots, and that the
work was not proceeding as expeditiously as the contractor
had committed to the previous month.
In January 1974 the Corps issued a cease and desist
order to BDF, having heard nothing further from Mr.
Steeg. The Corps informed BDF that it had determined
that federal permits were required for construction of the
levee and canal, ircluding the closures of Bayou Boeuf and
Kenta Canal, based on an on site inspection of the property
by the Corps. The levee was approximately 90% complete
at that time. ;
On March 8, 1974, the District Engineer wrote to
A-15
BDF to direct it to submit a permit application for dredg-
ing and filling already done and for work necessary to com-
plete the project. BDF was advised that an Environmental
Impact Statement (‘‘EIS’’) would have to be prepared
before final action could be taken on the permit, due to the
potential environmental impact of the proposed project. 42
U.S.C. § 4332(2)(C). On April 4, 1974, BDF suggested to the
Corps that by modifying its plans in such a way as not to
block Bayou Boeuf, it could avoid Corps jurisdiction entire-
ly. BDF also requested a temporary permit to complete the
work already begun. The Corps advised Mr. Steeg that it
had no authority to issue a temporary permit. Information
before the Corps indicated that Bayou Boeuf had already
been blocked.
In February 1975 the United States filed an enforce-
ment action against BDF for violations of Section 10 of the
Rivers and Harbors Appropriations Act of 1899 (““RHA’’),
33 U.S.C. § 403. United States of America v. Bayou des
Familles Development Corporation, No. 75-536 (E.D.La.).
The proceeding was resolved through entry of a final judg-
ment that required BDF to pay a civil penalty of $25,000
and to submit an after-the-fact application to the Corps
within 60 days for all work already done within the “‘pro-
ject area which was done below the elevation of mean high
tide.’’ The ‘‘project area’’ was defined as those areas within
the project which were under the ownership of BDF on Oc-
tober 17, 1974. The elevation of mean high tide for pur-
poses of the order was specified to be 1.5 feet above mean
sea level.
On April 7, 1975, BDF submitted an after-the-fact
application for the construction of a levee to enclose ap-
proximately 2,000 acres. The Corps issued a public notice
of the proposed project on April 28, 1975, including its
A-16
determination that an EIS was required as part of the per-
mit review process.
A draft EIS was submitted to the Corps, and revised
in accordance with the Corps’ comments. A public meeting
on the draft EIS and proposed project was held on October
23, 1975. Numerous persons, several federal agencies and
one state agency expressed objections to the project; some
comments in support of the project were also given. The
Corps received many letters in opposition to the project
after the meeting as well. No responses to the public com-
ments were sent to the Corps by BDF, although ample op-
portunity for response was provided.
The Corps’ deliberations on plaintiff's permit ap-
plication were influenced by the potential creation of the
Jean Lafitte National Historical Park (‘‘the park’’) in the
vicinity of the subject property. Study of the feasibility of
such a park had been funded by a specific congressional ap-
propriation in August 1972. P.L. 92-369. On November 10,
1978, the park was established by act of Congress. 16
U.S.C. § 230. The park boundaries encompass part of
BDF’s property and extend over the levee built by BDF.
The provisions establishing the park cali for the
designation of a ‘core area’ of approximately 8,000 acres
and a ‘“‘park protection zone’”’ of 12,000 acres to serve as a
buffer area between the core area and adjacent
developments. P.L. 95-625, 16 U.S.C. § 230a(b). The
Secretary of the Interior is authorized to acquire property
within the core area, while uses in the park protection zone
are to be regulated by local authorities pursuant to
guidelines developed by the Secretary of the Interior in
consultation with State and local authorities within six
months of the enactment of the statute. If the State and
A-17
local authorities fai! to enact or enforce rules regulating
uses of properties in the park protection zone. the
Secretary of the Interior is authorized to acquire real pro-
perty interests in lands within the park protection zone to
protect the values for which the park was established. Jd.
16 U.S.C. § 230a(e). Numerous local agencies are involved
in developing the guidelines; progress has been slow. To
date, the Jefferson Parish Council has not approved the
proposed guidelines. Over 1000 acres of BDF’s property
lies in the park protection zone.
On January 28, 1980, the Department of the Interior
(“DOI”), through the National Park Service, informed
BDF that DOI proposed to acquire a 151 acre tract for in-
clusion in the core area of the park. DOI has acquired more
than 2200 acres in the core area, but has not yet begun
negotiations with BDF for acquisition of its 151 acre tract.
At the date of trial, funding for such acquisition was very
uncertain.
Another influence on the Corps’ processing of BDF’s
permit application was the continuing uncertainty about
the placement of the West Bank flood control and hur-
ricane protection levee. In May 1978 the Corps presented
a number of proposals for the hurricane levee placement to
the Jefferson Parish Council. Only one of the proposals
presented to the Council followed the alignment of the
BDF levee. In making the proposals, the Corps took into
account the potential creation of the park, later realized in
November 1978.
On September 17, 1979, the District Engineer wrote
to the President of the Jefferson Parish Council to inform
him of the Corps’ decision to recommend to Congress a
levee alignment which followed the park boundaries rather
A-18
than the BDF levee line. The levee alignment proposed by
the Corps would generally provide protection to areas of
the West Bank that have already been developed. The ma-
jority of the subject property, however, lies outside of the
area that would be protected under the Corps’ proposal. In
developing the proposal, the Corps considered, among
other factors, the potential impacts any hurricane levee
would have on the newly-created park and upon the uses
and values to be served and protected by the park.
Because the Corps has not yet received the necessary
local assurances, the Corps has been unable to submit a
final recommendation regarding the levee alignment to
Congress for approval. Congressional approval and ap-
propriations must be obtained before design and construc-
tion of the levee may begin. 33 U.S.C. § 701c.
Finally, after almost four years of deliberations and
intervening events, on September 17, 1979, the Corps
denied BDF’s application for an after-the-fact permit. The
District Engineer articulated the basis for his decision:
I find that denial of the Department of the Army
after-the-fact permit prescribed by regulations
published in 33 C.F.R. 320 through 329 to Bayou
Des Familles Development Corporation is based
on thorough analysis and evaluation of the
various factors enumerated above; that there are
reasonable alternatives available that will achieve
the purposes for which the work is being con-
structed; that the proposed work is not in accor-
dance with the overall desires of the public as
reflected in the comments of state, Federal, and
local agencies and the general public; that the pro-
posed work does not comply with established
State and local laws regulations and codes; that
A-19
there have been identified significant adverse en-
vironmental effects related to the work; that the
denial of this permit is consonant with national
policy, statutes, and administrative directives;
and that on balance the total public interest
should best be served by the denial of a Depart-
ment of the Army after-the-fact permit to Bayou
Des Familles Development Corporation.
The Corps specifically considered the anticipated
flood control benefits that would likely result from the pro-
ject as well as the statements of officials of Jefferson
Parish and others who favored the project. However, in
weighing these benefits against the expected adverse en-
vironmental impacts of the work, the District Engineer
concluded that the detriments outweighed the benefits.
On November 2, 1979, the instant action was filed by
BDF against the Corps, DOI and the United States.! BDF
seeks to enjoin the Corps’ denial of its permit application,
claiming that the Corps lacked jurisdiction over the subject
property in 1973, and in the alternative, that the Corps fail-
ed to give proper weight to the flood protection provided by
BDF’s levee in denying the permit. Plaintiff also seeks to
enjoin the Corps’ recommendation of a levee alignment
other than one following its own levee line. Finally, plaintiff
seeks to enjoin DOI from issuing regulations covering the
park protection zone beyond the six-month period specified
in the park’s authorization statute, and to enjoin DOI from
including its property in the park’s core area without pro-
viding funding for its acquisition.
! Jefferson Parish was originally also named as a defendant, but
was subsequently dismissed.
A-20
CORPS’ JURISDICTION UNDER THE RHA
Plaintiff claims that the Corps’ actions should be in-
validated because the Corps erred in asserting its jurisdic-
tion over the levee project under Section 10 of the Rivers
and Harbors Appropriations Act of 1899 (““RHA’’), 33
U.S.C. § 403. The RHA prohibits any activity affecting the
course, condition, location or capacity of any navigable
water unless authorized by a permit issued by the Corps.
Plaintiff contends that its plans did not affect ‘‘navigable
waters’’ within the meaning of the statute or the Corps’
regulations in effect at the time jurisdiction was asserted.
In regulations published on September 9 and 16,
1972, the Corps defined ‘‘navigable waters’’ to extend its
regulatory jurisdiction in coastal areas to the line on the
shore reached by the plane of the mean (average) high
water. 33 C.F.R. § 209.260(k)(1)(ii). The regulations further
provided that regulatory jurisdiction extends to the entire
surface and bed of all water bodies subject to tidal action
even though portions of the water body may be extremely
shallow, or obstructed by vegetation. 33 C.F.R. §
209.260(k)(2). The Corps ‘asserts that federal regulatory
jurisdiction under Section 10 existed in 1973 because (1)
the plans called for blockage of two tidal waterbodies, Ken-
ta Canal and Bayou Boeuf, and (2) at least some of the
marshland on which the levee was built is ‘‘navigable in
law’’ because it lies below the plane of mean high water.
Judicial precedent recognizes several tests for
navigability: (1) ebb and flow of the tide, (2) connection
with a continuous interstate waterway, (3) navigable
“ “Tidal waters by their very nature form a continuous water
body with interstate watcrways."’ DeFelice, 641 F.2d at 1175.
A-21
capacity, and (4) navigable in fact. United States v.
DeFelice, 641 F.2d 1169 (5th Cir.) cert. denied, __ U.S. _,
102 S.Ct. 474, 70 L.Ed.2d 247 (1981), citing Kaiser Aetna
v. United States, 444 U.S. 164, 170-172, 100 S.Ct. 383,
387-389, 62 L.Ed.2d 332 (1979). The ebb and flow test in
this case establishes the Corps’ jurisdiction over plaintiff's
levee construction under Section 10.
Evidence before the Corps in 1973, and evidence
presented at trial to this court, show that both Kenta Canal
and Bayou Boeuf have a direct hydrological connection to
the Gulf of Mexico through connecting canals, bayous,
lakes, and Barataria Bay. Plaintiff's expert at trial admit-
ted that both waterways are subject to tidal influence, ex-
periencing a range of tide? of approximately 0.2 feet. For
the purpose of establishing federal regulatory jurisdiction,
the amount of tidal influence is irrelevant as long as a
waterbody is in fact subject to the ebb and flow of the tide.
Bayou Boeuf, a natural waterway subject to tidal in-
fluence, is ‘‘navigable’’ for purposes of Section 10 jurisdic-
tion. See United States v. Lewis, 355 F.Supp. 1132
(S.D.Ga.1973); United States v. Cannon, 363 F.Supp. 1045
(D.Del.1973); United States v. Holland, 373 F.Supp. 665
(M.D.Fla.1974); Leslie Salt Co. v. Froehlke, 578 F.2d 742
(9th Cir. 1978). Plaintiff's failure to obtain a permit prior to
blocking Bayou Boeuf constituted a violation of Section 10
of the RHA.
Plaintiff continued to rely on the opinion of the
Corps’ District Counsel, later overturned by the Wash-
ington, D.C. office, that although Kenta Canal was tidal,
3 “Range of tide’ is the difference between mean high tide and
mean low tide.
A-22
as an artificial canal opened only at one end, it was not
‘navigable’. The opinion of the District Counsel, subject
to internal agency review, was not binding on the Corps.
An agency may adjust its policies and rulings in the light
of its experience. Creppel v. U.S. Army Corps of Engineers,
670 F.2d 564 (5th Cir. 1982).
United States v. Stoeco Homes, Inc., 498 F.2d 597
(3d Cir. 1974), is dispositive. In Stoeco the court held that
once artificial water bodies are connected to tidal water
bodies, they become ‘‘navigable waters of the United
States”’ by operation of law. Stoeco, 498 F.2d at 611. This
holding was followed by the Fifth Circuit in United States
v. Sexton Cove Estates, Inc., 526 F.2d 1293 (5th Cir. 1976),
where the Corps’ jurisdiction was upheld over five canals
connecting to a tidal water body, and in United States v.
DeFelice, supra, where jurisdiction was upheld over con-
struction of a dam across an artificial, privately owned
canal, subject to tidal influence. This court finds that the
Corps’ assertion of jurisdiction over any obstruction of
Kenta Canal, a tidal water body when the 1972 regulations
were issued, was proper. Plaintiff's failure to obtain a per-
mit prior to plugging Kenta Canal constituted a violation
of Section 10 of the RHA.4
The Corps also asserts jurisdiction under the RHA
over marshlands on the subject property which are inun-
dated by mean high tide. 33 C.F.R. § 209.260(k)(1)(ii). Mean
4 Evidence was presented by the federal defendants that Kenta
Canal meets other tests of navigability as well. Past use in interstate
commerce is suggested by evidence of cypress logging activity on Kenta
Canal, but not conclusively proved. Navigable capacity under United
States v. Appalachian Power Co., 311 U.S. 377, 61 S.Ct. 291, 85 L.Ed.
243 (1940) (commerce could be made possible with artificial aid), was
also suggested. In light of the tidal nature of Kenta Canal, there is no
need for this court to assess the sufficiency of such evidence.
A-23
high tide is defined as the average of all high tides in a
specific area measured over a lunar cycle of 18.6 years. Jd.
Construction of a levee and canal system on tidal marshes,
or construction of a levee which obstructs the ebb and flow
of the tide over tida! marshes, is subject to the permit re-
quirements of Section 10 of the RHA. Stoeco, 498 F.2d at
611.
In October 1970 the Corps performed surveys of the
subject property to establish its ground level elevation in
conjunction with the federal flood insurance program. This
survey showed that the surface elevations of the subject
property near Louisiana State Highway 45, on the eastern
boundary of the property, are about three feet above mean
sea level, or three feet National Geodetic Vertical Datum
(““NGVD"). NGVD is referenced to the 1929 datum, a stan-
dard plane against which elevations are established, and is
simply the zero point for referencing surface elevation. The
elevation steadily drops as one proceeds west from Loui-
siana State Highway 45 until at a distance of about 2,000
feet west of the road, the surface elevation is approximate-
ly 0.0 feet NGVD to -0.2 feet NGVD.
In 1974 the Corps calculated the level of mean high
tide on the subject property to be 1.5 feet above NGVD.
This level of mean high tide in areas of elevation of 1.5 feet
NGVD and less indicates that the area is ‘navigable’
under the Corps’ regulations.
In 1978 the Corps discovered that the calculation of
mean high tide on subject property was too high. In 1980
the tide gauge at Barataria Station, upon which the Corps
had relied in calculating mean high tide to be 1.5 NGVD,
was adjusted by 0.65 feet. Taking the original calculation
of mean high tide at 1.5 feet and correcting for the error in
A-24
the gauge by subtracting 0.65 feet, the corrected mean high
tide value at the subject property is 0.85 feet above NGVD.
The corrected value also indicates that the area is tidally
washed.
Federal defendants claim that plaintiff may not ask
the court to invalidate the assertion of Section 10 jurisdic-
tion based on information never submitted to the agency.
Plaintiff's expert testified at trial that he knew the Corps’
tide gauge must be inaccurate, but BDF never so informed
the Corps. Without deciding the issue of whether the court
in this case should consider the gauge inaccuracy in
evaluating the propriety of the Corps’ actions, see Doyle v.
United States, 599 F.2d 984, 1000-1001, amended In re
Doyle, 609 F.2d 990 (Ct.Cl.1979); D.C. Transit System v.
WMATA, 466 F.2d 394, 413-414, (D.C.Cir.1972), I find that
the inaccuracy makes no difference in the outcome.
Whether mean high tide is assumed to be 1.5 feet NGVD
or 0.85 feet NGVD, the subject property is inundated at
mean high tide.
At trial plaintiff's expert, the consulting engineer for
the BDF project, testified that mean high water did not in-
undate the subject property. In his calculations, he relied
on Coast and Geodetic survey navigation charts published
by the National Ocean Survey, referenced to mean low
water, rather than to NGVD. It is standard practice to
refer to local tide gauges to determine whether mean high
tide inundates property at a given surface elevation
NGVD. The Corps calculated the level of mean high tide on
the subject property by using tide gauge readings from the
gauge closest to the area at Barataria Station, a few miles
away. Plaintiff's expert did not rely on local tide gauges to
reference the mean low tide data to NGVD. I find that the
procedure used by plaintiff's expert does not yield reliable
A-25
results.
Evidence presented at trial by defendants’ expert in
wetlands ecology and identification, Dr. R. Terry Huffman,
adds further support to the finding that the area in ques-
tion is tidally washed. After visiting twelve sites along the
western and southern portions of the property on October
18, 1981, he testified that the soil and water in the area
have a salty taste, indicating some type of tidal flushing.
Watermarks and bright green duckweed on trees four
inches above the water line in some channels suggest tidal
fluctuation in the area. Vegetation found on the property is
consistent with slightly brackish swamp or marsh. Dr.
Huffman observed stunted cypress trees and the absence
of juvenile regeneration at several sites, and concluded that
saltwater intrusion was causing these conditions. The area
is hydrologically connected with waterways that connect
with the Gulf of Mexico. Dr. Huffman testified that the
dikes of channels in the area are breached, permitting an
uninterrupted flow of water onto the subject property, and
that there is evidence of ebb and flow of water in the
breaches. With the exception of the site visited near the
pumping station at the southeastern extremity of the pro-
perty, Dr. Huffman found the area to be subject to tidal
influence.
I find that the Corps’ assertion of jurisdiction over
any obstruction of the tidal marshes on subject property
under Section 10 of the RHA was proper. Plaintiff's failure
to obtain a permit prior to constructing a levee and canal
system on tidal marshland constituted a violation of
federal law. 33 U.S.C. § 403.
=—
A-26
CORPS’ JURISDICTION UNDER THE FWPCA
On October 18, 1972, the Federal Water Pollution
Control Act Amendments (‘“‘FWPCA”’) were enacted. 33
U.S.C. § 1251 et seq. (renamed Clean Water Act in 1977).
Section 301l(a) of the FWPCA, 33 U.S.C. § 1311(a), pro-
hibits discharges of pollutants into the navigable waters
except as authorized by permit. The Corps first proposed
“interim guidance” regulating discharges of dredged or fill
material into the navigable waters pursuant to Section 404
of the FWPCA on May 10, 1973 (38 Fed.Reg.12217). The
Corps issued final Section 404 regulations on April 4, 1974
(39 Fed.Reg.12119). Any discharge of pollutants into
navigable waters, except in compliance with the FWPCA,
is prohibited. 33 U.S.C. § 1311(a). ‘‘Navigable waters”’ are
defined as ‘‘waters of the United States, including the ter-
ritorial seas.’’ 33 U.S.C. § 1362(7). The Corps’ regulatory
jurisdictinn under the FWPCA is broader than its jurisdic-
tion under the RHA. Leslie Salt, 578 F.2d at 754-755 (9th
Cir. 1978); Natural Resources Defense Council v. Callaway,
392 F.Supp. 685 (D.D.C.1975). Under the FWPCA, the
Corps has the right to control the disposal of dredged
material upon freshwater as well as tidal wetlands.
American Dredging Co. v. Dutchyshyn, 480 F.Supp. 957
(E.D.Pa.), aff'd, 614 F.2d 769 (3d Cir. 1979).
It is evident from the legislative history of the Clean
Water Act of 1977 that Congress was aware of the Corps’
interpretation of Section 404, and approved of it. The
Senate Environment and Public Works Committee, in com-
menting on the Senate bill, stated:
Section 404 of the Federal Water Pollution Con-
trol Act Amendments of 1972 required a permit
program to control the adverse effects caused by
A-27
point source discharges of dredged or fill material
into the navigable waters including: (1) the
destruction and degradation of aquatic resources
that resuits from replacing water with dredged
material or fill material; and (2) the contamination
of water resources with dredged or fill material
that contains toxic substances.
The committee amendment is designed to reaf-
firm this intent and dispel the wide-spread fears
that the program is regulating activities that
were not intended to be regulated.
S.Rep.No. 95-370, 95th Cong., 1st Sess. (1977), at 74-75,
reprinted in [1977] U.S. Code Cong. & Ad. News 4326,
4399-4400 (emphasis added).
The permit program established under Section 404 of
the Federal Water Pollution Control Act Amendments of
1972 was intended to control the degradation of aquatic
resources that results from any replacement of water with
fill material, as well as the degradation that results from
the discharge of dredged or fill material which contains tox-
ic substances. See S.Rep.No. 95-370, supra. 33 U.S.C. §
1362(6).
On July 19, 1977, the Corps promulgated final
regulations implementing the permit programs under Sec-
tion 10 of the RHA and Section 404 of the FWPCA. 42
Fed.Reg.37122, codified at 33 C.F.R. § 320-329. These
regulations superseded the September 1972 Corps defini-
tion of navigable waters of the United States. They also
superseded the July 25, 1975, interim final regulations, 40
Fed.Reg. 31320, promulgated in response to NRDC v.
Callaway, supra, which invalidated the Corps 1974 regula-
tions implementing the Section 404 permitting program
A-28
insofar as they purported to limit federal permitting
jurisdiction to traditionally navigable waters. These July
1977 regulations clarified the definition of navigable
waters of the United States to conform with the Corps’
practice relating to permit processing. Wetlands are de-
fined in the 1977 regulations as ‘‘those areas that are inun-
dated or saturated by surface or ground water at a frequen-
cy and duration sufficient to support, and that under nor-
mal circumstances do support a prevalence of vegetation
typically adapted for life in saturated soil conditions.’’ 33
C.F.R. § 323.2(c). This definition is substantively the same
as the July 1975 definition. 33 C.F.R. § 209.120(d)(2) (1976).
The area in question, with the exception of some of
the ridge area along Louisiana State Highway 45, is a
wetland within the regulatory definition of that term.°
> As I have already found, defendants’ expert in wetlands ecology
and identification, Dr. R. Terry Huffman, visited 12 sites chosen as
representative of types of topographic relief, habitat, and vegetative
cover that are indicative of the overall environmental characteristics of
the area in question. In almost all sites visited, Dr. Huffman, based on
his education, experience, and observations, found indications of
wetland hydrology, wetland soil conditions and wetland vegetation.
The soil at most of the sites visited is saturated with water. The
soil is peaty, organic, mucky, and very black. The vegetation is
characteristically that of wetlands, with areas of marsh containing cat-
tails, arrowhead, and maiden cane, and areas of cypress tupelo swamp
complex and floating shrub swamp with bayberry and red maple. Dr.
Huffman found standing water in some areas, which after consulting
with the National Weather Service about recent absence of flooding or
excessive rainfall in the area, he found to be a further indication of
wetland hydrology. Dr. Huffman is trained in remote sensing tech-
niques. His examination of aerial infra-red photographs of the area
taken in 1978, 1974, and 1973, together with his on-site investigation,
led him to the opinion that the entire area in question, with the excep-
tion of the high ridge area, is and has been continuously since at least
1970 a wetland. This court finds that testimony persuasive.
Dr. Huffman's conclusion is supported by the administrative
P
A-29
The discharges of fill into the tidal wetlands in ques-
tion and the discharges of dredged or fill material to dam
Bayou Boeuf and Kenta Canal as part of plaintiff's levee
project construction constituted discharges of pollutants
into the navigable waters within the meaning of the
FWPCA.
In October 1973 when the Corps’ permitting author-
ities became aware of plaintiff's levee and canal construc-
tion activities, the Corps had the authority under the
FWPCA to require plaintiff to apply for a permit. Further-
more, the Corps properly determined that the discharges of
fill into the wetland area in question and into Bayou Boeuf
and Kenta Canal were subject to federal jurisdiction under
the FWPCA as well as under the RHA. Plaintiff’s failure
to obtain a permit before commencing construction of its
levee and canal system violated federal law. 33 U.S.C. §§
403, 1311(a), 1344.
THE 1979 PERMIT APPLICATION DENIAL
The court, having found that the District Engineer
acted within the scope of his authority in asserting jurisdic-
tion, next must consider whether the decision to deny the
permit was arbitrary and capricious, an abuse of discretion
or otherwise not in accordance with law. Taylor v. District
Engineer, 567 F.2d 1332 (5th Cir. 1976).
In reviewing the Corps’ permit denial, this court is
(Footnote 5 continued)
record, the West Bank Soil Survey prepared by the U.S. Soil Conserva-
tion Service, and the factual testimony of Calvin Patrick O'Neil and S.
Dayton Mathews, both of whom also visited the site. Plaintiff presented
no lay or expert evidence to refute Dr. Huffman’s conclusion that the
area in question is a wetland, and has been one continuously since 1970.
A-30
limited to the administrative record before the Corps at the
time it made its decision in September 1979. Citizens to
Preserve Overton Park, Inc. v. Volpe, 401 U.S. 402, 91 S.Ct.
814, 28 L.Ed.2d 136 (1971); Camp v. Pitts, 411 U.S. 138, 93
S.Ct. 1241, 36 L.Ed.2d 106 (1973).
The standard for review of the Corps’ denial of plain-
tiff's permit application is that provided in the Ad-
ministretive Procedure Act, 5 U.S.C. § 706. The court’s
review is not de novo. The court is not empowered to
substitute its judgment for that of the agency. The review-
ing court must determine whether the agency considered
all relevant factors, but may not reweigh the evidence. Jd.
The July 1977 Corps regulations implementing the
RHA Section 10 and the FWPCA Section 404 permit pro-
grams retain the requirement set forth in previous regula-
tions that all applications for permits to conduct activities
affecting waters of the United States be subject to a public
interest review. 33 C.F.R. § 320. The factors to be con-
sidered include conservation, economics, aesthetics,
general environmental concerns, historic values, fish and
wildlife values, flood damage prevention, land use, naviga-
tien, recreation, water supply, water quality, energy needs,
safety, food production and the general welfare. The regula-
tions state that no permit will be granted unless it is found
to be in the public interest. 33 C.F.R. § 320.4(a). Further,
the regulations require the Corps to evaluate the effects of
a proposed project on wetlands and state that unnecessary
alteration or destruction of wetlands should be discourag-
ed. 33 C.F.R. § 320.4(b). Proposed projects must also be
evaluated with regard to their potential impact on fish and
wildlife, 33 C.F.R. § 320.4(c), and upon water quality, 33
C.F.R. § 320.4(d).
A-31
The 1977 Corps regulations require the Corps to use
the following criteria in evaluating permit applications:
(i) the relative extent of the public and private
need for the proposed structure or work;
(ii) the desirability of using appropriate alter-
native locations and methods to accomplish the
objective of the proposed structure or work;
(iii) the extent and permanence of the beneficial
and/or detrimental effects with (sic) the proposed
structure or work may have on the public and
private uses to which the area is suited; and
(iv) the probable impact of each proposal in rela-
tion to the cumulative effect created by other ex-
isting and anticipated structures or work in the
general area.
33 C.F.R. § 320.4(a)(2).6
© The Corps is also required to consider the effect on wetlands
that would result from the proposed project.
(b) Effect on wetlands. (1) Wetlands are vital areas that
constitute a productive and valuable public resource, the un-
necessary alteration or destruction of which should be
discouraged as contrary to the public interest
(2) Wetlands considered to perform functions important to
the public interest include:
(i) Wetlands which serve important natural biological func-
tions, including food chain production, general habitat, and
nesting, spawning, rearing and resting sites for aquatic or
land species;
(ii) Wetlands set aside for study of the aquatic environ-
ment or as sanctuaries or refuges;
(iii) Wetlands, the destruction or alteration of which would
A-32
The Corps’ evaluation of Section 404 permit applica-
tions must also take into account the criteria incorporated
(Footnote 6 continued)
affect detrimentally natural drainage characteristics,
sedimentation patterns, salinity distribution, flushing
characteristics, current patterns, or other environmental
characteristics;
(iv) Wetlands which are significant in shielding other areas
from wave action, erosion, or storm damage. Such wetlands
are often associated with barrier beaches, islands, reefs and
bars;
(v) Wetlands which serve as valuable storage areas for
storm and flood waters;
(vi) Wetlands which are prime natural recharge areas.
Prime recharge areas are locations where surface and ground
water are directly interconnected; and
(vii) Wetlands through natural water filtration processes
serve to purify water.
(3) Although a particular alteration of wetlands may con-
stitute a minor change, the cumulative effect of numerous
such piecemeal changes often results in a major impairment
of the wetland resources. Thus, the particular wetland site
for which an application is made will be evaluated with the
recognition that it is part of a complete and interrelated
wetland area. In addition, the District Engineer may under-
take reviews of particular wetland areas in consultation with
the appropriate Regional Director of the Fish and Wildlife
Service, the Regional Director of the National Marine
Fisheries Service of the National Oceanic and Atmospheric
Administration, the Regional Administrator of the En-
vironmental Protection Agency, the local representative of
the Soil Conservation Service of the Department of
Agriculture, and the head of the appropriate State agency to
assess the cumulative effect of activities in such areas.
(4) No permit will be granted to work in wetlands identified
as important by subparagraph (2), above, unless the District
Engineer concludes, on the basis of the analysis required in
paragraph (a), above, that the benefits of the proposed
alteration outweigh the damage to the wetlands resource
and the proposed alteration is necessary to realize those
» A-33
into guidelines established by the Environmental Protec-
tion Agency (“EPA”) pursuant to Section 404(b) of the
FWPCA. See 40 C.F.R. § 230 (40 Fed.Reg. 41293,
September 5. 1975). The EPA § 404(b) guidelines establish
criteria for evaluating the water quality impacts of propos-
ed projects.
The Corps evaluated the public comments, the com-
ments of governmental agencies, the data generated by the
Corps, and the data presented by BDF and its consultants
in reviewing BDF’s application. Of key concern to the
Corps were the comments from the public and from other
federal agencies relating to the environmental effects of the
proposed work.
The area in question provides for water filtration,
assists in maintaining the salinity regime for the Barataria
Basin, provides habitat for terrestrial and aquatic fauna,
and provides significant detritus export vital to the
maintenance and health of Louisiana Gulf fisheries.
Development of the area in question and the destruc-
tion of almost 2,000 acres of wetlands would result in the
loss of wildlife habitat, the loss of water purification and
filtration benefits, amd have significant adverse impacts on
(Footnote 6 continued)
benefits. Jn evaluating whether a particular alteration is
necessary, the District Engineer shall consider whether the
proposed activity is primarily dependent on being located in,
or in close proximity to the aquatic environment and
whether feasible alternative sites are available. The appli-
cant must provide sufficient information on the need to
locate the proposed activity in the wetland and must provide
data on the basis of which the availability of feasible alter-
native sites can be evaluated.
33 C.F.R. § 320.4(b) (emphasis added).
A-34
the Barataria Bay fisheries resources due to loss of detritus
contribution and habitat. After evaluating the above fac-
tors and weighing the public need against the private need
for the project, as required by Corps’ regulations, the
District Engineer concluded that the proposed work would
not be in the public interest.
Based on the evidence in the administrative record
before the Corps at the time it denied plaintiff's permit ap-
plication on September 17, 1979, the Corps’ decision was
not arbitrary or capricious, an abuse of discretion, nor
otherwise not in accordance with law. The Corps considered
all relevant factors. The Corps was required by regulations
to consider not only the flood protection aspects of the pro-
posed project but other factors, including water
dependence of the project and ecological consequences, ef-
fect on wetlands water quality, and effects on fish and
wildlife habitat. 33 C.F.R. § 320.4. The Corps may properly
deny a permit on ecological grounds. Zabel v. Tabb, 430
F.2d 199 (5th Cir. 1970), cert. denied, 401 U.S. 910, 91 S.Ct.
873, 27 L.Ed.2d 808 (1971).
The court concludes that as a matter of law, plaintiff
is not entitled to ‘‘credit’’ for its previous illegal levee and
canal construction as a factor in evaluating the 1975 permit
application. When a developer proceeds with dredging
operations without permission, it does so at its own peril.
Weiszmann v. District Engineer, 526 F.2d 1302, 1305 (5th
Cir. 1976); United States v. Lewis, 355 F.Supp. 1132, 1141
(S.D.Ga.1973); United States v. Sunset Cove, Inc., 514 F.2d
1089, 1090 (9th Cir. 1975). The Corps notified plaintiff to
cease its dredge and fill operation as soon as the permitting
branch became aware of the work. BDF did not wait for a
final determination of navigability before proceeding with
its operations. Once a final determination was made, BDF
A-35
continued to assert that a permit was not necessary, sub-
mitting its application only when required to do so by the
1975 consent order. Such ‘‘self-help for the impatient’ can-
not circumvent enforcement of the Corps’ statutory man-
dates. United States v. Joseph G. Moretti, 478 F.2d 418,
427 (5th Cir. 1973); Weiszmann v. District Engineer, 526
F.2d at 1305.
Nothing in the evidence presented at trial by plain-
tiffs suggests to the court that the decision to deny the per-
mit was based on less than a full investigation of conditions
and application of the relevant statutes to the facts ad-
duced by the Corps.
CONSTITUTIONAL CLAIMS
Plaintiff has raised a plethora of procedural due pro-
cess claims, most of which can easily be disposed of. These
claims relate to the constitutionality of the Corps’ regula-
tions under the RHA and the FWPCA, the delay in pro-
cessing BDF’s permit application, the failure of the DOI to
promulgate guidelines for the park protection zone and its
authority to act in the future, the failure of Congress to ap-
propriate funds for the acquisition of the subject property
within the core area of the park, and the Corps’ failure to
recommend a West Bank hurricane levee placement in line
with plaintiff's desires. Each issue will be discussed in turn,
bearing in mind that the contemporaneous construction of
an agency of a regulation it is charged with administering
is entitled to deference. Udall v. Tallman, 380 U.S. 1, 16, 85
S.Ct. 792, 801, 13 L.Ed.2d 616 (1965). Further, where an
agency’s interpretation of its own regulation is reasonable,
it must stand even though it may not appear as reasonable
as some other interpretation. Homan & Crimen, Inc. v. Har-
ris, 626 F.2d 1201, 1208-9 reh. denied, 633 F.2d 582 (5th
A-36
Cir. 1980). Agency action is entitled to a presumption of
validity, Ethyl Corp. v. EPA, 541 F.2d 1 (D.C.Cir.), cert.
denied, 426 U.S. 941, 96 S.Ct. 2663, 49 L.Ed.2d 349 (1976),
and statutes are presumptively valid. Port Const. Co. v.
Government of the Virgin Islands, 359 F.2d 663 (3d Cir.
1966). ;
The Permit Proceedings
Arguments concerning the unconstitutionality of the
Corps’ application of Section 10 and Section 404 in this
case are without merit. The Congressional mandate that
plaintiff apply for a permit before constructing a levee on
wetlands below mean high tide is a valid exercise of the
constitutional Commerce Clause power. Zabel v. Tabb, 430
F.2d 199, 203-206 (5th Cir. 1970), cert. denied, 401 U.S. 910,
$1 S.Ct. 873, 27 L.Ed.2d 808 (1971) (holding that the RHA
is constitutional); United States v. Byrd, 609 F.2d 1204
(7th Cir. 1979) (holding that the FWPCA is constitutional
under ‘the Commerce Clause); United States v. Phelps
Dodge Corp., 391 F.Supp. 1181 (D.Ariz.1975) (holding that
the FWPCA is not unconstitutionally vague, that it does
not violate ex post facto principles because of alleged
uncertainty as to the extent of jurisdiction, and that the
commerce power extends to control water pollution in all
waters).
The regulations governing the issuance of permits
under Section 10 and Section 404 are not unconstitutional-
ly vague. They specify the applicable procedures, the
criteria for the public interest review, and the factors that
the Corps must consider. 33 C.F.R. §§ 320-329. Further
guidance is provided by the Environmental Protection
Agency’s § 404(b) guidelines. The record shows that all of
the elements required to be considered by the regulations
el
A-37
were evaluated by the Corps; the weight to be assigned
each factor is properly left to the discretion of the agency.
The regulations are reasonable and consistent with the in-
tent of Congress. Leslie Salt Co. v. Froehlke, supra.
Absent proof of invidious arbitrary discrimination,
plaintiff's charge of selective prosecution cannot be sus-
tained. United States v. Hercules, Inc., 335 F.Supp. 102
(D.Kan.1971). No such proof has been offered. In cases
such as this, the United States has broad prosecutorial
discretion. Sierra Club v. Train, 557 F.2d 485 (5th Cir.
1977).
The long delay between the submission of plaintiff's
permit application and the Corps’ ruling in 1979, while un-
fortunate, does not rise to the level of a denial of due pro-
cess. The Corps’ consideration of the impact of possible ef-
fluent from plaintiff's proposed sewage treatment plant on
the park, and respect for the park Administrator's request
that a levee not be constructed within the park boundaries,
did not exceed the Corps’ statutory mandate to consider
the environmental effects of the proposed project, see Zabel
v. Tabb, 430 F.2d at 209-214, although consideration of
those factors may have slowed the processing of BDF'’s
permit application. In any event, the authority plaintiff
cites in requesting that the court enjoin the permit denial,
see, e.g. Deering Milliken, Inc. v. Johnston, 295 F.2d 856,
861-64 (4th Cir. 1961); International Association of
Machinists & Aerospace Workers v. National Mediation
Board, 425 F.2d 527, 535 n.3 (D.C.Cir.1970), supports
judicial intervention only to ‘“‘compel agency ac-
tion...unreasonably delayed”’ in accordance with 5 U.S.C. §
706(1), not judicial intervention to invalidate agency action
where the agency has acted in an allegedly unreasonable
time. EEOC v. Raymond Metal Products Co., 385 F.Supp.
7
at:
A-38
907, 914 (D.Md.1974), aff'd, 530 F.2d 590 (4th Cir. 1976),
cited in Potomac Electric Power Co. v. Environmental Pro-
tection Agency, 650 F.2d 509, 510 n.1 (4th Cir. 1981).
The Park
As I have said, Jean Lafitte National Historical Park
was created by Act of Congress on November 10, 1978. 16
U.S.C. § 230a. The park consists primarily of the 8,000-acre
core area, also referred to as the Barataria Marsh Unit, and
a 12,000-acre Park Protection Zone. The statute authorizes
the Secretary of the Interior to acquire the acreage com-
prising the core area. As to the park protection zone, uses
therein are to be regulated by state and local authorities by
regulations that comport with guidelines to be developed
by the Secretary of the Interior in consultation with those
authorities. Upon failure of local authorities to adopt or en-
force regulations the Secretary may acquire property in-
terests in the park protection zone to protect the values for
which the core area was established. See Section 902(e) of
the Act.
The Park Act delegates unlimited authority to ac-
quire property interests in the core area. It is beyond
dispute that the United States may take land for federal
purposes by eminent domain. Kohl v. United States, 91
U.S. 367, 23 L.Ed. 449 (1875); United States v. Jones, 109
U.S. 513, 3 S.Ct. 346, 27 L.Ed. 1015 (1883); Shoemaker v.
United States, 147 U.S. 282, 13 S.Ct. 361, 37 L.Ed. i70
(1893). Thus, the Park Act, as an exercise of that power, is
constitutional and there is authority for the Department of
the Interior to acquire the 151 acres of the area in question
that are within the core area.
As to the park protection zone, the Secretary’s
nish el
A-39
powers of condemnation are limited. Section 902(e) of the
Park Act, 16 U.S.C. § 230a(e), makes it clear that the
Secretary may not acquire property interests in the park
protection zone unless state and local authorities fail to
enact or enforce regulations for the use of the park protec-
tion zone, and with respect to a particular use or area, such
failure threatens the core area and the values for which it
was created.
The concept of a limited power of condemnation is
not new with this statute. It has been used in other parks.
See, e.g., P.L. 90-545, as amended by P.L. 95-250, 16 U.S.C.
§ 79a et seg. [Redwoods National Park]; P.L. 92-400, 16
U.S.C. § 460aa et seg. [Sawtooth National Recreation
Area].
From a constitutional standpoint, if local authorities
regulate in the park protection zone, it is pursuant to the
police power. However, no local regulations have yet been
enacted; therefore, there is no constitutional issue based on
any state police power authority. Any guidelines developed
by the Secretary of the Interior for the park protection zone
in consultation with State and local authorities would not
be an exercise of the police power. Further, they would not
themselves prohibit any activities in the park protection
zone. Rather, they would provide the criteria pursuant to
which the Secretary may exercise the limited power of con-
demnation in the park protection zone in the event that
local regulations are not enacted or enforced. Since it is en-
tirely speculative at this point whether any state or local
ordinances will be enacted, and if enacted, how they will af-
fect the area in question, plaintiff's claim is not ripe.
Although the Park Act provides for the Secretary of
the Interior to develop guidelines in consultation with
A-40
State and local authorities within six months after enact-
ment of the statute, the court concludes that the six month
deadline is not mandatory. Ralpho v. Bell, 569 F.2d 607,
626-628, reh. denied, 569 F.2d 636 (D.C.Cir.1977); United
States v. Morris, 252 F.2d 643, 649 (5th Cir. 1958). The pro-
vision is not intended as a limitation on power but rather
as a guide for the conduct of orderly procedure, id., and
under the circumstances, the Department of the Interior’s
failure to develop guidelines is excusable. The Department
of the Interior is not precluded from continuing its efforts
to work with state and local authorities to develop
guidelines.
As to the 151 acres, a different issue has been
presented. Plaintiff alleges that there is a violation of due
process where, as here, there has been only an announce-
ment of the intention to condemn, contingent upon the
availability of funds. Funds for acquisition of properties in
the core area have been severely limited. In addition, the
order or priority of acquisition is a discretionary matter.
The slowness of the acquisition process, while perhaps un-
fortunate, goes neither to the authority of Congress to
establish the park nor to the authority of the Department
of the Interior ta make acquisitions. Where the Depart-
ment of the Interior has done all it can to implement the
statute and its requirements, and where inability to pro-
ceed is due to a lack of Congressional authorization or ap-
propriations, it will not be held to have failed to perform
the duties imposed by the statute. Sierra Club v. Depart-
ment of the Interior, 424 F.Supp. 172, 175 (N.D.Cal.1976).
The remedy, if any, lies with Congress. Id.
In conclusion, the court finds that the statute
creating Jean Lafitte National Historical Park is constitu-
tional. The court further finds that the plaintiff has failed
A-41
to state a claim upon which relief may be granted with
respect to the Department of the Interior’s implementation
of the Park Act.
The Hurricane Levee
There is no question that the Flood Control Act, 33
U.S.C. § 701, et seq., is valid on its face as an exercise of the
Commerce Clause power. Development and construction of
flood control projects is clearly a proper activity and is
related to federal authority to regulate navigable waters.
Plaintiff’s claim that the failure to place a flood con-
trol levee where plaintiff would like it to be does not create
a justiciable case or controversy ripe for review. Allain-
Lebreton Co. v. Department of Army, 670 F.2d 43 (5th Cir.
1982).
In 1974 Congress amended the Flood Control Act to
require the Corps, in formulating flood control plans, to
employ the most economically, socially, and environmen-
tally acceptable means of reducing or preventing flood
damages. 33 U.S.C. § 701b-11(a); Creppel v. U.S. Army
Corps of Engineers, 500 F.Supp. 1108, 1117 (E.D.La.1980),
rev'd and remanded, 670 F.2d 564 (5th Cir. 1982). Even if
the Corps did, in mid-1972, propose an alignment similar to
that along which plaintiff later began construction of a
levee, the Corps was not bound by that proposal. Jd. at 572.
The Corps was, however, required to take subse-
quently enacted federal legislation, including the FWPCA,
the amendment to the Flood Control Act, and the Park Act
and regulations, into account in developing a proposal for
hurricane protection on the West Bank. Even if the 1972
proposal had passed an earlier cost-benefit analysis, the
A-42
Corps could not ignore the Congressional policies express-
ed in subsequent legislation. Thus, the Corps has properly
considered subsequent legislation, specifically that legisla-
tion relating to environmental protection and to establish-
ment of Jean Lafitte Park, in developing a flood control
proposal for the West Bank.
Development of recommendations for flood control
projects is entrusted to the Corps’ discretion. 33 U.S.C. §
701b-8. However, the only body with authority to make a
final determination as to whether or where a flood control
project will be funded and built is Congress. Flood control,
dealing as it does with the regulation and flow of navigable
waters, is a responsibility that devolves from Congress’
Commerce Clause power. Even if this court chose to ques-
tion what is clearly a rational legislative judgment, this
court lacks the authority to order the Corps to build a hur-
ricane levee along the alignment of plaintiff's incomplete
levee, as plaintiff has asked the court to do.
This court finds that plaintiff has failed to present
evidence entitling it to relief. Further, the court finds that
the Corps has not erred either in proposing a hurricane
levee alignment that does not include the entirety of the
area in question or in having not yet constructed a levee.
Takings
Plaintiff's exclusive remedy for claims of uncompen-
sated takings, through delay or otherwise, if any are pre-
sent in this case, rests with the Court of Claims under the
Tucker Act, 28 U.S.C. § 1491. American Dredging Com-
pany v. Dutchyshyn, 480 F.Supp. 959 (E.D.Pa.), aff'd, 614
F.2d 769 (3d Cir. 1979). Framing the complaint as one for
injunctive relief cannot defeat Court of Claims jurisdiction.
A-43
A. L. Rowan & Son v. Department of Housing, 611 F.2d
997 (5th Cir. 1980). Because plaintiff has an adequate
remedy at law for money damages if, indeed, any taking of
plaintiff's property has occurred, injunctive relief is not ap-
propriate in this case. Regional Rail Reorganization Cases,
419 U.S. 102, 95 S.Ct. 335, 42 L.Ed.2d 320 (1974).
PETITIONER’S COMMENTS ON
DISTRICT COURT OPINION
The findings of fact of the District Court are general-
ly correct. However, there are some errors as noted below.
References are made to the page of the reported decision.
Page 1029—The Court refers to ‘‘one of the sites”
recommended by the Corps. The Court is confused. In
1972, only one site was recommended. Subsequently in
1978, after the determination of the boundary of the Park
Protection Zone and its co-existence with the levee line
became relevant, some 14 sites were recommended, of
which approximately 7 involved the existing levee line.
After the Parish of Jefferson reversed itself and endorsed
the line on which the Bayou des Familles levee had been
built for purely economical reasons (because it would not
have to pay for the base of the levee or for the land), Col.
Sands, the then District Engineer, declared that this deci-
sion was solely his and that he had chosen the line which
formed the boundary of the Park Protection Zone.
Page 1030—The Court states that Chatry advised
that ‘‘some of the hurricane requirements had been met.”’
This, too, is an understatement, as you will see from
Chatry’s letter which is a part of this record as Appendix
B, Item 4.
A-44
The Court failed to note, although it was emphasized
on several occasions, that with his communication to the
Corps of Engineers on August 20, 1973, the Director of
Sanitation of the Parish of Jefferson had sent the Corps of
Engineers a copy of the Bayou des Familles plans, and fur-
ther failed to recognize that these plans had been sent to
the permit department by a copy of the October 7th letter
from Farmer to Condon, by the copy to C. W. Decker who
was in charge of permits.
Also at Page 1030, the Court adopts Col. Hunt’s (the
then District Engineer) position that he first became aware
of this as a result of an inspection, and does not take note
that Col. Hunt knew or should have known through his
department, that the Corps of Engineers had been advised
as early as August, 1973 of the work on the Bayou des
Familles levee.
Also at Page 1030, the Court refers to the cor-
respondence whereby Bayou des Familles Development
Corps’ counsel agreed not to block Bayou Boeuf. There
seems to be some confusion that Bayou Boeuf has been
blocked. If so, it is also a fact that Bayou des Familles had
no knowledge of this at the time of the correspondence with
Col. Hunt or during the hearing.
Page 1023—The Court infers that the Kenta Canal
has been plugged. This is not a fact. The Kenta Canal has
never been plugged. This is shown by the position of the
Corps of Engineers that it is considering granting the
Parish of Jefferson the right to use this levee line, provided
there are flood gates installed at the Kenta Canal.
Page 1035—In consideration of the CWA, the Court
completely ignored the exemption which was relied upon
A-45
by the Corps itself in the Orleans Audubon case.
Page 1039—We suggest that the Court here, as we
have stressed in argument, completely missed the point of
the constitutional arguments made by the Petitioner.
A-46
UNITED STATES COURT OF APPEALS
FOR THE FIFTH CIRCUIT
No. 81-3700
D. C. Docket No. CA-79-4324-E
BAYOU des FAMILLES
DEVELOPMENT CORPORATION,
Plaintiff-Appeillant,
versus
UNITED STATES CORPS OF ENGINEERS,
ET AL.,
Defendants-Appellees
Appeal from the United States District Court for the
Eastern District of Louisiana
Filed Aug. 19, 1983
Before CLARK, Chief Judge, GOLDBERG and POLITZ,
Circuit Judges.
JUDGMENT
This cause came on to be heard on the record on ap-
peal and was argued by counsel;
ON CONSIDERATION WHEREOF, It is now here
ordered and adjudged by this Court that the judgment of
the said District Court in this cause be, and the same is
hereby, affirmed;
IT IS FURTHER ORDERED that plaintiff-
ws
5 re S 7
6 ee ae
A-47
appellant pay to defendants-appellees, the costs un appeal
to be taxed by the Clerk of this Court.
June 23, 1983
ISSUED AS MANDATE: Aug. 18, 1983
Date of Entry, Aug. 22, 1983
A-48
IN THE UNITED STATES COURT OF APPEALS
FOR THE FIFTH CIRCUIT
No. 81-3700
BAYOU des FAMILLES
DEVELOPMENT CORPORATION,
Plaintiff-Appellant,
versus
UNITED STATES CORPS OF ENGINEERS,
ET AL.,
Defendants-Appellees.
Appeal from the United States District Court for the
Eastern District of Louisiana
ON PETITION FOR REHEARING
(AUGUST 8, 1983)
Before CLARK, Chief Judge, GOLDBERG and POLITZ,
Circuit Judges.
PER CURIAM:
IT IS ORDERED that the petition for rehearing fil-
ed in the above entitled and numbered cause be and the
same is hereby denied.
ENTERED FOR THE COURT:
United States Circuit Judge
¥.
. «.
J =
OS > a
A-49
IN REPLY REFER TO
LMNPL-L 9 October 1973
SUBJECT: Reevaluation of Base Flood Elevations in
Reaches 4 and 5 of the Flood Insurance
Study Jefferson Parish Unincorporated,
Louisiana, Harvey Drainage Area West
Bank of Jefferson Parish
THRU: Division Engineer, Lower Mississippi Valley
ATTN: LAVTD-M
TO: HQDA (DAEN-CNP-F)
WASH DC 20314
1. Re erences inclosed:
a. Copy of letter dated 30 July 1973, Mr. Ray L. Con-
don, Jr., Director, Jefferson Parish Department of
Drainage and Sewerage, subject, “
unincorporated area of Parish of Jefferson, Westbank.”’
b. Copy of letter dated 21 August 1973, Mr. Ray L.
Condon, Jr., Director, Jefferson Parish Department of
Drainage and Sewerage, subject, ‘‘Harvey Drainage Area
West Jefferson Parish.”
2. The subject reevaluation requested by the Federal In-
surance Administration has been completed and results are
furnished herein.
3. The interior levee along Cousins Canal (see Plate 30, in-
closure 3) has recently been degraded, consequently under
present conditions the base flood elevation for Reach 5 is
4.2 feet mean sea level (m.s.l.). At present that portion of
Zone A5 known as Harvey Drainage Area, with the first
A-50
lift of the Corps of Engineers’ levee along Harvey Canal
completed and the Cousins Canal pumping station
operating, is provided with 40-year protection against
hurricane-produced tides. A rainstorm with a recurrent fre-
quency of once in 100 years could produce a stage of 1.9
feet m.s.l. in Reach 5. However, within the Harvey
Drainage Area, when the storm drainage is completed and
connected with the Cousins Canal pumping station the
stage of 100-year rainfall will be reduced to 1.6 feet m.s.l.
This work should be completed within the next six months.
4. Degrading of the interior levee along Cousins Canal in-
corporated a portion of the area originally in Reach 4 into
Reach 5. This area is now served by the new drainage pum-
ping station located on Cousins and Harvey Canals.
5. The Bayou Des Familles levee on the west side of
Barataria Highway (see inclosure 5) is under construction
by private interests, however, the completion date is not
known at this time. If this levee is built to the grade of 7-8
feet m.s.l. as specified in the construction drawings with a
cross section adequate to insure its integrity and is proper-
ly maintained, then Reach 5 will be provided protection
against hurricane-produced stages on the order of once in
100 years or better. When the levee is completed, the flood
stages produced by a 100-year frequency hurricane will be
reduced from 4.2 feet m.s.l. resulting from tides to 1.6 feet
m.s.l. resulting from rainfall only.
6. Three sets of preliminary prints of revised flood in-
surance zone maps and corresponding elevation-frequency
curves covering subject area are inclosed, one set of which
is to be retained by DNV.
7. Copies of the revised maps and elevation frequency
A-51
curves will be available at a later date.
8. A copy of this letter with inclosures has been furnished
Mr. Ray Condon, Director of Jefferson Parish Department
of Drainage and Sewerage.
FOR THE DISTRICT ENGINEER:
FREDERIC M. CHATRY
Acting Chief, Planning Division
5 Incl (trip) BAEHR
1. Copy of letter dated 30 July 1973 LMNED
2. Copy of letter dated 21 August 1973
3. Flood insurance zone maps DECKER
—Plates 17, 24, 25, 30 & 34 LMNOD-S
4. Frequency curves—Reaches 4 & 5
5. Levee location map KING
LMNDE-E
CF: (w/basic + incl)
Mr. Ray Condon CHATRY
Mr. C. Krebs (picked up) LMNPL
Mr. Earl Moss (sent by transmittal slip dated 9 Oct. 73)
A-52
CARD NO. 0338
LMNOD-SP (Jefferson Parish Wetlands)19
Permit Application by Bayou Des Familles Development
Corporation
District Engineer C/Operations Div 10 Dee 75
Mr. Decker/ga/264
1. All comments on the above application and draft EIS
have been received. Planning Division has begun the pro-
cess of preparing the final EIS.
2. It is apparent that the decision on the issuance of a per-
mit and the decision on the West Bank Hurricane Protec-
tion project are closely related. In fact, the decisions should
be made in concert.
3. If a decision is made to deny the permit application, it
would be inconsistent to propose a Corps levee in the same
area. If we propose to build a hurricane levee near the aline-
ment of the Bayou Des Familles levee, there is no reason
why a permit should not be issued.
4. In our opinion, there is sufficient information available
now to support a recommendation for denial without
preparing the final EIS. It is also possible to foresee a
recommendation for issuance of the permit if we will, in the
near future, construct a hurricane protection levee in the
area.
5. We, therefore, propose that representatives of Opera-
tions Division, Planning Division and Counsel meet with
you or LTC Hubert, thoroughly discuss the matter, review
are
A-53
all available information, determine the probability that a
hurricane protection project will encompass the Bayou Des
Familles area and base further actions on the permit mat-
ter on that determination.
6. If it is apparent that denial of the permit will be recom-
mended, we cannot see any value in expending the time of
our personnel in preparing the final EIS and in delaying the
final determination of permit issuance or denial if a finding
can be made now.
7. Strong opposition to issuance of the permit has been ex-
pressed by EPA, MMFS, USF&WS, the State Parks and
Recreation Commission, and the State Planning Office. It
is probable that these same agencies will also oppose a hur-
ricane levee which destroys the wetlands of this area.
NETTLES
CF:
LMNPL
LMNPL-R
LMNPL-RE
LMNPL-F
LMNOC
A-54
P.O. Box 429, Arabi, Louisiana 70032
W38 March 28, 1979
Memorandum
To: Regional Director, Southwest Region
From: Superintendent, Jean Lafitte
Subject: Section 902(b) & (c), PL 95-625 Guidelines on
criteria for use and development in the park pro-
tection zone
Section 902(c) limits the purpose of these guidelines to the
preservation of certain values within the ‘‘core”’ area of the
Park. We need not, therefore, suffer long with the delusion
that the park protection zone is, or can become an effective
extension of the Park under the existing legislation. Even
under Section 902(e), which provides for our acquisition of
properties in the protection zone if all else fails, limits that
acquisition to the interest necessary to achieve the
prescribed degree of protection for the ‘‘core’’ area.
Section 404 of the Federal Water Pollution Control Act,
and the regulations promulgated to implement it, appear to
effectively protect the wetlands in the protection zone from
development requiring dredging or filling. This condition
will prevail as long as the wetlands remain such and the on-
ly activity that has the potential for altering that condition
is the hurricane protection program under study by the
Corps of Engineers. The location of the levees and pumping
stations for this system has been, and will continue to be
controversial. Whatever the Corps study and the politics
trend toward as a location for levees, etc., I'm convinced
that we can effectively keep them out of the protection
boo m6
A-55
zone. The political climate is controlled by two factions at
the moment. One is the proposed water line to the town of
Lafitte which EPA is holding up until the Parish estab-
lishes a growth limit line, which becomes their preferred
location for the hurricane protection levee. The second is a
growing public clamor for flood protection in developed,
developing and undeveloped existing dryland areas. Both
of these are persuading the Parish Council to cooperate
with any endeavor that will speed a decision and the con-
struction of the flood protection system. The only counter
to this trend is coming from owners of property in the
wetlands area that will probably remain outside the protec-
tive levees. Many of these were speculative acquisitions by
corporations and individuals involving large loans, heavy
interest payments and predating the present public,
political and legal climate relative to wetlands. Where the
flood protection system excludes these areas the investors
will find themselves without a market and with literally no
opportunity to develop one.
This is the genisis of the current effort of the Parish Coun-
cil to initiate, through Senator Johnston and Represen-
tative Boggs, additional legislation to expand the fee ac-
quisition area of Jean Lafitte National Historical Park to
include the park protection zone. We would become the
market. If this plan fails, and based on early reaction from
the Congressional staffs it appears that it will, the next
scenario will probably involve a concerted effort to force
our hand toward acquisition under Section 902(e). This
scenario would almost of necessity involve degradation of
wetland, if not parkland resources. It would probably
ultimately succeed with the net effect of causing us to pay
higher prices for less valuable park land. The spectre of this
scenario developing to its climax persuades me to support
the current Parish effort to modify the legislation albiet an
A-56
admitted long shot.
In the interim, we are required by the legislation to develop
the guidelines and criteria for development and use of pro-
perty in the park protection zone. Following are the
guidelines I have drafted and propose to begin discussing
with State and local officials shortly after April 1.
1. The alteration of existing drainage patterns, or natural
water movement, whether in or out of channels, whether
perennial or seasonal, is not permitted.
2. The introduction of any pollutant from any source,
regardless of the degree of treatment is not permitted.
3. The discharge of concentrated storm run-off into either
the park protection zone, or the ‘‘core’’ area of the park is
not permitted.
4. During construction and operation of any development
occuring within the park protection zone, or its watershed,
no sediment, or chemicals from any source will be permit-
ted to escape into the aquatic ecosystem of the park protec-
tion zone, or the ‘‘core’’ area of the park. This includes, but
is not limited to, road surfacing chemicals, petroleum pro-
ducts, fertilizers, pecticides, herbicides, dust, leachades
from waste piles, etc.
5. In recognition of the limited size of the ‘‘core’’ area, its
accessability via several waterways and its interrelation-
ship with the protection zone, a moratorium on leasing and
development of fishing, recreation or trapping camps is
hereby established pending the completion of the general
management plan for the Park.
A-57
6. Anti-litter ordinances will be reviewed, strengthened as
appropriate, and enforced by Jefferson Parish and National
Park Service officials throughout the ‘‘core’’ and protection
zone.
7. Owners of existing camps will be required to haul out
refuse.
8. While the exploration for and development of oil and gas
resources within the Park is envisioned by the legislation
the spirit of these guidelines relative to impacts on natural
water movement, discharge of waste materials, escape of
chemicals and litter is also applicable to these activities.
Your early review and comment on these proposed guide-
lines would be appreciated. Telephone conversations with
anyone interested would also be welcome.
James L. Isenogle
ce: DSC
WASO (Attn. Eldon Reyer)
A-58
UNITED STATES DISTRICT COURT
EASTERN DISTRICT OF LOUISIANA
ORLEANS AUDUBON SOCIETY, CIVIL ACTION
ET AL
NO. 81-2248
VERSUS
SECTION “D”
COLONEL ROBERT C. LEE, ET AL
ORDER
In this action, the Orleans Audubon Society and the
Ecology Center of Louisiana (Plaintiffs) and Intervenor,
Sierra Club, seek to overturn the decision of officials of the
United States Army Corps of Engineers (Corps) and the
United States Environmental Protection Agency (EPA)
not to require Intervenor, CIT Corporation (CIT), to obtain
individual permits under Sections 9 and 10 of the Rivers
and Harbors Appropriations Act of 1899 (RHA), 33 U.S.C.
401, 403, and Section 404 of the Clean Water Act (CWA),
33 U.S.C. 1344. Plaintiffs contend that the failure of the
named officials to require individual permits was arbitrary
and capricious and an abuse of discretion. One of the Mo-
tions before the Court is Plaintiff's Motion for Partial Sum-
mary Judgment declaring the installation of two culverts
in a parcel of land owned by CIT to be illegal and requiring
Defendant, the Corps, to require CIT to apply for a Section
404 Clean Water Act permit and further ordering In-
tervenor, CIT, to remove the culverts in question and
restore the levees to their condition prior to the culvert
installation.
Federal Defendantg and Intervenor, CIT, oppose
Plaintiffs’ Motion for Summary Judgment and fur-
ther seek to have Plaintiffs’ Complaint dismissed or in the
A-59
alternative, to have summary judgment granted in Federal
Defendants’ favor. All of these Motions came on for hear-
ing on a former date and now, after consideration of the
record herein, the memoranda submitted and argument of
counsel, the Court rules as follows:
1. FACTS
The subject of this litigation is a tract of land of ap-
proximately 466 acres located west of the Mississippi River
in Jefferson Parish, Louisiana. The land is primarily a
tupelo gum swamp. In 1972, the predecessor in title to CIT,
the current owner, constructed levees around the property.
In 1976, Colonel E. J. Rush, then the District Engineer for
the New Orleans District of the Corps, issued a cease and
desist order to the predecessor in title and directed that he
apply for an after-the-fact permit for the work in question.
CIT acquired the tract in 1977 through foreclosure and on
June 1, 1977, applied for the after-the-fact permit as its _
predecessor had been directed to do. Subsequent thereto,
Colonel Thomas Sands succeeded Colonel Rush as District
Engineer of the New Orleans District and, after inquiry
from counsel for CIT concerning whether the Corps had
properly asserted Federal Regulatory Jurisdiction over the
activities that were the subject of the after-the-fact permit
application and, after a thorough review and analysis, con-
cluded and so advised counsel for CIT on June 21, 1979,
that the Corps did not have jurisdiction requiring an in-
dividual permit and that the Corps now declined to exercise
discretionary authority to require such a permit because in
the Corps’ opinion, the activities in question were author-
ized under a nationwide permit set forth in 33 CFR 322.4(g)
and 33 CFR 323.4-1(a). Plaintiffs’ challenge this action by
Colonel Sands in not requiring CIT to obtain the after-the-
fact permit.
A-60
In 1979, certain gaps in the levee system were
discovered and the Corps concluded that no individual per-
mit was required for repair of the gaps. Plaintiffs protest
that decision too and in January 1980 sent the Corps and
EPA a letter advising of their intention to sue under Sec-
tion 505 of the CWA, 33 U.S.C. 1365.
In 1980 and 1981, CIT installed drainage culverts
through the levee enclosing the swamp in question and
again Plaintiffs protested and urged the Corps to require
CIT to obtain a permit under the applicable provisions of
the Clean Water Act. The Corps, after consultation with
the EPA, concluded it did not have authority to regulate
the activity in question and that the activities were
authorized by nationwide permit.
In the instant litigation, Plaintiffs seek declaratory
and mandatory injunctive relief and urge this Court to
order the Corps and EPA to require CIT to apply for in-
dividual permits under Section 10 of the RHA and Section
404 of the CWA. Intervenor Sierra seeks the same relief.
2. STANDARD OF REVIEW
At the outset, this Court must consider the ap-
plicable legal standard in reviewing the decision of the
Corps not to require an individual permit for work in ques-
tion. Whether or not this Court agrees with the decision of
the Corps is of no moment.
““***the Court must consider whether the deci-
sion was based on a consideration of relevant fac-
tors and whether there has been a clear error of
judgment...although this inquiry into the facts is
to be searching and careful, the ultimate standard
A-61
of review is a narrow one. The Court is not em-
powered to substitute its judgment for that of the
agency." Citizens to Preserve Overton Park v.
Volpe, 401 U.S. 402, 416, 91 S.Ct. 814, 823, 28
L.Ed.2d 136 (1971)
Only if the Court finds that the Corps’ decision was
arbitrary, capricious, or in abuse of discretion may this
Court order remedial action. Indeed, the decision of the
agency is presumed to be correct. United States v. City of
Chicago, 400 U.S. 8 (1970). In considering whether or not
the action of the Corps or the action of the EPA was ar-
bitrary, this Court must look to the record before those
agencies when their decisions were reached; Camp v. Pitts,
411 U.S. 138 (1973).
Furthermore, because the decision of the Corps
whether or not to require the individual work permits is
clearly a discretionary function, the relief of mandamus
would not be available to Plaintiffs. Only if this Court
found that the Corps had in fact arbitrarily failed to make
a required discretionary decision could Plaintiffs be afford-
ed any relief. And in that case, the relief to be afforded
would be a remand to the Corps to require them to make
the discretionary decision but without direction as to how
that discretion should be exercised. In the case at bar, the
Corps, after careful consideration, chose not’ to require in-
dividual permits for the activities in question because the
regulatory guidelines, 40 CFR 230 (1975) were not ap-
plicable to the activities in question and the activities in
question were authorized by nationwide permit. Thus, the
issue before this Court is whether or not the Corps, after
consultation with the EPA, abused its discretion in
reaching that decision.
A-62
At oral argument, counsel for Plaintiffs, while initial-
ly suggesting that perhaps the record of the Corps filed
with the Court might not be complete, later conceded that
the Court had at least ‘99 percent of it’’ and that if he
became aware of any additional relative documents he
would bring them to the Court’s attention. No additional
documents have been filed with the Court since oral argu-
ment. Additionally, at oral argument, counsel for Plaintiffs
advised the Court that the Court had before it the required
-documents on which decisions on the various Motions
could be made.
After carefully reviewing the relevant documents,
this Court finds that the discretionary decisions of the
EPA and the Corps are not arbitrary and capricious and do
not reflect an abuse of the discretion granted to those
agencies.
Accordingly, the Motion of Plaintiffs for Pertial
Summary Judgment should be and is hereby DENIED and
the Motions of Defendants and Intervenor, CIT Corpora-
tion, to Dismiss or alternatively for Summary Judgment,
are GRANTED and this suit is dismissed at Plaintiffs’
costs.
New Orleans, Louisiana, this 29th day of March,
1983.
UNITED STATES DISTRICT JUDGE
A-63
OPINION OF THE DISTRICT COUNSEL
Subject body of water is an artificial canal which flows into
Bayou Barataria at its southern end and terminates on
privately-owned property at the northern end. The ex-
istence of past interstate commerce is alluded to in a letter
by the conservation chairman of Orleans Audubon Society
(Exh. 1). Therein it is alleged that log floating operations
were undertaken around 1910. Research has failed to un-
cover substantiation for this position. It cannot be ascer-
tained whether single logs were floated at that time or
whether floating rafts were transported thereon. No suffi-
cient information exists to determine if, in fact, these logs
ever entered interstate commerce or if they were trans-
ported solely in furtherance of intrastate trade. It has been ©
orally reported by a representative of a local drainage
department that, presently, trappers carry out their ac-
tivities throughout the entire extent of the canal. This
report is unsubstantiated by affidavit or by other concrete
support. Moreover, it is questionable that travel on a body
of water for purposes of private fishing, hunting, and trap-
ping qualifies as interstate commerce. Most cases hold
such activity does not constitute sufficient basis for a find-
ing of federal jurisdiction. See George v. Beavark, Inc. 402
F.2d 977 (8th C.A. 1968)-admiralty case; see also State by
Burnquist v. Bollenbach, 63 N.W. 2d 278.
As a general rule, the character of commerce essential to
navigability is that which is useful and has practical utility
to the public. There has been no showing that the use of
Kenta Canal meets this test. ER 1165-2-302 §8a provides in
pertinent part that ‘‘...A canal open to navigable waters of
the United States on only one end is itself navigable where
it in fact supports interstate commerce.’’ Information con-
tained in subject report fails to lend adequate support to a
A-64
conclusion that interstate commerce is presently sustained
on Kenta Canal. Consequently, there is no justification for
asserting federal jurisdiction over the waterway. ER
1165-2-302 §12b states inter alia that regulatory jurisdic-
tion extends to the entire surface and bed of all waterbodies
subject to tidal action...’’ That regulation cannot be cited
as authority for asserting jurisdiction over subject water-
way since this rule excepts from its scope artificial canals
opened at only one end.
JOSEPH A. TOWERS
District Counsel