Amicus Brief — Escondido Mut. Water Co. v. La Jolla Band of Mission Indians
Supreme Court brief1984
Ask Donna
What actually matters in this document.
Text
No. 82-2056
IN THE
Supreme Court of the United
OcToBEerR TERM, 1983
Office - Supreme Court, U.S
pe ee
FEB 28 1984
EX*NO® t 1S
ESCONDIDO MUTUAL WATER COMPANY, CITY OF ONDIDO,
ee
and
VISTA IRRIGATION DISTRICT,
Petitioners,
V.
La JOLLA, RINCON, SAN PASQUAL, PAUMA, and
PALLA BANDS OF MISSION INDIANS, and
THE SECRETARY OF THE INTERIOR,
Respondents.
On Writ of Certiorari to the United States
Court of Appeals for the Ninth Circuit
BRIEF OF AMICI CURIAE
NATIONAL WILDLIFE FEDERATION, AMERICAN
RIVERS CONSERVATION COUNCIL, CALIFORNIA
TROUT, COLORADO WILDLIFE FEDERATION,
ENVIRONMENTAL DEFENSE FUND, ENVIRONMENTAL
POLICY INSTITUTE, FRIENDS OF THE
EARTH, FRIENDS OF THE RIVER, INC., IDAHO
ENVIRONMENTAL COUNCIL, IDAHO WILDLIFE
FEDERATION, IZAAK WALTON LEAGUE OF AMERICA,
INC., MONTANA WILDLIFE FEDERATION, NATIONAL
AUDUBON SOCIETY, NATURAL RESOURCES
DEFENSE COUNCIL, INC., OREGON WILDLIFE
FEDERATION, SIERRA CLUB, TROUT UNLIMITED,
VERMONT NATURAL RESOURCES COUNCIL,
WILDERNESS SOCIETY,
and WYOMING WILDLIFE FEDERATION
IN SUPPORT OF RESPONDENTS
PATRICK A. PARENTEAU
Counsel of Record
CHRISTOPHER H. MEYER
National Wildlife Federation
1412 Sixteenth Street, N.W.
Washington, D.C. 20036
202/797-6859
Attorneys for Amici Curiae
February 23, 1984
i
QUESTION PRESENTED
Whether the Federal Energy Regulatory Commission may
reject license conditions found necessary by federal land man-
agement agencies to mitigate damage to federal reservations
from private hydroelectric power projects located within such
reservations. *
* Issues before this Court but not addressed in this brief are identified at
3, n.2.
‘i
TABLE OF CONTENTS
cop
CPF REIS DP ORRIEEEES BEBOP cesecccccccnencvscnnssoessesseecenovonebeneess i
Fe I I EERE BD on cecccinseresssovsocevennsesipnvocccnnenseniess ii
EE Ee Fs CRORE BEI o- creteneccsccnonsnscsvenbovenctosensorneabe iv
INTERESTS OF AMICI CURIAE .............ccssccsssssssssseeeees 2
SUMMARY OF ARGUMENT. ...ccccccccccrsccscsevscseccscscsscsees 3
TTS ieccertiashecitiiteinetiniprenspnenecvieepintiemepimeseninnepens 4
I. THE PLAIN MEANING OF SECTION 4(e)
IS THAT THE CONDITIONS DEEMED NEC-
ESSARY BY FEDERAL LAND MANAGE-
MENT AGENCIES MUST BE INCLUDED
BY THE COMMISSION IN HYDROELEC-
ie EE ED icitcnntdenvieesensicitniscninesitveeseressneeses 5
II. THERE IS NO REASON TO DEPART FROM
THE PROVISION’S PLAIN MEANING............ 6
A. The Purported “Conflict” Petitioners Have
Discovered Between the Section 4(e¢) Pro-
viso and the Rest of the Federal Power Act
Is No Conflict at All, But Rather a Logical
Division of Authority ................:ccccceeseeeeseees 7
B. The Commission Has Construed a Vir-
tually Identical Provision of the Federal
Power Act as Limiting Its Authority to
Review Agency Conditions ...................0..+. 11
Congress Has Adopted a Similar Division
of Responsibility for Other Agencies .......... 14
Db. The Legislative History of the Federal
Power Act Affirms the Plain Meaning of
I EID ial ci heidi oe teninccsidieensecstinnietomices 15
E. The Reading of Section 4(e) Urged by
Developers and the Commission Would
Render the Provision a Nullity ................... 17
F. Developers Are Free To Challenge Any
Conditions Included by Interior Which
They Believe To Be Unreasonable ............. 18
III. THE COMMISSION’S INTERPRETATION
OF SECTION 4(e¢) SHOULD BE GIVEN NO
MORE DEFERENCE THAN INTERIOR’S
CONTRARY INTERPRETATION ............00000++ 20
Page
IIIT iis nialcshasth chistes daa pbcteniioncinsicaidepeietesibaantellliatian 21
APPENDIX A
Detailed Statement of Interests .................ccccsceeseeeees A-1
APPENDIX B
Letter to R. Max Peterson, Chief, U.S. Forest
rey REI BOI pervnctnsccecnesosidenincdstenennssacion B-1
Letter from R. M. Housley, Deputy Chief, U.S.
Forest Service, January 17, 1984 ..0........ccccccseeeeeees B-3
Letter from J. B. Hilmon, Acting Deputy Chief,
U.S. Forest Service, February 14, 1984 ................ B-5
iv
TABLE OF AUTHORITIES
CASES:
American Paper Institute, Inc. v. American Electric
Power Service Corp., 103 S.Ct. 1921 (1983) ............
Atchison, Topeka & Santa Fe Railroad Co. v. United
nL SEED MeL ENED © DMI BD wii iencetdstnthintacncborsectoscosones
Boston Sand Co. v. United States, 278 U.S. 41 (1928)
Church of the Holy Trinity v. United States, 143 U.S.
RIT ceccstdatcciicinsthiateshtahaeiai edb botibebecamncssivedsé vebuten
Consumer Product Safety Commission v. GTE Syl-
vania, Inc., 447 U.S. 102 (1980) .........cccccceeeseeeeeeeeees
Escondido Mutual Water Co. v. FERC, 701 F.2d 826
(9th Cir. 1983), Appendix to Petition at 31.............
FERC v. Mississippi, 102 S.Ct. 2126 (1982) .........000+5
First Iowa Hydro-Electric Cooperative v. FPC, 328
BO EE IED kid cicccisdtihineniniatppadenanpitetieeneestncceseccosenes
Maine v. Thiboutot, 448 U.S. 1 (1980) .........cccceeeeeeeee
McEnvoy v. United States, 322 U.S. 102 (1944) .........
Muller v. Oregon, 208 U.S. 412 (1907) ......ccccccceeeeeeeesee
Train v. Colorado Public Interest Research Group,
Seid GIN RENE Ie PEE Dt csdichiprrinctabepenninbeniiannchcermscensts
Udall v. FPC, 387 U.S. 428 (1967) ......csssessssssesseseeeesees
United States v. American Trucking Associations, 310
be RE ee een eee
United States v. Katz, 271 U.S. 354 (1925) ..........ccc00
Watt v. Alaska, 451 U.S. 259 (1981) .....ccccccccesseeseerees
Weinberger v. Hynson, Wescott and Dunning, Inc.,
EN OO C BTS D sincgthntciecsdntntgnicinquesingiciintipemesans
STATUTES:
Act of March 3, 1921, ch. 129, 41 Stat. 1353 (1921)...
Act of Sept. 11, 1976, Pub. L. No. 94-407, 90 Stat.
1238 (1976) (codified at 16 U.S.C. sh 1273(a),
1278(a) (1982)) eostibeeceenensstngpenvocessondoteanons
Administrative Procedure Act §§ 5, 7, 8. ‘5 U.S.C.
Se i, Ses SEO UTE paschntiteinitsvnntasaneicqeuvactascustndans
Administrative Procedure Act § 10(e), 5 U.S.C.
§§ 706(2)(A)-706(2)(E) (1982) ....cecccecceeeeeeeee
rH
a
17
18-19
Department of Energy Organization Act, 42 U.S.C.
SS 7134, TISL, FETE TUTE Cees d saeeiscedercemntettes
Energy Security Act of 1980 § 408, Pub. L. No. 96-
294, 94 Stat. 611 (1980) (codified at 16 U.S.C.
FB HOG, BIOS (BSGED cctccscreamsnsthpieensinndaeiniates
Federal Power Act §3(2), 16 U.S.C. § 796(2)
Se Se EE AS ey BS
Federal Power Act §4(e), 16 US.C. § 797(e)
CHRIS Pcnsncscepncinscssevicsenconpenaicaiainaaaaatanniiie
Federal Power Act §4(f), 16 US.C. § 797(f)
( BIGZ) ecccccsvvesinsessesesmpepnncnieutadaiiiamaiaanaiiaiies
€ TSGEB ) ecvecocesonscosencccosnencusentieninesstaniiigantanvetaiaaiabmesainl
C EDEEE ) nccnccnstssetiasenstssiessctsemmnetipammdiaaiameiliaialaiiss
Federal Power Act § 15, 16 U.S.C. § 808 (1982).........
Federal Power Act §23(b), 16 U.S.C. § 817(b)
C BSB ) cccenscscecestsnninintastneniitghieeasaiaiaammaia amie ciate
Federal Power Act § 30, 16 U.S.C. § 823a (1982)......
Federal Power Act § 313(b), 16 U.S.C. § 825/(b)
C TGGEB ) sccsccnsensacocstessiscntpisiiakaniaatmalan amen
Federal Water Power Act of 1920, ch. 285, 41 Stat.
1063 (1920)........ Sececnenssinddintanniimaiaaaaaa aaa
Fish and Wildlife Coordination Act, 16 U.S.C.
SE 661-GEN GS) C RODD Dec reccsctstctctatctnisssnrnbaptivtiideessands
Forest and Rangeland Renewable Resources Plan-
ning Act of 1974, Pub. L. No. 93-378, 88 Stat. 476
feces (codified at 16 U.S.C. §§ 1600-1687
€ BSG ) ) cecccndqorscctsisnmasnescenentipeanlansssentsabionminsasaastnaiaien
Hells Canyon National Recreation Area Act,
$§ 3(a), 4, Pub. L. No. 94-199, 89 Stat. 1117
(1975) (codified at 16 US.C. §§ 460gg-2,
1274(a)( 12) (1982))
Mineral Leasing Act for Acquired Lands of 1947, 30
U.S.C. §§ 351-359 (1976 & Supp. V 1981) .............
Mineral Leasing Act of 1920, 30 U.S.C. §§ 181-287
(1976 & Supp. V 1981)
Mission Indian Relief Act of 1891, ch. 65, 26 Stat.
ri fo, ) ERIN,
3, 11-14
19
16-18
11, 12
10
National Forest Management Act of 1976, Pub. L.
94-588, 90 Stat. 2949 (1976) (codified at 16
U.S.C. $8 1600-1687 (1982) ) ou... eceeeeeeeeeeeeeee
Power Act Amendments of 1930, ch. 572, 46 Stat.
Pe i ccegiliilaitisenediehditisinadadiecimiuiencdetebsecenvenvtnnions
Power Act Amendments of 1935, ch. 687, 49 Stat.
iach cic harshatennisphnnasessoveessocssseehseghieemienpence
Public Utility Regulatory Policies Act of 1978, Pub.
L. No. 95-617, 92 Stat. 3117 (1978) (codified at
16 U.S.C. §§ 2601-2708 (1982) ) occ ceeeeeeeeeee
ADMINISTRATIVE DECISIONS:
Dryden Hydro Associates, Project No. 7030-001, 26
FERC 7 61,135 (Feb. 6, 1984)..............cccsscccsssroessoes
Duncan Miller, 79 Interior Dec. 416 (1972) .............4.
Fall Creek Associates, Project No. 7082-000, 25
FERC ¥ 62,092 (Oct. 24, 1983) ..........cscccssscssssceeseees
Great Northern Hydro Co., Project No. 7038-000, 25
FERC 4 62,287 (Dec. 5, 1983) ..........scsccsssscessessessees
Hydro-Cor, Inc., Project No. 7176-000, 25 FERC
Be BID Srcicicabibicciensnertverensemeenesesnes
Lester Kelley, et al. Project Nos. 6442-000, et al., 25
PERC F 61,410 (DGC. 22, 1963) | cccsecocccvvcssesesccccessacee
Mountain West Hydro, Inc., Project No. 7134-000, 25
FERC 4 62,056 (Oct. 18, 1983) ..........ccccsscccssscesseees
Sallie B. Sanford, 22 Interior Board of Land Appeals
Ban cigs chincdiociahigsabbdetieijakedeienstitseneanpiadeastanmocionse
Sierra Pacific Power Company, Project Nos. 4161-
000, 4162-000, 4163-000, 4164-000, 19 FERC
ET a, CONE B hddindiinicteninimsnsientedpimenvestnipabernisoveines
Southern Pacific Land Company, Project No. 5585-
000, 19 FERC § 61,297 ( 1982) ...........cscssscesseessssess
Swanson Mining Corporation and Walter M. Gleason,
Project No. 5677-000, 20 FERC 4 61,226 (1982)...
REGULATIONS:
Conduit Exemption Rules, 18 C.F.R. § 4.94 (1983)...
Preamble to Five Megawatts or Less Exemption
Rules, 45 Fed. Reg. 76,115 (1980) ..........cccccscceeseeees
Protest and Intervention Rules, 18 C.F.R.
eS By ae AE 0 EE Pcticepiien eeccancdecviatberinarese
CONSTITUTION:
Commerce clause, U.S. Const. art. I, § 8, cl. 3..............
Property clause, U.S. Const. art. IV, § 3, cl. 2 ..............
TREATISE:
C. D. Sands, 2A Sutherland Statutes and Statutory
Construction § 45.12 (4d ed. 1973) ..cecceeceeseeeeeeees
MISCELLANEOUS:
Environmental Unit to Review Procedure to Assess
Hydro Impact, Monitor, Vol. III, No. 20, at 1 (Oct.
BE RR ce En aR aE
Joint Petition of the National Marine Fisheries Ser-
vice and the Tulalip Tribes of Washington for
Coordination of Proceedings, for Development of
Data, and for Hearing, Project Nos. 4218 et al.
(filed Feb. 22, 1983) ..............02. ett glghersseessecsseesneenes
Land Areas of the National Fotest System, U.S.
Department of Agriculture, Forest Service, FS-383,
EG Ree D etctteancilte isan dbianariinttpestnsnectbanrinecie
Letter from J. B. Hilmon, Acting Deputy Chief, U.S.
Forest Service (Feb. 14, 1984) .............cccccccscsssssseees
Letter from R. M. Housley, Deputy Chief, U.S.
Forest Service (Jan. 17, 1984) .0..........cccccccccessssssseees
Letter to R. M. Peterson, Chief, U.S. Forest Service
SI ip IO hereetiicensissictliss Rade esedinnsnnithvekdseaencabingetoptes
Memorandum of O. C. Merrill, Chief Engineer, For-
—— at 6 (Oct. 31, 1917), Joint Appendix at
i tibsiiicataenchepusnnpsthsclidalpinicinichassegebivienptibanntoamlecs
Se Pc rtihipnsinersiececsnibtccdessepoteninhuitnigeniiovmctitiasinsenubtietbe
Statement of Secretary Houston, Hearings on Water
Power Before the House Committee on Water
Power, 65th Cong., 2nd Sess., at 676-77 (1918) .....
The Twelve License Conditions, Joint Appendix at
218-242, Commission’s Brief at Sa-lla ................0+
ia
17
16-17
IN THE
Supreme Court of the Bnited States
OcToOBER TERM, 1983
No. 82-2056
ESCONDIDO MUTUAL WaTER COMPANY, CITY OF ESCONDIDO,
and
VISTA IRRIGATION DISTRICT,
Petitioners,
Vv.
La JOLLA, RINCON, SAN PASQUAL, PAUMA, and
PALLA BANDS OF MISSION INDIANS and
THE SECRETARY OF THE INTERIOR,
Respondents.
On Writ of Certiorari to the United States
Court of Appeals for the Ninth Circuit
BRIEF OF AMICI CURIAE
NATIONAL WILDLIFE FEDERATION, AMERICAN
RIVERS CONSERVATION COUNCIL, CALIFORNIA
TROUT, COLORADO WILDLIFE FEDERATION,
ENVIRONMENTAL DEFENSE FUND, ENVIRONMENTAL
POLICY INSTITUTE, FRIENDS OF THE
EARTH, FRIENDS OF THE RIVER, INC., IDAHO
ENVIRONMENTAL COUNCIL, IDAHO WILDLIFE
FEDERATION, IZAAK WALTON LEAGUE OF AMERICA,
INC., MONTANA WILDLIFE FEDERATION, NATIONAL
AUDUBON SOCIETY, NATURAL RESOURCES
DEFENSE COUNCIL, INC., OREGON WILDLIFE
FEDERATION, SIERRA CLUB, TROUT UNLIMITED,
VERMONT NATURAL RESOURCES COUNCIL,
WILDERNESS SOCIETY,
and WYOMING WILDLIFE FEDERATION
IN SUPPORT OF RESPONDENTS
2
INTERESTS OF AMICI CURIAE
Pursuant to Supreme Court Rule 36.2, the National Wild-
life Federation, American Rivers Conservation Council, Cali-
fornia Trout, Colorado Wildlife Federation, Environmental
Defense Fund, Environmental Policy Institute, Friends of the
Earth, Friends of the River, Inc., Idaho Environmental Council,
Idaho Wildlife Federation, Izaak Walton League of America,
Inc., Montana Wildlife Federation, National Audubon Society,
Natural Resources Defense Council, Inc., Oregon Wildlife
Federation, Sierra Club, Trout Unlimited, Vermont Natural
Resources Council, Wilderness Society, and Wyoming Wildlife
Federation file this brief as amici curiae in support of respond-
ents. Letters of consent from counsel for the parties have been
filed with the Clerk.
The members of amici curiae organizations use the nation’s
rivers on national forests and other federal reservations for
fishing, hunting, canoeing, kayaking, rafting, swimming, camp-
ing, bird watching, photography, and other forms of recreation.
Many of these streams and rivers will be adversely affected by
hydroelectric power development. However, far from opposing
all hydroelectric development, amici curiae have actively sup-
ported the balanced development of this renewable resource.'
Amici curiae see the environmental safeguards at stake in this
litigation as critical to the maintenance of that balance.
A more detailed statement regarding the interests of amici
curiae is set out as Appendix A to this brief.
‘ For example, several of amici curiae filed briefs in this Court as amici
curiae in support of the constitutionality of the Public Utility Regulatory
Policies Act of 1978, Pub. L. No. 95-617, 92 Stat. 3117 (1978) (codified at 16
U.S.C. §§ 2601-2708 (1982)) (the Act provides incentives to encourage
retrofiting of existing dams for power production), in FERC v. Mississippi,
102 S.Ct. 2126 (1982), and in support of the Federal Energy Regulatory
Commission's “avoided cost” rule implementing the Act in American Paper
Institute, Inc. v. American Electric Power Service Corp., 103 S.Ct. 1921
(1983).
3
SUMMARY OF ARGUMENT
The principle issue in this case is a straightforward ques-
tion of statutory construction arising under the Federal Power
Act (“FPA” or “the Act”).2 The FPA charges the Federal
Energy Regulatory Commission (“Commission”)? with the
task of licensing ¢ virtually all non-federal hydroelectric power
production in the nation.5 In most instances the Commission
has the final say (subject, of course, to judicial review) with
regard to all issues affecting the license.
In granting this broad authority to the Commission, how-
ever, Congress carved out an important exception. Section 4(e)
2 This brief addresses the scope of the conditioning authority in section
4(¢) of the Federal Power Act, 16 U.S.C. § 797(¢) (1982). This provision,
invoked here by the Department of the Interior to secure certain protections
for respondent Indian Bands, is the same authority utilized by that depart-
ment and other federal agencies »> secure environmental mitigation for
hydroelectric projects located on national forests and other federal reserva-
uons. ( The term “reservations”, as defined in the FPA, encompasses national
forests and other withdrawn and acquired lands of the United States, except
for national parks which receive protection under another statute. See this
brief at 5, n.8.) The critical issue to am‘ci curiae is the mandatory nature of
the 4(¢) conditioning authority. Of less practical concern, in the view of amici
curiae, is the reach of that authority beyond the physical confines of the
federal reservation. Consequently, amici curiae take no position on the
question of whether a “reserved water right” is a “reservation” under the
FPA. Nor do they address questions in this case relating to the rights of the
Indian Bands under treaties, the Federal Power Act, 16 U.S.C. §§ 791a-825r
(1982), the Mission Indian Relief Act of 1891, ch. 65, 26 Stat. 712 (1891),
and other applicable law.
3 The term “Commission” refers both to the Federal Energy Regulatory
Commission and its predecessor, the Federal Power Commission. See
Department of Energy Organization Act, 42 U.S.C. §§ 7134, 7151, 7171-7177
(1982).
“FPA $§ 4(e), 15, 23(b), 16 U.S.C. §§ 797(e), 808, 817(b) (1982).
The Commission also issues preliminary permits (which secure an applicant's
priority for a subsequent license), FPA § 4(f), 16 U.S.C. § 797(f) (1982),
and exemptions from licensing requirements, FPA § 30, 16 U.S.C § 823a
( 1982); Public Utility Regulatory Policies Act §§ 405, 408, 16 U.S.C. §§ 2705,
2708 ( 1982).
5 This licensing authority extends to all projects reached by the federal
regulatory power under the commerce and property clauses of the Con-
stitution. FPA § 4(¢), 16 U.S.C. § 797(e) (1982); U.S. Const. art. 1, § 8, cl.
3; U.S. Const. art. IV, § 3, cl. 2.
4
of the Act—the same section which empowers the Commission
to license projects—contains the following limitation:
Provided, That licenses . . . within any reservation .. .
shall be subject to and contain such conditions as the
Secretary of the department under whose supervision
such reservation falls shall deem necessary for the
adequate protection and utilization of such reserva-
tion.
FPA § 4(e), 16 U.S.C. § 797(e) (1982).
The question in this case is simple. Does this statutory
language “mean[] what it says’? Maine v. Thiboutot, 448
U.S. 1, 4 (1980). Or, as petitioners would have it, should the
Court “improve” upon the scheme laid out by Congress, and
read into these words a new meaning such that the Commis-
sion—rather than the agencies charged with managing our
federal reservations—becomes the arbiter of how much
environmental protection is necessary?
ARGUMENT
This case arose over a diversion of water from the San Luis
River in California. Petitioners Escondido Mutual Water
Company, City of Escondido, and Vista Irrigation District
(hereinafter “developers”) sought relicensing ® of an irrigation
project which produces some incidental hydroelectric power.
The Department of the Interior (“Interior”) sought to attach
certain conditions to the license to protect the interests of
respondents La Jolla, Rincon, San Pasqual, Pauma, and Palla
Bands of Mission Indians. Developers objected to the condi-
tions, and the Federal Energy Regulatory Commission (““Com-
mission”) rejected ten out of twelve of Interior’s conditions.’
* Developers initially sought relicensing of the project. However, the
Commission decided to issue another “original” license because the scope of
the project was substantially changed from that of the first license. This had
the effect of mooting a dispute over whether the section 4(¢) conditioning
authority attaches to renewed as well as original licenses.
7 Joint Appendix at 218-242, Commission's Brief at Sa-lla. The
Commission's brief incorrectly identifies Interior's conditions 10, 11, and 12 as
conditions 9, 10, and 11, respectively.
5
The case has grown into much more than a dispute over
ten rejected conditions. The Commission maintains that In-
terior may not impose, but may only recommend to the
Commission, conditions on the licenses it issues. If that is so,
then neither may any other federal land management agency
(hereinafter “land manager”) impose conditions it finds neces-
sary to protect those federal reservations ® it is charged by
Congress with managing.®
I. THE PLAIN MEANING OF SECTION 4(e) IS THAT
THE CONDITIONS DEEMED NECESSARY BY FED-
ERAL LAND MANAGEMENT AGENCIES MUST BE
INCLUDED BY THE COMMISSION IN HYDRO-
ELECTRIC LICENSES.
The dispute turns on the meaning of the following sen-
tence. “[Ll]icenses . . . within any reservation . . . shall be
subject to and contain such conditions as the Secretary of the
department under whose supervision such reservation falls shall
deem necessary for the adequate protection and utilization of
such reservation.” Federal Power Act (“FPA” or “the Act’)
§ 4(e), 16 U.S.C. § 797(e) (1982) (emphasis added).
There is no disagreement among the parties to this case as
to the plain meaning of these words. Federal land managers
® Under the Federal Power Act, “reservations” is defined to include
“national forest, tribal lands embraced within Indian reservations, military
reservations, and other lands and interests in lands owned by the United
States, and withdrawn, reserved, or withheld from private appropriation and
disposal under the public land laws; also lands and interests in lands acquired
and held for any public purpose; but shall not include national monuments or
national parks”. Federal Power Act § 3(2), 16 U.S.C. § 796(2) (1982).
National Parks are excluded from the section 4(¢) provision because they
receive special protection under a separate statute prohibiting the construction
of hydroelectric power projects within them, Act of March 3, 1921, ch. 129, 41
Stat. 1353 (1921).
® Conservationists’ greatest concern is with national forest lands covering
over 190 million acres, Land Areas of the National Forest System, U.S.
Department of Agriculture, Forest Service, FS-383, at 1 (1983). It is
estimated that in the next decade, 3,000 hydroelectric projects will be
proposed for licensing on these lands alone. Letter of J. B. Hilmon, Acting
Deputy Chief, Forest Service, to Christopher H. Meyer (Feb. 14, 1984) set
out in Appendix B at B-5.
6
are charged under the FPA with determining which conditions
are “necessary for the adequate protection and utilization” of
federal reservations. The Commission’s role in this respect is
purely ministerial: it “shall” incorporate such conditions in any
license it issues.’ Indeed. the Commission appears to concede
in its main brief that, if the plain meaning of section 4(e)
governs, the decision of the Ninth Circuit on this question must
be affirmed."'
Il. THERE IS NO REASON TO DEPART FROM THE
PROVISION’S PLAIN MEANING.
In urging the adoption of the p.-in meaning of section
4(e), amici curiae conservation organizations (“conserva-
tionists”) do not contend that the Court is prohibited from
scrutinizing the legislative history behind the Act.'? The issue
is not whether extrinsic evidence may be explored, but what
happens when that exploration proves fruitless. On this point
the law is also clear. “Absent a clearly expressed legislative
intention to the contrary, [the statute’s] language must ordi-
narily be regarded as conclusive.” Consumer Product Safety
Commission v. GTE Sylvania, Inc., 447 U.S. 102, 108 (1980).
In other words, in order to justify a departure from the plain
1© This mandatory language is in sharp contrast to other provisions of the
FPA, such as section |4(b) dealing with federal takeover. “In any relicensing
proceeding before the Commission any Federal department or agency may
timely recommend, pursuant to such rules as the Commission shall prescribe,
that the United States exercise its right to take over any project or projects.”
FPA § 14(b), 16 U.S.C. § 807(b) (1982) (emphasis added). Clearly, had
Congress wished to make section 4(¢) conditions mere recommendations, it
knew how to do so.
‘1 “(In the decision of the Ninth Circuit below] the majority's reliance
upon the plain language rule does not advance its position. It is true that
Section 4(¢) provides that the license ‘shall’ include the conditions which the
Secretary deems necessary, but that does not end the inquiry.” Commission's
Brief at 20-21 (reference omitted ).
‘2 Such a biind approach to the law was abandoned long ago by this
Court. “[T]he plain-meaning rule is ‘rather an axiom of experience than a
rule of law, and does not preclude consideration of persuasive evidence if it
exists."” Watt v. Alaska, 451 U.S. 259, 266 (1981) (quoting Boston Sand Co.
v. United States, 278 U.S. 41, 48 (1928)); see Train v. Colorado Public
Interest Research Group, Inc., 426 US. i, 10 (1976); United States v.
American Trucking Associations, 310 U.S. 534, 543-44 (1940).
5
meaning of a statute, it must be demonstrated that the plain
language of the act violates the legislative intent and leads to an
“absurd result”. 19
A. The Purported “Conflict” Petitioners Have Dis-
covered Between the Section 4(e) Proviso and the
Rest of the Federal Power Act Is No Conflict at All,
But Rather a Logical Division of Authority.
Petitioners advance four arguments to support their con-
clusion that the plain meaning of the section 4(e) proviso
conflicts with the rest of the FPA, and must therefore be
reinterpreted by the Court.
The first argument rests on the allegedly comprehensive
nature of the FPA. The argument boils down to this: Because
the FPA was intended to “centralize authority in the Commis-
sion”, Commission’s Brief at 21, Congress must not have
intended section 4(e¢) to “undermine” the Commission’s power,
Commission’s Brief at 20. To put it more bluntly, petitioners
urge that the existence of a comprehensive organic act justifies
the Commission in ignoring express congressional directives
which limit its power under that act. Whatever merit this novel
principle of law might otherwise have, the argument overlooks
the obvious fact that each of the federal agencies involved
operates under a comprehensive organic act.'4 The purported
“conflict” posed by the ability of federal land managers to
impose license conditions against the wishes of the Commission
is no more real than the conflict one might find in the
Commission’s ability to license a project on federal lands which
the land manager believes interferes with its comprehensive
management of those lands. Such abstract conflicts are better
resolved by reference to statute than through judicial guess-
work.
'3“All laws are to be given a sensible construction; and a literal
application of a statute which would lead to absurd consequences, should be
avoided whenever reasonable application can be given to it, consistent with
the legislative purpose.” United States v. Katz, 271 U.S. 354, 357 (1925). See
Atchison, Topeka & Santa Fe Railroad Co. v. United States, 295 U.S. 193, 208
(1935) (dissent); Church of the Holy Trinity v. United States, 143 U.S. 457,
459 (1892).
4 See this brief at 10, 0.18
8
Next petitioners raise section 10(a).'5 FPA § 10(a), 16
U.S.C. § 803(a) (1982). Because the Commission is instructed
under this section to license only those projects which are “best
adapted to a comprehensive plan” for the river basin, petition-
ers argue that the Commission must therefore be able to reject
conditions imposed by land managers under section 4(e).
Commission’s Brief at 19-20, n.25, 33; Developers’ Brief at 33-
18 Conservationists find ironic the Commission's reliance here on the
mandate for comprehensive planning under section 10(a). Environmental
organizations, Indian Tribes, and government fisheries agencies have sought
repeatedly to persuade the Commission that section 10(a) does, in fact,
require the preparation of comprehensive plans for river basins. See, e.g.,
Joint Petition of the National Marine Fisheries Service and the Tulalip Tribes
of Washington for Coordination of Proceedings, for Development of Data,
and for Hearing, Project Nos. 4218, 4741, 4786, 4885, 5305, 5338, 5339,
$341, 5356, 5358, 5400, 5402, 5403, 5404, 5428, 5430, 5431, $432, 5433,
$434, 5435, 5436, 5437, 5438, 5439, 5440, 5500, 5555, 5610, 5611, 5612,
6541, 5676, 5681, 5683, 5757, 5758, 5759, $777, 5778, 5816, 5818, 5819,
$825, 5829, 5837, 5853, 5926, 6176, 6216, 6220, 6221, 6256, 6295, 6310,
6311, 6348, 6465, 6495, 6496, 6503, 6505, 6506, 6507, 6530, 6533, 6534,
6539, 6611, 6672, 6830 (filed Feb. 22, 1983) (Snohomish River Basin in
Washington). Dozens of similar petitions have been filed on projects
proposed within the Salmon River Basin in Idaho, the Willamette River Basin
in Oregon, and the Wenatchee River Basin in Washington. To date these
efforts have not been successful. While the Commission has yet to rule finally
on any of these petitions, it has nevertheless issued preliminary permits over
objections in the Salmon River Basin, Order Denying Appeals, Lester Kelley,
et al., Project Nos. 6442-000, et al, 25 FERC 61,410 (Dec. 22, 1983), the
Snohomish River Basin, Order Issuing Preliminary Permit, Great Northern
Hydro Co., Project No. 7038-000, 25 FERC 62,287 (Dec. 5, 1983), the
Willamette River Basin, Orders Issuing Preliminary Permits, Mountain West
Hydro Inc., Project No. 7134-000, 25 FERC 62,056 (Oct. 18, 1983); Fall
Creek Associates, Project No. 7082-000, 25 FERC 62,092 (Oct. 24, 1983);
Hydro-Cor, Inc. Project No. 7176-000, 25 FERC 62,096 (Oct. 24, 1983), and
the Wenatchee River Basin, Order Denying Appeal, Dryden Hydro Associates,
Project No. 7030-001, 26 FERC 61,135 (Feb. 6, 1984). Moreover, on
September 15, 1983, the Commission rejected, by a 40 vote (former
Chairman C. M. Butler was not present), a staff proposal to undertake
cumulative environmental impact studies for multiple hydroelectric devel-
opment projects within river basins. Environmental Unit to Review Procedure
to Assess Hydro Impact, Monitor, Vol. Ill, No. 20, at 1 (Oct. 3, 1983) (the
Monitor is the Commission's official monthly publication). In short, the
section 10(a) mandate—which the Commission here finds to be so broad—is
the same mandate which the Commission has construed so narrowly that in
over fifty years it has never found it necessary to prepare a single com-
prehensive river basin plan.
9
34. How this conclusion follows is unclear. Section 10(a) is a
general articulation of the “public interest” considerations
which govern the Commission’s licensing decisions. Udall v.
FPC, 387 U.S. 428, 450 (1967). These general principles in no
way erase the more specific constraints imposed under section
4(e).'® Thus, while the Commission is guided by the section
10(a) public interest criteria in choosing the “best adapted”
project, its universe for selection is limited under the FPA to
projects whose harm to federal lands is mitigated through
section 4(e) conditions.
Third, the Commission tells the Court that the first clause
of the section 4(e) proviso conflicts with the second. Commis-
sion’s Brief at 17-20. The first clause requires a finding by the
Commission that “no interference or inconsistency” with the
purposes of the reservation will result from the issuance of a
license. The second clause contains the conditioning authonty
which is the subject of this litigation, There is no inconsistency
here. The “no interference or inconsistency” finding is a go/no-
go decision on the project. Congress withheld that power from
the land managers and placed it in the hands of the Commis-
sion. Left to the land managers under the second clause is the
authority, not to halt a project, but to specify mitigation
measures. In so allocating authority between the agencies,
Congress did not create a conflict. It struck a balance.
Finally, the Commission alludes to an “incongruous result”
which it fears might flow from a literal reading of section 4(e).
Commission’s Brief at 19-20. What the Commission apparently
has in mind is the possibility that the conditions imposed by a
land manager might render a power project uneconomical and
thereby in effect “veto” the license. Conservationists do not
shrink from the implications of this hypothetical.'7 If a private
6 Specific statutory provisions control the general. McEnvoy v. United
States, 322 U.S. 102, 107 (1944).
17 Conservationists would emphasize, however, that the notion of arrest-
ing hydroelectric development via 4(¢) conditions is nothing more than
hypothetical. The practical impact of 4(¢) conditions in the overwhelming
majority of cases is to mitigate, not halt, development. Moreover any
unreasonable conditions may be challenged by the applicant. See this brief at
18-19.
10
hydroelectric project on land reserved for public benefit cannot
turn a profit unless mitigation measures are eliminated, then
perhaps that project should not be built. There is certainly no
reason to read a contrary result into a plainly worded statutory
provision. If Congress wished to promote uneconomical
hydroelectric development by curtailing mitigation measures, it
is certainly within its power to do so. Section 4(e), however,
reflects a different choice of policy.
A straightforward reading of the Act demonstrates that
Congress intended to draw upon the special expertise of
multiple federal agencies where federal reservations are con-
cerned.'® Recognizing their intimate knowledge and under-
standing of the natural resources under their control, Congress
authorized federal land managers to require whatever mitiga-
tion measures they determine are necessary for projects located
within their reservations.
In so doing Congress did not “undermine the very author-
ity” of the Commission, Commission’s Brief at 20. In fact, the
Commission retains full authority to make those decisions
which fall within its expertise. It is for the Commission, not the
land manager, to weigh competing proposals for hydroelectric
development. It is for the Commission to assess the economic
feasibility and structural integrity of the various projects. It is
for the Commission to set the licensing fees and annual charges.
And it is for the Commission to forecast energy demands for the
region and consider what investments will best serve the public
good.
18 Federal land managers are charged under their organic and planning
acts with broad management responsibilities. For example, Congress has
created an intricate system of planning for all of the national forests. Forest
and Rangeland Renewable Resources Planning Act of 1974, Pub. L. No. 93-
378, 88 Stat. 476 (1974) (codified at 16 U.S.C. §§ 1600-1687 (1982));
National Forest Management Act of 1976, Pub. L. No. 94-588, 90 Stat. 2949
(1976) (codified at 16 U.S.C. §§ 1600-1687 (1982)). These laws—which
contain expressions of congressional will every bit as comprehensive and
detailed as those found in the FPA—provide the Forest Service with
guidelines encompassing everything from the selection of scientific com-
mittees to formulas to determine the allowable timber harvest on certain
lands.
<
.
11
The land manager’s responsibilities, on the other hand, are
sharply circumscribed. The land manager must determine what
mitigation measures are necessary for the “adequate protection
and utilization” of the reservations under its authority, in-
cluding, for example, the flows of water necessary to sustain
fisheries, the devices required to permit fish migration, and the
steps that must be taken to maintain water quality. In short, it
is for the land manager to say what must be done to minimize
destruction of public resources. These concerns may seem
“parochial” to developers, Developers’ Brief at 33, and the
result “undesirable” to the Commission, Commission’s Brief at
20, but to Congress the approach embodied in section 4(e)
reflects something more substantial: a firm commitment to
sound planning and balanced resource management.
B. The Commission Has Construed a Virtually Identical
Provision of the Federal Power Act as Limiting Its
Authority to Review Agency Conditions.
Section 4(e) of the FPA is not the only provision of federal
power law authorizing other agencies to mandate binding
conditions on hydropower projects within the Commission’s
jurisdiction. For instance, under section 30, 16 U.S.C. § 823a
(1982), the Commission is authorized to make the final
determination as to whether “manmade conduit” projects
(operated primarily for agricultural, municipal, or industrial
water supply purposes ) should be exempted from licensing and
other requirements, while the final authority to impose binding
conditions on such exempted projects is reserved to state and
federal fish and wildlife agencies.‘9 An identical arrangement
was adopted under section 408 of the Energy Security Act of
1980, Pub. L. No. 96-294, 94 Stat. 611 (1980) (amending
sections 405 and 408 of the Public Utility Regulatory Policies
Act of 1978) (codified at 16 U.S.C.
9 Section 30(c) provides in part, “[T]he Commission . . . shall include
in any such exemption—(1) such terms and conditions as the Fish and
Wildlife Service and the State agency each determine are appropriate to
prevent the loss of, or damage to, such resources and to otherwise carry out
the purposes of [the Fish and Wildlife Coordination] Act....” 16 U.S.C.
§ 823a(c) (1982).
12
$§ 2705, 2708 (1982) ), for projects of five megawatts or less.2°
(Both the “conduit exemption” and the “five megawatts or less
exemption” operate through section 30(c) of the FPA.)
In its implementing regulations for the “five megawatts or
less exemption” the Commission specifically rejected the argu-
ment of commenters that it should evaluate the reasonableness
of agency conditions.2"
Article 2 [to be included in each exemption] requires
compliance with any conditions prescribed by fish
and wildlife agencies. Commenters claim that this is
a forfeiture of Commission responsibilities which will
deter exemption applications. they [sic] request that
the Commission prescribes [sic] lenient environmen-
tal conditions where appropriate or possible, elimi-
nate Article 2 where state licensing procedures exist,
or at least urge other agencies to make conditions
minimal. Section 408 of the ESA [Energy Security
Act], which incorporates part of section 30 of the
[Federal Power] Act, gives fish and wildlife agencies
authority to establish binding exemption conditions
for carrying out the purposes of the Fish and Wildlife
Coordination Act. The Commission will not interpret
the statute otherwise. However, it is for the Commis-
sion to insert the recommendations of those other
agencies as conditions of an exemption.
Preamble to Five Megawatts or Less Rules, 45 Fed. Reg.
76,115, 76,120 (1980) (emphasis added).
2“The Commission may in its discretion . . . grant an exemption .
subject to the same limitations (t0 ensure protection for fish and wildlife as
el ao cle eee ee ae
subsections (c) and (d) of section 30 of the Federal Power Act... .” Energy
Security Act of 1980 § 408(b), 16 U.S.C. § 2705(d) (1982).
2’ The implementing regulations for the conduit exemption are in accord.
“The construction, operation, and maintenance of the exempt facility must
comply with any terms and conditions that any Federal or State fish and
wildlife agencies have determined are appropriate to prevent loss of, or
damage to, fish or wildlife resources or otherwise to carry out the purposes of
the Fish and Wildlife Coordination Act.” Conduit Exemption Rules, 18
C.F.R. § 4.94 (1983).
13
In three cases in the last two years the Commission has
reiterated this position. In each of these cases applicants for
exemptions urged the Commission to reject conditions offered
by other agencies as unreasonable. In each case the Commis-
sion insisted that it has no power to second guess the resource
agencies. “It is not within our authority to review conditions
imposed by fish and wildlife agencies pursuant to section 408 of
the ESA [Energy Security Act].”” Order on Appeal, Swanson
Mining Corporation and Walter M. Gleason, Project No. 5677-
000, 20 FERC ¥ 61,226 (1982) (a petition for rehearing on an
unrelated issue was granted by the Commission in an unpub-
lished order on April 22, 1983).22 “The Commission has no
authority to modify the requirement [for minimum flows
imposed by a state fish and wildlife agency].” Order Denying
Appeal, Southern Pacific Land Company, Project No. 5585-000,
19 FERC 4 61,297 (1982). “[WhJe find that recommendation
of 150 cfs [cubic feet per second] of minimum flow is a
mandatory condition .... Consequently, there is no reason for
the Commission to hold a hearing on the minimum flow issue,
as requested by Sierra.” Order on Rehearing, Sierra Pacific
Power Company, Project Nos. 4161-000, 4162-000, 4163-000,
4164-000, 19 FERC ¥ 61,307 (1982).
The Commission’s position on section 30(c) simply cannot
be reconciled with its position on section 4(e). The operative
language of the conditioning authority under the licensing
provision (section 4(¢)) and the exemption provision (section
30(c)) is virtually identical. Section 4(e) uses the words “shall
be subject to and contain such conditions”. FPA § 4(e), 16
U.S.C. § 797(e) (1982). Section 30(c) tracks this language
closely with the words “shall include in any exemption such
terms and conditions”. FPA § 30(c), 16 U.S.C. § 823a(c)
(1982).
22 In the Swanson order the Commission also states that it is not bound to
include terms and conditions “related not to that project’s environmental
impact.” Conservationists have no quarrel with this contention. But that, of
course, is not the question in this case. Here the Commission, while conceding
that the conditions fall within the scope of section 4(¢), insists on rejecting
them nevertheless because it does not like the result reached by Interior.
14
The two provisions cannot be distinguished on the basis of
what they say about the nature of the conditioning authority,
because they both say the same thing. More importantly, the
Commission’s elaborate “contextual” argument—that section
4(e) somehow changes meaning when read in the context of
the whole Federal Power Act—collides with the Commission’s
contrary position on section 30(c). Both provisions come from
the same Act and must therefore be read in the same context. If
the “comprehensive” nature of the FPA does not require the
Commission to be the final arbiter of conditions under section
30(c), then this same context can hardly mandate the opposite
result when applied to the nearly identical language of section
4(e).
C. Congress Has Adopted a Similar Division of Respon-
sibility for Other Agencies.
The notion that one federal agency should be charged with
issuing a license, permit, lease, or other authorization while a
different federal agency is authorized to specify binding condi-
tions is hardly novel. Under the mining laws, for example,
Interior’s Bureau of Land Management issues mineral leases,
while other land managers attach conditions when the mining
will occur on such agency’s land.?3
The question of whether the mineral leasing agency may
review the reasonableness of the conditioning agency’s condi-
tions bears an obvious resemblance to the question posed here
under the Federal Power Act. The issue has been litigated, and
23 The Mineral Leasing Act for Acquired Lands of 1947 provides, “No
mireral deposit covered by this section shall be leased except with the consent
of the head of the executive department, independent establishment, or
instrumentality having jurisdiction over the lands containing such deposit, or
holding a mortgage or deed of trust secured by such lands which is unsatisfied
of record, and subject to such conditions as that official may prescribe to insure
the adequate utilization of the lands for the primary purposes for which they
have been acquired or are being administered . . . .” 30 U.S.C. § 352 (1976 &
Supp. V 1981) (emphasis added ).
15
the government has consistently taken the position that one
agency may not second guess the other.24
Of course, whether in the context of a mining lease
application or a hydroelectric license application, an applicant
who believes that the conditioning agency has acted unreason-
ably may seek relief in court.25 The point is that under the
mining law abuse of agency power must be corrected by a
judge, not another agency. Conservationists can conceive of no
rationale for a different result under the parallel provisions of
the power law.
D. The Legislative History of the Federal Power Act
Affirms the Plain Meaning of Section 4(e).
A thorough examination of the legislative history of the
Federal Power Act yields no persuasive evidence that Congress
intended anything different from what it said in section 4(e).
Indeed, it strongly supports the interpretation adopted by the
Ninth Circuit in the case below.
24 In Sallie B. Sanford, 22 Interior Board of Land Appeals 289 (1975),
the Interior Board of Land Appeals upheld a Bureau of Land Management
decision granting a lease to the applicant subject to conditions which the U.S.
Army Corps of Engineers, which administers the land where the lease was to
be located, had submitted to the Bureau. The appeals board held that the
Bureau of Land Management had properly required the applicant to accept
the stipulations or suffer a rejection of the offer to grant the lease; and further
stated that the BLM had no authority to issue the lease free of the stipulations.
This interpetation had previously been upheld by the Department of
Interior in Duncan Miller, 79 Interior Dec. 416 (1972). In distinguishing
between the Mineral Leasing Act of 1920, 30 U.S.C. §§ 181-287 (1976 &
Supp. V 1981) and the Mineral Leasing Act for Acquired Lands Act of 1947,
30 U.S.C. §§ 351-359 (1976 & Supp. V 1981), the Board of Land Appeals
explained that the latter expressly provided that the Secretary could only lease
the applicable lands subject to those conditions which the executive depart-
ment or agency having jurisdiction over the land had prescribed to insure the
adequate utilization of the lands for the primary purpose for which they had
been acquired. It stated further, “This Board has recognized this obligation
even where it has appeared to the Board that the special stipulations
requested by the administering agency were unreasonable.” 79 Interior Dec.
at 420 (1972), (citations omitted ).
25 See this brief at 18-19.
16
There is no disagreement with petitioners’ assertion that
the purpose of the Federal Water Power Act of 1920, ch. 285,
41 Stat. 1063 (1920) (hereinafter “1920 Act’) 26 was to
“centralize authority in the Commission, ‘instead of the piece-
meal, restrictive, negative approach of the Rivers and Harbors
Acts and other federal laws previously enacted’”. Commis-
sion’s Brief at 21 (quoting First Iowa Hydro-Electric Coopera-
tive v. FPC, 328 U.S. 152, 180 (1946)). Statements of this
general purpose found in the legislative history, see Commis-
sion’s Brief at 21-25; Developers’ Brief at 34-35,27 are hardly
surprising and certainly of no consequence to the issue at hand.
Far more significant are the three direct references in the
legislative history of the 1920 Act to the section 4(e)2® condi-
tioning proviso. Each of these conforms to the plain meaning of
section 4(¢).29
26 The Federal Water Power Act of 1920 was later incorporated, as
Subchaper I, into the Federal Power Act, Power Act Ameadments of 1935,
ch. 687, 49 Stat. 838 (1935).
27 Much of petitioners’ discussion of the legislative history actually
explores the 1930 amendments to the 1920 Act, Power Act Amendments of
1930, ch. 572, 46 Stat. 797 (1930). Commission's Brief at 25-26; Developers’
Brief at 35-37. This history is not even directed to section 4(¢)—which has
never been amended—and, even if it were, would be of limited utility in
interpreting congressional intent ten years earlier. “Thus, even when it would
be otherwise useful, subsequent legislative history will rarely override a
reasonable interpretation of a statute that can be gleaned from its language
and legislative history prior to its enactment.” Consumer Product Safety
Commissica v. GTE Sylvania, Inc., 447 U.S. 102, 118 (1980).
28 Section 4(¢) of the FPA was designated section 4(d) in the Federal
Water Power Act of 1920.
29 Mr. O. C. Merill, the principal architect of the bill, summarized the
conditioning authority as follows:
Licenses for power sites within the National Forests to be subject
to such provisions for the protection of the Forest as the Secretary
of Agriculture may deem necessary. Similarly, for parks and
other reservations under the control of the Departments of the
Interior and of War. Plans of structures involving navigable
streams to be subject to the approval of the Secretary of War.
This provision is for the purpose of preserving the adminis-
trative responsibility of each of the three Departments over lands
and other matters within their exclusive jurisdiction.
(footnote continues)
17
E. The Reading of Section 4(e) Urged by Developers
and the Commission Would Render the Provision a
Nullity.
It is not to be presumed that Congress means merely to
restate the obvious when it enacts provisions of law.% Yet this
is precisely the result urged upon the Court by petitioners in
their claim that section 4(e) merely authorizes federal land
managers to make recommendations to the Commission. This
(footnote continued)
Memorandum of O.C. Merrill, Chief Engineer, Forest Service at 6 (Oct. 31,
1917), Joint Appendix at 369, 373-74.
During a floor debate Senator Walsh spoke in opposition to an amend-
ment to the 1920 Act to create a tribal veto for projects on Indian lands
because the Indians’ interests were already well protected under section 4(e):
[T]he matter goes before the commission, which consists of the
Secretary of War, the Secretary of the Interior and the Secretary
of Agriculture. They all agree that it is in the public interest that
the license should be granted, or a majority of them so agree.
Furthermore, the head of the department must agree; that is to
say, the Secretary of the Interior in the case of an Indian
reservation must agree that the licence shall be issued.
59 Cong. Rec. 1564 (1920); see Developers’ Brief at 14.
Secretary of Agriculture David F. Houston testified along the same line:
If | am not mistaken, the provisions in the proposed measure are
more restrictive than existing law, in that they require the assent
of three heads of departments [the Departments of War, Agricul-
ture, and Interior which formed the original Commission] and
also the assent of the particular head of the department immedi-
ately charged with that government interest.
Hearings on Water Power Before the House Committee on Water Power,
65th Cong., 2nd Sess., at 678 (1918).
%“A statute is a solemn enactment of the state acting through its
legislature and it must be assumed that this process achieves an effective and
operative result. It cannot be presumed that the legislature would do a futile
thing.” C. D. Sands, 2A Sutherland Statutes and Statutory Construction
§ 45.12 (4d ed. 1973). In other words, statutes are to be read in such a way
that they add something to the law. It is a “well-established rule of statutory
construction that all parts of a statute, if at all possible, are to be given effect.”
Weinberger v. Hynson, Wescott and Dunning, Inc., 412 U.S. 609, 633 (1973).
18
is so because federal agencies need no special authorization to
recommend conditions to the Commission. Any interested
person may do that.3'
The suggestion that section 4(e) conditions were meant to
be mere recommendations is even more pointless when consid-
ered in the context of the provision’s origins in the Federal
Water Power Act of 1920, at which that time the Secretaries of
the Interior and Agriculture actually sat on the Commission.
They clearly did not need section 4(e) in order to make
“recommendations” to their fellow Commissioners. If section
4(e) adds anything, it must shift from the Commission to
federal land managers the authority to decide what mitigation
measures are needed to protect federal reservations.
F. Developers Are Free To Challenge Any Conditions
Included by Interior Which They Believe To Be
Unreasonable.
Developers and the Commission refer frequently in their
briefs to the “veto power” section 4(¢€) would bestow upon
federal land managers if its plain meaning were adopted.
Developers’ Brief at 34, 35, 38; Commission’s Brief at 11, 14,
20. But no such veto power is claimed by Interior. If
developers are dissatisfied with the conditions included by
Interior, their remedy is simple. They may go to court and urge
that the conditions are “arbitrary, capricious, an abuse of
discretion, or otherwise not in accordance with law.” Admin-
istrative Procedure Act § 10(e), 5 U.S.C. § 706(2)(A)
(1982).32 Interior and other land managers are no more
immune from judicial review than is the Commission.
31 The Commission's rules provide for participation in licensing proceed-
ings through protests (which are essentially comments) and through inter-
vention. 18 C.F.R. § 385.211 (1983) (dealing with protests); 18 C.F.R.
§ 385.214 (1983) (dealing with intervention). The Departments of the
Interior and Agriculture routinely comment and frequently intervene in such
proceedings.
32 On rehearing in the instant case the Ninth Circuit clarified procedures
for judicial review. Review of all matters connected with the license—
whether objections to decisions made by the Commission or to conditions
imposed by other agencies-—would be had in a single action in the U.S. Court
of Appeals pursuant to the FPA’s provision for direct review, FPA § 313(b),
(footnote continues)
19
Yet, rather than take advantage of this common form of
action, developers and the Commission would construct a more
complex mechanism for review. As they would have it,
developers should present their argument on the reasonableness
of Interior’s conditions not directly to a court, but first to the
Commission. The Commission would then sit in judgment on
the “reasonableness” of the conditions found necessary by
Interior. Should developers be dissatisfied with the Commis-
sion’s conclusion, they might then appeal the Commission’s
determination to the U.S. Court of Appeals pursuant to FPA
§ 313(b), 16 U.S.C. § 825 b) (1982).
But there the confusion begins. What should the Court of
Appeals make of the record below? Presumably it would be
required to judge whether the Commission acted arbitrarily in
assessing the reasonableness of Interior’s finding that the
conditions were necessary. Such a convoluted judicial task—in
which the court must review the reasonableness of one agency’s
assessment of the reasonableness of another agency’s find-
ing—is without precedent in administrative law.
How much simpler it would be for developers to go
directly to the U.S. Court of Appeals once the license is issued
and present their claim that the conditions mandated by the
land manager are arbitrary and capricious. Simple, but much
less satisfying to the developers, of course, than getting two
bites at the apple.
4
(footnote continued)
16 U.S.C. § 8254 b). Escondido Mutual Water Co. v. FERC, 701 F.2d 826,
827 (9th Cir. 1983), Appendix to Petition at 31. While the Ninth Circuit did
not state which standard of review would be applicable to review of such
conditions, it seems clear to conservationists that the “arbitrary and cap-
ricious” standard, Administrative Procedure Act §10(e), 5 U.S.C.
§ 706(2)(A) (1982), would apply. While other aspects of the relicensing
decision may be subject to the more searching “substantial evidence” test,
Administrative Procedure Act § 10(e), 5 U.S.C. § 706(2)(E) (1982), the
decision of the land manager regarding licensing conditions is informal
agency action not requiring a hearing “on the record” Administrative
Procedure Act §§ 5, 7, 8, 5 U.S.C. §§ 554, 556, 557 (1982).
33 Would, for example, the court be required to determine whether the
Commission failed to consider a relevant factor in its determination that the
land manager overlooked another relevant factor?
20
Ill. THE COMMISSION’S INTERPRETATION OF SEC-
TION 4(e) SHOULD BE GIVEN NO MORE DE-
FERENCE THAN INTERIOR’S CONTRARY INTER-
PRETATION.
Petitioners insist that this Court is bound to give “great
deference” to the longstanding interpretation of the FPA
offered by the Commission. Developers’ Brief at 37-38; see
Commission’s Brief at 33. This argument may be disposed of
easily.
Each of the many cases this Court has decided on the issue
of deference to agency interpretation of law deal with chal-
lenges by a private party to decisions or interpretations of a
single regulatory agency. Such is not the circumstance here.
Instead, positions taken by two federal agencies, each charged
with important regulatory responsibilities under the same law,
are in conflict. Each agency claims to have maintained its
position long and consistently.*4
There is no rule of administrative law or statutory construc-
tion which can resolve which agency shall receive “more”
deference. (Should it be the oldest agency? The largest? The
most independent? The most politically responsive?) In cases of
conflict between agencies, the Court must let the statute speak
for itself.
% Conservationists do not find that the Commission's position has been
held as long as it claims. The early cases cited by petitioners, Commission’s
Brief at 33; Developers’ Brief at 37-38, do not appear to be on point. See
Interior’s Brief in Opposition to Petition for Certiorari at 19.
21
CONCLUSION Fa
What began as a seemingly parochial Indian water rights
dispute has escalated into a debate on the nation’s policy of
resource management. From a few cubic feet per second of
water in an artificial waterway the stakes have grown to literally
thousands of contests over the streams and rivers which cross
the nation’s public forests, mountains, and deserts.
In the next decade an estimated 3,000 applications for
hydroelectric licenses will be filed by private parties on our
national forests alone.3S Whether the Secretaries charged by
Congress with managing those reservations or the Commission
established by Congress to monitor the development of the
nation’s water resources shall have the final say in conditioning
those projects is no small matter.
Conservationists bear the scars of years of battle with the
Commission over projects which would have flooded such
priceless resources as Hell’s Canyon on the Snake River divid-
ing Oregon and Idaho or the New River Gorge in the Appala-
chian Mountains of North Carolina. (Both projects would have
been licensed by the Commission but for the intervention of
Congress. )9© Consequently a check on the power of the Com-
mission to authorize the destruction of such river resources
seems to conservationists eminently sensible.
But neither the wisdom which conservationists see in the
balancing of authorities related to river development on public
lands, nor the efficiency the Commission sees in consolidating
that power in its hands, is an issue for this Court to decide.
Such questions are reserved for Congress. Congress has
35 See this brief at 5, n. 9.
% Hells Canyon National Recreation Area Act $§ 3(a), 4, Pub. L. No.
94-199, 89 Stat. 1117 (1975) (codified at 16 U.S.C. §§ 460gg-2, 1274(a)( 12)
(1982) ) (prohibiting the Commission from issuing a proposed license on the
Snake River); Act of Sept. 11, 1976, Pub. L. No. 94-407, 90 Stat. 1238 (1976)
(codified at 16 U.S.C. §§ 1273(a), 1278(a) (1982)) (revoking a license
granted on the New River).
22
considered, resolved, and spoken. Its conclusion is stated
clearly in section 4(e). Conservationists urge that it be applied.
Respectfully submitted,
NATIONAL WILDLIFE FEDERATION,
AMERICAN RIVERS CONSERVATION
COUNCIL,
CALIFORNIA TROUT,
COLORADO WILDLIFE FEDERATION,
ENVIRONMENTAL DEFENSE FUND,
ENVIRONMENTAL POLICY INSTITUTE,
FRIENDS OF THE EARTH,
FRIENDS OF THE RIVER, INC.,
IDAHO ENVIRONMENTAL COUNCIL,
IDAHO WILDLIFE FEDERATION,
IZAAK WALTON LEAGUE OF AMERICA,
INC.,
MONTANA WILDLIFE FEDERATION,
NATIONAL AUDUBON SOCIETY,
NATURAL RESOURCES DEFENSE
COUNCIL, INC.,
OREGON WILDLIFE FEDERATION,
SIERRA CLUB,
TROUT UNLIMITED,
VERMONT NATURAL RESOURCES
COUNCIL,
WILDERNESS SOCIETY, and
WYOMING WILDLIFE FEDERATION,
Amici Curiae
By: PaTRICK A. PARENTEAU,
Counsel of Record
CHRISTOPHER H. MEYER
National Wildlife Federation
1412 Sixteenth Street, N.W.
Washington, D.C. 20036
202/797-6859
Attorneys for Amici Curiae
February 23, 1984
A-l
APPENDIX A
Detailed Statement of Interests
The National Wildlife Federation is a nonprofit member-
ship organization incorporated in 1939 under the laws of the
District of Columbia. The Federation maintains its headquar-
ters at 1412 Sixteenth Street, N.W., Washington, D.C. 20036
(telephone 202-797-6859). The Federation is the largest
nongovernmental conservation education organization in the
world, with affiliate organizations in fifty-one states and terri-
tories. Its 4.1 million members and supporters are dedicated to
increasing public awareness of the need for wise use, proper
management, and conservation of our natural resources. The
Federation undertakes a comprehensive conservation education
program, distributes numerous periodicals and educational
materials, lobbies for the adoption of laws to protect and
improve the environment, and litigates when necessary to
conserve natural resources and wildlife. The Federation’s
Water Resources Program has undertaken a broad range of
legal, legislative, administrative, and educational initiatives
aimed at improving the management of our nation’s rivers with
particular attention given to the sensitive and intelligent devel-
opment of hydroelectric power. In addition, the Federation’s
Public Lands and Energy Program actively promotes the
conservation of energy from hydroelectric and other power
sources.
American Rivers Conservation Council is a nonprofit
membership organization incorporated in the District of Co-
lumbia. Organized in 1973, it now counts over 4,000 members
nationwide. Its business address is 323 Pennsylvania Avenue,
S.E., Washington, D.C. 20003 (telephone 202-547-6900). The
American Rivers Conservation Council is the only national
citizens group dedicated exclusively to river conservation. Its
principal activities include seeking additions to the National
Wild and Scenic Rivers System, support for state and local river
conservation programs, opposition to wasteful or destructive
water projects, and expansion of public awareness and appre-
ciation of our river heritage. The Council publishes American
Rivers, a quarterly journal of river conservation.
A-2
California Trout is a nonprofit, tax-exempt corporation
organized under the laws of the state of California and having
its principal office and place of business at 550 California Street,
San Francisco, California 94104 (telephone 415-392-8887).
California Trout is a statewide conservation organization sup-
ported by sport fishermen, with approximately 1,600 individual
members and forty affiliated local angling clubs representing
another 2,000 persons. California Trout was organized in 1970
to protect and restore wild trout, native steelhead, and the
waters that nurture them in California. California Trout has
intervened in numerous licensing proceedings before the Fed-
eral Energy Regulatory Commission.
The Colorado Wildlife Federation is organized under the
laws of the state of Colorado and is affiliated with the National
Wildlife Federation whose goals and objectives it shares. It
maintains its headquarters at P.O. Box 18887, Denver, Colo-
rado 80218 (telephone 303-830-2557).
The Environmental Defense Fund is a nationwide public
interest organization with approximately 45,000 members. Its
staff of lawyers, scientists, and economists works to protect and
improve environmental quality and public health. The Fund
pursues responsible reform of public policy in the fields of
energy and resource conservation, pest control, toxic chemicals,
water resources, air quality, land use and wiidlife, working
through research, public education, and judicial, administrative,
and legislative action. The Environmental Defense Fund is
organized under the laws of the state of New York with its
headquarters at 444 Park Avenue, South, New York, New
York 10016 (telephone 212-686-4191).
The Environmental Policy Institute is a nonprofit organiza-
tion incorporated under the laws of the District of Columbia in
1974. The Institute engages in research, public education,
lobbying, and litigation activities in support of energy and
water conservation, the protection of air, water and land
resources, the safe and clean use of coal, oil, and natural gas,
limitations on the use of nuclear power and weaponry, and the
protection of agricultural resources and the nation’s food
resource base. The Institute has over 10,000 contributors and
A-3
supporters from around the country. The organization main-
tains its headquarters at 218 D Street, S.E., Washington, D.C.
20003 (telephone 202-544-2600).
Friends of the Earth is a nonprofit corporation founded in
1969 under the laws of the state of New York. Its headquarters
are located at 1045 Sansome Street, San Francisco, California
94111 (telephone 415-433-7373). Friends of the Earth is a
national conservation organization with 32,000 members in the
United States, and international affiliate organizations in
twenty-six other countries. Since its founding, Friends of the
Earth has worked to secure preservation and protection of the
nation’s heritage of outstanding free-flowing rivers and streams,
the diminution of which has become an increasing concern to
the organization’s members in recent years.
Friends of the River, Inc. is organized under the California
nonprofit corporation law for the purpose, in part, of advocat-
ing the preservation of riparian ecosystems and the natural
values of free-flowing rivers in the western United States.
Friends of the River actively pursues these goals through its
legal, administrative, legislative, research, and public education
programs. It maintains its headquarters at Building C, Fort
Mason, San Francisco, California 94123 (telephone 415-771-
0401). Currently Friends of the River has 3,000 members in
more than thirty states.
The Idaho Environmental Council was founded under the
laws of the state of Idaho to coordinate and stimulate the
creative ideas, manpower, and financial resources of
conservation-minded individuals and organizations to provide
an increased understanding of modern man’s impact upon his
environment. The Council is headquartered at P.O. Box 1708,
Idaho Falls, Idaho 83401 (telephone 208-345-2030).
The Idaho Wildlife Federation is a state affiliate of the
National Wildlife Federation whose goals and objectives it
shares. It is organizated under the laws of the state of Idaho,
and maintains its offices at 432 S. 11th Street, Pocatello, Idaho
83201 (telephone 208-233-3079).
The Izaak Walton League of America, Inc. is organized to
promote means and opportunities for educating the public to
A-4
conserve, maintain, protect, and restore the soil, forest, water,
air, and other natural resources of the United States, and to
promote the enjoyment and wholesome utilization of those
resources. The League is organized under the laws of the state
of Illinois, and is headquartered at 1701 North Fort Myer
Drive, Suite 1100, Arlington, Virginia 22209 (telephone 703-
528-1818).
The Montana Wildlife Federation is an affiliate of the
National Wildlife Federation whose goals and objectives it
shares. The Montana Wildlife Federation is organized under
the laws of the state of Montana and is headquartered at P.O.
Box 3526, Bozeman, Montana 59715 (telephone 406-587-
1713).
The National Audubon Society is one of the oldest, largest,
and most experienced national conservation organizations. It is
devoted to conservation and protection of the natural environ-
ment which supports bot humankind and wildlife. The
Society’s 512,000 members in 492 chapters are backed by a
full-time staff of 130 persons working in the New York
headquarters, Washington, D.C. office, four state offices, four
camps, four nature centers, two research centers, and ten
regional offices. The staff includes scientists and other profes-
sionals specialized in water policy. Among the Society’s
purposes is the wise use of the nation’s water resources and
protection of riparian and aquatic habitat. The Society is a
nonprofit corporation organized under the laws of the state of
New York with headquarters at 950 Third Avenue, New York,
New York 10022 (telephone 212-832-3200).
Natural Resources Defense Council, Inc. is a nonprofit
membership organization incorporated under the laws of the
state of New York. Its headquarters are at 122 East 42nd
Street, New York, New York 10168 (telephone 212-949-0049).
The Council has approximately 28,000 members residing in all
states and territories. Since its inception in 1970, the Natural
Resources Defense Council has been dedicated to the prudent
management and the wise use of the natural resources of the
earth, including energy and water resources, through the advo-
cacy of effective federal, state, and local laws.
A-5
The Oregon Wildlife Federation is an affiliate of the
National Wildlife Federation whose goals and objectives it
shares. The Oregon Wildlife Federation is organized under the
laws of the state of Oregon. It maintains its offices at 2753 N.
32nd, Springfield, Oregon 97377 (telephone 503-747-8400 ).
The Sierra Club is a nonprofit corporation, organized
under the laws of the state of California, having its principal
Office and place of business at 530 Bush Street, San Francisco,
California 94108 (telephone 415-981-8634). The Sierra Club
is a national conservation organization founded in 1882 with
approximately 330,000 members. The purposes of the Sierra
Club are to explore, enjoy, and protect the wild places of the
earth; to practice and promote the responsible use of the earth’s
ecosystems and resources; and to educate and enlist humanity
to protect and restore the quality of the natural and human
environment.
Trout Unlimited is a nonprofit international conservation
organization incorporated in 1959 under the laws of the state of
Michigan. The organization maintains its headquarters at 501
Church Street, N.E., Vienna, Virginia 22180 (telephone 703-
281-1100). Its 37,000 members are dedicated to the protection
of clean water and the enhancement of trout and salmon
resources. Trout Unlimited’s twenty-five years of work to
enhance salmonoid habitat has involved its members in
educational programs, water quality surveillance programs, and
field projects designed to restore degraded habitats and provide
up- and down-stream passages for fish migration.
The Vermont Natural Resources Council is a state affiliate
of the National Wildlife Federation whose goals and objectives
it shares. The Council is organized under the laws of the state
of Vermont and maintains its headquarters at 7 Main Street,
Montpelier, Vermont 05602 (telephone 802-223-2328).
The Wilderness Society is a national conservation organi-
zation with approximately 105,000 members nationwide. It is
incorporated in Washington, D.C. and maintains its headquar-
ters at 1901 Pennsylvania Avenue, N.W., Washington, D.C.
20006 (telephone 202-828-6600). A primary concern of the
Society since its founding in 1935 has been the establishment
A-6
and proper management of wilderness areas. Protection of
wild and free-flowing rivers through wilderness and wilderness
candidate areas is integral to the preservation of their wilder-
ness character. Efforts to preserve wild and free-flowing rivers
are ranked high on the Society’s conservation agenda.
The Wyoming Wildlife Federation is a state affiliate of the
National Wildlife Federation whose goals and objectives it
shares. It is organized under the laws of the state of Wyoming
and is headquartered at P.O. Box 333, Cheyenne, Wyoming
82003 (telephone 307-637-5433).
B-1
APPENDIX B*
Letter to R. Max Peterson, Chief, U.S. Forest Service,
January 4, 1984
HAND DELIVER
January 4, 1984
R. Max Peterson, Chief
United States Forest Service
P.O. Box 2417
Washington, D.C. 20013
Attention: Richard D. Hull
Director of Lands
United States Forest Service
Dear Chief Peterson:
The National Wildlife Federation and other environmen-
tal organizations are deeply concerned with the exponential
growth in proposals for hydroelectric power projects within
national forests and other federal reservations. We would
appreciate an answer to each of the following questions regard-
ing the numbers of development proposals within reservations
under the Secretary of Agriculture’s jurisdiction, and the pro-
cess by which the Secretary exercises his responsibilities under
section 4(e) of the Federal Power Act, 16 U.S.C. § 797(e)
(1982), and other applicable law in protecting, managing, and
utilizing these lands and resources.
1. Please describe the process used by the Department of
Agriculture to develop necessary conditions pursuant to section
4(e) for hydroelectric power licenses within reservations under
the jurisdiction of the Secretary of Agriculture.
* In appending this correspondence to their brief, amici curiae do not
seek to supplement the record on review. Rather they wish solely to identify
matters of public fact, Muller v. Oregon, 208 U.S. 412, 419-21 (1907) (on
“the Brandeis brief”), which demonstrate the gravity of problem posed.
B-2
2. During fiscal year 1983, how many hydroelectric power
applications (for licenses, permits, and exemptions) were no-
ticed to the Department of Agriculture by the Federal Energy
Regulatory Commission within reservations under the Secre-
tary’s jurisdiction? What percentage of all applications noticed
during fiscal year 1983 do the applications within these reserva-
tions constitute? If possible, please provide a breakdown (1)
by category of applicauion (license, permit, and exemption)
and (2) by reservation, for these applications.
3. In approximately what percentage of cases, both histori-
cally and currently, does the Secretary of Agriculture exercise
his conditioning power under section 4(e) with respect to
applications for licenses within reservations under the Depart-
ment’s jurisdiction? In what percentage of these cases does
the Commission include without significant modification all the
conditions imposed by the Secretary in the licenses it issues?
How does the Department deal with those instances in which
the Commission significantly modifies or rejects conditions
which the Department has found necessary to impose?
Sincerely,
Christopher H. Meyer
Counsel
Water Resources Program
B-3
Letter from R. M. Housley, Deputy Chief, U.S. Forest Service,
January 17, 1984
United States Department
of Agriculture
Forest Service
Washington Office
12th & Independence, SW
P.O. Box 2417
Washington, D.C. 20013
Reply to: 2770
Date: Jan 17 1984
Mr. Christopher H. Meyer
Counsel
Water Resources Program
National Wildlife Federation, NW
Washington, D.C. 20036
Dear Mr. Meyer:
This is in response to your January 4 letter and Dave
Conrad’s discussions with members of our Lands Staff, con-
cerning the Department of Agriculture’s role in the Federal
.Energy Regulatory Commission (FERC) hydroelectric licens-
ing process.
Answers to your questions are as follows:
Question 1. Exhibit | includes a flow chart and a general
description of our process for handling FERC projects. Special
conditions are only developed to avoid or mitigate environmen-
tal impacts caused by project operations not adequately covered
in the Commission’s standard form license articles. The special
conditions are drafted by functional specialists most knowl-
edgeable of the impact. They are then subjected to a rigid
review to assure clarity, applicability, reasonableness, that the
conditions are within our jurisdictional! authority and that they
conform to Agency and Department policy.
Question 2. The number of hydroelectric power appli-
cations reviewed by the Department during fiscal year 1983 is
B-4
shown in Exhibit 2. The table breaks the data down by type of
applications, type of action, and by Forest Service Region. The
table distinguishes between those affecting National Forest
System (NFS) lands and other (non-FWS) lands.
Question 3. The Secretary of Agriculture exercises his
conditioning power under Section 4(e) on all license appli-
cations directly affecting Department programs. This amounts
to about 60 percent of all license applications. Approximately
66 percent of our section 4(e) responses to FERC include one
or more special license conditions. The Commission includes
without significant modification approximately 80 percent of
these special conditions in licenses issued.
How we have handled the significant modifications or
rejections depends on the seriousness of the impact, the overall
reasonableness of our request, extraneous circumstances, such
as cases where the license had been issued before FERC had
received our 4(e) report. Exhibit 3 includes samples of our
4(e) report, how they were handled by the Commission and a
note on our follow up action if any.
Our basic approach is to notify FERC of the discrepancy if
significant and, since the passage of the Federal Land Policy
and Management Act (FLPMA), deny the licensee access to
NFS lands. After exhausting the administrative appeal process,
our backup is through litigation.
Sincerely,
R. M. Housley
Deputy Chief
[ Attachments omitted }
B-5
Letter from J. B. Hilmon, Acting Deputy Chief, U.S. Forest
Service, February 14, 1984
United States Department
of Agriculture
Forest Service
Washington Office
12th & Independence, SW
P.O. Box 2417
Washington, D.C. 20013
Reply to: 2770
Date: February 14, 1984
Mr. Christopher H. Meyer
1412 Sixteenth Street, NW
Washington, D.C. 20036
Dear Mr. Meyer:
This supplements our January 17 letter concerning the
Department of Agriculture’s role in the Federal Energy Regu-
latory Commission (FERC) hydroelectric licensing process.
An extrapolation of data derived from an analysis of
applications for license or amendment of license received
during the past four years indicates that in the next decade
some 3,000 applications will be filed with the Federal Energy
Regulatory Commission that will affect National Forest lands.
Each application is reviewed carefully and conditions are
developed to adequately protect or mitigate damage to re-
sources under our charge. The purposes of the conditions are
compromised when FERC substantially modifies or rejects our
recommendations.
Based on a sampling of 201 license (or amendment)
applications, where licenses were issued during the period
between April 18, 1980, and January 13, 1984, or pending as of
January 30, 1984, we find that out of 19 licenses issued during
this period affecting National Forest lands, in 13 instances the
Secretary of Agriculture included conditions by authority of
B-6
Section 4(e) FPA (41 Stat. at 1065) as amended. Of the 13
cases where 4(e) conditions were included:
6 were accepted by the Commission without substan-
tial modification;
1 was accepted but with substantial modification;
3 of the cases involved some outright rejections of our
4(e) conditions; and
3 of the cases involved Commission-issued licenses
where all of our 4(e) conditions were rejected.
Although this is not an inclusive listing of all license cases
under review during this period, we do feel this is a representa-
tive sample.
The Secretary of Agriculture exercises special care in
establishing specific 4(e) conditions which we believe to be
essential and in distinguishing these conditions from general
comments or recommendations regarding FERC applications
for license applications (See Tables 1 and 2, enclosed).
Sincerely,
J. B. Hilmon
Acting Deputy Chief
Enclosures
B-7
[ Attachment to Letter of February 14, 1984 |
TABLE 1
1 2 3 4 5 6 7
No. of 4(e) Without With Some Where
Projects 4e) Included Substantial Substantial With All
Reviewed Letter in Modifi- Modifi- Some Were
in to FERC Letter cation cations Rejections Rejected
Sample‘ No.(%)' No. (%)? No. (%)? No.(%)? No. (%)? No. (%)?
Licenses Issued or Amended
Involving FS Lands
| ETC TE ee oe 19 13 13 6 l 3 3
Amendments................... 20 11 & 3 1 l 3
ee 39 24(62) 21(88) 9(43) 2(10) 4(19) 6(28)
Other Lands
IN iicicluioadaccupincdenscceds 40 14 l l
Amendments................... 17
| SE $7 14(25) 1(7) 1( 100)
Total Issued or Amended....... 96 38(40) 22(45) 2(45) 2(9) 4(18) 6(27)
Licenses or Amendments
- Pending as of 1/30/84
Involving FS Lands
NI it ctriscasesents 72 72 43
Amendments ........... 4 4 3
ea 76 76(100) 46(61)
Other Lands
II Aansidisccnitic- pve 29 29 4
Amendments............
Ee 29 29(100) 4(14)
Total Pending ....................0--.- 105 105( 100) 50( 48)
Total Reviewed ...................... 201
1 Column 2 % Column |
2 Column 3 % Column 2
3 Columns 4, 5, 6, or 7 % Column 3
“Sample a sampling of licenses and amendments issued during April 18, 1980, and January 13,
1984, or pending as of January 30, 1984.
[Additional Attachment omitted }
This is a copy of a public record, reproduced as it was published. It is not legal advice, and it may not be the version a court would rely on. Check the official source before you cite it.