Opposition Brief — District Council of Iron Workers of California v. Camping Construction Co.
Supreme Court brief1991
Ask Donna
What actually matters in this document.
Text
Supreme Court, US
FILED
No. 90-1413 APR 10 1998
| OFFICE OF THE G
In The
Supreme Court of the United States
October Term, 1990
+
DISTRICT COUNCIL OF IRON WORKERS
OF THE STATE OF CALIFORNIA AND
VICINITY, L- CIO, an unincorporated
association, and Iron Workers Local Union
No. 378, an unincorporated association,
Petitioners,
CAMPING CONSTRUCTION COMPANY,
Respondent
—
Petition For A Writ Of Certiorari To The
United States Court Of Appeals
For The Ninth Circuit
oo
BRIEF IN OPPOSITION
n
Mark R. THierman*®
Joun W. Pracer, Jr
Rosert Frep
THIeERMAN, Coox, Brown & Pracer
601 California Street,
17th Floor
San Francisco, CA 94108-2822
(415) 391-9200
Attorneys for Respondent
Camping Construction Company
Counsel of Record
April 1991
COLELE LAW G20) PRINTING CO. Gee 240
O8 CALL COLLACT a) M).2a))
QUESTIONS PRESENTED
1. DOES THE COURT, RATHER THAN AN ARBITRA-
TOR, HAVE THE OBLIGATION UNDER FEDERAL
LABOR LAW AND POLICY TO DETERMINE WHETHER
A COLLECTIVE-BARGAINING AGREEMENT ARISING
UNDER SECTION &f) OF THE NATIONAL LABOR
RELATIONS ACT, AND EXECUTED AND REPUDIATED
PRIOR TO THE DECISION OF THE NATIONAL LABOR
RELATIONS BOARD IN JOHN R. DEKLEWA & SONS,
282 N.L.R.B. 1375 (1987) ENF. SUB. NOM. INTERNA-
TIONAL ASSOCIATION OF BRIDGE, STRUCTURAL &
ORNAMENTAL IRONWORKERS, LOCAL 3 V. N.L.R.B.,
843 F. 2d 70 (3rd CIR.), CERT. DEN. 488 U.S. 889 (1988)
HAS BEEN REPUDIATED, OR CONTINUES TO EXIST?
TABLE OF CONTENTS
I „ EES cccccccccccccccccceevecee
r rene
Goernee. ccc cccccccess ee dess ss dess
cre ⸗ ů ů ...es
V svc ccocccocccccescesecencece
STATEMENT OF THE CAS ll...
REASONS FOR DENYING THE WRIT.............
THE ISSUE OF DEKLEWA RETROACTIVITY IS
NOT BEFORE THE COURT IN THIS CASE BUT
SHOULD THE COURT DEEM PLENARY
REVIEW PROPER SUCH REVIEW SHOULD
INCLUDE THE MERITS OF THE ADOPTION OF
THE DEFERRAL BY THE COURT TO THE
BOARD'S “LAW CHANGING” DECISION IN
, ˙AA ; nne.
NO CONELICT EXISTS WITH THE PRIOR
DECISIONS OF THE COURT ON THE ISSUE OF
ARBITRABILITY OF DISPUTES................
, · .
iv
TABLE OF AUTHORITIES
Cases
AT&T Techno v. Communications Workers,
47S UG. CEB TIGGE) 2. „ 6
Brotherhood of Teamsters & Auto Truck Drivers
Local No. 70 v. Interstate Distributor Co., 832
R2d S07 (th Cie. 1967)... cccccccccccccccccces
lon Construction v. District Council of Painters
No. 16, 803 F.2d 1050 (9th Cir. 1986)...........
Jim McNeff v. Todd, 461 U.S. 260, 103 S. Ct. 1753
. oc ccccccvccccccasccccccescevcesscevecesece
John R Deklewa & Sons, 282 N.L.R.B. 1375 (1987),
enf. sub. nom. International Association of
Bridge Structural & Ornamental Ironworkers,
Local 3 v. N.L.R.B., 843 F. 2d 70, cert. den. 488
UD. GED CIGD o ccccccccccccccccvcccavcccsecece
Mesa Verde Construction v. Northern California
District Council of Laborers, 885 F.2d 594 (9th
pan e den. U.S. 59 US LW. 3250
%CCCCVTTTCVTTTTTTTT
Mitsubishi Motors * v. Soler Chrysler -Plym-
outh, Inc, 473 U.S. 614
Ornamental Ironworkers, Local 3 v. N.L.R.B., 843
F.2d 70 (3d Cir. 1988), cert. den. 488 U.S. 889
CIDE oo co cvcccccccccccvcvccccsscccocceseescoess
Shearson/American Express, Inc. v. McMahon,
462 US. 22D (1967) 2. cccccccccccccccecccccscces
Steelworkers v. American Mfg. Co., 363 U.S. 564
. cccccccccccccccccccsssccccccscvccescuecs
Steelworkers v. Enterprise Wheel & Car Corp., 363
CLI
Steelworkers v. Warriors & Gulf Navigation Co,
SES US. SFE CIDER)... ccccvcccscccccessccvccces:
eee
‘eee
OPINIONS BELOW
The relevant opinions below are set forth at page 2 of
Petitioners’ Iron Workers Petition for a Writ of Certiorari
to the United States Court of Appeals for the Ninth
Circuit, No. 90-1413. (“Petition”).
eo —
JURISDICTION
The relevant jurisdictional history is set forth at Peti-
tion, page 2. The Petition was received on March 11, 1991.
This opposition is timely filed under 28 U.S.C. § 2101 and
Rule 12 of the Court.
—>
STATUTES INVOLVED
The relevant statutory provisions are set forth at
Petition, page 3 and Appendix H.
—
STATEMENT OF THE CASE
On September 16, 1987, Camping Construction Com-
pany (“Camping”) filed a Complaint for Declaratory and
injunctive Relief in the U.S. District Court for the North-
ern District of California, invoking the jurisdiction of that
Court under Section 301 of the Labor-Management Rela-
tions Act of 1947, as amended, 29 U.S.C. §185. The Com-
plaint sought the intervention of the District Court in a
dispute over whether the conduct of either Camping or
the Unions negated the continued existence of a collec-
tive-bargaining agreement and the continued vitality of
the arbitration provisions thereof. Camping contended
that if there was no collective-bargaining contract extant
between the parties, then a fortiori there was no agree-
ment to arbitrate disputes arising out of events occurring
subsequent to that contract’s demise.
The facts were not in dispute. In 1978 Camping exe-
cuted a pre-hire memorandum agreement with the Peti-
tioners, District Council of Iron Workers and Iron
Workers Local 378. The master agreement to which the
memorandum agreement referred contained grievance
and arbitration provisions and a termination date of June
30, 1980. The Unions notified Camping of their desire to
modify the agreement on February 21, 1980, thus trigger-
ing the termination of the collective-bargaining agree-
ment on June 30, 1980, or so Camping contended.
Camping, in reliance upon that position, did not comply
with the agreement's provisions after June 30, 1980, and
believed that its open and notorious failure to do so was
known to the Unions, which began to picket Camping at
jobsites within their jurisdiction.
Seven years later, however, the Unions sought to
invoke the grievance and arbitration provisions of the
then current Master Labor Agreement, a collective-bar-
gaining agreement to which Camping had never
assented. Grievances filed by the Unions alleging viola-
tions of that agreement's provisions were premised upon
Camping’s failure to have used the Unions’ members on
Camping’s construction projects in 1987, and were sched-
uled for arbitration before the Board of Adjustment pro-
vided for in that Master Labor Agreement.
_ 1 ⁰
Since the existence of an agreement to arbitrate dis-
putes is for a court, not an arbitrator, to decide, Camping
sought to have the District Court review whether it was
bound to arbitrate the asserted grievances of the Unions,
and to stay the scheduled arbitration proceedings pend-
ing such review.
The District Court, at Camping’s request, issued a
Preliminary Injunction staying arbitration proceedings
pending final disposition of the issue before the Court as
to whether Camping was bound to a contract calling for
arbitration of disputes. It is the propriety of the issuance
of that injunction which is at issue in the Cross Petition
for Certiorari being filed by Camping in conjunction with
this Opposition.
Although the District Court subsequently granted
summary judgment for the Unions - concluding that the
question of the collective-bargaining agreement's termi-
nation, lawful repudiation, and very existence was for the
arbitrator to determine the U.S. Court of Appeals for
the Ninth Circuit partially disagreed. It held (1) the issue
as to the “termination” of the agreement was for the
arbitrator, (2) the issue as to the lawful repudiation of the
Section 8(f) pre-hire collective-bargaining agreement was
for the District Court to decide, but (3) the District Court
could not issue an order staying arbitration proceedings
without full compliance with the provisions of the
Norris-LaGuardia Act, 29 U.S.C. §§101-115.
Petitioners have requested certiorari on the second of
these three issues, as to whether the court, not an arbitra-
tor should properly decide whether an otherwise lawful
pre-Deklewa repudiation occurred, framed, as an implicit
condition predicate, in terns of a generalized request for
review by the Court of the underlying issue of retroactive
application of Deklewa.
*
REASONS FOR DENYING THE WRIT
I. THE ISSUE OF DEKLEWA RETROACTIVITY IS
NOT BEFORE THE COURT IN THIS CASE BUT
SHOULD THE COURT DEEM PLENARY REVIEW
PROPER SUCH REVIEW SHOULD INCLUDE THE
MERITS OF THE ADOPTION OF AND DEFERRAL
BY THE COURT TO THE BOARD'S “LAW CHANG-
ING” DECISION IN THAT CASE
Petitioners raise no real issue that may be determined
by the Court without revisiting either the no-retroactivity
rule of Mesa Verde’ and the substantive validity of the
decision of the National Labor Relations Board in
Deklewa.? Prior to Deklewa, the Board, the Circuits and the
Court all considered repudiation an integral characteristic
of section 8(f) agreements. Absent Deklewa, it is plain that
repudiation rights are not grievable because no arbitra-
tion obligations can arise from a contract that does not
exist. The Board’s construction of the Act, adopted by the
1 Mesa Verde Construction v. Northern California District
Counsel of Laborers, 885 F.2d 594 (9th Cir.), cert. den. U
___, 59 U.S.L.W. 3250 (1990).
2? John R. Deklewa & Sons, 282 NL REH 1375 (1987), emf. sud.
nom. International Association of Bridge Structural & Ornamental
Ironworkers, Local J N.L.R.B., 843 F.2d 70 (3d Cir. 1988), cert.
den. 488 U.S. 889 (1988).
Court in McNeff and the Ninth Circuit in lon Construction,*
and affirmed in Interstate Distributor Co.* and Camping, gives
no hint of any controversy whatsoever on this issue.
The decision below simply confirms that since
pre-Deklewa repudiations under 800 agreements are not
grievable, the Court retains primary jurisdiction to deter-
mine whether repudiation has occurred. Factually it is no
different from that presented in Mesa Verde save that the
issue of repudiation has not yet been decided by a Dis-
trict Court. The issues of retroactivity were fully briefed
in Mesa Verde and Petitioners’ brief herein adds no new
arguments“ Deklewa retroactivity is simply not before the
Court in this case, and for that reason is not ripe for
decision. Should the Court deem plenary review justified,
Camping respectfully requests that the Court exercise the
same discretion with respect to the Questions Presented
in the Cross-Petition previously filed in Mesa Verde, on
the merits of the adoption of and deferral by the Court to
the Board's “law changing” decision in Deklewe.”
* Jim MeNeff v Todd, 461 U.S. 260, 103 S Ct. 1753 (1983).
* lon Construction v District Cowncil of Painters No. 16, 803
F.2d 1050 (9th Cir. 1986).
* Brotherhood of Teamsters & Auto Truct Drivers Local No. 70
& Interstate Distributor Co. 832 F.2d S07 (9th Cir. 1987)
A copy of the Response filed by Mesa Verde on the issue
of retroactivity is attached herein as Appendix A“ for the
convenience of the Court in assessing the underlying merits of
Petitioners’ request for plenary review.
For the convenience of the Court, the Cross Petition in Mess
Verde Construction Co. d Northern California District Council of
Laborers, et al. Case No. 89-1874 is reproduced at Appendix “B*
nT
6
Il. NO CONFLICT EXISTS WITH THE PRIOR DECI-
SIONS OF THE COURT ON THE ISSUE OF ARBI-
TRABILITY OF DISPUTES
Similarly, no substantive conflict exists with respect
to the presumption in favor of arbitrability of contractual
disputes. That presumption, which has its genesis in the
willing agreement of contracting parties, depends on the
statutory framework that governs their substantive con-
duct. In purporting to rely on that presumption, Peti-
tioner is simply missing - or obscuring - the point. Rights
arising under federal enactments, whether it be federal
antitrust doctrine securities law“ or federal labor law,
are specific to those enactments and their own unique
policy considerations. The scope of any presumption as to
the “arbitrability” of statutory rights is for Congress and
the Court to determine. The issue is not whether as a
generalized proposition, because they are of statutory
origin, rights so created are, a fortiori, not arbitrable, but
whether the particular statutory right of repudiation is
consistent with the statutory scheme set forth in section
8(f) of the National Labor Relations Act.'®
® See Mitsubishi Motors Corp. v. Soler Chrysler-Plymouth,
Inc., 473 U.S. 614 (1985).
% Shearson/American Express, Inc. v. McMahon, 482 U.S. 220
(1987).
0 29 U.S.C. 158 (f). The independent non-arbitrable char-
acter of a section 8(f) repudiation is not premised on the
inviolability of the labor agreement or any supposed gener-
alized immunity from arbitration. To the contrary, the Court
has, in cases ranging from the Steelworkers Trilogy (Steelworkers
v. American Mfg. Co., 363 U.S. 564 (1960); Steelworkers v. Enter-
prise Wheel & Car Corp., 363 U.S. 593 (1960); Steelworkers v
(Continued on following page)
The substantive issues of uniform application of fed-
eral statutory law advanced by Petitioner simply do not
arise and no certworthy issue is presented. The myth of
immortality vested in the right of repudiation by Peti-
tioner by virtue of the automatic renewal of construction
industry collective-bargaining agreements does not coin-
cide with the harder realities of the Ninth Circuit's deci-
sion in Mesa Verde, which forecloses the possibility of
reasonable reliance on the right to repudiate in either
Board doctrine or Ninth Circuit law. Indeed, if repudia-
tion does have continued viability after Mesa Verde, it can
only exist if the Court chooses to revisit that decision on
the merits.
(Continued from previous page)
Warrior & Gulf Navigation Co., 363 U.S. 574 (1960)) to AT&T
Technologies (AT&T Technologies v. Communications Workers, 475
U.S. 643 (1986), acknowledged the traditional role of arbitra-
tion in the processing of grievances arising under labor agree-
ments. Issues of contract formation, termination and,
especially, repudiation are quite another matter. The abuse of
discretion lies in the unfounded belief that repudiation is
grievable in the first instance, not in the rectification of that
error by a district court. Mesa Verde Construction Co. v Northern
California District Council of Laborers, 598 FSupp. 1092 N. D
Cal. 1984)
CONCLUSION
For all the foregoing reasons, Camping respectfully
submits that this Petition for Writ of Certiorari should be
denied. However, should the Court believe that the issues
warrant plenary review, Camping respectfully urges the
Court to grant the Cross-Petition for Writ of Certiorari
filed herewith.
Respectfully submitted,
Marx R. Tuns
Joun W. Pracer, Je.
Rosext Faub
Tem, Coox, Baown & Peraces
601 California Street,
17th Floor
San Francisco, CA 94108-2822
(415) 391-9200
2
Camping ruct ion Company
Counsel of Record
April 1991
App. 1
APPENDIX A
No. 89-1661
—+
In The
Supreme Court of the United States
October Term, 1989
—
NORTHERN CALIFORNIA DISTRICT COUNCIL OF
LABORERS, AND CARPENTERS 46 NORTHERN
CALIFORNIA COUNTIES CONFERENCE BOARD,
Petitioners,
MESA VERDE CONSTRUCTION CO,
Respondent.
+
RESPONSE TO PETITION FOR A WRIT OF
CERTIORARI TO THE UNITED STATES COURT
OF APPEALS FOR THE NINTH CIRCUIT
>
OPINIONS BELOW
The Order and Amended Opinion of the United
States Court of Appeals for the Ninth Circuit after
remand from the en banc Court (Pet. App. A) is reported
at 885 F.2d 594. The Opinion of the en banc Court (Pet.
App. B) filed November 15, 1988 is reported at 861 F.2d
1124. The Opinion of the original three-judge panel of the
United States Court of Appeals for the Ninth Circuit (Pet.
App. O) filed June 23, 1987 is reported at 820 F.2d 1006
The Decision of the United States District Court for the
_
App. 2
Northern District of California (Pet. App. D) filed Decem-
ber 13, 1984 is reported at 598 F. Supp. 1092. The Order of
the United States District Court for the Northern District
of California denying the Motion for Alteration, Amend-
ment or Vacation of Order (Pet. App. E) filed February 11,
1985 is reported at 602 F. Supp. 327.
+
JURISDICTION
The Judgment and Opinion of the original three-
judge panel of the United States Court of Appeals for the
Ninth Circuit was entered on June 23, 1987. A timely
Petition for Rehearing and Suggestion for Rehearing en
banc was filed and granted. The Decision of the en banc
Court reversing the earlier Opinion and remanding the
case to the three-judge panel to determine the question of
retroactivity was filed on November 15, 1988. The Deci-
sion of the three-judge panel after remand was filed on
September 13, 1989. A timely Petition for Rehearing and
Suggestion for Rehearing en banc was filed on September
27, 1989. On January 26, 1990, the Petition for Rehearing
was denied, and the Suggestion for Rehearing en banc
was rejected, and the Order of the three-judge panel was
amended.
The jurisdiction of the Court has been invoked under
28 U.S.C. § 1254(1). The Petition was timely filed with the
Court under 28 U.S.C. § 2101(c), and this Response is
filed pursuant to the Request of the Court.
+
App. 3
STATUTES INVOLVED
The relevant statutory provisions are:
A. National Labor Relations Act, as amended, Sec-
tion 8(f), 29 U.S.C. § 15800.
B. Labor-Management Relations Act of 1947, as
amended, Section 301, 29 U.S.C. § 185.
Pertinent portions of these statutory provisions are
reproduced at Pet. App. F.
+
STATEMENT OF THE CASE
The Northern California District Council of Laborers
(“Laborers”) and the Carpenters 46 Northern California
Counties Conference Board (“Carpenters”) are labor
organizations within the meaning of the National Labor
Relations Act of 1947, as amended (hereinafter “NLRA”),
29 US.C. § 152(d). Mesa Verde Construction Company
(“Mesa Verde”) is an employer primarily engaged in the
construction industry within the meaning of § 8(f) of the
NLRA, 29 U.S.C. § 15800.
In 1979, Mesa Verde entered into its first collective
bargaining agreement with the Laborers, and signed an
additional collective bargaining agreement with the
Laborers on June 26, 1980. On November 17, 1982, Mesa
Verde and the Laborers agreed in writing that their 1980
contract would continue in effect until June 15, 1986.
Mesa Verde first entered into a collective bargaining
agreement with the Carpenters in August, 1979. Through
a subsequent agreement executed in June, 1980, Mesa
— c
App. 4
Verde accepted the new June 16, 1980 to June 15, 1983
Carpenters Master Agreement. On September 8, 1982,
Mesa Verde and the Carpenters entered into an early
extension of the agreement to June 15, 1986. *
Despite the fact that the agreements with both unions
were to remain in effect until June 15, 1986, Mesa Verde,
by way of letters, informed the Unions of its intent to
abrogate or repudiate its collective bargaining agree-
ments in May of 1984. At the time, Mesa Verde was
working on a project in Hercules, California, at which it
employed members of both Unions.
In late May or early June of 1984, Mesa Verde began
work on another project employing non-union workers.
Both unions filed grievances against Mesa Verde and
requested arbitration over Mesa Verde’s contractual obli-
gations on the mew project. Mesa Verde brought suit
under Section 301 of the LMRA, 29 U.S.C. § 185, against
both Unions seeking a declaratory judgment that it need
not comply with the Agreements with respect to projects
begun after its repudiation of the Agreements. The Dis-
trict Court stayed the arbitrations pending resolution of
the declaratory judgment action and later granted Mesa
Verde summary judgment against both Unions.
The District Court concluded that Mesa Verde was a
“project by project” employer, and that neither Union had
“majority” support in the relevant units, ie. the new
projects. The Court held that the collective bargaining
agreements at issue were “pre-hire” agreements autho-
rized by § 8(f) of the NLRA and that Mesa Verde’s May,
1984 letters were sufficient to repudiate the Agreements.
+
App. 5
REASONS FOR DENYING THE WRIT
Summary of Argument
Although the issues underlying Petitioner's argu-
ment are important in the administration of the day-to-
day relationships between construction unions and con-
struction employers, those issues are not of such impor-
tance as to warrant the review of the Court.
The decision of the court below correctly analyzed
whether the “law-changing” decision of the National
Labor Relations Board (“NLRB”) should be applied retro-
actively to the factual situation present in this case. Chev-
ron Oil Co. v. Huson, 404 U.S. 97, 92 S.Ct. 349 (1971). Its
decision rested upon settled principles of law.
Although “the general rule of long-standing is that
the law announced in la] Court’s decision controls the
case at bar,” see eg, St. Francis College v. Al-Khazraji, 481
U.S. 604, 608, 107 S.Ct. 2022, 2025 (1987), the Court has
recognized that this general rule is subject to exception
where, inter alia, substantial inequitable results would
occur. See, e.g., Chevron Oil Co. v. Huson, 404 U.S. 97, 92
S.Ct. 349 (1971)
Mesa Verde recognizes that among the members of
the Court, there may be differences of opinion as to the
continued viability of the Court's civil retroactivity doc-
trine, e. g., American Trucking Associations, Inc., et al. v.
Smith, 495 US. __, __ S.Ct. __ (June 4, 1990), but
respectfully suggests that under the reasoning of either
the plurality or dissent in that case, the outcome of this
case would be the same. Hence, review of the “retroac-
tivity” issues presented by Petitioner is unnecessary
App. 6
In its attempt to convince the Court otherwise, Peti-
tioner has mischaracterized certain facts, and over-
emphasized the impact of the decision of the court below.
It does not create the parade of horribles that Petitioner
has suggested.
Finally, this case does not present a situation where
there is a clear conflict among the Circuits on the precise
issues presented.
ARGUMENT
A. The Court Below Correctly Concluded That
Retroactive Application Of The NLRB’s “Law-
Changing” Decision in John R. Deklewa &
Sons, Inc. To The Parties In This Case Was
Unwarranted.
The Chevron Oil v. Huson test to determine whether a
decision should not be given retroactive effect — a test
which apparently still commands support of the plurality
of the Court - has three parts, which may be summarized
as follows:
1. whether the “law-changing” decision is one
of first impression, or overrules clear past
precedent;
2. whether retrospective operation of the law-
changing decision would further or retard
the operation of the rule in question;
3. whether retrospective Moen of the rule
will impose substantial inequitable results.
Application of these three factors to the situation
here reveals the correctness of the decision of the court
below.
App. 7
First, the “repudiation” rule applicable to Section 8(f)
pre-hire contracts, previously grounded in NLRB prece-
dents, see ¢.g., D'Angelo & Kahn, Inc., 248 NLRB 396
(1980), was clearly overruled by the NLRB in john R.
Deklewa & Sons, Inc., 282 NLRB No. 184 (1987). The Ninth
Circuit, which itself had previously adopted the “repu-
diation” rule as the law in its Circuit, see e. g., United Bhd.
of Carpenters & Joiners Local 2247 v. Endicott Enters., 806
F.2d 918 (9th Cir. 1986), clearly “overruled” its own past
precedents on this subject in its en banc decision below.
The pre-Deklewa law concerning a party's ability to
repudiate a pre-hire agreement during its term was abun-
dantly clear, even if the law as to all of the types of
methods to accomplish it was not. The “law-changing”
decision involved here - either the NLRB’s decision, or
that of the Ninth Circuit's en banc panel - overturned the
clear past precedent as to the employer's ability to repudi-
ate such agreements. Under the NLRB’s holding in
Deklewa, neither a union nor an employer has the ability
to lawfully repudiate a pre-hire agreement during its
unexpired term; the question of the proper method to
accomplish such a repudiation has become irrelevant.
Second, retrospective operation of the new “non-
repudiation” rule endorsed by the majority of the en banc
Court below would not further “employee free choice” or
“labor relations stability”. The practical effect of retroac-
tivity of the new “non-repudiation” rule of the NLRB and
Ninth Circuit would be to judicially impose a collective-
bargaining representative upon the “non-union” workers
employed by Mesa Verde on the projects at issue (Pet. p.
App. 8
4), thereby currently depriving them of any free choice as
to a bargaining representative, and depriving them of the
ability they may have had six years ago to renounce the
Union as their representative through an NLRB election.
Moreover, contrary to Petitioner’s suggestions (Pet.
p. 7), “labor relations stability” is fostered, not retarded,
when the parties to a collective-bargaining relationship
even one legitimated by Section 8(f) of the Act - enter
into and live by the rules of such a relationship knowing
their respective rights and obligations. Here, both the
Unions and the Employer must be held to have known
when they entered into their original relationship and
subsequently lived by it that the pre-hire agreements
were voluntary and voidable by either party. The Unions
could not expect that such agreements were enforceable
unless they became the majority bargaining representa-
tive at each new jobsite, Dee Cee Floor Covering, 232 NLRB
421 (1977), and the Employer must be held to have known
that as long as the Union had majority status“, the
Employer would not be permitted to ignore the agree-
ment or the economic consequences of its voluntary exe-
cution. NLRB v. Pacific Erectors, Inc., 718 F.2d 1459 (9th
Cir. 1983).
Petitioner’s stated fears of forum-shopping (Pet. p.
11) should not persuade the Court that a prospective
application of the new rules will retard their operation.
The issue is not whether the NLRB and the courts have
different rules today for the parties to collective-bargain-
ing relationships. Rather, the issue is whether a termina-
tion of the relationship, accomplished in full accord with
the law at the time of the operative conduct, is to be
App. 9
penalized by retroactive adoption of a new rule out-
lawing such termination. Nothing in the law would have
prevented the Unions here from challenging Mesa
Verde’s repudiation of the collective-bargaining agree-
ments in appropriate charges made to the NLRB in 1984
at the time of the operative conduct, or would have
prevented the Unions from arguing to the NLRB that on
the facts or the law, Mesa Verde had unlawfully termi-
nated the collective-bargaining relationship. The Unions
simply chose not to do so, and now complain that their
failure to have done so should be remedied by retroactive
application of rules which did not exist at the time.
Petitioner’s “forum shopping” fears are illusory ones, for
all cases involving repudiation conduct after the date of
the Deklewa decision will be governed by it, and only a
few old situations will be governed by the prior rules.
As to the third prong of the Chevron Oil test -
whether retrospective application of the rule will impose
substantial inequitable results the reliance interests of
the parties clearly suggest that Mesa Verde, and other
employers, who relied upon the fundamental principles
of law developed under Section 8(f) and Section 8(a)(5) of
the Act would be unfairly treated by retroactive applica-
tion of a rule which not only changes their economic and
administrative expectations, but also the length and char-
acter of their relationship with the Unions involved.
Here, the “grievances” of the Laborers and Carpen-
ters deal with alleged violations of the collective-bargain-
ing agreement which occurred after, not before, the
repudiation of the agreement by Mesa Verde (Pet. App.
64a). The undisputed facts reveal that the Unions were
not the freely-chosen majority bargaining representative
App. 10
of the employees working at the construction projects
begun after the May 8 and May 15 repudiations of the
Carpenters and Laborers Agreements. (Pet. App. 84a,
100a)
The economic and administrative consequences of
retroactive application of the new non-repudiation rule
would be to impose upon Mesa Verde the financial bur-
dens of labor costs not expected as to those projects, as
well as the necessity to deal with the Unions as to all the
“wages, hours and other terms and conditions of employ-
ment” of Mesa Verde’s employees notwithstanding the
“non-majority” status of those Unions. Retroactive appli-
cation would likewise impose contractual arbitration
clauses. A voluntary method of settling disputes - favored
by the Court for precisely this reason - would become,
with adroit judicial prestidigitation, involuntary.
This case was carried to judgment in the District
Court on the basis of settled principles of law. Mesa
Verde premised its repudiation conduct on rights
grounded in applicable NLRB and Ninth Circuit prece-
dent, see Dee Cee Floor Covering, Inc., supra; NLRB v.
Pacific Erectors, Inc., supra. The case was litigated with the
understanding of all concerned that the operative princi-
ples governing the parties conduct were clear.
The Court has recognized that the lower courts,
when considering whether a “law-changing” decision
should be applied retroactively, should look at the harsh
and disruptive effects upon the litigants, and should be
guided by the following principles: if the operative con-
duct or events occurred before the “law-changing” deci-
sion, a court should apply the law prevailing at the time
App. 11
of the conduct; otherwise, the court should apply the new
law. American Trucking Associations, Inc. d Smith, supra, 495
US. at __. Recognizing the reliance interests of the par-
ties, that is what the Ninth Circuit has done in this case.
Mesa Verde’s repudiation of the Laborers and Car-
penters agreements occurred almost three years before
the “law-changing” decision of the NLRB in Deklewa.
Therefore, it was proper for the Ninth Circuit to affirm
the District Court's entry of judgment which had applied
the prior law to the conduct which occurred prior to the
“law-changing” decision. This position is consistent with
the Court's precedents in similar circumstances. See, e
Northern Pipeline Construction Co. v. Marathon Pipe Line
Co., 458 U.S. 50, 88, 102 S.Ct. 2858 (1982) (“law-changing”
decision not applied retroactively when to do so would
have upset judgment entered prior to “law-changing”
decision).
In sum, since the Ninth Circuit correctly evaluated
the application of the Chevron Oil factors to this case,
there is no overriding warrant for the Court to exercise its
supervisory power and review the Ninth Circuit's anal-
ysis of the retroactivity issue
B. There Is No Conflict In The Courts Of Appeals
Which Warrants Resolution By The Court At
This Time.
Petitioner suggests that the Ninth Circuit and the
Third, Eighth and Seventh Circuits are in conflict as to
whether the NLRB’s decision in Deklewa should be
applied retroactively. Although it is true that the Third,
Eighth, and Seventh Circuits have seen fit to defer to the
App. 12
NLRB’s conclusion that the new non-repudiation rules
should apply retroactively to pending NLRB cases, see,
Ironworkers Local 3 v. NLRB, 843 F.2d 770 (3rd Cir. 1988);
NLRB v. W.L. Miller Co., 871 F.2d 745 (8th Cir. 1989); NLRB
v. Bufco Corp., _ F.2d __ (7th Cir. 1990), no Circuit
Court is in conflict with the Ninth Circuit on the applica-
tion of such a rule in cases arising under Section 301 of
the LMRA, 29 U.S.C. § 185.
Whatever may be said of the correctness of the non-
repudiation rule adopted by the NLRB in Deklewa, the
“law changing” decision of the NLRB was premised upon
administrative convenience to overcome the NLRB’s per-
ceptions of the evidentiary problems in litigation of
unfair labor practices. The NLRB’s unfair labor practice
decisions do not always formulate the rules for the
enforcement of collective-bargaining agreements under
Section 301. Indeed, that dichotomy was foreseen by the
Court in Jim McNeff, Inc. v. Todd, 461 U.S. 260, 103 S.Ct.
1753 (1983). There, the Court concluded that although a
Section 8(f) pre-hire agreement may form the basis of a
breach of contract claim under Section 301 even if the
Union does not represent a “majority” of the employees
in the relevant unit, such a contract does not obligate the
employer to “bargain” with the Union under penalty of
an unfair labor practice. Jim McNeff, Inc. v Todd, supra;
John R. Deklewa and Sons, Inc., supra.
It would not be improper to have as a matter of
federal labor policy a divergence in the law under differ-
ent Sections of the Labor Act concerning the enfor-
ceability of pre-hire agreements. Since the unfair labor
practice Sections of the Act, and Section 301 serve differ-
ent purposes, Jim McNeff, Inc. v. Todd, supra, it is not
necessary for the Court to fashion rules so as to create
App. 13
identical results under them. Given such, it is not neces-
sary for the Court to review the “retroactivity” analysis of
the Ninth Circuit here simply to attempt to square the
results in the two different lines of cases unfair labor
practices cases, and Section 301 breach of contract cases.
C. Even If The Court's Civil Retroactivity Doctrine
Were To Be lied Simply As A Remedial
One, The le Balance In This Case Tilts
In Favor Of Upholding The Decision Below.
One of the functions of the Court is to construe
statutes, determining the meaning of them as Congress
intended. Chevron U.S.A. v. Natural Resources Defense
Council, Inc, 467 U.S. 837, 104 S.Ct. 2778 (1984). Although
in reviewing an administrative agency's interpretation of
the statute it is charged with enforcing, the Court may
apply a deferential test of “reasonableness”, the judiciary
still is obligated to and does exercise its function with an
eye on what Congress intended to be the law governing
the rights and obligations of the parties regulated by
those statutes. Id.
As Mesa Verde has set forth in its Cross-Petition For
Writ of Certiorari, No. 89-1874, the Ninth Circuit's en banc
decision here gave almost blind deference to an adminis-
trative agency which changed its mind about what rules
were “workable” and about the proper Congressional
intent behind two interrelated Sections of the Labor Act.
Contrary to the Ninth Circuit, the question before it in
this case was not whether the Court's decision in McNeff
can be read as supporting the Board’s decision in
Deklewa, but rather whether the Labor Act's provisions
themselves can support Deklewa. As Justice Scalia has
App. 14
stated: “We defer to agencies, however (and thus apply a
mere “reasonableness” standard of review) in their con-
struction of their statutes, not of our opinions.” NLRB Y
IBEW, Local 340. U.S. ___, 107 S.Ct. 2002, 2015 (1987)
(Scalia, J. dissenting).
Even so, the extent that both the NLRB and the Ninth
Circuit have appropriately changed the law in their
respective jurisdictions so that now Mesa Verde’s lawful
repudiation of its pre-hire agreement would be unlawful,
the question remains as to the remedy. If the dissent’s
view in American Trucking Associations, Inc. v. Smith, supra,
is applied here, this new rule would be applied retroac-
tively to the facts of this case, leaving it to the lower
courts to determine the remedy to be enjoyed by the
Unions. Here the suit was one for declaratory, not mone-
tary, relief, so that a limitation on the scope of recovery
would be inappropriate.
However, the reliance interests of the parties suggest
that the Unions are entitled to no relief. The parties’
relationship was governed by the applicable NLRB prece-
dent, applicable Circuit Court precedent and the Court s
decisions. The conduct of Mesa Verde in repudiating its
Agreements with the Laborers and Carpenters was prem-
ised upon the intent of Congress that pre-hire agreements
were to be “voluntary”, Jim McNeff, Inc. v. Todd, supra,
and the practical realities that minority Unions in the
construction industry were treated differently by Con-
gress when it enacted Section 800 in 1959. .
Principles of equity eschew reliance on rigid applica-
tion of technical rules, and it is precisely for this reason
App. 15
that the Court adopted its Chevron Oil retroactivity doc-
trine. Mesa Verde relied upon the law as it existed in 1984
to repudiate its contracts. The Unions chose not to chal-
lenge such conduct as an unfair labor practice, but chose
to litigate the matter to judgment under that law. It seems
unquestionable that the conduct of Mesa Verde, once
lawful, cannot be made unlawful by changes in the law it
had no hand in shaping, changes it could not have fore-
seen in light of the Court’s decision in McNeff.
The Ninth Circuit correctly rejected rigid adherence
to the new rule, and balanced the equities concluding that
the Unions here were entitled to no relief, albeit doing so
by application of the civil retroactivity principles of Chev-
ron Oil. That equitable balancing in the form of viewing
the matter as one of remedy results in the same conclu-
sion.
Hence, assuming arguendo the correctness of the
Ninth Circuit's deference to the NLRB and its adoption of
Deklewa as the law of that Circuit, the outcome of this
matter should have been, and should be that the Unions
are not entitled to enforce the repudiated pre-hire agree-
ment.
D. Should The Court Grant Review Of The Ninth
Circuit's Retroactivity Decision, The Court
Should Also Review The Underlying “Law-
changing” Decision On Its Merits.
Although the retroactivity issues presented by Peti-
tioner do not warrant review by the Court, Mesa Verde
respectfully suggests that the Ninth Circuit has erred in
not following the Court's decision in Jim McNeff, Inc. v.
App. 16
Todd, supra. There, the Court clearly stated that Section
8(f) pre-hire agreements were voidable and capable of
unilateral repudiation until the Union achieved majority
status in the relevant unit, but were fully enforceable
under Section 301 of the LMRA, 29 U.S.C. § 185, absent
such repudiation. That the NLRB, an administrative
agency, has concluded that such a rule is now “unwork-
able”, or that the Ninth Circuit shares such a view, is no
excuse for either to ignore the applicable precedent of the
Court. As the Court stated only recently: “If a precedent
of this Court has direct application in a case, yet appears
to rest on reasons rejected in some other line of decisions,
the Court of Appeals should follow the case which
directly controls, leaving to this Court the prerogative of
overruling its own decisions.” Rodriguez de Quijas, et al. v.
Shearson/American Express, Inc., 490 US. __, __, 109 S.Ct.
1917, 1922 (1989).
The Court of Appeals below did not respect that
admonition, which clearly was applicable here. It is for
this reason that Mesa Verde has sought the Court's plen-
ary review of the entire Section 8(f) — Section 8(a)(5)
ruling of the NLRB in Deklewa. See, Cross-Petition for
Writ of Certiorari, in No. 89-1874. Unless the Court either
“overrules” its McNeff decision, or “overrules” the Ninth
Circuit en banc decision here, litigants can not know
whether their conduct past or future will expose them to
Sec. 301 liability.
Mesa Verde suggests that the Court's decision in
McNeff rested upon sound reasoning, and carefully bal-
anced union-employer-employee rights in the construc-
tion industry. Respect for the principles of stare decisis
suggests that the Court should not tamper with the rules
App. 17
formulated in McNeff. Such principles also suggest that
the Ninth Circuit's deferential adoption of the non-repu-
diation rule of Deklewa was unsound and contrary to law.
+
CONCLUSION
For all the foregoing reasons, Mesa Verde respectfully
submits that this Petition for Writ of Certiorari should be
denied.
However, should the Court believe that the issues
herein warrant plenary review, Mesa Verde respectfully
urges the Court to grant the Cross-Petition for Writ of
Certiorari in No. 89-1784, and review the underlying
questions of the correctness of the Ninth Circuit's en banc
“law-changing” decision.
Respectfully submitted,
Marx R. Tiexman*
Joun W. Pracer, Jr.
Rowert Frep
TrermMan, Coox, Brown &
PRAGER
601 California Street,
17th Floor
San Francisco, CA 94108-2822
Attorneys for Respondent,
Mesa Verde Construction Co.
Counsel of Record
July 1990
App. 18
APPENDIX B
No.
—
In The
Supreme Court of the United States
October Term, 1989
—
MESA VERDE CONSTRUCTION CO.,
v Cross- Petit ioner,
NORTHERN CALIFORNIA DISTRICT COUNCIL
OF LABORERS, AND
CARPENTERS 46 NORTHERN CALIFORNIA
COUNTIES CONFERENCE BOARD,
Respondent.
—
CROSS-PETITION FOR A WRIT OF
CERTIORARI TO THE
UNITED STATES COURT OF APPEALS
FOR THE NINTH CIRCUIT
- > —ͤ—
Mesa Verde Construction Company (“Mesa Verde”)
petitions for a Writ of Certiorari to review the Order and
Amended Opinion of the United States Court of Appeals
for the Ninth Circuit entered in this proceeding on Janu-
ary 26, 1990.
—
OPINIONS BELOW
The relevant opinions below are set forth at page 2 of
Petitioners’ Laborers’ and Carpenters’ Petition for a Writ
App. 19
of Certiorari to the United States Court of Appeals for the
Ninth Circuit in the connected case of Northern Califor-
nia District Council of Laborers, and Carpenters 46
Northern California Counties Conference Board v. Mesa
Verde Construction Co., No. 89-1661 (“Petition”) and
Appendices A-E thereto.
+
JURISDICTION
The relevant jurisdictional history is set forth at Peti-
tion, page 2. The jurisdiction of the Court is invoked
under 28 U.S.C. § 1254(1). The Petition was received on
April 30, 1990. This Cross-petition is timely filed under 28
U.S.C. § 2101 and Rule 12.3 of the Court.
+
STATUTES INVOLVED
The relevant statutory provisions are set forth at
Petition, page 2 and Appendix F, with the addition,
herein and at Appendix A, of the following:
A. National Labor Relations Act, as amended, sec-
tion(s) 8(a)(5); 8(b)(3); 8(b)(7)(C); Sa) and 10(b)
[29 U.S.C. §§ 158(a)(5); (b)(3); (b)(7MC); § 159(a)
and § 160(b)]
o—
STATEMENT OF THE CASE
The factual statement of this case is fairly set forth in
the Petition for Certiorari and in the opinion below.
+
REASONS FOR GRANTING THE WRIT
More important than the issues of labor law pre-
sented by the instant case, the question raised below is
App. 20
the responsibility of the National Labor Relations Board
to follow the decisions and statutory interpretations of
the United States Supreme Court, and the role of federal
appellate courts in deferring to the NLRB in cases of
conflict between the Supreme Court and the NLRB’s cur-
rent opinion. The Courts of Appeal for the Ninth, Third,
Seventh and Eighth Circuits' have abandoned the tradi-
tional balance between the judiciary and the courts by
adopting a decision of an administrative agency that
purports to overrule Supreme Court precedent and clear
statutory construction in the name of administrative con-
venience. Judge Kozinski, writing in dissent in Mesa
Verde, en banc, ends his analysis by noting “I can only
hope that the Court will have occasion for sober reflec-
tion on the wisdom of the approach taken by our court
today and by the Third Circuit in International Ass'n of
Bridge, Structural and Ornamental lron Workers, Local 3 v.
NLRB, 843 F.2d 770 (3rd Cir.), cert. denied. U.S.
109 S.Ct. 222, 102 L.Ed.2d 213 (1988).” The elegiac ele-
gance of Judge Kozinski’s plea merits just such consider-
ation by the Court, and, accordingly, it is on those terms
that prayer for plenary relief is made.
The Cross-Petition For Certiorari Should Be Granted
Because The Decision Of The Court Of Appeals For The
Ninth Circuit Directly Conflicts With The Holding And
Opinion Of The Court.
In 1977, General Counsel for the National Labor Rela-
tions Board argued to the Court in its brief to the United
' NLRB U WL. Miller Co, 871 F.2d 745 (8th Cir. 1989);
NLRB vp. BUFCO Cory, Fd 1 WL 37251 (7th Cir.
1990)
App. 21
States Supreme Court in NLRB v. Local Union No. 103, Int'l
Assoc. of Bridge, Structural and Ornamental Iron Workers
(Higdon), No. 76-719 (October Term, 1976) that the
language of section 8(f) and its relationship to other pro-
visions of the Act reflect that section 8(f) was not intended
to relieve unions that are parties to pre-hire agreements from
the obligation to achieve majority support before they can
require an employer to honor such an agreement by means of
section 8(a)(5). . . IId. at 23-24)(emphasis added). While
there were other arguable interpretations of Section 8(f)
and its legislative history, the United States Supreme
Court announced that the Board’s position was essen-
tially correct, and stated: “the pre-hire agreement is void-
able and does not have the same stature as a collective
bargaining contract entered into with a union actually
representing a majority of the employees and recognized
as such by the employer.” 434 U.S. at 341. The Court
affirmed the Board’s decision that picketing to enforce a
pre- hire agreement violated NLRA section 8(b)(7)(C) [29
U.S.C. section 158(b(7(C)], as “acceptable” and a “defen-
sible construction of the statute.” Id. at 341, 350. It is not
“acceptable” for the Board to ignore the fact that the
Supreme Court in Higdon upheld the Board based upon a
review of the legislative history of section 8(f), and was
not merely reiterating the Board's philosophy.
The Supreme Court embraced this logic and statutory
interpretation in the context of a trust fund lawsuit under
section 301 of the National Labor Relations Act [29 U.S.C.
§ 185] in the case of Jim McNeff, Inc. v. Todd, 461 U.S. 260
(1983). In MeNeff, as in this case, the union brought suit
under section 301 of the Labor Management Relations Act
to enforce a pre-hire agreement. The Court unanimously
App. 22
affirmed that an employer has an “undoubted right to
repudiate a pre-hire agreement before the union attains
majority support in the relevant unit.. 461 U.S. at 270
(emphasis added). See also Id. at 271 (“a section 8(f) pre-
hire agreement is subject to repudiation until the union
establishes majority status”), and see Woelke and Romero
Framing, Inc. v. NLRB, 456 U.S. 645, 664 (1981) (“[the
employers], if they do not have a stable workforce among
whom the union has secured a majority, may be free to
repudiate the agreement at any project which the union
has not demonstrated that it represents the majority of
their employees”). By emphasizing that the Court's juris-
diction derived from section 301, the Court drew a “criti-
cal distinction” between the Board’s obligation to decide
unfair labor practice charges and the Court's obligation to
construe the enforceability of collective bargaining agree-
ments under section 301. The Court noted that only the
former had been addressed in Higdon. The latter was
settled in McNeff. Id. at 267, and at 267 n. 7. See also
Thurston Motor Lines, Inc. v. Jordank, Rand, Ltd., 460 U.S.
533, 535 (1983); Hutto v. Davis, 454 U.S. 370, 375 (1982)
(per curiam). Thus, the meaning of section 8(f) and its
legislative history became the finding of the Court.
Only four years after the Court’s opinion in McNeff,
in the case of John R. Deklewa and Sons, Inc., 282 NLRB No.
184 (1987), the NLRB decided, for administrative conve-
nience, to abandon this view of the legislative history.
Less than two years after Deklewa, the NLRB has likewise
abandoned the reasoning behind Deklewa in the case of
Laborers’ Local Union No. 1184 (NVE Constructors, Inc.),
App. 23
296 NLRB No. 165 (1989).2 Although it is raised in the
context of a trust fund lawsuit under Section 301 of the
Act, the Court of Appeals for the Ninth Circuit has over-
ruled existing Circuit Court cases and applied the NLRH s
vicw of section 8(f) instead of the Supreme Court's view.’
The Court must preserve the balance of power between
the executive, legislative and judicial branches of govern-
ment, and remind the agency and Court of Appeals that
due process of law includes the principles of stare decisis
? As will be set forth later, the NLRB erred in its reasoning
in support of the Deklewa decision. The first part of the Deklewa
decision describes well the subsidiary rules and policies devel-
oped as a result of the Supreme Court's decision in Higdon. In
Deklewa, the Board found it intellectually difficult to justify a
presumption in favor of majority status from the mere passage
of time or from the use of exclusive union hiring halls, trust
fund benefits, or forced union membership. This lead to the
result that all construction agreements which are not sup-
ported by card based or other independent pre-signing indica-
tions of majority status remain section 8(f) pre-hire agreements
until and unless the union wins in an NLRB conducted election
or is voluntarily recognized based upon independent evidence
of majority status. However, this does not make pre-hire agrce-
ment non-voidable, it does not create temporary fictitious 9a)
relationships and it does not mean the Supreme Court's opin-
ions in Higdon and McNeff can be ignored.
A further reason not to apply Deklewa in the context of
this section 301 suit is that the Board itself would not and
could not apply its decision to the facts of this case. The Board
held that Deklewa would apply only “to this case and to all
pending cases in whatever stage.” Deklewa at 1389. This case is
not now, nor could it ever be, presented for adjudication to the
Board. The Board could not accept an unfair labor practice
charge under section 8(a)(5) because the six-month statute of
limitations has run. NLRA section 10(b) [29 U.S.C. § 160(b)]
App. 24
and the power of higher courts to mandate to lower
courts the outcome of decisions based upon clear rules of
precedent. Otherwise, the principle of jurisprudence
becomes the mere political whim of the most recent judi-
cial or administrative official to deal with the problem.
MceNeff Was A Trust Fund Case In Which The Supreme
Court Did Not Defer To Any Agency Ruling. Likewise,
In Trust Fund Cases, A Federal Court Owes No Duty Of
Deferral To The NLRB, Especially When The Board
Rewrites The Act In The Name Of Administrative Con-
venience Instead Of Interpreting Congressional Intent.
The Court owes no deference to an agency which
attempts to engage “in the unauthorized assump-
tion . . of major policy decisions properly made by
Congress.” American Ship Building Company v. NLRB, 380
U.S. 300, 318 (1965). It is the responsibility of the Court
authoritatively to construe statutes, and to reject an
agency interpretation which is contrary to congressional
intent. Chevron USA v. Natural Resources Defense Council,
467 U.S. 837, 843-844 (1984); FEC v. Democratic Senatorial
Campaign Committee, 454 U.S. 27, 32 (1981). The agency is
subject to even greater scrutiny when it abruptly departs
from precedent. NLRB v. Local Union No. 103, International
Association of Bridge, Structural and Ornamental Iron
Workers, AFL-CIO (“Higdon”), 434 U.S. 335, 351 (1978);
Lovshin d. Department of the Navy, 767 F.2d 826, 840 (D.C.
Cir. 1985), cert. denied., 106 S.Ct. 1523 (1986); Frank Dieh!
Farms v. Secretary of Labor, 696 F.2d 1325, 1330 (11th Cir.
1983); NRDC Y EPA, 683 F.2d 752, 760 Gd Cir. 1982);
especially so precedent set by the Court.
App. 25
Judge Kozinski, in his eloquent dissent to the dect
sion of the Ninth Circuit en banc, excerpts from which
follow, presented the issue directly.
“It is emphatically, the province and duty of
the judicial department, to say what the law is.”
Marbury v. Madison, 5 U.S. (1 Cranch) 137, 176,
2 L.Ed. 60 (1803). To MARBURY’s
nouncement the majority would add a icil:
“until and unless the agency charged with
administering the law changes its mind.”
According to the majority, if a federal court
relies on an agency's int tion of a statute,
the court's construction is binding only until the
a + decides the statute means something
altogether. At that point the court, or a
higher court, or a lower court, may - nay, must
follow the agency's new interpretation unless
that — cena is — — * 1
respectfully suggest, results in a significant shift
of authority from the judiciary to the executive
branch. Whenever Congress charges an agency,
board, commission or department with adminis-
tering a statute - | would venture to that
this includes a substantial majority of our most
significant federal laws - the judges become the
handmaidens of the agency, ted to decid-
ing not what the law is, but only whether the
agency's construction of the law is reasonable.
This is no small change. Courts and agen-
cies are fundamentally different, both institu-
tionally and functionally. Judicial decision
making is hedged about with a variety of consti-
tutional safeguards designed to protect it from
manipulation by the political branches. In inter
preting statutes, courts are bound to find and
apply the meaning endowed them by Congress
and the President. It is emphatically not the
function of courts to read policy content into
statutes, or to interpret them in a way that will
App. 26
foster a particular political viewpoint. Adminis-
trative agencies, by contrast, are designed to
bend with the political winds. The leadership
and policy direction of executive departments
change with every administration; members of
so-called independent agencies are appointed
with reference to their political affiliations.
Agency officials are expected to rely on their
views of public policy in carrying out their
responsibilities.
Because judges must read a statute in the
way that best reflects its meaning, courts are far
slower than agencies in overruling their deci-
sions. Once a circuit interprets a statute, only an
en banc panel of the same court or the Supreme
Court may adopt a different construction; only
the Supreme Court may modify or reverse its
own prior construction of a statute. By contrast,
agencies can change their outlook as often and
easily as a chameleon changes its color. A
change of administration may prompt an execu-
tive department to alter its position on a partic-
ular piece of legislation overnight. As positions
taken by a regulatory agency may hinge on a
narrow majority, appointment of a single com-
missioner may drastically change the agency’s
approach to its organic statute.
This difference between the constraints on
the judiciary and the broad freedom afforded
agencies derives directly from the disparate
functions they perform. When courts interpret a
Statute, they search for its true meaning - and
there can never be more than one true meaning.
To be sure, reasonable minds may differ as to
what that meaning may be; occasionally it may
be necessary to correct a judicial decision that
misreads that meaning. But in performing their
ry ee function, judges must listen for the voice
of the legislature, not to the sound of their own
heartbeats. Because courts are bound by the best
App. 27
construction of the statute, they may alter their
interpretation only in response to a powerful
new insight as to the law’s meaning, not because
a 8 panel of judges prefers a different
result.
Agencies, on the other hand, may turn on a
dime: Their proper function is to fill in policy
gaps pursuant to an explicit or implicit delega-
tion of authority from Congress. See, e.g., Mor-
ton v. Ruiz, 415 U.S. 199, 231, 94 S.Ct. 1055, 1072,
39 L.Ed.2d 270 (1974) (“[t}he power of an admin-
istrative agency to administer a congressionally
created ... ram necessarily requires the
formulation of policy and the making of rules to
fill any gap left, implicitly or explicitly, by Con-
gress”). Where Congress has delegat such
authority, the statute becomes a clear vessel
which changes its tint as it is filled and refilled
by various policy pigments. Because the agency
administering the statute is not bound to a sin-
gle formulation of statutory language, it may
make changes without considering whether the
new approach more accurately reflects the
meaning of the statute.
Both types of decision making processes
serve a vital function so long as each is confined
to its own sphere. The spr cony, Bp astray in
conflating the two. This error has the effect of
displacing the courts’ methodical, deliberate
search for a law’s meaning with the policy judg-
ment of a 1 responsive administrative
agency. This is troubling both as a jurispruden-
tial and as a practical matter.
Jurisprudentially, | am troubled by the
majority’s implicit holding that the meaning of a
statute can change in an instant simply because
an administrative agency has said so. Statutory
— is not a matter of hopes or wishes, it is
a fact. In settling on a particular interpretation
App. 28
of a statute, the court is saying: “This is the
meaning that was actually conferred upon this
statute * Congress.” In reaching that conclu-
sion, the court looks first at the statute’s lan-
guage and structure, but may also rely on the
statute's legislative history and the view of the
agency charged with its enforcement. A change
in the agency's view alters this calculus and
may motivate a reviewing court to reconsider
the soundness of its prior interpretation. But a
change in an agency's position cannot automat-
ically alter the meaning Congress gave the stat-
ute years earlier.
By reaching the contrary conclusion, the
court is, in effect, holding that statutes have no
fixed meaning, that in passing laws — —
approves a range of possible interpretations,
each as good as the next. While this a h
fits in neatly with the lar mythology, con-
ceived and nurtured * 1 — that
words are incapable of conveying precise con-
cepts, it — the basic principle that
language provides a meaningful constraint on
public a rivate conduct.” Trident Center v.
Connecticut General Life Ins. Co., 847 F.2d 564, 569
(9th Cir. 1988). Needless to say, I disagree with
this approach which, in my view, represents a
serious abdication of judicial responsibility.
[FN 2] A reassuring — te: the
majority is not — — with its own
prescription: ifically, the majority to
great pains iy srs A that Deklewa's inter
pretation of section 8(f) is not merely permis-
sible, but — Majority opinion at
1132-34. Thus, the court observes that
“Deklewa’s literal reading of the second
[of section 8(f)} is more likely reading of con-
ressional intent than that given by RI. Smith,”
J. at 1132 (emphasis added), and concludes that
“[t}he Board's prior rule, allowing repudiation
_&<<<mmoe™- ————
App. 29
of such agreements in addition to these explicit
statutory protections, has proved unwise.” Id. at
1133. Such ruminations have no legitimate place
within the analytical framework adopted by the
majority: If we are bound to follow the Board,
we must approve even a poor interpretation of
the statute, so long as it falls within the range of
permissible meanings. Future courts might be
wise to note the majority’s concern with what
“best serves the interests of employers and
employees,” id. at 1129, and then do as we do,
not as we Say.
And this brings me to the practical prob-
lems wrought by today’s decision. The en banc
court’s ruling - should it become the law of the
land- will make hundreds, perhaps thousands,
of laws that have been conclusively interpreted
by the courts subject to uncertainty whenever
there is a shift in the political winds. A brief
survey of recent cases in which the Supreme
Court has relied on an agency’s interpretation
suggests the scope of the problem. (citations
omitted) .. Our circuit has deferred to agency
construction of statutes in an equally wide range
of cases (citations omitted)
This handful of examples barely hints at the
scope of the problem created by today’s deci-
sion. If deference means blind adherence to the
agency’s construction as it meanders through
the range of non-irrational meanings, federal
judges should plan to take a long holiday and
observe from afar as the body of federal law
develops without their further meaningful
input. A change of this magnitude in the rela-
tionship between the judicial and executive
branches of government should come from the
Supreme Court, if it comes at all.
App. 30
The Board Has Not Construed Section 8(f), It Has
Rewritten It
Section 9(a) of the National Labor Relations Act is the
equivalent of a Bill of Rights for collective bargaining. It
applies, by its terms, after employees have, “by a major-
ity of the employees in a unit appropriate for such pur-
poses” chosen a representative to bargain for them
collectively. Section(s) 8(a)(5) and 8(b)(3) of the Act guar-
antee the freedom to make that choice by identifying
coercive or bad faith conduct by both union and
employer.
Contracts executed pursuant to section 8(f) of the Act
are different from section 9(a) collective bargaining agree-
ments. Retail Clerk's Int'l Assn. v. Lion Dry Goods, 369 U.S.
17, 27, 35 (1962). In enacting section 8(f) of the Act,
Congress fashioned a limited exception to the principle of
employee free choice enforced by sections 8(a) and (b) of
the Act. Thus, section(s) 8(a)(2) and (5) forbid an
employer from entering into a union agreement without
prior evidence of employee support. Section 8(f) validates
this otherwise unfair labor practice by permitting an
agreement to be reached on a pre-hire basis, e.g. before
any evidence of union support. In so doing, the Congress
clearly indicated that such an agreement must be “purely
voluntary” and free of coercion. Unless confirmed by
evidence of majority support, pre-Deklewa section 8(f)
contracts were considered purely executory and repudia-
ble at any time.
In implementing the Congressional mandate repre-
sented by section 8(f), the Board considered that the
—_
App. 31
shifting nature of the construction workforce made elec-
tions or a showing of cards, the traditional means recog-
nized in the Act for a demonstration of majority support,
impractical. Accordingly, the Board fashioned two addi-
tional devices to make employee choice possible. Thus,
the doctrines of conversion and merger serve to provide
the equivalent of an election by allowing proof that an
employer's workforce has the permanent and stable char-
acteristics of a non-construction employer; or if the
underlying contract is executed through a multi-
employer group, that a overall majority exists in favor of
the union, and therefore, the 8(f) contract is considered
merged into the larger whole.
Repudiation, merger and conversion were, until
Deklewa, entrenched and unchallenged Board law. The
only controversy was when a merger or conversion
occurred. The concepts required an employer to “chart”
its workforce, job-by-job and look for a statistically signif-
icant portion of employees working on more than one
jobsite successively. The trial court in Mesa Verde was able
to perform this task quite easily. See Mesa Verde Construc-
tion Co. v. Northern California District Council of Laborers,
598 F. Supp. 1092, 1097-1099 (N.D. Cal. 1984). Not only
are the “rules” of then existing Board law on merger and
conversion set forth clearly in the first pages of the
Deklewa decision, but they were widely published and
understood by the labor law community. Job-site by job-
site employers could repudiate for future jobs only,
unless they merged their workforce into the multi-
employer group’s workforce. See, e.g., Baton Rouge Build-
ing Trades Council v. E.C. Schaffer, 657 F.2d 806 (Sth Cir.
1981); Thierman & Pattison, Lowest Responsible Bidder,
App. 32
(1985). These rules have been adopted by the Court,
under the mandate it itself laid out in Chevron U.S.A. v.
Natural Resources Defense Council, 467 U.S. 837 (1984), as
permissible constructions of the Act.
The Deklewa rule abandons the doctrines of repudia-
tion, merger and conversion. In their stead, the Board has
altered the mechanisms by which elections may be sought
under the Act, by concluding that the contract bar rule
does not apply, and therefore employers may call for
decertification elections at any time without showing
proof of employee dissatisfaction with the union. This is a
useless slight of hand, since the union is by definition a
minority representative and existing Board law before
Deklewa allowed an employer to file a petition for an
election anytime anyway. See Albuquerque Insulation Con-
tractor, 256 NLRB No. 15 (1981)4
In Deklewa, the Board abandoned the statutory con-
struction it had urged before the Supreme Court in Hig-
don, and held that, in all respects, 8(f) agreements are
fully enforceable by Section(s) 8(a)(5) and 8(b)(3), as are
traditional collective bargaining agreements under the
Act.“ The NLRB also implied in Deklewa, that unions
* The pre-Deklewa reason for an employer to file for an
clection was that then the NLRB would make the initial deter-
mination that the contract was a pre-hire agreement and no
conversion or merger had occurred. The Union could always
file an unfair labor practice charge if it believed the contract
was not a pre-hire agreement.
* This position is somewhat disingenuous as to unions
who decide to “disclaim” and then renounce the section 8(f)
(Continued on following page)
App. 33
could not picket to obtain an employer’s signature to a
pre-hire agreement, since pre-hire agreements had to be
voluntarily entered into, although in a more recent deci-
sion, the Board has retraced its steps on that point, limit-
ing issuance of complaint under section 8(b)(7), in
contradictory fashion, to situations where there are no
unit employees or the picketing for a pre-hire agreement
has exceeded 30 days. See NVE Constructors, Inc., supra.
The Board’s pronouncement in Deklewa, that section
8(f) contracts are no longer (or were never) repudiable,
and that henceforth pre-hire agreements will be enforced
during their term under section(s) 8(a)(5) and 8(b)(3)
without regard to whether the union actually achieves
status under section 9(a) as the majority representative
contradicts the plain language of the statute. Section 8(f)
provides that “it shall not be an unfair labor practice
under subsections (a) and (b)” for a construction industry
employer to enter into an agreement with a union whose
majority status has “not been established under the pro-
visions of section 9 of this Act prior to the making of such
agreement.... See also S. Rep. No. 187 at 55, 1 Leg. Hist.
451; H. Rep. 741 at 50, 1 Leg. Hist. 808 (emphasis added).
(Section 8(f) “[mJakes clear that it is not an unfair labor
practice for an employer . . . to enter into [pre-hire agree-
ments] . . . without the union’s majority status having
(Continued from previous page)
agreement. The NLRB still belicves the relationship between a
union and the employces to be such a critical element of the
collective bargaining relationship that the union that docs not
“represent” employees can repudiate. Morcover, 8(f) agree-
ments, even after Deklewa, are not binding on employers with-
out employees. See e. g, Stack Electric, 290 NLRB No. 73 (1988).
App. 34
been established. ). Nothing in section 8(f) intended
pre-hire agreements to be enforced in the same manner as
collective bargaining agreements under section 9(a).®
Just a few years ago, the NLRB believed that Con-
gress wanted pre-hire agreements to be purely voluntary
and “at will” for the duration of a jobsite or until the
union became the majority representative of employees.
The NLRB and the courts were keenly aware of the power
of construction unions to engage in top down organizing.
Congress having legitimized the industry practice of
union only projects through the construction industry
proviso to section 8(e), the NLRB developed the law of
pre-hire abrogration to prevent contracts of adhesion and
to avoid trying issues of fraudulent or coercive induce-
ment. See Woelke and Romero Framing, Inc. v. NLRB, 456
U.S. 645, 665 (1981). In its brief to the Court in Higdon, the
* A more plausible holding, consistent with the decisions
of the Court and the legislative history, would affirm Congress’
intent that all contracts in the construction industry are consid-
ered pre-hire and “at will”. Let the union that seeks the benefit
of a section 9a) relationship come forward to file for an
clection. The Board’s pre-Deklewa position is similar to the
common law concepts of capacity to contract. A minor, who
lacks the legal capacity to contract, can void any contract, but
can continue to receive goods and services as long as the minor
pays for goods and services already received. In the pre-hire
context, the union lacks the capacity to enter into a binding
contract, but the employer must honor the contract for the job
or project, and must continue trust fund contributions until
notice is given to prevent third party reliance. Deklewa has
created a fictitious capacity in a minority union to enter into
binding contracts not envisioned in the Act, permitting them
an unequal bargaining position in establishing a permanent
relationship with an employer.
1 ˙ 2
App. 35
General Counsel emphatically affirmed that the statute,
as written, compelled the Board’s result: section 8(f) did
not create 9(a) rights.
[T]he issue in [Higdon is] whether Section 8(f)
itself establishes that a union signatory to a pre-
hire agreement shall be deemed by operation of
law to be the recognized bargaining representa-
tive of all employees subsequently hired until
the agreement expires or the union is ousted by an
employer — initiated board election. As we demon-
strate below, neither the language of section 8(f)
nor its legislative history supports that conclusion,
or in any way suggests that Congress intended
so sweeping a qualification of the Act's major
— that employees shall be represented by
argaining agents of their own choosing. [Br. of
the Board in Higdon, pp. 18-19.]
Nothing in the language of Section 8(f), how-
ever, suggests that it was designed to confer
upon a union that is a party to a pre-hire agree-
ment the kind of representative status that would
support a Section 8(a)(5) bargaining order against
an employer who refused to bargain with it.
Indeed the language and structure of the Act sug-
gests precisely the opposite.
Significantly, Congress in 1959 did not, in
section 8(f) or elsewhere modify section 8(a)(5),
which makes it an unfair labor practice for an
employer “to refuse to bargain collectively with
the representatives of his employees, subject to
the provisions of section 9(a)” [emphasis in origi-
nal]. IId. at 22-23.
In short the language of section 8(f) and its
relationship to other provisions of the Act
reflect that section 8(f) was not intended to relive
unions that are parties to pre-hire agreements from
the obligation to achieve majority support before they
can require an employer to honor such an agreement
App. 36
by means of section 8(a)(5). ... IId. at 23-24]
(emphasis added).
For many years, union advocates have urged Con-
gress to alter the special character of 8(f) contracts to
make them instantly enforceable, upon execution. In Dek-
lewa, as affirmed in Mesa Verde, the Board did what the
Congress would not. Indeed, just this point was made to
the Court by the General Counsel in Higdon:
The legislative history of Section 8(f)) confirms
that Congress did not intend its authorization of
prehire agreements in the construction industry
to confer automatic representative status or to
obviate the union’s obligation to acquire major-
ity support. Congress rejected a proposal that
would have permitted the Board to certify a
union signing a prehire agreement as the
employees’ representative without an election
or other proof of majority support merely upon
a showing of a history of bargaining between
the union and the employer. [/d.] [See Section
702 of H.R. 8400, 86th Cong, Ist Sess., 1 Leg.
Hist. 678-79 (1959); 105 Cong. Rec. 6431, 15,
541-42, 17, 899, 18, 135 (1959).
The effort continues in Congress to this day. See e.g., H.R.
281, 100th Cong, Ist Sess. That, it is submitted, is where
it belongs.
Only An En Banc Panel Of The Court Should Have The
Ability To Alter Established Circuit Precedent In Order
To Ensure The Stability Of Our Laws And Reduce
Unjustified Appeals, And The NLRB Is Not Entitled To
Any Special Exemption.
The Ninth Circuit has long held that a decision of a
three judge panel may only be reversed en banc. “(U]nder
the long standing practice of this court, a panel may not
overrule a prior decision.” Charleston v. United States, 444
App. 37
F.2d 504 at n. 3 (9th Cir. 1961) (citing 9th Cir. Rule 23, 28
U.S.C.). A majority of other circuits have followed the
same practice. See En Banc Proceedings, 37 ALR 274, §5.
(Second, Third, Fourth, Fifth, and District of Columbia
Circuits.)
The en banc panel has now unwisely departed from
this principle, known in the Circuit as the Royal Develop-
ment rule. (Royal Development Co. v. NLRB, 703 F.2d 363,
369 (9th Cir. 1983)), citing NLRB v. J. Weingarten, Inc., 485
F.2d 1135 (Sth Cir. 1973), rev’d, 420 U.S. 251, 95 S.Ct. 959,
43 L.Ed.2d 171 (1975). This departure is particularly
unsound with regard to Circuit decisions adopting or
rejecting Board law in the typical case because the Circuit
court functions as a court of first resort for the purposes
of judicial review. In actions arising, as does this one,
under section 301, the trial court exercises its original
jurisdiction in interpretation of the Act in the enforce-
ment of collective bargaining agreements, subject to the
consent of the Circuit. As the Ninth Circuit observed in
Royal, this jurisdictional mandate is consistent with
sound
[plolicy reasons for refusing to adopt a Board
decision that conflicts with our earlier precedent
absent an en banc convening of the court. In
effect, the Board would be free to “reverse”
circuit decisions whenever its membership
changed, thus relegating the courts of appeal to
a minor supervisory role over the Board. This,
we believe, would be inconsistent with our leg-
islative process.
Id., 703 F.2d at 368.
The fundamental error in Mesa Verde's adoption of
Deklewa is that it is premised on a false belief that the
App. 38
Board may alter the rights created by the Act in discharg-
ing its duty to implement and interpret. The historical
charge of appellate courts, identified so clearly by Judge
Kozinski, is to isolate and correct such errors. Facilitating
their commission by permitting a variation of the en banc
rules invites a compromise of the essential guarantee of
justice which the Court exists to preserve.
+
CONCLUSION
For the above stated reasons this cross-petition for a
writ of certiorari should be granted.
Respectfully submitted,
Mark R. THteRMan*
Joun W. Pracer, Jr.
Rosert Friep
THiERMAN, Coox, Brown & PrRacer
601 California Street, 17th Floor
San Francisco, CA 94108-2822
(415) 391-9200
Counsel for Cross-Petitioner
Counsel of Record
May, 1990
App. 39
APPENDIX A
SUBCHAPTER IV- LIABILITIES OF AND
RESTRICTIONS ON LABOR AND MANAGEMENT
§ 158. UNFAIR LABOR PRACTICES
(a) It shall be an unfair labor practice for
an employer -
(5) to refuse to bargain collectively
with the representatives of his — sub-
ject to the provisions of section 9a).
(b) It shall be an unfair labor practice for a
labor organization or its agents
(3) to refuse to bargain collectively
with an employer, provided it is the representa-
tive of his employees subject to the provisions of
section 9(a);
(7) to picket or cause to be picketed,
or threaten to picket or cause to be picketed, any
employer where an object thereof is forcing or
requiring an employer to recognize or bargain
with a labor organization as the representative
of his employees, or forcing or requiring the
71 — of an employer to or select
such labor organization as their collective bar-
gaining representative, unless such labor organi-
zation is currently certified as the representative
of such employees:
(C) where such picketing has been
conducted without a petition under section 9c)
being filed within a reasonable period of time
not to exceed thirty days from the commence-
ment of such picketing: Provided, That when
such a petition has been filed the Board shall
forthwith, without regard to the provisions of
section 9(c)(1) or the absence of a showing of a
substantial interest on the part of the labor
organization, direct an election in such unit as
App. 40
the Board finds to be appropriate and shall cer-
tify the results thereof: Provided further, That
nothing in this subparagraph (C) shall be con-
strued to prohibit any picketing or other public-
ity for the purpose of truthfully advising the
public (including consumers) that an employer
does not employ members of, or have a contract
with, a labor organization, unless an effect of
such picketing is to induce any individual
employed by any other person in the course of
his employment, not to pick up, deliver or trans-
port any goods or not to perform any services,
Nothing in this paragraph (7) shall be construed to per-
mit any act which would otherwise be an unfair labor
practice under this section 8(b).
§ 159 REPRESENTATIVES AND ELECTION
Sec. 9. (a) Representatives designated or
selected for the purposes of collective bargain-
ing by the majority of the employees in a unit
appropriate for such purposes, shall be the
exclusive representatives of all the employees in
such unit for the purposes of collective bargain-
ing in respect to rates of pay, wages, hours of
employment, or other conditions of employ-
ment: Provided, That any individual employee or
a group of employees shall have the right at any
time to present grievances to their employer and
to have such grievances adjusted, without the
intervention of the bargaining representative, as
long as the adjustment is not inconsistent with
the terms of a collective-bargaining contract or
agreement then in effect: Provided further, That
the bargaining representative has been given
opportunity to be present at such adjustment.
c
App. 41
§ 160 PREVENTION OF UNFAIR LABOR PRACTICES
Sec. 10. (b) Whenever it is charged that
any person has engaged in or is engaging in any
such unfair labor practice, the Board, or any
agent or agency designated by the Board for
such purposes, shall have power to issue and
cause to be served upon such person a com-
plaint stating the charges in that respect, and
containing a notice of — before the Board
or a member thereof, or before a designated
agent or agency, at a place therein fixed, not less
than five days after the serving of said com-
laint: Provided, That no complaint shall issue
sed upon any unfair labor practice occurring
more than six months prior to the pe of the
charge with the Board and the service of a cop
thereof upon the person against whom suc
charge is made, unless the = aggrieved
thereby was prevented from filing such charge
by reason of service in the armed forces, in
which event the six-month period shall be com-
puted from the day of his discharge. Any such
complaint may be amended by the member,
agent, or agency conducting the hearing or the
Board in its discretion at + time prior to the
issuance of an order based thereon. The person
so complained of shall have the right to file an
answer to the original or amended complaint
and to appear in person or otherwise and give
testimony at the place and time fixed in the
complaint. In the discretion of the member,
agent, or agency conducting the hearing or the
Board, any other person may be allowed to
intervene in the said proceeding and to present
testimony. Any such proceeding shall, so far as
practicable, be conducted in accordance with the
rules of evidence applicable in the district courts
of the United States under the rules of civil
rocedure for the district courts of the United
tates, adopted by the Supreme Court of the
App. 42
United States pursuant to the Act of June 19,
1934 (U.S.C., title 28, secs. 723-b, 723-C).