Opposition Brief — Litton Industrial Automation Systems, Inc. v. General Electric Co.
Supreme Court brief1991
Ask Donna
What actually matters in this document.
Text
No. 90-1221
IN THE -
Supreme Court of the United States
OCTOBER TERM, 1990
LITTON INDUSTRIAL AUTOMATION SYSTEMS, INC.
and LITTON INDUSTRIES, INC.,
Petitioners,
V.
GENERAL ELECTRIC COMPANY,
Respondent.
On Petition for a Writ of Certiorari to the
United States Court of Appeals
for the Eighth Circuit
RESPONDENT’S BRIEF IN OPPOSITION
CARTER G. PHILLIPS JAMES L. MOELLER *
SIDLEY & AUSTIN WILLIAM F. ForpD
1722 Eye Street, N.W. LINDA GILL TAYLOR
Washington, D.C. 20006 GAGE & TUCKER
(202) 429-4000 2345 Grand Avenue
RICHARD M. RITTENBERG Post Office Box 4] 8200
General Electric Company Kansas City, MO 64141
1635 Broadway (816) 474-6460
Ft. Wayne, IN 46801
Counsel for Respondent
March 4, 1991 * Counsel of Record
eatin
WILSON - Eres PRINTING Co., INC. - 789-0096 - WASHINGTON, D.C. 20001
BEST AVAILABLE COPY
QUESTIONS PRESENTED
1. Whether the courts below erred in finding that
GE’s excavation and disposal of hazardous substances
at a particular site constituted a “removal” action within
the meaning of the now-superseded 1985 National Con-
tingency Plan.
2. Whether Section 107 of the Comprehensive Environ-
mental Response, Compensation, and Liability Act of
1980, as amended (“CERCLA”), which expressly author-
izes recovery of the costs of “enforcement activities” as
an element of the total “response costs” incurred in re-
moving hazardous substances, permits GE to recover at-
torneys fees reasonably incurred in obtaining reimburse-
ment.
(i)
ii
RULE 29.1 STATEMENT
The respondent in these proceedings is the General
Electric Company, which has no parent corporation and
no subsidiaries that are not wholly owned.
TABLE OF CONTENTS
8h ye 8h Ee yg 2) |
I I WP acon occcinnennceousensstenevtncnscescessonns
pe ey |. Se
STATEMENT
DISCUSSION
CONCLUSION
(iii)
12
iv
TABLE OF AUTHORITIES
CASES Page
Exxon Corp. V. Hunt, 475 U.S. 355 (1986) ........... 6
Cadillac Fairview/California, Inc. v. Dow Chem.
Co., 840 F.2d 691 (9th Cir. 1988) .....000000 11
Pease & Curren Ref., Inc. V. Spectrolab, Inc., 744
F. Supp. 945 (C.D. Cal. 1990)
Shapiro v. Alexanderson, 741 F. Supp. 472, reh’g
denied, 743 F. Supp. 268 (S.D.N.Y. 1990) -........ 10
Wickland Oil Terminals v. Asarco, Inc., 792 F.2d
ne a siiaestcanienbiasids achioane 8,11
STATUTES AND REGULATIONS
Superfund Amendments and Reauthorization Act
of 1986, Pub. L. No. 99-499, 100 Stat. 1613
(1986) (“SARA”) (codified as amended at 42
RS SEER passim
42 U.S.C. § 9601(25) (1982)
48 U.S.C. §$ 9601 (35) (1968) ..................................... 9,10
a ciainsatnineanneninabinns
42 U.S.C. § 9067 (a) (4) (B)
Ee a
re I ia csesiccttnncenecee
a cients...
40 C.F.R. § 300.64 (1988)
on esuscmnntamensmane
40 C.F.R. § 300.65 (b) (1) (1988)
40 C.F.R. § 300.65 (c) (6) (1988)
40 C.F.R. § 300.65 (c) (7) (1988)
Pe of E ) __, em NE
40 C.F.R. §§ 300.65-.67 (1985) .......:.......0000000000.. 0.2...
650 Fed. Reg. 47,980 (1985) ........................000...........
LEGISLATIVE MATERIALS
H.R. Conf. Rep. 962, 99th Cong., 2d Sess. 4, re-
printed in 1986 U.S. Code Cong. & Admin. News
BRR O RSIS “TEN re re 10
DHANINANAHWMWMHAAWHW
I er erry Hse
IN THE
Siypreme Court of the United States
OCTOBER TERM, 1990
No. 90-1221
LITTON INDUSTRIAL AUTOMATION SYSTEMS, INC.
and LITTON INDUSTRIES, INC.,
Petitioners,
V.
GENERAL ELECTRIC COMPANY,
Respondent.
On Petition for a Writ of Certiorari to the
United States Court of Appeals
for the Eighth Circuit
RESPONDENT’S BRIEF IN OPPOSITION
General Electric Company (“GE”) hereby opposes the
petition for a writ of certiorari filed in this case.
STATEMENT
1. This case involves GE’s cleanup of hazardous wastes
that were dumped in a field in Springfield, Missouri, dur-
ing 1959-1962 by a company that was purchased and
operated by petitioners. Specifically, petitioners are solely
responsible for concentrations of “copper, chrome, zinc,
lead and cyanide” that were placed at the site as wastes
2
from a typewriter factory they operated. Pet. App. A20.
Although petitioners repeatedly (Pet. 3, 14) dismiss as
trivial the environmental risks for which they are respon-
sible, it is undisputec that the wastes were located a few
hundred feet from residential neighborhoods to the north,
apartment complexes to the west and a major street to
the south. Pet. App. A138. Moreover, both the Missouri
Department of Health and the courts below found that
the site posed a substantial health risk to children and
others in those areas. Pet. App. A3, A19, A21, A30.
In March 1979, GE purchased the site from petition-
ers. Petitioners did not disclose their dumping to GE
and GE did not become aware of it until the summer
of 1980. Initially, both GE and the state’s environ-
mental agency, the Missouri Department of Natural Re-
sources (“MDNR”), concluded that there was no signifi-
cant health risk that required cleanup work at the site.
Pet. App. A2. However, in 1985, after GE arranged
to sell the site to a third party, the MDNR conducted a
new investigation and concluded that a significant health
threat did exist. As the Environmental Protection
Agency explained, “what was considered to be trace
amounts in 1981 are now acknowledged as representing
a threat to human health and the environment.” Pet.
App. A19-A20.
In response, GE employed an environmental engineer-
ing firm to study the site and to make recommendations
concerning the proper response. GE then “engaged in a
proper assessment of the potential hazard and evaluation
of the aiternative modes of remediation,” and “selected
the remedy that was the most cost effective in the long
run.” Pet. App. A40-A41.
During this period both GE and the purchaser of the
property notified petitioners of the problem at the site
and strongly encouraged petitioners to participate in
both the planning and implementation of the site cleanup.
In response, petitioners refused to “participate[] in any
3
of the investigation, evaluation, or cleanup of the site.”
Pet. App. A3-A4. Accordingly, GE entered into a consent
decree with the site purchaser and the MDNR to develop
and implement a cleanup plan that would be consistent
with the National Contingency Plan (“NCP”) of 1985,
which implemented CERCLA until recently. 40 C.F.R.
§ 300 et seg. (1986). Under the decree, the planning
and performance of GE’s cleanup was fully monitored
and approved by the MDNR.’
GE then proceeded to clean up the site pursuant to the
decree, beginning in October 1986. Almost immediately
after excavation began, GE found several drums buried
just below the surface, one of which contained ‘‘extremely
hazardous substances.” Pet. App. A3. Cleanup was dis-
continued in December 1986, to permit additional site
analysis after the drums were discovered, and excavation
was not resumed until May 1987. The removal process
was completed in December 1987. Pet. App. A3. When
GE’s cleanup was complete, MDNR determined that GE
had complied fuily with the decree and the work plan
MDNR had approved, and the MDNR declared the site
safe for future development and use. Pet. App. A23.
2. GE filed the instant lawsuit pursuant to Section 107
of CERCLA, 42 U.S.C. § 9607, seeking to recover from
petitioners the cost of cleaning up the hazardous wastes
for which petitioners were solely responsible. Petitioners’
primary argument was that GE’s action had constituted a
“remedial action” and not a “removal” action, and that
GE had not complied strictly with all of the NCP require-
ments for a remedial action. In particular, petitioners
'The MDNR held three public meetings of the Missouri Haz-
ardous Waste Management Commission concerning the site during
the course of its assessment. The third meeting was held after
the excavation option had been tentatively selected but before it
had been formally approved and before the consent decree was
entered. In fact, public input caused a change in the method
selected for disposing of the removed wastes. Pet. App. A24,
4
argued that greater public participation should have been
required. Accordingly, they argued that GE was not en-
titled to recover its costs under Section 107.
After a four-day bench trial, the district court heid
that all of the costs were properly recoverable under Sec-
tion 107. The court found that the cleanup did constitute
a “removal” within the meaning of the statute, but also
held that whether GE’s action was labeled as removal or
remedial was irrelevant because, under either approach,
GE’s actions were consistent with the 1985 NCP. The
court also found that every cost incurred by GE was
necessary to comply with MDNR requirements. Pet. App.
A22. Finally, the district court awarded GE its attorneys
fees in prosecuting the action as recoverable “enforce-
ment” costs permitted under Section 107. Pet. App. A16-
A43.
The court of appeals affirmed unanimously. Pet. App.
Al-Al4. The court of appeals based its decision on the
district court’s findings that the cleanup was a removal
and that GE had complied completely with the NCP re-
quirements for removal of wastes. Pet. App. A7, A9.
In analyzing the issue this way, the court of appeals fol-
lowed the course proposed by the United States as amicus
curiae. The government expressed some concern about
what type of public participation would be sufficient when
a cleanup is pursued as a remedial action, but argued
that the court of appeals did not have to address the issue
because GE’s action properly was found to have been a
removal action in conformity with the 1985 NCP. App.,
infra at 17a. Accordingly, the United States urged the
court of appeals to affirm.
2 Petitioners have seriously distorted the thrust of the United
States’ brief before the court of appeals. But, instead of engaying
in a lengthy rebuttal, which would merely beg the question of
which party was accurately describing the brief, GE has reproduced
the United States’ brief in full as an appendix to this Opposition.
Suffice it to say, however, that “the importance for this Court of
ET ES EEE
5
The court of appeals also held that GE was entitled to
attorneys fees. It reasoned that “it would strain the
statutory language to the breaking point to read [attor-
neys fees] out of the ‘necessary costs’ that [CERCLA]
allows private parties to recover.” Pet. App. A13.
DISCUSSION
1. Petitioners argue initially that the courts below
erred in finding that GE’s excavation constituted a “re-
moval” within the meaning of the statute. But this argu-
ment is inherently factbound. Moreover, the holding on
this issue is correct, conflicts with no decision of any
other court and accordingly does not warrant further
review. Even if the issue otherwise seemed worthy of
review, this would be the wrong case in which to decide it.
First, the specific question posed here has extremely lim-
ited prospective significance because it depends upon GF’s
compliance with the 1985 NCP, which has been superseded
by a 1990 plan. Additionally, petitioners are hardly the
proper party to press the public interest claims they assert
in this Court.
a. It is difficult to imagine an issue less worthy of
review by this Court than the narrow question of whether
GE’s excavation of a site in Springfield, Missouri consti-
tuted a “removal” within the meaning of CERCLA.
Nevertheless, in trying to convert this into an issue of
broader significance, petitioners argue that there are two
absolute pre-conditions to a removal which were ignored
by the court of appeals. First, they assert that removal is
only appropriate in response to an “imminent threat” of
harm. Second, they argue that there is an absolute one-
the decision below” is not enhanced simply because the government
appeared solely for the purpose of persuading that court to do
precisely what it did. To the contrary, the court’s willingness to
adopt the government’s analysis merely “highlights” (Pet. 9) the
eorrectness of that holding.
6
year time limit for accomplishing a removal. Neither
assertion has merit.
First, contrary to petitioners’ claim, neither CERCLA
nor the 1985 NCP contains any requirement of “immi-
nent” risk. The NCP expressly authorizes a removal ac-
tion whenever any health threat exists. 40 C.F.R. § 300.65
(b)(1) (1988) (Pet. App. A66) (removal action authorized
where “a threat to public health or welfare” exists).
Indeed, at the time EPA adopted the 1985 NCP, the EPA
specifically rejected an effort to require an “imminent
threat” as a condition of initiating a removal action. See
50 Fed. Reg. 47,930 (1985) (explaining why “imminent
danger” comments were not adopted). In the 1985 NCP,
the EPA abandoned the standards and procedures for
“immediate” and “planned” removal actions that existed
under the 1982 NCP, 40 C.F.R. §§ 300.65-.67 (1985),
in favor of a single unified and more flexible “removal”
action triggered by the “threat to public health” standard
in the 1985 NCP.
Under the proper “threat to public health” standard,
it is clear that the decision approving this removal was
correct. The court of appeals, the district court, the EPA,
and the Missouri administrative agencies all have care-
fully reviewed the evidence and have unanimously con-
cluded that the wastes petitioners dumped on this site
constituted a hazard sufficient to warrant GE’s removal
action.
Second, petitioners cite nothing for the unbending rule
that an excavation that is forced to continue beyond a set
period of time is necessarily converted into a remedial
action. The NCP explicitly exempts private party removal
actions, such as GE’s here, from such limitations. 40
C.F.R. § 300.65(i) (1988) (Pet. App. A68-A69). Nor is
there any case or regulatory support for such a rule.
Instead, the cases cited by petitioners (Pet. 13-14) merely
indicate that, in general, removals are of a shorter dura-
tion than remedial actions. See, ¢.g., Exxon Corp. v. Hunt,
7
475 U.S. 355 (1986) (general description of regulatory
scheme in case involving unrelated issue of preemption).
Nothing in the decision below conflicts with those state-
ments.
This case well illustrates, however, why an unbending
rule, such as the one petitioners propose, makes no sense.
The removal here would clearly have been completed in a
much shorter period of time if GE had not discovered
drums and additional hazardous wastes once the excava-
tion began. For that reason, and with MDNR approval,
GE halted the removal process to assess more fully the
environmental risks. After that assessment, GE proceeded
to complete the removal. The entire process lasted longer
than a year, but the actual excavation and removal por-
tions of the cleanup took a considerably shorter time and
one that the courts below correctly found was fully con-
sistent with a removal action. See page 3, supra.
Finally, petitioners’ effort categorically to exclude GE’s
cleanup from the definition of removal is completely
undermined by the regulation defining that term. The
1985 NCP removal provision expressly declares removal
of contaminated drums and highly contaminated soils,
which are at issue here, to be “as a general rule, appro-
priate” for a removal action. 40 C.F.R. § 300.65(c) (6)
& (7) (1988) (Pet. App. A67) (emphasis supplied). In
sum, there is nothing in the decision on removal in this
case that transcends the Springfield, Missouri site.
b. Even if the removal issue were arguably incorrectly
decided and somehow presented a legal issue, it is clear
that the holding concerning compliance with the 1985 NCP
has limited prospective significance. In response to the
1986 SARA amendments,’ the EPA has promulgated a
new 1990 NCP that substantially alters the provisions of
% Superfund Amendments and Reauthorization Act of 1986, Pub.
L. No. 99-499, 100 Stat. 1613 (1986) (“SARA”) (codified as
amended at 42 U.S.C. § 9601 et seq.).
8
the 1985 NCP in the very areas on which petitioners now
focus—removal and remedial actions.‘ Because the NCP
in effect at the time response costs are incurred will gov-
ern the recoverability of those costs, Wickland Oil Ter-
minals v. Asarco, Inc., 792 F.2d 887, 891 (9th Cir. 1986),
any interpretation by this Court of the now superseded
NCP would be of limited applicability for future cases.
ce. Finally, petitioners’ arguments extolling the virtues
of public participation in the cleanup of hazardous wastes
are disingenuous. Petitioners basically argue that GE
made the site too clean, and that greater public involve-
ment was important to increase the likelihood that a less
effective method of cleanup might have been adopted. It
is nonsense for petitioners to suggest that the public might
have urged a /ess protective or effective remedy than that
approved by the state agencies responsible for protecting
the public health and welfare.®
Nor was greater opportunity for public participation
necessary to ensure that petitioners themselves were in-
formed about GE’s cleanup efforts. As the district court
4 As a result of the EPA’s revisions to the NCP, the 1990 NCP
imposes new substantive requirements for both removals and re-
medial actions, in the types of assessments preceding each, in the
standards applied to each, and in the public participation associated
with each. Compare, e.g., 40 C.F.R. §§ 300.64 and 300.65 (1988)
(Pet. App. A65) with 40 C.F.R. §§ 300.410 and 300.415 (1990) (Pet.
App. A88-A96).
5 Petitioners’ repeated assertions that GE somehow acted im-
properly in its sale of the site to a third party and that GE engaged
in gold plating in its removal actions are completely contradicted by
the findings of the lower courts. With respect to the sale, the dis-
trict court pointedly found that petitioners have “not been injured
nor prejudiced by any actions of GE regarding the subsequent sale
of the property.” Pet. App. A27. Moreover, all of the costs were
found to have been necessary to effect compliance with the 1985
NCP as enforced by the state agency. Pet. App. All, A40-A41.
Petitioners simply have no factually supported basis for complaining
about the ultimate costs of a removal in which they refused to
participate.
9
pointedly observed, petitioners already “had every oppor-
tunity to participate in the clean-up but failed to do so.”
Pet. App. A41. Under these circumstances, petitioners’
claim that interests in public participation were somehow
impaired by the removal in this case is completely hollow.
2. Petitioners argue that the courts below erred in
holding that attorneys fees are recoverable under Section
107 by a party such as GE—which has incurred all of the
costs of removal of hazardous wastes and which seeks
nothing more than reimbursement—from the party who
is responsible for the wastes and who has refused to par-
ticipate in any way in the cleanup. The holding of the
Eighth Circuit, however, is based squarely on the text
of the statute and unquestionably promotes the essential
purposes of CERCLA. Moreover, petitioners acknowledge
that the decision of the court of appeals is the first appel-
late decision on this question. Thus, even if the holding
were less clearly correct, the issue still would not warrant
review now.
There is a clear textual authorization for the fee re-
covery in the statute. Under Section 107 of CERCLA,
liable parties such as petitioners are liable for any nec-
essary “costs of response.” 42 U.S.C. § 9607(a) (4) (B).
Under Section 101 of CERCLA, the term “response”
means “remove, removal, remedy, and remedial action,
all such terms (including the terms ‘removal’ and ‘reme-
dial action’) include enforcement activities related
thereto.” 42 U.S.C. § 9601(25) (1988) (emphasis added).
As both courts below concluded, “enforcement activities”
was a reference to activities to enforce CERCLA’s cost
recovery provisions, including attorneys fees and ex-
penses.® As another court has held,
® The “enforcement activities” language was added to CERCLA
by the SARA amendments. Prior to 1986, the term “response” was
defined as meaning “remove, removal, remedy, and remedia! action.”
42 U.S.C. 9601(25) (1982). The 1986 SARA amendments added on
the end of that definition that “[a]ll such terms (including the
10
Congress intended for “enforcement activities” to in-
clude attorneys fees expended to induce a responsible
party to comply with the remedial actions mandated
by CERCLA. This court cannot ascertain any other
logical interpretation which would give effect to this
phrase. If this court were to rule otherwise, the
phrase ‘enforcement activities’ would be superflu-
ous.
Pease & Curren Ref., Inc. v. Spectrolab, Inc., 744 IF.
Supp. 945, 949-52 (C.D. Cal. 1990). Accord Shapiro v.
Alexanderson, 741 F. Supp. 472, 480, reh’g denied, 743
F. Supp. 268 (S.D.N.Y. 1990).
Even petitioners seem to concede that Congress in-
serted the term “enforcement activities” to make certain
that the recovery of attorneys fees, which had been upheld
in a few government cost recovery cases, would continue.
Pet. 17. However, citing irrelevant legislative history,’
petitioners incorrectly argue that Congress only intended
for the government to recover attorneys fees, and not for
private parties to do so.
This argument is refuted by the statute itself. The
SARA amendments placed the “enforcement” language
in a general definitional section which applies to all par-
ties—both governmental and private—acting under Sec-
tion 107 of CERCLA. Had Congress intended to limit the
recovery of attorneys fees io the government, Congress
terms ‘removal’ and ‘remedial action’) include enforcement activities
related thereto.” 42 U.S.C. § 9601(25) (1988) (emphasis added).
‘
7 Petitioners argue that Congress intended the “enforcement”
language to cover attorneys fees, but only the EPA’s attorneys fees.
Petitioners’ sole support for this argument is a House Report, H.R.
Rep. No. 253, which stated that the SARA amendment related to
EPA’s cost recovery. Pet. 17. However, this Report was attached
to a bill that did not become law, H.R. 2817, see 1986 U.S. Code
Cong. & Admin. News 2835, and the conference report to the bill
which did become law has no such EPA-restricted language. H.R.
Conf. Rep. 962, 99th Cong., 2d Sess. 4, reprinted in 1986 U.S. Code
Cong. & Admin. News 3276.
11 ‘
would not have placed the amendment in a provision of
general applicability. Congress could have placed the
amendment in a CERCLA section applicable only to the
government," or it could have expressly qualified the
right. There is, however, nothing inherent in the phrase
“enforcement activities’ to suggest it should be limited
to governmental, as opposed to private, enforcement ac-
tivities: courts have repeatedly characterized private
party CERCLA cost-recovery actions as “private enforce-
ment.” Wickland Oil Terminals, 792 F.2d at 892 (“pri-
vate enforcement actions under section 107(a)”’) ; Cadillac
Fairview/California, Inc. v. Dow Chem. Co., 840 F.2d
691, 694 (9th Cir. 1988) (“private enforcement
actions”).
GE invoked Section 107 in precisely the same way
the United States does when it seeks to collect CERCLA
response costs. Given that private parties have the right
to bring cost-recovery actions under CERCLA, that both
the government and private parties look to the same
provision for recovery of response costs, and that the defi-
nition of “response” is the same for all parties pursuing
an action under Section 107, petitio: srs cannot reason-
ably contend that there is no authority for recovery of
attorneys fees. Accordingly, because the attorneys fee
award in this case is fully supported by the statutory
language and by the articulated Congressional purposes
of encouraging voluntary cleanups and settlements, the
petition should be denied.
Finally, even if the statutory authorization for fee re-
covery was not as clear as it is, there are relatively few
8 Section 104, cited by petitioners, authorizes the Government
to perform environmental responses, to incur expenses in connection
therewith, and to pursue cost recovery actions for reimbursement.
When the Government files such actions, however, it does so under
Section 107, the section which defines cost recovery actions and cre-
ates the liability for “any other necessary costs of response.” The
relief obtainable flows from Section 107, as defined in Section
101(25), and is the same relief available to private parties when
they act under this provision.
12
cases interpreting this statute and no case other than
this one has reached a court of appeals. Until such time
as an appellate court rejects the persuasive reasoning of
the Eighth Circuit, it is clearly premature for this Court
to consider the issue.
* * * *
At the end of the day, this is a case that should never
have required litigation. Petitioners were responsible for
all of the hazardous wastes; they had complete knowledge
of both their responsibility and GE’s proposed course of
action. GE performed the response action effectively and
included no unnecessary costs. Petitioners simply ignored
the problem. What they should have done was to reach
some agreement with GE (either before or after removal)
with respect to these costs. Instead, petitioners have
fought, now all the way to this Court, to avoid their
responsibility. The fight should end now; the petition
should be denied.
CONCLUSION
The petition for a writ of certiorari should be denied.
Respectfully submitted,
CARTER G. PHILLIPS JAMES L. MOELLEF *
SIDLEY & AUSTIN WILLIAM F. ForpD
1722 Eye Street, N.W. LINDA GILL TAYLOR
Washington, D.C. 20006 GAGE & TUCKER
(202) 429-4000 2345 Grand Avenue
RICHARD M. RITTENBERG Post Office Box 418200
General Electric Company Kansas City, MO 64141
1635 Broadway (816) 474-6460
Ft. Wayne, IN 46801
Counsel for Respondent
March 4, 1991 * Counsel of Record
APPENDIX
|
|
|
|
la
APPENDIX
UNITED STATES COURT OF APPEALS
FOR THE EIGHTH CIRCUIT
No. 89-2845 WM
GENERAL ELECTRIC COMPANY,
Plaintiff-Appellee,
v.
LITTON BUSINESS SYSTEMS, INC.,
Defendant-A ppellant
On Appeal From the United States District Court
for the Western District of Missouri
BRIEF FOR THE UNITED STATES, AMICUS CURIAE
RICHARD B. STEWART
Assistant Attorney General
DAVID C. SHILTON
MAUREEN M. KATz
Of Counsel: JACQUES B. GELIN
ANDREW GORDON Attorneys,
LAWRENCE E. STARFIELD Department of Justice
Office of General Counsel Land and Natural
HELEN KENNEDY Resources Division
Office of Enforcement and Washington, D.C. 20530
Compliance Monitoring (202) 633-2762
Environmental Protection Agency
Washington, D.C. 20460
2a
SUMMARY AND REQUEST FOR ORAL ARGUMENT
In this case, General Electric Company (GE) filed a
private cost recovery action against Litton Business Sys-
tems under Section 107(a) of the Comprehensive Environ-
mental Response, Compensation, and Liability Act of 1980
(CERCLA), 42 U.S.C. 9607(a). GE sovght recovery of
nearly $1 million in costs incurred in removing hazardous
substances from a site GE bought from Litton in 1970.
After a trial, the district court (Clark, J.) found Litton
liable for all response costs incurred by GE. 715 F. Supp.
949. The court rejected Litton’s contention that GE had
not complied with the public comment requirement of the
National Contingency Plan, and determined that GE’s
“compliance with legally applicable or relevant appropri-
ate state requirements provides a substantially equivalent
opportunity for public involvement” (id. at 961), stating
that “if notice to the public is a requirement, the input
of the Missouri Department of Natural Resources serves
as a substitute for pubiic comment.” Jd, Based on GE’s
documented cooperation with the State, the court con-
cluded that GE’s actions were “ccasistent with the NCP.”
Id. at 961; see id. at 963. The court also rejected Litton’s
“unclean hands” defense, ruling that the equitable princi-
ple did not apply in this case because GE’s alleged mis-
conduct neither injured nor prejudiced Litton (id. at
955) ; it questioned whether that principle could ever ap-
ply in an action under CERCLA. Ibid.
Litton now appeals from that judgment. Since the
United States is appearing solely as amicus curiae, we
express no view with regard to oral argument.
3a
INDEX
Page
Summary and Request for Oral Argument ....................
ID IID Girnnsscencenseisdiinsniinishnanentntrentapenheetanioteasinnienisuti [6a]
Statement of Jurisdiction .................... geet telat aga eae [6a]
ea ananiniannaenenanie [6a]
Statutory and Regulatory Provisions Involved ............ [7a]
Interest of the United States and Summary of
I iii ener inalaieitadacldt denies iacianaeiligan tinea [Ta]
ls nddeiinaeenebaeells [10a]
1. Statutory and regulatory framework .................. {10a]
2. The facts of this controversy ................................ [14a]
Standard of Appellate Review .......................-.....-..-0:0--++ [16a]
ARGUMENT:
I. The 1985 National Contingency Plan does not
Specifically Require that Private Parties Pro-
vide for Oppurtunities for Public Comment in
Formulation and in Conducting a “Removal”
pI Reset CGO oe Ise Oe ae ee [17a]
II. Compliance with State, Regulatory Provisions
Pertaining to the Cleanup of a Hazardous Waste
Site Satisfies the “Public Participation” Require-
ments of the 1985 NCP for a “Remedial” Action
Only if the State Regulatory Opportunity for
Public Involvement in the Choice of the
aa en cudecgmaaneseedehabied [19a]
III. Wnclean Hands is not Available as a Defense
in CERCLA Private Party Actions _..................... [21a]
RRR LAr a ae cee Ree Soe Ee POR PE Pe Ere [22a]
447
4a
CITATIONS
Cases: Page
Amland Properties Corp. v. Aluminum Co. of
America, 711 F. Supp. 784 ...................... [13a, 14a, 20a]
Artesian Water Co. v. Gov. of New Castle County,
659 F. Supp. 1269, aff’d on other grounds, 851
an IG As IRICEN ORD OOF ae, SA Nx [12a]
Bulk Distrib. Centers, Inc. v. Monsanto Co., 589
rs I 5 ceccesthinsd.ntocanaesanssuiumcncnidnibieamcianensices [12a]
Dedham Water Co. v. Cumberland Farms Dairy,
I I a sic eacemeecaicen [9a, 10a, 12a]
Exxon v. Hunt, 475 U.S. 356 .......................- [8a, 10a, 12a]
Lone Pine Steering Committee v. EPA, F.2d 882,
UE I CI Fs I ikke cepcieeccerneprerccensicns [10a]
New York v. Shore Realty Corp., 648 F. Supp. 255.. [12a]
Smith Land & Improvement Corp. v. Celotex Corp.,
851 F.2d 86, cert. denied, 109 S. Ct. 837 _....... {[lla, 22a]
State of New York v. Shore Realty Corp., 759 F.2d
United States v. Northeastern Pharmaceutical &
Chem. Co., Inc., 810 F.2d 726, cert. denied, 484
RE IT Reoaeenee secs rele ere SN ISON RO [12a]
U.S. v. Aceto Agricultural Chemicals Corp., 872
OE a OPE SE a es ee eae Noe! [10a, 1la, 22a]
Versatile Metals, Inc. v. Union Corp., 693 F. Supp.
cen ea ccasacomnaeeineoiraanehn [14a]
Walls v. Waste Resources Corp., 761 F.2d 311......... [12a]
Statutes, Rules and Regulations:
The Hazardous Substance Superfund,
I as adasiaieslivcsinnn one [lla]
Se I I ida rcecrcectinitnees si elpapanbesies peas [6a]
I cata psterssocaceusobenncecs haclsiaeticlagetddiaabancei lad [6a]
Sn a a caitiies [6a]
Comprehensive Environmental Response, Compen-
sation, and Liability Act of 1980 (CERCLA),
94 Stat. 2796, 42 U.S.C. 9601 et seq., as amended
by the Superfund Amendments and Reauthori-
zation Act of 1986 (SARA), 100 Stat. 1613:
Section 101 (23), 42 U.S.C. 9601 (23) ............ (7a, 13a]
Section 101 (24), 42 U.S.C. 9601 (24) ............. [7a, 13a]
5a
Statutes, Rules and Regulations—Continued: Page
Section 104, 42 U.S.C. 9604 000. [lla]
Section 104(c) (1), 42 U.S.C. 9604 (c) (1) ........ [13a]
Section 105, 42 U.S.C. 9605 ...000 ee. ... [10a]
Section 106, 42 U.S.C. 9606.00. [lla]
Section 107 (a) (1), 42 U.S.C. 9607 (a) (1)........ [lla]
Section 107 (a) (2), 42 U.S.C. 9607 (a) (2) ........ [lla]
Section 107 (a) (3)-(4), 42 U.S.C. 9607 (a) (3)-
Ree dk LSA ee .... [lla]
Section 107 (a) (4) (A), 42 U.S.C. 9607 (a) (4)
| ERAS. Rr airy op eee eee eae [9a, lla, 12a]
Section 107 (a) (4) (B), 42 U.S.C. 9607 (a) (4)
OM ERE. ER oe ee [ passim |
Section 107 (b), 42 U.S.C. 9607(b) 20... [22a]
Section 107 (f), 42 U.S.C. 9607 (f) 000... . [12a]
Section 111 (a) (1), 42 U.S.C. 9611 (a) (1)......... [lla]
Section 111 (a) (2), 42 U.S.C. 9611(a) (2)... [11a]
Section 113 (a), 42 U.S.C. 9613 (a)... .. [12a]
Section 113(f) (1), 42 U.S.C. 9613(f) (1) ........ [lla]
mecteee ae, G2 UBC. GORI .........-2----0000000-00-0------- [lla]
cesses ccncnenrecasenssrorscevenexe [7a, 12a}
Poe 2 {Feats OSE IAS ARIE ts [passim }
es MD na ooo ccocecenescsscosvesaconucs [13a]
Rae te PERE ERO es [i3a]
I nn [13a]
asad cca easecensnnanecksvatourectoncs he [7a}
ok fe Se eee ee [14a, 17a, 18a]
ee I i. cccencnersannasenssbvocssasious [18a]
I a seshuwnnapabaneoecsibenas [7a]
ne ND CI OD cis iccvccrnninvceanvnweesendunsere [13a]
40 C.F.R. 300.71 (a) (2) (ii) (D) ..........................[14a, 19a]
ee in ccceue me [12a]
Miscellaneous:
“Developments in the Law Toxic Waste Litiga-
tion,” 99 Harv. L. Rev. 1458 (1986)... [9a}
6a
No. 89-2845 WM
UNITED STATES COURT OF APPEALS
: FOR THE EIGHTH CIRCUIT
GENERAL ELECTRIC COMPANY,
Plaintiff-Appellee
V.
LITTON BUSINESS SYSTEMS, INC.,
Defenaant-A ppellant
On Appeal From the United States District Court
for the Western District of Missouri
BRIEF FOR THE UNITED STATES
AS AMICUS CURIAE
OPINION BELOW
The opinion of District Judge Russell G. Clark appears
at Joint Appendix 5 and is reported at 715 F. Supp. 949.
STATEMENT OF JURISDICTION
The judgment was entered on June 20, 1989, and a
timely notice of appeal was filed by Litton Business Sys-
tems, Inc. on November 13, 1989, pursuant to 28 U.S.C.
2107 and Fed. R. Civ. P. 4(a) (1). The jurisdiction of
this Court rests on 28 U.S.C, 1291.
ISSUE PRESENTED
Whether compliance with state regulatory provisions
concerning removing hazardous substances from a par-
ticular site satisfies the prerequisites for recovering re-
sponse costs for actions under Section 107(a) (4) (B) of
7a
the Comprehensive Environmental Response, Compensa-
tion, and Liability Act of 1980 (CERCLA), as specified
in the “National Contingency Plan” (NCP) adopted by
the Environmental Protection Agency, 40 C.F.R. 300.1
et seq., including any applicable public participation re-
quirements.
STATUTORY AND REGULATORY
PROVISIONS INVOLVED
Due to their length, Sections 107(a), 101/23) and
(24) of CERCLA, 94 Stat. 2796, as amended, 42 U.S.C.
9607(a)}, 9601(23) and (24), and 40 C.F.R. 300.65,
300.71 and 300.67(d), are reproduced as an Addendum
to this brief.
INTEREST OF THE UNITED STATES AND
SUMMARY OF ARGUMENT
The United States agrees that the district court reached
the correct result on the public participation issue in this
case. Based upon the evidence available to it, the United
States believes that the record in this case indicates that
the General Electric Co. (GE) action may have been a
“removal” action (CERCLA Section 101(23)) to which
no public participation requirements attach, and that
even if the action were considered to be a “remedial”
action (CERCLA Section 101(24)), the record supports a
conclusion that GE substantially complied with the NCP’s
requirement for “public comment.” We also believe that
the court properly rejected defendant Litton’s unclean
hands argument. The chief reason of the United States
for participating in this appeal is to assist this Court in
developing a sound rationale for this result.
We are uneasy about the district court’s articulation
of the standards for a private party’s compliance with
the pertinent NCP public participation requirements for
remedial actions. The district court concluded, first, that
no public hearing was required because GE complied with
the legally applicable or relevant and appropriate state
8a
requirements (ARARs) that the substances be removed.
715 F. Supp. at 961. Second, the court proffers an alter-
native ground for NCP compliance by stating that the
state’s “input” on GE’s response action served as a sub-
stitute for public comment. Ibid. To the extent that the
district court’s opinion may be read as suggesting that
compliance with substantive state regulatory waste-
removal provisions alone satisfies the public participation
requirements for remedial actions, this conclusion is wrong
hecause it belittles the importance of the public participa-
tion contemplated by the NCP. Accordingly, the United
States wishes to emphasize that compliance with a state
regulatory provision may satisfy the federal NCP re-
quirement for public participation during selection of a
remedial action, but only if that provision in fact offers
“substantially equivalent” opportunities for public com-
ment.
It is established policy under CERCLA to enccurage
private parties to perform voluntary cleanups. See L'xxon
v. Hunt, 475 U.S. 355, 359 (1986). Cleanups which are
undertaken and financed by private parties serve to en-
hance the enforcement efforts of EPA and to preserve
the resources of the Superfund for use at sites without
identified or financially viable responsible parties. Accord-
ingly, it is important that technical obstacles not prevent
these parties from recovering their response costs from
those who are responsible for the contamination. The
application of a rigid, formalistic test to a party’s com-
pliance with the public comment requirement for remedial
actions would, in the view of the United States, serve as
a disincentive to voluntary cleanups.’ Nevertheless, this
policy must be balanced against the interest that the pub-
lic has in participating in the selection of a response
1 Additionally, The United States could be prejudiced if technical
inconsistencies with the NCP precluded recovery by the Environ-
mental Protection Agency (EPA) in its enforcement actions. 42
U.S.C. 9607 (a) (4) (A).
9a
action, and the interest of the public in assuring that an
environmentally sound cleanup occurs.
The United States believes that this Court, in resolv-
ing this matter, should not apply an overly restrictive
test for compliance with the public comment require-
ment for remedial actions. One of Congress’ principal
purposes in enacting CERCLA was to place the costs and
responsibility for remedying harmful conditions caused by
hazardous waste disposal on those responsible for the
problem. See, e.g., Dedham Water.Co. v. Cumberland
Farms Dairy, 805 F.2d 1074, 1081 (1st Cir. 1986).
Similarly, the United States does not want to discourage
private parties from cleaning up hazardous waste sites
by elcouraging excessive formalism; the Environmenta!
Protection Agency believes that private party cost re-
covery should be allowed where it proceeds in “substan-
tial” compliance with EPA’s regulations, including the
requirement that concerned parties be allowed to review
and evaluate proposed remedial-actions. The 1985 NCP
was designed to encourage more private sector cleanups
—cleanups that had been discouraged by courts’ restric-
tive readings of Section 107(a) (4) (B)’s requirement of
consistency with the NCP. See Note, “Developments in
the Law—Toxic Waste Litigation,” 99 Harv. L.Rev.
1458, 1503 (1986) (by including the public comment re-
quirement concerning the selection of a remedial action,
the NCP “prevents the streamlined response that should
be the primary advantage of private party cleanups.”).
For these reasons, the United States has determined to
participate as amicus in this case to assist this Court in
defining the rules for private party compliance with the
NCP public participation requirements.
In this brief, we will first clarify what distinguishes a
“removal” from a “remedial” action, and explain what
public participation standards are applicable to both
types of actions under the NCP. We will point out,
first, that there would be no applicable public partici-
10a
pation requirements if this clean up were viewed as a
removal rather than a remedial action (see supra at
9). Second, if the cleanup is considered a remedial ac-
tion, there must be opportunities for public participation
substantially equivalent to those called for in the NCP
(supra at 16). Finally, we will explain why “unclean
hands” is not an available defense to liability in CERCLA
cost recovery actions.
STATEMENT
1. Statutory and regulatory framework.—Congress
enacted CERCLA, 94 Stat. 2796, 42 U.S.C. 9601 et seq.,
as amended by the Superfund Amendments and Reau-
thorization Act of 1986 (SARA), 100 Stat. 1613, as a
legislative response to the growing problem of toxic
wastes, many of which were disposed of before their
dangers were widely known and had contaminated land
and water resources. The statute attempts to create a
coherent answer to two related problems: the emergency
abatement of releases of hazardous substances into the
environment and the response, both short- and long-term,
to the presence of hazardous substances in existing dis-
posal sites. See Lone Pine Steering Committee v. EPA,
777 F.2d 882, 886 (3d Cir. 1985), cert. denied, 476 U.S.
1115 (1986). Many of these sites had been abandoned
by any party who could be held accountable for the
cleanup. Whenever possible, however, CERCLA places
the ultimate financial burden of toxic waste cleanup on
those responsible for creating the harmful conditions.
See Exxon Corp. v. Hunt, 475 U.S. 355, 359 (1986);
U.S. v. Aceto Agricultural Chemicals Corp., 872 F.2d
1373, 1377 (8th Cir. 1989).
Section 105 of CERCLA authorizes the President to in-
_ corporate into the national contingency plan (NCP)
“procedures and standards for responding to releases of
hazardous substances.” 42 U.S.C. 9605. Section 221 es-
tablished the Hazardous Substance Response Trust Fund,
lla
popularly known as the “Superfund.” 42 U.S.C. 9631.
Superfund monies finance response measures by the En-
vironmental Protection Agency that are consistent with
the national contingency plan. CERCLA Sections 104
and 111(a) (1), 42 U.S.C. 9604 and 9611(a) (1). They
also finance private response costs that are approved
under the NCP and are federally certified. Section 111
(a) (2), 42 U.S.C. 9611(a) (2). In addition, under Sec-
tion 106 the federal government may seek injunctive re-
lief from the actual or threatened release of a hazardous
substance. 42 U.S.C. 9606. Section 107(a) (4) (A)
makes certain parties responsible for the presence of
hazardous substances liable to federal and state govern-
ments and Indian tribes for response costs. 42 U.S.C.
9607(a) (4) (A). For example, current owners and op-
erators of the property are liable under Section 107(a)
(1), while former owners and operators such as Litton
are liable under Section 107(a) (2). Other categories of
liable persons include “transporters” and “generators” of
hazardous substances. 42 U.S.C. 9607(a) (3)-(4). U.S.
v. Aceto Agricultural Chemicals Corp., 872 F.2d at 1377.
Similarly, Section 107(a) (4) (B), makes responsible par-
ties liable to private persons for response costs. 42
U.S.C. 9607(a) (4) (B). In those situations in which the
party seeking recovery is also statutorily liable the claim
may be one for contribution which is authorized under
Section 113(f) (1). 42 U.S.C. 9613(f) (1). See Smith
Land and Improvement Corp. v. Celotex Corp., 851 F.2d
86, 88-89 (3rd Cir. 1988), cert. denied, 109 S. Ct. 837
(1989).
CERCLA Section 107(a)(4)(B), the focal point of
this case, expressly creates a private cause of action
against Section 107(a)-responsible parties for the re-
covery of “necessary costs of response incurred by any
other person consistent with the national contingency
2 Repealed by SARA; the Hazardous Substance Superfund is
currently established under 26 U.S.C. 9507.
12a
plan [NCP}.” 42 U.S.C. 9607(a) (4)(B).2 (The NCP
is the set of regulations promulgated by the EPA that
govern response actions for hazardous substance releases
and provide appropriate guidelines for state and federal
agencies. See 40 C.F.R. 300.1 et seq.) *
The statute was designed primarily to facilitate the
prompt cleanup of hazardous substances sites. It accom-
»lishes this purpose by placing the ultimate financial
responsibility for cleanup on those responsible for the
hazardous wastes. Exxon v. Hunt, supra; Walls v. Waste
Resources Corp., 761 F.2d 311, 318 (6th Cir. 1985).
Allowing a private action to recover response costs from
3 An actien for natural resource damages may be brought only
by the United States, a state government, or an Indian tribe. 7d.
Section 107(f), 42 U.S.C. 9607(f). Response actions taken by the
United States, a state government, or an Indian tribe are presumed
to be “not inconsistent with the national contingency plan” under
Section 107(a) (4) (A); the defendant has the burden of proving
otherwise. United States v. Northeastern Pharmaceutical & Chem.
Co., Inc., 810 F.2d 726, 747 (8th Cir. 1986), cert. denied, 484 U.S.
848 (1987). Conversely, private plaintiffs have the burden of prov-
ing that their response actions are “consistent with the national
contingency plan” under Sectior 107(a)(4)(B). Artesian Water
Co. v. Gov. of New Castle County, 659 F. Supp. 1269, 1277 n.8
(D. Del. 1987) (citations omitted); aff’d on other grounds, 851
F.2d 643 (3d Cir. 1988); New York v. Shore Realty Corp., 648
F. Supp. 255, 268 (E.D. NY. 1986); Bulk Distrib. Centers, Inc. v.
Monsanto Co., 589 F. Supp. 1437, 1444 (S.D. Fla. 1984).
4 The NCP constitutes EPA’s national regulations adopted under
Section 105 of CERCLA appearing at 40 C.F.R. 300.1-300.81. The
regulations describe methods of responding to hazardous substance
releases and set forth guidelines for the appropriate roles of state
and federal agencies and private parties. Judicial review of these
regulations can be had only by filing a petition for review in the
District of Columbia Circuit under Section 113(a) of CERCLA,
42 U.S.C. 9613(a). The NCP cannot be challenged in district court
in the context of a cost recovery action. On February 2, 1990, the
EPA Administrator signed a final rule revising the NCP; that rule
will take effect 20 days after publication in the Federal Register.
Publication is expected by the end of February.
13a
responsible parties under Section 107(a)(4)(B) is thus
consistent with both the language of that Section and the
congressional purpose underlying CERCLA as a whole.
CERCLA delineates two types of response actions—
“removal” and “remedial” actions, see Section 101(23)
and (24), each of which must comply with certain re-
quirements under the NCP. Removal actions are gen-
erally short-term environmental responses. Remedial
actions, on the other hand, are generally long-term re-
sponses. Amland Properties Corp. v. Aluminum Co. of
America, 711 F. Supp. 784, 795 (D. N.J. 1989).5 For
removal actions, the NCP provides for relatively simple
procedural prerequisites. See 40 C.F.R. 300.65. Section
300.65 of the NCP sets forth no requirements for oppor-
tunities for public comment for private party removal
actions (except to the extent such opportunities are re-
quired by legaliy applicable or relevant and appropriate
state requirements (ARARs) and are practicable) .°
With respect to remedial actions, however, the NCP
provides for substantially more detailed procedural and
5 For example, the 1985 version of the NCP that applies here,
with a number of exceptions, sets a $1 million limit or a six-month
deadline for a Superfund-financed “removal action.” 40 C.F.R.
300.65(b) (3). On October 17, 1986, the Superfund Amendment
and Reauthorization Act extended the limits to 1 vear and $2 million
for a CERCLA removal action. 42 U.S.C. 9604(c) (1). The statute
also allows exceptions to these limits.
® The NCP does require that removal actions taken “pursuant
to section 300.65” include a formal community relations plan for
actions extending beyond 45 days and have a spokesperson to in-
form the community of actions taken and respond to inquiries. 40
C.F.R. 300.67. While this requirement appears to apply to state,
federal lead or tribal removals, private party actions are not taken
“pursuant to section 300.65” and thus are not specifically required
to meet these same requirements; rather, 40 C.F.R. 300.71 (a) (2) (i)
simply requires private party actions to be “consistent with” Sec-
tion 300.65. (To the extent the requirement in 40 C.F.R. 300.67(b)
is found to apply, the public meetings at which the site was dis-
cussed appear to satisfy the requirement.)
l4a
ubstantive requirements. See 40 C.F.R. 300.68. In par-
cieular, the NCP requires, among other things, that a
private party contemplating the undertaking of a re-
medial action must first provide an opportunity for
“appropriate public comment” unless compliance with a
state regulatory provision “provides a substantially equiv-
alent opportunity for public involvement on the choice of
remedy.” 40 C.F.R. 300.71 (a) (2) (ii) (D).
The distinction between public participation regula-
tions for removal as opposed to remedial actions is im-
portant because removal actions need comply only with the
relatively simple NCP requirements set forth at 40
C.F.R. 300.65, whereas remedial actions must comport
with “more detailed procedural and substantive provisions
of the NCP” set forth at 40 C.P.R. 300.68. Amland,
supra (citations omitted) ; Versatile Metals, Inc. v. U nion
Corp., 693 F. Supp. 1568, 1577-1578 (E.D. Pa. 1988).
2. The facts of this controversy—tIn this case, GE
brought a private party recovery action pursuant to
Section 107(a) (4) (B) of CERCLA against Litton Busi-
ness Systems, Inc. (Litton). GE sought recovery of costs
incurred in cleaning up cyanide-based electroplating solu-
tions and residues at a Springfield, Mo., site which it
purchased from Litton in 1970. Litton is the successor by
merger to Royal McBee Corporation, which, through its
subsidiary, Royal Typewriter, operated a manufacturing
facility at the site between 1959 and 1965. Litton con-
tinued the business until 1969 when operations were shut
down. A byproduct of the manufacturing process was
cyanide-based electroplating waste which was dumped on
a vacant portion of the site, “hich adjoins apartment
complexes and retail, commercial, and manufacturing
properties.
After a four-day bench trial, the district court found
Litton liable for all response costs incurred by GE. 715
F. Supp. 949. The court also awarded GE prejudgment
lda
interest and attorneys’ fees. In so doing, the court re-
jected Litton’s argument that GE’s public participation
activities were not consistent with the NCP and, thus,
that its costs were not recoverable in accordance with
Section 107(a) (4) (B) of CERCLA.
In its opinion, the district court found that there was
no evidence that GE had dumped any waste containing
the chemicals later found to be the source of contamina-
tion. 715 F. Supp. at 951. The court found that GE
had worked with the State to develop a remediation plan,
entered into an administrative consent decree under State
law, and conducted and financed the cleanup. Jd. at 951-
954. Although GE gave Litton early notice of its
CERCLA claim, Litton chose not to participate in the
remediation effort. Jd. at 952.
The court addressed in summary fashion each element
of CERCLA liability and found Litton liable. In particu-
lar, based on GE’s close cooperation with state authorities,
the court found that GE’s public participation activities
were “consistent with the NCP.” Jd. at 961 and 963.
For example, in rejecting Litton’s challenge to GE’s re-
covery on the ground that GE failed to comply with the
public hearing requirement of the NCP, the court found
that GE implemented a removal action consistent with
the NCP and Section 300.65 (id. at 960 and 961), and
that GE’s “compliance with legally applicable or relevant
and appropriate state requirements provides a substan-
tially equivalent opportunity for public involvement,” id.
at 961. Furthermore, the court stated that “if notice to
the public is a requirement, the input of the Missouri
Department of Natural Resources serves as a substitute
for public comment.” Jbid.
The court rejected Litton’s defense that GE should be
barred from recovering because of unclean hands. /d. at
955, Litton had areued that GE should he barred from
recovering because several vears after discovery of the
l6a
contamination, but before the cleanup, GE agreed to sell
the site to a third party, allegedly without disclosing Lit-
ton’s dumping. The court held that the principle of un-
clean hands was inapplicable to the facts because Lition
was not injured or prejudiced by GE’s alleged improper
conduct. Jbid. In dicta, the court also stated that it is
“doubtful” whether the doctrine is applicable in CERCLA
cases. Ibid.
Finally, the court disposed of Litton’s argument that
the “Collateral Benefit Rule” should bar GE from bene-
fiting by having Litton pay for the cleanup because, al-
legedly, GE knew about the dumping when it purchased
the site in 1970. Jd. at 963. The court ruled that the
evidence failed to support Litton’s argument that the
property was being used as a dump when GE bought it,
or that GE could have seen such dumping activities since
they were not visible from the plant.
This appeal followed.
STANDARD OF APPELLATE REVIEW
The questions (1) whether GE, removing hazardous
waste from a particular site, satisfied the prerequisites
for a private recovery of response costs under CERCLA,
as specified in the “National Contingency Plan” adopted
by the Environmental Protection Agency, including any
applicable public participation requirements, and (2)
whether the defense of unclean hands bars private re-
covery actions under CERCLA, are both issues of law
reviewable de novo in this Court. Wells v. Walker, 852
F.2d 368 (8th Cir. 1988), cert. denied, 109 S. Ct. 1121
(1989).
17a
ARGUMENT
|
THE 1985 NATIONAL CONTINGENCY PLAN
DOES NOT SPECIFICALLY REQUIRE THAT
PRIVATE PARTIES PROVIDE FOR
OPPORTUNITIES FOR PUBLIC COMMENT IN
FORMULATING AND IN CONDUCTING A
“REMOVAL” ACTION
As an initial matter, it_is important to decide whether
GE conducted a “removal” or “remedial” action. The
distinction is important because, as we have explained
(supra at 9), GE’s compliance with the NCP’s public
participation requirement is relevant only if GE’s response
action was, in fact, a remedial action.
The district court explicitly found that “GE’s action
was consistent with the NCP as a removal action” (715
F. Supp. at 960) and stated further that “plaintiff imple-
mented the removal action consistent with § 300.65
[which governs removal actions]” (id. at 961), strongly
suggesting that the district found the action to be a re-
moval. Further, the action was “short-term,” as it was
completed in less than 2 months (id. at 953) and at a
cost (with interest) of approximately $1 million (id. at
$63). Indeed, the court concluded that “no public hear-
ing was required due to the fact that GE was comply-
ing with legally applicable or relevant and appropriate
state requirements that the waste be removed.” Id. at
961 (emphasis supplied). However, at the same time, the
court found that GE provided a “site investigation and
analysis of remedial alternatives as required under 300.68
|which governs remedial actions],” /d. and the court
also discussed at length the requirements of 300.68. /d.
at 961-62. This raises some question as to whether the
18a
district court firmly decided if GE’s action was a removal
or a remedial action under CERCLA.’
Overall, the court’s findings of fact suggest that the
record would support the conclusion that GE conducted
only a “removal” action. (“Court finds that GE’s action
was consistent with the NCP as a removal action” 715
F. Supp. at 960, and “[ilit is clear to this Court that
plaintiff [GE] implemented the removal action consistent
with § 300.65” id. 961.) As set forth above, if GE’s re-
sponse at the site was a “removal” action, the 1985
NCP sets forth no specific requirements for public com-
ment opportunities (except to the extent such opportuni-
ties are required by ARARs and are practicable). 40
C.F.R. 300.65.5. Thus, if GE’s action was a “removal”
under the 1985 NCP, then the court’s discussion of GE’s
compliance with the NCP’s public participation require-
ment may be presumed to be dicta, in response to Litton’s
claims, and is not necessary to the court’s holding. (Note
that Litton’s brief clearly treats GE’s action as remedial,
subject to the full panoply of procedures mandated by
< 300.68. |
reé
7 We note that a Remedial Investigation/Feasibility Study (RI/
RS) was performed at the GE site. Such studies generally precede
remedial actions, although in many cases a removal may be per-
formed based on finding in an RI/FS. Also, soil removal can be
an appropriate action to be taken in the context of a remedial ac-
tion. 40 C.F.R. 300.68 (j) (3).
5 See footnote 6.
ed
19a
II
COMPLIANCE WITH STATE REGULATORY
PROVISIONS PERTAINING TO THE CLEANUP
OF A HAZARDOUS WASTE SITE SATISFIES THE
“PUBLIC PARTICIPATION” REQUIREMENTS OF
THE 1985 NCP FOR A “REMEDIAL” ACTION
ONLY IF THE STATE REGULATORY PROVISIONS
PROVIDE FOR A SUBSTANTIALLY EQUIVALENT
OPPORTUNITY FOR PUBLIC INVOLVEMENT
IN THE CHOICE OF THE “REMEDY”
Assuming, however, that GE’s response constituted a
“remedial” action, the United States regards as troub!-
ing the court’s conclusion that no public comment was
required because GE was complying with legally appli-
cable or relevant and appropriate state requirements
(ARARs) “that the waste be removed.” Jd. at 961.
If GE’s action were a remedial action no public hear-
ing would have been required if GE had been complying
with ARARs that “provide[d] a substantially equivalent
opportunity for public involvement in the choice of rem-
edy.” 300.71(a) (2) (ii)(D). Compliance with a sub-
stantive ARAR governing the extent and results of rem-
edy action, however, does not necessarily satisfy the pub-
lic participation requirement of the NCP. The district
court’s statement could be read to suggest that such sub-
stantive compliance would be sufficient, since it refers to
the ARAR standard for remedial actions.’ The district —
court may have concluded, sub silentio, that compliance ©
with one or more ARARs provided “substantially equiv-
alent” opportunities for public involvement, but the opin-
® The court’s statement may also be read to reflect a finding that
no public hearing was required because the state requirement “that
the wastes be removed” identifies GE’s response as a “removal”
action.
20a
ion lacks such an analysis.’° The United States submits
that compliance with a state ARAR satisfies the public
participation requirements of the 1985 NCP for a re-
medial action only if that ARAR includes procedural
provisions that afford “substantially equivalent” oppor-
tunities for public involvement. The district court’s opin-
ion here does not show how compliance with a specific
state ARAR with procedural elements afforded “sub-
stantially equivalent” opportunities for public participa-
t'on and thus satisfied the requirements for remedial ac-
tions in the 1985 NCP.
The district court’s additional statement that the
State’s input in the remedy selection “serves as a sub-
stitute for public comment,” is, in the view of the United
States, erroneous. The United States submits that a pri-
vate party taking remedial action must either provide
some opportunity for public comment on the alternatives
from which a remedial action will be selected, or comply
with a state or local ARAR that includes substantially
equivalent opportunities for public participation in the
seiection of the remedy. The involvement of the state is
simply not a substitute for public participation rights."
Of course, even assuming that GE’s response was in-
deed a remedial action, the record in this case may well
support the conclusion that there was substantial com-
plianece with the public participation requirement. For
example, the opinion indicates that the State Hazardous
Waste Commission held three meetings in which the GE
10 There are findings of fact showing public participation (see,
e.g., finding 20, id. at 952), but these findings are not referenced
in the public participation discussion.
1! Recently, for instance, in Amland Properties Corp. v. Aluminum
Co. of America, 711 F. Supp. 784 (D. N.J. 1989), the court rejected
the contention that the participation of state and local officials,
and the participation of the state environmental agency in the
tandard-setting process obviated the need for a public comment
period. 7d. at 801.
pede
Zla
site was discussed. Jd. at 952. The district court found
that these public hearings were held “both before and
during the course of the cleanup at the site[,]” that pub-
lie notice was provided, and that the public attended the
meetings. IJd.'* Litton cannot convincingly assert that
the public was not involved in the cleanup process in the
face of the court’s finding that changes in the response
actions were made because of “local publicity.” Jd. at
954. If the public had an opportunity to discuss the re-
mediation plans at these hearings, then GE’s response
actions may well have been consistent with the public par-
ticipation requirements of the 1985 NCP, even those for
remedial actions.’* If this was indeed the case, then the
federal government’s concerns about sustaining the in-
tegrity of the public participation process would be sat-
isfied.
III
UNCLEAN HANDS IS NOT AVAILABLE AS A
DEFENSE IN CERCLA PRIVATE PARTY ACTIONS
While Litton does not directly raise the defense of
“unclean hands” in its opening brief, it did so below, and
here it attacks GE’s motives and tactics in this contro-
versy. It is thus worth pointing out that “unclean
hands” is not an available defense to liability in a
CERCLA cost recovery action under Section 107(a), al-
12 Tn addition to the fact that public meetings were held to dis-
cuss the GE site, the district court specifically found that Litton
was directly advised of GE’s potential CERCLA claims prior to
the time that they were incurred, but chose not to cooperate with
GE in negotiating with regard to the cleanup (an issue which
Litton’s brief on appeal does not address). /t. at 952 and 954.
Thus, Litton clearly had an opportunity to participate in the response
action, and no other member of the public has asserted a denial of
a similar opportunity for involvemert. Litton’s notice of GE’s
actions, while not determinative of GE’s compliance of the NCP’s
public participation requirements, is arguably a factor to be con-
sidered in aliocating the parties’ equitable shares of response costs.
13 We have been advised that no transcripts were made offthese
state commission meetings.
22a
though the courts may equitably allocate response costs
as they determine to be appropriate when both plaintiff
and defendant are liable entities and the suit is thus for
contribution. Smith Land & Improvement Corp., 851
F.2d at 88-89. The district court properly rejected Lit-
ton’s unclean hands argument: CERCLA is a strict lia-
bility statute, State of New York v. Shore Realty Corp.,
759 F.2d 1032, 1042 (2d Cir 1985); U.S. v. Aceto Agri-
cultural Chemical Corp., 872 F.2d at 1377. The statute,
in Section 107(b) allows only a limited set of defenses
against liability, 42 U.S.C. 9607(b). Equitable defenses,
such as “unclean hands,” are not among the defenses
Congress authorized in Section 107(b). However, it may
be apropriate for a court to consider equitable defenses
similar to unclean hands in apportioning costs under
CERCLA Section 113(f). See Smith Land & Improve-
ment Corp., supra.
CONCLUSION
For the foregoing reasons, the judgment of the district
court should be affirmed.
Respectfully submitted,
RICHARD B. STEWART
Assistant Attorney General
DAVID C. SHILTON
MAUREEN M. KATz
Of Counsel: JACQUES B. GELIN
LAWRENCE E. STARFIELD Attorneys,
ANDREW GORDON Department of Justice
‘Office of General Counsel Land and Natural
Resources Division
Office of Enforcement and Washington, D.C-20530
Compliance Monitoring (202) 633-2762
Environmental Protection Agency
Washington, D.C. 20460
FEBRUARY 1990
90-11-2-550
HELEN KENNEDY
23a
CERTIFICATE OF SERVICE
I hereby certify that all parties required to be served
have been served copies of the Brief for the United
States, Amicus Curiae by mail, properly addressed and
— postage prepaid on February 16, 1990 to:
James L. Moeller
William F. Ford
GAGE & TUCKER
2345 Grand Avenue
P.O. Box 418200
Kansas City, Missouri 64141
Bruce W. Kauffman
Sherly L. Auerbach
DILWORTH, PAXSON, KALISH & KAUFFMAN
2600 The Fidelity Building
Philadelphia, Pennsylvania 19109-1094
Mathew W. Placzek
JOYNER, PLASZEK & FRANCIS
1722 South Glenstone, Suite J
Springfield, Missouri 65808-0108
Theodore F. Craver
Mark Stanga
Litton Industries, Inc.
490 L’Enfant Plaza
Suite 8206
Washington, D.C. 20024
/s/ Jacques B. Gelin
JACQUES B. GELIN
Attorney, Department of Justice
Washington, D.C. 20530
(202) 633-2762
This is a copy of a public record, reproduced as it was published. It is not legal advice, and it may not be the version a court would rely on. Check the official source before you cite it.