Petition — Chemical Manufacturers Ass'n v. U. S. Environmental Protection Agency
Supreme Court brief1982
Ask Donna
What actually matters in this document.
Text
yO - Supreme Cor
g1-2198 re")
WAY 28 1982
No. Si.
ne
IN THE
Supreme Court of the Anited States
OCTOBER TERM, 1981
CHEMICAL MANUFA<TURERS ASSOCIATION, ef al.,
AMERICAN [RON & STEEL INSTITUTE, ef al.,
AMERICAN Paper INSI/TUTE, ef al.,
AMERICAN PETROLEUM INSTITUTE, ef ai.,
AMERICAN TEXTILE MANUFACTURERS INSTITUTE,
NATIONAL COAL ASSOCIATION, and
VIRGINIA ELECTRIC AND PoweR COMPANY, ef al.,
Petitioners,
Vv.
U.S. ENVIRONMENTAL PROTECTION AGENCY and
ANNE M. GorsucH, ADMINISTRATOR, U.S.
ENVIRONMENTAL PROTECTION AGENCY,
Respondents.
PETITION FOR A WRIT OF CERTIORARI TO
THE UNITED STATES COURT OF APPEALS
FOR THE DISTRICT OF COLUMBIA CIRCUIT
THEODORE L. GARRETT
Patricia A. BARALD
CorINNE A. GOLDSTEIN
COVINGTON & BURLING
1201 Pennsylvania Avenue, N.W.
Washington, D.C. 20044
(202) 662-6000
Attorneys for Petitioners
Chemical Manufacturers Association, et al.
May 1982
QUESTIONS PRESENTED
The decision at issue involves fundamental questions as to
the proper court for judicial review of Environmental Protection
Agency (“EPA”) regulations under the Clean Water Act
(“CWA” or “the Act”). The D.C. Circuit has asserted direct
appellate jurisdiction under Section 509(b)(1) of the Act, 33
U.S.C. § 1369(b)(1), over challenges to EPA’s general policy
and procedural regulations governing the grant or denial of
National Pollutant Discharge Elimination System (“NPDES”)
permits. In doing so, it specifically rejected the contrary reason-
ing of a decision of the Third Circuit, and upset settled ex-
pectations as to the limited breadth of appellate jurisdiction
under the Act. The questions presented are:
1. Whether EPA’s procedural regulations governing the
grant or denial of NPDES permits, 40 C.F.R. Parts 122-125
(1980), constitute “effluent limitation|s] or other limitation|s]”
under Section 509(b)(1) of the Act, reviewable in the courts of
appeals.
2. Whether the court below exceeded the statutory limits
on its jurisdiction under Section 509(b)(1) of the Act, and
misinterpreted prior decisions of this Court, in asserting appel-
late jurisdiction over the NPDES permit regulations.
PARTIES
The parties to this action are as follows: '
Chemical Manufacturers Association, Virginia Manufacturers
Association, Inc., Virginia Chemicals, Inc., American Cyana-
mid Company, Borden Inc., E. I. du Pont de Nemours & Co.,
FMC Corporation, Kaiser Aluminum & Chemical Company,
Monsanto Company, Northern Petrochemical Company, Olin
Corporation, PPG Industries, Inc., Rohm and Haas Company,
Stauffer Chemical Company, The B. F. Goodrich Company,
The Goodyear Tire & Rubber Company, Union Carbide Cor-
poration;
American Iron & Steel Institute, Allegheny Ludlum Steel
Corporation, Armco Inc., Bethlehem Steel Corporation, Cy-
clops Corporation, Inland Steel Company, Jones & Laughlin
Steel Corporation, National Steel Corporation, Republic Steel
Corporation, United States Steel Corporation;
American Paper Institute, National Forest Products Asso-
ciation;
American Petroleum Institute, Atlantic Richfield Company,
Chevron U.S.A., Inc., Conoco Inc., Exxon Corporation, Getty
Oil Corporation, Gulf Oil Corporation, Marathon Oil Com-
pany, Mobil Oil Corporation, Phillips Petroleum Company,
Shell Oil Company, Standard Oil Company (Indiana), Texaco
Inc., Union Oil Company of California;
American Textile Manufacturers Institute;
Burlington Industries, Inc.;
Citizens for a Better Environment;
'In accordance with Rule 28.1 of the Rules of the Supreme Court, the
parent companies, subsidiaries and affiliates of each corporate party to this
petition are set forth in the Appendix at A-17.
Ford Motor Company;
General Motors Corporation;
Kennecott Corporation;
National Coal Association;
Natural Resources Defense Council, Inc.;
Pennzoil Company;
State of West Virginia;
Tenneco Cil Company;
United Technologies Corporation; and
Virginia Electric and Power Company, Alabama Power Com-
pany, Allegheny Power System, Inc. , American Electric Power
Company, Inc., Baltimore Gas & Electric Company, Boston
Edison Company, Carolina Power & Light Company, Central
and South West Services, Inc. , Central Illinois Light Company,
Central Illinois Public Service Company, Cincinnati Gas &
Electric Company, Cleveland Electric Illuminating Company,
Columbus & Southern Ohio Electric Co. , Commonwealth Edi-
son Company, Consolidated Edison Company of New York,
Inc., The Dayton Power & Light Company, Delmarva Power &
Light Company, Detroit Edison Company, Duke Power Com-
pany, Edison Electric Institute, Florida Power & Light Com-
pany, Gulf States Utilities Company, Houston Lighting &
Power Company, Illinois Power Company, Indianapolis Power
& Light Company, lowa Public Service Company, Kansas City
Power & Light Company, Long Island Lighting Company,
Madison Gas and Electric Company, Middle South Utilities,
Inc., Minnesota Power & Light Company, Montaup Electric
Company, National Rural Electric Cooperative Association,
New England Power Company, New York State Electric & Gas
Corporation, Niagara Mohawk Power Corporation, Northeast
Utilities Services Company, Northern Indiana Public Service
iv
Company, Northern States Power Company (Minn.), Ohio
Edison Company, Oklahoma Gas and Electric Company, Paci-
fic Gas & Electric Company, Pennsylvania Power & Light
Company, Philadelphia Electric Company, Potomac Electric
Power Company, Public Services Electric & Gas Company,
Public Service Company of Indiana, Inc., Rochester Gas &
Electric Company, San Diego Gas & Electric Company, South
Carolina Electric & Gas Company, Southern California Edison
Company, The Southern Company, Tampa Electric Company,
Texas Utilities Company, Toledo Edison Company, Union
Electric Company, Wisconsin Electric Power Company, Wis-
consin Power & Light Company, Wisconsin Public Service
Corporation. *
? The foregoing list comprises the petitioners who challenged EPA regula-
tions promulgated pursuant to the Clean Water Act and who therefore had an
interest in the decision below. In the proceedings below, the D.C. Circuit
has also consolidated petitions challenging EPA regulations under other
Statutes. The latter petitioners, who did not participate in the D.C. Circuit's
consideration of the jurisdictional issue involved here, are as follows:
Continental Oil Company, The Standard Oil Company (Ohio), The Ferroal-
loys Association, Allegheny Ludlum Industries, Inc., Kimberly-Clark
Corporation, Mining and Reclamation Council of America, Inc., Avtex
Fibers, Inc., Edison Electric Institute, et al., Stablex Corporation, Amer-
ican Wood Preservers Institute, G + W Natural Resources Group, Amer-
ican Chrome & Chemicals, Inc. , Linden Chemicals & Plastics, Inc., Polysar
Limited, The Lubrizol Corporation, Allied Chemical Corporation, The Dow
Chemical Company, American Mining Congress, et al., AMAX, Inc.,
Texas Oil & Gas Corp., National Solid Wastes Management Association,
Cincinnati Gas & Electric Company, Atlantic Cement Company, Inc., et
al., Tennessee Gas Transmission Company, Colt Industries Inc., Kaiser
Steel Corporation, Lone Star Steel Company, Wheeling-Pittsburgh Steel
Corporation, Kerr-McGee Nuclear Corporation, Kerr-McGee Refining
Corporation, Kerr-McGee Corporation, State of Texas, Duval Corporation,
Everest Minerals Corporation, Jefferson Lake Sulphur Company (a division
of Occidental Chemical Company), Texasgulf Inc., Independent Petroleum
Association of America, and Mid-Continent Oil and Gas Association.
TABLE OF CONTENTS
Page
SUNOEE PEED occ wcdwbabeneeweaechceeaccebes i
SEL CUDE Lautan’: 6 05 bd GRA Cbs be Sc amawes o4ae Cavehee ii
OE i caus kos Cc Red ebAd O40 4s ane ACES Vv
a IIE 0.0.2 v0 SAp kde edae Rae bawh 18 600800 vi
TEENY ead os 05 tence sass teas ocean nev ee eens 1
I Ad Sn dn gt Vambeae bedi den hyadubee we dbus 2
STATUTES AND REGULATIONS INVOLVED .............6.505+ 2
PR rer rere ret rare 2
A. Legislative And Administrative Background .... 3
DE, PD SOREN. CERN ee rca uwneSsseedaeve 5
REASONS FOR GRANTING THE WRIT .... 2.0... 0666 e ee eee 7
I. The Decision Below Creates A Conflict In The Circuits
And Departs From Prior Decisions Of This Court .... 8
Il. The Devision Below Involves Recurring Questions Con-
cerning Judicial Review Under The Clean Water Act. 11
lll. The Decision Below Contravenes Congress’ Limited
Grant Of Jurisdiction To The Courts A s And
Conflicts With The Structure And Purpose Clean
WES Ua vatvds b pF eecwacaecevewtceeren) (cee 13
ES Cit th Saat ls 4 Coad be abe Cuaieae » ok tae 18
vi
TABLE OF AUTHORITIES
Cases: Page
American Federation of Labor v. NLRB, 308 U.S. 401
DE: s'n6 UUadksd on Oebed¥eceee'’t.e oc tivties 13, 14, 18
American Iron & Steel Institute v. EPA, 543 F.2d 521 (3d Cir.
SE Wael oa hing CGUAb Ahn o Unt. 6B P Os-6% Punt 8.9, 10
American Power & Light Co. v. S.E.C., 325 U.S. 385 (1945) s
Assessors v. Osbornes, 9 Wall 567, 76 U.S. 567 (1869) .. 13
Bethlehem Steel Corp. v. EPA, 538 F.2d 513 (2d Cir. 1976) —10
Central Hudson Gas & Electric Corp. v. EPA, 587 F.2d 549
SE SE tht Soh ed cece tcduleu vhbueod sete 10, I
Crown Simpson Pulp Co. v. Costle, 599 F.2d 897 (9th Cir.
1979), reversed on other grounds, 445 U.S. 193
ED AS dddiwe vids 66 bad eutiltte oodedievas 10, 12, 15
E. 1. du Pont de Nemours & Company v. Train, 430 U.S. 112
EE owt t by ih oe wands Ghd ob s0ta¥e chs dacmn 4, 10, 12
Environmental Defense Fund, Inc. v. Costle, 657 F.2d 275
IE Geno dona CWA 6 GaN eden ccs ads donned 15
EPA v. California ex rel. State Water Resources Control
Board, 426 U.S. 200 (1976) ......... ve schbilvan ites 15
Harrison v. PPG Industries, Inc., 446 U.S. 578 (1980) .. 7, 18
Ickes v. Associated Industries of New York State, Inc., 320 U.S.
tin cis tdiuls cebusadianthwss$esddy oe be
Investment Company Institute v. Board of Governors of the
Federal Reserve System, 551 F.2d 1270(D.C. Cir. 1977) 9
Jarecki v. G. D. Searle & Co., 367 U.S. 303 (1961) ..... 17
Land v. Dollar, 330 U.S. 731 (1947) 2... cee 8
Louisville & Nashville Railroad Co. v. Mottley, 211 U.S. 149
PE oti bteobsEs wa den ued oprobyecscogescoud’ 14
Montgomery Environmental Coalition v. Costle, 646 F.2d 568
DEE (S¥ideandevectcegtachocccccssees 15
Sumner v. Mata, 449 U.S. 539 (1981) 6... 6c ccc eee 14
Third National Bank in Nashville \. Impac Limited, Inc., 432
IES bint dbo nen st sWbitses eoticevese 17
STATUTES:
28 U.S.C.
28 U.S.C.
33 U.S.C.
33 U.S.C.
33 U.S.C.
33 U.S.C.
33 U.S.C.
33 U.S.C.
33 U.S.C.
33 U.S.C.
33 U.S.C.
33 U.S.C.
33 U.S.C.
33 U.S.C.
33 U.S.C.
33 U.S.C.
33 U.S.C.
33 U.S.C.
33 U.S.C.
33 U.S.C.
33 U.S.C.
33 U.S.C.
33 U.S.C.
33 U.S.C.
42 U.S.C.
42 U.S.C.
42 U.S.C.
42 U.S.C.
42 U.S.C.
42 U.S.C.
Vii
Table of Authorities Continued
Page
MOREE cclepbiddcdscdebedbakeees 40 castene 2
cs cue doteess caveiiten ¢reh sass Coax 3
aE: &. coucas doe ckhoned contb ei ts kits eee 4
PE . Pektiahi garde caddeopunees edpieccas 4
a cd oddtt aided bed tibn bd esoec6s cowe 4
PD. tele Ps dn peswegdad ule tase secede 4
Di 2iee theese wh bdo bwandediia + ecevudses 4
gO ES ES ROSES So A ay 4
IN oie la ah ae» oleh aaa an 16
REE cctvecdobvdchewdadbdececedeaee 16
SD Eck bbb 4606 6d bed eee eee v0.0 abeds 16
ET Sci davda dc aides die wadussesdanb as 16
DE J. thik é6 ce o6seeeenedesabuesaeasy 4
ED: <iptuwddde one Shaw ed 4 cdetodags 15
i Se Te es 4 ede ede 16
ED ee ne dd a Ga ndode bdeb hd be kbne 3
EY satisk wht Nadewe ahve 6x tee tue 7
ae ond 5 bb SV 04 COU ERED D coe 0 608 16
nS 7 cl et die by sedale codes Coakahs 16, 17
NE is Cok tii, Dg a tk soe ag cae 16
A oy deb Ve En clve de obs costgiein passim
a . . oy cayetons passim
a siete nes dokentenen 2
EE OC cies Ja ca i aaetie wee cone’ 16
aD £i6 0 tana als codes Vpaiby.s ceed seun's 3
IN on. da cw kc soda sagehveceivyesp i 14
ED on bcos cd Ch eURB URES dues ey eens 14
a eA, get ois get oe aaa 3
ED 21, 504 0c tee b aruba vee veenesd 14
SS Se Ae, ee 3,14
Table of Authorities Continued
Page
REGULATIONS:
ee eo os os we ak tbs i, 2.4.5
en a ae ee ee Ce wceccees 4
SE = «0 ood cnweebaae cba ibe) 6s ¢eéedesen 4
I ee cece euent 4
CE PPE et Ee 8
ag a I a ore s
ST CRED 0 oo ob daw bd ninth Se dbue sc cactecceces 4
Nd ee oe ns oc odhes dcac 4
20... i rch a dadbinsccescocscee 4
SE Ms cds 6s vic hese de kaetnsecccdceact 4
CONGRESSIONAL MATERIAL:
S. Rep. No. 92-414, 92d Cong., Ist Sess. (1971) ........ 17
FEDERAL REGISTER:
44 Fed. Reg. 32854-956 (June 7, 1979) ................ 5
44 Fed. Reg. 32855 (June 7, 1979) ................455. 6
45 Fed. Reg. 33290-588 (May 19, 1980) ............... 5
IN THE
Supreme Court of the Anited States
OcTOBER TERM, 1981
ee
No. #1-___
CHEMICAL MANUFACTURERS ASSOCIATION, ef al.,
AMERICAN IRON & Steer INstirute, et al.,
AMERICAN Paper INSTITUTE, ef al.,
AMERICAN PETROLEUM INSTITUTE, ef al.,
AMERICAN TEXTILE MANUFACTURERS INSTITUTE,
NATIONAL COAL ASSOCIATION, and
VirGINIA ELECTRIC AND Power ComPANy, ef al.,
Petitioners,
w,
U.S. ENVIRONMENTAL PROTECTION AGENCY and
ANNE M. Gorsuch, ADMINISTRATOR, U.S.
ENVIRONMENTAL PROTECTION AGENCY,
Respondents.
PETITION FOR A WRIT OF CERTIORARI TO
THE UNITED STATES COURT OF APPEALS
FOR THE DISTRICT OF COLUMBIA CIRCUIT
Petitioners Chemical Manufacturers Association, et al., pray
that a writ of certiorari issue to review the opinion and judgment
of the United States Court of Appeals for the District of Co-
lumbia Circuit in this case involving the parties named in the
above caption.
OPINION BELOW
The opinion of the court of appeals below is unofficially
reported at 17 E.R.C. 1007, and is reprinted in the Appendix to
this petition at A-1.
2
JURISDICTION
The order of the court of appeals was entered on March 2,
1982. The jurisdiction of this Court is invoked pursuant to 28
U.S.C. § 1254(1).
STATUTES AND REGULATIONS INVOLVED
Section 509(b)(1) of the CWA, 33 U.S.C. § 1369%(b)(1),
vests the federal courts of appeals with original jurisdiction to
review six specified categories of EPA action, including action:
“in approving or promulgating any effluent limitation or
other limitation under section 1311, 1312 or 1316 [of the
CWA].” 33 U.S.C. § 1369(b)(1)(E).
With limited exceptions, review of EPA action within the six
Section 509(b)(1) categories must be sought within 90 days of
the date of the challenged action. Section 509(b)(2) of the Act
provides that “[ajction of the Administrator with respect to
which review could have been obtained under [§ 509(b)(1)]
shall not be subject to judicial review in any civil or criminal
proceeding for enforcement.” 33 U.S.C. § 1369(b)(2). Section
509(b)(1) of the Act is set forth below at 14-15.
EPA’s regulations governing the procedures for issuing
NPDES permits are codified at 40 C.F.R. Parts 122-125.
STATEMENT OF THE CASE
This petition raises a central issue as to the scheme for
judicial review of agency action under the Clean Water Act. It is
of fundamental importance that the means for seeking judicial
review, and the court in which review must be sought, be
decision below has created a conflict in the circuits and has
upset settled expectations as to the courts which must review
EPA actions under the Clean Water Act.
3
This petition seeks review of a judgment of the D.C. Circuit
which broadly and improperly expands court of appeals
jurisdiction to cover review of EPA's policy and procedural
permit regulations under the Clean Water Act, despite the
absence of any explicit reference to such regulations in the
applicable judicial review provisions of the Act. The decision
below misconstrues a decision of this Court and involves a
recurring issue of considerable importance.
A. Legislative And Administrative Background
Congress purposely split jurisdiction over review of EPA’s
actions under the CWA between the courts of appeals and the
district courts. In sharp contrast to the jurisdictional provisions
of other environmental statutes, where Congress chose to vest
the courts of appeals with jurisdiction to review all agency
actions, ' Congress deliberately limited appellate review under
the CWA to six specified categories of EPA actions, only one of
which is involved here, namely “approving or promulgating
any effluent limitation or other limitation.” CWA
§ 509(b)(1)(E). * Jurisdiction to review all other EPA actions
under the CWA is vested in the federal district courts by 28
U.S.C. § 1331 and by certain specific review provisions in
Section 505 of the CWA, 33 U.S.C. § 1365.
The issue involve. ‘ere is whether EPA’s NPDES regula-
tions are properly reviewable in the courts of appeals under
Section 509(b)(1)(E). This issue turns on the distinction be-
tween effluent limitations under the Act and EPA’s procedural
regulations for issuance of NPDES permits.
' See, e.g., 42 U.S.C. § 7607(b\ 1) (Clean Air Act); 42 U.S.C. § 300j-7
(Safe Drinking Water Act); 42 U.S.C. § 6976 (Resource Conservation and
Recovery Act). See also n.18 below.
733 U.S.C. § 136% b\ 1 WE). Section 50%b\(1) is set forth below at
14-15.
4
The “WA prohibits the discharge of any pollutant into the
nation’s waters unless and until the discharger has obtained a
NPDES permit under Section 402 of the Aci, 33 U.S.C.
§ 1342. NPDES permits specify the types and amounts of
pollutants an individual source may discharge. These specifica-
tions are based primarily on numerical “effluent limitations”
guidelines promulgated by EPA pursuant to Sections 301 and
304 of the Act, 33 U.S.C. §§ 1311, 1314, which set forth the
amounts of various pollutants which may be discharged by
particular industries based upon the application of appropriate
treatment technology. Such numerical effluent limitations have
been before the Court previously, ' but are not involved here. *
The NPDES regulations in question, 40 C.F.R. Parts 122-
125, establish detailed policies and procedures for issuing and
denying NPDES permits «nder Section 402 of the CWA. For
example, the regulations govern who may sign permit applica-
tions and monitoring reports (40C.F.R. § 122.6), the duration
and termination of permits (40 C.F.R. §§ 122.9, 122.16), the
sharing of information by states with EPA (40 C.F.R.
§ 123.10), EPA review of state permits (40 C.F.R. § 123.75),
ex parte communications during permit hearings (40 C.F.R.
§ 124.78), and cross-examination during non-adversary panel
hearings (40 C.F.R. § 124.121).
See E. 1. du Pont de Nemours & Company v. Train, 430 U.S. 112
(1977).
* The Act also contains separate provisions governing discharges of pollu-
tants by new sources and requiring the establishment of toxic pollutant
standards and water quality standards. 33 U.S.C. §§ 1316, 1317, 1312 asd
1313, respectively. These new source performance standards, toxic pollu-
tant standards and water quality standards, which also form the basis for
numerical limitations in permits, are not at issue in this case.
B. Proceedings Below
The current NPDES procedural rules, which extensively
revised prior rules, were first promulgated on June 7, 1979 (44
Fed. Reg. 32854-956). The rules were then repromulgated, in
slightly modified form, as part of EPA’s consolidated permit
regulations, 45 Fed. Reg. 33290-588 (May 19, 1980). These
procedural rules are now codified at 40 C.F.R. Parts 122-125.
Challenges to both the June, 1979 NPDES and May, 1980
“consolidated permit” regulations were filed by industry and
environmental groups in both federal district courts ° and feder-
al courts of appeals. Industry petitioners have consistently
maintained that only the federal district courts have jurisdiction
over these challenges. However, in light of the uncertainty over
the courts of appeals jurisdiction under Section 509(b)(1) of the
Clean Water Act, industry petitioners filed “protective” peti-
tions for review in the courts of appeals, in order not to risk
forfeiting entirely their rights to review should a court of
appeals later decide the jurisdictional issue in its own favor. °
This forfeiture problem arises because Section 509(b)(1) re-
quires petitions for review in the courts of appeals to be filed
within 90 days of the chaiienged Agency action. Failure to do so
precludes the raising in any subsequent enforcement proceed-
ing of any issue that could have been raised before a court of
appeals. 33 U.S.C. § 1369(b)(2).
The confusion over this critical jurisdictional issue is
graphically illustrated by EPA’s own change in position on this
* American Iron & Steel Institute, ef a/. v. Costle, No. 79-1218 (W.D.
Pa.); American Petroleum Institute, ef a/. v. Costle, No. 79-0858, (W.D.
La.); Appalachian Power Co., et al. v. Costle, No. 79-0188 (W.D. Va.);
Chemical Manufacturers Ass'n... et al. v. EPA, No. 79-0184 (W.D. Va.):
and Natural Resources Defense Council. Inc. v. Costle, No. 79-2948
(D.D.C.).
* See p. 9n.12 below. The various petitions were eventually consolidated
in the D.C. Circuit.
6
point. Throughout the long history of these proceedings, EPA
has insisted that Section 509(b)(1) of the CWA does not vest
Original jurisdiction in the courts of appeals to review the
challenged procedural retulations. The preamble to the June,
1979 regulations ’ stated unequivocally that review in a court of
appeals under Section 509(b)(1) “is not provided for actions in
issuing general regulations governing the issuance of NPDES
permits.” 44 Fed. Reg. 32855 (June 7, 1979). In pleadings filed
in the various federal court proceedings, the Agency has reiter-
ated that:
“Neither the 1979 NPDES regulations nor the NPDES
elements of the Consolidated Regulations fall within any
of the categories specified in § 509(b)(1).”*
Not until EPA filed its brief below did it take the position that
the challenged procedural regulations were “effluent limita-
tion|s] or other limitation{s]” under Section 509(b)(1)(E).
The question of the jurisdiction of the court under Section
509(b)(1) of the CWA was presented to the D.C. Circuit on
motion of the industry petitioners to dismiss their prote= tive
petitions for lack of jurisdiction. The industry parties argued
that Section 509(b)(1) of the CWA does not apply to the
NPDES procedural regulations. Industry petitioners also
argued that substantial policy grounds exist for a narrow read-
ing of the judicial review provisions of the CWA.
After briefing and oral argument, the D.C. Circuit denied the
motion, holding that the NPDES regulations are “effluent
limitation[s] or other limitation[{s]” under Section 509(b)(1)(E)
of the Act. The court acknowledged that, on its face, this
’ As the court below noted, these regulations are the same as the current
NPDES regulations, with only “slight substantive modifications.” Appx.
A-4.
* EPA Motion to Transfer at 6 (August 22, 1980), filed in Virginia Electric
and Power Company, ef al. v. EPA, No. 79-1347 (4th Cir.).
7
provision appears to cover only numerical limitations oa pollu-
tant discharges, as also indicated by the usage of this phrase in
the citizen suit provision of the Act. 33 U.S.C. § 1365(a).
However, the court avoided this conclusion with the explana-
tion that Congress sometimes uses the same word with different
meanings. Appx. A-6 n.10. The court also admitted that the
Third Circuit “has adopted the position industry urges here,”
but concluded that it did not agree with that Circuit. Appx. A-7.
The D.C. Circuit expressed its view that national uniformity is
“an important goal in dealing with broad regulations,” and is
“best served by initial review in a court of appeals.” Appx.
A-10 n.15. The court did not cite any statutory language or
legislative history to support these conclusions.
As a result of the D.C. Circuit’s determination, industry
petitioners must litigate the merits of these and all other argua-
bly similar regulations in the courts of appeals, or lose their
right to challenge the substantive validity of such regulations in
any subsequent enforcement proceedings.
REASONS FOR GRANTING THE WRIT
The Court should grant the petition for certiorari in this case
for three reasons that the Court has traditionally deemed to
warrant plenary review. First, the decision below creates a
direct conflict among the circuits, and has upset settled ex-
pectations concerning judicial review under the Clean Water
Act. Second, the decision below raises a major jurisdictional
problem of nationwide importance that will continue to plague
both the federal district courts and the federal courts of appeals,
and to waste the time, energy, and resources of courts and
litigants alike, unless resolved by this Court.’ And third, the
* See, e.g., Harrison v. PPG Industries, Inc., 446 U.S. 578, 586 (1980),
in which this Court granted certiorari “because of the importance of
determining the locus of judicial review of the actions of EPA.”
decision below is at odds with the language and history of the
Clean Water Act. It presents fundamental questions of impera-
tive public importance which only this Court can determine
concerning the authority of the federal courts of appeals to
circumvent the limits on their jurisdiction iinposed by Con-
gress, and the interpretation of a statute which, since its enact-
ment, has occasioned considerable litigation. "°
I. The Decision Below Creates A Conflict In the Circuits And
Departs From Prior Decisions Of This Court
As the court below acknowledged, its decision is in direct
conflict with the decision of the Court of Appeals for the Third
Circuit in American Iron & Steel Institute (“ AIST’) v. EPA, 543
F.2d 521 (3d Cir. 1976), which held that the courts of appeals
are without jurisdiction to review NPDES regulations that
merely “prescribe the policy and procedures to be followed in
connection with applications for permits.” 543 F.2d at 526. A
revised version of the regulations at issue in that case is part of
the regulations under challenge here. '' The court in A/S/ noted
that th> Act defined an effluent limitation as a restriction on the
quantities, rates or concentrations of pollutants, and held that
EPA’s procedural regulations were not subject to review under
Section 509(b) of the CWA. Although the D.C. Circuit ad-
vanced several theories on which to explain its disagreement
with A/S/ v. EPA, the court acknowledged that it “specifically
rejected the reasoning of A/S/.” Appx. A-7.
"© It is well established in this Court that a writ of certiorari may be granted
to review an order below denying a motion to dismiss for lack of jurisdiction
where, as here, the petition presents legal issues of great public importance
that are fundamental to the further conduct of the case. Land v. Dollar, 330
U.S. 731 (1947); American Power & Light Co. v. S.E.C., 325 U.S. 385
(1945); Ickes v. Associated Industries of New York State, Inc., 320 U.S.
707 (1943) (per curiam).
"40 C.F.R. §§ 122.63(g), 122.63(h).
9
The decisions of the two circuits cannot be squared. In A/S/,
the court recognized the clear jurisdictional barrier to federal
appellate review of regulations that “do no more than prescribe
the policy and procedures to be followed in connection with
applications for permits,” 543 F.2d at 526, stating:
“(W]e do not believe, in view of the explicit and limited
provisions of 33 U.S.C. § 1369(b)(1)(E) and (F), that
Congress intended us to engage in deliberations of thir sort
> My = of a full and comprehensive record.” 543
.2d at 528.
The D.C. Circuit's effort to explain its disagreement with
AISI by stating that the Third Circuit has confused jurisdiction
with “considerations of ripeness for review,” Appx. A-8, illus-
trates the lack of clarity in its own reasoning. Under the D.C.
Circuit’s approach, petitioners would be forced to file protec-
tive petitions in the courts of appeals * as soon as any general
procedural NPDES regulation is promulgated that might
adversely affect the source in a future permit or enforcement
proceeding, and then move to dismiss the petitions on ripeness
grounds, " in order to be sure of preserving later review in the
proper forum in the context of a permit or enforcement proceed-
ing. We submit that the Third Circuit was neither confused nor
incorrect in holding that Congress, by narrowly and expressly
limiting original court of appeals jurisdiction under Section
509(b)(1), intended to preclude, not require, such a result.
'? The Court of Appeals for District of Columbia Circuit encouraged the
filing of “protective” petitions in other contexts. See, ¢.g., Investment
Company Institute v. Board of Governors of the Federal Reserve System,
551 F.2d 1270 (D.C. Cir. 1977).
'' In upholding its jurisdiction to review the challenged regulations, the
court below stated, “The parties have not yet briefed the issue of the ripeness
of the CPR’s, and we do not today hold that any of them are ripe for review.
We hold only that this court has authority under § 509(b)( 1 )(E) to review
any CPR’s that are ripe.” Appx. A-8 n.13.
i «al
10
The court below also speculated that this Court's decisions in
E. 1. du Pont de Nemours & Co. v. Train, 430 U.S. 112(1977),
and Crown Simpson Pulp Co. v. Costle, 445 U.S. 193 (1980),
decided after A/S/, might have caused the Third Circuit to give a
more “practical” and less “cramped” construction to the limits
on its jurisdiction under Section 509(b). Appx. A-11. The D.C.
Circuit’s conclusion that the reasoning of the du Pont and
Crown Simpson cases “strongly supports” its decisions (Appx.
A-11) instead underscores its departure from the principles in
these cases. Neither decision permits a court of appeals to
ignore the express "’ nits on its jurisdiction in order to reach a
result it considers re “practical” than that directed by Con-
gress. Moreover, as the court below acknowledged, Appx.
A-11 n.16, the regulations at issue in those cases, particularly
the du Pont case, were a far cry from the general policy and
procedural regulations at issue here. In the du Pont case, the
Court held merely that specific industry-wide effluent limita-
tions guidelines setting forth numerical limitations fell within
the courts of appeals’ jurisdiction under Section 509(b)(1)(E) of
the Act. That result is wholly consistent with the Third Circuit's
holding in A/S/. The same cannot be said for the D.C. Circuit's
effort to use the du Pont decision as a wedge to expand its
jurisdiction over regulations wholly unrelated to specific
numerical “effluent limitation[s] or other limitation|s].”
The broad construction given to Section 509(b) of the CWA
by the D.C. Circuit is also inconsistent with the approach taken
by the Second Circuit in interpreting this judicial review provi-
sion:
“{I}t seems to us that when a jurisdictional statute sets forth
with such specificity the actions of an administrative agen-
cy which may be reviewed in the courts of appeals, a
litigant seeking such review of an action that is not speci-
fied bears a particularly heavy burden.”
Bethlehem Steel Corp. v. EPA, 538 F.2d 513, 517-18 (2d Cir.
1976). See also, Central Hudson Gas & Electric Corp. v. EPA,
587 F.2d 549, 555-57 (2d Cir. 1978). We submit that this
approach taken by the Second and Third Circuits is more sound
than the expansive assertion of jurisdiction by the D.C. Circuit
below.
Il. The Decision Below Involves Recurring Questions Concerning
Judicial Review Under The Clean Water Act
Allowing the decision below to stand would raise a host of
new problems eliminated by Congress’ narrow and careful
delineation of court of appeals’ jurisdiction in Section
509(b)(1). If regulations as broad and general as those at issue
here are considered to be “effluent limitation[s] or other limita-
tion(s],” it is difficult if not impossible to limit the term rational-
ly in future cases. While the court below insisted that its
decision “does not turn § 509(b)(1) into a comprehensive re-
view provision that Congress did not intend it to be,” Appx. A-8
n.14, it fails to provide any basis whatsoever for drawing
reasonable distinctions. “
As a result of the conflict between the circuits on this critical
jurisdictional point, the many thousands of industrial dis-
chargers throughout the country that are subject to NPDES
requirements can have no certainty as to the proper forum for
judicial review of any NPDES regulations. The consequence
will necessarily be a deluge of “protective” petitions in the
federal courts of appeals each and every time NPDES regula-
tions are promulgated.
As a result, virtually any restrictions of any sort on industrial dis-
chargers (and there has yet to be an NPDES regulation that does not arguably
impose some type of restriction) must now be challenged within 90 days in
the courts of appeals. The standard announced by the court below is whether
the regulations impose any “ ‘restriction on the untrammeled discretion of
the industry’ that existed before passage of the CWA.” Appx. A-9.
12
Considering that the Clean Water Act and the regulations
thereunder are not only one of the most important and complex
but also one of the most hotly debated and extensively litigated
regulatory programs in existence today, the potential burden
on the courts and on litigants is truly staggering. The procedural
background of this case alone helps illustrate the magnitude of
the problem. Because of the uncertainty as to court of appeals
jurisdiction over the consolidated permi’ regulations, nce fewer
than twelve petitions for review were filed in the courts of
appeals, and at least five complaints were filed in the district
courts. After three years of active litigation, the parties are no
nearer to litigating the merits of the challenged regulations than
they were in June, 1979. In fact, given the D.C. Circuit's
Statements on the “ripeness” issue, another long, preliminary
issue lies ahead to be briefed and decided by that court. "
Although the court below apparently believed that its deci-
sion would lessen the burden on the courts by requiring initial
review in a court of appeals of such regulations, Appx. A-9-10,
and A-10 n.15, that is clearly not the case. As indicated above,
the D.C. Circuit has stated that many of such regulations may
not be ripe for review, and might thus be reviewable in a
particular factual context in connection with an enforcement
proceeding in a district court or a suit in a court of appeals
concerning the issuance of an NPDES permit. To preserve such
later review, however, petitioners will be compelled to file
protective petitions in the courts of appeals and then move to
dismiss the petitions on ripeness grounds, thereby adding to the
courts’ burdens.
'S This Court's decisions in Crown Simpson and du Pont, supra, cite only
a few of the many district court and court of appeals decisions on NPDES
issues.
The parties before the D.C. Circuit agree that certain of the NPDES
issues are ripe for review but others are not yet ripe, and have advised that
court of their intention soon to submit a motion to dismiss the unripe issues.
13
Moreover, with regard to future challenges to regulations
under the CWA, the D.C. Circuit’s opinion has left even the
status of court of appeals jurisdiction in complete confusion.
The court below noted that:
“Industry petitioners argue that if the CPR’s are review-
able in a court of appeals, virtually any action
under the CWA will be so reviewable, thus contravening
the congressional intent. EPA contend: however — and
does rot — that certain ‘ions under the
CWA are outside of § 509(b)(1). See EPA Brief at 27.
* * * We do not decide that we would lack jurisdiction in
all the cases EPA lists. . ..” Appx. A-8 n.14.
Virtually all EPA regulations under the Clean Water Act will
from now on be subject to challenge in both the federal courts of
appeals '’ and the district courts, where burdensome litigation
and conflicting decisions as to jurisdiction are again likely.
Only this Court can bring to a halt the tremendous waste of
judicial resources that will necessarily follow if the D.C. Cir-
cuit’s decision is allowed to stand.
Ill. The Decision Below Contravenes Congress’ Limited Grant Of
Jurisdiction To The Courts Of Appeals And Conflicts With
The Structure And Purpose Of The Clean Water Act
It is one of the most basic principles of federal jurisdiction
that the courts of appeals are courts of limited jurisdiction, with
only such jurisdiction as is expressly granted to them by statute.
American F ederation of Labor v. NLRB, 308 U.S. 401 (1940);
Assessors v. Osbornes, 9 Wall. 567, 76 U.S. 567 (1869).
Although there may be excellent policy reasons for doing so,
the courts may not expand that limited jurisdiction without
express authorization from Congress. A.F. of L. v. NLRB, 308
"’ As noted at p.5 above. the preclusive nature of Section 50% b) 1) review
in effect mandates such “protective” suits.
14
U.S. at 411-412. It is the responsibility of this Court to ensure
that the statutory limits and bounds of the lowe: courts’ jurisdic-
tion are not exceeded. Sumner v. Mata, 449 U.S. 539, 547 n.2
(1981); Louisville & Nashville Railroad Co. v. Mottley, 211
U.S. 149, 152 (1908).
While Congress could have vested original jurisdiction in the
courts of appeals to review virtually all regulations of general
applicability under the CWA promulgated by EPA, as it did
under other environmental statutes," it declined to do so.
Instead, Section 509(b)( 1) provides for original court of appeals
jurisdiction over EPA actions in only six enumerated situations.
These are EPA actions:
“(A) ea er oe oe
16 of this title,
“(B) in making any determination pursuant to section
1316(b)(1)(C) of this title,
“(C) in promulgating any effluent standard, prohibition,
or pretreatment standard under section 1317 ofthis tie,
“(D) in making any determination as to a State
progratn submitted under section 1342(b) of this cde,
" See, e.g., 42 U.S.C. § 7607(b)( 1) (authorizing court of appeals review
of eight specified categories of action and “any other nationally applicable
regulations promulgated or final action taken” under the Clean Air Act); 42
U.S.C. §§ 300j-7(a)( 1) and (a)(2) (authorizing District of Columbia Court
of Appeals review of four specified categories of action and “any general
regulation for the administration” of the Underground Injection Control
program under the Safe Drinking Weter Act, and court of appeals review in
the appropriate circuit of “any other regulation”); and 42 U.S.C.
§ 6976(a)(1) (authorizing the filing with courts of appeals of “a petition for
review of action of the Administrator in promulgating any regulation” under
the Resource Conservation and Recovery Act).
vs
wv
15
“(E) in approving or promulgating any effluent limita-
tion or other limitation under section 1311, 1312, or 1316
of this title, and
“(F) in issuing or ing any it under section 1342
of this title, . . ..- 33 U.S.C. § 1369(b)(1).
' As ‘s apparent from: the language of Section 509(b)(1), these six
enumerated actions fall intu two basic categories: (1) review of
final agency action in approving or disapproving state NPDES
programs and individual NPDES permits, and (2) review of the
technical effluent standards and limitations required by the
Agency to be incorporated, where applicable, in all NPDES
permits.
The language and legislative history of the Act, as well as the
relevant case law, confirm that the phrase “effluent limitation or
other limitation,” as contained in Section 509(b)(1)(E), refers
to numerical restrictions on the quantities of pollutants that may
be discharge. The phrase “effluent limitation” is defined in the
Act as:
“[A]ny restriction established by a State or the Administra-
tor on ities, rates, and concentrations of chemical,
charged from point sources into navigable waters, the
waters of the contiguous zone, or the ocean, including
schedules of compliance.” 33 U.S.C. § 1362(11).
“Effluent limitations” have been described as “aterm of art. . .
restricting the quantities of pollutants that enterprises in a given
industry may discharge.” "
,
Crown Simpson Pulp Co. v. Costle, 599 F.2d 897, 902 (9th Cir. 1979),
reversed on other grounds, 445 U.S. 193 (1980). “[E}fflvent limitations are
technical specifications of the quantities of various polluting substances that
a permittee may lawfully discharge.” Montgomery Environmental Coalition
v. Costle, 646 F.2d 568, 574 (D.C. Cir. 1980). Effluent limitations are
“specified maximum levels of pollution allowed to be discharged by an
individual source.” Environmental Defense Fund, Inc. v. Costle, 657 F.2d
275, 279 (D.C. Cir. 1981). See also EPA v. California ex rel. State Water
Resources Control Board, 426 U.S. 200, 204-05 (1976).
16
Although the phrase “effluent limitation or other limitation”
is not defined in the Act, the phrase is used in no fewer than
eight other sections of the Act. Not a single one of these sections
refers, either expressly or by implication, to regulations other
than numerical specifications on pollutant levels. * The citizen
suit provision of the Act authorizes any interested person to
commence a suit in federai district court against “any person
. . . in violation of . . . an effluent standard or limitation under
this chapter.” 33 U.S.C. § 1365(a)(1). This section, which
defines the violation of an “effluent standard or limitation” to
include “an effluent limitation or other limitation” under Sec-
tions 301 and 302, confirms that only numerical specifications
® See 33 U.S.C. §§ 1318(a) (record keeping relating to the development
of “any effluent limitation, or other limitation, prohibition, or effluent
standard, pretreatment standard of performance”); 1341(a)(4) review of the
manner in which a facility shall be operated to insure that no “effluent
limitations or other limitations or other applicable water quality require-
ments” will be violated); 1341(b) (EPA required to provide information on
“effluent limitations, or other limitations, standards, regulations, or require-
ments, or water quality criteria” to the states or other Federal departments or
agencies), 1341(d) (certification required to set forth “effluent limitations
and other limitations, and monitoring requirements” to assure compliance
with effluent limitations and standards); 1362(17) (“schedule of com-
pliance” defined to include enforceable sequence of actions leading to
compliance with “an effluent limitation, or other limitation, prohibition or
standard”); 1365(f) (for purposes of citizens’ suits, “effluent standard or
limitation” is defined to include “an effluent limitation or other limitation
under section 1311 or 1312”); 1367(d) (employee protection provisions do
not apply to deliberate violations of “any prohibition of effluent limitation or
other limitation”); and 1370 (states may not adopt or enforce any “effluent
limitation, 0: other limitation, effluent standard, prohibition, pretreatment
standard, or s' ndard of performance” less stringent than federal standards).
17
were intended. 33 U.S.C. § 1365(f). As the Senate Committee
on Public Works explained the citizen suit provision:
“Enforcement of pollution regulations is not a technical
matter beyond the competence of the courts. The citizen
suit provision is consistent with principles underlying the
Federal Water Pollution Control Act, that is the develop-
ment of clear and identifiable requirements. Such require-
ments should ide manageable and precise benchmarks
for enforcement. *
There is no question that the D.C. Circuit has asserted
jurisdiction over regulations which have virtually nothing to do
with identifiable limitations on discharges. The court below so
acknowledged:
“These regulations do not set any numerical limitations on
pollutant discharge. Instead, they are a complex set of
procedures for issuing or denying NPDES permits. . ..”
“The CPR’s, everyone agrees, are far more general [than
regulations based on precise, technical information and
applied to particular po eaag! point sources] and rest
dominantly on policy ” Appx. A-4, A-9.
The court nevertheless determined that, as a matter of policy, it
would be more “practical” to extend its jurisdiction under
Section 509(b)(1)(E) to include such regulations. Appx. A-11.
It is clear from the language of the statute that such an extension
of the court of appeals’ jurisdiction is unwarranted. ”
*§. Rep. No. 92-414, 92d Cong., Ist Sess. 81 (1971) (emphasis added).
” Significantly, the court below cited nothing in the language or legisla-
tive history of the Act that would warrant expanding its jurisdiction in this
fashion. Moreover, even if the statute and legislative history were at all
ambiguous on that point — which industry petitioners submit they are not —
the maxims of noscitur a sociis and ejusdem generis apply “in order to avoid
the giving of unintended breadth to the Acts of Congress.” Jarecki v. G D.
Searle & Co., 367 U.S. 303, 307 (1961). See also, Third National Bank in
Nashville v. Impac Limited, Inc., 432 U.S. 312, 322-23.
* A:
Whether or not the various policy reasons cited by the court
below ”' are valid bases for expanding court of appeals jurisdic-
tion is an issue for Congress. A.F. of L., 308 U.S. at 411-412.
In the absence of such congressional authority, the courts are
without power to take such action unilaterally, even for the best
of “policy” reasons. /d. See also, Harrison, 446 U.S. at 593.
CONCLUSION
For the foregoing reasons, the petition for a writ of certiorari
should be granted.
Respec “ully submitted,
THEODORE L. GARRETT
Patricia A. BARALD
CorINNE A. GOLDSTEIN
COVINGTON & BURLING
1201 Pennsylvania Avenue, N.W.
Washington, D.C. 20044
(202) 662-6000
Attorneys for Petitioners
Chemical Manufacturers Association, et al.
May 1982
2 The primary policy reasons given by the court below are (1) national
uniformity, (2) judicial economy, and (3) court of appeals expertise in
reviewing “broad policy-oriented rules.” Appx. A-9-10 and A-10 n.15.