Record and brief — Pacific Legal Foundation v. State Energy Resources Conservation & Development Commission
Supreme Court brief1982
Ask Donna
What actually matters in this document.
Text
-uoIeg
81- 1 944 Supreme Court, U.S.
FILED
a | , APR 80 We
ALEXANOER L. STEVAS
In THE CLERK
Supreme Court of the United States
OctTosBer TERM, 1981
PacirFic LEGAL FOUNDATION, ef al.,
Petitioners,
Vv.
STATE ENERGY RESOURCES CONSERVATION &
DEVELOPMENT COMMISSION, ef al,
Respondents.
Petition for a Writ of Certiorari
to the United States Court of Appeals
for the Ninth Circuit
RONALD A. ZUMBRUN
Rosin L. Rivett
Pacific Legal Foundation
455 Capitol Mall, Suite 600
Sacramento, California 95814
Telephone: (916) 444-0154
RAYMOND M. MOMBOISSE
SAM KAZMAN
Pacific Legal Foundation
1990 M Street, N.W., Suite 550
Washington, D.C. 20036
Telephone: (202) 466-2686
Attorneys for Petitioners
i
QUESTIONS PRESENTED FOR REVIEW
1. Whether federal regulation of nuclear energy and
federal policy to encourage its development and use, under the
Atomic Energy Act, 42 U.S.C. §§ 2011-2281, preempt Califor-
nia’s prohibition on the construction of new nuclear power
plants.
2. Whether an individual whose job at a proposed nuclear
power plant was destroyed by California’s nuclear moratorium
has standing to challenge the validity of that law.
PARTIES BELOW
The parties in the action below were the following:
1. plaintiffs-appellees—Pacific Legal Foundation, a
nonprofit California corporation;* the San Diego Coalition, a
nonprofit California corporation; the San Diego Section of the
American Nuclear Society, a New York corporation; the San
Diego County Building and Construction Trades Council, a
labor organization; and Robert C. Thornberry, an individual;
2. defendants-appellants—the California State Energy
Resources Conservation and Development Commission, a state
agency; and Emilio E. Varanini, III, C. Suzanne Reed,
Ronald D. Doctor, Russell L. Schweickart, and James L.
Walker, in their capacities as members of the Commission;
3. defendants-intervenors—the Natural Resources Defense
Council, Inc., the Environmental Defense Fund, Inc., the Sierra
Club, and Californians for Nuclear Safeguards.
In the Court of Appeals for the Ninth Circuit, this action
was consolidated with the case of Pacific Gas & Electric Co. v.
State Energy Resources Conservation & Development Commis-
sion. The plaintiffs-appellees in that action were Pacific Gas
and Electric Company and Southern California Edison Com-
pany, and they have filed a separate petition for certiorari with
this Court. The defendant and defendant-intervenor parties in
that action were the same as those in the instant case.
* Pacific Legz! Foundation has no parent companies or subsidiaries. It is
affiliated with the College of Public Interest Law, a fellowship program for
law school graduates.
TABLE OF CONTENTS
CONSTITUTIONAL AND STATUTORY PROVI-
Ee TM ccinisstnccsnsoscssnnnnessensesssnestentuinsinntanes
BREET CO
B. History of the Proceedings Below....................:-00++
REASONS FOR GRANTING THE WRIT....................
I. THE NINTH CIRCUIT’S DECISION UP-
HOLDING CALIFORNIA’S NUCLEAR
MORATORIUM CONFLICTS WITH THE
RULINGS OF THIS COURT AND OF OTH-
ER CIRCUIT COURTS ON FEDERAL PRE-
EMPTION OF NUCLEAR ENERGY REGU-
LATION AND ALLOWS THE OBSTRUC-
TION OF FEDERAL POLICY TO PROMOTE
THE DEVELOPMENT AND USE OF NU-
ee a liaesictrinisnnnssnsnvinnsntetsocnssinascnennnsnanesese
A. The Ninth Circuit Ignored the Supreme
Court’s Explicit Ruling on the In-
conclusiveness of Legislative Committee
Reports When It Ruled that California’s
Nuclear Moratorium Is Not Aimed at the
Prohibited Area of Safety Regulation.........
B. Under Principles Set Forth by the Su-
ee Court, the Federal Government's
cisions Concerning Nuclear Waste Dis-
posal Preempt Any Contrary Decision by
SII dccshtstsineaserssessicctceneensitetimanmneinees
C. California’s Nuclear Moratorium Ob-
structs Federal Policy on an Issue of Na-
i cetsccnscnesncscntssscntndiatanitsndenes
Il. CONTRARY TO THE NINTH CIRCUIT,
THE DESTRUCTION OF AN _ INDIVID-
UAL’S JOB BY CALIFORNIA’S NUCLEAR
MORATORIUM IS A SUFFICIENT BASIS
ee STANDING TO CHALLENGE THAT
FE siniasncccsesnnintibnannsneinesnisctnunenasetenniineennnnnnien
Ill. THIS CASE IS APPROPRIATE FOR RE-
VIEW DESPITE THE FACT THAT IT IN-
VOLVES A REVERSAL OF SUMMARY
FESO teccrernncitercssttanannemessrmanentnnninnninmnasiaee
«EIS ESIAE SESE ASSO ona nee
APPENDIX
Opinion of the District Court .............ccccccseesseeeeeeenees
Order of the Court of Appeals Denying Rehearing..
Annotations to California Public Resources Code
i SII ocinkacinscsineibileiitdlliasstcieppeneisineennaaceauiteunaaiinbies
I Wiiteiiteniticnitieiscsctnincnnnsinnensbiniaiintiinns
TABLE OF AUTHORITIES CITED
CASES
Carson v. Domestic and Foreign Commerce Corp., 337
SR SET ITI onecdaninsaptiaaettindninceteninndpespiiiieanidadiediiiatn
Cox Broadcasting Corp. v. Cohn, 420 U.S. 469 (1975)...
Duke Power Co. v. Carolina Environmental Study
Gree, Bae.. GIB US. FOC TG T6 ) ncvececceccosesvccccssescevensssnene
General Electric Co. v. Fahner, Nos. 80-C-6835, 81-C-
461 (N.D. Ill. Oct. 12, 1981), appeal docketed sub
nom. Illinois v. General Electric Co., Nos. 81-2768,
eee Fe te PEs Gi, WIE D ececccctecesssccsscsocenssinnnentns
Gillespie v. United States Steel Corp., 379 US. 148
AIST ctabiienenieseasniticsistbedeniaisaneeiassemnnnsianienntéeneeemmneineate
14
16
21
22
20
20
Hines v. Davidowitz, 312 U.S. 52 (1941) .............cceeee
Land v. Dollar, 330 U.S. 731 (1947) .....ccccccccccceeeeeeeeees
Meyer v. Nebraska, 262 U.S. 290 (1923) ......ccccccccceeeeee
Natural Resources Defense Council, Inc. v. Nuclear
—* Commission, 582 F.2d 166 (2d Cir.
1978)
Northern States Power Co. v. Minnesota, 447 F.2d
eae 8th Cir. 1971), aff'd mem., 405 U.S. 1035
( is ciatheaniabddeassatbatidetisbibnemnnenitcmngeemenmnindieennnes
Gar S. Ga, GE UE, Be 0 FFG Pecccccccccccccccscctenssssensseeees
Perez v. Campbell, 402 U.S. 637 (1971) .....cccccccceeeeeeeee
Peterson v. City of Greenville, 373 U.S. 244 ( 1963).....
Power Reactor Development Co. vy. International
Union of Electrical, Radio & Machine Workers,
fg | GF, | ERE eeeneorenere
Ray v. Atlantic Richfield Co., 435 U.S. 151 (1978) .....
Regents of University of California v. Bakke, 438 U.S.
I TUTTI iiss lantiarieidahcaiacicinaniaibieanianiainbmnaemnansniiinen
Silkwood v. Kerr-McGee Corp., No. 79-1894 (10th
Ss ls WII idnraistuniienicensecnsmniiiecnsasigmanieniinete
Train v. Colorado Public Interest Research Group,
ES EERE Care cme eee
United States v. City of New York, 463 F. Supp. 604
a 6 SP ihaecaicnserdnniemnsnenasesenianssenieinantiinnds
United States v. General Motors Corp., 323 U.S. 373
SUIT sciateini hears cuanmaasitnechasestbectgunittnedaadibenmbies
Village of Arlington Heights v. Metropolitan Housing
Development Corp., 429 U.S. 252 (1977) ...cccccceeceeeee
Washington State Building & Construction Trades
Council v. Spellman, 518 F. Supp. 928 (E.D.
Wash. 1981), appeal docketed, No. 81-3453 (9th
nee
UNITED STATES CONSTITUTION
RS EE LT Te
EE STREP a Oe Ce
Page
15
20
16
12-13
8-9
17-18
11-12,14
16
19
17
FEDERAL STATUTES
a a cenndetleaaicitihs dtielnencintinateies igaiaiai ha oleae
Atomic Energy Act of 1954, Pub. L. No. 83-703, 68
Stat. 919, 42 U.S.C. $$ 2011-2282 .0.0...........ccccceseese
Price-Anderson Act, 42 U.S.C., § 2210..........cccccsesceseees
Energy Reorganization Act of 1974, 42 U.S.C.
a a eae ietnrsatasntidanteipseataiidennmnanitieisnidinnasani
STATE STATUTES AND PROPOSITIONS
California Public Resources Code
|” ERITREA Sc: ae
a eee
a ol
Warren-Alquist State Energy Resources Con-
servation and Development Act, Cal. Pub. Res.
SS RoE ee
aes Nuclear Safeguards Initiative ( Proposition
i icciesischicisheenniiviietetaesiededenilteldehaiaesietaateenasiandiicnhniieeiabiitiecabeainadaihs
MISCELLANEOUS
17 Weekly Comp. of Pres. Docs. 1101 (Oct. 8, 1981).
i
Passim
3
No.
IN THE
Supreme Court of the United States
OcTOBER TERM, 1981
PaciFic LEGAL FOUNDATION, ef al.,
Petitioners,
Vv.
STATE ENERGY RESOURCES CONSERVATION &
DEVELOPMENT COMMISSION, ef ai,
Respondents.
Petition for a Writ of Certiorari
to the United States Court of Appeals
for the Ninth Circuit
Petitioners Pacific Legal Foundation (PLF), the San
Diego Coalition, the San Diego Section of the American
Nuclear Society, the San Diego County Building and Construc-
tion Trades Council, and Robert C. Thornberry respectfully
request that this Court issue a writ of certiorari to review the
opinion and judgment of the United States Court of Appeals for
the Ninth Circuit.
OPINIONS BELOW
The opinion of the Court of Appeals in this case, and in the
consolidated action brought by the Pacific Gas and Electric
Company (the PG&E case), is officially reported as Pacific
Legal Foundation v. State Energy Resources Conservation &
2
Development Commission, 659 F.2d 903 (9th Cir. 1981). The
Ninth Circuit’s opinion is reprinted in the appendix to the
petition for certiorari which has been separately filed by PG&E
(PG&E App.). The PG&E appendix is incorporated by
reference into this petition.
The opinion of the District Court in the PLF case is
officially reported at 472 F. Supp. 191 (S.D. Cal. 1979) and is
reprinted in the appendix to this petition. PLF App. |. The
District Court opinion in the related PG&E case is officially
reported at 489 F. Supp. 699 (E.D. Cal. 1980) and is reprinted
in the PG&E Appendix.
JURISDICTION
The opinion of the Court of Appeals was issued on
October 7, 1981. No separate judgment was issued. A timely
motion for rehearing was denied on January 20, 1982. PLF
App. 19. The jurisdiction of this Court is invoked under 28
U.S.C. § 1254(1).
CONSTITUTIONAL AND STATUTORY
PROVISIONS INVOLVED
This case involves the question of whether federal law and
policy on nuclear energy preempt California’s across-the-board
prohibition on the construction of new nuclear plants. Califor-
nia’s nuclear moratorium is contained in Section 25524.2 of the
California Public Resources Code. The federal law against
which that moratorium must be judged is the Atomic Energy
Act, 42 U.S.C. §§ 2011-2282. These laws are set forth in the
PG&E Appendix and are hereb~’ incorporated by reference.
The governing provision of the United States Constitution
on the issue of preemption is the supremacy clause:
“This Constitution, and the Laws of the United
States which shall be made in Pursuance thereof; and
all Treaties made, or which shall be made, under the
Authority of the United States, shall be the supreme
3
Law of the Land; and the Judges in every State shall
be bound thereby, any Thing in the Constitution or
Laws of any State to the Contrary notwithstanding.”
Art. VI, cl. 2.
Also at issue in this case is the question of whether a
nuclear engineer whose job was destroyed by the moratorium
has standing, on that basis, to challenge its validity. The
governing provision of the Constitution regarding this question
is the “case and controversy” clause of article III:
“The judicial Power shall extend to all Cases, in
Law and Equity, arising under this Constitution, the
Laws of the United States and Treaties made, or
which shall be made, under their Authority... .”
Art. III, § 2.
STATEMENT OF THE CASE
A. Introduction
In the Atomic Energy Act of 1954, Pub. L. No. 83-703,
68 Stat. 919, Congress determined to allow private industry to
Participate in the field of nuclear energy as a means of
encouraging the development and utilization of that energy
source for peaceful purposes. In 1976, California enacted a
moratorium on the construction of new nuclear plants in the
state. This moratorium was one of three amendments which
were added to the state’s Public Resources Code and which are
known collectively as the California Nuclear Laws. The
Nuclear Laws impose a number of preconditions to the con-
struction of any new nuclear plants within California. New
Section 25524.1 prohibits the construction of any new nuclear
plant which requires fuel rod reprocessing until it is found that
there is a federally approved technology for reprocessing or
storing spent fuel rods. Section 25524.2, the nuclear morato-
rium provision, prohibits the construction of new plants absent
a finding that the federal government has approved a method
for disposing of high-level nuclear wastes. Finally, Section
25524.3 forbids the construction of new plants until the com-
4
pletion of a feasibility study on placing such plants either
underground or surrounded by earthen berms. PG&E App.
207-17.
The California Nuclear Laws are implemented by the
State Energy Resources Conservation and Developme™t Com-
mission (State Energy Commisssion ), which was established in
1974 by the Warren-Alquist State Energy Resources Con-
servation and Development Act, Cal. Pub. Res. Code §§ 25000,
et seq. PG&E App. 193. It is the responsibility of the State
Energy Commission to make the findings required by the
California Nuclear Laws. These findings can be disapproved
by the California Legislature, but otherwise they are a pre-
requisite to the certification of any new nuclear plant within the
state. No power generating facility can be constructed in
California without such certification. Cal. Pub. Res. Code
§ 25500, PG&E App. 194-95.
The California Nuclear Laws were considered and enacted
during the pendency of the public referendum measure known
as the California Nuclear Safeguards Initiative, or Proposition
15 (reprinted at PLF App. 22). PLF v. State Energy Commis-
sion, 659 F.2d at 924, PG&E App. 37. Proposition 15 proposed
a number of prerequisites for the certification of new nuclear
plants and for the continued operation of existing nuclear
plants. It would have required the removal of the limits
imposed by the federal government on the liability of plant
operators for nuclear accidents under the Price-Anderson Act,
42 U.S.C. § 2210. It also would have required numerous safety
assurances regarding nuclear plant operation. In the words of
the State Energy Commission, Proposition 15 “would have
simply shut down all existing nuclear power plants and flatly
prohibited the construction of new ones.” State Energy Com-
mission, Appellate Brief at 9; see also 659 F.2d at 924, PG&E
App. 37-39.
The California Nuclear Laws were enacted on June 3,
1976. Five days later, Proposition 15 was rejected by the voters
of California by a 2-1 margin. PLF, Appellate Brief at 5S.
On January 25, 1978, the State Energy Commission issued
its finding that there was no federally approved technology for
the disposal of high-level nuclear wastes. PLF v. State Energy
5
Commission, 472 F. Supp. at 194. The Commission therefore
could not make the affirmative finding on waste disposal
required by the California Nuclear Laws.
Two days later, on January 27, 1978, the Board of
Directors of the San Diego Gas and Electric Company resolved
that it would attempt to obtain an exemption from the Califor-
nia Nuclear Laws for a proposed plant known as the Sundesert
Nuclear Project. Excerpt of Record (ER) at 437-38, PLF v.
State Energy Commission (9th Cir. ).
On May 3, 1978, the Board of Directors gave up its
attempt. Having failed to obtain an exemption for the Sunde-
sert project, it decided to “[i]mmediately stop any further
Sundesert expenditures” and “[p]romptly terminate all Sunde-
sert contracts ....” ER at 440.
Robert C. Thornberry is a nuclear engineer who was
employed by San Diego Gas and Electric on the Sundesert
project. On May 31, 1978, four weeks after the Board of
Directors decided to terminate Sundesert, Robert Thornberry
lost his job due to a reduction in force at the project. ER at 376,
442; 659 F.2d at 909-10.
B. History of the Proceedings Below
The PLF action challenging the California Nuclear Laws
was filed four months after Robert Thornberry lost his job. The
action was brought in federal district court on behalf of
Mr. Thornberry and four organizations. The basis for federal
jurisdiction was 28 U.S.C. §§ 1331(a) (federal question) and
1337 (regulation of commerce ).
The District Court entered its judgment on March 6, 1979,
after hearing motions for summary judgment and dismissal.
The court ruled that only Robert Thornberry had standing to
challenge the California Nuclear Laws, and that only
Section 25524.2, the moratorium provision, was ripe for review.
That provision was found unconstitutional on the ground of
federal preemption. The court ruled that it invaded the area of
radiation hazard control, which Congress had foreclosed to
state legislation, and that it frustrated the congressional objec-
tive of encouraging nuclear energy development by prohibiting
6
new nuclear plants. The court refused to accept the State
Energy Commission’s claim that, because the Nuclear Laws
were allegedly enacted for economic purposes and not for
reasons of safety, they were therefore valid. 472 F. Supp. at
198, PLF App. 12.
Thirteen months after the judgment in the PLF case,
another district court issued a similar, though broader, ruling in
a separate action brought by PG&E. That court found that all
three of the California Nuclear Laws were federally preempted,
as well as several other provisions of the California Public
Resources Code.
The PLF and PG&E cases were consolidated on appeal
before the Ninth Circuit. On October 7, 1981, a panel of that
court ruled that only two provisions of the Public Resources
Code were ripe for review—the nuclear moratorium, and
another section requiring that all power plant proposals contain
at least three alternate sites. The court held both provisions to
be valid, accepting the State Energy Commission’s claim that
the moratorium was “directed toward purposes other than
protection against radiation hazards.” 659 F.2d at 925, PG&E
App. 40. The court also found that there was no frustration of
federal policy by the state laws, despite their effect of blocking
the construction of any new nuclear plants.
On the question of standing, the court ruled that, even if
Thornberry had lost his job as a result of the nuclear morato-
rium, this “would not suffice to give Thornberry standing”—he
would still have to prove that he would get his job back were
the moratorium to be invalidated. 659 F.2d at 913, PG&E
App. 14. The court reversed the judgments in both cases, and
remanded the PLF case for further proceedings. On January
20, 1982, timely petitions for rehearing in both cases were
denied, leading to the petitions for certiorari which have been
separately filed in both this and the PG&E case.
REASONS FOR GRANTING THE WRIT
The decision of the Court of Appeals effectively rewrites
the law of preemption on the issue of state enactments which
7
conflict with federal policy. Despite the fact that Congress has
determined to encourage the development and use of nuclear
energy as a matter of national policy, the court’s ruling opens
the door for any state to block categorically the deveiopment of
this energy source. Such a result would be of national
consequence at any time; because of the energy shortages of the
past decade, the present importance of this issue cannot be
overstated. The decision itself conflicts with legal principles
established by this Court regarding the preemptive scope of the
Atomic Energy Act and the manner in which federal-state
conflicts are to be analyzed and resolved. For these reasons,
this petition for certiorari should be granted.
THE NINTH CIRCUIT'S DECISION UPHOLDING
CALIFORNIA’S NUCLEAR MORATORIUM CONFLICTS
WITH TH& RULINGS OF THIS COURT AND OF OTHER
CIRCUIT COURTS ON FEDERAL PREEMPTION OF
NUCLEAR ENERGY REGULATION AND ALLOWS THE
OBSTRUCTION OF FEDERAL POLICY TO PROMOTE
THE DEVELOPMENT AND USE OF NUCLEAR POWER
The Atomic Energy Act states, as congressional policy, that
the “development, utilization, and control of atomic energy for
military and for all other purposes are vital to the common
defense and security.” 42 U.S.C. §2012(a). It declares that
one of its purposes is
“to encourage widespread participation in the devel-
opment and utilization of atomic energy for peaceful
purposes to the maximum extent consistent with the
common defense and security and with the health
and safety of the public....” Jd. at § 2013(d).
It expressly reserves the regulation of nuclear plant con-
struction and operation to the federal government, and it
explicitly prohibits state regulation of such plants with respect
to radiation hazards. Under 42 U.S.C. § 2021(c)(1), the
“construction and operation of any [nuclear] production or
utilization facility” is and must remain the responsibility of the
Nuclear Regulatory Commission ( NRC) (formerly the Atomic
Energy Commission ( AEC); see 659 F.2d at 920 n.25, PG&E
App. 29 n.25). Unlike other subject areas, for which responsi-
bility may be transferred to states pursuant to 42 U.S.C.
§ 2021(b), this is an area for which federal responsibility
cannot be delegated. Similarly, while 42 U.S.C. § 2021(k)
preserves state regulatory authority, it does so only for those
regulations which are “for purposes other than protection
against radiation hazards.” (Emphasis added. )
The preemptive scope of these provisions was extensively
analyzed in Northern States Power Co. v. Minnesota, 447 F.2d
1143 (8th Cir. 1971), aff'd mem., 405 U.S. 1035 (1972).1 The
court there found that the legislative history
“makes it clear that Congress intended to pre-empt
the field of the licensing and regulation of nuclear
reactors to the exclusion of the states and that it did
not intend to provide for dual regulation of radiation
hazards, even as to those activities which could be
turned over to the states.” 447 F.2d at 1151.
The court concluded that “the federal government has
exclusive authority under the doctrine of pre-emption to regu-
late the construction and operation of nuclear power
plants....” Jd. at 1154.
The Northern States holding has since been applied by a
number of courts. In Train v. Colorado Public Interest Re-
search Group, Inc., this Court noted that
“state regulatory programs must be compatible with
the AEC’s regulatory program, § 2021(d)(2), and
States are precluded from playing any role in several
significant areas of regulation....” 426 US. 1, 16
n.12 (1976), citing Northern States.
In Silkwood v. Kerr-McGee Corp., the Tenth Circuit stated
that
“w]e cannot read [Northern States] and Train
other than as requiring us to hold invalid any state
‘The summary affirmance of Northern States by this Court was a
decision on the merits and is binding on lower federal courts. Hicks v.
Miranda, 422 U.S. 332, 344-45 (1975).
9
action that competes substantially with the AEC
(NRC) in its regulation of radiation hazards associ-
ated with plants handling nuclear material.” No. 79-
1894 (10th Cir. Dec. 11, 1981), slip op. at 29
(reversing an award of punitive damages against a
nuclear plant).
Several district courts have similarly invalidated state and
local laws on the basis of Northern States. Restrictions on the
importation of out-of-state nuclear waste were stricken in
General Electric Co. v. Fahner, Nos. 80-C-6835, 81-C-461
(N.D. Ill. Oct. 12, 1981), appeal docketed sub nom. Illinois v.
General Electric Co., Nos. 81-2768, 81-2778 (7th Cir. Nov. 6,
1981), and Washington State Building & Construction Trades
Council v. Spellman, 518 F. Supp. 928 (E.D. Wash. 1981),
appeal docketed, No. 81-3453 (9th Cir. July 27, 1981). In
United States v. City of New York, 463 F. Supp. 604 (S.D.N.Y.
1978), a municipal requirement of health and safety certificates
for nuclear facilities was likewise invalidated.
The Ninth Circuit stated that it was following the Northern
States decision in upholding California’s nuclear moratorium.
According to the court, this across-the-board prohibition of new
nuclear plants is not a regulation aimed at safety hazards, does
not intrude upon an area of federal control, and does not
frustrate congressional policy with respect to nuclear energy.
Each of these conclusions is inaccurate and obscures the actual
impact of the moratorium. More importantly, the court arrived
at these conclusions in a manner contrary to the approach
which this Court has set forth for analyzing preemption issues.
A. The Ninth Circuit Ignored the Supreme Court’s Explicit
Ruling on the Inconclusiveness of Legislative Committee
Reports When It Ruled that California’s Nuclear Morato-
rium Is Not Aimed at the Prohibited Area of Safety
Regulation
The Ninth Circuit upheld California’s nuclear moratorium
on the ground that its purpose is not safety but economics. This
holding is contradicted by the very history of the moratorium.
Furthermore, the court reached it by giving conclusive weight
to the report of a state legislative committee—an approach
10
which this Court expressly rejected as “aberrational” in Perez v.
Cambell, 402 U.S. 637, 651 (1971).
As explained at page 4, supra, the California Nuclear Laws
were considered and enacted while Proposition 15 was before
the voters of California. The relationship between the two has
never been questioned. The California Assembly Committee
on Resources, Land Use, and Energy, which drafted the laws,
stated that this legislation was “designed to achieve in part and
to supplement the goals of the Initiative [Proposition 15].”
ER at 212. Because of the similar purposes of Proposition 15
and the Nuclear Laws, the state legislature provided that the
laws “shall not become operative if Proposition 15
...is adopted.” Historical Note to Section 25524.2, PLF App.
21. The State Energy Commission even claimed that the
Nuclear Laws were responsible for the defeat of Proposition 15
by making it unnecessary:
“Forestalling voter approval of a ballot initiative that
would have simply shut down all existing nuclear
power plants and flatly prohibited the construction of
new ones, the legislature therefore enacted three
laws, including the nuclear waste-disposal
law .... ” State Energy Commission, Appellate
Brief at 9-10 ( footnote omitted ).
The Ninth Circuit accordingly characterized the Nuclear
Laws as “an alternative to... Proposition 15.” 659 F.2d at 924,
PG&E App. 37. Yet it proceeded to construct a dichotomy
between their purposes. According to the court, there were “a
number of perceived problems with nuclear power, some
safety-related and some economic.” Jd., PG&E App. 38. The
economic issues were allegedly “stipulated” by industry and
government, while the safety issues were disputed. Jd. Despite
the court’s recognition of these problems, the court found that
the initiative and the Nuclear Laws did not deal with them in
similar fashions. According to the court, “Proposition 15 was
designed to deal with both types of problems associated with
nuclear waste disposal.” Jd, PG&E App. 39. On the other
hand, the nuclear moratorium
“was intended to deal only with the ‘stipulated’
problem caused by the lack of any approved method
of waste disposal. The [state legislative] committee
explained that its bills were ‘designed to provide a
pause in the deployment of nuclear power plants
until [certain] problems which may ‘clog’ the nuclear
fuel cycle are resolved.’ ... One of the ‘major dis-
tinguishing features’ differentiating Proposition 15
and the committee bills was that ‘[w]aste disposal
safety is not directly addressed by the bills, which ask
only that a method be chosen and accepted by the
federal government.’ ” 659 F.2d at 925, PG&E App.
39-40 (emphasis in original, citations omitted ).
As this passage indicates, the court had one and only one
basis for its conclusion—the report of the California Assembly
Committee on Resources, Land Use, and Energy.? The Su-
preme Court has made it clear that, in analyzing a preemption
problem, such a legislative document must be viewed critically;
otherwise, it would be all too easy for a state committee to save
an invalid law by means of a carefully worded report:
“We can no longer adhere to the aberrational
doctrine . . . that state law may frustrate the operation
of federal law as long as the state legislature in
Passing its law had some purpose in mind other than
one of frustration. Apart from the fact that it is at
odds with the approach taken in nearly all our
Supremacy Clause cases, such a doctrine would enable
state legislatures to nullify nearly all unwanted federal
legislation by simply publishing a legislative committee
report articulating some state interest or policy---other
than frustration of the federal objective—that would
be tangentially furthered by the proposed state law.
... [A]ny state legislation which frustrates the full
effectiveness of federal law is rendered invalid by the
Supremacy Clause.” Perez v. Campbell, 402 U.S. at
651-52 (emphasis added ).
The District Court followed this approach, rejecting the
premise
“that any sort of regulation at all is permissible as
long as a state legislature is willing and ingenious
2 The court cites this document nearly a dozen times in the course of
discussing the legislative purpose of the Nuclear Laws, and relies on it
exclusively in this regard. See 659 F.2d at 924-25, PG&E App. 37-40.
12
enough to conjure up a legislative purpose other than
radiation control.” 472 F. Supp. at 198, PLF App. 12.
Yet Perez goes totally unmentioned in the Ninth Circuit’s
opinion. There is not even a suggestion in the appellate
decision that it might be appropriate to give this committee
report less chan conclusive weight, despite the clear likelihood
that the authors of that report were aware of the potential
conflict with federal law.
The Ninth Circuit admitted that Proposition 15 was at least
in part a safety measure. 659 F.2d at 924, PG&E App. 37-38.
It admitted that the Nuclear Laws were “enacted as an
alternative” to that measure. Jd, PG&E App. 37. Yet it
nonetheless proceeded to find that the Nuclear Laws were not
safety related, on the basis of an elaborate construct of “stipu-
lated” and non-stipulated issues set forth in the report of a state
assembly committee. This approach is contrary to common
sense, and it was explicitly rejected by this Court in Perez. As
in the case of the Emperor’s New Clothes, the committee’s
attempt to bedeck a statute with secondary purposes should not
succeed in hiding what is underneath.
B. Under Principles Set Forth by the Supreme Court, the
Federal Government’s Decisions Concerning Nuclear
Waste Disposal Preempt Any Contrary Decision by Cali-
fornia
Unlike California, the federal government has, through the
NRC, proceeded with the development of nuclear energy
despite the fact that no method for the permanent disposal of
nuclear wastes has yet been decided upon. As the Second
Circuit stated in Natural Resources Defense Council, Inc. v.
NRC,
3 The assembly committee recognized that there were serious questions
regarding the constitutionality of Proposition 15 under the supremacy clause,
and extensively discussed this issue in its report. ER at 182-89. Once the
Nuclear Laws were enacted, both the California Legislative Counsel and the
State Attorney General concluded that these laws were federally preempted.
Exhibits A and B to PLF Memorandum in Opposition to Request for
Continuance of Summary Judgment Hearing (S.D. Cal. Nov. 8, 1978); see
also PLF App. 21.
13
“ ‘it is clear that from the very beginnings of com-
mercial nuclear power the Congress was aware of the
absence of a permanent waste disposal facility, but
decided to proceed with power plant licensing.’”
582 F.2d 166, 170 (2d Cir. 1978) (citation omitted ).
That court found that “Congress did not intend such a
condition” as a prerequisite to licensing. 582 F.2d at 171.
“[1]f there were any doubt over the intent of Con-
gress... not to require a moratorium on nuclear
power reactor licensing pending an affirmative
determination [on permanent waste disposal], we
are persuaded that the matter was laid to rest by
enactment of the Energy Reorganization Act of
1974... 42 U.S.C. §§ 5801 et seg. Therein, Congress
expressly recognized and impliedly approved NRC’s
regulatory scheme and practice. ...” 582 F.2d at
174.4
Thus, neither the NRC nor Congress has chosen to sus-
pend the licensing of new nuclear plants pending the final
approval of a waste disposal technology. This Court has made
it clear that such a decision preempts contrary action by a state.
“*(Whyhere failure of... federal officials affirma-
tively to exercise their full authority takes on the
4 Surprisingly, the Ninth Circuit cited the 1974 Energy Reorganization
Act in support of its claim that federal policy regarding nuclear energy had
changed. 659 F.2d at 926-27, PG&E App. 43-44.
The Supreme Court has itself noted the special relevance of Congress's
extensive involvement in overseeing the administrative regulation of nuclear
energy.
“It may often be shaky business to attribute significance to the
inaction of Congress, but under these circumstances, and consid-
ering especially the peculiar responsibility and place of the Joint
Committee on Atomic Energy in the statutory scheme, we think it
fair to read this history as a de facto acquiescence in and
ratification of the [AEC's] licensing procedure by Congress.”
Power Reactor Dev. Co. v. International Union of Electrical,
Radio & Machine Workers, 367 U.S. 396, 409 (1961).
(The Joint Committee was abolished in 1977. Its functions are now carried
out by separate House and Senate committees. 42 U.S.C. §§ 2258-2259.) The
Second Circuit quoted this passage in its opinion in Natural Resources
Defense Council, 582 F.2d at 172.
14
character of a ruling that no such regulation is
appropriate or approved pursuant to the policy of the
statute,” States are not permitted to use their police
power to enact such a regulation.” Ray v. Aflantic
Richfield Co., 435 U.S. 151, 178 (1978), quoting
Bethlehem Steel Co. v. New York State Labor Rela-
tions Board, 330 U.S. 767, 774 (1947).
Like the principle set forth in Perez that state legislative
reports are not to be given conclusive effect, this principle of
preemption goes unmentioned in the Ninth Circuit’s decision.
C. California’s Nuclear Moratorium Obstructs Federal Po-
licy on an Issue of National Importance
The importance of the Ninth Circuit’s ruling is evident
from both its subject matter and from the possibility that it will
be applied on a national basis. In the recent words of the
President, nuclear energy is “[o]ne of the best potential sources
of new electrical energy supplies in the coming decades. ...”
Statement Announcing a Series of Policy Initiatives, 17 Weekly
Comp. of Pres. Docs. 1101 (Oct. 8, 1981). Given that 23 states
filed amicus briefs with the Ninth Circuit in support of Califor-
nia (659 F.2d at 907 n.2, PG&E App. 3 n.2), the court’s ruling
upholding C ‘ifornia’s moratorium opens the door to similar
State provisions across the country.
The Ninth Circuit ruled that California’s moratorium does
not obstruct or frustrate national policy regarding nuclear
energy. However, aside from a total shutdown of existing
nuclear plants, it is difficult to imagine how any state could
more effectively block a congressional policy of encouraging
nuclear energy development than by categorically prohibiting
all new nuclear plants.
It is the across-the-board nature of California’s morato-
rium which is the touchstone in this case. This is not a question
of whether an individual proposed plant should or should not
be certified. The issue is whether a state may prohibit new
power plants, on a categorical basis, solely because they employ
nuclear power.
15
In answering this question in the manner it does, the Ninth
Circuit significantly distorts the type of federal policy which
would be frustrated by the California moratorium. According
to the court, such a policy would involve “an intent to promote
nuclear power at ail costs.” 659 F.2d at 926, PG&E App. 42
(emphasis added). Having constructed this straw man as the
sine qua non of preemption, it is not surprising that the court
fails to find such an extreme policy in the Atomic Energy Act.
The Act sets forth, as one of its objectives,
“a program to encourage widespread participation in
the development and utilization of atomic energy for
peaceful purposes to the maximum extent consistent
with the common defense and security and with the
health and safety of the public....” 42 U.S.C.
§ 2013(d).
The fact that Congress may also seek to encourage the utili-
zation of other energy sources does not detract from this stated
policy of encouraging nuclear power development and use.
The basis upon which to determine whether this policy has
been altered is no different from the basis for deciding that
Congress has altered “the pervasive regulatory scheme embo-
died in the [Atomic Energy Act].” Train, 426 U.S. at 24. In
the Supreme Court’s own words, that basis is “the clear
indication of legislative intent that we might expect before
recognizing such a change in policy.” Jd.
That basis simply does not exist. California’s absolute
moratorium inescapably “stands as an obstacle to the accom-
plishment and execution of the full purposes and objectives of
Congress.” Hines v. Davidowitz, 312 U.S. 52, 67 (1941). By
virtue of that frustration of federal policy, California’s morato-
rium should be ruled invalid.
16
CONTRARY TO THE NINTH CIRCUIT, THE
DESTRUCTION OF AN INDIVIDUAL’S JOB BY
CALIFORNIA’S NUCLEAR MORATORIUM
IS A SUFFICIENT BASIS FOR STANDING
TO CHALLENGE THAT LAW
The District Court found that “an independent reason the
utility company suspended Sundesert was the California Nucle-
ar Laws.” 472 F. Supp. at 195, PLF App. 7. The Ninth Circuit
decided that “[e]ven if this were true, it would not suffice to
give Thornberry standing.” 659 F.2d at 913, PG&E App. 14.
According to the Ninth Circuit, the fact that it would be up to
the utility company, a third party not before the court, to offer
Thornberry his job back makes this fact of causation an
insufficient basis for standing. This ruling is unjustified.
The “right of the individual ...to engage in any of the
common occupations of life” is among the liberties guaranteed
by the Constitution. Meyer v. Nebraska, 262 U.S. 390, 399
(1923). The destruction of that right by a state law is a
sufficient basis for an injured person to seek judicial redress.
While the redressability of injury is undeniably an essential
element of standing, this element need only be satisfied to a
degree of likelihood. Once that is done, the issue of redressa-
bility will not obscure the more basic issue of injury caused by
the law being challenged.
This is demonstrated by decisions of this Court dealing
with government-caused injuries in which redress depended
upon factors or parties beyond the court’s jurisdiction. In
Peterson v. City of Greenvilie, 373 U.S. 244 (1963), this Court
reversed the trespass convictions of sit-in demonstrators who
were protesting a local ordinance which required racial segrega-
tion at lunch counters. The Court acted despite the claim that
the manager of the lunch counter, who was not before the court,
would have engaged in discrimination even in the absence of
that ordinance:
“[T]hese convictions cannot stand, even assum-
ing... that the manager would have acted as he did
17
independently of the existence of the ordinance.”
373 U.S. at 248 (emphasis added ).
In Village of Arlington Heights v. Metropolitan Housing
Development Corp., 429 U.S. 252 (1977), this Court upheld a
housing developer’s standing to challenge zoning which
blocked a proposed project. The Court rejected any need for a
“guarantee that [the project] will be built,” despite the fact
that outside parties would have to provide the “financing” and
“federal subsidies” essential to the project. 429 U.S. at 261 and
n.7. The Court stated that all such projects “are subject to some
extent to similar uncertainties.” Jd. The fact that the challenged
zoning stood “as an absolute barrier to” the project sufficed for
standing. Jd. California’s nuclear moratorium is no less abso-
lute a barrier to Thornberry’s employment at Sundesert.
In Regents of University of California v. Bakke, 438 U.S.
265 (1978), this Court allowed an unsuccessful medical school
applicant to challenge the school’s special admissions program,
despite the fact that the applicant might not be admitted in any
case:
“{E]ven if Bakke had been unable to prove that he
would have been admitted in the absence of the
special program, it would not follow that he lacked
standing. ... The trial court found [a redressable]
injury, apart from failure to be admitted, in the
University’s decision not to permit Bakke to compete
for all 100 places in the class... .” 438 U.S. at 280
n.14 ( Powell, J.) (emphasis added ).
The nuclear moratorium has no less of an impact on Thorn-
berry’s opportunity to apply for work at Sundesert or at any
other future nuclear plant.
In Orr v. Orr, 440 U.S. 268 (1979), this Court upheld the
standing of a divorced man, who was under court order to pay
alimony, to challenge Alabama’s alimony statutes on the
ground that they denied him equal protection by placing the
duty to pay alimony only on husbands and not wives. The
18
Court ruled despite the probability that Alabama would re-
spond to an adverse holding by “extending alimony rights to
needy husbands as well as wives.” Jd. at 272; this was a “strong
likelihood,” according to Rehnquist, J., dissenting, id. at 296.
Were this to occur, Mr. Orr would not receive redress despite
having won his case. Yet the Court stated that the
“holdings of the Alabama courts stand as a total bar
to appellant’s relief; his constitutional attack holds
the only promise of escape from the burden that
derives from the challenged statutes.” Jd. at 273.
The Ninth Circuit’s ruling in this case is a similar bar to
Thornberry, and invalidation of California’s moratorium is the
only means by which he can escape from the burden of that
law.
Perhaps the closest factual analogy to Thornberry’s situ-
ation is in Duke Power Co. v. Carolina Environmental Study
Group, Inc., 438 U.S. 59 (1978). A number of organizations
and individuals challenged the constitutionality of the Price-
Anderson Act, 42 U.S.C. § 2210, alleging that its limitation of
nuclear accident liability was the “but for” causal element in
the construction of two nuclear plants. The operation of these
plants, in turn, would allegedly injure the environment and
property values in their vicinity. Regardless of the ruling on
Price-Anderson’s validity, redress of the alleged injuries would
depend on whether or not the Duke Power Company decided
to continue with the construction of the plants. Yet this Court
upheld standing without even determining if it had jurisdiction
over Duke Power:
“We need not resolve the question of whether Duke
Power is a proper party... and Duke’s presence or
absence makes no material difference to either our
consideration of the merits of the controversy or our
authority to award the requested relief.” 438 U.S. at
72 n.16; see also id. at 101 (Rehnquist, J., dis-
senting ).
Parties claiming to be injured by nuclear plants thus had
standing to challenge the validity of a law which allegedly
19
made it possible for those plants to be built. There is no reason
why Robert Thornberry should not have standing to challenge
the law which made it impossible for him to continue working
at Sundesert. No less than the parties in Duke Power,
Thornberry has
“ ‘alleged such a personal stake in the outcome of the
controversy as to assure that concrete adverseness
which sharpens the presentation of issues upon which
the court so largely depends for illumination of
difficult constitutional questions.”” Duke Power,
438 U.S. at 72, quoting Baker v. Carr, 369 U.S. 186,
204 (1962).
Having lost his job at Sundesert as a result of California’s
nuclear moratorium, he should now be allowed to challenge
that law in court.
THIS CASE IS APPROPRIATE FOR REVIEW DESPITE
THE FACT THAT IT INVOLVES A REVERSAL OF
SUMMARY JUDGMENT
In the PLF case, the Court of Appeals reversed a summary
judgment and remanded the case “for trial or for other
proceedings consisient with [its] opinion.” 659 F.2d at 928,
PG&E App. 46. The court’s substantive rulings on the issues of
preemption and standing, however, are for all practical pur-
poses final rulings in this case. Its finding that California’s
nuclear moratorium is not federally preempted puts an end to
any further proceedings; it would be futile for Robert Thorn-
berry to further attempt to challenge a state law which has
already been ruled valid. If the court’s ruling on preemption
stands, then its substantive holding on both this issue and on
the issue of standing will remain as the final rulings in this case.
The court’s rulings are thus appropriate for review “in-
asmuch as [they are] fundamental to the further conduct of the
case.” United States v. General Motors Corp., 323 U.S. 373, 377
20
(1945); see, e.g., Gillespie v. United States Steel Corp., 379 US.
148, 153 (1964); Carson v. Domestic and Foreign Commerce
Corp., 337 U.S. 682, 685 n.3 (1949); Land v. Dollar, 330 US.
731, 734 n.2 (1947). As this Court has stated in applying the
analogous requirement of finality in reviewing state court
judgments, review is appropriate when “the federal issue is
conclusive or the outcome of further proceedings [is] pre-
ordained.” Cox Broadcasting Corp. v. Cohn, 420 U.S. 469, 479
(1975). Thus, the Ninth Circuit’s action constitutes a final
disposition of the PLF case in its entirety.
21
CONCLUSION
In upholding California’s nuclear moratorium, the Ninth
Circuit has approved state obstruction of an important and
explicit congressional policy—the encouragement of nuclear
energy development and use. The importance of this ruling is
emphasized by the unprecedented energy shortages of recent
years; the potential of the ruling to open the door to widespread
obstruction is demonstrated by the participation of over 20
states in the court below in support of California.
In reaching its decision, the Ninth Circuit ignored Supreme
Court rulings on dealing with preemption disputes. It gave
conclusive weight to a state assembly committee report, despite
this Court’s characterization of such an approach as
“aberrational.” It ignored the preemptive effect of the federal
government’s decision to proceed with nuclear energy devel-
opment in the absence of an approved means of storing nuclear
wastes. It disregarded the national policy to promote this
energy source, which is explicitly stated in the Atomic Energy
Act. Finally, it denied standing to an individual who had been
thrown out of a job by the very law he sought to challenge.
For these reasons, and for the other reasons set forth
above, this petition for certiorari should be granted.
Respectfully submitted,
RONALD A. ZUMBRUN
RosIN L. RIVETT
Pacific Legal Foundation
455 Capitol Mall, Suite 600
Sacramento, California 95814
Telephone: (916) 444-0154
RAYMOND M. MOMBOISSE
SAM KAZMAN
Pacific Legal Foundation
1990 M Street, N.W., Suite 550
Washington, D.C. 20036
Telephone: (202) 466-2686
Attorneys for Petitioners
April 20, 1982
yipueddy
l
OPINION OF THE DISTRICT COURT
Unrrtep States District COURT
SOUTHERN DISTRICT OF CALIFORNIA
Civil No. 78-711-E
Pacific LEGAL FOUNDATION, a nonprofit California corpo-
ration; THE SAN DiEGO COALITION, a nonprofit California
corporation; SAN DiEGO SECTION OF THE AMERICAN NUCLEAR
Society, a New York corporation; SAN DiEGO COUNTY BUILD-
ING AND CONSTRUCTION TRAD:S COUNCIL, a labor organiza-
tion; and RoBert C. THORNBERRY, an individual,
Plaintiffs,
Vv.
STATE ENERGY RESOURCES CONSERVATION & DEVELOPMENT
COMMISSION, a state agency; RICHARD L. MAULLIN, Chairman;
and Commissioners Emitio E. VaARANINI, III, ARLAND D.
PASTERNAK, C. SUZANNE REED, and RONALD D. Doctor,
Defendants.
NATURAL RESOURCES DEFENSE COUNCIL, INC., ef ai.,
Defendants-
Intervenors.
William B. Enright, Judge Filed March 6, 1979
MEMORANDUM DECISION
This case involves a challenge to the constitutionality of
three sections of the California Public Resources Code: sections
25524.1, 25524.2 and 25524.3. Plaintiffs contend that these
sections, which impose certain requirements on the certification
of nuclear fission thermal power plants in this state, invade a
field of regulation which has been preempted by the federal
2
government. Specifically, plaintiffs assert that the Atomic
Energy Act of 1954, as amended, 42 U.S.C. §§ 2011-2281
(1970), preempts the state laws in question.
Before the court for resolution are plaintiffs’ motion for
summary judgment, defendants’ motion to reconsider the mo-
tion to dismiss the complaint or, in the alternative, to certify an
interlocutory appeal, and cross motions brought to strike the
various affidavits and exhibits filed both parties. Upon due
consideration of the memoranda filed by the parties, the
declarations and exhibits, and the arguments of counsel, and
for the reasons set forth herein, the court rules as follows: the.
motion to reconsider the motion to dismiss is denied, as is the
motion to certify an interlocutory appeal, plaintiffs’ motion for
summary judgment is granted, and the various motions to strike
are resolved as set forth below.
Originally, the federal government retained exclusive au-
thority over the development and use of atomic energy. Act of
Aug. 1, 1946, ch. 724, 60 Stat. 755. In 1954, Congress
recognized that private businesses might play a role in the
peaceful development and generation of nuclear power. Con-
gress passed the Atomic Energy Act of 1954, as amended, 42
U.S.C. §§ 2011-2281 (1970), establishing the Atomic Energy
Commission (AEC)' to regulate and promote the use of
nuclear energy. Licensing and regulation of nuclear materials
was subject to federal authority, in order to ensure public safety
and national security. Jd. § 2012.
In 1959, Congress sought to define the States’ role in the
regulation of nuclear materials by enacting amendments to the
Atomic Energy Act. Jd. § 2021. The amendments recognized
the States’ interest in the peaceful use of atomic energy and
proposed to establish procedures whereby certain of the AEC’s
‘In 1974, the Energy Reorganization Act became law, transferring the
licensing and regulatory functions of the Atomic Energy Commission to the
Nuclear Regulatory Commission (NRC). 42 U.S.C. § 5841(f). The AEC’s
previous research and development functions were transferred to the Energy
Research and Development Agency and, later, to the Department of Energy.
Id. §§ 7101-7352. Thus, while the NRC is the successor agency to the AEC, it
retains only licensing and regulatory functions.
3
regulatory authority over source, by-product and special nucle-
ar materials could be assumed by the States. The amendments
provide for agreements between the governor of a State and the
AEC to accomplish this purpose.
The amendments se* forth specific limits on the delegation
of regulatory authority with regard to nuclear materials. The
federal government retained responsibility for regulating “the
construction and operation of any production or utilization
facility,” the import or export of nuclear materials, and the
disposal of nuclear materials that the AEC decides shall not be
disposed of without a license. Jd. § 2021(c). The amendments
also provided that the States may regulate “activities for
purposes other than protection against radiation hazards.” Jd.
§ 2021(k).
In 1974, the California legislature enacted the Warren-
Alquist State Energy Resources Conservation and Development
Act, establishing a comprehensive power-plant siting procedure
for new thermal-electric power plants and vesting exclusive
jurisdiction to approve such power plants in the State Energy
Resources Conservation and Development Commission.
Cal.Pub.Res.Code §§ 25000-25968. The Energy Commission
must review safety and reliability factors for all types of thermal
power plants. Jd. §§ 25001 & 25511. In 1976, three statutes
imposing certain requirements for the construction of nuclear
power plants were added. Cal.Pub.Res.Code §§ 25524.1,
25524.2 & 25524.3. These three sections are the subject of the
instant lawsuit. Plaintiffs contend that these three sections of
the Public Resources Code, referred to herein as the California
Nuclear Laws, invade a field of regulation which has been
preempted by the federal government under the Atomic Energy
Act of 1954.
California Public Resources Code section 25524.1(a) pro-
vides that no new nuclear fissior thermal power plant requiring
the reprocessing of fuel rods shall be permitted land use in the
State or certified by the Energy Commission until (1) the
Energy Commission finds that the United States agency has
approved a technology for the construction and operation of
nuclear fuel rod reprocessing plants and (2) the commission
4
has reported its findings to the state legislature, which has the
power to disaffirm them. Subsection (b) of this statute requires
the state commission to make a case-by-case determination that
adequate fuel rod reprocessing capacity or waste storage capa-
city will be available by the time a particular facility requires
reprocessing or waste storage.
Section 25524.2 provides that no nuclear power plant shall
be certified by the state commission until it finds (1) that the
authorized United States agency has approved a technology for
disposal of high-level nuclear wastes and (2) the commission
has reported its findings to the state legislature, which has the
power to disaffirm them.
Section 25524.3 applies to nuclear power plants for which
notices of intent are filed with and accepted by the state
commission after January 1, 1980. The Commission cannot
certify these plants until (1) the commission completes a study
of the necessity, effectiveness and economic feasibility of berm
containment and locating reactors underground and (2) the
legislature evaluates the study.
California Public Resources Code section 25524.25 re-
quired the California Energy Commission to inform the legisla-
ture by January 1978 whether the findings on fuel rod reproces-
sing and waste disposal could be made. The Energy Commis-
sion has concluded that section 25524.1(a), referring only to
power plants that require nuclear fuel rod reprocessing, is not
applicable because reprocessing is not required by the federal
government nor required by technical operational require-
ments. Jn the Matter of Implementation of Nuclear Reproces-
sing and Waste Disposal Statutes, No. 76—NL—1l,
76—NL—3, at 5 (Jan. 25, 1978). As to subsection
25524.1(b), the commission determined that it will, as man-
dated by statute, evaluate on a case-by-case basis the fuel
storage capacity at individual reactor sites. Jd. The commission
found that the findings required by section 25524.2 could not be
made because the federal agencies have not approved a waste
disposal technology. Jd.
With respect to section 25524.3, the commission has
reported that rules and regulations on undergrounding and
5
berm containment are not warranted. Staff of California
Energy Commission, Draft, Underground Siting of Nuclear
Power Reactors: An Option for California: A Summary of the
Technical and Economic Implications with Recommendations iv,
v, xi, 9—4 (June 1978). The Energy Commission has adopted
this report. Jn the Matter of Determinations of the Commission
Pursuant to Public Resources Code Section 25524.3, No.
76—NL—2 (Sept. 13, 1978).
As a preliminary matter, the court notes that sections
25524.1 and 25524.3 have been rendered moot by the decisions
of the California Energy Commission. The commission has
determined that section 25524.1(a) does not apply to any
reactors proposed for California. Section 25524.1(b) requires a
case-by-case evaluation of fuel storage capacity at individual
reactor sites. No particular storage capacity is specified.
Plaintiffs have failed to demonstrate how this section impedes
the development of nuclear power in California.
Similarly, section 25524.3 is not implicated in the present
controversy. By its terms, this section applies only to power
plants for which a notice of intent is accepted after January 1,
1980.
Plaintiffs argue that the federal government could reinsti-
tute a reprocessing requirement, at which time the California
statute would apply. In the event that action occurred,
plaintiffs could institute a challenge at that time. Issues will not
be found moot if they are capable of repetition, yet likely to
evade review. Roe v. Wade, 410 U.S. 113, 93 S.Ct. 705, 35
L.Ed.2d 147 (1973). While the issues presented here might be
capable of repetition, plaintiffs have not shown that these issues
are likely to evade review if a reprocessing requirement is
instituted.
Accordingly, the court concludes that only section 25524.2,
requiring the existence and approval of a high level waste
disposal technology which the Energy Commission has deter-
mined not to exist, presently impedes certification of nuclear
power plants in California.
6
II
Before proceeding to the substantive issue of preemption,
the court must determine that plaintiffs have a personal stake in
the outcome of the controversy, entitling them to invoke the
court’s determination of the constitutional issues presented. For
purposes of the motion for summary judgment, plaintiffs rely on
their allegations of lost jobs and harm to the environment as
providing standing to sue. Defendants contend that plaintiffs’
declarations and exhibits offered in support of their alleged
injuries are incompetent and speculative. Further, defendants
claim that their own affidavits place many of the alleged effects
of alternate energy source development at issue, and raise a
factual dispute as to the existence of the alleged injuries.
The court finds it unnecessary to rule on the numerous
objections to the declarations and exhibits filed by both parties.
Only one plaintiff, Robert Thornberry, has presented evidence
of a particularized injury due to the California Nuclear Law.2
As to this plaintiff's injury, the facts are unequivocal.
Thornberry was hired by San Diego Gas and Electric
Company and assigned to work on the licensing of the Sundes-
ert nuclear power project in Southern California. Shortly after
San Diego Gas and Electric Company’s board of directors
resolved to terminate the Sundesert project, Mr. Thornberry
lost his job due to a reduction in force.
Defendants do not dispute that Thornberry suffered an
injury. Nor do they dispute that Thornberry lost his job as a
result of the suspension of Sundesert. However, they attack the
2 With the exception of plaintiff Robert Thornberry’s declaration and
exhibits, the declarations offered in support of plaintiffs’ standing to sue fail to
demonstrate a concrete injury as a result of the California Nuclear Laws. The
court finds the general allegations of lost jobs and environmental harm to be
speculative, conclusory and unsupported by specific facts. In addition, no
casual connection between the alleged injuries and the California Nuclear
Laws is conclusively established. In contrast, the court finds Thornberry’s
injury to be concrete and traceable to the Energy Commission’s decisions
effectively placing a moratorium on the development of nuclear power plants
in California.
5
causal connection in another way, arguing that Thornberry’s
injury is not a result of the California Nuclear Laws because the
Sundesert project would have been terminated in any event due
to the utility company’s inability to secure a general rate
increase to finance work in progress.
Plaintiffs agree that financial impediments contributed to
the demise of Sundesert. However, plaintiffs submit that an
independent reason the utility company suspended Sundesert
was the California Nuclear Laws. This contention is supported
by the resolution of San Diego Gas and Electric Company’s
board of directors, listing the utility’s failure to obtain an
exemption from the nuclear laws as one reason for suspending
the Sundesert project. This contention is uncontroverted by
defendants’ declarations, which state only that in the declar-
ants’ opinions Sundesert was closed due to failure to obtain a
rate increase.
Although the causal connection is indirect, the connection
is sufficient to provide standing. Duke Power Company v.
Carolina Environmental Study Group, Inc., 438 U.S. 59, 75
n.20, 98 S.Ct. 2620, 2631 n.20, 57 L.Ed.2d 595, 612 n.20
(1978); United States v. SCRAP, 412 U.S. 669, 93 S.Ct. 2405,
37 L.Ed.2d 254 (1973). As revealed by the utility’s board of
directors, the California Nuclear Laws were perceived as a
substantial impediment to final certification of the Sundesert
power plan and additional expenditures were authorized only
until the company had time to pursue an exemption from these
laws. The court finds a “substantial likelihood” that the
Sundes.:t project would proceed absent the California Nuclear
Laws and that Thornberry would not have been terminated.
Duke Power Company v. Carolina Environmental Study Group,
Inc., supra; Arlington Heights v. Metropolitan Housing Devel-
opment Corp., 429 U.S. 252, 261, 97 S.Ct. 555, 50 L.Ed.2d 450
(1977).
Defendants have also questioned the ripeness of the issues
for judicial resolution, both by seeking a reconsideration of this
court’s ruling on the motion to dismiss and by various declara-
tions which defendants claim raise factual disputes as to
ripeness.
The rationale for the ripeness doctrine is “to prevent the
courts, through avoidance of premature adjudication, from
entangling themselves in abstract disagreements over adminis-
trative policies, and also to protect the agencies from judicial
interference until an administrative decision has been formal-
ized and its effects felt in a concrete way by the chalienging
parties.” Abbott Laboratories v. Gardner 387 U.S. 136, 148-49,
87 S.Ct. 1507, 1515, 18 L.Ed.2d 681 (1967).
In the present case a moratorium has been effected by
formal agency action. The California Energy Commission has
determined that the specified findings on waste disposal, with-
out which no nuclear power plant may be certified, cannot be
made. Indisputably, no nuclear power plants can be licensed in
California, at least temporarily. Even Professor Tribe, a strong
proponent of the California Nuclear Laws, has concluded:
“In light of the findings in its decision, the Energy
Commission cannot presently certify any nuclear
fission thermal power plants. The conditions im-
posed by the nuclear provisions will prevent such
certification until the technology or means for dis-
posing of high-level radioactive wastes actually exists,
and is approved by the federal government. The
Energy Commission projects that such capability will
be available no sooner than the mid-1980’s; the time
required may easily extend into the 1990's.”
Tribe, California Declines the Nuclear Gamble: Is Such a State
Choice Preempted?, 7 ECOLOGY L.Q. 679, 683 (1979) (foot-
notes omitted ).
Plaintiff Thornberry has demonstrated that he feels the
effects of the moratorium in a concrete way. As a result of San
Diego Gas and Electric Company’s failure to gain an exemption
from the California Nuclear Laws for its Sundesert project, Mr.
Thornberry lost his job. This plaintiff has demonstrated that
the moratorium itself contributed to the suspension of Sunde-
sert and caused his injuries.
9
PREEMPTION OF PUBLIC RESOURCES
CODE SECTION 25524.2
The doctrine of federal preemption of state authority has
its origin in the “Supremacy Clause” of Article VI of the
Constitution, which declares that;
“This Constitution, and the Laws of the United States
which shall be made in Pursuance thereof. . . shall be
the Supreme Law of the Land... any Thing in the
Constitution or Laws of any State to the Contrary
notwithstanding.”
When, as here, a State’s exercise of its police power is chal-
lenged under the Supremacy Clause, a federal court must
commence its analysis “with the assumption that tl.2 historic
police powers of the States were not to be superseded by the
Federal Act unless that was the clear and manifest purpose of
Congress.” Rice v. Santa Fe Elevator Corp., 331 U.S. 218, 230,
67 S.Ct. 1146, 1152, 91 L.Ed. 1447 (1947); Ray v. Atlantic
Richfield Co., 435 U.S. 151, 98 S.Ct. 988, 994, 55 L.Ed.2d 179
(1978). One of the legitimate inquiries is whether Congress has
either explicitly or implicitly prohibited the States from regu-
lating matters which relate to nuclear waste disposal or to the
construction and operation of nuclear power plants.
Express preemption occurs when Congress has expressly
stated either in a federal statute or in the legislative history
pertaining thereto that federal regulation was intended to be
exclusive. Railway Employees’ Department v. Hanson, 351 U.S.
225, 76 S.Ct. 714, 100 L.Ed. 1112 (1956); Pennsylvania v.
Nelson, 350 U.S. 497, 501-02, 76 S.Ct. 477, 479, 100 L.Ed. 640
(1956); Schwabacher v. United States, 334 U.S. 182, 197, 68
S.Ct. 958, 966, 92 L.Ed. 1305 (1948).
Even in the absence of an express Congressional declara-
tion that federal regulation is intended to be exclusive, federal
preemption may be found by implication:
“[The Congressional] purpose may be evidenced in
several ways. The scheme of federal regulation may
be so pervasive as to make reasonable the inference
10
that Congress left no room for the States to Supple-
ment it. ... Or the Act of Congress may touch a
field in which the federal interest is so dominant that
the federal system will be assumed to preclude
enforcement of state laws on the same subject. ...
Likewise, the object sought to be obtained by the
federal law and the character of obligations imposed
by it may reveal the same purpose. ...”
Rice v. Santa Fe Elevator Corp., 331 U.S. 218, 230, 67 S.Ct.
1146, 1152, 91 L.Ed. 1447 (1947).
Finally, even if Congress has not completely foreclosed
state legislation in a particular area, a state statute is void to the
extent that it actually conflicts with a valid federal statute. Ray
v. Atlantic Richfield Co., supra, 435 U.S. at 158, 98 S.Ct. at 994.
A conflict in this sense may be found in at least two types of
circumstances. First, conflict preemption will occur “where
compliance with both federal and state regulation is a physical
impossibility.” Florida Lime & Avocado Growers, Inc. v. Paul,
373 U.S. 132, 142-43, 83 S.Ct. 1210, 1217, 10 L.Ed.2d 248
(1963). Second, a conflict will be found where the state “law
stands as an obstacle to the accomplishment and execution of
the full purposes and objectives of Congress.” Hines v. Davido-
witz, 312 U.S. 52, 67, 61 S.Ct. 399, 404, 85 L.Ed. 581 (1941).
Applying the foregoing principles of law, the court finds
California Public Resources Code section 25524.2 preempted
both because Congress has impliedly foreclosed state legislation
on the subject of nuclear waste disposal and, alternatively,
because the statute stands as an obstacle to the purposes and
objectives of Congress as stated in the Atomic Energy Act of
1954, as amended, 42 U.S.C. § 201i et seg.
IMPLIED PREEMPTION
The issue of whether the federal government has preemp-
ted the sphere of radiological hazard regulation is not a matter
of first impression in the federal courts. Thus far the issue has
been squarely confronted in two cases, and in both instances a
conclusion of implied preemption was reached. Northern States
Power Company v. State of Minnesota, 447 F.2d 1143 (8th Cir.
1971), aff'd mem., Minnesota v. Northern States Power Co., 405
U.S. 1035, 92 S.Ct. 1307, 31 L.Ed.2d 576 (1972); United States
v. City of New York, 463 F. Supp. 604 (S.D.N.Y.1978).
Minnesota, like California in the case at bar, attempted to
regulate on the subject of radioactive waste disposal. Acting
through its Pollution Control Agency, it established stringent
standards for radioactive liquid and gaseous discharges from
nuclear power plants licensed by the Atomic Energy Commis-
sion (AEC). The Northern States court, emphasizing the
importance of the interrelationship between subsections (c)
and (k) of 42 U.S.C. § 2021,3 interpreted the Atomic Energy
Act, as amended, to preclude concurrent state regulation of
matters reserved to the AEC in section 2021(c) and found the
Minnesota regulation preempted. The Court arrived at this
conclusion after a thorough examination of the legislative
history pertaining to the Atomic Energy Act of 1954 and its
subsequent amendment in 1959. The Northern States holding
was extensively relied upon by a District Court which reached a
similar result in United States v. City of New York, supra. In
that case the court found that a provision of the New York City
Health Code purporting to require licensing by the Commis-
sioner of Health as a precondition to nuclear reactor operation
was unconstitutional insofar as it had been impliedly preempted
by the Atomic Energy Act.
Defendants apparently do not contest the reasoning and
result of the courts in Northern States and United States v. City
3447 F.2d at 1149.
4“We are more concerned here with subsection (c) of § 2021 which
prohibits the AEC from discontinuing its authority and responsibility with
respect to the regulation of certain specified activities. ... Minnesota inter-
prets this subsection only as prohibiting fota/ relinquishment by the federal
government over nuclear power plants, but does not view the concurrent
exercise of state control over nuclear facilities as being forbidden by the
Act... We cannot agree with Minnesota's position that dual control over
atomic power plants and the level of effluents discharged therefrom is
permissible under the Act... .” 447 F.2d at 1149.
a
1Z
of New York except insofar as they make certain arguments
from the Clean Air Act amendments of 1977.5 Instead, they
seek to avoid the effect of these decisions by distinguishing
them. Relying principally upon section 2021(k), defendants
urge the court to uphold Public Resources Code section 25524.2
on the basis that the statute regulates “activities for purposes
other than protection against radiation hazards.” 42 U.S.C.
§ 2021(k). They suggest that section 25524.2 is valid because it
was not enacted for the prohibited purpose of radiation control.
Rather, the argument runs, it was enacted for the economic
purpose of insuring that Californians will not have to bear the
financial risk of funding nuclear power plants which may later
be shut down because of inadequate permanent waste disposal
facilities.
Initially, the court would note that defendants’ argument
rests upon an exceedingly broad interpretation of section
2021(k). The underlying premise seems to be that any sort of
regulation at all is permissible as long as a state legislature is
willing and ingenious enough to conjure up a legislative
purpose other than radiation control. The evil inherent in
giving conclusive effect to declared state legislative purposes to
uphold a state statute or regulation which would otherwise be
preempted has previously been recognized by the Supreme
Court. Perez v. Campbell, 402 U.S. 637, 651-52, 91 S.Ct. 1704,
5 Defendants suggest that the 1977 amendments to the Clean Air Act, 42
U.S.C. § 7401 ef seg., manifest an intent of Congress to legislatively overrule
Northern States Power Company v. State of Minnesota, 447 F.2d 1143 (8th
Cir. 1971. Although the legislative history of the amendments appears to
indicate Congressional disapproval of Northern States in the narrow context
of radioactive air pollution, see House Rep. No. 95-564 at 143, there is no
basis for the supposition that Congress disapproved of the decision in other
contexts, such as, for example, nuclear waste disposal. Indeed, the legislative
history of the amendments seems to affirmatively show that Congress was
aware of the Northern States case and, except in the context of radioactive air
pollution, declined to upset the major part of the holding.
13
1712, 29 L.Ed.2d 233 (1971).® It would appear that under
defendants’ suggested interpretation of section 202i(k) the
Minnesota regulation held unconstitutional in Northern States
would have successfully withstood a preemption challenge if
the Minnesota Pollution Control Agency or some other state
authority had asserted the purpose of the regulation to be the
minimization of future medical costs associated with a high
incidence of cancer precipitated by the radioactive effluvia from
the nuclear power plants.
More generally, the danger inherent in interpreting section
2021(k) in the broad manner defendants suggest is that the
zone of exclusive federal regulation under section 2021(c)
could readily be nullified through careful tailoring of state
legislative purposes. If section 2021(k) is broadly interpreted
to validate any state statute or regulation as long as there
appears a stated purpose other than protection against radiation
hazard, then the States would effectively be permitted to
intrude into the preempted sphere and regulate radiation
hazard under the guise of a permitted legislative purpose. It is
scarcely ‘redible that Congress, in enacting section 2021(k),
intended to furnish the States with a means of evading and
undermining the NRC’s exclusive regulatory authority under
section 2021(c). Rather, the better inference would scem to be
that Congress envisioned that section 2021(k) would be inter-
preted in such a fashion as not to nullify what Congress
provided in section 2021(c).
The legislative history of the 1959 amendments to the
Atomic Energy Act of 1954 somewhat lends support to the view
6 The Court wrote in Perez: “We can no longer adhere to the aberra-
tional doctrine of Kesler |v. Dept. of Pub. Safety, 369 U.S. 153, 82 S.Ct. 807, 7
L.Ed.2d 641] and Reitz |v. Mealey, 314 U.S. 33, 62 S.Ct. 241, 241, 86 L.Ed.
21] that state law may frustrate the operation of federal law as long as the
state legislature in passing its law had some purpose in raind other than one of
frustration. Apart from the fact that it is at odds with the approach taken in
nearly all our Supremacy Clause cases, such a doctrine would enable state
legislatures to nullify nearly all unwanted federal legislation by simply
publishing a legislative committee report articulating some state interest or
policy—other than frustration of the federal objective—that would be
tangentially furthered by the proposed state law.” 402 U.S. at 651-52, 91 S.Ct.
at 1712.
14
that Congress commended to the federal courts the task of
interpreting section 2021(k) in a manner harmonious with
section 2021(c). At the conclusion of the May 1959 hearings,
the Joint Committee on Atomic Energy proposed to amend
what is presently section 2021(k) as follows:
“It is the intention of this Act that State laws and
regulations concerning the control of radiation haz-
ards from byproduct, source, and special nuclear
materials shall not be applicable except pursuant to
an agreement entered into with the Commission
pursuant to subsection b... .””
Subsequently, the General Manager of the AEC sent a letter to
Chairman Anderson of the Joint Committee recommending
deletion of this sentence:
“At the hearing, we recommended the omission of
the sentence. ... In suggesting the elimination of the
sentence, we did not intend to leave any room for the
exercise of concurrent jurisdiction by the States to
control radiation from those materials. Our sole
purpose was to leave room for the courts to determine
the applicability of particular State laws and regu-
lations dealing with matters on the fringe of the
preempted area in the light of all the provisions and
purposes of the Atomic Energy Act, rather than in the
light of a single sentence.”’®
The Joint Committee adopted the AEC’s suggestion and ac-
cordingly deleted the sentence. The weight given by the Joint
Committee to the AEC’s interpretation of section 2021(k)
seems to indicate Congressional approval of the position that
the precise extent of preemption under the section is to be
? Hearings Before the Joint Comm. on Atomic Energy on Federal-State
Relationships in the Atomic Energy Field, 86th Cong., st Sess. 488 (1959).
(Joint Comm. Hearings).
8 Joint Comm. Hearings at 500. (Emphasis added)
15
determined by the courts in the light of all the provisions and
purposes of the Atomic Energy Act.®
For the reasons stated above, the court finds itself unable
to interpret section 2021(k) as giving conclusive effect to a
declared state legislative purpose for purposes of determining
the validity of a state statute or regulation under the section.
That California may have predicated Public Resources Code
section 25524.2 upon an economic purpose is not a sufficient
condition for a finding of constitutionality. Instead of focusing
narrowly on the issue of California’s legislative purpose, the
court will examine whether section 25524.2 impinges upon the
sphere of exclusive regulatory jurisdiction reserved to the NRC
in section 2021(c).
Section 2021(c) provides that the NRC shall retain au-
thority and responsibility with respect to the regulation of the
construction and operation of nuclear power plants and with
respect to the regulation of nuclear waste disposal.'° In the
exercise of its discretion, the NRC has decided not to require
the existence of a technology for the permanent disposal of
nuclear waste as a condition precedent for the construction and
operation of nuclear reactors. The NRC’s decision in this
regard falls within the preempted sphere because it relates to,
touches upon and involves the regulation of radiation hazard
pertaining to the construction and operation of nuclear power
plants and to nuclear waste disposal. California has decided
otherwise, decreeing that no nuclear power plant may be
constructed in the State of California unless there exists a
demonstrated technology for the disposal of nuclear waste. The
court finds that the question of whether nuclear power plants
may be constructed and operated in the absence of a demon-
strated technology for the permanent disposal of nuclear waste
® See Murphy & La Pierre, Nuclear ‘Moratorium’ Legislation in the
States and the Supremacy Clause: A Case of Express Preemption, 76
Colum.L.Rev. 392, 398-405 (1976): “As the AEC recognized, the exact
bounds of state regulation for these ‘other’ purposes, which may have
incidental effect on materials or facilities licensed by the Commission, cannot
readily be determined. But it is only in this regard that section 274 [42 U.S.C.
§ 202] leaves the precise extent of preemption to be answered by the courts.”
42 U.S.C. § 2021(c)( 1), 2021(c)(4).
16
is exclusively reserved to the NRC by section 2021(c) and that
state regulaton on this subject is displaced. Accordingly, the
court holds California Public Resources Code section 25524.2
impliedly preempted.
PUBLIC RESOURCES CODE § 25524.2 AS AN OBSTACLE
TO THE PURPOSES AND OBJECTIVES OF CONGRESS
Assuming arguendo that Congress has not completely
foreclosed state regulation on the subject of radiation hazard
control, California Public Resources Code section 25524.2 is
nonetheless void because it “stands as an obstacle to the
accomplishment and execution of the full purposes and objec-
tives of Congress,” Hines v. Davidowitz, 312 U.S. 52, 67, 61
S.Ct. 399, 404, 85 L.Ed. 581(1941), in encouraging and
fostering the development, use and control of atomic energy.
The substantive provisions of the Atomic Energy Act of
1954 are preceded by general statutory provisions which set
forth Congressional findings, a Congressional declaration of
policy and Congressional purposes. 42 U.S.C. §§ 2011, 2012,
2013. These provisions appear to provide an excellent means of
gauging the “purposes and objectives of Congress” within the
meaning of the Hines decision. Section 2011 indicates that the
development, use and control of atomic energy for the purpose
of achieving certain ends is declared to be the policy of the
United States. Section 2012 asserts as a Congressional finding
that “[t]he development, utilization, and control of atomic
energy for military and for all other purposes are vital to the
common defense and security.” 42 U.S.C. § 2012(a). Section
2013 manifests the intent of Congress to provide for “a
program to encourage widespread participation in the devel-
opment and utilization of atomic energy for peaceful pur-
poses....” 42 U.S.C. §2013(d). When taken together, the
foregoing provisions of law suggest that Congress contemplated
the ongoing development of nuclear energy, subject to state and
federal regulation. The court in Northern States reached a
similar conclusion as to the import of these statutory provisions:
“Congressional objectives expressed in the 1954 Act
evince a legislative design to foster and encourage the
17
development, use and control] of atomic energy so as
to make the maximum contribution to the general
welfare and to increase the standard of living. 42
U.S.C. §§ 2011, 2012.”
Northern States Power Company v. State of Minnesota, supra,
447 F.2d at 1153.
Congress’ policy to encourage the development and utili-
zation of nuclear energy would decidedly be frustrated if all
fifty states had statutes similar to California Public Resources
Code section 25524.2. Although the Atomic Energy Act cer-
tainly leaves room for the states to regulate on the subject of
nuclear energy within the confines of section 202i(k) and
2021(b), the power to regulate is not necessarily the power to
prohibit. There seems little point in enacting an Atomic Energy
Act and establishing a federal agency to promulgate extensive
and pervasive regulations on the subject of construction and
operation of nuclear reactors and the disposal of nuclear waste
if it is within the prerogative of the states to outlaw the use of
atomic energy within their borders.
The court finds its conclusion of preemption strengthened
by the analogous case of First lowa Hydro-Electric Cooperative
v. Federal Power Commission, 328 U.S. 152, 66 S.Ct. 906, 90
L.Ed. 1143 (1946). In that case First lowa Hydro-Electric
Cooperative (First lowa) sought to construct and operate a
dam on the Cedar River in lowa. Its application to the Federal
Power Commission ( FPC) for a license was denied on the basis
that First lowa had failed to submit satisfactory evidence of
compliance with the laws of the State of lowa. Among these
laws was a Statute requiring a party proposing to construct a
dam to obtain a permit from the State Executive Council.
The Supreme Court found the FPC’s denial of First lowa’s
application unwarranted under the Federal Water Power Act
and declined to interpret the Act as requiring a license applicant
to demonstrate compliance with state laws. The Court held that
the purpose of the Act was to promote the comprehensive
development of water resources of the United States; that the
detailed provisions of the Act providing for the federal plan of
regulation left no room or need for conflicting state controls."'
First lowa appears to indicate that states cannot enact
legislation which tends to frustrate national plans to develop
resources for use in interstate commerce. Public Resources
Code section 25524.2 is consequently preempted because it
would seriously disrupt the national plan and policy of Con-
gress for the development of nuclear energy.'? The statute
stands as an obstacle to the accomplishment and execution of
the full purposes and objectives of Congress in developing the
peaceful use of atomic energy.
Defendants have eloquently and articulately apprised the
court of their concerns relative to the practicality and advis-
ability of the use of nuclear energy as an alternative power
source. The arguments advanced by defendants with respect to
this subject are indeed weighty and not lacking in appeal.
However, it is the province and duty of this court “to say what
the law is,” Marbury v. Madison, 1 Cranch. 137, 2 L.Ed.
60( 1803), rather than to pass on the public policy question of
whether the states ought to utilize or not to utilize atomic
energy or whether the federal government ought to grant
autonomy to the states on the nuclear question. Many of the
arguments made before this court, therefore, would seem more
appropriately presented to Congress.
For the reasons stated above, the court declares California
Public Resources Code section 25524.2 unconstitutional.
11328 U.S. at 180-181. 66 S.Ct. at 919-920.
12 See Murphy & La Pierre, Nuclear ‘Moratorium’ Legislation in the
States and the Supremacy Clause: A Case of Express Preemption, 76
Colum.L.Rev. 392, 447-450 (1976).
19
ORDER OF THE COURT OF APPEALS
DENYING REHEARING
United States Court of Appeals
For THE NINTH CIRCUIT
Nos. 79-3365, 79-3382,
80-4265, 80-4273
PaciFic LEGAL FOUNDATION, a California
Nonprofit Corporation, ef al.,
Plaintiffs-Appellees,
¥.
STATE ENERGY RESOURCES CONSERVATION & DEVELOPMENT
COMMISSION, a state agency, ef al.,
Defendants-Appeliants.
NATURAL Resources DEFENSE COUNCIL, INC., ef al.,
Defendants-Intervenors-Appellants.
Paciric GAS AND ELEcTric Co. and
SOUTHERN CALIFORNIA EDISON Co.,
Plaintiffs-Appellees,
Wo
STATE ENERGY RESOURCES CONSERVATION & DEVELOPMENT
COMMISSION, a state agency, ef al.,
Defendants-Appellants.
NATURAL RESOURCES DEFENSE COUNCIL, INC., ef al.,
Defendants-Intervenors-Appellants.
Before FLETCHER and FERGUSON, Circuit Judges and
FITZGERALD, District Judge.
Filed January 20, 1982
20
The panel as constituted in the above case has voted to
deny the petition for rehearing. Judges Fletcher and Ferguson
have voted to reject the suggestion for a rehearing en banc, and
Judge Fitzgerald has recommended rejection of the suggestion
for rehearing en banc.
The full court has been advised of the suggestion for en
banc hearing, and no judge of the court has requested a vote on
the suggestion for rehearing en banc. Fed. R. App. 35(b).
The petition for rehearing is denied and the suggestion for
a rehearing en banc is rejected.
21
ANNOTATIONS TO CALIFORNIA PUBLIC
RESOURCES CODE § 25524.2
Historical Note
Section 2 of Stats.1976, c. 196, p.
“The provisions of this act shall not become operative
if Proposition 15 of the June 1976 election is adopted by
the people, whether or not this bill is chaptered before or
after such adoption.” [Proposition 15, Nuclear Power
Plants, was rejected by the people on June 8, 1976. ]
provided:
[Reprinted from CAL. PUB. RES. CODE ( West 1977) ]
1. Validity
Sections 25524.1, this section and 25524.3, imposing state
regulatory authority over certain aspects of the development,
construction and operation of nuclear power plants are
preempted by the federal regulatory scheme with respect to
nuclear energy and therefore are in violation of the Supremacy
Clause of the United States Constitution. 61 Ops.Atty.Gen.
159, 4-25-78.
{ Reprinted from CAL. PUB. RES. CODE ( West Supp. 1982) ]
22
TEXT OF PROPOSITION 15
This initiative measure proposes to add a Title 7.8 to the
Government Code. It does not amend any existing law.
PROPOSED LAW
Sec. |. Title 7.8 (commencing with Section 67500) is
added to the Government Code, to read:
TITLE 7.8 LAND USE AND NUCLEAR POWER
LIABILITY AND SAFEGUARDS ACT
67500. This title shall be known and may be cited as the
Nuclear Safeguards Act.
67501. The people and the State of California hereby find
and declare that nuclear power plants can have a profound
effect on the planning for, and the use of, large areas of the
state, as do related facilities connected with the manufacture,
transportation, and storage of nuclear fuel, and the trans-
portation, reprocessing, storage, and disposal of radioactive
materials from nuclear fission power plants.
67502. The people further find and declare that substan-
tial questions have been raised concerning the effect of nuclear
fission power plants on land use and land use planning, as well
as on public health and safety. Such questions include, but are
not limited to, (a) the reliability of the performance of such
plants, with serious economic, security, health, and safety
consequences; (b) the reliability of the emergency safety
systems for such plants; (c) the security of such plants, and of
systems of transportation, reprocessing, and disposal or storage
of wastes from such plants from earthquakes, other acts of God,
theft, sabotage, and the like; (d) the state of knowledge
regarding ways to store safely or adequately dispose of the
radioactive waste products from nuclear fission power plants
and related facilities; and (e) the creation by one generation of
potentially catastrophic hazards for future generations.
23
67503. A nuclear fission power plant and related facilities
may be a permitted land use in the State of California and its
waters and considered to be reasonably safe and susceptible to
rational land use planning, and may be licensed by state or
local agencies, and may be constructed in the state only if all of
the following conditions are met:
(a) after one year from the date of the passage of this
measure, the liability limits imposed by the federal government
have been removed and full compensation assured, either by
law or waiver, as determined by a California court of competent
jurisdiction and subject to the normal rights of appeal, for the
people and businesses of California in the event of personal
injury, property damage, or economic losses resulting from
escape or diversion of radioactivity or radioactive materials
from a nuclear fission power plant, and from escape or
diversion of radioactivity or radioactive materials in the prepa-
ration, transportation, reprocessing, and storage or disposal of
such materials associated with such a plant; and
(b) after five years from the date of the passage of this
measure.
(1) the effectiveness of all safety systems, including but not
limited to the emergency core cooling system, of any nuclear
fission power plant operating or to be operated in the State of
California is demonstrated, by comprehensively testing in ac-
tual operation substantially similar physical systems, to the
satisfaction of the Legislature, subject to the procedures speci-
fied in Section 67507; and
(2) the radioactive wastes from such a plant can be stored
or disposed of, with no reasonable chance, as determined by the
Legislature, subject to the procedures specified in Section
67507, of intentional or unintentional escape of such wastes or
radioactivity into the natural environment which will eventually
adversely affect the land or the people of the State of Califor-
nia, whether due to imperfect storage technologies, earthquakes
or other acts of God, theft, sabotage, acts of war, governmental
or social instabilities, or whatever other sources the Legislature
may deem to be reasonably possible.
24
67504. (a) If within one year from the date of the passage
of this measure the provisions of subsection 67503( a) have not
been met, then each existing nuclear fission power plant and
such plants under construction failing to meet the conditions
specified in subsection 67503(a) shall not be operated at any
time at more than sixty per cent of the original licensed core
power level of such plant.
(b) Beginning five years from the date of the passage of
this measure, each existing nuclear fission power plant and each
such plant under construction shall not be operated at any time
at more than sixty per cent of the licensed core power level of
such plant and shall thereafter be derated at a rate of ten per
cent per year of the licensed core power level of such plant, and
shall not be operated at any time in excess of such reduced core
power level, unless all of the conditions enumerated in Section
67503 are met.
67505. The provisions of Sections 67503 and 67504 shall
not apply to small-scale nuclear fission reactors used exclusively
for medical or experimental purposes.
67506. One year from the date of the passage of this
measure, the Legislature shall initiate the hearing process
specified in Section 67507, and, within three years from the
date of the passage of this measure, determine whether it is
reasonable to expect that the conditions specified in Section
67503( b) will be met. Unless the Legislature determines that it
is reasonable to expect that the conditions of Section 67503(b)
will be met, then nuclear fission power plants shall be a
permitted land use in California only if such existing plants and
such plants under construction are operated at no more than
sixty per cent of their licensed core power level. Unless the
determinations specified in this section are made in the affirma-
tive, then neither the siting nor the construction of nuclear
fission power plants or related facilities shall be a permitted
land use in California.
67507. The determinations of the Legislature made
pursuant to subsection 67503(b) and Section 67507 shall be
made only after sufficient findings and only by a two-thirds vote
of each house.
25
(a) To advise it in these determinations, the Legislature
shall appoint an advisory group of at least fifteen (15) persons,
comprised of distinguished experts in the fields of nuclear
engineering, nuclear weaponry, land use planning, cancer re-
search, sabotage techniques, security systems, public health,
geology, seismology, energy resources, liability insurance, trans-
portation security, and environmental sciences; as well as
concerned citizens. The membership of this advisory group
shall represent the full range of opinion on the relevant
questions. The group shall solicit opinions and information
from responsible interested parties, and hold widely publicized
public hearings, after adequate notice, in various parts of the
State prior to preparing its final report. At such hearings an
opportunity to testify shall be given to all persons and an
Opportunity to cross-examine witnesses shall be given to all
interested parties, within reasonable limits of time. The
advisory group shall make public a final report, including
minority reports if necessary, containing its findings, con-
clusions, and recommendations. Such report shall be summa-
rized in plain language and made available to the general
public at no more than the cost of reproduction.
(b) To ensure full public participation in the determina-
tions specified in subsection 67503(b) and Section 67506, the
Legislature shall also hold open and public hearings, within a
reasonable time after the publication of the report specified in
subsection (a) of this section, and before making its findings,
giving full and adequate notice, and an opportunity to testify to
all persons and the right to cross-examine witnesses to all
interested parties, within reasonable limits of time.
(c) All documents, records, studies, analyses, testimony,
and the like submitted to the Legislature in conjunction with its
determinations specified in subsection 67503(b) and Section
67506, or to the advisory group described in subsection (a) of
this section, shall be made available to the general public at no
more than the cost of reproduction.
(d) No more than one-third of the members of the
advisory group specified in this section shall have, during the
two years prior to their appointment to the group, received any
26
substantial portion of their income directly or indirectly from
any individual, association, corporation, or governmental
agency engaged in the research, development, promotion,
manufacture, construction, sale, utilization, or regulation of
nuclear fission power plants or their components.
(e) The members of the advisory group shall serve without
compensation, but shall be reimbursed for the actual and
necessary expenses incurred in the performance of their duties
to the extent that reimbursement is not otherwise provided by
another public agency. Members who are not employees of
other public agencies shall receive fifty dollars ($50) for each
full day of attending meetings of the advisory group.
(f) The advisory group may:
(1) Accept grants, contributions, and appropriations;
(2) Create a staff as it deems necessary;
(3) Contract for any professional services if such work
or services cannot satisfactorily be performed by its em-
ployees;
(4) Be sued and sue to obtain any remedy to restrain
violations of this title. Upon request of the advisory group,
the State Attorney General shall provide necessary legal
representation.
(5) Take any action it deems reasonable and neces-
sary to carry out the provisions of this title.
(g) The advisory group and all members of the advisory
group shall comply with the provisions of Sections 87100
through 87312 inclusive, of Title 9 of the California Govern-
ment Code.
(h) Any person who violates any provision of this section
shall be subject to a fine of not more than ten thousand dollars
($10,000), and shall be prohibited from serving on the adviso-
ry group.
67508. (a) The Governor shall annually publish, publicize,
and release to the news media and to the appropriate officials of
affected communities the entire evacuation plans specified in
27
the licensing of each nuclear fission power plant. Copies of
such plans shall be made available to the public upon request,
at no more than the cost of reproduction.
(b) The Governor shall propose procedures for annual
review by state and local officials of established evacuation
plans, with regard for, but not limited to such factors as changes
in traffic patterns, population densities, and new construction of
schools, hospitals, industrial facilities, and the like. Opportunity
for full public participation in such reviews shall be provided.
Sec. 2. There is hereby appropriated from the General
Fund in the State Treasury to the legislative advisory group
created by Section 67507 of the Government Code the sum of
eight hundred thousand dollars ($800,000) for expenditures
necessary in carrying out the responsibilities and duties set forth
in Section 67507 of the Government Code.
Sec. 3. Amendments to this measure shall be made only by
a two-thirds affirmative vote of each house of the Legislature,
and may be made only to achieve the objectives of this
measure.
Sec. 4. If any provision of this measure or the application
thereof to any person or circumstances is held invalid, such
invalidity shall not affect other provisions or applications of the
measure which can be given effect without the invalid provision
or application, and to this end the provisions of this measure
are severable.
[Reprinted from Excerpt of Record at 217-21, Pacific Legal
Foundation v. State Energy Resources Conservation & Devel-
opment Commission, Nos. 79-3365, 79-3382, 659 F.2d 903 (9th
Cir. 1981)]
——
=—
~
7
-_—_.
Office - Supreme Court, U.S.
No. 81-1944 FILED
IN THE ee ee
SUPREME COURT OF THE UNITED STATES
October Term, 1981
PACIFIC LEGAL FOUNDATION, et al,
vs.
STATE ENERGY RESOURCES CONSERVATION
AND DEVELOPMENT COMMISSION, et ai,
Respondents.
PACIFIC GAS AND ELECTRIC
COMPANY and SOUTHERN
CALIFORNIA EDISON COMPANY,
Petitioners,
vs.
STATE ENERGY RESOURCES CONSERVATION
AND DEVELOPMENT COMMISSION, et ai,
Petitioners,
Respondents.
4
Consolidated Response to Petitions for Writ
of Certiorari to the United States Court
of Appeals for the Ninth Circuit
(617) 495-4621
ROGER BEERS
KATHRYN BURKETT DICKSON
QUESTIONS PRESENTED
1. Did the Ninth Circuit err in holding that a nuclear
engineer, who allegedly lost his job when his employer
cancelled a power plant project, was not entitled to sum-
mary judgment on the issue of his standing to challenge
the validity of a state law, where (a) factual disputes
existed as to whether the challenged law caused the
project’s cancellation, and (b) the engineer failed even
to allege that invalidation of the law would likely redress
his loss of employment?
2. Did the Ninth Circuit err in treating as unripe for
adjudication two utilities’ omnibus preemption chal-
lenges to state statutes that had not yet been authorita-
tively interpreted or finally applied to any utility’s
nuclear project, where the plaintiff utilities’ claims of
present injury were based exclusively on their fears
about how the provisions might be interpreted and ap-
plied in the future?
3. Did the Ninth Circuit err in holding that two Cali-
fornia statutes which address California’s need for a reli-
able, economical, and environmentally acceptable
supply of electrical energy, do so without intruding into
federally preempted areas of radiation hazard control or
obstructing any congressional objective regarding nu-
clear power?
4. Does any of these questions pose an issue of suffi-
cient legal or factual significance to warrant current
resolution by this Court?
TABLE OF CONTENTS
Ee en ee mn
TABLE OF CONTENTS .0....ccssssssssssssssssssssssee aiaidinen iii
TABLE OF AUTHORITIES onetime Vv
JURISDICTION = wa oe
ST SI I iat icles sctittiienteenicttianintiemiennnininenians 2
ee 2
The Atomic Energy Act of 1954 and the Challenged Statutes.......... 4
Petitioners’ Omnibus Preemption Claims sesitaiaihaapinatali y
REASONS FOR DENYING THE WRIT 10
I. THE NINTH CIRCUIT WAS CLEARLY CORRECT IN HOLD-
ING THAT PETITIONER THORNBERRY WAS NOT ENTI-
TLED TO SUMMARY JUDGMENT ON THE QUESTION OF
STITT ietirtnensetinitnetiensiceniigtbemiatiieainnicatens 12
Il. THE UTILITIES’ CHALLENGES TO STATE STATUTES
THAT MIGHT NEVER BE APPLIED, ADMINISTRATIVE AC-
TIONS THAT MIGHT NEVER BE TAKEN, AND JUDICIAL
DETERMINATIONS THAT MIGHT NEVER BE MADE, DO
NOT WARRANT PLENARY REVIEW.. 14
A. The Ninth Circuit Was Clearly Correct in Refusing to Award
the Utilities the Anticipatory Advisory Opinions They Sought..... 15
B. Even if the Utilities’ Challenges to the Waste Disposal Law
and Three-Site Requirement Were Ripe, Plenary Review by
This Court of the Validity of Those Statutes Would be Prema-
ture 18
Ill. NOTHING IN THE MERITS OF PETITIONERS’ OMNIBUS
PREEMPTION ATTACK ON CALIFORNIA’S POWER
PLANT REGULATIONS WARRANTS THIS COURT'S PLE-
NARY CONSIDERATION . . 20
A. The Regulatory Means Chosen by California Herein Were So
Plainly Authorized by Congress Itself That Petitioners’ Only
Proper Recourse Is To That Body Rather Than to This Court..... 20
B. The Ninth Circuit’s Decision Does Not Portend Any Nation-
wide Impact of a Sort Which Might Merit Review on Certio-
rari
C. Nor Is Certiorari Warranted to Consider Hypothetical “Con-
-—- Saetonntrcemastmnmnadmineslslenanammadesoan
CONCLUSION
iv
TABLE OF AUTHORITIES CITED
Cases
Page
Commonwealth Edison Co. v. Montana, 101 S.Ct. 2946 (1981) .......000 24
Communist Party v. Subversive Activities Control Board, 367 U.S. 1
(1961) 18
DeCanas v. Bica, 42A U.S. 351 (1976) 26
Duke Power Co. v. Carolina Environmental Study Group, Inc., 438
US. 59 (1978) 14
Exxon Corp. v. Governor of Maryland, 437 U.S. UT (1978) ......0.-ssssss0e« 25
FTC v. Standard Oil Co., 449 U.S. 232 (1980) 17
Hodel v. Virginia Mining & Reclamation Association, 452 U.S., 264
(1981) 16
Illinois v. Kerr-McGee Chemical Corp., Nos. 81-1110, 81-1152, (7th
Cir., May 4, 1982) 11, 22
Kewanee Oil Co. v. Bicron Corp., 416 U.S. 470 (1974) 26
McCulloch v. Maryland, \7 U.S. (4 Wheat.) 316 (1819) 20
— Lynch, Pierce, Fenner & Smith, Inc. vy. Ware, 414 U.S. 117
(1973) 23
New Hampshire v. Atomic Energy Commission, 406 F.2d 170 (1st
Cir.), cert. denied, 395 U.S. 962 (1969) 26
New York Telephone Co. v. New York Labor Department, 440 US.
519 (1979) 26
Northern States Power Co. v. Minnesota, 447 F.2d 1143 (8th Cir.
1971). affd mem., 405 U.S. 1035 (1972) - 11, 21
Orr v. Orr, 440 U.S. 268 (1979) 13, 14
Pacific Gas & Electric Co. v. State Energy Resources Conservation
and Development Commission, 489 F Supp. 699 (E.D. Cal. 1980) ....... 3
_ Pacific Legal Foundation v. State Energy Resources Conservation
and Development Commission, 472 F Supp. 191 (S.D. Cal. 1979)....... 3
Perez v. Campbell, 402 U.S. 637 (1971) 22
Peterson v. City of Greenville, 373 U.S. 244 (1963) ...cccsesseesvessneesnes 13, 14
Ray v. ARCO, 435 U.S. 151 (1978) 26
Red Lion Broadcasting Co. v. Federal Communications Comm'n.,
295 U.S. 367 (1969) 22
Regents of Univ. of California v. Bakke, 438 U.S. 265 (1978) ........+0s00+ 13
Silkwood v. Kerr-McGee Corp., 667 F.2d 908 (10th Cir. 1981) ........:..0++ ll
Silver v. New York Stock Exchange, 373 U.S. 341 (1963) ......sssvessvesseeene 23
—— Eastern Kentucky Welfare Rights Organization, 426 US. 26
(1976) 14
Singleton v. Wulff, 428 U.S. 106 (1976) 14
The Montrosa v. Carbon Black Export, Inc., 359 U.S. 180 (1959) .......... 18
United States v. Nixon, 418 U.S. 683 (1974) 2
Valley Forge Christian College v. Americans United for Separation
of Church and State, Inc., 102 S.Ct. 752 (1982) 13
Village of Arlington Heights v. Metropolitan Housing Dev. Corp.,
429 U.S. 252 (1977) 13
Federal Constitutional Provisions, Statutes,
and Regulations
United States Constitution:
Article III 13, 14
Atomic Energy Act of 1954, 42 U.S.C., §§ 2011 et.seq. ........ss passim
$1, 42 US.C., § 2011
$1, 42 US.C., § 2013(d)
§ 271, 42 US.C., § 2018
§ 274, 42 US.C., § 2021
§ 274(b), 42 US.C., § 2021 (b)
§274(c), 42 US.C., § 2021 (c)
§ 274(k), 42 U.S.C., § 2021 (k) 5, 21,
Clean Air Act Amendments of 1977:
§ 116, 42 US.C., § 7416
§ 122, 42 U.S.C., § 7422
t of Energy Reorganization Act of 1977:
42 US.C., § 7112
Energy Reorganization Act of 1974:
42 US.C., § 5801
42 US.C., § 5812
42 US.C., §5814
42 US.C., § 5841
NRC Authorization Act for Fiscal Year 1980, 96th Cong., 2d
Sess. (1980)
§ 108(f)
28 U.S.C. § 1254(1)
US. Sup.Ct. Rule 19.6
10 C.F.R. §§ 51.20-51.26
State Constitutional Provisions and Statutes
Warren-Alquist State Energy Resources Conservation and Develop-
ment Act, Cal. Pub. Res. Code, §§ 25000 et seq.
not
ge
ve
Sera ae RRK KR RK VEuBIEL
§
Ra
_—
bl -
nn
th po
>
pe
>
fe
>
a
a>
>
ad
g
to
SAAADAAAAALD|
§ 25524 7
25524. 1 (a) 15
25524.1 (b) 15
§ 25524.2 3, 9, 19
§ 25524.3 15
§ 25525 7
§ 25528 7, 16
§ 25532 7
N.Y. Public Authorities Law § 1005 24
Nucleonics Week,
il 29, 1982, at 9 19
ee
and Waste Disposal Statutes, Docket Nos. 76-NL-1, 3 (1978) ........... 18
R. Stern & E. Gressman, Supreme Court Practice 54-55 (5th ed.
1978) hie
Washington Post, April 27, 1982 at 17 8
wha
No. 81-1944
No. 81-1945
IN THE
SUPREME COURT OF THE UNITED STATES
October Term, 1981
PACIFIC LEGAL FOUNDATION, et ai,
Petitioners,
vs.
STATE ENERGY RESOURCES CONSERVATION
AND DEVELOPMENT COMMISSION, et ai,
Respondents.
PACIFIC GAS and ELECTRIC
COMPANY and SOUTHERN
CALIFORNIA EDISON COMPANY,
Petitioners,
vs.
STATE ENERGY RESOURCES CONSERVATION
AND DEVELOPMENT COMMISSION, et al,
Respondents.
4
Consolidated Response to Petitions for Writ
of Certiorari to the United States Court
of Appeals for the Ninth Circuit
JURISDICTION
Of the seven petitioners filing papers with this Court
herein, four were not even “parties to the proceedings
in the court whose judgment is sought to be reviewed”
(Sup. Ct. R. 19.6), and accordingly cannot seek certiorari
under 28 U.S.C. § 1254(1) to review the Ninth Circuit's
decision.' See R. STERN & E. GRESSMAN, SUPREME
' The petitioners listed in No. 81-1945 are Pacific Gas & Electric
Company and Southern California Edison Company. Four of the
= os
CourRT PRACTICE 54-55 (5th ed. 1978); cf United States
v. Nixon, 418 U.S. 683, 690-92 (1974). Thus, only the peti-
tions of Robert C. Thornberry in No. 81-1944 (“PLF’’),
and of Pacific Gas & Electric Company and Southern
California Edison Company in No. 81-1945 (“PG&E”),
are properly before this Court.’
STATEMENT OF THE CASE
Proceedings Below
Respondents, State Energy Resources Conservation
and Development Commission, et a/.,’ oppose the peti-
tions for certiorari in PLF and PG&E to review the
Ninth Circuit’s reversal of two federal district court
judgments, consolidated on appeal in the court below.
These judgments struck down, as preempted, key as-
pects of California’s system for regulating the commer-
cial generation of electricity for its people by
state-regulated utilities.
In PLF the federal district court for the Southern Dis-
trict of California had summarily voided Cal. Pub. Res.
oes listed in No. 81-1944—Pacific Legal Foundation, the
pee Sanaa, the San Diego Section of the American
Nuclear Society, and the San Diego County Building and Con-
struction Trades Council—were all denied summary judgment
by the trial court on standing on. PLF Pet. App. at 6. On
ovember 1, °979, the Ninth Circuit properly “dismissed [their]
aoeaee on the standing issue] on the ground that it was not
taken from a final Fm poe &E Pet. App. (hereinafter
a) at 8 n.11. These parties did not attempt to renew their
standing claims in connection with petitioner Robert C. Thorn-
berry’s defense below of his favorable district court judgment.
Nor do the questions presented in either petition even purport
to bring their standing claims before this Court.
* Respondents file this single brief in epqestion to both petitions.
* The respondents, hereinafter collectively referred to as “the En-
ergy Commission,” are listed in PG&E Pet. at ii.
_
Code § 25524.2 (“the waste disposal law’’) , by which Cal-
ifornia proposed to delay further state certification of
nuclear power plants pending federal resolution of the
nuclear waste disposal problem—a problem that could,
if unresolved, doom such plants to future interruption or
abandonment at federal insistence.‘ In PG&E the fed-
eral district court for the Eastern District of California
had invalidated the waste disposal law and 16 other
provisions of the Warren-Alquist State Energy Re-
sources Conservation and Development Act (“the War-
ren-Alquist Act”), Cal. Pub. Res. Code §§ 25500-25986,
California’s comprehensive legislative scheme for regu-
lating electric power supply.’ Both courts held that the
challenged statutes were preempted by the Atomic
Energy Act of 1954, as amended, 42 U.S.C. $§ 2011 et
seq., on the ground that the laws invaded a sphere of
exclusive federal regulatory authority under the 1954
Act, and frustrated federal objectives with respect to
nuclear power.
The Ninth Circuit reversed, rejecting these preemp-
tion holdings after ruling (1) that the district court in
PLF had erred in awarding summary judgment to
plaintiff Thornberry without conducting a trial on his
standing; and (2) that the district court in PG&E had
erred in treating as ripe for adjudication, even at the
behest of parties with standing, the host of anticipatory
* Pacific Legal Foundation, et al. v. State Energy Resources Conser-
vation and Development Commission, et al. 472 F Supp. 191
(S.D. Cal. 1979), reprinted in PLF Pet. App. at 1-18.
° Pacific Gas & Electric Co., et al. v. State Energy Resources Con-
servation and Development Commission, et. al. 489 F Supp. 699
(E.D. Cal. 1980), reprinted in App. at 55-64. Hereinafter, all
references to the provisions of the Warren-Alquist Act are to
section numbers in the California Public Resources Code.
preemption challenges made by the utility plaintiffs.
The Ninth Circuit held that only two of the 17 provisions
challenged by those plaintiffs were ripe for review—the
waste disposal law and Section 25503 of the Warren-
Alquist Act, requiring a utility to include at least three
alternative sites in its application for any proposed pow-
er plant (“the three-site requirement”). App. at 19-27.°
The court concluded that neither was preempted by the
Atomic Energy Act of 1954 because both were “enacted
for purposes other than protection against radiation haz-
ards” (id. at 2), and “do not impede congressional goals”
(id. at 46).
The Atomic Energy Act of 1954
and the Challenged Statutes
The basic allocation of state and federal authority to
regulate the commercial use of nuclear power was es-
tablished by the Atomic Energy Act of 1954. That legisla-
tion allowed industry for the first time to participate in
the development of nuclear power, authorizing private
firms to take possession of nuclear materials and to build
commercial reactors under licenses from the Atomic
Energy Commission.’ At the same time, Section 271 of
the 1954 Act expressly preserved broad state authority
over these facilities:
“Nothing in this chapter shall be construed to affect
the authority or regulations of any Federal, State, or
® The court noted that its conclusion regarding the validity of
Section 25503 “necessarily affect[ed]” Sections 25504 and 25516,
as well, since they also contained requirements relating to three
sites. App. at 23 n.22.
7 The Atomic ran Saseeenien (“AEC”) was dismantled b
Section 104 of the Energy Reorganization Act of 1974, 42 U.S.C.
Seat and its promotional functions were transferred to the
ergy Research and Development Administration. Jd. The
AEC’sr tory functions were transferred to the Nuclear Reg-
ulatory Commission (“NRC”). /d. § 5841.
ates
local agency with respect to the generation, sale, or
transmission of electric power produced through the
use of nuclear ‘facilities licensed by the [Nuclear Reg-
ulatory] Commission.” 42 U.S.C. § 2018.
In 1959, Congress made clear that any preemption of
state authority was limited to regulation of “radiation
hazards,” when it added Section 274 to the 1954 Act. 42
U.S.C. § 2021. That provision establishes a procedure (in
sub-section (b)) for delegating certain of the NRC’s
radiation protection responsibilities to the States. While
sub-section (c) of Section 274 prevents the NRC from
transferring to the States its radiation protection author-
ity with respect to the construction and operation of any
nuclear power plant, sub-section (k) contains an express
disclaimer of any intent to preempt state authority
beyond the regulation of radiation hazards:
“Nothing in this section shall be construed to affect
the authority of any State or local agency to regulate
activities for purposes other than protection against
radiation hazards.” 42 U.S.C. § 2021 (k).
Moreover, Congress has specifically authorized state
regulation even of radiation hazards in the contexts of
air pollution control and nuclear power plant emer-
gency planning.®
* Under Section 122 of the Clean Air Act Amendments of 1977—
relied on by the Ninth Circuit (App. at 33 n.28, 44), but nowhere
mentioned by any petitioner—Congress permitted the States to
regulate radioactive air emissions from nuclear power plants for
the purpose of protection against radiation hazards, authorizing
state and local see age to adopt and enforce radioactive
emission or ambient air standards more stringent than those
imposed by the federal government. 42 U.S.C. §§ 7416, 7422. Un-
der Section 108(f) of the NRC Authorization Act for Fiscal Year
1980, 96th Cong., 2d Sess. (1980), Pub. L. No. 96-295, 94 Stat. 783
1980) (relating to nuclear power plant emergency planning),
ngress ifically approved “the states’ authority to set nu-
clear toy 4 plant a and land use requirements more strin-
gent those of the NRC,” as the Ninth Circuit observed. App.
at 45. Nowhere do petitioners discuss this legislation either.
-6-
Based on its review of these enactments, the Ninth
Circuit determined—consistent with the rulings of
other circuits (see page 21 infra),—that Congress has
expressly confined the preemptive force of the Atomic
Energy Act of 1954 to certain forms of “state regulation
of radiation hazards associated with nuclear power.”
App. at 33. The States remain free under the 1954 Act to
approve or disapprove proposed nuclear power plants—
as they may approve or disapprove proposed power
plants utilizing other energy sources—from the stand-
points of cost, reliability, land-use, resource-allocation,
and other vital state policies. App. at 43.°
The provisions of state law challenged by petitioners
are part of a comprehensive energy planning and facil-
ity siting statute intended to serve these state interests.
Thus, California’s Warren-Alquist Act requires that any
utility proposing to build a power plant in the state,
whether nuclear or non-nuclear, submit data dealing
with a large number of subjects concerning the pro-
posal.'° The Energy Commission is required to make
® The Ninth Circuit acknowledged, of course, that “[s]tate regula-
tions which ses conflict with regulations of the NRC would
... . be preempted even if they were enacted for pu other
than protection against radiation hazards.” App. at 33 n.29. This
case plainly presents no such conflict. See page 23-27 infra.
© The provisions challenged by the utility petitioners require that
a utility obtain the Energy Commission's “certification” of an
energy facility prior to commencing construction (§ 25500,
25517), and they establish a two-stage licensing process for this
purpose. The process comes with the utility’s submission of a
‘Notice of Intention” (“NOI”) to build a power plant (§ 25502).
In the NOI phase, which lasts a year, the Commission examines
the need for additional energy facilities and the relative merit of
particular sites and technologies. The provisions challenged by
petitioners specify the general contents of the NOI to be submit-
ted by the utility (§ 25504), and authorize the Commission to
seek certain additional information (§ 25511). Other provisions
merely specify the format or findings required in the Commis-
sion’s initial a, order (§ 25512), report (§ 25514), and
approval of the NOI (§ 25516).
” oe
various determinations based on this data— including,
for example, whether the supply project conforms to the
Commission’s long-range demand forerast (§§ 25523 (f),
25524). As the Ninth Circuit correctly observed, “we
have no way of knowing . . . to what purposes the in-
formation might be put . . . whether the Energy Com-
mission will ever deny certification, or whether such a
denial might be based upon impermissible reasons.”
App. at 20-21. For present purposes, what may be most
significant is the statute’s specific directive—not men-
tioned by petitioners and not yet construed by any state
court—that “[iJn no event shall the [Energy] Commis-
sion make any finding in conflict with applicable federal
law or regulation” (§ 25525) ."!
Of the two provisions in the Warren-Alquist Act held
ripe for review by the Ninth Circuit, one requires that
information be submitted on three alternative sites for
any proposed power plant (§ 25503). This three-site law
“applies to all power plants, nuclear and non-nuclear.”
App. at 41. Its purpose is not only to provide the Energy
If the NOI is approved, the we iy then file an “Application
for Certification” (“AFC ”), which commences an eighteen-
month proceeding to determine whether a permit should be
issued for the actual construction of the facility on a icular
site (§ 25519). In the AFC phase, the provisions challenged by
petitioners —_ require certain information be included
in the AFC an t the AFC be distributed to various agencies
(§§ 25519, 25520). They also require that the Commission's deci-
sion on the AFC include certain findings (§ 25523), and that the
Commission establish a “monitoring system” to ensure compli-
ance with its decisions (§ 25532).
‘! Other provisions of the Warren-Alquist Act mandate all appropri-
ate deference to relevant federal law as well. See, e.g., 25500
(certification authority vested in Energy Commission “to the
extent permitted by federal law”) ; § 95598 (Energy Commission
required to assure that areas surrounding a proposed plant will
not su uently exceed population densities specified by the
NRC and by applicable state land-use planning requirements).
~
Commission with “an efficient meaus of deciding where
a proposed power plant should be located” (id.) , but also
to allow the “banking” of other acceptable sites in order
to expedite future siting proceedings. It is obviously “un-
related to protection against radiation hazards.” /d. at
40-41.
Nor does the other provision held ripe for review by
the Ninth Circuit—the waste disposal law—purport to
regulate radiation hazards. As the Ninth Circuit ob-
served, the waste-disposal law is not directed at where,
how safely, or by what methods, any power plant’s ra-
dioactive wastes are to be disposed of—and, a fortiori, is
not a “regulation” of any radiation hazards associated
with such waste disposal. Rather, the waste disposal law
reflects California’s concern that federal authorities
might order the shutdown of nuclear plants generating
such wastes, if a method of waste disposal is not ap-
proved by the federal government on a timely basis.!?
As the Ninth Circuit stated:
“Until a method of waste disposal is approved by the
federal government, California has reason to believe
that uncertainties in the nuclear fuel cycle make nu-
clear power an uneconomical and uncertain source
‘2 Although the expected useful operating life of a nuclear power
reactor is approximately 30—40 years, the storage capacity on-site
for the wastes generated by the reactor is typically limited to
5-10 years accumulation. Thus, off-site storage for such wastes—
at a federally approved repository—must be made available after
that time in order to keep reactors operating. Bridenbaugh Dec-
laration § 30 [Excerpts iced on appeal (hereinafter “ER’”’)
at 257]. See also, Washington Post, April 37, 1982 at 17 (“As [s]pent
fuel from the 74 nuclear power plants around the country .. .
il[es] up in temporary storage sites,” some of the plants might
‘be forced to close.”). For instance, Virginia Electric Power
Company officials project that unless federal waste policies are
resolved, the utility may have to shut down its nuclear plant,
because it will run out of storage space for its used-up fuel. Jd.
eS
of energy. The legislature has chosen to mandate
reliance upon other energy sources until these un-
certainties associated with nuclear power are re-
solved.” App. at 40.
Thus, the waste disposal law is concerned solely with the
existence of a federally approved waste disposal
method, “not with the adequacy of the method.” App.
at 40.'%
Petitioners’ Omnibus Preemption Challenge
Neither of the two laws sustained below, nor any oth-
ers challenged in the district courts, has ever been ap-
plied to deny or condition certification of a nuclear plant
proposed by the util’ , petitioners or by anyone else,
much less been given any authoritative construction by
a state court. The utilities assert that all their claims are
ripe because they challenge “the very existence of the
California certification system and other statutes. . . .”
13 California itself is not a probable target for ultimate disposal of
high-level nuclear wastes; the State seems “never [to have] been
roposed as the site for a permanent high-level radioactive waste
isposal facility.” Lash Affidavit € 11 (ER at 315).
e utility petitioners assert that the waste disposal law re-
quires the Energy Commission to make “‘an independent deter-
mination whether a satisfactory technology or means for the
disposal of high-level nuclear waste evists in fact.” (PG&E Pet.
at 18 (emphasis in a) . na that the Commission must
nooneeael y second-guess the safety of the technology eventually
approved by the federal government. But section 25524.2 does
not, on its face, require any such thing. Rather it merely requires
a determination that “there exists a demonstrated technology or
means for the disposal of high-level nuclear waste,” and the stat-
ute makes clear in subsection (c) that this does not mean that
actual “facilities for the application of such technology and/or
means be available” at the time this determination is made. As
the statute itself explains, the State must be assured “that the
United States through its authorized agency has approved” this
technology. Finally, it was obviously necessary in Section 25524.2
to vest some state agency—in this case, the Energy Commission
—with authority to determine whether all of these conditions for
reactor licensing had been met.
@ 19-—
PG&E Pet. at 26 (emphasis in original). The Ninth Cir-
cuit’s response was straightforward: “[a] case or contro-
versy is not presented simply because a party is subject
to a general regulatory process which, when applied to
the specific facts developed in some future administra-
tive proceeding, might cause a state agency to take a
particular action which some court might thereafter de-
termine to be unconstitutional.” App. at 22. (citation
omitted).
Petitioner Thornberry, who has not even alleged a
risk of state action directed against him, seeks to assert
derivatively the third-party rights of the regulated utili-
ties—and claims both standing to enforce such rights
and the ripeness of his attempt to do so—on the theory
that the Sundesert nuclear project on which he had
been employed was cancelled partly because of the
pendency of the waste disposal law. Given the factual
dispute as to whether the project would have been can-
celled even without that law,'* and given that Thorn-
berry had not even “alleged . . . that he might get his
job back if the Sundesert project were revived” (App. at
16), the Ninth Circuit held summary judgment in
Thornberry’s favor on the issue of standing to have been
improper. /d. at 13.
REASONS FOR DENYING THE WRIT
Several circuit courts of appeals have consistently
held that the Atomic Energy Act of 1954 impliedly
preempts state regulation of radiological hazards but
that Congress has expressly declined to preempt other
‘4 The Ninth Circuit noted there was evidence in the record from
which a trier of fact could infer that the Sundesert project was
financially infeasible. App. at 11-13.
ths.
forms of state regulation of electric power generat.un by
nuclear plants. Northern States Power Co. v. Minnesota,
447 F.2d 1143, 1150 (8th Cir. 1971), affd mem., 405 U.S.
1035 (1972); Silkwood v. Kerr-McGee Corp., 667 F.2d
908, 920 (10th Cir. 1981); Z//inois v. Kerr-McGee Chemi-
cal Corp., Nos. 81-1110, 81-1152 (7th Cir., May 4, 1982).
The Ninth Circuit’s decision is well within this consensus
as to the scope of federal preemption under the Atomic
Energy Act. Petitioners’ dissatisfaction with the result
reached by the Ninth Circuit in applying these clear
rules is not accompanied by any demonstration of con-
flict with the decisions of another circuit or of this Court
that would justify granting a writ of certiorari.
Certainly, the “across-the-board” character of the
challenged statutes (PLF Pet. at 14) does not lend any
national significance to the Ninth Circuit’s otherwise
unremarkable decision. The State’s undeniable ability to
refuse to license proposed nuclear plants, one by one, as
inconsistent with the State’s power needs, its environ-
mental concerns apart from radiation hazards, or its
cost-benefit assessments of alternative means of gener-
ating power (PG&E Pet. at 16-17) renders protests
about “across-the-board” regulation simply a quarrel
with the State’s chosen mechanism for producing an
indisputably lawful result.
Federal judicial action to deprive a State of the option
to proceed with caution in licensing new nuclear plants
for commercial power generation on the record in this
case would require both an unprecedented disregard of
Article III limits on federal court intervention and an
override of Congress’s explicit allocation of authority
between the NRC and the States with respect to nuclear
power regulation. The Ninth Circuit, in declining peti-
= =
tioners’ invitation to take these two steps—steps that
would swell federal judicial power at the expense of
both Congress and the States—has vindicated well-set-
tled and important principles of federalism and of the
separation of powers, but has provided no occasion for
plenary review by this Court.
|. THE NINTH CIRCUIT WAS CLEARLY CORRECT IN HOLDING THAT
PETITIONER THORNBERRY WAS NOT ENTITLED TO SUMMARY
JUDGMENT ON THE QUESTION OF STANDING.
On motion for summary judgment below, petitiones
Thornberry claimed standing on the grounds that (1,
the waste-disposal law caused SDG&E, his employer
(but not a party below), to cancel the Sundesert nuclear
power plant project on which he had been employed as
a nuclear engineer, and (2) the cancellation of the
Sundesert project caused Thornberry to lose his job.
App. at 11. The Ninth Circuit noted that the Energy
Commission disputed both of these premises (id.), and
concluded that these material questions of fact as to
“causation” should have precluded a grant of standing
to Thornberry on summary judgment.'® /d. at 13. The
Ninth Circuit further noted that Thornberry had not
demonstrated any likelihood that Sundesert would pro-
ceed if the nuclear waste disposal law was invalidated,
1S Observing that it could “affirm a grant of summary judgment
only if the material facts are undisputed and the moving | pm
is entitled to judgment as a matter of law” (App. at 11), and that
it was required to “view all evidence and factual inferences in
the light most favorable to the non-moving party, the Energy
Commission” (id.), the Ninth Circuit noted the “material ques-
tions” of causation raised by the Energy Commission’s evidence
(1) that the Sundesert project was independently doomed by
financial obstacles and (2) that the Sundesert project had been
cancelled + sapatenetne meee I the pendency of a bill in the Califor-
my ered exempting the project from the waste disposal law.
. at 11-16.
=
and that Thornberry had “not even alleged, much less
proved, that he might get his job back if the Sundesert
project were revived” Jd. at 16. Thus, the Ninth Circuit
concluded that “[oJ]n the record before us, it is a mere
speculative possibility that the relief sought would rem-
edy Thornberry’s injury.” Jd. at 16. The court held that
“{slummary judgment on the issue of standing was
therefore improper.” /d. at 13.
In light of this Court’s frequent admonition that, as an
“irreducible minimum,” Article III requires a plaintiff
invoking federal judicial power to demonstrate both
that his injury “fairly can be traced to the challenged
action” and that the injury “is likely to be redressed by
a favorable decision” ( Valley Forge Christian College v.
Americans United For Separation of Church and State,
Inc., 102 S.Ct. 752, 758 (1982)), the Ninth Circuit was
clearly correct in holding that the district court had
erred in granting Thornberry’s motion for summary
judgment on the standing issue while material issues of
fact remained as to causation and redressability.'® The
‘6 The cases cited by petitioner Thornberry (PLF Pet. at 16-19)
represent no departure from this Court’s well-established re-
dressability requirement. In Village of Arlington Heights v. Met-
ropolitan Housing Development Corp., 429 U.S. 252, 262 (1977),
this Court held that a “substantial likelihood” existed that re-
spondent’s proposed housing project would proceed if the of-
fending ordinance were invalidated. Similarly, in Duke Power
Co. v. Carolina Environmental Study Group, Inc., 438 U.S. 59,
74-75 (1978), the Court found a “substantial likelihood” that
invalidation of the Price-Anderson Act would block two nuclear
power plants which respondents viewed as a threat to them. And
in Regents of the University of California v. Bakke, 438 U.S. 265,
281 n.14 (1978), this Court ruled that the injury to respondent of
being excluded from oy ye for all 100 ay in a medical
school class on the basis of his race was “likely to be redressed”
by invalidating the special program prescribing his exclusion.
eterson v. City of Greenville, 373 U.S. 244 (1963), and Orryv. Orr
440 U.S. 268 (1979), are altogether inapposite. In Peterson, this
Court held, inter alia, that trespass convictions that had the effect
of enforcing a city ordinance mandating racial discrimination
a
district court’s ruling was indeed “gratuitous and thus
inconsistent with the Article III limitation.” Simon v.
Eastern Kentucky Welfare Rights Organization, 426 U.S.
26, 38 (1976) .7
For these reasons, certiorari must be denied in PLF:
As discussed below, it must also be denied in PG&E.'*
ll. THE UTILITIES’ CHALLENGES TO STATE STATUTES THAT MIGHT
NEVER BE APPLIED, ADMINISTRATIVE ACTIONS THAT MIGHT NEV-
ER BE TAKEN, AND JUDICIAL DETERMINATIONS THAT MIGHT
NEVER BE MADE, DO NOT WARRANT PLENARY REVIEW.
The utility petitioners offer no persuasive reasons for
this Court to review now those matters which were held
were invalid regardless of the motives of the private actor invok-
ing the trespass statute. 373 U.S. at 248. And in Orr, the Court
re to bar challenges to underinclusive statutes simply be-
cause a state could theoretically thwart any successful plaintiff by
Spey. - invalidated law to the plaintiff's disadvantage. 440
». at .
‘7 The Ninth Circuit also pointedly observed that Thornberry’s al-
leged injury “result{ed) from the independent action of a third
party not before the court’—SDG&E, Thornberry’s erstwhile
employer. App. at 15 n.17. In this respect, Thornberry’s suit may
be seen as an effort to invoke SDG&E’s rights under the Atomic
paetay Act, although Thornberry offers no reason to depart
from the settled principle that “one party [should ordinarily be
denied] standing to assert the legal rights of another” (Duke
Power Co. v. Carolina Environmental Study Group, Inc., 438 U.S.
59, 80 (1978))—a principle of avoiding “adjudication of rights
which those not before the Court may wish to assert, and [of
providing] the assurance that the most effective advocate of the
rights at issue is present to charnpion them.” /d., citing Singleton
v. Wulff, 428 U.S. 106, 113-14 (1976) (plurality opinion). For this
independent reason, Thornberry was properly denied standing.
‘8 Thornberry is clearly not entitled to seek review in this Court of
the Ninth Circuit's substantive rulings unless the Ninth Circuit
erred in holding that Thornberry had failed to establish his own
standing. Thus, it makes no difference that in the wake of the
Ninth Circuit’s substantive rulings “it would be futile for Robert
Thornberry to further attempt to challenge a state law which has
already been ruled valid.” PLF Pet. at 19. Inasmuch as the Ninth
Circuit's reversai in PLF on the standing issue left on/y the sub-
stantive issues in PG&E appropriate for review by the Ninth
Circuit, Thornberry is in effect claiming the right to seek review
of the Ninth Circuit’s disposition of a case to which he was not
a party.
- =
unripe for federal adjudication by the Ninth Circuit.
Indeed, even their challenges to the two provisions
which the Ninth Circuit held ripe for such adjudication
do not present an appropriate occasion for this Court’s
plenary review at this time.
A. The Ninth Circuit Was Clearly Correct In Refusing to Award the
Utilities the Anticipatory Advisory Opinions They Sought.
Twelve of the 15 provisions of the Warren-Alquist Act
which were deemed unripe for review by the court be-
low merely established licensing procedures or informa-
tion-gathering requirements. The Ninth Circuit was
properly unwilling to speculate as “te what purposes the
information might be put” in this “certification system,”
or to guess whether or why a power plant proposed by
the utility petitioners might ever be rejected. App. at
20-21. Two other provisions not considered timely for
adjudication are no longer being challenged by the util-
ity petitioners.'® The final unripe provision, dealing
with the acquisition of development rights in the vicin-
ity of nuclear power plants, was also one which had not
yet been applied or interpreted by the State and might
never have to be invoked. Thus the court of appeals
concluded that the question of its constitutionality
“would be better decided after the statute has been
1® Section 25524.1(a) predicated California’s future reliance on nu-
clear power plants that require “reprocessing” of fuel upon the
establishment of the necessary technology, and Section 25524.3
ordered a study of the feasibility of undergrounding or berm
containment o a soe plants. The utility petitioners
have abandoned any challenge to these provisions in their peti-
tion (PG&E Pet. at 6 n.5), but maintain their challenge to sub-
section (b) of Section 25524.1, peng bey the storage capacity
for “spent fuel” at the reactor site. The Ninth Circuit correctly
held, however, that the challenge to Section 25524.1(b) was not
ripe for review “[b]ecause we cannot know whether the Energy
Commission will ever find a nuclear plant’s storage capacity to
be inadequate.” App. at 25.
-16-
applied.” Jd. at 22.?°
Because these utilities have never pursued certifica-
tion of a nuclear project under these laws (see notes 21,
25 infra), they are reduced to arguing that “the very
existence” of these statutes causes them judicially cogni-
zable injury. PG&E Pet. at 26 (emphasis in original).
Thus, in lieu of seeking certification of a power plant
from the Energy Commission, petitioners requested an
advisory opinion from a federal district court—despite
“this Court’s oft-repeated admonition that the constitu-
tionality of statutes ought not to be decided except in an
actual factual setting that makes such a decision neces-
sary.” Hodel v. Virginia Mining & Reclamation Associa-
tion, 452 U.S. 264, 294-95 (1981).
It is for want of any concrete application of the laws
challenged below that these petitioners have been com-
pelled to make the myriad, speculative, and broadly
framed preemption claims asserted in this case. Accord-
ingly, because petitioners have not awaited—or even
sought—the kind of definitive state agency or judicial
construction of the statutes which would appear in a
decision approving or rejecting a nuclear plant, petition-
20 This provision of the Warren-Alquist Act, Section 25528, again
— to all kinds of power plants, and in the case of nuclear
— simply requires an applicant, as a prerequisite for Ener
mmission approval, to agree to acquire such rights as ma
needed to assure that areas surrounding a ech. lant will not
subsequently exceed population densities specified by the NRC
itself and by all applicable state land-use planning requirements.
The Ninth Circuit noted that the Energy Commission was direct-
ed to waive the development-rights acquisition requirement un-
der certain circumstances, and that the statute contemplates that
the Energy Commission “will ordinarily follow NRC standards
on population yee ol App. at 22-23. Moreover, state authority
to impose such land-use restrictions was clearly confirmed by
Congress in the NRC Authorization Act for Fiscal Year 1980,
discussed in note 8 supra.
-17-
ers cannot point to a single instance in which the Energy
Commission has regulated radiation hazards.?! For this
reason, petitioners sidestep the unbroken line of judicial
precedents limiting the zone of federal preemption in
this area to radiation hazard control, and seek to extend
that zone across some undefined but unmistakably wid-
er terrain. Ultimately, petitioners’ claims could not be
considered ripe for review unless one were to accept
their radically expansive notion that there is something
furrdamentally awry in the mere fact that there “coexist
two regulatory agencies—one federal and one state” —
or in the fact that a public utility can be “required to
serve two exacting taskmasters.” PG&E Pet. at 9, 4-5.
Such assertions are simply too naive to merit this Court’s
plenary attention.??
21 In the absence of such a final decision, the utilities rely heavily
on speculation arising out of a single incident—a dispute
between the Commission and PG&E. over the contents of the
initial application for a power plant known as the Stanislaus
Project. PC&E Pet. at 22-23. Even if petitioners’ characteriza-
tion of this incident were accepted, this Court has made clear
that an agency’s treatment of the document which initiates a
proceeding—in this case a preliminary license application—can-
not be reviewed as a definitive statement of the agency’s position
on the issues to be decided in the os. See v. Stand-
ard Oil Co., 449 U.S. 232, 239-43 (1980). Moreover, in this case the
trial court had before it uncontroverted testimony from the
Commission’s staff, regarding the Commission's legitimate pur-
pom, unrelated to radiation protection, for demanding the in-
ormation in question. See Direct Testimony of Gary Simon, pp.
81-100 (Jan. 7, 1980).
22 The Ninth Circuit similarly refused to allow the utility petitioners
to “establish a justiciable controversy by simply asserting that the
risk of future harm causes them a present injury.” App. at 22.
Beyond the claim that all 15 statutes deemed unripe by the Ninth
Circuit stand in the aggregate as an “absolute barrier” to their
oor petitioners make no attempt to show that the supposed
dships of participating in an Energy Commission siting pro-
a constitute anything beyond a a and annoy-
ance of litigation [which] is ‘part of the social burden of living
under government.’ ” v. Standard Oil Co., 449 U.S. 232, 244
(1980). Nor is there anything in the findings of the trial courts
below which made it inappropriate for the Ninth Circuit to ex-
amine the differences in the statutes before it to determine
o IBa
B. Even if the Utilities’ Challenges to the Waste Disposal Law and
Three-Site Requirement Were Ripe, Plenary Review by This Court
of the Validity of Those Statutes Would be Premature.
While the Ninth Circuit held that the utilities’ chal-
lenges to the waste disposal law and the three-site re-
quirement were ripe for adjudication, they are surely
premature for review by this Court on certiorari while
there remain major unanswered questions as to how
those laws will be interpreted by either the Energy
Commission or the State’s courts—especially in light of
the Warren Alquist Act’s repeated injunctions to the
Energy Commnission to comply with federal law. As this
Court has observed, even resolution by this Court of
“questions of public importance . . . can await a day
when the issue is posed less abstractly” than it plainly is
here. The Montrosa v. Carbon Black Export, Inc., 359
U.S. 180, 184 (1959) (dismissing certiorari as improvi-
dently granted).
Thus, although the petitioning utilities now complain
that the waste disposal law prevents them from plan-
ning for nuclear power plants until the Energy Commis-
sion has determinea that a means of waste disposal
exists, over four years ago these same petitioners argued
before the Energy Commission that it could even then
affirmatively find that the nuclear waste disposal tech-
nology required by the waste disposal law already exist-
ed.27>. While the Energy Commission has always
disagreed with this contention, had petitioners pursued
which claims “would be illuminated by the development of a
better factual record” (App. at 20) and thus should await applica-
tion by the agency. Cf Communist Party v. Subversive Activities
Control Board, 367 U.S. 1, 71 (1961).
23 See Petition for Reconsideration in the Matter of Implementa-
tion of Nuclear Reprocessing and Waste Disposal Statutes, Dock-
et Nos. 76-NL-1, 3 (1978).
ia.
this argument in state court to a favorable conclusion,
any question of preemption involving that provision
could have been mooted. Even if the Ninth Circuit was
correct in ruling that the district court in PG&E “did not
abuse its discretion in declining to abstain” (App. at 27
n.24), the case for this Court’s discretionary review is
gravely weakened by the absence of any definitive state
court ruling on this question of state law. Moreover,
there is no reason to assume in advance—as the utilities
apparently do (see PG&E Pet. at 18-19) that the Ener-
gy Commission or the California Legislature would ever
determine that a waste disposal technology does not
exist if the federal government at some later date finds
that one doe. .** Similarly, there is no reason to hypoth-
esize, as the utilities do (see PG&E Pet. at 20), any
conflict between California’s requirement of three sites
and the NRC’s requirement of one—in advance of the
actual siting proceedings that would consider particular
sites.?®
24 As the Ninth Circuit noted, “[sJuch a possibility need not concern
us . . . [since] it will be time to consider any future conflicts if
and when they arise.” App. at 40 n.35. Indeed, although the Ninth
Circuit held the waste dis law ripe for review, its opinion
shows some hesitancy in doing so:
“Section 25524.2 does not have any immediate impact on the
utilities; they may continue to submit notices of intention and
app ications for certification for their proposed nuclear plants,
and the Energy Commission must still receive and process the
notices and applications even though the required findings have
not been made. . . . No plants may be certified until the find-
ings are made, but the utilities concede that their pro
. —— are many years from being eligible for certification.” App.
at 26.
Indeed press accounts of this law have noted that “[n]o particu-
lar plant is threatened by the moratorium [under the waste dis-
posal law] since plants under construction are not affected and
no new nuclear power plants are planned in California in the
foreseeable future.” Nucleonics Week, April 29, 1982, at 9.
25 Indeed, there was uncontradicted evidence in the trial court of
efforts by the Energy Commission, PG&E, and the NRC to coor-
dinate the siting proceedings of the two agencies in dealing with
the Stanislaus project (see note 21 supra). See Hahn Declaration
_20-
Inasmuch as the waste disposal law and the three-site
requirernent have never been construed or applied in
any such certification proceedings and have never been
reviewed by the California Courts, the Ninth Circuit's
substantive assessment of the reach of the Atomic Ener-
gy Act of 1954 with respect to those laws is at best prema-
ture for plenary review by this Court.?®
Whatever one’s views of the merits, therefore, certio-
rari should be denied for these reasons.
ill. NOTHING IN THE MERITS OF PETITIONERS’ OMNIBUS PREEMP-
TION ATTACK ON CALIFORNIA'S POWER PLANT REGULATIONS
WARRANTS THIS COURT'S PLENARY CONSIDERATION
A. The Regulatory Means Chosen by California Herein Were So Plain-
ly Authorized by Congress Itself that Petitioners’ Only Proper Re-
course Is to That Body Rather than to This Court.
Nothing in either of the petitions filed herein suggests
a need for this Court’s plenary review of the Ninth Cir-
cuit’s analysis of the scope of federal preemption under
5-14 [ER at 264-70]. PG&E aborted this coordination effort by
ling this suit, although its chief supply planner had written the
NRC to say, “I see no procedural conflicts that should occur
between the re Commission’s and the NRC’s review proc-
esses... .” Id, . D [ER at 278]. Moreover, the characteriza-
tion of the NRC’s pr ures as requiring only one site may itself
be an exaggeration given NRC regulations calling for informa-
tion from applicants relating to “alternatives to the preposed
action.” See 10 C.F.R. §§ 51.20-51.26.
26 Although respondents argued below that neither of these two
laws was ripe for review, they have not cross-petitioned from the
Ninth Circuit’s contrary ripeness holding, believing that no issue
worthy of certiorari is poe by that ey in light of the
Ninth Circuit’s favorable ruling on the merits. Respondents ac-
knowledge, however, that lack of ripeness, rather than absence
of an implied cause of action for private enforcement, was the
bar to the utilities’ invocation of the Atomic Energy Act of 1954.
For the utilities relied on the Atomic Energy Act of 1954 and the
Supremacy Clause only defensively, cf McCulloch v. Maryland,
17 U.S. (4 Wheat.) 316 (1819), rather than “claiming enforce-
ment rights under the [1954] Act.” App. at 52 (Ferguson, J.,
concurring). That California has yet to move against these utili-
ties may make such reliance premature, but it does not transgress
limits on inference of positive causes of action.
= 2
the Atomic Energy Act of 1954, or of the propriety of the
state authority exercised in the waste disposal law and in
the three-site requirement. Indeed, despite petitioners’
exertions to make this case appear otherwise, the instant
dispute is not truly between California and Congress,
but rather between the State and certain of its own
regulated electric utilities. Those utilities evidently wish
to make their own determinations as to electricity sup-
ply in the case of nuclear power plants, without the usual
accountability to the State that licenses these utilities to
meet its power needs. As the Ninth Circuit carefully
explained, however, Congress has amply authorized the
States to make just the sorts of decisions upheld below
under Sections 271 and 274(k) of the Atomic Energy Act
of 1954,?7 and, indeed, has authorized the States to
make decisions regarding control of radiation hazards
under the Clean Air Act Amendments of 1977 and the
NRC Authorization Act for Fiscal Year 1980. See App. at
29-33, 44-45; see also note 8 supra.
Nor does the decision below conflict with any ruling
27 The utilities’ assertion that Section 271 protects a State’s authority
over such electric power only “after it is generated” (PG&E Pet.
at 14n.11, emphasis in original) is plainly contradicted by Section
271’s express reservation of state authority over electric power
“generation” as such, and finds no support in any decision of this
Court or any other. Likewise the utilities’ assertion that Section
274(c) was “intended to preserve the exclusivity of the NRC's
jurisdiction” in areas beyond radiation hazards ( E Pet. at 17
(emphasis in original) ) ape the fact that Section 274 by its
terms deals only with the regulation of “radiation hazards.”
Moreover, Dw only logically acceptable reason for inclusion of
subsection (k) . . . was to make it clear that Congress was not,
by subsection (c) of the 1959 amendment, in any way further
limiting the power of the states to — activities, other than
radiation hazards, associated with those areas over which the
AEC was forbidden by that subsection to relinquish its control.”
Northern States Power Co. v. Minnesota, 447 F.°4 1143, 1150 (8th
= 1971), affd mem., 405 U.S. 1035 (1972) (emphasis in origi-
~29 —
of this Court or of any other circuit. While the utility
petitioners attempt to conjure up a conflict between the
Ninth Circuit’s decision and that of the Eighth Circuit in
Northern States Power Co. v. Minnesota, 447 F.2d 1143
(8th Cir. 1971), aff'd mem., 405 U.S. 1035 (1972) (see
PG&E Pet. at 10), in fact the Ninth Circuit expressly
followed the decision in Northern States. App. at 35. As
the Seventh Circuit recently stated in J//inois v. Kerr-
McGee Chemical Corp., Nos. 81-1110, 81-1152, Slip Op.
at 17 (7th Cir., May 4, 1982), “the Ninth Circuit agreed
with the Eighth Circuit in Northern States that Con-
gress intended the Atomic Energy Act to preempt state
regulation of radiation hazards.” 2°
The utility petitioners’ claims of preemption under
the Atomic Energy Act are ultimately premised not on
28 Even petitioner Thornberry agrees with this proposition (PLF
Pet. at 7), although he purports to discern in the Ninth Circuit's
review of the legislative history of the waste disposal law a viola-
tion of this Court's decision in Perez v. Campbell, 402 U.S. 637,
651-52 (1971). Thornber:, would have preferred that the Ninth
Circuit give less credence to that law’s actual history in deter-
mining its purposes. PLF Pet. at 11. In his view, the Ninth Cir-
cuit should have divined those purposes from an analysis of the
text of another measure, Proposition 15, which was in fact defeat-
ed (id. at 10)—despite this Court’s observation that “unsuccess-
ful attempts at legislation are not the best of guides to legislative
intent.” Red Lion Broadcasting Co. v. Federal Communications
Comm n, 295 U.S. 367, 381 n.11 (1969). Nothing in Perez requires
that this bizarre mode of statutory construction be utilized in a
preemption case. Rather, the Court there determined that the
state law obstructed a federal objective and then held that it was
immaterial whether the State’s purpose was to obstruct the pur-
pose of the federal law or not. If the Atomic Energy Act in fact
contained a federal pro-nuclear mandate, intended to override
all state objections based on need, cost, or reliability, then Perez
might indeed make the State’s purposes in regulating nuclear
facilities irrelevant. But the Atomic Energy Act manifestly con-
tains no such mandate (see note 30 infra), and Perez surely does
not require that the State’s purposes of regulation be ignored
when Congress has expressly chosen such purposes in tion
274(k) as the dividing line between preempted and non-
preempted regulation.
» 3 o
any plausible interpretation of the 1954 Act, but on these
petitioners’ extravagant notions of what “preemption”
is all about. Thus, while refusing to acknowledge the
express limitations on preemption stated in the Atomic
Energy Acct itself, the utilities appear to believe that the
mere overlap in the subject matters of regulation
between federal and state authorities somehow requires
the ouster of all state authority across this wide realm.
See, e.g., PG&E Pet. at 4,21. The Ninth Circuit correct-
ly rejected this unprecedented approach, and con-
ducted instead a careful and detailed assessment of the
particular interests and objectives underlying the fed-
eral and state enactments at issue, in an effort to “recon-
cile ‘the operation of both statutory schemes with one
another rather than holding one completely ousted.’ ”
Merrill Lynch, Pierce, Fenner & Smith, Inc. v. Ware, 414
U.S. 117, 127 (1973), quoting Si/ver v. New York Stock
Exchange, 373 U.S. 341, 357 (1963). See App. at 37-46.
When thus understood, petitioners’ claims merit no
further judicial review. If these utilities seek relief from
the specific forms of state regulation upheld below, they
should be petitioning Congress and not this Court.
B. The Ninth Circuit's Decision Does Not Portend Any Nationwide Im-
pact of a Sort Which Might Merit Review on Certiorari.
It goes without saying that the decision below—
upholding two aspects of California’s system for regulat-
ing its electric utility companies—is of moment to Cali-
fornia and the utilities it regulates. But the utilities’
assertion that this decision will “sound the death knell”
for nuclear power in California (PG&E Pet. at 9) and
petitioner Thornberry’s purported concern about “the
possibility that it will be applied on a national basis”
(PLF Pet. at 14), could be taken seriously only if the
sit.
basic tenets of the Atomic Energy Act of 1954 were
systematically ignored.
Congress never contemplated that the Atomic Ener-
gy Act of 1954 would deprive States of their right to
determine whether (and to what extent) their energy
needs should be met by nuclear power or by some other
energy tec':nology.?® Indeed, the preservation of this
traditional sphere of state authority was the manifest
aim of Congress in including Sections 271 and 274(k) in
the Act. 42 U.S.C. §§ 2018, 2021 (k).°° Moreover, Con-
2° Even the utilities concede state “authority or responsibility to
make decisions concerning the need for additional electric pow-
er generating capacity, the absolute or relative cost acceptability
of a nuclear plant, electric power ae sen) . . . [and] the sale
or transmission of electric power produced by nuclear facilities.”
PG&E Pet. at 16-17. Of course, this kind of authority can be
exercised most directly by any State choosing to perform itself all
of the functions of an electric utility and to exercise all of the
management prerogatives for planning and yee new gener-
ating capacity. Cf N.Y. Pub. Auth. Law § 1005 (establishing pub-
lic power authority). Petitioners do not deny that any State could
e such a choice and could thereupon limit, for any reason of
state energy policy, the amount of public resources invested in
nuclear power plants. On the other hand, the fact that the State’s
electrical energy supply is provided by state chartered utilities
rather than a state agency obviously does not in itself evoke any
limitation in the Atomic Energy Act upon the State’s authority
to direct choices of sites or selections among energy technologies.
3° These provisions in themselves preclude any inference of “an
intent to promote nuclear power at all costs” (App. at 42) merely
from the broad statements of policy contained in the 1954 Act.
Thus, notwithstanding Congress’s intention in 1954 to encourage
rivate industry to enter the nuclear field (e.g., 42 U.S.C.
'9013(d) ) or to direct the development of nuclear power “so as
to promote world peace, oo ones the general welfare, increase
the standard of living, and strengthen free enterprise” (id.
§ 2011), this Court only this term refused to find federal
reemption of state energy legislation merely on the basis of
“general statements” of encouragement of an energy source in
federal legislation. Commonwealth Edison Co. v. Montana, 101
S.Ct. 2946, 2962 (1981). The Court held that such general state-
ments—in that case dealing with another energy source, coal—
do not “demonstrate a congressional intent to preempt all state
a that may have an adverse impact on the use of coal.”
-25-
gress has made clear in subsequent enactments that
there is no national objective which favors the develop-
ment and deployment of nuclear energy as a source of
commercial electricity at the expense of any other con-
siderations in a State’s energy or environmental policy.*!
In light of the Clean Air Act Amendments of 1977, 42
U.S.C. §$§ 7416, 7422, and the NRC Authorization Act for
Fiscal Year 1980 (see ncte 8 supra), the actions Califor-
nia has taken here pale beside those a State could plainly
take with Congress’s blessing under these laws—even to
the point of “keep[ing]
This text is long and has been trimmed here. Open the source document for the complete record.