Petition — Bosco v. Beck
Supreme Court brief1980
Ask Donna
What actually matters in this document.
Text
—
Supreme Court, U.S
R{ LE}
APR 15 1980
ICHAEL RODAK, JR., CLERt
In The
SUPREME COURT OF THE UNITED STATES
October Term 1979
79-1643
No.
MARGARET E. BOSCO, Petitioner
Ve
ECKARDT C, BECK, Region II
Administrator ,U.S.ENVIRONMENTAL
PROTECTION AGENCY ,OUGLAS COSTLE,
as Administrator , U.S.ENVIRONMENTAL
PROTECTION AGENCY, JERRY ENGLISH,
as Commissioner , N.J.DEPARTMENT OF
ENVIRONMENTAL PROTECTION, PEQUEST
RIVER MUNICIPAL UTILITIES AUTHORITY
(WARREN COUNTY) and TOWN OF BELVIDERE,
Respondents.
PETITION FOR WRIT OF CERTIORARI
TO THE UNITED STATES COURT OF
APPEALS FOR THE THIRD CIRCUIT
MARGARET E, BOSCO
167R Washington Street
Belvidere , New Jersey
201-475-2715 07823
Petitioner pro se
Be
In The
SUPREME COURT OF THE UNITED STATES
October Term 1979
No.
MARGARET E. BOSCO, petitioner
Ve
ECKARDT C. BECK, Region II
Administrator ,U.S.ENVIRONMENTAL.
PROTECTION AGENCY ,OUGLAS COSTLE,
as Administrator , U.S.ENVIROMNMENTAL
PROTECTION AGENCY, JERRY ENGLISH ,
as Commissioner , N.J.DEPARTMENT OF
ENVIRONMENTAL PROTECTION, PEQUEST
RIVER MUNICIPAL UTILITIES AUTHORITY
(WARREN COUNTY) and TOWN OF BELVIDERE,
Respondents.
PETITION FOR WRIT OF CERTIORARI
TO THE UNITED STATES COURT OF
APPEALS FOR THE THIRD CIRCUIT
MARGARET E. BOSCO
167R Washington Street
Belvidere , New Jersey
201=-475=2715 07823
Petitioner pro se
>.
i
INDEX
Opinion BHELOW. cccccccccccccccccccces
JUPISGLICELON. .ccccccccccccccccccccce
Questions presented. .cccccccccccccece
Statutory and
Constitutional Provisions........-..
Othe references... s¢-. e@eeeseeeeees &
Cases ee ie ee eke ebeoe oO
Statement Of Che CABRecccccccccecsccses
Reasons for granting the writ.......
EE EE ee
Affidavit of EO ee eee a
Appendix
A Order of the United States
Court of Appeals for the
Third i ae a i
B Order of U.S.District Court
for the District of
New Jersey @eee7e*eeesee7e91eeeeees¢e
EEE
Cc Affidavit/ BMS Gc ccccescecos
34
35
37
73
ii
INDEX (continued)
CITATIONS
63 Har. Law Rev. S-13 1949
Davis Administrative Law
Ethics Manual For House of Represent-
atives Chap. 4 Hse Doc. 96-134
CASES CITED
Shiffler supra 548 F. 2d 104 n.5
N.A.A.C.P. v. Medical Center, 584 F. 2d
619, 635 n.- 19
Kleppe 427 U.S. 412
Citizens to Preserve Overton Park
ve Volpe, 402 U.S.(1921
Duguesne Light Co. v. EPA, S22 F. 2d 1186,
1192-93 (3d Cir. 1975)
Buck Hill Falls v. Grant, 388 F. Supp. 394
(1975), 537 F. 2d 29 (1976), 388 F. Supp.
398
Hanly v. Kleindienst , 471 F. 2d 823
(2d Cir. 1972)
Wyoming Outdoor Coorindating Council
v. Butz, 484 F. 2d 1244 (lOth Cir.1973)
Minnesota Public Interest Group v. Butz
498 F. 2d 1314 (8th Cir. 1974
Sierra Club v. Froehkle, $34 F. 2d 1289
Nucleus of Chicago Home Owners Assoc.
ve. Lynn, 524 F. 2d 225 (7th Cir,1975)
First National Bank of Chicago v.
Richardson, 484F. 2d 1369, 1381(7th Cir.
1973)
e834
INDEX continued
CASES. Cited
Mid-Shiawassee County Concerned Citizens
v. Train, 408 F. Supp. 650
U.S. v. Miss. Valley Gen. Co, 5 L. Ed 268
E. Stanley v. ILL., 92 S. Ct. 1208,
405 U.S. 645, 31 L. Ed 2d S51 U.S. ILL.
(1972)
IN THE
SUPREME COURT OF THE UNITED STATES
October Term 1979
No.
MARGARET E,. BOSCO, Petitioner
Ve
ECKARDT C. BECK, ET AL, Respondents
PETITION FOR A WRIT OF CERTIORARI TO THE
UNITED STATES COURT OF APPEALS FOR
THE THIRD CIRCUIT
The petitioner Margaret E. Bosco >
respectfully prays that a writ of certior-—
ari issue to review the Judgment Order of
the United States Court of Appeals for the
Third Circuit entered in this proceeding
on January 18 , 1980 , affirming the Decis-
ion of the U.S.D.C., August 30, 1979.
OPINION BELOW
The Opinion of the Court of Appeals
appears in the Appendix hereto,App. A.
The Opinion of the U.S.D.C. for New Jersey
also appears in the Appendix hereto, App.B.
aQo
JURISDICTION
The judgment of the Court of Appeals
for the Third Circuit was entered on
January 18, 1980. A timely petition for
certiorari was filed within 90 days of
that date. This Court's jurisdiction is
invoked under 28 U.S.C. § 1254(1) and
R. 19(1)(b), and R. 22(3).
QUESTIONS PRESENTED
1. Whether the Order of the United
States District Court for New Jersey was
erroneous because it was based On apply=
ing the wrong standard of review in that
it used the relatively low standard of
“arbitrary and capricious" rather than
that of “reasonableness”.
2- Whether, in assuming that "arbit-
ray and capricious" standard of review
was the proper one, the decision of the
U.S.D.C. not to require an Environmental
Impact Statement was supported by the
evidence.
3. Whether the decision of the Court
was in error by its failure to take into
consideration the relevant contributory
factors of the ‘armetwisting' by fact of
political intervention and alleged con-
flict-of-interests of special federal
ae |
government employee and other associates
of the Pequest River Municipal Utilities
Authority and. Town of Belvidere, as applic-
ants, in violation of federal statutes and
codes of ethics; bringing undue pressure
on government agency and affecting the
decision-making in formal administrative
process.
4. Whether the decision of the Court
was in error by its failure to take into
consideration the alleged pattern of
tarm=—twisting' which would increase the
likelihood of partiality, arbitrariness
and error in the administrative decislon
not to have an EIS to such an extent as
to deprive petitioner and other citizens
of their right to a fair and impartial
hearing.
STATUTORY AND CONSTITUTIONAL
PROVISIONS INVOLVED
U.S.C. 42 § 4821 et seq.
U.S.C. 42 § 4332 et seq.
U.S.C. 18 § 201
UeS.C. 18 205
U.S.C. 18 § 434
Constitutional Amendment 14
United States Sup. Crt. Dig. Vol. SA
Constitutional Law, Supp. 1979
a--
OTHER REFERENCES
63 Har. Law Rev. S-13 1949
Davis Administrative Law §1.02
Ethics Manual For The Members And Employees
of The House of Representatives
Chapter 4. Documant No. 96-134, 96th Cong.
First Session
CASES CITED
Shiffler supra 548 F. 2d 104 n.5
N.A.A.C.P. ve. Medical Center, 584 F 2d 619,
635 n.19
Kleppe 427 U.S. at 412
Citizens to Preserve Overton Park v. Volpe,
402 U.S. (1971)
Duquesne Light Co. v. EPA, 522 F. 2d 1186,
1192-92 (3d Cir. 3975)
Buck Hill Falls v. Grant 388 F. Supp. 394
(1975), 537 F. 2d 29 (1976), 388 F. Supp.
398
Hanly ve. Kleindienst 471 F. 2d 823
(2d Cir. 1972)
Wyoming Outdoor Coordinating Council v.Butz
484 F. 2d 1244 (10th Cir. 1973)
Minnesota Public Interest Research Group
ve Butz, 498 F. 2d 1314 (8th Cir.1974)
Sierra Club v. Froehlke, 534 F. 2d 1289
Nucleus of Chicago Home Owners Assoc.v. Lynn
524 F. 2d 225 (7th Cir.1975)
First National Bank of Chicago v.Rishardson
484, F. 2d 1369, 1381 (7th Cir.1973)
Mid-Shiawassee County Concerned Citizens
ve Train, 408 F. Supp. 650
U.S. ve Miss. Valley Gen. Co., 5 Le Ed 268
E. Stanley v. Ill., 92 S. Ct. 1208,
405 U.S. 645, 31 L. Ed 2d S51 U.S.ILL.(1972)
afin
-STATEMENT OF THE CASE
The basis for the instant case stems
from the failure, and refusal, of the
Environmental Protection Agency (herein-
after referred to as EPA) to prepare and
issue the necessary Environmental Impact
Statement (EIS) within the meaning of the
National Environmental Policy Act (NEPA)
of 1969, and their own rules and regul-
ations pursuant to U.S.C. 42 § 4321 et
seqe and U.S.C. 42 § 4832 et seq., prior
¢o final approval of federal funding, in
the amount of $2 ,866,732.00 for regional
sewerage treatment facility construction,
and $1,800,929.00 for the town of Belvid—
ere collection system. EPA approval for
federal funding represents 75% of the
cost.
The cost continues to change, adding
ever-increasing adverse economic impact
to the already overburdened taxpayer and
resident; costs that were never explained
to the public.
The original feasibility study area
encompassed approximately 70 sq. mls.,
including the towns of Belvidere and
Oxford and Hope, and portions of the
-§—
townships of White, Knowlton, Mansfield,
Frelingheysen, Blairstown and part of
Washington; in the County of Warren.
When the Authority re-organized
in May, 1978, all towns and townships
withdrew as participants of the author-
ity, with the exception of Belvidere
and Oxford, with a total area remaining
of less than 7 sq. mls. (each with sep—
arate planned sewerage treatment facil-
ity and collection system); and White
Township, with an area of approximately
18 sqe mls., mostly rural, to be divided—-
up between the Belvidere and Oxford sew=-
erage facilities. Project design size .
remains the same as for the original area.
In August, 1978, after learning that
the with<drawal ‘deadline’ had passed,
White Township residents held a mass
meeting with township officials to pro-
test their inclusion as participants in
the sewerage projects and demanded that
township officials "get them out".
aJa
At said meeting it was learned that
Hotification of withdrawal date was not
brought to the attention of all members
due to a family emergency of one of the
officials who also serves on the Pequest
River MU Authority.
Members of the PRMUA include:
(1) John King, (now) former White
Township official and member of
the PRMUAs a Banker by profession,
(2) Henry Monetti, resident of
Mansfield Township; Real Estate
Broker by profession,
(3)Thomas Planer resident of Hope;
Insurance Executive by profession,
(4) Leonard Becker, Mayor of Oxford;
fuel oil company maintenance person=-
nel,
(5) Irene Smith Mayor of Belvidere
and former Special Federal Govern—
ment Employee as District Staff Aide
to former Congresswoman Helen Meyner.
After PRMUA ignored repeated requests
to meet with the White Township Planning
Board (relevant to the Master Plan of the
Township and the fact that the Belvidere
Treatment Plant would be located in White),
citizens organization CASE (Citizens Ag-
ainst Sewer Encroachment) , residents of
Belvidere and Oxford held another mass
meeting in the Warren County Courthouse
aQo
on October 25, 1978, to co-incide with
PRMUA meeting, whose members attended
very reluctantly, after strong insistance
of those in attendance at the meeting.
After lengthy and heated debate,
White was granted permission to withdraw
from the authority-——-only to have this
rescinded at a later date by then Comm
issioner O'Hern.
At that meeting, a letter was read—
from Eckardt Beck--stating that final
approval of the projects had been gran-
ted; omitting any reference to the Neg-
ative Declaration that had been issued
September 8, 1978, or the comment Limit-
ation (already ended).
Petiti ner and other citizens atten-
ded Authority meetings and Town Council
meetings requesting information relevant
to proposed costs to residents, adverse
impact to the environment, etc.; continu-
ally receiving the answer that "its too
early for any answers". After final
approval of federal funding by EPA, the
answers changed to “it's too late, where
were you earlier?" (Approval , Nov., 1978.
No mention was made of the political
intervention being conducted (verified
-9—
in affidavit of Irene Smith, spec. fed.
gov't. employee and chairperson of the
PRMUA).
Petitioner and others continued to
communicate, by phone and in writing,
with offices and officials of EPA and DEP,
requesting further study of the proposed
projects and the adverse impacts of same,
as well as requesting that alternatives
be considered. EPA inter-agency letters
attest to the fact that large regional
sewage systems are too costly for resid—
ents in small towns and rural areas with
populations of less than 10,000.
See A.R. #1-#31, communications to agencies.
These have not been referred to in any of
respondents! briefs to the lower Courts.
Offices of Attorney General and Public
Advocate were contacted to look into the
possibility of conflict-of-interest
of chairperson of PRMUA, attorney serving
‘anthority' and county.
Finally on February 15, 1979, capit=—
ulating to continued pressure by petitioner,
CASE members and others , EPA scheduled a
public meeting in the Courthouse in Belvi-
dere; making it very clear that this was
not a public hearing.
When announcing the impending meeting
at the January PRMUA meeting, chairperson
of ‘authority' stated that:
"this meeting is being held only
to ‘straighten out' the ‘loyal
Cpposition'.
On February 16, 1979, White Township
received the 'news!' that Commissioner
O'Hern had denied permission to withdraw
from the Authority; with the added inform—
ation that if they continued to pursue
this course, and should they be success-
ful in so doing, they would jeopardize
for any future time, any privilege of
applying for federal funding for any dis-
posal system problem, should the problem
arise.
In March, 1979, EPA issued the ‘ans-
wer' to the Feb. 15 meeting, in the form
of a Lengthy letter affirming earlier
approval of the projects and funding.
Also in March, 1979, petitioner , and
others , learned for the first time of the
existence of the Negative Declaration
and requested same from EPA,
On June 13 , 1979, petitioner in this
case filed in the U S.District Court in
Newark, N.J-, a verified complaint to
declare invalid and enjoin defendants'
actions in approving and planning to pto=-
ceed with the known projects for PRMUA and
Town of Belvidere, despite no EIS by EPA.
June 27, 1979, petitioner filed notice
of motion for Preliminary Injunction, with
supporting memorandum of law, in United
States District Court;.with affidavit of
service to all parties.
(Case transferred from Newark to Trenton,
New Jersey: Assigned to Judge George Barlow).
August 1, 1979, answer of defendant
O'Hern filed, witn motion for summary judg-
ment, returnable August 2l, 1979.
August 6, 1979, defendant Town of Bel=
videre filed answer.
August 10, 1979, petitioner filed reply
brief to counterclaim;and notice of motion
for consolidation of hearing on preliminar
injunction.
August 13, 1979, federal defendants
filed notice of motion for summary judg-
ment, returnable August 21, 1979.
August 20, 1979, answer of defendant
PRMUA filed; also affidavit of Irene Smith
and Roy Elam filed.
August 21, 1979, prior.to hearing, in
U.S.Federal Building in Trenton, Alias
Summons served to PRMUA; on fifth attempt.
=12<
August 21, 1979, Civil No. 79-1865, Hearing
in U.S.District Court in Trenton;
Judge Clarkson S. Fisher presiding.
August 30, 1979, Opinion with Judgment
and Order handed down; denying plaintiff's
application for injunctive relief and dis-
missing complaint with costs in favor of
defendants Eckardt C. Beck, Douglas Costle,
Daniel )'Hern, PRMUA and Town of Belvidere
against plaintiff Margaret E. Bosco.
September 12, 1979, ~plaintiff became
the appellant in filing Notice of Appeal
to the U.S.Court of Appeals for the Third
Circuit.
October 18, 1979, brief filed in sups
port of appeal, in office of clerk of the
Court of Appeals, Philadelphia, Pa.
December 12, 1979, petitioner,. then
appellant, filed Reply Brief to counter—
claim by appellees.
January 8, 1980, case, No. 79=2300,
submitted on Briefs under Rule 12(6),
before Judges Rosenn, Weis and Garth.
January 18, 1980, Ordered that the
Judgment of the U.S.D.C. be affirmed,
each side bearing their own costs.
The question of the propriety of bring-
ing undue pressure in the form of political
intervention on the decision-making in a
formal administrative process is a sub-
stantial one to be treated by this Court.
-1l3<
REASONS FOR GRANTING THE WRIT
1. THE DECISION BELOW DECIDED AN IMPORT-
ANT QUESTION OF FEDERAL LAW WHICH
HAS NOT BEEN, BUT SHOULD BE, SETTLED
BY THIS COURT IN THAT THE APPLICAT-
ION OF IT WAS BASED ON THE WRONG
STANDARD OF REVIEW SINCE IT USED THE
RELATIVELY LOW STANDARD OF "ARBITRARY
AND CAPRICIOUS” RATHER THAN THAT OF
"REASONABLENESS".
On page ll, para. 2 of the Order it
states:
"The Court of Appeals for the
‘ Third Circu:.t has not expresses
a clear preference for either
standard of review. It has
raised the issue and declined
to decide it numerous times.
See, e.g., Shiffler, supra,
548 F. 2d 104, n.5; N.A.A.C.P.
v. Medical Center, S584 F. 2d 619,
635 ne 19- L therefore will not
deviate from my prior decision
to apply the arbitrary and cap-
ricious standard to review chal-
lenged agency actions under NEPA.
See also Kleppe, supra, 427 U.S.
at 412; Citizens to Preserve
Overton Park v. Volpe, 4Ol U.S.
402 (1971); Duquesne Light Co.
ve EPA, 522 F. 2d 1186, 1192-93
(3d Cir. 1975). I must there-
fore review the administrative
record upon which EPA based its
decision in order to insure that
there was a sound basis for the
decision and that. it was not
arbitrary and capricious".
ol 4
But if the Third Circuit has not ex-
pressed a clear preference for either
standard of review it certainly seemed to
show a leaning in favor of the “reasonable—
ness" standard in the Buck Hill Falls case
(Concerned Citizens, etc.) , 388 F. Supp.
394 (1975) , vacated in part in 537 F. 2d
29 (1976). At 388 F. Supp. 398 the COurt
states:
"The Court is aware of authority
in the Second Circuit holding
that an agency decision not to
file an environmental impact
statement should be overturned
only if it is arbitrary and cap-
ricious." Hanly v. Kleindienst,
471 F. 2a 823 (aa Cir.1972) ,
cert. denied 412 U.S. 908,
93 S- Ct. 2290, 36 Le. Ed 2d
974 (1972). We think the bet-
ter view is set forth in Judge
Friendly's dissent in that case
and in Wyoming Outdoor Coordin-
ating Council v. Butz, 4&8 F. 2d
1244 (10th Cir.1973) and Minnes-
ota Public Interest Research
Group v. Butz, 498 F. 2d 1314
8th Cir.1974).
At 49 it states:
"The standard to be employed by
the Court in reviewing whether
Plaintiffs can probably show
that Defendants violated the
law in approving the project
without preparing an impact
statement is one of reasonable~
ness, i.e. , were Defendants
-15—
reasonable in concluding that
the Buck Hill Falls Dam and
Impoundment did not require
preparation of an EIS".
Since on review the case was vacated..
in part by the Third Circuit, (537 F. 2d 29
1976), but did not disturb the requirement
that an EIS be prepared, than by implic-
ation it affirmed the standard of review
used which was the higher one of reason-
ableness.
A close inspection of the cases cited
in other circuits in support of the more
lenient"arbitrary and capricious" stand-
ard show, in Sierra Club v. Froehlke, 534
F. 2a 1289 that the Court states at 1305:
‘The standard of review to be
applied here ‘nd in other sim—-
ilar cases is set forth in
Citizens to Preserve Overton
Park v. Volpo, supra, 401 U.S.
at 416, 91 S. Ct. at 824,
The reviewing court must first
determine whether the agency
acted within the scipe of its
authority, and next whether
the decision reached was arb-
itrary, capricious, an abuse
of discretion, or otherwise not
in accordance with law. In mak=
ing the latter determination the
court must decide if the agency
failed to consider all relevant
factors in reaching its decis-—-
ion, or if the decision itself
represented a clear error in
judgment".
(underline added)
aiGe
Adding that:
We have reviewed with care the
evidence submitted and we find
no Clear error in the determin-
ation made",
From the above it would seem to indic-
ate that, although the court stated that
the standard of review to be used includ-
ed “arbitrary and capricious", it actually
made its decision on the basis of a care-
ful review of the evidence submitted and
the finding of "no clear error in the det—
mination made". So, in fact, the court
went further than determining on the sole
basis of “arbitrary and capricious",
In Nucleus of Chicago Home Owners v.
Lynn, 524 F. 2d 225 (7th Cir.1975), it
states at 229:
"As an initial matter, we note
that the parties agree that
HUD's determination that an en-
vironmentl impact statement need
not be filed must stand unless
it is arbitrary, capricious, an.
abuse of discretion or other-
wise not in accordance with law.
First National Bank of Chicago
v. Richardson, 484 F, 2d 1369,
1381 (7th Cir. 1973)".
This case was decided on the basis of
"arbitrary and capricious" standard, but
the facts show that it was "...another
episode in the continuing dispute over
al7e
the location of public housing in the
Chicago Metropolitan area”. From these
facts it's obvious that it represented a
minimum of environmental impact on the
community at large because what differ-
ence would it make except socially or
economically in a big city. This dis-
tinguished it from the instant case.
Also on page 11 in Hanly v. Kleindienst
471 F. 2d 823 (2d Cir.1972) case it was
not unamimous on the question of which
standard to be used with Judge Friendly
making a strong dissent...,, and
This is another case where a public tutiid-
ing was proposed in the lower Manhattan
area of New York City, in place of a build-
irgalready existing and so it would appear
that the environmental impact of the con=-
struction would be minimal as compared to
the sociologic aspect. as was stated in the
suit.
And in the Mid-Shiawassee County Con-
cerned Citizens v. Train, 408 F. Supp.650,
although the court stated at 653:
"In the absence of a specific dir-
ective from this circuit, the
court concludes that the “arbit-
rary or. capricious" standard is
appropriate in this case”,
It also stated at 659:
"Given the record before the EPA,
these findings were hardly arbit-
rary , capricious, or an abuse of
discretion. Indeed, EPA's decis-—
ion to issue a negative declara-
tion appears more than reason-=-
able and there is a reasonable
basis in the record for EPA's key
findings".
So that it was saying in effect that
the “reasonableness” factor was also taken
into consideration.
On page 10 of the Order it states as
follows:
"There is, however, a conflict
among circuits , and even among
the judges of this District, as
to the appropriate standard of
review which I must apply. In
some circuits, EPA, or any other
agency subject to NEPA, is held
to the relatively high standard
of "reasonableness". E.g. Mim-—
esota Public Interest Research
Gro v. Butz, 498 F. 2d 1314
8TH Cir. 1974) (en banc); Texas
Committee on Natural Resources
v. Berglund, 573 F. 2d 201(5th
Circuit 1978); Ci of Davis v.
Coleman, 521 F. 2d 661 (9th Cir.
1975); Wyoming Outdoor Coordin-
ating Council v. Butz, 484 F. 2d
1244 (1loth Cir.1973); Internat-
ional Harvester Co. v. Ruckels-=-
haus , 478 F. 2d 615 (D.C.cir.
1973). Under this standard
plaintiff need only show that
EPA's decision was unreasonable
to prevail in this action.
CunderLine added)
al 9a
Petitioner contends that the more
formidable arguments are to be found in
the cases in favor of the "reasonable"
standard cited above on Pg. 10 of the
Order. The arguments for that standard
are summarized in one of them, Wyoming:.
Outdoors Coordinating Council v. Butz,
484 F. 24244 (10th Cir.1973) at 1249:
"We are persuaded that the gen-
eral reference to discretion ~
in 8 706(2)(A) of the Admin-
istrative Procedure Act, al-
though applicable to some
other reviewable administrat—
ive decisions, see Citizens
to Preserve Overton Park v.
Volpe, 401 U.S. 42, 416,
91 S. Ct. 814, 28 Le Ed 2d
136, does not apply here to
the agency's determination
under NEPA. Under the spec=-
ific terms of NEPA we feel
that the proper standard,
as stated earlier, is whether
the negative determination
was reasonable in the light
of the mandatory require-
ments and high standards
set by the statute so as to
be"in accordance with law'"-—
another ground of review in
8 706 (2)(A) which may be
applied consistently with
the procedural demands of
NEPA."
For the above reasons petitioner
contends that the District Court applied
the wrong standard of review in using the
“arbitrary and capricious" standard.
@20=
2. ASSUMING THAT THE "ARBITRARY AND
CAPRICIOUS" STANDARD OF REVIEW
WAS THE PROPER ONE, THE DECISION
OF THE DISTRICT COURT NOT TO RE-
QUIRE AN EIS WAS ERRONEOUS IN THAT
IT WAS NOT SUPPORTED BY THE EVIDENCE.
The Order of the Court on page 5 states:
"the EPA must also comply with
the provisions of NEPA. NEPA
was passed a decade ago for the
stated purpose of encouraging
a “productive and enjoyable har—
mony between man and his enviro-
ment” and promoting “effort which
will prevent or eliminate damage
to the environment and biosphere
and stimulate the health and wel-
fare of man..." 42 U.S.C. § 4321.
To effect that purpose NEPA com-
mands "all agencies of the Federal
Government to :
(C) include in every recommendation
or report on proposals for legis-
lation and other major Federal act-
ions significantly affecting the qual-
ity of the human environment, a det-
ailed statement by the responsible
official on-——
(4) the environmental impact of
the proposed action,
{fi) any adverse environmental
effects which cannot be avoided
should the proposal be implemen-
ted,
(111) alternatives to the proposed
action,
(4+) the relationship between loc-
al short-term uses of man's envir=-
onment and the maintenance and en—
hancement of long-term productiv=
ity, and
(v) any irreversible and irret-
rievable commitments of resour=
ces which would be involved in the
proposed action should it be implem-
ented",
42 U.S.C. 8 4332 (2)(C).
As to the question of whether the in-
stant case involves a major federal action,
the Opinion states clearly on pg. 16:
"I agree with plaintiff and must con=-
clude that these projects do con=-
stitute major federal actions".
On pg- 17, stating:
Plaintiff's complaint comes closer
to the mark when she points to the
contradictory statements contained
in the EIA with regard to odors
produced by the treatment plant
and their impact on Belvidere's
residents. At. page 3 the EIA
admits that odors will be produced
at the treatment facility, but
concludes that "(s)ince there are
no communities near the plant site
the adverse effect of odors on
residents in (sic) non-existent".
At page 4, however, the EIA states
that the (n)oise produced by the
sewage treatment plant will affet
residential areas to some extent
because of the location of homes
in the immediate area”. And, fin-
ally, at page S the EIAagain ref-
ers to odors, this time conclud-
ing that "(a)s there are houses
adjacent to the treatment plant
site (odors) may be a problem in
the absence of screening veget-
ation to reduce the wind velocity
at the plant site".
-22-
“Needless to say, this is an
indication of sloppy draftsman—
ship”.
Petitioner respectfully disagrees with
the conclusion of the Court below in char-
acterizing the contradictions made by the
agency concerning major environmental im—-
pacts to the adjacent residents as ‘sloppy
draftsmanship'. It is petitioner's con-
tention that the question raised by the
admitted contradiction is one of fact and
not of writing. Are there residents in the
area who will be affected by the cdors and
noise-——-or not? Any conclusion by the agency
that they are not there when they are— is
clearly arbitrary and capricious.
(underline added)
Petitioner respectfully contends that
the decision of the Court below condones
non-compliance with the mandate in NEPA as
intended by Congress, See opinion (and ord=
er) page 5:
“the EPA must comply with the prov—
isions of NEPA...promoting “ef-
forts which will prevent or elin-
inate damage to the environment
and biosphere and stimulate the
health and welfare of man.....
42 U.S.c. § 4321...".
and by this contradiction of the meaning
of NEPA allows for creating damage to the
environment as a prerogative of discret-
ionary decision-making.
-23-<
3. THE COURT BELOW "IMPROPERLY"
SANCTIONED THE SIGNIFICANT RELEVANT
FACTORS OF CONFLICT-OF-INTERESTS OF
SPECIAL FEDERAL GOVERNMENT EMPLOYEE
AND SEVERAL INDIVIDUALS AT ALL LEVELS
OF THE APPLICATION PROCESS.
U.S.C. Title 18 § 201 under Exec. Order
No 11222, May 8, 1965, 30 F.R. 6469, at
STANDARDS OF ETHICAL CONDUCT FOR GOVERNMENT
OFFICERS AND EMPLOYEES, Part I-Policy in
Section 101 states:
Where government is based on the
consent of the governed, every
citizen is entitled to have com-
plete confidence in the integrity o
of his government. Each individ-
ual officer, employee, or adviser
of government must help to earn
and must honor that trust by his
own integrity and conduct in all
official actions”.
In Part II-STANDARDS OF CONDUCT, Sec. 101(c):
"It is the intent of this section
that employees avoid any action,
whether or not specifically pro-
hibited by subsection (a) which
might result in, or create appear-
ance of-—
(3) impeding government effic-
Lency or economy;
(4) losing complete independence
or impartiality of action;
(S) making a government decision
outside official channels; or
(6) affecting adversely the con-
fidence of the public in the
integrity of the Government".
+ es os se + eee cme
-24—
In United States v. Mississippi Valley
Gen. Co., 5 L Ed 2d 268 at § 2., Construct=-
ion and purpose of statute":"consent of
superiors":
"Like other conflict-in-interest
statutes, 18 U.S.C. 434 is
designed to prohibit government
officials from engaging in con-
duct that might be inimical to
the best interests of the gener-
al public:.....The statute:.is
designed to protect the United
States, as a government, from
the mistakes, as well as the
connivance, of its own officers
and agents";
thus recognizing the human frailties of
those in government positions as being
just that, albeit sometimes in a more
vulnerable position than desired. .
Chapter 4 of House Document No. 96-134,
ETHICS MANUAL FOR MEMBERS AND EMPLOYEES
OF THE HOUSE OF REPRESENTATIVES states
on Page 30:
". ~-congressional staffers may
not represent persons in a priv=-
ate capacity before the Govern-
ment or in court concerning a
matter affecting the United
States, but may engage in such
representational activities only
in connection with performing
and fulfilling official congress-
ional duties. In addition to
specific statutory proscriptions,
ethicalstandard and guidelines
-25—
exist concerning the permiss=—
ible scope of such activities
to prevent abuses of office and
to prevent undue or improper
influence or pressure upon ad-—
ministrative process".
Qn page 32 at Prohibited Ex Parte Commun—
ications it states:
"The "Government Sunshine Act"
enacted in 1976 contains a prov=
ision which prohibits in certain
circumstances “ex parte communic
ations" with administrative agen—
cies. Ex parte communications
are oral or written communicat-
ions made without proper notice
to all parties and not on the pub—
lic record, from an interested
person outside of the agency to
a member of the agency, am admin-
istrative judge, or to an employ=
ee involved in the decision-mak-.
ing process..."
(underline added)
It is just this action on the part
of the special federal government employee,
as evidenced in Affidavit of said employee,
that implies that ODER: Upeseure and pol-
itical intervention" on the decision-making
of a formal administrative agency process".
In the Opinion of the Court on page 20:
"At oral argument plaintiff ref-
erred numerous times to alleged
conflicts—of-interests on the
part of an individual who was
both mayor of Belvidere, the
chairperson of the PRMUA, and a
former staff member of former
Congresswoman Helen Meyner.
Although, if proven, there might
be some basis for complaint un-
der state law 40:69A-163...
these allegations have no bear-
ing upon the question which I
am calied upon ta decide, whether
EPA properly concluded that an
EIS was not required",
the Court continues with:
"I recognize that fairly strong
legal arguments can be made for
the application of the reason—
able standard”.
The Record of the Court below at oral
argument will show that petitioner did point
eut appearances of conflict-of-interests
on the part of several individuals assoc-.
iates with the application process of the
PRMUA and town of Belvidere:
(1) Chairperson of the PRMUA, special
federal government employee; ajso
serves as mayor of Belvidere;
(2) Attorney for PRMUA serves concur-
rently as Prosecutor for Warren County
in apparent disregard for Opinion 415,
that appears to discourage this type
of action in order to avoid the appear—.
ance of conflict-of-interest in the
same vein as that proscribed inU.S.C 18
3 201 on page 274 under PartI and Part
II of "Standards of Conduct for Govern
ment Employees and Officers” wherein
it states:
“Where government is based on the
=27=
consent of the governed, every
citizen is entitled to have
complete confidence in the in-
tegrity of his government..."
(3) Former Councilman. resigned from
his elective post to accept position
with PRMUA, after having advocated and
voted for sewage projects.
(4) Chairman of Belvidere Planning
Board (now state employee) was employed
by PRMUA while under suspension as
inspector with Warren County Health
Board.
(5) Engineer serves both PRMUA and town
collection system, though this is a
practise of strong concern to the State
Board of Professional Engineers and
Land Surveyors.
4. THE PATTERN OF "ARM-TWISTING"
INCREASED THE LIKELIHOOD OF PARTIAL—
ITY TQ SUCH AN EXTENT AS TO DEPRIVE
PETITIONER AND OTHER CITIZENS OF THE
RIGHT TO HAVE CONFIDENCE IN THE IN-.
TEGRITY OF GOVERNMENT OFFICIALS AND
AGENCIES AND PRE-DESTINED APPROVAL
OF FEDERAL FUNDING FOR MAJOR FEDERAL
ACTIONS WITHOUT PREPARATION OF AN
“EIS” BY THE EPA.
Petitiomer respectfully believes that
the Judge's failure to "get at the facts"
as they relate to the merits of the case,
defeats the very purpose of judicial re-
view in the due process of law;
and refers to 63 Har. Law Rev.
wherein is stated:
— Chief” had several purposes
in going into the merits of a
case on petition for certiorari
or the jurisdictional statement.
First, He was interested in prev-
enting grave mis-carriages of
justice, and occasionally he
would recommend the grant of
certiorari in a case of no public
importance whatever simply because
the decision below was unjust,
umreasonable, or plainly wrong".
The instant case is of public import—-
ance in thet the EPA, a Government agency,
granted the approval of federal funds for
major federal actions without the prepar-
ation of an EIS in the interest of the
human environment.
Page 16 of the Opinion states in agree-
ments:
"I agree with plaintiff and must
conclude that these projects do
constitute major federal actions".
In United States Supreme Court Digest,
Vol SA, Constitutional Law, Supp. 1979
at 251 and Constitutional Guarantees in
General, U.S.C.A.j Constitutional Amend.14;
E. Stanley v. ILL., 92 S. Ct 1208, 405 U.S
64S, 31 Le Ed 2d S51, U.S. ILL, 1972:
"The Constitution recognizes
higher values than speed and
* Reference to Chief Justice Hughes
(underline added)
. -29=
efficiency; the Bill of Rights
in general, and the due process
clause in particular, were dis-
igned to protect the fragile
values of vulnerable citizenry
from the overbearing concern
for efficiency and efficacy
which may characterize praise—-
worthy government officials no
less, and perhaps more than —
mediocre ones".
It is noted in Sup. Court Practise,
Stern & Gressman, Sth Ed., in Chap.4,
"Factors Motivating the Exercise of Juris=-
diction”, at 4:18, Erroneousness of Decis=-
ions below, on pg. 298, that:
"But on occasion the Court does
accept a case for review for no
apparent reason other than error
in the lower court's decision, and
it does so even though there seems
to be no conflicting decisions,
no novel or impartant principles
of law and no elements of great
public interest at stake. It is
enough that four or more Justices
are so doubtful of the correctness
of the decision below that they
desire further consideration of
the case. They may be motivated
by a feeling that the decision
represents a gross miscarriage of
justice or a subtle errosion of a
statutory or legal principle”.
See, supra, 63 Har. Law Rev. concerning the
"“spveral purposes of Yoing into the merits
of a case”; coupled with and appearing on
the same page at_supra:
=30-
"The Constitution recognizes
higher values than cpeed and
efficiency; the Bill of Rights
in general, and the due process
Clause in particular, were des-
igned to protect the fragile
values of vulnerable citizenry..;
each recognizing that which is addressed in
Davis Administrative Law Text at § 1.02,
'The Place of Administrative Action in
Our Governmental and Legal Systems’
wherein is stated:
"™r. Justice Jackson asserted in
a formal opinion in 1952: "The ;
rise of administrative bodies
probably has been the most sign-
nificant legal trend of the last
century and perhaps more values
today are affected by their dec-
isions than by those of all the
courts, review of administrative
decisions apart";
continuing infra with:
"ir. Justice Frankfurter in 1957
wrote of the Supreme Court's
work:"Review of administrative
action, mainly reflecting enforce-
ment of federal regulatory stat-
utes, constitutes the largest
category of the Court's work,
comprising one-third of the tot-
al cases decided on the merits".
Constitutional Law, including
"cases with constitutional under
tones" was in second place, with
less than one-fourth of the cases
eee ebut the administrative proc-
ess affects nearly every one in
Many ways nearly every day....";
the Justice expressed the effects of
ain
administrative discretionary actions of
the fragile values of vulnerable citizenry.
The correctness of the decision below
raises a substantial question of the pro-
priety of undue pressure and political
intervention in the decision-making of a
formal administrative process.
The refusal of the Third Circuit to
respect the facts that pre-destined EPA
approval of federal funds for major fed-
eral projects in the absence of an EIS
cannot be justified.
CONCLUSION
For these reasons, and because the
questions raised are substantial and need
the exercise of this Court that exists as
a safeguard to "liberty And Justice For All"
as expressed in our Pledge of Allegiance,
and guaranteed in the Constitution and the
Bill of Rights, petitioner has filed for
a writ of certiorari to review the judgment
and opinion of the Court below.
gaan rues
neaien E. Bosco
167/ Washington Street
Belvidere, New Jersey 07823
Petitioner pro se
Dated:
April ll, 1980 .
a32e
In The
SUPREME COURT OF THE UNITED STATES
October Term 1979
No.
AFFIDAVIT OF SERVICE
MARGARET E. BOSCO
Petitioner,
Ve
ECKARDT C. BECK, Region II Administrator,
U.S.-Environmental Protection Agency,
DOUGLAS COSTLE, as Administrator, U.S.En=-
vironmental Protection Agency,
JERRY ENGLISH, Commissioner, N.J. Department
of Environmental Protection, PEQUEST RIVER
MUNICIPAL UTILITIES AUTHORITY(WARREN COUNTY)
and TOWN of BELVIDERE,
Respondents.
Margaret E. Bosco, of full age, being
duly sworn according to law upon her oath
deposes and says:
1. I am the Petitioner in the above—
entitled case.
2- On the 14 day of April, 1980, three
copies of the Petition for Writ of Certior—
ari were mailed, postage prepaid, to the
Solicitor General, U.S. Department of
Justice, Washington, D.C. 20530; Thomas H.
Pacheco, Esq., Land and Natural Resources
Division, U.S. Department of Justice, Wash=-
ington, D.C. 20530; Dennis J. Krumholz,
-33—
Office of the Attorney General, State of
New Jersey, 36 W. State Street, Trenton,
New Jersey 08625; Louis J. Bizzari,Esq.
Assistant United States Attorney
402. E. State Street, Trenton, New Jersey
08605; I further certify that three
copies of the same were delivered to the
offices of James A. Tirrell, Esq., Cor=
liss Avenue and Warren Street, Phillips-
burg, New Jersey 08865; and William R.
Albrecht, Esq., Schenck, Price, Smith
and King, 416 Front Street, Belvidere,
New Jersey 07823.
Age Chia.
t E. Bosco
187 igfet E- Bos Street
Belvidere, New Jersey 07823
Petitioner pro se
Sworn and subscribed to
before me, this /;#
day of Zs, 1979
Qe 4. bar
NOTARY PUBLIC OF NEW JERSEY
ee Expires Oct. 8, 153}
34—
APPENDIX A
UNITED STATES COURT OF APPEALS
FOR THE THIRD CIRCUIT
No. 79=2300
MARGARET E. BOSCO
Appellant
Ve
ECKARDT C. BECK,.as Region II Adminis-
trator, U.S.~ENVIRONMENTAL PROTECTION
AGENCY, DOUGLAS COSTLE, as Administrator,
U.S-ENVIRONMENTAL PROTECTION AGENCY,
DANIEL O'HERN, Commissioner, N.J.DEPART=
MENT ENVIRONMENTAL PROTECTION, PEQUEST
RIVER MUNICIPAL UTILITIES AUTHORITY
(Warren County), and TOWN OF BELVIDERE
APPEAL FROM THE UNITED STATES DISTRICT
COURT FOR THE DISTRICT OF NEW JERSEY
D.C. Civil No. 79-1865
Submitted Under Rule 12(6) January 8,1980
Before: ROSENN, WEIS, and GARTH, CIRCUIT
JUDGES
JUDGMENT ORDER
After consideration of all conten-
tions raised by appellant, it is,
ADJUDGED and ORDERED that the judgment
of the district court be and is hereby
affirmed.
Each side to bear their own costs.
BY THE COURT
MAX ROSENN
Dated: Jan 18, 1980 Circuit Judge
=35=
APPENDIX B
UNITED STATES DISTRICT CCURT
DISTRICT OF NEW JERSEY
Civil Action No. 79-1865
Judge Clarkson S. Fisher
MARGARET E.j BOSCO,Plaintiff
Ve
ECKARDT C. BECK,Region II Administrator,
U.S.ENVIRONMENTAL PROTECTION AGENCY,
DOUGLAS COSTLE COSTLE,Administrator,
U.S-ENVIRONMENTAL PROTECTIONAGENCY,
JERRY ENGLISH, Commissioner, N.J.DEP—
ARTMENT OF ENVIRONMENTAL PROTECTION,
PEQUEST RIVER MUNICIPAL UTILITIES AUTH-
ORITY(WARREN COUNTY) and TOWN OF BELVIDERE
; Defendants.
ORDER AND JUDGMENT FILED August 30, 1979
This action having been tried to the
Court without a jury, the trial on the
merits having been advanced and consoli-
dated with the hearing on plaintiff's app-
lication for preliminary injunctive relief
with the consent of the parties under
Fed.R.Civ.P.65(a)(2); and
The Court having reviewed the adminis-
trative record, all testimony and other ev—
idence together with the briefs and oral
argument of counsel; and
The Court having decided for the reasons
set ferth in its opinion of August 30,1979
that the plaintiff's causes for injunctive
-36—
relief under the National Environmental
Policy Act of 1969, 42 U.S.C. § 4321,et
seqe, should be denied;
IT IS, this 30th day of August, 1979,
hereby ORDERED:
(1) That plaintiff's application
for injunctive relief is
denied and her complaint
dismissed; and
(2) All other motions presently
pending before the Court
are denied.
Clarkson S. Fisher
Chief Judge
NOT TO BE PUBLISHED
UNITED STATES DISTRICT COURT
DISTRICT OF NEW JERSEY
MARGARET E. BOSCO :Civil Action
. Plaintiff ,No.79-1865
ECKARDT C. BECK, Region II
Administrator, U.S.ENVIRON=-
MENTAL PROTECTION AGENCY; : OPINION
DOUGLAS COSTLE,Administrat-
or,U.S~ENVIRONMENTAL PROT= : FILED
ECTION AGENCYJERRY ENGLISH, August 30,1979
Commissioner, N.J.DEPART-= $
MENT OF ENVIRONMENTAL PROTECT
ION;PEQUEST RIVER MUNICIPAL :
UTILITIES( WARREN COUNTY) and
TOWN OF BELVIDERE, $
Defendants.
CLARKSON S.. FISHER,Chief Judge
Appearances:
Margaret E. Bosco
167R Washington Street
Belvidere, New Jersey 07823
Plaintiff pro se
Louis J. Bizzari,Esq.
Assistant United States Attorney
Federal Building
402 East State Street
Trenton, New Jersey, 08605
(Attorney for Defendants
Costle and Beck)
Dennis J. Krumholz,£Esqa.
Deputy Attorney General
State of New Jersey
36 West State Street
Trenton, New Jersey 08625
(Attorney for Defendant English)
-38—
Appearances: cont'd
James A. Tirrell,Esq.
Corliss & Warren Street
Phillipsburg, New Jersey 08865
William R. Albrecht,Esq.
Schenck, Price, Smith & King
P.O.Box #133
Belvidere, New Jersey 07823
Plaintiff Margaret E. Bosco brings
this attiori under the National Environ-
mental Policy Act of 1969(hereinafter
NEPA") ,42U.S.C. $4321 et seq., seeking
injunctive relief restraining the def
endants from proceeding with plans to
build sewerage collection and treatment
facilities in and around Belvidere, New
Jersey, until an Environmental Impact
Statement(hereinafter "EIS") had been
prepared. Plaintiff contends that an
EIS is required by NEPA § 102(2)(C),
42 U.S.C.3 4332(2)(C), because the con-
struction of the sewerage facilities
would be a major federal action sign—
ificantly affecting the quality of the
human environment.
lL. BACKGROUND
The Parties: Plaintiff Margaret E.
Bosco is a resident of the Town of Bel=
videre and the owner of property within
the area to be served by the proposed
-39—
sewerage projects. Plaintiff claims a
direct and adverse effect upon her per=-
sonal and property rights as a result of
the construction of these projects.
Plaintiff's standing to bring this
challenge has not been questioned by the
defendants.
The defendant Eckardt C. Beck is the
Regional Administrator of Region II of
the Environmental Protection Agency.
Douglas M.-€dstle is the National Admin—-
istrator of EPA. Beck and Costle are
collectively referred to as the federal
defendants. Jerry English is the Comm
issioner of the New Jersey Department of
Environmental Protection(hereinafter "'DEP).
The Warren County=-Pequest River Municipal
Utilities Authority(hereinafter "“PRMUA")
is the agency responsible for wastewater
management in the drainage basin of the
Pequest River and its tributaries in
Warren County.
(end of pg.2 of the Opinion)
beg.P8--3-
New Jersey. It is the agency designated
to administer the actual planning, design,
construction and operation of these proj-—-
ects. The PRMUA was formerly known as
the as the Warren County—-Pequest River
Sewerage Authority. The final defendant,
aliG=
the Town of Belvidere, is the local mun-
icipality which will be served by the
sewerage treatment and collection sys-
tem. Each of the defendants has app-=
eared and retained separate counsel.
Tite Projects: The projects which
plaintiff seeks to halt were developed
jointly by the PRMUA, DEP and Town of
Beividere and are to be 75% funded by
the federal government. New Jersey is
to fund 8% of the projects and the re-
mainder is to be borrowed. The first
project is the construction of a waste-
water treatment plant in White Township,
to be maintained by the PRMUA. The PRMUA
applied for federal financial assistance
on November 5S, 1977. The application
was approved and Grant No. C-34—454-02
in the amount of $2,851,252.00 was award—
ed..on September 29, 1978, The second
project is the construction of a waste=-
water collection system in the Town of
Belvidere which will transfer Belvidere
sewerage to the PRMUA treatment facility.
The application for funds to build the
collection system was filed by the Town
of Belvidere on September 19, 1977, and
on September 29, 1978, the EPA approved
Grant Now C-34—-513-01 in the amount of
$1,804,435.00. .
atiea
The Proceedings in this Court:
August 21, 1979, was the return date of
plaintiff’s application for a prelimin-
ary injunction pursuant to Fed.R.Civ.P.
65(a). Also returnable on that date were
cross-motions for summary judgment,
Fed.R.Civ.P.56, filed by both the fed-
eral defendants and the DEP. In addit-
ion, with the consent of all parties, I
ordered the trial of this action on the
merits advanced and consolidated with
the hearing on plaintiff's application
for a preliminary injunction.
Fed.R.Civ.P.65(a)(2). This (end pg-3)
(beg.pg.4)
opinion therefore finally resolves this
controversy and constitutes my conclus=-
ions of law and findings of fact.
Fed.R.Civ.P.52.
II. THE STATUTORY FRAMEWORK
The Federal Water Pollution Control
Act (hereinafter referred the "Clean
Water Act"), 33 U.S.C. $ 1252 et seq.,
as amended, established an EPA grant
program under which federal funds may
be used to finance the construction of
publicly owned sewerage treatment fac-
ilities. Under that grant program,
-42-
EPA is authorized to make grants to any
state, municipal, inter-state or. inter-
municipal agency for the planning, des-
ign and construction of waste-water treat-
ment facilities and waste-water collect-
ion systems. Clean Water Act #$8201(g),
212(a), 33 U.S.c. 88 1281(g), 1291(a).
Up to 75% of the total eligible costs of
an EPA approved project may be funded by
the federal government. Clean Water Act
8 202, 33 U.S.C. § 1282.
EPA's decision to fund the proposed
construction of sewerage treatment fac-
ilities is accomplished in three dis-
tinct steps. Each step involves a sep=
arate and independent EPA determination.
as to whether a grant of funds should be
made. 40 C.F.R. § 35.903(a)(1978). EPA
grants are made in Step 1 for use by the
grantee in carrying out feasibility stud-
ies and other preliminary planning mat-
ters. At tis stage primary attention
is paid to the selection of the best
location for the treatment facility. The
grantee is also charged with the duty of
preliminary examining the environmental
impact of the proposed facilities. The
grantee (end pg. 4)
=43<
(beg. pg. 5)
should prepare a facilities plan devel-
oped in accordance with 40 C.F.R.35.917=1l,
which is then submitted to EPA for approv-
al.
If the EPA approves the facilities
plan, a Step 2 grant may be awarded to
fund the preparation of construction draw-
ings anc specifications necessary for the
construction of the approved facility.
Finally, a Step 3 grant may be awarded
to fund the actual construction of the
facility in accordance with the design
requirements developed under Steps I and 2.
40 C.F.R. $8 35.930-1(a).
Grant funds are allocated among the
states in accord with a formula specif-
ied by Congress. Clean Water Act 3 205,
33 U.S.C. § 1285. The state is primar-
ily responsible for determining the
amount and timing of federal assistance
to each municipality. Generally, no
grant assistance may be awarded unless
priority for a project has been deter-
mined by the state in accordance with a
priority system developed by the state
andk approved by the EPA. 40 C.F.R.
§ 35.912. DEP is the state agency res=-
ponsible for performing this function.
Although the state plays an important
ata
role in determining the priority of
wastewater treatment projects and in
reviewing project applications, waste-
water treatment projects are primarily
planned and carried out at the local
level.
In addition to complying with the
requirements of the Clean Water Act,
the EPA must also comply with the prov=-
isions of NEPA.j NEPA was passed a dec=-
ade ago for the stated purpose of en=
couraging a "productive and enjoyable
harmony between man and his environment"
and promoting "efforts which will pre=-
vent or eliminate damage to the envir—-
onment and biosphere and stimulate the
health and welfare of man..." 42U.5.C.
8 4321. To effect that purposeNEPA
commands "all agencies of the Federal
Government" to (end Pg. 5)
(beg. pg. 6)
(C) include in every recommendation
or report on proposals for legis=
lation and other major Federal act-
ions significantly affecting the
quality of the human environment,
a detailed statement by the res=
ponsible cfficial on-——
(i) the environmental impact of
the proposed action,.
(ii) amy adverse environmental
effects which cannot be avoid—
ed should the proposal be im-
plemented,
(iii) alternatives to the prop-
osed action,
(iv) the relationship between
local short-term uses of man's
environment and the maintenance
and enhancement of long-term
productivity, and
(v) any irreversible and irre~
trievable commitments of res-
ources which would be involved
in the proposed action should it
be implemented.
42 U.S.C. § 4332(2)(Cc).
The result of this requirement is
that federal agencies are to examine
each action which they propose to take,
and, if they determine that the proposed
action is a major federal action which
will significantly affect the quality
of the human environment, prepare anEISs
with respect to the proposed action. It
is with this requirement that plaintiff
contends defendants have not complied.
The obligation to prepare anEIS is
imposed upon all Federal Agencies.
Rather than establish a single body with
authority to promulgate uniform regul=
ations enforcing this obligation, how—
ever, NEPA leaves it to each Federal
Agency to formulate its own regulations
implementing the Act. The EPA has prom-
ulgated such regulations. See 40 C.F.R.
§ 6.100 et seq.
-46-
EPA regulations under NEPA ccntain
both general provisions applicable to
all EPA actions, see 40 C.F.R. $8 6.100-
6.402, and (end pg. 6)
(beg. pg. 7)
additional special provisions govern=
ing proposed wastewater treatment works
construction grants made under the Clean
Water Act. 40 C.F.R. § 6.500-6.514.
Under these regulations an applicant for
@ wastewater treatment works construct-
ion grant is required to submit an envir=
onmental assessment to EPA as part of the
facilities plan developed under a Step l
grant. 40 C.F.R. § 6.512(a). The envir-
ommental assessment must include a des-=
cription of the environmental impacts
of the proposed action, a description of
steps to minimize any adverse environmen-
tal effects, an evaluation of alternatives,
a description of the existing and future
environment without the proposed project,
and supporting documentation. Id.The
_ purpose of the environmental assessment
is to ensure that the Step 1 grantee con-
siders the environmental impacts of a
proposed action at the earliest possible
point in the Step 1 grantee's planning
process, as well as to assist the EPA in
deciding whether an EIS is required.
-47<
40 C.F.R.§ 6.202. In order to insure
public participation in the development
of the facilities plan, the EPA regul-
ations require a Step l grantee to hold
at least one public hearing before the
grantee finally adopts the proposed fac-
ilities plan as the plan to submit to
the EPA for approval. 40 C.F.R. § 6.512(b)
It is the responsibility of the EPA,
however, to determine whether an EIS is
required by NEPA. That determination is
made during an environmental review con-
ducted either before approval of the fac-
ilities plan, or, if an approved facilit-
ies plan is not required, before Step 2
and Step 3 grants are awarded. 40 C.F.R.
§ 6.504(a). EPA must study the proposed
action, including a review of the envir-
onmental assessment prepared by the app-
licant, to identify and evaluate the prob-
able environmental consequences of both
the proposed action and any feasible alt-
ernatives. 40 C.F.R. § 6.204. (end pg.7)
From this review, EPA determines whether
significant impacts are anticipated from
the proposed action, whether any feas-
ible alternatives can be adopted or chan-
ges can be made in project design to el=-
iminate significant adverse impacts, and
a48a
whether an EIS or a Negative Declaration
is required. Id.
The criteria for determining whether
an EIS should be prepared are set out in
regulations. 40 C.F.R. 88 6.200, 6.510.
In part, the criteria aid in determining
whether a proposed action will have sign-
ificant environmental effects.40 C.F.R.
§ 6.200(a). The special regulations deal-
ing with wastewater treatment facility
grants set out additional factors to be
considered. 40 C.F.R. 8.510. Addition-
ally, the regulations mandate the prepar-
ation of an EIS when the "environmental
impact" of the proposal "is likely to be
highly controversial". 40 C.F.R. § 6.200(b).
If EPA determines that an EIS is not
required it will issue a Negative Declar-
ation together with an Environmental Im-
pact Appraisal (hereinafter (EIA). The
Negative Declaration is a written announce
ment prepared after EPA's environmental
review stating that EPA has determined
that an EIS is not required for a proposed
project. 40 C.F.R. § 6.102(e). The EIA
should support that decision and should
briefly describe the proposed action and
feasible alternatives, environmental im-
pacts of the proposed action, unavoidable
adverse impacts of the proposed action,
-49—-
the relationship petween short-term uses
of man's environment and the maintenance
and enhancement of long-term productivity,
steps to minimize harm to the environment,
irreversible and irretrievable commitments
of resources to implement the action,
comments and consultations on the proj-
ect, and reasons for concluding that the
proposed action will not have a signific-
ant environmental impact. 40 C.F.R.36.212
(b) (2). (end pg. 8)
(beg. pg. 9)
The Negative Declaration and EIA are
then made available to the public. The
public is given fifteen working days to
comment on the two documents. No admin-
istrative action on the project can be
taken by EPA during the public comment
period. 40 C.F.R. § 6.212. After the
fifteen days have expired, EPA reviews
and considers the public comments rec-
eived and, if significant environmental
issues have not been raised, the grant
award may be made. 40 C.F.R. $ 6.108(c).
In the present controversy, EPA det-
ermined, after its environmental review,
that the construction of the proposed
waste-water treatment facilities would .
-50-
not have a significant impact upon the
environment. A Negative Declaration and
EIA were therefore issued in lieu of an
EIS. Plaintiff challenges EPA's decis-
ion not to issue an EIS, primarily on
the ground that the proposals will have
a significent impact on the environment.
Plaintiff would have the Court overturn
EPA's determination to the contrary, and
require the preparation of an EIS before
the proposed grant is made.
II. THIS COURT'S TASK — THE
APPROPRIATE STANDARD OF
REVIEW
It is important to establish the
exact nature of this Court's responsib-
ility before undertaking an exhaustive
examination of the administrative rec-
ord below and the evidence and argum-
ent presented at the hearing. I must
emphatically state that this Court is
not empowered to question EPA's sub=-
stantive decision to approve these pro-
“jects and to grant funds for their
end pg. 9)
beg.pg.10)
construction. I may not substitute my
own judgment as to the desirability of
these projects for that of EPA E.g. ,
Kleppe v. Sierra Club, 427 U.S. 390,
410 n. 12 (1976).
-5l-
NEPA is a procedural statute. It estab-
lishes procedures which a Federal Agency
must follow when it is considering a
course of action. That procedure is des-
igned to insure that the agency takes a
hard look at the environmental consequen=-
ces of its proposed action. I am to be
concerned not with the actual environment-—
al impact of these projects but only with
whether EPA examined and weighed these
impacts when it decided to proceed with
these projects. It is plaintiff's bur-
den, therefore, to show that EPA did not
give sufficient consideration to these
impacts when it chose not to prepare an
EIS.
There is, however, a conflict among
the circuits, and even among the judges
of this District, as to the appropriate
standard of review which I must apply.
In some circuits, EPA, or any other
agency subject to NEPA, is held to the
relatively high standard of “reasonable-
ness". E.g., Minnesota Public Intersst
Research Group v. Butz, 498 F. 2d 1314
(8th Cir.1974) (en banc); Texas Commit-
tee on Natural Resources v. Berglund,
573 F. 2d 201 (Sth Cir. 1978); City of
Davis v. Coleman, S21 F. 2d661(9th Cir.
1975); Wyoming Outdoor Coordinating
Council v. Butz, 484 F. 2d 1244 (10th Cir.
1973)
ee re me me ee ee ee - - —o-
——- .
-52-
International Harvester Co. v. Ruckelshaus
478 F. 2d 615 (D.C.Cir.1973). Under this
standard plaintiff need only show that
EPA's decision was unreasonable to pre=-
vail in this action, See Concerned Citiz-
ens of Waterford Township,Inc. v. Berg-
lund, Civil No. 77-222 (D.N.J. May 12,1978)
(Gerry, D.J.). In other circuits EPA is
held to the more lenient "arbitrary and
capricious” standard. E.g., Sierra Club
ve Froehlke, 534 F. 2d 1289 (9th Cir.
(end pg. 10)
(beg. pg. 11)
1976); Nucleus of Chicago Home Owners
Association v. Lynn,524 F. 2d225(7th Cir.
1975(; Hanly v. Kleindienst, 471 F 2d
823 (2d Cir. 1972),cert denied, 412 U.S.
908 (1973); Mid-Shiawassee County Con- .
cerned Citizens v. Train, 408 F. Supp.
650 (E.D. Mich. 1976), aff'd mem.,
559 F. 2d4'1220 (dth Cir.1977). Under
this standard plaintiff has the more
adifficalt task of showing that EPA's
decision was arbitrary and capricious.
See Shiffler v. Rumsfield, Civil No.
75-2129 (D.N.J. May4, 1976) (Fisher,D.J.),
aff'd sub nom Shiffler v. Schlesinger ,
548 F. 2d 96 (3d Cir.1977) (without ex-
pressing an opinion on the appropriate
standard of review.)
-53-
The Court of Appeals for the Third
Circuit has not expressed a clear pref-
erence for either standard of review. It
has raised the issue and declined to dec=-
ide it numerous times. See,,e.g.,
Shiffler, supra, 548 F 2d at 104,n.5;
N.A.A.C.P. v. Medical Center, 584 F. 2d 619,
635 n.19. I therefore will not deviate
from my prior decision to apply the ar-
bitrary and capricious standard to review
challenged agency actions under NEPA.
See also Kleppe, supra, 427 U.S. at 412;
Citizens to Preserve Overton Park v. Volpe,
401 U.S. 402 (1971); Duquesne Light Co.
v. EPA, 522 F. 2d 1186, 1192-93 (3d Cir.
1975). I must therefore review the admin-
istrative record upon which EPA based its
decision and that it was not arbitrary ori
capricious.
III. THE RECORD BELOW
State and local authorities in the
Warren County=Pequest River locale first
began considering the advisability of re-
placing (end pg. 11)
beg. 2
Belvidere's system of individual septic
tank sewerage treatment with centralized
sewerage collection and treatment facilit—
ies in the 1960's. See Town of Belvidere
-54-
Master Plan (McCrosky and Reuter, July
1964); Feasibility Report on Regional
Sewerage Facilities, Warren County, New
Jersey (Elam and Popoff 1968); Adminis-
trative Record, Item (hereinafter "A.R.#")
87 at 3. The PRMUA, with the aid of a
Step 1 grant from EPA, commissioned the
engineering firm of Elam & Popoff, P.A.,
to prepare a facilities plan which would
examine the alternatives and propose the
most apprepriate wastewater treatment fac-
ilities for use in Belvidere's future.
Their report, entitled "Wastewater Facil-
ities Plan for the Pequest River Drainage
Basin, Warren Co." (hereinafter "Plan"),
was issued in September of 1977. See A.R.
#92. This report was submitted to EPA
for approval in conjunction with tHe app-
lication of the PRMUA and the Town of
Belvidere for grant funds to constuct the
sewerage facilities. at issue here.
The Plan proposed by the applicants
was the result of long and careful study.
Prior to the issuance of the final plan,
a draft of the Plan was issued in May of
1976. A.R.#88. In compliance with EPA
regulations. 40 C,F,R, 3 6.512(b), a
public hearing was held after the draft
plan was proposed and before the final
-55-
Plan was adopted and submitted to EPA
for approval. See A.R.# 92, Appendix E.
(Transcript of Publie Hearing, May 27,
1976). In that same month, defendants’
engineers also issued a document entit-
led "Environmental Assessment for the
Proposed Sanitary Sewer Collection Sys-
tem (Belvidere)". A.R.#87. Although
not required by EPA regulations, a pub-=-
lic hearing was also held with respect
to the Environmental Assessment. See A.R.#
#88, (end pg. 12
beg. » 15)
Appendix A. (Transcript of Public Hearing,
August 9, 1976). Additional Project and
Engineer's Reports were prepared to con=
form with New Jersey DEP regulations in
1973 and 1974. Those reports were all
revised and updated in November, 1976.
SeeA.R. ## 89, 90, 91. |
All of these documents were submitted
to EPA as part of the grant application.
I have not set out their contents in de-
tail because EPA may not rely solely upon
them in determining whether a proposal
will have significant environmental ef-
fects. Rather, EPA is charged with the
duty of conducting an independent exam-
ination of the project in order to det-
ermine the significance of the project's
-56<
environmental consequences.
After the grant application was cert—
ified to EPA by DEP, EPA commenced its
environmental review to determine if an
EIS was required. 40 C.F.R. $8 6.104(c),
6.204. The purpose of that review is to
"determine whether significant impacts
are anticipated from the proposed action,
whether any feasible alternatives can be
adopted or changes can be made in project
design to eliminate significant adverse
impacts, and whether an EIS or a Negat-
ive Declaration is required". 40 C.F.R.
$ 6.204.
Based upon its environmental review
of these projects EPA datermined that an
EIS was not required. A Negative Declar-
ation was issued with respect to each pro-
ject. See A.R. #r 32,33. A single EIA
covering both projects was issued setting
forth EPA's analysis and findings. Id.
It is that EIA which is the center of
much of this controversy. It is an elev=
en—page document, with attachments,which
concludes that the construction would have
only a minimal impact by inducement of in-
creased housing primarily around the edge
of the already developed area; that the
unavoidable adverse (end pg. 13)
beg. pg.14)
aSJa
(beg.pg 14) environmental impacts are
primary impacts due to actual construct-
ion, the effects of which are short-
termed and able to be minimized by con-
struction specifications and control
constraints; that land application and
wastewater reuse were not acceptable ‘alt-
ernatives; and that the construction pro-
jects involving surface water discharge
will have a long-term beneficial effect
on the economy by achieving water qual=-
ity standards, improving water quality
so as to increase the aesthetic and re--
creational value of the area, and ex-
panding the area's sewer service while
eliminating the problems caused by exist-=-
ing septic systems. See 40 C.F.R.§6.212
(b) (2).
In accordance with 40 C.F.R. $6.212(a)
the Negative Declaration was not, at the
time of its issuance, EPA's final decis-
ion. Copies of the Negative Declaration
were distributed among the public and
comments were solicited. A fifteen-day
comment period was provided, 40 C.F.R.
$3 6.212(a). Only one comment was rec-
eived during that period. See A.R. # 34.
After the comment period expired, the
decision not to prepare an EIS was fin-
alized, and a determination was made to
to grant the applications and fund the
projects.
The two construction grants were fin-
ally awarded on September 29, 1978. Only
after that time was EPA barraged with num-
erous comments belatedly objecting to the
projects. See A.R. ## 38, 41, 44, 48, 70,
. tag T8— 75, 76, 77, 78, 80, 81, 82, 383, 36.
Although not called for by the regulations,
EPA responded to all of these comments. A
public meeting was also held to respond to
the objections. See A.R. ## 57, 58, 59, 7],
and 94 (Transcript of EPA Public Meeting,
February 15, 1979). The meeting was not
merely between EPA officials and local cit=
izens, butalso in attendance (end pg. 14)
(beg, pg. 15)were numerous representatives
of the state and local agencies involved
in the planning of the projects. That meet-
ing was chaired by Mr. Kenneth Stoller, P.E.
the Chief of the New Jersey Water Programs
Branch of the DEP. Plaintiff was also in
attendance and made known her objections at
that time. A subsequent letter, dated
March 20, 1979, was sent out to those in
attendance. In nineteen pages that letter
sought to address the issues raised at the
meeting. See A.R. # 71. The applicants
thereafter decided to proceed with the pro=-
ject as planned and EPA reaffirmed both its
decision not to prepare an EIS and its
decision to grant funds to build the
facilities.
IV. PLAINTIFF'S OBJECTIONS
TO EPA's DECISION
EPA regulations set forth a long and
detailed list of the general criteria to
be considered when a decision as to the
need for an EIS is to be made. See Ad...
C.F.R. SS 6.200(a),6.510. The regulations
also set out in some detail the proced-
ure by which that determination is to be
made, including the amount of public part-
icipation required. See 40 C.F.R. $8 6.512(b)
6.212(a). Rather than wade through these
regulations one by one to determine whether
EPA has complied with them all, I will foc-
us. upon the specific objecions raised by
Plaintiff's complaint. Although it is dif-
ficult to extract with precison what plaint-
iff's objections are, I believe that they
can accurately be lumped together in four
categories. They are:
(1) EPA's conclusion that these pro=—
jects are not major federal actions
significantly affecting the quality
of the human environment is incorrect;
end » Ae
ith: pg. 16)
2) These projects are controversial
oa
-60-
and require the preparation of an EIS;
(3) The decision making process was
tainted by EPA's failure to consider
‘potential alternatives to these pro-
jects; and
(4) The decision making process was
tainted by the lack of public partic-=-
ipation.
-
A. Major Federal Actions Signific-
antly Affecting the Quality .
of the Human Environment.
This Circuit has adopted a dual stand—
ard in interpreting the requirements of
this phrase. N.A.A.C.P. v. Medical Center
Inc., 584 F. 2d at 625-27. An EIS is
therefore required if an action is both a
major federal action and if it will have
significant environmental consequences.
The two terms do not have identical mean-
ings.
Plaintiff points to the cost to the
federal government of these projects, up-
ward of $4,000,000.00, to bolster her
claim that these projects constitute maj-
or federal actions. See Concerned Citiz-
ens of Buck Hill Falls v. Grant, 388 F.
Supp. 394, 398 (M.D.Pa. 1975), vacated
and remanded in part on other grounds,
537 F. 2d 29 (3d Cir. 1976). None of
the defendants have challenged this con-
tention. I agree with plaintiff and must
aia
conclude that these projects do constit-
ute major federal actions.
Plaintiff also contends that EPA's
conclusion that the projects will not
significantly affect the environment is
not supported by the record. The com-
plaint makes specific references to at
least five impacts which plaintiff al-
leges are significant: (1) reduction in
general level of groundwater recharge;
(2) air pollution (end pg. 16)
beg. pg. 17)
from the operation of the treatment plant;
(3) damage to private property caused by
alignments of the collection system; (4)
damage to trout maintenance streams |
caused by alignments of the collection
system; and (5) damage to acquatic biota
at site of the treatment plant outfall
into the Delaware River.
A review of the administrative record
reveals that none of these impacts es-—-
caped the attention of EPA. In each case
EPA noted the probable existence of the
impact, and then determined that the an-
ticipated impact was insignificant.
The ELA, A.R. ## 32, 33 at page 6,
recognized that there would be reduction
in the general groundwater recharge level.
=622
In a letter distributed subsequent to the
public meeting of February 15, 1979, EPA
stated specifically that:
Based upon calculations using the
basin area of the Pequest River at
Belvidere the amount of recharge
lost due to the projects would be
2006 million gallons per day per
square mile (mgd/sq. ml.). The
total recharge to the basin area
would be 1.3 mgd/sq. ml.. This
value was determined by calculating
the total amount of recharge avail-
able from precipitation and runoff.
As can be seen the amount lost due
to the projects is a negligible
amount. (A.R. Item 71, p. 17).
It was certainly not unreasonable for
EPA to conclude that a groundwater loss
of less than five=-tenths of one per cent
would not be a significant impact upon
the environment.
Plaintiff's complaint comes closer
to the mark when she points to the con-
tradictory statements contained in the EIA
with regard to odors produced by the
treatment plant and their impact on
Belvidere's residents. At page 3 the EIA
admits that odors will be produced at the
treatment facility, but concludes that
"(s)ince end a 22
(beg. pg- 18) there are no communities
near the plant site, the adverse effects
of odors on residents in (sic) non-exist—
-63-
ent". At page 4, however, the EIA states
that the "(n)oise produced by the sewage
treatment plant will affect residential
areas to some extent because of the loc=-
ation of homes in the immediate area".
And, finally, at page S, the EIA again
refers to odors, this time concluding
that "(a)s there are houses adjacent to
the treatment plant site (odors) may be
a problem in the absence of screening
vegetation to reduce win? velocity at
the plant site".
Needless to say, this is an indicat-
ion of sloppy draftsmanship. However,
it points out that the problem of odors
was given serious consideration and proc-
edures were chosen to mitigate any impact.
"C)areful operation and maintenance prac=-
tices and the use of chlorine” will min-
imize odors actually produced." ETA,
supra, at 3. A vegetation screen will be
constructed to reduce the impact upon the
town of odors not eliminated. EPA con=-
cluded that the use of these devices would
reduce the level of this impact to insign-
ificance.
The EIA also noted that the proposed
alignments of the collection system will
have an impact on the environment. The
primary impacts, however, will occur
ee eT ee, . ;
-64—
during construction and will be largely
eliminated when construction is completed.
Numerous techniques have been adopted to
minimize this impact. The construction
easements will be wider than the perman-
ent easements. Vegetation will not be
removed outside of the construction ease=-
ment and the sites will have to be ret-
urned to their original condition after-
ward. Tree tunnelling will be utilized
to prevent the destruction of mature trees
with diameters of twelve inches or more.
See A.R. # 87 at 35-45. (end pg. 18)
beg. - 19)
Even after construction additional
steps have been taken to minimize the
permanent environmental consequences of
the alignment. The manhole covers of
alignments in the flood plain will be
watertight. The alignments have been
placed in positions where gravity, rath-
er than pumping stations, can be used to
maintain the flow of the sewerage. The
net effect of these and other design
features of the Facilities Plan rendered
these impacts in EPA's eyes, at least,
insignificant.
Plaintiff's allegations with regard
to. alignments crossing a certain trout
maintenance stream are also without merit.
-65—
She merely argues that the streams will
be crossed. No mention is made of how
the crossing will affect the environment,
or why such impacts are significant. In
fact, the state defendants are quick to
point out that no evidence has been pres-
ented that the stream is in fact a trout
- maintenance streat.
Finally, plaintiff's reference to the
increased river turbulence at the outfall
from the treatment plant is to no avail.
The EIA notes the increase in turbulence.
The Plan lists the figures upon which
EPA's determination of insignificance is
based.
The Delaware River at Belvidere has an
average flow of 7,817 cubic feet per sec-
ond. The outfall for the treatment plant
will add to that amount an additional .77
cubic feet per second. A.R. # 92 at
IX-37. Once again there is a sound basis
in the record for EPA's conclusion that
this is not a significant impact.
lL. Plaintiff also complained about the
fact that 7% of the easements will trav-
erse private property, thereby preventing
the construction of swimming pools or
buildings with foundations in these areas.
Although certainly significant to the in-
dividual landowners, I do not believe it
unreasonable to conclude that these effects
are not significant as that term is employed
in NEPA (end pg. 19)
(beg. pg 20) —
I have not mentioned other averments
of plaintiff, made either in her verified
complaint, in her brief, or at oral arg-
ument, because they have less merit than
the five discussed above. In each case
an impact has been noted by EPA and EPA
has concluded that the impact is not sign-
ificant. 2/ Their conclusions are based
upon a solid foundation of study and in-
vestigation. On the basis of the record
before me, and the oral argument of all
parties at the hearing, and the testimony
of witnesses on behalf of plaintiff's
case, I am satisfied that the defendants'
acts were neither arbitrary nor capric-=-
ious, nor an abuse of discretion. 3/ The
decision therefore must be upheld.
Be. Matters of Public Controversy
in addition to requiring an EIA for
every major federal action significantly
affecting the quality of the human envir=
onment, EPA also requires the preparat-
ion of an EIS “when the. environmental
impact of a proposed EPA action is likely
to be highly controversial". 40 C.F.R.
$ 6.200(b). Plaintiff invokes this rule
because of the controversial nature of
the project and the great public outery
against it.
-67=<
2. At oral argument plaintiff referred
numerous times to alleged conflicts of
interest on the part of an individual
who was both mayor of Belvidere, the
chairperson of the PRMUA, and a former
staff member of former Congresswoman
Helen Meyner. Although, if proven,
there might be some basis for complaint
under state law because of the activit-
ies of this state official, see, e-g.,
have no bearing upon the question which
I am called upon to decide, whether EPA
properly concluded that an EIS was not
required.
3. Notwithstanding the fact that I be-
lieve the arbitrary and capricious
standard to be the appropriate stand-
ard of review of EPA-NEPA decisions,
see supra at 10-11, I recognize that
fairly strong legal arguments can be
made for the application of the reason-
able standard. I would therefore like
to note that, on the basis of the rec-
ord before me, I would conclude that
EPA, based on the record before it,
reasonably concluded that the impacts
of these projects were not significant.
(end pg. 20)
beg. wm
Plaintiff, however, misreads the
nature of the rule. The rule comes into
play only if the environmental impact of
a project, and not the decision to build
it, is a subject of controversy. E.g.,
Rucker v. Willis,484 F. 2d 158, 162 (
(4th Cir. 1973). In this case, all part-
ies seem to agree about the probable nat-
-68=
ure of the environmental impacts. of the
project. The dispute is over whether
the impacts are significant. Anr.EIS is
therefore not required by 40 C.F.R.
$ 6.200(b).
C. Consideration of Alternatives
Plaintiff's ‘allegations that the dec-
ision was tainted because EPA failed to
consider the alternatives is entirely
without merit. The briefest examination
of the record reveals that it is totally
unsupported by the record. See A.R.#?87,
at 10-12; 29 at Part Vii; 32, 33 at 8-9;
71 at 2—5. More specifically, plaintiff
contends that defendants failed to con=—
sider what she refers to as the "lagoon"
method. Although I cannot pinpoint in
the record at what stage EPA first con-=-
sidered tha lagoon alternative, by the
time the EPA reaffirmed its decision to
make the grant it had clearly addressed
plaintiff's preferred alternative. See
A.R. # 71 at 12. I must therefore re-
ject plaintiff's arguments that EPA
failed to consider appropriate alternat—
ive treatment technologies.
_--- —-< ’
D. Public Participation in the
Decision Making Process.
Plaintiff has repeatedly asserted
that the lack of public participation
in the decision making process renders
the EPA decision void. She has not,
however, set out with any specificity
end . oo
beg. e 22
how it was that the public was excluded
from the decision making process. A
review of the administrative record, See
infra at 12-15, shows that the public was
given the opportunity to participate and
in fact took advantage of that opportun-
ity.
The draft facilities plan was released
in May of 1976. AR. # 87. Im accord with
40 C.F.R. § 6.512(b), the responsible
officials scheduled a public hearing to
consider the draft. The hearing was con=
ducted on May 27, 1976. See A.R. # 92,
App. E (Transcript of Public Meeting,
May 27, 1979). Public Notice of the hear-
ing was given by publication in the "star-
Gazette" on April 22, 1976, and in the
"Belvidere News" on April 21, 1976. In
each case the notice specified the topics
to be discussed and indicated when and
where copies of the draft plan could be
found. See Ex. Fel, F-2 of Appendix
Filed in Support of State Defendant's
Motion For Summary Judgment. Additional
steps were taken by the defendants to
insure adequate public notice, includ-
ing the sending of letters to the town
clerks of all of the involved communit—-
ies, and to community groups indicating
an interest in the matter. See A.R #92,
App. E at 43-47.
A separate town meeting was held with
respect to the Environmental Assessment.
A.R. # 87. That meeting was held on
August 9, 1976. See A.R. # 87, App. A
franscript of Public Hearing of August 9,
1976.).
On September 8, 1978, EPA issued the
Negative Declarations and EIA's on these
projects. Copies were mailed to some
forty individuals. See A.R. # 32,33.
A fifteen-day comment period was estab—
lished pursuant to 49 C.F.R. § 6.212(b).
Although not required by law, EPA sched-
uled a public meeting for February 15,
1979. See (end pg. 22)
(beg. pg. 23) AR. # 94(Transcript of
Public Meeting, February 15, 1979).
That meeting and the outcome of that
meeting have been discussed previously,
see supra, pages 14-15, and I will not
cepeat that discussion here. See
AR. ## 57, 58, 59, 71, 94.
On the basis of this review of the
record I do not detect any grievous
flaws in the proceedings conducted by
the EPA. The public did participate
quite vigorously in the decision making
process. Aside from her general alleg—=
ations, plaintiff has pointed to no spec-
ific defects to which I may direct my
attention. I must therefore conclude
that EPA complied with the obligations
imposed upon it by its own regulations.
Ve. CONCLUSION
Since the trial on the merits of
this action was advanced and consolid-
ated with the hearing on the application
for a preliminary injunction, Fed.R.Civ.P.
65(a)(2), I must determine whether plain-
tiff has demonstrated her entitlement to
the entry of a permanent injunction.
. Rather, than look to whether plaintiff has
demonstrated a reasonable probability that
she will succeed on the merits, see
Doe v. Colautti, 592 F. 2d 705(3d Cir.,1979)
72
.I must determine whether in fact and law
plaintiff has succeeded on the merits of
this action. As can be seen from my
review of the arguments of plaintiff
and the evidence adduced in her behalf,
I am satisfied that plaintiff has been
unable to sustain her burden of showing
that EPA's decision not to prepare an
EIS for these projects was arbitrary or
capricious. See also Mid-Shiawasee
County Concerned Citizens v. Train,
end . 2a
(beg. pg. 24) 408 F. Supp. 650 (E.D.Mich.
1976), aff'd mem. 559 F. 2d 1220 (6th Cir.
1977); Pokorny v. Costle, 464 F. Supp.
1273 (D.Neb.1979); Conc »>rned Citizens of
Waterford Township, Inc. v. Berglund, Civil
No. 77-2220 (D.N.J. May 13, 1978).
Plaintiff's application for injunc-
tive relief. is therefore denied, her
complaint dismissed, and judgment will be
entered in favor of all defendants. [LI
therefore need not address the numerous
other issues raised at the hearing, and
all other motions are denied. Judgment
shall be entered in accord with this
opinion.
.
APPENDIX ¢
SCHENCK, PRICE, SMITH & KING
416 Front Street
P.O.Box 133
Belvidere, New Jersey 07823
(201}475=3333
Attorneys._for the Defendant
Town of Belvidere
MARGARET E. BOSCO
Plaintiff
Ve
ECKARDT C. BECK, as RegionILI
Administrator, U.S~ENVIRONMENTAL
PROTECTION AGENCY,DOUGLAS COSTLE,
Administrator, U.S.~ENVIRONMENTAL
PROTECTION AGENCY, DANIAL O'HEARN,
Commissioner N.J. DEPARTMENT OF
ENVIRONMENTAL PROTECTION,PEQUEST
RIVER MUNICIPAL UTILITIES AUTHOR-
ITY(WARREN COUNTY), and TOWN OF
BELVIDERE
Defendants
United States District Court For the
District of New Jersey
Civil Action No. 79-1865
AFFIDAVIT
STATE OF NEW JERSEY )
COUNTY OF WARREN ) SS
IRENE M. SMITH, of full age, being
duly sworn upon her oath, according to
law deposes and says:
I. I reside at 628 Third Street in
the Town of Belvidere, New Jersey.
2- I have been a life-long resident
of this community.
— eee = ee - i
3. In January, 1974 I was appointed
by then Congresswoman Helen Meyner to
serve as her Staff Aide for Warren County,
New Jersey.
4. In carrying out my duties as Staff
Aide, I established an office in my home
in the town of Belvidere and maintained
a telephone answering service 24 hours
per day. The fact that I was Congress—-
woman Meyner's Staff Aide was a.matter
of public knowledge and the telephone
number was listed in the telephone dir=
ectory.
S. I served as Staff Aide until mid
January, 1979 at which time I completed
my term following Congresswoman Meyner's
defeat in the general election held in
November, 1978.
6. In the summer of 1976 I was asked
if I would serve as a member of PRMUA
and I accepted. On August 2, 1976 I was
appointed by the Board of Chosen Free=-
holders of the County of Warren to serve
as a member of the PRMUA.
% Following my appointment I asked
for and received copies of the minutes
and reports for the prior seven(7) years
PRMUA had been in existence. |
8. I read all of the minutes and
reports of the previous meetings and on
my own initiative visited sewerage plants
and facilities in Newark, Delaware, Mary-
land, Virginia, Cleveland, Ohio, Wood=
bridge-Raritan, New Jersey and Flemington,
New Jersey. Additionally, I conferred
with officials and representatives of the
facilities and the government who were
familiar with the installations to obtain
in-depth information concerning the prob—
lems associated with sewerage treatment
and related matters.
9. Upon my assumption of the position
of a member of the PRMUA I endeavored to
determine why the project sould not get
6ff “"dead-center".
10. In an effort to have the several
government agencies who had the respon-
sibility to determine whether or not the
project was feasible and necessary, make
a decision, be it for or against the pro-
ject, I contacted many elected government
officials.
ll. In the fall of 1976, I ran for an
unexpired term on the Town Council of the
town of Belvidere and was elected.
12. At the annual meeting of the PRMUA
in January, 1977, I was elected Chairper-
son of the PRMUA.
13. Im my new capacity as an elected
official of the town of Belvidere and as
the Chairperson of the PRMUA, I continued
to inquire of government officials as to
the status of the project.
14. In December, 1976, I testified at
a public meeting in Trenton, New Jersey
before the State Department of Environ-
mental Protection advocating the approval
of the sewer project.
1S. In March, 1977, I contacted Douglas
Herbst of the United States Environmental
Protection Agency and requested that he
come to Belvidere, New Jersey and person=
ally inspect the area. A meeting was held
at the County Court House, Belvidere, New
Jersey and the communities of Belvidere
and Oxford, New Jersey were toured. The
proposed site was the same then as it is
now and has always been the same.
16. In May of 1977 when no action had
been taken by the Governmental Agencies
concerning this project, I again contacted
Douglas Herbdst and he again inspected the
area and in particular the area behind
the Blair Apartments is Belvidere, New
Jersey.
17. In July, 1977 when no official
action had been taken by either the
U.S. Government or the State of New
Jersey, I hand delivered a letter to
Henry Luther, Esq. , Chief of Staff of
Governor Brendan Byrne and requested the
Governor and his Commissioner of Departe
ment of Environmental Protection, David
Bardin to get the program off "dead center",
18. Im August, 1977 I_took a similar
letter to the Honorable Walter Mondal
Vice President of the United States o
America requesting the Environmental Pro-
tection Agency to make a decision be it
"ves" or "no" but to make a decision.
19. When Congresswoman Meyner was
still in office, I went to her office in
Morristown, New Jersey and briefed her
Aide on the details of the project.
20. In the fall of 1977 I was elected
Mayor of the town of Belvidere and upon
assuming the duties of that office in
January, 1978, I continued to appeal to
the Federal and State Officials to make a
"decision".
21. In February, 1978 I was re-elected
Chairperson of the PRMUA.
22. In October, 1978, I received word
that a decision had at last been made to
approve:the project and the Town of Belvid-
ere was to receive a grant for the con-
struction of its treatment plant and for
the construction of the collection system.
23. At all times when I contacted gov-
ernment officials, elected or appointed,
Federal and State, I always asked that they
make a decision. While I was in favor of
the project I was more concerned that a
“decision” be mede as contrasted to what
it would be. The action I took was prop-
er, responsible and necessary in my cap-=-
acity as an elected official of the Town
of Belvidere and Chairperson of the PRMUA.
24. In the Memorandum of Law filed by
the Plaintiff, Margaret Bosco in this
cause in support of her Motion for Injunc-
tive Relief, the following statement is
made:
The occasion of "conflict of inter-
est" is strongly suggested by fin-
ancial sponsorship of the Irene
Smith Radio Program by Underhill
Associates, financial advisors to
both PRMUA and town of Belvidere,
in matters pertaining to Bond An-
ticipation Notes and related finan-
cial matters of the projects. This
benefit in addition to a position
held with the newly developed pro-
gram of the Department of Travel
and Tourism (for the State of New’
Jersey) gives the appearance of a
flagrant violation of EPA regulat~
ions 25.7, Advisory Groups, in
FR final regulations, Part V.
: 25. In the summer of 1978 I was asked
to take over the radio program then being
emceed by Charles Haytaian as he had be-
come a candidate for elected office and
could not continue in that capacity due
to Federal Communications Commission Reg-
ulations.
26. From the summer of 1978 to Nov-
ember 1978, I conducted a talk interview
type program on Radio Station WRNJ in
Hackettstown, New Jersey. I did not rec-
eive any remuneration for that position.
27. In January 1979 I was asked by the
Manager of WRNJ if I would again manage
the talk interview type program on their
station, and I accepted in the Spring of
1979.
28. The Financial Advisor of the PRMUA
and the town of Belvidere in the years
1977, 1978 and 1979 was Underhill Assoc-
lates and the accounts were handled by
Jerome Burke.
29. Mr. Burke upon his hearing I was going
to have a radio program stated to me that
he was interested in advertising it in the
Warren County area and wanted to know if
his company could be a co-sponsor of my
program. I informed him he should contact
the station concerning same.
30. For a period of 13 weeks Underhill
Associates did in fact advertise on my
program and paid WRNJ the total sum of
$325.00 for the advertising time. I, in
accordance with my employment terms with
the radio station, received a remuneration
in the total sum of $130.00 for the 13
weeks Underhill Associates advertised on
the radio program.
31. It should be noted that in addition
to Underhill Associates being one of the
sponsors of my program, the following also
sponsored the program for that 13 week per-=
Lod, Bowers, Schumann & Welsh, Johanna
Farms, Mountain Lake Casino, Lanark Inn,
L'Boutique, County Cousins, North Warren
Farm and Home Supply and New Jersey Lottery
Commission.
32. At no time have I receive any mon-
ey, financial or other benefits as a result
of my services as Chairperson of the PRMUA,
Councilman, Mayor or member of the PRMUA.
Nor did I ever solicit the same or have it
offered to me.
33. Recently I have been employed by
the New Jersey Department of Travel and
Tourism. This is not a newly developed
agency as asserted by the Plaintiff but
has been in existence for many years.
34. I did not receive the position
with Travel and Tourism as a result of
any favor, partronage or reward for my
efforts in having the Belvidere and
Oxford sewer projects approved but rather
because of my wide knowledge of New
Jersey History and Geography as well as my
my genuine interest in seeing the ben—
efits of New Jersey promoted to tourists
from outside the "Garden State".
35. In recent years there have been
numerous cases of septic system problems
and failures developing within the Town
of Belvidere. Because of this long stand—-
ing problem and the efforts undertaken by
the elected officials of the town of Bel-
videre and the PRMUA, the Warren County
Board of Health did not mandate the prob-
lems be corrected as the construction of
the proposed sewerage system would com-
pletely solve and eliminate the problem
Additionally, due to the frequency of the
required cleaning and repairing of septic
systems within the town of Belvidere, the
Warren County Board of Health informed me
that citizens of the town of Belvidere
would not be required to obtain a permit
to have their septic system cleaned or
repaired in as much as the sewer project
had been approved.
36. Senior citizens, contrary to what
the Plaintiff alleges in Paragraph 6g of
her Complaint, will not suffer financial
hardship due to the required sewer hook
up cost of individual residences. [In
seeking to have the sewer..project approv—
ed, the town of Belvidere was successful
in having a grant in the total sum of
$45,000.00 made available to senior
citizens of the town of Belvidere
(S5 years or older) to assist them in
defraying the cost of hook up expenses.
The maximum grant for each senior cit-
izen is $1,500.00.
37. I have known the Plaintiff per-
sonally for many, many years and state
that at no time relavent was any in-
formation concerning the sewer project
in question withheld from the public
in general and Plaintiff in particular.
At all times the town of Belvidere, PRMUA
and the other government agencies have
fully and completely cooperated with the
public in making information available
as to the nature and size of the system.
In fact, additional public meetings
were held when same were not required
by government regulations or laws in
order for all citizens to be apprised
of the project and to request inform-
ation from the representatives respon-
sible for its implementation.
38. This Affidavit is made in opp—
osition to the Motion for Injunctive
Relief that has been filed by the
Plaintiff, Margaret Bosco in this case.
Irene Smith
Dated August 3, 1979.