Respondents Brief — Environmental Protection Agency v. National Crushed Stone Ass'n
Supreme Court brief1980
Ask Donna
What actually matters in this document.
Text
ete
ay,
R
Keres we!
~~ .
5S Be ss ‘
| Fe
fate §
PETS PS:
INDEX
OPINIONS BELOW AND JURISDICTION ................
STATUTES AND REGULATIONS INVOLVED..........
COUNTERSTATEMENT OF QUESTIONS PRE-
SI sicicancacreceiiesiatinledtedeesscdictectbepinsienninntaniesonshumbiniemnditia
COUNTERSTATEMENT OF THE CASE ....................
SUMMARY OF ARGUMENT .....W0. wo... aren rs
IEE hbescisnicsiainisalilideiiaeisimabhciaisncabiinen withsicatia
I. A Variance Provision that Includes Considera-
tion of Economic Capability Ts Required By the
Language and Structure of the Act ........0...000.....
II.
A.
B.
The Function of the BPT Variance Provi-
The BPT Variance Provision Must at Least
Allow Consideration of All Factors Con-
tained in Section 304(b) (1) (B), and These
Factors Include Economic Capability ............
The Factors Set Forth In Section 301(c) are
By Analogy Relevant to BPT Variance De-
SRE A aA nn eee USO aN TD
The Decisions of the Court of Appeals Are Con-
sistent With Congressional Intent ..........00000.........
A.
The Legislative History of the 1977 Amend-
ments Supports the Decisions Below Be-
cause Congress Implicitly Sanctioned Both
BPT Variances and Appalachian Power......
The Government Consistently Relies on Irrel-
evant Legislative History 2.200.000.0000...
13
13
17
23
27
27
32
ii
INDEX—Continued
Page
C. Consideration of Economic Capability Would
Not Require EPA to Conduct “Plant-by-
Plant” Economic Impact Determinations...... 36
III. The Agency’s Construction of the Proper Scope
of a BPT Variance Is Not Entitled to Deference.. 38
BI III i cncicncosaneencnsecomeeneirenienvesnnbaanontioniiiensininnenesnie 41
APPENDICES:
Appendix A—EPA Development Document for
Ee I sinicinncescissictiererncorenncnincoinane A-1
Appendix B—EPA Economic Impact Report for
the Mineral Mining and Processing
IT scien cnevcascecennsenciscesionncensenion B-1
Appendix C—EPA Development Document for
Mineral Mining and Processing In-
CI cic censianiersncincintnctnisemntisenl C-1
Appendix D—Written Statement of Robert L.
Hayes, TCS Financial Consultants,
on Behalf of the Environmental
Protection Agency (March 30,
so uanemanantaibianctons D-1
iii
TABLE OF AUTHORITIES
CASES: Page
American Iron & Steel Inst. v. EPA, 526 F.2d 1027
SI I a 6
American Iron & Steel Inst. v. EPA, 568 F.2d 284
I a 21
American Paper Inst. Vv. _EPA, 543 F.2d 328 (D.C.
Cir. 1976), cert. dism’d, 429 U.S. 967 (1976)... 6
American Petroleum Inst. v. EPA, 540 F.2d 1023
(10th Cir. 1976), cert. denied, 430 U.S. 922
EE dei, ..... 6,29
Appalachian Power Co. | Vv. Costle, 545 F.2d 1251
(4th Cir. 1976) 0000... _ passim
Consolidation Coal Co. v. Costle, 604 F.2d 239 (4th
I tee eee eee passim
E. 1. du Pont de Nemours & Co. Vv. Train, 480 U.S.
Le aia passim
E. 1. du Pont de Nemours & Co. v. Train, 541 F.2d
1018 (4th Cir. 1976), aff’d in part, rev'd in part,
ge ee 4, 5, 6, 23
In re Louisiana-Pacific Corp., 10 ERC 1841 (Sept.
15, 1977) . 7
National Crushed Stone ‘Association v. EPA, 601
F.2d 111 (4th Cir. 1979) _. SD PoE A passim
Natural Resources Defense Council v. EPA, 537
eo Fk SS eee 6, 14, 29
Natural Resources Defense Council vy. Train, 8
ERC 2120 (D.D.C. .176), as modified, 12 ERC
1833 (D.D.C. 1979) . a 32
Portland Cement Association Vv. -Ruckelshaus, 486
F.2d 375 (D.C. Cir. 1978), cert. denied, 417 U.S.
RSE cr 37
SEC v. Sloan, 436 U.S. 103 (1978) a ere 38
Teamsters V. Daniel, 489 U.S. 551 38
Union Electric v. EPA, 427 U.S. 246 (1976) . 26, 27
United States v. National Ass’n of Securities
Dealers, Inc., 422 U.S. 694 (1975) : 38
United States Steel Corp. v. Train, 556 F.2d
(7th Cir. 1977)... scavsihtipiainbsaieaannaaneae “8, 21, 39, 40
iv
TABLE OF AUTHORITIES—Continued
Page
Weyerhaeuser Co. v. Costle, 590 F.2d 1011 (D.C.
+ 13, 14, 16, 17, 21, 22, 23, 26, 29, 36, 37
Zenith Radio Corp. v. United States, 437 U.S. 443
RIE «15:2 tris seaicabccssuidenicbncsdlaihenteiiaaishirendbanonnionnamsonadeasts 38
Zuber v. Allen, 396 U.S. 168 (1969) ........................ 38
STATUTES:
Federal Water Pollution Control Act Amend-
ments, Pub. L. No. 95-200, 86 Stat. 816, as
amended by the Clean Water Act Amendments
of 1977, Pub. L. No. 95-217, 91 Stat. 1566, and
by the Act of Nov. 2, 1978, Pub. L. No. 95-576,
I al oesiceardehannbntin’. omawigscnial passim
§ 301, 38 U.S.C. §1311 (1976 & Supp. I,
ic OR SE EE A gee 3, 4, 6
§ 301(b) (1} (A), 33 U.S.C. § 1311 (b) (1) (A)
Ce Oe I, hy BPE OD a cicncnsnicccsessiccsccntncins 2, 3, 18, 24
§ 301(b) (2) (A), 33 U.S.C. § 1311 (b) (2) (A)
CE A, Ba RE OE vic scecsnccreccesnaroenngeesctencin 3
§ 301 (b) (2) (C), 83 U.S.C. § 1311 (b) (2) (C)
I oe i calern aeagthaneiribapmiantiions 3, 32
§ 301 (b) (2) (D), 33 U.S.C. § 1811 (b) (2) (D)
— ___, CRES PREEeererecrer ore 3
§ 301(b) (2) (EB), 33 U.S.C. § 1311 (b) (2) (EB)
ic eaiidinhcehtrnriccmantnytsamneyi 32
§ 301(b) (2) (F), 33 U.S.C. § 1311 (b) (2) (F)
(Supp. I, 1977) ....... ania atiaadeaaipnadesdsannbceabeasia 3
§ 301(c), 33 U.S.C. § 1311 (c) IEE rcnseceneosas passim
§ 304, 33 U.S.C. § 1814 (1976 & Supp. I,
al edth pein 3,9
§ 304(b), 33 U.S.C. $1314(b) (1976 & Supp.
te A i iar EAE iene een er 4,6
§ 364(b) (1), 33 U.S.C. § 1314 (b) (1) (1976).. 2, 138,
18
§ 304(b) (1) (B}3, 33 U.S.C. § 1814(b) (1) (B)
i RES OE OO TORO Re Oe passim
Vv
TABLE OF AUTHORITIES—Continued
Page
§ 304(b) (2), 38 U.S.C. § 1814(b) (2) (1976).. 3, 24,
25
§ 309(a) (5) (B), 33 U.S.C. § 1819(a) (5) (B)
EN __: SSRRERDIE RS tere sienuaer 3, 27, 28
§ 402, 33 U.S.C. § 1842 (1976) -... oe. 4
§ 502(14), 33 U.S.C. § 1862(14) (1976).......... 3
REGULATIONS:
Oe i is ID cc cadicccnnccsncsscinececcscntesnicsnecs 8
I Ss eee 8, 37
in A ERR aR SR ON AER Rete SRT A el 37
I rr ee kk eT oa 15
| RNASE RED oe A A 15
I ae hh 15
Se lS RE SS TES RAE 15
| eG SE a et eh es ARS 15
FEDERAL REGISTER:
43 Fed. Reg. 8818 (March 8, 1978) .................000.... 8
43 Fed. Reg. 50042 (October 26, 1978) ................. 18, 19
44 Fed. Reg. 31893 (June 7, 1979) 0.00... 8
44 Fed. Reg. 32950 (June 7, 1979) ....000...oeee eee. 8, 37
44 Fed. Reg. 38763 (July 2, 1979) .o00...e ee. 39
MISCELLANEOUS:
A Legislative History of the Water Pollution Con-
trol Act Amendments of 1972, Congressional
Research Service, Library of Congress, Ser. No.
a passim
A Legislative History of the Clean Water Act
Amendments of 1977, Congressiona! Research
Service, Library of Congress, Ser. No. 95-14
RY ec ee ee ge passim
“Case Law Under the Federal Water Pollution
Control Act Amendments of 1977,” Congres-
sional Research Service, Library of Congress,
House Public Works and Transportation Com-
mittee Print 95-35 29
vi
TABLE OF AUTHORITIES—Continued
Currie, “Congress, the Court and Water Pollu-
tion,” Supreme Court Review (1977) . -.........
Federal Water Pollution Control Act Amendments
of 1977, Hearings Before the Subcommittee on
Environment and Public Works, 95th Cong., ist
Sess., Series 9-H25 (1977) .....................-.csssscssseses
Hearings on the Implementation of the Federal
Water Pollution Control Act Before the Subcom-
mittee on Investigations and Review of the
House Committee on Public Works, 93rd Cong.,
RR ALS Ane ene one Ere
Kalur, “Will Judicial Error Allow Industrial Point
Sources to Avoid BPT and Perhaps BAT Later?
A Story of Good Intentions, Bad Dictum and
Ugly Consequence,” Ecological Law Quarterly,
A no cc biaenahneaneeanh
S. 2453, H.R. 6867, 96th Cong., 2d Sess. (1980)
(printed in 126 Cong. Rec. S. 2656-S. 2657 (daily
ed. March 19, 1980) )
APPENDICES:
Appendix A—EPA Development Document for
REPS TRS Olona er CRE NCEA
Appendix B—EPA Economic Impact Report for
the Mineral Mining and Processing Industry ......
Appendix C—EPA Development Document for
the Mineral Mining and Processing Industry .
Appendix D—Written Statement of Robert L.
Hayes, TCS Financial Consultants, on Behalf of
the Environmental Protection Agency (March
RR ee ee ae ae een roe
Page
34
20
24
31
15, 16
IN THE
Supreme Court of the United States
OCTOBER TERM, 1979
No. 79-770
ENVIRONMENTAL PROTECTION AGENCY,
- Petitioner
NATIONAL CRUSHED STONE ASSOCIATION, et al.,
Respondents
DouGLAS M. COSTLE, ADMINISTRATOR,
ENVIRONMENTAL PROTECTION AGENCY,
- Petitioner
CONSOLIDATION COAL COMPANY, et al.,
Respondents
On Writ of Certiorari to the United States Court of Appeals
for the Fourth Circuit
BRIEF FOR RESPONDENTS
OPINIONS BELOW AND JURISDICTION
The opinion of the United States Court of Appeals for
the Fourth Circuit in National Crushed Stone Association
v. EPA is reported at 601 F.2d 111. The opinion of that
court in Consolidation Coal Co. v. Costle is reported at
604 F.2d 239. The opinions below are also set forth at
pages la-37a and 40a-78a of the Government’s Petition
for a Writ of Certicrari.
We agree with the statement concerning this Court’s
jurisdiction set forth at page 2 of the Petitioners’ Brief.
2
STATUTES AND REGULATIONS INVOLVED
Pertinent portions of the Act and Title 40 of the Code
of Federal Regulations are set forth in Appendix A to
the Government’s Brief, at pages la-6a.
COUNTERSTATEMENT OF QUESTIONS PRESENTED
(1) Whether the variance provision contained in regu-
iations prescribing “presumptively applicable” industry-
wide effluent limitations promulgated pursuant to the
Clean Water Act' by the United States Environmental
Protection Agency (EPA) and based upon application of
the “best practicable technology currently available”
(BPT), 833 U.S.C. §§1811(b) (1) (A), 13814(b) (1)
(1976), must allow some consideration of the variance
applicant’s economic capability to comply with those limi-
tations when such variance provisions redefine BPT for
a “fundamentally different” facility by reference to
statutory factors including “total cost of application of
technology” in relation to effluent reduction benefits?
(2) Whether the court below was correct in concluding
that EPA’s BPT variance provision must allow some
consideration of economic capability versus effluent re-
duction benefits by analogy to section 301(c) of the Act?
COUNTERSTATEMENT OF THE CASE
1. The issue raised by the Government in these cases
concerns the proper scope of EPA’s regulations authoriz-
ing variances from industry-wide BPT effluent limitation
1The Federal Water Pollution Control Act Amendments
(FWPCA), Pub. L. No. 92-500, 86 Stat. 816, were amended
by the Clean Water Act Amendments of 1977 (CWA), Pub.
L. No. 95-217, 91 Stat. 1566, and by the Act of Nov. 2, 1978,
Pub. L. No. 95-576, 92 Stat. 2467. Hereinafter, this statute
as currently amended will be referred to as the “Act” or the
“Clean Water Act.”
3
regulations. This issue results in large part from the
confused and conflicting language in the Clean Water Act
in which Congress attempted to implement a far reaching
program for the control of water pollution. Technology
based limitations on the amounts of pollutants which are
discharged in effluents are a crucial element of this pro-
gram.
The Act requires “classes and categories of [existing]
point sources” to achieve such effluent limitations based
on the “best available technology economically achievable”
(BAT) by 1984, or in some cases, 1987, while existing
“point sources” are required to achieve BPT limitations
by 1977, or in some cases, 1979.2 33 U.S.C. §§ 1811(b)
(1) (A), 13811 (b) (2) (A), (C), (D), (F), 1819(a) (5)
(B) (1976 & Supp. I, 1977). BPT and BAT are to be
determined by reference to certain statutory factors
specified respectively in sections 304(b) (1), 304(b) (2)
of the Act, which also require EPA to develop BPT and
BAT effluent limitations “guidelines” based on these fac-
tors for “classes and categories of point sources”. 33
U.S.C. $$ 13814(b’ (1), 1314(b) (2) (1976 & Supp. I,
1977).
However, Congress failed to explain the relationship
between these EPA-promulgated section 304 guidelines
and the section 301 effluent limitations. Congress also
failed to explain whether EPA or the states were to
establish section 301 effluent limitations, and how those
2 The Act defines “point source” as:
any discernible, confined and discrete conveyance, includ-
ing but not limited to any pipe, ditch, channel, tunnel,
conduit, weil, discrete fissure, container, rolling stock,
concentrated animal feeding operation, or vessel or other
floating craft, from which pollutants are or may be
discharged.
33 U.S.C. § 1362(14) (1976).
4
limitations are to be applied through permits issued under
the National Poilutant Discharge Elimination System
(NPDES) established by section 402 of the Act, 33
U.S.C. $ 1342 (1976). Fisaaily, Congress did not explain
why section 301 BPT limitations were to be established
for “point sources”, while BAT limitations were to be
established for “classes and categories of point sources”.
See El. duPont de Nemours & Co. y. Train, 430 U.S.
112, 116-21 (1976).
Early in EPA’s implementation of the Act, these am-
biguities in congressional intent coalesced to form one
crucial question: whether specific, numerical BPT and
BAT effluent limitations were to be developed and applied
by EPA through promulgation of nationally uniform,
industry-wide regulations, or whether EPA was instead
only to provide general guidance through section 304(b)
guidelines to NPDES permit issuers who would then set
specific effluent limitations in individual permits on the
basis of these guidelines. Given Congress’ failure to
answer this question, its resolution was left to the courts.
2. In duPont v. Train, 541 F.2d 1018 (1976), the
United States Court of Appeals for the Fourth Circuit
interpreted the Act as allowing EPA to promulgate
reguiations establishing specific BPT and BAT effluent
limitations regulations which are “presumptively applica-
ble” to classes and categories of existing point sources.
However, that court also held that this presumption may
be rebutted by a particular facility in an application for
a variance from these nationally uniform, industry-wide
regulations. Jd. at 1028. The Fourth Circuit in duPont
v. Train rested its conclusion that industry-wide BPT
effluent limitation regulations must contain variances in
part on the fact that the Act explicitly provided in section
301(c), 33 U.S.C. $1811(c) (1976), for case-by-case
flexibility in applying ‘class and category’ BAT limita-
tions to specific point sources. Section 301(c) authorizes
5
EPA to modify the industry-wide BAT limitations when
a discharger demonstrates to EPA that it is employing
the “maximum use of technology within [its] economic
capability” and that the modified BAT limitations “will
result in reasonable further progress toward the elimi-
nation of the discharge of potiutants”. 541 F.2d at 1028
(citing 33 U.S.C. § 1311(c) (1976)). However, while the
Fourth Circuit determined that a variance provision was
a necessary component of a regulatory scheme which
rested on nationally uniform BPT effluent limitation
regulations, it declined to discuss the appropriate scope
of such a variance provision because, at the time, EPA’s
administration of its variance provision regulations was
a “matter of speculation.” 541 F.2d at 1028.
On review of the Fourth Circuit’s duPont v. Train
decision, this Court held that the second-stage BAT limi-
tations were clearly to be promulgated by EPA as na-
tionally uniform, industry-wide regulations. duPont, 430
U.S. at 126-27, 136. The Court then held, for various
reasons, that it would be incongruous for the 1977 BPT
limitations to be established by a process different from
that used to establish BAT limitations. 430 U.S. at
127-28. Thus, by analogy to EPA’s more obvious statu-
tory authority to promulgate industry-wide BAT limita-
tions, this Court in duPont agreed with the Fourth
Circuit* that “the statute authorizes the 1977 BPT
limitations as well as the BAT limitations to be set by
regulation, so long as some allowance is made for varia-
tions in individual plants, as EPA has done by including
a variance clause in its 1977 limitations.” 430 U.S. at
i28 (emphasis added). In reaching these conclusions,
this Court noted and discussed section 301(c), the Act’s
* Except for reversing the Fourth Circuit’s holding that
variances are required for new as well as existing sources,
this Court in duPont affirmed “all other aspects” of the Fourth
Circuit’s decision. 430 U.S. at 139.
6
express provision for modifying industry-wide BAT limi-
tations on economic capability grounds. 430 U.S. at 127
n.17. And in a footnote, this Court agreed with the
Fourth Circuit that “consideration of whether EPA’s
{BPT] variance provision has the proper scope would be
premature.” 430 U.S. at 128 n.19.*
3. Subsequent to its duPont v. Train decision, the
Fourth Circuit addressed the scope of BPT variance pro-
visions in three decisions, including the two now before
this Court for review. Each of these decisions involved
essentially the same variance provision, but EPA’s inter-
pretation of that provision changed considerably from
the first to the last two.
‘In its opinion in duPont, this Court also clarified the am-
biguous relationship between section 304(b) effluent limita-
tion guidelines and section 301 effluent limitations by allow-
ing EPA to combine promulgation of section 304 (b) guide-
lines, which “survey the practicable or available pollution-
control technology for an industry and assess its effective-
ness,” with the Agency’s promulgation of section 301 effluent
limitations, which “determine the effluent limitations for par-
ticular plants.” See 480 U.S. at 130-32.
5 Prior to this Court’s duPont decision, three Circuits in
addition to the Fourth upheld EPA’s authority to promulgate
single-number, industry-wide, BPT effluent limitation regula-
tions which included variance provisions. See American
Paper Inst. v. EPA, 543 F.2d 328, 335-38 (D.C. Cir. 1976),
cert. dism’d, 429 U.S. 967 (1976) ; American Petroleum Insti-
tute v. EPA, 540 F.2d 1023, 1030-33 (10th Cir. 1976), cert.
denied. 480 U.S. 922 (1977); Natural Resources Defense
Council v. EPA. 537 F.2d 642 (2d Cir. 1976). The Third
Circuit rejected both this industry-wide, single-number ap-
proach and EPA’s variance provision as being too inflexible.
See American Iron & Steel, Inst. v. EPA, 526 F.2d 1027,
1046-47 (3rd Cir. 1975). However, none of these courts
reached any holding as to the proper scope of a BPT vari-
ance provision.
7
The first of these decisions was Appalachian Power Co.
Vv. T'rain, 545 F.2d 1351 (1976), in which the Fourth
Circuit set aside as “unduly restrictive’ a BPT variance
provision for the steam electric power generating point
source category which contained essentially the same lan-
guage as the variance provision later remanded by that
court in the Crushed Stone and Consolidation Coal de-
cisions. Compare Appalachian Power at 1358-60 with
Crushed Stone, 601 F.2d at 122 and Consolidation Coal,
604 F.2d at 243-44. Prior to the Appalachian Power de-
cision, EPA had interpreted its BPT variance provision
as being limited only “to considerations of technical and
engineering factors,” and as precluding any considera-
tion of other factors specified by section 304(b) (1) (B)
of the Act such as non-water quality environmental im-
pact and “total cost” in relation to effluent reduction
benefits. See Appalachian Power, 545 F.2d at 1359-60.
The Fourth Circuit rejected this interpretation and held,
inter alia, that both section 304(b)(1)(B) and section
301(c) of the Act demonstrated that cost considerations
were relevant to BPT variance requests. 545 F.2d at
1359-60.
Subsequent to the Appalachian Power decision, EPA
engaged in a rather convoluted series of actions through
which it ultimately arrived at its current interpretation
in these cases of its standard BPT variance provision.
First, in rejecting an application for a BPT variance
filed by a member of the pulp-paper industry, EPA stated
that BPT variances must be based “on fundamental dif-
ferences in factors which are appropriate to technology-
based regulations and limitations derived through the
variance process must still meet the congressional
definition of best practicable technology currently avail-
able.” In re Louisiana-Pacific Corp., 10 ERC 1841,
1851 (Sept. 15, 1977). Second, in response to the Fourth
Cireuit’s remand in Appalachian Power, EPA promul-
gated a new BPT variance provision applicable only to
8
steam electric power plants which “would allow the
[NPDES] permit issuers to consider significant cost
differentials and other economic factors applicable to
the particular source involved.” 43 Fed. Reg. 8813
(March 3, 1978). Third, on October 17, 1978, EPA
finally withdrew its original interpretation of its stand-
ard BPT variance provision which limited the scope of
that provision to consideration of only technical and
engineering factors. It was this interpretation which the
Fourth Circuit had struck down in Appalachian Power as
being “unduly restrictive.” See Crushed Stone, 601 F.2d
at 123. Finally, on June 7, 1979, EPA promulgated
regulations governing its NPDES permit program that
contained a BPT variance provision which explicitly in-
cludes consideration of all of the factors contained in
section 304(b) (1) (B) of the Act, including the “cost of
compliance with required control technology.” 40 C.F.R.
§ 125.31(d) (6), 44 Fed. Reg. 32950. However, the
Agency interprets this consideration of “cost” to pre-
clude any examination of the “discharger’s ability to pay
for the required waste treatment.” 40 C.F.R. § 125.31
(e) (3), 44 Fed. Reg. at 32951. See generally 44 Fed.
Reg. 32893-94 (explanatory preamble).
4, The Fourth Circuit in Crushed Stone and Consoli-
dation Coal did not hold that BPT variances must be
granted to any facility which cannot afford to comply
with industry-wide BPT effluent limitation regulations.
Indeed, the court below specifically rejected EPA’s as-
sertion that Appalachian Power required the Agency to
grant variance requests based only on a plant’s economic
inability ‘‘ ‘to comply with the national BPT limitation.’ ”
601 F.2d at 123. On the contrary, the Fourth Circuit
in Crushed Stone only held that if a facility “‘is doing
all that the maximum use of technology within its eco-
nomic capability will permit and if such use will result in
reasonable further progress toward the elimination of the
9
discharge of pollutants,” it should be given a BPT
variance “ ‘should it comply with any other requirements
of the variance.’” 601 F.2d at 124 (quoting Appalachian
Power, 545 F.2d at 1378) (emphasis in the original).*
In Consolidation Coal, the Fourth Circuit, citing its
Crushed Stone decision, remanded EPA’s BPT variance
provision for the coal mining point source category. 604
F.2d at 243-244. In directing EPA to revise that pro-
vision in conformity with Crushed Stone and Appalachian
Power, the court in Consolidation Coal noted the industry
petitioners’ argument that BPT variances must allow
consideration of all section 304(b)(1)(B) and 801(e)
factors. 604 F.2d at 243-44.
5. The Government attempts to convince this Court
that the position urged by respondents would create a
“loophole” designed to exempt from control marginal
plants that cannot survive with the additional costs im-
posed by BPT limitations. See Petitioners’ Brief at 23,
27, 30-35. Because the Government places such stress on
° The Fourth Circuit in Crushed Stone relied on its previous
holding in Appalachian Power that EPA must consider not
only “the statutory factors set out in” section 301(c) when
ruling on a variance request, but also those factors set out in
section 304(b) (1) (B) of the CWA. Appalachian Power, 545
F.2d at 1359-60. The Appalachian Power court also explained
that “[i]n requiring that EPA give weight to the relevant
statutory factors in developing a subsequent variance provi-
sion, we in no way intend to imply that EPA’s regulations
must provide for a detailed cost-benefit analysis at the permit
granting stage.” 545 F.2d at 1360 n.23. Instead,
an overall cost-benefit analysis for each category or sub-
category satisfies the mandate of § 304 in this regard.
The variance provision should, however, allow the per-
mit issuer to consider significant cost differentials of the
particular point source involved.
545 F.2d at 1360 n. 23.
10
this issue, we wish at the outset to state clearly our posi-
tion. We do not contend that a plant should be entitled
to a BPT variance simply because it is financially
troubled. Higher “total costs” than those assumed by
EPA in establishing its BPT regulations for a particular
industry do not occur in a vacuum. Rather, they are
normally the result of tangible factors—the age of equip-
ment and facilities involved, the process employed, engi-
neering and process factors, energy and other require-
ments. At the same time, the fact that a particular
discharger is not economically capable of installing the
required control technology which EPA has determined
the industry in general is capable of installing may well
place that discharger in a position that is “fundamentally
different” from others in the industry. The inquiry,
however, does not stop here. Rather, in redefining BPT
for a facility that is “fundamentally different”, the per-
mit issuer must consider all of the statutory factors,
including the “total cost” of various treatment alterna-
tives considered. If an alternative is so expensive that
it would bankrupt the plant, then the economic conse-
quences of forcing the plant to close is part of the “total
cost” in relation to effluent reduction benefits that should
be considered along with the other statutory factors in
determining BPT for the plant.
SUMMARY OF ARGUMENT
BPT variances were not specifically addressed by Con-
gress in the 1972 amendments to the FWPCA. Instead,
they were required by this and other Courts to preserve
EPA’s authority to promulgate presumptively applicable
nationally uniform, industry-wide BPT limitation regu-
lations. EPA’s industry-wide BPT limitations do not
adequately take into account facilities whose characteris-
tics are “fundamentally different” from the assumptions
on which EPA bases those industry-wide BPT limita-
tions. Thus, an adequate BPT variance is an essential
11
part of the Agency’s effluent limitations regulatory pro-
gram.
Given EPA’s interpretation of its BPT variance prv-
vision as including all of the factors contained in section
304(b) (1) ‘(B), consideration of the economic capability
of the discharger to meet the presumptively applicable
BPT effluent limitations regulations must be relevant to
BPT determinations. EPA interprets its BPT variance
provision as allowing limitations based on BPT to be
defined for anomalous facilities at the NPDES permit
issuing stage, and therefore admits that all factors rele-
vant to its determination of industry-wide BPT limita-
tions are relevant to BPT variance determinations. These
factors, set out in section 304(b)(1)(B) of the Act, in-
clude the “total cost of application of technology” in
relation to effluent reduction benefits. Congress clearly
defined “total cost” to include some consideration of eco-
nomic impact or capability. Since economic capability is
a relevant consideration when EPA is developing indus-
try-wide BPT limitations, it must also be relevant to
BPT variance determinations because these determina-
tions are, according to EPA, based on the same section
304(b) (1) (B) faetors.
Since EPA’s authority to promulgate industry-wide
BPT limitations is derived by analogy to its authority
to develop industry-wide BAT limitations, economic
capability is also a relevant consideration in BPT vari-
ance determinations by analogy to section 301(c) of the
Act. Section 301(c) of the Act allows industry-wide
BAT limitations to be modified for a facility upon a
demonstration that it is doing all within its economic
capability and is achieving a reasonable further progress
in reducing pollutant discharge. This required demon-
stration is analogous to and consistent with the balanc-
ing of “total cost” (including economic impact or capa-
bility) and effluent reduction benefits in BPT variance
determinations.
12
EPA’s insistence that the express language of section
301(c) renders it inapplicable to BPT variances misses
the point. The court below never literally applied sec-
tion 301(c) to the BPT variance provision. Instead, it
only referred to section 301(c) to determine what eco-
nomic “tests” or “considerations” were appropriate in
applying the “total cost” factor in section 304 (b) (1) (B)
in the context of a BPT variance determination. This
reference to section 301(c) for guidance is analogous to
this Court’s reasoning in duPont that Congress’ express
provision for uniform BAT regulations sustained an im-
plication of EPA’s authority to promulgate industry-wide
BPT limitations. Any other interpretation would result
in BAT limitations being more flexible than BPT limita-
tions, even when those limitations are identical. The
court below did not hold that a BPT variance must be
granted to any facility which cannot afford the industry-
wide BPT limitations. Instead, it held only that the
balance between cost, including economic capability, and
pollutant reduction benefits is always one factor appro-
priate to BPT variance determinations.
The legislative history of the 1977 Amendments to the
Act supports the reasoning of the court below. Congress
was aware of judicially sanctioned BPT variances at the
time it was considering the 1977 amendments. Yet it
did not eliminate them. Congress was also aware of the
Fourth Circuit’s Appalachian Power decision, which re-
quired consideration of economic capability in BPT vari-
ance determinations. Yet Congress never criticized or
overruled that decision despite its express rejection of
other decisions. On the contrary, there is evidence that
Congress agreed with the Fourth Circuit BPT variance
provision holding in Appalachian Power. Moreover, one
of the primary goals of the 1977 Amendments to the Act
was to render the effluent limitations regulatory scheme
more flexible, and this flexibility is one of the functions
served by the BPT variance required by the court below.
13
The decisions below do not require EPA to determine
economic impact on a plant-by-plant basis. EPA need
only examine a discharger’s demonstration of total cost,
including economic impact, versus effluent reduction
benefits at its facility. There is no evidence that this
comparison would burden EPA any more than determin-
ing fundamental differences at the applicant’s facility in
other pertinent factors set forth in section 304(b) (1) (B).
EPA’s interpretation of the appropriate scope of the
BPT variance provision is not entitled to deference by
the Court. EPA’s interpretation has been inconsistent,
is not longstanding, and conflicts with actual Agency
practice. Moreover, EPA’s interpretation also conflicts
with statutory language and the relevant legislative his-
tory, and it has never been sanctioned by Congress.
Finally, EPA’s interpretation of its BPT variance pro-
vision is internally inconsistent and unreasonable.
ARGUMENT
I. A VARIANCE PROVISION THAT INCLUDES CON-
SIDERATION OF ECONOMIC CAPABILITY IS RE-
QUIRED BY THE LANGUAGE AND STRUCTURE
OF THE ACT
A. The Function of the BPT Variance Provision
BPT variance provisions were not specifically addressed
by Congress when it drafted the 1972 Amendments to
the Act. Instead, they were recognized by this and other
courts both as a necessary concomitant of EPA’s author-
ity to promulgate nationally uniform, industry-wide
BPT effluent iimitations,” and as a mechanism required
7 See, e.g., duPont, 430 U.S. at 127-28; Weyerhaeuser Co.
Vv. Costle, 590 F.2d 1011, 1031-84 (D.C. Cir. 1978). Others
besides the courts have recognized the critical role that a
14
to ensure that the variety among facilities within an
industry is adequately addressed at some point because
that variety is often not addressed by EPA’s industry-
wide limitations. See NRDC v. EPA, 537 F.2d at 647.°
Indeed, it would be unrealistic to expect EPA’s indus-
try-wide BPT effluent limitations regulations to reflect
fundamental differences among plants given the manner
in which they are developed. For example, EPA did not
add the costs of all individual coal mines, crushed stone,
or construction sand and gravel facilities in arriving at
meaningful variance provision plays in the BPT regulatory
scheme. For example, in testimony before the Subcommittee
on Environmental Pollution in 1977, the Natural Resources
Defense Council (NRDC) testified that “a fundamental vari-
ance provision” was integral to the Act’s system of “national,
uniform, minimum effluent limitations.” See Federal Water
Pollution Control Act Amendments of 1977, Hearings before
the Subcommittee on Environmental Pollution of the Senate
Comm. on Environment and Public Works, 95th Cong., Ist
Sess., Series 9-H25, Part 9, at 37 (1977). Despite this Court’s
holding in duPont that such variances are a prerequisite to
EPA’s promulgation of industry-wide BPT limitations for a
particular category of dischargers, the Government neverthe-
less questions in its Brief “whether EPA need grant any
variances from the 1977 limitations at all.” Petitioners’ Brief,
at 25.
8 As EPA itself pointed out in its BPT variance provisions
for the coal mining and crushed stone industries, its industry-
wide BPT limitations may not address the fundamenta! differ-
ences among plants within these industries. In relevant part,
these variance provisions state that:
In establishing the limitation set forth in this section,
EPA took into account all information it was able to col-
lect, develop and solicit with respect to factors . . . which
can affect the industry subcategorization and effluent
levels established. It is, however, possible that data
which would affect these limitations have not been avail-
15
its “total cost” estimate for these industries. Instead,
the Agency utilized certain fictional “model plants” em-
ploying all the required treatment technologies to develop
its industry-wide cost estimates.’ Thus, an adequate
BPT variance provision is crucial if fundamental dif-
ferences among real plants, including fundamental dif-
ferences in their “total cost,” are to be adequately ad-
dressed at some stage in the limitation setting process."
Such a provision does not constitute a “loophole” through
which individual facilities may escape BPT compliance.
On the contrary, it redefines BPT for those “funda-
mentally different” individual facilities whose operations
are not accurately reflected by the assumptions under-
lying EPA’s industry-wide BPT limitations.
Hypothetically, other devices could accomplish the same
purpose. EPA could elaborately subcategorize every in-
dustry so that only genuinely similar facilities are subject
to the same BPT limitations.'' However, totally accurate
able and, as a result, these limitations should be ad-
justed for certair plants in this industry.
40 C.F.R. §§ 434.22, 32, .42 (1979) (coal mining category) ;
40 C.F.R. §§ 436.33, .43 (1979) (mineral mining and process-
ing category).
® See, e.g., EPA Development Document for Coal Industry
at 183, 186, Appendix A at A-3, A-4; EPA’s Economic Impact
Report for the Mineral Mining and Processing Industry at
I+ to I-6, Appendix B at B-1 to B-3.
©The Agency has expressly acknowledged the limitations
on its economic models:
“To a certain extent, each plant in the industry is a
special case. The use of a model facility cannot take such
specificity into account.”
See Appendix B at B-3.
™ For example, the D.C. Circuit in Weyerhaeuser pointed
out that in developing effluent limitations for the “bleached”
16
subcategorization of a very large, diverse industry would
undoubtedly strain EPA’s resources far more than proc-
essing an occasional variance request at the NPDES
permit stage. For example, surface and underground
coal mines and coal preparation plants are in operation
in virtually every major region of the country and are,
therefore, subject to a variety of climatic, hydrological
and geologic conditions. These varying background con-
ditions determine not only volume and constituents of
waste water discharges, but also the type and degree
and therefore the cost of treatment required.'* Similarly,
there are more than 4,800 crushed stone facilities which
range in size from less than 25,000 tons/year to 15 mil-
lion tons/year annual production. The volume of con-
tamination by pollutants at a particular quarry is de-
pendent on site specific precipitation patterns, geological
features, mine layout and topography. The construction
sand and gravel industry is equally diverse, since it en-
compasses more than 5000 facilities located throughout
the country, ranging in size from under 25,000 tons per
year to over 1 million tons per year annual production.
The amount of process water used by these facilities,
and its contamination, depends on the type of raw ma-
terial, the amount of impurities and fines present, and
paper industry, EPA identified 16 different categories, di-
vided into 66 subdivisions, resulting in one set of limitations
for every 5 mills. As the Weyerhaeuser Court noted, “This
extensive subdivision safeguarded against overzealous stand-
ards, increased the confidence that can be placed in the prac-
ticability of the regulations, and diminished the need to
handle variation through the variance process. 590 F.2d at
1053 (emphasis added) ; cf. duPont, 430 U.S. at 131 n.21.
(Court stresses use of subcategorization to support diversity.)
12 See Appendix A at A-2 to A-3.
17
the customer’s specifications, all of which vary from
plant to plant.*
Totally accurate subcategorization of such large and
diverse industries would be extremely difficult. Therefore,
for these and other similarly situated industries, a BPT
variance provision that allows for consideration of funda-
mental differences between an individual discharger and
the hypothetical or “average” discharger on which the
BPT limitations regulations were based is crucial if
only genuinely similar plants are to be subject to similar
effluent limitations.
Analysis of the Act and its legislative history demon-
strate that such provisions must provide for consideration
of all of the statutory factors relevant to determining
BPT. One of these factors is the “total cost” to the
facility of meeting the nationally uniform regulations,
including the economic capability of the facility to install
necessary control equipment.
B. The BPT Variance Provision Must at Least Allow
Consideration of All Factors Contained in Section
304(b)(1)(B), and These Factors Include Economic
Capability
Since the function of a BPT variance is to determine
BPT at an individual facility, all factors relevant in set-
ting industry-wide BPT limitations must also be relevant
under the BPT variance. Weyerhacuser, 590 F.2d at
1034-36; Appalachian Power, 545 F.2d at 1359-60; see
* See, e.g., EPA Development Document for the Mineral
Mining and Processing Industry, Appendix C at C-5, C-6. EPA
did not even attempt to survey all of the plants in the mineral
mining industry or mines in the coal mining industry that
would be subject to the industry-wide BPT effluent limitations
regulations. There are over 4800 crushed stone plants, ac-
cording to EPA, but the Agency visited only 41 and had data
for only 189, less than 5 percent of the industry. See Appendix
C at C-2 to C-4.
18
United States Steel Corp. v. Train, 556 F.2d 822, 844-47
(7th Cir. 1977). EPA itself has agreed with this in-
evitable conclusion. Compare Petitioners’ Brief, at 19-20
with 43 Fed. Reg. 50042 (Oct. 26, 1978). Given uni-
versal agreement that BPT variance provisions at least
include consideration of all statutory industry-wide BPT
factors, one must ascertain congressional intent as to the
precise nature of these statutory BPT factors in order to
make a determination of the variance provision’s proper
scope.
These factors clearly include “total cost” since section
304(b) (1) (B) requires EPA to consider “the total cost
of application of technology in relation to the effluent
reduction benefits to be achieved from such application.”
33 U.S.C. §1314(b)(1)(B) (1976)."% The legislative
14 During the House debate on the 1972 FWPCA Confer-
ence Committee Report, Representative Wright emphasized
congressional intent that best “practicable” technology was to
be defined by reference to all the section 304(b) factors,
including “total cost” :
The conference report utilizes the term “practicable” in
section 301(b) (1) (A) in the requirements for effluent
limitations which must be achieved by July 1, 1977. There
are set out in section 304(b)(1)(B), which relates to
section 301(b) (1) (A), a number of factors relating to
the assessment of “best practicable contro! technology
currently available.” This includes consideration of the
total cost of application of technology in relation to the
effluent reduction to be achieved from such application,
nonwater quality environmental impact, and energy re-
quirements.
A Legislative History of the Water Pollution Control Act
Amendments of 1972, Congressional Research Service, Li-
brary of Congress, Ser. No. 93-1 (Jan. 1973) (hereinafter
referred to as 1972 Leg. Hist.), Vol. 1, at 259-60 (emphasis
added).
19
history of the 1972 Amendments to the Act defined the
phrase “total cost” contained in section 304{b) (1) (B) as
those
internal, or plant, costs sustained by the owner or
operator and those external costs such as potential
unemployment, dislocation and rural area economic
development sustained by the community area, or
region
Despite this unambiguous definition of “total cost,” the
Agency at least in these cases still argues that its re-
quired cost considerations during BPT variance proceed-
ings need encompass no consideration of the variance
applicant’s ability to afford those industry-wide BPT
limitations. See, e.g., Petitioners’ Brief, at 2, 11, 17, 19,
22-24,'°
Contrary to the Government’s arguments, however, Con-
gress unambiguously defined “total cost” not only to in-
clude the individual owner or operator’s “internal, or plant
costs,” but also “external costs” such as “unemployment”
and “dislocation”.’’ Only by surveying the economic
® [1] 1972 Leg. Hist. at 231 (Rep. Jones explaining FWPCA
Conference Rep. on House floor).
*® According to EPA, BPT variances will now be granted
upon a showing that
the plant’s own compliance costs with the national zuide-
line limitation would be X times greater than the coin-
pliance costs of the plants EPA considered in setting the
[1977 limitations].
Petitioners’ Brief at 11 (quoting 48 Fed. Reg. 50042 (Oct. 26,
1978)). In contexts other than the cases now before this
Court for review, however, EPA has apparently agreed that
BPT variance provisions must encompass economic capability
considerations. Text, infra at 39-41.
‘7 One must note the importance of Representative Jones’
statement as to congressional intent underlying the term
“total cost”. Not only was he Floor Manager during the House
20
capability of the plants which make up the industry in
question, can EPA consider costs in terms of unemploy-
ment and social dislocation in determining what consti-
tutes best “practicable” technology. During oversight
hearings on the 1972 Amendments to the FWPCA, Rep-
resentative Wright reemphasized congressional intent
that the statutory term “practicable” encompassed eco-
nomic capability considerations:
[T]he word “practicable” encompasses technology, it
encompasses economics, it encompasses local circum-
stances, it encompasses the capability of a given
plant or industry to perform to a given level without
incurring such severe financial loss that it would
have to curtail its operations and result in unem-
ployment."*
Thus, the economic capability of affected facilities to in-
stall required pollution control technology is clearly rele-
vant in setting industry-wide BPT limitations under
section 304(b) (1) (B) of the Act. Consequently, it must
also be a relevant consideration under EPA’s BPT vari-
ance provision since, as EPA has stated, that provision
must include consideration of all industry-wide BPT
debate on the 1972 Amendments, but he also is frequently
cited in the Government’s Brief as an authority on Congress’
intent as to the Act. See Petitioners’ Brief, at 31, 34.
In 1977, Congress also stressed the importance of “total
costs” in determining BPT limitations for depressed indus-
tries. A Legislative History of the Clean Water Act of 1977,
A Continuation of the Legislative History of the Federal
Water Pollution Control Act, Congressional Research Service,
Library of Congress, Ser. No. 95-14 (Oct. 1978) (1977 Leg.
Hist.), Vol. 4, at 1314.
18 Hearings on the Implementation of the Federal Water
Pollution Control Act Before the Subcom. on Investigations
and Review of the House Comm. on Pub. Works, 93d Cong.,
2d Sess. 490 (1974) (emphasis added).
21
factors. Appalachian Power, 545 F.2d at 1359; see United
States Steel, 556 F.2d at 845-46 & n.42; cf. American
Iron & Steel Inst. v. EPA, 568 F.2d 284, 301 (3rd Cir.
1977) (court approves EPA procedure for comparing
general BPT cost estimates with “total (including site-
specific) costs of reporting plants”).
The D.C. Cireuit’s opinion in Weyerhaeuser, upon
which both the Government and NRDC rely, must be
read as reaching this same conclusion if that opinion is
to be internally coherent. In Weyerhaeuser, the court
concluded that
{a]lthough the “total cost” of pollution control at
the petitioning mill must be considered under a satis-
factory variance provision, it is only relevant “in
relation to the effiuent reduction benefits to be
achieved” at that mill, section 304(b)(1)(B); so
long as those costs relative to the pollution reduction
gains are not different from those that may be im-
posed on the industry as a whole, the difficulty, or in
fact the inability, of the operator to absorb the costs
need not contro! the variance decision.
590 F.2d at 1036 ‘footnote omitted) (emphasis in the
original) ."*
'°In construing Congress’ definition of “total cost,” the
D.C. Circuit in Weyerhaeuser concluded that “Cujnder this
definition certain economic factors must be considered but
they need not be decisive if associated with commensurate
pollution-ending gains, and they do not, without more, include
the fact that the operator is experiencing difficulty in, or is
unable to absorb the costs.” 590 F.2d at 1086 n.35 (emphasis
added). This statement is only consistent with other aspects
of the Weverhaeuser opinion if one interprets it as requiring @«
fundamental difference between the varience applicant’s cost”
effluent reduction benefit ratio and that which was established
by EPA for the entire industry. Under Weyerhaeuser, this
fundamentally different cost benefit ratio would be necessary
22
Implicit in this passage from the Weyerhaeuser opin-
ion is the conclusion that when the variance applicant’s
ratio of “total cost” (including economic capability) to
effluent reduction benefits is “different” from that which
could have been imposed by the relevant industry-wide
BPT limitations, then the applicant’s “difficulty” or “in-
ability” to afford those limitations may “control the
variance decision.” Thus, although the Government cites
the Weyerhaeuser opinion at numerous points in its
Brief, ¢.g., Petitioners’ Brief, at 24 n.19, 25, 29, the
D.C. Circuit’s analysis does not support the Government’s
position that it need not, and, in fact, cannot ever con-
sider economic capability in determining BPT variance
requests.
On the contrary, Weyerhaeuser is generally consistent
with the Fourth Circuit’s opinions on most aspects of this
total cost issue.*® Both courts agree that EPA must
consider an individual operator’s “total cost.” Both
courts also agree that BPT variances should not be
granted simply because an individual operator cannot
afford to install industry-wide BPT limitations. Instead,
an individual operator’s economic ability to comply with
industry-wide BPT limitations is only one component of
a “total cost” calculation which in turn must be balanced
against effluent reduction benefits. Compare 590 F.2d at
1036 with Crushed Stone, 601 F.2d at 123-24. And both
courts also acknowledge the relevance of BPT variance
provision factors other than this total cost/effluent re-
to trigger some consideration of economic capability. Com-
pare 590 F.2d at 1035-36 with 590 F.2d at 1039 nn.38-39,
1040.
20 Indeed, at numerous points in its Weyerhaeuser opinion,
the D.C. Circuit cited the Fourth Circuit’s Appalachian Power
opinion with approval. See 590 F.2d at 1036 n.35, 1038, 1039
n.38.
23
duction benefit comparison. Compare 590 F.2d at 1035
n.34, 1040 with 601 F.2d at 124 and 545 F.2d at 1359-60.
C. The Factors Set Forth In Section 301(c) of The
The Act are By Analogy Relevant to BPT Variance
Determinations
This Court in duPont upheld EPA’s authority to pro-
mulgate industry-wide BPT limitations only by analogy
to its more obvious statutory authority to promulgate
industry-wide BAT limitations, which are subject to
modifications on grounds including economic capability
balanced against effluent reduction benefits." The Fourth
Circuit in its earlier opinion in duPont v. Train had
reached this same conclusion by a similar analysis.
Crucial to the Fourth Circuit’s duPont v. Train holding
on this point were: (i) EPA’s authority under Section
301(c) to modify BAT limitations; and (ii) that court’s
conclusion that “the ‘best practicable control technology’
for 1977 may not be construed more stringently than the
‘best available technology economically achievable’ as
ameliorated by the qualification of § 301(c) for [BAT]
limitations.” 541 F.2d at 1028.
First in Appalachian Power and subsequently in
Crushed Stone and Consolidation Coal, the Fourth Cir-
cuit used this analogy to the BAT limitations in holding
that any BPT variance provision must take into con-
sideration, inter alia, the statutory factors set out in
section 301(c). 601 F.2d at 123-24; 545 F.2d at 1359-
60. The Fourth Circuit reasoned that Congress did not
intend 1977 BPT limitations to be applied any more
inflexibly than the second-stage BAT standards. Since
the harsh inflexibility of the BAT requirements is miti-
gated by the economic capability consideration specified
by section 301(c), economic capability should also be
21 Text, supra at 5-6.
24
relevant to the BPT variance.22 This same conclusion
was reached by a commentator cited twice in the Gov-
ernment’s Brief.**
The Fourth Circuit in Appalachian Power, Crushed
Stone, and Consolidation Coal held neither that the BPT
variance provision must be identical to section 301(c),
nor that section 301(c) applied “ex proprio vigore” to
BPT limitations. Petitioners’ Brief, at 26. Rather, it
only held that section 301(c) factors should also be rele-
vant under the BPT variance. In essence, the Fourth
Cireuit referred to section 301(c) to determine what
economic considerations were appropriate when the per-
mit issuer examined, in the context of a BPT variance
request, the “total cost” factor contained in section
304 (b) (1) (B). Nevertheless, the Government continually
recites the actual text of sections 301(c) and 304(b)
(2) (A)—particularly the phrases “economically achiev-
able” and “reasonable further progress toward the elimi-
nation of the discharge of pollutants’—and argues that,
by their terms, these sections render the section 301(c)
factors inapplicable to BPT variances. See Petitioners’
Brief, at 23-25, 27. The Government’s concern with the
Act’s statutory language, which it had earlier described
as “less than pellucid” (id. at 18), is curious since section
22 NRDC argues in its amicus brief that “Congress made
the explicit economic escape value in section 301(c) appli-
cable only to the more costly BAT limitations.” NRDC
Amicus Brief, at 20. BAT limitations will not be “more
costly” than BPT limitations when, as in the case of the
crushed stone industry, EPA promulgates identical BPT and
BAT limitations.
23 See Kalur, Will Judicial Error Allow Industrial Point
Sources to Avoid BPT and Perhaps BAT Later? A Story of
Good Intentions, Bad Dictum and Ugly Consequence, 7 Ecol.
L.Q. 955, 976 (1979) (cited in Petitioners’ Brief at 26, 33
n.25).
25
301(b)(1)(A) requires effluent limitations for “point
sources”, not “classes and categories” of point sources.
Thus, industry-wide BPT limitation regulations are only
justified “as a matter of statutory language” if one anal-
ogizes to the Act’s required procedures for developing 1984
BAT limitation regulations, as this Court did in duPont.
The Act expressly allows modification of these BAT limi-
tations through section 301(c) on grounds including a
facility’s inability to afford them. Consequently, by anal-
ogy, a BPT variance provision should aiso encompass
similar considerations of economic capability. This con-
clusion underscores the fact that the phrase “total cost”
used in section 304(b) (1) (B), applied in the context of
a request for a variance from “presumptively applicable”
BPT effluent limitations regulations, must include con-
sideration of the “economic capability” of the requestor
to comply with the otherwise appliceble BPT effluent
limitations regulations.
Finally, the Government contends that it is not required
to perform any kind of cost-benefit balancing when de-
veloping BAT limitations, while only some form of indus-
try-wide cost-benefit balancing is required for 1977 BPT
limitations. According to the Government, this is the
“only difference between Section 304(b)(1)(B) and
Section 304(b) (2) (B).” Petitioners’ Brief, at 24 & n.20.
Assuming arguendo that this reading of the Act is cor-
rect, then one could interpret section 301(c) as expressly
providing for some BAT economic capability /effluent
reduction benefit balancing on the individual facility
level. Under section 301(c), the amount of money which
an individual facility can afford to spend on pollution
control technology must be balanced against the effluent
reduction benefits achieved by that level of affordable
pollution control technology in order to determine
whether effluent limits less stringent than industry-wide
BAT limitation levels should be established for that fa-
cility. Thus, Section 301(¢) provides a balancing mecha-
26
nism in order to relieve the onerous inflexibility of
nationally uniform, industry-wide BAT regulations.
Since EPA has authority to promulgate industry-wide
BPT regulations only by analogy to its authority to
proraulgate industry-wide BAT regulations, and since the
Act expressly provides for such an economic capability/
effluent reduction balancing to adjust these more rigor-
ous, industry-wide BAT regulations, then by analogy,
BPT variance provisions should allow the variance appli-
cant to perform and submit a similar analysis.”' Con-
trary to the Government’s position, such an approach to
BPT variances is buttressed by and consistent with both
the Act’s express requirement of some form of industry-
wide BPT ccst-benefit balancing and EPA’s acknowledg-
ment that all BPT industry-wide factors are relevant
to its BPT variance clause.”
In Weyerhaeuser, the D.C. Circuit also agreed with the
Fourth Circuit that this Court’s duPont decision required
EPA to “give permittees the ability to secure variances from
the 1977 limitations analogous to their statutorily provided
ability to secure the same with respect to the [BAT] limita-
tions.” 590 F.2d at 1034. In a footnote, the court noted that
its conclusion was “somewhat different” from the Fourth
Circuit’s in Appalachian Power. Since it believed that the Act
“reveais quite clearly” the relationship between section 301
(c) and 1984 BAT limitations, the D.C. Circuit only in-
sisted “that the EPA’s application of the 1977 variance allow-
ance bear a similar relationship to the factors the statute
deems crucial to the development of the general 1977 limita-
tions.” 590 F.2d at 1034 0.30. This distinction drawn by the
Weyerhaeuser court may be one ‘without a difference,’ because
Weyerhaeuser can only be read as implying that, under some
circumstances, the 1977 BPT “total cost” factor requires con-
sideration of economic capability. See 590 F.2d at 1036 &
n.35.
_ 8 This court’s opinion in Union Electric Co. v. EPA, 427
U.S. 246 (1976), also supports affirmance of the decisions
27
II. THE DECISIONS OF THE COURT OF APPEALS |
ARE CONSISTENT WITH CONGRESSIONAL IN-
TENT
A. The Legislative History of the 1977 Amendments
Supports the Decisions Below Because Congress
Implicitly Sanctioned Both BPT Variances and
Appalachian Power
The term “variance” appears several times in the
legislative history to the 1977 Amendments to the Act.
In most instances, the references arose in the context of
an amendment to section 309 of the Act, which authorizes
EPA to extend the date for BPT compliance until April
1, 1979. 33 U.S.C. § 1819(a) (5)(B) (Supp. I, 1977).
Congress intended this mechanism for extending BPT
compliance time to complement, not replace BPT variance
provisions. As described by Senator Muskie, this amend-
ment to section 809 was simply an attempt to relieve
the inflexible compliance date for achieving BPT limita-
tions without adding “a new layer of review” to that
below. In Union Electric, this Court held, inter alia, that
when reviewing state implementation plans under the Clean
Air Act, EPA may not consider the economic feasibility of the
plan’s requirement since economic feasibility is not encom-
passed within the specific statutory assessment criteria. 427
U.S. at 256-57. Under a similar analysis, EPA must give
some consideration to a BPT variance applicant’s economic
capability of achieving industry-wi2z BPT limitations because
“total cost,” a statutory BPT consideration factor, as defined
in the Act’s legislative history, encompasses consideration of
economic capability. Also, Congress made economic capability
a consideration in Section 301(c), and those section 301 (c)
factors must apply by analogy to BPT variances. Finally,
one must also note the similar importance of an adequate
variance provision to this Court’s Union Electric decision.
See 427 U.S. at 266-67.
28
already provided by existing variance provisions. See
[4] 1977 Leg. Hist. at 861-62. In fact, the relevant
legislative history of the 1977 Amendments reveals that
one purpose of these section 309 amendments was to
allow EPA to grant BPT compliance-time extensions to
facilities that raised “legitimate issues,” involving either
the “required technology” or “other points,” through
“established” “[a]ppeal mechanisms” such as administra-
tive variance proceedings and judicial review thereof.
See [4] 1977 Leg. Hist. at 693-94, 861-62, 1054; [3]
1977 Leg. Hist. at 408. Thus, a facility could apply for
a BPT variance and a section 309 extension of the statu-
tory deadline for BPT compliance.”
There is also no doubt that Congress in considering
the 1977 Amendments was aware of the Fourth Circuit’s
Appalachian Power decision on which that court’s sub-
sequent Crushed Stone and Consolidation Coal decisions
were based. In 1977, Congress rejected an amendment
which would have conferred exclusive jurisdiction over
the variance regulations remanded in Appalachian Power,
and other EPA rules of nationwide impact, on the Court
of Appeals for the District of Columbia Circuit. [4] 1977
Leg. Hist. at 878, 1012-29. The potential implications of
passage of such an amendment on the Fourth Circuit’s
remand in Appalachian Power had been specifically
brought to the attention of the Senate.”
26During the debate on the House bill, Representative
Bonker noted congressional intent to extend the BPT compli-
ance deadline for “industrial dischargers who have not com-
pleted their facilities due to bona fide challenges to the EPA’s
effluent limitations.” Among the “bona fide’ challenges
justifying an extension of BPT compliance time was “EPA’s
delay in promulgating a meaningful variance procedure.” [4]
1977 Leg. Hist. at 1314.
27 See Federal] Water Pollution Control Act Amendments of
1977, Hearings before the Subcommittee on Environmental
29
Congressional awareness and approval of the Appa-
lachian Power holding are also evinced by two other aspects
of the legislative history of the 1977 Amendments. First,
Representative Clausen, ranking minority member of the
Subcommittee on Water Resources, stated during the
House debate on the Conference Report to the final 1977
amendments that “[a] full understanding of Public Law
92-500 [the 1972 Amendments] can only be achieved by
having an understanding of the case law interpreting
the public law.” [3] 1977 Leg. Hist. at 374.2* At the
time Representative Clausen made this statement, only
the Appalachian Power court had addressed the proper
scope of a BPT variance provision; the D.C. Circuit had
not reached its decision in Weyerhaeuser, and the Ameri-
can Petroleum and NRDC v. EPA courts had declined
to rule on its interpretation and application. Consequent-
ly, this passage from the 1977 CWA legislative history
indicates congressional approval of the analysis of the
BPT variance provision contained in Appalachian Power.
In fact, the case law Report cited by Representative
Clausen concluded that, in regard to section 301(c) BAT
modifications based in part on economic capability, “the
language in [this Court’s] duPont case would seem to
Pollution of the Senate Comm. on Environment and Public
Works, 95th Cong., Ist Sess., Series 9-H25, Part 9, at 17
(1977).
** At this point during the House debate, Rep. Clausen re-
ferred to a Library of Congress report on case law under the
1972 FWPCA: “Case Law Under the Federal Water Pollu-
tion Control Act Amendment of 1977, Library of Congress,
Congressional Research Service, House Public Works and
Transportation Committee Print 95-35 (Report). [3] 1977
Leg. Hist. at 374. This Report was prepared in September
1977, before debate on the final CWA, and discusses both
Appalachian Power and this Court’s duPont decision. E.g.,
Report at 20, 28.
30
mandate similar provisions for 1977 limitations.” Re-
port at 20.*° Thus, consistent with Appalachian Power
and the decisions below, Congress clearly intended EPA
to consider “potential cost to individual companies” when
implementing the Act.
Second, when Congress disapproved of cases interpret-
ing the Act, it did so explicitly in the legislative history
of the 1977 Amendments.*” Consequently, its failure to
reject the Appalachian Power decision can only be con-
strued as approval and acceptance of the Fourth Circuit’s
analysis of the BPT variance issue in that case.
2° Rep. Clausen also pointed out that
it is not the intent of this legislative effort to invest EPA
with discretion in the interest of a precisely target [sic]
series of regulatory activities, and then see this discre-
tion nullified by agency shortcuts and across-the-board
regulatory requirements. Constraints on agency man-
power and other resources may ‘well prove incentives to
such an approach. But it is intended that the Agency
bear in mind the potential cost to individual companies,
entire industries, and the economy at large to result if
the act is not administered as intended by the Congress.
As reflected by the conference report on [the CWA],
these concerns are prominent among those motivating
this legislation. Excessive regulation in the name of ad-
ministrative convenience will not be tolerated. This con-
cern will remain uppermost in mind as the Congress
continues to exercise its legislative and oversight re-
sponsibilities in this field.
{3] 1977 Leg. Hist. at 373 (emphasis added).
3° See {4} i977 Leg. Hist. at 693 (rejecting Sixth Circuit
holding that some circumstances justified extension of BPT
compliance time under FWPCA), 701 (rejecting Eighth Cir-
cuit holding that U.S. Corps of Engineers was exempt from
State environmental law).
31
In general, the 1977 Amendments evince congressional
intent to render the Act’s effluent limitations more flexi-
ble at least in part because BPT had proven more string-
ent than anticipated. See [3] 1977 Leg. Hist. at 370
(House debate on Conference Report); [3] 1977 Leg.
Hist. at 269 (Conference Report). Thus, although Con-
gress did not explicitly address the BPT variance in the
1977 Amendments, its overall intent to make the Act
more flexible“ is consistent with the Fourth Circuit’s
requirement that BPT variance provisions also be flexi-
ble in their scope. And Congress’ failure to enact an
express BPT variance provision may be traced to its
implicit approval of the decisions in duPont and Appa-
lachian Power.
Ironically, the Government devotes an entire page of
its Brief to passages from the 1977 Amendments’ legis-
lative history demonstrating Congress’ concern over the
Act’s economic impact on industry. See Petitioners’
Brief, at 41. The Government then concludes on the
basis of this legislative concern that Congress determined
not to “ ‘provide general exemptions or extensions for the
1977 deadlines.’”’ Petitioners’ Brief, at 41-42. This con-
clusion, of course, misses the point since as the Govern-
ment admits, BPT variances are not “exemptions or ex-
tensions” from 1977 BPT requirements, but instead re-
define BPT for a particular point source. And, it also
ignores the basic thrust of the 1977 amendments, which
3! Congress’ continuing desire to render ihe Act still more
flexible is evinced by currently pending legislation which
under certain circumstances would require EPA to modify
or withdraw effluent limitations which threaten unemploy-
ment because of plant closings. S. 2453, H.R. 6867, 96th Cong.,
2d Sess. (1980) (printed in 126 Cong. Rec. S. 2656-S. 2657
(daily ed. March 19, 1980) ).
32
was to provide greater flexibility to the Act. See gen-
erally {3] 1977 Leg. Hist. at 425, 497; [4] 1977 Leg.
Hist. at 1815.
Finally, the Government’s contention that any consid-
eration of economic capability during the BPT variance
process “would impose a substantial burden on” the
Agenev and “further delay implementation of the 1977
limitations”, see Petitioners’ Brief, at 42, ignores both
Congress’ express satisfaction with the degree of indus-
trial compliance with the 1977 BPT limitations® and
the probability that few BPT variances will be filed in
the future because the 1977 BPT deadline is long past
and point source dischargers in major industries will have
to comply with BAT limitations for toxic pollutants and
BCT limitations by July 1, 1984. 83 U.S.C. -§ 1311(b)
(2)(C), (E) (Supp. I, 1977). See generally NRDC v.
Train, 8 ERC 2120 (D.D.C. 1976), as modified, 12 ERC
1833 (D.D.C. 1979).
B. The Government Consistently Relies on Irrelevant
Legislative History
In contrast to its deliberations prior to passage of the
1977 Amendments, Congress never directly addressed or
considered BPT variances in drafting the 1972 Amend-
ments to the Act, despite the Government's hyperbolic
assertion that this legislative history
unequivocally shows that Congress intended EPA to
set the 1977 limitations on an industry-wide basis
* See, e.g., [3] 1977 Leg. Hist., at 323, 330, 369-70, 462-63,
478. It is worth noting that, contrary to the implication given
in the Government’s brief, Congress in its consideration of
the 1977 Amendments repeatedly criticized EPA’s adminis-
tration of the Act. See, e.g., [8] 1977 Leg. Hist. at 377-80,
381, 385, 386, 409.
33
and that neither Section 304(b) (1) (B) nor Section
3U1(c) requires EPA to grant variances from the
1977 limitations to individual point sources in finan-
cial difficulty.
Petitioners’ Brief, at 30.*
In general, the Government’s use of legislative history
ean be dismissed as falling into several different, but
ielaied categories of error. First, the Government cites
numerous statements to the effect that Congress did not
intend to exempt facilities from BPT limitations simply
because they cannot afford to comply with those regula-
tions. See, e.g., Petitioners’ Brief, at 28-29, 30, 34-36.
The Fourth Circuit has never held, and the respondents
have never argued, that a facility should receive a BPT
variance simply because it cannot afford to comply with
industry-wide BPT limitations. Second, the Government
cites legislative history to the effect that every affected
facility must achieve BPT and that it should not be modi-
fied or waived for economic reasons. See, e.g., Petition-
ers’ Brief, at 28, 31-34, 37-38. This argument misses
the point. As the Government acknowledges in other
sections of its Brief, the NPDES permit limitation re-
ceived through a BPT variance does not “modify” BPT
limitations for a particular facility; it is BPT for that
33 Indeed, were the FWPCA legislative history so un-
equivocal on just the first assertion made in this passage,
then this Court need not have rendered much of its duPont
opinion. Moreover, the Government appears to have missed
those parts of the legislative history of the 1972 Amend-
ments which reflect an overall abiding concern that the cost
of any pollution controls be reasonable and that the economic
impact resulting from such controls be tolerable. See, e.g.,
[1] 1972 Leg. Hist. at 231 (Rep. Jones), 350, 352 (Rep.
Blatnik) ; [2] 1972 Leg. Hist. at 1272 (Sen. Randolph), 1281
(Sen. Bentsen). Affordability is an essential component of
reasonable costs.
34
facility. Third, the Government cites legislative history
relieving EPA from any duty to determine economic im-
pact on a case-by-case basis. See, e.g., Petitioners’ Brief,
at 31-34. But this discussion by the legislature was in
the context of establishing industry-wide regulations and
is contradicted by other portions of the FWPCA legis-
lative history. See duPont, 480 U.S. at 131 n.21. More-
over, as discussed infra at 36-37, EPA need not perform
such a case-by-case economic impact analysis in a vari-
ance proceeding because the burden is on the variance
applicant to make this showing.
In addition to these categories of general error, some
portions of the legislative history cited by the Govern-
ment warrant specific comment. First, the Government
accords great weight to a written statement Senator
Muskie inserted into the record of the Senate’s debate on
the Conference Report on the 1972 Amendments to the
Act. See Petitioners’ Brief, at 33-34 & n.26. This state-
ment, offered as an “explanation of each of the signifi-
cant provisions of the Act,” appears rather to have been
an effort by the Senator to write his own gloss on agree-
ments reached during the conference." One commentator,
noting contradictory Conference Report statements on
the degree to which effluent limitations may vary with
individual circumstances, observed that Senator Muskie
“chose the half of the Conference Report he preferred,
insisting that the modified bill provided for nationally
uniform limitations based on BPT.”* One portion of
“Senator Muskie’s colleagues in both Houses strongly
disagreed with aspects of this statement. See, ¢.g., [1| 1972
Leg. Hist. at 105-08 (remarks of Rep. Dingell), 205 (re
marks of Senator Jackson).
** Currie, “Congress, the Court and Water Pollution,” 1977
S. Ct. Rev. 39, 51.
35
the 1972 legislative history ignored by Senator Muskie
stated that
{iJn defining best practicable [technology] for any
given industrial category, the Cornmittee expects the
Administrator to take a number of factors into ac-
count. These factors should include [those listed in
Section 304(b)(1}(B)]. . . . In applying effluent
limitations to any individual plant, the factors cited
above should be applied to that specific plant.
{2| 1972 Leg. Hist. at 1468 (emphasis supplied).
Second, for some reason, the Government also dwells
at great length on that section of the Act which estab-
lished a loan fund to enable facilities to comply with its
requirements. Sec Petitioners’ Brief, at 28, 36-38 (citing
section 8, 86 Stat. 898-99 (amending 15 U.S.C. § 636)).
The Government apparently relies on a statement by
Senator Nelson regarding this loan fund for the proposi-
tion that “Congress deliberately chose not to permit vari-
ances from the 1977 limitations on the ground of financial
hardship.” Petitioners’ Brief, at 37. Senator Nelson’s
statement does not specifically address BPT variance
provisions; rather, it appears to reject all economic vari-
ances from the Act’s “pollution controls.” Thus, Congress
obviously did not agree with Senator Nelson that this
loan fund was an “ ‘alternative to . . . waiving strict
environmental standards where economic hardship could
be shown,’” Petitioners’ Brief, at 37 (quoting [2] 1972
Leg. Hist. at 1355), because it expressly provided for
modification of BAT limitations on economic grounds.
33 U.S.C. §1311/e) (1976). Moreover, a BPT variance
provision does not waive BPT limitations requirements;
it redefines those requirements for an individual plant.
Thus, a facility in compliance with BPT limitations
granted through the variance process would be eligible
36
for these loans. See generaily Petitioners’ Brief, at 37-
38. Also, as discussed previously, BPT variances may
not be based solely on “financial hardship.” Rather, eco-
nomic capability is only one of a number of factors to be
considered by the permit issuer in deciding on a BPT
variance request. In any event, the availability of such
loans merely demonstrates Congress’ concern over the
economic impact of its effluent limitations.**
C. Consideration of Economic Capability in the BPT
Variance Process Would Not Require EPA to Con-
duct “Plant-by-Plant” Economic Impact Determi-
nations
The Government recites legislative history stating that
EPA need only determine the economic impact of its BPT
limitations on classes or categories of industrial point
source dischargers, not on individual facilities. See Peti-
tioners’ Brief, at 30-34. This legislative history is irrele-
vant because it pertains only to EPA’s promulgation of
industry-wide BPT effluent limitations; it does not ad-
dress the extent of EPA’s duty in the context of a BPT
variance request to consider a discharger’s economic
capability to comply. See 590 F.2d at 1037 n.36.
Moreover, this part of the Government’s argument
completely ignores the process by which variance requests
are determined and, therefore, raises an illusory issue.
At the variance stage, EPA need not itself perform a
plant-specific cost-benefit analysis or any other kind of
»
86 As stated by Rep. Harrington during the debate on this
funding section of the House Report: ‘No one in Congress
wishes to legislate so irresponsibly that we drive out of
business those who sincerely wish to abide by the new pollu-
tion laws but who, because of a bad state of the economy,
will be forced to close.” [1] 1972 Leg. Hist. at 450.
37
plant-specific economic impact analysis. Appalachian
Power, 545 F.2d at 1860 n.23. Rather, the burden is on
the variance applicant to present evidence on site-specific
costs. Weyerhaeuser, 590 F.2d at 1037 n.36. See gen-
erally 40 CFR §§ 125.31, 125.32, 44 Fed. Reg. 32950-51
(June 7, 1979). The variance mechanism will be trig-
gered only where the applicant can show a fundamental
difference between it and the rest of the industry. Thus,
EPA need only consider the evidence submitted by the
applicant and compare it to the industry-wide cost-
benefit comparison and other economic analyses already
performed by the Agency in its rulemaking.” This ap-
proach to the variance process would not “place [the]
impossible burden on EPA,” which this Court strove to
avoid in duPont. See generally 480 U.S. at 132. It is
worth noting, in this regard, that the Government has
not even presented this Court with the number of BPT
variance requests which EPA has received.
Finally, as discussed previously, “total cost,” includ-
ing economic capability to comply, is only one factor
relevant to a BPT variance determination. Other factors
specified in section 304(b) (1) (B) may also warrant a
BPT variance. Determination of fundamental differences
with respect to these other factors could also be compli-
cated and time consuming. Yet EPA admits that its
variance must encompass those other factors and has not
complained about the burden such determinations would
place on it.
37 Cf. Portland Cement Ass’n Vv. Ruckelshaus, 486 F.2d 375,
887 (D.C. Cir. 1973) (EPA has no affirmative duty to make
a quantified cost-benefit analysis under the Clean Air Act but
must consider such studies when submitted by companies),
cert. denied, 417 U.S. 921 (1974).
88
Ill. THE AGENCY’S CONSTRUCTION OF THE
PROPER SCOPE OF A BPT VARIANCE PROVI-
SION IS NOT ENTITLED TO DEFERENCE
Only an Agency’s consistent, long-standing, and sub-
stantially contemporaneous construction of a statute is
entitled to “considerable” weight by a reviewing court.
See Zenith Radio Corp. v. United States, 4837 U.S. 443,
450 (1978) ; United States v. National Ass’n of Securi-
ties Dealers, Inc., 422 U.S. 694, 718-19 (1975). And
even when these conditions are met, the Agency’s con-
struction is “not controlling.” 422 U.S. at 719. “[I]t
is only one input in the interpretational equation,” and
“[i]ts impact carries more weight when the administra-
tors participated in drafting and directly made known
their views to Congress in committee hearings.” Zuber
v. Allen, 396 U.S. 168, 192 (1969) (citations omitted)
(emphasis added) ; accord, SEC v. Sloan, 436 U.S. 102,
117-21 (1978). Thus, deference to the Agency’s construc-
tion of a statute is inappropriate when that construction
is not longstanding, see Teamsters v. Daniel, 439 U.S.
551, 565-66 (1979), and any deference is always “con-
strained” by the court’s “obligation to honor the clear
meaning of a statute, as revealed by its language, pur-
pose, and history.” Jd. at 566 n.20.
Contrary to statements in the Government’s Brief,
EPA has not consistently provided a “well articulated”
interpretation of the BPT variance provision required by
this Court’s reading of the Act. On the contrary, it has
repeatedly changed its view as to the proper scope of the
provision.** After several permutations, EPA finally
agrees with the court below that its variance provision
must encompass all section 304(b)(1)(B) factors, in-
cluding “total cost.” Yet the Agency, at least in these
cases, still ignores Congress’ unambiguous intent that
88 See generally text, supra at 6-8.
39
“total cost” include some consideration of economic capa-
bility. EPA’s claims about its “consistent” construction
of the proper scope of its BPT variance provision are
rendered even more unreliable by the fact that, until the
Government filed its brief on the merits of this case,
EPA had argued to this Court that this issue was not
ripe for judicial review.”
The interpretation of EPA’s BPT variance provision
put forward in (he Government’s brief also conflicts with
prior Agency practice. For example, in United States
Steel, during administrative proceedings whose “proper
inquiry” was whether a BPT variance was warranted,
EPA presented and assessed evidence on, inter alia, the
cost to a particular steel works of complying with in-
dustry-wide BPT limitation regulations. 556 F.2d at
844-46. In considering the costs of these regulations,
EPA both compared their resulting capital costs to the
facility’s entire capital replacement costs and determined
daily operating costs associated with meeting the regula-
3® Until now, EPA argued that the proper scope and appli-
cation of a BPT variance provision could not be determined
by a court without reference to the record established in an
actual variance proceeding. See Government Petition for a
Writ of Certiorari, at 3, 20-21; Respondents’ Brief, Consoli-
dation Coal v. Costle, at 16-20. Indeed, EPA had unsuccess-
fully petitioned the Fourth Circuit to recall its mandate in
Appalachian Power after this Court’s duPont decision on the
grounds that determination of its variance provision’s proper
scope would be speculative except in the context of an actual
variance application. See No. 74-2096, Order of Sept. 26,
1977.
40 BPA relies on United States Steel for its authority to
set case-by-case NPDES permit limitations. See 44 Fed. Reg.
38763 (column 3) (July 2, 1979). This case and EPA’s con-
duct of the variance proceedings at issue in this case were
also noted with approval in the 1977 amendments’ legisla-
tive history. See [4] 1977 Leg. Hist. at 862.
40
tions. 556 F.2d at 846 n.42. On the basis of these and
other considerations, EPA determined the industry-wide
BPT limitations to be “feasible” for that particular fa-
cility. 556 F.2d at 846. There is no discussion in United
States Steel of the proposition that this plant’s compliance
costs/effluent reduction benefits ratio must be “funda-
mentally different” from the entire industry’s before
a variance could be granted, and EPA’s actual reassess-
ment of this plant’s ability to comply with the industry-
wide limitations can only be characterized as encom-
passing some consideration of whether the plant can af-
ford those regulations, i.e., whether those industry-wide
regulations are economically “feasible” for that par-
ticular plant.
Moreover, in processing an actual BPT variance re-
quest by the Jones & Laughlin Steel Corporation, EPA
commissioned a financial consultant “to analyze the
financial capability of Jones & Laughlin Steel Corpora-
tion . . . to afford BPT treatment facilities at its Ali-
quippa and Pittsburgh works.” *' Finally, EPA’s reliance
on legislative history stating that it is not required “ ‘to
determine the economic impact of controls on any indi-
vidual plant in a single community,’ ” * conflicts not only
with its actual practice in the United States Steel and
Jones & Laughlin proceedings, but also with its general
interpretation of the BPT variance provision as requiring
a variance if “a discharger . . . could show that given its
unique location and circumstances, adherence to the 1977
“1 See Written statement of Robert L. Hayes, TCS Financial
Consultants, on behalf of the United States Envronmental
Protection Agency concerning the financial capabilities of the
Jones & Laughlin Steel Corp., at 3 (March 30, 1979), in
Appendix D at D-1.
* Petitioners’ Brief, at 34 ‘quoting [1] 1972 Leg. Hist.
at 170) (emphasis in the original).
41
limitations would be substantially more expensive . . .
than compliance by other members of the same industry.”
Petitioners’ Brief, at 10-11.
Finally, there is no indication either that EPA has ever
presented its interpretation of this provision to Congress
or that Congress has ever agreed with the Agency’s in-
terpretation. However, as demonstrated supra, there is
evidence in the legislative history to the 1977 CWA
amendments that Congress was aware of and approved
the Fourth Circuit’s holding in Appalachian Power that
BPT variance provisions must allow some consideration
of economic capability.
CONCLUSION
For the foregoing reasons the decisions below should
be affirmed in all respects.
Respectfully submitted,
GEORGE C. FREEMAN, JR.
MICHAEL B. BARR
Scott SLAUGHTER
HUNTON & WILLIAMS
1919 Pennsylvania Ave., N.W.
Washington, D.C. 20006
Attorneys for National Coal
Association
Of Counsel:
ROBERT F.. STAUFFER
General Counsel
National Coal Association
1130 Seventeenth St., N.W.
Washington, D.C. 20036
THEODORE L. GARRETT
COVINGTON & BURLING
888 Sixteenth St., N.W.
Washington, D.C. 20006
Attorney for National Crushed
Stone Association, Warren
Brothers Company and
Arkhola Sand and Gravel
Company
LAWRENCE A. DEMASE
ROSE, SCHMIDT, DIXON,
HASLEY & WHYTE
900 Oliver Building
Pittsburgh, Pennsylvania
15222
Attorney for Consolidation Coal
Company and Bethlehem Steel
Corporation
THOMAS E. CAHILL
Peabody Coal Company
919 Bond St.
Evansville, Indiana 47732
Attorney for Peabody Coal
Company
THEODORE L. GARRETT
COVINGTON & BURLING
888 Sixteenth St., N.W.
Washington, D.C. 20006
Attorney for Cedar Coal
Company, Central Appalachian
Coal Company, Central Coal
Company, Central Ohio
Coal Company, Southern
Appalachian Coal Company,
Southern Ohio Coal Company
and Windsor Power House
Coal Company
FRANK J. CLEMENTS
THORP, REED & ARMSTRONG
2900 Grant Building
Pittsburgh, Pennsylvania
15219
Attorney for Nationai Steel
Corporation, Republic Steel
Corporation and United States
Steel Corporation
RONALD R. JANKE
JONES, Day, REAVIS & POGUE
1709 Union Commerce
Building
Cleveland, Ohio 44115
Attorney for the North
American Coal Corporation
APPENDICES
A-1
APPENDIX A
EPA 440, 1-76 057-a
Development Document for Interim Final Effluent
Limitations Guidelines and New Source Performance
Standards for the
COAL MINING
Point Source Category
{EPA SEAL]
UNITED STATES ENVIRONMENTAL PROTECTION
AGENCY
May 1976
A-2
(51)
SECTION V
WASTE CHARACTERIZATION
The nature and quantity of pollutants discharged in
waste water from surface and underground coal mining
operations and coal preparation facilities varies signifi-
cantly throughout the United States. The waste water
situation evident in the mining segment of the coal indus-
try is unlike that encountered in most other industries.
Usually, most industries utilize water in the specific
processes they employ. This water frequently becomes
contaminated during the process and must be treated
prior to discharge. In contrast, water is not utilized in
the actual mining of coal in the U.S. at the present except
for dust allaying and fire protection. Waste water handl-
ing and management is required in most coal mining
methods or systems to insure the continuance of the
mining operation and to improve the efficiency of the
mining operation. Water enters mines via precipitation,
groundwater infiltration, and surface runoff where it
can become polluted by contact with materials in the coal,
overburden material and mine bottom. This waste water
is discharged from the mine as mine drainage which may
require treatment before it can enter into navigable
water. The waste water from coal mining operations is
unrelated, or only indirectly related, to production quanti-
ties. Therefore, raw waste loadings are expressed in
terms of concentration rather than uniis of production.
In addition to handling and treating mine drainage dur-
ing actual coal loading or coal production, coal mine
operators are faced with the same burden during idle
periods. Waste water handling problems are generally
insignificant during initial start-up of a new under-
A-3
ground mining operation. However, these problems con-
tinue to grow as the mine is expanded and developed and,
unless control technology is employed may continue in-
definitely as a pollution source after coal production has
ceased. Surface mines can be somewhat more predictable
in their production of waste water pollutants. Waste
water handling within a surface mine can be fairly
uniform throughout the life of the mine. It is highly de-
pendent upon precipitation patterns and control tech-
nology employed, i.e.: use of diversion ditches, burial of
toxic materials, and concurrent reclamation. Without the
use of control measures at surface mines the problems
of waste water pollution would also grow and continue
indefinitely after coal production has ceased.
[183]
Cost For Treating Coal Mine Discharges as Supplied to
EPA Water Economic Branch
The 40 CFR 434 esteblished four subcategories for the
industry :
Subpart A—Coal Preparation Plant Subcategory;
Subpart B—Coal Storage, Refuse Storage and Coal
Preparation Plant Ancillary Area Sub-
category ;
Subpart C—Acid or Ferruginous Mine Drainage Sub-
category ;
Subpart D—Alkaline Mine Drainage Subcategory.
For the purpose of making an economic analysis of the
impact to the coal mine industry for meeting the addi-
tional limitations required by the court order of Decem-
ber 16, 1975 (NRDC vs Train, Civ. Dkt. No. 1609-73)
establishing additional limitations for the coal mining
point source category the industry was segmented into
model mines and preparation plants. These models were
A-4
supplied by the contractor who is preparing the draft
economic analysis. (See Figure 41) A complete copy of
this report is available through EPA Public Information
Reference Unit, Room 2922 (EPA Library) Waterside
Mall, 401 M Street, S.W. Washington, D.C.
[186]
* * * *
The selected approach for costs, cost factors and cost-
ing methodology for the model mine segments provided
entailed the derivation costs for the various facilities
and activities which, in combination, form the specified
treatment processes. Where practical and applicable, the
costs are shown as a function of variables which are
generally known for specific mining operations (e.g. daily
flow rate, size of impoundment area, amount of flocculant
added per volume of waste water). ‘
B-1
APPENDIX B
ECONOMIC IMPACT
OF
EFFLUENT GUIDELINES
MINERAL MINING
AND PROCESSING INDUSTRY
Construction Sand and Gravel
Crushed Stone
Industrial Sand
Phosphate Rock
U.S. Environmental Protection Agency
Office of Water Planning and Standards
Washington, D.C. 20460
[I-4]
The impact in each industry segment is analyzed by
means of a model plant which describes the financial
structure (revenues, normal operating costs, capital em-
ployed, net revenues, etc.) and the control costs required
to meet the guideline standard. The model plants are
used to estimate the impact for each segment. The follow-
ing six levels of impact are analyzed:
1. Price Effects—the segment is analyzed in terms
of competitive structure, price elasticity, avail-
ability of substitutes, etc., all of which will deter-
mine the ability of the plants in the segment to
pass on the increased costs of operation;
bo
Financial E ffects—the exnected shift in net reve-
nues and capital requirements are analyzed to
estimate the [I-5] number of plants in the seg-
ment which would be expected to close;
B-2
3. Production Effects—the impact of expected clo-
sures on production in the segment is analyzed;
4. Employment Effects—the employment impact of
plant clusures is assessed from the anticipated
closures ;
5. Community E ffects—any expected employment or
income loss because of plant closures is analyzed
for its adverse impact on the region in which the
closing plants are located; and
6. Balance of Trade Effects—a substantial shift in
production or prices could hamper exports and/or
encourage imports. Any such events would im-
pact the nation’s balance of trade. Most of the
industries produce relatively low-value products
that are not a significant part of the nation’s
foreign trade. Only phosphate rock has any po-
tential impact on balance of trade.
The application of a general analysis to the
specific problems of those industries is not with-
out limitations. This study has attempted to rec-
ognize the limitations and to make assumptions
that would overstate adverse economic impact
generated by the imposition of the effluent guide-
lines.
7. Industry Growth E ffects—any expected change in
the projected industry growth rate is assessed
from the impact of expected closures, which in-
corporates the expected shift in net revenues,
capital requirements, and prices.
[1-6]
One of the principal limitations of the analysis is that
the natural-resource base industries’ costs of operations
and control will depend on the specific site for each plant.
B-3
To a certain extent, each plant in the industry is a
special case. The use of a model facility cannot take
such specificity into account. Thus, the actual financial
situation and control costs for any given plant may be
different from the model used to represent it.
In many cases, information on the exact numbers of
plants in each required analytical segment has not been
available. Therefore, estimates were made as to the num-
bers of firms in each segment and those estimates are a
significant factor in determining the expected economic
impact.
All these limitations must be considered in light of the
results. Very little adverse economic impact is antici-
pated; so small, in fact, that a doubling or tripling of
impact would not make the national aggregate impact
significant. However, each plant closure causes a signifi-
cant adverse impact for its employees and potentially for
the community that loses the jobs and incomes generated
by the plant.
“
s
«
'
F ilies
'
|
‘
rf A ; 7
. - 4 s A : , : nae _ o te 7
> ares a ow -* - 7 i —_ Ss a oe im ye oe ied 4
C-1
APPENDIX C
DEVELOPMENT DOCUMENT
FOR THE
MINERAL MINiNG AND PROCESSING INDUSTRY
Douglas M. Costle
Administrator
Thomas C. Jorling
Assistant Administrator for
Water and Hazardous Matevials
Eckardt C. Beck
Deputy Assistant Administrator for
Water Planning and Standards
Robert B. Schaffer
Director, Effluent Guidelines Division
Ronald G. Kirby
Project Officer
July 1977
Effluent Guidelines Division
Office of Water and Hazardous Meterials
U.S. Environmental Protection Agency
Washington, D.C. 20460
C-2
[12]
TABLE 2
DATA BASE
No. Plants
No. Data
Subcategory Plants Visited Available Sampled
Dimension Stone 194 20 20 5
Crushed Stone 4,800
Dray 5 52 *
Wet 26 130 9
Flotation 8 2 3 i
Shell Dredging 50 4 4 0
Construction Sand
Gravel
Dry 750 0 50 *
Wet 4,250 46 100 15
Dredging (on-land) 50 8 15 0
Dredging (on-
board) 100 3 25 0
Industrial Sand
Dry 20 0 5 #
Wet 130 3 10 2
Flotation 17 4 10 2
Acid Leaching 3 3 3 0
Flotation (HF) 1 1 1 1
Gypsum
Dry 73 5 54 2
Wet Scrubbing 5 1 8 1
HMS 2 1 2 +
Asphaltic Minerals
Limestone 2 0 2 *
Bituminous
Oil Impreg.
Diatomite 1 1 1 *
Gilsonite 1 1 1 1
Asbestos
Dry 4 2 4 1
Wet 1 1 1 *
Woolastonite 1 1 1 *
*There is no discharge of process waste water in the subcate-
gories under normal operating conditions.
C-3
TABLE 2—Continued
DATA BASE
No. Plants
No. Data
Subcategory Plants Visited Available Sampled
Lightweight Aggregates
Perlite 13 4 4 *
Pumice 1 2 7
Vermiculite 2 2 2 bal
Mica & Sericite
Dry 7 5 7 *
Wet 8 2 3 #
Wet Beneficiation Y | 5 Yj bad
Barite
Dry 9 4 8 ™
Wet 14 7 14 *
Flotation 4 3 4 1
Fluorspar
HMS 6 4 6 *
Flotation 6 4 5 2
Drying and
Pelletizing 2 1 2 *
[13]
Salines from Brine
Lakes 3 3 8 *
Borax | 1 1 *
Potash 5 4 5
Trona Ore 4 2 4
Phosphate Rock
Eastern 22 21 20 5
Western 6 6 6 2
Rock Salt 21 11 15 3
Sulfur
Anhydrite 2 1 2 *
On-Shore 9 7 9 5
Off-Shore 2 1 1 1
Mineral Pigments 11 3 8 bad
2 2 2
Lithium Minerals 2
* There is no discharge of process waste water in the subcate-
gories ur ’_s normal operating conditions.
Subcategory
Sodium Sulfate
Bentonite
Fire Clay
Fuller’s Earth
Attapulgite
Montmor.
Ball Clay
Feldspar
Wet
Dry
Kyanite
Magnesite
Shale and Common
Clay
Aplite
Talc Minerals
Dry
Washing
HMS, Flotation
Natural Abrasives
Garnet
Tripoli
Diatomite
Graphite
Misc. Minerals
Jade
Novaculite
Total
C-4
Table 2—Continued
DATA BASE
nn ;
No. Data
Plants _ Visited Available Sampled _
6 2 2 *
37 : 2 *
81 9 9 *
10 4 5 2
4 3 8 3
4 4 °
37 total 6 7 0
12 4 4 0
5 5 5 5
2 2 2 *
3 2 2 *
1 1 1 *
129 10 20 *
2 2 2 *
27 12 20 ”
2 1 2 *
4 4 4 4
3 2 a 0
4 P 4 *
9 3 3 *
1 1 1 0
est. 10 1 1 .
1 1 1 *
11,019 312 735 17
* There is no discharge of process waste water in the subcate-
gories under normal cperating conditions.
«lll
C-5
[18]
The crushed stone industry is widespread and varied in
size of facilities and types of material produced. The
size of individual firms varies from small independent
producers with single facilities to large diversified cor-
porations with 50 or more crushed stone facilities as
well as other important interests. Facility capacities
range from less than 22,700 kkg/yr (25,000 tons/yr) to
‘about 13.6 million kkg/yr (15 million tons/yr). As Table
5 shows only about 5.2 percent of the commercial fa-
cilities are of a 816,000 kkg (900,000 ton) capacity or
larger, but these account for 39.5 percent of the total
output. At the other extreme, facilities of less than
22,700 kkg (25,000 ton) annual capacity made up 33.3
percent of the total number but produce only 1.3 percent
of the national total. Geographically, the facilities are
widespread with all States reporting production. In gen-
eral, stone output of the individual States correlates with
population and industrial activity as shown by Figure
2. This is true because of the large cost of shipment in
relation to the value of the crushed stone.
[24]
* a * *
The crushed stone and sand and gravel industries, on the
basis of tonage are the largest nonfuel mineral indus-
tries. Because of their widespread occurrence and the
necessity for producing sand and gravel near the point
of use, there are more than 5,000 firms engaged in com-
mercial sand and gravel output, with no single firm
being large enough to dominate the industry. Facility
sizes range from very small producers of pit-run ma-
terial to highly automated permanent installations cap-
able of supplying as much as 3.6 million kkg (4 million
tons) yearly of closely graded and processed products;
the average commercial facility capacity is about 108,000
C-6
kkg/yr (120,000 tons/yr). As seen from Table 7 about
40 percent of all commercial facilities are of less than
22,600 kkg (25,000 tons) capacity, but together these
account for only 4 percent of the total commercial pro-
duction. At the other extreme, commercial operations
with production capacities of more than 907,000 kkg (1
million tons) account for less than 1 percent of the total
number of facilities and for 12 to 15 percent of the
commercial production.
D-1
APPENDIX D
WRITTEN STATEMENT
OF
Robert L. Hayes
TCS Financial Consultants
210 25th Avenue North
Nashville, Tennessee 37203
ON BEHALF OF THE
United States Environmental Protection Agency
concerning the financial capabilities of the
Jones & Laughlin Steel Corporation
March 30, 1979
[3]
SCOPE OF THE ANALYSIS
I have been _,uested by EPA to analyze the financial
capability of Jones & Laughlin Steel Corporation (J&L)
to afford BPT treatment facilities at its Aliquippa and
Pittsburgh works.
This is a copy of a public record, reproduced as it was published. It is not legal advice, and it may not be the version a court would rely on. Check the official source before you cite it.