§u the Supreme Court of the United States
OCTOBER TERM, 1978
FEDERAL COMMUNICATIONS COMMISSION, PETITIONER
MCI TELECOMMUNICATIONS CORPORATION, et al.
PETITION FOR A WRIT OF CERTIORARI TO THE
UNITED STATES COURT OF APPEALS FOR
THE DISTRICT OF COLUMBIA CIRCUIT
ROBERT R. BRUCE,
General Counsel,
DAVID J. SAYLOR,
Deputy General Counsel,
DANIEL M. ARMSTRONG,
Associate General Counsel,
JOHN E. INGLE,
Counsel.
Federal Communications Commission
Washington, D.C. 20554
(202) 632-7112
Page
I IT ai psrpiesectersincesipneninsinecloctemeci paceasdiiaeonien 1
PO Sin 5 a eee 2
I i ee 2
I FI isisticsencieccsscenitieticnisinsterntiaatnabaiaiianssenae ties 4
IIR sscusintstsitirnssnstisinsntapidiciehstersigistannmntbeiadiiateedmaiaineta 5
OF FN TT EET ODED 8 8
B. The Declaratory Ruling __..... iahesdabigsineshiattietiaaien 14
1. Relevant Interconnection Orders —.............. 15
2. The Clarification Order -..............................--- 18
Ge cenit thee EA 20
Reasons for Granting the Writ —...... eee 21
1. Conflict with the Third Cireuit .. 0. 22
2. Expansion of the Execunet I Mandate _............. 27
3. Judicial Intrusion into Administrative Process.. 29
4. Error in Statutory Construction .......0......0..... 32
ONT eisieccctseicissinenlesibieitiaeisisci tentacle 37
CITATIONS
Court decisions:
American Tel. & Tel. Co. v. FCC, 539 F.2d 767
es aN IIE acletchicseenichepneccctnnndsleicddichinibcindcmamacminane 10
American Tel. & Tel. Co. v. FCC, 487 F.2d 865
RR BRN Tne EOP NS ot Se 8
Atchison, T. & S.F. R.R. v. Denver & N.O.R.R.,
See ne I se 15
Atchison, T. & S.F. R. Co. v. Wichita Bd. of Trade,
SE Ts Te ID nies te eas 31
Bell Telephone Co. of Penn. v. FCC, 503 F.2d 1250
(3rd Cir. 1974), cert. denied, 422 U.S. 1026, reh.
denied, 423 U.S. 886 (1975) _7, 10, 15, 17, 18, 22, 30, 33
ALLE LO
Court decisions—Continued
City of Tacoma Vv. Taxpayers of Tacoma, 357 U.S.
I a os sesakideusharenstasniaesais
Federal Communications Commission v. Pottsville
Broadcasting Co., 309 U.S. 134 (1940) —.............
Federal Power Commission v. Idaho Power Co.,
Se I I I gcse nctecisescieestinsinnciis odepansiamisiap latinas
Federal Power Commission Vv. Transcontinental
Gas Pipe Line Corp., 423 U.S. 326 (1976) _........
Federal Trade Commission Vv. Colgate-Palmolive
ig ee rs Ie I ccerritn eeiececeteetetcreree
Microwave Communications Inc. v. AT&T, 369 F.
Supp. 1004 (E.D. Penn. 1973), vacated, 496 F.2d
214 (3rd Cir. 1974) -...... REE ENE es 10,
MCI Telecommunications Corp. Vv. FCC, No. 78-
1150, D.C. Circuit (filed February 23, 1978)
Nader v. FCC, 520 F.2d 182 (D.C. Cir. 1975) —_....
National Labor Relations Board v. Donnelly Co.,
Seas I i alenaninepeiabiavess
Perkins v. Standard Oil Co., 399 U.S. 222 (1970) ..
Red Lion Broadcasting Co. v. FCC, 395 U.S. 367
I sal ica ct aa asns on dhnlbwistenachcaeiaieiniebines
Securities & Exchange Commission Vv. Chenery
eS OG | Ee . : gence :
Udall v. Tallman, 380 U.S. 1 (1965) .........-...--....
Vermont Yankee Nuclear Power Corp. v. Natural
Resources Def. Coun., Inc., No. 76-419, decided
pk a eT Ne ee eee eee
Washington Util. & Trans. Comm, v. FCC, 513
F.2d 1142 (9th Cir.), cert. denied, 423 U.S. 836
IID saclsinsscok ceptible nal cnadeaniaeltcaesadalamtnideiciora dina
Agency decisions:
Bell System Tariff Offerings, 46 FCC 2d 413
(1974) <ciindidadatticicds decatbiaccanisaatenieadinacuniaaiets
Customer Interconnection, 61 FCC 2d 766 (1976).
In The Matter of MTS and WATS Market Struc-
ture, FCC 78-144 (released Feb. 28, 1978)...
MCI Telecommunications Corp. (Execunet), 60
FCC 2d 25 (1976)
Page
17, 24
Ill
Agency decisions—Continued Page
Specialized Common Carrier Services, 29 FCC 2d
870, 31 FCC 2d 1106 (1971), aff'd sub nom.
Washington Util. & Transp. Comm. v. FCC, 513
F.2d 1142 (9th Cir.), cert. denied, 423 U.S. 836
ESSER terre seca bsatedbalcnsn sacnchacad 8, 16, 17, 30
Private Line Cases, 34 FCC 244 (1961), 34 FCC
217 (1963), aff’d sub nom., Wilson & Co.w. FCC,
335 F.2d 788 (7th Cir. 1964), remanded for con-
sent settlement, 382 U.S. 454 (1966) —_.............. 9
Western Union Telegraph Co., 17 FCC 152 (1952),
Bg REL nt ONS TR NERO 15
Other citations:
Statutes and regulations:
gS Te | |: 5 EE een 2
go Ag) eee cane ne eEeon 33
ee TR I sien serttctnenioncecinniaclecspieieiesitiee 2
Communications Act of 1934, 48 Stat. 1064, as
amended, 47 U.S.C. §§ 151-609:
RBA RES ERE Eve ae eR 2,3, 4, 15
a ertsnemceinnpnioniell 2,3,11
fe RTO cee Oo LC TIONED 4,5
FRR EA RD ee RO 4, 5, 33
M. Irwin, The Telecommunications Industry
NN el El a calvetnnstanuntnasnsenned 8
President’s Task Force on Communications Policy,
pe I I 8
Beslan oa
a ihe cn
=
Iu the Supreme Court of the United States
OCTOBER TERM, 1978
No.
FEDERAL COMMUNICATIONS COMMISSION, PETITIONER
Vv.
MCI TELECOMMUNICATIONS CORPORATION, et al.
PETITION FOR A WRIT OF CERTIORARI TO THE
UNITED STATES COURT OF APPEALS FOR
THE DISTRICT OF COLUMBIA CIRCUIT
The Federal Communications Commission respect-
fully asks this Court to issue a writ of certiorari to
review the April 14, 1978, order of the Court of
Appeals for the District of Columbia (Ewecunet I/)
which granted a motion for an order directing com-
pliance with that court’s previous mandate in MCI
Telecommunications Corp. v. FCC, 561 F.2d 365 (D.C.
Cir. 1977), cert. denied, 434 U.S. 1040 (1978) (Evxe-
cunet I).
OPINIONS BELOW
The order and opinion of the court of appeals (Pet.
App. A) and the decision of the FCC (Pet. App.
C) are not yet reported.
(1)
2
JURISDICTION
The court of appeals issued its order on April 14,
1978. That court denied timely filed petitions for
rehearing and suggestions of rehearing en banc by
orders dated May 8, 1978 (Pet. App. D). This pe-
tition is filed within the time allowed by statute, as
enlarged by this Court’s order to August 17, 1978.
28 U.S.C. § 2850(a). This Court has jurisdiction
by virtue of 28 U.S.C. § 1254(1).
QUESTIONS PRESENTED
Common carriers have no duty under the Com-
munications Act to connect their facilities with those
of other carriers unless and until the FCC, “after
opportunity for hearing,” finds that connection is
“necessary or desirable in the public interest. .. .”
47 U.S.C. § 201(a). In response to a request by
the American Telephone and Telegraph Company
(AT&T) for clarification of its interconnection ob-
ligations, the FCC issued a declaratory ruling that
its own orders pursuant to Section 201(a) had not
required the established telephone carriers to pro-
vide interconnections for use by the specialized car-
riers in offering ordinary long distance service. (Pet.
App. C.) The court of appeals, purporting to enforce
its mandate in Execunet J (Pet. App. B), which dealt
with the scope of specialized carriers’ facilities au-
thorizations under Section 214, 47 U.S.C. § 214, re-
quired immediate interconnection between the car-
riers without limitation as to services (Pet. App.
A).
3
The Execunet II decision presents these anomalies.
First, in ordering interconnection, the court of ap-
peals relied primarily on its earlier interpretation (in
Execunet I) of a provision (Section 214) which does
not have anything to do with interconnection, rather
than on an independent evaluation of Section 201(a),
which does govern interconnection. Second, although
Section 201(a) plainly contemplates that the FCC
knowingly hold a “hearing” and thereafter make an
affirmative “public interest” finding before mandat-
ing interconnection, the Hxecunet II court disbe-
lieved or ignored the FCC’s protestations that it had
never held such a hearing, never made the requisite
finding, and never mandated interconnection. Third,
on the strength of Execwnet I, which barely men-
tioned and certainly never focused upon the subject
of interconnection, the Execunet II decision overrode
another decision (the Third Circuit’s) which had di-
rectly considered and defined the scope of the FCC’s
only relevant interconnection orders, in reliance upon
and consistent with the FCC’s views. Fourth, even
though AT&T had been specifically denied an FCC
hearing on MTS/WATS interconnection because that
issue was beyond the scope of the inquiry, Execunet
IT told AT&T years later that the issue had been
decided after all and that the carrier reasonably
should have known that all along.
The questions for this Court are:
1. Did the court of appeals impermissibly expand
its mandate to govern matters which were neither
4
considered nor decided in its earlier decision but
which had been resolved definitively in another circuit
in a manner that conflicts directly with the order in
Execunet II?
2. Did the court of appeals act beyond its au-
thority as a court reviewing agency action when it
ordered immediate carrier interconnection?
3. Did the court of appeals erroneously apply the
relevant statute in finding that the FCC had required
carriers to connect their facilities even though (a)
the agency concededly had not provided an oppor-
tunity for hearing and had not made the requisite
publie interest finding and (b) another court of ap-
peals, on direct review of the FCC’s interconnection
order, had held that those orders did not require this
kind of connection?
STATUTES INVOLVED
Sections 201(a) and 214(a) and (c) of the Com-
munications Act of 1934, 48 Stat. 1064, as amended,
AT U.S.C. §§ 201(a), 214(a) and (c), state, in perti-
nent part:
Section 201(a). It shall be the duty of every
common carrier engaged in interstate and for-
eign communication by wire or radio * * *, in
accordance with the orders of the Commission,
in cases where the Commission, after opportunity
for hearing, finds such action necessary or desir-
able in the public interest, to establish physical
connections with other carriers * * *.
5
Section 214(a). No carrier shall undertake the
construction of a new line or of an extension of
any line, or shall acquire or operate any line, or
extension thereof, or shall engage in transmission
over or by means of such additional or extended
line, unless and until there shall first have been
obtained from the Commission a certificate that
the present or future public convenience and
necessity require or will require the construc-
tion, or operation, or construction and operation,
of such additional or extended line * * *.
Section 214(c). The Commission shall have
power to issue such certificate as applied for,
or to refuse to issue it, or to issue it for a por-
tion or portions of a line, or extension thereof
* * *, or for the partial exercise only of such
right or privilege, and may attach to the is-
suance of the certificate such terms and condi-
tions as in its judgment the public convenience
and necessity may require * * *,
STATEMENT
The court of appeals continues in this case to
make and implement important communications
policy. In Ewecunet I, the court held that the FCC
had inadvertently granted unlimited authorizations
to the “specialized’”” common carriers, with the re-
sult that those carriers are free to offer any services
they may choose over their own intercity facilities.
That decision drastically expanded the FCC’s com-
petition policy to include services the FCC had not
intended to embrace in its policy. (Pet. App. B.)
6
In this case, the court of appeals implemented its
earlier expansion of the FCC’s competition policy by
directing the established telephone companies to in-
terconnect their local exchange facilities with the
specialized carriers’ interstate facilities. (Pet. App.
B.) The court of appeals’ latest order rested not on
error in the FCC’s own interconnection decisions,
but upon the court’s own perception of what is neces-
sary to realize “the intended effect of [its] decree”
in Execunet I.
The court of appeals in Execunet II granted a
motion for an order requiring immediate intercon-
nection between local exchange telephone facilities
and the intercity facilities of specialized communica-
tions common carriers, to enable those carriers to
provide ordinary long distance service. (Pet. App.
4A-5A.) Although that court purported merely to
direct compliance with its earlier mandate in Execu-
net I,‘ its order in effect (1) performed an important
substantive administrative function (requiring car-
riers to connect their facilities) that Congress has
expressly delegated to the FCC; (2) expanded the
Execunet I mandate to govern matters that the court
did not consider or decide in that case; (3) summarily
reversed a decision of the FCC that rested entirely
upon the agency’s construction of its own prior or-
ders, as another court of appeals had construed those
1MCI Telecommunications Corp. Vv. FCC, supra, 561 F.2d
865 (Pet. App. B).
7
orders on direct review;* and (4) left the FCC with
the dilemma of irreconcilable judicial mandates with
respect to the scope of its outstanding interconnec-
tion orders.
Execunet II apparently rests upon the court of
appeals’ assumption that its earlier mandate had
resolved all questions regarding long distance tele-
phone competition in favor of the successful litigants
in Execunet I. (Pet. App. 18A, 5E, 10D.) Thus, the
court required interconnection because, as a practical
matter, the specialized carriers needed local ex-
change facilities to provide long distance service—
even though the court had not considered the “very
different issue” of interconnection in Execunet I (Pet.
App. 27B n. 59) and even though the holding in that
case had been limited expressly to a finding of pro-
cedural error in the FCC’s certification process (Pet.
App. 30B-31B, 32B). In this statement, we describe
briefly the Execunet I case, the relevant interconnec-
tion orders as construed on direct review in another
circuit, the FCC’s declaratory ruling in this case,
and the Execunet II decision.
* Bell Telephone Co. of Penn. v. FCC, 503 F.2d 1250 (3rd
Cir. 1974), cert. denied, 422 U.S. 1026, reh. denied, 423 U.S.
886 (1975).
8
A. Execunet I. *
Interstate common carriers provide services that
may be divided into two broad categories: public
telecommunications services, including ordinary long
distance message toll telephone service (MTS) and
wide area telephone service (WATS); and private
line services, also known as leased line services.‘
While MTS and WATS historically have been mo-
nopoly offerings, private line services have been com-
petitive to some degree.’ The Commission in recent
years has encouraged and authorized new entry into
specialized private line services.° It has not con-
sciously introduced competition into MTS and WATS.
* We describe the Execunet I case in some detail because an
understanding of that case is essential to informed action on
our petition for certiorari. Although the FCC continues to be-
lieve that Execunet I was incorrectly decided, this Court de
nied our petition for certiorari in that case. 434 U.S. 1040.
Our present petition assumes that Execunet I is now binding
on the Commission.
*President’s Task Force on Communications Policy, Final
Report, Ch. 6, pp. 9-10 (1968); M. Irwin, The Telecommunica-
tions Industry, pp. 24-25 (1971).
*See Nader v. FCC, 520 F.2d 182, 197 (D.C. Cir. 1975);
American Tel. & Tel. Co. Vv. FCC, 487 F.2d 865, 868 (2d Cir.
1973).
* E.g., Specialized Common Carrier Services, 29 FCC 2d
870, 31 FCC 2d 1106 (1971), aff'd sub nom. Washington Util.
& Transp. Comm. Vv. FCC, 513 F.2d 1142 (9th Cir.), cert.
denied, 423 U.S. 836 (1975). See generally, Custemer Inter-
connection, 61 FCC 2d 766 (1976) (an appraisal of the eco-
nomic impact of the FCC’s competition policies on the tele-
communications industry, including an overview of those
policies).
9
MCI Telecommunications Corp., the petitioner in
the court of appeals, is a “specialized common car-
rier” operating under FCC authorizations. MCI filed
a tariff in 1974 to broaden its service offerings by
providing a “metered use service’ as an additional
option to its full-time and part-time private line
services.’ Although the tariff did not mention Execu-
net by name or describe the service. MCI began to
offer Execunet pursuant to the tariff early in 1975.
Several months later, AT&T complained to the
FCC that Execunet was outside the scope of MCI’s
authorizations. AT&T alleged that Execunet was
not a private line service at all, but was functionally
the same as MTS or WATS.* (Pet. App. 4B.) The
* A private line service is what the name implies: a service
in which the customer buys the privilege of using facilities
that are dedicated in some meaningful respect to his or her
personal use, always available to the customer, directly con-
necting the customer’s premises with another point (or a num-
ber of other points) selected in advance, capable of instant
connection without the need for dialing, and tariffed at a
periodic rate rather than according to use. See MCI Tele-
communications Corp. (Ezecunet), 60 FCC 2d 25, 40-44
(1976). A private line service need not have all these charac-
teristics. Private Line Cases, 34 FCC 244, 249-51 (1961), 34
FCC 217 (1963), aff’d sub nom. Wilson & Co. Vv. FCC, 335 F.2d
788, 792 (7th Cir. 1964), remanded for consent settlement, 382
U.S. 454 (1966).
* An Execunet customer may place calls from any telephone
in the Execunet network to any telephone in a distant city
in the network by dialing a local MCI number, a customer
access code, and the telephone number in the distant city. The
customer pays a toll for each call that is based on time and
distance, subject to a minimum monthly charge. (Pet. App.
5A n.2, 3B & n.3.)
10
Commission had consistently asserted that it had au-
thorized competition by specialized carriers such as
MCI only in private line services, and that those
carriers had no authority to provide MTS or WATS.’
After obtaining comments from interested parties
and hearing oral argument, the FCC concluded that
Execunet was not a private line service, but that it
had all the essential characteristics of MTS or
WATS. Concluding that MCI had no authority to
offer such a service under its existing certificates, the
Commission directed MCI to cease and desist from
offering Execunet.”
On judicial review, the court of appeals reversed,
in Execunet I. (Pet. App. B.) After outlining its
view of the statutory scheme for regulating common
* See American Tel. & Tel. Co. v. FCC, 5389 F.2d 767 (D.C.
Cir. 1976); Washington Util. & Transp. Comm., supra, 513
F.2d 1142; Bell Tel. Co. of Penn., supra, 503 F.2d 1250. Cf.
Microwave Communications, Inc. v. AT&T, 369 F. Supp. 1004
(E.D. Penn. 1973), vacated (on primary jurisdiction grounds),
496 F.2d 214 (3d Cir. 1974). The FCC had confined its spe-
cialized carrier proceeding to private line services as a matter
of administrative efficiency, both because the applicants had
proposed only that kind of service and because the public
policy questions involved in MTS/WATS competition would
be much more complex and apparently did not need to be
resolved in that proceeding.
2° MCI Telecommunications Corp., 60 FCC 2d 25. The ques-
tion for the FCC in that proceeding was whether MCI’s exist-
ing certificates were broad enough to permit the offering of
Execunet—not whether the FCC shou!d open further markets
(including the MTS and WATS markets) to competition. Jd.
at 35.
11
carriers under Title II of the Communications Act,
that court stated:
Applying these principles to the instant case,
the issues to be resolved are two: whether and
to what extent Section 214 of the Communica-
tions Act expressly authorizes the Commission
to impose prior approval requirements through
the facilities authorization mechanism, and
whether the Commission has properly exercised
whatever authority it may have under Section
214.
(Pet. App. 21B.) The court of appeals decided, on
the basis of statutory analysis, that the FCC did
have authority to restrict the services a carrier may
offer; but it found that the FCC may do so only
if it has “affirmatively determined” that the public
convenience and necessity require such restrictions.
(Pet. App. 24B-26B. )
Turning to the second question—whether the FCC
had properly exercised its authority to restrict MCI’s
authorizations to particular services—the court of
appeals analyzed the Specialized Common Carrier
Services rulemaking proceeding, and concluded that
the Commission had not made the requisite statutory
findings to restrict specialized carriers to private line
services. (Pet. App. 26B-31B.) Accordingly, it held
that MCI’s facility authorizations were not restricted
and that the Commission had erred in requiring MCI
to cease and desist from offering Execunet on grounds
that it was an unauthorized service. Id.
12
That court made no findings beyond its holding
that the FCC had not properly restricted MCI’s au-
thorizations and therefore could not require MCI to
terminate a particular service on grounds that it was
unauthorized. In fact, the court of a expressly
denied any broader holding:
We have today decided that the Commission
erred in rejecting MCI’s Execunet tariff as un-
authorized. The Commission has no general au-
thority to insist that carriers receive its ap-
proval before filing tariffs proposing new services
or rates. Only if the Commission has determined
that the public convenience and necessity may
require that new services receive advance ap-
proval can it then reject a tariff as unauthorized.
In so holding we have not had to consider, and
have not considered, whether competition like
that posed by Execunet is in the public interest.
That will be the question for the Commission to
decide should it elect to continue these proceed-
ings.
(Pet. App. 32B.) There was no mention of intercon-
nection rights or obligations, because none of the
parties had raised these questions either before the
Commission or in the court of appeals.”
™ The court of appeals also did not disturb the FCC’s find-
ing that Execunet was the functional equivalent of MTS or
WATS, although MCI had challenged that finding on review.
(Pet. App. 36C.)
cueitieeenee ern.
13
When the FCC and others petitioned this Court for
certiorari,” MCI and another specialized carrier,
Southern Pacific Communications Co., argued that the
Court should deny the petitions because, inter alia,
(1) the court of appeals had merely remanded the
matter to the FCC for its further consideration, (2)
the Execunet decision was narrowly limited to a find-
ing of procedural inadequacy in the certification
process and did not require the FCC to take any par-
ticular action with regard to its competition policies,
and (3) in this posture, the case was not ripe for
review by this Court.” The Court denied the pe-
titions for certiorari, although, of course, we have
no way of knowing whether these arguments by MCI
and Southern Pacific influenced its decision.
Shortly after denial of certiorari, the FCC under-
took to set its competition policies in order, in light
of both its statutory mandate and the Execunet I
mandate. First, it initiated an inquiry into the MTS
and WATS market structure, with a view to de-
termining whether competition in those areas would
serve the public interest.** Second, the Commission
12 The United States Independent Telephone Ass’n (USITA)
and AT&T filed petitions in addition to the FCC’s petition.
Nos. 77-420, 77-421 and 77-436.
18 MCI’s Brief for the Respondents in Opposition, pp. 35-40;
Brief for the Respondent Southern Pacific Communications
Co. in Opposition, pp. 10-14.
4 434 U.S. 1040 (Justices Stewart and Powell stating that
they would have granted the writ).
15 In the Matter of MTS and WATS Market Structure, FCC
78-144, released February 28, 1978. The Execunet I opinion
14
acted on a petition by AT&T for clarification of that
company’s interconnection obligations to MCI and
other specialized carriers. The FCC’s declaratory rul-
ing in response to AT&T’s petition, interpreting the
agency’s own previous orders as not requiring inter-
connection for MTS and WATS services, was the
genesis of Execunet IJ. (Pet. App. C.)
B. The Declaratory Ruling.
AT&T’s petition asked the FCC to issue a de-
claratory ruling with regard to its outstanding in-
terconnection orders so as to make clear that the
telephone company had no obligation to provide ad-
ditional interconnections to MCI for Execunet and
other non-private line services." The Commission
considered the petition in light of comments and ar-
guments of interested parties and in full awareness
had stated that the court of appeals had not considered
“whether competition like that posed by Execunet is in the
public interest,” and had said that was “the question for the
Commission to decide should it elect to continue these pro-
ceedings.” (Pet. App. 32B.) In fact, the Commission had no
“election” in the matter. It had a statutory responsibility to
resolve this important policy question, as well as a duty to act
on specific applications and requests for rulings, such as
AT&T’s request for clarification of its interconnection obliga-
tions. (Pet. App. 43C.)
1» AT&T asked the FCC broadly to declare that there was
no interconnection obligation under the antitrust laws, the
common law, or any other federal or state statute in addition
to the Communications Act. The Commission expressly de-
nied the petition insofar as it requested a determination of
AT&T’s obligations arising apart from the Communications
Act. (Pet. App. 52C, 11A n.14.)
15
of the Execunet [ mandate. But its decision neces-
sarily rested upon an interpretation of its own pre-
vious interconnection orders, as those orders had
been construed on direct review.
1. Relevant interconnection orders. Although com-
mon carriers have no duty under the Communications
Act to connect their facilities with those of other
carriers,” the Commission may require interconnec-
tion, after opportunity for hearing, on the basis of a
public interest finding. 47 U.S.C. § 201(a). Rights
and obligations to interconnection do not arise from
certification of facilities; rather, interconnection and
certification are discrete regulatory functions gov-
erned by independent statutes and different policy
objectives and concerns.”
In its Specialized Common Carrier Services pro-
ceeding, the Commission established an open entry
policy under Section 214(a) for new carriers who
had proposed to offer specialized communications
services. At the same time, the Commission addressed
the Section 201(a) problem of providing local distri-
7 Bell Tel. Co. of Penn., supra, 503 F.2d at 1270. See
Atchison, T. & S.F. R.R. v. Denver & N.O. R.R., 110 U.S. 667,
680 (1884); Western Union Telegraph Co., 17 FCC 152, 171
(1952), 17 FCC 5038 (1953).
The Commission may grant a certificate of convenience
and necessity authorizing new facilities, pursuant to Section
214(a), without requiring interconnection, pursuant to Section
2U1 (a). See Western Union Telegraph Co.,. supra, 17 FCC 503
(FCC denied request of Western Union for connection with
AT&T for purposes of providing video transmission service
over facilities the Commission had authorized).
16
bution facilities for the new carriers, and declared
that “established carriers with exchange facilities
should, upon request, permit interconnection or leased
channel arrangements on reasonable terms and con-
ditions to be negotiated with the new carriers... .”
Specialized Common Carrier Services, 29 FCC 2d at
940. The interconnection question, like the question
of Section 214 authorizations, was considered on the
assumption that the only authorizations and inter-
connection rights at stake were those essential to the
provision of specialized services.
Two years later, MCI complained to the Commis-
sion that AT&T had refused to interconnect with
MCI for the provision of two services (“FX” and
“CCSA”)” which AT&T offered to the public as pri-
vate line services. After a show cause proceeding in
which all interested parties filed comments and ar-
gued before the Commission en banc, the Commission
concluded that its Specialized Common Carrier Serv-
ices decision had required interconnection for all pri-
vate line services, including FX and CCSA.” The
1° For a description of these two private line services, see
Bell System Tariff Offerings, 46 FCC 2d 413, 418 n.5 (1974),
quoted at Bell Tel. Co. of Penn., supra, 503 F.2d at 1254 n.4.
20 In oral argument before the FCC, Mr. Laurence E. Harris,
MCI’s vice president, stated that one reason for assuming
that the Commission had ordered FX and CCSA interconnec-
tion was that “the staff specifically singled out and excluded
from consideration MTS and WATS services. Had it contem-
plated that FX and CCSA or any other services were not in-
cluded [in the interconnection obligation], it would clearly
have made specific reference to them at this point.” FCC
17
Commission ordered AT&T to provide the intercon-
nection MCI had asked for those two services. Bell
System Tariff Offerings, 46 FCC 2d 413.
On judicial review, the Third Circuit affirmed. Bell
Tel. Co. of Penn., supra, 503 F.2d 1250. In the proc-
ess, that court had to resolve an argument that the
interconnection requirement was overbroad. The
Third Circuit agreed that the requirement, if it were
read in a vacuum, “is somewhat vague and, to a cer-
tain extent, overbroad.” But it found no necessity to
remand on this ground, because it read the inter-
connection requirement in the context of the Special-
ized Common Carrier Services proceeding. Given this
context, the court found that the FCC’s order took
on a definite meaning:
As we read the order, the FCC has required
AT&T to provide to the specialized carriers those
(interconnection) elements of private line serv-
ices which AT&T supplies to its affiliates and
furnishes to customers through its Long Lines
Department. -
503 F.2d at 1273-74. It affirmed the interconnection
order, thus construed.”
Docket No. 19896, Tr. pp. 77, 78 (March 4, 1974). See also
MCI Communications Corp. v. AT&T, supra n.9, 369 F.
Supp. at 1027 (“The Commission did mention wide area tele-
phone service (WATS) and long-distance toll service, but only
to exclude them from the scope of the decision. If FX, CCSA,
and interexchange were to have been excluded also, they
would have been singled out as were WATS and private long-
distance toll calls.’’)
21 The Third Circuit also found that AT&T had not been
deprived of its hearing rights under Section 201(a) because
18
The Commission has issued no other interconnec-
tion orders either constricting or expanding the rights
of the specialized carriers and the obligations of the
established carriers.
2. The Clarification Order. At an open meeting
on February 23, 1978, in which interconnection, serv-
ice competition and the Execunet I decision were dis-
cussed at length, the FCC adopted its declaratory
ruling. The ruling rested on the Commission’s con-
struction of its own interconnection orders, as af-
firmed and construed by the Third Circuit, in the
light of Execunet I. (Pet. App. C.) The Commission
concluded that it had provided no opportunity for
hearing on MTS and WATS interconnection and had
not made the statutory public interest finding that
was required for a Section 201(a) order to inter-
connect. Thus, the Commission declared that AT&T
had no obligation under outstanding FCC orders to
provide additional interconnection for Execunet or
other services that are substantially equivalent to
MTS or WATS. Id.
The FCC stated that its interconnection ruling was
“entirely consistent” with Ewxecunet I. (Pet. App.
it had “notice of the Commission’s intentions” as to intercon-
nection and could claim “neither surprise nor denial of the
opportunity to speak meaningfully to the issues before the
Commission.” 503 F.2d at 1268.
22 In its brief in Bell Tel. Co. of Penn., supra, the FCC had
told the Third Circuit that if any serious questions arose as
to the extent of AT&T’s interconnection obligations to the spe-
cialized carriers, “AT&T can seek guidance from the Com-
mission.” (Pet. App. 43C.)
19
41C.) The error the court had found in that case
was the FCC’s failure to make an affirmative public
interest finding which the court regarded as a pre-
requisite to imposing service restrictions on certifi-
cates. The court had reasoned that “failure to con-
sider” the matter was not the same thing as making
“an affirmative determination” that the public in-
terest required restrictions, the Commission stated.
(Pet. App. 41C, referring to the court’s reasoning at
Pet. App. 27B-28B.)
The FCC said that Section 201(a) also required an
affirmative finding as a prerequisite to an intercon-
nection order. Since the Commission had expressly
excluded MTS and WATS from consideration in the
Specialized Common Carrier Services proceeding, it
had made no affirmative determination that intercon-
nection for such services would serve the public in-
terest. (Pet. App. 41C-42C.) Thus, the Commission
concluded, its prior orders as construed in Execunet
I could not have required such interconnection. Jd.
MCI immediately petitioned the D.C. Circuit for
review of the declaratory order. At the same time,
it filed a motion with the court, in the Execunet I
docket, asking for an order directing the FCC to
comply with the court’s mandate by requiring AT&T
to furnish additional interconnection facilities for
Execunet.
28 MCI Telecommunications Corp. v. FCC, No. 78-1150, D.C.
Circuit. This case remains on the docket in the D.C. Circuit.
20
C, Execunet IT.
The Commission had no opportunity to defend its
‘declaratory ruling on the merits, as it would on di-
rect review. Instead, the Commission addressed itself
to the motion to direct compliance with mandate.” It
argued that Execunet I did not and could not require
interconnection because neither the parties nor the
court had addressed that matter in the earlier case.
In any event, the Commission argued, the Third Cir-
cuit had resolved the interconnection question on di-
rect review in precisely the same way as the declara-
tory ruling, and the mandate of the Third Circuit
controls the question—not the mandate of the D.C.
Cireuit in Execunet I. The Commission urged the
court of appeals to deny the motion and to consider
interconnection in the separate review proceeding that
MCI had initiated, in which the FCC would have a
full opportunity for briefing and oral argument.
The court of appeals issued its Execunet II order
on April 14, 1978. Conceding that Execunet I was
“not addressed explicitly to the interconnection issue
or to AT&T’s obligation to provide interconnection”
(Pet. App. 13A), the court concluded that the
“thrust” of its opinion and “the expansive interpreta-
tion of Specialized Carrier’ it had advanced “clearly
mandate[d] an equally expansive view of the scope
of the interconnection obligations” (Pet. App. 16A,
24 The FCC released its order on February 28. FCC litiga-
tion counsel responded to the motion to direct compliance on
April 6. There was no opportunity for oral argument.
21
17A). Denial of further Execunet interconnections,
that court said, “deliberately frustrates the purpose
of the litigation” (Pet. App. 18A), and gives MCI
“good cause to feel that [the FCC order] is strikingly
unfair” (Pet. App. 12A).
The court of appeals rejected the argument that
the Third Circuit’s decision controlled the intercon-
nection matter:
[J]Just as the Third Circuit found Specialized
Carrier sufficiently broad to include FX and
CCSA service, notwithstanding the absence of
specific references to those services, so too we
have found that decision broad enough to encom-
pass Execunet, notwithstanding the similar ab-
sence of specific references.
(Pet. App. 21A.) The D.C. Circuit did not address
the Commission’s observation in the ruling that Sec-
tion 201(a) requires an affirmative public interest
finding as a prerequisite to an order for MTS and
WATS interconnection and that the FCC had made
no such finding.
The court of appeals denied rehearing and rehear-
ing en banc on May 8, 1978, with Judges Leventhal
and McGowan not participating. (Pet. App. D.)*
REASONS FOR GRANTING THE WRIT
The Court should grant the writ because (1) the
order in Execunet II conflicts directly with a decision
** This Court, on May 22, denied the applications of AT&T
and USITA for stay pending, certiorari.
22
of the Third Circuit and thus confronts the Commis-
sion with irreconcilable judicial interpretations of its
interconnection orders; (2) the court of appeals has
expanded its Execunet I mandate to govern matters
the court did not consider or decide in the earlier
case; (3) the court of appeals has performed an ad-
ministrative function in establishing important com-
munications policy and ordering interconnection to
implement its policy, in derogation of the Commis-
sion’s statutory function and in violation of the proper
role of courts reviewing agency action; and (4) the
court’s decision is wrong as a matter of statutory
interpretation and construction of the relevant agency
decisions.
1. Conflict with the Third Circuit.
The Third Circuit’s decision in Bell Tel. Co. of
Penn., supra, 503 F.2d 1250, affirmed the FCC’s only
relevant interconnection orders and construed them
as requiring AT&T to interconnect with the special-
ized carriers only for the full range of private line
services. The Third Circuit directly addressed the
scope of interconnection under those orders, because
that was what its case was about. It found, after
analysis of the FCC’s Specialized Common Carrier
Services policy decision and the interconnection en-
forcement order in Bell System Tariff Offerings,”
that the FCC had required only “those (interconnec-
tion) elements of private line service which AT&T
2°46 FCC 2d 413 (1974). The Third Circuit reviewed the
interconnection enforcement order in Bell Tel. Co. of Penn.
ED bie et ed OR we eh Ed le
23
supplies to its affiliates... .” 503 F.2d at 1273-74.
The court also found that AT&T had the required
“opportunity for hearing” because it was given “no
tice of the Commission’s intentions” and thus could
claim “neither surprise nor denial of the opportunity
to speak meaningfully to the issues before the Com-
mission... .” Id. at 1268.
To resolve AT&T’s inadequate notice and over-
breadth arguments, the Third Circuit had to deter-
mine whether and where the Commission had drawn
a line between services for which interconnection had
been ordered and services for which interconnection
had not been ordered. By contrast, the D.C. Circuit
held that the Commission had not drawn such a line
and, indeed, that further proceedings were necessary
before the Commission could lawfully forbid inter-
connection for any category of services. A close anal-
ysis of the process of reasoning by which the Third
Circuit reached its holdings on notice and breadth
reveals the irreconcilable conflict with the rationale
and decision in Execunet II.
In determining that AT&T had adequate notice in
the Specialized Common Carrier Services proceeding,
the Third Circuit relied heavily on the notice’s dis-
tinction between “message toll telephone and wide
area telephone service” on the one hand and “private
line program transmission and other more specialized
services” on the other hand. 503 F.2d at 1269. Quot-
ing the rulemaking notice, the court concluded that
the Commission had contemplated that, at most, only
“2.4 percent” of AT&T’s total business would be
24
“vulnerable to competition” if interconnection were
ordered. Jd. In reasoning that the Commission’s
reference to “percentages” and its “analysis” of com-
petitive vulnerability gave adequate notice that FX
and CCSA were candidates for forced interconnec-
tion, the Third Circuit explicitly decided, first, that
the “2-4 percent” excluded MTS/WATS and, second,
that FX and CCSA were “perforce include[d]” on
the basis of “[s]imple mathematics.” Jd. Thus, the
exclusion of MTS/WATS was a logical prerequisite
to the court’s inclusion of FX and CCSA, and was
not mere dictum or a negative inference unnecessary
to the result.”
The exclusion of MTS/WATS was also an essential
ingredient of the Third Circuit’s affirmance of the
breadth of the interconnection order. AT&T had
charged that the order was “unbounded.” Agreeing
that the order on its face provided insufficient guid-
ance, the court limited the order to “private line”
services in accordance with what it viewed as the
intended “context” of the Commission’s decision. 503
F.2d at 1273. The court indicated that, absent this
limitation, remand would have been necessary.* Id.
27 See also MCI Communications, Inc. Vv. AT&T, supra, 369
F. Supp. at 1015, 1027.
*° If thereafter the Commission had ruled that its previous
order did compel interconnection with MCI for Execunet and
other MTS- and WATS-like services, AT&T could have gone
promptly to the Third Circuit and obtained summary reversal.
AT&T’s argument would have been bolstered by the fact that
in obtaining the Third Circuit’s initial ruling, the Commission,
MCI, and others had represented that the interconnection
ae ee aS ee ae Ee Oe OD Te BR ODS PUNO Y Me Oe fe A MLA ALN art A Saeed ntl Goh a LY PS, AT lM a MRT ge a Sky LRTI Ue ewe
25
The D.C. Circuit ruling stands in stark contrast
to the foregoing. Whereas the Third Circuit effec-
tively decided that the adequacy of notice and the
breadth of the interconnection obligation hinged on
the exclusion of MTS/WATS, the D.C. Circuit held
that interconnection for MTS/WATS-type services
was obligatory. The D.C. Circuit stated that its ex-
pansive interpretation of MCI’s authorizations ‘“man-
dates an equally expansive view of the interconnec-
tion obligation. .. .” (Pet. App. 17A.) Since that
court had earlier held that MCI’s authorizations were
not restricted in any way (Pet. App. 31B), it follows
from the Execunet II order that the interconnection
obligation is similarly unbounded. This is precisely
the construction that the Third Circuit rejected in
affirming the Commission’s order as having a “defi-
nite meaning.” 503 F.2d at 12738.
Thus, we have two appellate courts interpreting the
same agency orders in flatly inconsistent and irrecon-
cilable ways—the one court agreeing with the agency
which issued the order and the other (the D.C. Cir-
cuit) deriving a contrary meaning not from the face
or context of the order but from the court’s earlier
opinion {Execunet I) on a “very different issue” (Sec-
tion 214 facilities authorization). (Pet. App. 27B
n.59.) Moreover, each court was governed by a dif-
obligation extended to private line services and no farther.
(Pet. App. 32C-33C, 37C.) The Third Circuit’s repeated refer-
ences to “private line” or “specialized” services (503 F.2d at
1254, 1256, 1259, 1260, 1261, 1273) amply testify to the court’s
reliance on the parties’ representations.
26
ferent understanding of Section 201(a). The Third
Circuit viewed an FCC hearing and “public interest”
finding as “condition[s] precedent” to imposition of
any interconnection order. 503 F.2d at 1270. Con-
ceding that the FCC had not yet made that “public
interest” finding (Pet. App. 8B), the D.C. Circuit
necessarily viewed Section 201(a) differently.
The conflict between the circuits will have con-
tinuing adverse consequences. Not only will the Com-
mission face the continued dilemma of whether to
obey the one circuit or the other, but affected parties
appealing future Commission decisions may expand
the controversy to other circuits.” To ensure a ra-
tional and consistent nationwide communications
policy in this vital area, the Court should grant cer-
tiorari and resolve the conflict between the circuits.”
2° For instance, if MCI or another specialized carrier files
tariffs which presuppose interconnection with non-Bell oper-
ating companies for MTS/WATS-like services, the Commis-
sion will have to determine whether such interconnection was
required by the 1971 Specialized Common Carrier Services
decision. If the Commission, relying upon Ezecunet II, rules
that interconnection was so required, the affected telephone
companies may well seek reversal in the Third or another
circuit.
*° The conflict with Bell Tel. Co. of Penn. is clearer and
more direct in this case than in Execunet I. In Execunet I, the
D.C. Circuit had not purported to construe the interconnection
orders at stake in Bell Tel. Co. of Penn. By contrast, in Eze-
cunet II, the D.C. Circuit construed the very same orders pre-
viously and differently construed by the Third Circuit. More-
over, the conflict between the circuit’s views of Section 201 (a)
became manifest only when the D.C. Circuit explictly dealt
with interconnection.
Yh a —
27
2. Expansion of the Execunet I Mandate.
The court of appeals summarily required inter-
connection in an order purporting merely to enforce
its previous mandate. But the earlier decision had
resolved only two issues:
whether and to what extent Section 214 of the
Communications Act expressly authorizes the
Commission to impose prior approval require-
ments through the facilities authorization mecha-
nism, and whether the Commission has properly
exercised whatever authority it may have under
Section 214.
(Pet. App. 21B.) It answered the first in the affirma-
tive; but it reversed the Commission on the sole
ground that the agency had not “properly exercised’”’
its authority under Section 214(c) to restrict MCI’s
certificates because it had not made the requisite
public interest finding. (Pet. App. 22B-31B.)
The court did not decide anything about intercon-
nection in Execunet I." The issue was not raised
either at the agency or in the review proceeding.”
31 The Execunet I opinion mentioned interconnection only
in a footnote attempting to distinguish the Bell Tel. Co. of
Penn. decision as involving “a very different issue” from the
Execunet I case—namely, the scope of AT&T’s interconnection
obligation. (Pet. App. 27B n.59.)
82 The court of appeals appears in Execunet II to suggest
some kind of estoppel because the FCC did not rely upon the
interconnection issue in its 1976 cease and desist order. (Pet.
App. 12A-13A.) But there was no reason for the FCC to
address that issue. As the court of appeals apparently con-
cedes, the FCC firmly believed that MCI had limited authori-
zations, and that the pertinent inquiry was whether Execunet
28
Indeed, the court went out of its way to deny that its
holding was broad. It disclaimed any finding that the
public interest required Execunet, it left such ques-
tions to further proceedings at the FCC, and it stated
its holding narrowly as limited to a procedural fail-
ure on the part of the FCC. (Pet. App. 31B, 32B.)*
Now the court of appeals appears to say that Eve-
cunet I mandates interconnection that is coextensive
with MCI’s unrestricted certificates. The court ap-
parently assumes that its decision required the re-
moval of any and all obstacles to MCI’s implementa-
tion of Execunet service, without regard to what the
Commission might have ordered and, if necessary to
achieve that end, without regard to the statutory
prerequisites to an interconnection order. 47 U.S.C.
§ 201(a).™
But the reviewing court does not dictate a result;
nor does it sit to vindicate expectations or the ulti-
was beyond the limit. When the FCC found in the original
decision that Execunet was not an authorized service, in its
view of the specialized carrier policy, its inquiry was at an
end.
83 The court’s characterization of its own opinion supported
the oppositions to the petitions for certiorari, which argued
that the decision was so narrow and unassuming as not to
warrant Supreme Court review.
** In a per curiam memorandum attached to an order staying
its Execunet II decision, the court reveals the sweeping view
it now takes of Execunet I. The court states, in effect, that
the Commission may not take any action, pending “final rules”
after agency rulemaking, that would be inconsistent with what
the court has established as “MCI’s right to enter the market
now.” (Pet. App. 10E.)
29
mate purposes of litigants. Its function ends when
“an error of law is laid bare.” At that point, “the
matter once more goes to the agency for reconsidera-
tion.” Federal Power Commission v. Idaho Power
Co., 344 U.S. 17, 20-21 (1952). Execunet I properly
controls only those matters the court considered and
decided directly. See Perkins v. Standard Oil Co.,
399 U.S. 222 (1970); Federal Trade Commission v.
Colgate-Palmolive Co., 380 U.S. 874 (1965). The
words of the opinion, and not the private thoughts
of the judges, constitute the mandate.* The words
and the reasoning of Execunet I do not require or
justify the court of appeals’ interconnection order.
This Court should grant the writ, in exercise of
its supervisory power over inferior courts, to con-
strue the Execunet I mandate in the accepted and
usual course of judicial proceedings, on the basis of
matters actually considered and decided. Federal
Trade Commission vy. Colgate-Palmolive Co., supra,
380 U.S. at 379; National Labor Rel. Bd. v. Donnelly
Co., 330 U.S. 219, 227; Federal Communications
Comm'n v. Pottsville Broadcasting Co., 309 U.S. 134,
141 (1940).
3. Judicial Intrusion into Administrative Process.
In addition to ignoring the controlling decision of
the Third Circuit and improperly expanding its own
mandate, the court of appeals intruded into the
85 Litigants may not be left to speculate as to the require-
ments of the mandate. See National Labor Relations Board
v. Donnelly Co., 380 U.S. 219, 229 (1947).
30
FCC‘s decision-making process by directly ordering
carrier interconnection to implement judge-made com-
munications policy. As the Third Circuit said in Bell
Tel. Co. of Penn.:
Section 201(a) of the Communications Act re-
quires (as a conditien precedent to the issuance
of interconnection orders) that the FCC make
a finding that the proposed interconnection will
be “necessary or desirable in the public interest.”
503 F.2d at 1270. Although the FCC plainly has had
no hearing on MTS/WATS interconnection and has
made no finding that such interconnection is ‘‘neces-
sary or desirable in the public interest,” Execunet I/
required immediate interconnection. The court of
appeals has no authority either to disregard the statu-
tory requirements or to assume the Commission’s
function.
Congress gave the FCC the responsibility to make
and implement communications policy. That includes
the big decisions, such as Specialized Common Carrier
Services, supra, 29 FCC 2d 870, and the smaller ones
that carry out policy in a consistent and rational
manner. All its decisions are subject to judicial re-
view; and if error is found, the FCC must take
corrective action. But the decisions must be the
FCC’s. When the court of appeals ordered intercon-
nection, it “overstepped the bounds of its reviewing
authority,” Federal Power Commission v. Transcon-
tinental Gas Pipe Line Corp., 423 U.S. 326, 331
(1976), and “usurped an administrative function,”
ae ik
Ns
31
Federal Power Commission v. Idaho Power Co., supra,
344 U.S. at 20.
The order to interconnect underscores a more fun-
damental problem in this case: the court of appeals
has made important communications policy and will
not countenance any action by the FCC—even lawful
and reasonable action—that might frustrate the “in-
tended effect of [the court’s] decree.” (Pet. App.
18A.)*” But as we pointed out above, the function
of the reviewing court ends when agency error is
“laid bare.” At that point, the Commission once
again must enforce “the legislative policy committed
to its charge.” Federal Communications Comm’n v.
Pottsville Broadcasting Co., supra, 309 U.S. at 145.
The court of appeals, in rejecting the FCC’s inter-
connection ruling, appears to claim, in effect, that
“the Commission lacks power to enforce the standards
of the Act in this proceeding.” See Securities & Evx-
change Comm’n v. Chenery Corp., 332 U.S. 194, 203-
04 (1947). Such a claim “deserves rejection.” Jd.”
36 It seems fair to characterize the court’s current view of
Execunet I as a judicial rulemaking proceeding in which the
FCC was permitted to participate and which established, as
a matter of policy, “MCI’s right to enter the market now.”
(Pet. App. 10E.) As this Court has pointed out, it is all too
easy for a reviewing court to judge agency action “in the light
of policies the court, rather than the agency, seeks to imple-
ment... .” Atchison, T. & S.F.R. Co. v. Wichita Bd. of Trade,
412 U.S. 800, 809 (1973). But this approach to judicial review
improperly interferes with Congress’ assignment of particular
functions to agencies. /d.
st Bxecunet II also violates the Chenery principle that agen-
’ cies may act either by general rule or by individual order. 332
32
The court of appeals’ interconnection order was an
exercise of an administrative function, plainly in
violation of consistent rulings in this Court. The
Court should grant the writ to restore the appellate
review process to its proper bounds.
4, Error in Statutory Construction.
The FCC properly determined in the declaratory
ruling that it had not made a public interest finding
to justify an interconnection order for MTS/WATS-
type services. (Pet. App. 36C-48C.) The court of
appeals also eschewed any finding that MTS/WATS
competition is in the public interest. (Pet. App. 32B.)
Yet, Execunet II required interconnection in the face
of a statute that expressly forbids such an order in
the absence of an affirmative public interest finding.
47 U.S.C. § 201(a). Because no one has made that
finding, the court’s order rests upon an error in
statutory construction.
U.S. at 199-204. The court stated, apparently as an independ-
ent ground for its order, that “tariff and rulemaking proceed-
ings” were the “exclusive means” by which the FCC could
affect the services provided by specialized carriers. (Pet. App.
16A, 17A, 4E.) But the agency “must retain power to deal
with the problems on a case-by-case basis if the administrative
process is to be effective.” 332 U.S. at 203. The Commission
surely cannot be faulted for acting on AT&T’s petition for a
declaratory interpretation of its own outstanding orders,
simply because the court of appeals contemplated rulemaking
as the “exclusive means” for further agency action in this
area. Nor, for that matter, could the FCC ignore its statutory
duties under Section 201(a) even though Ezecunet I had over-
looked that provision.
ates tte.
33
The court apparently believed that the logic behind
its Hxecunet I interpretation of Section 214 also
controlled the interpretation of Section 201(a). A
comparison of the two provisions, however, leads to
a contrary conclusion. Section 214(c) says that the
FCC “may attach to issuance of the [214] certificate
such terms and conditions as in its judgment the
public convenience and necessity may require.” 47
U.S.C. §214(c) (emphasis added). In contrast to
this permissive language which helped form Execunet
I’s view that such conditions are the exception and
not the rule (Pet. App. 9A n.10), Section 201(a)
makes it clear that the FCC must provide an ‘“‘op-
portunity for hearing” and make a “public interest”
finding before ordering interconnection.
The essentional rationale of Execunet I was that,
under Section 214, once facilities are authorized, a
carrier may offer any services with those facilities un-
less the FCC imposes an express service-limiting con-
dition on the authorization. It does not follow, how-
ever, that interconnection orders under Section 201
(a) are similarly unbounded.* It is one thing to au-
38 Our argument here is independent of the argument that
the Third Circuit definitively construed the scope of the inter-
connection order in Bell Tel. Co. of Penn., supra, 503 F.2d
1250. We point out, however, that both statutory and decisional
law indicates that the Third Circuit jurisdiction became ex-
clusive when the petition for review of the interconnection
orders was filed there, and that the decision of that court
precluded any “collateral attack” on its judgment in new liti-
gation between the same parties. 28 U.S.C. § 2349; City of
Tacoma V. Taxpayers of Tacoma, 357 U.S. 320, 339-40 (1958).
34
thorize a carrier to construct and use its own facilities
in whatever way it may wish. But, as the “oppor-
tunity for hearing’’/“public interest” finding scheme
of Section 201(a) attests, it is quite a different thing
to require access to and use of another company’s
facilities for any possible service. In recognition of
the infringement on the business affairs of a separate
company, Section 201(a) permits the FCC to require
interconnection only to the extent “such action [is]
necessary or desirable in the public interest.” *°
In Execunet I, the court reversed the FCC because
the agency had failed, in the court’s view, to make
an “affirmative determination” of public interest need
for restrictions on MCI’s authorizations. (Pet. App.
24B-31B.) The court stated:
We can assume, without deciding, that a service
like Execunet was not within the contemplation
of the Commission when. it made the Specialized
Carrier decision. Nonetheless, it is readily ap-
parent that failure to consider the public interest
ramifications of a service—either pro or con—
during resolution of a Section 214(a) application
is simply not the same thing as an affirmative
determination that the “public convenience and
3° Hxecunet II makes much of the fact that AT&T did pro-
vide interconnections during the pendency of Ezecunet I. A
carrier’s previous voluntary interconnection arrangement
might be a proper consideration for the FCC to weigh in
determining whether compulsory interconnection thereafter
is “necessary or desirable in the public interest.” But such
prior practice is hardly justification for a court to usurp the
FCC’s function of balancing that consideration against other
competing public interest factors.
2 REE Ad cea OC aR ele SN lt Oe
35
necessity may require” a restriction on a facility
authorization limiting a carrier to provision
solely of those services proposed in its Section
214(a) application.
(Pet. App. 27B-28B. Emphasis added.)
But if a “failure to consider the public interest
ramifications” could not satisfy a statutory require-
ment of affirmative public interest findings in Section
214(c), it follows that the same “failure” would not
satisfy the requirement of public interest findings
that are a prerequisite to an order to interconnect
in Section 201(a). We submit that the court’s ap-
proaches to the requirements of public interest find-
ings in these two statutes are irreconcilable.”
The Commission’s declaratory ruling, moreover,
proceeded from a construction of the agency’s own
interconnection orders, as those orders had been in-
terpreted on direct judicial review and as the FCC
had consistently read and applied them. The agency’s
reading of its own Act and particularly of its own
decisions is entitled to deference in the courts, and
must be given controlling weight unless 1+ is plainly
erroneous. Red Lion Broadcasting Co. v. FCC, 395
4° The FCC argued in Execunet I, of course, that it could
impose service restrictions on certificates without an affirma-
tive public interest finding by virtue of the statute’s provision
for granting “such certificate as applied for.” That position
is entirely consistent with our argument that Section 201 (a),
which contains no such alternative route to ordering intercon-
nection, requires an affirmative public interest finding that the
FCC has not made as to interconnection for MTS/WATS-type
services.
36
U.S. 367, 381 (1969); Udall vy. Tallman, 380 U.S. 1,
16-18 (1965). In this case, the court of appeals
treated the agency’s construction almost with con-
tempt: ‘“‘[The Commission’s declaratory ruling] re-
flected only the Commission’s interpretation of the
statutory provisions of the Communications Act and
of earlier decisions rendered by the Commission, the
Third Circuit, and, most importantly, this court in
Execunet I.” (Pet. App. 10E. Emphasis added.)
Under the proper test, if the FCC’s interpretations
of the statutory provisions and its own earlier deci-
sions are reasonable—as they plainly are—this Court
“must reverse the decision of the Court of Appeals.”
Udall v. Tallman, supra, 380 U.S. at 18. The court
of appeals may not override agency action “simply
because the court is unhappy with the result reached.”
Vermont Yankee Nuclear Power Corp. v. Natural
Resources Def. Coun., Inc., No. 76-419 (decided April
3, 1978), slip opinion p. 36.
CONCLUSION
DAVID J. SAYLOR,
veral Counsel
Associate Gene
JOHN E. INGLE,
Counsel.
2 amr hi
SOVERMMENT PRINTING OFFICE
This is a copy of a public record, reproduced as it was published. It is not legal advice, and it may not be the version a court would rely on. Check the official source before you cite it.