Petition — Marshall v. Daniel Construction Co.

Supreme Court brief1978

Ask Donna

What actually matters in this document.

Text

ly THE

Supreme Court of the United States

_— TERM, 1

No. 7 r 160 ¢

JOHNSON, DRAKE & PIPER, INCORPORATED,

Petitioner,

STATE OF NEW YORK,

Respondent.

_________f

PETITION FOR A WRIT OF CERTIORARI TO THE

COURT OF APPEALS OF THE STATE OF NEW YORK

E. Noetes Lowe

630 Fifth Avenue

New York, New York 10020

Attorney for Petitioner

. Cuaries B. Morrveavx, Jr.

630 Fifth Avenue

New York, New York 10020

Of Counsel

=_ oo . ee ES es i ee

el ae hs ion rs

~~

=

e

Cun fF oOo Se Se wh

ES I . hccadtaness indncdeqaseces

Reasons ror GrantTiIne THE Wait:

Porxt I—Certiorar: should be granted to review state

judicial action which has endorsed the ignoring

of fundamental due process where there was re-

ceived at trial a report, admittedly containing im-

proper portions, without cross examination, and

where thereafter the trial judge extensively and

decisively relied upon its improper portions, des-

pite his statement that the improper portions of

the report would be disregarded .............. 8

Porxt II—It is important for the Court to hear this

ease since an interpretation of the New York

Court of Claims Act which condone. a deviation

from normal trial procedures and rules of evi-

dence will set a precedent for the trial of future

construction claims in New York State and else-

EN daneeuwaskecbuwcesutébaedeckecducdloues ll

UTE RRO SARE Se Wary act Re aT Ae ye ee eS 12

ii TABLE OF AUTHORITIES

PAGE

Appendix A, Decision of Court of Appeals, State of

I, ee go a Al

Appendix B, Decision of Appellate Division, Third

Department, Supreme Court, State of New York A3

Appendix C, Decision of Court of Claims, State of

Sada dd ote beak ddd ctélion dkun ee scee A6

Appendix D, Partial Comparison of Claim Report

with Decision of Court of Claims ............. A59

CrraTions

Cases:

Conduit and Foundation Corp. v. State (Ct. Claims,

SEE, ode. SF entcidnsdinedsl cesece 12

Carolina Glass Co. v. South Carolina, 240 U.S. 205 .. 8

Hamling v. United States, 418 U.S. 87 ............. 9

Horoch v. State, 286 App.Div. 303, 143 N.Y.S.2d

Meyers v. United States, 272 U.S. 52 .............

Rosenbloom v. Metromedia, Inc., 403 U.S. 29 ...... 10

Saunders v. Shaw, 244 U.S. 317 ................... i)

United States v. El Paso Natural Gas Co., 376 US.

Gee ctWbe edi cevin cess TIT Tee 7

Wingo, Warden v. Wedding, 418 U.S. 461 (1974) ... 10

Statutes:

New York Court of Claims Act, §8 ............... 3,8,9

——- —

TABLE OF # UTHORITIES

Miscellaneous:

Grey, Due Process: Procedural Fairness and Sub-

stantive Rights (ed. by Pennoch and Chapman)

1977

tl lt i i i i

In THE

Supreme Court of the United States

OCTOBER TERM, 1977

No.

s+.

» 4

Jounson, Drake & Piper, [NconPoraTeD,

Petitioner,

Vv.

State or New York,

Respondent.

i

»

PETITION FOR A WRIT OF CERTIORARI TO THE

COURT OF APPEALS OF THE STATE OF NEW YORK

Petitioner, Johnson, Drake & Piper, Incorporated, a

corporation organized under the laws of the State of

Minnesota, respectfully prays that a writ of certiorari

issue to review the decision of the Court of Appeals of the

State of New York entered in this proceeding on November

15, 1977.

Opinions Below

The opinion of the Court of Appeals is reported at 43

N.Y.2d 677, 371 N.E.2d 786, and 401 N.Y.S.2d 23, and

appears in the appendix hereto (p. Al). The opinion of the

Appellate Division of the Supreme Court of the State of

New York, Third Department, is reported at 49 A.D.2d

776, 372 N.Y.S.2d 242 and appears in the appendix hereto

(p. A3). The opinion of the Court of Claims of the State of

New York is unreported and appears in the appendix hereto

(p. A6).

Jurisdiction

The memorandum decision of the Court of Appeals of

the State of New York sought to be reviewed was filed

on November 15, 1977. A timely petition for rehearing

was denied by the Court of Appeals on February 9, 1978

and this petition for certiorari has been filed within 90

days of that date. The jurisdiction of this Court to

review the decision of the Ccui* of Appeals by writ

of certiorari is believed to be conferred by 28 U.S.C.

§ 1257(3).

Questions Presented

1) Whether due process was denied to petitioner by

the cumulative effect of the actions of the State Court

of Claims, in an action against the State, where the trial

judge:

a) admitted into evidence, over petitioner’s objection,

a State-prepared claim report containing legal con-

clusions, hearsay and opinion statements regarding

which report no meaningful cross examination was

possible, while stating that he would disregard all

objectionable material in the report; but

b) nevertheless based his decision almost entirely upon

the State claim report, mechanically adopting large

portions thereof, ignoring the contrary evidence

presented by petitioner.

2) Whether the action by the State appellate courts,

allowing the Court of Claims Act to be interpreted as to

permit decisive reliance by the Court of Claims upon

the above-mentioned claim report, in lien of testimony

and cross examination, was such a departure from the

rules of evidence and the norms of due process as to be

violative of the requirements of the Fourteenth Amend-

ment.

Constitutional and Statutory Provisions Involved

This case involves the first section of the Fourteenth

Amendment of the Constitution of the United States which

provides as follows: :

All persons born or naturalized in the United States,

and subject to the jurisdiction thereof, are citizens of

the United States and of the State wherein they reside.

No State shall make or enforce any law which shall

abridge the privileges or immunities of citizens of the

United States; nor shall any State deprive any person

of life, iberty, or property, without due process of law;

nor deny to any person within its jurisdiction the equal

protection of the laws. (Emphasis added.)

This case also involves the New York Court of Claims

Act, $8, which provides as follows:

The state hereby waives its immunity from liability

and action and hereby assumes liability and consents

to have the same determined in accordance with the

same rules of law as applied to actions m the swpreme

court against individuals or corporations, provided

the claimant complies with the limitations of this ar-

ticle. Nothing herein contained shall be construed to

affect, alter or repeal any provision of the workmen’s

compensation law. (Emphasis added.)

Statement of the Case

Nature of the Claim

This action arose out of a contract between petitioner,

a Minnesota corporation, and the State of New York, De-

partment of Public Works, entered into in October 1961,

for construction with federal aid of a highway interchange

in Queens County in New York City.

wh ven SO

4

As a direct result of performing the work under this

contract, petitioner and its subcontractors suffered actual,

out-of-pocket losses (job expenditures beyond job receipts)

of over $2,500,000 due to action and misrepresentations of

State officials.

Claim was brought in the New York State Court of

Claims, pursuant to the Court of Claims Act, alleging

breach of contract by the State in that, 1) the State had

misrepresented the foundation work to be performed by

altering before bidding date the design documents pre-

pared by the State’s own consultants; 2) the State had

improperly directed the work of petitioner in the field so

as to cause increased, delayed, and unnecessary foundation

work; and 3) the State had refused time extensions to

petitioner, threatened termination and demanded costly

acceleration of the work to meet the original contract

completion date.

Trial

Trial of the claim herein, before Judge Adolph C.

Orlando of the Court of Claims, took place over 23 days.

Petitioner’s proof included testimony from engineers who

had prepared the contract bid to the State, testimony from

construction personnel who had been on the job daily, testi-

mony from an independent soils and foundation engineer,

testimony from subcontractors of petitioner, and pertinent

records of the State and petitioner (A1-2847).

The State’s case, on the other hand consisted of neg-

ligible direct testimony (A2960-3046) but included a bulk

submission of boxes of correspondence (Exs. Q & R) and

a lengthy ‘‘claim report’’ (Ex. Y), over 200 pages long,

which had been prepared for the State Department of

Public Works by the State’s retained consultants. The

claim report and the correspondence were received by the

trial judge in evidence, over objection (A2975-6, A2865),

even though he acknowledged after a ‘‘quick perusal’’ that

a ee ee |

the claim report contained conclusions, hearsay and ‘‘other

objectionable material’’ (A2979). He stated, ‘‘I’m going

to disregard completely all of the evidence which I feel in

this report that is objectionable in accordance with the.

rules of evidence of this State’’ (A2979-2980).

Following trial, requested findings of fact were submitted

by petitioner and by the State Attorney General (A3271-

3307).

Trial Court Decision

Contrary to his statement at trial, however, the trial

judge did not disregard the many improper portions of the

report but incorporated conclusions, hearsay, allegations

and argumentation therefrom into his decision, in rejecting

virtually all of the petitioner’s claim. Many findings were

made on matters calling for expert opinion evidence, solely

on the basis of hearsay statements taken directly, and

sometimes verbatim, from the claim report. Page after

page of his ‘‘decision’’ can readily be tracked in the re-

port, including verbatim passages and even typographical

errors. A partial comparison of the claim report with the

decision accompanies this petition in the appendix (p. A59).

The trial court refused to pass upon any of the requested

findings of either party (Appendix, p. A57).

Appellate Decisions

On appeal, the Appellate Division, in its brief opinion,

tersely stated that, ‘‘as trier of both the law and the facts,

the lower court was entitled to rely’’ upon the claim re-

port ‘‘to the extent that it deemed justified in reaching its

decision,’’ and apparently took the position that the Court

of Claims cured any error with respect to the admission of

such report into evidence when ‘‘it specifically informed

the attorneys for both parties on the record that it would

disregard any objectionable material contained therein.”’

(Appendix, p. A5; emphasis added. )

6

On appeal to the Court of Appeals, that court agreed with

the Appellate Division, that the State Court of Claims was

entitled to rely upon the claim report prepared by the

State’s consultants, as stated in the decision of which this

petition seeks review (Appendix, p. A2).

The stage in the proceedings at which denial of due

process herein became fully apparent was after trial, at the

time of the decision of the court of first instance. It could

not have been earlier anticipated that the trial judge would

heavily depend upon the report’s improper portions after

having said they would be ignored. (The trial record re-

flects vigorous objection to the exhibit being received

(A2975-2976) and also reflects that meaningful cross exami-

nation could not be conducted because those who actually

prepared the report were not produced by the State. When

questioned as to the report on cross, the witness who iden-

tified it responded, “I don’t remember’’ or “I don’t know,”

over fifty (50) times (Tr. A2980-3046) and acknowledged

“I didn’t prepare any of the report” (A3036).)

In petitioner’s brief to the intermediate appellate court,

it was pointed out that the State report had been prepared

by persons whom petitioner had had no opportunity of

cross-examining, that the trial judge had not ignored the

improper parts of the report as promised but had para-

phrased them, and that petitioner’s right to an independent

judgment by the court on proper evidence had been ignored.

The Appellate Division passed upon the process followed,

stating that the lower court was entitled to rely upon the

claim analysis.

At the Court of Appeals of the State of New York, the

procedural unfairness of the trial court was again pointed

out, petitioner noting in its briefs that the usual presenta-

tion of testimony by experts subject to cross-examination

had been dispensed with, that the trial judge had not ig-

nored the conclusions, hearsay and opinion statements in

the report but had mechanically adopted them, and that

7

the trial court had delegated its judicial function to the

executive branch instead of independently discharging its

responsibility (citing United States v. El Paso Natural

Gas Co., 375 U.S. 651, 656, 657).

Petitioner pointed out that this improper procedural

shortcut substituted for a decision on the trial evidence the

pre-trial determination of the same State administrative

agency involved in the litigation. Petitioner noted that the

irregular procedure followed by the court was contrary to

the intent of the Constitution and contrary to the concept

of the separation of powers and judicial independence, in

the name of expedieney (citing Judge Brandeis’ dissenting

opinion in Meyers v. United States, 272 US. 52, 293). It

was pointed out that the claim report had been the core of

the State’s defense (the State having called only four wit-

nesses: the witness who identified the claim report, who

gave little direct testimony (A2960-3046), two State em-

ployees who merely identified records (A2850-2869, A2945-

2960), and an auditor on damages (A2869-2944)); in this

context, petitioner’s fundamental right to cross-examina-

tion and to a reasoned decision on proper evidence had been

substantially violated.

The Court of Appeals passed upon the question thus pre-

sented, rejected petitioner’s argument and specifically

approved the trial court’s manner of use of the claim re-

port.

:

:

POINT I

Certiorari should be granted to review state judicial

action which has endorsed the of funda-

proper portions of the report would be disregarded.

New York State has waived sovereign immunity and has

agreed to be subject to suit in contract cases. Section 8

of the New York Court of Claims Act provides that the

State waives immunity and consents to have its liability

determined in accordance with the same rules of law (both

as to evidence and substantive law (Horoch v. State, 286

App.Div. 303, 143 N.Y.S.2d 327)) as applied in actions

against individuals or corporations. While a state cannot

be compelled to provide a means by which a suit can be

brought against itself (Carolina Glass Co. v. South Caro-

lina, 240 U.S. 305 (1915)), once having thus waived immu-

nity and having agreed with those with whom it contracts

to being subject to suit, New York cannot allow its courts

to function in a manner that ignores fundamental due

process. At the very least, it cannot restrict the waiver by

a curtailment on the statutorily established judicial pro-

cedure with respect to state contracts entered into in the

expectation of the availability of a judicial remedy.

Even if it be argued (as the State has) that it is ex-

pedient to dispense with the normal rules of evidence in

a large complicated case against the State, there cannot be

one law of evidence and procedure for the sovereign and

another for those who contract with the State, in the face

of the language of Section 8 of the Court of Claims Act.

ee ne

Here due process was violated by the cumulative effect

of:

lack of advance notice of the claim report, the heart

of the State’s case, not seen by petitioner before trial;

the improper receipt by the court of the report as

“evidence” when it was a multi-authored conglomer-

ate of hearsay, conclusions and opinion on the whole

of petitioner’s claim; and

the lack of confrontation and cross examination of the

report’s largely anonymous authors.

Additionally, petitioner was precluded from offering re-

buttal testimony to the improper parts of the report

because those parts of the report were to have been dis-

regarded and ignored by the trial court, ie., treated as

though never before the court at all. The trial court’s

about-face in its decision, and mechanical adoption of the

report, thus not only improperly mingled State executive

and judicial functions but also denied petitioner an oppor-

tunity to rebut the State’s case. Prior to the decision,

petitioner had a right to assume that the court would do

what it said it would do—ignore the improper parts of the

report. Rebuttal was unnecessary. Analogously, in

Saunders v. Shaw, 244 U.S. 317 (1917), the act complained

of was similarly done unexpectedly when the complaining

party no longer had any right to add to the trial record.

Justice Holmes of this Court said that, “‘it would leave

a serious gap in the remedy for infraction of constitu.

tional rights,” if a party were bound to contemplate a

later decision by a court which would render trial proof

necessary which, based upon trial rulings. was apparently

unnecessary (244 U.S. at 320; see also discussion of

Saunders in Hamling v. United States, 418 U.S. ST (1974).

dissenting opinion of Justice Brennan at p. 14%).

This Court, ought to scrutinize closely the procedural

fairness, impartiality and neutrality of the State--stab-

-

-

:

10

S

lished forum where large claims against the State are

be judicially determined. To allow reliance by the State

courts upon a report prepared under the aegis of the

involved administrative agency, naturally inclined to

cover up or rationalize its own mistakes and misrepre-

sentations, is to denigrate the judicial process and slide

into judicial inertia at the ..pense of a fair hearing. (Cf.

Grey, Due Process: Procedural Fairness and Substantive

Rights (edited by Pennock and Chapman) New York, 1977,

pp. 182, 187).

The procedures by which the facts of a case are deter-

mined by the factfinder assume an importance fully as great

as the validity of the rule of law applied, as this Court

noted in Wingo, Warden v. Wedding, 418 U.S. 461 (1974).

In testing whether state law applied by a state court is

action within the due process clause of the Fourteenth

Amendment, this Court can well examine the circumstances

of the factfinding process in order to make a constitutional

judgment (Rosenbloom v. Metromedia, Inc., 403 U.S. 29,

53, 54 (1971)).

Related to the trial court’s complete dependence on the

report, but a separate violation of petitioner’s due process

rights, was the failure and refusal of the trial court to pass

on issues tendered at the trial and covered in the requested

findings. If the essence of due process is to “proceed upon

inquiry and render judgment only after trial,” due process

was not afforded here where the substance of the decision

was written before the trial began.

ay

POINT Il

It is important for the Court to hear this case since

interpretation of the New York Court of Claims

Tf State action, whether under the authority o1 legisla-

tive or judicial interpretation, deprives an individua! of a

fundamental constitutional right, this Court may review

such action. The necessary effect of the action of the State

courts herein is to interpret the Court of Claims Act so as

to establish different rules for the trial of construction

claims deemed complex, rules so relaxed as to be repugnant

to due process. This was the rationale urged by the Attor-

ney General on appeal who argued that the case was “a

multi-cause of action construction contract claim involving

technical subject matter” (Br., p. 43); this view, was seem-

ingly accepted by the appellate courts. (This case was

actually far less complex than many construction contract

cases routinely decided elsewhere on a reasoned review

of the valid evidence.)

There should be equal standing before the courts of the

State and equal entitlement to due process whether a

claimant is in the State Court of Claims as a resident

landowner in an appropriations claim or as a foreign cor-

poration in a construction contract claim. A distinction be-

tween ordinary cases and construction cases for the appli-

cation of the rules of evidence is unsupportable.

This case has prospective significance because similar

situations are bound to recur in future cases under the

New York Court of Claims Act, and probably in other

states as well under parallel state law, if this case is al-

lowed to stand as precedent. Already, in at least one

12

other case in the New York State Court of Claims subse-

quent to this case, the Attorney General urged admission

of a similar report in lieu of the usual procedure for pre-

senting evidence, in the same fashion, to save time; in cit-

ing this case, the Attorney General noted that “new law”

was involved. (Conduit and Fowndation Corp. v. State

(Ct. Claims, Claim No. 54809, Tr. 3642, 3651)).

Thus, certiorari is particularly appropriate to clarify

the law with respect to the future construction claims

which will recur under federal aid and federal grant pro-

grams and in which the same questions with respect to

due process, and with respect to the Court of Claims Act,

are bound to arise.

Conclusion

Wuererore, petitioner respectfully prays that a writ of

certiorari be granted.

Respectfully submitted,

E. Nosites Lowe

630 Fifth Avenne

New York, New York 10020

Attorney for Petitioner

Cartes B. Motiveavx, Jr.

630 Fifth Avenue

New York, New York 10020

Of Counsel

a ll a tt Ail le I ti A A a A “a —

Al

Appendix A, Decision of Court of Appeals,

State of New York.

STATE OF NEW YORK

COURT OF APPEALS

MEMORANDUM

This memorandum is uncorrected and subject to re-

vision before publication in the New York Reports.

|

—_

No. 528

Johnson, Drake & Piper, Incorporated,

Appellant,

vs.

State of New York,

Respondent.

—_

_

(528) Charles B. Molineaux, Jr.. & Arthur Karger,

NY City for appellant.

Louis J. Lefkowitz, Attorney-General (Richard J.

Dorsey & Ruth Kessler Toch of counsel) for respondent.

MEMORANDUM:

The order of the Appellate Division should be affirmed,

with costs.

Appellant's right, if any, to damages for claimed over-

runs in the pile foundation work and in consequence of

claimed deijays in the work depends on the determination

of mixed qnestions of fact and law to be resolved on the

basis of the evidentiary facts established and the inferences

fairly to be drawn from such facts. The same is true with

respect to the assertions of liability based on alleged mis-

representations of the State affecting the pile foundation

A2

Appendiz A, Decision of Court of Appeals,

State of New York.

work (including alleged bad faith on the part of the State)

and as to the scope of cofferdam work. These issues were

resolved, expressly or by necessary implication, in favor

of the State by the Court of Claims and such resolutions

were later affirmed at the Appellate Division. As such,

there being evidence in the record for their support, they

are now beyond the scope of our review. We agree with

the Appellate Division that, in the light of the express

qualifications on its use stated by the trial judge, the court

was entitled to utilize the claim analysis prepared by the

State’s project designer and consultant to the extent that

it deemed justified in reaching its decision.

Order affirmed, with costs, in a memorandum. All] concur.

Decided November 15, 1977

mer —

a eS ee eee .

A3

Appendix B, Decision of Appellate Division, Third

Department, Supreme Court, State of New York.

Supreme Covurt—Appe.tiate Drvision

Tamp Jvupicia, DepaRTMENT

September 11, 1975 25559

uw

~ 2

Jonnson, Draxe & Piven, [wcorporaTen,

Appellant,

v.

State or New Yorx, Respondent.

(Claim No. 48874.)

i.

a

Appeal by claimant from a judgment of the Court of

Claims, entered October 24, 1974, which dismissed causes

of action First through Sixth of the claim herein, except

for certain awards made with respect to parts of the Sec-

ond, Fourth and Fifth causes of action totalling $16,657.07,

interest thereon and interest on the amount of the pre-

viously severed Seventh cause of action.

In the fall of 1961, claimant entered into a contract with

the State of New York for the construction of a portion

of the new Van Wyck Expressway and its interchange

with the existing Long Island Expressway. Included in

the work specifications were the erection of an elevated

viaduct on bridge piers to cross over the Long Island

Expressway and the construction of various ramps, serv-

ice roads and drainage lines, and claimant completed the

project to the apparent satisfaction of the State. On

this appeal, however, claimant contends that the State in-

creased the cost of completion through various breaches

A4

Appendix B, Decision of Appellate Division, Third

Department, Supreme Court, State of New York.

and, therefore, it seeks monies in addition to the amounts

set forth in the itemized contract payment schedules.

Although numerous grounds ior additional payments

were asserted in the lower court, here claimant focuses

principally on only three, namely: that the work specifica-

tions misrepresented the depths to which piles supporting

the bridge piers would have to be driven; that the State

implied that the necessary cofferdams could be built at a

cost of $176,000 by refusing to accept bids therefor in

excess of that amount; and that the State unreasonably

ordered acceleration of the construction, thereby disrupt-

ing the sequence of the work and increasing its cost.

With regard to the depths to which the piles were ulti-

mately driven, there were concededly substantial overruns

from the work specifications. However, claimant has al-

ready been compensated for the increased footage at the

unit price of $4.50 per foot as provided in the contract.

Moreover, prior to the submission of its bid, claimant

made only the most cursory examination of the project site

and of information relative thereto readily available from

the State and, thus, exhibited an attitude of complete in-

difference towards its contractual obligation to base its

proposal upon information gained from ‘‘ personal investi-

gation and research and not from the estimate of records’’

of the State (cf. Johnson, Drake & Piper v. State of New

York, 31 A D 2d 980; Johnson, Drake & Piper v. N. Y. State

Thruway Auth., 22 A D 2d 321). As for the use of the

dynamic formula technique for determining the depths to

which the piles were to be driven, claimant was put on

notice by the work specifications that this technique was to

be utilized and, consequently, even if its use did result

in longer piles than would static load tests, claimant’s bid

should have been adjusted accordingly.

A5

Appendia B, Decision of Appellate Division, Third

Department, Supreme Court, State of New York.

The remaining grounds for relief relied upon by claim-

ant are likewise without merit. Assuming arguendo that

the State did imply that the cofferdams could be built for

$176,000, claimant did not prove that construction at such

a cost was impossible, and, furthermore, there is ample

support in the record for the lower court’s decision that

claimant’s own errors in cofferdam design, especially its

selection of inadequate sheeting, caused the lost time and

unanticipated costs of dam construction. Similarly, in

its attempt to accelerate the work, the State was merely

seeking the completion of the project on the agreed upon

date and, again, numerous instances in the record support

the lower court’s determination that the delays and the

need to accelerate were the fault of claimant.

Finally, we would note that, as trier of both the law

and the facts, the lower court was entitled to rely upon

the claim analysis prepared by the State’s project designer

and consultant, Tippetts-Abbett-McCarthy-Stratten, to the

extent that it deemed justified in reaching its decision,

and it specifically informed the attorneys for both parties

on the record that it would disregard any objectionable

material contained therein.

Judgment affirmed, with costs.

Greensiort, J.P., Sweeney, Kane, Marw and Reynoxps,

JJ., concur.”

A6

Appendix C, Decision of Court of Claims,

State of New York.

Decision

STATE OF NEW YORK : COURT OF CLAIMS

Ciam No. 48874

Decision

7°

—

Jounson, Drake and Pirer, Inc.,

Claimant,

—against—

Tue Strate or New York,

Defendant.

%

—

APPEARANCES:

For the Claimant:

Norton, Sacks, Molineaux, & Pastore, Esqs.,

by Charles B. Molineaux, Esq.,

of Counsel

For the State:

The Honorable Louis J, Lefkowitz,

Attorney General, by J. Joseph Murphy

and Joseph T. Hopkins, Assistant Attorneys

General, of Counsel ;

OrLanpo, J.

The above-entitled action duly came on for trial at a term

of this Court held at the Court of Claims, 270 Broadway,

New York. The Claimant and the State appeared by Coun-

sel, as noted above. The Court, having heard all the proofs

of the parties and the arguments of Counsel, and the case

having been finally submitted to the Court and due delibera-

tion having been had, finds and decides as follows:

ee Se ae

AZT

Appendiz C, Decision of Court of Claims,

State of New York.

The claim was duly and timely filed with the Clerk of the

Court of Claims and with the Attorney General on Novem-

ber 3, 1967. With a single exception, it has not been as-

signed or submitted to any other officer, Coyrt or tribunal

for audit or determination. The sole exception is an assign-

ment of monies concededly due and paid to the North-

western National Bank of Minneapolis by order of Court

of Claims Judge Alexander Del Giorno dated December 21,

1967. The claim of the Northwestern National Bank of

Minneapolis was dismissed on the ground that the bank

was not a necessary or proper party.

Seven Causes of Action were alleged in the claim and

the total amount for which judgment was originally sought

was $4,895,899.02. In its Proposed Conclusions of Law the

Claimant sets forth damages in the sum of $3,921,510.70 and

interest.

On December 20, 1967, an order was filed severing the

Claim and awarding to the Claimant for the Seventh Cause

of Action in the sum of $294,401.39 and further awarding

the Claimant the return of bonds having a par value of

$66,000. The question of interest, if any, on the sum and

bonds involved in the Seventh Cause of Action was de-

ferred until the determination of the balance of the claim

and the remaining Causes of Action.

The claim arises from alleged breaches of contract known

as FAVWE 61-3 and FIHHE 61-1, which was entered into

on October 31, 1961 by the Claimant and the Department of

Public Works (now known as the Department of Trans-

portation) of the State of New York. The contract called

for the construction of an interchange of two arterial high-

ways, Van Wyck Expressway and the Long Island Express-

way, the former requiring the construction of an elevated

portion of the Van Wyck Expressway Extension on bridge

piers (41 piers for approximately % of a mile), construc-

tion of four ramps (also on piers) and construction of

Cm A SM

A8

Appendiz C, Decision of Court of Claims,

State of New York.

ramps on ground level; and of a portion of Interstate

Route Connection 514. The construction included, but was

not limited to, foundation work, driving of piles, erection of

structural steel for the roadway, concrete paving, service

road, access ramps, retaining walls and sewers, relocation

of a road, park roads, drainage and waterline.

The contracted project was designed for the State, and

its construction was supervised, by .he private engineering

and consulting firm of Tippetts-Abbett-McCarthy-Stratton

(TAMS). In Jeauary 1959, design work for the project

was begun as yart of a feasibility study contract between

TAMS and the Triboro Bridge and Tunnel Authority. In

April 1960 TAMS entered into a new contract with the

State for the design and preparation of the documents for

Contracts FAVWE 61-3 and FIHHE 61-1.

The First Cause of Action, the basic and major cause

from which the others proliferate, alleges a Contract, dated

October 30, 1961, between the State and the Claimant, the

performance by the Claimant of all the terms and condi-

tions of the Contract . . . “as well as certain other work

which it was directed to perform .. .”, the acceptance by the

State, on August 13, 1964, of the Contract as performed,

and the receipt by the Claimant on or about August 30, 1967

of the Final Agreement and Final Estimate.

The First Cause alleges that:

“The within claim is for the increased cost, expense,

and damage incurred by Johnson in the performance

of the work under the said contract occasioned by the

acts, faults, errors and omissions of the State of New

York, its agents, representatives, servants and/or

employees, for extra and additional work done in con-

nection with the said contract, for damages, for breach

of said contract and for work done under said con-

tract” (Ninth Paragraph)

RU Rinciean ics cise 2 Lue chen Se wee Se ee ee

A9

Appendia C, Decision of Court of Claims,

State of New York.

The First Cause further alleges that:

“The contract, among other things expressly repre-

sented and warranted and made statements concerning

conditions as to the physical character of the soil at

the site of construction, the type of piles necessary,

the method of driving said piles, the expected length of

said piles, construction of required cofferdams, and

that fills could be placed without disturbance to the ex-

isting river bottom, which representations, warranties

and statements Johnson properly relied upon in the

preparation and submission of its bid”. (Tenth Para-

graph)

The State’s Demand for Bill of Particulars sought to

have the Claimant “set forth in haec verba each and

every representation, warranty and statement .. .” in re-

spect of the details of the allegation.

The Claimant’s Verified Bill of Particulars (Paragraph

3 (1) through 3 (6)) is not responsive to this demand. The

response makes repeated general references to the Contract

Proposal (236 pages), the boring logs, and the Contract

Drawings (301 plates). In Paragraph 3 (2) it refers to

“Contract Documents”, “its analysis of all the contract

documents” and “contract representations”. Had the

Claimant’s Verified Bill of Particulars set .. rth in haec

verba, each representation, warranty and statement, as re-

quired by the Demand for a Bill of Particulars, this Court

would net be put to speculating whether any representa-

tion, warranty or statement can possibly be inferred from a

reading of the boring logs and Contract Drawings. The

Claimant has failed to do so. The burden of a responsive

presentation of such material in a form intelligible to the

Court should have been but was not borne by the Claim-

ant. Representations, warranties or statements cannot be

inferred from linguistic nuances.

Al0

Appendiz C, Decision of Court of Claims,

State of New York.

The Eleventh Paragraph of the First Cause of Action

alleges that the Claimant encountered materially different

soil conditions from those represented or warranted and

that, because of such conditions, “. . . and the directives,

acts, faults, delays, errors and omissions of the State . . .

the performance of pile driving and foundation work under

the contract was disrupted and rendered more expensive

than contemplated or intended by the contract .. .”

The Claimant’s Verified Bill of Particulars (Page 4.

Paragraph 4, to Page 10) repeats but fails to particularize

the general language of the claim that “soil conditions en.

countered by Johnson, Drake and Piper were materially

different from those represented by the State and con.

templated by the parties .. .”’

The Contract Proposal deals admonitorily and specif.

ically with the nature and extent of the contract's responsi.

bilities. (Special Foundation Notes, Pages 29 through 31).

The contractor's

“Special attention is directed to the effect of special

subsurface conditions on the contruction operations.

Any work required to support or to assist the i

of equipment, forms, ete., due to the special subsurface

conditions shall be included in the unit price bid for

the appropriate items . . . the contractor's attention,

however, is called to the fact that the information ob.

by Paragraph 3 of the contract agreement . . In the

event that subsurface conditions vary from those

shown by the explorations, the contractor will still be

required to establish the foundations to the necessary

load-carrying capacities as directed by the Engineer”

(Page 30, 31).

All

Appendiz C, Decision of Court of Claims,

State of New VY ork.

The Claimant's Project Engineer, Calvin L. Zemsky, testi-

fied under cross-exammastion that be had pot examined the

organic silt, and that the Claimant had received a copy of

the State's boring logs of core samples which were taken

from the earth at different levels. He knew that those sam-

pies were available to prospective bidders.

The Clairmeant was clearly indifferent to the responsi-

bilities and obligations it had aseumed under the Contract

Proposals. Relevant portions of Zemsky's cross-cxatmina-

thon follow:

Q. ... Now did you seeure any boring information

from the Babylon (fice! |

A. Net personally, but the company secured it.

Q. And just what information, to your knowledge,

did they secure!

A. Well, there was a set of boring sheets that came

down from either District 10 or Albany. 1 don't know

where, bat they came dows with the set of plans or im-

mechately after that to the bid room.

Y. De you have any personal knowledge as to how

that infortnat.on was acquired!

A. Ne, es.

Y. .. . Bat you made so persenal investigation in

either Habylen or 9 the Albany Offe< 1

A. Ne, sir.

The Court: No personal inve-tigation as to what!

As to borongs!

Y. Of the borings, ar of the boring or of soils in.

fortnation !

A. Ne, sir.

Y. Ded you make any ‘equiry from what we cal!

TAMS Sethe Departmen.

a a sisi

Al2

Appendiz C, Decision of Court of Claims,

State of New York.

Mr. Murphy: By TAMS, your honor, I mean

Tippetts-A bbett-McCarthy-Stratton.

The Court: I understand.

Q. Did you make any inquiry as to their department

as to what information they had?

A. No, sir.

Q. To your knowledge did anyone from your com-

pany make any such inquiry?

A. Not that I know of.

Q. And you are aware that the State of New York

has a rather extensive soils department, are you not,

down in Albany?

A. I know they have the department, as to how ex-

tensive it is I have no knowledge.

Q. You made no inquiries as to subsoil conditions at

that department?

A. No, sir.

Q. Did you know whether anyone from Johnson,

Drake & Piper did?

A. Not that I know of.

Q. Did you consult with any private consultants as

to soils conditions?

A. No, sir.

(Transcript, Vol. V, Pages 30 through 33)

Q. Mr. Zemsky, this morning we were talking about

pile driving, examination of soils. Remember? I

asked you whether or not you examined this organic

silt by squeezing it and I think your answer was no,

you hadn't. Whatever it was, you were aware, and I

think you received, through someone else in your

organization, a copy of the boring logs, did you not,

prepared by the State?

Al3

Appendiz C, Decision of Court of Claims,

State of New York.

A. Yes, sir.

Q. And you were aware, were you not, that when

those boring logs were taken core samples were taken

from the earth at different levels and recorded on the

boring logs?

A. Yes.

Q. And you realize, do you not, that those samples

are available for prospective bidders and you were so

advised by the Proposal?

A. It is in the Proposal that they are.

Q. Did you or anyone of your organization go to

Babylon to examine these core samples or any place

else?

A. I did not go, and as far as I know no one from the

organization went.

(Transcript, Vol. V, Pages 92, 93)

> >. >.

Q. Now I believe you testified you reviewed the bor-

ings on this job? Is that correct?

A. Well, it is a question what you mean by reviewed.

I looked at the borings on the job.

Q. Did you have occasion to use them in the field,

to compare what you found in the field as to what the

borings showed?

A. We had the borings in the field and—we looked

at them but didn’t make a detailed study between the

borings and the actual field condition.

(Transcript, Vol. V, Page 144)

The Claimant had been informed that:

“Subsurface explorations have been made for this

project at locations indicated on the Plans. The rec-

ords of these explorations are available to bidders for

their expection at the «fice of the District Engineer,

District No. 10, Babylon, L. I New York, and at the

Al4

Appendix C, Decision of Court of Claims,

State of New York.

office of the Deputy Chief Engineer—Bridges, Grade

Separations and Structures, Albany, New York. Sam-

ples of the material encountered, where samples have

been taken, may be inspected at the District Office.

The foundation designs for this project have been

selected after due study and deliberation of the results

of the subsurface explorations” (Special Foundation

Notes, Contract Proposal, Page 29)

The claimant had been advised that the State anticipated

certain types of subsurface materials would be encountered

in the construction area. These materials were described

(1) a layer of miscellaneous fill varying from about

5 to 40 feet in thickness below the ground surface.

This fill may consist of sand, silt, cinder, brick,

wood, ete. There is little or no miscellaneous

fill, however, in a narrow bank along the banks

of the Flushing River.

(2) A stratum of organic silt or peat under the mis-

cellaneous fill or below the bottom of the Flushing

River. The thickness of this stratum varies within

the wide limits. It extends as much as 70 to 80

feet below ground surface in some locations, while

little or no organic silt may be found in the area

of relatively higher ground along the easterly

boundary of the project area.

(3) A sand and silt deposit under the organic silt.

No bedrock was encountered within the depth of

borings made for this project. (Special Founda-

tion Notes, Contract Proposal, Page 29)

In an earlier case, the same Claimant against the New

York State Thruway Authority (22 AD 2nd 321), the

Al5

Appendiz C, Decision of Court of Claims,

State of New York.

Court said:

**The bidder was adequately warned that the informa-

tion to be obtained in connection with the site and its

environment and the conditions affecting the work

were to be secured by personal investigation and re-

search and that there was to be no exclusive reliance

on estimates or records of the State or the Authority.

The contractor was informed that there were records

of subsurface explorations available for review by

interested parties, but it did not look at them. It

made no inquiry about possibility of the presence of

sand and did not examine the State’s boring of the

area although they were available. The claimant’s

representatives did not see what they should have

seen and made little or no effort to take advantage

of the State’s data about the site. Their entire in-

vestigation was casual, cursory and inadequate. The

trial court properly determined that the contractor’s

investigation was not conducted with reasonable care

for if it had been it would have been obvious that

there was sand on the bottom of the face, gravel and

sand mixture in the middle of the face and gravel on

top of the open face. ‘The claimant saw fit to make

its bid without resort to these common and simple

safeguards. It may not now secure from the court an

alteration of its contract as a substitute for the care

and prudence with which the business man of aver-

age caution would exercise in serious undertakings’.

(Niewenhous Co. v. State of New York, 248 App.

Div. 658, 659).”’

The alleged increases in cost to the Claimant under the

First Cause of Action, all allegedly ‘‘without fault on

ite part’’ (Par. 12) are set forth in Schedules A through

I, attached to the claim, in the total amount of $2,414,230.06.

Al6

Appendiz C, Decision of Court of Claims,

State of New York.

Schedule A claims increased cost ($73,601.81) because

Claimant used steel sheeting for certain piers (ML-13 NB,

ML-16 NB, ML-21 NB, ML-28 SB) whose conditions, as

represented by the contract, would have permitted the use

of wood sheeting.

Page 125 of the Contract Proposal, under Item 83 X

states that the relevant general specifications for Tempo-

rary Sheet piling apply. It states, in part:

-'The contrateor, at his option, may use either timber

or steel piling or H-Section steel piles of adequate

cross section and length with timber plank interpile

sheeting’’.

The choice of construction methods or materials was the

Claimant’s sole responsibility. The Claimant’s use of

wood sheeting showed a disregard of the conditions indi-

eated in the Contract Documents and either inadequate or

no pre-bid investigation of .

Schedule B claims additio cost ($77 680.61) in re-

moving excessive excavation materials and stabilizing pier

excavations at proper elevations.

The Claimant’s pier excavation to reduce excessive

heave, before and after pile driving, should have been

within sheeted excavation to a sufficient depth below the

bottom of the excavation. The responsibiilty, under the

contract for designing and providing adequate temporary

sheeting and bracing, rested with the Claimant and it was

not required to submit its design for review by the Engi-

neer. The Claimant chose to over-excavate to remove

excessive heave rather than to provide adequate sheeting

as indicated by the terms of the contract. On-site obser-

vation and evaluations of soil conditions would have fore-

warned the Claimant against such error.

The claim for increased cost for the stabilization of the

subsoil, of the pier subgrade, is governed by Page 30

Al7

Appendiz C, Decision of Court of Claims,

State of New York.

of the Contract Proposal which states, in part:

‘Special attention is directed to the effect of special

subsurface conditions on the construction operations.

Any work required to support or to assist the handling

of equipment, forms, ete. due to the special subsurface

conditions shall be included in the unit price bid for

the appropriate items’’.

The cost of stabilizing the subgrade was part of the

Claimant’s contractual obligation and the cost should have

been included in the bid price of the appropriated items.

Schedule C claims increased cost ($964,647.60) in re-

spect of driving cast-in-place piles. This claim arises

from the Claimant’s inaccurate evaluation of the exist-

ing soil condition about which it was forewarned in the

boring logs and on Page 29-31 of the Special Foundation

Notes of the Contract Proposal.

The subsurface conditions indicated an indefinite length

of piles to be driven. The Claimant, nevertheless, chose

for use a pile which is more costly according to its alle-

gation, when driven to a length in excess of 80 feet. The

total driven length of closed end cast-in-place concrete

piles, found acceptable and paid for in the Final Estignate

was 357,395 feet, an increase in driven length of approxi-

mately 25% above the estimated quantity.

The presence of obstructions during pile driving and the

method for payment for the removal of these obstruc-

tions are dealt with as a responsibility of the Claimant

on Page 30 of the Contract Proposal.

The claim for payment costs due to delays incurred by

snbeontractor Raymond International, Inc., is unfounded

inasmuch as the delays occurred primarily because of a

lack of coordination between the Claimant and its subcon-

tractor and also because the improperly designed coffer-

Als

Appendix C, Decision of Court of Claims,

State of New York.

dams failed when pile driving equipment was placed on

their perimeter.

Schedule D, claiming additional cost ($885,903.60) for

the construction and excavation of temporary cofferdams

(Item 82S), in the course of bridge pier construction along

the Flushing River, is predicated on soil conditions en-

countered which were, allegedly, materially different from

those indicated in the contract.

The Claimant alleges that the soil conditions encountered

made it impossible to construct cofferdams without driving

long heavy section steel sheet piling into firm subsurface

material; that increased cost was incurred because of the

addtional time required to drive sheeting and to excavate

material; that there was the necessity for a greater quan-

tity and heavier and longer section of steel sheeting and

for furnishing additional equipment to drive and extract

the piling and the increased incident of damaged and cut

sheeting.

The Claimant was adequately forewarned of the sub-

surface conditions in the Special Foundation Notes of the

Contract Proposal, Page 29. The Claimant was further

forewarned that certain specified locations would require

the use of surcharge to stabilize and consolidate com-

pressible material and that the surcharge material was not

to be removed without the direction of the Engineer. Other

references to poor foundation materials can be found in

the Contract Proposal.

The design and the execution of cofferdams as a way

of providing dewatered conditions for the construction of

various foundations shown on the plan was left to the

judgment of the contractor. It was allowed by the Con-

tract Proposal (Page 124, Item 82S) to suggest any other

means of accomplishing the result which would be ac-

ceptable to the Engineer. The Claimant’s attempt to con-

Al9g

Appendiz C, Decision of Court of Claims,

State of New York.

struct cofferdams of wood sheeting and AP3 steel sheet-

ing failed. A Z-type sheeting finally prevailed.

Nothing in the record would justify the Claimant’s

allegation that the contract implied which cofferdam sheet-

ing was indicated in the contract drawings. On the con-

trary, the Contract Proposal (Page 124) states that Public

Works Specifications, Item 82 (Page 369), apply, as

follows:

‘*Cofferdams may be constructed of earth, earth-filled

bags, sheet piling or any other materials which the

Contractor may elect to use. The foundations shall

be placed with the cofferdams in an unwatered con-

dition, unless otherwise indicated on the plans. Un-

watering equipment and any necessary bracing shall

be of adequate quality and capacity and shall be so

arranged to permit their proper functioning in

connection With the cofferdams’’.

On the subject of payment, the Contract Proposal (P

124) provided: got cng

‘*‘where the cofferdams are so indicated no separate

payment will be made for temporary sheeting in the

respective locations’’.

The claimant bore sole responsibility for the selection

of the wood sheeting and the AP3 steel sheeting which

resulted in the cofferdam failures (at ML-12SB, ML-13SB,

ML-14 NB, ML-14SB, ML-22NB, ML-23NB and ML-27SB).

The cofferdams failures were, in turn responsible for the

retardation in the Progress Schedule of the pile-driving

operations as pointed out in a letter from TAMS to the

District Engineer’s Office dated September 20, 1962.

The Schedule D claim for excavation cost in the sum of

$104,920.12 (which included $28,614.09 for truck and dump

.

A20

Appendiz C, Decision of Court of Claims,

State of New York.

charges and $52,643.62 for direct labor charges) is predi-

cated on the claimant’s failure to design and construct

adequate cofferdams to cope with the condition of organic

silt. Forewarning was given to the claimant of this condi-

dition in the Special Foundations Notes of the Contract

Proposal (Page 29). The claimant bore responsibility

for the disposal of the excavation material away from the

site in accordance with the provision on Page 49 of the

Contract Proposal that:

‘* _ _ gil materials excavated under Item 5S, Trench,

Culvert and Bridge Excavation shall become the prop-

erty of the Contractor and shall be disposed of away

from the site.”’ =

The effective date of the Contract was October 31, 1961

and the date of completion was within 24 months of that

date. The Progress Schedule, dated November 28, 1961,

required piles to be driven beginning December 1961 and

to be completed by December 1962. There was no specific

indication in the Progress Schedule of a completion date

for cofferdams, but, as a practical matter, they had to be

constructed sometime before the piles could be driven.

Work began on the cofferdams on June 4, 1962, a loss

of approximately 7 months of the 24 months allowed for

the completion of the entire contract.

On June 4, 1962 the Contractor commenced, and on June

18, 1962, completed construction of cofferdam ML-12SB

of wood sheeting. As a result of the load of the pile

rig, the wood sheeting shifted and more than 5 feet of

heave occurred during the pile-driving operations. An

attempt, between August 27, 1962 and August 29, 1962

to repair the cofferdam failed. The cofferdam was re-

built of steel sheeting between February 25, 1963 and

March 25, 1963.

A21

Appendiz C, Decision of Court of Claims,

State of New York.

Cofferdam ML-13SB was constructed of AP-3 steel sheet-

ing between June 4, and June 11, 1962. Efforts to save

it, between June 11 and September 5, 1962 were unavail-

ing. It was dismantled and reconstructed of heavier ZP

a aera between December 14, 1962 and February

’

Cofferdam ML-14N and SB was constructed of AP-3

steel sheeting between July 24, 1962 and August 11, 1962.

When efforts to save it, between August 1, 1962 and Sep-

tember 5, 1962, failed, it was dismantled and reconstructed

bag steel sheeting between January 30, 1963 and April 2,

Cofferdam ML-27SB was constructed of wood sheeting

between July 3, 1962 and July 12, 1962. It was salvaged

November 16, 1962 after intermittent repairs, which were

nae because the sheeting had shifted under imposed

Cofferdam ML-22NB was constructed of wood sheeting

between August 16, 1962 and September 5, 1962 and par-

tially reconstructed of AP-3 steel sheeting between Sep-

tember 5, 1962 and October 25, 1962.

Cofferdam ML-23NB was constructed of wood sheeting

between August 13 and August 22, 1962. A portion of it

which failed was replaced by AP-3 steel sheeting between

November 19 and November 26, 1962. Cofferdam HD—

Pier 9 was constructed on September 14, 1962 of Z-type

sheeting of 40-foot lengths but was found to be inadequate.

Longer sheeting proved to be acceptable for this and for

the remaining cofferdams.

The Claimant defaulted in its plainly defined respon-

sibilities under the Contract Proposal and Public Works

Specifications in respect of the cofferdams. It failed to

start work on the cofferdams until approximately 7 months

had elapsed from the date of the signing of the Contract.

The cofferdam failures were responsible for the removal

A22

Appendix C, Decision of Court of Claims,

State of New York.

from tk job-site of two pile driving rigs. The conse-

quences of overall delay in pile driving, footing, column

and column cap concrete work and steel work construction

were an increase in overall cost. The Claimant having

fallen far behind in his Progress schedule, incurred the

increased expense of additional sheeting and bracing, hir-

ing additional personnel and providing additional sites for

the pile subcontractor, in attempting to meet the contract

completion deadline. The additional eost for the removal

and replacement of damaged sheeting for new sheeting and

for the excavation of heave resulted from the Claimant’s

erroneous choice of wood sheeting and AP-3 steel sheeting.

Had the Claimant used the Z-type sheeting of correct size

from the inception of the cofferdam construction, had they

done so timely instead of delaying 7 months, the chain of

costly misadventure would not have been forged.

The Claimant has not submitted any evidence of the

actual cost they might have incurred had they chosen to

use the correct size Z-type sheeting from the inception of

the cofferdam construction, or of the quantity of such

sheeting that might have been required. No evidence was

adduced of the amount of the difference, if any, between

such cost and the allowable maximum of $176,000 for cof-

ferdams. The temporary Z-type sheeting might have been

economically reused by the Claimant had the Claimant

made the choice in the first place. Their late use when the

Claimant was lagging badly precluded such reuse.

The Claimant’s Brief After Trial (Page 124) states:

“As to the cofferdams, the very fact of the gross dis-

parity between the State’s represented cost and the

actual cost incurred by Claimants demonstrates how

qualitatively different the scope of work required was

from the work contractually indicated. Quantum

meruit clearly applies without further discussion”.

A23

Appendix C, Decision of Court of Claims,

State of New York.

The Court rejects the argument that the size of the dis-

parity between the work contractually required and the

actual cost incurred demonstrates a qualitative difference.

The difference, far from demonstrating a qualitative dif-

ference, is, in the judgment of the Court, persuasive evi-

dence of the Claimant’s careless and wasteful performance

and conduct of the project. To find liability in the State

is to exculpate the Claimant and its subcontractors and to

reward them for their ineptitude.

“One who makes a contract cannot be certain that he

will be able to do the work for the amount of his bid.

The risk of failure falls on his shoulders. Equity

does not relieve from bargains merely because they

are unprofitable”. Weston vy. State, 262 N.Y. at P.51

Schedule E claims additional cost ($33,856.84) incurred

in the removal of mud waves. This Schedule is based

upon the allegation in the Claim (Paragraph 10) of express

representations, warranties and statements “. . . that fills

could be placed without disturbances to the existing river

bottom . . .”, and that the Claimart “. . . encountered

materially different soil conditions . . .” which required

“. . . the use of additional equipment, labor and materia!

. .” (Paragraph 11).

In response to the Demand for a Verified Bill of Particu-

lars to “set forth in haee verba each and every represen-

tation, warranty and statement concerning . . . (6) that

fills could be placed without listurbances to the existing

river bottom” The Claimant, in its Verified Bill of Particu-

lars, replied (Paragraph 3 Sub. 6): “Sheets 37, 38 and 44

of the Contract Drawings show that fill is to be placed in

and along the banks of the Flushing River with no warn-

ings as to mud waves, heaves or other disturbances being

noted”. While the indicated Contract Drawings indicate

Appendix C, Decision of “o4rt of Clans,

State of New York.

that fill is to be placed in and along the banks of the Pins.

ing River neither these or any other Contract Drawings

contain “warnings’’.

The absence of a “warning” cannot be deemed a repre

sentation, Warranty or statement, where the State bar

afforded the Contractor ample opportunity to cuatime the

State's records and the Contractor hae wet availed itectt

of the opportunity or where the Contract Docanents, ac

here, contain adequate admonitery language.

The Contract Proposai and Public Works Specifications

were sufficiently explicit for a Contractor of sinc, standing

and longtime expertise to have bees forewarned that the

rapid piacement of heavy etmhankenents, and the auc of

heavy tractors to tove the material, on a deep rubetratac:

of organic silt, would probably cause mid waves. The com

tractor could have chosen lighter construction equipimce!

and a thin blanket of fli and allowed » fait day for Shee

organic silt to regaig ite strength.

The Cla.mant began to place teasporary 40 ia the Flack.

ing River in June 19992 as 9 teame of facilitatiag the con.

struction of coflerdame. The tetparary alteration of the

bounds of the Pigshing Hives wae a epomeate of eomrensctuce

for such constriction ated the gud wares were 9 ctunotns tant

of the Claimant's Ulbechoren cometrwction tuethuende.

Schedule F clatmee additional cost (M4OSPOTS) aucwt ted

in the pumping of water, The Domead fur a VeriGed Bul

of Particulars (Paragraph 5) sought to have the Clgismet

.. state where ated thes the wales wae pragegien foe whink

claun os made...” The Vesified Bali of Martacniase i Pare

graph [Aj) states: :

“The water ae pumped free oariews ace ratione

tnasde for pucre aad degumage thewsghnest the ates of thie

contract between Neowerher, 1061 amd Jaaeary 14,

iad”,

AS

A ppemiia C, Deesssom of Court of Claims,

State of New York.

Ute ant one-half pages ipp. 14, 15) containing dates fol-

tow. Locetiogs are aenttted.

ln ome of ity Proposed Piedings of Fact (No. 334) the

(lasteae! slates:

“The State's ausdei verified that claimant incurred addi-

toomal conte ue the performance of pumping the water

prrer ta Jaswary 15, i968 in the amount (after over-

howd atl profit have bees added) of $9,463.46 (Ex-

bakes TP”.

The Agdit *Seleeddalc IF} sand:

.. . Reebotors have not bees able to estimate from the

ted eatitnate the coptemplate! pumping costs nor has

‘he clasteant’s repremeptative, Mr. Fimen, enlightened

awitece as to where sack coats were included in bid

< eS. ggtc.

Awditegs have therefore transferred actual audited

coete te “Ne Acdit Determination’ inasmuch as con-

tem phated cost could wet be worried by auditors”. (Em-

phaee acbcherd 5.

“* Waemeaet ded met eohent any equipment logs or ree-

otds te tetleet whee’ pumps were used on a daily or

weekly beece, Clarmaat did submit an inventory equip-

snows towwrd whack reflected equipment owned, and in

cottass umetgmees, the job location thereof. Some

‘Keyppopaccnt Traaeferred Reports’ were also submitted

who toflertedd the transfer of equipment from one job

to atether, However, from the reeards submitted,

amdstogs comhd versfy only that the oquipment (pumps)

cigztued ae om ned eq ptmert, as owned by the com-

pass. Aediters cusld wot verit y which pumps were

used gah when they weee used, wor could auditors

conte thet off the pamps claamed were on the job site

ted the peeved clamed as assed...” ( Ernphasis added)

.

a ee ,

A26

Appendiz C, Decision of Court of Claims,

State of New York.

The Claimant was forewarned by the Contract Proposal

of the presence of ground water (Page 30):

“The Contractor’s attention is directed to the necessity

of recognizing the elevation of ground water so that he

will progress his work with full knowledge of water

being present. Any cost involved in keeping the site

free from water shall be included in the price bid for

the appropriate items for the required work except as

otherwise noted”.

The Claimant was informed by the Public Works Speci-

fications (Page 207, Item 5, Trench, Culvert and Bridge Ex-

cavation) that the cost of dewatering was to be included in

the price bid for Item 5 and that he was obliged to “keep

the site of the work free from earth, water, snow and ice

during construction .. .” A similar instruction was re-

peated in respect of cofferdams with the added advice that

“onwatering equipment and any necessary bracing shall be

of adequate quality and capacity and shall be so arranged

as to permit their proper functioning in connection with the

cofferdams” (Page 369, Item 32S, Cofferdams). The

Claimant’s failure, in respect of cofferdams, was responsi-

ble in a good measure for the increased cost incurred in de-

watering, a failure which might have been avoided by the

use of Z-type steel sheeting of sufficient depth.

The dewatering of piers where no sheeting had been in-

stalled to stabilize the open excavation (ML-Piers-1N&S,

2N&S, 3N&S, 4N&S, 5N&S, 6S, 7S, ML-Abutment; Ramp

HB-Piers 2 & 7, Ramp HC-Piers 9, 10, 11, 12, 13 and 16)

should have been considered by the Claimant in calculating

its bid.

The Claimant’s drawing (#C-1, November 28, 1961,

“Plan of Construction work in Flushing River”) for the

control of the water level in Flushing River, was approved

A27

Appendiz C, Decision of Court of Claims,

State of New York.

by the World’s Fair Corporation (Permit M-20, December

18, 1961). The drawing provided for the installation of a

36” corrugated metal pipe at an invert elevation of —4.00

ft. in both upstream and downstream dams which were to

be constructed by the Claimant in the Flushing River.

Temporary haul roads were to be constructed over the dams

with an elevation of +2.0 ft.

The Claimant constructed earth and brick dikes but

omitted the pipes. The dikes failed, the project site was

flooded, and the resulting mud waves checked the water

flow downstream and caused it to back up. In June 1962,

the Claimant installed a 30’ corrugated metal pipe for the

diversion of the river. The lack of conirol of the Flushing

River level was a result of the Claimant’s failure to ad-

here to its own approved Drawing #C-1 of November 28,

1961. The failure accounted for the additional cost in-

curred under this Schedule. The flooding of the project site

occurred because the Claimant failed to install drainage

pipes under the earth dikes. The later installation of 30

corrugated metal pipes proved inadequate for the proper

flow of the river.

In November 1962 the Claimant installed a 48’ pipe. The

problem remained unsolved because the 48’ pipe had not

been placed at the proper elevation. On April 2, 1963 the

State advised the New York Department of Parks that the

water had been lowered to an acceptable level.

Schedule G claims additional cost ($179,951.34) was in-

curred in the removal of obstructions to the pile driving,

such as timber piles, concrete boulders, etc., which were not

indicated in the Contract Documents. The Demand for a

Verified Bill of Particulars required the Claimant to “give

the location and describe the obstructions which were re-

moved and the date of their removal . . .” (Paragraph 5).

The locations and approximate dates of removal are set

forth in the Verified Bill of Particulars (Pages 15-17).

A%8

Appendiz C, Decision of Court of Claims,

State of Neu York.

The Claimant states that the various obstructions which

it encountered were “contrary to the representation con-

tained in the Contract”. In what way or what representa-

tions is not stated. Nor does the Verified Bill of Particu-

lars state that these obstructions were 10 or more feet be-

low subgrade, a fact which would make the claim payable

as force account work.

The words of the Contract Proposal on the subject

follow:

“If any obstructions to pile driving are encountered,

ten (10) feet or less from the bottom of the footing,

the Contractor shall, if so ordered by the Engineer,

pull the partially driven pile or piles and remove the

obstruction, backfilling hole with approved suitable

material and thoroughly compacting backfill to the

satisfaction of the Engineer. However, no partially

driven pile shall be removed until the Engineer is sat-

isfied that the Contractor has made every effort to

drive the pile through the obstruction. Payment will

be made for excavation under Item 5S and for sheet-

ing under the appropriate item; no other extra pay-

ment will be made for this work”. (Page 30)

Other provisions of the Contract Documents are appli-

cable. Special Foundation Notes of the Contract Proposal

(Page 31) call attention “. . . to the fact that the infor-

mation obtained therefrom is not to be considered as a sub-

stitute for personal investigation and research by the Con-

tractor as required by Paragraph 3 of the Contract Agree-

ment”,

The Contract Proposal (Item 818, Page 123) provides

a linear foot formula of payment for demolition of existing

piles and cradle. It provides for payment of excavation

A29

Appendix C, Decision of Court of Claims,

State of New York.

under Item 5S, Trench, Culvert and Bridge excavation

within the limits indicated on the plans.

The Contract Proposal (Item 84TP, Page 172) pro-

vides a linear foot formula of payment for the Removal

of Tops of Existing Timber Piles. The quantity paid for

is the actual number of linear feet of pile removed or

demolished. The unit price bid covers the cost of furnish-

ing all labor, material and equipment to complete the

excavation and removal.

The Contract Proposal (Item 85 CO, Cast-in-Place Con-

crete Piles, Open-End, Page 128) states:

‘‘Wherever abandoned underground structures are

encountered 10 feet or less at the bottom of the pro-

posed pile caps the engineer may direct removal of

part or all such structures and backfilling with ap-

proved suitable material. The Contractor shall per-

form the work in accordance with such direction.

Excavation shall be performed and paid for under

Item 5S; furnishing and placing sheeting material for

back-fill under Item 2EF-B. No other payment will

be made for work incidental to encountering and re-

moving abandoned underground structures’’.

The Contract Proposal (Item 103D, Page 135) requires

the Contractor to remove existing drainage structures as

indicated on the plans and as directed by the engineer.

The Contractor is required to remove pilings in accordance

with the requirements for Item 84 TP (supra). Dis-

posal must be away from the site. Back-fill must be

performed with materials conforming to the requirements

of Item 2 EF-B on selected fill. The methods of payment

are precisely described under Contract Proposal Items

84 TP, 5S and 2EF-B.

Contract Drawings 53.60 and 199 of the Contract Plans

ea ee

A30

Appendiz C, Decision of Court of Claims,

State of New York.

indicate that the removal of potential obstructions, exist-

ing timber piles and concrete caps were a responsibility

of the Contractor and that their removal, within the pur-

ys of Item 851D, were included for payment under Item

The greater part of the claim under Schedule G seeks

$146,355.68 for the cost of excavation and removal of ob-

structions at ML-25 NB & HC-6. The Claimant subse-

quently reduced the amount to $122,729.46.

Payment by the State to the Claimant for removing ob-

structions was made under the following force accounts:

1) NewlItem904A (ML-25 NB & HC-6) $69,013.83

2) New Item 918 (ML-Pier 19) 936.64

3) New Item 924 (ML-Pier 18 SB) 7,995.19

Payment was made under Item 5S for the removal of

a 48 inch water-main at Piers HC-9, HC-10, HC-12 and

HC-13. (Page 1635, Final Estimate). The claim for addi-

tional payment for removing obstructions in 18 piers was

included under Item 5S.

Schedule H claims additional cost ($39,642.14) incurred

in the construction of additional pile cap forms (Para-

graph 12). The Demand for a Verified Bill of Particulars

requires that the claimant ‘‘give the location by station

or otherwise describe the additional pile cap forms which

were constructed’’, The Verified Bill of Particulars al-

leges that pile cap forms were required at 57 designated

pier locations. The need for such forms occurred because

the soil conditions encountered were allegedly different

from those which the Claimant stated had been repre-

sented in the contract. The Claimant alleges that it had

to do form work not contemplated originally thereby in-

curring increased cost in the construction of additional

pile cap forms.

A31

Appendiz C, Decision of Court of Claims,

State of New York.

The Claimant alleges that pile cap forms were required

at the designated pier locations ‘‘where it was originally

contemplated that sheeting would be driven on the neat

line of the footings thus eliminating the necessity for

forms’’. (Verified Bill of Particulars, Page 41).

The Claimant, in its Proposed Findings of Fact (No.

358), alleges that ‘‘these additional costs were incurred

by the Claimant because of misrepresentation, fraud and

active interferences of the State’’. No evidence was ad-

duced to support the Proposed Finding.

In its Proposed Findings of Fact (No. 359) the Claim-

ant states that ‘‘The State’s audit verified that claimant

incurred additional costs in the construction of additional

pile cap forms in the sum (after overhead and profit had

been added) of $37,114.10’.

An audit is not a determination of legal liability. The

State’s auditors, in their letter dated September 1, 1972,

transmitting the Audit to the Assistant Attorney General,

wrote:

‘*The audit was performed for the primary purpose

of determining whether the claimant’s records and

supporting data substantiated the amount scheduled

in the claim. It is not within the scope,of our audit

to make any judgment concerning (1) the legality

of the entire claim or any portion thereof, and (2) the

engineering aspects of claim’’. (Emphasis added)

(Exhibit T).

Schedule I of the claim, brought by the claimant in

behalf of its subcontractor, Bar Steel Construction Cor-

poration, seeks the amount of the increased costs ($109,-

046.88) of placing steel for piles, caps, footings and col-

umns to April 9, 1963.

‘*. . . because, inter alia, of non-sequentiai, inter-

rupted and piece-meal work as a result of the founda-

aay aa

A32

Appendiz C, Decision of Court of Claims,

State of New York.

tion conditions; performance of work under more

difficult field conditions, including winter weather;

performance of certain work, including cutting and

welding in the field, which would have been performed

more efficiently in the shop’’. (Verified Bill of Par-

ticulars, Page 17).

Bar Steel Construction Corporation entered into a sub-

contract with the Claimant on November 7, 1961 requiring

the contractor to furnish a quantity of bar reinforcements

for structures For Trucks Job-site “at no cost to the

subcontractor’; to furnish a crane as required at no

cost to the subcontractor except that the subcontractor

would pay the crew. The subcontractor was required to

furnish the necessary tie-wire and all other accessories.

The contract provided that the subcontractor be paid in

full by the contractor ninety (90) days after completion

and acceptance of subcontractor’s work by the owner.

Of the amount in Schedule I of the claim the State’s

auditors found $103,877.08 “not subject to audit determina-

tion’’ and $5,169.80 “not includible in claim”. The reasons

for their findings are stated in the Auditor’s Report (Ex-

hibit T, Schedule 1-1).

Bar Steel Construction Corporation failed to offer in

evidence its estimator’s bid work-up (Transcript, Vol.

XXI, Page 35). Its schedule of additional cost was pre-

pared for this claim (Transcript, Vol. XXI, Page 36) but

it submitted no claim to Johnson, Drake & Piper. The

President of Bar Steel Construction Corporation, Cedric

Janien, was asked whether he had billed the amount shown

on that schedule to Johnson, Drake & Piper and he replied:

“No we didn’t”. (Transcript, Vol. XXI, Page 37).

The subsurface conditions at the site were not different

from the conditions described in the Special Foundation

A33

Appendiz C, Decision of Court of Claims,

State of New York.

Notes of the Contract Proposal to which the Court has

already referred. The design decision to support all foot-

ings on piles was based on such subsurface conditions.

The State is not liable to the contractor-claimant under

Schedule I, nor to the subcontractor. The subcontractor,

if it has incurred any losses under the contract of Novem-

ber 7, 1961, would have to seek recourse against the Con-

tractor.

The Second Cause of Action, Schedule J seeks to recover

additional costs ($1,486,783.62) incurred in:

“ _ . the failure on the part of the State to approve

timely the cast-in-place pile subeontractor, the failure

on the part of the State to coordinate the work prop-

erly, the failure on the part of the State to provide

access to the site of the work to Johnson, the failure

of the State to fulfill other obligations on its part to be

fulfilled, and because of the performance of extra

work, Johnson became entitled to appropriate exten-

sions of time in the completion of the Contract” (Para-

graph 14, Notice of Claim).

The Demand for a Verified Pull of Particulars required

the claimant to set forth the facts underlying these conclu-

sory allegations.

The Contract was entered into October 31, 1961. The

first pile rig arrived on jobsite January 30, 1962 and the

first pile was driven February 13, 1962 by Raymond Inter-

national, Inc., pending the approval of their pipe-step

taper pile (ED-410) and other piles and equipment. Ray-

mond expected that the piles and hammers which it in-

tended to use on this jobsite would likely meet with the

State’s approval inasmuch as similar instruments had been

aproved by the State on January 5, 1962 for Contract

FAVWE 61-4.

A34

Appendiz C, Decision of Court of Claims,

State of New York.

The allegation that the State failed to coordinate the

work properly and to provide for the claimart’s access to

the site attributes responsibility to the State for a situation

completely controlled by and the responsibility of others,

by the terms of the Contract Proposal. From February

1963 to the date of completion of claimant’s work, the men,

materials and equipment of numerous other contractors of

the World’s Fair Corporation converged on the jobsite.

The contractors, including the claimant, failed to coordi-

nate their activities thus obstructing, delaying and inter-

fering with the claimant’s work. The Claimant, in turn,

obstructed, delayed and interfered with other contractors.

Responsibility and liability are attributable to these con-

tractors and no liability adheres to the State. (Contract

Proposal, Pages 34-40, 110-122).

The Claimant alleges (Verified Bill of Particulars, 6C,

Pages 47-49) that the State unreasonably delayed from

December, 1961 to January, 1962 in submitting timber pile

order lists to it after the timber test piles had been driven.

The approval of H. Johnson as subcontractor was given

promptly on December 5, 1961 and two timber test piles

were immediately driven. The remaining 13 timber test

piles were driven between December 6, 1961 and December

29, 1961. The estimated quantity of 1,000 linear feet was

overrun by 35 feet.

On December 14, 1961 the State approved the use of 50

foot lengths of timber piles for various structures (114,

119, 120 through 124A). On January 2, 1962 subcontractor

Johnson began driving piles from M.H. 122A toward M.H.

120; and continued pile driving on January 3-5, 8-12, 16-19,

22, 1962. The contractor left the jobsite on January 23,

1962 because of a delay in the delivery of piles, but re-

turned and resumed pile driving on February 2, 1962.

On January 23, 1962 the Claimant was given a list of 13

add'tional test piles which were driven between February

am

! | -

s

- .

:

A35

Appendix C, Decision of Court of Claims,

State of New York.

12, 1962 and February 28, 1962. On February 23, 1962 and

again on February 28, 1962 TAMS gave the Claimant

order lists for all piles except a group represented by test

pile CB-146.

The Public Works Specifications (Pages 374, 375) pro-

vide for ordering of additional test piles and for the au-

thority of the Deputy Chief Engineer to change the loca-

tions, numbers, lengths and methods of driving test piles

at any time during the progress of the work. The sub-

contractor continued timber pile driving between February

2, 1962 and March 28, 1962, and, after unloading 85-foot

piles on March 29-30, 1962, left the jobsite to return on

April 29, 1962 to resume driving the 85-foot piles. The

svbeontractor again discontinued pile driving, between

May 8-28, 1962 and again from June &, 1962 to October 9,

1962.

The suspension of pile driving during the latter four-

month period occurred despite the stockpile availability

of 500 timber piles of 80 foot length and the availability

on order of 300 more, as well as shorter piles which could

have been obtained on notice. Because of insufficient

sheeting from the drainage pier work, the claimant ordered

a stoppage of pile driving on the drainage work to favor

its pier work.

The Claimant’s allegations (Verified Bill of Particulars,

Page 48) that the State unreasonably delayed providing

engineer lay-outs to the claimant, and that the State de-

laved unreasonably in checking the claimant’s lay-outs after

the latter began preparing them, are unsupported by proof.

The Claimant, after destroying restaking piles, failed to

comply with the requirements of the Contract Proposal

(Page 25, Stake-out Survey) that the Contractor “. . . must

provide his own men and instruments ‘or actually reestab-

lishing such marks if they had been destroyed due to his

Appendiz C, Decision of Court of Claims,

State of New York.

operations or any other causes, subject to the check and

correction of the Engineer”.

To expedite the work TAMS provided the lay-out, the

Claimant having failed to comply with the Contract Pro-

posal. On January 15, 1962 the claimant wrote to TAMS

requesting a stake-out of various piers. On February 2,

1962, the State informed the Claimant that it was trans-

ferring the responsibility for the stake-out from TAMS to

the Claimant in accordance with the obligation imposed on

the claimant by the Contract Proposal.

The Claimant's allegation (Verified Bill of Particulars,

Page 48) that “Throughout the job the State was unreason-

ably slow in responding to requests by JDP and in supply-

ing necessary clarification, approvals, information, etc.” is

general to the edge of vagueness and without any visible

support in the record.

The Claimant’s further allegation (Verified Bill of Par-

ticulars, Page 48) that “Throughout the job, State arbi-

trarily and unreasonably required JDP to overdrive its

pile to a bearing capacity beyond that specified in the Con-

tract” (6) should be considered in the light of Public Works

Specifications.

“When required, the lengths and number of the piles

will be determined by actual loading of the tests, which

will be paid for under the Item Load Tests for Piles.

“All piles shall be driven to the elevation shown on the

plans or to the resistance ordered by the Deputy Chief

Engineer (Bridges) at the time of Driving”. (Page

378, sub-paragraph h).

Pile-driving began on February 13, 1962 with a pipe-step

tapered pile to a depth of 106 feet in Pier HC-1. The sub-

contractor continued driving piles at HC-1 on February 14,

and 15, 1962. On February 16, 1962, it drove four piles in

A37

Appendix C, Decision of Court of Claims,

State of New York.

Pier HC-2. These piles were driven an average of 140 feet

without obtaining the required blow count, a figure in ex-

cess of the State’s estimate of 75 feet. Piles were driven

at Piers HC-3, HD-5, HD-6, before April 2, 1962 when the

Claimant complained of delay in receiving permission to

concrete piles and footings. The pouring of piles at these

piers took place between March 28 and May 2, 1962 and

the concreting of the footings on May 8 and 9, 1962.

The so-called Engineering News Record Formula of

measuring driving resistance by blows per foot and of de-

termining the allowable load capacity was regarded as un-

reliable by TAMS. Although the Public Works Specifica-

tions (Item 88P) makes provision for load tests for piles,

the manner of loading a test pile must be as shown or in-

dicated on the plans or as ordered by the Engineer. Neither

the Contract Proposal nor any order of the District Engi-

neer dealt with the subject.

As late as July 25, 1962, the District Engineer, in a letter

to TAMS, stated the standard for the installation of cast-

in-place concrete piles.

“The required driving resistance shall be 150% of that

computed from the Engineering News Record formula

utilizing the 35 ton pile bearing requirement, and the

driving energy of the Raymond single acting, heavy

ram 1S hammer which was approved for this work. The

open end piles under Item 85CO shall be driven to that

penetration that will develop the required resistance.

The minimum penetration for these piles however,

shall be 10 feet below the invert of the existing 12’-

6’x8’-0’ Storm Sewer”.

On August 14, 1962 according to the Resident Engineer,

a 221 foot pile was driven in the HA-Abutment. On August

15, 1962 TAMS studied the feasibility of “freezing” piles at

AMS

A ppemdia ©. Drewisnem of Camtt of Chem.

State wt Now Tock,

Se stmnpe Cente S20 3G Senet depths, wand am ea queriament tse

racue tay (fe allomume the giles te teammate gmdustmetved «ree,

St) prone emewemetal Oke Meptieulies 1, INET the Des.

pegernor aEET OCS the “Creeping” anctind Fae Soya

Marek 25, 106, slates “vied

Tike State cetiausterd ZMH Limeme feet of emetiiee

poles, (Comteges Mrepmeml, Mage 3, teen Km"). The Chain

aos wee pad toe SETS F Gaese feet (Tranacsigs, Ver. ¥,

Page 153); Mine Mesemmte, Steet Fy,

Tie (Taveumat ailiegice kat “thie Mate attiitagds aad oe.

Commmmmbly gefaned te perens SIP te conwretc amy puller

Set BR pilleubsinamy withie BOK Feet bind tere cwmnplieted”

(Veretied Mul of Mastiontase, Mage &4).

| Tike CDacaeimant’s Pawjient Ringigeies viaad tue mensiid hep Sue

Sqiwwmtemetiog wmedicns Mie utvegubagity aart etheds whack

Sohn pord the Claraunat, Pevimiegham Se cemuegetc weetais

fotee wete demued the nemttmetioe Bewmase the sthentices

seghs kane peered Saanaging te sgsvermding aenettwmetoon

Thelig ne a wiexmetictc Medic ark due je amp grie dovr ume reeteuc.

Soo Se FARMS bat seetited petaeesilp Seems & tack of cm,

oototatiom Metmeenk She Cleat gad Ge Sik ateacter.

Mivetie med coe “adwicie phievic price, atsea hupoutms Gree clesaes,

waters ome mad Swe wictelie Gtetietie thie Malnecmtegetee’s roe

Coes Cle gk adored Se penmedigs the wemesetc. The Hess.

Seat Regence, em Deady 84, Si, emaeplintmed te the Chains

ants Pawjewt Magiaees od :

““. 9 = @ Seta Sere Segiie af Between cue week amd

iO dene betege Bapauend cometetcr The piles after thes

ate davven, acd Thetetege, semne poses ate sat civcrther

suphased cy Thee Teen’.

ee ee

PPLE VS hp MII ONES te EK

AIS

A ppomdes C, Decisson of Court of Claims,

State of New York.

The Selesstractor had so less than five other jobs in

the sntee aren at this time. (Transcript, Vol. XIII, Pages

S, 9.

The Claitwars alleges (Second Cause of Action Par. 14)

the gorforsanee of extra work. It alleges further that

ite porivyesence of work called for by the Contractor was

detested, imterfered with and made more difficult; that

Pe atest of work which it had to perform was increased

thereby optitiing i to corresponding time extensions.

(Vers®ead Mill of Particulars, Page 49, subparagraph 6

id}.

The “extra work’’ oxnsists of ao listing of 43 instances

(Verified Bill of Particulars, Page 49 through 52, Ex-

hebets G, L. & M of the Verified Bill of Particulars). This

allegatian comprehends every aspect of the claim for work

whee wae required by the contractor done to correct im-

proper werk dene or done with little or no delay or done

withewt additional time, or which was not the subject of

ay record or directive. Twelve additional instances of

tetxs of changed or extra work which allegedly hindered,

interfered with or increased the work done are

felty explained and negative any suggestion of the State’s

ability (Exhibit ¥, Pages [1-48 to I-64).

15 of the Second Cause of Action alleges

that, despite the Claimant's entitlement to time extensions,

whieh were refused or not granted, the State directed the

Cinitesnt to accelerate its performance to meet the original

date or the subsequently extended completion

dates amd that such extensions were in@dequate and not

properly granted.

The Verified Bill of Particulars (Pages 54 through 57)

repeats the allegation in general terms that: ‘JDP was

delavect, interfered with and hindered in the performance

of ite work and was required to do extra and additional

A40

Appendiz C, Decision of Court of Claims,

State of New York.

work’’, It refers to Paragraphs 3 to 6 and 12 for a full

description of the actions and alleges that it protested, but

that the State failed and refused to grant an extension of

the completion date. Instead it allegedly ordered the

claimant to accelerate its performance to complete the

work by the specified contract date.

Informal written requests for time extensions and re-

imbursements appeared in letters, dealing with other sub-

jects, from the Claimant to TAMS dated January 23,

1962. The first formal request, Notice of Application

for Extension of Time, dated October 29, 1963, submitted

by the Claimant to the District Engineer, sought an exten-

sion of time from the original contract completion date,

October 31, 1963, to December 31, 1963. The Notice of

Application for an Extension of Time was filed two days

before the scheduled completion date, although Article 4,

Page 23, of the Public Works Specifications provides:

‘Notice of Application for such extension shall be

filed with the District Engineer of the district within

which the highway under construction is located at

least 15 days prior to the date of completion fixed

by the terms of the agreement’. (Interlineation

added).

The record abounds in evidence that the Claimant lagged

behind the Progress Schedule throughoui the contract term.

The District Engineer noted on March 20, 1962 that the

Claimant had accounted for earned money of 3% of the

contract instead of 13% as required by the Schedule. On

June 26, 1962 the Claimant was 3 months behind. It was

so informed and was asked to increase the size of its

working force to complete the contract on the date

scheduled.

The District Engineer on November 8, 1962, informed

the Claimant that it was lagging behind its latest Progress

A41

Appendix C, Decision of Court of Claims,

State of New York.

Schedule. It was urged to ‘‘. . . initiate the necessary

steps to increase your present rate of progress’’ to mcet

the contract completion date.

On December 31, 1962, the Resident Engineer informed

the Claimant’s office Engineer that the project was 41%

complete and the Progress Schedule required 62% com-

pletion. On January 11, 1963 the Resident Engineer in-

formed the Claimant that it was more than 2 months

behind Schedule. On June 13, 1963 the Superintendent

of Public Works sent a wire to the Claimant informing

it that 77% of contract time had elapsed and the work

called for in the approved Progress Schedule had been

only 63% completed, i.e. 3 months behind time Claimant’s

January 29, 1963 Progress Schedule. The wire contained

the following:

‘‘T hereby direct you to increase your working hours

or take other measures as necessary immediately to

put your job on schedule’’.

On August 8, 1963, the TAMS Project Engineer advised

the Claimant to increase its rate of placement of deck

concrete. At this date, the Claimant was % months be-

hind its Progress Schedule.

Pursuant to the Contract Proposal (Page 36, Progress

_ of Work) the Claimant bore responsibility for submitting

a completed Schedule of operations and of re-submitting

it, if necessary, for the approval of the Engineer. The

Contract Proposal states:

‘‘The Contractor will be required to place sufficient

equipment, labor efforts on the work within ten days

after the award of the contract so that the work may

be progressed in accordance with the approved

schedule’’.

ob

A42

Appendiz C, Decision of Court of Claims,

State of New York.

The State’s efforts to secure the Claimant’s compliance

with the Schedule of Progress and to assure the timely

completion of the Contract have been extensively char-

acterized by the Claimant as acceleration. The Claimant’s

Proposed Findings of Fact (No. 430):

“The acceleration directed by the State was without

basis in its contract with claimant (Ex. 380)”

is notable for two reasons. First, Exhibit 380, no matter

how viewed, offers no support for the Proposed Finding.

Second, the Contract, which has a stated date of completion,

is deemd to offer no basis for one of its parties, the State,

to urge the other party, the Claimant, to abide by the

Schedule and make very effort for a timely completion. The

Claimant, in effect, seeks to have the State held liable for

its efforts to have the Claimant live up to its contractual

obligation. This Court will not assist the Claimant in the

attempt.

The total amount sought by the Claimant for his Second

Cause of Action is the additional cost allegedly incurred in

accelerating the performance of the work is $1,486,783.62.

Of the sixteen items comprising the total amount only Item

10 is one for which the Court finds the State liable. The

Claimant incurred the additional cost of siliconing concrete

deck work in the sum of $3,232.81, a sum which included the

general Contractor’s 5% markup on the subcontractor’s cost

and remained unpaid. The silicone was added at the State’s

instructions and was not included in the original contract

(Exhibit 401; Transcript, Vol. XVII, Pages 26-28).

The Third Cause of Action alleges increased cost

($455,008.62) incurred by the Claimant:

“. .. because of the failure of the State, its agents,

servants and/or employees to coordinate and progress

the work in the area of the site in which Johnson was

A438

Appendiz C, Decision of Court of Claims,

State of New York.

to perform its Contract and the work embraced therein

and because of directives by the State to perform cer-

tain extra work, Johnson was caused to perform its

Contract and work embraced therein }1 a manner not

contemplated and intended by the Contract at the time

of bid.” (Notice of Claim, Par. 20).

It alleges further that it was compelled, under protest

and solely because of the State’s failure:

“ .. to perform its work for an extended period, Le.

from October 30, 1963 to July 16, 1964, thereby being

required to incur additional and increased cost and ex-

pense for material, labor and services . . .” (Notice of

Claim, Par. 21).

The Third Cause of Action is based entirely upon the con-

ditions and allegations already set forth in the First and

Second Causes of Action with both of which the Court has

already dealt. The Claimant seeks to burden the State with

the responsibility for delay in completing the contract from

its scheduled date, October 30, 1963, to its extended date,

July 16, 1964, and to recover the

“ . . inereased cost of performing the work after the

said date which cost were over and above what the cost

would have been had contractor been permitted to per-

form the work as contemplated and intended by the

contract the time of bid”.

In its Statement of Claim (Verified Bill of Particulars,

Exhibit B, Pages 26, 27) the Claimant seeks $299,048.03

“for the extended period of overhead, general equipment

rental and administrative costs” (Part A). It claims

$97,973.17 “. . . ineurred increased cost in pumping water

after the date upon which it would have been completed, i.e.

A44

Appendiz C, Decision of Court of Ciaims,

State of New York.

January 14, 1963”. (Part B). It claims $19,770.33 for the

alleged cost in placement of reinforcing steel after August

1, 1963. (Part C). It claims $38,273.09 for the alleged in-

creased cost incurred by its Subcontractor, Jandous Elec-

trical Company, a sum consisting entirely of charges for

supervisory personnel and equipment but containing no

charges for electricians or other labor. (Part D).

The greater part of alleged damages in the Third Cause

of Action (Part A) is attributed by the Claimant to the in-

terferences at the jobsite of other contractors, particularly

Tufano Construction Corporation. (Proposed Findings of

Fact, Nos. 478 through 482). The Contract Proposal (Page

35) defines the responsibility of the Claimant and the obli-

gation of the State in such situations, as follows:

“In case of interference between the operations of dif-

ferent contractors, the Engineer will be the sole judge

of the rights of each contractor and of the sequence of

work necessary to expedite the completion of the en-

tire project, and in all cases his decision shall be ac-

cepted as final. The Contractor agrees that he has

included in his unit prices bid for the various items of

the Contract the additional cost of deing the work

under this Contract because of the fact that he does not

have a clear site for the wo.k and because of inter-

ference of roadway use, other contractors and neces-

sary utility work and because of any other limitations

herein specified.”

. . .

“Delays in the availability of any part of the site or

any delays due to interference between the several

contractors, or by utility companies, shall be compen-

sated for by the Superintendent of Public Works solely

through granting an extension of time in which to com-

plete the work of the Contract. The Contractor shall

A45

Appendiz C, Decision of Court of Claims,

State of New York.

have no other claim against the State of New York for

any damages due to such delays or interference, other

than extended time in which to complete the work”.

The Scheduled completion of pumping (Part B) by Janu-

ary 14, 1963 was rendered impossible by the Claimant’s use

of inadequate lengths and insufficient strength of sheeting

which it employed. The responsibility for failure to per-

form the work properly rests with the Claimant and not

with the State.

The Scheduled completion by August 1, 1963 of the work

of subcontractor Bar Steel Construction Corporation was

delayed to December, 1963 (Part C). The claim for the

placement of reinforcing steel after August 1, 1963, an item

that was bid and paid for, has no relevancy in point of time

as charged by the Claimant. The cause of the deiay was

revealed by the President of the Bar Steel Construction

Corporation, Cedric Janien, in cross-examination:

‘‘Q. But you couldn’t do your work, could you sir,

until the cofferdams were built where they were neces-

sary and until the pile driving was done, is that cor-

rect?

A. That’s correct.

Q. If there was a cofferdam failure you could not get

access to that area, could you?

The Witness: No, we couldn’t work efficiently.

If there was a failure we had to hang around.’’

(Transcript, Vol. XXI, Pages 31, 32).

If extra work was performed the subcontractor was re-

quired by Article 14 of its Agreement with the Claimant

to bill the Claimant for it. It failed to bill the Claimant for

extra work or for additional costs. The schedule for ad-

A46

Appendix C, Decision of Court of Claims,

State of New York.

ditional costs, from August to December 1963, was prepared

for claim purposes of the Claimant (ibid, Pages 26 through

37). The responsibility, if any, for additional costs in-

curred is a matter to be determined between the Claimant

and its subcontractor.

The claim (Part D) for $38,277.09 for increased costs be-

cause of delays to subcontractor Jandous Electric Con-

struction Corporation fails to indicate any reason for hold-

ing the State liable. Vice President Feinsilber of Jandous,

under cross-examination, stated that his company had no

bid work-up for the project (Transcript Vol. XVIII, Page

17); that the extra work beyond what was called for in the

contract had been paid for (ibid, Page 22); and that he

was not making any claim for idle equipment (ibid, Page

24).

The Fourth Cause of Action, consisting of miscellaneous

claims, seeks to recover $89,230.84, the additional and in-

creased cost and expense allegedly incurred, under protest,

in having been ordered by the State to perform certain

extra and/or additional work beyond that required by the

Contract. The allegedly extra and/or additional work is

set forth in the Statement of Claim (Verified Bill of Par-

ticulars, Exhibit B, Pages 30 through 39, Schedule O, Notice

of Claims) in 16 paragraphs. The Court’s findings in

respect of each is stated:

1) The Claimant seeks $33,307.52 for the installation

of permanent steel sheeting in the construction of the

drainage run 20-21-22 at Rodman Street. The Claimant

had the obligation of removing and salvaging the sheeting,

under Item 83X, after having beén advised that he would

not be paid for permanent sheeting.

2) The Claimant seeks $6,689.62 for the excavation of

earth materials from the Flushing River South of the haul

A47

Appendiz C, Decision of Court of Claims,

State of New York.

road in the vicinity of Pier HD-9. The restoration of the

river to its original condition was an obligation of the

Claimant under Item 82S of the Contract Proposal (Page

124), and of the Publie Works Specifications (Page 43).

The Claimant seeks $2,619.74 for new coping allegedly

required for the alteration of existing walls at Piers HB-2

and HC-16. The Superintendent of Public Works properly

denied this claim in his letter to the Claimant dated July

23, 1964 on the ground that ‘‘the minor changes in the stone

coping required for restoration are apparent from the

plans and specifications’’.

4) The Claimant seeks $412.12 for the State’s alleged

failure to afford it a proper site in Park Service Road A

in the vicinity of Piers HD-5 and HC-2 which necessitated

the concreting of the pavement of the partially constructed

roadway before covering it with asphaltic concrete paving.

The need for concreting resulted from the operations of

another contractor, Tufano Contracting Corporation. If

the Claimant has sustained damages it should proceed

against Tufano and not against the State.

5) In response to the claim for $910.30 for the taking

of concrete cores in the footings of Piers HA-2 and ML-37

and 39 and in the pavement of North Collector Distributor

Road, the District Engineer in his letter of April 28, 1969

correctly replied that . . . ‘‘the contractor violated con-

tract specifications . . . was advised of such violations and

requested to provide proof as to the strength accept-

ability . . . the cost of all such cores or other methods of

proof that the Contractor selects shall be borne by the

Contractor with no contribution whatsoever by the State

of New York’’. The Claimant was paid $300 for the taking

of test cores at ML-37N and 39S under new Item 925. It

is not entitled to further payment.

A48

Appendiz C, Decision of Court of Claims,

State of New York.

6) The claim for $438.56 for extra work in connection

with the fabrication of Item 202-8 galvanized W.I. pipe was

co.rectly disallowed by the Superintendent of Public Works

because the Claimant had:

‘‘Apparently failed to follow the revisions and cor-

rections shown on the shop drawings and did not head

the ‘Approved as Noted’ statement thereon. Note ‘A’

clearly stated that all dimensions and correction de-

tails ‘shall be verified in the field before fabrication’.

‘‘Tt is also noted that additional costs incurred were

undoubtedly the direct result of failure to clearly and

accurately observe, define and fabricate the bridge

drainage facility that could be installed at the location

required by the contract plans.’’

7) A claim in the sum of $263 for inspecting and clean-

ing an existing 18” sanitary sewer line under the Flushing

River was correctly disallowed by the Superintendent of

Publie Works in a letter to the Claimant dated July 13, 1964

because rectification of the damage that the contractor

itself had caused cannot be considered extra work within

the purview of the Public Works Specifications.

8) The claim for $5,455 deriving from an alleged order

of the State requiring the contractor to place additional

concrete was properly disallowed by the District Engineer

in a letter to the contractor dated October 23, 1964. The

structural steel stringers over which the concrete was

placed had excessive camber and would ordinarily have

been rejected. Due to the pressure of a World’s Fair dead-

line the District Engineer accepted the stringers thereby

necessitating a finished concrete slab thickness 8” less than

required in the contract.

A49

Appendiz C, Decision of Court of Claims,

State of New York.

9) The ciaim in the sum of $1,365.58 for the alleged addi-

tional cost of opening the viaduct on December 30, 1963

was properly disallowed by the Superintendent of Public

Works in his letter to the contractor dated June 30, 1964.

The Contract Proposal (Page 118, Paragraph i) provides:

‘*‘When directed by the District Engineer the contrac-

tor shall open to traffic any portions of new pavement

or structures before final acceptance of a contract.”

The same ‘‘shall be paid for at the lamp sum price bid for

this item’’.

10) The claim for $219.87 for the eaulking under the mall

barrier posts on the Main Line Viaduct was correctly dis-

allowed as contract work covered by the Contract Proposal

and the Public Works Specifications.

11) The Claimant seeks $2,201.42 for the construction of

field inlet 102A and catch basin 102B ordered by the Dis-

trict Office. The Superintendent of Public Works in a

letter to the Contractor, dated May 13, 1964 correctly dis-

allowed the Claimant for the following reason:

‘*We find the work ordered by the District Office was

completely similar to other drainage work on the con-

tract plans and within the intent, scope and require-

ment of the contract which provides proper and

adequate drainage facilities within the project site.

The additional drainage work is not found excessive

in quantity and was ordered when your forces were

working on the site. The order was reasonable and

necessary and in accordance with the spirit and intent

of the Contract and its specifications.’’

12) The Claimant seeks $1,468.48 for having repaired

leaks in the 20” force main. The Superintendent of Public

A50

Appendiz C, Decision of Court of Claims,

State of New York.

Works in a letter to the Claimant July 10, 1964 correctly

disallowed the claim because the leaks which developed

were the direct result >f the Claimant’s construction opera-

tions, such as pile « ‘iving and other heavy construction

activities, performed directly above and adjacent to the

sanitary line. The responsibility and cost for repairing

this damaged line was the contractor’s.

13) The Claimant seeks $859.71 for corrective work on

sign support bases L-3, and L-12. The Superintendent of

Public Works properly disallowed any liability of the State

for this work in a letter to the Claimant dated August 27,

1964 which read, in part, as follows:

‘*We have reviewed your letter and the appropriate

contract documents and find that a construction error

produced in the expansion joint of the VanWyck Ex-

pressway viaduct at sign base supports L-3 and L-12

was so produced by you and is a clear violation and

contradiction of the subject contract plan requirements.

‘*All remedial work is to be performed by you at nu

cost to the State.’’

14) This claim is in the sum of $9,894.72 for the purchase

of additional reinforcements alleged to have been required

by the ‘‘redesign of the concrete structure on the HE Ramp

east and west side . . .’’ (Paragraph 23, Notice of Claim).

The Demand for a Verified Bill of Particulars (Paragraph

12, Pages 6, 7) required the Claimant to set forth in detail

the facts underlying this pirt of the claim. The Verified

Bill of Particulars (Paragraph 12 (0), Page 84) stated

that:

‘*Contracts Drawings 204, 205, 206 and 207, which

relate to the HE Ramp, were revised by the State

A51

Appendiz C, Decision of Court of Claims,

State of New York.

primarily to provide for a continuous pile cap support.

This revision, araong other things, required that the

concrete forms had to remain in place, that reinforcing

steel which had already been fabricated and delivered

had to be revised, and that backfilling and overall

construction methods were complicated and made more

expensive and time consuming.”’

The record bears out this portion of the claim. The

claimant, in its Proposed Findings of Fact (Nos. 554

through 557) reduced the claim to $8,311.26, to reflect the

audit figure after deducting the disallowed sums.

15) A claim in the sum of $21,560.26 for the increased

cost of timber pile cut-offs (Paragraph 23, Notice of Claim)

is described in detail in the Verified Bill of Particulars

(Paragraph 12 (p), Page 84), which states that:

‘‘JDP incurred increased costs in cutting, removing

and disposing of these increased lengths.’’

The claim was properly disallowed because of a provi-

sion of Public Works Specifications:

‘‘m. Measurement and Payment. . . . The unit price

bid per linear foot shall include the cost of furnishing

all labor, materials end equipment necessary to com-

plete the work. . .

‘‘Piles that are delivered at the site of the work in

accordance with the itemized list furnished the Con-

tractor by the Engineer, and that for any reason are

not used in the work shall be the Contractor’s property

if he so elects. In event that the Contractor does not

desire to retain these piles for his own use, the De-

partment will purchase the same at the cost of the

piles delivered at the site of the work.’’ (Page 379).

AS?

Logie © Denon oF Cannt oF t titans.

Sake 08 Mew F veh.

36) A cligctie om Sue srmte of $3,564.10 appenty ta the No

Tate of Clee (Pavagenpi 22, Siedule Oy, The Verpfied

Had wf Pyatneminne (42 (cq). Page $4) states :

“SOP wae Geceted a: an Mem of exten werk (Itecw

WOT! Se pevtodte sniiemtting of the comegele paretnest

ete he <pietang ousemient af Lame Pelged Bagecsowas.”’

The CRedeemat ohatee Sheet ch tame send cmete of 916,085.99,

hegs senienserg ee tthe ste of G14476. 79, aad seek

Se semmmied Se Bevenwe This terme aeeemat Werk Hem

WUE msie tretetperinlly cemapietied on Pehrmmey 14, 1S6% aed

Hasnlliy cminphictid we Sganmey 1, IGE The Clarenamt fqileel

te seas owpieeiy sewception$ Selle aad the dieeropemcios

‘heat apeprepesiers wen Sheene Shalt mete enptemsttierd wartassierd the

scdeuctaon, of Shae clams So $2, 00K, the gtncmst conticnyd

Soy Sie Readme “s Be pines.

Tbe FR Ces of Dita sMhoges that:

“The priegieste? Fined Agrertzent sed Finat Pets.

cra e hieticnt wae gemdic Lalsely, cegumeousiy, arhs.

tone, weenie. a. bed Saath, om celntion of the

Sedmme acud gtr cetere of Sie Clenteaet and sesseonetruc

ae Shevest ax Skat, stem ether Shinge, 1 oortifiod

Led ginrwaient She qumetituer of gimognts et forth usder

She <tefue breiew depagmpted “Gaastety of Ansount

augers ty eetied metegd «af ceetifying the true

oud cegieeh qeaiices peepesizy eommpated . *' (No-

‘are ad KTae, Taeageagis 26).

The Dewan tee a Vested Mail at Particulars sought to

tire ive C Tdi

wet Seeth She arte sardettyiag the conclusory

aitiegetien Shei the goeepected Pinal Agresment anil

Feel Metieaa*e wae acade falecty, etrancausly, arbi

A53

Appendiz C, Decision of Court of Claims,

State of New York.

trarily, wrongfully, in bad faith, in violation of the

terms and provisions of the contract and in miscon-

struction thereof, including, but not limited to, setting

forth in haee verba the terms and the provisions of the

contract which were violated and the terms and provi-

sions of the contract which were misconstrued . . .’’

(Demand 14a)

The Verified Bill of Particulars fails entirely to respond

to the Demands of Paragraph 14.

The Fifth Cause of Action sets forth eight separate

claims for which the Claimant seeks additional compensa-

tion of $79,101.43. In its Proposed Findings of Facts (No.

570) the Claimant has reduced its total claim to $78,801.43.

The State's Auditor’s Report (Exhibit T, Page 162) states

that:

‘“‘No data was submitted by claimant, therefore,

auditors have placed the amount of claim as un-

audited.’’

The Court’s findings in respect of the eight claims fol-

low :

1) The Claimant’s allegation that it is entitled to pay-

ment in the sum of $14,668.00 for specified quantities of

Items 258 and 25SU is without merit. The State properly

denied such payment because the Contract Proposal (Pages

92, 93) provides for payment for square yards of pavement

and not for square yards of steel fabricated reinforcements.

2) The claim for $4,000 under Items 47 and 47C involv-

ing a substitution pursuant to Contract Amendment No. 2,

is correctly made and is approved.

3) The claim for $3,126 for additional top soil under

Items 121 and 121A is disallowed. The Public Works

Ad4

Appendiz C, Decision of Court of Claims,

State of New York.

Specifications (Pages 439, 440) provide for payment of the

number of cubic yards of top soil measured after it had

been acceptably plaeed and such payment includes full

compensation for all labor, materials, equipment and inci-

dentals necessary to complete the work as specified. The

Claimant’s failure to stock pile and place the top soil

properly and its partial loss before final placement are the

Claimant’s responsibility.

4) The claim for $9,003.06 to cover a quantity of Item

2078 which, allegedly, had not been certified, was properly

disallowed. The additional amount is for 15,005.10 lbs., of

steel water main specials at $.60 per lb. An examination

of the Contract Proposal (Page 146) under Item 2078S dis-

closes that the straight pieces of pipe, for which additional

payment was sought, were specifically excluded from this

Item.

5) The claim for additional payment under Item 76YS

in the sum of $3,505.02 was properly rejected by the State

because of nonperformance of the alleged watchmen serv-

ice (Final Estimate, Page 10).

6) The claim for additional payment of $300, for an

altered two-catch basin, field inlets, manholes and top in-

lets at the HF Ramp, was properly disallowed. No evi-

dence was adduced of the locations at which the work was

alleged to have been done. The Final Estimate included

payment for all alterations at the HF Ramp.

7) The claim in the sum of $42,118.43 for additional pay-

ment under Item 84TC which, allegedly had not been prop-

erly certified, was correctly disallowed. The claim is based

upon the incorrect assumption that 30’ was the estimated

length of creosoted timber piles. The total quantity con-

sisted of 2,694 creosoted timber piles having a total of

A55

Appendiz C, Decision of Court of Claims,

State of New York.

141,431 linear feet or an average estimated length of 54.45

linear feet, and was paid for in accordance with the Public

Works Specifications (Page 379). Piles in excess of 66

feet were paid for additionally.

8) A claim in the sum of $2,380.92 is made in behalf of

Claimant’s Subcontractor W. B. Johnson, Jr., for addi-

tional payment under Item 28B for a quantity of sheer

cofinectors. The claim was properly disallowed because

the Claimant failed to reply to a Demand (Par. 15, Demand

for a Verified Bill of Particulars) for a location by stations

where the work was performed or the material incorpo-

rated. The Claimant adduced no evidence in support of its

claim.

The Sixth Cause of Action alleges an additional amount

of $2,643.06 due under Item 601, Watchmen Service. The

State sought to have the Claimant:

‘¢. . . furnish a schedule of the dates and hours Uni-

formed Watchmen Service worked but for which the

Claimant was not paid.’’ (Demand, Verified Bill of

Particulars, Par. 16).

The Verified Bill of Particulars did not respond to the

Demand. It was marked ‘‘unaudited’’ by the State’s

auditors because ‘‘Claimant did not submit supporting

data”. No evidence was adduced in support of this Cause

of Action.

The Contract was accepted as performed on August 13,

1964. The Final Estimate was not received until August

80, 1967. The time gap is unexplained. Lawful interest

is to be computed from November 13, 1964.

The trial transcript in the above-entitled suit consists of

23 volumes and more than 4,000 pages. The Exhibits, num-

bering 626, cover more than 5,000 pages. The Verified Bill

of Particulars, motions papers, briefs and memorandums

consist of more than 1,100 pages.

A56

Appendix C, Decision of Court of Claims,

State of New York.

CPLR 4213 (a) states:

‘*Before the case is finally submitted the Court shall

afford the parties an opportunity to submit requests

for Findings of Facts. Each request shall be num-

bered and so phrased that the Court may conveniently

pass upon it.’’

The Claimant has submitted for the Court’s considera-

tion a single page containing 5 suggested Conclusions of

Law and 70 single spaced pages containing 575 Proposed

Findings of Facts and approximately 2,000 references to

the transcript and the Exhibits.

The Court has sought to render its written decision

within 60 days after final submission, as provided in CPLR

4213 (b) and (c), but has been thwarted by the sheer mass

of Exhibits and Proposed Findings of Facts. The attempt

would be time-consuming and complicated by the repetition

of evidentiary material, comment, argumentation and other

improprieties of style and substance not within the purview

of CPLR 4213. Few of the 575 Proposed Findings of Facts

could be called ultimate or essential facts.

The State submitted 98 Proposed Findings of Facts.

Proposed Finding of Fact No. 1 states: ‘‘The following

Proposal provisions (Exhibit 1 in Evidence) are applicable

to pile driving’. Three and one-half pages of actual text

from Exhibit 1 follow. The second Finding of Fact states:

‘*The following provisions of the Public Works Specifica-

tions of January 2, 1957 (Exhibit 3 in Evidence) are also

applicable to pile driving’’. Six and one-half pages of

actual text from Exhibit 3 follow. The Proposed Finding

on cofferdams states that the provisions of Exhibits 1 and

3 on the subject are applicable and two and one-half pages

of actual] text from both Exhibits follow.

A57

Appendia C, Decision of Court of Claims,

State of New York.

Under the heading General and Mixed Findings five and

one-half pages of further actual text from Exhibit 1 follow. ©

In summary, 18 pages of a total of 28 pages of the State’s

Proposed Findings of Facts are verbatim extracts from the

contract documents that are in evidence. If the State felt

that certain provisions of these two Exhibits had par-

ticular legal significance it could have called such provisions

to the attention of the Court in its Memorandum of Law.

Counsel for both parties have ignored a long line of deci-

sions defining the nature and purpose of Proposed Findings

of Facts and the specific instructions of this Court that

such Findings contain ultimate or essential facts and no

evidentiary material. Their lapses into compliance and

intelligible utterance of ultimate facts are so infrequent as

to defy the Court’s prolonged effort to search them out.

With occasional exceptions, the 673 Proposed Findings of

both parties are argumentative, discursive and evidentiary.

Accordingly, the Court has not marked the Proposed Find-

ings of either party.

The Court finds that the Claimant has failed to sustain

the burden of proof in respect of the State’s liability in all

six Causes of Action with the exception of:

The Second Cause of Action, Schedule J, Item 10, for

which the Court awards $3,232.81 ;

The Fourth Cause of Action, Schedule O, Item 14, for

which the Court awards $8,311.26;

The Fourth Cause of Action, Schedule O, Item 16, for

which the Court awards $1,108 ;

The Fifth Cause of Action, Items 47 and 47C, for which

the Court awards $4,000.

The Court awards the Claimant $16,652.07, the total of

the awards in the Second, Fourth and Fifth Causes of

Action, with lawful interest from November 13, 1964 to the

date of entry of judgment herein.

—

~

A58

Appendiz C, Decision of Court of Claims,

State of New York.

In the Seventh Cause of Action, severed by Order filed

December 20, 1967, for which judgment was awarded in

the sum of $294,401.39 and the further award to the Claim-

ant of a return of Bonds of a par value of $66,000, the

Court awards lawful interest on the amount of $294,401.39

from November 13, 1964 to December 29, 1967, date of

entry of the severance judgment, in the amount of

$36,832.89, with interest on said sum from December 29,

1967 to the date of entry of judgment herein.

LET JUDGMENT BE ENTERED ACCORDINGLY.

Apotex C. OrLaspo

Judge of the Court of Claims

Dated: Aug. 26th 1974

New York, New York

A59

Appendix D, Partial Comparison of Claim Report

With Decision of Court of Claims.

For ease of comparison the text will be printed on the

following pages.

A60

State’s Exhibit Y (Claim Report)

Fimst Cavsz or Action

pp. I-1,2 AstoSched.A: “The Claimant’s use of wood

sheeting at these four sites was done without regard to the

conditions indicated in the Contract Documents, inadequate

pre-bid investigation of the site...”

p. 1-3 Sched. B: ‘‘ Excessive heave within sheeted exca-

vations can be prevented by the installation of the sheeting

to a sufficient depth below the bottom of the excavation.’’

_p. 14 Claimant “elected to over-excavate to remove an-

ticipated excessive heave, rather than provide adequate

— as required under the terms of the Contract

ments.

P. I-6 Sched. C: “In spite of the subsurface conditions

indicating an indefinite length of pe to be driven, the

Contractor selected to use a type of pile which, he alleges,

. ~~ a costly to him when the driven length exceeds 80

ee

p. I-15 “The delays sustained by the Subcontractor and

Contractor were a matter of their own internal arran

ments. They did not coordinate their activities .... The

primary reason the work was “disjointed”, however, was

the excessive number of cofferdam failures attributable

solely to the Claimant.”

p. 1-41 Sched. D [quote from Proposal, p. 29} ‘‘Bidders

were further forewarued of the poor subsurface conditions

in that the use of surcharge as a means of stabilizing and

consolidating compressible materials would be required at

certain locations.”

pp. I-45,46 ‘There is no basis for the Claimant’s allega-

tion that the Contract Documents implied that short coffer-

dam sheeting would be sufficient, since no sheeting of any

kind was indicated on the Contract Plans for the construc-

tion of cofferdams.’’ [Quote from standard specification

Item 82, p. 369 and from Contract Proposal, p. 124]

‘The methods of construction adopted by the Contractor

were the Claimant’s sole responsibility. His selection of

A61

Decision

Fist Cause or Action

A3319 As to Sched. A: “The Claimant’s use of wood

sheeting showed disregard of the conditions indicated in

the Contract Documents and either inadequate or no pre-

bid investigation of the site.”

A3319 Sched. B: “The Claimant’s pier excavation to

reduce exvessive heave .. . should have been within sheeted

excavation to a sufficient depth below the bottom of the

excavation.”

A3319 “Claimant chose to over-excavate to remove ex-

cessive heave rather than to provide adequate sheeting as

indicated by the terms of the contract.”

A3320 Sched. C: “The subsurface conditions indicated

an indefinite length of piles to be driven. The Claimant,

nevertheless, chose for use a pile which is more costly ac-

a to its allegation, when driven to a length in excess

of eet.”

A3321 Delays to subcontractor Raymond, “occurred pri-

marily because of a lack of coordination between the Claim-

ant and its subcontractor and also because the improperly

designed cofferdams failed when pile driving equipment

was placed on their perimeter.”

A3321-2 Sched. D: Claimant was adequately fore-

warned by the Contract Proposal, p. 29, and “further fore-

warned that certain specified locations would require the

use aaa to stabilize and consolidate compressible

material... .’’

A3322-3 “Nothing in the record would justify the Claim-

ant’s allegation that the contract implied which cofferdam

sheeting was indicated in the contract we [Quotes

from standard specifications, Item 82, p. 369 and from

Contract Proposal, p. 124]. The claimant bore sole re-

sponsibility for the selection of the wood sheeting and

the AP3 steel sheeting which resulted in the cofferdam

ailures... .”

A62

State’s Exhibit Y (Claim Report)

the inadequate timbe: --</or AP3 steel sheeting resulted

in failures of severa! cofferdams.”

p. I-47 [A) letter dated Se ber 20, 1962 from TAMS

to the District Engineer's office containfed) TAMS com.

ments on the Contractor's revised Progress Schedule and

“pointed out the lack of p in pile driving operations

resulting from numerous cofferdam failures.”

p. 1-50 ‘‘The Contract was signed with an effuctive date

of October 31, 1961 and work to be completed within 24

months. The approved P Schedule dated November

28, 1961 showed piles to be driven commencing in December

1961 and completed by December 1962. Although coffer-

dams, as a separate item of work, were not shown in the

Progress Schedule, the cofferdams would have to be con-

structed within or prior to the time period that piles were to

be driven. However, Claimant did not commence work on

the cofferdams until June 4, 1962, amounting to a time loss

of 7 months, or approximately 25 percent of the total avail-

able contract time,”

pp. I-52, 53 ‘‘In swumary, it is our opinion that the

Claimant’s failure to execute this Item of Work at the Con-

tract bid price was due solely to his failure to recognize and

meet the problems involved in the construction of coffer-

dams. In addition, the Contractor did not commence work

on the cofferdams until 7 months after the signing of the

Contract, which precluded completing the work on time.

As a result of the cofferdam failures enumerated herein-

above, two pile driving rigs were removed from the job-

site, and the rate of pile installation was greatly reduced.

There was also an overall delay in pile driving, footing,

column, and column cap concrete work, and steelwork con-

struction so that these costs also increased. Since the

Claimant realized that he was falling further behind his

progress schedule, he elected to purchase additional sheet-

ing and bracing, hire additional crews and provide addi-

tional work sites for the pile subcontractor in order to

accelerate the work in an attempt to effect completion of

the work by the Contract completion date. The costs for

extraction and replacement of damaged sheeting, addi-

A63

_A3323 “The cofferdams failures were, in turn respon-

sible for the retardation in the Progress Schedule of the

Tor, operations as pointed out in a letter from

ig to the District Engineer’s Office dated September

A3324 “The effective date of the Contract was Octo-

ber 31, 1961 and the date of completion was within 24

mor ths of that date. The Progress Schedule, dated No-

vember 28, 1961, required piles to be driven beginning

December 1961 and to be completed by December 1962.

There was no specific indication in the Progress Schedule

of a completion date for cofferdams, but, as a practical

matter, they had to be constructed sometime before the

~ could be driven. Work began on the cofferdams on

une 4, 1962, a loss of approximately 7 months of the 24

months allowed for the completion of the entire contract.”

A3326 “The Claimant defaulted in its plainly defined re-

sponsibilities under the Contract Proposal and Public

orks Specifications in respect of the cofferdams. It

failed to start work on the cofferdams until approximately

7 months had elapsed from the date of the signing of the

Contract. The cofferdam failures were responsible for the

removal from the job-site of two - driving rigs. The

consequences of overall delay in pile driving, footing, col-

umn and column cap concrete work and steel work con-

struction were an increase in overall cost. The Claimant

having fallen far behind in his Progress schedule, incurred

the increased expense of additional sheeting and bracing,

hiring additional personnel and providing additional sites

for the pile subcontractor, in attempting to meet the con-

tract completion deadline. The additional cost for the re-

moval and replacement of damaged sheeting for new sheet-

ing and for the excavation of heave resulted from the

Claimant’s erroneous choice of wood sheeting and AI-3

steel sheeting. Had the Claimant used the Z-type sheeting

of correct size from the inception of the cofferdam con-

struction, had they done so timely instead of delaying 7

A64

State’s Exhibit Y (Claim Report)

tional sheeting, and excavation of heave can only be attrib-

utable to the Contractor’s choice of inadequate wood and

AP-3 steel sheeting in the initial stages of the work. Had

the Z type sheeting of proper lengths been employed from

the beginning of the job, the additional costs claimed by

the Contractor would not have been incurred. This claim

is hereby rejected.”

p. 52 “One year after the Contract was executed in Oc-

tober 1961, the problem of the cofferdam construction was

finally resolved. Unfortunately, it was too late to econom-

ically perform the remaining work of this Item within the

remaining Contract time, since the urgency of the work did

not permit the multiple use of sheeting as is normally

practiced.’’

pp. 56,57 ‘The rapid placeyient of heavy embankments

using heavy tractors to move the material is not “standard

construction practice” for this type of work. Rather, the

Claimant should have used proven construction practices

where organic silt is involved. These practices should have

included the use of lighter construction equipment and the

placement of thin blankets of fill.... The original strength

can be regained if the material is allowed to remain un-

disturbed for a period of approximately 24 hours.”’

p. 57 ‘*. . . eofferdam construction commenced in June

1962 at which time the Claimant placed temporary fill in the

Flushing River. The fill was placed to facilitate cofferdam

construction.’’

p. I-58 ‘In essence, the Claimant’s own construction

procedures were responsible for the mud waves, so there-

fore he was obligated to remove them, inasmuch as they

blocked the flow of the Flushing River. All costs for re-

moval of the mud waves should have been anticipated b

ee and included in Contract bid Item 82S, Cof-

erdams.’’

pp. I-63,64 Sched. F: [Quotes p. 30 of Proposal and

pp. 207 and 369 of standard

specifications. }

“TIad interlocking Z-type steel sheeting heen used and

properly placed to sufficient depths to penetrate the under-

A65

Decision

months, the chain of costly misadventure would not have

been forged.’’ |

A3327 “The temporary Z-type sheeting might have been

economically reused by the Claimant had the Claimant

made the choice in the first place. Their iate use when the

Claimant was lagging badly precluded such reuse.”

A3329 Sched. E: “The Contract Proposal and Public

Works po ye rege om were sufficiently explicit for a Con-

tractor of size, standing and longtime expertise to have

been forewarned that the rapid placement of heavy em-

bankments, and the use of heavy tractors to move the ma-

terial, on a deep substratum of organic silt, would probably

cause mud waves. The contractor could have chosen lighter

construction equipment and a thin blanket of fill and al-

lowed a full day for the organic silt to regain its strength.”

A3329 “The Claimant began to place temporary 4] in

the Flushing River in June 1962 as a means of facilitating

the construction of cofferdams.”

A3329-30 “The temporary alteration of the bounds of

the Flushing River was a measure of convenience for such

construction and the nud waves were a concomitant of the

Claimant’s ill-chosen construction methods.”

A3331-2 Sched. F: [Quotes p. 30 of Proposal, and pp.

207 +i 369 of standard specifica-

tions.

“The Claimant’s failure, in respect of cofferdams, was

responsible in a good measure for the increased cost in-

A€e

Seete's Enhehet Y i Chain Report)

pug ooyedee 25 aged oBectsreiy semi the excavations, the

fists af protegeng wenld have bees, commderably reduced.”

@ $.46F ~Fise Werht's Fase Cotpersicnn contended that

a wae JD Sactere % place pipes wader the dikes and

Riches GC. gop 17842 lQuctes from pp. 30-31 and re-

fers te @. 133 of Contract Pro-

poass, quetes p. 138, refers to

@ i235; geters to contract draw-

wage 33, GO and £99.)

e $:90 “Ae geevecmely stated Serein the subsurface

crmisloums cameranteged f the sete were mot different from

Thee rqudcioese Ioaetybed sander tke Spemal Foundations

Manes oe page 27 of the Cemitract Proposal. . .*’

“Tie Sedut Ger She detege deremen te og rt ali foot-

cage on prles wae The preteate of +t.0ustabic rface con-

Stueme aueapebic of eoppetiong spread footings."

2506" Aemmetomgiy, the euboontractor'’s claim is in-

oo, oy Smet, the swneurred losses during

She cieretne of She oesit, koe clases shold be directed against

the Gemets) Cleatcacter.~

Secene Cacse o¢ Actios

@ $2.5 ~We are of the agemuen that tis portion of the

less bee ce setedey. ... In fnet. though the pipe-ste

Sages gee (203.430) Bad not yet boon 5 app ’

eens commmernes deving sack piles on February 13,

= a | Me. Pier 5. We ae therefore, o

pete’ nis Lobe ime t oe ng approval o

Vier? eigrespeketet ated polee, dering that types of

es omg hanwewese Lad been approved by the State on

ommary 5 $962 fer Costract PAVWES1-4."’

A67

Decisi

curred in dewatering, a failure which might have been

avoided by the use of Z-type steel sheeting of sufficient -

depth.”

A3333 “The flooding of the project site occurred be-

cause the Claimant failed to install drainage pipes under

the earth dikes.”

A3334-6 Sched. G: [Quotes from pp. 30-31 and refers

to p. 123 of Contract Proposal,

uotes p. 138, refers to p. 135; re-

ers to contract drawings 53, &0

and 199.]

A3339-40 Sched. I: “The subsurface conditions at the

site were not different from the conditions described in

the Special Foundation Notes of the Contract Proposal to

which the Court has already referred.

The design decision to support all footings on piles was

based on such subsurface conditions.

The State is not liable to the contractor-claimant under

Schedule I, nor to the subcontractor. The subcontractor,

if it has incurred any losses under the contract of Novem-

ber 7, 1961, would have to seek recourse against the Con-

tractor.’

Seconp Cause or Action

A3340 Sched. J: “The Contract was entered into Octo-

ber 31, 1961. The first pile rig arrived on jobsite January

30, 1962 and the first pile was driven February 13, 1962 by

Raymond International, Inc., pending the approval of their

pipe-step taper pile (ED-410) and other piles and equip-

ment. hiomes expected that the piles and hammers

which it intended to use on this jobsite would likely meet

with the State’s approval inasmuch as similar instruments

had been approved by the State on January 5, 1962 for

Contract FA 61-4.’’

~ ——— =

a i — =

eS Sa OOS see Oe ea

A68

State’s Exhibit Y (Claim Report)

p. Il4 “. .. the Claimant that there was a

general, continuing and pervasive failure by the State to

properly cordinate the work and to provide JDP with rea-

sonably free and unobstructed access to the site of the work.

Beginning in February, 1963 and continuing until JDP’s

work was completed, equi t, ahashahe call labor forces

of contractors for the World’s Fair were present on the

jobsite. These contractors _— equipment and stored

materials all over the site, extensive work on the site,

and were continually moving men and equipment back and

forth over the site. . . . The work of these contractors was

not coordinated with that of JDP and their presence on

ps — obstructed, delayed and interfered with

"8s work.”’

tae II-9, II-17 “We agree that interference did in fact

e place; however, there is no basis for a claim against

the State of New York, which was not the offending party.”

‘*The provisions of Coordination of Work-Availability of

Site, pages 34 and 35 of the Contract Proposal, clearly in-

dicated to the Claimant that delays, interruptions, and

hindrances were to be anticipated... .”’

p. II-23 ‘‘(1) Claimant alleges that the State unreason-

ably delayed in submitting timber pile order lists to JDP

after the timber test piles had been driven. The inclusive

dates of this failure are December 1961-January 1962... .’’

‘*The Engineer’s diary records that on December 5, 1961:

1) Subcontractor H. Johnson arrived on the job; 2) the

District Engineer Ss by telephone, H. Johnson as

Subcontractor; 3) the driving of two timber test piles in

structures 120 and 123 by the Subcontractor Johnson.

‘‘The Engineer’s diary records that the remaining 13

timber test piles were driven between December 6 and 29,

1961. The estimated quantity of 1,000 L.F. was overrun

by 35 feet” (sic).

Decisi

A3341-2 “The —o mye that the State failed to coordi.

nate the work properly and to provide for the claimant’s

access to the site attributes responsibility to the State fora

situation completely controlled by and the “+ ‘eee of

others, by the terms of the Contract Proposal.

From February 1963 to the date of completion of claim-

ant’s work, the men, materials and equipment of numerous

other contractors of the World’s Fair Corporation con-

verged on the jobsite.

The contractors, including the claimant, failed to coor-

dinate their activities thus obstructing, delaying and in-

terfering with the claimant’s work.”

A334.. “The Claimant, in turn, obstructed, delayed and

interfered with other contractors. Responsibility and lia-

bility are attributable to these contractors and no liability

T1012) to the State. (Contract Proposal, Pages 34-40,

A3341 “The Claimar: alleges (Verified Bill of Particu-

lars, 6C, Pages 47-49) that the State unreasonably delayed

from December, 1961 to January, 1962 in submitting timber

ile order lists to it after the timber test piles had been

riven.

The approval of H. Johnson as subcontractor was given

promptly on December 5, 1961 and two timber test piles

were immediately driven. The remaining 13 timber test

piles were driven between December 6, 1961 and December

29, 1961. The estimated quantity of 1,000 linear feet was

overrun by 35 feet” (sic).

-¢

y

“s

* ;

A70

State’s Exhibit Y (Claim Report)

p. [1-27 ‘‘TAMS, in order to expedite the work, per-

formed detailed layout including off-setting drainage struc-

tures and ditches, re-setting centerline after excavation and

other detail layouts, which were, in fact, the responsibility

of the Contractor.’’ |

‘*By letter dated January 15, 1962 to TAMS, Claimant

requested stake-out of various piers, including a request to

“restake the centerline of Ramp Piers HD-1, HD-2 and

HD-3”, work not required to be performed by TAMS. Sub-

sequently, by letter dated February 2, 1962, the State trans-

ferred. the responsibility of “Stakeout Survey” from

TAMS to the Claimant.”

p. II-34 ‘‘(5) Claimant alleges that throughout the job

the Stake was unreasonably slow in responding to requests

by JDP and in supplying necessary clarifications, ap-

provals, information, etc.

Our comments are: ;

The Claimant’s statement is too vague to permit us to

reply to his charges until they are spelled out in detail.’’

p. II-38 [Quote from Specifications, p. 378, h.}] ‘‘Pile

driving commenced on this project on February 13,

1962, at which time a ag tapered pile was driven to

a depth of 106 feet in Pier HC-1 without obtaining the re-

uired blow count. Raymond continued driving piles in

C-1 on February 14 and 15, and on February 16 drove

four piles in Pier HC-2. These piles were being driven to

an average depth of 140 feet as compared to the State’s

estimate of 75 feet. On February 20, 1962, this matter was

discussed by telephone with Assistant District Engineer,

Ralph Hollweg, to the effect that the overrun was alarming

and warranted close examination by the District Engineer’s

office.’’

p. II-39 “The cast-in-place concrete piles on this project

were considered by TAMS to develop their load-carrying

capacity by a combination of side friction and point bear-

ing. It was noted that the set-up of the svil experienced

after an intervai of one day after driving, indicated that

the frictional resistance, which was minor during driving,

built up rapidly after the driving stopped. Therefore, the

A71

Decision

A3343-4 “To — the work TAMS provided the lay-

out, the Claimant having failed to comply with the Con-

tract Proposal. On January 15, 1962 the claimant wrote

to TAMS requesting a stake-out of various piers. On

February 2, 1962, the State informed the Claimant that it

was transferring the responsibility for the stake-out from

TAMS to the Claimant in accordance with the obligation

imposed on the claimant by the Contract Proposal.”

_A3344_ “The Claimant’s allegation (Verified Bill of Par-

ticulars, Page 48) that “Throughout the job the State was

unreasonably slow in responding to requests by JDP and

in supplying necessary clarification, approvals, informa-

tion, etc.” is general to the edge of vagueness and without

any visible support in the record.

A3344 [Quote from Specifications, p. 378, h.] “Pile-

driving began on February 13, 1962 with a pi e-step ta-

pered pile to a depth of 106 feet in Pier HC-1. The subcon-

tractor continued driving piles at HC-1 on February 14,

and 15, 1962. On February 16, 1962, it drove four piles in

Pier HC-2. These piles were driven an average of 140 feet

without obtaining the required blow count, a figure in excess

of the State’s estimate of 75 feet.”

A3345 “The so-called Engineering News Record For-

muia of measuring driving resistance fy blows per foot and

of determining the allowable |oad capacity was regarded as

unreliable by TAMS. Although the Public Works Speci-

fications (Item 88P) makes provision for load tests for

piles, the manner of loading a test pile must be as shown

or indicated in the plans or as ordered by the Engineer.

— = —_——— S--—

|

A72

State’s Exhibit Y (Claim Report)

a resistance measured in blows per foot was not con-

side to be a reliable indication of the frictional resist-

ance. The ENR formula is also an unreliable indication -

of determining the allowable load capacity of the piles.

The only reliable method for determining’ such capacity

would be through performing load tests. ad tests were

not included in the Specifications issued by the Albany of-

fice of NYSDPW.”

p. II-38 ‘‘This criterion was confirmed by the District

Engineer in a letter dated July 25, 1962 for installation of

pom sg Ye Concrete Piles-Open End, to wit: ‘The re-

uired i shall be 150% of that computed

rom the ENR formula, utilizing the 35-ton pile bearing

requirement... .’”’

pp. II-41, 42 ‘‘On August 14, 1962 the Resident Engi-

neer’s diary recorded the driving of a 221’ length pile in the

HA-abutment. The Resident Engineer contacted the TAMS

office (Dr. Chu) and representatives of the State, Mr. S. B.

Schiffman and R. L. Carter, in order to study the feasibility

of “freezing” piles at 110-115 foot depths. Pipe piles of

12” diameter were driven on August 15, 1962 and allowed

to remain undisturbed over-night. Dr. Chu of TAMS and

R. L. Carter of the State were witnesses to the redriving

of the piles. The tests showed favorable results, and the

District office on August 16 approved new criteria for pile

driving in said abutment, and a minimum pile | of 119

feet was set. Correspondence by Consultant of August 21

and approval by D.E. on September 7 verify the verbal

approval of this pile driving criterion.”

pp. II-68-70 ‘The above letters, with the exception of (f),

were addressed to TAMS and did not have the subject of

extensions of time as their main theme. We believe that

the excerpts which we have quoted c! demonstrate

Ces Go seqpeste Sr eutenniane of time, Claimant

refers to in his claim, were informai, at best.’’

[Quotes Art. 4 of standard specifications filing

time for formal application for extension of time.

yaaeeee————e—eEeeEeEs SS lc Ol eeee”.hC _

A73

Decisi

Neither the Contract Proposal nor any order of the Dis-

trict Engineer dealt with the subject.” .

“As late as July 25, 1962, the District Engineer, in a

letter to TAMS, stated the standard for the installation of

cast-in-place concrete piles.

“The required driving resistance shall be 150% of that

computed from the Engineering News Record formula

utilizing the 35 ton pile bearing requirement... .”

A3345-6 “On August 14, 1962 according to the Resident

Engineer, a 221 foot pile was driven in the HA-Abutment.

On A t 15, 1962 TAMS studied the feasibility of “freez-

ing” piles at no more than 110-115 foot depths, and an ex-

periment the same day (In allowing the piles to remain

undisturbed overnight) proved successful. On September

7, +e ee District Engineer approved the “freezing”

me <

A3348 “Informa! written requests for time extensions

and reimnbursements appeared in letters, dealing with other

subjects, from the Claimant to TAMS dated January 23,

1962” (sic).

A3349-50

(Quotes Art. 4 of standard specifications concerning filing

time for formal epplication for extension of time.)

A74

State’s Exhibit Y (Claim Report)

[Refers to letters and statements of State of March 20,

June November 8 and December 31, 1962; January 11,

J aes 31, 1963, June 13, 1963 and August 8, 1963.)

II-81 [as to in the Second Cause of Action

the State’s consultants denied liability on all sixteen items

except item 10:])

“10. Additional Cost gay mae i ee »

t of comments are: Pa:

the ‘additional he yay be allowable since the silicone was

added on instructions from the State.”

Tuirap. Cause or Action

. III-1 “Our comments are: It seems that the Claimant

nes based his claim for additional payment in the amount

of $455,008.62 in Claim III on the conditions and allega-

tions previously described in Claims I and II.

Fourra Cause or AcTion

pp. IV-1 to [V-16 [All 16 miscellaneous items were re-

jected in the State’s consultants’ report.)

. 1V-5 As to item 5, test cores, letter of District Engi-

oie “of April 28, 1969” is quoted. (sic) [The date is a

typographical error. |

A75

Decision

[Refers to letters and statements of State of March 20,

June 26, November 8 and December 31, 1962; January 11,

June 13 and August 8, 1963.]

A3351 Second Cause of Action damages:

“Of the sixteen items comprising the total amount only

Item 10 is one for which the Court finds the State liable.

The Claimant incurred the additional cost of siliconing

concrete deck work in the sum of $3,232.81.... The

silicone was added at the State’s instructions... .”

Tarp Cause or Action

p. 35 A3352 “The Third Cause of Action is based en-

tirely _~ the conditions and allegations already set forth

in the First and Second Causes of Action with both of

which the Court has already dealt. The Claimant seeks

to burden the State with the responsibility for delay in

completing the contract from its scheduled date, October

30, 1963, to its extended date, July 16, 1964.”

Fourts Cause or Action

A3356-63 [All 16 miscellaneous items were rejected in

the decision except item 14, additional reinforcing steel in

connection with the redesign at the HE Ramp.)

A3357 [As to item 5, test cores, letter of District Engi-

neer “of April 28, 1969” is quoted (sic). [The identical

typographica! error appears in the decision as in the claim

report. ]