Amicus Brief — EPA v. California Ex Rel. State Water Resources Control Bd.
Supreme Court brief1976
Ask Donna
What actually matters in this document.
Text
IN THE _— |
SUPREME COURT OF THE UNITED STATES
OCTOBER TERM, 1974
NO. 74-1435
THE ENVIRONMENTAL PROTECTION AGENCY,
and RUSSELL E. TRAIN, AS ADMINISTRATOR OF
THE ENVIRONMENTAL PROTECTION AGENCY,
UNITED STATES OF AMERICA, ____- ... PETITIONERS,
VS:
PEOPLE OF THE STATE OF CALIFORNIA, EL REL
STATE WATER RESOURCES CONTROL BOARD,
and STATE OF WASHINGTON AND ITS
DEPARTMENT OF ECOLOGY, .. -.._.. RESPONDENTS.
ON WRIT OF CERTIORARI TO THE UNITED STATES
COURT OF APPEALS FOR THE NINTH CIRCUIT
BRIEF OF THE COMMONWEALTH OF KENTUCKY,
STATE OF GEORGIA, STATE OF HAWAH, STATE OF
OHIO, AND COMMONWEALTH OF PENNSYLVANIA AS
AMICI CURIAE IN SUPPORT OF RESPONDENTS.
COMMONWEALTH OF KENTUCKY STATE OF GEORGIA
ED W. HANCOCK ARTHUR K. BOLTON
Attorney General Attorney General
DAVID C. SHORT 132 Judicial Building
Assistant Attorney General Atlanta, Georgia 30334
Assistant Attorney General
Room 26, Capitol Building
Frankfort, Kentucky 40601
Telephone (502) 564-3594
COUNSEL FOR AMICI CURIAE
(Continued inside Front Cover)
a
Petition For Writ of Certiorari Filed May 14, 1975
Certiorari Granted June 23, 1975
STATE OF HAWAII, STATE OF OHIO, AND
COMMONWEALTH OF PENNSYLVANIA
———
TABLE OF CONTENTS
TABLE OF AUTHORITIES CITED ..........
INTEREST OF THE AMICI CURIAE -
{Commonwealth of Kentucky, State of Georgia,
State of Hawaii, State of Ohio, and
Commonwealth of Pennsylvania] ..............
SUMMARY OF ARGUMENTS ..............
GED. Seb ccccedceevesevceccccoesees
ARGUMENT I
THE ADMINISTRATOR OF THE ENVIRONMENTAL
PROTECTION AGENCY HAS EXCEEDED HIS AU-
THORITY UNDER THE FEDERAL WATER POLLU-
TION CONTROL ACT OF 1972 IN REFUSING TO
SUSPEND HIS ISSUANCE OF NPDES PERMITS TO
AGENCIES AND INSTRUMENTALITIES OF THE
FEDERAL GOVERNMENT DISCHARGING POLLU-
TANTS TO NAVIGABLE WATERS LOCATED WITH-
IN STATES WHOSE WATER POLLUTION CONTROL
PROGRAMS HAVE BEEN APPROVED PURSUANT
TO SECTION 402 OF THE ACT, 33 U.S.C. 51342, AND
ARE APPLICABLE TO SUCH POINT SOURCES OF
DISCHARGE PURSUANT TO SECTION 313 OF THE
oe oe eee ee... 6...
ii
TABLE OF CONTENTS
Page
ARGUMENT II
THE SUPREMACY CLAUSE OF THE UNITED
STATES CONTITUTION, ARTICLE VI, CLAUSE 2,
DOES NOT BAR THE ISSUANCE OF NPDES PER-
MITS BY THE STATES TO AGENCIES AND IN-
STRUMENTALITIES OF THE FEDERAL GOVERN-
MENT UNDER THE FEDERAL WATER POLLUTION
CONTROL ACT OF 1972 AND DOES NOT PROVIDE
A BASIS FOR THE ADMINISTRATOR’S FAILURE
TO SUSPEND HIS ISSUANCE OF NPDES PERMITS
FOR DISCHARGES INTO THE NAVIGABLE WA-
TERS OF A STATE HAVING AN APPROVED
WATER POLLUTION CONTROL PROGRAM _. .. 23-30
iit Ss. custysatueneneeian 31-33
CERTIFICATE OF SERVICE .........000008: 34-35
TABLE OF AUTHORITIES
Cases Page
Alabama v. Seeber, 502 F. 2d 1238, 1243 (1974),
Petition For Writ of Certiorari pending sub nom.
Seeber v. Alabama, No. 74-851. ..........-0000585 26
Baltimore National Bank v. State Tax Commission,
Sy Wn BT Eb ccacndeoncessceetobeses 27
California v. Davidson,
Ss We Ce Gl, BOGE) Sc dccccccccccss 14
California v. EPA, 511 F. 2d 963, 966, 967, 970, 972
(9 CA, February 13, 1975) .........---e eee 14, 27
Florida Lime and Avocado Growers, Inc. v. Paul,
Sr Ss Ee EE wasoces cecnccnctccacecce 29
Hines v. Davidowitz, 312 U.S. 52 (1941) .......... 28
Jarecki v. G. D. Searle & Co., 367 U.S. 303 (1961) .. 21
Mayo v. U.S., 319 U.S. 441, 446, 63 S.Ct. 1137, 1140,
2" § & Fe PP rriTerrTiTeTe
Nash v. Florida Industrial Commission,
See US. Bee CUED bic dS civ cdvenddetnseewes 29
Perez v. Campbell, 402 U.S. 637, 649 (1971) ...... 28
Sears Roebuck & Co. v. Stiffel Co.,
TP Ths Se CH bo ees ev envecied's 29
Steward Machine Co. v. Davis,
/ Bi Be Fey ere eveverrr rite 29
Washington Market Co. v. Hoffman,
208 U.S. 112 (1B79) 2... cccccccccccccccccees 21
Weinberger v. Hynson, Westcott & Denning, Inc.,
412 US, 609 (1973) . 1... ee eee eee e creer eens 21
iv
Statutes
Page
[Federal Water Pollution Control Act Amendments of
1972, 33 U.S.C. 1251, et seq.]
Title I — Research and Related Programs, Federal
Water Pollution Control Act Amendments of 1972,
Title 33, Sections 1251-1265, U.S.C. .......... 7
Title II — Grants For Construction of Treatment
Works, Federal Water Pollution Control Act
Amendments of 1972,
Title 33, Sections 1251-1265, U.S.C. ............ 7
Title III — Standards and Enforcement, Federal +
Water Pollution Control Act Amendments of 1972,
Title 33, Sections 1311-1328, U.S.C. ............ 8
Title IV — Permits and Licenses, Federal Water
Pollution Control Act Amendments of 1972,
Title 33, Sections 1341-1345, U.S.C. .......... 8
Section 101(a), Federal Water Pollution
Control Act Amendments of 1972,
Zee SE, Satie TsseCah, VUGs..ccccccccoccece 3
Section 101(b), Federal Water Pollution
Control Act Amendments of 1972,
Title 33, Section 1251(b), U.S.C. ......eeeeeees 3
Section 101(f), Federal Water Pollution
Control Act Amendments of 1972,
Title 33, Section 1251(f), U.S.C. ........ sseete a0
Section 301, Federal Water Pollution
Control Act Amendments of 1972,
Titie 33, Section 1311, U.S.C. ........++++++ 9, 15, 2
Vv
Statutes (Continued)
Page
Section 303, Federal Water Pollution
Control Act Amendments of 1972,
oo F SEE Y ree 15
Section 303(e), Federal Water Pollution
Control Act Amendments of 1972,
Title 33, Section 1313(e), U.S.C. ............ 3
Section 304(h), Federal Water Pollution
Control Act Amendments of 1972,
Title 33, Section 1314(h), U.S.C. .............. 3
Section 313, Federal Water Pollution Control Act
Amendments of 1972, Title 33, Section 1323,
U.S.C. .... 4, 6, 7, 18, 20, 21, 23, 24, 25, 27, 28, 31
Section 401, Federal Water Pollution
Control Act Amendments of 1972,
Title 33, Section 1341, U.S.C. ................ - 22
" Section 402, Federal Water Pollution Control Act
Amendments of 1972, Title 33, Section 1342,
Gen whee a ccs 3, 4, 5, 6, 7, 8, 11, 18, 19, 23, 30
Section 402(a), Federal Water Pollution Control
Act Amendments of 1972, Title 33,
section 1342(a), U.S.C. .......... 9, 12, 21, 23, 30
Section 402(b), Federal Water Pollution Control Act
Amendments of 1972, Title 33,
Section 1342(b); U.S.C. .............. 5, 9, 12, 16, 31
Section 402(c), Federal Water Pollution Control Act
Amendments of 1972, Title 33,
~ Section 1342(c), U.S.C. ............ 10, 12, 30, ‘31
a
vi
Statutes (Continued)
Page
Section 402(d), Federal Water Pollution
Control Act Amendments of 1972,
Title 33, Section 1342(d), U.S.C. .....seeeeeees 18
Section 402(k), Federal Water Pollution
Control Act Amendments of 1972,
Title 33, Section 1342(k), U.S.C. ......eee00+ 9 22
Section 505, Federal Water Pollution
Control Act Amendments of 1972,
Title 33, Section 1365, U.S.C. ........eee0-- 21, 22
Section 505(f), Federal Water Pollution
Control Act Amendments of 1972,
Title 33, Section 1365(f), U.S.C. ...ceeeseeeeee 23
Section 510, Federal Water Pollution
Control Act Amendments of 1972,
Title 33, Section 1370, U.S.C. ........ 4, 13, 15, 20
Other References
40 C.F.R. Part 124 ......ceeeeeeeveee TETTTTTTT il
40 C.F.R. Section 124.10 ......--eeeee sccccccccce . Os
40 C.F.R. Section 124.21 .......-eeees ocegoceqoes ae
40 C.F.R. Section 124.42 ......+++. cocceccensenee!! ar
Dendy, Bill B.; Affidavit of ....... cocossccoce Oy ae
In The
SUPREME COURT OF THE UNITED STATES
October Term, 1974
NO. 74-1435
THE ENVIRONMENTAL PROTECTION AGENCY,
and RUSSELL E. TRAIN, AS ADMINISTRATOR OF
THE ENVIRONMENTAL PROTECTION AGENCY,
UNITED STATES OF AMERICA, ____. ... PETITIONERS,
VS:
PEOPLE OF THE STATE OF CALIFORNIA, EL REL
STATE WATER RESOURCES CONTROL BOARD,
and STATE OF WASHINGTON AND ITS
DEPARTMENT OF ECOLOGY, _.. RESPONDENTS.
ON WRIT OF CERTIORARI TO THE UNITED STATES
COURT OF APPEALS FOR THE NINTH CIRCUIT
BRIEF OF THE COMMONWEALTH, STATE OF
GEORGIA, STATE OF HAWAII, STATE OF OHIO, AND
COMMONWEALTH OF PENNSYLVANIA AS AMICI
CURIAE IN SUPPORT OF RESPONDENTS.
MAY IT PLEASE THE COURT:
INTEREST OF THE AMICI CURIAE
The States represented in this Amici Brief have a
common interest in the proper and effective implementa-
tion of their respective programs for the issuance of Na-
tional Pollutant Discharge Elimination System permits
2
under the Federal Water Pollution Control Act
Amendments of 1972. The States of Georgia, Ohio, and
Hawaii have developed and submitted their programs
to the Environmental Protection Agency and have been
delegated authority to issue National Pollutant Discharge
Elimination System permits subject to the same unreason-
able and unauthorized exception which prompted the States
of California and Washington to initiate this action.’ The
Commonwealth of Kentucky and the Commonwealth of
Pennsylvania have not yet been delegated such permit
issuing authority but anticipate that under current regu-
lations of the Environmental Protection Agency any fu-
ture approval of their programs would be made subject to
the same limitation.
The water pollution control programs of each State
'The State of Ohio was granted authority to issue NPDES
permits by a letter from the Regional Administrator, Region
V, Environmental Protection Agency, dated March ll,
1974; the approval of the Ohio program was published in
the Federal Register, Vol. 39, No. 13), page 26061, dated
July 16, 1974. The State of Georgia was granted authority
to issue NPDES permits by a letter from the Regional Ad-
ministrator, Region IV, Environmental Protection Agency,
dated June 28, 1974; the approval of the Georgia program
was published in the Federal Register, Vol. 39, No. 137,
page 26061, dated July 16, 1974. The State of Hawaii was
granted authority to issue NPDES permits by a letter from
the Regional Adminisrator, Region IX, Environmenal Pro-
tection Agency, dated November 28, 1974; the approval of
the Hawaii program was published in the Federal Register,
Vol. 39, No. 244, page 43759, dated December 18, 1974.
desiring to administer the National Pollutant Discharge
Elimination System permit program for the navigable
waters within their respective jurisdictions, including the
amici States as well as respondents herein, must include
at least the minimum standards and requirements specified
in the Act. In developing these programs, the States
have been, and are, required to meet all the criteria con-
tained in Section 402 of the Act, 33 U.S.C. §1342, regula-
tions promulgated by the Environmental Protection
Agency pursuant to Section 304(h), 33 U.S.C. §1314(h),
and Section 402, and the requirements of Section 303(e),
33 U.S.C. §1313(e), relating to the States’ continuing
planning process. In incorporating these measures into
the State program and in carrying out and implementing
these requirements to achieve the goals of the Act, the
States must be able to control all point source discharges
to navigable waters within their respective jurisdictions.
The objective of the Act is to restore and maintain
the chemical, physical, and biological integrity of the Na-
tion’s waters;? primary responsibility for the achievement
of this goal is vested in the States. The means selected
by the Congress for the attainment of this end is the regu-
lation of all cischargers of pollutants through the opera-
733 U.S.C. §1251(a); Section 101(a) of the Federal Water
Pollution Control Act of 1972.
33 U.S.C. §1251(b); Section 101(b) of the Federal Water
Pollution Control Act of 1972.
4
tion of the National Pollutant Discharge Elimination
System permitting process. In Section 402 of the Act,
33 U.S.C. §1342, the Congress provided for the admini-
stration of this system through the operation of State
control programs. In specifying the requirements to be
incorporated into these State programs and providing for
continuous review, the Congress has assured that these
programs will be formulated and operated in accordance
with the Act. Absent control over all sources discharging
into navigable waters subject to the State’s jurisdiction,
the Administrator could not approve the program and
the State could not effectively formulate or enforce the
standards authorized by Section 510 of the Act, 33 U.S.C.
§1370, and made applicable to Federal facilities by Section
313 of the Act, 33 U.S.C. $1323. The unwarranted and
unauthorized refusal of the Administrator to relinquish
permitting authority over point sources operated by the
Federal government poses a serious hindrance to the ef-
fective and efticient implementation of the National Pollu-
tant Discharge Elimination System with respect to the
waters involved and thwarts State efforts to meet their
responsibilities under the Federal Water Pollution Control
Act.
Amici herein support the respondents and the Court
of Appeals For the Ninth Circuit in the position that the
refusal of the Administrator to delegate to the States au-
thority to issue National Pollutant Discharge Elimination
System permits with respect to the facilities of the Federal
government is beyond the powers, and in conflict with
BEST COPY AVAILABLE
5
the duties, of the Administrator under the Federal Water
Pollution Control Act Amendments of 1972, 33 U.S.C.
§1251, et seq.
SUMMARY OF ARGUMENTS
I. Section 402 of the Federal Water Pollution Control
Act Amendments of 1972, 33 U.S.C. §1342, establishes
the National Pollutant Discharge Elimination System
and contains the instructions of the Congress with respect
to the administration and implementation of that system.
Basic to the administration of the National Pollutant Dis-
charge Elimination System is the right of the States to
issue the NPDES permits required for discharges into
the navigable waters subject to that State’s jurisdiction.
The Congress provided in Section 402(b) of the Act that
the State could develop and submit for approval its pro-
gram for the issuance of such permits and that if the
Administrator found the program adequate he was to
suspend his own issuance of permits with respect to such
waters. The Administrator has disregarded this specific
Congressional directive and has refused to relinquish per-
mitting authority over facilities operated by the Federal
government.
This refusal cannot be supported in the Federal Water
Pollution Control Act and poses a serious hindrance to the
effective implementation of State programs. These pro-
grams are designed to control all navigable waters within
a State’s jurisdiction and cannot be implemented without
control over each source contributing to the pollution of
such waters. Since NPDES permits are specifically re-
quired by the Act and such permits are to be issued by
6
the States, the requirements imposed under State programs
are without doubt “requirements respecting control and
abatement of pollution’ within the meaning of Section
313 of the Act, 33 U.S.C. $1323. As such, they are re-
quirements with which all Federal facilities must comply
in accordance with the directives of the Congress.
II. The Supremacy Clause does not bar the State is-
suance of NPDES permits to facilities of the Federal
government and is inapposite in this action for three rea-
sons: (i) Federal facilities have been specifically sub-
jected to the requirements of State regulatory programs
in the area of water pollution control by Congressional
waiver contained in Section 313 of the Federal Water Pol-
lution Control Act Amendments of 1972, 33 U.S.C. $1323;
(ii) application of the Supremacy Clause in this action is
contrary to the purposes of the clause since the require-
ments of State water pollution control programs do not in
any wey frustrate or pose an obstacle to the application
of Federal law but rather were adopted in order to carry
out the objectives of the Federal Water Pollution Control
Act, as amended; (iii) in accordance with Section 402
of the Act, 33 U.S.C. $1342, the water pollution control
programs of the respondents have been approved and such
programs are operating under a direct, and authorized,
delegation of Federal authority and are enforceable re-
quirements of Federal law.
BEST COPY AVMLAge
7
ARGUMENT I
THE ADMINISTRATOR OF THE ENVIRONMENTAL
PROTECTION AGENCY HAS EXCEEDED HIS AU;
THORITY UNDER THE FEDERAL WATER POLLU-
TION CONTROL ACT OF 1972 IN REFUSING TO SU-
SPEND HIS ISSUANCE OF NPDES PERMITS TO
AGENCIES AND INSTRUMENTALITIES OF THE
FEDERAL GOVERNMENT DISCHARGING POLLU-
TAN7S TO NAVIGABLE WATERS LOCATED WITHIN.
STATES WHOSE WATER POLLUTION CONTROL
PROGRAMS HAVE BEEN APPROVED PURSUANT TO
SECTION 402 OF THE ACT, 33 U.S.C. §1342, AND ARE
APPLICABLE TO SUCH POINT SOURCES OF DISs-
CHARGE PURSUANT TO SECTION 313 OF THE ACT,
$3 U.S.C. §1323.
In the Federal Water Pollution Control Act Amend-
ments of 1972, the Congress enacted a comprehensive,
multi-faceted, and clearly discernible plan designed to
restore and maintain the quality of the waters of the
United States. This plan involves first, the improvement
and development of new waste water treatment and eon-
trol technology through the conduct of research and the
construction of demonstration projects for various treat-
ment methods.‘ The Act also directs the expenditure of
huge amounts of money in construction grants for needed
waste water treatment facilities throughout the Nation.’
In order to assure that technological developments and
advances were properly implemented and that construc-
‘Federal Water Pollution Control Act Amendments of 1972,
Title I — Research and Related Programs, 33 U.S.C. 1251-
1265.
‘Id. Title 11 — Grants for construction of treatment works,
$3 U.S.C. 1281-1292.
-
tion grants were used to finance only needed and properly
designed facilities, the Congress also instituted the Na-
tional Pollutant Discharge Elimination System and made
unlawful any discharge of pollutants not in conformity
with a permit issued in accordance with this system. Fed-
eral Water Pollution Control Act Amendments of 1972,
* Title IV — Permits and Licenses, 33 U.S.C. 1341-1345,
and Title 11] — Standards and Enforcement, 33 U.S.C.
1311-1328.
It is the proper administration and implementation
of this system in accordance with the directives of the
Congress, and the failure of the Administrator of the
Environmental Protection Agency to effectuate these di-
rections, which are involved in this action. The Court of
Appeals For the Ninth Circuit has correctly declared in-
valid the administrative regulation upon which the Ad-
ministrator relied in refusing to relinquish permitting
authority over point sources operated by the Federal gov-
ernment and has placed the administration of the National
Pollutant Discharge Elimination System permit program
with the respondents herein as directed in the Act and a8
intended by the Congress.
The National Pollutant Discharge Elimination Sys-
tem (hereinafter referred to as NPDES) was established
in Section 402 of the Act, 33 U.S.C. §1342, and that
Section contains the instructions of Congress with respect
to the administration and implementation of the system.
The approach of the permit system is similar to that em-
ployed in other regulatory statutes; an act is declared un-
lawful and then a procedure is established through which
the prohibition may be modified and the activity controlled
9
and regulated. In the Federal Water Pollution Control
Act, Section 301, 33 U.S.C. §1311, makes unlawful the dis-
charge of any pollutant except in compliance with Sections
301, 302, 306, 307, 318, 402 and 404 of the Act. However,
Section 402(k), 33 U.S.C. §1342(k), provides that com-
pliance with a permit issued pursuant to Section 402 is
to be deemed compliance with Section 301, Section 302,
Section 306, and Section 307. The discharge of pollutants
from point sources is, therefore, unlawful except as au-
thorized in an NPDES permit. Under this system, all
point sources are required to obtain such permits, includ-
ing point sources operated by the Federal government. In-
deed, Federal dischargers have been regularly applying
for National Pollutant Discharge Elimination System
permits and even under the Administrator’s interpretation
would be expected to continue such applications and
renewals.‘
Initial permitting authority under the National Pol-
lutant Discharge Elimination System clearly rests with
the Administrator pursuant to Section 402(a), 33 U.S.C.
§1342(a). However, in keeping with the State’s respon-
sibility for the control of water pollution for all waters
within their jurisdiction, Section 402(b), 33 U.S.C.
§1342{b), provides for the development of State programs
for the issuance of National Pollutant Discharge Elimina-
tion System permits. In pertinent part, “Section 402(b)
of the Act, 33 U.S.C. §1342(b), provides:
“. , . [t]he Governor of each State desiring to ad-
minister its own permit program for discharges into
*See: Petitioners’ Brief, page 10.
10
navigable waters within its jurisdiction may submit
to the Administrator a full and complete description
of the program it proposes to establish and administer
under State law or under an interstate compact... .
The Administrator shall approve each such submitted
program unless he determines that adequate authority
does not exist.” (Emphasis Added).
This section continues by describing the elements
which must, as a minimum, be incorporated into each
State program. The Administrator’s duty is clear; if
each prescribed measure is not contained in the plan, he
should not approve the program, however, if the plan does
include all the requisite authority, he “shall approve” the
program submitted.
The instructions of the Congress with respect to the
administration of the National Pollutant Discharge Eli-
mination System are further continued in Section 402(c),
33 U.S.C. §1342(c)}, of the Act, which reads, in pertinent
part:
“(1) Not later than ninety days aiter the date on
which a State has submitted a program (or revision
thereof) pursuant to subsection (b) of this section,
the Administrator shall suspend the issuance of per-
mits under subsection (a) of this section as to those
navigable waters subject to such program unless he
determines that the State permit program does not
meet the requirements of subsection (b) of this sec-
tion or does not conform to the guidelines issued under
Section 304(h) (2) of this Act.” (Emphasis Added).
Again, the Administrator’s duties are clear and his
actions are mandatory; unless he finds the State program
deficient, he “shall suspend” his own issuance of permits
11
for those navigable waters subject to the State program.
The clear and explicit instructions of the Congress
are not, however, reflected in the regulations promulgated
by the Administrator. In regulations promulated in 40
C.F.R., Part 124, the Environmental Protection Agency
set forth “State Program Elements Necessary for Partici-
pation in the National Pollutant Discharge Elimination
System.’ These regulations are, in part, inconsistent with
the Federal Water Pollution Control Act Amendments of
1972 in that they attempt to authorize a dual permitting
system which is not contemplated in the Act and also that
these regulations attempt to alter the jurisdictional base
of the Act from navigable waters to point sources of dis-
charge.
Section 402, 33 U.S.C. §1342, for instance, clearly
limits the Administrator’s alternatives to either approval
or disapproval of a submitted State program. However, it
is apparent from the provisions of 40 C.F.R. §124.10, and
particularly the accompanying comment, that the Ad-
ministrator does not acknowledge this constraint. 40
C.F.R. §124.10, and comment, read, in part, as follows:
“Prohibition of discharges into State waters:
Except as provided in §124.11, any State or interstate
program participating in the NPDES must have a
statute or regulation, enforceable in State courts,
which prohibits discharges of pollutants by any per-
son except as authorized pursuant to an NPDES
permit.
‘Published at 37 Federal Register 28390, December 2, 1972;
amended by 38 Federal Register 17999, July 5, 1973, and 38
Federal Register 19894, July 24, 1973. |
12
(Comment: ... Except as provided in §124.11, excep-
tions to the general prohibition cannot be approved.
Depending on their scope and nature, any such ex-
ceptions will either (1) constitute grounds for with-
holding approval of the entire submitted program un-
til such time as the State or interstate agency revises
or modifies its program to conform to this subpart, or
(2) constitute categories, types, or sizes of point
sources for which the Administrator will not suspend
the issuance of NPDES permits. In the latter care,
the Administrator will issue NPDES permits for
those point sources not subject to the State or inter-
state agency's authority.)” (Emphasis Added)
This regulation, if implemented in accordance with
the accompanying comment, clearly does not implement
or conform to the provisions of Section 402. The authority
to make a partial delegation is not contained in the Act
and the jurisdictional criteria stated in Section 402 is
related to navigable waters, not to point sources. These
errors are repeated throughout the regulations and the
application of these erroneous constructions effectively
precludes the efficient implementation of the State pro-
grams authorized in Section 402(b), 33 U.S.C. §1342(b).
The jurisdiction of the States under their approved
NPDES permit issuing programs is coextensive with that
of the Administrator insofar as the control of point sources
discharging to the navigable waters covered by the pro-
gram is concerned. Section 402(c), 33 U.S.C. §1342(c),
makes it perfectly clear that upon approval of the State’s
program the authority of the Administrator under Section
402(a). 33 U.S.C. §1342(a), is suspended with respect
13
to the navigable waters covered by the State program.
The requirement that each point source obtain an NPDES
permit is in no way effected by the delegation to the State
of authority to issue such permits, the only change is the
idemtty of the governmental entity implementing the pro-
gram.
Moreover, efficient implementation of any more
stringent standards contained in a State’s plan, and au-
thorized in Section 510 of the Act, 33 U.S.C. §1370, nec-
essitates that the State have control over all discharges to
navigable waters within its jurisdiction. What petitioner
suggests and advocates is that Congress intended that there
be a dual permitting system with two separate agencies
administering two separate water pollution control pro-
grams and issuing NPDES permits to separate point
sources discharging to the same navigable waters.
Coordinating such permit issuing powers creates incredible
administrative entanglements and makes it impossible for
either agency to conduct a cohesive and effective program
for any particular water. Such a program is certainly not
consistent with the streamlining of administrative proc-
esses for the implementation of the Act called for in Sec-
tion 101(f), 33 U.S.C. §1251(f£):
“It is the national policy that to the maximum extent
possible the procedures utilized for implementing this
Act shall encourage the drastic minimization of
paperwork and interagency decision procedures, and
the best use of available manpower and funds, so as
to prevent needless duplication and unnecessary de-
lays at all levels of government.”
Rather than decrease the traffic of paperwork and inter-
agency decision making, the position of petitioner can
14
only increase such burdens and the experience of Cali-
fornia with this dual system demonstrates that the imposi-
tion of more stringent State “substantive” requirements is
impaired where the State does not issue all the permits
for its waters. As shown by the Affidavit of Bill B. Dendy,
the operation of the dual system has resulted in the issuance
of NPDES permits which failed to incorporate permit
conditions relating to substantive control and discharge
standards of the California program.®
Further, the development of applicable substantive
standards is hindered under the system currently operated.
Interpreting the case of California v. Davidson, 3 E.R.C.
1157 (N.D. Cal. 1971), the United States Court of Ap-
peals For the Ninth Circuit found that the determination
of substantive requirements applicable to any particular
source could ordinarily he accomplished only through the
administrative process. The Control strategies and ef-
fluent limitations to be applied must be tailored to the
individual source after considering the design of the
facility, the quantity and timing of its discharge, the na-
tAffidavit of Bill B. Dendy, Appendix, pp. 40-42, cites two
such NPDES permits issued by the Administrator. In dis-
cussing this Affidavit in a footnote to California v. EPA, 511
F.2d 963, 966, the Court below observed:
“(t]he Administrator is continuing to screen such state-
requested permit conditions, and apply his own notions
of ‘best practicable’ and ‘best available’ technology and
of what constitutes compliance ‘to the fullest extent pos-
sible’ in issuing permits to federal agencies, rather than
the standards suggested by the state.’ ”’
%California v. EPA, 511 F.2d 963, at 967 (9 CA, Feb. 13, 1975).
15
ture and concentration of its discharge, and the existing
state of the water into which the discharge is made. For
instance, Section 303, 33 U.S.C. $1313, authorizes, indeed
requires, the States to identify waters where the applica-
tion of the effluent standards contained in Section 301, 33
U.S.C. §1311, are not stringent enough to meet minimum
water quality standards arid requires the computation of
maximum daily pollutant loads and the permits issued
must reflect effluent limitations based on planned waste
load allocations and frequently incorporating additional
controls such as timing and rate of discharge. The al-
location of maximum daily pollutant loads among the
various dischargers on a particular stream or stream seg-
ment simply cannot be made or effectively planned without
control over each point source. The necessity that such
control rest with the States is amplified by the wide variety
of programs authorized under Section 510, 33 U.S.C.
§1370.
In addition to providing for more stringent standards
than those imposed by the Administrator, Section 510
also authorizes the State programs to be broader and to
examine different factors than those considered by the
Administrator. The standards set forth in Section 402(b),
Section 303(e)(3), and in the regulations of the Admini-
strator are the minimal requisites of State plans and form
a floor, not a ceiling, for the State program. This relation
has been recognized in the regulations of the Environ-
mental Protection Agency:
40 C.F.R. §124.21 “Application for NPDES permit.
Procedures of any State or interstate agency partici-
pating in the NPDES shall insure that every applicant.
16
for an NPDES permit complies with NPDES iiling
requirements. Such procedures and require: ents
shall include the following:
(a) Except as provided in paragraphs (b) nd
(c) (4) of this section and except as provided by the
Administrator in regulations issued under the act,
any person discharging or who proposes to discharge
pollutants shall complete, sign, and submit an NPDF'S
application short form in accordance with the instruc-
tions provided with such form.
COMMENT. Federal filing requirements for the
NPDES include the timely filing of a properly com-
pleted Refuse Act or NPDES application form. State
and interstate agencies may specify, where necessary,
additional filing requirements such as the submission
of engineering reports, plans, and specifications for
present or propose treatment or control of discharges
of pollutants. While duplication should be avoided,
the Administrator recognizes that the NPDES appli-
cation form may not by itself satisfy the needs of
every participating program.”
The Administrator expressly recognizes in this regu-
lation that this additional information may be necessary
to carry out the State program even though not necessary
to his own Section 402(a) permit issuing program. How-
ever, these additional requirements are no less a part of
the National Pollutant Discharge Elimination System un-
der Section 402(b). 33 U.S.C. §1342(b), than the re-
quirements of the Administrator’s program and as part
of the approved programs for the issuance of the permits
they are requirements with which all applicants, including
17
Federal dischargers, must comply. Recognition of State
procedures applicable to all applicants for NPDES per-
mits is also found in 40 C.F.R. $124.42:
“Application of effluent standards and limitations,
water quality standards, and other requirements.
(a) Procedures for any State or interstate program
participating in the NPDES must insure that the
terms and conditions of each issued NPDES permit
apply and insure compliance with all of the following,
whenever applicable:
(4) Any more stringent limitation, including those
(i) necessary to meet water quality standards, treat-
ment standards, or schedules of compliance, estab-
lished pursuant to any State law or regulation (under
authority preserved by section 510), or (ii) neces-
sary to meet any other Federal law or regulation, or
(iii) required to implement any applicable water qual-
ity standards; such limitations to include any legally
applicable requirements necessary to implement total
maximum daily loads established pursuant to section
303(d) and incorporated in the continuing planning
process approved under section 303(e) of the Act
and any regulations and guidelines issued pursuant
thereto.
The only limitation imposed by the Congress on the
operation of these State water pollution control programs
is that they must be at all times administered in a manner
consistent with the Act and impose standards at least as
stringent as those in the Act and the regulations of the
18
Administrator. Section 402, 33 U.S.C. §1342, contains
provisions designed to give just such assurances. Section
402(c)(2), Section 402 (c)(3), and Section 402 (d)
provide that the Administrator is to carry out a continu-
ing review of the State programs and of permits issued
or proposed under these programs and gives him authority
to withdraw his approval if the program is not admini-
stered in accordance with the Act. Again, the Administra-
tor’s alternatives are to approve or disapprove the pro-
gram; nowhere is there any authority to retain his Section
402(a) authority to issue permits for any source discharg-
ing to a navigable water subject to an approved State
program.
The applicability of the State program to all sources
of pollutant discharge is mandated by Section 402,, 33
U.S.C. §1342, and guaranteed in Section 313, 33 U.S.C.
§1323. In that section, the Congress has declared that
facilities of all branches of the Federal government shall
comply with all the “requirements respecting control and
abatement of pollution” which are imposed on any other
person discharging to the waters of any particular State
or locality. In pertinent part, Section 313, 33 U.S.C.
§1323, reads as follows:
“Each department, agency, or instrumentality, of the
executive, legislative and judicial branches of the
Federal Government (1) having jurisdiction over any
property or facility, or (2) engaged in any activity
resulting, or which may result, in the discharge or
runoff of pollutants shall comply with Federal, State,
interstate, and local requirements respecting control
and abatement of pollution to the same extent that
19
any person is subject to such requirements, including
the payment of reasonable service charges.”
From this section, it is clear that if a requirement is
a “requirement respecting control and abatement of pol-
lution” it is a requirement with which Federal facilities
shall comply. Nowhere in this section is there any basis
for a distinction between substantive and procedural re-
quirements of State law. Indeed, Section 402, 33 U.S.C.
§1342, demonstrates the Congress was concerned with the
implementation of full and complete programs of water
pollution control and was concerned that such programs
be properly administered.
The position maintained by petitioner herein totally
precludes the operation of such a program. Petitioner
suggests that facilities of the Federal government need
only comply with the substantive effluent standards and
compliance schedules promulgated by the State, and need
not apply for State operating permits. This position, how-
ever, ignores the manner by which such standards are
formulated and applied. The control strategies and ef-
fluent limitations applicable to any particular source can
only be determined by reference to the nature of the source,
its size, and location, the quality of the water into which
the discharge flows, and the type and nature of the con-
trol equipment and treatment facilities available for such
facilities. Such determinations cannot be made absent an
administrative examination of the source and its circum-
stances. It is through the operation of the control pro
gram, therefore, that the standards which petitioner claims
must be met are formulated and applied. This is particu-
larly true where more stringent standards, authorized
20
pursuant to Section 510, 33 U.S.C. $1370, are to be im-
posed or where the effluent limitations promulgated by
the Administrator pursuant to Section 301, 33 U.S.C.
§1311, are inadequate to produce acceptable water quality.
Petitioner’s restrictive interpretation of the phrase
“requirements respecting control and abatement of pollu-
tion” is further undermined by the language imposing an
obligation to pay “reasonable service charges.” Petitioner’s
contention that this language contemplates only charges
for the use of public treatment works does not relate to
other language in Section 313, 33 U.S.C. §1323, and de-
prives this phrase of any operative effect whatsoever. In
discussing this language and petitioners’ contention that it
referred to charges for the use of public treatment works,
the Ninth Circuit Court of Appeals reasoned:
“Although a state’s taxing power cannot operate
within the confines of a federal enclave without the
consent of the United States, no serious contention
has ever been made that subordinate governmental
bodies must supply public utility services to federal
agencies free of normal user charges. Hence, there
would be no need for Congress to explicitly direct
federal agencies to pay their full share of municipal
sewer system costs. On the other hand, any permit
program charges might be sufficiently in the nature
of a tax that specific federal consent would be re-
quired before they could be certified as ‘properly
payable’ federal obligations.” (Citations omitted).
511 F.2d 963, at 970 (9 CA, February 13, 1975).
This interpretation of the reasonable service charge
language is in accord with the principle of statutory con-
21
struction that where possible all the language of a statute
should be given operative effect and meaning. See: Wash-
ington Market Co. v. Hoffman, 101 U.S. 112 (1879);
Jarecki v. G. D. Searle & Co. 367 U.S. 303 (1961) ; Wein-
berger v. Hynson, Westcott & Denning, Inc., 412 U.S.
609 (1973). In addition to being violate of this principle,
the interpretation advanced by petitioner appears totally
unrelated to the rest of Section 313, 33 U.S.C. §1323.
This section is concerned with requirements which must
be met by the discharger. The reference of the section is
to charges relating to the imposition of State and local
requirements, not to the operation of publicly owned treat-
ment works. Thus, even where Federal agencies discharge
through a publicly owned treatment works the charges
referred to in Section 313 are properly read as incident to
the imposition of the State or local requirements rather
than the actual treatment process employed.
In lieu of compliance with the provisions of a State’s
water pollution control program, the petitioner herein
urges that enforcement of the standards of the Act, in-
cluding any more stringent “substantive” state standards
is to be secured solely through court action pursuant to
Section 505, 33 U.S.C. §1365. This approach is not, how-
ever, adequate to perform the functions of the State pro-
gram. It does not provide any guidance in the determina-
tion and formulation of what standards should be applied
to a particular source and is totally inadequate to assure
that stringent State standards are implemented and en-
forced. Under NPDES permits issued by the Admini-
strator pursuant to his Section 402(a) powers, the facili-
ties of the Federal government could be insulated from
any enforcement of the State’s standards. Pursuant to
‘BEST COPY AVAILABLE
22
Section 402(k), 33 U.S.C. §1342(k). compliance with the
terms and conditions of a permit issued pursuant to Sec-
tion 402 is deemed compliance with the Act for purposes
of Section 505, 33 U.S.C. §1365. If, therefore, the con-
ditions imposed by the Administrator on such an NPDES
permit did not reflect the imposition of the State standards,
the discharger could, at least arguably, escape these State
programs entirely. As shown by the Affidavit of Billy
B. Dendy, (Appendix, pp. 40-42), discussed at page 14
of this Brief and in footnote 8 herein, there have been
instances where the Administrator has, indeed, failed
to incorporate State recommendations into NPDES per-
mits issued to point sources discharging to the navigable
waters of California. In these instances, the administra-
tion and enforcement of the Act falls exclusively upon
the Courts without any recourse to administrative
processes.
In addition to providing an inappropriate Section
402(k), 33 U.S.C. §1342(k), defense, the contentions of
the petitioner deny any operative effect to Section 313,
33 U.S.C. §1323. By equating the obligations imposed
in Section 313 with those specifically actionable under
Section 505, 33 U.S.C. §1365, petitioner effectively renders
Section 313 a redundant and unnecessary restatement of
Section 505 except as to the ability of the President to
exenipt complaince. Moreover, petitioner argues, based on
exemptive language contained in Section 401, 33 U.S.C.
§1341, that even Section 505 has limited application as to
Federal facilities. However, this exemption demonstrates
only that where the Congress wished to relieve the Federal
government of a compliance obligation it did so expressly
and in specific languag. No such language appears in
es ose ee See
23
Section 313, 33 U.S.C. $1323, nor is there any exemption
from State programs adopted and approved under Section.
402, 33 U.S.C. §1342. The absence of such express exemp-
tion is especially significant in light of the Section 505(f)
reference to permit conditions and Section 313 require-
ments. The judicial enforcement of such conditions nec-
essarily and inescapably implies the administrative imposi-
tion of such requirements.
Administrative imposition of permit conditions is
precisely what the Congress contemplated in Section 402
of the Act and the provisions of the State programs for
the issuance of permits are clearly “requirements respect-
ing control and abatement of pollution” within the mean-
ing of Section 313, 33 U.S.C. §1323. As stated by the
Court of Appeals for the Ninth Circuit:
“{i]t would appear that the reference to Section 313
to federal agency compliance with state ‘requirements’
was purposeful and artistic, and was meant to refer
to these requirements which state administrative
agencies might adopt under their express Section 402
authorizations.”
511 F. 2d 963, at 972 (9 CA, February 13, 1975).
24
ARGUMENT II
THE SUPREMACY CLAUSE OF THE UNITED STATES
CONSTITUTION, ARTICLE VI, CLAUSE 2, DOES NOT
BAR THE ISSUANCE OF NPDES PERMITS BY THE
STATES TO AGENCIES AND INSTRUMENTALITIES
OF THE FEDERAL GOVERNMENT UNDER THE
FEDERAL WATER POLLUTION CONTROL ACT OF
1972 AND DOES NOT PROVIDE A BASIS FOR THE
ADMINISTRATOR’S FAILURE TO SUSPEND
ISSUANCE OF NPDES PERMITS FOR DISCHARGES
INTO THE NAVIGABLE WATERS OF A STATE HAV-
ING AN APPROVED WATER POLLUTION CONTROL
PROGRAM.
There are at least three reasons why the Supremacy
Clause does not operate to preclude the State issuance of
National Pollutant Discharge Flimination System permits
under the provisions of the Federal Water Pollution Con-
trol Act of 1972. First, Section 313 of the Federal Water
Pollution Control Act, 33 U.S.C. §1323, expresses a clear
Congressional waiver and specifically subjects Federal
facilities to the requirements of State programs for the
issuance of NPDES permits and other requirements
respecting control and abatement of pollution. Second,
application of the Supremacy Clause in this action is con-
trary to the policy supporting the rule since the issuance of
NPDES permits by these States does not frustrate Fed-
eral law, the evil against which the Supremacy Clause pro-
tects. Third, the programs for the issuance of these Fed-
eral permits which were submitted by California and
Washington have been approved by the Administrator of
the Environmental Protection Agency and the Administra-
tor is mandated to delegate his authority to issue such
permits.
A A SS ee
25
The power of the Congress to waive the immunity of
the Federal government under the Supremacy Clause is
clear. As was stated in Mayo v. United States, 319 U.S.
441, 446, 63 S.Ct. 1137, 1140, 87 L.Ed. 1504, 1508 (1943):
“It lies within Congressional power to authorize
regulation, including taxation, by the state of federal
instrumentalities.”
In this case, Congress has enacted such a waiver. In
enacting Section 313, 33 U.S.C. §1323, the Congress has
declared clearly, explicitly, and most affirmatively, that
Federal facilities “shall comply” with State water pollu-
tion control requirements:
“Each department, agency, or instrumentality of
the executive, legislative, and judicial branches of
the Federal Government (1) having jurisdiction over
any property or facility, or (2) engaged in any ac-
tivity resulting, or which may result, in the discharge
or run-off of pollutants shall comply with Federal,
State, interstate, and local requirements respecting
control and abatement of pollution to the same ex-
tent that any person is subject to such requirements,
including the payment of reasonable service charges.
The President may exempt any effluent source of any.
department, agency, or instrumentality in the execu-
tive branch from compliance with any such a re-
quirement if he determines it to be in the paramount
interest of the United States to do so; except that
no exemption may be granted from the requirements
of section 306 or 307 of this Act. No such exemp-
tions shall be granted due to lack of appropriation
unless the President shall have specifically requested
26
such appropriation as a part of the budgetary process
and the Congress shall have failed to make available
such requested appropriation. Any exemption shall
be for a period not in excess of one year, but addi-
tional exemptions may be granted for periods of not
to exceed one year upon the President’s making a
new determination. The President shall report each
January to the Congress all exemptions from the re-
quirements of this section granted during the preced-
ing calendar year, together with his reason for grant-
ing such exemption.”
It is difficult to imagine how Congress could have made
a more affirmative declaration that the facilities of the
Federal government were subject to the requirements of
State pollution control programs than was made in this
section. The uncompromising and unlimited language em-
ployed leaves no room for discretion; if the requirement
is a “requirement respecting control and abatement of pol-
lution”, it is a requirement to which Federal facilities are
subject. Certainly, the elements of a State program for
the issuance of permits required under the Act are “re-
quirements respecting control and abatement of pollution.”
In the case of Alabama v. Seeber, 502 F. 2d 1238, 1243
(1974), the Court of Appeals For the Fifth Circuit con-
Strued substantially identical language from the Clean
Air Act Amendments of 1970 and concluded:
“The phrase ‘shall comply with . . . State. . . require-
ments respecting control and abatement of air pollu-
tion to the same extent that any person is subject to
such requirements’ effectively conveys a Congressional
‘” intent that federal facilities are to be treated equally
t
27
with private facilities in the scheme of control estab-
lished by the Act. Recognizing that in particular
instances such treatment might prove inconsistent
with the national interest, the section provides for
executive exemption from any requirements.’
Similarly, the Court below herein ruled the language of
the Section 313, 33 U.S.C. §1323, waiver was sufficiently
clear and free from ambiguity and went on to state:
“Section 313 also requires federal agencies to comply
with state pollution control requirements ‘to the same
extent that any person is subject to such require-
ments.’ Hence, the extent of the federal agency com-
pliance duty can only be gauged from the type of
program that section 402 of the Act demands that
states institute for private dischargers.” California
v. EPA, 511 F. 2d 963, at 970 (9 CA, February 13,
1975).
Further, with respect to the nature and scope of the re
quirements imposed under Section 313, the Court of Ap-
peals For the Ninth Circuit concluded:
“TI]t would appear that the reference in Section 313
to federal agency compliance with state ‘require-
ments,’ was purposeful and artistic, and was meant
to refer to those requirements which state administra-
tive agencies might adopt under their express Section
402 authorizations.’ California v. EPA, supra, at 972.
The ability of Congress to employ broad and uncom-
promising language in waiving Federal Supremacy and
subjecting Federal facilities to State regulation was also
established in Baltimore National Rank v. State Tax Com-
mission, 297 U.S. 209 (1936). The issue presented in
PD PVSSGD ET
28
that case was the power of a State to tax shares in a na-
tional bank which were held by an instrumentality of the
Federal government. The Court held that the State did
have such a power, and based its holdings on the fact that
Congress had consented to this taxation by statute. The
language of this statute indicated that “all” the shares of
a national banking association whose principal place of busi-
ness is within the limits of a State are subject to taxation
at the discretion of that State’s legislature. From this,
the Court reasoned that shares held by an agency of the
Federal government were taxable. In the instant case,
the language of Section 313, 33 U.S.C. §1323, is even
more explicit in indicating the consent of Conress to waive
any insulation that a Federal facility might possess under
the Supremacy Clause. Section 313 expressly provides
that the Federal facilities are subject to local “require-
ments” in pollution matters. This is a clear and unequivo-
cal waiver of any Federal primacy under the Supremacy
Clause.
The application cf the Supremacy Clause is also in-
appropriate in this case because the regulations which Cali-
fornia and Washington seek to impose do not in any way
act to frustrate or thwart the application of Federal law,
but rather are in furtherance of and were adopted pursuant
to Federal law. In the case of Perez v. Campbell, 402 U.S.
637 (1971), this Court quoted with approval the standard
for determining whether a State statute was in conflict
With the Supremacy Clause first enunicicated in Hines v.
Davidowitz, 312 U.S. 52 (1941):
“ ‘Tn the final analysis,’ our function is to determine
whether a challenged state statute ‘stands as an
obstacle to the accomplishment and execution of the
full purposes and objectives of Congress.” Perez v.
Campbell, supra, at 649.
See also: Florida Lime & Avocado Growers, Inc. v. Paul,
373 U.S. 132 (1963) ; Sears, Roebuck & Co. v. Stiffel Co.,
376 U.S. 224 (1964) ; Nash v. Florida Industrial Commis-
sion, 389 U.S. 235 (1967).
Applying the Hines test to the instant case, there is
no question that these requirements do not conflict with
Federal law since it is through the application of the
State programs for the issuance of National Pollutant
Discharge Elimination System permits that the objectives
and goals of the Federal Water Pollution Control Act are
to be obtained. In fact, it was at the specific direction of
Congress that these plans were formulated and adopted.
Under these circumstances, the Supremacy Clause is
clearly not a bar to this action to secure compliance with
the programs of California and Washington for the is-
suance of National Pollutant Discharge Elimination Sys-
tem permits.
Finally, the Supremacy Clause is inapposite in this
case because the States have been delegate.’ authority to
administer the requirements of the Federal Act. The water
pollution control programs of the States have not been
adopted sua sponte in the provincial exercise of police
powers, but rather in direct response to Federal require
ments and in order to qualify for the delegation of Federal
authority to administer a Federal Act. Such a delegation
of Federal authority in the administration of a Federal
Act was upheld in Stewart Machine Co. v. Davis, 301 U.S.
548 (1937). In that case, the States had been delegated au-
30
thority to administer the provisions of a Federal program of
unemployment insurance established under the Social Se-
curity Act of 1935, 42 U.S.C. §501-503. Similarly, the Fed-
eral Water Pollution Control Act, 33 U.S.C. $1251, et
seq., directs that authority to issue NPDES permits is to
be delegated to the States, providing the program operated
by the States meets all listed requisites. The Administra-
tor has found that the programs operated by the respond-
ents herein do meet the requirements of Section 402 of
the Act, 33 U.S.C. §1342, and yet has refused to suspend
his own authority as directed in Section 402(c), 33 U.S.C.
§$1342(c). There can be no violation of the Supremacy
Clause where, as here, Congress has explicitly authorized
State regulation of Federal installations under a Federal
Act. Despite the fact that the control programs are em-
bodied in State law, the permits issued through the opera-
tion of these programs are Federal permits within the Na-
tional Pollutant Discharge Elimination System and are
enforceable by the Administrator and the Federal Courts
as Federal requirements.
31
CONCLUSION
The failure of the Administrator to relinquish per-
mitting authority over the Federal agencies and installa-
tions discharging pollutants to navigable waters covered
by a State water pollution control program which has been
approved pursuant to Section 402(b) of the Act, 33 U.S.C.
§1342(b), deprives that State of its primary rights and
responsibilities to prevent and reduce water pollution and
to plan the development and use of land and water re-
sources within its jurisdiction. The Administrator’s act
is contrary to both the explicit language of the Act and
the policies which underlie it. Section 402(c), of the Act,
33 U.S.C. §1342(c), requires and mandates the Admini-
strator to suspend his issuance of permits where there its
an applicable State program approved under Section
402(b). The provisions of these programs for the issuance
of NPDES permits are certainly “requirements respect-
ing control and abatement of pollution” within the mean-
ing of Section 313 of the Act, 33 U.S.C. §1323. Section
313, therefore, obligates the agencies of the Federal gov-
ernment to comply with the requirements of these pro-
grams just as if they were private citizens, and to the same
extent. Operation of a successful program to clean up
the waters of any State requires that the administering
body have contro] over every point source discharge into
those waters. It was the intent of the Congress that the
States and not the Administrator were to be primarily
responsible for achieving this goal. The Administrator’s
action thwarts the well and carefully conceived plan of
the Congress and poses an obstacle and hindrance to the
effective and efficient implementation of the Federal Water
Pollution Control Act of 1972.
32
For these and the foregoing reasons, the Judgment
of the United States Court of Appeals For the Ninth
Circuit should be affirmed.
Dated: SEPTEMBER 30 _ 1075,
Respectfully Submitted,
W. HANCOCK
ATTORNEY GENERAL
COMMONWEALTH OF KENTUCKY
DAVID C. SHORT
ASSISTANT ATTORNEY GENERAL
COMMONWEALTH OF KENTUCKY
DAVID D. BEALS
ASSISTANT ATTORNEY GENERAL
COMMONWEALTH OF KENTUCKY
Room 26, Capitol Building
Frankfort, Kentucky 40601
Telephone: (502) 564-3594
. ARTHUR K. BOLTON
' ATTORNEY GENERAL
' STATE OF GEORGIA
132 Judicial Building
Atlanta, Georgia 30334
Telephone (404) 656-4585
|
CO ie a Re
33
RONALD Y. AMEMIYA
ATTORNEY GENERAL
STATE OF HAWAII
WILLIAM J. BROWN
ATTORNEY GENERAL
STATE OF OHIO
State Office Tower
30 East Broad Street
Columbus, Ohio 43215
Telephone (614) 466-3376
WILLIAM M. EICHBAUM
DEPUTY SECRETARY FOR
ENFORCEMENT AND GENERAL
COUNSEL PENNSYLVANIA
DEPARTMENT OF
ENVIRONMENTAL RESOURCES
614 Executive House
Post Office Box 2357
101 South Second Sreet
Harrisburg, Pennsylvania 17120
Telephone (717) 787-7060
COUNSEL FOR AMICI CURIAB
COMMONWEALTH OF KENTUCKY,
STATE OF GEORGIA, STATE OF
HAWAII, STATE OF OHIO, AND
COMMONWEALTH OF
PENNSYLVANIA
34
CERTIFICATE OF SERVICE:
The undersigned hereby certifies that the herein
BRIEF OF THE COMMONWEALTH OF KEN-
TUCKY, STATE OF GEORGIA, STATE OF
HAWAII, STATE OF OHIO, AND COMMON-
WEALTH OF PENNSYLVANIA AS AMICI CURIAE
IN SUPPORT OF RESPONDENTS was served by
mailing three copies hereof, via United States Mail, air
mail, postage prepaid, to: Honorable Robert H. Bork,
Solicitor General, Department of Justice, Tenth and Con-
Stitution Avenue, Washington, D.C., 20530; Honorable
A. Raymond Randolph, Jr., Deputy Solicitor General, De-
partment of Justice, Tenth and Constitution Avenue,
Washington, D.C., 20530; Honorable Wallace H. John-
son, Assistant Attorney General, Land and Natural Re-
sources Division, Department of Justice, Tenth and Con-
stitution Avenue, Washington, D.C., 20530; Honorable
Edmund B. Clark, Attorney, Department of Justice, Tenth
and Constitution Avenue, Washington, D.C., 20530;
Honorable Raymond N. Zagone, Attorney, Department
of Justice, Washington, D.C., 20530; Honorable Raymond
W. Mushai, Attorney, Department of Justice, Washing-
ton, D.C., 20530; Honorable Robert V. Zener, General
Counsel, Environmental Protection Agency, Fourth and
M Streets, S. W., Washington, D.C., 20460; Honorable
Evelle J. Younger, Attorney General, State of California,
Honorable Roderick Walston, Deputy Attorney General,
State of California, Honorable Richard C. Jacobs, Deputy
Attorney General, State of California, and Honorable Carl
Boronkay, Assistant Attorney General, State of Califor-
nia, 6000 State Building, San Francisco, California, 94101;
Honorable V. Frank Mendicino, Attorney General, State
55
of Wyoming, 210 State Capitol, Cheyenne, Wyoming,
82001, and Honorable Maryland S. Kite, Special Assistant
Attorney General, State of Wyoming, Attorney General
Office, 210 State Capitol, Cheyenne, Wyoming, 82001;
Honorable Bronson C. LaFollette, Attorney General, State
of Wisconsin, Department of Justice, State Capitol, Madi-
son, Wisconsin, 53702; Honorable John J. Hill, Attorney
General. State of Texas, Supreme Court Building, Austin,
Texas, 78711; and Circuit Judge Eugene A. Wright, Cir-
cuit Judge Herbert Y. C. Choy, and Judge Burns, United
States Court of Appeals For the Ninth Circuit, San Fran-
cisco, California, 94101, and further the undersigned
hereby certifies that all parties required to be served in
this action have been served, all this the 30 day of
September, 1975.
COUNSEL FOR AMICI CURIAE
COMMONWEALTH OF KENTUCKY,
STATE OF GEORGIA, STATE OF
HAWAII, STATE OF OHIO, AND
COMMONWEALTH OF
PENNSYLVANIA
By: an *
DAVID C. SHORT
ASSISTANT ATTORNEY GENERAL
COMMONWEALTH OF KENTUCKY
Yi, Poe i Rahn
DAVID D. BEALS ;
ASSISTANT ATTORNEY GENERAL
COMMONWEALTH OF KENTUCKY
By: