Amicus Curiae Brief — Leonard W. Hoffmann, et al., Petitioners v. WBI Energy Transmission, Inc.
Supreme Court briefSep 21, 2026
Ask Donna
What actually matters in this document.
Text
No. 25-159
In the Supreme Court of the United States
LEONARD W. HOFFMANN, ET AL., PETITIONERS,
v.
WBI ENERGY TRANSMISSION, INC.
ON WRIT OF CERTIORARI TO THE UNITED STATES
COURT OF APPEALS FOR THE EIGHTH CIRCUIT
BRIEF OF THE INTERSTATE NATURAL GAS
ASSOCIATION OF AMERICA AND THE
AMERICAN PETROLEUM INSTITUTE AS
AMICI CURIAE IN SUPPORT OF
RESPONDENT
JOAN DRESKIN
INTERSTATE NATURAL
GAS ASSOCIATION OF
AMERICA
25 Massachusetts Ave.,
NW, Suite 500N
Washington, DC 20001
Counsel for Interstate
Natural Gas Association of America
JEREMY C. MARWELL
Counsel of Record
VINSON & ELKINS LLP
2200 Pennsylvania Ave.,
NW, Suite 500 West
Washington, DC 20037
(202) 639-6507
jmarwell@velaw.com
Counsel for Amici Curiae
(Additional counsel listed inside cover)
GRACE D. SODERBERG
AMERICAN PETROLEUM
INSTITUTE
200 Massachusetts
Ave., NW
Washington, DC 20001
SAMANTHA GARZA
VINSON & ELKINS LLP
200 West 6th St.,
Suite 2500
Austin, TX 78701
Counsel for Amici Curiae
Counsel for American
Petroleum Institute
TABLE OF CONTENTS
Page
Table of Authorities.................................................... II
Interest of Amici Curiae ............................................. 1
Introduction and Summary of Argument ................... 2
Argument ..................................................................... 7
I.
The Eminent Domain Power Is an Essential
Part of the NGA’s Statutory Framework. ........... 7
II. Interstate Natural Gas Pipeline Companies
Are Responsible Stewards of the Federal
Eminent Domain Power and Exercise It Only
as a Last Resort. ................................................ 10
III. Applying State Law to Measure Just
Compensation in Federal Eminent Domain
Actions Would Increase the Length and Cost
of Condemnation Cases and Create
Misaligned Incentives. ....................................... 20
Conclusion ................................................................. 29
(I)
II
TABLE OF AUTHORITIES
Cases:
Page(s)
Almota Farmers Elevator & Warehouse Co. v.
United States, 409 U.S. 470 (1973) ................. 23, 28
Appalachian Voices v. FERC,
139 F.4th 903 (D.C. Cir. 2025) .............................. 16
Atl. Coast Pipeline, LLC v. 0.07 Acre, More or
Less, 396 F. Supp. 3d 628 (W.D. Va. 2019) ........... 24
Commonwealth Transp. Comm’r v. Glass,
613 S.E.2d 411 (Va. 2005) ..................................... 24
DeKalb Cnty. v. Trs., Decatur Lodge No. 1602,
B.P.O. Elks, 251 S.E.2d 243 (Ga. 1978) ................ 21
E. Tenn. Nat. Gas Co. v. Sage,
361 F.3d 808 (4th Cir. 2004) ................................. 16
Fla. Se. Connection, LLC v. 0.821 Acres of Land,
More or Less,
223 F. Supp. 3d 1227 (M.D. Fla. 2016) ................. 16
Guardian Pipeline, L.L.C. v. 950.80 Acres of
Land, 210 F. Supp. 2d 976 (N.D. Ill. 2002)........... 16
Joseph B. Doerr Tr. v. Cent. Fla. Expressway
Auth., 177 So. 3d 1209 (Fla. 2015) ........................ 21
Mountain Valley Pipeline, LLC v. 6.56 Acres of
Land, Owned by Sandra Townes Powell,
915 F.3d 197 (4th Cir. 2019) ........................... 13, 19
NAACP v. Fed. Power Comm’n,
425 U.S. 662 (1976)................................................ 28
Nexus Gas Transmission, LLC v. City of Green,
757 Fed. Appx. 489 (6th Cir. 2018) ....................... 10
PennEast Pipeline Co. v. New Jersey,
594 U.S. 482 (2021).............................................. 8, 9
III
Cases—Continued:
Page(s)
Sabal Trail Transmission, LLC v. +/- 1.401
Acres of Land, No. 16-cv-278, 2026 WL 964386
(M.D. Fla. Mar. 27, 2026) ...................................... 13
United States v. 8.929 Acres of Land,
36 F.4th 240 (4th Cir. 2022) .................................. 24
United States v. Bodcaw Co.,
440 U.S. 202 (1979).......................................... 20, 28
USG Pipeline Co. v. 1.74 Acres,
1 F. Supp. 2d 816 (E.D. Tenn. 1998) ............... 10, 18
Constitutional Provisions:
U.S. Const. Amend. V...................................... 5, 22, 23
Fla. Const. art. X, § 6 ................................................ 21
Ga. Const. art. I, § 3, ¶ I............................................ 21
Statutes:
15 U.S.C. § 717 ............................................................1
15 U.S.C. § 717f(h) ................................................ 2, 12
Fla. Stat. § 73.092 ..................................................... 21
Ga. Code § 22-1-12..................................................... 21
Regulations:
18 C.F.R. § 157.20(b) ................................................. 16
IV
Administrative Materials:
Page(s)
Certification of New Interstate Nat. Gas Pipeline
Facilities, 88 FERC ¶ 61,227 (1999) ..................... 12
Midwestern Gas Transmission Co.,
116 FERC ¶ 61,182 (2006) .................................... 19
Mountain Valley Pipeline, LLC,
163 FERC ¶ 61,197 (2018) .................................... 13
PennEast Pipeline Co.,
164 FERC ¶ 61,098 (2018) ......................................9
Other Authorities:
Amendments to the Natural Gas Act: Hearings on
H.R. 2185, H.R. 2235, H.R. 2292, H.R. 2569,
and H.R. 2956 Before the H. Comm. on
Interstate and Foreign Commerce, 80th Cong.,
1st Sess. (1947) ........................................................8
Comments of the Interstate Natural Gas
Association of America, FERC Docket No.
PL 18-1-000, PL21-3-000 (Apr. 25, 2022)
(Accession No. 20220425-5448) ................... 3, 11, 14
Domina Law Grp., Nebraska Landowner
Litigation Prompts Biden Administration to
End Keystone XL Pipeline (Jan. 19, 2021),
https://bit.ly/4cPKBhb ........................................... 16
Domina Law Grp., TransCanada Keystone XL
Pipeline, https://bit.ly/3VfgjOI .............................. 26
V
Other Authorities—Continued:
Page(s)
Edelman, Gilad, Pipeline Companies Paying
More to Cross Private Land, Tex. Trib. (June
18, 2014) ................................................................. 17
INGAA Foundation, Inc., Report No. 2016.01,
Pipeline Impact to Property Value and Property
Insurability (2016) ................................................. 14
INGAA, Commitments to Landowners (Feb.
2019), https://perma.cc/2KFK-KUD6 .......... 3, 10, 11
Initial Comments of Enbridge Gas Pipelines,
FERC Docket No. PL 18-1-000 (May 26, 2021)
(Accession No. 20210526-5225) ....................... 19, 27
Klass, Alexandra B. & Danielle Meinhardt,
Transporting Oil and Gas: U.S. Infrastructure
Challenges, 100 IOWA L. REV. 947 (2015)................8
Miceli, Thomas J. & C.F. Sirmans, The Holdout
Problem, Urban Sprawl, and Eminent Domain,
16 J. OF HOUS. ECON. 309 (2007) ........................... 15
Posner, Richard A., Economic Analysis of Law
(6th ed. 2003) ......................................................... 15
Prop. Rights & Pipeline Ctr.,
Get a Lawyer, https://perma.cc/4656-N5GF.......... 26
S. Rep. No. 429, 80th Cong., 1st Sess. (1947) .............8
Sever Walker Padgett, Southeast Supply
Enhancement, https://perma.cc/4B6U-BW3V ....... 26
U.S. Energy Info. Admin., U.S. Natural Gas
Consumption Set a Monthly and Yearly Record
in 2025 (Mar. 18, 2026),
https://perma.cc/BG34-GGGL .................................9
INTEREST OF AMICI CURIAE 1
The Interstate Natural Gas Association of America
(“INGAA”) is a national trade association that advocates regulatory and legislative positions of importance to the interstate natural gas pipeline industry in North America. INGAA represents the majority
of interstate natural gas companies in the United
States, which are regulated by the Federal Energy
Regulatory Commission (“FERC”) under the Natural
Gas Act (“NGA”), 15 U.S.C. § 717 et seq. INGAA’s
members transport much of the nation’s natural gas
through a network of approximately 200,000 miles of
pipelines. They have a substantial interest in pipeline
development, continued investment in energy infrastructure, and predictable, consistent, rational, and
fair law and policy affecting natural gas transportation and storage.
The American Petroleum Institute (“API”), a national trade association, represents all aspects of
America’s oil and natural gas industry, which supports nearly 11 million U.S. jobs and is backed by a
growing grassroots movement of millions of Americans. API’s approximately 600 members produce, process, and distribute the majority of the nation’s energy. API was formed in 1919 as a standards-setting
organization and has developed more than 800 standards to enhance operational and environmental
1 Pursuant
to Supreme Court Rule 37.6, amici curiae state
that no counsel for any party authored this brief in whole or in
part and no entity or person, aside from amici curiae, their
members, or their counsel, made any monetary contribution
intended to fund the preparation or submission of this brief.
(1)
2
safety,
efficiency
https://www.api.org/.
and
sustainability.
See
Amici have an interest in this case because applying federal law to measure just compensation when a
natural gas company exercises the federal power of
eminent domain under the Natural Gas Act will ensure uniformity, consistency, and fairness for pipeline
companies and landowners alike. FERC-regulated
pipeline projects are part of a broader network of interstate infrastructure that, by its nature, frequently
crosses state lines. Moreover, amici have unique,
real-world insight into the interstate pipeline industry’s use of the eminent domain power granted under
the NGA and the practical consequences of applying
state law to determine just compensation.
INTRODUCTION AND
SUMMARY OF ARGUMENT
1. The federal eminent domain power is integral
to the NGA’s nationwide statutory framework. Prior
to Congress amending the NGA to delegate that power
to pipeline companies with certificated projects, interstate pipelines were hindered by a patchwork of state
laws related to eminent domain. In many instances,
companies could not build the infrastructure that
FERC had determined was necessary to the public interest, where state law failed to provide the necessary
authorizations or was overtly hostile to interstate natural gas pipelines. Congress resolved this issue in
1947 by enacting NGA section 7(h), which confers “the
right of eminent domain” on holders of a FERC certificate. 15 U.S.C. § 717f(h). In the decades that followed, the NGA’s federal eminent domain power became (and remains today) a vital tool for ensuring that
3
pipeline companies can build, operate, and maintain
infrastructure that is necessary to serve the public interest and help meet the Nation’s energy needs.
2. Despite the practical and legal importance of
the federal eminent domain power, INGAA members
have made a collective commitment to using this tool
only as a last resort. See INGAA, Commitments to
Landowners (Feb. 2019), https://perma.cc/2KFKKUD6. Pipeline companies understand the responsibility that comes with the delegation of that authority.
A recent survey of INGAA members reveals that over
a nine-year span, pipeline companies initiated NGA
condemnation proceedings for only 10% of tracts affected by certificated projects of ten miles or more and
litigated cases to the point of judicial valuation less
than 1% of the time. See Comments of the Interstate
Natural Gas Association of America, FERC Docket
No. PL 18-1-000, PL21-3-000 at 72 (Apr. 25, 2022) (Accession No. 20220425-5448) (“INGAA Comments”). 2
There are good reasons for that approach. Pipeline
companies are highly motivated to reach voluntary
agreements with landowners, to avoid the expense
and delays associated with lengthy condemnation proceedings and to foster a positive working relationship
with landowners with whom they will interact for
many years while the pipeline is in service. And price
is not the only term on which pipelines seek to reach
agreement with landowners. Pipeline companies
work diligently to accommodate nonmonetary concerns where feasible, such as adjusting rights-of-way
2 Available
by searching via accession number in FERC’s
eLibrary, https://elibrary.ferc.gov/eLibrary/search.
4
to avoid areas of particular importance on a tract, or
crafting construction schedules to avoid interfering
with agricultural seasons and other surface uses.
Although pipeline companies avoid condemnation
where possible, that does not mean that the federal
eminent domain authority is unimportant. Quite the
contrary. Condemnation actions may be the only viable path to develop a project—not only where parties
are unable to agree on price or other terms, but also
where no single tract owner has the clear right to negotiate with a developer. Parties may resort to court
action to resolve probate or estate issues, to quiet title,
to resolve disagreements among joint landowners, or
to address situations where landowners cannot be located. And because the NGA does not provide a separate statutory right of access to property to conduct
surveys, in some jurisdictions pipeline companies may
seek preliminary relief through a condemnation action to undertake environmental and cultural surveys, to gather information that is necessary to identify an appropriate route and to apply for required authorizations.
Landowners do not lack bargaining power in
these situations. Landowners and their counsel understand that pipeline projects are time sensitive, as
projects are designed and built to meet customer demand. Landowners further understand that such projects, like all linear infrastructure, depend on securing
easements for the entire project right-of-way. Such
knowledge encourages “holdouts,” who delay providing access to a property or resist coming to a valuation
agreement to drive up the price, hoping that a pipeline
will capitulate to avoid the delay and uncertainty of
5
litigation. Nor is it accurate to say that pipeline companies have an incentive to low-ball property owners
in negotiations; such tactics discourage agreements,
delay permitting, and hamper project development,
contrary to the developers’ interests. In practice, natural gas pipeline companies routinely pay more than
the assessed market value of a particular easement if
it means avoiding litigation, given the practical value
to pipelines of reaching early and voluntary agreements with landowners.
3. Allowing state law to define just compensation
in actions exercising the NGA’s federal eminent domain authority will create a patchwork of varying and
inconsistent legal standards and practical results.
Misaligned incentives will make pipeline development
more burdensome and expensive. Increased costs will
ultimately harm the hundreds of millions of Americans who depend on natural gas for heating, cooking,
cooling, and electric power generation.
To begin, applying the settled federal law definition of just compensation is most consistent with the
statutory text, history, and this Court’s precedent.
See Resp’t Br. 13-33; U.S. Cert. Br. 8-15. Such a rule
will also provide a single, uniform, and determinate
standard. A federal-law standard avoids the unfair
situation of neighboring landowners along a single
pipeline, who happen to be separated by a state border, receiving disparate compensation for similar
easements. A state-by-state approach will also be
more burdensome for pipeline companies whose projects are, by nature, part of a broader interstate system. A uniform federal standard is easier to administer, builds on a well-settled and well-understood body
6
of stable federal law, and ensures predictable administration of compensation awards under the Fifth
Amendment.
A state-law measure of just compensation, by contrast, would make eminent domain cases more uncertain, protracted, and expensive. As reflected in the
amicus briefs filed in this Court supporting Petitioner,
many states have a highly sophisticated landowner
bar. Counsel are adept at leveraging state law regimes that allow for the recovery of attorneys’ fees and
other litigation expenses, such as appraisal fees. In
the experience of amici and their members, attorneys
proactively target pipeline projects and aggressively
solicit landowner clients along the proposed right-ofway as soon as a potential project is made public.
Although the dispute in this case involves attorneys’ fees, a holding from this Court that state law
governs just compensation under the NGA’s federal
eminent domain authority would implicate a wide
range of other issues, many of which are unsettled.
Adopting Petitioners’ view of the law would declare an
open-season for landowners to raise and litigate various issues under state law. These include the measure of pre-judgment interest, the availability of
“stigma” damages and other theories of compensation
that differ from the fair-market-value standard under
federal law, and the standard for determining a parcel’s “highest and best use”—to name just a few examples. Those points would need to be litigated and resolved on a state-by-state basis across dozens or hundreds of cases, nationwide, every year. This proliferation of unsettled issues will inevitably protract
7
condemnation proceedings and decrease the likelihood of voluntary agreement or settlement.
A regime that allows landowners to shift their litigation costs to the pipeline will inevitably result in
opportunistic behavior and misaligned incentives. A
party who knows that win or lose, an adversary will
cover their litigation costs lacks an incentive to make
reasonable cost-benefit judgments about the value of
continuing to litigate—tending to protract proceedings and increase unproductive costs. In addition,
natural gas companies have encountered appraisers
who provide extremely low-cost initial appraisals that
dramatically overstate property value, creating unrealistic expectations in the property owner. When litigation inevitably ensues, appraisers may elevate the
price and scope of their services once it becomes apparent that the fees are likely to be shifted to the pipeline company in litigation. Those litigation costs are
created whether or not the landowner ultimately benefits from forcing a case into litigation. Petitioner’s
rule not only departs from statutory text, history, and
precedent, but will lead to these and other misaligned
incentives and inefficiencies, driving up the ultimate
cost of projects needed to serve the public interest.
ARGUMENT
I. The Eminent Domain Power Is an Essential
Part of the NGA’s Statutory Framework.
Without the federal eminent domain power,
FERC determinations that a particular interstate
natural gas pipeline is required by the public convenience and necessity could be rendered a dead letter,
with pipelines unable to proceed in many
8
jurisdictions. As the NGA’s history reveals and this
Court has explained, prior to conferral of the federal
eminent domain power on certificate holders, FERCapproved pipeline infrastructure projects were hindered or altogether thwarted in the many states that
did not provide state-law eminent domain power for
federally approved pipelines. See PennEast Pipeline
Co. v. New Jersey, 594 U.S. 482, 489 (2021) (citing S.
Rep. No. 429, 80th Cong., 1st Sess. 2-3 (1947)).
The legal and practical problems of a patchwork
state-law approach to eminent domain were pronounced. Some states overtly discriminated against
interstate projects (and project developers) by denying
foreign corporations the right to bring condemnation
actions. Other states refused to allow the use of eminent domain unless the operation of the pipeline in
question would benefit that state’s residents—a parochial requirement that was a poor fit for projects designed to move natural gas for long distances, across
multiple state lines. PennEast, 594 U.S. at 489. This
patchwork of state laws frustrated the federal scheme
and resulted in an inability to meet natural gas demand. See S. Rep. No. 429, 80th Cong., 1st Sess. 2-3;
Amendments to the Natural Gas Act: Hearings on H.R.
2185, H.R. 2235, H.R. 2292, H.R. 2569, and H.R. 2956
Before the H. Comm. on Interstate and Foreign Commerce, 80th Cong., 1st Sess. 543-545, 556-558 (1947);
Alexandra B. Klass & Danielle Meinhardt, Transporting Oil and Gas: U.S. Infrastructure Challenges, 100
IOWA L. REV. 947, 996-998 (2015). In short, the absence of federal eminent domain authority under the
NGA often rendered the “right to build” “illusory.”
PennEast, 594 U.S. at 489.
9
Ultimately, “Congress acted to remedy this defect” and “amended the NGA to authorize certificate
holders to exercise the federal eminent domain
power.” PennEast, 594 U.S. at 489 (emphasis omitted). In so doing, Congress provided “a mechanism for
certificate holders to secure property rights necessary
to build pipelines” to “ensure[] that certificates of public convenience and necessity could be given effect.”
Id. at 489-490; accord PennEast Pipeline Co., 164
FERC ¶ 61,098, P 29 (2018) (determination by FERC
that “[t]he power of eminent domain conferred by
NGA section 7(h) is a necessary part of the statutory
scheme to regulate the transportation and sale of natural gas in interstate commerce”). As this Court has
explained, “the federal eminent domain power” delegated via the NGA “is complete in itself,” whether
“condemnation suits [are brought] by the Federal Government [or] its delegatees.” PennEast, 594 U.S. at
508 (internal quotation marks and citation omitted).
Today, the Nation’s demand for natural gas is at
an all-time high.3 The federal eminent domain power
remains a vital part of the NGA’s statutory framework, and the effective and efficient resolution of condemnation cases is a necessary prerequisite for constructing and operating the infrastructure that is
needed to serve the public interest.
3 U.S. Energy Info. Admin., U.S. Natural Gas Consumption
Set a Monthly and Yearly Record in 2025 (Mar. 18, 2026),
https://perma.cc/BG34-GGGL.
10
II. Interstate Natural Gas Pipeline Companies
Are Responsible Stewards of the Federal
Eminent Domain Power and Exercise It Only
as a Last Resort.
1. Natural gas companies recognize the considerable responsibility that comes with Congress’s delegation of federal eminent domain authority in the NGA.
As a group, they have committed to exercising it “only
* * * as a means of last resort,” and they “begin every
easement negotiation with the expectation that a mutual agreement can be reached and eminent domain
rights will not need to be exercised.” INGAA, Commitments
to
Landowners
(Feb.
2019),
https://perma.cc/2KFK-KUD6.
This commitment is borne out by history and
practice. Easements for interstate natural gas pipelines are primarily obtained through voluntary agreements with landowners, without resort to litigation—
and this is true even for large “greenfield” projects
that may require acquiring many hundreds or even
thousands of easements across a lengthy new pipeline
route. See, e.g., Nexus Gas Transmission, LLC v. City
of Green, 757 Fed. Appx. 489, 491 (6th Cir. 2018) (noting that pipeline company had “negotiated voluntary
easements on 97% of the 2,070 tracts of land that lay
in the path of the pipeline”); USG Pipeline Co. v. 1.74
Acres, 1 F. Supp. 2d 816, 824 (E.D. Tenn. 1998) (noting that pipeline company “desired to acquire easements from landowners by negotiations and settlement rather than eminent domain whenever possible”).
In 2021, INGAA conducted a survey of its members regarding their use of eminent domain. The
11
survey involved 123 pipeline projects of over ten miles
in length that were certificated by FERC and placed
into service within a nine-year period (September
2011 through September 2020). These projects required easements across 25,268 tracts of land. The
survey found that condemnation proceedings were initiated for approximately 10% of the tracts, and less
than 1% required litigation through the point of full
judicial valuation. See INGAA Comments at 72. Over
71% of the time, INGAA members were able to execute agreements with landowners for an easement
prior to sending a final offer letter. Ibid. That trend
remains true today. Most of the time, natural gas
companies are able to come to an agreement with
landowners regarding a needed easement well in advance of the initiation of condemnation proceedings.
2. Natural gas companies have strong incentives
to develop and maintain positive working relationships with affected landowners. Years ago, INGAA
adopted, and its members continue to abide by, “Commitments to Landowners” to guide interactions with
landowners and set a framework for positive, mutually respectful relationships. See INGAA, Commitments to Landowners, supra. These commitments require negotiating in good faith with the goal of reaching a mutually agreeable easement. Ibid.
Pipeline companies believe that coming to a mutually acceptable agreement with a landowner is a
better, faster outcome than resorting to litigation.
Most often, the property interest needed to build a
pipeline is an underground easement allowing installation and long-term or indefinite presence of a pipeline, which means that the pipeline company’s
12
interest in the land continues alongside the landowner’s fee without appreciable conflict. Because natural gas pipelines have lifespans of many decades,
during which the asset requires periodic inspection
and maintenance, pipeline companies know up front
that they will need to engage productively with the
landowner going forward. It is in the company’s best
interest to come to an amicable result and foster a constructive and respectful working relationship.
FERC policies for reviewing and approving pipeline projects encourage negotiation with landowners.
A proposed project’s need for significant condemnation can weigh in FERC’s balancing of the public interest, in deciding whether to approve a pipeline company’s application for proposed new pipeline facilities.
See Certification of New Interstate Nat. Gas Pipeline
Facilities, 88 FERC ¶ 61,227, pp. 61,749-61,750
(1999). Accordingly, pipeline companies are incentivized to reach agreements with landowners along the
right-of-way even prior to certification (i.e., prior to
the point at which the pipeline would have eminent
domain authority, see 15 U.S.C. § 717f(h)) to increase
their chances of project approval.
Only once FERC approves a project does the pipeline company obtain legal authority to initiate condemnation proceedings. See 15 U.S.C. § 717f(h). Critically, even at that stage, the company remains highly
motivated to reach agreement with landowners to
avoid the cost and delay of protracted litigation. Because companies may need to purchase long-lead-time
items (e.g., steel, pipeline, equipment) before all necessary permits are obtained, postponing construction
for easement litigation increases the carrying cost of
13
those resources. Pipeline projects face strict deadlines
to meet time-sensitive customer needs and contractual commitments, and FERC regularly imposes
deadlines for completing construction as a condition of
approving new projects. As FERC has explained,
“condemning private property generally is not in the
pipeline’s best interest. The condemnation process
can be a prolonged and expensive process that could
delay construction of the pipeline and add significant
costs to the project.” Mountain Valley Pipeline, LLC,
163 FERC ¶ 61,197, P 70 (2018) (footnote omitted); see
also Mountain Valley Pipeline, LLC v. 6.56 Acres of
Land, 915 F.3d 197, 211 (4th Cir. 2019) (noting that
eminent domain process “could take more than three
years to complete – bringing it outside FERC’s in-service deadline [for the certificated pipeline]”).
For example, the Sabal Trail project, discussed by
some of Petitioners’ amici, was built and entered service in 2017. But the last condemnation actions in
Florida (where, under currently applicable precedent,
landowners are entitled to recover attorneys’ fees in
addition to compensation for the easement) were only
finally resolved about a decade later, in 2026. See,
e.g., Sabal Trail Transmission, LLC v. +/- 1.401 Acres
of Land, No. 16-cv-278, 2026 WL 964386, at *1 (M.D.
Fla. Mar. 27, 2026). Strikingly, the vast majority of
that decade-long litigation time involved disputes
over the landowner’s attempt to recover attorneys’
fees, not time spent litigating valuation of the easement itself.
Although condemnation cases can be vigorously
litigated, it is important to put the impacts on landowners into context. The easements obtained are
14
typically for a fully underground pipeline, accompanied by temporary surface use for installation and
maintenance. A pipeline is installed several feet or
more below ground, the trench is backfilled, and the
surface is restored as close as feasible to preconstruction conditions. Certain limitations on surface uses
may exist for safety and operational reasons. But the
practical reality is that many landowners and third
parties will not even be aware of the presence of an
interstate gas pipeline after it has been installed and
the surface remediated, apart from periodic stakes
marking the presence of an underground pipeline.
Moreover, empirical studies show that, on average,
the presence of an underground interstate natural gas
pipeline does not negatively affect property values.
See INGAA Foundation, Inc., Report No. 2016.01,
Pipeline Impact to Property Value and Property Insurability (2016), https://perma.cc/RJQ5-TTXH (concluding, based on quantitative analysis of data from a diverse range of properties nationwide, that the presence of an underground, FERC-regulated natural gas
pipeline does not affect the value of a home or its insurability).
3. Petitioners and their amici imply that condemnation actions are disproportionately filed against
small parcel individual landowners, who must then
face large corporations in court. See, e.g., Florida
Property Owners Amicus Br. 3-4. But this narrative
is incomplete at best. Condemnation actions can involve a range of landowners, including property held
by large corporations or even states. Nor is the use of
eminent domain power limited to disagreements regarding the value of a property interest. Litigation
15
may be necessary for numerous reasons, such as to
quiet title of a tract; to resolve probate or estate issues; where there is a lack of unanimity among joint
owners; or where landowners cannot be located or fail
to respond. See INGAA Comments at 72.
Moreover, in the context of large infrastructure
projects like pipelines, it is not accurate to suggest
that landowners lack bargaining power. Contra Owners’ Counsel Amicus Br. 5-6. To the contrary, the
“holdout problem” is well-known in economic literature.4 An interstate pipeline project—which can require the up-front investment of tens or hundreds of
millions of dollars before a shovel hits the ground—
cannot be built and enter service (and earn revenue)
until each and every easement is obtained along the
right-of-way. Accordingly, landowners and their
counsel have an incentive to resist settlement and delay pipeline access to the property, hoping that the
cost to the pipeline—and thus the pipeline’s settlement window—will escalate as the project moves
through the development process. See Richard A. Posner, Economic Analysis of Law § 3.7 (6th ed. 2003)
(noting that once pipeline development begins, the
cost of rerouting becomes very high, tempting landowners in the pipeline path to hold out “for a very high
price”).
Landowners and their counsel are also keenly
aware that pipeline projects are time-sensitive. Such
projects are authorized only after a demonstrated
4 See,
e.g., Thomas J. Miceli & C.F. Sirmans, The Holdout
Problem, Urban Sprawl, and Eminent Domain, 16 J. OF HOUS.
ECON. 309 (2007).
16
showing of need for gas transportation capacity. In
many cases, local utilities have signed long-term contracts that require the pipeline to be operational by a
certain date to serve end-use customers. Additionally,
FERC certificates authorizing the pipeline project
routinely include a deadline by which construction
must be completed, as a condition of the underlying
authorization. See 18 C.F.R. § 157.20(b).
Landowners and their counsel understand that
delaying the pipeline’s physical access to property—
even for preliminary steps such as the environmental
or cultural surveys necessary to apply for certain permits—or delaying agreement to an easement can delay the project as a whole, with disproportionate cost
imposed on the project developer. See, e.g., E. Tenn.
Nat. Gas Co. v. Sage, 361 F.3d 808, 829 (4th Cir. 2004)
(noting that “any single parcel has the potential of
holding up the entire project” (citation omitted));
Guardian Pipeline, L.L.C. v. 950.80 Acres of Land, 210
F. Supp. 2d 976, 978-979 (N.D. Ill. 2002) (noting that
“any delays or an inability to sequence construction
will occasion great additional expense to [the pipeline]”); Fla. Se. Connection, LLC v. 0.821 Acres of
Land, More or Less, 223 F. Supp. 3d 1227, 1231 (M.D.
Fla. 2016) (“A delay in obtaining access to the [e]asements would delay the entire [p]roject and cause [the
pipeline company] to significantly risk failing to meet
its * * * in-service deadline.”).
With delay as the “coin of the realm” by those opposed to new infrastructure, Appalachian Voices v.
FERC, 139 F.4th 903, 917 (D.C. Cir. 2025) (Henderson, J., concurring), landowners can obstruct the overall project or even force its cancellation by dragging
17
the pipeline into litigation.5 This reality gives landowners significant leverage. See, e.g., LandQuire,
Pipeline Easements—Read, Negotiate, and Get Value
Despite
Everything
(Jan.
20,
2026),
https://perma.cc/L86E-DZA3 (website offering advisory services, arguing that landowners with property
subject to eminent domain for a pipeline should “use
time to your advantage,” noting that pipeline “operators overwhelmingly prefer to negotiate voluntary
agreements. Why? Expropriation proceedings drag on
for 18-36 months. They cost $50,000 to $200,000 in legal fees. They also generate negative publicity. Your
bargaining power is real * * * .”).
4. In the experience of amici’s members and their
counsel, pipeline companies do not have an incentive
to provide landowners with inadequate initial offers.
In practice, it is better, cheaper, and more certain for
the pipeline to reach voluntary agreement with landowners than to spend years litigating. Thus, pipeline
companies have an incentive to offer landowners attractive values during negotiations (with agreed-upon
amounts often far exceeding appraised figures), in
hopes of reaching a consensual agreement. See Gilad
Edelman, Pipeline Companies Paying More to Cross
Private Land, Tex. Trib. (June 18, 2014),
https://perma.cc/H4HY-6A8B (observing trend of
“landowners increasingly aware of the potential for
high payouts” when pipeline eminent domain cases
are litigated under state law, “leading to a cycle of escalating costs,” and quoting landowner counsel that
5 See, e.g., Domina Law Grp., Nebraska Landowner Litigation
Prompts Biden Administration to End Keystone XL Pipeline (Jan.
19, 2021), https://bit.ly/4cPKBhb.
18
out-of-court “negotiations * * * are tracking very close
to those amounts [recovered at trial]”); cf. National
Ass’n of Realtors Amicus Br. 19 (alleging lowball offers). For example, USG Pipeline Co. described one
pipeline’s “efforts in reaching a starting point for offers.” A pipeline employee testified that “they initially
* * * obtained easements from six landowners at
$1,500 an acre. Subsequently, they negotiated a
higher amount with a landowner, $2,300–$2,400 per
acre, and went back to the first six landowners and
paid them at that same rate.” 1 F. Supp. 2d at 822.
In other words, even after securing a mutually agreeable initial rate, the pipeline company unilaterally
raised the rate for several landowners to match the
higher rate that another landowner later received.
5. Although pipeline companies seek to avoid condemnation, in some instances that step is unavoidable. For instance, in many jurisdictions, pipeline companies must invoke the federal eminent domain power
and seek preliminary judicial relief to obtain even initial physical access to property for conducting surveys. The NGA does not contain a separate statutory
provision giving a developer access to property along
the right-of-way to perform environmental, historic,
and other surveys. This preliminary access is necessary to gather the kind of site-specific information
that allows a project developer to reduce impacts to
protected resources, and is also typically needed even
to apply for required permits and other authorizations.
Survey access to landowner properties is critically
important early in the process to help project developers identify potentially sensitive areas to mitigate or
19
avoid. Developers will work to identify property features that may have particular importance or value to
a landowner, such as a grazing area, wetland, or road,
that can be accommodated in the project development
process. Particularly in early-stage development, obtaining property access allows pipelines to work with
landowners to accommodate those interests, such as
by shifting the proposed pipeline right-of-way where
feasible. See, e.g., Initial Comments of Enbridge Gas
Pipelines, FERC Docket No. PL 18-1-000 at 64-65
(May 26, 2021) (Accession No. 20210526-5225) (large
interstate gas pipeline developer noting that it “has
routinely employed re-routes to avoid the use of eminent domain [and] address landowner concerns”);
Midwestern Gas Transmission Co., 116 FERC
¶ 61,182, P 48 (2006) (FERC order noting that “[pipeline company] has an incentive to negotiate easements agreements to avoid condemnation litigation,
and * * * such agreements are flexible enough to shift
the route alignment slightly to accommodate individual landowner needs on their property usually without further Commission approval”).
Contrary to the suggestion by petitioners and
their amici, when pipelines obtain preliminary access
via an eminent domain proceeding, that access is often
conditioned on the pipeline first paying multiples of
the appraised value into the court’s registry in cash or
a bond. In many instances, the landowner can withdraw those funds during the pendency of case. See,
e.g., Mountain Valley Pipeline, 915 F.3d at 209 (“To
ensure that the landowners would be compensated
fully, the district courts required [the pipeline company] to post deposits, which the landowners could
20
draw upon while the proceedings continued.”); contra
Owners’ Counsel Amicus Br. 5 (suggesting owners do
not have access to funds until the case is over or the
pipeline is already built).
III. Applying State Law to Measure Just
Compensation in Federal Eminent Domain
Actions Would Increase the Length and
Cost of Condemnation Cases and Create
Misaligned Incentives.
This Court should hold that federal law defines
just compensation in federal eminent domain actions
under the NGA. As Respondent and the United States
persuasively show, such a result is most consistent
with statutory text, history and precedent. Resp’t Br.
13-33; U.S. Cert. Br. 10-18. A contrary ruling would
increase the length, complexity, and cost of eminent
domain actions by imposing a patchwork of varying
and inconsistent state laws on compensation. Landowners in some states are entitled to recover attorneys’ fees and other litigation costs from the pipeline,
although such amounts are not recoverable under federal law. See United States v. Bodcaw Co., 440 U.S.
202, 203 (1979) (per curiam). States also have varying
approaches to other issues that bear on the measure
of just compensation: how the parcel subject to the
taking is defined, whether a landowner can claim consequential, indirect, or other damages beyond fair
market value of the property taken, and what the rate
of prejudgment interest would be, to name just a few.
Such a regime would also create practical difficulties,
misaligned incentives, and increase the overall cost of
condemnation cases, to the ultimate detriment of
American energy consumers.
21
1. Applying state law to govern the measure of
just compensation would create an inefficient and potentially inconsistent patchwork of approaches governing the exercise of what should be a unified federal
eminent domain power. That patchwork will not only
increase the time and cost of acquiring easements to
build projects required to serve the public interest, but
will also undercut the interest of uniformity and fairness in treatment of landowners. FERC-jurisdictional
pipelines are, by definition, part of a larger interstate
network that crisscrosses state lines. Under petitioners’ approach, however, adjacent landowners affected
by the same pipeline but who are separated only by a
state line may receive dramatically different compensation for similar easements. For example, Florida
law assures a property owner “full compensation,”
Fla. Const. art. X, § 6, defined in that state to include
attorneys’ fees. See Joseph B. Doerr Tr. v. Cent. Fla.
Expressway Auth., 177 So. 3d 1209, 1215 (Fla. 2015)
(“full compensation under the Florida Constitution includes the right to a reasonable attorney’s fee for the
property owner”); Fla. Stat. § 73.092. Conversely, a
neighbor across the border in Georgia is entitled to
“just and adequate compensation,” Ga. Const. art. I,
§ 3, ¶ I, which under state law generally does not include attorney’s fees. See DeKalb Cnty. v. Trs., Decatur Lodge No. 1602, B.P.O. Elks, 251 S.E.2d 243, 244
(Ga. 1978); see also Ga. Code § 22-1-12 (providing for
attorney’s fees in eminent domain proceedings only
when it is adjudged that the condemnor cannot acquire the property by condemnation or the condemnor
abandons the proceeding).
22
Moreover, an approach under which a pipeline
company needs to conform its eminent domain proceedings and cost awards to different state laws across
a single project imposes additional burdens and costs
for developing needed infrastructure. Pipelines will
bear the additional cost of tailoring different strategies for acquiring easements on a jurisdiction-by-jurisdiction basis, both during initial negotiations
(which occur in the shadow of governing law), and via
litigation where necessary in some cases. By contrast,
a uniform federal approach to defining just compensation would offer efficiencies from the uniform application of the predictable, well-settled principles under
the Fifth Amendment that govern when the United
States is the condemnor.
2. Holding that state law governs the measure of
just compensation in NGA condemnation actions
would implicate a wide range of unsettled issues, all
of which would need to be litigated and resolved on a
state-by-state basis across dozens or hundreds of
cases nationwide every year. Such a framework
would dramatically increase the complexity, length,
and expense of condemnation actions. Greater uncertainty in the background rules of compensation would,
in turn, make voluntary agreements and settlements
less likely, as landowners leverage uncertainty to demand higher payouts, or choose to roll the dice with
litigation.
Petitioners and their amici “lean in” to this concern, emphasizing the number and diversity of statelaw approaches to measuring just compensation. See,
e.g., Landowner Groups Amicus Br. 15-16; Owners
Council Amicus 17-18. But this diversity is a bug, not
23
a positive feature, of their case. A state-law just compensation regime would create additional uncertainty
and vastly expand the number of issues that would
need to be litigated and resolved on a case-by-case basis.
States may provide entitlement not only to attorneys’ fees but also other costs of litigation, such as expert appraisal fees. In some jurisdictions, landowners
have aggressively litigated for so-called “severance” or
“stigma” damages under state law—where landowners seek not only the fair-market value of the easement taken as the Fifth Amendment provides, see Almota Farmers Elevator & Warehouse Co. v. United
States, 409 U.S. 470, 474 (1973), but also damages allegedly associated with prospective diminution in the
use or value of the property, harm to a business operating from that property, or even harms to a non-existent business that an owner one day hopes to develop. See Florida Property Owners Amicus Br. 1415. Simply enumerating these theories of compensation underscores the ways in which adopting Petitioners’ proposed rule would increase the number and
complexity of questions for litigation in condemnation
cases.
Another common issue in pipeline eminent domain cases is how to define the “highest and best” use
of a property, and in turn how to delineate the boundaries of the parcel “subject to” the taking. For instance, if a pipeline takes an underground easement
crossing one corner of an agricultural field, but that
field is adjacent to a separate parcel containing a
farmhouse, is the parcel “subject” to the taking defined as just the agricultural field, or the field together
24
with the residential parcel? Landowners and the
pipeline may have sharply differing views about what
is (or could be) the “highest and best” use of property
with and without a pipeline. See Atl. Coast Pipeline,
LLC v. 0.07 Acre, More or Less, 396 F. Supp. 3d 628,
647 (W.D. Va. 2019) (“In condemnation, the larger
parcel is ‘the tract or tracts of land which are under
the beneficial control of a single individual or entity
and have the same, or an integrated, highest and best
use.’” (citation omitted)). In practice, how the parcel
subject to the taking is defined can significantly
change the amount of compensation; if a landowner
proves a 5% diminution in value due to taking of an
easement, the amount of compensation will scale with
the size of the defined “parcel.”
Unsurprisingly, states differ significantly in how
to undertake this inquiry, whereas federal law provides a single uniform approach. Adopting Petitioners’ position would present the added burdens and
complexity associated with a patchwork of state laws.
Moreover, it bears emphasis that federal law does not
always advantage the pipeline over the property
owner, in terms of calculating the value of an easement. Compare United States v. 8.929 Acres of Land,
36 F.4th 240, 260 (4th Cir. 2022) (providing that, under federal law, separate tracts can be considered as a
single parcel for eminent domain purposes if there is
a “possibility” of the tracts being put to a unitary use
in “the reasonably near future” such that it is “reasonably sufficient to affect market value” (citation omitted)), with Commonwealth Transp. Comm’r v. Glass,
613 S.E.2d 411, 417 (Va. 2005) (Virginia law, requiring “actual, permanent and present joint use of all the
25
parcels as of the date of take” to find unity of lands for
purposes of defining the parcel subject to the taking).
Thus, although Petitioners here argue vigorously for
state law to apply, in the experience of natural gas
companies, landowners not infrequently have argued
for a federal-law standard on larger-parcel and other
issues, where it provided the possibility of a higher
compensation award.
Other legal issues abound, all of which would be
litigated on a state-by-state basis, across dozens or
hundreds of eminent domain cases every year, inevitably generating inconsistent results if Petitioners
prevail in this Court. The proliferation of issues to be
litigated creates uncertainty and discourages prompt,
efficient, and voluntary settlement. By contrast, fidelity to statutory text, history, and precedent, and holding that federal law governs just compensation in federal eminent domain actions, would promote clarity,
increase efficiency, and avoid unnecessarily protracted litigation.
3. Applying state law to measure “just compensation” in NGA cases will also lead to misaligned incentives, causing practical difficulties and increasing
costs. As the amicus briefs in this case illustrate, numerous jurisdictions entitle landowners to recover attorneys’ fees and other litigation expenses from the
condemning authority. That rule can create incentives for landowners and their counsel to engage in
unproductive litigation without regard to whether
those efforts ultimately benefit landowners.
Many jurisdictions have an extremely sophisticated and experienced landowner bar, whose members aggressively solicit clients as soon as a proposed
26
project is announced. Lawyers gather landowner information from public records as soon as a potential
project is known, and bombard property owners with
solicitations for representation. See Prop. Rights &
Pipeline Ctr., Get a Lawyer, https://perma.cc/4656N5GF (last visited Sept. 16, 2026) (landowner nonprofit warning of “eminent domain lawyers flocking
like seagulls to get groups of landowners to sign with
them” and noting that, based on landowner experience, “many eminent domain lawyers were simply in
it to ‘negotiate,’ and get their share of the pie”). Some
landowner attorneys specifically target pipeline projects. See, e.g., Sever Walker Padgett, Southeast Supply Enhancement, https://perma.cc/4B6U-BW3V (last
visited Sept. 16, 2026) (landowner attorney with
pages dedicated to targeting specific interstate pipeline projects); Domina Law Grp., TransCanada Keystone XL Pipeline, https://bit.ly/3VfgjOI (last visited
Sept. 16, 2026) (touting termination of Keystone XL
Pipeline project in part due to landowner litigation).
While amici are not privy to the precise fee arrangements between landowner attorneys and their
clients, a system in which landowners do not cover any
of the costs of their lawyers creates incentives for unproductive litigation. Where—win or lose—a landowner knows that their adversary will cover their litigation costs, that landowner lacks incentive to make
informed cost-benefit judgments about the value of
continued litigation. The inevitable result is to protract proceedings, increasing the total cost and burden
of acquiring pipeline easements, even where doing so
does not ultimately benefit landowners. For instance,
in jurisdictions where state law allows appraisal costs
27
to be shifted to the pipeline company in litigation, an
appraiser may offer a low-cost initial appraisal that
reflects a highly inflated property value. An unrealistically high initial appraisal can make the landowner
less likely to settle, and the case more likely to proceed
to litigation. But when the case proceeds to litigation,
appraiser fees and costs (e.g., reports, testimony) tend
to skyrocket, without pushback from a landowner who
expects to shift those costs to the pipeline in connection with any ultimate award. That is true whether
or not the landowner actually recovers anything close
to the initial appraisal.
Other misaligned incentives exist as well. For example, in the experience of amici members and their
counsel, landowners often care significantly about
practical issues other than the bottom-line dollar
value paid for the easement. Landowners might place
a significant practical value on adjusting a pipeline
route to avoid certain sensitive areas or surface features to protect existing uses, or on scheduling construction to avoid interfering with planting or harvesting seasons. Natural gas companies and their
counsel work diligently to accommodate landowners
on such issues.
See, e.g., Initial Comments of
Enbridge Gas Pipelines, FERC Docket No. PL 18-1000 at 64-65 (May 26, 2021) (Accession No. 202105265225) (large pipeline developer noting that it “has routinely employed re-routes to avoid the use of eminent
domain [and] address landowner concerns”).
However, in the experience of many natural gas
companies, once a landowner is represented by counsel, such discussions are sometimes pretermitted in
favor of an exclusive focus on the bottom-line dollar
28
value of the easement. That pivot may reflect the reality that landowner counsel’s compensation is typically fixed as a percentage of dollars recovered, not
based on securing nonmonetary accommodations.
Given that the pipeline cannot communicate directly
with landowners once they are represented by counsel, discussions about nonmonetary accommodations
often stop entirely—to the apparent detriment of
landowners.
Applying federal law would replace this patchwork of approaches with the stable, well-understood
principles that govern just compensation under the
Fifth Amendment. See Almota Farmers, 409 U.S. at
474 (property owner entitled “to the fair market value
of his property at the time of the taking”); Bodcaw, 440
U.S. at 203 (just compensation does not extend to “indirect costs to the property owner caused by the taking of his land”). Adopting a clear, determinate federal-law standard would facilitate parties reaching
agreement without the need for litigation, and would
reduce and streamline case trajectories for those matters where litigation is unavoidable. In short, applying federal law would improve the overall efficiency of
federal eminent domain proceedings under the NGA,
and help avoid unproductive litigation and opportunistic behavior that can follow from misaligned incentives—all to the benefit of the hundreds of millions of
Americans who depend on the Natural Gas Act to foster “the orderly development of plentiful supplies of
* * * natural gas at reasonable prices.” NAACP v. Fed.
Power Comm’n, 425 U.S. 662, 669-670 (1976).
29
CONCLUSION
The judgment of the United States Court of Appeals for the Eighth Circuit should be affirmed.
Respectfully submitted.
JOAN DRESKIN
INTERSTATE NATURAL
GAS ASSOCIATION OF
AMERICA
25 Massachusetts Ave.,
NW, Suite 500N
Washington, DC 20001
Counsel for Interstate
Natural Gas Association of America
GRACE D. SODERBERG
AMERICAN PETROLEUM
INSTITUTE
200 Massachusetts
Ave., NW
Washington, DC 20001
Counsel for American
Petroleum Institute
SEPTEMBER 2026
JEREMY C. MARWELL
Counsel of Record
VINSON & ELKINS LLP
2200 Pennsylvania Ave.,
NW, Suite 500 West
Washington, DC 20037
(202) 639-6507
jmarwell@velaw.com
SAMANTHA GARZA
VINSON & ELKINS LLP
200 West 6th St.,
Suite 2500
Austin, TX 78701
Counsel for Amici Curiae