Petition for Writ of Certiorari — Blue Mountains Biodiversity Project, Petitioner v. Shane Jeffries, in His Official Capacity as Ochoco National Forest Supervisor, et al.
Supreme Court briefSep 13, 2024
Ask Donna
What actually matters in this document.
Text
No. _____
IN THE
Supreme Court of the United States
_________
BLUE MOUNTAINS BIODIVERSITY PROJECT,
Petitioner,
v.
SHANE JEFFRIES, IN HIS OFFICIAL CAPACITY AS
OCHOCO NATIONAL FOREST SUPERVISOR, ET AL.,
Respondents.
________
On Petition for a Writ of Certiorari
to the United States Court of Appeals
for the Ninth Circuit
________
PETITION FOR A WRIT OF CERTIORARI
________
David A. Strauss
Sarah M. Konsky
JENNER & BLOCK SUPREME
COURT AND APPELLATE
CLINIC
1111 E. 60th Street
Chicago, IL 60637
Matthew S. Hellman
Counsel of Record
JENNER & BLOCK LLP
1099 New York Ave. NW
Washington, DC 20016
(202) 639-6000
mhellman@jenner.com
Thomas C. Buchele
EARTHRISE LAW CENTER
10101 S. Terwilliger Blvd.
Portland, OR 97219
Michael T. Brody
Andrew L. Osborne
JENNER & BLOCK LLP
353 N. Clark Street
Chicago, IL 60654
Jesse A. Buss
Bridgett A. Chevalier
WILLAMETTE LAW GROUP, PC
411 Fifth Street
Oregon City, OR 97045
i
QUESTION PRESENTED
The Administrative Procedure Act provides that
courts “shall review the whole record” in adjudicating
agency action. 5 U.S.C. § 706. Lower courts are divided
over whether an agency’s allegedly deliberative
materials—memoranda and other iterative documents
that an agency creates and considers in undertaking
agency action—are a part of the “whole record” on
judicial review. Most courts have concluded that the
“whole record” means what it says: deliberative
materials are a part of the administrative record, and the
agency must produce a privilege log if it seeks to
withhold deliberative documents.
In the decision below, the Ninth Circuit joined the
D.C. Circuit in holding that materials an agency deems
“deliberative” are categorically excluded from the
administrative record. The Court of Appeals further
held that because, in its view, deliberative materials are
not part of the administrative record, the agency need
not produce a privilege log identifying the withheld
materials absent a showing the agency acted in bad faith
or engaged in other misconduct in classifying the
documents as deliberative.
The question presented is:
Whether the Administrative Procedure Act, which
requires an agency to produce its “whole record” for
judicial review, permits an agency to categorically and
unilaterally exclude from the administrative record
materials that the agency deems deliberative.
ii
PARTIES TO THE PROCEEDING
Petitioner is the Blue Mountains Biodiversity Project.
Respondents are Shane Jeffries, in his official capacity
as Ochoco National Forest Supervisor, and the United
States Forest Service, an agency of the United States
Department of Agriculture.
RELATED PROCEEDINGS
Blue Mountains Biodiversity Project v. Jefferies, No.
2:20-CV-02158-SU, 2021 WL 3683879 (D. Or. Aug. 19,
2021)
Blue Mountains Biodiversity Project v. Jeffries, No.
2:20-CV-2158-MO, 2021 WL 5150659 (D. Or. Sept. 29,
2021)
Blue Mountains Biodiversity Project v. Jeffries, No.
2:20-CV-02158-MO, 2022 WL 4466928 (D. Or. Sept. 26,
2022)
Blue Mountains Biodiversity Project v. Jeffries, 72
F.4th 991 (9th Cir. 2023)
Blue Mountains Biodiversity Project v. Jeffries, 99
F.4th 438 (9th Cir. 2024)
iii
TABLE OF CONTENTS
QUESTION PRESENTED .............................................. i
PARTIES TO THE PROCEEDING ............................. ii
RELATED PROCEEDINGS.......................................... ii
TABLE OF AUTHORITIES .......................................... v
OPINIONS BELOW ......................................................... 1
JURISDICTION ................................................................ 1
STATUTORY PROVISION INVOLVED .................... 1
INTRODUCTION ............................................................. 2
STATEMENT OF THE CASE ....................................... 5
REASONS
FOR
GRANTING
THE
PETITION ........................................................................ 10
I.
The Question Presented Has Divided
The Lower Courts. ............................................... 10
II.
The Ninth Circuit’s Decision Is Wrong............. 14
III.
The Question Presented Is Important
And Recurring. ..................................................... 22
CONCLUSION ................................................................ 24
Appendix A
Blue Mountains Biodiversity Project v.
Jeffries, 99 F.4th 438 (9th Cir. 2024) ........................ 1a
Appendix B
Blue Mountains Biodiversity Project v.
Jeffries, 72 F.4th 991 (9th Cir. 2023) ...................... 41a
iv
Appendix C
Blue Mountains Biodiversity Project v.
Jeffries, No. 20-cv-02158, 2022 WL 4466928
(D. Or. Sept. 26, 2022) .............................................. 59a
Appendix D
Minutes of Proceedings, Blue Mountains
Biodiversity Project v. Jeffries, No. 20-cv02158, 2021 WL 5150659 (D. Or. Sept. 29,
2021)............................................................................ 80a
Appendix E
Blue Mountains Biodiversity Project v.
Jeffries, No. 20-cv-02158, 2021 WL 3683879
(D. Or. Aug. 19, 2021) ............................................... 82a
v
TABLE OF AUTHORITIES
CASES
American Farm Bureau Federation v.
United States EPA, No. 1:11-CV-0067,
2011 WL 6826539 (M.D. Pa. Dec. 28,
2011) .......................................................................... 15
Armament Services International Inc. v.
Attorney General United States, 760 F.
App’x 114 (3d Cir. 2019) ......................................... 15
Bar MK Ranches v. Yuetter, 994 F.2d 735
(10th Cir. 1993) ........................................................ 18
Bartell Ranch LLC v. McCullough, No.
321CV00080, 2022 WL 2093053 (D. Nev.
June 10, 2022) .......................................................... 23
Brotherhood of Locomotive Engineers &
Trainmen
v.
Federal
Railroad
Administration, 972 F.3d 83 (D.C. Cir.
2020) .......................................................................... 15
Burlington Northern Railroad Co. v.
Oklahoma Tax Commission, 481 U.S.
454 (1987) ................................................................. 13
Camp v. Pitts, 411 U.S. 138 (1973) ............................. 19
Casa De Maryland v. United States
Department of Homeland Security, 924
F.3d 684 (4th Cir. 2019) .......................................... 15
Casey v. Berryhill, 853 F.3d 322 (7th Cir.
2017) .......................................................................... 15
vi
Center for Biological Diversity v. United
States Fish & Wildlife Service, No. 2:19CV-14243, 2020 WL 2732340 (S.D. Fla.
May 26, 2020) ..................................................... 11, 12
Chen v. Mayor & City Council of Baltimore,
574 U.S. 988 (2014) .................................................. 13
Citizens to Preserve Overton Park, Inc. v.
Volpe, 401 U.S. 402 (1971) ................. 2, 9, 14, 17, 19
Clinch Coalition v. United States Forest
Service, 597 F. Supp. 3d 916 (W.D. Va.
2022) .................................................................... 10, 12
Defenders of Wildlife v. Department of the
Interior, No. 18-2090, Order (4th Cir.
Feb. 5, 2019), ECF No. 70 ..................................... 12
Eastern Associated Coal Corp. v. United
Mine Workers of America, 531 U.S. 57
(2000) ........................................................................ 13
Exxon Mobil Corp. v. Mnuchin, No. 3:17CV-1930-B, 2018 WL 4103724 (N.D. Tex.
Aug. 29, 2018) .......................................................... 11
Friends of the Clearwater v. Higgins, 523 F.
Supp. 3d 1213 (D. Idaho 2021) ......................... 15, 21
Gillum v. Commissioner, 676 F.3d 633 (8th
Cir. 2012) .................................................................. 16
Inland
Empire-Immigrant
Youth
Collective v. Nielsen, No. 17-CV-2048,
2019 WL 13240629 (C.D. Cal. Apr. 8,
2019) .......................................................................... 22
vii
Lamps Plus, Inc. v. Varela, 587 U.S. 176
(2019) ........................................................................ 13
Loper Bright Enterprises v. Raimondo, 144
S. Ct. 2244 (2024)................................................. 4, 24
Lynce v. Mathis, 519 U.S. 433 (1997) ......................... 13
Majali v. United States Department of
Labor, 294 F. App’x 562 (11th Cir. 2008) ............. 16
Medina County Environmental Action
Ass’n v. Surface Transportation Board,
602 F.3d 687 (5th Cir. 2010)................................... 16
Meister v. United States Department of
Agriculture, 623 F.3d 363 (6th Cir.
2010) .......................................................................... 15
Miami Nation of Indians of Indiana v.
Babbitt, 979 F. Supp. 771 (N.D. Ind.
1996) .......................................................................... 11
Morgan v. United States, 304 U.S. 1 (1938) ................ 9
Motor Vehicle Manufacturers Ass’n of
United States, Inc. v. State Farm
Mutual Automobile Insurance Co., 463
U.S. 29 (1983) ....................................................... 3, 15
National Council of Negro Women v.
Buttigieg, No. 1:22-CV-314, 2024 WL
1287611 (S.D. Miss. Mar. 26, 2024) ................. 11, 12
New York v. Wolf, No. 20-CV-1127, 2020
WL 2049187 (S.D.N.Y. Apr. 29, 2020) ................. 12
In re Nielsen, No. 17-3345, slip op. (2d Cir.
Dec. 27, 2017), ECF No. 171 ............................ 11, 12
viii
Oak Grove Technologies, LLC v. United
States, 156 Fed. Cl. 594 (2021), aff’d in
part, rev’d in part on other grounds, __
F.4th __, No. 22-1557, 2024 WL 4138392
(Fed. Cir. Sept. 11, 2024) ....................................... 11
Oceana, Inc. v. Ross, 920 F.3d 855 (D.C. Cir.
2019) ................................................................ 9, 12, 13
Ranchers Cattlemen Action Legal Fund
United Stockgrowers of America v.
United
States
Department
of
Agriculture, 35 F.4th 1225 (10th Cir.
2022), cert. denied, 143 S. Ct. 1000
(2023) ........................................................................ 16
Save the Colorado v. Spellmon, No. 18-CV03258, 2023 WL 2402923 (D. Colo. Mar. 7,
2023) .......................................................... 2, 10, 11, 12
Sierra Club v. United States Army Corps of
Engineers, No. 2:20-CV-00396, 2022 WL
2953075 (D. Me. July 26, 2022) .............................. 12
Sierra Club v. United States Fish &
Wildlife Service, No. 2:20-CV-13, 2021
WL 5634131 (M.D. Fla. Dec. 1, 2021) ................... 13
Sierra Club v. Zinke, No. 17-CV-7187, 2018
WL 3126401 (N.D. Cal. June 26, 2018) ................. 22
South Carolina Coastal Conservation
League v. Ross, 431 F. Supp. 3d 719
(D.S.C. 2020) ...................................................... 11, 12
ix
State v. United States Immigration &
Customs Enforcement, 438 F. Supp. 3d
216 (S.D.N.Y. 2020) .......................................... 11, 12
Texas General Land Office v. Biden, No.
7:21-CV-00272, 2023 WL 2733388 (S.D.
Tex. Mar. 31, 2023).................................................. 13
In re United States, 583 U.S. 29 (2017).. 4, 8, 14, 18, 23
United States Fish & Wildlife Service v.
Sierra Club, Inc., 592 U.S. 261 (2021) .................. 21
United States v. Morgan, 313 U.S. 409
(1941) ........................................................................ 19
Utahns for Better Transportation v. United
States Department of Transportation,
305 F.3d 1152 (10th Cir. 2002),
modification on reh’g, 319 F.3d 1207
(10th Cir. 2003) ........................................................ 16
Veterans Contracting Group, Inc. v. United
States, 920 F.3d 801 (Fed. Cir. 2019).................... 15
STATUTES
5 U.S.C. § 552(a)(4)(B).................................................. 20
5 U.S.C. § 552(a)(8)(A)(i)(I) ......................................... 20
5 U.S.C. § 552(b)(5) ....................................................... 20
5 U.S.C. § 706 ........................................................ 1, 2, 14
28 U.S.C. § 1254(1) .......................................................... 1
1
OPINIONS BELOW
The Magistrate Judge for the United States District
Court for the District of Oregon’s opinion is not
published but is reproduced in the Appendix hereto at
Pet. App. 82a.
The district court’s Minutes of
Proceedings is not published but is reproduced in the
Appendix hereto at Pet. App. 80a. The district court’s
opinion is not published but is reproduced in the
Appendix hereto at Pet. App. 59a. The Ninth Circuit’s
opinion is reported at 72 F.4th 991 and reproduced in the
Appendix hereto at Pet. App. 41a. The Ninth Circuit’s
amended opinion and divided order denying rehearing
en banc is reported at 99 F.4th 438 and reproduced in the
Appendix hereto at Pet. App. 1a.
JURISDICTION
The Ninth Circuit entered judgment on July 3, 2023,
and denied a petition for rehearing en banc on April 16,
2024. Pet. App. 41a. On July 10, 2024, this Court
extended the deadline to file a petition for writ of
certiorari to September 13, 2024. This Court has
jurisdiction under 28 U.S.C. § 1254(1).
STATUTORY PROVISION INVOLVED
This case involves Section 706 of Title 5 of the U.S.
Code, which states in relevant part:
In making the foregoing determinations,
the court shall review the whole record or
those parts of it cited by a party, and due
account shall be taken of the rule of
prejudicial error..
2
INTRODUCTION
Judicial review under the Administrative Procedure
Act (“APA”) requires courts to “review the whole
record,” 5 U.S.C. § 706, meaning “the full administrative
record that was before the Secretary at the time he
made his decision,” Citizens to Preserve Overton Park,
Inc. v. Volpe, 401 U.S. 402, 420 (1971).
This case presents a straightforward and recurring
question of statutory interpretation that has divided
lower courts: whether materials the agency deems
“deliberative” are categorically excluded from the
“whole record” under the APA. In the decision below,
the Ninth Circuit joined the D.C. Circuit in answering
yes. But the “growing consensus” in the lower courts is
that the whole record means the whole record, including
deliberative documents that were before the agency
when it took action. Save the Colo. v. Spellmon, No. 18CV-03258, 2023 WL 2402923, at *4 (D. Colo. Mar. 7, 2023)
(cataloging authority).
Under the APA and this Court’s precedent, the
Ninth and D.C. Circuits are wrong. Deliberative
materials—such as memoranda, drafts, emails, letters,
and other materials considered by the agency in
reaching a decision—are documents before the agency
at the time it makes a decision. There is no basis for
treating these materials as outside the “full” and
“whole” administrative record. Indeed, their very
name—deliberative documents—bespeaks that they are
documents that were before the agency and informed its
decision-making.
These documents can and do
illuminate the issues that are at the core of judicial
3
review of administrative action: whether the agency
acted arbitrarily, whether it took a hard look at the
problem before it, or whether it provided an explanation
for its decision that, in fact, ran counter to the evidence
before the agency. See Motor Vehicle Mfrs. Ass’n of
U.S., Inc. v. State Farm Mut. Auto. Ins. Co., 463 U.S. 29,
43 (1983).
A rule that allows agencies to unilaterally excise
documents from the record because they are
deliberative, however, creates a one-way ratchet that
undermines effective judicial review. When deliberative
documents support agency action, the agency may
include such documents in the administrative record
while leaving out others that call into question the
quality of its reasoning. But when deliberative materials
call into question the legality of agency action, the
agency has unilateral discretion to shield those
documents from a court. Judicial review of the “whole
record” does not mean the record that the agency
selects.
The decision below emphasized that deliberative
documents may be subject to privilege. But the answer
for privileged documents is a privilege log subject to
judicial oversight, not silent exclusion. If an agency
believes that documents that it relied upon are
privileged, it can log those documents and make an
assertion of privilege that can be tested by the opposing
party and assessed by the reviewing court. Under the
rule adopted below, the agency may simply withhold
documents altogether without any mechanism to
challenge such exclusions, essentially self-adjudicating
4
the validity of its own assertion of privilege. To be sure,
the courts adopting this rule have left open exceptions
for when the agency withholds documents in bad faith.
But litigants will have little ability to challenge the
exclusion of documents they do not know about,
regardless of whether the agency acts in bad or good
faith.
What the “whole record” means is a question that
implicates nearly every case under the APA. It strikes
at the core of judicial review of agency action, which
“cannot function if the agency is permitted to decide
unilaterally what documents it submits to the reviewing
court as the administrative record.” In re United States,
583 U.S. 1029, 1030 (2017) (Breyer, J., dissenting from
the grant of stay). By permitting agencies to designate
materials “deliberative” with no meaningful review of
those decisions, the decision below “place[s] a finger on
the scales of justice in favor of the most powerful of
litigants, the federal government.” Loper Bright Enters.
v. Raimondo, 144 S. Ct. 2244, 2285 (2024) (Gorsuch, J.,
concurring) (quotation marks omitted).
This Court should grant the petition to address this
disputed, recurring, and important question, and
reverse because the decision below is inconsistent with
the text of the APA and this Court’s precedent.
5
STATEMENT OF THE CASE
In 2015, the National Forest Service (“Service”)
approved the Walton Lake Restoration Project—a
logging project sited within a 218-acre recreation area in
an Oregon forest. The project included replacing the
site’s trees—which were infested with laminated root
rot and bark beetles—with disease-resistant ones. The
Blue
Mountains
Biodiversity
Project
(“Blue
Mountains”) sued and sought a preliminary injunction to
enjoin the Service’s 2015 decision.
The district court entered Blue Mountains’
requested injunction, and the next day, the Service
withdrew its 2015 decision “to allow additional analysis
of the proposed activities.” Pet. App. 45a (quotation
marks omitted). A few days later, the Service stated
that it would undertake “[a]dditional planning and
analysis . . . with the goal of releasing an Environmental
[Assessment (“EA”)].” Pet. App. 45a (alterations in
original) (quotation marks omitted).
The Service released two EAs and accompanying
decision notices in 2017 and 2020, respectively. After the
Service issued the 2017 EA, it withdrew it later that
same year, citing a need for “additional dialogue and
analysis.” Pet. App. 46a (quotation marks omitted). The
Service then issued a 2020 revised EA that analyzed four
action alternatives, including a no-action alternative.
The Service selected the alternative that authorized
thirty-five acres of sanitation logging and 143 acres of
commercial and noncommercial thinning to reduce the
risk of wildfires and bark beetle infestation. The 2020
decision notice stated that the Project “provides the best
6
opportunity for long-term public enjoyment of this area,
with fewer risks of falling trees, and more longevity in
the large ponderosa pines that provide much of the
scenic quality” and found that there would be no
significant environmental impact.
Pet. App. 46a
(quotation marks omitted).
Blue Mountains then challenged the 2020 decision
notice. The Service filed the administrative record in
early 2021, and Blue Mountains later filed a motion to
compel completion of the administrative record, or, in
the alternative, a privilege log detailing why certain
documents had been withheld. Blue Mountains sought
to compel completion of the administrative record with
certain documents from the Service’s 2016
administrative record that were omitted from its 2021
record, “162 documents produced to [it] pursuant to a
Freedom of Information Act (‘FOIA’) request,” and
other related documents pertinent to its claims. Pet.
App. 85a.
Specifically, Blue Mountains sought the Service’s
past reports, emails, and internal communications. Pls.’
Mot. 12-13, 14-17, ECF No. 10, Blue Mountains
Biodiversity Project v. Jefferies, No. 2:20-CV-02158-SU,
2021 WL 3683879 (D. Or. Aug. 19, 2021). FOIA revealed
documents directly relevant to the administrative
challenge, including documents concerning the logging
contract for the area surrounding the Lake and the
Service’s National Environmental Policy Act analysis.
Alternatively, Blue Mountains requested a privilege log
identifying the documents or information withheld with
specificity. Id. The magistrate judge recommended
7
denying Blue Mountains’ motion to compel and declined
to order the Service to produce a privilege log. Pet. App.
82a-96a. The magistrate judge concluded that the
documents sought were “deliberative materials” “not
properly part of the administrative record.” Pet. App.
95a.
The district judge adopted the magistrate judge’s
reasoning and denied the motion to complete the record
but again preliminarily enjoined any logging for the
Project. Pet. App. 80a-81a. The district court later
granted the Service partial summary judgment and
dissolved the preliminary injunction against the 2020
project. Pet. App. 59a-79a. Blue Mountains appealed.
The Ninth Circuit affirmed the district court’s
judgment. Pet. App. 41a-58a. The court acknowledged
that “[n]o previous Ninth Circuit opinion addresses
whether deliberative materials are part of the ‘whole
record’” and that “[d]istrict courts in this Circuit are
split on the issue.” Pet. App. 48a. But based on two
“well-settled” legal principles, Pet. App. 48a, the court
concluded that deliberative materials were not part of
the administrative record and that the agency need not
produce a privilege log absent “a showing of bad faith or
improper behavior.” Pet. App. 49a (quotation marks
omitted). The court came to that conclusion primarily on
the ground that an agency is entitled to a presumption
of regularity and that the lawfulness of agency action is
based on the reasons offered by the agency. Pet. App.
49a.
A divided Ninth Circuit denied Blue Mountains’
petition for rehearing en banc. Judge Berzon, joined by
8
three other judges, dissented from the denial of
rehearing en banc. Pet. App. 20a-40a. The dissent
argued that the panel decision was “not only wrong but
is likely to reduce APA review in many instances to a
charade.” Pet. App. 24a. The dissent observed that “the
Supreme Court has never ‘limit[ed] the “full
administrative record” to those materials that the
agency unilaterally decides should be considered by the
reviewing court.’” Pet. App. 22a-23a (quoting In re
United States, 583 U.S. at 1030 (Breyer, J., dissenting
from the grant of a stay)). Further, the dissent
reasoned, “for purposes of APA review, ‘[t]he whole
record’ includes everything that was before the agency
pertaining to the merits of its decision.” Pet. App. 26a
(citation omitted). The dissent concluded that the
majority’s decision would be “damaging to judicial
review of agency action,” setting “a new baseline in
which the government need not justify its claims of
privilege except in limited circumstances, as yet
unexplained.” Pet. App. 34a.
The dissent further noted that the panel decision
likely contradicted this Court’s unanimous indication in
In re United States, 583 U.S. 29 (2017), that “district
courts could potentially ‘compel the Government to
disclose [ ] document[s] that the Government believes is
privileged’ so long as the court ‘first provid[es] the
Government with the opportunity to argue the issue.’”
Pet. App. 25a (quoting In re United States, 583 U.S. 29,
32 (2017) (alterations in original)). This Court there
“declined to adopt the government’s view of its
unilateral power to designate the administrative
record.” Pet. App. 25a. “Instead, the Court explained
9
that if the threshold arguments were resolved in favor
of the district court’s jurisdiction, then the district court
‘may consider whether narrower amendments to the
record are necessary and appropriate.’” Pet. App. 25a
(quoting In re United States, 583 U.S. at 32). Therefore,
the dissent noted, this Court did not hold that “the
district court was precluded from expanding the record
at all, absent a showing of some unusual circumstance, or
that the agency could decide for itself which material
was deliberative.” Pet. App. 26a.
Moreover, the dissent reasoned, the two Supreme
Court opinions relied on by the panel opinion, Citizens to
Preserve Overton Park, Inc., 401 U.S. at 420, and
Morgan v. United States, 304 U.S. 1, 18 (1938), are both
inapposite.
Neither concerned the scope of an
administrative record or whether a privilege log is
required. And the panel’s reliance on the D.C. Circuit’s
decision in Oceana, Inc. v. Ross, 920 F.3d 855 (D.C. Cir.
2019), was misplaced because that court relied on the
same Supreme Court cases. Separately, the D.C.
Circuit’s
emphasis
on
deliberative
materials’
discoverability was incorrect because “the concept of
discoverability has no bearing on the meaning of the
‘whole record’ for APA cases.” Pet. App. 33a.
Finally, the dissent concluded that the panel’s
decision was “damaging to judicial review of agency
action” in three distinct ways. Pet. App. 34a. First, the
decision will make “governmental mistakes or
misconduct … unlikely to come to light” because “[t]he
opinion sets a new baseline in which the government
need not justify its claims of privilege except in limited
10
circumstances, as yet unexplained.” Pet. App. 34a.
Second, the decision “creates a tension with [] FOIA case
law, which requires the government to supply a
privilege log to justify withholding of documents claimed
to be deliberative.” Pet. App. 34a (internal quotations
omitted). And third, “the decision fails to acknowledge
that deliberative materials are central in cases in which
the decisionmaker’s subjective intent is properly at
issue.” Pet. App. 34a.
Blue Mountains timely filed this petition for
certiorari.
REASONS FOR GRANTING THE PETITION
I. The Question Presented Has Divided The Lower
Courts.
The lower courts acknowledge that they are sharply
divided on the question of whether deliberative
documents are part of the administrative record.
On one side of the divide are the courts that have
joined the “growing consensus” that deliberative
materials are a part of the administrative record. Save
the Colo., 2023 WL 2402923, at *4. These courts hold
that the administrative record consists of the “‘full
administrative record that was before [the agency] at
the time [it] made [the] decision,’” and that to exclude
deliberative materials as categorically irrelevant “leads
to the strange result wherein the agency may claim
documents are relevant for purposes of developing its
final rule but irrelevant for purposes of the court’s
review of that final rule.” Clinch Coal. v. U.S. Forest
Serv., 597 F. Supp. 3d 916, 921, 923 (W.D. Va. 2022)
11
(quoting Citizens to Pres. Overton Park, Inc., 401 U.S.
at 419-20).
Accordingly, these courts require agencies to
“submit a log if they withhold privileged materials from
an [administrative record].” Save the Colo., 2023 WL
2402923, at *4. See, e.g., State v. U.S. Immigr. &
Customs Enf’t, 438 F. Supp. 3d 216, 220 (S.D.N.Y. 2020);
S.C. Coastal Conservation League v. Ross, 431 F. Supp.
3d 719, 725 (D.S.C. 2020); Oak Grove Techs., LLC v.
United States, 156 Fed. Cl. 594, 600-01 (2021), aff’d in
part, rev’d in part on other grounds, __ F.4th __, No. 221557, 2024 WL 4138392 (Fed. Cir. Sept. 11, 2024); Ctr. for
Biological Diversity v. U.S. Fish & Wildlife Serv., No.
2:19-CV-14243, 2020 WL 2732340, at *5 (S.D. Fla. May
26, 2020); Exxon Mobil Corp. v. Mnuchin, No. 3:17-CV1930-B, 2018 WL 4103724, at *2 (N.D. Tex. Aug. 29,
2018); Miami Nation of Indians of Ind. v. Babbitt, 979 F.
Supp. 771, 778 (N.D. Ind. 1996); Nat’l Council of Negro
Women v. Buttigieg, No. 1:22-CV-314, 2024 WL 1287611,
at *5-6 (S.D. Miss. Mar. 26, 2024).
Although no circuit has issued a precedential decision
holding that deliberative materials are part of the
administrative record, the Second and Fourth Circuits
have each issued influential nonprecedential decisions
adopting that rule. The Second Circuit found that “the
possibility that some documents not included in the
record may be deliberative does not necessarily mean
that they were properly excluded.” In re Nielsen, No.
17-3345, slip op. at 3 (2d Cir. Dec. 27, 2017), ECF No. 171.
And it emphasized that “without a privilege log, the
District Court would be unable to evaluate the
12
Government’s assertions of privilege.” Id. The Fourth
Circuit reached an analogous conclusion in its order in
Defenders of Wildlife v. Dep’t of the Interior, No. 182090, Order (4th Cir. Feb. 5, 2019), ECF No. 70,
requiring that the Government submit a privilege log to
identify documents it withheld under the guise of the
deliberative-process privilege.
Many lower courts, both within and without the
Second and Fourth Circuits, have relied on these
opinions in holding that deliberative documents are part
of the administrative record. See, e.g., U.S. Immigr. &
Customs Enf’t, 438 F. Supp. 3d at 218 (looking to 2d Cir.
holding in In re Nielsen); New York v. Wolf, No. 20-CV1127, 2020 WL 2049187, at *2 (S.D.N.Y. Apr. 29, 2020)
(same); Clinch Coal., 597 F. Supp. 3d at 925 (looking to
4th Cir. holding in Defenders of Wildlife); Nat’l Council
of Negro Women v. Buttigieg, 2024 WL 1287611, at *4
(looking to both the 2nd Cir. and 4th Cir. holdings); Save
the Colo., 2023 WL 2402923, at *4 (same); Sierra Club v.
U.S. Army Corps of Eng’rs, No. 2:20-CV-00396, 2022
WL 2953075, at *3 (D. Me. July 26, 2022) (same); Ctr. for
Biological Diversity, 2020 WL 2732340, at *4; S.C.
Coastal Conservation League v. Ross, 431 F. Supp. 3d at
725 (same).
On the other side of the divide are the courts, now
joined by the Ninth Circuit, which hold that deliberative
materials are not part of the administrative record, and
further, that the agency has no obligation to log such
materials. The D.C. Circuit adopted that rule in Oceana,
Inc. v. Ross, 920 F.3d 855 (D.C. Cir. 2019), where it held
that “predecisional and deliberative documents ‘are not
13
part of the administrative record to begin with,’ so they
‘do not need to be logged as withheld from the
administrative record.’” Id. at 865 (citation omitted).
Far fewer lower courts have also adopted that rule. See,
e.g., Tex. Gen. Land Off. v. Biden, No. 7:21-CV-00272,
2023 WL 2733388, at *6 (S.D. Tex. Mar. 31, 2023)
(“[P]rivileged materials are not proper for inclusion in
the administrative record and thus Defendants are not
required to produce a privilege log.”); Sierra Club v. U.S.
Fish & Wildlife Serv., No. 2:20-CV-13, 2021 WL 5634131,
at *3 (M.D. Fla. Dec. 1, 2021) (“Defendants did not have
to produce a privilege log detailing the documents
protected by deliberative process privilege[.]”).
Given the number of lower court decisions
addressing the question presented, further percolation
is unlikely to yield significant insight. 1 The lower courts
are divided on this question, and only this Court can
authoritatively answer it. Review is warranted.
1
This Court will grant certiorari where a nonprecedential opinion
or order supplies the basis for a circuit divide. See, e.g., Lamps Plus,
Inc. v. Varela, 587 U.S. 176, 180 (2019) (granting certiorari with a
single unpublished decision on one side of a circuit disagreement);
Chen v. Mayor & City Council of Balt., 574 U.S. 988, 988 (2014)
(same); E. Associated Coal Corp. v. United Mine Workers of Am.,
531 U.S. 57, 61 (2000) (same); Burlington N. R.R. Co. v. Okla. Tax
Comm’n, 481 U.S. 454, 460 (1987) (same); Lynce v. Mathis, 519 U.S.
433, 436 (1997) (same but with an “unpublished order” from the
Eleventh Circuit).
14
II. The Ninth Circuit’s Decision Is Wrong.
Review is also warranted because the decision below
is inconsistent with the APA’s text and this Court’s
precedent.
A. The APA provides that, in judicial review of
agency action, the court “shall review the whole
record[.]” 5 U.S.C. § 706. The “whole record,” this Court
has held, means “the full administrative record that was
before the Secretary at the time he made his decision.”
Citizens to Preserve Overton Park, Inc., 401 U.S. at 420.
Otherwise, “judicial review cannot function if the agency
is permitted to decide unilaterally what documents it
submits to the reviewing court as the administrative
record.” In re United States, 583 U.S. at 1030 (Breyer,
J., dissenting from the grant of a stay). Meaningful
judicial oversight depends upon the review of “all
relevant materials presented to the agency, including
not only materials supportive of the government’s
decision but also materials contrary to the government’s
decision.” Id. at 1030-31.
Drafts, letters, emails, and other materials that the
agency considered in taking action are materials
“before” the agency. Indeed, it is inherent in the very
label “deliberative” that these are documents that the
agency considered. Such materials may shed light on
core questions of judicial review. For example, a
deliberative memorandum or email may reveal that the
agency has “failed to consider an important aspect of the
problem, offered an explanation for its decision that runs
counter to the evidence before the agency, or is so
implausible that it could not be ascribed to a difference
15
in view or the product of agency expertise.” State Farm,
463 U.S. at 43. See also, e.g., Friends of the Clearwater
v. Higgins, 523 F. Supp. 3d 1213, 1227 (D. Idaho 2021)
(“There can be no doubt that under some circumstances,
pre-decisional deliberative communications may go to
the heart of the question of whether an agency action
was arbitrary and capricious, an abuse of discretion or
otherwise inconsistent with the law under Section 706(2)
of the APA.” (quotation marks omitted)).
And in practice, courts regularly consider such
materials in reviewing agency action. See, e.g., Pet. App.
28a (Berzon, J., dissenting) (collecting cases where
courts have “routinely reviewed letters, drafts, emails,
and other nonfinal materials in the course of evaluating
the lawfulness of agency action”); Bhd. of Locomotive
Eng’rs & Trainmen v. Fed. R.R. Admin., 972 F.3d 83,
98-115 (D.C. Cir. 2020) (relying on emails, letters, and
drafts to vacate agency action); Meister v. U.S. Dep’t of
Agric., 623 F.3d 363, 375 (6th Cir. 2010) (relying on
emails in the administrative record to find agency action
unlawful); Am. Farm Bureau Fed’n v. U.S. EPA, No.
1:11-CV-0067, 2011 WL 6826539, at *9 (M.D. Pa. Dec. 28,
2011) (holding that “email chain[s] should be included” in
the administrative record, even though “they related
only to draft[s]”). 2
2
See also Armament Servs. Int’l Inc. v. Att’y Gen. U.S., 760 F.
App’x 114, 118-20 (3d Cir. 2019); Veterans Contracting Grp., Inc. v.
United States, 920 F.3d 801, 803-05 (Fed. Cir. 2019); Casa De
Maryland v. U.S. Dep’t of Homeland Sec., 924 F.3d 684, 705 (4th
Cir. 2019); Casey v. Berryhill, 853 F.3d 322, 326-28 (7th Cir. 2017);
16
For example, in Ranchers Cattleman Action Legal
Fund United Stockgrowers of America, the United
States Department of Agriculture did not contest that
deliberative materials should be part of the
administrative record.
There, after the plaintiff
reviewed past FOIA requests and notified the agency
via a status report that deliberative emails were
potentially excluded from the record, the agency agreed
to supplement the record without claiming that the
documents were privileged.
Ranchers Cattlemen
Action Legal Fund United Stockgrowers of Am.,
Ranchers Cattlemen Action Legal Fund United
Stockgrowers of Am. v. U.S. Dep’t of Agric., 35 F.4th
1225, 1235 (10th Cir. 2022), cert. denied, 143 S. Ct. 1000
(2023). The emails, in turn, aided the court in its review
of the lawfulness of the agency’s action. Id. at 1242-48.
B. The Ninth Circuit based its contrary holding on
two “principles governing judicial review of agency
action under the APA.” Pet. App. 48a. First, it
concluded that “the whole record,” under the APA “is
ordinarily ‘the record the agency presents,’” Pet. App.
48a (quoting Fla. Power & Light Co. v. Lorion, 470 U.S.
729, 743-44 (1985)). Thus, according to the Ninth Circuit,
the record an agency submits for review is “subject to a
presumption of regularity” and “barring clear evidence
Gillum v. Commissioner, 676 F.3d 633, 644-45 (8th Cir. 2012);
Medina Cnty. Env’t Action Ass’n v. Surface Transp. Bd., 602 F.3d
687, 690-99 (5th Cir. 2010); Majali v. U.S. Dep’t of Lab., 294 F. App’x
562, 568 (11th Cir. 2008); Utahns for Better Transp. v. U.S. Dep’t of
Transp., 305 F.3d 1152, 1166-68, 1170-72 (10th Cir. 2002),
modification on reh’g, 319 F.3d 1207 (10th Cir. 2003).
17
to the contrary,” a court will “presume that an agency
properly designated the Administrative Record.” Pet.
App. 48a (quotation marks omitted). Second, the Ninth
Circuit determined that a reviewing court must “assess
the lawfulness of agency action based on the reasons
offered by the agency,” and therefore, “[d]eliberative
documents, which are prepared to aid the decisionmaker
in arriving at a decision, are ordinarily not relevant.”
Pet. App. 48a.
Neither rationale withstands scrutiny. As to the first
rationale, a “presumption of regularity” has no bearing
on whether material belongs in the “whole record” in the
first place. As this Court has held, the presumption of
regularity “is not to shield [agency] action from a
thorough, probing, in-depth review.”
Citizens to
Preserve Overton Park, Inc., 401 U.S. at 415. The
question is thus not in the first instance whether the
agency can be trusted to identify deliberative
documents, but whether the rule should be that
deliberative documents can be categorically excluded
based on agency say-so. As Judge Berzon correctly
noted, “[T]he presumption of regularity is a presumption
that the agency has done what it is supposed to do; it
does not tell us what the agency is supposed to do …
[nor] describe the breadth of the record that should be
produced and so does not explain to what the
presumption attaches.” Pet. App. 29a-30a. (Berzon, J.,
dissenting).
Moreover, the APA’s judicial review framework does
not give the agency unilateral discretion to determine
what the record is. As Justice Breyer put it, this Court
18
has never “read Overton Park to limit the ‘full
administrative record’ to those materials that the
agency unilaterally decides should be considered by the
reviewing court.” In re United States, 583 U.S. at 1030
(Breyer, J., dissenting from grant of stay); Bar MK
Ranches v. Yuetter, 994 F.2d 735, 739 (10th Cir. 1993)
(agency “may not unilaterally determine what
constitutes” the record). The Ninth Circuit’s holding,
however, does just that, giving agencies unilateral and
unreviewable discretion to determine the scope of the
“whole record.”
But if the agency’s unilateral
determination were all that mattered, there would be no
point in invoking a “presumption of regularity” in the
first place.
Nor are such documents properly excluded on the
ground that only the agency’s stated reasons matter or
that its “subjective” views are irrelevant. True, agency
action is judged by the agency’s stated reasons, but the
adequacy of those reasons is measured against the
information that was before the agency. A reviewing
court cannot conduct that assessment without looking at
all the materials that were before the agency. If internal
memoranda show that certain agency actions will create
a redressable injury, and the final action does not
account for that issue, then that could demonstrate the
agency’s decision to move forward with the action is
arbitrary and capricious. The Ninth Circuit’s position
makes that review impossible. The result is that
reviewing courts will be unable to discharge their
judicial review responsibilities under the APA.
19
Similarly, the Ninth Circuit’s reliance on the general
limitation against probing “mental processes of
administrative decisionmakers” is inapposite. Pet. App.
31a (quotation marks omitted) (Berzon, J., dissenting).
That principle concerns the generation of new material,
such as deposing an agency decisionmaker, which goes
beyond the record before the agency. See Citizens to
Preserve Overton Park, Inc., 401 U.S. at 420; United
States v. Morgan, 313 U.S. 409, 422 (1941). Seeking
extrinsic, after-the-fact evidence is generally not
appropriate because agency decisions are judged by the
material in front of the agency at the time it made its
decision. See Camp v. Pitts, 411 U.S. 138, 142 (1973)
(“[T]he focal point for judicial review should be the
administrative record already in existence, not some
new record made initially in the reviewing court.”). The
principle announced in those cases does not apply to predecisional deliberative documents because it “concern[s]
the propriety of post-decisional testimony of
administrative decisionmakers, which obviously was not
part of the administrative record because it did not exist
at the time the agency made its decision.” Pet. App. 32a
(Berzon, J., dissenting).
Deliberative materials,
however, are before the agency at the time a decision is
made, and their inclusion would not require the
production of any post-decisional evidence.
C. The decision below also creates tension between
Section 706 and another part of the APA—FOIA. FOIA
expressly permits agencies to withhold from disclosure
certain documents, including “inter-agency or intraagency memorandums or letters that would not be
available by law to a party other than an agency in
20
litigation with the agency.” 5 U.S.C. § 552(b)(5). In the
FOIA context, the burden is on the government to claim
the deliberative privilege, withheld documents must
generally be logged, and the privilege is not categorical
or absolute. See id. § 552(a)(4)(B), (a)(8)(A)(i)(I). As the
dissent below explained:
There is no basis in the APA for providing
litigants challenging agency action with
less access to public documents than is
available to interested members of the
public under FOIA. Notably, APA review
requires consideration of the “whole
record,” with no express exceptions, 5
U.S.C. § 706, whereas FOIA includes
several express exemptions to public
access, 5 U.S.C. § 552(b).
Pet. App. 38a (Berzon, J., dissenting). By failing to
require agencies to even produce a privilege log,
withheld documents are acknowledged under FOIA but
remain a mystery under Section 706. There is no
statutory warrant for that irrational outcome.
Nor does the APA require a plaintiff to go through
the FOIA process to obtain documents that should be
included in the administrative record in the first place.
As this case demonstrates, even when a litigant
fortuitously goes through the separate FOIA process,
any documents received will not automatically become
part of the administrative record. If the agency refuses
to supplement the record, APA plaintiffs must engage in
additional litigation to supplement the administrative
record on a case-by-case basis. The APA does not
21
require plaintiffs to jump through so many loops to
secure meaningful judicial review.
D. The Ninth Circuit was also wrong to grant
agencies a blanket presumption in favor of deliberative
process privilege. The deliberative process privilege is
a form of executive privilege that “shields from
disclosure documents reflecting advisory opinions,
recommendations and deliberations comprising part of a
process by which governmental decisions and policies
are formulated.” United States Fish & Wildlife Serv. v.
Sierra Club, Inc., 592 U.S. 261, 267 (2021) (internal
quotation marks omitted). But like any other litigant, if
an agency has a valid privilege claim, it cannot
unilaterally withhold responsive documents without
providing a privilege log that accounts for the whole
record. “[T]he correct way to address the tension
between APA review and deliberative process privilege
is for [the agency] either to file a privilege log or submit
allegedly privileged documents for in camera review.”
Friends of the Clearwater, 523 F. Supp. 3d at 1227 (citing
authority).
Nor is it any answer to say that a plaintiff can seek
relief if it can show agency malfeasance or the agency
has excluded materials that are not deliberative. Pet.
App. 11a-12a.
First, the APA’s “whole record”
requirement means that these materials should be
included in the first place—the statute places no burden
on a litigant to make a separate showing to trigger that
obligation. Yet under the Ninth Circuit’s approach, the
agency is permitted to exclude altogether documents
that it deems deliberative. In other words, it is not
22
malfeasance that keeps the material out; it is the wrong
rule.
Finally, even if malfeasance were relevant, there
would be no consistent and workable way for a litigant
or a court to discover such malfeasance given the
demanding bar for discovery in APA cases, the agency’s
unilateral control of the administrative record, and the
Ninth Circuit’s holding that deliberative documents
need not be accounted for in a privilege log. Pet. App.
34a (Berzon, J., dissenting) (“Without a privilege log …
governmental mistakes or misconduct are unlikely to
come to light.”); Inland Empire-Immigrant Youth
Collective v. Nielsen, No. 17-CV-2048, 2019 WL
13240629, at *6 (C.D. Cal. Apr. 8, 2019) (“[I]t would be
very difficult, if not impossible, for an APA plaintiff to
challenge a claim of deliberative process privilege or to
make the required showing of need necessary to
overcome the privilege without at least some description
of the document over which privilege is asserted.”);
Sierra Club v. Zinke, No. 17-CV-7187, 2018 WL 3126401,
at *5 (N.D. Cal. June 26, 2018) (“The only way to know if
privilege applies is to review the deliberative documents
in a privilege log.”).
III. The Question
Recurring.
Presented
Is
Important
And
The question in this case—regarding the scope of the
“whole record” to support judicial review—arises in
almost every APA challenge. The Ninth Circuit’s
holding sharply hampers judicial review under the APA
by permitting agencies, in every case, to secretly
23
designate materials as “deliberative” materials to shield
them from litigants and reviewing courts.
The rule below thus permits, if not encourages,
perverse outcomes. An agency can present a “whole
record” by excluding unhelpful deliberative materials
while including those that bolster its reasoning and
manufacture a favorable record. Without a privilege log,
there is no realistic way to know that the agency has
done so. Even if the agency is acting in good faith, it may
erroneously exclude documents that a court would
conclude are not deliberative, let alone not subject to a
privilege. Or an agency may exclude broad swaths of
documents it has not even reviewed for any valid
privilege. See, e.g., Bartell Ranch LLC v. McCullough,
No. 321CV00080, 2022 WL 2093053, at *2, *4 (D. Nev.
June 10, 2022) (court-ordered privilege log revealed that
an agency “had not reviewed between six and eight
thousand of those documents before withholding them as
deliberative”). The rule shields such errors from judicial
review entirely. The APA’s “whole record” requirement
exists to check exactly this: unreviewable agency
authority.
Judicial review under the APA “cannot function if
the agency is permitted to decide unilaterally what
documents it submits to the reviewing court as the
administrative record.” In re United States, 583 U.S. at
1030 (Breyer, J., dissenting from the grant of stay). The
rule below gives license to agencies to introduce
deliberative documents when they are favorable, yet
omit them when they undercut its reasoning, regardless
of the role the document may have played in the agency’s
24
decision-making process. And without a privilege log, it
is nearly impossible to know that the agency is doing so.
The upshot of the decision below, therefore, is that the
agency enjoys a degree of unilateral discretion over the
scope of discoverable material that would be unthinkable
for any other litigant. In effect, the Ninth Circuit’s
holding “place[s] a finger on the scales of justice in favor
of the most powerful of litigants, the federal
government.” Loper Bright Enters., 144 S. Ct. at 2285
(Gorsuch, J., concurring).
CONCLUSION
The Court should grant the petition for certiorari.
25
Respectfully submitted,
David A. Strauss
Sarah M. Konsky
JENNER & BLOCK SUPREME
COURT AND APPELLATE
CLINIC
1111 E. 60th Street
Chicago, IL 60637
Matthew S. Hellman
Counsel of Record
JENNER & BLOCK LLP
1099 New York Ave. NW
Washington, DC 20016
(202) 639-6000
mhellman@jenner.com
Thomas C. Buchele
EARTHRISE LAW CENTER
10101 S. Terwilliger Blvd.
Portland, OR 97219
Michael T. Brody
Andrew L. Osborne
JENNER & BLOCK LLP
353 N. Clark Street
Chicago, IL 60654
Jesse A. Buss
Bridgett A. Chevalier
WILLAMETTE LAW
GROUP, PC
411 Fifth Street
Oregon City, OR 97045
APPENDIX
ia
TABLE OF CONTENTS
Appendix A
Blue Mountains Biodiversity Project v.
Jeffries, 99 F.4th 438 (9th Cir. 2024) ........................ 1a
Appendix B
Blue Mountains Biodiversity Project v.
Jeffries, 72 F.4th 991 (9th Cir. 2023) ...................... 41a
Appendix C
Blue Mountains Biodiversity Project v.
Jeffries, No. 20-cv-02158, 2022 WL 4466928
(D. Or. Sept. 26, 2022) .............................................. 59a
Appendix D
Minutes of Proceedings, Blue Mountains
Biodiversity Project v. Jeffries, No. 20-cv02158, 2021 WL 5150659 (D. Or. Sept. 29,
2021)............................................................................ 80a
Appendix E
Blue Mountains Biodiversity Project v.
Jeffries, No. 20-cv-02158, 2021 WL 3683879
(D. Or. Aug. 19, 2021) ............................................... 82a
1a
Appendix A
FOR PUBLICATION
UNITED STATES COURT OF APPEALS
FOR THE NINTH CIRCUIT
BLUE MOUNTAINS
BIODIVERSITY PROJECT, an
Oregon non-profit corporation,
Plaintiff-Appellant,
v.
SHANE JEFFRIES, in his official
capacity as Ochoco National Forest
Supervisor; UNITED STATES
FOREST SERVICE, an agency of the
United States Department of
Agriculture,
No. 22-35857
D.C. No. 2:20cv-02158-MO
ORDER AND
AMENDED
OPINION
Defendants-Appellees.
Appeal from the United States District Court
for the District of Oregon
Michael W. Mosman, District Judge, Presiding
Argued and Submitted March 30, 2023
Seattle, Washington
Filed July 3, 2023
Amended April 16, 2024
2a
Before: Jacqueline H. Nguyen and Andrew D. Hurwitz,
Circuit Judges, and Dean D. Pregerson, District
Judge.
Order;
Opinion by Judge Hurwitz;
Statement Respecting Denial of Rehearing En Banc by
Judge Berzon
SUMMARY
Environmental Law
The panel filed (1) an order denying a petition for
panel rehearing, denying a petition for rehearing en
banc, and amending the opinion filed on July 3, 2023; and
(2) an amended opinion affirming the district court’s
summary judgment in favor of the U.S. Forest Service
in an action brought by Blue Mountains Biodiversity
Project (“BMBP”) alleging that the Service’s approval of
the Walton Lake Restoration Project violated the
National Environmental Policy Act (“NEPA”), the
National Forest Management Act, and the
Administrative Procedure Act (“APA”).
The Forest Service developed the Project to replace
trees infested with laminated root rot and bark beetles
with disease-resistant trees. In May 2016, the Service
contracted with T2, a private company, for logging to
The Honorable Dean D. Pregerson, United States District Judge
for the Central District of California, sitting by designation.
This summary constitutes no part of the opinion of the court. It
has been prepared by court staff for the convenience of the reader.
3a
implement the decision. The Service issued a revised
Environmental Assessment (“EA”) in July 2020 and a
revised decision notice in December 2020. BMBP filed
this action challenging the 2020 decision notice. The
Service filed an administrative record (“AR”) in 2021.
The panel first addressed BMBP’s argument that
the AR was incomplete. First, BMBP argued that
deliberative materials were part of the “whole record”
and that a privilege log was required if they were not
included in the AR. The panel held that deliberative
materials are generally not part of the AR absent
impropriety or bad faith by the agency. Because
deliberative materials are not part of the administrative
record to begin with, they are not required to be placed
on a privilege log. The district court did not abuse its
discretion by declining to order the production of a
privilege log. Second, BMBP argued that all documents
in the 2016 AR should be in the AR for this case. BMBP
contended that the documents in the 2016 AR were
necessarily before the agency in the 2020 process
because the Project was a continuation of the withdrawn
one. The panel held that BMBP’s arguments failed to
overcome the presumption of regularity. The 2020
decision notice expressly stated that the Forest Service
began the NEPA process again in 2019. The record also
supported the Service’s contention that it included only
documents from previous NEPA analyses that were
considered in the 2020 decision. The panel concluded
that the district court acted within its discretion in
denying the motion to supplement the AR.
The panel next addressed whether the Service
violated NEPA by approving the Project. First, the
4a
panel held that BMBP failed to establish that the logging
contract with T2 improperly committed resources under
any standard. There is also no evidence that the agency
merely engaged in post hoc rationalization in the 2020
decision. Second, the panel rejected BMBP’s contention
that the EA diluted the significance of some impacts by
analyzing them on too large a scale. The BMBP did not
show why the choice of a broader context in the
challenged instances was arbitrary or capricious. Also,
the regulations list ten non-exhaustive relevant factors
for consideration. The panel held that whether the
factors were assessed individually or cumulatively, the
record did not establish a clear error of judgment in the
Service’s intensity findings, which “refers to the
severity of impact” within the selected context. 40
C.F.R. § 1508.27(b).
The panel affirmed the judgment of the district
court and lifted the previous stay of its order dissolving
the preliminary injunction.
In a statement respecting the denial of rehearing en
banc, Judge Berzon, joined by Wardlaw, Paez, and Koh,
wrote that the panel’s holding permits government
agencies to sanitize the record available to reviewing
courts, thereby severely curtailing meaningful judicial
review of administrative action. The panel’s opinion
conflicts with case law by holding that materials
protected by the deliberative process privilege were not
part of the “whole record” for purposes of judicial review
under the APA. Judge Berzon would hold that if
government agencies wish to withhold documents in
APA cases based on a privilege, they should have to
provide a privilege log with justification for each
5a
document for which they assert a privilege, as they must
do under Freedom of Information Act precedent.
COUNSEL
Jesse A. Buss (argued) and Bridgett A. Chevallier,
Willamette Law Group, Oregon City, Oregon; Thomas
C. Buchele, Earthrise Law Center, Lewis & Clark Law
School, Portland, Oregon; for Plaintiff-Appellant.
Robert P. Stockman (argued) and Joan M. Pepin,
Attorneys; Sean C. Duffy, Trial Attorney; Environment
and Natural Resources Division, United States
Department of Justice, Washington, D.C.; Rick Grisel,
Attorney, Office of the General Counsel, United States
Department of Agriculture, Portland, Oregon; Rebecca
Harrison, Senior Counsel; Todd Kim, Assistant
Attorney General; United States Department of Justice,
Washington, D.C.; for Defendants-Appellees.
Kelly K. Simon, American Civil Liberties Union
Foundation of Oregon, Portland, Oregon; Cody Wofsy,
Katrina Eiland, and Hannah Schoen, American Civil
Liberties Union Foundation, San Francisco, California;
for Amici Curiae American Civil Liberties Union,
Immigrants’ Rights Project, and American Civil
Liberties Union of Oregon.
J. Patrick Hunter, Southern Environmental Law
Center, Asheville, North Carolina, for Amici Curiae
South Carolina Coastal Conservation League,
Charleston Waterkeeper, Chattooga Conservancy,
MountainTrue, Wild Virginia, Conservation Law
Foundation, Clinch Coalition, Virginia Wilderness
Committee, Cherokee Forest Voices, and Defenders of
Wildlife.
6a
Amy van Saun, Center for Food Safety, Portland,
Oregon; Andrew R. Missel, Advocates for the West,
Portland, Oregon; Jennifer Best, Director, Wildlife Law
Program Friends of Animals, Centennial, Colorado; for
Amici Curiae Environmental Organizations and Law
Professors.
ORDER
The opinion filed on July 3, 2023, and appearing at 72
F.4th 991, is AMENDED as follows:
At 72 F.4th at 997, add the following footnote
immediately after the sentence beginning with
“Deliberative documents, which are prepared to aid the
decision-maker in arriving at a decision”:
“[T]he deliberative process privilege shields from
disclosure documents reflecting advisory
opinions, recommendations and deliberations
comprising part of a process by which
governmental decisions and policies are
formulated.” United States Fish and Wildlife
Serv. v. Sierra Club, Inc., 592 U.S. 261, 267 (2021)
(cleaned up); see also F.T.C. v. Warner
Commc’ns, Inc., 742 F.2d 1156, 1161 (9th Cir.
1984) (same). The privilege does not apply,
however, to any factual information upon which
the agency has relied. In re United States, 875
F.3d 1200, 1211-12 (9th Cir. 2017) (Watford, J.,
dissenting) (citing Portland Audubon Soc’y v.
Endangered Species Comm., 984 F.2d 1534, 1548
(9th Cir. 1993)).
At 72 F.4th at 997, delete:
7a
We agree, however, with the D.C. Circuit
that “a showing of bad faith or improper
behavior” might justify production of a
privilege log to allow the district to
determine whether excluded documents
are actually deliberative.
and replace with:
But whether materials are in fact
deliberative is subject to judicial review,
and in appropriate circumstances district
courts may order a privilege log to aid in
that analysis. For example, we agree with
the D.C. Circuit that “a showing of bad
faith or improper behavior” might justify
production of a privilege log to allow the
district to determine whether excluded
documents are actually deliberative.
With these amendments, the panel unanimously
voted to deny the petition for panel rehearing. Judge
Nguyen voted to deny the petition for rehearing en banc,
and Judges Hurwitz and Pregerson so recommend.
The full court was advised of the petition for
rehearing en banc. A judge of the court requested a vote
on whether to rehear the matter en banc. The matter
failed to receive a majority of the votes of the nonrecused active judges in favor of en banc consideration.
Fed. R. App. P. 35. The petition for panel rehearing and
rehearing en banc, Dkt. 39, is DENIED. No further
petitions for rehearing en banc will be considered.
Judges Forrest and Johnstone did not participate in the
deliberations or vote in this case.
8a
OPINION
HURWITZ, Circuit Judge:
This case involves claims by the Blue Mountains
Biodiversity Project (“BMBP”) that the approval of the
Walton Lake Restoration Project by the U.S. Forest
Service violated the National Environmental Policy Act,
the National Forest Management Act, and the
Administrative Procedure Act. The district court
granted summary judgment against BMBP on all claims
relevant to this appeal. We affirm.
BACKGROUND
Walton Lake is a 218-acre recreation site in the
Ochoco National Forest in Oregon. The Forest Service
developed the Walton Lake Restoration Project
(“Project”) to replace trees infested with laminated root
rot and bark beetles with disease-resistant ones. In
2015, relying on a regulation that excludes the sanitation
harvest of trees to control disease and insects from some
National Environmental Policy Act (“NEPA”)
requirements, 36 C.F.R. § 220.6(e)(14) (2015), the
Service issued a decision memorandum approving the
Project. In May 2016, the Service contracted with T2, a
private company, for logging to implement that decision.
Although no logging has yet occurred, the T2 contract
remains in place.
BMBP sued, challenging the 2015 decision, and the
district court preliminarily enjoined the logging on
October 18, 2016. The next day, the Service withdrew
its decision “to allow additional analysis of the proposed
activities.” On October 21, 2016, the Service stated that
it would undertake “[a]dditional planning and
9a
analysis . . . with the goal of releasing an Environmental
[Assessment (“EA”)].” 1
The Service issued an EA and a decision notice
approving the Project in 2017 but withdrew the decision
notice later that year, citing a need for “additional
dialogue and analysis.” The Service issued a revised EA
in July 2020 and a revised decision notice in December
2020. The revised EA analyzed four alternatives,
including a no-action alternative.
The selected
alternative authorizes thirty-five acres of sanitation
logging and 143 acres of commercial and noncommercial
thinning to reduce the risk of wildfires and bark beetle
infestation. The 2020 decision notice stated that the
Project “provides the best opportunity for long-term
public enjoyment of this area, with fewer risks of falling
trees, and more longevity in the large ponderosa pines
that provide much of the scenic quality”; found that
there would be no significant environmental impact; and
made four Project-specific amendments to the Ochoco
National Forest Plan.
BMBP then filed this action challenging the 2020
decision notice. The Service filed an administrative
record (“AR”) in early 2021. A magistrate judge
recommended denial of BMBP’s motion to compel
completion of the AR and declined to order the Service
to produce a privilege log, concluding that certain
documents sought by BMBP were deliberative
materials, and BMBP did not establish that some
documents in the AR filed in response to the 2016 suit
1
The district court granted BMBP’s motion to dismiss the 2016 suit
on June 19, 2017.
10a
were “before the agency” in its 2020 decision. The
district judge adopted the magistrate judge’s reasoning
and denied the motion, but again preliminarily enjoined
any logging for the Project.
The district court later granted the Service summary
judgment on all but one of BMBP’s claims. It concluded
that the logging contract with T2 was not an
“irreversible and irretrievable commitment” of
resources because it could be unilaterally modified or
terminated. It also held that the Service reasonably
found that the Project would not have a significant
environmental impact and thus reasonably declined to
prepare an environmental impact statement (“EIS”).
The court entered a final judgment and dissolved the
preliminary injunction. 2 BMBP timely appealed, and we
have jurisdiction under 28 U.S.C. § 1291. 3
DISCUSSION
I.
We first address BMBP’s argument that the AR is
incomplete. The Administrative Procedure Act (“APA”)
requires us to “review the whole record,” 5 U.S.C. § 706,
including “all documents and materials directly or
indirectly considered by agency decision-makers,”
Thompson v. U.S. Dep’t of Lab., 885 F.2d 551, 555 (9th
Cir. 1989) (cleaned up). BMBP argues that deliberative
2
The district court stayed its order dissolving the preliminary
injunction, however, pending our decision on a motion for a stay
pending appeal. We granted that stay and expedited this appeal.
3
The Service has not appealed the district court’s grant of summary
judgment to BMBP on one of its NEPA claims.
11a
materials are part of the “whole record” and that a
privilege log is required if they are not included in the
AR. It also contends that all documents in the 2016 AR
should be in the AR for this case.
A.
No previous Ninth Circuit opinion addresses
whether deliberative materials are part of the “whole
record.” District courts in this Circuit are split on the
issue. See Save the Colorado v. U.S. Dep’t of the Interior,
517 F. Supp. 3d 890, 896–97 (D. Ariz. 2021) (collecting
cases). The District of Columbia Circuit, however, has
held that deliberative materials are generally not part of
the AR absent impropriety or bad faith by the agency.
See Oceana, Inc. v. Ross, 920 F.3d 855, 865 (D.C. Cir.
2019). We agree.
Our holding rests on two well-settled principles
governing judicial review of agency action under the
APA. First, “the whole record,” 5 U.S.C. § 706, is
ordinarily “the record the agency presents,” Fla. Power
& Light Co. v. Lorion, 470 U.S. 729, 743–44 (1985).
“[L]ike other official agency actions, an agency’s
statement of what is in the record is subject to a
presumption of regularity.” Goffney v. Becerra, 995 F.3d
737, 748 (9th Cir. 2021). Thus, barring “clear evidence to
the contrary,” we “presume that an agency properly
designated the Administrative Record.” Id. (cleaned
up).
Second, we assess the lawfulness of agency action
based on the reasons offered by the agency. See Motor
Vehicle Mfrs. Ass’n of the U.S., Inc. v. State Farm Mut.
Auto. Ins. Co., 463 U.S. 29, 50 (1983). Deliberative
12a
documents, which are prepared to aid the decisionmaker in arriving at a decision, are ordinarily not
relevant to that analysis. 4 See Oceana, 920 F.3d at 865;
see also Citizens to Preserve Overton Park, Inc. v. Volpe,
401 U.S. 402, 420 (1971) (“[I]nquiry into the mental
processes of administrative decisionmakers is usually to
be avoided.”), abrogated on other grounds by Califano v.
Sanders, 430 U.S. 99, 105 (1977); Morgan v. United
States, 304 U.S. 1, 18 (1938) (noting it is “not the function
of the court to probe the mental processes of the
Secretary in reaching his conclusions”).
Because
deliberative materials are “not part of the
administrative record to begin with,” they are “not
required to be placed on a privilege log.” Oceana, 920
F.3d at 865 (cleaned up). But whether materials are in
fact deliberative is subject to judicial review, and in
appropriate circumstances district courts may order a
privilege log to aid in that analysis. For example, we
agree with the D.C. Circuit that “a showing of bad faith
or improper behavior” might justify production of a
privilege log to allow the district to determine whether
excluded documents are actually deliberative. Id.; see
4
“[T]he deliberative process privilege shields from disclosure
documents reflecting advisory opinions, recommendations and
deliberations comprising part of a process by which governmental
decisions and policies are formulated.” United States Fish and
Wildlife Serv. v. Sierra Club, Inc., 592 U.S. 261, 267 (2021) (cleaned
up); see also F.T.C. v. Warner Commc’ns, Inc., 742 F.2d 1156, 1161
(9th Cir. 1984) (same). The privilege does not apply, however, to
any factual information upon which the agency has relied. In re
United States, 875 F.3d 1200, 1211-12 (9th Cir. 2017) (Watford, J.,
dissenting) (citing Portland Audubon Soc’y v. Endangered Species
Comm., 984 F.2d 1534, 1548 (9th Cir. 1993)).
13a
also In re United States, 875 F.3d 1200, 1211–12 (9th Cir.
2017) (Watford, J., dissenting) (discussing potential
circumstances justifying expansion of the AR), vacated,
138 S. Ct. 443, 445 (2017).
But, BMBP does not assert any misconduct by the
Service, nor does it contend that specific documents
were improperly classified as deliberative. Although we
leave for another day a detailed exploration of the
precise circumstances under which a district court can
order the production of a privilege log, the court here did
not abuse its discretion by declining to do so in this case.
B.
BMBP also contends that the documents in the 2016
AR were necessarily before the agency in the 2020
process because the Project is a continuation of the
withdrawn one. In so arguing, BMBP cites statements
by the Service suggesting that the 2020 decision relied
on an “additional” NEPA analysis, a District Ranger’s
description of that analysis as a “continuation of the
Walton Lake Restoration analysis and documentation,”
and the Service’s reliance on a 2015 Forest Health
Report before the district court and an appellate
motions panel.
BMBP’s arguments, however, fail to overcome the
presumption of regularity. See Goffney, 995 F.3d at 748.
The 2020 decision notice expressly stated that “[t]he
Forest Service began the NEPA process again in 2019
with a scoping letter dated August 7, 2019.” The phrase
“additional analysis” is not inconsistent with preparing a
new AR to support a new NEPA analysis. Nor do the
views of a single Service employee necessarily reflect
14a
those of the agency or its ultimate decision-maker. See
Nat’l Ass’n of Home Builders v. Defs. of Wildlife, 551
U.S. 644, 659 (2007). The record also supports the
Service’s contention that it included only documents
from previous NEPA analyses that were considered in
the 2020 decision. For example, the Service did not cite
the 2015 Forest Health Report in its 2020 decision,
relying instead on a new 2019 Forest Health Report.
And, the Service’s citations to the 2015 Report in prior
court proceedings did not involve the validity of the 2020
decision but rather a separate 2017 decision to close
sections of the recreation site because of safety concerns.
We place a thumb on the scale against
supplementation of the AR, see Goffney, 995 F.3d at 747–
48, and BMBP has not demonstrated how the inclusion
of “over two thousand pages that the Service had
included in the 2016 AR,” would “identify and plug holes
in the administrative record,” Fence Creek Cattle Co. v.
U.S. Forest Serv., 602 F.3d 1125, 1131 (9th Cir. 2010)
(cleaned up). Because BMBP “has not met its heavy
burden to show that the additional materials sought are
necessary to adequately review the Forest Service’s
decision,” id., the district court acted within its
discretion in denying the motion to supplement the AR.
II.
We next address whether the Service violated
NEPA by approving the Project. NEPA imposes “a set
of action-forcing procedures that require that agencies
take a hard look at [the] environmental consequences” of
their actions. Robertson v. Methow Valley Citizens
Council, 490 U.S. 332, 350 (1989) (cleaned up).
“Although these procedures are almost certain to affect
15a
the agency’s substantive decision, . . . NEPA itself does
not mandate particular results, but simply prescribes
the necessary process.” Id.
A.
The Council on Environmental Quality (“CEQ”)
issues regulations to guide agencies in determining what
actions are subject to NEPA requirements. See 40
C.F.R. § 1500.3. 5 Those regulations prohibit an agency
from “commit[ting] resources prejudicing selection of
alternatives” or taking actions that would “[l]imit the
choice of reasonable alternatives.” Id. §§ 1502.2(f),
1506.1(a)(2). BMBP contends that the logging contract
with T2 violated these regulations. The parties dispute
whether an improper commitment of resources must be
“irreversible and irretrievable,” Metcalf v. Daley, 214
F.3d 1135, 1143 (9th Cir. 2000) (cleaned up), or something
less. We need not decide that issue, however, because
BMBP has failed to establish that the contract
improperly committed resources under any standard.
Under the contract, T2 will receive $78,262 to
remove non-commercial timber and about $36,000 worth
of harvested commercial timber. Critically, the Service
reserved the right to “terminate this contract, or any
part hereof, for its sole convenience,” at which point T2
“shall immediately stop all work.” 48 C.F.R. § 52.2124(l); see WildWest Inst. v. Bull, 547 F.3d 1162, 1169 (9th
Cir. 2008) (stressing that the Service “clearly retained
the authority to change course or to alter the plan it was
5
Unless otherwise indicated, all citations are to the 2019 version of
the Code of Federal Regulations.
16a
considering implementing”); see also Nat’l Audubon
Soc’y v. Dep’t of the Navy, 422 F.3d 174, 206 (4th Cir.
2005) (holding that preparatory activities did not violate
NEPA in part because that they did not “include cutting
even a single blade of grass in preparation for
construction”). T2 has not conducted any logging under
the contract because the Service has not issued a notice
to proceed. And, given the district court’s preliminary
injunction against logging, which has been stayed
pending appeal, no logging can occur until this case is
resolved. See supra note 2. Nor has the Service made
any payments to T2.
There is also no evidence that the agency “merely
engaged” in “post hoc rationalization” in the 2020
decision. Nat’l Audubon Soc’y, 422 F.3d at 199. BMBP
argues that an internal email by a Service employee
suggests that termination of the contract would cost the
Service appropriated dollars and prevent funding of a
new project. But, another Service employee explained
in the same email chain that any future work under the
contract “must adhere to what is in the new NEPA
decision” and that pending the outcome of that decision,
the Service might need to “terminate[ ] and resolicit[ ]”
the contract.
Rather than rely on “the alleged subjective intent of
agency personnel divined through selective quotations
from email trails,” we “look to . . . the environmental
analysis itself.” Id. The EA contains no indication that
the T2 contract prejudiced or limited the consideration
of alternatives. After analyzing the effects of no action
and several alternatives that reduced or eliminated
commercial logging, the Service chose the Project
17a
because it “best meets the Purpose and Need of Action,”
would “better meet the management objectives of the
area,” and “provides the best opportunity for long-term
public enjoyment of this area.” The Service also stated
that it “considered all reasonable alternatives and would
not be limited in choice because the final service
agreement or other tool of implementation would be
written to align with the final decision.”
B.
NEPA mandates an EIS for “major Federal actions
significantly affecting the quality of the human
environment.” 42 U.S.C. § 4332(C). An agency need not,
however, prepare an EIS if it prepares an EA that
“briefly presents the reasons why the proposed agency
action will not have a significant impact on the human
environment.” Dep’t of Transp. v. Pub. Citizen, 541 U.S.
752, 757–58 (2004). Significance depends on an action’s
“context” and “intensity.”
40 C.F.R. § 1508.27.
“Although . . . review under the arbitrary and capricious
standard is deferential,” an agency’s finding of no
significant impact is arbitrary or capricious if the
petitioner has raised “substantial questions whether a
project may have a significant effect on the
environment.” Blue Mountains Biodiversity Project v.
Blackwood, 161 F.3d 1208, 1212–14, 1216 (9th Cir. 1998)
(cleaned up).
1.
“Context simply delimits the scope of the agency’s
action, including the interests affected.” In Defense of
Animals v. U.S. Dep’t of the Interior, 751 F.3d 1054, 1068
(9th Cir. 2014) (cleaned up); see 40 C.F.R. § 1508.27(a)
18a
(listing potential contexts). Although the agency should
be mindful “that use of a larger analysis area can dilute
the apparent magnitude of environmental impacts,”
“[i]dentifying the appropriate geographic scope is a task
assigned to the special competency of the appropriate
agency.” Friends of the Wild Swan v. Weber, 767 F.3d
936, 943 (9th Cir. 2014) (cleaned up).
BMBP contends that the EA diluted the significance
of some impacts by analyzing them on too large a scale.
However, “[a]lthough 40 C.F.R. § 1508.27(a) suggests
that site-specific actions are generally evaluated in the
context of a project locale, nothing in the regulation
prohibits the [Service] from exercising its discretion to
apply a [larger] analysis when appropriate.” Tri-Valley
CAREs v. U.S. Dep’t of Energy, 671 F.3d 1113, 1127 (9th
Cir. 2012). And BMBP has not shown why the choice of
a broader context in the challenged instances was
arbitrary or capricious. See Ctr. for Cmty. Action &
Env’t Just. v. FAA, 18 F.4th 592, 599 (9th Cir. 2021)
(noting that the petitioner bears the burden of
persuasion); cf. Anderson v. Evans, 371 F.3d 475, 489–92
(9th Cir. 2004) (explaining why the local context was
especially relevant for assessing whether the project’s
effects would be controversial).
Indeed, BMBP concedes in its briefing that the 2020
decision “acknowledges the highly-localized nature of
the Project’s effects” and that the EA contains a
“disclosure of local impacts.” The Service extensively
analyzed various local impacts—including those on
scenic integrity, on late and old structure stands, and on
threatened and endangered species. And, the EA
explained why it chose certain broader contexts for
19a
analysis in other instances. The record fails to establish
that the agency’s decisions about context were
“arbitrary, capricious, an abuse of discretion, or
otherwise not in accordance with law.” 5 U.S.C.
§ 706(2)(A).
2.
Intensity “refers to the severity of impact” within
the selected context. 40 C.F.R. § 1508.27(b). The
regulations list ten non-exhaustive relevant factors for
consideration, including the “[u]nique characteristics of
the geographic area”; the “degree to which the
effects . . . are likely to be highly controversial”; the
“degree to which the action may establish a precedent
for future actions with significant effects”; and whether
the action “threatens a violation of Federal, State, or
local law or requirements imposed for the protection of
the environment.” Id. Whether the factors are assessed
individually or cumulatively, the record does not
establish a “clear error of judgment” in the Service’s
intensity findings.
Blue Mountains Biodiversity
Project, 161 F.3d at 1211 (cleaned up).
Although the EA described Walton Lake as “unique”
because it boasts a high number of visitors and is “the
only Developed Recreation Management Area that has
a lake with the combination of moist mixed conifer and
dry mixed conifer forest surrounding it,” the Service
reasonably found that the Project would affect neither
the lake itself, nor “the diversity of tree species in the
project area around Walton Lake.” The Service also
reasonably concluded that the Project “would not
substantially affect the use of the area as a recreation
site” because the infested area was already closed to
20a
recreational uses for safety reasons. And BMBP does
not challenge the Service’s conclusion that the Project
would not affect any of the “unique” characteristics
listed in the regulation. See 40 C.F.R. § 1508.27(b)(3).
The record also does not suggest that the Project is
highly controversial. See id. § 1508.27(b)(4). “A project
is highly controversial if there is a substantial dispute
about the size, nature, or effect of the major Federal
action,” which “exists when evidence . . . casts serious
doubt upon the reasonableness of an agency’s
conclusions.” WildEarth Guardians v. Provencio, 923
F.3d 655, 673 (9th Cir. 2019) (cleaned up). But, a project
is not rendered highly controversial simply because
“qualified experts disagree.” Greenpeace Action v.
Franklin, 14 F.3d 1324, 1335 (9th Cir. 1992). Rather,
“[w]hen specialists express conflicting views, an agency
must have discretion to rely on the reasonable opinions
of its own qualified experts.” Marsh v. Or. Nat. Res.
Council, 490 U.S. 360, 378 (1989).
The Service concluded that the Project was not
highly controversial because its potential effects were
well-established or supported by the best available
science. Citing a range of research, the Service found
“no evidence that the proposed treatments would
exacerbate” laminated root rot. It also decided against
stump removal because of “soil disturbance” and “the
high cost of removing stumps.”
The scientific studies cited by BMBP do not render
these findings arbitrary or capricious.
One
acknowledges that “an appropriate strategy” is “based
on several factors”; another expresses some skepticism
about sanitation harvesting but also notes the potential
21a
effectiveness of “spacing trees through thinning, by
removing stumps, or by planting and managing resistant
and immune trees species”; and a third does not discuss
sanitation harvesting at all. Although BMBP also cites
Dr. Chad Hanson’s opinion that logging would “likely
increase [laminated root rot] occurrence,” the Service
reviewed that opinion but ultimately concluded that the
overall evidence weighed against its conclusions. One
negative comment does not establish high controversy.
See Native Ecosystems Council v. U.S. Forest Serv., 428
F.3d 1233, 1243–44 (9th Cir. 2005).
It was also reasonable for the Service to conclude
that the Project is unlikely to establish a precedent for
future actions. See 40 C.F.R. § 1508.27(b)(6). The
Service explained that “no other known Developed
Recreation Management Areas . . . have a laminated root
rot problem on the Ochoco National Forest.” The
Service found that the Project is “site-specific” and “any
future decision would need to go through the NEPA
process.” Even if other sites might one day develop
similar infestation issues, that does not necessarily make
this Project precedential, “especially since any other
[project] would be subject to its own NEPA analysis.”
WildEarth Guardians, 923 F.3d at 674.
The Service’s decision also reasonably accounted for
federal, state, and local laws.
See 40 C.F.R.
§ 1508.27(b)(10). Although forest plan amendments that
“may create a significant environmental effect” require
an EIS, there is an exception for “every plan amendment
. . . that applies only to one project or activity.” 36 C.F.R.
§ 219.13(b)(3). The amendments to the Ochoco National
Forest Plan at issue are each related to one project.
22a
CONCLUSION
We AFFIRM the judgment of the district court and
lift our previous stay of its order dissolving the
preliminary injunction.
BERZON, Circuit Judge, with whom WARDLAW,
PAEZ, and KOH, Circuit Judges, join, respecting the
denial of rehearing en banc:
The panel’s holding in this case permits government
agencies to sanitize the record available to reviewing
courts, thereby severely curtailing meaningful judicial
review of administrative action. I respectfully disagree
with this court’s refusal to reconsider the panel opinion
en banc.
The Administrative Procedure Act (“APA”)
mandates that, when considering challenges to the
lawfulness of agency action, “the court shall review the
whole record or those parts of it cited by a party.” 5
U.S.C. § 706. This court has long held that the “whole
record” consists of all documents and materials
considered by the agency before making its decision. See
Portland Audubon Soc’y v. Endangered Species Comm.,
984 F.2d 1534, 1548 (9th Cir. 1993); Thompson v. U.S.
Dep’t of Lab., 885 F.2d 551, 555 (9th Cir. 1989); see also,
e.g., Goffney v. Becerra, 995 F.3d 737, 747 (9th Cir. 2021)
(citing Portland Audubon Soc’y, 984 F.2d at 1548); Pac.
Choice Seafood Co. v. Ross, 976 F.3d 932, 942 (9th Cir.
2020) (same).
In keeping with our precedents, the Supreme Court
has never “limit[ed] the ‘full administrative record’ to
23a
those materials that the agency unilaterally decides
should be considered by the reviewing court.” In re
United States, 583 U.S. 1029, 138 S. Ct. 371, 372 (2017)
(Breyer, J., dissenting from the grant of a stay).
“[J]udicial review cannot function if the agency is
permitted to decide unilaterally what documents it
submits to the reviewing court as the administrative
record.” Id. That is because “[e]ffective review depends
upon the administrative record containing all relevant
materials presented to the agency, including not only
materials supportive of the government’s decision but
also materials contrary to the government’s decision.”
Id. 1
In conflict with our case law, the decision here holds
that materials protected by the deliberative process
privilege are not part of the “whole record” for purposes
of judicial review under the APA. Blue Mountains
Biodiversity Project v. Jeffries, 72 F.4th 991, 996–97 (9th
Cir. 2023). The deliberative process privilege applies to
“documents
that
reflect
advisory
opinions,
recommendations and deliberations comprising part of a
process by which government decisions and policies are
formulated,” but does not protect “[p]urely factual
material.” F.T.C. v. Warner Commc’ns Inc., 742 F.2d
1156, 1161 (9th Cir. 1984).
According to the panel opinion, because deliberative
documents are—says the panel—not part of the “whole
1
As I explain later, although in dissent as to the stay, Justice Breyer
later joined the unanimous merits opinion in In re United States, 583
U.S. 29, 31–32 (2017) (per curiam), which was consistent with the
analysis in his stay dissent. See infra at Part I.
24a
record,” the government ordinarily need not prepare a
privilege log indicating the basis for excluding
“deliberative” documents as privileged.
Blue
Mountains, 72 F.4th at 997. Under the opinion, absent
a showing of bad faith or impropriety (or perhaps some
other exception, not articulated), the government may
routinely and unilaterally withhold all documents it
deems “deliberative” without providing any account to
the court or the litigants of the basis for excluding those
documents. That holding is not only wrong but is likely
to reduce APA review in many instances to a charade.
I.
In In re United States, the federal government
advanced in the Supreme Court the same position taken
by the opinion in this case: that review of agency
decisions under the APA “must be based exclusively on
the documents that the Government itself unilaterally
selected for submission to the District Court.” In re
U.S., 138 S. Ct. at 372 (Breyer, J., dissenting from the
grant of a stay). The district court in In re United States
had determined that the record designated by the
government was incomplete, and so ordered the
government to complete the administrative record and
produce a privilege log. See Regents of Univ. of
California v. U.S. Dep’t of Homeland Sec., No. C 1705211 WHA, 2017 WL 4642324, *7–8 (N.D. Cal. Oct. 17,
2017). After we upheld the district court’s decision on
mandamus review, In re United States, 875 F.3d 1200
(9th Cir. 2017), the government sought review in the
Supreme Court. The Supreme Court granted a stay to
consider the government’s mandamus request. In re
U.S., 138 S. Ct. at 371. Joined by three justices in dissent
25a
from the grant of the stay Justice Breyer maintained
that the Supreme Court has never held that the “whole
record” in APA cases is whatever documents the
government
unilaterally
designates
as
the
administrative record. In re U.S., 138 S. Ct. at 372.
The Supreme Court subsequently granted certiorari
and issued a unanimous opinion in In re United States.
583 U.S. 29 (2017) (per curiam). That opinion allowed the
district court’s order to remain in place and declined to
adopt the government’s view of its unilateral power to
designate the administrative record. Id. at 31–32.
More specifically, the Court in In re United States
held that the district court should have first resolved
two threshold jurisdictional arguments that “if accepted,
likely would eliminate the need for the District Court to
examine a complete administrative record.” Id. at 31–
32. But the Court did not disapprove the district court’s
order directing the government to complete the
administrative record and produce a privilege log. See
id. at 32. Instead, the Court explained that if the
threshold arguments were resolved in favor of the
district court’s jurisdiction, then the district court “may
consider whether narrower amendments to the record
are necessary and appropriate.” Id. The Supreme Court
further indicated that the district court could potentially
“compel the Government to disclose [] document[s] that
the Government believes is privileged” so long as the
court “first provid[es] the Government with the
opportunity to argue the issue.” Id.
In other words, consistent with Justice Breyer’s
earlier dissent from the stay order, the Supreme Court’s
unanimous opinion made clear that the district court had
26a
power either to maintain its existing order for
completion of the administrative record and production
of a privilege log, or to “narrow[]” it, as long as the
government had a chance to litigate the question of
privilege. Id. The Supreme Court’s merits opinion did
not hold—as did the panel opinion in this case—that the
district court was precluded from expanding the record
at all, absent a showing of some unusual circumstance, or
that the agency could decide for itself which material
was deliberative.
And Justice Breyer obviously
understood the merits opinion as consistent with the
analysis in his earlier stay dissent—an analysis squarely
contrary to the panel opinion in this case—as he joined
the merits opinion.
II.
In keeping with the view that prevailed in In re
United States, our Circuit has repeatedly held that for
purposes of APA review, “‘[t]he whole record’ includes
everything that was before the agency pertaining to the
merits of its decision.” Portland Audubon Soc’y, 984
F.2d at 1548 (emphasis added). See also, e.g., Pac.
Choice Seafood Co., 976 F.3d at 942 (same); Goffney, 995
F.3d at 747 (same); Thompson, 885 F.2d at 555.
Our requirement that the administrative record be
complete is critical for effective judicial review. In APA
agency review cases, private parties may not introduce
new facts, and discovery is ordinarily not available. As
the Supreme Court has observed, “the focal point for
judicial review” in APA cases “should be the
administrative record already in existence, not some
new record made initially in the reviewing court.” Camp
v. Pitts, 411 U.S. 138, 142 (1973). “[T]he general rule [is]
27a
that agency actions are to be judged on the agency
record alone, without discovery.” Pub. Power Council
v. Johnson, 674 F.2d 791, 794 (9th Cir. 1982).
Our Circuit law is clear that, given that judicial
review is limited to the administrative record, the
administrative record must be complete. “If the record
is not complete, then the requirement that the agency
decision be supported by ‘the record’ becomes almost
meaningless.” Portland Audubon Soc’y, 984 F.2d at
1548; accord In re United States, 138 S. Ct. at 372
(Breyer, J., dissenting from the grant of a stay).
Accordingly, Portland Audubon Society explained that
“a record that does not include all matters on which the
[agency] relied does not constitute the ‘whole record’
required for judicial review,” and “the failure to include
all materials in the record violates the Administrative
Procedure Act.” Id. at 1536–37. Further, “[w]hen it
appears the agency has relied on documents or materials
not included in the record, supplementation is
appropriate.” Id. at 1548.
Thompson similarly held that “[t]he whole
administrative record . . . is not necessarily those
documents that the agency has compiled and submitted
as ‘the’ administrative record.” 885 F.2d at 555; see also
Bar MK Ranches v. Yuetter, 994 F.2d 735, 739 (10th Cir.
1993) (“An agency may not unilaterally determine what
constitutes the Administrative Record”). Instead, “[t]he
‘whole’ administrative record . . . consists of all
documents and materials directly or indirectly
considered by agency decision-makers and includes
evidence contrary to the agency’s position.” Thompson,
28a
885 F.2d at 555 (internal quotation marks and citation
omitted).
More recently, in Pacific Choice Seafood Company,
we rejected an argument that in reviewing a National
Marine Fisheries Service decision, we should “examine
only the Service’s [final] decision memoranda while
ignoring” earlier materials, analyses, and reports
produced by a regional fishery management council
during a “years-long deliberative process” that preceded
the Service’s final decision. 976 F.3d at 936, 942.
Emphasizing that the “whole record” includes
“everything that was before the agency,” we noted that
the plaintiff “offer[ed] no authority supporting its
assertion that we should focus exclusively on the
Service’s memoranda from the very end of the
administrative process.” Id. at 942. See also id. at 943
(relying in part on “the extensive discussion of
[applicable] factors presented at each step of the
rulemaking process” in concluding that the agency had
engaged in reasoned decisionmaking).
Consistent with these precedents, we have routinely
reviewed letters, drafts, emails, and other nonfinal
materials in the course of evaluating the lawfulness of
agency action. For example, Barnes v. U.S. Department
of Transportation, 655 F.3d 1124 (9th Cir. 2011),
considered a statement made by a Federal Aviation
Authority (“FAA”) official while commenting on a draft
document related to an environmental assessment of a
new airport runway. Id. at 1133. The government
contended that we should disregard the statement
because it was “made in the early stages of the
administrative process” and “that courts must focus on
29a
the final action by an agency.” Id. We disagreed,
explaining that the Supreme Court has not held that
“such preliminary determinations are irrelevant in any
context . . . or that they may not be considered when
reviewing an agency action.” Id. at 1134. We also
considered “a series of emails in the administrative
record” reflecting concerns raised by FAA employees
about the proposed project. Id. at 1135. See also, e.g.,
Native Village of Point Hope v. Jewell, 740 F.3d 489,
499–501 (9th Cir. 2014) (considering “internal [agency]
emails,” draft tables or charts, and commentary by
agency staff on proposed scenarios); Earth Island
Institute v. Hogarth, 494 F.3d 757, 768–69 (9th Cir. 2007)
(relying on an administrative record that included
“internal memoranda” as well as draft “talking points”).
The holding here that the “whole record” does not
include deliberative material cannot be reconciled with
these precedents. Under our case law, drafts and other
non-final documents may properly be reviewed by the
court as part of the “whole record,” unless the
government justifies its decision to withhold such
documents in a privilege log.
III.
Aside from creating an intracircuit conflict, the
reasons provided in the opinion in support of its holding
on the administrative record issue are seriously flawed.
A.
The opinion “rests” in part on the principle that “an
agency’s statement of what is in the record is subject to
a presumption of regularity.” Blue Mountains, 72 F.4th
at 996–97. But the presumption of regularity is a
30a
presumption that the agency has done what it is
supposed to do; it does not tell us what the agency is
supposed to do. More specifically, the presumption does
not describe the breadth of the record that should be
produced and so does not explain to what the
presumption attaches. That is, if the legal rule is that
the record is everything that was before the agency (as
our precedents have long held), then we can presume—
but not conclusively—that what is presented was
everything before the agency. So the presumption has
nothing to do with what is actually in an appropriate
administrative record in the first instance.
B.
The opinion also reasons that “[d]eliberative
documents, which are prepared to aid the decisionmaker in arriving at a decision, are ordinarily not
relevant” to judicial review of the lawfulness of agency
action. Blue Mountains, 72 F.4th at 997. In support of
this proposition, the opinion relies on Citizens to
Preserve Overton Park, Inc. v. Volpe, 401 U.S. 402, 420
(1971), abrogated on other grounds by Califano v.
Sanders, 430 U.S. 99, 105 (1977), and Morgan v. United
States, 304 U.S. 1, 18 (1938). See Blue Mountains, 72
F.4th at 997. Neither case supports the panel’s
conclusion.
Overton Park involved a challenge to the Secretary
of Transportation’s decision to authorize the
construction of a highway through a public park. 401
U.S. at 406. In announcing his decision, the Secretary
made no formal findings. 401 U.S. at 407–08. The
Supreme Court explained that judicial “review is to be
based on the full administrative record that was before
31a
the Secretary at the time he made his decision.” Id. at
420. But because of the inadequacy of the existing
record in that case, the Court held that post-decisional
fact development was perhaps necessary for effective
judicial review:
The court may require the administrative officials
who participated in the decision to give testimony
explaining their action. Of course, such inquiry
into the mental processes of administrative
decisionmakers is usually to be avoided. . . . And
where there are administrative findings that
were made at the same time as the decision, . . .
there must be a strong showing of bad faith or
improper behavior before such inquiry may be
made. But here there are no such formal findings
and it may be that the only way there can be
effective judicial review is by examining the
decisionmakers themselves.
Id. (emphasis added) (citing United States v. Morgan,
313 U.S. 409, 422 (1941) (hereinafter Morgan II)).
Similarly, in Morgan, after the district court received
testimony from the Secretary of Agriculture about his
decisional process, the Supreme Court observed that “it
was not the function of the court to probe the mental
processes of the Secretary in reaching his conclusions if
he gave the hearing which the law required.” 304 U.S.
at 14, 18; see also Morgan II, 313 U.S. at 422. 2
2
The Supreme Court in Morgan, a case concerning an adjudicative
proceeding, reversed the district court’s decision because the
plaintiffs were not provided with sufficient information about the
32a
Thus, both cases concern the propriety of postdecisional testimony of administrative decisionmakers,
which obviously was not part of the administrative
record because it did not exist at the time the agency
made its decision. See In re United States, 138 S. Ct. at
373 (Breyer, J., dissenting from the grant of a stay).
“Probing a decisionmaker’s subjective mental
reasoning—what was at issue in Morgan and Overton
Park—is distinct from the ordinary judicial task of
evaluating whether the decision itself was objectively
valid, considering all of the materials before the
decisionmaker at the time he made the decision.” Id.
Neither Morgan or Overton Park concerns the scope of
the administrative record reviewed under the APA or
supports the conclusion that deliberative documents
actually before the agency when reaching its decision
are not part of the administrative record. Nor do they
concern the circumstances warranting a privilege log.
C.
The opinion also heavily relies on the D.C. Circuit’s
decision in Oceana, Inc. v. Ross, 920 F.3d 855 (D.C. Cir.
2019). Blue Mountains, 72 F.4th at 996–97. Oceana, in
turn, relied on In re Subpoena Duces Tecum Served on
Off. of Comptroller of Currency, 156 F.3d 1279, 1279–80
(D.C. Cir. 1998) (opinion on petition for rehearing). And
In re Subpoena Duces Tecum relied on Morgan, Overton
Park, and Camp in concluding that “[a]gency
deliberations not part of the record are deemed
immaterial.” Id. at 1279–80 (emphasis added). That
government’s position to satisfy the requirement of a full and fair
hearing. Morgan, 304 U.S. at 18–19, 22.
33a
statement indicates that agency deliberations can be
“part of the record,” and says nothing about the
treatment of agency deliberations that are part of the
record.
Yet, Oceana seized on this statement—which like the
Supreme Court cases the panel opinion in this case cites,
references
extra-record
discovery
into
the
decisionmaker’s subjective motivations—to conclude
that deliberative documents that were before the agency
are not part of the administrative record. See 920 F.3d
at 865 (citing In re Subpoena Duces Tecum, 156 F.3d at
1279, 1280). As far as I can tell, no other Circuit has
adopted the D.C. Circuit’s wrongheaded approach.
Moreover, as discussed, Oceana’s conclusion conflicts
with our Circuit’s controlling precedents.
Oceana also asserts that “[b]ecause predecisional
documents are ‘immaterial,’ they are not ‘discoverable.’”
920 F.3d at 865 (citation omitted). But the concept of
discoverability has no bearing on the meaning of the
“whole record” for APA cases. Again, discovery is
ordinarily not available in APA review cases. See supra
at Part II. As the “whole record” is not determined
through discovery, the discovery-related concept of
“relevan[ce],” see Fed. R. Civ. Proc. 26(b)(1), is not
helpful for purposes of defining the “whole record.”
Instead, as our case law reflects, the “whole record”
consists of everything that was “directly or indirectly
considered” by the agency. Thompson, 885 F.2d at 555
(emphasis and quotation marks omitted).
34a
IV.
In other key respects as well, the decision in this case
is damaging to judicial review of agency action. The
opinion sets a new baseline in which the government
need not justify its claims of privilege except in limited
circumstances, as yet unexplained. Without a privilege
log, however, governmental mistakes or misconduct are
unlikely to come to light. The panel’s holding also
creates a tension with Freedom of Information Act
(“FOIA”) case law, which requires the government to
supply a privilege log to justify withholding of
documents claimed to be deliberative. And the decision
fails to acknowledge that deliberative materials are
central in cases in which the decisionmaker’s subjective
intent is properly at issue. See, e.g. Dep’t of Com. v. New
York, 139 S. Ct. 2551, 2573–74 (2019).
A.
Although the opinion purports to “leave for another
day a detailed exploration of the precise circumstances
under which a district court can order the production of
a privilege log,” it concludes that the district court
properly declined to order a privilege log here because
Blue Mountains Biodiversity Project “does not assert
any misconduct by the Service, nor does it contend that
specific documents were improperly classified as
deliberative.” Blue Mountains, 72 F.4th at 997.
Absent a privilege log, it is very unlikely—absent
public announcements or a leak by government
officials—that litigants will be able to point to “specific”
documents improperly excluded.
The reason is
obvious—they will be unaware that such documents
35a
exist. See, e.g., Inland Empire-Immigrant Youth
Collective v. Nielsen, No. EDCV 17-2048 PSG SHKx,
2019 WL 13240629, at *6 (C.D. Cal. Apr. 8, 2019) (“[I]t
would be very difficult, if not impossible, for an APA
plaintiff to challenge a claim of deliberative process
privilege or to make the required showing of need
necessary to overcome the privilege without at least
some description of the document over which privilege
is asserted.”); Sierra Club v. Zinke, No. 17-CV-07187WHO, 2018 WL 3126401, at *5 (N.D. Cal. June 26, 2018)
(“The only way to know if privilege applies is to review
the deliberative documents in a privilege log.”).
Importantly, agencies may inadvertently omit
material from the administrative record without acting
in bad faith. In Bartell Ranch LLC v. McCullough, No.
3:21-CV-00080-MMD-CLB, 2022 WL 2093053, at *3 (D.
Nev. June 10, 2022), for example, the Bureau of Land
Management had a practice of assuming that only the
documents that individual agency staff had added to a
case file as they were generated should be produced as
the record, and that all documents not added to the case
file were deliberative. Id. As a result of that practice,
neither the agency nor its counsel looked outside the
case file for record documents, nor did they make any
individualized determinations about whether the six to
eight thousand emails they excluded were actually
deliberative. Id. Had the court not ordered the agency
to provide a privilege log, the agency’s error would
never have come to light. Id.
An agency may also make a legal error in
determining which documents to exclude, such as when
it applies an incorrect legal standard when compiling the
36a
record. See, e.g., Inland Empire-Immigrant Youth
Collective, 2019 WL 13240629, at *4 (recognizing that
“[t]he application of an incorrect standard” provides
reason to believe the record produced by the agency is
incomplete) (quotation marks and citation omitted). The
possibility that the agency may apply an incorrect legal
standard in excluding deliberative material from the
administrative record is far from theoretical. Without
the understanding that the “whole record” includes
deliberative material and may require a privilege log
identifying such material, errors of this kind will remain
hidden from the litigants and the court, and the outcome
of the case could well be affected.
For these reasons, if the government wishes to
exclude from the record material before the agency as
deliberative, it should have to identify those specific
documents and justify their exclusion in a log provided
to the court.
B.
The process just described is the one we have long
followed in cases under another provision of the APA—
the Freedom of Information Act—when the government
claims that deliberative material is exempt from
disclosure. There is no reason the process should be
different here.
“The statute known as the FOIA is actually a part of
the Administrative Procedure Act (APA).” U.S. Dep’t
of Just. v. Reps. Comm. For Freedom of Press, 489 U.S.
749, 754 (1989). FOIA Exemption 5 permits the
government to avoid disclosure of “inter-agency or
intra-agency memorandums or letters that would not be
37a
available by law to a party other than an agency in
litigation with the agency.” 5 U.S.C. § 552(b)(5). This
exemption “allows agencies to withhold privileged
information, including documents revealing an agency’s
deliberative process.” Transgender L. Ctr. v. Immigr. &
Customs Enf’t, 46 F.4th 771, 782 (9th Cir. 2022).
Under FOIA, the government has the burden of
demonstrating that a claimed privilege applies. See id.
at 781; 5 U.S.C. § 552(a)(4)(B). “[O]ur caselaw . . .
demands a careful document-by-document review” to
determine whether the agency has met its burden to
show that the deliberative process privilege applies.
Transgender L. Ctr., 46 F.4th at 786. To aid the court’s
determination, government agencies seeking to avoid
disclosure of public records must submit a “Vaughn
index,” which “‘identif[ies] the documents withheld, the
FOIA exemptions claimed, and a particularized
explanation of why each document falls within the
claimed exemption.’” Id. at 781 (quoting Lahr v. Nat’l
Transp. Safety Bd., 569 F.3d 964, 989 (9th Cir. 2009)); see
Vaughn v. Rosen, 484 F.2d 820, 826–28 (D.C. Cir. 1973).
“[T]he purpose of the index is . . . to afford the requester
an opportunity to intelligently advocate release of the
withheld documents and to afford the court an
opportunity to intelligently judge the contest.”
Transgender L. Ctr., 46 F.4th at 782 (quotation marks
and citation omitted).
In FOIA cases, the deliberative process privilege is
not absolute. Instead, “[w]e have held that ‘[a] litigant
may obtain deliberative materials if his or her need for
the materials and the need for accurate fact-finding
override the government’s interest in non-disclosure.’”
38a
Karnoski, 926 F.3d at 1206 (quoting Warner, 742 F.2d at
1161); see also 5 U.S.C. § 552(a)(8)(A)(i)(I). There is no
basis in the APA for providing litigants challenging
agency action with less access to public documents than
is available to interested members of the public under
FOIA. Notably, APA review requires consideration of
the “whole record,” with no express exceptions, 5 U.S.C.
§ 706, whereas FOIA includes several express
exemptions to public access, 5 U.S.C. § 552(b).
The incongruity between FOIA and the APA, 5
U.S.C. § 706, created by the panel’s decision is seriously
inefficient for litigants, agencies, and the courts. To
obtain access to the complete administrative record or
identify what documents may exist, litigants seeking to
challenge agency action will first have to file FOIA
requests and then litigate the agency’s decision to claim
a FOIA exemption, potentially running into statute of
limitations problems for the APA action while the FOIA
process inches forward. Agencies will have to respond
to and litigate those FOIA requests. And the courts will
have to resolve both FOIA claims and APA challenges.
C.
Finally, but importantly, an agency’s subjective
motivations sometimes are critical in APA cases. In
cases in which the legal claim places the agency’s
subjective intent directly at issue—such as a claim that
plausibly alleges that the decisionmaker’s intent was
discriminatory or retaliatory—deliberative materials
actually considered will be central to judicial review.
Such materials can be identified only if included in the
whole record and, if appropriate, a privilege log.
39a
The opinion does not except such cases from the rule
it establishes about the limited scope of the
administrative record. Yet the D.C. Circuit’s decision In
re Subpoena Duces Tecum, relied on by Oceana, held
that in cases that “directly call into question the agency’s
subjective intent,” the subjective motivation of the
decisionmakers is at issue, and the deliberative process
privilege is inapplicable. See 156 F.3d at 1280; see also
In re Subpoena Duces Tecum Served on Off. of
Comptroller of Currency, 145 F.3d 1422, 1424 (D.C.
Cir.), on reh’g, 156 F.3d 1279 (D.C. Cir. 1998).
Department of Commerce likewise reflects that
inquiry into an administrative agency’s mental
processes is permitted where the decisionmakers’
motives are at issue. There, the Supreme Court held
that inquiry into a decisionmaker’s “mental processes”
was appropriate where there was evidence in the
administrative record that the Secretary of Commerce’s
stated reasons for his decision were pretextual. 139 S.
Ct. at 2573–74. Department of Commerce reflects that
the decisionmaker’s subjective motivations are at issue
when the claim is that the agency’s stated reasons for its
decision were “contrived.” See id. at 2575–76. It follows
that when such claims are alleged, deliberative
documents are directly on point and, for that reason as
well as those generally applicable, may not be excluded
from the administrative record.
The holding in this case that “deliberative materials
are ‘not part of the administrative record to begin with,’”
and that only “the reasons offered by the agency”
matter, Blue Mountains, 72 F.4th at 997, contains no
recognition that this rule would fatally undermine cases
40a
in which the basis for the challenge to the agency’s
decision is that there were other reasons, not expressed
in the official explanation of the agency’s decision, that
were actually determinative. The recognition that there
may be unspecified circumstances in which challengers
may be able to come forward with evidence of bad faith
or impropriety and then have access to deliberative
material does not fill that gap. Without access to the
“whole record,” including a privilege log of assertedly
deliberative material, the only way to begin to make a
showing of illicit motivation or pretext would be through
public statements by decisionmakers or leaks from
government insiders.
***
In sum, if government agencies wish to withhold
documents in APA cases based on a privilege, they
should have to provide a privilege log with a justification
for each document for which they assert a privilege, as
they must do under our FOIA precedents. Without a
complete record or a privilege log to aid in the
determination of whether the record is complete,
government agencies will have the last word on what
information other litigants and the court may see, and
effective judicial review of government action under the
APA will be severely undermined. Our court should
have heard this case en banc to eliminate this serious
threat to meaningful judicial review of agency action.
41a
Appendix B
FOR PUBLICATION
UNITED STATES COURT OF APPEALS
FOR THE NINTH CIRCUIT
BLUE MOUNTAINS
BIODIVERSITY PROJECT, an
Oregon non-profit corporation,
No. 22-35857
D.C. No. 2:20cv-02158-MO
Plaintiff-Appellant,
v.
OPINION
SHANE JEFFRIES, in his official
capacity as Ochoco National Forest
Supervisor; UNITED STATES
FOREST SERVICE, an agency of the
United States Department of
Agriculture,
Defendants-Appellees.
Appeal from the United States District Court
for the District of Oregon
Michael W. Mosman, District Judge, Presiding
Argued and Submitted March 30, 2023
Seattle, Washington
Filed July 3, 2023
42a
Before: Jacqueline H. Nguyen and Andrew D. Hurwitz,
Circuit Judges, and Dean D. Pregerson, District
Judge.
Opinion by Judge Hurwitz
SUMMARY
Environmental Law
The panel affirmed the district court’s summary
judgment in favor of the U.S. Forest Service in an action
brought by Blue Mountains Biodiversity Project
(“BMBP”) alleging that the Service’s approval of the
Walton Lake Restoration Project violated the National
Environmental Policy Act (“NEPA”), the National
Forest Management Act, and the Administrative
Procedure Act.
The Forest Service developed the Project to replace
trees infested with laminated root rot and bark beetles
with disease-resistant ones. In May 2016, the Service
contracted with T2, a private company, for logging to
implement the decision. The Service issued a revised
Environmental Assessment (“EA”) in July 2020 and a
revised decision notice in December 2020. BMBP filed
this action challenging the 2020 decision notice. The
Service filed an administrative record (“AR”) in 2021.
The Honorable Dean D. Pregerson, United States District Judge
for the Central District of California, sitting by designation.
This summary constitutes no part of the opinion of the court. It
has been prepared by court staff for the convenience of the reader.
43a
The panel first addressed BMBP’s argument that the
AR was incomplete.
First, BMBP argued that
deliberative materials were part of the “whole record”
and that a privilege log was required if they were not
included in the AR. The panel held that deliberative
materials are generally not part of the AR absent
impropriety or bad faith by the agency. Because
deliberative materials are not part of the administrative
record to begin with, they are not required to be placed
on a privilege log. The district court did not abuse its
discretion by declining to order the production of a
privilege log. Second, BMBP argued that all documents
in the 2016 AR should be in the AR for this case. BMBP
contended that the documents in the 2016 AR were
necessarily before the agency in the 2020 process
because the Project was a continuation of the withdrawn
one. The panel held that BMBP’s arguments failed to
overcome the presumption of regularity. The 2020
decision notice expressly stated that the Forest Service
began the NEPA process again in 2019. The record also
supported the Service’s contention that it included only
documents from previous NEPA analyses that were
considered in the 2020 decision. The panel concluded
that the district court acted within its discretion in
denying the motion to supplement the AR.
The panel next addressed whether the Service
violated NEPA by approving the Project. First, the
panel held that BMBP failed to establish that the logging
contract with T2 improperly committed resources under
any standard. There is also no evidence that the agency
merely engaged in post hoc rationalization in the 2020
decision. Second, the panel rejected BMBP’s contention
that the EA diluted the significance of some impacts by
44a
analyzing them on too large a scale. The BMBP did not
show why the choice of a broader context in the
challenged instances was arbitrary or capricious. Also,
the regulations list ten non-exhaustive relevant factors
for consideration. The panel held that whether the
factors were assessed individually or cumulatively, the
record did not establish a clear error of judgment in the
Service’s intensity findings, which “refers to the
severity of impact” within the selected context. 40
C.F.R. § 1508.27(b).
The panel affirmed the judgment of the district court
and lifted the previous stay of its order dissolving the
preliminary injunction.
COUNSEL
Jesse A. Buss (argued) and Bridgett A. Chevallier,
Willamette Law Group PC, Oregon City, Oregon;
Thomas C. Buchele, Earthrise Law Center, Portland,
Oregon; for Plaintiff-Appellant.
Robert P. Stockman (argued), Sean C. Duffy, and Joan
M. Pepin, Attorneys; Todd Kim, Assistant Attorney
General; Environment and Natural Resources Division,
United States Department of Justice; Washington, D.C.;
Rick Grisel, Attorney; Rebecca Harrison, Senior
Counsel; Office of the General Counsel; Washington,
D.C.; for Defendants-Appellees.
OPINION
HURWITZ, Circuit Judge:
This case involves claims by the Blue Mountains
Biodiversity Project (“BMBP”) that the approval of the
Walton Lake Restoration Project by the U.S. Forest
45a
Service violated the National Environmental Policy Act,
the National Forest Management Act, and the
Administrative Procedure Act. The district court
granted summary judgment against BMBP on all claims
relevant to this appeal. We affirm.
BACKGROUND
Walton Lake is a 218-acre recreation site in the
Ochoco National Forest in Oregon. The Forest Service
developed the Walton Lake Restoration Project
(“Project”) to replace trees infested with laminated root
rot and bark beetles with disease-resistant ones. In
2015, relying on a regulation that excludes the sanitation
harvest of trees to control disease and insects from some
National Environmental Policy Act (“NEPA”)
requirements, 36 C.F.R. § 220.6(e)(14) (2015), the
Service issued a decision memorandum approving the
Project. In May 2016, the Service contracted with T2, a
private company, for logging to implement that decision.
Although no logging has yet occurred, the T2 contract
remains in place.
BMBP sued, challenging the 2015 decision, and the
district court preliminarily enjoined the logging on
October 18, 2016. The next day, the Service withdrew
its decision “to allow additional analysis of the proposed
activities.” On October 21, 2016, the Service stated that
it would undertake “[a]dditional planning and
analysis . . . with the goal of releasing an Environmental
[Assessment (“EA”)].” 1
1
The district court granted BMBP’s motion to dismiss the 2016 suit
on June 19, 2017.
46a
The Service issued an EA and a decision notice
approving the Project in 2017 but withdrew the decision
notice later that year, citing a need for “additional
dialogue and analysis.” The Service issued a revised EA
in July 2020 and a revised decision notice in December
2020. The revised EA analyzed four alternatives,
including a no-action alternative.
The selected
alternative authorizes thirty-five acres of sanitation
logging and 143 acres of commercial and noncommercial
thinning to reduce the risk of wildfires and bark beetle
infestation. The 2020 decision notice stated that the
Project “provides the best opportunity for long-term
public enjoyment of this area, with fewer risks of falling
trees, and more longevity in the large ponderosa pines
that provide much of the scenic quality”; found that
there would be no significant environmental impact; and
made four Project-specific amendments to the Ochoco
National Forest Plan.
BMBP then filed this action challenging the 2020
decision notice. The Service filed an administrative
record (“AR”) in early 2021. A magistrate judge
recommended denial of BMBP’s motion to compel
completion of the AR and declined to order the Service
to produce a privilege log, concluding that certain
documents sought by BMBP were deliberative
materials, and BMBP did not establish that some
documents in the AR filed in response to the 2016 suit
were “before the agency” in its 2020 decision. The
district judge adopted the magistrate judge’s reasoning
and denied the motion, but again preliminarily enjoined
any logging for the Project.
47a
The district court later granted the Service summary
judgment on all but one of BMBP’s claims. It concluded
that the logging contract with T2 was not an
“irreversible and irretrievable commitment” of
resources because it could be unilaterally modified or
terminated. It also held that the Service reasonably
found that the Project would not have a significant
environmental impact and thus reasonably declined to
prepare an environmental impact statement (“EIS”).
The court entered a final judgment and dissolved the
preliminary injunction. 2 BMBP timely appealed, and we
have jurisdiction under 28 U.S.C. § 1291. 3
DISCUSSION
I.
We first address BMBP’s argument that the AR is
incomplete. The Administrative Procedure Act (“APA”)
requires us to “review the whole record,” 5 U.S.C. § 706,
including “all documents and materials directly or
indirectly considered by agency decision-makers,”
Thompson v. U.S. Dep’t of Lab., 885 F.2d 551, 555 (9th
Cir. 1989) (cleaned up). BMBP argues that deliberative
materials are part of the “whole record” and that a
privilege log is required if they are not included in the
AR. It also contends that all documents in the 2016 AR
should be in the AR for this case.
2
The district court stayed its order dissolving the preliminary
injunction, however, pending our decision on a motion for a stay
pending appeal. We granted that stay and expedited this appeal.
3
The Service has not appealed the district court’s grant of summary
judgment to BMBP on one of its NEPA claims.
48a
A.
No previous Ninth Circuit opinion addresses
whether deliberative materials are part of the “whole
record.” District courts in this Circuit are split on the
issue. See Save the Colorado v. U.S. Dep’t of the Interior,
517 F. Supp. 3d 890, 896–97 (D. Ariz. 2021) (collecting
cases). The District of Columbia Circuit, however, has
held that deliberative materials are generally not part of
the AR absent impropriety or bad faith by the agency.
See Oceana, Inc. v. Ross, 920 F.3d 855, 865 (D.C. Cir.
2019). We agree.
Our holding rests on two well-settled principles
governing judicial review of agency action under the
APA. First, “the whole record,” 5 U.S.C. § 706, is
ordinarily “the record the agency presents,” Fla. Power
& Light Co. v. Lorion, 470 U.S. 729, 743–44 (1985).
“[L]ike other official agency actions, an agency’s
statement of what is in the record is subject to a
presumption of regularity.” Goffney v. Becerra, 995 F.3d
737, 748 (9th Cir. 2021). Thus, barring “clear evidence to
the contrary,” we “presume that an agency properly
designated the Administrative Record.” Id. (cleaned
up).
Second, we assess the lawfulness of agency action
based on the reasons offered by the agency. See Motor
Vehicle Mfrs. Ass’n of the U.S., Inc. v. State Farm Mut.
Auto. Ins. Co., 463 U.S. 29, 50 (1983). Deliberative
documents, which are prepared to aid the decisionmaker in arriving at a decision, are ordinarily not
relevant to that analysis. See Oceana, 920 F.3d at 865;
see also Citizens to Preserve Overton Park, Inc. v. Volpe,
401 U.S. 402, 420 (1971) (“[I]nquiry into the mental
49a
processes of administrative decisionmakers is usually to
be avoided.”), abrogated on other grounds by Califano v.
Sanders, 430 U.S. 99, 105 (1977); Morgan v. United
States, 304 U.S. 1, 18 (1938) (noting it is “not the function
of the court to probe the mental processes of the
Secretary in reaching his conclusions”).
Because
deliberative materials are “not part of the
administrative record to begin with,” they are “not
required to be placed on a privilege log.” Oceana, 920
F.3d at 865 (cleaned up). We agree, however, with the
D.C. Circuit that “a showing of bad faith or improper
behavior” might justify production of a privilege log to
allow the district to determine whether excluded
documents are actually deliberative. Id.; see also In re
United States, 875 F.3d 1200, 1211–12 (9th Cir. 2017)
(Watford, J., dissenting) (discussing potential
circumstances justifying expansion of the AR), vacated,
138 S. Ct. 443, 445 (2017).
But, BMBP does not assert any misconduct by the
Service, nor does it contend that specific documents
were improperly classified as deliberative. Although we
leave for another day a detailed exploration of the
precise circumstances under which a district court can
order the production of a privilege log, the court here did
not abuse its discretion by declining to do so in this case.
B.
BMBP also contends that the documents in the 2016
AR were necessarily before the agency in the 2020
process because the Project is a continuation of the
withdrawn one. In so arguing, BMBP cites statements
by the Service suggesting that the 2020 decision relied
on an “additional” NEPA analysis, a District Ranger’s
50a
description of that analysis as a “continuation of the
Walton Lake Restoration analysis and documentation,”
and the Service’s reliance on a 2015 Forest Health
Report before the district court and an appellate
motions panel.
BMBP’s arguments, however, fail to overcome the
presumption of regularity. See Goffney, 995 F.3d at 748.
The 2020 decision notice expressly stated that “[t]he
Forest Service began the NEPA process again in 2019
with a scoping letter dated August 7, 2019.” The phrase
“additional analysis” is not inconsistent with preparing a
new AR to support a new NEPA analysis. Nor do the
views of a single Service employee necessarily reflect
those of the agency or its ultimate decision-maker. See
Nat’l Ass’n of Home Builders v. Defs. of Wildlife, 551
U.S. 644, 659 (2007). The record also supports the
Service’s contention that it included only documents
from previous NEPA analyses that were considered in
the 2020 decision. For example, the Service did not cite
the 2015 Forest Health Report in its 2020 decision,
relying instead on a new 2019 Forest Health Report.
And, the Service’s citations to the 2015 Report in prior
court proceedings did not involve the validity of the 2020
decision but rather a separate 2017 decision to close
sections of the recreation site because of safety concerns.
We place a thumb on the scale against
supplementation of the AR, see Goffney, 995 F.3d at 747–
48, and BMBP has not demonstrated how the inclusion
of “over two thousand pages that the Service had
included in the 2016 AR,” would “identify and plug holes
in the administrative record,” Fence Creek Cattle Co. v.
U.S. Forest Serv., 602 F.3d 1125, 1131 (9th Cir. 2010)
51a
(cleaned up). Because BMBP “has not met its heavy
burden to show that the additional materials sought are
necessary to adequately review the Forest Service’s
decision,” id., the district court acted within its
discretion in denying the motion to supplement the AR.
II.
We next address whether the Service violated
NEPA by approving the Project. NEPA imposes “a set
of action-forcing procedures that require that agencies
take a hard look at [the] environmental consequences” of
their actions. Robertson v. Methow Valley Citizens
Council, 490 U.S. 332, 350 (1989) (cleaned up).
“Although these procedures are almost certain to affect
the agency’s substantive decision, . . . NEPA itself does
not mandate particular results, but simply prescribes
the necessary process.” Id.
A.
The Council on Environmental Quality (“CEQ”)
issues regulations to guide agencies in determining what
actions are subject to NEPA requirements. See 40
C.F.R. § 1500.3. 4 Those regulations prohibit an agency
from “commit[ting] resources prejudicing selection of
alternatives” or taking actions that would “[l]imit the
choice of reasonable alternatives.” Id. §§ 1502.2(f),
1506.1(a)(2). BMBP contends that the logging contract
with T2 violated these regulations. The parties dispute
whether an improper commitment of resources must be
“irreversible and irretrievable,” Metcalf v. Daley, 214
4
Unless otherwise indicated, all citations are to the 2019 version of
the Code of Federal Regulations.
52a
F.3d 1135, 1143 (9th Cir. 2000) (cleaned up), or something
less. We need not decide that issue, however, because
BMBP has failed to establish that the contract
improperly committed resources under any standard.
Under the contract, T2 will receive $78,262 to
remove non-commercial timber and about $36,000 worth
of harvested commercial timber. Critically, the Service
reserved the right to “terminate this contract, or any
part hereof, for its sole convenience,” at which point T2
“shall immediately stop all work.” 48 C.F.R. § 52.2124(l); see WildWest Inst. v. Bull, 547 F.3d 1162, 1169 (9th
Cir. 2008) (stressing that the Service “clearly retained
the authority to change course or to alter the plan it was
considering implementing”); see also Nat’l Audubon
Soc’y v. Dep’t of the Navy, 422 F.3d 174, 206 (4th Cir.
2005) (holding that preparatory activities did not violate
NEPA in part because that they did not “include cutting
even a single blade of grass in preparation for
construction”). T2 has not conducted any logging under
the contract because the Service has not issued a notice
to proceed. And, given the district court’s preliminary
injunction against logging, which has been stayed
pending appeal, no logging can occur until this case is
resolved. See supra note 2. Nor has the Service made
any payments to T2.
There is also no evidence that the agency “merely
engaged” in “post hoc rationalization” in the 2020
decision. Nat’l Audubon Soc’y, 422 F.3d at 199. BMBP
argues that an internal email by a Service employee
suggests that termination of the contract would cost the
Service appropriated dollars and prevent funding of a
new project. But, another Service employee explained
53a
in the same email chain that any future work under the
contract “must adhere to what is in the new NEPA
decision” and that pending the outcome of that decision,
the Service might need to “terminate[ ] and resolicit[ ]”
the contract.
Rather than rely on “the alleged subjective intent of
agency personnel divined through selective quotations
from email trails,” we “look to . . . the environmental
analysis itself.” Id. The EA contains no indication that
the T2 contract prejudiced or limited the consideration
of alternatives. After analyzing the effects of no action
and several alternatives that reduced or eliminated
commercial logging, the Service chose the Project
because it “best meets the Purpose and Need of Action,”
would “better meet the management objectives of the
area,” and “provides the best opportunity for long-term
public enjoyment of this area.” The Service also stated
that it “considered all reasonable alternatives and would
not be limited in choice because the final service
agreement or other tool of implementation would be
written to align with the final decision.”
B.
NEPA mandates an EIS for “major Federal actions
significantly affecting the quality of the human
environment.” 42 U.S.C. § 4332(C). An agency need not,
however, prepare an EIS if it prepares an EA that
“briefly presents the reasons why the proposed agency
action will not have a significant impact on the human
environment.” Dep’t of Transp. v. Pub. Citizen, 541 U.S.
752, 757–58 (2004). Significance depends on an action’s
“context” and “intensity.”
40 C.F.R. § 1508.27.
“Although . . . review under the arbitrary and capricious
54a
standard is deferential,” an agency’s finding of no
significant impact is arbitrary or capricious if the
petitioner has raised “substantial questions whether a
project may have a significant effect on the
environment.” Blue Mountains Biodiversity Project v.
Blackwood, 161 F.3d 1208, 1212–14, 1216 (9th Cir. 1998)
(cleaned up).
1.
“Context simply delimits the scope of the agency’s
action, including the interests affected.” In Defense of
Animals v. U.S. Dep’t of the Interior, 751 F.3d 1054, 1068
(9th Cir. 2014) (cleaned up); see 40 C.F.R. § 1508.27(a)
(listing potential contexts). Although the agency should
be mindful “that use of a larger analysis area can dilute
the apparent magnitude of environmental impacts,”
“[i]dentifying the appropriate geographic scope is a task
assigned to the special competency of the appropriate
agency.” Friends of the Wild Swan v. Weber, 767 F.3d
936, 943 (9th Cir. 2014) (cleaned up).
BMBP contends that the EA diluted the significance
of some impacts by analyzing them on too large a scale.
However, “[a]lthough 40 C.F.R. § 1508.27(a) suggests
that site-specific actions are generally evaluated in the
context of a project locale, nothing in the regulation
prohibits the [Service] from exercising its discretion to
apply a [larger] analysis when appropriate.” Tri-Valley
CAREs v. U.S. Dep’t of Energy, 671 F.3d 1113, 1127 (9th
Cir. 2012). And BMBP has not shown why the choice of
a broader context in the challenged instances was
arbitrary or capricious. See Ctr. for Cmty. Action &
Env’t Just. v. FAA, 18 F.4th 592, 599 (9th Cir. 2021)
(noting that the petitioner bears the burden of
55a
persuasion); cf. Anderson v. Evans, 371 F.3d 475, 489–92
(9th Cir. 2004) (explaining why the local context was
especially relevant for assessing whether the project’s
effects would be controversial).
Indeed, BMBP concedes in its briefing that the 2020
decision “acknowledges the highly-localized nature of
the Project’s effects” and that the EA contains a
“disclosure of local impacts.” The Service extensively
analyzed various local impacts—including those on
scenic integrity, on late and old structure stands, and on
threatened and endangered species. And, the EA
explained why it chose certain broader contexts for
analysis in other instances. The record fails to establish
that the agency’s decisions about context were
“arbitrary, capricious, an abuse of discretion, or
otherwise not in accordance with law.” 5 U.S.C.
§ 706(2)(A).
2.
Intensity “refers to the severity of impact” within
the selected context. 40 C.F.R. § 1508.27(b). The
regulations list ten non-exhaustive relevant factors for
consideration, including the “[u]nique characteristics of
the geographic area”; the “degree to which the
effects . . . are likely to be highly controversial”; the
“degree to which the action may establish a precedent
for future actions with significant effects”; and whether
the action “threatens a violation of Federal, State, or
local law or requirements imposed for the protection of
the environment.” Id. Whether the factors are assessed
individually or cumulatively, the record does not
establish a “clear error of judgment” in the Service’s
56a
intensity findings.
Blue Mountains Biodiversity
Project, 161 F.3d at 1211 (cleaned up).
Although the EA described Walton Lake as “unique”
because it boasts a high number of visitors and is “the
only Developed Recreation Management Area that has
a lake with the combination of moist mixed conifer and
dry mixed conifer forest surrounding it,” the Service
reasonably found that the Project would affect neither
the lake itself, nor “the diversity of tree species in the
project area around Walton Lake.” The Service also
reasonably concluded that the Project “would not
substantially affect the use of the area as a recreation
site” because the infested area was already closed to
recreational uses for safety reasons. And BMBP does
not challenge the Service’s conclusion that the Project
would not affect any of the “unique” characteristics
listed in the regulation. See 40 C.F.R. § 1508.27(b)(3).
The record also does not suggest that the Project is
highly controversial. See id. § 1508.27(b)(4). “A project
is highly controversial if there is a substantial dispute
about the size, nature, or effect of the major Federal
action,” which “exists when evidence . . . casts serious
doubt upon the reasonableness of an agency’s
conclusions.” WildEarth Guardians v. Provencio, 923
F.3d 655, 673 (9th Cir. 2019) (cleaned up). But, a project
is not rendered highly controversial simply because
“qualified experts disagree.” Greenpeace Action v.
Franklin, 14 F.3d 1324, 1335 (9th Cir. 1992). Rather,
“[w]hen specialists express conflicting views, an agency
must have discretion to rely on the reasonable opinions
of its own qualified experts.” Marsh v. Or. Nat. Res.
Council, 490 U.S. 360, 378 (1989).
57a
The Service concluded that the Project was not
highly controversial because its potential effects were
well-established or supported by the best available
science. Citing a range of research, the Service found
“no evidence that the proposed treatments would
exacerbate” laminated root rot. I t also decided against
stump removal because of “soil disturbance” and “the
high cost of removing stumps.”
The scientific studies cited by BMBP do not render
these findings arbitrary or capricious.
One
acknowledges that “an appropriate strategy” is “based
on several factors”; another expresses some skepticism
about sanitation harvesting but also notes the potential
effectiveness of “spacing trees through thinning, by
removing stumps, or by planting and managing resistant
and immune trees species”; and a third does not discuss
sanitation harvesting at all. Although BMBP also cites
Dr. Chad Hanson’s opinion that logging would “likely
increase [laminated root rot] occurrence,” the Service
reviewed that opinion but ultimately concluded that the
overall evidence weighed against its conclusions. One
negative comment does not establish high controversy.
See Native Ecosystems Council v. U.S. Forest Serv., 428
F.3d 1233, 1243–44 (9th Cir. 2005).
It was also reasonable for the Service to conclude
that the Project is unlikely to establish a precedent for
future actions. See 40 C.F.R. § 1508.27(b)(6). The
Service explained that “no other known Developed
Recreation Management Areas . . . have a laminated root
rot problem on the Ochoco National Forest.” The
Service found that the Project is “site-specific” and “any
future decision would need to go through the NEPA
58a
process.” Even if other sites might one day develop
similar infestation issues, that does not necessarily make
this Project precedential, “especially since any other
[project] would be subject to its own NEPA analysis.”
WildEarth Guardians, 923 F.3d at 674.
The Service’s decision also reasonably accounted for
federal, state, and local laws.
See 40 C.F.R.
§ 1508.27(b)(10). Although forest plan amendments that
“may create a significant environmental effect” require
an EIS, there is an exception for “every plan amendment
. . . that applies only to one project or activity.” 36 C.F.R.
§ 219.13(b)(3). The amendments to the Ochoco National
Forest Plan at issue are each related to one project.
CONCLUSION
We AFFIRM the judgment of the district court and
lift our previous stay of its order dissolving the
preliminary injunction.
59a
Appendix C
IN THE UNITED STATES DISTRICT COURT
FOR THE DISTRICT OF OREGON
PORTLAND DIVISION
BLUE MOUNTAINS
BIODIVERSITY PROJECT,
Plaintiff,
v.
No. 2:20-cv-02158-MO
OPINION AND
ORDER
SHANE JEFFRIES, et al.,
Defendants.
MOSMAN, J.,
This matter comes before me on Plaintiff’s Motion for
Summary Judgment [ECF 66] and Defendants’ Cross
Motion for Summary Judgment [ECF 67].
Oral
Argument was held on July 25, 2022, at which I
GRANTED IN PART and DENIED IN PART both
parties’ Motions, for the reasons stated on the record.
Minutes of Proceedings [ECF 80]. I also TOOK
UNDER ADVISEMENT various claims and asked
Plaintiff for a supplemental statement of authorities.
See Statement of Supplemental Authority [ECF 81].
For the reasons below, I GRANT Defendants’ motion
and DENY Plaintiff’s motion on all claims taken under
advisement.
BACKGROUND
Plaintiff Blue Mountains Biodiversity Project
(“BMBP”) seeks vacatur of a United States Forest
60a
Service (“Defendant” or the “Forest Service” or the
“Service”) decision, as well as declaratory and injunctive
relief under the Administrative Procedure Act (“APA”).
BMBP challenges the Decision Notice (“DN”), including
the Finding of No Significant Impact (“FONSI”), and
underlying Environmental Assessment (“EA”) issued
by Defendant approving the Walton Lake Restoration
Project (“the project”), which is a logging proposal in the
Ochoco National Forest (“ONF”). Am. Compl. [ECF 12]
¶ 1. The Amended Complaint alleges seven violations of
the National Environmental Policy Act (“NEPA”) and
four violations of the National Forest Management Act
(“NFMA”). Am. Compl. [ECF 12] ¶¶ 60–90. After
various proceedings, Plaintiff moved for summary
judgment; Defendants did likewise shortly thereafter.
Pl.’s Mot. for Summ. J. [ECF 66]; Defs.’ Cross Mot. for
Summ. J. [ECF 67]. For those claims which I took under
advisement after Oral Argument on July 25, 2022, I
provide my decision and reasons below.
LEGAL STANDARD
Summary judgment is proper “if the movant shows
that there is no genuine dispute as to any material fact
and the movant is entitled to judgment as a matter of
law.” Fed. R. Civ. P. 56(a). The initial burden for a
motion for summary judgment is on the moving party to
identify the absence of a genuine issue of material fact.
Celotex Corp. v. Catrett, 477 U.S. 317, 323 (1986). Once
that burden is satisfied, the burden shifts to the nonmoving party to demonstrate, through the production of
evidence listed in Fed. R. Civ. P. 56(c)(1), that there
remains a “genuine issue for trial.” Celotex, 477 U.S. at
324. The non-moving party may not rely upon the
61a
pleading allegations, Brinson v. Linda Rose Joint
Venture, 53 F.3d 1044, 1049 (9th Cir. 1995) (citing Fed.
R. Civ. P 56(e)), or “unsupported conjecture or
conclusory statements,” Hernandez v. Spacelabs Med.
Inc., 343 F.3d 1107, 1112 (9th Cir. 2003). All reasonable
doubts and inferences to be drawn from the facts are to
be viewed in the light most favorable to the nonmoving
party. Matsushita Elec. Indus. Co., Ltd. v. Zenith Radio
Corp., 475 U.S. 574, 587 (1986).
Because BMBP’s claims allege the Service violated
NEPA and NFMA, they are governed by the APA.
Native Ecosystems Council v. Dombeck, 304 F.3d 886,
891 (9th Cir. 2002). “When reviewing an agency’s final
decision, the court’s duty on summary judgment is to
determine whether the evidence in the administrative
record permitted the agency to make that decision as a
matter of law.” Nw. Envtl. Advocates v. U.S. Envtl.
Prot. Agency, 855 F. Supp. 2d 1199, 1204 (D. Or. 2012).
“This review is governed by the [APA’s] arbitrary and
capricious standard.” Id. (citing 5 U.S.C. § 706(2)(A)).
“To determine whether an agency decision is
arbitrary and capricious, the court should ‘consider
whether the decision was based on a consideration of the
relevant factors and whether there has been a clear
error of judgment.’” Id. at 1204 (citing Marsh v. Or. Nat.
Res. Council, 490 U.S. 360, 378 (1989)).
“After
considering the relevant factors, the agency must
articulate a satisfactory explanation for its action,
including a rational connection between the facts found
and the agency’s conclusions.” Id. (citing Ctr. for
Biological Diversity v. Nat’l Highway Traffic Safety
Admin., 538 F.3d 1172, 1193 (9th Cir. 2008)).
62a
“An arbitrary and capricious finding is necessary if
the agency ‘relied on factors Congress did not intent it
to consider, entirely failed to consider an important
aspect of the problem, or offered an explanation that
runs counter to the evidence before the agency or is so
implausible that it could not be ascribed to a difference
in view or the product of agency expertise.’” Id. (citing
Lands Council v. McNair, 629 F.3d 1070, 1074 (9th Cir.
2010)). “Review under this standard is narrow, and the
court may not substitute its judgment for the judgment
of the agency.” Id. “The court must be ‘at its most
deferential’ when reviewing an agency’s scientific
determinations.” Id. (citing Balt. Gas & Elec. Co. v. Nat.
Res. Def. Council, Inc., 462 U.S. 87, 103 (1983)).
DISCUSSION
I. Claim 1, Count 2
BMBP argues that the Service violated NEPA by
having an unreasonably narrow purpose and need
statements in its EA. Pl.’s Mot. for Summ. J. [ECF 66]
at 16. According to BMBP, the first and fourth
statements unreasonably defined the purpose and need
for the project too narrowly such that they ignore the
Walton Lake area’s ONF Plan management objectives
and exclude reasonable alternatives that should be
considered. Id.
NEPA requires agencies to “briefly specify the
underlying purpose and need to which the agency is
responding in proposing the alternatives including the
proposed action.” 40 C.F.R. § 1502.13. An agency “may
not define the objectives of its actions in terms so
unreasonably narrow that only one alternative ... would
accomplish the goals of the agency’s action.” Nat’l Parks
63a
Conservation Ass’n v. BLM, 606 F.3d 1058, 1070 (9th
Cir. 2010). An agency enjoys “considerable discretion”
to define the purpose and need statement. Id. Further,
the statement of purpose and need is evaluated under a
“reasonableness” standard on appeal. Id.
A. First Purpose and Need Statement
The ONF Plan (the “Plan”) designates the Walton
Lake recreation area as a “Developed Recreation
Management Area” with two sub-areas—a “Developed
Site” and a “Visual Influence Area.” Mot. for Summ. J.
[ECF 66] at 18. The Plan provides for different
restrictions on the two sub-areas. Id. For the
Developed Site, the plan says, “[h]arvest only for the
purpose of maintaining safe and attractive recreational
sites.” AR 1629. For the Visual Influence Area, the plan
says, “[e]mphasize maintenance of large, ponderosa pine
and western larch.”
Id.
It goes on to state,
“[p]recommercial thinning and commercial thinning may
be done to meet the visual quality objectives and
maintain healthy stands.” Id.
BMBP contends that the first purpose and need
statement—”[t]here is a need to curb the laminated root
rot infestation where it occurs within the Developed
Recreation Management Area around Walton Lake, to
develop a healthy stand of vegetation, and provide for
public safety,” AR 7573—impermissible lumps together
these two areas and “preordain[s]” the chosen
alternative. Mot. for Summ. J. [ECF 66] at 18–19. By
describing the issue as a “need” to curb laminated root
rot (“LRR”) in all areas of the Recreation Management
Area, the statement makes it seem as if the Service’s
outcome would be the only one that would “curb” LRR
64a
everywhere, according to BMBP. Id. Instead, each subarea should have been considered on its own. Id.
The Service responds that the first purpose and need
statement is consistent with the Plan’s mandatory
direction to prevent and suppress insect and disease
outbreaks. Defs. Mot. for Summ. J. [ECF 67] at 31. The
Plan contains forest health standards and guidelines that
direct the Service to “[u]tilize all methods to prevent or
suppress insect and disease outbreaks” and to
“[e]mphasize detection and treatment of bark beetle and
root disease occurrences, as these relate to providing a
safe environment....” AR 1569. The Service argues that
this standard applies to the entire Developed Recreation
Area (that contains the two sub-areas) as a whole. Defs.
Reply in Supp. of Mot. for Summ. J. [ECF 72] at 19. The
EA confirms that these standards from the Plan apply
to the entire Developed Recreation Area. Id. (citing AR
7575).
I find the Service’s argument persuasive on this
point. The purpose and need statement in the EA says
that the LRR needs to be curbed in the larger Developed
Recreation Management Area. When one reads the Plan
and what it says should be done for the two sub-areas
within the broader Developed Recreation Management
Area, the EA and the Plan are not inconsistent.
Generally speaking, to curb something means to
restrain, or keep in check; alternatively, to check or
control.
See Curb, Merriam-Webster’s Collegiate
Dictionary (11th ed. 2005). I do not think that “curbing”
LRR in some way violates the plan’s requirement to
“harvest only for the purpose of maintaining safe and
attractive recreational sites” or thinning “done to ...
65a
maintain healthy stands.” In sum, I find neither the
language nor the Service’s reading and use of the
purpose and need statement to be too narrow; nor are
they arbitrary or capricious.
B. Fourth Purpose and Need Statement
The fourth purpose and need statement states:
“There is a need to amend the Ochoco Land and
Resource Management Plan.” AR 7574. BMBP argues
that “[b]y using elements of the preferred alternative to
define the ‘need’ of the action, the Service put the cart
before the horse, violating NEPA’s requirement that
the purpose and need be used to identify the
alternatives.” Pl.’s Mot. for Summ. J. [ECF 66] at 20. By
including a need to amend the plan, any alternative that
does not include a plan amendment is eliminated. Id. at
19. The Service counters that its regulations require the
Service to “base a plan amendment on a preliminary
identification of the need to change the plan.” Defs.’
Reply ISO Mot. for Summ. J. [ECF 72] at 18 (citing 36
C.F.R. § 219.13) (“When a plan amendment is made
together with, and only applies to, a project or activity
decision, the analysis prepared for the project or activity
may serve as the documentation for the preliminary
identification of the need to change the plan.”)
The Service has the winning argument here. As
noted, the Forest Service’s regulations state that the
Service must preliminarily identify the need to change
the plan—and that is precisely what it did here. The
Service’s actions were therefore not arbitrary and
capricious.
In light of the discussion and reasons given above, I
GRANT the Service’s motion and DENY BMBP’s
66a
motion as to both the first and the fourth purpose and
need statements under Claim 1, Count 2.
II. Claim 1, Count 3
In determining whether a purpose and need
statement is reasonable, the Ninth Circuit “first
determine[s] whether the statement of purpose and
need was reasonable, and then whether the range of
alternatives considered was reasonable in light of that
purpose and need.” League of Wilderness Def. v. U.S.
Forest Serv., 689 F.3d 1060, 1069 (9th Cir. 2012). As
noted above regarding Claim 1, Count 2, I find the
purpose and need statements reasonable, so I must next
consider BMBP’s contentions about the range of
alternatives considered. Under NEPA and applicable
case law, the Forest Service has to include a brief
discussion of “appropriate” and “reasonable”
alternatives, but there is no correct number of
alternatives required or proscribed.
36 C.F.R.
§ 220.7(b)(2) (Forest Service regulations implementing
NEPA); 40 C.F.R. § 1508.9; Native Ecosystems Council
v. U.S. Forest Serv., 428 F.3d 1232, 1246 (9th Cir. 2005).
The Forest Service’s obligations under an EA are less
than under an Environmental Impact Study (“EIS”).
Native Ecosystems, 428 F.3d at 1246.
BMBP argues that the Service violated NEPA by
failing to meaningfully consider an adequate range of
alternatives in its EA. To BMBP, this failure is shown
by the fact that the Service framed the Plan
amendments and LRR elimination as project “needs,”
thereby spurning other choices that did not involve a
Plan amendment or which would not entirely curb LRR
in all areas. Pl.’s Mot. for Summ. J. [ECF 66] at 21.
67a
Additionally, BMBP argues that the Forest Service
should have considered an alternative that limited the
logging to within 150 feet of the road. Id. at 23.
However, the Service did consider four alternatives,
including the proposed action, and discussed them in
detail. Defs.’ Mot. for Summ. J. [ECF 67] at 33. It also
considered six others but did not discuss them in detail.
Id. No alternative was rejected based on whether or not
the alternative required plan amendments. Id. One
alternative, alternative three, did in fact limit logging to
within 150’ of the road; the Forest Service considered,
but did not ultimately adopt, this alternative. Id.
In short, the Service did what it was required to do
in its analysis of the alternatives.
Its briefing
thoroughly explains why, among the options, the Service
made the choice it did. See, e.g., Defs.’ Mot. for Summ. J.
[ECF 67] at 34. That the Service chose the alternative
BMBP disliked is not actionable. I find the Walton Lake
EA adequate and the Service’s consideration of
alternatives reasonable.
I therefore GRANT the
Service’s motion and DENY BMBP’s motion on Claim 1,
Count 3.
III. Claim 1, Count 4
BMBP next alleges that the Forest Service’s ongoing
contract with T2 violates NEPA as an irretrievable
commitment. The parties dispute both the applicable
standard and its application to the facts of this case.
A. Applicable Standard
The Parties dispute what the applicable standard is
for considering this claim. BMBP argues that an
agency’s action violates NEPA when it takes any pre-
68a
NEPA action that commits resources in a way that
“prejudice[s] [the] selection of alternatives before
making a final decision,” 40 C.F.R. § 1502.2(f), or may
“limit the choice of reasonable alternatives.” Id.
§ 1506.1(a)(2). On the other hand, the Service contends
that the question to ask is whether there was an
“irreversible and irretrievable commitment of
resources.” Metcalf v. Daley, 214 F.3d 1135, 1143 (9th
Cir. 2000). After discussion at Oral Argument, Counsel
for Plaintiff submitted a Supplemental Statement of
Authority regarding this issue. Pl.’s Statement of Suppl.
Authority [ECF 81].
Metcalf’s
“irreversible
and
irretrievable
commitment of resources” standard originates from
NEPA. See 42 U.S.C. § 4332. This statute requires all
government agencies to include in “every report or
recommendation on proposals for ... major Federal
actions significantly affecting the quality of the human
environment” various assessments of the environmental
impact of that action, including a statement of “any
irreversible and irretrievable commitments of resources
which would be involved in the proposed action should it
be implemented.” Id. § 4332(C)(v). Implicit in this
requirement is the idea that resources for a project
should not be irreversibly and irretrievably committed
prior to taking the proposed action—or even assessing
the proposed action. Conner v. Burford, 848 F.2d 1441,
1446 n.13 (9th Cir. 1988).
NEPA also created the Council on Environmental
Quality (“CEQ”), which later was tasked with creating
regulations to implement NEPA. Id. §§ 4342–4347;
Andrus v. Sierra Club, 442 U.S. 347, 357 (1979). These
69a
regulations are found at 40 C.F.R. §§ 1500.1–1508.2. The
regulations’ standards for the commitment of resources
prior to an EA or an EIS are lower than what the
statutory text requires, as the regulations preclude any
“prejudicing selection of alternatives before making a
final decision” (EISs) and “limit[ing] the choice of
reasonable alternatives” (EAs and EISs).
Id.
§§ 1502.2(f), 1506.1(a)(2).
Given this area of contradiction between the statute
and the regulations—it is much easier for a commitment
to prejudice or limit alternatives than for it to be
considered irreversible and irretrievable—the Ninth
Circuit appears to have focused on the statutory
language. Usually, it is the regulations that provide
specificity, but here, the statutory text is a bit clearer
and more workable than the broader, more uncertain
regulations. As such, the Ninth Circuit has applied the
“irreversible and irretrievable” standard to both preEIS and pre-EA resource commitments. “This court has
interpreted [the NEPA] regulations as requiring
agencies to prepare NEPA documents, such as an EA or
an EIS, ‘before any irreversible and irretrievable
commitment of resources.’” Metcalf v. Daley, 214 F.3d
1135, 1143 (9th Cir. 2000). Similarly, WildWest Inst. v.
Bull, 547 F.3d 1162 (9th Cir. 2008), notes that this
standard comes not directly from the regulations, but
from the court’s “[c]onstruing” of them. Id. at 1168. In
any event, the “irreversible and irretrievable” standard
is precedent in the Ninth Circuit, and I will apply it.
Metcalf goes on to talk about the “point of
commitment” to a particular proposal and states that if
a contract amounts to a “surrender of the Government’s
70a
right to prevent activity in the area” then there was an
irretrievable and irreversible commitment of resources.
Metcalf, 214 F.3d at 1144. Alternatively, if the agency
was free to follow a schedule or alter it as conditions
warranted, there was no problematic commitment. Id.
B. Application
Here, the Forest Service entered into a contract with
a company called T2 in 2016 for a logging contract it had
tried and failed to implement at that time. Pl.’s Mot. for
Summ. J. [ECF 66] at 11. BMBP argues that this act by
the Service committed both natural resources (the old
growth trees it has contracted with T2 for T2 to log) as
well as financial resources (appropriated dollars) before
the NEPA process was complete. Id. at 12–16. In
support of its argument, BMBP cites an email from a
Forest Service Contracting officer. The officer wrote,
“[i]f the treatment prescription changes drastically or
wood product value continues to decline[,] that contract
awarded years ago will be terminated without
performance[,] and we will lose those appropriated
dollars and likely not have the funds to compete and
complete a new project.” Id. at 14–15 (citing AR 7897).
The Service responds by saying that the contract did
not in any way bind or commit the Forest Service. Defs.’
Mot. for Summ. J. [ECF 67] at 27, 29. As such, the
Service argues the contract did not prejudice or limit the
Forest Service’s alternatives during the NEPA process;
any other contentions are “conjecture.” Id. at 29. To
support its argument that no resources were
irreversibly or irretrievably committed, the Service
points to the fact that the Service could sign a new
contract and terminate the existing contract, and the
71a
amount paid to T2 was a relatively modest sum. Id. at
28–29.
Furthermore, according to the Service,
unappropriated funds are not a natural resource and
therefore not subject to the “irreversible and
irretrievable” standard. Id. at 29 n.13. At bottom,
BMBP’s claim rests on single, speculative email about
annual appropriations, and it is uncertain if the email
was ever seen by the Forest Supervisor or informed any
decision-making whatsoever. Defs.’ Reply in Supp.
[ECF 72] at 16; Defs.’ Resp. to Sur-Reply [ECF 79] at 2.
One email describing one contract does not transform
that contract into an irreversible and irretrievable
commitment. The Government did not surrender its
rights; as the Service points out, it was free to sign a new
contract or terminate the existing one as conditions
warranted. The government maintained control over
activity in the area at issue. I therefore GRANT the
Service’s motion and DENY BMBP’s motion as to Claim
1, Count 4.
IV. Claim 1, Count 5 & Claim 2, Count 2
Under NEPA, agencies are required to prepare an
EIS for all “major federal actions significantly affecting
the quality of the human environment.” 42 U.S.C.
§ 4332(C). The burden is on the agency to demonstrate
why an action is not significant and no EIS is required.
Metcalf, 214 F.3d at 1142. Plaintiff’s next argument is
that the Service did not carry this burden of showing the
project to be insignificant; according to Plaintiff, the
FONSI in the DN inadequately describes why the
project should be considered insignificant. Mot. for
Summ. J. [ECF 66] at 26. Therefore, Plaintiff contends,
72a
the project is significant under NEPA, and an EIS is
required. Id.
The significance of an action is determined by looking
at its (i) context and (ii) intensity. Natl’ Parks &
Conserv. Ass’n v. Babbit, 241 F.3d 722, 730 (9th Cir.
2001). I address these two factors in turn.
A. Context
Determining the relevant context boils down to two
dispositive issues. First, I must consider the proper
roles of the EA and the FONSI. Second, I must ensure
the Service looked at the project’s environmental
impacts at the level required by regulation.
BMBP’s argument as to the first issue is that the text
of the FONSI does not consider the project’s impacts
within the local context of the Walton Lake Recreation
Area. Pl.’s Mot. for Summ. J. [ECF 66] at 26. The
Service’s response is that the EA, which the FONSI
explicitly relies upon, considers the impact in several
contexts—including the locality, as required by the
regulation—and provides a convincing statement of
re