Petition for Writ of Certiorari — Paragon Asset Company, Ltd., Petitioner v. American Steamship Owners Mutual Protection and Indemnity Association, Inc.

Supreme Court briefAug 27, 2024

Ask Donna

What actually matters in this document.

Text

No. 24IN THE

Supreme Court of the United States

PARAGON ASSET COMPANY, LTD.,

Petitioner,

v.

AMERICAN STEAMSHIP OWNERS MUTUAL

PROTECTION AND INDEMNITY ASSOCIATION,

INCORPORATED

Respondents.

ON PETITION FOR A WRIT OF CERTIORARI TO THE UNITED

STATES COURT OF A PPEALS FOR THE FIFTH CIRCUIT

PETITION FOR A WRIT OF CERTIORARI

JOHN A. SCIALDONE

Counsel of Record

SCIALDONE LAW FIRM, PLLC

1319 24th Avenue

Gulfport, MS 39501

(228) 822-9340

MVFLDOGRQH#VOÀUPXVFRP

Counsel for Petitioner

332049

A

(800) 274-3321 • (800) 359-6859

i

QUESTIONS PRESENTED

The questions presented are:

1. Whether, under federal maritime law, the

unambiguous terms of a written maritime

contract cannot be altered by parol

evidence, as this Court has held, or can be

contradicted and nullified by parol evidence

where one party later claims certain terms

were ‘intended for its benefit’, as the Fifth

Circuit has now held.

2. Whether, under federal maritime law, a

shipowner facing a force majeure event has

a duty to exercise ordinary reasonable care,

as this Court has held, where hindsight

analysis cannot be used to determine the

reasonableness of the shipowner’s actions,

as held in the Eleventh Circuit and other

federal courts, or if this duty requires a

shipowner to act upon predictions only

verifiable through hindsight knowledge, a

new standard imposed by the Fifth Circuit.

ii

PARTIES TO THE PROCEEDING

Petitioners in this Court are Paragon Asset

Company, Limited; Paragon International Finance

Company; Paragon Offshore Drilling, L.L.C.; and

Paragon Offshore Limited. Respondents in this Court

are American Steamship Owners Mutual Protection

and Indemnity Association, Incorporated; and Signet

Maritime Corporation.

RULE 29.6 STATEMENT

Paragon Asset Company, Ltd. is not a

corporation, and is a wholly owned subsidiary of Borr

Drilling Limited (NYSE & OSE ticker “BORR”), a

public limited liability company.

Paragon Asset Company Ltd.’s affiliate

companies, Paragon Offshore Limited, Paragon

Offshore Drilling, LLC, and Paragon International

Finance Co., are also wholly owned subsidiaries of

Borr Drilling Limited.

RELATED CASES

Related cases to this proceeding are:

-

Paragon Asset Company Ltd, as Owner of

the Drillship DPDS1 v. Gulf Copper &

Manufacturing Corporation, et al., No.

1:17-cv-203, U.S. District Court for the

Southern District of Texas, Brownsville

division. Judgment entered March 9,

iii

2023.

-

Signet Maritime Corporation, as Owner of

the Tug SIGNET ENTERPRISE, its

engines, tackle, etc., in a cause of

exoneration from or limitation of liability,

No. 1:17-cv-247, U.S. District Court for

the

Southern

District

of

Texas,

Brownsville division. Judgment entered

March 9, 2023.

-

Signet Maritime Corporation, as Owner of

the Tug SIGNET ARCTURUS, its

Engines, Tackle, Etc., in a Cause of

Exoneration from or Limitation of

Liability, No. 1:18-cv-035, U.S. District

Court for the Southern District of Texas,

Brownsville division. Judgment entered

March 9, 2023.

-

Paragon Asset Company, Limited, as

Owner of the Drillship DPDS1 v.

American Steamship Owners Mutual

Protection and Indemnity Association,

Incorporated, No. 23-40209, U.S. Court of

Appeals for the Fifth Circuit. Judgment

entered April 24, 2024.

iv

TABLE OF CONTENTS

Page

QUESTION PRESENTED ......................................... i

PARTIES TO THE PROCEEDING ........................... ii

RULE 29.6 STATEMENT.......................................... ii

RELATED CASES ..................................................... ii

TABLE OF CONTENTS ........................................... iv

TABLE OF AUTHORITIES ................................... vii

PETITION FOR WRIT OF CERTIORARI .................1

OPINIONS BELOW ....................................................1

JURISDICTION ..........................................................1

CONSTITUTIONAL AND STATUTORY

PROVISIONS INVOLVED .........................................2

STATEMENT OF THE CASE ....................................3

A. Legal Background ..................................................6

B. Factual Background ..............................................8

C. Proceedings Below ...............................................11

REASONS FOR GRANTING THE PETITION .......15

I. Under federal maritime law, parol evidence

v

cannot modify the written terms of a

maritime contract ...........................................15

A. The principles of general maritime

law governing interpretation and

enforcement of maritime contracts

are well-established ..................................16

B. The Fifth Circuit’s decision conflicts

with this Court’s precedent ......................20

C. The Fifth Circuit’s decision relied

on state law in contravention of

federal principles governing maritime

contracts, disrupting the uniformity

of general maritime law ............................25

D. The Fifth Circuit’s decision will

disrupt maritime commerce by

destabilizing maritime contracts ..............28

II. Under federal maritime law, a shipowner

facing a force majeure event is held to a

standard of ordinary reasonable care .................31

A. The principles of general maritime

law articulating the defenses governing

collisions and allisions are wellestablished by this Court and welldeveloped by the circuit courts .................32

B. The Fifth Circuit’s decision conflicts

vi

with this Court’s precedent governing

reasonable care and disregards wellestablished principles governing the

force majeure defense, creating a

split amongst the circuits .........................37

C. The Fifth Circuit’s decision creates

a circuit split and will disrupt both

the uniformity of general maritime law

and stability of maritime commerce .........41

CONCLUSION ..........................................................43

APPENDIX A - Opinion of the United States

Court of Appeals for the Fifth Circuit,

Dated April 24, 2024 .................................................1a

APPENDIX B - Amended Order and Opinion

of the United States District Court for the

Southern District of Texas, Brownsville

Division, Dated August 17, 2022 ............................29a

APPENDIX C - Final Judgment of the United

States District Court for the Southern District

of Texas, Brownsville Division,

Dated March 9, 2023 .............................................154a

APPENDIX D - Order Denying Petition for

Rehearing by the United States Court of

Appeals for the Fifth Circuit,

Dated May 29, 2024 ..............................................158a

vii

TABLE OF AUTHORITIES

CASES

Page

Am. Dredging Co. v. Miller,

510 U.S. 443 (1994) .....................................................7

Am. Marine Tech, Inc. v. World Grp. Yachting,

Inc., 2021 WL 4785888 (11th Cir. Oct. 14, 2021) .....19

Am. Roll-On Roll-Off Carrier, LLC v. P&O Ports

Baltimore, Inc., 479 F.3d 288 (4th Cir. 2007) ..........18

Atlanta-Schiffahrts v. United States,

299 F. Supp. 781 (E.D. La. 1969)..............................36

Capozziello v. Brasileiro,

443 F.2d 1155 (2d Cir. 1971) ....................................18

CITGO Asphalt Ref. Co. v. Frescati Shipping

Co., Ltd., 589 U.S. 348 (2020) ..... 17, 18, 19, 20, 24, 25

Corbitt v. Diamond M. Drilling Co.,

654 F.2d 329 (5th Cir. 1981) ...............................17, 19

Davis v. Valsamis, Inc.,

752 Fed. App’x. 688 (11th Cir. 2018) ........................17

Day v. Am. Seafoods Co. LLC,

557 F.3d 1056 (9th Cir. 2009) ...................................19

Exxon Co., U.S.A. v. Sofec, Inc.,

517 U.S. 830 (1996) ...................................................33

viii

Fischer v. S/Y Neraida,

508 F.3d 586 (11th Cir. 2007) ........... 32, 33, 34, 35, 41

Flores v. Am. Seafoods Co.,

335 F.3d 904 (9th Cir. 2003) ...............................17, 19

Fontenot v. Mesa Petroleum Co.,

791 F.2d 1207 (5th Cir. 1986) ...................................17

Foster Wheeler Energy Corp. v. An Ning Jiang

MV, 383 F.3d 349 (5th Cir. 2004) .............................18

Garrett v. Moore-McCormack Co.,

317 U.S. 239 (1942) .....................................................7

Garza v. Marine Transp. Lines, Inc.,

861 F.2d 23 (2d Cir. 1988) ........................................19

Great Lakes Ins. SE v. Raiders Retreat Realty

Co., LLC, 601 U.S. 65 (2024) ............................7, 8, 25

Hardy v. Gulf Oil Corp.,

949 F.2d 826 (5th Cir. 1992) .....................................29

In re Complaint of Bankers Trust Co.,

651 F.2d 160 (3d Cir. 1981) ......................................37

In re Marine Leasing Servs., Inc.,

328 F. Supp. 589 (E.D. La. 1971), aff’d,

471 F.2d 255 (5th Cir. 1973) .....................................26

In re United States,

425 F.2d 991 (5th Cir. 1970) ................... 33, 34, 35, 37

ix

Instone Travel Tech Marine & Offshore v. Int’l.

Shipping Partners, Inc., 334 F.3d 423

(5th Cir. 2003) ...........................................................27

Internaves de Mexico s.a. de C.V. v. Andromeda

S.S. Corp., 898 F.3d 1087 (11th Cir. 2018) ..............18

Johnson v. Structured Asset Servs., LLC,

148 S.W.3d 711 (Tex. App. 2004) ........................26, 27

Kossick v. United Fruit Co.,

365 U.S. 731 (1961) ...............................................7, 19

Ladner v. Bender Welding & Mach. Co.,

336 F. Supp. 1264 (S.D. Miss. 1971) ........................36

Lord & Taylor LLC v. Zim Integrated Shipping

Servs., Ltd., 108 F. Supp. 3d 197 (S.D.N.Y. 2015) ...35

Mamiye Bros. v. Barber S.S. Lines, Inc.,

241 F. Supp. 99, 108 (S.D.N.Y. 1965), aff’d,

360 F.2d 774 (2d Cir. 1966) ......................................34

Norfolk S. Ry. Co. v. Kirby,

543 U.S. 14 (2004) ....................................... 7, 8, 16, 25

Pope & Talbot, Inc. v. Hawn,

346 U.S. 406 (1953) ...................................................17

Progressive Rail Inc. v. CSX Transp., Inc.,

981 F.3d 529 (6th Cir. 2020) .....................................19

x

Puerto Rico Fast Ferries LLC v. SeaTran Marine,

LLC, 102 F.4th 538 (1st Cir. 2024)...........................19

S. Pacific Co. v. Jensen,

244 U.S. 205 (1917) ......................................... 7, 16, 28

Simmons v. Berglin,

401 Fed. App’x 903 (5th Cir. 2010) ...........................35

Stolt Achievement v. Dredge B.E. Lindholm,

447 F.3d 360 (5th Cir. 2006) .....................................33

Swenson v. The Argonaut,

204 F.2d 636 (3d Cir. 1953) ......................................34

Texas A&M Research Found. v. Magna Transp.,

Inc., 338 F.3d 394 (5th Cir. 2003) .............................29

The Charles H. Sells,

89 F.2d 631(2d Cir. 1937) .........................................34

The Clarita,

90 U.S. (23 Wall.) 1 (1874) ........................................33

The Grace Girdler,

74 U.S. (7 Wall.) 196 (1868) .......................... 33, 35, 41

The Lottawanna,

88 U.S. (21 Wall.) 558 (1874) ......................................7

The Louisiana,

70 U.S. (3 Wall.) 164 (1865) ................................32, 33

xi

The Virginia Ehrman,

97 U.S. 309 (1877) .....................................................33

United Geophysical Co. v. Vela,

231 F.2d 816 (5th Cir. 1956) .....................................35

United States v. Lykes Bros. S.S. Co.,

511 F.2d 218 (5th Cir. 1975) .....................................35

United States v. Reliable Transfer Co.,

421 U.S. 397, 411 (1975) ...........................................32

Valley Line Co. v. Musgrove Towing Serv., Inc.,

654 F. Supp. 1009 (S.D. Tex. 1987) ..........................36

Varibus Corp. v. South Hampton Co.,

623 S.W.2d 157 (Tex. App. 1981) ..............................27

Weathersby v. Conoco Oil Co.,

752 F.2d 953 (5th Cir. 1984) .....................................17

Weyerhaeuser Co. v. Atropos Island,

777 F.2d 1344 (9th Cir. 1985) ...................................34

Yamaha Motor Corp., U.S.A. v. Calhoun,

516 U.S. 199 (1996) .....................................................7

Young v. Merrill Lynch & Co.,

658 F.3d 436 (5th Cir. 2011) .....................................20

xii

CONSTITUTION & STATUTES

U.S. Const. art. III, § 2, cl. 1 .......................................2

28 U.S.C. § 1333(1)..................................................2, 3

OTHER AUTHORITIES

1 Thomas J. Schoenbaum, Admiralty and Maritime

Law (6th ed. 2018) ............................................7, 8, 27

1

PETITION FOR WRIT OF CERTIORARI

Paragon Asset Company, Ltd. (hereinafter

“Paragon”) respectfully petitions for a writ of

certiorari to review the judgment of the United States

Court of Appeals for the Fifth Circuit in this case.

OPINIONS BELOW

The opinion of the court of appeals (App. A, pp.

1a-28a) is reported at Paragon Asset Company, Ltd. v.

American Steamship Owners Mutual Protection and

Indemnity Association, Inc., 99 F.4th 736, 738-750

(5th Cir. 2024). The court of appeals’ order denying

Paragon’s petition for rehearing en banc (App. D, pp.

158a-161a) is unreported.

The opinion of the district court (App. B, pp.

29a-153a) is reported at Paragon Asset Company Ltd.

v. Gulf Copper & Manufacturing Corp., et al., 622

F.Supp.3d 360, 371-426 (S.D. Tex. 2022).

JURISDICTION

The court of appeals issued its opinion on April

24, 2024. App. A, pp. 1a-28a. Paragon’s timely

petition for rehearing was denied on May 29, 2024.

App. D, pp. 158a-161a. This Court has jurisdiction

under 28 U.S.C.A. § 1254(1).

2

CONSTITUTIONAL AND STATUTORY

PROVISIONS INVOLVED

The judicial Power shall extend to all

cases, in Law and Equity, arising under

this Constitution, the laws of the United

States, and Treaties made, or which

shall be made, under their authority;—

to all Cases affecting Ambassadors,

other public Ministers and Consuls;—to

all cases of admiralty and maritime

jurisdiction; to Controversies to which

the United States shall be a Party;—to

Controversies between two or more

States; between a State and Citizens of

another State, between Citizens of

different States,—between Citizens of

the same State claiming Lands under

Grants of different States, and between

a State, or the Citizens thereof, and

foreign States, Citizens or Subjects.

U.S. Const. art. III, § 2, cl. 1 (emphasis added).

The district courts shall have original

jurisdiction, exclusive of the courts of the

States, of:

(1) Any civil case of admiralty or

maritime jurisdiction, saving to

suitors in all cases all other remedies to

which they are otherwise entitled.

3

(2) Any prize brought into the United

States and all proceedings for the

condemnation of property taken as prize.

28 U.S.C. § 1333(1) (emphasis added).

STATEMENT OF THE CASE

The Fifth Circuit’s decision doubly threatens

the stability of maritime commerce. Paragon Asset

Co., Ltd. v. Am. S.S. Owners Mut. Prot. & Indem.

Ass’n, Inc., 99 F.4th 736, 738-750 (5th Cir. Apr. 24,

2024) (App. A).

First, contrary to this Court’s longstanding

precedents governing the interpretation of maritime

contracts, the Fifth Circuit sanctioned the use of parol

evidence to contradict and subvert the plain,

unambiguous terms of a written maritime contract.

A drafter may now selectively insert subjective

intent to unilaterally nullify a contract’s express

written terms to escape its application, to grant itself

“rights” found nowhere in its written terms, and to

retroactively sanction its own actions otherwise

prohibited by the contract’s written terms.

The Fifth Circuit’s judgment permits a party

belatedly to claim that a provision is “for its benefit”

in order to avoid said provision, even though the

contract’s written terms expressly prohibit it. And a

party may accomplish this by adducing subjective

4

parol evidence to support a meaning found nowhere

in the contract’s four corners.

Hence, the Fifth Circuit has held that federal

maritime law permits the unilateral waiver of a

written contractual provision.

The Fifth Circuit’s decision violates the

standards for maritime contract interpretation

articulated by this Court. Moreover, it provides an

unsound method of contract interpretation and

maritime policy. Undisturbed, this decision will

undermine the national uniformity of federal

maritime law and destabilize maritime commerce.

This rule will open all maritime contracts to

parol evidence and subjective intent and deny

commercial parties the ability to rely on the

negotiated plainly written terms of a contract.

In nuce, the Fifth Circuit now permits a drafter

to defeat the plain written terms of a contract via the

drafter’s subjective intent. This is opposed by law and

logic, and will render written contracts meaningless.

Second, contrary to this Court’s longstanding

precedent governing maritime negligence and the

force majeure defense, the Fifth Circuit has

transformed the duty of care owed by a shipowner

from one of ordinary reasonableness to one of

perfection.

5

To reach this result, the Fifth Circuit condoned

the district court’s use of hindsight analysis to

evaluate

the

shipowner’s

actions,

forever

compromising the viability of force majeure as a

defense in maritime cases by imposing a duty to

accurately predict and respond to future unknowable

events squarely outside of its control.

Such an analysis – originally decried by the

Fifth Circuit itself almost 70 years ago – remains

verboten in the other Circuit courts.

But the Fifth Circuit has now held “prudent

shipowners foresee” unforeseeable situations, and

make plans which assume any possible “sudden

changes in circumstances.”

It is impossible to reconcile the Fifth Circuit’s

holding with this Court’s 150-year-old standard of

ordinary reasonable care.

Furthermore, the Fifth Circuit’s requirement

to “foresee” any and all potential events by thirdparty vessels, port authorities, the United States, or

the weather – over which it has no control –effectively

eliminates seventy years of consistency among the

Circuit courts prohibiting hindsight analysis in

determining whether a shipowner acted reasonably in

responding to a force majeure threat.

The Fifth Circuit’s sanction of hindsight is not

only unreasonable, but dangerous. It creates a rule

where, to be considered ‘ordinarily reasonable,’

6

shipowners must execute an evacuation from port if

its location falls within a potential “cone of

uncertainty.” In this case, that encompassed a 600

mile stretch of coastline spanning two countries – the

majority of which was ultimately unaffected by the

storm. The Fifth Circuit’s standard will result in

mass evacuations, chaos, unnecessary loss of life and

property as vessels depart port into unknown

conditions as to the actual path of the storm.

And it creates a circuit split in a literal sense –

dividing the Gulf of Mexico in half – separating ports

in Texas, Louisiana, and Mississippi from the rest of

the United States.

In short, it requires sheer luck, essentially

foreclosing the force majeure defense for any

overwhelmed vessel – no matter her efforts – and is

akin to strict liability for the shipowner.

This case presents the ideal vehicle to resolve

the newly created conflict among the circuits and

articulate a uniform standard applying to the force

majeure defense.

A. Legal Background

This case presents an important issue of

federal maritime law that warrants this Court’s

review, particularly in light of this Court’s vital role

in shaping rules of admiralty and safeguarding

maritime commerce.

7

Article III, Section 2, Clause 1 of the United

States Constitution extends the federal judicial power

to “all Cases of admiralty and maritime

Jurisdiction.”1

This grant of power - “the only instance where

the Constitution delegates jurisdiction over an entire

subject matter to the federal judiciary”2 “contemplates a system of maritime law coextensive

with, and operating uniformly in, the whole country.”3

Thus, “[t]he policy reason for this important

and unique doctrine is the need for uniformity, which

is an overriding value in admiralty law,”4 and “[t]he

Seizing upon this grant of authority, Congress enacted the

Judiciary Act of 1789, which vested the district courts of the

United States “exclusive original cognizance of all civil causes of

admiralty and maritime jurisdiction ....” 1 Thomas J.

Schoenbaum, Admiralty and Maritime Law § 3:1 (6th ed. 2018)

(citations omitted). This congressional grant of judicial power

has been carried through to today’s 28 U.S.C. § 1333.

2 Schoenbaum, supra § 3:1 (emphasis added).

3 Great Lakes Ins. SE v. Raiders Retreat Realty Co., LLC, 601

U.S. 65, 69 (2024) (citation and internal quotation marks

omitted). This principle has been consistently reinforced and

upheld by this Court. See, e.g., The Lottawanna, 88 U.S. (21

Wall.) 558 (1874); S. Pacific Co. v. Jensen, 244 U.S. 205 (1917);

Garrett v. Moore-McCormack Co., 317 U.S. 239 (1942); Kossick

v. United Fruit Co., 365 U.S. 731 (1961); Am. Dredging Co. v.

Miller, 510 U.S. 443, 451 (1994); Yamaha Motor Corp., U.S.A. v.

Calhoun, 516 U.S. 199 (1996); Norfolk S. Ry. Co. v. James N.

Kirby, Pty Ltd., 543 U.S. 14 (2004); Great Lakes, 601 U.S. 65.

4 Schoenbaum, supra § 4:1 (emphasis original).

1

8

purposes of that uniform system include promoting

‘the great interests of navigation and commerce ....’”5

Indeed, “[f]rom earliest times, maritime law

[has been] shaped by the practical needs of those

engaged in maritime commerce.”6 And as this Court

has instructed, “[t]he ‘fundamental interest giving

rise to maritime jurisdiction is “the protection of

maritime commerce.’”7

B. Factual Background

This case involves claims for damages arising

after the breakaway of an unmanned and unpowered

drillship (the “DPDS1”) during the landfall of Hurricane

Harvey on Friday, August 25, 2017.

Prior to and during Hurricane Harvey’s landfall,

DPDS1, owned by Paragon, was cold-stacked and

moored at a dock in Port Aransas, Texas.

On Monday, August 21, Paragon put Signet (a

local harbor tug company) on notice that it might need

tow-out services for DPDS1, depending upon the

then-unnamed storm’s development, which Paragon

was monitoring.

5 Great Lakes, 601 U.S. at 69 (quoting 3 J. Story, Commentaries

on the Constitution of the United States § 1666 (1st ed. 1833)).

6 Schoenbaum, supra § 1:1.

7 Norfolk S. Ry., 543 U.S. at 15, 25 (citations omitted, emphasis

original).

9

The morning of Wednesday, August 23,

although no official advisories had been issued at the

time, Paragon informed Signet that DPDS1 would be

towed out to open sea to evade the hurricane. The

parties began contract negotiations under a master

charter agreement, and port authorities scheduled

DPDS1 as first in line to be towed out of port the

morning of Thursday, August 24.

Port authorities had scheduled two warmstacked, manned vessels to be towed out on

Wednesday, prior to DPDS1’s Thursday departure.

After the first of those vessels suffered mechanical

breakdowns and delays, the port authorities moved

the second vessel’s tow-out to take place during the

first slot on Thursday, bumping DPDS1’s departure

to the second slot.

The morning of Thursday, August 24, that

second vessel (which now occupied DPDS1’s former

slot) began its tow-out. DPDS1, next in line, was

ready and waiting only for Signet’s tugs to come

retrieve her. But just before DPDS1’s departure - in

response to the rapid intensification of the storm

overnight - port authorities abruptly closed the port

to facilitate the evacuation of military vessels and

cancelled all remaining tow-outs - including DPDS1’s,

forcing the vessel to remain in port.

Only after the tow-out’s cancellation was

Harvey first officially forecast to make landfall as a

“major” hurricane. And only three-and-a-half hours

after the port’s closure, the Coast Guard ordered all

10

personnel remaining at the dock to evacuate. During

that window, Paragon fortified DPDS1’s moorings,

had a marine surveyor inspect the lines, and enlisted

tugs to support the lines during the storm.

Concerned whether DPDS1’s moorings could

withstand the now-major hurricane (which Paragon

reasonably believed could withstand low-category one

conditions), Paragon and Signet (the tug company

originally hired to tow DPDS1 out, and the only tug

company in operation at the time) agreed that Signet

would provide two harbor tugs, ARCTURUS and

ENTERPRISE, to remain alongside DPDS1 during

the storm. The tugs would apply motive power to help

keep the vessel moored during the storm and attempt

to control DPDS1 if she broke free.

After the port’s closure, Signet and Paragon

briefly discussed these tug services over the phone,

including the rate and nature of the services. Later

that afternoon, in the midst of a mandatory civilian

evacuation, Signet’s in-house counsel emailed

Signet’s Ingleside Tariff to Paragon’s in-house

counsel, merely stating the attached document would

govern the services. Paragon acknowledged the email.

The morning of Friday, August 25, Signet’s

tugs secured themselves to DPDS1. For at least ten

hours, DPDS1’s moorings withstood progressively

strengthening tropical storm and hurricane-force

winds as Hurricane Harvey advanced towards the

Texas coast. Two hours after the Category-4 eyewall

began to pass over Port Aransas, the winds started

11

pushing DPDS1 away from the dock. This

overwhelmed the moorings and, around 11:00 p.m., at

the height of the storm, DPDS1 broke free.

Signet’s tugs, unable to control DPDS1’s

movement in near-100 mph winds, were pushed into

two nearby drilling rigs, their towlines snapping.

ENTERPRISE sank and ARCTURUS was damaged,

but no crew were injured.

DPDS1, now free-floating in the midst of the

hurricane, was driven into the ship channel, and

eventually grounded near the bank.

The next morning, Paragon retained Signet to

provide a tug to monitor the grounded vessel until she

could be salvaged. This arrangement continued until

the evening of August 28, when DPDS1 refloated and

began drifting, eventually alliding with a nearby

university research pier. Afterwards, Signet’s tug

pinned DPDS1 to the shore. Signet subsequently

provided additional tugs to hold DPDS1 to the shore

until the drillship could be towed to another dock to

be scrapped.

C. Proceedings Below

Three Complaints in Limitation ensued, filed

by Paragon (as owner of DPDS1) and Signet (as owner

of ARCTURUS and ENTERPRISE). Both parties filed

counterclaims, and Paragon made claims against

Signet’s insurer (“American Club”).

12

The owners of the dock, the two adjacent

drilling rigs, and the research pier filed claims for

property damages, respectively. Paragon and Signet

each independently settled all of these claims prior to

trial.

In July and August of 2021, the district court

held a five-day bench trial on the claims remaining

between Paragon, Signet, and American Club.

On August 17, 2022, the district court filed an

amended order and opinion (App. B, p.p. 29a-153a) in

which it ruled that Paragon was solely responsible for

the August 25, 2017 breakaway of DPDS1 and liable

for all damages resulting from the immediate

aftermath of that event. The district court also ruled

that Paragon and Signet were equally liable for

damages resulting from the refloating and allision.

The district court rejected Paragon’s force

majeure defense, holding Paragon acted unreasonably

by failing to issue an evacuation order on Monday,

August 21 and by relying on inaccurate engineering

reports regarding its mooring system. The district

court reasoned that, as of Monday afternoon, Paragon

should have anticipated the future breakdowns,

delays, and evacuations of other vessels and the port’s

eventual closure on Thursday (the combination of

which resulted in the cancellation of DPDS1’s tow), as

well as the storm’s future rapid intensification into a

on Thursday, which overwhelmed DPDS1’s moorings.

13

The district court did not evaluate Signet’s

conduct under towage law, holding that, because

Signet did not undertake to transport DPDS1,

Signet’s duties under towage law were inapplicable.

Ascribing no duty to Signet under these

circumstances, the district court did not engage in an

analysis under comparative fault. It reasoned that

Paragon was the only party who had any duty.

The district court accepted Signet’s parol

evidence and ignored the Tariff’s written terms to

find Signet unilaterally waived certain provisions for

its benefit, despite the Tariff’s written terms to the

contrary. Partially invoking Texas law despite the

Tariff’s governance by general maritime law, the

district court held that, because Signet impliedly

waived the Tariff’s written provisions prohibiting its

application to a deadship or during heightened port

conditions, the Tariff governed the parties’

relationship. As a direct result, Signet was able to

seek (and was subsequently awarded) both indemnity

for its separate, pretrial settlement agreement and

attorney’s fees from Paragon.

On April 24, 2024, the Fifth Circuit affirmed

the district court’s opinion in its entirety. (App. A, p.p.

1a-28a).

The Fifth Circuit rejected Paragon’s argument

that, under general maritime law, the Tariff should

be construed according to its written terms, which

prohibited its application, and Signet should not be

permitted to alter the plain meaning of those terms

14

after-the-fact via parol evidence. Against wellestablished principles of maritime contract

interpretation, the Fifth Circuit held that the Tariff’s

language “explicitly excluding ‘assistance to a

deadship’ or services during ‘heightened Coast Guard

port conditions’ was for the benefit of Signet and could

be waived unilaterally under federal maritime and

Texas law.”

The Fifth Circuit rejected Paragon’s argument

that, under general maritime law, a shipowner

responding to a force majeure event is held to a

standard of ordinary reasonable care, not a standard

of perfection, and that its decisions should not be

examined under facts knowable only through

hindsight. Against well-established principles of

general maritime law governing the force majeure

defense, the Fifth Circuit held Paragon “failed to show

that it ‘took reasonable precautions under the

circumstances as known or reasonably to be

anticipated’”,

endorsing

the

district

court’s

conclusions that “a prudent shipmaster would [not

merely] anticipate” future mechanical failures of

other vessels, future delays of other vessels, future

evacuations of Naval vessels, future rapid

intensification of the storm, and future closure of the

port less than 24-hours before landfall, but also

“anticipate” and accurately respond to these events

almost four days before any of them even began to

transpire.

The Fifth Circuit rejected Paragon’s argument

that, under general maritime law, Signet, as a tug

15

company providing tug services, should be judged

according to its obligations under towage law.

Instead, the Fifth Circuit created a “voyage” test,

holding that tugs providing tug services to a vessel,

but not literal transportation from ‘point A’ to ‘point

B’, are not bound by the traditional duties of a tug

under general maritime law, including a tug’s

responsibility to protect itself. Declining to articulate

any duty owed by a tug under these circumstances,

the Fifth Circuit affirmed the district court’s

allocation of total liability to Paragon for damages to

Signet’s tugs during the breakaway, the very risk

Signet was hired to face.

The court of appeals subsequently denied

rehearing en banc. (App. D, p.p. 158a-161a).

REASONS FOR GRANTING THE PETITION

I.

Under federal maritime law, parol

evidence cannot modify the written

terms of a maritime contract.

The Fifth Circuit’s departure from principles

federal general maritime law governing the

enforcement and interpretation of maritime contracts

warrants this Court’s review. See Sup. Ct. R. 10(a),

10(c).

The Fifth Circuit has created a new rule of

maritime contract interpretation which conflicts with

the precedent established by this Court and other

circuit courts.

16

The effects of this departure will be felt beyond

this case and will be detrimental to maritime

commerce, and it is vital that this Court grant review

to ensure the consistent application and continued

uniformity of the federal general maritime law.

A.

The principles of general maritime

law governing interpretation and

enforcement of maritime contracts

are well-established.

The principles of general maritime law

governing the interpretation of maritime contracts

are well-established. The tenets articulated by this

Court have been consistently followed the courts of

appeal, including the Fifth Circuit – until this case.

First, federal common law controls the

interpretation of a maritime contract. See, e.g.,

Norfolk S. Ry. Co., 543 U.S. at 22-23 (“When a

contract is a maritime one ... federal law controls [its]

interpretation.”) (citation omitted); Har–Win, Inc. v.

Consol. Grain & Barge Co., 794 F.2d 985, 987 (5th

Cir. 1986).

Second, state law principles may only be

applied insofar as they do not contravene general

maritime law or disrupt the uniformity of maritime

law. See, e.g., Jensen, 244 U.S. at 216 (prohibiting

application of state law which “works material

prejudice to the characteristic features of the general

maritime law or interferes with the proper harmony

17

and uniformity of that law”); Pope & Talbot, Inc. v.

Hawn, 346 U.S. 406 (1953).

Third, a maritime contract must be construed

by its terms and consistent with the intent of the

parties. See, e.g., CITGO Asphalt Ref. Co. v. Frescati

Shipping Co, Ltd., 589 U.S. 348, 355 (2020)

(“Maritime contracts must be construed like any other

contracts: by their terms and consistent with the

intent of the parties.”) (citation and internal

quotation marks omitted); Fontenot v. Mesa

Petroleum Co., 791 F.2d 1207, 1214 (5th Cir. 1986) (a

“contract should be read as whole, and a court should

not look beyond the written language ... to determine

the intent of the parties”) (citing Weathersby v. Conoco

Oil Co., 752 F.2d 953, 955 (5th Cir. 1984); Corbitt v.

Diamond M. Drilling Co., 654 F.2d 329, 332-33 (5th

Cir. 1981)).

Fourth, a maritime contract should be read in

toto, and its clear, unambiguous terms should be

given their plain meaning. See, e.g., CITGO, 589 U.S.

at 355 (“Where the words of a contract in writing are

clear and unambiguous, its meaning is to be

ascertained in accordance with its plainly expressed

intent.”) (citation and internal quotation marks

omitted); Weathersby, 752 F.2d at 955 (“A maritime

contract ... should be read as a whole and its words

given their plain meaning”) (citation and internal

quotation marks omitted); Starrag v. Maersk, Inc.,

486 F.3d 607, 616 (9th Cir. 2007); Flores v. Am.

Seafoods Co., 335 F.3d 904, 910 (9th Cir. 2003); Davis

18

v. Valsamis, Inc., 752 Fed. App’x. 688, 692 (11th Cir.

2018).

Fifth, a maritime contract should be

interpreted so that all its terms are consistent with

each other, and no terms are rendered meaningless or

superfluous. See, e.g., CITGO, 589 U.S. at 361-62

(“Perhaps the dissent says it best: We must ‘reject

[this] interpretation that ... se[ts] up ... two clauses in

conflict with one another.’”) (citation and internal

quotation marks omitted, alterations in original);

Capozziello v. Brasileiro, 443 F.2d 1155 (2d Cir. 1971)

(“an interpretation [which] would not only create an

internal redundancy in the clause but [ ] also render

the clause meaningless .... should be avoided”)

(citations omitted); Am. Roll-On Roll-Off Carrier,

LLC v. P&O Ports Baltimore, Inc., 479 F.3d 288, 293

(4th Cir. 2007) (“maritime contracts, like other

contracts, should be interpreted as so to give effect to

each provision of the contract”) (citation omitted);

Foster Wheeler Energy Corp. v. An Ning Jiang MV,

383 F.3d 349, 354 (5th Cir. 2004) (“[f]ederal courts

sitting in admiralty adhere to the axiom that ‘a

contract should be interpreted so as to give meaning

to all of its terms—presuming that every provision

was intended to accomplish some purpose, and that

none are deemed superfluous’”) (citation and internal

quotation marks omitted; Internaves de Mexico s.a. de

C.V. v. Andromeda S.S. Corp., 898 F.3d 1087 (11th

Cir. 2018).

Sixth, where a maritime contract’s terms are

unambiguous, they cannot be varied by extrinsic

19

evidence, and the parties’ intent is determined from

the face of the agreement. See, e.g., CITGO, 589 U.S.

at 355; Puerto Rico Fast Ferries LLC v. SeaTran

Marine, LLC, 102 F.4th 538, 546 (1st Cir. 2024);

Garza v. Marine Transp. Lines, Inc., 861 F.2d 23, 2637 (2d Cir. 1988) (“The purpose and essence of the

[parol evidence] rule is to avoid the possibility that

fraud might be perpetrated if testimony as to

subjective intent could be substituted for the plain

meaning of a contract. In the absence of ambiguity,

the effect of admitting extrinsic evidence would be to

allow one party to substitute his view of his

obligations for those clearly stated; Corbitt, 654 F.2d

at 332-33; Progressive Rail Inc. v. CSX Transp., Inc.,

981 F.3d 529 (6th Cir. 2020); Day v. Am. Seafoods Co.

LLC, 557 F.3d 1056, 1058 (9th Cir. 2009); Flores, 335

F.3d at 910.

Seventh, an oral maritime contract is valid if

there is a meeting of the minds on all essential terms

and obligations of the agreement. See, e.g.,

Kossick, 365 U.S. at 734 (“oral contracts are generally

regarded as valid by maritime law”); Fuesting v.

Lafayette Parish Bayou Vermilion Dist., 470 F.3d 576,

580 (5th Cir. 2006); Am. Marine Tech, Inc. v. World

Grp. Yachting, Inc., 2021 WL 4785888, at *3 (11th

Cir. Oct. 14, 2021).

In a non-maritime context, the Fifth Circuit

has cautioned that courts “may neither rewrite, under

the guise of interpretation, a term of the contract

when the term is clear and unambiguous, nor redraft

a contract to accord with its instinct for the

20

dispensation of equity upon the facts of a given case.”

Young v. Merrill Lynch & Co., 658 F.3d 436, 448 (5th

Cir. 2011) (citation omitted); see CITGO, 589 U.S. at

364 (“Neither tort principles nor policy objectives,

however, override the ... clause’s unambiguous

meaning.”).

B.

The Fifth Circuit’s decision

conflicts with this Court’s

precedent.

Despite foundations of contract interpretation,

the Fifth Circuit held that the Tariff’s language

“explicitly excluding ‘assistance to a deadship’ or

services during ‘heightened Coast Guard port

conditions’ was for the benefit of Signet and could be

waived unilaterally under federal maritime and

Texas law.” See App. A, p.p. 19a-28a.

That holding permitted extrinsic evidence to

override the Tariff’s written terms, thereby rendering

multiple portions of the Tariff’s language

meaningless, and allowed one party’s subjective

intent to override the Tariff’s plain language.

This decision and line of reasoning directly

conflicts with this Court’s precedent and the rules

followed by the other circuit courts.

First, the Tariff’s language expressly excludes

services to a deadship or during heightened port

21

conditions.8 Nowhere does the Tariff state or indicate

that this provision is intended for Signet’s benefit.

Second, the Tariff’s language mandates that

any services to a deadship or under heightened port

conditions “... shall be governed by the terms and

conditions of a suitable contract used by Signet for

such Services.”9 On its face, the terms indicate Signet

intended for a contract other than the Tariff to apply.

As the drafter, Signet could have included a “right” to

waive this section if it so desired, but instead

expressly stated the opposite, mandating that the

Tariff would not apply. By accepting extrinsic parol

evidence, the Fifth Circuit rendered this provision

meaningless.

Third, the Tariff’s language provides that “...

Signet shall have the right at any time, upon thirty

(30) days’ advance notice to Owners, to ... adjust terms

or conditions.”10 These terms indicate Signet intended

for any amendment to be predicated by 30-days

advance notice to a shipowner. By permitting Signet

to alter the Tariff’s terms less than 24-hours prior to

the commencement of services, the Fifth Circuit

rendered this provision meaningless.

Fourth, the Tariff’s language provides that

“[a]ll notices under this Tariff shall be in writing ....”11

8 See Section 5, ROA.14301.

9 See Id. The Fifth Circuit did not discuss this portion of Section

5 in its Opinion.

10 See Section 21(a), ROA.14308.

11 See Id.

22

These terms indicate that, in addition to requiring 30days’ advance notice, any such notice adjusting the

contract’s terms must be in writing. By permitting

Signet to alter the Tariff’s terms orally and/or

impliedly, the Fifth Circuit rendered this provision

meaningless.

Fifth, the Tariff’s language provides that “[t]his

Tariff supersedes all previous contracts of whatsoever

kind or nature, and constitutes the final, entire,

complete, and integrated agreement between or

among the parties ....”12 Allowing Signet to

incorporate oral and/or implied amendments to the

Tariff, and holding that the Tariff was incorporated

into a prior oral agreement between the parties by

reference, the Fifth Circuit rendered this provision

meaningless.

Sixth, the Tariff’s language provides that “[a]s

between the parties, no oral statements or prior

written material not specifically incorporated herein

shall be of any force and effect.”13 Allowing Signet to

incorporate oral and/or implied amendments to the

Tariff, and holding that the Tariff was incorporated

into a prior oral agreement between the parties by

reference, the Fifth Circuit rendered this provision

meaningless.

See Section 21(b), ROA.14308. The Fifth Circuit did not

discuss this portion of Section 21(b) in its Opinion.

13 See Id. The Fifth Circuit did not discuss this portion of Section

21(b) in its Opinion.

12

23

Seventh, the Tariff’s language provides that

“[t]he parties specifically acknowledge that, in

agreeing to this Tariff, each is relying solely upon the

representations and agreements contained in this

Tariff and no others.”14 Allowing Signet to incorporate

oral and/or implied amendments to the Tariff, and

holding that the Tariff was incorporated into a prior

oral agreement between the parties by reference, the

Fifth Circuit rendered this provision meaningless.

Eighth, the Tariff’s language provides that

“[a]ll prior representations or agreements, whether

written or oral, not expressly incorporated herein, are

superseded.”15 By allowing Signet to incorporate oral

and/or implied amendments to the Tariff, and holding

that the Tariff was incorporated into a prior oral

agreement between the parties by reference, the Fifth

Circuit rendered this provision meaningless.

Ninth, the Tariff’s language provides that

“[t]his Tariff shall not be amended, modified, or

waived unless and until made in writing and signed

by each party hereto.”16 This provision is self-evident,

and nowhere does the Tariff state or indicate that a

provision may otherwise be orally or impliedly

altered. Yet the Fifth Circuit accepted extrinsic parol

evidence directly contradicting this provision,

substituting subjective intent for plain meaning. By

14 See Id. The Fifth Circuit did not discuss this portion of Section

21(b) in its Opinion.

15 See Id. The Fifth Circuit did not discuss this portion of Section

21(b) in its Opinion.

16 See Id.

24

allowing Signet to orally and/or implied alter the

Tariff, the Fifth Circuit rendered this provision

meaningless.

In sum, the Tariff’s terms prohibited both its

application under the instant circumstances, and any

implied waiver of its terms. It also excluded any

exception to these provisions, whether intended for

Signet’s benefit or otherwise. The Tariff’s written,

mandatory terms foreclosed any argument that

Signet had an implied “right” to impliedly waive the

terms of Section 5. Yet the Fifth Circuit held Signet

did have such a right, and permitted Signet to

circumvent the written terms via the use of parol

evidence.

Through its acceptance of extrinsic evidence,

and in disregard of this Court’s precedents and the

general maritime law, the Fifth Circuit altered the

Tariff’s unambiguous, written provisions via parol

evidence; disregarded the plain meaning of the

Tariff’s language;17 disregarded four instances of the

word “shall”;18 rendered multiple terms meaningless

17 See Green v. Biddle, 21 U.S. (8 Wheat) 1, 89-90 (1823) (“where

the words of a ... contract, have a plain and obvious meaning, all

construction, in hostility with such meaning, is excluded”).

18 As this Court has explained, use of the term “shall” in a clause,

which “usually connotes a requirement,” should “foreclose[ ] the

... permissive view” that the clause merely indicates an “elective

right”, as such interpretation would “sidestep[] the ... clause’s

plain terms.” See CITGO, 589 U.S. at 1088 n.3 (internal

quotation marks and citations omitted).

25

and superfluous; and rendered multiple provisions

contradictory.19

C.

The Fifth Circuit’s decision relied

on state law in contravention of

federal principles governing

maritime contracts, disrupting the

uniformity of general maritime

law.

This Court has long instructed that federal

common law controls the interpretation of maritime

contracts, and that state law which conflicts with

general maritime law cannot apply.20 Furthermore,

the Tariff’s provisions expressly mandated that its

interpretation “shall” be governed by the general

maritime law.21

Against this Court’s precedent and the Tariff’s

own instructions, the Fifth Circuit “borrowed” state

law which conflicted with the general maritime law,

applying it to the exclusion of established principles

of contract interpretation. Relying on state law, the

Fifth Circuit held that, under federal maritime law, a

As this Court has explained, “[w]e must ‘reject [this]

interpretation that ... se[ts] up ... two clauses in conflict with one

another.’” CITGO, 589 U.S. 348 at 361-62 (quoting Thomas, J.,

dissenting).

20 See Great Lakes, 601 U.S. at 86 (Thomas, J., concurring)

(“Litigants and courts should heed our instruction that general

maritime law applies in maritime contract disputes unless they

‘so implicate local interests as to beckon interpretation by state

law.’”) (quoting Norfolk S. Ry., 543 U.S. at 27).

21 See Section 20(a), ROA.14308.

19

26

party may unilaterally waive a contract provision

intended for its benefit.

Unclear is where the Fifth Circuit found any

maritime authority articulating, supporting, or

lending itself to such a rule.

While the Fifth Circuit did cite one federal case

in support of this supposed rule of federal maritime

law, the dicta it relied upon lends no support to its

sweeping and vague ‘waiver rule.’22 Unlike the

circumstances surrounding the Fifth Circuit’s

decision in this case, Stauffer Chemical Co. v.

Brunson concerned mutual waiver of a written term

by both parties for the mutual benefit of both parties,

and there was no mention of a written term

prohibiting such waiver. 380 F.2d 174 (5th Cir. 1967).

The only other case relied upon by the Fifth

Circuit, a Texas state court case, similarly fails to

support the existence of a unilateral waiver rule.23

Unlike the present case, the non-maritime contract

at-issue in Johnson v. Structured Asset Services, LLC

did not contain a provision prohibiting unilateral or

implied waivers. 148 S.W.3d 711 (Tex. App. 2004).

Even if this did support the Fifth Circuit’s decision,

the court’s reliance on it would be impermissible

under federal maritime law.

22 See App. A, p.p. 25a (citing Stauffer Chem. Co. v. Brunson, 380

F.2d 174 (5th Cir. 1967)).

23 See App. A, p.p. 25a (citing Johnson v. Structured Asset Servs.,

LLC, 148 S.W.3d 711 (Tex. App. 2004)).

27

Furthermore, the Fifth Circuit relied on

Johnson to the exclusion of Texas law directly

contradicting its decision and unilateral waiver rule.

For example, the contract at-issue in Varibus Corp. v.

South Hampton Co. contained a written provision

prohibiting verbal amendments. 623 S.W.2d 157 (Tex.

App. 1981). The court rejected the notion that either

party could verbally or unilaterally waive a term,

even if intended only for that party’s benefit, and held

that any such waiver “would amount to a unilateral

modification of the contract in violation of” its own

provisions. 623 S.W.2d 157, 160 (Tex. App. 1981); see

Instone Travel Tech Marine & Offshore v. Int’l.

Shipping Partners, Inc., 334 F.3d 423, 428 (5th Cir.

2003) (“Texas law requires us to peruse the complete

document to understand, harmonize, and effectuate

all its provisions.”) (citation and internal quotation

marks omitted).

Thus, the Fifth Circuit has created a new rule

that under general maritime law, the drafter of a

contract may unilaterally waive a written provision

intended for its benefit, despite the contract’s written

terms expressly prohibiting same.

Nothing in the Fifth Circuit’s decision explains

how this is or why this should be a rule of general

maritime law.24

24 See Schoenbaum, supra § 4:4 (“Although the federal judiciary

has the power to announce new principles of general maritime

law, this is done very infrequently and only when there is a

compelling need to fashion new rules.” ).

28

The Fifth Circuit’s new rule means that a

written contract’s plain, unambiguous terms may be

nullified by extrinsic parol evidence which contradicts

those terms and supplies subjective intent. This

violates established principles of maritime contract

interpretation discussed earlier, and “interferes with

the proper harmony and uniformity of” the general

maritime law.25

As the Fifth Circuit’s unilateral waiver rule

conflicts with general maritime principles of contract

interpretation, and the court of appeals applied this

rule to the exclusion of those principles, it is unclear

which rule should prevail. Courts are left to wonder

how to determine whether the unilateral waiver rule

or another rule of construction should prevail.

That a contract’s terms will be enforced as

written in one circuit, but may be altered by

subjective, extrinsic evidence in another circuit will

lead to the sort of inconsistency in federal law that

this Court typically grants certiorari to prevent.

D.

The Fifth Circuit’s decision will

disrupt maritime commerce by

destabilizing maritime contracts.

This decision will void the true enforceability of

written terms prohibiting unwritten or unilateral

amendments. This core principle – pervasively

common to maritime contracts and many other areas

25 See Jensen, 244 U.S. at 216.

29

of interstate commerce – will become obsolete if one

party can unilaterally decide to waive certain

provisions of a contract which that party subjectively

believes to be for its own benefit, and where that

modification is not communicated to the other party –

let alone reduced to writing and acknowledged by the

signature of both parties, as required by the contract’s

written terms.

Here, Signet introduced parol evidence in

circumvention of the Tariff’s express provisions

prohibiting its application. The court allowed this

parol evidence to imply a waiver of those provisions,

despite language expressly prohibiting such

amendment. Signet then asserted the remainder of its

Tariff should be strictly enforced by its written terms:

namely, those allowing it to recover indemnity and

attorney’s fees from Paragon, which were never

bargained for. The Fifth Circuit affirmed the district

court’s erroneous acceptance of this assertion, thereby

disregarding two additional principles of general

maritime law, and affording Signet remedies to which

it would not otherwise be entitled.26 Stated another

way, the court’s means to a desired result in this

specific case is no justification for undermining the

integrity of all written maritime contracts through a

sweeping new rule.

26 See Hardy v. Gulf Oil Corp., 949 F.2d 826, 834 (5th Cir. 1992)

(discussing contractual indemnity); Texas A&M Research

Found. v. Magna Transp., Inc., 338 F.3d 394, 405-06 (5th Cir.

2003) (discussing attorney’s fees).

30

Where the only evidence of a provision being for

a party’s benefit is derived from parol evidence, a

party could advance almost any provision as being

intended for its benefit, and thereby be permitted

waive or invoke same despite contrary written terms.

How are courts to determine whether a

provision is intended for a party’s benefit? If a

contract’s written terms may not be enforced as

written, how can a party ever be on notice of those

terms? If a contract contains unspoken rights and

remedies, how can there ever be a meeting of the

minds?

Perhaps of greatest concern, it will be

impossible for two parties to a written contract to

eliminate the uncertainty created by this ruling, since

even a written commitment not to amend terms

without reducing that change to a bilaterally signed

writing is unenforceable, as even that provision can

be waived by one party if that party believes the

waiver applies to a provision intended only for its

benefit.

The Fifth Circuit’s decision will undermine the

integrity of every form of maritime contract, as every

written maritime contract is now open for challenge

based on one party’s subjective belief and intent,

including marine insurance, charter parties,

indemnity clauses, contracts of affreightment, and

bills of lading. Parties will be held to terms unseen

and never bargained for, left to the mercy of the

other’s subjective intent.

31

II.

Under federal maritime law, a

shipowner facing a force majeure event

is held to a standard of ordinary

reasonable care.

The Fifth Circuit’s departure from the

established principles of federal general maritime law

governing the duty owed by a shipowner responding

to a force majeure event warrants this Court’s review.

Sup. Ct. R. 10(a), 10(c).

The Fifth Circuit has placed an impossible

burden of “reasonable” conduct on shipowners which

conflicts with this Court’s precedent and rejects

general maritime law principles followed by the other

circuit courts. By imposing a requirement to not only

accurately predict future decisions by other

shipowners, but also their potential mechanical

issues or evacuation plans; to not only accurately

predict and plan in advance for “sudden changes and

circumstances”, but also the actions of the United

States and the weather; and by imposing a

requirement that shipowners accurately act in

advance of same, the Court has functionally

eliminated a prohibition against hindsight analysis

and limited viability of the force majeure defense.

If this standard is applied in the future, these

criteria for “reasonable” conduct will defeat a force

majeure defense in every case. Reasonable conduct

does not require perfection and it certainly does not

demand omniscience.

32

The effects of the Fifth Circuit’s reasoning will

reach beyond this case and be detrimental to

maritime commerce, as it will essentially impose

strict liability upon any vessel overwhelmed by a

hurricane, effectively nullifying the force majeure

defense.

A.

The principles of general maritime

law articulating the defenses

governing collisions and allisions

are well-established by this Court

and well-developed by the circuit

courts.

An analysis of the force majeure defense begins

with the standards governing a shipowner’s duty of

care in allision or collision cases.

In The Louisiana, this Court articulated the

presumption that when a drifting vessel allides with

a stationary object, the drifting vessel is presumed to

be at fault. 70 U.S. (3 Wall.) 164, 173 (1865). There

are three ways in which a shipowner may rebut this

presumption.

First, the shipowner may demonstrate that the

allision “was the fault of the stationary object,”

similar to a contributory negligence27 defense. See

Fischer v. S/Y Neraida, 508 F.3d 586, 593 (11th Cir.

2007). Second, the shipowner may demonstrate that

27 See United States v. Reliable Transfer Co., 421 U.S. 397, 411

(1975).

33

it “acted with reasonable care,” similar to a denial of

negligence. See Fischer, 508 F.3d at 593. Third, the

shipowner may demonstrate that the allision was an

“unavoidable accident” (also referred to as a force

majeure or “Act of God”), similar to a superseding

causation28 defense. See Fischer, 508 F.3d at 593.

While the analysis of the second and third

defenses can overlap, “[e]ach independent argument,

if sustained, is sufficient to defeat liability.” Id.

In The Louisiana and similar cases, this Court

established that the standard of care in admiralty is

“reasonable care under the circumstances” – and not

a higher standard. See, e.g., The Virginia Ehrman, 97

U.S. 309 (1877); The Clarita, 90 U.S. (23 Wall.) 1

(1874); The Grace Girdler, 74 U.S. (7 Wall.) 196

(1868).

In keeping with this Court’s precedent, the

former Fifth Circuit articulated that the standard for

determining whether the shipowner is free from fault

is whether the shipowner “took reasonable

precautions under the circumstances as known or

reasonably to be anticipated.” In re United States, 425

F.2d 991, 995 (5th Cir. 1970).

See Exxon Co., U.S.A. v. Sofec, Inc., 517 U.S. 830, 837-38

(1996). Superseding cause “applies where the defendant’s

negligence in fact substantially contributed to the [] injury, but

the injury was actually brought about by a later cause of

independent origin that was not foreseeable.” Stolt Achievement

v. Dredge B.E. Lindholm, 447 F.3d 360, 367-68 (5th Cir. 2006).

28

34

The other circuit courts, in turn, have also

adhered to the reasonable care standard. See, e.g.,

Fischer, 508 F.3d at 594 (“We find no authority and

discern no reason now to impose upon defendants in

allision cases a higher standard of care than ordinary

reasonableness.”); Weyerhaeuser Co. v. Atropos

Island, 777 F.2d 1344, 1348 (9th Cir. 1985); Mamiye

Bros. v. Barber S.S. Lines, Inc., 241 F. Supp. 99, 108

(S.D.N.Y. 1965), aff’d, 360 F.2d 774 (2d Cir. 1966);

Swenson v. The Argonaut, 204 F.2d 636 (3d Cir. 1953);

The Charles H. Sells, 89 F.2d 631, 633 (2d Cir. 1937)

Importantly, as the Eleventh Circuit has

instructed, “[a]though what ‘reasonable care’ requires

changes with the circumstances, the standard

recognizes the existence in every case of something

more that could be done – and perhaps would be

legally required under a ‘highest degree of caution’

standard – but that reasonable care does not

demand.” Fischer, 508 F.3d at 595.

In the context of a force majeure event, the

shipowner must prove both that the weather was

“heavy”29 and that the shipowner “took reasonable

precautions under the circumstances as known or

reasonably to be anticipated.” In re United States, 425

F.2d 991, 995 (5th Cir. 1970); see Fischer, 508 F.3d at

596.

In the present action, it was established that Hurricane

Harvey was a force majeure event; therefore, the analysis

focused on whether Paragon acted reasonably under the

circumstances.

29

35

Accordingly, “[i]f those responsible for the

[vessel] were reasonable in their anticipation of the

severity of the impending storm and undertook

reasonable precautions in light of such anticipation,

then they are relieved of liability.” In re United States,

425 F.2d at 995. “The highest degree of caution that

can be used is not required” of the shipowner. See The

Grace Girdler, 74 U.S. (7 Wall.) 196 (1868).

Crucially, the shipowner’s conduct cannot be

viewed through the lens of hindsight, or “through

some sort of nautical rear view mirror.” See United

Geophysical Co. v. Vela, 231 F.2d 816, 818-19 (5th Cir.

1956); see also United States v. Lykes Bros. S.S. Co.,

511 F.2d 218, 225 (5th Cir. 1975).

Instead, the shipowner’s actions are examined

against information “known” at the time or that it

“reasonably should have anticipated” at the time. In

re United States, 425 F.2d at 995; see Simmons v.

Berglin, 401 Fed. App’x 903, 908 (5th Cir. 2010)

(rejecting “hindsight speculations about what could

have been done”); Lord & Taylor, 108 F. Supp. 3d at

226 (rejecting plaintiff’s speculations “based on a

Monday-morning-quarterback assessment ... not on

the information known to [the defendant]”).30

30 Consistent with the prohibition on hindsight, courts generally

begin their examination of a shipowner’s actions from the point

when it is reasonably certain a storm’s landfall will affect the

vessel’s location, which usually coincides with the issuance of the

first official storm watch or warning for that location, often 2472 hours prior to landfall. See, e.g., Fischer, 508 F.3d 586; Lord

& Taylor LLC v. Zim Integrated Shipping Servs., Ltd., 108 F.

36

This makes sense. If courts examined the

shipowner’s actions against information which the

shipowner had no way of knowing, or which did not

exist, the shipowner’s burden would be impossible,

and the defense would be nullified.

There is no vision which is as clear as

hindsight. Images come into almost

perfect focus through the evidentiary

microscope of a lawyer’s hindsight. After

thousands of daily and weekly

occurrences of maritime life are

discarded, the lawyer can isolate a few

incidents for examination with such a

microscope to document things such as

privity or knowledge. This process

proceeds as if a reasonable person had

no other responsibilities or phenomena

or events to observe other than those

incidents now carefully isolated and

focused on through this hindsight

perspective. If life were so simple,

foreseeability under the law would be

the equivalent of omniscience.

Supp. 3d 197 (S.D.N.Y. 2015); Valley Line Co. v. Musgrove

Towing Serv., Inc., 654 F. Supp. 1009 (S.D. Tex. 1987); In re

Marine Leasing Servs., Inc., 328 F. Supp. 589 (E.D. La. 1971),

aff’d, 471 F.2d 255 (5th Cir. 1973); Ladner v. Bender Welding &

Mach. Co., 336 F. Supp. 1264 (S.D. Miss. 1971); AtlantaSchiffahrts v. United States, 299 F. Supp. 781, 783 (E.D. La.

1969).

37

In re Complaint of Bankers Trust Co., 651 F.2d 160,

170 (3d Cir. 1981).

B.

The Fifth Circuit’s decision

conflicts with this Court’s

precedent governing reasonable

care and disregards wellestablished principles governing

the force majeure defense, creating

a split amongst the circuits.

The Fifth Circuit has placed the responsibility

on the shipowner to exhibit clairvoyance in order to

be considered reasonable, departing from this Court’s

precedent. The result is an elimination of the

longstanding rule against hindsight analysis, and

sharply conflicts with the standards established by

the Eleventh Circuit and followed by other district

courts.

The Fifth Circuit held that “Paragon has failed

to show that it ‘took reasonable precautions under the

circumstances as known or reasonably to be

anticipated.’” See App. A, p.p. 19a (citing In re United

States, 425 F.2d 991, 995 (5th Cir. 1970)).

The Fifth Circuit reasoned that the district

court “did not use ‘hindsight’ but rather applied the

judgment that the other drillship owners employed at

the time of the storm” and, furthermore, that “the

district court’s holdings about what a prudent

shipmaster would anticipate ... are not contrary to

law.” See App. A, p.p. 19a.

38

In concluding Paragon failed to take

reasonable precautions under the circumstances, the

Fifth Circuit affirmed the district court’s conclusions

that Paragon was unreasonable on relying on a portscheduled evacuation slot because it (1) “did not have

a reasonable basis on which to gauge the strength of

its mooring system”; (2) should have anticipated

vessel breakdown and delays on Wednesday, August

23; (3) should have anticipated the Navy’s evacuation

on Thursday, August 24; (3) should have anticipated

the Port’s closure on Thursday, August 24; and (4)

should have anticipated the storm’s rapid

intensification on Thursday, August 24, among other

things.

While reviewing the issue the Fifth Circuit

noted:

Considering these facts, the District

Court rejected Paragon’s argument that

the delays on Thursday morning were

unforeseeable, because “prudent ship

masters foresee such situations and

factor them into their decision making

timetable.” The District Court held that

a prudent shipmaster would recognize

that Navy ships would have priority over

commercial ships in an evacuation, and

that “[a] prudent shipmaster cannot rely

on the plan that assumes the best-case

scenario with no sudden changes in

circumstances.”

39

App. A, p.p. 18.

It seems Fifth Circuit had its reservations in

affirming the district court’s conclusion but relented

under the belief that it was factual in nature.

As a reviewing court, we have a clear

mandate. “Even though we might have

weighed the evidence differently had we

been sitting as trier of fact, we must

accept the district court’s findings as

long as they are plausible in light of the

record viewed in its entirety.” Perlman v.

Pioneer Ltd. P’ship, 918 F.2d 1244, 1247

(5th Cir. 1990).

App. A, p.p. 19.

But this is not a matter of “weighing” the facts.

The Fifth Circuit sanctioned the district court’s

reliance on facts only knowable through hindsight to

reach its conclusion. As each of those findings

necessarily relied on hindsight, the Fifth Circuit’s

endorsement of the district court’s reasoning is

erroneous as a matter of law.

In fact, a closer look at the district court’s

assignment of fault would show that virtually all of

the elements were influenced by a standard of care

that required an accurate prediction of categorically

unknowable events that were under the control of

third parties with a variable nature of the storm itself.

40

The district court’s conclusion that Paragon

should have made the decision to evacuate DPDS1 “no

later than the afternoon [of] Monday, August 21”

demonstrates the gravity of the Fifth Circuit’s error.

See App. B, p.p. 97a. Had Paragon made its decision

on Monday and disaster had later struck in the Gulf,

the district court could have utilized this same

forecast to conclude that Paragon should have waited

for a more certain forecast before making its decision.

It is the totality of the Fifth Circuit’s approach

which results in a complete cancellation of the force

majeure defense by redefining the standard of

reasonableness to require actions based on knowledge

only ascertainable in hindsight, and after the events

have already occurred.

The Fifth Circuit’s standard for reasonable

care in anticipation of a force majeure event is an

application of hindsight, departure from analysis of

every other circuit, and disruption of the fundamental

standard for reasonableness applied in collision cases.

This case presents the opportunity for this

Court to establish a uniform standard among the

circuits that will apply to bedrock concepts of

reasonableness, duty of care and the exceptionally

important maritime defense of force majeure.

41

C.

The Fifth Circuit’s decision creates

a Circuit split and will disrupt both

the uniformity of general maritime

law and stability of maritime

commerce.

The Fifth Circuit’s standard of “reasonable

care” is unsound as a matter of maritime policy, and

would create total instability and chaos in the

maritime industry.

Against this Court’s precedent, the Fifth

Circuit not only required “[t]he highest degree of

caution that can be used” from the shipowner, but has

established a level of accurate prediction that is

unsustainable. In this manner it has rejected this

Court’s standard of “reasonable care under the

circumstances,” eliminating the viability of the force

majeure defense under any conceivable circumstance.

See The Grace Girdler, 74 U.S. (7 Wall.) 196; see also

Fischer, 508 F.3d at 594 (11th Cir. 2007) (explaining

that the standard of care is

“ordinary

reasonableness”).

According to the Fifth Circuit, a “reasonable”

shipowner must foresee a potential storm’s strength

and path at landfall before the meteorologists do,

must foresee every other vessel’s mechanical

breakdowns before their owners do, must foresee

every potential delay in port traffic before the port

authorities do, must foresee any evacuation of United

States vessels before the United States Navy does,

must foresee the closure of the port before the United

42

States Coast Guard does, must foresee the mandatory

evacuation of a town before its mayor does, and must

foresee the cancellation of its tow-out before its tug

company does.

Moreover, the resulting conflict between the

Fifth Circuit and Eleventh Circuit (both prominent in

developing federal maritime law) warrants this

Court’s review. It not only divides the Gulf of Mexico

in half, but isolates ports in the Fifth Circuit from the

rest of the nation.

Hurricanes make landfall along the entire

southern and eastern coasts of the United States

(with increasing frequency) each year, and this lack of

uniformity coupled with the uncertainty and

unfairness created by the Fifth Circuit’s standard will

eventually lead to absurd consequences. For example,

if a storm makes landfall over Mobile Bay, shipowners

to the East will be held to a standard of ordinary

reasonableness, whereas shipowners to the West will

be held to a standard of virtual clairvoyance, and a

requirement to immediately evacuate at the first

indication of any potential tropical threat in order to

avoid liability.

This will result in public chaos in ports and

place shipowners at great risk, with the inevitable

result of vessels attempting to outrun a storm with no

idea where to go.

43

This is an unworkable standard which sets a

dangerous precedent by promoting mass public chaos,

placing vessels and seamen at grave risk.

CONCLUSION

Wherefore, Paragon prays that certiorari be

granted.

Respectfully submitted,

JOHN A. SCIALDONE

Counsel of Record

Scialdone Law Firm, PLLC

1319 24th Avenue

Gulfport, MS 39501

(228) 822-9340

jscialdone@slfirmus.com

Counsel for Petitioner

August 27, 2024

APPENDIX

i

TABLE OF APPENDICES

Page

APPENDIX A — OPINION OF THE UNITED

STATES COURT OF APPEALS FOR THE

FIFTH CIRCUIT, FILED APRIL 24, 2024 . . . . . .1a

APPENDIX B — AMENDED ORDER AND

OPINION OF THE UNITED STATES

DISTRICT COURT FOR THE SOUTHERN

DISTRICT OF TEXAS, BROWNSVILLE

DIVISION, FILED AUGUST 17, 2022 . . . . . . . . . .29a

A PPEN DI X C — F I NA L J U D GM EN T

OF THE UNITED STATES DISTRICT

COURT FOR THE SOU THERN

DISTRICT OF TEXAS, BROWNSVILLE

DIVISION, FILED MARCH 9, 2023 . . . . . . . . . .154a

A P PEN DI X D — ON PET I T ION F OR

R EH E A RI NG EN BA NC OF T H E

UNITED STATES COURT OF

APPEALS FOR THE FIFTH CIRCUIT,

FILED APRIL 24, 2024 . . . . . . . . . . . . . . . . . . . . .158a

1a

APPENDIX A — Appendix

OPINIONAOF THE UNITED

STATES COURT OF APPEALS FOR THE

FIFTH CIRCUIT, FILED APRIL 24, 2024

UNITED STATES COURT OF APPEALS

FOR THE FIFTH CIRCUIT

No. 23-40209

PARAGON ASSET COMPANY, LIMITED,

AS OWNER OF THE DRILLSHIP DPDS1,

Plaintiff—Appellant

v.

AMERICAN STEAMSHIP OWNERS

MUTUAL PROTECTION AND INDEMNITY

ASSOCIATION, INCORPORATED,

Defendant—Appellee

v.

PARAGON OFFSHORE LIMITED,

Defendant—Appellant

PARAGON INTERNATIONAL FINANCE COMPANY,

Third Party Defendant—Appellant

2a

Appendix A

PARAGON OFFSHORE DRILLING, L.L.C.,

Counter-Claimant—Appellant

v.

SIGNET MARITIME CORPORATION,

Claimant—Appellee

IN THE MATTER OF THE COMPLAINT OF

SIGNET MARITIME CORPORATION,

AS OWNER OF THE TUG SIGNET ENTERPRISE,

ITS ENGINES, TACKLE, ETC., IN A CAUSE

OF EXONERATION FROM OR

LIMITATION OF LIABILITY,

Plaintiff—Appellee

SIGNET MARITIME CORPORATION,

AS OWNER OF THE TUG SIGNET ENTERPRISE,

ITS ENGINES, TACKLE, ETC., IN A CAUSE

OF EXONERATION FROM OR

LIMITATION OF LIABILITY,

Plaintiff—Appellee

v.

PARAGON ASSET COMPANY, LIMITED,

Counter-Claimant—Appellant

3a

Appendix A

IN THE MATTER OF THE COMPLAINT OF

SIGNET MARITIME CORPORATION,

AS OWNER OF THE TUG SIGNET ARCTURUS,

ITS ENGINES, TACKLE, ETC., IN A CAUSE

OF EXONERATION FROM OR

LIMITATION OF LIABILITY,

Plaintiff—Appellee

SIGNET MARITIME CORPORATION, AS OWNER

OF THE TUG SIGNET ARCTURUS, ITS ENGINES,

TACKLE, ETC., IN A CAUSE OF EXONERATION

FROM OR LIMITATION OF LIABILITY,

Plaintiff—Appellee

v.

PARAGON ASSET COMPANY, LIMITED,

Appellant

Argued: February 5, 2024

Decided and Filed: April 24, 2024

No. 23-40209 On Appeal from the United States

District Court for the Southern District of Texas,

Brownsville Division

Nos. 1:17-CV-203, 1:17-CV-247, 1:18-CV-35—

Fernando, MI Rodriguez, Jr. District Judge

4a

Appendix A

OPINION

Before: HIGGINBOTHAM, SMITH, and HIGGINSON, Circuit

Judges.

HIGGINSON, Circuit Judge:

This is an appeal of an Opinion and Order issued by the

district court concerning liability in a series of maritime

casualties caused by the breakaway of a drillship in Port

Aransas, Texas during and after Hurricane Harvey.

Appellant Paragon Asset Company (“Paragon”) owned

the vessel, the DPDS1—an unmanned and unpowered

drillship—which was docked at Port Aransas prior to

Hurricane Harvey’s arrival to the area on August 25,

2017. After its evacuation effort failed, Paragon hired two

tugs owned by Signet Maritime Corporation (“Signet”) to

apply power throughout the storm in an attempt to help

keep the vessel moored to the dock.

On August 25, 2017, at the height of the storm, the

DPDS1 broke from its moorings, alliding with both Signet

tugs and sinking one. The DPDS1 then ran aground in

the Corpus Christi ship channel, but on August 28, 2017

LWUHÁRDWHGDQGDOOLGHGZLWKDQHDUE\UHVHDUFKSLHURZQHG

by the University of Texas (“UT”). Applying maritime

negligence law, the district court found Paragon alone to

be liable for the August 25 breakaway. Because Signet had

supplied a third tug to monitor the DPDS1’s movement

after the storm, and that tug failed to stop the vessel’s

allision with the UT pier, the district court concluded that

Signet and Paragon were equally liable for the damages

suffered by UT.

5a

Appendix A

Paragon appeals, asking that we apply a “towage

law” standard of duty to Signet’s provision of its services

to Paragon. Paragon further contests the district court’s

determination that a force majeure defense was not

available to Paragon, and asks us to reverse the district

court’s determination regarding which contract between

the parties governed Signet’s services. Having reviewed

WKHUHFRUGDQGUHOHYDQWODZZHÀQGWKDWWKHGLVWULFWFRXUW

GLG QRW HUU LQ LWV ÀQGLQJ RI IDFWV RU FRQFOXVLRQV RI ODZ

Accordingly, we AFFIRM.

I.

On Wednesday, August 23, 2017, Paragon and Signet

began discussions regarding the hiring of Signet tugs to

tow the DPDS1 out to open sea before Hurricane Harvey

made landfall. On Thursday, August 24, 2017, after delays

and the closure of the port foiled the DPDS1’s evacuation

effort, Signet agreed to provide Paragon with two tugs,

the ARCTURUS and the ENTERPRISE, to aid in

keeping the DPDS1 moored to the Port Aransas dock

during the storm. At around 11:00 P.M. on August 25,

2017, the DPDS1 broke free of its moorings and propelled

the ARCTURUS and the ENTERPRISE into nearby oil

rigs. The ENTERPRISE sank, and the ARCTURUS and

the oil rigs sustained damage. The ENTERPRISE crew

was rescued the next morning.

The DPDS1 continued into the Corpus Christi ship

channel, where it remained grounded for three days.

During this time, Paragon retained Signet to provide a tug

to monitor the grounded vessel. On August 27, 2017, the

6a

Appendix A

tug CONSTELLATION began monitoring the DPDS1,

but because the DPDS1 had loose lines hanging from it,

and because Hurricane Harvey was projected to return

to Corpus Christi, the crew of the CONSTELLATION

did so from a nearby dock rather than next to the vessel

LWVHOI2Q$XJXVWWKH'3'6UHÁRDWHGDQGDOOLGHG

into the UT research pier. The CONSTELLATION was

unable to stop the allision with the UT pier, but afterwards

it pinned the DPDS1 to the shore. Signet subsequently

provided three more tugs to hold the DPDS1 to the shore

until the drillship could be towed to another dock.

$IWHUDÀYHGD\EHQFKWULDOWKHGLVWULFWFRXUWIRXQG

that Paragon alone was liable for the August 25, 2017

breakaway of the drillship, and rejected its force majeure

defense as well as its argument that Signet assumed the

risk by agreeing to help keep the vessel moored. In doing

so, the trial court rejected Paragon’s argument that it had

no duty to Signet under maritime law of towage, holding

that Signet did not undertake the tow of the DPDS1 or

take control of it, so towage law was inapplicable. The

district court held that, under maritime law of negligence,

Paragon was liable for the breakaway incident because it

unreasonably relied on reports about the strength of its

mooring system, which it knew were not based in fact,

and because Paragon’s leadership failed to call for an

evacuation when it became clear that was the prudent

course of action. The district court found the parties—

Paragon and Signet—each to be 50% liable for the damage

to the UT research pier.

7a

Appendix A

Finally, the parties debated whether a Master

Charter Agreement (“MCA”) or Signet’s Tariff (“the

Tariff”) governed Signet’s provision of tugboats to

Paragon. The district court ruled in favor of the Tariff,

ÀQGLQJWKDW6LJQHWKDGH[SUHVVO\UHIXVHGWRDJUHHWRWKH

terms of the MCA for the provision of services, pointing

to the course of dealing in the summer of 2017, when

Paragon had engaged Signet tows to hold the drillship

multiple times and had paid the Tariff rate. The district

court rejected Paragon’s arguments that the MCA

governed, including its contention that the Tariff could

not govern because it contained explicit language that it

did not cover Signet’s services to vessels “aground or in

distress, including assistance to a deadship . . . , or when

Services are performed during heightened Coast Guard

port conditions.”

Paragon appeals on three issues: first, it argues

that the trial court should have applied towage law, thus

shifting to Signet some duty owed to keep the drillship

from harming others’ property. Second, it argues that the

trial court erred in rejecting its force majeure defense,

“impermissibly” holding Paragon “to a standard of

perfection and infallible judgment by viewing its actions

through the lens of post hoc knowledge.” Third, it argues

WKDWWKHWULDOFRXUWHUUHGLQÀQGLQJWKDW6LJQHW·V7DULII

governed the interactions between the two parties,

because Signet unilaterally and orally amended the Tariff.

Rather, under general maritime and Texas law, the district

court should have held the relationship to be “at law” or

governed by the MCA, and Signet should not have been

allowed to seek indemnity or attorney’s fees from Paragon.

8a

Appendix A

II.

“The standard of review for a bench trial is well

HVWDEOLVKHGÀQGLQJVRIIDFWDUHUHYLHZHGIRUFOHDUHUURU

and legal issues are reviewed de novo.” One Beacon Ins.

Co. v. Crowley Marine Servs., Inc., 648 F.3d 258, 262

(5th Cir. 2011) (italics omitted) (quoting Water Craft

Mgmt. LLC v. Mercury Marine, 457 F.3d 484, 488 (5th

&LU   :H ZLOO ÀUVW FRQVLGHU ZKHWKHU WKH GLVWULFW

court incorrectly applied maritime negligence law, before

turning to Paragon’s arguments regarding the force

majeure defense and the governing contract.

Paragon contends that the district court erred when

it applied general maritime negligence law rather than

towage law. Paragon argues not that it would be released

from liability if the district court recognized Signet’s

activities on August 25, 2017 as a tow; rather, it asserts

that the application of towage law would re-orient the

inquiry about Paragon’s duty to Signet and Signet’s

duty to Paragon so as to reduce Paragon’s fault. At trial,

Paragon situated its law of towage argument within a

larger contention that Signet assumed the risk that the

DPDS1 might break free when Signet agreed to the task

of helping keep the DPDS1 at the dock—and, therefore,

that Signet forfeited any right to recover from Paragon

when it failed to mitigate the risk it was hired to guard

against. The district court rejected this argument, and

Paragon does not pursue its general assumption of risk

argument on appeal.

Here, Paragon has retained its claim that the law of

maritime towage should apply. The district court rejected

9a

Appendix A

the towage law standard that Paragon proposed because

“Signet never undertook the tow of the DPDS1, and at

no point did Paragon relinquish custody of the DPDS1 to

the Signet tugs.” Helping keep the DPDS1 moored to the

dock did not constitute a tow, the district court held, and

“Paragon did not shift to Signet the duties that Paragon

owed to ensure that the drillship was properly moored to

prevent allision with objects within the scope of danger

should the mooring system fail.”

Instead, the district court found that the incidents

during Hurricane Harvey should be governed by the

standard for negligence articulated within general

maritime law. “To establish maritime negligence, ‘a

plaintiff must demonstrate that there was [1] a duty

owed by the defendant to the plaintiff, [2] breach of

that duty, [3] injury sustained by the plaintiff, and [4] a

causal connection between the defendant’s conduct and

the plaintiff’s injury.’” GIC Servs., L.L.C. v. Freightplus

USA, Inc., 866 F.3d 649, 659 (5th Cir. 2017) (alteration

in original) (quoting Canal Barge Co. v. Torco Oil Co.,

220 F.3d 370, 376 (5th Cir. 2000)). A shipmaster has a “a

special duty to take all reasonable steps consistent with

safety to [a] ship and her crew, to avoid or minimize the

chance of harm to others.” Boudoin v. J. Ray McDermott

& Co., 281 F.2d 81, 85 (5th Cir. 1960). The Supreme Court

has stated that, if a ship drifts from her moorings and

causes a collision, “she must be liable for the damages

FRQVHTXHQW WKHUHRQ XQOHVV VKH FDQ VKRZ DIÀUPDWLYHO\

that the drifting was the result of inevitable accident,

or a vis major, which human skill and precaution, and a

proper display of nautical skill could not have prevented.”

10a

Appendix A

The Louisiana, 70 U.S. (3. Wall.) 164, 169 (1865) (internal

italics omitted).

The district court also cited our court’s decision in

In re United States, 425 F.2d 991, 995 (5th Cir. 1970)

to articulate the responsibility of a shipowner during a

storm: “If those responsible for the [barges that broke free

and caused allisions] were reasonable in their anticipation

of the severity of the impending storm and undertook

reasonable preparations in light of such anticipation, then

they are relieved of liability.” Id. $QG VSHFLÀFDOO\ ZLWK

regard to docked vessels, the trial court relied on the rule

expressed in the Carroll Towing case:

Since there are occasions when every vessel will

break from her moorings, and since, if she does,

she becomes a menace to those about her; the

owner’s duty, as in other similar situations, to

provide against resulting injuries is a function

of three variables: (1) The probability that she

will break away; (2) the gravity of the resulting

injury, if she does; (3) the burden of adequate

precautions.

United States v. Carroll Towing Co., 159 F.2d 169, 173

(2d Cir. 1947). Under the caselaw regarding maritime

negligence, the district court concluded that Paragon

ZDV QHJOLJHQW ÀUVW ´FRPSDQ\ GHFLVLRQ PDNHUV NQHZ

or should have known that they possessed inaccurate

information about the mooring system installed to keep

the DPDS1 docked,” because the reports on the strength

RIWKHPRRULQJV\VWHPFRPPLVVLRQHGE\3DUDJRQUHÁHFWHG

11a

Appendix A

projected combinations of mooring lines and ropes—not

any real mooring system that had actually been put in

place. Second, the district court found that Paragon

FRPSDQ\RIÀFLDOVZHUHXQUHDVRQDEOHLQWKHLUDVVHVVPHQW

of the strength and potential danger of Hurricane Harvey,

and in their choice to wait until Wednesday, August 23, to

choose to evacuate the drillship even though they received

weather reports at 9:00 A.M. the morning of Monday,

August 21 that showed Corpus Christi in the storm’s

cone of uncertainty. Testimony supported the trial court’s

IDFWXDOÀQGLQJWKDWWKH'3'6·VHYDFXDWLRQZRXOGPRUH

likely have been successful if Charles Yester, Paragon’s

Senior Vice President of Operations, had called in the

evacuation order earlier, and the trial court found that

a reasonable captain would have planned for potential

exigencies, including the sources of delay that accrued on

Thursday before the port closed.

Paragon argues that the district court was mistaken

in its reliance on the normal negligence standard for

maritime torts. Rather, it argues that Paragon “owed

Signet no duty to provide a vessel which would not

break away during Hurricane Harvey, as this was the

precise reason Signet undertook the job of holding it.”

Reasoning that the DPDS1 was a “dead” vessel, Paragon

relies on caselaw that emphasizes the duty of a tug owner

to guard against hazards, even those caused by the

unseaworthiness of the vessel being towed. See Bisso v.

Waterways Transp. Co., 235 F.2d 741, 743 (5th Cir. 1956)

(“To be sure, there was a strong current . . . but this was

well known and its imminence was the reason the owners

of [the vessel] agreed expressly with [the tug] to provide

a local assisting tug of adequate power.”).

12a

Appendix A

The threshold question, therefore, is whether the

relationship between Signet and Paragon involved a tow

at all. As an initial matter, treatises and caselaw state

generally that towage law is applicable when one vessel

acts to “aid the propulsion or to expedite the movement

of another vessel.” 2 T. Schoenbaum, Admiralty and

Maritime Law § 12:1 (West 6th ed. 2023); see also Stevens

v. The White City, 285 U.S. 195, 200 (1932) (“The supplying

of power by a vessel, usually one propelled by steam, to tow

or draw another is towage. Many vessels, such as barges

and canal boats, have no power of their own and are built

with a view to receiving their propelling force from other

sources. And vessels having motive power often employ

auxiliary power to assist them in moving about harbors

and docks.”).

By contrast, Paragon cites four cases that it says stand

for the proposition that “[t]owage law’s application does

not require a tug’s provision of motive power to a vessel

in transit” Canadian Aviator, Ltd. v. United States, 324

U.S. 215 (1945); Stevens v. E. W. Towing Co., 649 F.2d

1104 (5th Cir. 1981); Tebbs v. Baker-Whiteley Towing Co.,

407 F.2d 1055 (4th Cir. 1969); and River Pars. Co. v. M/V

FLAG ADRIENNE, 2002 WL 1453826 (E.D. La. Jul. 2,

2002). Signet counters that each of these cases “involved

an actual or contemplated voyage or movement” rather

than an “assist” designed to keep a vessel from moving.

Signet is correct. Three of these cases—Stevens,

Tebbs, and River Parishes Co.—involved accidents that

happened while a tug was trying to fasten itself to the

side of a vessel so that it could embark on a tug or tow of

13a

Appendix A

a vessel. See Stevens, 649 F.2d at 1109; Tebbs, 407 F.2d at

1057; River Parishes Co., 2002 WL 1453826, at *3. And in

Canadian Aviator, the tow was not attached to the tug,

but the tug was guiding it through waters when the tow

was grounded. 324 U.S. at 228.

More importantly, each of these cases took place in a

context that is dissimilar to the one at issue here: Stevens

involved a personal injury of a deckhand on a tug, which

occurred due to a shifting current and the negligence of

tug employees. 649 F.2d at 110. In River Parishes Co. the

tug grounded itself. 2002 WL 1453826, at *1. In Tebbs

the tug was attaching to its tow and nudged the tow into

another vessel. 407 F.2d at 1057. The tug in Canadian

Aviator ran its tow aground. 324 U.S. at 217. Each of

these cases, then, involves an action by the tug or its crew

that resulted in an injury, allision, or grounding. None of

these is analogous to what occurred here, where the tugs

applied their power to the DPDS1 but could not hold the

drillship after the DPDS1’s own mooring system failed.

Furthermore, the other cases cited by Paragon to

support its position—In re TT Boat Corp., 1999 WL

123810, at *6–7 (E.D. La. Mar. 2, 1999) and Bisso v.

Waterways Transp. Co., 235 F.2d at 743—both involved

a tug towing a vessel. In TT Boat Corp, a tug was towing

a manned barge, and the barge allided with an offshore

platform. TT Boat Corp., 1999 U.S. Dist. LEXIS 2754, at

*6–7. In Bisso, a tug was towing a vessel into the entrance

of the Southwest Pass of the Mississippi River. 235 F.2d

at 743. The tug attempted to swing its tow into the turn,

and due to the current the tow continued straight, then

14a

Appendix A

moved west, causing the tug and tow to be grounded. Id.

In both instances, too, a tug was acting in its capacity as

mover of other vessels and was in control of the navigation

on a journey. These cases are not analogous to the facts

here, where there was no journey—just the application

of the force of the tugs to prevent the improperly moored

DPDS1 from breaking free of the dock.1

Additionally, Paragon claims that the district court

was inconsistent because, while it did not apply towage

law to the August 25, 2017 events, it did apply towage law

when it considered the August 28, 2017 incident involving

the CONSTELLATION and the UT research pier. But

this is not a correct characterization of the district court’s

RSLQLRQ7KHGLVWULFWFRXUWVSHFLÀFDOO\VWDWHGWKDWWKH´ODZ

of tug and tow does not govern” the second allision because

“Signet did not undertake a tow of the DPDS1” when

it agreed to monitor the DPDS1 and then hold it to the

shore after it hit the UT research pier. The district court

did draw on towage law cases to describe Signet’s duties

as “neither a bailee nor an insurer of the tow” but held

that Signet remained “obligated to provide reasonable

care and skill ‘as prudent navigators employ for the

performance of similar services.’” King Fisher Marine

Serv., Inc. v. The NP Sunbonnet, 724 F.2d 1181, 1184 (5th.

Cir. 1984) (quoting Stevens, 285 U.S. at 202)); Even if the

employment of this terminology to describe Signet’s duties

to Paragon were erroneous, it was harmless because it did

1. The trial court pointed to the report of Signet’s mooring

expert, who concluded that given the wind conditions, the two

tugboats reduced the tension of the mooring lines by only three

percent.

15a

Appendix A

not meaningfully change the district court’s analysis of

the responsibilities of Signet and Paragon under maritime

QHJOLJHQFHODZUHVXOWLQJLQWKHWULDOFRXUW·VÀQGLQJHDFK

party 50% responsible for the damage to the UT pier.

Finally, Paragon positions the applicability of

towage law as a factor that would diminish its liability

meaningfully. That is not the case. As the district court

noted, even if towage law applied, Signet would be unable

to “complain about a condition of unseaworthiness or

other weakness that caused the loss if it knew of the

condition and failed to use reasonable care under the

circumstances.” King Fisher, 724 F.2d at 1184. But, as

the district court found, Signet had no opportunity to

determine whether the DPDS1’s mooring system would

be adequate to withstand the hurricane—so even a

KHLJKWHQHGGXW\IRU6LJQHWZRXOGQRWUHVXOWLQDÀQGLQJ

that Paragon was not negligent.

III.

Second, Paragon argues that the trial court erred in

its holding that Paragon could not rely on a force majeure

defense because its “delayed decision and inadequate

mooring system represented unreasonably deficient

actions by Paragon.” Paragon argues that the trial court

erred by holding it to a standard of “perfection” rather

than reasonability, and by evaluating Paragon’s decisions

“through some sort of nautical rear view mirror.” United

Geophysical Co. v. Vela, 231 F.2d 816, 819 (5th Cir. 1956).

The district court correctly articulated and applied

the standard for a force majeure defense, which may

16a

Appendix A

be invoked by a showing that an “Act of God,” such

as a hurricane, occurred and that a shipmaster “took

reasonable precautions under the circumstances as known

or reasonably to be anticipated.” See In re United States,

425 F.2d at 995. The district court also correctly noted

that “the party asserting the defense bears the burden of

proof.” See In re Marine Leasing Servs., 471 F.2d 255, 257

(5th Cir. 1973); see also In re United States, 425 F.2d at 995

(“The burden of proving inevitable accident or Act of God

rests heavily upon the vessel asserting such defense.”).

The parties did not dispute that Hurricane Harvey

ZDVDQ$FWRI*RGVXIÀFLHQWWRDFWLYDWHDIRUFHPDMHXUH

defense. However, with regard to the second factor—

reasonable precautions, the trial court cited Boudoin,

LQZKLFKRXUFRXUWDIÀUPHGDGLVWULFWFRXUW·VUXOLQJWKDW

an appellee was liable for its vessel’s breaking free of its

moorings and causing damage to a nearby dock during

Hurricane Audrey. 281 F.2d at 88. In that case, our court

found that, even though Audrey was a hurricane, the

appellee failed to meet its burden to show that “the tug

master had no reason to anticipate that Audrey would

strike with the fury which she had and where the [vessel]

ZDVPRRUHGµVXIÀFLHQWWRH[FXVHKLVIDLOXUHWRHYDFXDWH

the vessel. Id.

Paragon argues that, while the tug master in Boudoin

did not attempt to evacuate his vessel, Paragon did try to

evacuate the DPDS1 and was foiled in its attempts to do

so. However, the district court considered this argument

and concluded that “Paragon’s delay in deciding to tow

the DPDS1 out to sea ultimately caused the drillship to

17a

Appendix A

remain at the dock,” particularly considering what it knew

RUVKRXOGKDYHNQRZQDERXWWKHGHÀFLHQFLHVRIWKHPRRULQJ

system. The district court found the following facts:

1. On August 2, 2017, Aldert Schenkel, Vice President

of Engineering, recommended in an email that the DPDS1

should depart 3 days before an approaching storm that

had a wind speed of 63 mph or more.

2. On Monday, August 21, Paragon received two

weather reports. One, released at 4:00 A.M., reported

that the tropical system would reach winds of 65 mph. A

report later that morning put Port Aransas in the cone

of uncertainty, though it anticipated maximum winds to

be at 57 mph. At that time Schenkel (Vice President of

Engineering) told Michael Koenig (Marine Operations

Manager) that “we don’t have to do anything yet” and

they had about 24 hours to make a decision.

.RHQLJWHVWLÀHGWKDWKHWKRXJKWWKH\VKRXOGKDYH

“immediately” decided to move the vessel, but that he

deferred to decisionmakers.

4. A weather report on Monday, August 21, at 4:00

P.M. stated the maximum wind speeds were predicted

to be 70 mph.

5. At least one company, Rowan Companies, decided

no later than Monday to evacuate and it contacted

the A ransas-Corpus Christi Pilots Association to

communicate its decision.

18a

Appendix A

6. Paragon was aware that the Genesis Engineering

reports estimating the strength of the mooring system

were incorrect because it relied on a series of lines that

were hypothetical and not actually in place on the vessel.

7. Captain Jay Rivera, of the Aransas-Corpus Christi

3LORWV $VVRFLDWLRQ WHVWLÀHG WKDW D 0RQGD\ HYDFXDWLRQ

order would result in a “pretty good chance and a high

likelihood” that the DPDS1 would have been towed to sea

before the arrival of Hurricane Harvey.

7KH'3'6ZDVWKHRQO\GULOOVKLSRIÀYHGRFNHG

along the Texas Gulf Coast, that did not evacuate before

Hurricane Harvey.

9. While Charles Yester, Senior Vice President of

Operations, took some steps to prepare for an evacuation

DV HDUO\ DV 0RQGD\ KH GLG QRW ÀOH WKH 'HDGVKLS 7RZ

Application or communicate with port authorities.

3DUDJRQGLGQRWLVVXHLWVRIÀFLDORUGHURIHYDFXDWLRQXQWLO

Wednesday.

Considering these facts, the district court rejected

Paragon’s argument that the delays on Thursday were

unforeseeable, because “prudent shipmasters foresee

such situations and factor them into their decisionmaking timetable.” The district court held that a prudent

shipmaster would recognize that Navy ships would have

priority over commercial ships in an evacuation, and

that “[a] prudent shipmaster cannot rely on a plan that

assumes a best-case scenario with no sudden changes in

circumstances.”

19a

Appendix A

As a reviewing court, we have a clear mandate. “Even

though we might have weighed the evidence differently

had we been sitting as trier of fact, we must accept the

GLVWULFWFRXUW·VÀQGLQJVDVORQJDVWKH\DUHSODXVLEOHLQ

light of the record viewed in its entirety.” Perlman v.

Pioneer Ltd. P’ship, 918 F.2d 1244, 1247 (5th Cir. 1990).

The facts found by the district court are “plausible in light

of the record,” see id.DQGLQIDFWUHÁHFWLQSDLQVWDNLQJ

detail the accounts given in the testimony of Paragon’s

RZQRIÀFLDOV7KH'3'6ZDVWKHRQO\GULOOVKLSRIÀYH

moored there, that did not successfully evacuate from

Port Aransas before the storm. This indicates that the

trial court did not use “hindsight” but rather applied

the judgment that the other drillship owners employed

at the time of the storm. The district court’s holdings

about what a prudent shipmaster would anticipate, and

its determination that Paragon did not take “precautions

under the circumstances as known or reasonably to be

anticipated” are not contrary to law. Paragon has failed

to show that it “took reasonable precautions under the

circumstances as known or reasonably to be anticipated,”

In re United States, 425 F.2d at 995, and therefore a force

majeure defense is not available to Paragon.

IV.

Finally, Paragon contends that the trial court erred in

its ruling that the Tariff governed and asks that this court

reverse the district court and hold that the MCA governed

Signet’s services to Paragon during Hurricane Harvey.

20a

Appendix A

A s backg round on this dispute, in June 2015

Paragon and Signet established the MCA to streamline

future vessel-chartering negotiations. Each party was

represented by in-house counsel: Jay Oliver, Assistant

General Counsel for Paragon, and Scott Reid, General

Counsel for Signet. The MCA served as a template for

VSHFLÀFSURMHFWVDOORZLQJTXLFNÀQDOL]DWLRQRIGHWDLOVOLNH

rates and locations. The MCA includes three documents:

the document spelling out the agreement, along with two

parts of the Baltic & International Maritime Council

SUPPLYTIME 2005 Uniform Charter Party for Offshore

Service Vessels (“BIMCO”). Part I of the BIMCO

DJUHHPHQWZDVDIRUPZLWKER[HVWREHÀOOHGLQZLWK

details regarding each job, which would be completed

by business representatives rather than counsel. Part II

included contractual provisions tied to each of the boxes

in Part I. The main document of the MCA states that the

agreement “shall control and govern in all situations in

which Owners [(Signet)] charter to Charterers [(Paragon)]

a vessel or vessels, and the terms and conditions of this

Agreement shall be deemed incorporated by reference.”

While “activities” and “voyages” are referenced in the

MCA, hold-in-place services like those provided by Signet

on August 24, 2017 are not.

In August 2016, Signet introduced a Tariff establishing

terms and conditions for tug services in its Ingleside

division, applicable to customers within the Corpus Christi

port area. 2 As is discussed below, Signet billed Paragon

2. The district court found that Signet’s competitors in

Corpus Christi also published tariffs that showed set rates and

conditions for services provided within the harbor.

21a

Appendix A

according to the Tariff for services it provided earlier

that year, in June of 2017, when the DPDS1 had drifted

from its moorings and Signet sent tugs to hold it in place.

The parties agree that a maritime contract is reviewed

de novo. See Weathersby v. Conoco Oil Co., 752 F.2d 953,

955 (5th Cir. 1984) (“A maritime contract . . . should be read

as a whole and its words given their plain meaning unless

the provision is ambiguous.”). Paragon argues that Signet

proposed using the Tariff during Hurricane Harvey

without an arm’s-length negotiation, and that no evidence

supports the existence of an oral agreement between

Signet and Paragon to apply the Tariff. Paragon argues

that the only reference to the Tariff before Hurricane

Harvey’s landfall came from Signet’s General Counsel,

Scott Reid, in which he claimed that management agreed

to use the Tariff. Even accepting that the Tariff is valid,

Paragon contends, the only existing version was the Signet

Ingleside Tariff posted on Signet’s website and therefore

Paragon did not have the ability to review it.

Most problematic, Paragon posits, are the terms in the

Tariff that disallow unilateral, unwritten amendments and

exclude the kind of services rendered during Hurricane

Harvey. In this instance, Signet provided services to a

deadship during heightened port conditions—and each

circumstance was excluded from the Tariff, according to

Section 5, which reads:

This Tariff does not cover Services to vessels

aground or in distress, including assistance to a

deadship . . . , or when Services are performed

during heightened Coast Guard port conditions.

22a

Appendix A

Further, Paragon points to the contract language of

§ 21(a) and (b) of the Tariff. Section 21(a) gives Signet

the right to “adjust terms or conditions” with “thirty (30)

days’ advance notice to Owners” and states that these

adjustments “shall be in writing.” And § 21(b) provides

WKDWWKH´7DULIIVKDOOQRWEHDPHQGHGPRGLÀHGRUZDLYHG

unless and until made in writing and signed by each party

hereto.” Paragon argues that the trial court overlooked

the Tariff’s prohibition against unilateral waivers under

§§ 21(a) and (b). Paragon contends that the trial court’s

ruling is contrary to federal maritime and Texas law

principles by allowing a unilateral waiver of a provision

LQWHQGHGIRURQHSDUW\·VEHQHÀWDQGLQGRLQJVRUHQGHULQJ

a clause of the contract meaningless.

Finally, Paragon argues that the district court’s

GHFLVLRQXQGHUPLQHVWKH0&$·VVLJQLÀFDQFHDVDEODQNHW

contract between the parties to be applicable to multiple

transactions. Paragon contends that Signet’s refusal to

apply the MCA to the new services on the morning of

August 24 occurred “at the 11th hour” when there was not

“opportunity to discuss or negotiate.” Further, Paragon

maintains that negotiations between in-house counsels

were ongoing, indicating an agreement on material terms.

Paragon argues that despite not executing Section I of the

MCA, the information was never in dispute between the

parties and so it governed services Signet offered during

Hurricane Harvey. It asserts that the MCA, established

in June 2015, remained in effect and encompassed the

VHUYLFHVSURYLGHGGXULQJWKDWSHULRG,QVHHNLQJVSHFLÀF

evidence that Signet agreed to provide services under

the MCA, Paragon contends, the district court “ignored

evidence that the MCA always governs.”

23a

Appendix A

In its Order and Opinion, the district court rejected

Paragon’s argument that the MCA should govern Signet’s

services during Hurricane Harvey, ruling that the MCA,

signed in 2015, provided a “framework” for potential

VHUYLFHV EXW ODFNHG VSHFLÀF SHUIRUPDQFH REOLJDWLRQV

The district court found that, because the terms of the

MCA explicitly did “not obligate” Signet “to charter their

vessels to Paragon,” or vice versa, it was Paragon’s task to

prove at trial that Signet agreed the MCA would govern

the services provided during Hurricane Harvey.

Based on trial testimony the district court concluded

that negotiations between corporate counsels began on

Wednesday, August 23, in anticipation of the tow Signet

originally planned to complete before the DPDS1’s

evacuation was canceled. At that time, e-mails between

the two representatives primarily focused on the essential

terms within the MCA’s Part II, such as insurance and

indemnity provisions, emphasizing the uncommon risks

posed by Hurricane Harvey. But the Coast Guard’s closure

of the port on the morning of August 24 and the failure

RIWKH'3'6·VHYDFXDWLRQOHGWRDVLJQLÀFDQWFKDQJHLQ

services: rather than towing it to the sea, the Signet tugs

would now be hired to help keep the DPDS1 moored to

the dock. At that point, the district court found, “Signet

expressly refused” to provide the new services under the

MCA. At trial, Barry Snyder—the President and owner

RI6LJQHW³WHVWLÀHGWKDWLQDSKRQHFDOOZLWK6FKHQNHOKH

told Schenkel that it would be “very dangerous” to use the

MCA for the hold-in-place services. During a deposition,

6FKHQNHOWHVWLÀHGWKDWKHFRXOGQRWUHPHPEHULIKHKDG

spoken with Snyder about whether the MCA would govern

24a

Appendix A

the hold-in-place services. Accordingly, the district court

held that Paragon could not demonstrate that Signet

agreed that the MCA would govern Signet’s assistance

at the dock.

The district court cited other factors for its holding

that the MCA did not govern Signet’s services during

Hurricane Harvey: First, while they discussed and

agreed on the MCA terms for the tow-out services,

after it became clear that Signet would instead provide

hold-in-place services, the parties did not complete the

MREVSHFLÀF0&$IRUPV7KLVVLJQDOHGDQXQGHUVWDQGLQJ

that the MCA did not cover the new services Signet would

provide. Second, the district court held that Paragon’s

focus on MCA’s Paragraph 1.3—which stated the MCA

“shall control and govern in all situations in which [Signet]

charter[ed] to [Paragon] a vessel or vessels”—overlooked

WKHEURDGHUFRQWH[WRIWKH0&$DV3DUW,,VSHFLÀHGWKDW

its application was to “offshore activities” and “voyages.”

While towing the DPDS1 out to sea would have fallen

under this contract, the district court held, the actual

services rendered during Hurricane Harvey did not.

We agree with the district court that the parties’

past conduct demonstrates that these services were

governed by the Tariff, while MCA discussions arose

when considering “offshore activities.” For example,

Signet billed Paragon according to the Tariff for the

services it provided during the water surges in June of

2017, and no party presented evidence that there had

been discussion under the MCA. After Hurricane Harvey,

Signet tugs held the DPDS1 stationary on the shore of

25a

Appendix A

the ship channel, and Signet billed Paragon for Tariff

rates, while later talks about a tow to Brownsville for

the drillship to be scrapped occurred under the MCA.

This consistent pattern illustrated the parties’ practical

distinction between services governed by the Tariff and

“voyages” or “offshore activities” that were conducted

under the aegis of the MCA.

The course of dealing is also persuasive evidence

that the Tariff did in fact govern Signet’s provision of

services during Hurricane Harvey. Federal maritime

law permits oral agreements to incorporate the terms of

a written document, such as the Tariff. Kossick v. United

Fruit Co., 365 U.S. 731, 734 (1961). And the course of

dealing between Paragon and Signet—in which Signet

provided services, Signet invoiced under the Tariff,

and Paragon paid without complaint—established a

common understanding consistent with industry customs.

We agree with the district court that the language of

Paragraph 5 of the Tariff explicitly excluding “assistance

to a deadship” or services during “heightened Coast Guard

SRUWFRQGLWLRQVµZDVIRUWKHEHQHÀWRI6LJQHWDQGFRXOG

be waived unilaterally under federal maritime and Texas

law. See Stauffer Chem. Co. v. Brunson, 380 F.2d 174, 182

WK&LU  ´:HUHFRJQL]HWKDWDOWHUDWLRQPRGLÀFDWLRQ

or waiver of contract provisions may be implied from the

acts and circumstances surrounding the performance

of such contract.”); Johnson v. Structured Asset Servs.,

LLC, 148 S.W.3d 711, 722 (Tex. App. 2004) (“A party can

waive contract provisions that are in the contract for his

EHQHÀWµ FLWLQJJoiner v. Elrod, 716 S.W.2d 606, 609 (Tex.

App. 1986))).

26a

Appendix A

The trial record supports the district court’s conclusion

that both parties understood that the Tariff would be the

contract under which Signet’s provision of services during

Hurricane Harvey would be governed, despite contrary

language that appeared within the Tariff—and that

Paragon was not forced to accept these terms. Similarly,

Paragon fails to show that the trial court misapplied

contract law in its holding that Signet’s waiver of its right

to draft separate agreements in scenarios such as risky

weather was permissible. Paragraph 5 of the Tariff was

GHVLJQHGIRU6LJQHW·VEHQHÀWEHFDXVHLWDOORZHGÁH[LELOLW\

in assigning tug services without individual negotiations

and gave Signet the opportunity to provide alternate

terms or ask for higher prices in case it provided riskier

services. Because Signet expressly agreed to perform

services under the Tariff on August 24, Signet waived

the restrictions outlined in Paragraph 5 for that instance.

The district court also rejected Paragon’s duress and

unconscionability defenses, holding that The Elfrida, 172

U.S. 186, 192 (1898), does not support Paragon’s claim

of unconscionable bargains under extreme conditions.

The Tariff’s consistent terms, accepted by both parties

in previous transactions, demonstrate its enforceability.

Furthermore, Paragon’s argument of immediate danger

fails, as it sought Signet’s services to support its mooring

system, and it was not in a “helpless condition” when

it hired Signet. The district court found that Paragon

failed to demonstrate that the Tariff is a contract of

DGKHVLRQEHFDXVHWKHUHZDVQRVLJQLÀFDQWRQHVLGHGQHVV

or procedural unconscionability—both parties are

“sophisticated commercial enterprise[s]” represented

27a

Appendix A

by counsel. On August 24, Paragon’s counsel, Jay Oliver,

sent an email to Scott Reid in response to Reid’s own

email advising him that the commercial teams had

agreed that the hold-in-place would take place under the

Tariff. Oliver’s email read “Thanks for the update—much

appreciated.” The district court concluded that the Tariff

continued to govern services through the August 28

incident, with Signet’s invoicing Paragon on August 31,

2017, and Paragon’s paying without objection.

Upon examination of the law and the record, the trial

court did not err in its holding that the Tariff rather than

the MCA governed the provision of tugs during Hurricane

Harvey. Important facts led the trial court, and lead

us, to the conclusion that the parties all agreed that the

Tariff governed: First, the uncontroverted testimony

of Barry Snyder was that he and Schenkel agreed to

the use of the Tariff. 3 Second, Scott Reid’s August 24

message clearly stated that “[b]ecause we will not be

towing, but instead will be holding the DPDS1 in place,

Signet’s work will be governed by our Ingleside Tariff.”

Paragon’s General Counsel responded, “Thanks for the

update—much appreciated.” Third, course of dealing

evidence showed that Signet billed Paragon according

to the Tariff on multiple occasions for hold-in-place

activities and that Paragon had paid these bills without

complaint, while discussions about tows out of the harbor

involved negotiations under the MCA. Fourth, Signet also

billed Paragon under the Tariff on August 31, 2017, for

3. Schenkel testified that he could not remember the

conversation.

28a

Appendix A

the services it provided during Hurricane Harvey, and

Paragon paid without objection.4

Taken together, the evidence presented at trial

indicates that the Tariff rather than the MCA governed

the hold-in-place services that Signet provided when it

became clear that its tugs would no longer be towing the

DPDS1 to Port Aransas after the failed evacuation.

V.

+DYLQJUHYLHZHGWKHIDFWVDQGUHFRUGZHÀQGWKDW

the district court did not err in applying maritime

negligence law, in holding that the force majeure defense

was not available to Paragon, or in concluding that the

Tariff governed the services that Signet provided during

Hurricane Harvey. Therefore, we AFFIRM the rulings

of the district court’s Opinion and Order.

4. See One Beacon Ins. Co., 648 F.3d at 266 (ruling against

DOLWLJDQWWKDW´UDWLÀHGWKHLUFRXUVHRIGHDOLQJ>ZLWKWKHDGYHUVH

party] by submitting an invoice for the work on the barge without

objecting to the terms and conditions”).

29a

B ORDER AND

APPENDIX B —Appendix

AMENDED

OPINION OF THE UNITED STATES DISTRICT

COURT FOR THE SOUTHERN DISTRICT OF

TEXAS, BROWNSVILLE DIVISION,

FILED AUGUST 17, 2022

UNITED STATES DISTRICT COURT

FOR THE SOUTHERN DISTRICT OF TEXAS

BROWNSVILLE DIVISION

CONSOLIDATED

No. 1:17-cv-00203

PARAGON ASSET COMPANY LTD,

AS OWNER OF THE DRILLSHIP DPDS1

v.

GULF COPPER & MANUFACTURING

CORPORATION, et al.

No. 1:17-cv-00247

SIGNET MARITIME CORPORATION,

AS OWNER OF THE TUG SIGNET ENTERPRISE,

ITS ENGINES, TACKLE, ETC., IN A CAUSE

OF EXONERATION FROM OR

LIMITATION OF LIABILITY

30a

Appendix B

No. 1:18-cv-00035

SIGNET MARITIME CORPORATION,

AS OWNER OF THE TUG SIGNET ARCTURUS,

ITS ENGINES, TACKLE, ETC., IN A CAUSE

OF EXONERATION FROM OR

LIMITATION OF LIABILITY

Filed: August 17, 2022

AMENDED ORDER AND OPINION1

Judge Rodriguez

On August 25, 2017, Hurricane Harvey made landfall

near Corpus Christi as a Category 4 hurricane. In nearby

Port Aransas, the drillship DPDS1 lay docked, with no

crew, but with two tug boats alongside to help keep her

in place during the storm. Shortly before 11:00 p.m.,

the DPDS1 broke free from her moorings. The drillship

immediately propelled the two tug boats into adjacent

semisubmersible oil rigs, damaging those vessels and

sinking one tug boat and impairing the other. The DPDS1

itself moved into and grounded in the ship channel, but

UHÁRDWHGWKUHHGD\VODWHUWUDYHOLQJDFURVVWKHFKDQQHODQG

1. This Amended Order and Opinion supersedes the Order

and Opinion (Doc. 461) that the Court issued on March 31, 2022.

The Amended Order and Opinion takes into consideration the

arguments that the parties presented in Signet’s Motion to

Supplement and Modify the Court’s Order and Opinion (Doc.

463), Paragon’s Motion to Amend or Clarify (Doc. 464-1), and the

UHODWHGEULHÀQJ

31a

Appendix B

alliding with and damaging a research pier. The alleged

damages total well over $10,000,000.

7KUHH&RPSODLQWVLQ/LPLWDWLRQHQVXHGÀOHGE\WKH

respective owners of the DPDS1 (Paragon) and the two

WXJ ERDWV 6LJQHW  (DFK SDUW\ ÀOHG FRXQWHUFODLPV DQG

the owner of the semisubmersible oil rigs (Noble) and the

UHVHDUFKSLHU 7KH8QLYHUVLW\RI7H[DV ÀOHGFODLPVIRU

the damage to their property. Gulf Copper, which owned

WKHSLHUWRZKLFKWKH'3'6KDGEHHQGRFNHGDOVRÀOHGD

claim for damage to that pier. And Paragon made claims

against Signet’s insurer, American Club. 2

The parties completed extensive discovery and motion

practice, and in the process settled the claims that Noble,

WKH8QLYHUVLW\RI7H[DVDQG*XOI&RSSHUÀOHG,Q-XO\

DQG$XJXVWRIWKH&RXUWKHOGDÀYHGD\EHQFKWULDO

on the claims remaining between Paragon, Signet, and

$PHULFDQ&OXE$WWULDOZLWQHVVHVWHVWLÀHGDQGWKH

Court admitted over 1,200 exhibits. 3

2. Several parties possess a complex corporate structure,

which the parties do not dispute and which they set out as

Admissions of Fact within the Joint Pretrial Order. (Joint Pretrial

Order (“JPO”), ¶¶ 1–4, 6, (Doc. 314, 35–40)) The Court adopts those

admitted facts and for convenience will refer to the respective

corporate parties as Paragon, Signet, American Club, Noble, Gulf

Copper, and the University of Texas.

3. The parties also presented 16 witnesses by deposition.

See P.Ex.45–P.Ex.56 (Docs. 446-1–12); S.Ex.331–S.Ex.334 (Docs.

431-2–5). The Court accepted the deposition excerpts as if the

ZLWQHVVHVKDGWHVWLÀHGDWWULDO

32a

Appendix B

In this Order and Opinion, based on the voluminous

trial record and the applicable law, the Court renders its

ÀQGLQJVRIIDFWDQGFRQFOXVLRQVRIODZDVWRWKHGDPDJHV

caused by the relevant events, and the comparative liability

for those damages as between Signet and Paragon.

I.

Findings of Fact

A.

The History of the DPDS1

In 1979, the Dynamically Positioned Drillship Number

1 (“DPDS1”) began operating as a 449-foot, Liberian

ÁDJJHG GHHS ZDWHU GULOOLQJ VKLS 7KH YHVVHO SRVVHVVHG

thrusters that enabled it to remain dynamically positioned

over a drilling site in deep water. Over the decades,

various owners maintained and upgraded the drillship.

For example, in 2008, the owners fully refurbished the

vessel at an estimated cost of $350-500 million.

In 2010, Noble, Paragon’s parent company at the time,

acquired the DPDS1. Over the next few years, Noble

added new equipment and otherwise improved the vessel

in preparation for work off the Brazilian coast. Aldert

Schenkel, Paragon’s Vice President of Engineering,

oversaw this work and stated that the DPDS1 “was in

really good shape” at that time.4

In 2014, Noble spun off Paragon, which became

the sole owner of the DPDS1. The drillship continued

4. Schenkel Dep. (Vol. II), 180:12–13, P.Ex.45 (Doc. 446-1,

129).

33a

Appendix B

operations in Brazil. The following year, a downturn

in the crude oil market decreased the demand for deep

water drilling ships. As a result, Paragon decided to move

the vessel to Port Arthur, Texas, and the drillship never

again had commercial working ventures. By no later than

mid-August 2017, Paragon intended to scrap the DPDS1. 5

Between 2015 and 2017, the DPDS1 remained “cold

stacked”—i.e., the vessel was essentially shut down

without a crew onboard—at two separate locations in

Texas: Port Arthur and Port Aransas. During these years,

four Paragon employees held primary responsibility

for the DPDS1’s management and care: Charlie Yester

(Senior Vice President of Operations), Aldert Schenkel

(Vice President of Engineering), Michael Koenig (Marine

Operations Manager), and Jason Petten (Technical Marine

0DQDJHU 7KH\HDFKSRVVHVVHGVLJQLÀFDQWH[SHULHQFHLQ

the maritime drilling industry, although they possessed

limited experience preparing for hurricane season in the

Gulf of Mexico.

B. Paragon and Signet Business Relationship

1.

The Master Charter Agreement (“MCA”)

In June 2015, Paragon and Signet began their

business relationship by jointly creating a Master Charter

Agreement (MCA) to govern at least some of their

business dealings. Within the industry, companies who

plan to repeatedly work together commonly use an MCA to

5. Koenig Day 2 Tr., 19:15–24 (Doc. 448).

34a

Appendix B

“pre- negotiate such things as the indemnities, warranties,

[and] governing law”.6 Each company assigned an inhouse counsel—Jay Oliver, Assistant General Counsel for

Paragon, and Scott Reid, General Counsel for Signet—to

represent its respective interests in the negotiations.

The parties ultimately signed the MCA.7 This

successful conclusion, however, did not create an

enforceable contract. Rather, the signed document solely

provided a form to shorten the negotiation and drafting

process when Paragon required vessel-chartering

services for specific projects. The MCA established

a standard base of legal terms for certain work that

Paragon might contract in the future from Signet, and

allowed the companies’ respective commercial teams to

ÀQDOL]HLQGLYLGXDOYHVVHOKLUHVPRUHTXLFNO\E\SURYLGLQJ

RQO\WKHGHWDLOVQHHGHGIRUWKHYHVVHOVSHFLÀFDWLRQVVXFK

as the rate, time, and pick up and redelivery locations.

5HLG WHVWLÀHG WKDW RQH RI 6LJQHW·V SULPDU\ PRWLYDWLRQV

for entering into the MCA was that the company viewed

Paragon as a desirable customer in the Gulf of Mexico.

The MCA contained three sections: (1) a three-page

manuscript outlining the intent of the agreement; (2)

Part I of the Baltic & International Maritime Council

(BIMCO) SUPPLYTIME 2005 Uniform Charter Party

for Offshore Service Vessels; and (3) Part II of the BIMCO

form, which contained detailed provisions that would

govern all services provided. The BIMCO form functioned

6. Oliver Day 2 Tr., 297:8–18 (Doc. 448).

7. Master Charter Agreement, P.Ex.4 (Doc. 409-2).

35a

Appendix B

as a towage contract. Part I contained 35 blank boxes

WKDWWKHSDUWLHVÀOOHGZLWKHDFKMRE·VVSHFLÀFFRPPHUFLDO

terms, such as the services to be provided, the vessel that

would be supplied, the time and place of delivery, and the

rates. Such terms varied from project to project, and the

companies’ business representatives, rather than in-house

FRXQVHO ZRXOG DJUHH XSRQ WKHP 2OLYHU WHVWLÀHG WKDW

absent completion of Part I, “you don’t have a charter.”8

Within Part II, Section 1.3 indicated that the MCA

“shall control and govern in all situations in which Owners

[(Signet)] charter to Charterers [(Paragon)] a vessel or

vessels, and the terms and conditions of this Agreement

shall be deemed incorporated by reference”.9 At the same

time, other sections of Part II noted that the contract

applied to “offshore activities” and “voyages”,10 and no

section referenced hold-in-place or in-harbor services.

2.

The Signet Tariff

In August 2016, Signet published its tariff terms and

conditions for the Ingleside division of its operations, a

document referred to as the “Tariff ”.11 The agreement

applied to tug services that Signet provided to customers

within the greater Corpus Christi port area.

8. Oliver Day 2 Tr., 310:24–311:9 (Doc. 449).

9. Master Charter Agreement, P.Ex.4 (Doc. 409-2, 1).

10. Id. at 11 (Section 6(a)).

11. Signet 2016 Ingleside Tariff, S.Ex.1 (Doc. 414).

36a

Appendix B

Tug companies in United States ports commonly

use tariffs, which establish the terms of service, such as

the applicable rate and indemnity obligations, so that all

HQWLWLHVUHFHLYHWXJVHUYLFHVZLWKLQDVSHFLÀFSRUWRQHTXDO

terms. During the relevant period, Signet’s competitors

within the Greater Port of Corpus Christi maintained

tariffs with set rates, terms, and conditions. Signet

delivered its Tariff to customers every January and after

VLJQLÀFDQWPRGLÀFDWLRQV

The parties did not provide evidence as to whether or

when Signet delivered the Tariff to Paragon before August

2017. At the same time, Paragon does not dispute that it

could have accessed the Tariff, as Signet had published it.

C.

The DPDS1 in Port Arthur, Texas

In 2015, Paragon cold stacked the DPDS1 at the Gulf

Copper berth in Port Arthur, Texas. The vessel had no

permanent crew onboard, but a mooring crew and Paragon

employees regularly performed inspections. The DPDS1

DOZD\VUHPDLQHGDÁRDWDQGPDLQWDLQHGLWVQDYLJDWLRQDO

aids, including battery-operated lights. Paragon also

installed a RigStat GPS system to track small movements

by the rig and to detect any leakage on the vessel through

level sensors on the bilges. At least once a week, Koenig

would check on the DPDS1 to do “whatever needed to be

done”.12

In early 2017, however, the dock owners in Port Arthur

decided to convert the dock’s use. This decision forced

Paragon to relocate the DPDS1.

12. Koenig Day 1 Tr., 162–63 (Doc. 448).

37a

Appendix B

Koenig oversaw the site-selection process for the new

location, and he ultimately chose to dock the DPDS1 at

Port Aransas. He considered several potential sites along

the Gulf Coast, factoring in water and land access points,

potential hazards beneath the water’s surface, the quality

of the dock bollards, and the potential effect that adjacent

VKLS WUDIÀF FRXOG KDYH RQ GHYLVLQJ D VXLWDEOH PRRULQJ

arrangement. He considered each site’s proneness to

hurricanes, weighing the potential berth’s location and

possible hurricane landfalls. This analysis included

reviewing studies of the historical tracks of hurricanes

approaching the Texas coastline. Koenig did not detail

WKHVSHFLÀFKLVWRULFDOLQIRUPDWLRQWKDWKHUHYLHZHGEXW

6LJQHW·V ZHDWKHU H[SHUW -RVHSK 6SDLQ WHVWLÀHG WKDW

between 1951 and 2020, 23 hurricanes passed or made

landfall within 50 nautical miles of Port Aransas. He

explained that in a ten-year period, a 41.1% chance exists

of a major hurricane striking the Texas coast, and that in

his opinion, “in any given year,” a vessel owner along this

coastline “[has] to be prepared for a major hurricane.”13

Paragon maintained a general written hurricane

plan, but prepared such plans for individual vessels only

if local laws required it. In Port Aransas, no laws or local

authorities imposed such a requirement for a docked

vessel.14 Still, Paragon understood that when tropical

weather activity posed a threat to a docked vessel,

13. Spain Day 5 Tr., 90:18–20 (Doc. 452).

14. In contrast, when Paragon docked a drillship in Puerto

Rico, local laws required a written hurricane plan for the vessel,

so Paragon prepared one. Koenig Day 2 Tr., 36:4–16 (Doc. 449).

38a

Appendix B

Paragon had to choose between leaving the vessel docked

during the storm or towing the vessel out to sea. In

making this decision, Paragon would weigh the potential

ULVNVEHQHÀWVDQGFRVWVRIHDFKRSWLRQ

To track potential threats, Paragon monitored tropical

weather activity by receiving daily weather reports,

principally from WeatherOperations (“WeatherOps”),

which reported a storm’s current intensity, conditions,

location, and anticipated landfall. In addition, Paragon

PRQLWRUHG WKH JHQHUDO DQG VSHFLÀF KXUULFDQH ZHDWKHU

reports from the National Hurricane Center (“NHC”).

Although Koenig testified about the analysis he

undertook during the site-selection process, no Paragon

UHSUHVHQWDWLYHWHVWLÀHGDERXWZKDWWKHFRPSDQ\OHDUQHG

from that assessment. For example, Schenkel could not

UHFDOODQ\VSHFLÀFUHSRUWVWKDW.RHQLJ RUDQ\RQHHOVHDW

Paragon) generated from the analysis.15

Ultimately, Paragon decided to moor the DPDS1 at the

Gulf Copper dock in Port Aransas. On May 30, Paragon

had the DPDS1 towed to its new berth. Before the tow,

Paragon hired Hugh Gallagher with Dutton’s Navigation,

DQ RXWVLGH PDULQH VXUYH\ ÀUP WR LQVSHFW WKH '3'6

*DOODJKHUFHUWLÀHGWKDWWKHGULOOVKLSZDVLQJRRGFRQGLWLRQ

for the tow.16

15. Schenkel Dep. (Vol. I), 168:14–25, 172:22, 173:1–9, P.Ex.45

(Doc. 446-1, 44–45).

16. Gallager Dep., 81:1-8, P.Ex.50 (Doc. 446-6, 22).

39a

Appendix B

D.

Port Aransas, May–July 2017

For the move to Port Aransas, Paragon required the

services of tug boats to tow the DPDS1 from Port Arthur

to Harbor Island, near the port of Corpus Christi. Paragon

negotiated with Signet under the MCA for the services

of its tugs. The parties agreed on Part I of the BIMCO,

but never executed the document for these services.

Paragon ultimately chose another tow service provider,

which towed the DPDS1 to Harbor Island. From that

point, Paragon hired four Signet tugs to assist the DPDS1

to the Gulf Copper dock. For these services, the parties

never discussed the MCA, and Signet invoiced Paragon

in accordance with the Tariff.

On May 30, the DPDS1 arrived at her new berth. The

vessel lay bow in to the slip, with the dock to her port, and

with the Noble semisubmersible oil rigs moored across

the slip to the DPDS1’s starboard.

Schenkel, Koenig, and Petten designed the mooring

system for the drillship at this location. To evaluate the

strength of the system, Paragon hired the consulting

company Genesis Engineering. The first evaluation

occurred in late May, before the DPDS1 reached the Gulf

Copper dock. Paragon provided Genesis with the line

types, which included 10 three-inch Dyneema ropes and

10 three-inch polyester ropes. In general, different lines

exhibit varying breaking strengths and elasticity. The

Dyneema lines represented class two ropes, possessing

higher breaking strength and lower elasticity. Class one

40a

Appendix B

ropes, such as polyester lines, exhibit higher elasticity, but

possess lower breaking strength. In addition, the tension

on the ropes, and the evenness of the tension across all

the lines, can impact the overall strength of a mooring

system. For its initial report, Genesis applied assumed

WHQVLRQ PHWULFV $OWKRXJK 3DUDJRQ UHFHLYHG WKH ÀUVW

Genesis report, it is apparent that Paragon never utilized

the mooring system depicted in that analysis.

Shortly after docking the DPDS1 at the Gulf Copper

dock, an issue arose regarding the mooring system. On

DWOHDVWÀYHRFFDVLRQVEHWZHHQ0D\DQG-XQHODUJH

tanker vessels passing near the docked DPDS1 caused

“surge incidents”, in which a tanker vessels’ passage

caused the water level to rise and fall rapidly. Several

mooring lines holding the DPDS1 in place parted, and

metal mooring components called double bits or double

bollards broke away from their welded bases on the

vessel’s deck. The DPDS1 never broke away from the dock,

but on numerous occasions, Paragon hired Signet tugs to

come alongside the vessel to ensure that it remained in

place.

In response to the surge incidents, Paragon took steps

to strengthen the mooring system, including installing

new bollards and upgrading at least some of the mooring

ropes from polypropylene to higher-quality Dyneema

lines. Paragon also replaced all the bits on the drillship’s

port side, regardless of whether they had broken during

the surge incidents. Additionally, Paragon installed chains,

which were “heavy-duty steel wire/chain combinations”

41a

Appendix B

that absorbed the energy of the surges.17 Koenig explained

that Paragon used “two different class[es] of rope” to

create “a more balanced system”.18 He estimated that the

overall improvements and the analysis cost approximately

$500,000.

After Paragon completed the improvements, Petten

conferred with Genesis to re-evaluate the mooring system.

Paragon again informed Genesis of the line types, which

consisted of thirteen lines, including six three-inch

Dyneema lines, two wire-chain-wire combinations, and

ÀYHWKUHHLQFKSRO\HVWHUOLQHV,QLWV-XQHUHSRUW*HQHVLV

concluded that the mooring system could withstand

sustained winds of approximately 75 miles per hour

without exceeding industry recommended stress levels on

each mooring line.19 Standard mooring-marine guidelines

recommend that the lines possess a minimum factor of

safety (“FOS”) of 2.0, which means that the tension on the

rope is half of its minimum breaking strength. 20 As the

17. Koenig Day 2 Tr., 203 (Doc. 449); Yester Day 2 Tr., 57

(Doc. 449); Schenkel Dep. (Vol. I), 71:21–72:23, (Vol. II),

229:3–230:11, P.Ex.45 (Doc. 446-1, 20, 142).

18. Koenig Day 1 Tr., 203:19–205:25 (Doc. 448) (“[I]f you’re

mooring up to stay for a while, like we were, that’s important to

have a balanced system and one that’s analyzed by an engineering

company.”).

19. Genesis Engineering Report, June 26, 2017, S.Ex.160

(Doc. 423-13). Various sources utilize both knots per hour and

miles per hour when reporting wind speeds. For consistency, the

Court converts all wind speed measurements to miles per hour.

20. Greiner Day 4 Tr., 279:7-8 (Doc. 451).

42a

Appendix B

factor of safety decreases, the probability that the mooring

line will fail increases. The Genesis reports consistently

reported conclusions based on a 2.0 FOS.

The improvements resolved the issue of the surge

incidents.

In July, Genesis conducted another analysis, again

relying upon the line types that Paragon provided. In this

evaluation, Genesis assumed a mooring system composed

of eleven lines, including four three-inch Dyneema lines,

ÀYHWKUHHLQFKSRO\HVWHUOLQHVDQGWZRZLUHFKDLQZLUH

combinations. 21 Not only did the total number of lines

decrease by two as compared to the June report, but the

placement of the lines between the available anchor points

shifted. The record does not make clear what prompted

Paragon to request this analysis, or whether the changes

UHÁHFWHGDFWXDOPRGLÀFDWLRQVWRWKHPRRULQJV\VWHP,Q

this July report, Genesis concluded that the depicted

mooring system could withstand sustained wind speeds of

approximately 77 to 80 miles per hour, which represents

a low-level Category 1 hurricane. 22

In early August, based on the Genesis reports,

Paragon representatives communicated regarding the

conditions that would require the DPDS1’s evacuation.

21. Genesis Engineering Report, July 3, 2017, S.Ex.161 (Doc.

423-14).

22. See 6DIÀU6LPSVRQ +XUULFDQH :LQG 6FDOH GHÀQLQJ D

Category 1 hurricane as possessing sustained winds between 74

and 95 miles per hour).

43a

Appendix B

Petten concluded that the mooring analysis “show[ed]

the facility could stay on location up to a Category

1 hurricane”. 23 Koenig reached the same conclusion,

and he intended to order the DPDS1’s evacuation if

a predicted storm threatened to exceed the mooring

system’s capacity.24 Schenkel recommended a conservative

approach: “[T]o be sure we leave port in time, the word

‘hurricane’ needs to be broadly interpreted as a severe

storm.” 25 He continued: “Due to the uncertainty in the

predictions the DPDS1 should depart (10 days prior land

fall) when a storm is approaching with a predicted wind

speed of approx. [63+ miles per hour] which is equivalent

to a BF 10 storm (range [55 to 63 miles per hour]).” 26

Shortly after this communication, he followed up to clarify

that the vessel would “leave port 3 days prior to landfall”

and would spend 10 days offshore. 27

Consistent w ith these email communications,

6FKHQNHOWHVWLÀHGWKDW3DUDJRQDOZD\VSODQQHGWRWRZWKH

DPDS1 into the Gulf of Mexico in advance of a storm. 28 As

a result, he was not concerned that the mooring system

was incapable of withstanding more severe hurricane

23. Petten Day 2 Tr., 175:23–25 (Doc. 449).

24. Koenig Day 1 Tr., 147–49, 209 (Doc. 448).

25. Schenkel Email, S.Ex.271 (Doc. 429-10, 1–2).

21).

26. Id.; Schenkel Dep. (Vol. I), 77:9–21, P.Ex.45 (Doc. 446-1,

27. Schenkel Email, S.Ex.271 (Doc. 429-10, 1).

28. Schenkel Dep. (Vol. I), 193:1–21, P.Ex.45 (Doc. 446-1, 50).

44a

Appendix B

conditions. In other words, Paragon had designed its

system to withstand no more than the winds of a Category

1 hurricane, intending to evacuate the DPDS1 from the

port in the event of a stronger storm.

At trial, Koenig and Yester described the competing

risks involved in the decision to keep a drillship such as

the DPDS1 in port or to tow it out to sea when a storm

approached. Koenig emphasized the safety risks posed

by towing a cold-stacked vessel like the DPDS1 out to

sea. The tugboat crew would face inherent threats. For

example, the fact that the drillship would have no crew

meant that if a tow line became unattached while at sea,

no one would be onboard to reattach the line. In addition, if

the vessel collided with an offshore oil platform or another

vessel in the Gulf of Mexico, the tugboat would need to

cut loose from the vessel or potentially be damaged. In

addition, the drillship itself could sink and hit a pipeline,

causing environmental damage.

Yester explained that in general, he would “wait as

long [as he could] to make the decision” of whether to

remain in port or tow the DPDS1 out to sea, because of the

unpredictable nature of tropical weather events, combined

with the slow speed at which a vessel must be towed. 29 As

he explained, taking a drillship to sea could inadvertently

place the vessel directly in the storm’s path. 30 In addition,

towing a vessel out to sea entailed a cost ranging from

$300,000 to $900,000.

29. Yester Day 1 Tr., 65:1–2 (Doc. 448).

30. Id. at 64:13–66:19.

45a

Appendix B

E. Hurricane Harvey

1.

Thursday and Friday, August 17–18, 2017

On Thursday, August 17, the NHC issued an advisory

for Potential Tropical Cyclone Nine, reporting that the

storm had strengthened into Tropical Storm Harvey

and lay east of the Caribbean Sea. 31 The WeatherOps

report for the same day forecasted that the storm would

travel in a westward direction and reach Honduras and

Guatemala within three and four days, respectively.

WeatherOps noted that “some model guidance does

continue to strengthen the system to a low-end Category

1 Hurricane just before it reaches Belize.”32 At the same

WLPHWKHUHSRUWFODULÀHGWKDWEHFDXVHRI´ORZFRQÀGHQFH

in the intensity forecast beyond 36 hours”, WeatherOps

did not forecast that Tropical Storm Harvey would become

a hurricane. 33

On Friday, August 18, the WeatherOps report

maintained Tropical Storm Harvey on a westwardly

track, with little to no change in trajectory as compared

to the previous day’s forecast. 34 The report continued to

31. NHC Potential Tropical Cyclone Nine Forecast/Advisory

1, P.Ex.13 (Doc. 410-14, 7).

32. WeatherOps Active Storm Advisory # 9, P.Ex.13 (Doc.

410-14, 13).

33. Id.

34. WeatherOps Active Storm Advisory # 10, P.Ex.13 (Doc.

410-14,21).

46a

Appendix B

predict that the storm would not reach hurricane strength.

The NHC advisory reported that “slow strengthening is

possible during the next 48 hours.” 35

Both Paragon and Signet received these reports.

Signet personnel believed that Tropical Storm Harvey’s

“current predictions should have her clear of all Signet

Vessels” in the Port Aransas area. 36 Paragon employees

noted the storm, but when they “left work Friday, it was,

well, let’s see Monday what’s going on. Because it was on

the other side of Mexico, . . . and we didn’t know what was

going to happen.” 37

2.

Saturday and Sunday, August 19–20

At 4:00 p.m. on Saturday, August 19, 38 the NHC

advised that Tropical Storm Harvey had weakened to

a tropical depression. 39 WeatherOps predicted that the

storm would make landfall over the Yucatan Peninsula

and was unlikely to reach the Texas coast. 40 By late

35. NHC Tropical Storm Harvey Advisory 3A, P.Ex.13 (Doc.

410-14, 23).

36. Signet E-mail, P.Ex.13 (Doc. 410-14, 47).

37. Yester Day 1 Tr., 69:23–70:3 (Doc. 448).

38. Various exhibits utilize different time zones. For

convenience, the Court converts all time references to Central

Daylight Time.

39. NHC Tropical Depression Harvey Advisory # 10, P.Ex.13

(Doc. 410-14, 66).

40. WeatherOps Atlantic Tropical Daily Planner, P.Ex.13

(Doc. 410-14, 64).

47a

Appendix B

Saturday evening, the NHC advised that the “Remnants

of Harvey” had degenerated into a “Tropical Wave,” and

that the NHC would not release another public advisory on

the system “unless regeneration occurs”.41 Similarly, the

WeatherOps report indicated that “Harvey has weakened

below tropical depression level and is no longer considered

a threat.”42

During the early hours of Sunday, August 20,

WeatherOps continued to monitor the situation, noting

that while the system had “weakened into an open wave”,

the “remnants may reintensify toward the end of the

week over the Bay of Campeche”. 43 By mid-morning,

WeatherOps reported that the remnants had “become

better organized” and that a “moderate potential

[existed] for restrengthening into a minimal depression or

tropical storm prior to reaching northern Honduras and

the Yucatan peninsula.”44 The accompanying graphical

“Forecast Track” depicted a path that would have the

storm make landfall as a tropical storm near Tampico,

Mexico, with the cone of uncertainty possibly reaching into

41. NHC Remnants of Harvey Advisory # 11, P.Ex.13 (Doc.

410-14, 71).

42. WeatherOps Active Storm Advisory – Tropical Depression

Harvey 18, P.Ex.13 (Doc. 410-14, 72).

43. WeatherOps Atlantic Tropical Daily Planner, P.Ex.13

(Doc. 410-14, 75).

44. :HDWKHU2SV6LJQLÀFDQW7URSLFDO'LVWXUEDQFH$GYLVRU\

– Harvey 9, P.Ex.13 (Doc. 410-14, 76).

48a

Appendix B

deep south Texas, but not as far north as Port Aransas.45

Yester testified that he understood that the cone of

uncertainty meant that the storm’s track could fall within

any portion of the cone.46 Six hours later, the next report

communicated similar information.47

That Sunday evening, WeatherOps reported that

the storm remained likely to develop, at most, into a

tropical storm.48 )RU WKH ÀUVW WLPH KRZHYHU WKH ORQJ

range (i.e., 120-hour) cone of uncertainty included the

Port Aransas area.49 The new projection meant that a

tropical storm could make landfall near the DPDS1 by the

HQGRIWKHZHHN.RHQLJWHVWLÀHGWKDWDWVRPHSRLQWRYHU

the weekend, the storm “got my attention and I started

letting [Schenkel] and [Yester] know that we needed to

watch [] the weather [] and consider moving the DPDS1

out of port.”50

The storm also captured the attention of at least

one other vessel owner, Noble, which had two drill ships

45. WeatherOps Tropical Disturbance Harvey Advisory # 19,

P.Ex.13 (Doc. 410-14, 77).

46. Yester Day 1 Tr., 139:5–21 (Doc. 448).

47. WeatherOps Tropical Disturbance Harvey Advisory # 20,

P.Ex.13 (Doc. 410-14, 80).

48. WeatherOps Tropical Disturbance Harvey Advisory # 21,

P.Ex.13 (Doc. 410-14, 83).

49. Id.

50. Koenig Day 1 Tr., 227:1–15 (Doc. 448); see also Yester

Day 1 Tr., 80–81 (Doc. 448).

49a

Appendix B

docked further south in Port Isabel, Texas. On Sunday,

the WeatherOps projected track for the weather system

placed Port Isabel slightly outside the cone of uncertainty’s

northern boundary, with the storm’s landfall projected

for Friday, August 25, south of Tampico, Mexico, with

maximum sustained winds of 70 miles per hour. 51 Based

on its severe weather plan, Noble immediately began

evacuating its drill ships. 52

3.

Monday, August 21

By 10:00 a.m. on Monday morning, WeatherOps had

UHOHDVHG WZR PRUH UHSRUWV ZKLFK SURYHG VLJQLÀFDQW

The storm remained a tropical disturbance and was

“generally not well- organized”.53 In the 4:00 a.m. report,

WeatherOps predicted that on August 25, Harvey would

reach maximum wind speeds of 65 miles per hour. 54 Six

hours later, WeatherOps reduced this forecast, indicating

that maximum winds on August 25 would reach only 60

miles per hour. 55 In both reports, the forecasted track

51. WeatherOps Tropical Disturbance Harvey Advisory # 20,

P.Ex.13 (Doc.410–14, 80).

52. Report for the SIGNET ARCTURUS, S.Ex.29 (Doc.

416-3, 5–9).

53. WeatherOps Tropical Disturbance Harvey Advisory

# 23, P.Ex.13 (Doc. 410-14, 89).

54. WeatherOps Tropical Disturbance Harvey Advisory

# 22, P.Ex.13 (Doc. 410-14, 86).

55. WeatherOps Tropical Disturbance Harvey Advisory

# 23, P.Ex.13 (Doc. 410-14, 89).

50a

Appendix B

KDGVKLIWHGVLJQLÀFDQWO\QRUWKZDUGSODFLQJ3RUW$UDQVDV

well within the long-term cone of uncertainty. At the

same time, the predicted landfall remained in northern

Mexico. 56

At 11:05 a.m. that morning, Schenkel communicated

to Koenig that while concern existed, they had time before

PDNLQJDGHÀQLWLYHGHFLVLRQUHJDUGLQJWKH'3'6

The storm Harvey is moving in and get[ting]

closer to the DPDS1 (within 96 hours) than

anticipated and will be at [60 miles per hour]

within 96 hours (reduced over the last 6 hours).

The max allowable wind speed for the DPDS1

[to tow out to sea] was set at [72 miles per hour]

and notice period for readiness 72 hours. We

have to make a decision within the next 24 hours

about the next step since the speed is close to

the acceptable speed of [63 miles per hour] to

start preparing departure. It seems we don’t

have to do anything yet. 57

A few minutes later, Yester forwarded the WeatherOps

reports to Schenkel, opining that he did not “see where

we are in any danger unless something causes a drastic

56. :HDWKHU2SV6LJQLÀFDQW7URSLFDO'LVWXUEDQFH$GYLVRU\²

Harvey # 24, S.Ex.74 (Doc. 419-8, 41–46) (“The GFS and ECMWF

are in rather good agreement, bringing Harvey as a tropical storm

to a position just south of Brownsville by Friday afternoon.”).

57. Schenkel Email, S.Ex.271 (Doc. 429-10, 4).

51a

Appendix B

turn to the North.”58 Koenig disagreed, testifying that

based on these reports, he recommended that morning

that Paragon evacuate the DPDS1. 59 Paragon chose to

ZDLWEHIRUHPDNLQJDGHÀQLWLYHGHFLVLRQ

At the same time, Yester “decided to start whatever

process it took to get port clearance and tugboats and

everything ready to go” to prepare for the possibility

that the storm would take a turn to the North.60 He

recognized that he had to start the process as soon as

possible because it required two to three days to obtain

the necessary approvals and secure the required logistical

support. Late that morning, he called Patrick McTigue

of Signet to reserve tugs to tow the DPDS1 into the Gulf

of Mexico in the event that Paragon decided to evacuate

WKHYHVVHO.RHQLJWHVWLÀHGWKDW6LJQHWZDVJRLQJWREH

the only vendor to assist the DPDS1 with an evacuation,

meaning that Signet would provide both the harbor tow

and offshore tow services. McTigue provided a “Scope

of Work Estimated Cost Analysis” shortly after Koenig

called him.617KHVDPHGD\.RHQLJEHJDQWRÀOORXWWKH

applications for the United States Coast Guard and port

authorities and contacted Dutton’s Navigation to have a

VXUYH\RUYLVLWWKHYHVVHOWRREWDLQDFHUWLÀFDWLRQDSSURYLQJ

the towing gear and towing arrangement. He took these

58. Yester Email, P.Ex.17-A-Part 1 (Doc. 410-31, 252).

59. Koenig Day 2 Tr., 41:11–13 (Doc. 449).

60. Yester Day 1 Tr., 71:7–9 (Doc. 448).

61. Signet’s “Scope of Work Estimated Cost Analysis”,

P.Ex.17-A-Part 1 (Doc. 410-31, 1–2).

52a

Appendix B

steps “while we were seeing the storm progress and people

above [him]” made the decisions regarding the vessel.62

That afternoon, at 4:00 p.m., WeatherOps released its

next report, forecasting that Harvey would make landfall

“just south of Brownsville” on Friday, August 25, with

maximum winds of 70 miles per hour.63 Corpus Christi

lay well within the cone of uncertainty. The projected

track had shifted to the north, and WeatherOps explained

that certain factors “may result in additional northward

adjustments.”64

Six hours later, in its final report for Monday,

WeatherOps indicated “[n]o significant changes . . .

regarding the track or intensity forecast”.65 The report

forecasted that Harvey would “make landfall over

northern Mexico or the Lower Texas Coast as a strong

tropical storm or hurricane between 72 and 96 hours.”66

The maximum sustained wind speeds for Friday, August

25 were still predicted to be 70 miles per hour. Paragon

representatives do not appear to have commented upon

either of these latest revised forecasts.

62. Koenig Day 1 Tr., 230:20–23 (Doc. 448).

63. WeatherOps Tropical Disturbance Harvey Advisory

# 24, P.Ex.13 (Doc. 410-14, 93).

64. Id.

65. WeatherOps Tropical Disturbance Harvey Advisory

# 25, P.Ex.13 (Doc. 410-14, 96).

66. Id.

53a

Appendix B

At least one company, Rowan Companies, decided

by no later than Monday to evacuate the Port Aransas

port. Rowan contacted Captain Jay Rivera, the presiding

RIÀFHURIWKH$UDQVDV&RUSXV&KULVWL3LORWV$VVRFLDWLRQ

to express the company’s intent to evacuate.67

4.

Tuesday, August 22

The early Tuesday morning report from WeatherOps

made significant changes to the storm’s forecasted

track and strength. The storm remained a “Tropical

Disturbance”, but was now expected to strengthen into

a Category 1 hurricane with sustained wind speeds of 75

miles per hour by Friday, August 25.68 The most likely

path had again shifted northward, projecting landfall just

south of Corpus Christi as a tropical storm. The system

also had slowed, so that landfall was predicted for early

morning on Saturday, August 26.

At around 6:00 a.m. that morning, Yester forwarded

the report to Koenig and Schenkel, asking, “What Now?”69

Schenkel responded at 6:51 a.m., noting that the storm’s

intensity had increased, but opining that “the storm . . .

might move up North East even more and clear the DPDS1

on the clean side within 84 hours (might know within 6 to

67. Rivera Day 3 Tr., 256:19–257:16 (Doc. 450) (testifying that

the initial call occurred on either Sunday or Monday).

68. WeatherOps Tropical Disturbance Harvey Advisory

# 26, P.Ex.13 (Doc. 410-14, 99).

69. Yester Email, P.Ex.17-A-Part 1 (Doc. 410-31, 253).

54a

Appendix B

12 hours).” 70 He asked about certain preparations: “Mike

[Koenig] is talking to Signet for Tug and port Captain

about the preparations (yes/no?).”71 A few minutes later,

Koenig responded, commenting that “[t]he forecaster is

FRQÀGHQWWKHWUDFNZLOOJRPRUHWRWKHQRUWK7KLVSXWVWKH

DPDS1 on the clean side.”72 When referencing “clean side”,

Yester meant that in Port Aransas, the DPDS1 would be

on the storm’s west wall, which would deliver less intense

winds and surges.73 In essence, Yester read the forecast as

predicting that the storm would make landfall well north

of Port Aransas, with the center of the storm passing to

the east. As moving the DPDS1 out to sea meant traveling

eastward—i.e., into the stronger side of the storm—“we

ZRXOGKDYHDELWRIDKDUGWLPHÀQGLQJDQ\ZKHUHWRJRµKH

WHVWLÀHG74 In addition, given that the storm’s winds blew

in a counterclockwise rotation, Yester’s interpretation of

the WeatherOps report meant that “the winds would be

pushing the vessel against our bulkhead and not pulling

it away from the bulkhead, which would be good news for

us if that’s what happened.” 75 Yester responded to both

of these emails separately. To Schenkel, he recommended

that “[w]e should start some preparations but hold off

for another 12–24 hours, unless [Koenig] has another

70. Schenkel Email, P.Ex.17-A-Part 1 (Doc. 410-31, 254).

71. Id.

72. Koenig Email, P.Ex.17-A-Part 1 (Doc. 410-31, 253).

73. Yester Day 1 Tr., 83:15–20 (Doc. 448).

74. Id. at 83:25–84:1.

75. Id. at 84:3–7.

55a

Appendix B

view.” 76 Simultaneously, in a message to both Koenig and

Schenkel, he merely noted, “OK–we’ll see what happens.”77

At 10:00 a.m., WeatherOps released Advisory # 27,

again shifting the forecasted path slightly northward.

The “consensus forecast” was “for a strong tropical storm

or category one hurricane to reach the central Texas

coast Friday.” 78 Three hours later, WeatherOps released

Advisory # 27A, which reported that “recently available

forecast guidance continues to indicate significant

LQWHQVLÀFDWLRQRQ7KXUVGD\DQG)ULGD\µ 79

At 1:00 p.m. on Tuesday, the Coast Guard Captain

for Port Aransas set “Port Condition WHISKEY” for

the ports of Brownsville, Corpus Christi, and Victoria.

This alert level meant that the Coast Guard anticipated

sustained gale force winds (39 to 54 miles per hour) at

the port from a tropical or hurricane force storm within

72 hours. Signet advised its captains that “several of our

customers are making plans to activate their Hurricane

Response Plans within the next 24 to 36 hours” and

directed captains to “ensure all crew members are made

aware of these potential operations and all vessels are

readied should the orders begin to come in.”80

76. Yester Email, P.Ex.17-A-Part 1 (Doc. 410-31, 253–54).

77. Id. at 255.

78. WeatherOps Tropical Disturbance Harvey Advisory # 27,

P.Ex.13 (Doc. 410-14, 105).

79. WeatherOps Tropical Disturbance Harvey Advisory

# 27A, P.Ex.13 (Doc. 410-14, 108).

80. Gibson Email, P.Ex.23 (Doc. 439-43).

56a

Appendix B

At 4:00 p.m., WeatherOps projected that the storm

would make landfall in 72 hours (i.e., Friday afternoon)

as a Category 1 hurricane with sustained wind speeds

of 80 miles per hour and with the center of the storm

striking just north of the Corpus Christi area. 81 Shortly

after this report issued, a Signet employee reported that

´6HFWRU&RUSXV&KULVWLKDVEHHQQRWLÀHGWKDWWKH\DUHLQ

&RQGLWLRQ;5D\ KRXUV DQGYHVVHOWUDIÀFLVVWDUWLQJ

to leave the area.”82

5.

Wednesday, August 23

On Wednesday at 4:00 a.m., WeatherOps reported “[a]

slight shift northward in the forecast track . . . where the

center makes landfall over the Middle Texas Coast. The

intensity forecast still has Harvey becoming a tropical

storm or possibly a hurricane over the western Gulf prior

to landfall.”83

About four hours later, Yester formally notified

Paragon employees of the decision to evacuate the DPDS1:

“Due to the impending arrival of Tropical Storm ‘Harvey’

81. WeatherOps Tropical Disturbance Harvey Advisory # 28,

P.Ex.13 (Doc. 410-14, 111).

82. Johnson Email, P.Ex.13 (Doc. 410-14, 113). Hurricane

Port Condition X-RAY means that the weather advisories indicate

sustained gale force winds (39 to 54 miles per hour) from a tropical

or hurricane force storm are predicted to impact the port within

48 hours.

83. WeatherOps Tropical Disturbance Harvey Advisory # 30,

P.Ex.13 (Doc. 410-14, 124).

57a

Appendix B

we are compelled to move the DPDS1 out of its mooring

to open water.” 84 He reported that Paragon intended

to “move the rig this evening or tomorrow morning,

depending upon timing of port clearance and harbor tugs

to assist with the movement.”85 Schenkel responded almost

immediately, asking Paragon employees to “inform DNV

about the planned move”. 86 He echoed Yester’s message

that the vessel’s departure would occur “this afternoon or

early in the morning”, with Signet tugs assisting with the

dead tow. 87 Over the next few hours, Paragon’s employee,

5D\ &DUUHUD QRWLÀHG YDULRXV DJHQFLHV DQG FRPSDQLHV

about Paragon’s decision, although he noted his “sense

. . . that this storm will not be too bad.”88

By late morning, Paragon learned that the DPDS1’s

GHSDUWXUH ZRXOG QRW RFFXU WKDW GD\ GXH WR VKLS WUDIÀF

EXWZDV´SODQQHGIRUWRPRUURZDWÀUVWGD\OLJKWµ89 A few

hours later, the anticipated departure time was delayed

again, to Thursday afternoon.

At some point on Wednesday, in-house counsel for

Paragon and Signet began discussions regarding the

contract that would govern Signet’s provision of tug

84. Yester Email, P.Ex.17-A-Part 2 (Doc. 410-32, 2).

85. Id.

86. Schenkel Email, P.Ex.17-A-Part 2 (Doc. 410-32, 1).

87. Id.

88. UT Email, P.Ex.28-D (Doc. 441-31, 1).

89. Koenig Email, P.Ex.17-A-Part 1 (Doc. 410–31, 3).

58a

Appendix B

services for towing the DPDS1 out to sea. Signet’s

counsel (Reid) and Paragon’s counsel (Oliver) exchanged

YDULRXVHPDLOVWKURXJKRXWWKHGD\IRFXVLQJRQÀQDOL]LQJ

the terms of Part I and Part II of the Master Charter

$JUHHPHQW 7KH QHJRWLDWLRQV À[DWHG RQ WKH LQVXUDQFH

DQG LQGHPQLÀFDWLRQ SURYLVLRQV ZLWKLQ 3DUW ,, %\ ODWH

afternoon, Paragon had accepted Signet’s revisions to

3DUW ,, ´H[FHSW IRU WKH PRGLÀFDWLRQV ZH PDGH WR \RXU

proposed insurance revisions.”90 Paragon acknowledged

that the amendments to Part II of the MCA placed

greater exposure on Paragon and would cause it to be

responsible for any damage to a Signet tug in a salvagetype operation or loss to third-party property, and any

costs associated with cleanup. The terms of the insurance

were also amended to require Paragon to name Signet

as an additional insured on its insurance policies.91 By

late afternoon, Signet “agree[d] that the changes to

the insurance addendum are acceptable”.92 Late in the

evening, Paragon requested that Signet prepare Part I

and Part II for signature.

During the afternoon, the situation regarding the

DPDS1’s tow out worsened. Port authorities gave priority

to U.S. Navy vessels “departing en-masse from [Corpus

Christi]”,93 and Tropical Storm Harvey “appear[ed] to be

90. Oliver Email, P.Ex.17-A-Part 2 (Doc. 410-32, 9).

91. 0RGLÀHG 3DUW , Master Charter Agreement, AC.Ex.9,

(Doc. 436-7, 5).

92. Oliver Email, P.Ex.17-A-Part 1 (Doc. 410–31, 272).

93. Snyder Email, P.Ex.17-A-Part 2 (Doc. 410-32, 11).

59a

Appendix B

headed straight to” the area.94 Signet advised Paragon

that it would attempt to tow the DPDS1 out to sea after

the priority vessels departed, “if the port has not been

closed” by that time.95 If the port closed, Signet would

ask Captain Gibson, one of its local tug boat operators,

“to put a tug or two onto DPDS1 to hold her to the dock

at Gulf Copper”, but the ultimate decision would remain

WKH FDSWDLQ·V DV DQRWKHU FRPSDQ\ KDG D ULJKW RI ÀUVW

refusal for his services.96 At 5:12 p.m., Schenkel forwarded

Signet’s communication to Yester, warning him that the

DPDS1 “might not be able to leave the port anymore”.97 He

noted that they had “to work on a plan B which consist[ed]

of keeping the rig at the current berth and using 2 Signet

tugs to stabilize the rig.” 98 Later that evening, Koenig

responded that “[d]epending on the forecast in the

morning it might be best to stay in the berth with two

tugs rather than go outside and possibly be in the middle

of the storm.” 99

6.

Thursday, August 24

At 4:00 a.m. on Thursday morning, the NHC issued

DQRIÀFLDO6WRUP6XUJHDQG+XUULFDQH:DUQLQJIRUWKH

94. Id.

95. Id.

96. Id.

97. Schenkel Email, P.Ex.17-A-Part 2 (Doc. 410-32, 10).

98. Id.

99. Koenig Email, P.Ex.17-A-Part 2 (Doc. 410–32, 10).

60a

Appendix B

Port Aransas area. In this advisory, the NHC forecasted

+DUYH\WRVWUHQJWKHQLQWRDKXUULFDQHIRUWKHÀUVWWLPH100

/HVVWKDQDQKRXUODWHU6LJQHW·VFRXQVHOFRQÀUPHG

that he would “generate the BIMCO agreement for today’s

tow”.101 It is unclear whether Signet actually prepared

WKHÀQDOIRUPRIWKHFRQWUDFWEXWWKHSDUWLHVDJUHHWKDW

neither side signed such a document.

And by early morning, the issue became moot. Around

8:00 a.m., Signet’s Captain Gibson informed Snyder that

he had just been advised that the DPDS1 would not be

allowed to leave the port; the Coast Guard was closing the

Port of Corpus Christi. Captain Gibson agreed “with the

need to have hold tugs at Harbor Island with the [DPDS1]

to keep her alongside at Gulf Copper.”102 Minutes later,

Snyder informed Paragon of the development. And at 9:30

a.m., Paragon communicated to stakeholders that the

DPDS1 “will not be towed out and will remain in port.”103

Shortly after these communications, Snyder e-mailed

his Signet colleagues that the company desired to provide

the new services under the Tariff: “We need to pass

100. NHC Tropical Storm Harvey Advisory # 15, P.Ex.13

(Doc. 410-14, 173); NHC Tropical Storm Harvey Intermediate

Advisory # 15A, P.Ex.13 (Doc. 410-14, 177).

101. Reid Email, P.Ex.17-A-Part 1 (Doc. 410-31, 273).

102. Gibson Email, P.Ex.17-A-Part 2 (Doc. 410-32, 23).

103. Carrera Email, P.Ex.17-A-Part 2 (Doc. 410–32, 13)

(emphasis in original).

61a

Appendix B

onto [Paragon’s representatives] we’ll operate under our

tariff for this.”104 Later that morning, Snyder spoke with

Schenkel to discuss the situation. According to Snyder,

Schenkel requested that Signet provide two z-drive tug

boats to remain with the DPDS1 during the hurricane.105

Snyder agreed, but expressly indicated that the services

would be performed under the Tariff. At trial, Snyder

recounted the exchange they had on the matter:

And [Schenkel] said, Barry, is that the best you

can do, I don’t care to use the tariff, I’d prefer

to use the old contract.

I said, absolutely not, sir, it’s very dangerous

to use that.

He said, all right, is that the best you can do?

I said, yes, Aldert, we’ve been friends a long

time, this is protecting both of us.

He said, all right, get it done.106

6FKHQNHO WHVWLÀHG WKDW KH FRXOG QRW UHFDOO WKH SKRQH

conversation with Snyder, and that it may or may not have

occurred.107

104. Snyder Email, S.Ex.125 (Doc. 421-22, 30).

105. Schenkel Day 5 Tr., 202:3-6 (Doc. 452). A “z-drive” refers

to a propulsion system that can rotate 360 degrees, enabling the

tug boat to direct thrust in any direction. Id. at 140:16–18.

106. Snyder Day 5 Tr., 203:1–10 (Doc. 452).

107. Schenkel Dep. (Vol. I), 57:1–18, P.Ex.45 (Doc. 446-1, 16).

62a

Appendix B

After the phone call, Snyder instructed Signet’s

attorney (Reid) to communicate with Paragon’s counsel

(Oliver) about using the Tariff for the revised assignment.

That afternoon, Reid e-mailed Oliver, advising him

that “[b]ecause we will not be towing, but instead will

be holding the DPDS1 in place, Signet’s work will be

governed by our Ingleside Tariff ”, which he attached to

the message.108 Reid noted his understanding that the

companies’ respective commercial teams had agreed to

this contractual arrangement. In response, Oliver wrote,

“Thanks for the update—much appreciated.”109

By hiring Signet’s services, Paragon believed that

the tug boats pushing the DPDS1 against the mooring

side would “reduce the tension on the mooring lines”. In

addition, if the DPDS1 broke lose, “there would be two

tugboat[s] tied to the ship that could sort of keep it under

some kind of control”, and could help keep the drillship

from alliding with other objects and vessels in the port.110

In addition to hiring the Signet tugs, Paragon also

bolstered the DPDS1’s mooring system. Koenig was at

the dock that morning, and he consulted with the surveyor

he had previously contacted—Hugh Gallagher of Dutton’s

Navigation—whose task changed from certifying the

DPDS1 for a tow out to inspecting the mooring system

108. Reid Email, S.Ex.125 (Doc. 421-22, 32).

109. Oliver Email, S.Ex.125 (Doc. 421-22, 33).

110. Koenig Day 1 Tr., 244-45 (Doc. 448); see also Yester Day

1 Tr., 73-74 (Doc. 448).

63a

Appendix B

for a hold-in-place operation. Koenig and his crew of six to

HLJKWPHQ´XVHGHYHU\WKLQJKHFRXOGÀQGµWRVWUHQJWKHQ

the mooring system.111 They located three additional lines

in a nearby warehouse and added them, using Koenig’s

pick- up truck to tighten the lines.112 As to the condition of

WKHVHQHZURSHV*DOODJKHUWHVWLÀHGWKDWWKH\ORRNHGOLNH

weaker polypropylene lines, were deteriorated, and would

part easily due to their condition.113 Koenig conceded that

WKHPRRULQJOL

This text is long and has been trimmed here. Open the source document for the complete record.

This is a copy of a public record, reproduced as it was published. It is not legal advice, and it may not be the version a court would rely on. Check the official source before you cite it.

A word about cookies

We need a few to keep you signed in and the library working. The rest help us see which pages people use and where they get stuck. They stay off unless you say yes.

Petition for Writ of Certiorari — Paragon Asset Company, Ltd., Petitioner v. American Steamship Owners Mutual Protection and Indemnity Association, Inc. | Frix