No. 23-975
In The
Supreme Court of the United States
________________________
SEVEN COUNTY INFRASTRUCTURE COALITION AND
UINTA BASIN RAILWAY, LLC,
Petitioners,
v.
EAGLE COUNTY COLORADO AND CENTER FOR
BIOLOGICAL DIVERSITY, ET AL.,
Respondents.
________________________
On Writ of Certiorari to the
United States Court of Appeals
for the District of Columbia Circuit
________________________
BRIEF OF NACCO NATURAL RESOURCES
CORPORATION AS AMICUS CURIAE IN
SUPPORT OF PETITIONERS
_______________________
JEFFERY D. UBERSAX
CHARLES T. WEHLAND
BRANDON MORDUE
COUNSEL OF RECORD
KUSHNER & HAMED
JONES DAY
CO., LPA
110 N. Wacker Drive
1375 East Ninth St.
Suite 4800
Suite 1930
Chicago, IL 60606
Cleveland, OH 44114
312.269.4388
216.696.6700
ctwehland@jonesday.com
jdubersax@kushnerhamed.com
bmordue@kushnerhamed.com
Counsel for Amicus
September 4, 2024
i
TABLE OF CONTENTS
Table of Authorities ................................................... iii
Interests of Amicus Curiae ......................................... 1
Introduction and Summary of the Argument............ 2
Argument ..................................................................... 5
I. The Majority View Among the Circuits
Correctly Interprets Public Citizen ...................... 5
II. The D.C. Circuit’s Outlier Interpretation of
Public Citizen Makes for Bad National Policy and
Forces Agencies to Act Outside Their Jurisdiction
and Expertise ........................................................ 8
A. Project Delay Can Cause Project Death,
and That Is the Goal of Much Environmental
Litigation ........................................................ 8
B. Expansive NEPA Review Converts Vague
Enabling Statutes Into Limitless Fonts of
Veto Power.................................................... 10
C. The Resulting Problem Is Many Agency
Czars With Overlapping Vetoes, Regardless
of Expertise................................................... 15
III.Unlimited Consideration of Upstream and
Downstream Effects Creates an Unworkable
Standard for NEPA ............................................. 17
A. NEPA Review Beyond the Proximate Cause
of an Agency’s Action Has No Logical
Stopping Point .............................................. 17
B. New Regulations Will Exacerbate the
Problem and Turn U.S. Federal Agencies
Into Global Environmental Monitors .......... 22
ii
C. Limitless NEPA Review Is Bad for
Everyone ....................................................... 26
IV.NACCO’s Own Experiences Provide a Case
Study of the Negative Consequences of
Downstream Review ........................................... 28
Conclusion .................................................................. 33
iii
TABLE OF AUTHORITIES
Cases
Ctr. for Biological Diversity, Manasota-88, Inc.
v. United States Army Corps of Eng’rs,
941 F.3d 1288 (11th Cir. 2019) ........ 6, 16, 20, 21, 27
Dep't of Transp. v. Public Citizen,
541 U.S. 752 (2004) ...................... 2, 3, 5, 6, 7, 11, 17
Eagle Cty. v. Surface Transp. Bd.,
82 F.4th 1152 (D.C. Cir. 2023) ..... 2, 7, 11, 13, 16, 28
EarthReports, Inc. v. FERC,
828 F.3d 949 (D.C. Cir. 2016) ................................... 7
Kentuckians for the Commonwealth
v. U.S. Army Corps of Eng’rs,
746 F.3d 698 (6th Cir. 2014) .............................. 6, 17
Loper Bright Enters. v. Raimondo,
144 S. Ct. 2244, 2272 (2024)............................... 3, 23
Metro. Edison Co. v. People Against Nuclear Energy,
460 U.S. 766 (1983) ...................................... 5, 14, 17
Protect Our Parks, Inc. v. Buttigieg,
39 F.4th 389 (7th Cir. 2022) ............................. 6, 8, 9
Ravulapalli v. Napolitano,
773 F. Supp. 2d 41 (D.D.C. 2011)............................. 8
Robertson v. Methow Valley Citizens Council,
490 U.S. 332 (1989) ................................................ 10
iv
Sierra Club v. FERC (“Sabal Trail”),
867 F.3d 1357 (D.C. Cir. 2017) ..................... 7, 15, 30
Sierra Club v. FERC,
827 F.3d 36 (D.C. Cir. 2016)..................................... 7
Sierra Club v. FERC,
827 F.3d 59 (D.C. Cir. 2016)..................................... 7
West Virginia v. EPA,
142 S. Ct. 2587 (2022) ...................... 3, 15, 16, 27, 32
Statutes
30 U.S.C. § 1202(f) ..................................................... 28
30 U.S.C. § 201(a)(1) .................................................. 28
42 U.S.C. § 4332(C)(i) ................................................ 23
49 U.S.C. § 10101 ...................................................... 12
49 U.S.C. § 10101(1) .................................................. 12
49 U.S.C. § 10101(2) .................................................. 12
49 U.S.C. § 10101(5) .................................................. 13
49 U.S.C. § 10901(c) ............................................ 11, 12
Regulations
40 C.F.R. § 1501.3(b)(1) (2023).................................. 23
40 C.F.R. § 1501.3(d)(1) (2024).................................. 23
40 C.F.R. § 1508.1(i)(4) .............................................. 23
v
National Environmental Policy Act Implementing
Regulations Revisions,
87 FR 23453 (April 20, 2022)
(codified at 40 C.F.R. § 1508.1) ................................. 22
Other Authorities
James W. Coleman, Beyond the Pipeline Wars:
Reforming Environmental Assessment of Energy
Transport Infrastructure,
2018 UTAH L. REV. 119 (2018) .......................... 18, 19
James Coleman, Pipelines & Power-Lines: Building
the Energy Transport Future,
80 OHIO ST. L.J. 263 (2019) .............................. 26, 27
Amended Complaint, The Falkirk Mining Co. v. Dep’t
of the Interior, No. 1:24-cv-00040-DLH-CRH
(D.N.D. Apr. 4, 2024) ........................................ 29, 30
Sarah Imhoff, A Streamlined Approach to Renewable
Energy Development: Bringing the United States
Into a Greener Energy Future,
26 GEO. INT’L ENVTL. L. REV. 69 (2013) ................... 9
Sam Kalen, Mining Our Future Critical Minerals:
Does Darkness Await Us?,
51 ENVTL. L. REP. 11006 (2021).............................. 25
NORTH AMERICAN COAL CORPORATION, COMMENTS ON
THE DRAFT RESOURCE MANAGEMENT
PLAN/ENVIRONMENTAL IMPACT STATEMENT FOR THE
BUREAU OF LAND MANAGEMENT NORTH DAKOTA
Field Office (May 17, 2023),
available at https://perma.cc/G85J-6CK8. ............. 31
vi
J.B. Ruhl & James Salzman, What Happens When
the Green New Deal Meets the Old Green Laws?,
44 VT. L. REV. 693 (2020).................................. 10, 26
Benjamin K. Sovacool et al., Sustainable Minerals
and Metals for a Low-Carbon Future,
367 SCIENCE 30 (2020) ...................................... 24, 25
James T.B. Tripp & Nathan G. Alley, Streamlining
NEPA’s Environmental Review Process:
Suggestions for Agency Reform,
12 N.Y.U. ENVTL. L.J. 74 (2003) ............................... 8
1
INTERESTS OF AMICUS CURIAE
Amicus1 NACCO Natural Resources Corporation
(“NACCO”) is the parent corporation of a number of
mining and reclamation entities. NACCO mines coal,
lithium, and industrial minerals, and has interests in
oil and gas. NACCO’s coal mines supply over 25
million tons a year to lignite-fired electrical
generating units. NACCO’s business involves regular
interaction with regulatory agencies, including, as
part of permitting and leasing, the preparation of
environmental
assessments
(“EAs”)
and
environmental impact statements (“EISs”) under the
National Environmental Policy Act (“NEPA”).
NACCO subsidiaries operate more than thirty mines
across the country, including in Arkansas, Florida,
Mississippi, Nevada, North Dakota, Texas, and
Virginia, in the jurisdiction of multiple circuit courts.
In addition, NACCO subsidiary Catapult Mineral
Partners recently executed a purchase agreement to
acquire oil and gas interests in Utah’s Uinta Basin. If
developed, these oil and gas interests would greatly
benefit from completion of the rail line in this case.
Environmental reviews under NEPA cause
significant delay, and projects requiring an EIS are
frequent targets of litigation. A key reason for both is
that the bounds of NEPA review have become
uncertain because of different circuit court
interpretations of the statute. This promotes
sprawling EISs, results in costly or even project1 Pursuant to Rule 37.6,
amicus affirms that no counsel for a
party authored this brief in whole or in part and that no person
or entity other than amicus or its counsel made a monetary
contribution to its preparation or submission.
2
killing delay, and opens more avenues for attack in
litigation.
Ignoring the decision of this Court in Department
of Transportation v. Public Citizen, 541 U.S. 752
(2004), the decision of the D.C. Circuit below
exacerbates this uncertainty by requiring agencies to
analyze upstream and downstream environmental
impacts along the full supply chain of a project—
regardless of whether those other effects are within
the reviewing agency’s jurisdiction. This approach
sets no workable limits on the environmental analysis
under NEPA and subjects those seeking governmental
approval, like NACCO, to increased delay and cost, at
least, and conflicting agency determinations, at worst.
NACCO respectfully requests that the Court
reverse the D.C. Circuit.
INTRODUCTION AND
SUMMARY OF THE ARGUMENT
The D.C. Circuit’s opinion below analyzed an
authorization of the Surface Transportation Board
(“STB”) regarding the construction of an 88-mile
railroad in Utah. The D.C. Circuit found the project’s
EIS insufficient for failing to analyze upstream
development of oil and gas wells that had not been
constructed and downstream greenhouse gas
emissions from refining that same oil and gas,
presumed to later occur in Louisiana and Texas. Eagle
Cty. v. Surface Transp. Bd., 82 F.4th 1152, 1179-80
(D.C. Cir. 2023). That STB lacked any regulatory
authority over either the upstream or downstream
effects did not matter. Id. at 1180.
3
The D.C. Circuit’s approach conflicts with this
Court’s decision in Public Citizen, which made clear
that, under NEPA, an agency “cannot be considered a
legally relevant ‘cause’ of an effect that it cannot
prevent ‘due to its limited statutory authority.” 541
U.S. at 770.
The view of NEPA advanced by the D.C. Circuit
prolongs and adds uncertainty to environmental
review, delays project approval, and needlessly
creates opportunities for strategic litigation aimed at
halting development projects. Those are the most
immediate effects. More importantly, the D.C.
Circuit’s approach gives every governmental agency
vast veto power over disfavored projects based on
vague statutes allowing agencies to act based on, for
example, “public convenience and necessity”—even in
areas outside their expertise, even based on effects
outside their jurisdiction, and even when other
agencies are responsible for permitting and approving
those upstream and downstream impacts.
This view of the law effectively results in a
transformation of NEPA into a broad enabling statute,
authorizing any agency to halt a development project
based on alleged environmental effects occurring
anywhere in the causal chain. It enlarges the grasp of
the regulatory state in a manner this Court has
adjudged unlawful in recent decisions. E.g., Loper
Bright Enters. v. Raimondo, 144 S. Ct. 2244 (2024);
West Virginia v. EPA, 142 S. Ct. 2587 (2022). The D.C.
Circuit’s approach gives federal agencies with no
regulatory authority over, for instance, greenhouse
gas emissions, the ability to obstruct and delay
projects by mandating costly and protracted studies of
4
possible future CO2 emissions. This amounts to an
environmental veto castable by any agency with any
level of responsibility for approval of a federal project,
and is particularly troublesome when that agency does
not have the expertise to analyze potential CO2
emissions.
This problem will become even worse in light of the
recently promulgated NEPA regulations requiring
agencies to consider “global” environmental effects.
Historically, most NEPA suits have been aimed at
hindering fossil fuel development, but the law applies
to all major federal actions, including solar and wind
construction. Many of the minerals and metals for
wind and solar projects are sourced almost exclusively
abroad. Following the logic of Eagle County, agencies
under the new regulations would be required to
consider, for example, the upstream environmental
impacts of notoriously pollutive rare earth elements
extraction in China. China, of course, is not within the
jurisdiction of STB, but neither is oil refining.
No one benefits from this approach to NEPA,
except those seeking to delay projects with the aim of
killing them through increased costs and the passage
of time. Under this approach, agencies are tasked
with studying the effects of actions they do not
regulate in areas where they have no expertise.
Companies face conflicting rules across the circuits
and increased project costs from NEPA review and
litigation. The country as a whole—currently lacking
sufficient energy infrastructure, such as electricity
transmission assets—loses the ability to construct
energy infrastructure in anything resembling a
remotely timely manner.
5
For these reasons, the Court should reverse the
D.C. Circuit and clarify the meaning of Public Citizen
to place defined and manageable limits on NEPA
review. In doing so it should reject the Federal
Respondents’ position that agencies have discretion to
draw their own “context-specific causal lines” under
NEPA, Fed. Br. at 18, and make clear that NEPA
review should be limited to environmental effects
within an agency’s jurisdiction and proximately
caused by the agency’s action.
ARGUMENT
I.
The Majority View Among the Circuits
Correctly Interprets Public Citizen
In Public Citizen, this Court held that “where an
agency has no ability to prevent a certain effect due to
its limited statutory authority over the relevant
actions, the agency cannot be considered a legally
relevant ‘cause’ of the effect” for purposes of NEPA.
541 U.S. at 770. That holding drew upon the Court’s
earlier decision in Metropolitan Edison Co. v. People
Against Nuclear Energy, 460 U.S. 766, 774 (1983),
where the Court explained that the terms
“environmental effect” and “environmental impact” in
NEPA “include a requirement of a reasonably close
causal relationship between a change in the physical
environment and the effect at issue,” which the Court
equated to “the familiar doctrine of proximate cause
from tort law.”
Public Citizen elaborated that “inherent in NEPA
and its implementing regulations is a ‘rule of reason,’
which ensures that agencies determine whether and
6
to what extent to prepare an EIS based on the
usefulness of any new potential information to the
decisionmaking process.” 541 U.S. at 767. As a result,
when the environmental effects at issue fall outside an
agency’s scope of authority, “the agency need not
consider these effects in its EA.” Id. at 770.
Most circuits faithfully follow Public Citizen, but
the D.C. Circuit and the Ninth Circuit do not. For
example, in the Seventh Circuit, “an agency is on the
hook only for the decisions that it has the authority to
make.” Protect Our Parks, Inc. v. Buttigieg, 39 F.4th
389, 400 (7th Cir. 2022). The Sixth Circuit follows the
same rule. Kentuckians for the Commonwealth v. U.S.
Army Corps of Eng’rs, 746 F.3d 698, 710 (6th Cir.
2014) (“It stands to reason that, in the context of a
complete regulatory scheme, agencies may reasonably
limit their NEPA review to only those effects
proximately caused by the actions over which they
have regulatory responsibility.”). Likewise, in the
Eleventh Circuit, an agency performing a NEPA
review is permitted “to draw the line at the reaches of
its own jurisdiction.” Ctr. for Biological Diversity,
Manasota-88, Inc. v. United States Army Corps of
Eng’rs, 941 F.3d 1288, 1295 (11th Cir. 2019). To hold
otherwise, the Eleventh Circuit explained, would turn
NEPA review into a limitless analysis, much of it
premised on uncertain, hypothetical impacts. See id.
at 1297 (“If the Corps were required to consider all
effects that it might indirectly police—even those far
from its proper sphere of regulatory authority—its
NEPA review would have to account for every
conceivable environmental effect of fertilizer’s use.”).
7
Things are different in the D.C. Circuit.2 In the
D.C. Circuit, an agency “cannot avoid its responsibility
under NEPA to identify and describe the
environmental effects of increased oil drilling and
refining on the ground that it lacks authority to
prevent, control, or mitigate those developments.”
Eagle Cty., 82 F.4th at 1180. See also Sierra Club v.
FERC (“Sabal Trail”), 867 F.3d 1357, 1375 (D.C. Cir.
2017) (“[T]he existence of permit requirements
overseen by another federal agency or state permitting
authority cannot substitute for a proper NEPA
analysis”).
That approach runs contrary to Public Citizen,
which expressly rejected the “particularly unyielding
variation of ‘but for’ causation, where an agency’s
action is considered a cause of an environmental effect
even when the agency has no authority to prevent the
effect.” 541 U.S. at 767.
2 They were not always so. Before its Sabal Trail decision, the
D.C. Circuit faithfully adhered to Public Citizen. In a trio of 2016
decisions, for example, it ruled that FERC did not have to
consider in its NEPA review of natural gas pipelines the
upstream or downstream effects of gas production, transmission
or consumption, such as “additional greenhouse gas emissions,”
because FERC had no regulatory authority over such activities—
just as STB has none here. EarthReports, Inc. v. FERC, 828 F.3d
949, 955 (D.C. Cir. 2016); see also Sierra Club v. FERC, 827 F.3d
36 (D.C. Cir. 2016); Sierra Club v. FERC, 827 F.3d 59 (D.C. Cir.
2016).
8
II.
The D.C. Circuit’s Outlier Interpretation
of Public Citizen Makes for Bad National
Policy and Forces Agencies to Act Outside
Their Jurisdiction and Expertise
Despite being out of line with most other circuits,
the D.C. Circuit’s interpretation of Public Citizen has
outsized importance nationally. Venue for challenging
administrative actions often exists in the D.C. Circuit
because most agencies are headquartered there. See,
e.g., Ravulapalli v. Napolitano, 773 F. Supp. 2d 41, 56
(D.D.C. 2011). As a result, agencies across the country
face a dilemma: they must either risk the possibility
of litigation and remand by the D.C. Circuit, with its
onerous NEPA requirements, or else preemptively try
to follow those requirements because they might be
sued in D.C. rather than one of the other circuits.
A. Project Delay Can Cause Project Death,
and That Is the Goal of Much
Environmental Litigation
Commentators have observed for many years that
“[a]gencies will seek to protect EISs from legal
challenges by producing piles of paperwork that
exhaustively discuss every potential impact of the
proposed action—creating a ‘bullet-proof’ EIS.
Agencies may experience prolonged delays in the
production of a bullet-proof EIS.” James T.B. Tripp &
Nathan
G.
Alley,
Streamlining
NEPA’s
Environmental Review Process: Suggestions for
Agency Reform, 12 N.Y.U. ENVTL. L.J. 74, 83 (2003).
When upstream and downstream impacts are added,
there is even more to “bullet proof.” See Protect Our
Parks, 39 F.4th at 397 (“Preparing an EIS is expensive
9
and time-consuming . . . .”). And when an agency
cannot control the impacts being studied, the process
becomes a wasteful academic exercise. See id. at 400
(“It would be unreasonable to require agencies to
spend time and taxpayer dollars exploring
alternatives that would be impossible for the agency
to implement.”).
Litigation over NEPA is common. Delay and
increased costs are the primary goals of these
lawsuits, because “NEPA is a procedural statute, not
a substantive one.” Id. at 397. “NEPA suits are often
used by environmental and industry groups to take
financial resources away from developers and create
such delay as to completely impede the progress of a
project.” Sarah Imhoff, A Streamlined Approach to
Renewable Energy Development: Bringing the United
States Into a Greener Energy Future, 26 GEO. INT’L
ENVTL. L. REV. 69, 91 (2013).
The power to delay can be the power to destroy.
Energy development projects are major targets. This
case involves a rail line, but the real target of dilatory
litigation is oil and gas development that the line is
expected to facilitate.
Wind and solar projects likewise face aggressive
litigation under environmental statutes. Perhaps the
most infamous contemporary example is the Cape
Wind offshore wind farm project, which involved “a
staggering cast of well-funded opponents who used an
array of federal, state, and local siting and
environmental compliance laws to grind the project
into oblivion after a fight lasting over 16 years and
costing the developers $100 million.” J.B. Ruhl &
James Salzman, What Happens When the Green New
10
Deal Meets the Old Green Laws?, 44 VT. L. REV. 693,
716 (2020).
The D.C. Circuit’s approach increases litigation
risk, because including upstream and downstream
effects provides a virtually limitless array of targets.
This case provides a good example: the EIS for a small
railroad line located entirely in Utah was deemed
inadequate because it did not project emissions
related to possible oil and gas refining in Louisiana
and Texas. Under this approach, unqualified agencies
could pile speculation upon speculation to reach
untenable conclusions outside their area of
understanding, let alone expertise.
B. Expansive NEPA Review Converts
Vague Enabling Statutes Into Limitless
Fonts of Veto Power
The D.C. Circuit’s Eagle County and earlier Sabal
Trail decisions effect an unauthorized and unwise
expansion of administrative power to prevent
development and encourage agencies to act outside of
their authority.
NEPA is procedural, not substantive.
E.g.,
Robertson v. Methow Valley Citizens Council, 490 U.S.
332, 351 (1989) (“Other statutes may impose
substantive environmental obligations on federal
agencies, but NEPA merely prohibits uninformed—
rather than unwise—agency action.”). Yet the D.C.
Circuit’s approach uses NEPA to graft onto agencyenabling statutes regulatory powers not given to those
agencies.
11
STB has the power to authorize the construction of
rail lines based on “public convenience and necessity.”
49 U.S.C. § 10901(c). It does not have any jurisdiction,
expertise, or power over oil drilling and refining. The
D.C. Circuit acknowledged that, but found it
irrelevant. Eagle Cty., 82 F.4th at 1180 (holding that
“the agency is not excused from considering the
environmental impacts of a railway it approves even
where it lacks jurisdiction over the producer or
distributor of the [oil] transported by that railway”
(citation omitted; alteration original)).
That holding flies in the face of Public Citizen’s
proclamation that agencies need not consider under
NEPA effects that “an agency has no ability to
prevent.” 541 U.S. at 770. The D.C. Circuit, however,
tried to square the circle by pointing to STB’s ability
to consider “public convenience and necessity.” Eagle
Cty., 82 F.4th at 1180. As a result, the D.C. Circuit’s
approach allows any agency with discretionary
language like that—which is nearly every agency—to
disapprove a project based on any environmental
effect, real or imagined, at any point upstream or
downstream from the project, including where the
agency’s action is not the proximate cause of those
effects. The court of appeals thus held that NEPA
required analysis of downstream effects even though
STB “lacks authority to prevent, control, or mitigate
those developments,” because STB could deny the
permit based on “anticipated environmental and other
costs.” Id.
Under the D.C. Circuit’s decision, if STB thinks
that the costs of oil and gas development outweigh the
benefits, STB can deny a permit to build a railroad
12
facilitating that development.
Reaching that
conclusion requires using NEPA to supercharge
catchall language like “public convenience and
necessity” in a way that destroys the overarching
regulatory structure. As STB points out in its brief in
support of Petitioners, STB must enforce common
carrier obligations, which require “railroads to carry
all commodities upon reasonable request.” Fed. Br. at
4. The D.C. Circuit ruling prevents STB from carrying
out its statutory mandate.
Consider, first, that STB’s authorizing statute
directs that STB “shall issue a certificate” for building
a railroad “unless the Board finds that such activities
are inconsistent with the public convenience and
necessity.” 49 U.S.C. § 10901(c) (emphasis added). The
statutory language starts with a presumption in favor
of issuing a certificate to build.
The statute then describes, in fifteen subparts, “the
policy of the United States Government” with respect
to “regulating the railroad industry.” 49 U.S.C. §
10101. First on the list of policies is “to allow, to the
maximum extent possible, competition and the
demand for services to establish reasonable rates for
transportation by rail.” Id., § 10101(1). Second on the
list is “to minimize the need for Federal regulatory
control over the rail transportation system and to
require fair and expeditious regulatory decisions when
regulation is required.” Id., § 10101(2). Nowhere on
the list does one find “hinder the development and
shipment of disfavored commodities.”3
One does, however, find a policy “to foster sound economic
conditions in transportation and to ensure effective competition
3
13
Nevertheless, according to the D.C. Circuit,
because STB can act for “public convenience and
necessity,” any environmental effect can be a
justification to deny a permit, even if STB does not
oversee that effect; as a result, NEPA requires
analyzing that effect. Eagle Cty., 82 F.4th at 1180.
In reaching that conclusion, one must stack
hypotheticals atop counterfactuals and then work
backwards to the application at issue. First, STB
must imagine a world in which the rail line is built.
Second, STB must forecast upstream oil and gas
development after construction, including at various
price points for the end product and various costs
levels for initial development, all of which are affected
by a multitude of factors and can change rapidly.
Third, STB must conclude that these upstream
drilling projects will be approved by the relevant
regulators. Fourth, STB must conclude that the
subsequent refining of the oil generated upstream will
be approved by other downstream regulators. Fifth,
STB must analyze the emissions from the full lifecycle
of these approved projects, from extraction through
refining, years into the future. Sixth, STB must
conclude that the environmental costs of those
emissions outweigh the benefits, even though the
agencies overseeing the permitting of the
(hypothetical) upstream projects and downstream
refining of the output of those (hypothetical) projects
concluded otherwise. Effectively, STB must conclude
and coordination between rail carriers and other modes.” Id., §
10101(5). In this case, the entire purpose of the proposed rail line
is to allow more efficient transport because of the difficulties of
shipping by truck on the limited nearby roads. Eagle County, 82
F.4th at 1166.
14
in advance that the upstream and downstream
permitting agencies will make what STB deems to be
the wrong decision. As a result, STB chooses not to
authorize the railroad at all, premising its decision on
“public convenience”—contrary to true public
convenience, which is to be able to engage in interstate
commerce and, for Utah citizens, to be able to sell their
goods in a profitable manner.
Thus, from a statute explicitly prioritizing rail
development to maximize competition among carriers
and expressly seeking to minimize federal regulation
over the rail system, we arrive at a conclusion that the
railroad should not be built at all because STB
disagrees with the potential future decisions of other
regulators with expertise in overseeing oil and gas
drilling and refining. Only through that backwards
logic can the D.C. Circuit conclude that STB needed to
consider under NEPA the upstream and downstream
effects at issue here.
The actions of other permitting authorities—
upstream and downstream—are necessary links in
the causal chain over which STB has no control.
Unless those agencies take independent action, there
will be no environmental effects from oil production or
consumption to even discuss. By analogy to “the
familiar doctrine of proximate cause from tort law,”
Metro. Edison, 460 U.S. at 774, the consequence of
such intervening actions is that STB is not a legally
relevant cause of effects that might arise from
production or consumption approved by other
agencies.
15
C. The Resulting Problem Is Many Agency
Czars
With
Overlapping
Vetoes,
Regardless of Expertise
In effect, the Eagle County and Sabal Trail
decisions read discretionary language in agency
enabling statutes as permitting agencies to veto an
action based on effects they could not regulate in the
first instance. That makes little sense. STB has no
expertise in oil and gas refining, for obvious reasons.
It authorizes railroads, not oil wells or refineries. See
West Virginia, 142 S. Ct. at 2612-2613 (“When an
agency has no comparative expertise in making
certain policy judgments . . . Congress presumably
would not task it with doing so.” (cleaned up)). Here,
as in many cases, numerous other agencies with more
specific expertise are implicated, both upstream and
downstream, ranging from the Utah Department of
Natural Resources or, if federal land, the Bureau of
Land Management, to the Environmental Protection
Agency and its state counterparts in Utah, Texas,
Louisiana, and possibly elsewhere.
The D.C. Circuit allows STB to invade the
regulatory sphere of all those other agencies. In
dissent in the earlier Sabal Trail decision, Judge
Brown identified this very issue in the context of an
agency with an identically broad “public convenience
and necessity” statute. “[N]othing in the text of either
statute empowers the Commission to entirely deny the
construction of an export terminal or the issuance of a
certificate based solely on an adverse indirect
environmental effect regulated by another agency.”
867 F.3d at 1382 (Brown, J., dissenting in part).
16
Under the D.C. Circuit’s case law, however, even
though STB has no comparative expertise in refining,
it can block a railroad based on potential downstream
effects from that same refining. That view of virtually
limitless agency delegation cannot be reconciled with
this Court’s decisions. See West Virginia, 142 S. Ct. at
2609 (noting the “particular and recurring problem” of
“agencies asserting highly consequential power
beyond what Congress could reasonably be understood
to have granted”). Nevertheless, starting from the
premise of unfettered veto power based on the mere
speculative potential of anything environmentally
related, upstream or downstream, D.C. Circuit law
requires STB to create an EIS that analyzes
theoretical environmental effects anywhere in the
possible causal chain. This approach led the D.C.
Circuit to dismiss as “simply inapplicable” the
principle of this Court’s Public Citizen decision that an
agency “need not consider effects it cannot prevent.”
Eagle Cty., 82 F.4th at 1180.
The Eleventh Circuit colorfully, but accurately,
described the world created by the D.C. Circuit’s
“alternative, unbounded view of the public-interest
review” as one in which each agency functions as a “de
facto environmental-policy czar.” Army Corps, 941
F.3d at 1299. Because each agency involved anywhere
upstream or downstream in a project would have
equal blocking powers, Congress’s regulatory design
would be scrambled, and the risk of inconsistent,
project-killing agency determinations would be high.
See id. at 1296 (“Requiring the Corps to enter those
regulatory spheres not only offends congressional
design but risks duplicative, incongruous, and unwise
regulation. . . . Far from manageable, the new
17
inquiries required of the Corps would bog down agency
action in the name of duplicative and potentially
incoherent regulation.”). See also Kentuckians, 746
F.3d at 709 (“There are good reasons that Congress
would not have designed a regulatory system in which
each regulatory actor involved in a large operation,
even in a comparatively minor way, is required to
consider all of the effects of the overall project.”).
III.
Unlimited Consideration of Upstream and
Downstream
Effects
Creates
an
Unworkable Standard for NEPA
With respect to NEPA, this Court long has
cautioned that the “scope of the agency’s inquiries
must remain manageable.” Metro. Edison, 460 U.S. at
776. The decision below violates that principle. See
id. (“Time and resources are simply too limited for us
to believe that Congress intended to extend NEPA as
far as the Court of Appeals has taken it.”).
A. NEPA Review Beyond the Proximate
Cause of an Agency’s Action Has No
Logical Stopping Point
Public Citizen’s proximate cause test makes sense
as a dividing line for what must be included in a NEPA
analysis. In expressly rejecting the “particularly
unyielding variation of ‘but for’ causation” sought by
the challengers in that case, 541 U.S. at 767, the Court
explained that NEPA’s purpose of ensuring that
agencies act in an informed manner is not served by
consideration of environmental effects where the
agency “lacks the power to act” on them, id. at 768.
18
Aside from being outside STB’s jurisdiction, the
upstream and downstream effects cited by the D.C.
Circuit are highly speculative and uncertain,
requiring the agency to predict potential future
changes in the energy markets, including
development and refining levels, all of which are price,
material, and production dependent, in hypothetical
future worlds that do and do not include the project
under consideration. Cf. James W. Coleman, Beyond
the Pipeline Wars: Reforming Environmental
Assessment of Energy Transport Infrastructure, 2018
UTAH L. REV. 119, 143 (2018) (“In practice, in
unpredictably changing energy markets, it is nearly
impossible to predict the upstream and downstream
impact of a new pipeline project.”). No agency has that
gift of prophecy, especially when the agency has no
authority or expertise in a given arena, like STB here.
This is particularly true when considering the
length of time it takes to prepare an EIS and the
volatility of energy markets. The Keystone XL
pipeline provides a case study. As part of its EIS for
the pipeline, the State Department spent seven years
analyzing whether approval of the pipeline would
increase oil production in Canada. The EIS found that
the impact on upstream production would depend
primarily on the price of oil per barrel, with the
pipeline potentially impacting production only if oil
prices hovered between $65-$75 a barrel. See id. at
143-44. During the many years of review, oil prices
fluctuated between $44 and approximately $100. Id.
“In its final decision, the State Department confirmed
its view that the project was ‘unlikely to significantly
impact [oil] extraction’ but said that it should be
rejected anyway because, despite its analysis, it was
19
‘perceived as enabling’ oil extraction.” Id. at 145
(quoting U.S. DEP’T OF STATE, RECORD OF DECISION
AND NATIONAL INTEREST DETERMINATION 12 (2015)
(alteration original)).
Comparing that real-world example to the D.C.
Circuit’s supercharging of the “public convenience and
necessity” language in STB’s enabling statute, one is
left with a disturbing conclusion. Not only might STB
get the analysis wrong and block important
infrastructure development based on an errant
analysis of upstream or downstream factors beyond its
scope of authority, but STB might veto a development
project merely on the basis of “perceived”
environmental concerns caused by upstream or
downstream effects outside of its regulatory bailiwick.
Invariably, even if the state of the energy market
many years in the future could be predicted
accurately—and it cannot—forcing agencies to
consider upstream and downstream effects over which
they have no regulatory authority expands NEPA
review into a limitless consideration of environmental
effects that directly leads to first-order questions of
energy policy.
Here, STB was faulted for not
considering every emission—whether currently
existing or projected distant years into the future—
from the oil leaving the ground through the refining
stage, even though the only action in question was an
88-mile railroad in Utah. But why should the analysis
stop there? Basic economic principles lead to further
effects that could be considered.
Increased oil
production affects supply, increased supply lowers
costs, and cheaper gasoline causes more drivers to buy
it and drive more, affecting the cost calculus of
20
automobile owners debating whether to buy an
electric vehicle, a decision with knock-on effects for
overall U.S. climate policy.4
Ultimately, that is where the analysis leads. In
explicitly rejecting the D.C. Circuit’s approach, the
Eleventh Circuit, in a case involving phosphate
mining, explained that accounting for all downstream
effects would require the Corps of Engineers under
NEPA
“to
account
for
every
conceivable
environmental effect of fertilizer’s use.” Army Corps,
941 F.3d at 1297. Then, “because the Corps could
indirectly mitigate those effects by denying [the
company] its Section 404 permit and thereby choking
its fertilizer plants of phosphate, the Corps must
consider the environmental effects of crop
fertilization. That cannot be right.” Id. The effect of
the D.C. Circuit’s “unbounded view” of NEPA analysis
would go further: “Rather than consider whether the
Corps’ own action is in the public interest, that
broader view would have the Corps consider whether
fertilizer production and use is really worth the cost.”
Id. at 1299.
“And that,” the Eleventh Circuit
cautioned, “could be just the beginning. The next time
the Corps is asked to approve a section of a gas
4 One can readily imagine other far-ranging inquiries opened up
by the D.C. Circuit’s approach. The focus on oil and gas assumes
that is the only significant new development in the Uinta Basin.
But a decade or two down the line, the nature of the Uinta Basin
could change entirely, spurring new settlement and significant
population growth. New businesses may want to ship their cargo,
and new residents may wish to use the line for commuting. The
railway, as a common carrier, must transport it all. Must those
impacts be included in an NEPA analysis too? The amounts of
upstream and downstream greenhouse gas emissions are no less
speculative than the long-term land uses of the Uinta Basin.
21
pipeline running through a wetland, would the Corps
be required to consider whether the country’s reliance
on fossil fuels is really in the public interest?” Id.
Such decisions are reserved to Congress.
The approach advanced by the Federal
Respondents is no better, because it provides no
standard at all. The government argues what the
standard is not, but does not tell the Court what it
thinks it should be.
Thus, according to the government, the standard is
not the limits of an agency’s authority. Fed. Br. at 3233. The standard also is not the tort doctrine of
proximate cause. Id. at 34-37. The standard is not
reasonable foreseeability, because the government
maintains that even if the upstream and downstream
effects were reasonably foreseeable, STB did not need
to consider them. Id. at 41. Instead of any workable
standard, the government proposes “context-specific
causal lines,” id. at 18, described with this word salad:
the agency may draw a manageable causal
line that excludes the harms that the agency
lacks the statutory authority to prevent, and
that takes account of whether and to what
extent particular harms are too attenuated,
speculative, or otherwise insufficiently
material to the agency’s decisionmaking to
serve NEPA’s purposes and satisfy its rule of
reason, given the scope and nature of the
agency action and the governing statutes.
Id. at 30.
The government cites no law in support of this
vague pronouncement, which seems invented from
22
whole cloth to support a reversal here without
providing any guidance to agencies or courts on the
bounds of required NEPA analyses going forward.
The government’s supposed “causal line” is no line at
all, but only a case-by-case, effect-by-effect,
discretionary assessment, usually in areas outside of
the regulator’s expertise. Such an approach would
eliminate none of the uncertainty caused by the
decision below.
B. New Regulations Will Exacerbate the
Problem and Turn U.S. Federal
Agencies Into Global Environmental
Monitors
The current administration recently finalized the
second phase of revising the Council on
Environmental Quality’s (“CEQ’s”) rules governing
NEPA reviews. Stage one focused on undoing an
earlier rule that tied NEPA to Public Citizen’s
proximate cause test.
CEQ “reconsidered its
reasoning” and decided to strike from the rule “the
‘reasonably close causal relationship’ and ‘but for’
language drawn from Public Citizen.”
National
Environmental Policy Act Implementing Regulations
Revisions, 87 FR 23453, 23465 (April 20, 2022)
(codified at 40 C.F.R. § 1508.1).
Phase two pushes NEPA review even further. In
determining the appropriate level of NEPA review,
agencies previously were directed to consider “the
affected area (national, regional, or local) and its
resources,” with the regulations indicating that “in the
case of a site-specific action, significance would
usually depend only upon the effects in the local area.”
23
40 C.F.R. § 1501.3(b)(1) (2023). The new rules
obliterate that restrained focus, calling on agencies to
“analyze the significance of an action in several
contexts,” including “the potential global, national,
regional, and local contexts as well as the duration,
including short- and long-term effects.” 40 C.F.R.
§ 1501.3(d)(1) (2024).
Further emphasizing the
international focus of the review, CEQ added “climate
change-related effects” to a list of effects to be
analyzed under NEPA, “including the contribution of
a proposed action and its alternatives to climate
change, and the reasonably foreseeable effects of
climate change on the proposed action and its
alternatives.” 40 C.F.R. § 1508.1(i)(4).
In five years, companies have faced three
dramatically different versions of CEQ’s NEPA
regulations: the pre-2020 rules; the Trump
administration rules; and the Biden administration
rules.
Through all this regulatory flip-flop, Public
Citizen’s proximate cause ruling remained, as did the
statutory command tying the effects under a NEPA
analysis to “action” being analyzed. 42 U.S.C. §
4332(C)(i). No statutory change has occurred since
Public Citizen that would authorize the free-ranging
environmental review demanded by the D.C. Circuit,
and the new regulations further exacerbate the
problem. Cf. Loper Bright, 144 S. Ct. at 2272
(critiquing how a “statutory ambiguity . . . becomes a
license authorizing an agency to change positions as
much as it likes . . . even when Congress has given [it]
no power to do so”).
Combining upstream and downstream review with
a global focus will render NEPA review even more
24
boundless and unmanageable. It also will turn every
agency into a gatekeeper able to veto projects because
of environmental considerations, real or imagined,
anywhere in the world. This regulatory shift will
move beyond the problem created by the D.C. Circuit’s
decision, whereby agencies are responsible for
environmental effects under the jurisdiction of other
agencies, and usher in a new era where agencies are
tasked with considering environmental effects in other
countries under the regulatory jurisdiction of no
agency. All of this will occur without any direction or
authorization by Congress, even though such
expansive global NEPA review would work directly
against the interest of the U.S. economy.
Consider, for example, the close relationship
between mining and energy. As discussed in greater
detail below, the U.S. Department of the Interior,
Bureau of Land Management (“BLM”), controls
mineral leasing rights and for coal leases requires an
environmental assessment of the post-mining
combustion of coal by downstream power plants, even
though those power plants are not under BLM’s
regulatory control or within its expertise. So, too, are
wind and solar projects inextricably intertwined with
mineral extraction. Indeed, the “materials and metals
demanded by a low-carbon economy will be immense.”
Benjamin K. Sovacool et al., Sustainable Minerals and
Metals for a Low-Carbon Future, 367 SCIENCE 30, 30
(2020). Unlike coal, however, the vast majority of
these necessary minerals comes from abroad. See id.
at 33 (charting global critical mineral production,
including 95% of rare earth elements from China and
approximately two-thirds of cobalt from Congo).
25
The extraction of these necessary upstream
minerals for wind and solar is no different in terms of
the causal chain than the coal inputs to a power plant.
And reviewing agencies will not like what they find.
The negative social and environmental consequences
of mining in these countries are extraordinary. See,
e.g., id. at 30 (describing the use of child labor in
Congo’s cobalt mines where workers often lack “basic
safety equipment” and how China’s rare earth mining
and processing “has resulted in chemical pollution
from ammonium sulfate and ammonium chloride that
now threatens rural groundwater aquifers as well as
rivers and streams”); Sam Kalen, Mining Our Future
Critical Minerals: Does Darkness Await Us?, 51
ENVTL. L. REP. 11006, 11009 (2021) (“China’s
production of lithium has become an environmental
and international human rights issue.”); id. at 11021
(“The abuses flowing from cobalt mining in the
Democratic
Republic
of
the
Congo
are
unfathomable.”). Even when some of these necessary
minerals are produced domestically, there can be
international downstream impacts, such as the need
to ship resources abroad for processing. See id. at
11019 (“[A] California rare earth mine arguably has
abundant resources, but its product must be shipped
to China for processing.”).
Adding the global regulatory focus of the new rules
to the D.C. Circuit’s approach requiring upstream and
downstream environmental review could bring these
international environmental effects into the NEPA
analysis, even though no U.S. agency has regulatory
authority or any real influence whatsoever over
mining or processing in China or Congo. This is where
the D.C. Circuit’s approach leads, because under it the
26
limits of regulatory authority do not matter. This is
not what Congress authorized.
C. Limitless NEPA Review Is Bad for
Everyone
Much NEPA review involves the fossil fuel
industry. But there is no NEPA exemption for solar
and wind projects. They, too, must pass through the
same
onerous
NEPA
gauntlet,
and
the
upstream/downstream logic applies to them with
equal force.
Unsurprisingly, commentators have raised the
alarm that the expansion of NEPA review over the
past decade or so will delay renewable energy projects,
possibly even more than fossil fuel projects. See, e.g.,
Ruhl & Salzman, Old Green Laws, supra, at 695 (“The
existing project siting and environmental protection
regulatory regimes do not hand out a ‘green pass’ to
infrastructure projects that promote desirable
environmental outcomes.”); James Coleman, Pipelines
& Power-Lines: Building the Energy Transport Future,
80 OHIO ST. L.J. 263, 291 (2019) (“And the arguments
for
considering
upstream
and
downstream
consequences of electricity transmission are, if
anything, more reasonable than the same case for oil
pipelines . . . . Thus, renewable power is, if anything,
more vulnerable than oil pipelines to delay-byenvironmental-review
tactics.”);
id.
at
299
(“[A]ggressive judicial expansion of environmental
reviews is a unique danger to energy transport
investment.”).
27
This system benefits no one other than those
opposed to any sort of energy and related
infrastructure development.
Forcing agencies to
consider upstream and downstream effects in the
wheelhouse of other agencies—even effects that
already are permitted—demands that agencies act
outside of their expertise and well beyond what
Congress could have intended. See West Virginia, 142
S. Ct. at 2612-2613. Granting every agency involved
in a project, however peripherally, a veto because of
environmental effects, or claimed environmental
effects, anywhere in the project chain “risks
duplicative, incongruous, and unwise regulation.”
Army Corps, 941 F.3d at 1296. This overlapping set of
czars is unlikely to generate better environmental
analyses and is likely to generate inconsistent
analyses of the same effects. The D.C. Circuit’s ruling
primarily functions to multiply the opportunities to
delay or derail energy projects.
See Coleman,
Pipelines & Power-Lines, supra, at 296 (“And there is
no reason to think that subjecting each proposed
project to multiple veto gates would improve overall
economic and environmental results. Multiple veto
gates just mean more opportunities to kill proposed
investments—and that is true whether those
investments are in oil, gas, or renewable power
transport.” (footnote omitted)).
In sum, NEPA does not require or authorize
agencies to engage in costly and time-consuming
analyses of possible upstream and downstream effects
of agency actions that will not be proximately caused
by those actions. The Court should emphatically
reject the D.C. Circuit’s assertion that limits on
agency authority are “simply inapplicable” to the
28
scope of a NEPA analysis, Eagle Cty., 82 F.4th at 1180,
and should reaffirm the rule of Public Citizen.
IV.
NACCO’s Own Experiences Provide a Case
Study of the Negative Consequences of
Downstream Review
One of NACCO’s subsidiaries, North American
Coal, LLC (“NA Coal”), through its mining
subsidiaries, regularly enters into coal leases with
BLM. One of NA Coal’s mines is the Falkirk Mine in
North Dakota.
By statute, Congress has declared its intent to
“assure that the coal supply essential to the Nation’s
energy requirements, and to its economic and social
well-being is provided . . . .” 30 U.S.C. § 1202(f). One
way Congress has encouraged the development of coal
reserves from public lands is through the federal
leasing program. As part of federal leasing, the
Secretary of the Interior “is authorized to divide any
lands . . . which have been classified for coal leasing
into leasing tracts of such size as he finds appropriate
and in the public interests and which will permit the
mining of all coal which can be economically extracted
in such tract.” 30 U.S.C. § 201(a)(1).
Coal mines are planned far in advance to operate
for many years in order to ensure a steady and reliable
fuel supply to associated power generating stations.
Coal supply contracts can span decades, and the
leasing of mineral rights typically occurs in stages,
with areas to be mined at later dates leased closer in
time to when mining will occur.
29
NEPA review for a coal mine leasing application is
conducted by BLM and the Office of Surface Mining
and
Reclamation
Enforcement
(“OSMRE”).
Historically, these sorts of NEPA reviews took only a
few months, but in recent years they have become
almost interminable. The primary source of this delay
comes from analysis of downstream factors, such as
power plant emissions, over which neither BLM nor
OSMRE has regulatory authority or expertise. In the
case of power generating stations that NACCO
supplies, by the time of NEPA review for the lease, the
approvals and permits for the downstream activities
have already long been secured from the appropriate
regulatory authority.
Ownership of mineral interests in North Dakota is
fragmented; interests owned by the federal
government are scattered between those owned by
private parties in a checkerboard fashion. NA Coal’s
Falkirk Mine, which has been in operation since 1978,
includes a combination of coal leased from both private
parties and the government.
In anticipation of reaching new coal tracts in late
2024, Falkirk applied to BLM for a lease on October
30, 2019. Five years later, the lease application still
has not been acted upon in any way, and the
government has failed to complete the required NEPA
review, requiring NA Coal finally to file a lawsuit
against BLM. Amended Complaint, The Falkirk
Mining Co. v. Dep’t of the Interior, No. 1:24-cv-00040DLH-CRH (D.N.D. Apr. 4, 2024).
Notably, this lease required only an EA rather
than the more arduous EIS, or so everyone involved
thought at the beginning. A draft EA was submitted
30
shortly after the lease application. BLM planned to
notice a public hearing on the draft EA in 2021, but
then cancelled the planned public hearing without
explanation. Id. at ¶ 45. No draft EA was published
by BLM in 2022 either. In December 2023, after no
substantive progress in the preceding four years, BLM
notified NA Coal by telephone that the EA could not
move forward because no test exists to determine the
impact of the lease on global CO2 emissions. Id. at
¶ 47. At no point has the government ever sent any
notice of deficiency, as required by regulations, or any
notice of any information purported to be missing. Id.
at ¶ 49.
Instead, the lease application persists in
regulatory purgatory, delayed by a NEPA review of
emissions from already-permitted sources outside
BLM’s control and not proximately caused by the
action under review. Cf. Sabal Trail, 867 F.3d at 1381
(“[T]he truth is that [the agency] has no control over
whether the power plants that will emit these
greenhouse gases will come into existence or remain
in operation.”) (Brown, J., dissenting in part). Most
recently, after the filing of NACCO’s lawsuit, the
government attempted to moot the lawsuit by
changing its position and claiming that the lease will
require a full-blown EIS, which, of course, will take
even longer.
There is great irony in the government using
NEPA review to delay the Falkirk lease application
initially for five years and now, according to the
government’s estimate, until late 2025, at the earliest.
Because of how coal mining works and the
geographic distribution of federal and private coal in
31
North Dakota, rejecting the application would
increase air emissions. Falkirk Mine would have to go
around the federal holdings. Avoiding that coal would
force the mine to excavate in a less efficient pattern
that would disturb an additional 433.5 surface acres.
NA Coal estimates that doing so would burn an
additional 908,144 gallons of diesel fuel between the
truck shovel fleet, dozers, and blades necessary to do
this additional work. Conversely, if NA Coal were able
to mine through the federal coal, it could rely on its
more efficient electric dragline and reduce emissions.
NORTH AMERICAN COAL CORPORATION, COMMENTS ON
DRAFT
RESOURCE
MANAGEMENT
THE
PLAN/ENVIRONMENTAL IMPACT STATEMENT FOR THE
BUREAU OF LAND MANAGEMENT NORTH DAKOTA Field
Office 22-23 (May 17, 2023), available at
https://perma.cc/G85J-6CK8.
The downstream emissions from electricity
generation will occur regardless of whether BLM
approves the lease, because Falkirk Mine will
substitute other privately held coal in the area. Yet
the lease application cannot proceed nearly five years
after its initial filing because, among other alleged
effects outside its authority and expertise, BLM
belatedly claims an inability to adequately measure
the downstream impacts on global CO2 emissions
under NEPA—emissions that BLM cannot stop or
reduce, even if it denies the lease. Indeed, given that
all of Falkirk Mine’s coal is consumed by existing,
permitted power plants that EPA has been prevented
from regulating for CO2 emissions, the only apparent
purpose served by reviewing power plant CO2
emissions under NEPA is circumventing the
constitutional limits that this Court recognized on
32
EPA’s authority, to stop an activity that is otherwise
allowed, and even encouraged, by existing law. See
West Virginia, 142 S. Ct. at 2616.
In sum, Falkirk Mine offers a cautionary example
of the regulatory shenanigans and real-world impact
made possible by rulings like the D.C. Circuit’s
decision below.
33
CONCLUSION
The D.C. Circuit should be reversed, and NEPA
review should be limited to environmental effects
within an agency’s jurisdiction and proximately
caused by the agency’s action.
Respectfully submitted,
CHARLES T. WEHLAND
Counsel of Record
JONES DAY
110 N. Wacker Drive, Ste 4800
Chicago, IL 60606
312.269.4388
ctwehland@jonesday.com
JEFFERY D. UBERSAX
BRANDON MORDUE
KUSHNER & HAMED CO., LPA
1375 East Ninth St., Ste 1930
Cleveland, OH 44114
216.696.6700
jdubersax@kushnerhamed.com
bmordue@kushnerhamed.com
September 4, 2024
This is a copy of a public record, reproduced as it was published. It is not legal advice, and it may not be the version a court would rely on. Check the official source before you cite it.