No. 23-753
IN THE
Supreme Court of the United States
CITY AND COUNTY OF SAN FRANCISCO,
Petitioner,
v.
ENVIRONMENTAL PROTECTION AGENCY,
Respondent.
On Writ of Certiorari to the
United States Court of Appeals
for the Ninth Circuit
BRIEF FOR PETITIONER
CITY AND COUNTY OF
BEVERIDGE & DIAMOND, P.C.
SAN FRANCISCO
ANDREW C. SILTON
DAVID CHIU
JOHN C. CRUDEN
San Francisco City Attorney RICHARD S. DAVIS
1900 N Street N.W., Suite 100
YVONNE R. MERÉ
Chief Deputy City Attorney Washington, DC 20036
MACKENZIE S. SCHOONMAKER
TARA M. STEELEY
Chief of Appellate Litigation 825 3rd Avenue, 16th Floor
New York, NY 10022
Counsel of Record
DAVID S. LOUK
Counsel for Petitioner
JOHN S. RODDY
City and County of
ESTIE M. KUS
San Francisco
Deputy City Attorneys
1 Dr. Carlton B. Goodlett Pl.
July 19, 2024
San Francisco, CA 94102
(415) 554-4655
tara.steeley@sfcityatty.org
i
QUESTION PRESENTED
Whether the Clean Water Act allows EPA (or
an authorized State) to impose generic prohibitions
in NPDES permits that subject permitholders to
enforcement for exceedances of water quality standards
without identifying specific limits to which their
discharges must conform.
ii
PARTIES TO THE PROCEEDING
The names of all parties appear in the case caption
on the cover page.
iii
TABLE OF CONTENTS
QUESTION PRESENTED ..........................................i
PARTIES TO THE PROCEEDING ........................... ii
TABLE OF AUTHORITIES....................................... vi
OPINIONS BELOW .................................................... 1
JURISDICTION .......................................................... 1
STATUTES AND REGULATIONS INVOLVED ....... 1
INTRODUCTION........................................................ 2
STATEMENT OF THE CASE .................................... 7
I.
The Clean Water Act ........................................ 7
A. Congress passed the CWA because the
Nation needed an effective approach to
controlling water pollution. ...........................7
B. The CWA established NPDES permits,
which set effluent limitations to regulate
permitholders’ discharges. .............................8
1. NPDES Permits .........................................8
2. Effluent Limitations ..................................9
II.
San Francisco’s Combined Sewage and
Stormwater Treatment Facilities .................. 12
III. Case History .................................................. 14
A. EPA’s Issuance of the Oceanside Facilities’
2019 NPDES Permit .................................... 14
B. Administrative and Judicial Review of EPA’s
Permitting Decision ..................................... 17
SUMMARY OF THE ARGUMENT .......................... 19
ARGUMENT ............................................................. 23
iv
I.
The CWA does not authorize EPA to impose
permit conditions that hold permitholders
directly liable for the quality of receiving
waters. ............................................................. 24
A. EPA may only set effluent limitations that
restrict the nature or contents of discharges
from permitholders’ point sources. .............. 24
1. The CWA requires EPA to use effluent
limitations—not any other type of permit
condition—to meet water quality
standards. ................................................. 24
2. EPA must set effluent limitations that
restrict permitholders’ discharges at the
point source. ............................................. 31
B. The CWA’s structure reinforces that EPA
may not impose permit terms that measure
compliance based on exceedances of water
quality standards. ........................................ 34
II.
Pre- and post-enactment context confirms that
NPDES permits cannot condition compliance
on receiving water quality. ............................. 37
A. Receiving water prohibitions resuscitate the
ineffective approach to environmental
protection Congress rejected in passing the
CWA.............................................................. 38
B. EPA developed a regulatory regime premised
on an interpretation of section 301(b)(1)(C)
that aligns with San Francisco’s. ................ 41
v
III. The City’s straightforward interpretation of
the CWA allows the Act’s enforcement scheme
to function fairly and as designed. ................. 44
A. Receiving water prohibitions undermine the
CWA’s permit shield by depriving
permitholders of regulatory certainty. ........ 45
B. Enforcement actions demonstrate the
unfairness of prohibiting permitholders from
violating water quality standards. .............. 48
CONCLUSION .......................................................... 53
STATUTORY AND REGULATORY APPENDIX
vi
TABLE OF AUTHORITIES
Cases
Arkansas v. Oklahoma,
503 U.S. 91, 107 (1992) .......................... 9, 10, 11, 48
Citizens Coal Council v. EPA,
447 F.3d 879 (6th Cir. 2006) .................................. 33
City & Cnty. of San Francisco v. San
Francisco Bay Reg’l Water Quality Control
Bd., No. RG19042575 (Alameda Cnty.
Super. Ct.) .............................................................. 15
City of Milwaukee v. Illinois,
451 U.S. 304 (1981) ..................................................7
Cnty. of Maui v. Hawaii Wildlife Fund,
590 U.S. 165 (2020) .......................................... 32, 33
Corley v. United States,
556 U.S. 303 (2009) ................................................ 31
Duncan v. Walker,
533 U.S. 167 (2001) ................................................ 31
E.I. du Pont de Nemours & Co. v. Train,
430 U.S. 112 (1977) ................................................ 45
EPA v. California ex rel. State Water
Resources Control Bd.,
426 U.S. 200 (1976) ....2, 3, 7-9, 12, 16, 25, 38-40, 52
EPA v. Nat’l Crushed Stone Ass’n,
449 U.S. 64 (1980) .................................................. 23
FCC v. Fox Television Stations, Inc.,
567 U.S. 239 (2012) ................................................ 47
vii
Food & Drug Admin. v. Brown & Williamson
Tobacco Corp.,
529 U.S. 120 (2000) ................................................ 28
Groff v. DeJoy,
600 U.S. 447 (2023) ................................................ 25
Harrington v. Purdue Pharma L. P.,
144 S. Ct. 2071 (2024) ............................................ 26
INS v. Nat’l Ctr. for Immigrants’ Rts., Inc.,
502 U.S. 183 (1991) ................................................ 27
Int’l Paper Co. v. Ouellette,
479 U.S. 481 (1987) ................................................ 46
League of Wilderness Defs. v. Forsgren,
309 F.3d 1181 (9th Cir. 2002) ............................ 9, 47
Loper Bright Enters. v. Raimondo,
144 S. Ct. 2244 (2024) .......................... 26, 32, 41, 42
Los Angeles Cnty. Flood Control Dist. v. Nat.
Res. Def. Council, Inc.,
568 U.S. 78 (2013) ....................................................3
Nat. Res. Def. Council v. Metro. Water
Reclamation Dist. of Greater Chicago
175 F. Supp. 3d 1041 (N.D. Ill. 2016) .............. 49, 50
Nat. Res. Def. Council v. EPA,
808 F.3d 556 (2d Cir. 2015) ................................... 39
Nat. Res. Def. Council, Inc. v. Cnty. of
Los Angeles,
725 F.3d 1194 (9th Cir. 2013) .......................... 45, 49
New Prime Inc. v. Oliveira,
586 U.S. 105 (2019) ................................................ 26
viii
Nw. Env’t Advocs. v. City of Medford,
No. 1:18-cv-00856-CL,
2021 WL 2673126 (D. Or. June 9, 2021) ............... 49
Ohio Valley Env’t Coal. v. Fola Coal Co.,
845 F.3d 133 (4th Cir. 2017) ............................ 49, 50
Pac. Legal Found. v. Costle,
586 F.2d 650 (9th Cir. 1978) ................................. 14
Piney Run Pres. Ass’n v. Cnty. Comm’rs of
Carroll Cnty.,
268 F.3d 255 (4th Cir. 2001) .................................. 45
Powerex Corp. v. Reliant Energy Servs., Inc.,
551 U.S. 224 (2007) ................................................ 27
S. Fla. Water Mgmt. Dist. v. Miccosukee Tribe
of Indians,
541 U.S. 95 (2004) ....................................................3
Sackett v. EPA,
598 U.S. 651 (2023) .......................................... 21, 46
Stone v. INS,
514 U.S. 386 (1995) ................................................ 40
Swartz v. Beach,
229 F. Supp. 2d 1239 (D. Wyo. 2002) .................... 49
U.S. Army Corps of Eng’rs v. Hawkes,
578 U.S. 590 (2016) ................................................ 46
United States v. Atl. Rsch. Corp.,
551 U.S. 128 (2007) ................................................ 37
United States v. Taylor,
596 U.S. 845 (2022) ................................................ 26
Waterkeeper All., Inc. v. EPA,
399 F.3d 486 (2d Cir. 2005) ................................... 33
ix
Weinberger v. Romero-Barcelo,
456 U.S. 305 (1982) ..................................................2
West Virginia v. EPA,
597 U.S. 697 (2022) ................................................ 34
Whitfield v. United States,
543 U.S. 209 (2005) .................................... 20, 36, 37
Statutes
5 U.S.C. § 706(2)(A) ............................................. 19, 24
28 U.S.C. § 1254(1) ......................................................1
33 U.S.C. § 1160(c)(5) (1970)................... 2, 4, 7, 12, 40
33 U.S.C. § 1251 et seq. ...............................................7
33 U.S.C. § 1311 ................................................ 3, 9, 35
33 U.S.C. § 1311(a) .................................... 9, 34, 36, 37
33 U.S.C. § 1311(b)(1) ............................................... 25
33 U.S.C. § 1311(b)(1)(A) ........................ 10, 26, 27, 28
33 U.S.C. § 1311(b)(1)(B) ........................ 10, 26, 27, 28
33 U.S.C. § 1311(b)(1)(C) .............................. 10, 23, 29
33 U.S.C. § 1311(b)(2)(C) .......................................... 27
33 U.S.C. § 1311(b)(2)(D) .......................................... 27
33 U.S.C. § 1311(b)(2)(F) ........................................... 27
33 U.S.C. § 1311(b)(3)(A) ..........................................27
33 U.S.C. § 1311(b)(3)(B) ..........................................27
33 U.S.C. § 1311(i)(1) ................................................27
33 U.S.C. § 1311(m)(1) ..............................................27
33 U.S.C. § 1311(m)(2) ..............................................27
33 U.S.C. § 1311(n)(7) ...............................................27
x
33 U.S.C. § 1313 .................................................. 11, 34
33 U.S.C. § 1313(c)(2)(A) ........................................... 11
33 U.S.C. § 1313(d)(4) ............................................... 36
33 U.S.C. § 1314(b)(1)(A) .......................................... 33
33 U.S.C. § 1314(b)(2)(A) .......................................... 33
33 U.S.C. § 1314(b)(4)(A) .......................................... 33
33 U.S.C. § 1319 ........................................................ 37
33 U.S.C. § 1319(b) .................................................... 46
33 U.S.C. § 1319(c)(1)(A) ........................................... 46
33 U.S.C. § 1319(c)(2)(A) ..................................... 35, 37
33 U.S.C. § 1319(c)(3)(A) ........................................... 36
33 U.S.C. § 1319(d) ........................................ 35, 37, 46
33 U.S.C. § 1341(a)(1) .................................................8
33 U.S.C. § 1342 ..........................................................8
33 U.S.C. § 1342(a) .................................................... 14
33 U.S.C. § 1342(a)(1) ................................... 35, 36, 37
33 U.S.C. § 1342(b) .................................................... 14
33 U.S.C. § 1342(k) .......................................... 9, 21, 45
33 U.S.C. § 1342(o)(1) ................................................ 36
33 U.S.C. § 1342(o)(3) ................................................ 36
33 U.S.C. § 1362(11) .................................. 5, 10, 30, 31
33 U.S.C. § 1362(12)(A) ............................................. 32
33 U.S.C. § 1362(14) ....................................................9
33 U.S.C. § 1365(a) .................................................... 46
33 U.S.C. § 1365(a)(1)(A) .......................................... 37
xi
33 U.S.C. § 1365(f)............................................... 35, 37
33 U.S.C. § 1369(b)(1)(F) ........................................... 17
86 Stat. 844, Pub. L. No. 92-500, § 301 .................... 27
Cal. Water Code § 13050(l)(1)(A) .............................. 16
Regulations
40 C.F.R. § 19.4 ......................................................... 46
40 C.F.R. § 122.44(d) ................................................. 17
40 C.F.R. § 122.44(d)(1)............................................. 43
40 C.F.R. § 122.44(d)(1)(i) ................................... 11, 43
40 C.F.R. § 122.44(d)(1)(iii) ....................................... 11
40 C.F.R. § 122.44(d)(1)(vii)(A) ................................. 43
40 C.F.R. § 122.44(k)(3)............................................. 43
40 C.F.R. § 123.1(d)(1)............................................... 14
40 C.F.R. § 124.19(a) ................................................. 17
40 C.F.R. § 131.11(b) ................................................. 12
Legislative Materials
H. Rep. No. 92-911 (Mar. 3, 1972) ............................ 39
S. Comm. on Public Works,
93d Cong., 1 Legislative History of the
Water Pollution Control Act Amendments
of 1972 (1 Legis. History), Serial No. 93-1
(1973) ...................................................................... 38
S. Rep. No. 92-414 (Oct. 28, 1971) ............................ 39
Federal Register Notices
45 Fed. Reg. 33,290 (May 19, 1980) .................... 46, 47
xii
54 Fed. Reg. 23,868 (June 2, 1989) ............... 10, 42, 43
A Proclamation on the 50th Anniversary of
the Clean Water Act,
87 Fed. Reg. 63,661 (Oct. 17, 2022) .........................2
EPA,
Combined Sewer Overflow Control Policy,
59 Fed. Reg. 18,688 (Apr. 19, 1994) ....................... 14
Court Documents
Br. for EPA,
City & Cnty. of San Francisco v. EPA,
No. 21-70282 (9th Cir. Nov. 24, 2021)
(ECF No.33-1)................................................... 14, 23
Complaint in Intervention,
United States v. City & Cnty. of San
Francisco, No. 3:24-cv-02594
(N.D. Cal. May 31, 2024) (ECF No. 18-2) .............. 51
Complaint,
United States v. City & Cnty. of San
Francisco, No. 3:24-cv-02594 (N.D. Cal.
May 1, 2024) ............................................... 13, 50, 51
Other Authorities
EPA,
Basic Information about Nonpoint Source
(NPS) Pollution (Dec. 4, 2023), https://
perma.cc/YP8J-8PQ4 ............................................. 16
EPA,
Decisions of the Administrator & Decisions
of the General Counsel – National Pollutant
Discharge Elimination System Adjudicatory
Hearing Proceedings Vol. 1
(Sep. 1974 – Dec. 1975) .................................... 29, 42
xiii
EPA,
Decisions of the Administrator & Decisions
of the General Counsel – National Pollutant
Discharge Elimination System Adjudicatory
Hearing Proceedings Vol. 2
(Jan. 1976 – Dec. 1976) .......................................... 26
EPA,
EPA National Enforcement Initiative:
Keeping Raw Sewage and Contaminated
Stormwater Out of Our Nation’s Waters –
Status of Civil Judicial Consent Decrees
Addressing Combined Sewer Systems
(May 1, 2017), https://perma.cc/U7JU-477C ......... 46
EPA,
NPDES Permit Limits-TBELs and
WQBELs (Oct. 5, 2023), https://perma.cc/
A5X7-WJMX ........................................................... 10
EPA,
NPDES Permit Writers’ Manual
(Sep. 2010) .................................................. 30, 40, 44
EPA,
Technical Support Document for Water
Quality-Based Toxics Control
(Mar. 1991) ............................................................. 44
EPA,
The National Water Permit Program
(June 1, 1973) ............................................. 26, 31, 42
EPA,
Water Quality Standards Handbook
Ch. 3 (Dec. 2023) .................................................... 12
xiv
Gov’t Accountability Office,
Nonpoint Source Pollution (May 2012),
https://perma.cc/MQ6G-GLZB ............................... 47
Jeffrey M. Gaba,
Generally Illegal: NPDES General Permits
Under the Clean Water Act,
31 HARV. ENVTL. L. REV. 409 (2007) ................ 28, 48
Antonin Scalia & Bryan A. Garner,
Reading Law: The Interpretation of Legal
Texts (2012) ...........................................................30
The Random House Dictionary of the English
Language (1968)......................................... 29, 32, 33
Webster’s Ninth New Collegiate Dictionary
(1986) ......................................................................29
Webster’s Seventh New Collegiate Dictionary
(1971) ...................................................................... 32
Webster’s Third New International
Dictionary(1961)............................................... 29, 33
1
OPINIONS BELOW
The Ninth Circuit’s July 31, 2023, opinion is reported
at 75 F.4th 1074 and is reproduced in the Petition
Appendix starting at Pet. App. 1. The Environmental
Appeals Board’s December 1, 2020, opinion denying
review of the Environmental Protection Agency’s
permitting decision is reported at 18 E.A.D. 322 and
is reproduced starting at Pet. App. 402.
JURISDICTION
The Ninth Circuit issued its decision on July 31,
2023, and entered an order denying a timely petition
for rehearing en banc on October 10, 2023, Pet. App. 487.
The City timely filed a petition for a writ of certiorari
on January 8, 2024, which the Court granted on May
28, 2024. This Court has jurisdiction under 28 U.S.C.
§ 1254(1).
STATUTES AND REGULATIONS INVOLVED
Relevant statutory and regulatory provisions are
included in the Appendix.
2
INTRODUCTION
Congress’ passage of the Clean Water Act in 1972
was a landmark achievement, and “[f]ive decades later,
our Nation’s waters are dramatically cleaner.” A
Proclamation on the 50th Anniversary of the Clean
Water Act, 87 Fed. Reg. 63,661 (Oct. 17, 2022). The Act’s
success stems in no small part from its structure: the
statute draws a clear distinction between water quality
standards, which set goals for the condition of navigable
waters, and effluent limitations, which restrict discharges from point sources into those waters. EPA v.
California ex rel. State Water Resources Control Bd.
(California), 426 U.S. 200, 203–04 (1976).
Prior to the CWA, federal law used water quality
standards to regulate individual dischargers. Id. at
202. Rather than restrict specific pollutant levels that
any person could discharge, that law simply imposed
liability on anyone whose discharge was “causing or
contributing” to the “reduct[ion of] the quality of such
waters below the water quality standards.” 33 U.S.C.
§ 1160(c)(5) (1970). The pre-CWA scheme “proved ineffective.” California, 426 U.S. at 202. The law’s focus
on the overall quality of receiving waters made “it very
difficult to develop and enforce standards to govern the
conduct of individual polluters.” Id. at 202–03. Such
an approach provided no clear standards to guide
conduct ex ante, allowing for enforcement only after a
waterbody became “overpolluted.” See id. at 203–04.
When Congress passed the CWA in 1972, it did so
precisely “because it recognized this national effort to
abate and control water pollution ha[d] been inadequate
in every vital aspect.” Weinberger v. Romero-Barcelo,
456 U.S. 305, 319 (1982) (cleaned up).
Just as a chef will be more successful preparing a
soup recipe that specifies the qualities and quantities
3
of ingredients that go into the pot rather than by
telling the line cooks collectively to avoid making the
soup “too salty,” 1 the CWA restricts the pollutants
individual dischargers may add to navigable waters
instead of making them responsible for the overall
quality of those waters. The Act implements this
approach by requiring dischargers to obtain National
Pollutant Discharge Elimination System (NPDES)
permits that set “effluent limitations” established
under section 301 of the Act, 33 U.S.C. § 1311. Effluent
limitations impose “direct restrictions on discharges”
by specifying limits to which a permitholder’s discharges must conform. California, 426 U.S. at 204.
To return to the analogy, effluent limitations
restrict the specific ingredients each line cook may
add to the soup, not the quality of the soup itself.
But as the City and County of San Francisco (San
Francisco or the City) can attest, the Environmental
Protection Agency (EPA) has gone off-recipe, telling
dischargers that they are once again responsible for
the quality of the soup, rather than their individual
additions to it. When EPA most recently renewed the
NPDES permit authorizing San Francisco’s wastewater
treatment system to discharge treated effluent into
the Pacific Ocean (the Oceanside Permit), EPA
imposed conditions that require the City to avoid any
discharge that causes or contributes to a violation of
1 For the sake of simplicity, the City adopts this Court’s “apt”
analogy of receiving water additions under the CWA to additions
to a pot of soup. See S. Fla. Water Mgmt. Dist. v. Miccosukee
Tribe of Indians, 541 U.S. 95, 110 (2004) (“[I]f one takes a ladle
of soup from a pot, lifts it above the pot, and pours it back into
the pot, one has not ‘added’ soup or anything else to the pot.”);
Los Angeles Cnty. Flood Control Dist. v. Nat. Res. Def. Council,
Inc., 568 U.S. 78, 83 (2013) (same).
4
water quality standards. These conditions effectively
resurrect the ineffective statutory scheme Congress
supplanted with the CWA. Indeed, one of the prohibitions in the City’s Oceanside Permit mirrors that
rejected statutory approach nearly word for word.
Compare 33 U.S.C. § 1160(c)(5) (1970) (prohibiting
discharges “causing or contributing” to “reduct[ion of]
the quality of such waters below the water quality
standards”), with Pet. App. 97 (San Francisco’s discharges may “not cause or contribute to a violation of
any applicable water quality standard”).
San Francisco petitioned the Ninth Circuit for review
of this and a similar permit condition (together, the
Generic Prohibitions), objecting that these Generic
Prohibitions impermissibly measure the City’s compliance based on whether the receiving waters meet
water quality standards, instead of whether the City’s
discharges meet effluent limitations. The Generic
Prohibitions make compliance with the CWA elusive,
because a waterbody’s ability to meet water quality
standards at any time depends on pollutants that all
sources—not just San Francisco—contribute. The City
consequently lacks advanced notice of how much it
must control its discharges to comply with the Generic
Prohibitions.
Below, a split Ninth Circuit panel erroneously upheld
the Generic Prohibitions, largely by misconstruing the
City’s petition as an objection to narrative limitations.
See Pet. App. 30–36. San Francisco has no objection
to narrative effluent limitations, descriptive requirements that function to restrict a permitholder’s discharges. Instead, the City contests only the lawfulness
of limitations that make permitholders responsible for
the overall quality of receiving waters. The panel majority glossed over the text, structure, and context of
5
the Act to hold that EPA may impose prohibitions
based on receiving water quality—notwithstanding
that doing so is contrary to the CWA’s text, revives the
regulatory scheme Congress abandoned, and hinders
permitholders’ ability to assess what they must do to
comply with their permits. Pet. App. 32–33.
In dissent, Judge Collins found the Generic Prohibitions “inconsistent with the text of the CWA” by
“making the ultimate, overall ‘water quality standards’ themselves the applicable ‘limitation’ for an individual discharger.” Pet. App. 62–63 (Collins, J., dissenting). The Act requires EPA “to translate the overall water quality standards” into effluent limitations
that notify permitholders how much they need to control their discharges, he argued, and “the agency’s
erasure of this crucial distinction is fundamentally inconsistent with the CWA’s regulatory approach.” Id.
at 53, 63 (emphasis in original). As Judge Collins recognized, the Act clearly instructs EPA to impose requirements that restrict permitholders’ discharges at
their point sources—the very definition of an “effluent
limitation.” See 33 U.S.C. § 1362(11).
The Ninth Circuit further erred by blessing the Generic Prohibitions as a “backstop” to a permit’s effluent limitations. Pet. App. 36. Experience shows these
provisions are wielded by EPA (and many private
plaintiffs) as a sword rather than a shield. While this
case has been pending, EPA filed a lawsuit alleging
violations of a provision in another of the City’s
NPDES permits that—like the Generic Prohibitions—
prohibits San Francisco from causing violations of water quality standards in its receiving waters. EPA alleges that the City’s discharges have caused violations
of receiving water conditions since 2013, but nowhere
specifies how, if at all, the nature or contents of the
6
City’s discharges did so. Based on threadbare allegations, EPA seeks hundreds of millions of dollars in
civil penalties and even more in injunctive relief, all
without affording San Francisco notice of precisely
how the City could have reasonably avoided the alleged
violations, let alone correct them now.
The approach EPA has taken in permits like San
Francisco’s is unfair, unworkable, and, as Congress
recognized, not an effective way to protect the waters
of the United States. It also directly conflicts with the
text, structure, and historical context of the CWA.
The Ninth Circuit’s decision should be reversed, and
EPA should be required to protect water quality in the
manner Congress directed.
7
STATEMENT OF THE CASE
I. The Clean Water Act
A. Congress passed the CWA because the
Nation needed an effective approach to
controlling water pollution.
Congress enacted the Clean Water Act, Pub. L. 92500, 86 Stat. 816, 33 U.S.C. § 1251 et seq., in 1972 to
accomplish a “total restructuring” and “complete
rewriting” of the federal laws regulating water pollution.
City of Milwaukee v. Illinois, 451 U.S. 304, 317 (1981).
Before 1972, federal law “employed ambient water
quality standards specifying the acceptable levels of
pollution in a State’s interstate navigable waters as
the primary mechanism in its program for the control
of water pollution.” California, 426 U.S. at 202. That
law authorized enforcement against anyone whose
“discharge of matter into interstate waters” was
“causing or contributing” to the “reduc[tion of] the
quality of such waters below the water quality
standards.” 33 U.S.C. § 1160(c)(5) (1970).
This regulatory approach, in which “water quality
standards . . . serve[d] both to guide performance by
polluters and to trigger legal action to abate pollution,
proved ineffective.” California, 426 U.S. at 202. The
water quality standards were difficult to enforce
against individual dischargers for the same reason a
chef cannot easily identify which particular line cook
made the soup too salty. Because federal law focused
on navigable waters’ aggregate levels of pollution,
rather than on the “preventable causes of water pollution” discharged into them, ascertaining if dischargers
were out of compliance required “work[ing] backward
from an overpolluted body of water to determine
which point sources [we]re responsible.” Id. at 202,
8
204. This retrospective approach made “it very difficult
to develop and enforce standards to govern the
conduct of individual polluters.” Id. at 202–03. Worst,
it also failed to protect water quality because dischargers
lacked clear standards to guide their conduct ex ante;
they only learned of their failure to control their discharges adequately after water quality standards were
exceeded. See id. at 203.
B. The CWA established NPDES permits,
which set effluent limitations to regulate
permitholders’ discharges.
Faced with this failure, Congress enacted the CWA
to reboot water quality regulation. It “introduced two
major changes in the methods” used to control water
pollution: (1) the NPDES permit system, which establishes an individual discharger’s compliance obligations;
and (2) effluent limitations, the specific restrictions
that permits impose on the nature and contents of a
permitholder’s discharges. California, 426 U.S. at 204–
05.
1. NPDES Permits
Section 402 of the Act, 33 U.S.C. § 1342, establishes the NPDES permitting scheme. 2 Congress
established the NPDES program to regulate
dischargers individually, by making it “unlawful for
any person to discharge a pollutant without obtaining
2 The Act imposes a variety of other mandates on regulators,
including a requirement for states to issue certifications for
federally permitted activities “which may result in any discharge
into the navigable waters.” 33 U.S.C. § 1341(a)(1). That certification
scheme is not at issue in this case.
9
a permit and complying with its terms.” California,
426 U.S. at 205; see 33 U.S.C. § 1311(a). 3
Each NPDES permit “defines, and facilitates
compliance with, and enforcement of, a preponderance of a discharger’s obligations” under the CWA.
California, 426 U.S. at 205. The specific requirements
contained in an NPDES permit are subject to “direct
administrative and judicial enforcement.” Id. With
a handful of exceptions, an NPDES permitholder who
complies with the conditions of their permit is
“deemed to be in compliance” with the CWA’s antipollution mandate and not subject to enforcement.
Id.; see also 33 U.S.C. § 1342(k) (known as the “permit
shield”). This is true even where discharges that
comply with an NPDES permit “reach waters already
in violation of existing water quality standards.”
Arkansas v. Oklahoma, 503 U.S. 91, 107 (1992).
2. Effluent Limitations
The Act’s second major innovation was its establishment of effluent limitations: “direct restrictions on
discharges [that] facilitate enforcement by making it
unnecessary to work backward from an overpolluted
body of water to determine which point sources are
responsible.” California, 426 U.S. at 204. Section 301
of the Act, 33 U.S.C. § 1311 (“Effluent limitations”),
sets forth the Act’s requirements for setting effluent
3 The Act’s requirement to obtain an NPDES permit applies
only to “point sources”—“discernible, confined and discrete
conveyance[s] . . . from which pollutants are or may be
discharged.” 33 U.S.C. § 1362(14). Nonpoint source pollution,
which “arises from many dispersed activities over large areas,
and is not traceable to any single discrete source,” does not
require a permit. League of Wilderness Defs. v. Forsgren, 309
F.3d 1181, 1183–84 (9th Cir. 2002).
10
limitations—restrictions “on quantities, rates, and
concentrations of . . . constituents . . . discharged from
point sources.” 33 U.S.C. § 1362(11) (definition of
“effluent limitation”).
Section 301(b)(1) of the Act instructs EPA to establish “effluent limitations for point sources,” including
“publicly owned treatment works.” 33 U.S.C.
§ 1311(b)(1)(A)-(B). In the first instance, EPA sets
effluent limitations based on the application of
specified control technologies. See id. EPA calls these
“technology-based effluent limitations.” See EPA,
NPDES Permit Limits-TBELs and WQBELs (Oct. 5,
2023), https://perma.cc/A5X7-WJMX.
In many instances, technology-based effluent
limitations provide sufficient control of point sources’
discharges such that navigable waters will meet
applicable water quality standards. See id. However,
conditions in some waterbodies are such that
“implementing
technology-based
controls
is
inadequate to achieve water quality standards.” Id.
In these circumstances, section 301(b)(1)(C) requires
that EPA impose “any more stringent limitation,
including those necessary to meet water quality
standards . . . or required to implement any applicable
water quality standard.” 33 U.S.C. § 1311(b)(1)(C).
EPA has long understood section 301(b)(1)(C) to
mandate that the agency set “effluent limitations
necessary to meet all applicable water quality standards,” and has crafted a set of regulations for setting
these discharge restrictions. 54 Fed. Reg. 23,868,
23,875 (June 2, 1989) (emphasis added); Arkansas,
503 U.S. at 96 (“EPA’s Chief Judicial Officer . . . ruled
that § 301(b)(1)(C) . . . ‘requires an NPDES permit to
impose any effluent limitations necessary to comply
with applicable state water quality standards.’”
11
(emphasis added) (citation omitted)). The regulations
prescribe a methodology for identifying the need for
“water quality-based effluent limits” based on an
assessment of whether specific “pollutants or pollutant
parameters” in a point source’s discharge have a
“reasonable potential” to cause a waterbody to violate
water quality standards. 40 C.F.R. § 122.44(d)(1)(i),
(vii).
If EPA concludes that any pollutant in a discharge
has such a reasonable potential, EPA must impose
“effluent limit[ation]s for that pollutant.” 40 C.F.R.
§ 122.44(d)(1)(iii); Arkansas, 503 U.S. at 105
(affirming EPA’s obligation to set appropriate effluent
limitations under § 122.44(d)(1) to “ensure compliance
with the applicable water quality requirements”).
These effluent limitations may be stated numerically
(e.g., a restriction on a particular concentration of a
chemical in discharged effluent), or narratively (e.g., a
requirement to minimize solid or floatable matter
discharged from a point source).
The water quality standards that are the basis for
these effluent limitations are set under section 303 of
the Act, 33 U.S.C. § 1313, which requires States to
develop water quality standards that describe a
waterbody’s “desired condition,” subject to EPA’s review
and approval. Arkansas, 503 U.S. at 101; see 33 U.S.C.
§ 1313(c)(2)(A). These state-developed standards consist
of two primary components: (1) a water’s designated
use, such as “recreation[ ]” or “water suppl[y]”; and
(2) water quality criteria, appropriate benchmarks to
protect each designated use. 33 U.S.C. § 1313(c)(2)(A). 4
4 In California, a designated use is called a “beneficial use,”
and water quality criteria are referred to as “water quality
objectives.” See JA.32.
12
A State may express water quality criteria numerically (e.g., a maximum concentration of a chemical in
the receiving water) or narratively (e.g., narrative
criteria that set out broad goals for a water body). 5
See 40 C.F.R. § 131.11(b); EPA, Water Quality
Standards Handbook Ch. 3 at 6 (Dec. 2023).
Thus, while the Act retained water quality standards,
it does not replicate its predecessor’s mistake of
requiring dischargers to avoid “causing or contributing”
to conditions that fail to meet water quality standards.
33 U.S.C. § 1160(c)(5) (1970). Instead, the CWA recasts
water quality standards in a new role: serving as the
“basis for effluent limitations.” California, 426 U.S.
at 205 n.12. Under the Act, it is not the permitholder
that must comply with water quality standards, but
EPA, which has the duty to set effluent limitations for
permitholders that will ensure that water quality
standards are met.
II. San Francisco’s Combined Sewage
Stormwater Treatment Facilities
and
Despite that carefully designed regulatory scheme,
San Francisco now finds itself subject to the very obligation the CWA was designed to eliminate: a requirement not “to cause or contribute” to violations of water
quality standards. Like most cities in the United
States, see Pet. App. 7, San Francisco owns and operates facilities that collect, convey, and treat combined
sewage and stormwater. This case concerns the City’s
Oceanside Facilities, which provide combined sewage
and stormwater treatment for more than 250,000
5 For instance, California’s water quality criteria require
that “[m]arine communities . . . not be degraded,” and prohibit
“objectionable aquatic growths” or chemical conditions that
“degrade indigenous biota.” JA.38-39.
13
people living in the western portion of San Francisco
and include: (a) the Oceanside Water Pollution Control
Plant; and (b) over 250 miles of combined sewers. Pet.
App. 252–57. The City also operates a second combined sewer and wastewater treatment system, called
the Bayside Facilities, which serve the eastern portion
of San Francisco. The Bayside Facilities operate under
a separate NPDES permit, which is the subject of
EPA’s recently-filed enforcement action. 6
As an operator of a combined sewer system, San
Francisco is one of hundreds of older cities that experience combined sewer overflows (CSOs)—discharges
from the combined sewer before reaching the treatment
plant that occur when large storms cause flows to
exceed the sewer’s capacity. Id. at 258. The City has
made major investments in upgrading the Oceanside
Facilities to minimize CSOs and their impacts on
water
quality.
Among
other
infrastructure
improvements, the Oceanside Facilities include three
enormous transport and storage structures that can
store approximately 71 million gallons of combined
wastewater and stormwater. Pet. App. 254. These and
other improvements—part of a multibillion-dollar
citywide investment in CSO controls—reduced the
average
annual
frequency
of
CSOs
from
6 EPA sued San Francisco for allegedly violating a provision
of its Bayside permit that is substantively identical to the
Generic Prohibitions challenged in this case. See Complaint
¶ 100, United States v. City & Cnty. of San Francisco, No. 3:24cv-02594 (N.D. Cal. May 1, 2024) (ECF No. 1) (EPA Complaint)
(citing S.F. Bay Reg’l Water Quality Control Bd., Waste
Discharge Requirements for the Southeast Water Pollution Control
Plant et al., Order No. R2-2013-0029, NPDES No. CA0037664,
at § V.C (Aug. 19, 2013)), available at https://perma.cc/HT8MSS35.
14
approximately 114 per year to fewer than eight. See
JA.6; 9th Cir. ER 964; 9th Cir. Supp. ER 914.
III.
Case History
A. EPA’s Issuance of the Oceanside Facilities’
2019 NPDES Permit
EPA and the State of California, through the San
Francisco Bay Regional Water Quality Control Board
(Regional Board), jointly developed and issued the
Oceanside Facilities’ latest NPDES permit (the
Oceanside Permit) in 2019. 7 Pet. App. 80. The CWA
charges EPA with issuing permits in the first
instance, but most States—including California—are
authorized to issue permits for discharges into waters
within their jurisdiction. See 33 U.S.C. § 1342(b); 40
C.F.R. § 123.1(d)(1). 8 Only EPA, however, may issue
permits for ocean discharges occurring more than
three miles from shore. Pac. Legal Found. v. Costle,
586 F.2d 650, 655 (9th Cir. 1978), rev’d on other
grounds, Costle v. Pac. Legal Found., 445 U.S. 198
(1980). Because the Oceanside Facilities discharge both
7 The CWA classifies NPDES permits for combined sewer
systems in phases. Permitholders that have yet to develop a longterm plan to control their CSOs and select control projects are in
“Phase I,” and those that have completed their plans and selected
control projects fall into “Phase II.” See EPA, Combined Sewer
Overflow Control Policy, 59 Fed. Reg. 18,688, 18,696 (Apr. 19,
1994). Because San Francisco has already selected (and completed
building) its CSO control projects, EPA has placed San Francisco’s
permit in Phase II. See Br. for EPA 18, 23, 29, City & Cnty. of
San Francisco v. EPA, No. 21-70282 (9th Cir. Nov. 24, 2021) (ECF
No. 33-1).
8 For the reader’s convenience, this brief throughout refers
only to EPA, but this Court’s interpretation of the Act will govern
NPDES permits that may be issued under the Act by either EPA
or an authorized State. See 33 U.S.C. § 1342(a), (b).
15
close to and more than three miles from the shore, San
Francisco must obtain an NPDES permit from both
EPA and the Regional Board. 9
The Oceanside Permit comprises over 100 pages of
detailed requirements for San Francisco’s discharges
and includes both technology- and water quality-based
effluent limitations. The latter include two distinct sets
of water quality-based effluent limitations: (1) a numeric
effluent limitation that applies during dry weather;
and (2) narrative limitations that set comprehensive
management requirements for the operation of the
Oceanside Facilities during wet weather. Pet. App. 95–
97, 128–31.
Despite the wide-ranging scope of those effluent
limitations, EPA also included the two challenged
Generic Prohibitions in the final Oceanside Permit
over San Francisco’s objections. 9th Cir. ER 921–29.
Resurrecting the regulatory scheme that Congress
expressly abandoned in 1972, EPA inserted into Section
V—entitled “Receiving Water Limitations”—a condition
that a discharge may “not cause or contribute to a
violation of any applicable water quality standard.”
Pet. App. 97. EPA included a similar condition in
Attachment G, § I.I.1 that no “discharge of pollutants
shall create pollution, contamination, or nuisance
as defined by California Water Code section 13050.” Id.
at 339. California defines “pollution” by reference
to whether a surface water meets the beneficial use
9 Because the Regional Board’s approval of the Permit is a
distinct agency action, San Francisco separately challenged the
Regional Board’s decision in a state court proceeding. City &
Cnty. of San Francisco v. San Francisco Bay Reg’l Water Quality
Control Bd., No. RG19042575 (Alameda Cnty. Super. Ct.). This
state court litigation is stayed pending resolution of proceedings
in this Court.
16
component of the state’s water quality standards. See
Cal. Water Code § 13050(l)(1)(A) (defining “pollution”
to include “alteration of the quality of the waters of
the state . . . which unreasonably affects . . . [t]he waters
for beneficial uses”).
Thus, both Section V and Attachment G, § I.I.1—
the Generic Prohibitions—condition San Francisco’s
compliance on the overall quality of receiving waters.
Because water quality varies over time in response to
additional sources of pollutants and other factors, San
Francisco’s compliance with those permit conditions
will not be knowable at the time of discharge. 10
Instead, it often can only be determined by “work[ing]
backward” when the Pacific Ocean fails to meet water
quality standards, California, 426 U.S. at 204, to
determine if San Francisco’s discharges “create[d],”
“contribute[d] to” or “cause[d]” that deficiency. Pet.
App. 97, 339. In other words, San Francisco is subject
to the exact regulatory approach that the CWA was
supposed to supplant.
10 Nor can San Francisco control all nonpoint sources of
pollution into the Pacific Ocean, even though “nonpoint source
pollution is the leading remaining cause of water quality
problems.” EPA, Basic Information about Nonpoint Source (NPS)
Pollution (Dec. 4, 2023), https://perma.cc/YP8J-8PQ4.
17
B. Administrative and Judicial Review of
EPA’s Permitting Decision
San Francisco petitioned for review with EPA’s
Environmental Appeals Board (EAB) to challenge the
Generic Prohibitions and two other provisions. See 40
C.F.R. § 124.19(a). As relevant here, the City objected
that neither section 301(b)(1)(C) nor any other
provision of the Act authorized the agency to impose
the Generic Prohibitions. The EAB issued an order on
December 1, 2020, denying San Francisco’s petition
and concluding, among other things, that section
301(b)(1)(C) empowered the agency to impose the
Generic Prohibitions. See Pet. App. 433. EPA issued
its Notice of Final Permit Decision—marking final
agency action—on December 22, 2022. Pet. App. 77–79.
The City then timely petitioned for review in the
Ninth Circuit to challenge both the Generic Prohibitions and another provision of the Oceanside Permit.
See 33 U.S.C. § 1369(b)(1)(F). A divided Ninth Circuit
panel denied San Francisco’s petition and concluded,
as relevant here, that the Generic Prohibitions are
“consistent with the CWA and its implementing regulations.” Pet. App. 34. The panel majority held that
section 301(b)(1)(C) of the Act allows EPA to condition
compliance on the overall quality of receiving waters,
rather than on the nature or contents of the permitholder’s discharges, whenever EPA determines doing
so is “necessary.” 11 Pet. App. 32–33.
Judge Collins dissented, finding the Generic
Prohibitions “invalid” because they are “inconsistent
11 The panel majority also pointed to similar language in 40
C.F.R. § 122.44(d) as a basis for EPA’s authority to impose
generic prohibitions against violating water quality standards.
Pet. App. 32–33.
18
with the text of the CWA.” Pet. App. 50, 62. Analyzing
section 301(b)(1)(C), Judge Collins concluded that the
CWA “draws an explicit distinction between the ‘limitations’ that the agency must . . . impose on a particular
permittee[ ] and the overall ‘water quality standards’”
applicable to the relevant receiving water. Pet. App.
at 62. He wrote that the Generic Prohibitions “ignore
this critical distinction by making the ultimate, overall
‘water quality standards’ themselves the applicable
limitation for” San Francisco. Id. at 63. By conditioning
San Francisco’s ability to comply with its permit on
receiving water quality, Judge Collins concluded, EPA
“ha[d] fundamentally abdicated the regulatory task
assigned to it under the CWA”: prescribing effluent
limitations that restrict the pollutants in the City’s
discharges at a level that would meet or implement
water quality standards. Id. at 64.
19
SUMMARY OF THE ARGUMENT
The text, structure, and pre- and post-enactment
context of the CWA all make clear the Act does not
authorize EPA to impose NPDES permit requirements that condition permitholders’ compliance on
whether receiving waters meet applicable water
quality standards. EPA has argued, and the Ninth
Circuit
erroneously
concluded,
that
section
301(b)(1)(C) of the Act empowers the agency to impose
prohibitions of this kind. That section gives EPA no
such authority. Accordingly, EPA’s imposition of the
Generic Prohibitions is “not in accordance with law.”
5 U.S.C. § 706(2)(A).
I. The Act’s text and structure do not authorize
EPA to condition a permitholder’s compliance on the
quality of receiving waters. Section 301(b)(1)(C) commands EPA to use a specific regulatory tool to protect
water quality: effluent limitations, which Congress
defined to be restrictions on the nature or contents of
a permitholder’s discharges from their point sources.
A.1. Section 301(b)(1)(C) grants EPA the authority
to use only one mechanism to control permitholders’
discharges: effluent limitations. The sequencing of
terms both in subsection (b)(1) and throughout section
301 makes clear that subsection (b)(1)(C) is a narrow
directive to set more stringent “effluent limitations”—
not a grant of unfettered authority to impose the
Generic Prohibitions. Reading section 301(b)(1)(C) to
empower EPA to impose such prohibitions would render
the provision illogical and short-circuit its requirement
that “limitations” set under this provision be more
stringent than other effluent limitations set pursuant
to section 301(b)(1).
20
2. Congress’ instruction to EPA to set effluent
limitations precludes the agency from imposing permit
requirements that condition compliance on receiving
water quality. The Act’s definition of the term makes
clear that effluent limitations must restrict a permitholder’s discharges at the point source, prior to their
addition to navigable waters.
B. The Act’s structure confirms EPA may not
make permitholders responsible for exceedances of
water quality standards. Numerous provisions identify
which of the CWA’s requirements bind individual
permitholders, and none contemplates that a permitholder is directly liable for violations of section 303,
the Act’s water quality standards provision. It flies in
the face of logic—and Congress’ carefully drafted
regulatory regime—to interpret section 301(b)(1)(C)
to enable EPA to do what Congress declined to do
throughout the CWA. This Court should resist EPA’s
invitation to insert a requirement Congress expressly
declined to add. See Whitfield v. United States, 543
U.S. 209, 216–17 (2005).
II. The CWA’s pre-enactment context and early
post-enactment agency interpretations confirm what
the Act’s text makes clear: EPA may not impose permit
terms such as the Generic Prohibitions that condition
a permitholder’s compliance on receiving water
conditions.
A. The City’s interpretation ensures EPA cannot
revive aspects of the ineffective pollution control
system the CWA replaced, which regulated
dischargers based on whether they were causing or
contributing to exceedances of water quality standards. Congress designed section 301(b)(1)(C) to depart
from this failed approach by requiring EPA to impose
effluent limitations that make permitholders respon-
21
sible for what they can and must control—the nature
and content of their own discharges.
B. EPA’s longstanding agency interpretations of
section 301(b)(1)(C) confirm that this provision is not
a license to condition permitholders’ compliance on
receiving water quality. Based on its understanding
that section 301(b)(1)(C) requires it to set effluent
limitations, EPA has developed an entire regulatory
regime that demonstrates the agency possesses the tools
necessary to protect water quality without resorting
to unlawful permit terms like the Generic Prohibitions.
III. The Act’s permit shield and enforcement
provisions confirm the soundness of the City’s
interpretation of section 301(b)(1)(C) and the Act.
A. The City’s interpretation ensures permitholders
face the “crushing consequences” of the CWA’s enforcement machinery only when they violate pollution control
obligations clearly defined in their permits. Sackett v.
EPA, 598 U.S. 651, 660 (2023) (cleaned up). EPA’s
interpretation, by contrast, unsettles Congress’ careful
pairing of potentially severe enforcement penalties
with the Act’s guarantee of finality codified in the
statute’s permit shield, which deems conformity to a
permit’s specific requirements to be compliance with
the Act. See 33 U.S.C. § 1342(k).
B. Recent litigation, including a lawsuit brought
by EPA against San Francisco, shows how requirements
like the Generic Prohibitions harm permitholders. In
lawsuits seeking to enforce such conditions, courts
must decide after the fact how much permitholders
should have controlled their discharges, making permit
obligations “hopelessly indeterminate” and impeding
permitholders’ ability to assess their compliance ex ante.
Sackett, 598 U.S. at 681 (cleaned up). San Francisco
22
now faces such a lawsuit, brought by EPA, that seeks
to enforce a condition in the City’s Bayside permit
that—like the Generic Prohibitions—defines compliance
by reference to receiving water quality. Even after
being sued, San Francisco still does not know what
EPA contends San Francisco has done to violate that
permit condition, nor what, if anything, the City can
do to avoid future enforcement actions, short of
stopping wastewater treatment operations altogether.
Interpreting section 301(b)(1)(C) consistent with its
text, structure, and context ensures no permitholder
will face such a predicament.
23
ARGUMENT
The CWA does not allow EPA (or an authorized
State) 12 to impose permit conditions that—like the
Generic Prohibitions—condition a permitholder’s compliance on the quality of receiving waters. EPA has
argued, and the Ninth Circuit incorrectly held, that
section 301(b)(1)(C) of the Act, 33 U.S.C. § 1311(b)(1)(C),
authorizes the imposition of any receiving water
prohibition that EPA deems “necessary to meet water
quality standards.” See Pet. App. 32–33; Br. in Opp.
to Pet. for Writ of Cert. 2 (EPA BIO); see also Br. for
EPA, supra note 7, at 52. Section 301(b)(1)(C),
however, gives EPA no such discretion.
The Act’s text and structure instead establish one
mechanism for ensuring water quality standards are
met by permitholders: effluent limitations, which
regulate the nature and contents of a permitholder’s
discharges at the point source. Nothing in the Act’s
text or structure authorizes EPA to condition a permitholder’s compliance on the quality of receiving waters.
That understanding of the Act comports with this
Court’s longstanding expectation that EPA will
“translate[] Congress’ broad goal of eliminating the
discharge of pollutants into the navigable waters into
specific requirements that must be met by individual
point sources.” EPA v. Nat’l Crushed Stone Ass’n, 449
U.S. 64, 69 (1980) (cleaned up). That reading also
ensures the Act’s onerous enforcement consequences
only befall those permitholders who violate clear, ex
ante requirements in their permits.
12 As noted above, both EPA and authorized States may
issue NPDES permits, see supra at 14–15 & note 8, but for the
reader’s convenience, this brief throughout refers only to EPA.
24
The Generic Prohibitions thus exceed EPA’s
authority under section 301(b)(1)(C) because they do
not restrict the City’s discharges at its point sources.
Because the Generic Prohibitions are not effluent
limitations that section 301(b)(1)(C) authorizes the
agency to impose, they should be set aside as “not in
accordance with law,” 5 U.S.C. § 706(2)(A), and the
Court should reverse the Ninth Circuit’s contrary
holding.
I. The CWA does not authorize EPA to impose
permit conditions that hold permitholders
directly liable for the quality of receiving
waters.
Section 301(b)(1)(C)’s text and the Act’s structure
make clear EPA must use effluent limitations in
NPDES permits to ensure discharges are sufficiently
regulated to meet water quality standards. The
statutory definition of effluent limitations does not
allow EPA to condition a permitholder’s compliance
on receiving water quality. Moreover, reading section
301(b)(1)(C) as authorizing EPA to do so would flout
the text of other parts of section 301(b) and do violence
to related provisions of the Act.
A. EPA may only set effluent limitations that
restrict the nature or contents of
discharges from permitholders’ point
sources.
1. The CWA requires EPA to use
effluent limitations—not any other
type of permit condition—to meet
water quality standards.
Section 301(b)(1)(C) does not give the agency broad
discretion to impose permit conditions that simply
direct permitholders to avoid violating water quality
25
standards. Rather, Congress directed EPA to use
effluent limitations—the specific regulatory tool that
Congress determined would effectively control pollution
by establishing “direct restrictions on discharges.”
California, 426 U.S. at 204.
“[S]tatutory interpretation must begin with, and
ultimately heed, what a statute actually says.” Groff
v. DeJoy, 600 U.S. 447, 469 (2023) (cleaned up). Here,
section 301(b) provides in relevant part:
In order to carry out the objective of
this chapter there shall be achieved –
(A) . . . effluent limitations for point
sources, . . . which shall require the
application of the best practicable control
technology currently available as defined
by the Administrator pursuant to section
1314(b) of this title . . . ;
(B) for publicly owned treatment
works . . . , effluent limitations based upon
secondary treatment as defined by the
Administrator pursuant
to section
1314(d) . . . ; or,
(C) . . . any more stringent limitation,
including those necessary to meet water
quality standards, treatment standards,
or schedules of compliance, established
pursuant to any State law or regulations
. . . or any other Federal law or regulation,
or required to implement any applicable
water quality standard established pursuant to this chapter.
33 U.S.C. § 1311(b)(1) (emphases added).
26
Although section 301(b)(1)(C) uses only the word
“limitation,” its use within the broader context of
section 301 makes clear that Congress deployed it as
a shorthand for the defined term “effluent limitation.”
See United States v. Taylor, 596 U.S. 845, 856 (2022)
(“a law’s terms are best understood by the company
[they] kee[p]” (cleaned up)). To begin, the two (and
only) uses of “limitations” preceding (C) both require
the achievement of “effluent limitations” based on
specified technologies, 33 U.S.C. § 1311(b)(1)(A), (B).
Cf. New Prime Inc. v. Oliveira, 586 U.S. 105, 110, 111
(2019) (“statute’s terms and sequencing” show “antecedent statutory provisions limit the scope of” the
provision in question)); Harrington v. Purdue Pharma
L. P., 144 S. Ct. 2071, 2084 (2024) (“When resolving a
dispute about a statute’s meaning, we sometimes look
for guidance not just in its immediate terms but in
related provisions as well.”)
EPA itself has long recognized—since shortly after
Congress passed the Act—that “the position of
§ 301(b)(1)(C) following two other subparagraphs
which clearly establish effluent limitations favors a
construction of subparagraph (C) by which it also
This
‘establishes’
effluent
limitations.” 13
interpretation, coming shortly after the passage of the
Act, is especially telling. See Loper Bright Enters. v.
13 EPA, Decisions of the Administrator & Decisions of the
General Counsel – National Pollutant Discharge Elimination
System Adjudicatory Hearing Proceedings Vol. 2 at 116 (Jan.
1976 – Dec. 1976) (Jan. 22, 1976 decision of EPA’s General
Counsel) (emphasis added); see also EPA, The National Water
Permit Program 12 (June 1, 1973) (“more stringent effluent
limitations are to be imposed” when technology-based controls
are insufficient to attain water quality standards (emphasis
added)).
27
Raimondo, 144 S. Ct. 2244, 2258 (2024) (“[An] Executive
Branch interpretation [that] was issued roughly
contemporaneously with enactment of the statute . . .
can inform [a court’s] determination of what the law
is.” (cleaned up)).
That interpretation also ensures that “limitation”
has a consistent meaning—as a shorthand for
“effluent limitation”—throughout section 301. See
Powerex Corp. v. Reliant Energy Servs., Inc., 551 U.S.
224, 232 (2007) (invoking the consistent-usage canon
to find a term used in related provisions enacted at
the same time had the same meaning). For instance,
section 301(i)(1) refers to “limitations under subsection (b)(1)(B),” 33 U.S.C. § 1311(i)(1), a subsection
that addresses only “effluent limitations.” Id.
§ 1311(b)(1)(B). Other provisions of section 301 also
describe “effluent limitations” before referring to them
again simply as “limitations.” See id. § 1311(b)(2)(C)–
(D), (F), (3)(A)–(B), (m)(1)–(2), (n)(7). Indeed, Congress
removed any doubt that section 301(b)(1)(C)’s
“limitation” should have the same meaning as it does
elsewhere by providing section 301 an unambiguous
title: “Effluent limitations,” 86 Stat. 844, Pub. L. No.
92-500, § 301. See INS v. Nat’l Ctr. for Immigrants’
Rts., Inc., 502 U.S. 183, 189 (1991) (“the title of a
statute or section can aid in resolving an ambiguity in
the legislation’s text”).
Two additional aspects of section 301(b)(1)(C)
confirm that this provision authorizes EPA to impose
only effluent limitations. First, section 301(b)(1)(C)’s
use of a comparative adjective—“more stringent”—
requires a comparison to some other limitation preceding it. The only “limitations” preceding subsection
(b)(1)(C) are the “effluent limitations” in subsections
(b)(1)(A) & (B). Thus, the comparison of stringency that
28
the statute requires is only possible if the “limitation”
required by section 301(b)(1)(C) is the same kind as
those in the preceding subsections (A) and (B):
“effluent limitations.” Id. § 1311(b)(1)(A) –(B).
The converse interpretation hinders the comparison the text demands. A “limitation” that conditions
compliance on receiving water quality will necessarily
vary in its stringency depending on circumstances in
the receiving water that can include “other sources of
pollutants into the applicable waters,” Pet. App. 64
(Collins, J., dissenting) (emphasis in original), as well
as variations in flow or other conditions. 14 The
relative stringency of a permit condition like the
Generic Prohibitions will thus vary from season to
season, and day to day. When a receiving water’s
conditions are comparatively pristine, for example,
such a prohibition would allow a permitholder to
discharge in greater amounts than permitted by their
technology-based effluent limitations set under
subsections (b)(1)(A) – (B). In those circumstances,
the permit’s receiving water prohibition would be invalid
under section 301(b)(1)(C) because it would be less
stringent than the permit’s technology-based effluent
limitations.
Second, reading section 301(b)(1)(C) to require
EPA to set only effluent limitations ensures the
remainder of the provision functions coherently. See
Food & Drug Admin. v. Brown & Williamson Tobacco
Corp., 529 U.S. 120, 133 (2000) (“[a] court must . . .
interpret the statute as a symmetrical and coherent
regulatory scheme . . . . and fit, if possible, all parts into
14 See Jeffrey M. Gaba, Generally Illegal: NPDES General
Permits Under the Clean Water Act, 31 Harv. Envtl. L. Rev. 409,
441 (2007).
29
a harmonious whole” (cleaned up)). Section 301(b)(1)(C)
requires that the more stringent limitations will “meet
water quality standards” or “implement any applicable
water quality standard.” 33 U.S.C. § 1311(b)(1)(C)
(emphasis added). Both terms resist an interpretation
that would allow EPA to impose a “limitation” that
demands a permitholder avoid receiving water
conditions inconsistent with water quality standards.
“To meet” generally means “to conform” or “to
satisfy,”15 particularly with “exactitude and precision.” 16
Similarly, “to implement” means “to give practical
effect to and ensure of actual fulfillment by concrete
measures”17—an interpretation the EPA Administrator
long ago adopted with respect to this provision. 18
These verbs connote the need for a “limitation” to
impose precise, concrete restrictions on a permitholder’s
discharges.
“Meet,” The Random House Dictionary of the English
Language 831 (1968).
15
16 “Meet,” Webster’s Ninth New Collegiate Dictionary 738
(1986).
17 “Implement,” Webster’s Third New Int’l Dictionary 1134
(1961); “Implement,” The Random House Dictionary of the
English Language 667 (1968) (“to put into effect according to or
by means of a definite plan or procedure”).
18 “The word ‘implement,’ as used in the statute, is a
transitive verb which I interpret as meaning to carry something
into effect over a period of time, as opposed to the actual
realization or fulfilment of an objective.” EPA, Decisions of the
EPA Administrator & Decisions of the General Counsel –
National Pollutant Discharge Elimination System Adjudicatory
Hearing Proceedings Vol. 1 at 121 (Sep. 1974 – Dec. 1975)
(Decision of the Administrator, Oct. 10, 1975) (emphasis added)
(hereinafter Decisions of the EPA Administrator & Decisions of
the General Counsel Vol. 1).
30
An effluent limitation provides the precision and
specificity demanded by Congress’ choice of verbs.
The Act requires an effluent limitation to restrict
“quantities, rates, and concentrations of” pollutants in
a permitholder’s discharge. 33 U.S.C. § 1362(11). For
this reason, EPA’s guidance devotes a whole chapter
to explaining how permit writers should develop
specific effluent limitations that will meet and implement water quality standards. See EPA, NPDES
Permit Writers’ Manual (NPDES Manual) p. 6-32
(Sep. 2010) (instructing permit writer to “translate [a
receiving water’s loading capacity] into effluent limitations” because “[t]he requirements of a [receiving
water’s loading capacity] generally must be interpreted
in some way to be expressed as an effluent limitation”).
By contrast, permit terms like the Generic Prohibitions—which simply tell a permitholder not to “create
pollution,” Pet. App. 339, or not to “cause or contribute
to a violation of any applicable water quality standard,”
id. at 97—lack concrete or specific restrictions. In
effect, reading section 301(b)(1)(C) to allow EPA to
impose the Generic Prohibitions would enable the
agency simply to impose water quality standards “to
meet water quality standards” or “implement any
applicable water quality standard.” Such an interpretation is illogical and, worse yet, effectively reads
out of the statute Congress’ directive that EPA set
“limitations” that are distinct from—but that meet
and implement—water quality standards. 19 The Court
19 See Pet. App. 67 (Collins, J., dissenting) (Interpreting the
Act to allow EPA to impose the Generic Prohibitions enables “the
agency’s wholesale erasure of the distinction between the
‘limitations’ to be crafted by the agency and the ultimate water
31
should not countenance a reading of EPA’s authority
that would nullify these critical terms in section
301(b)(1)(C). See Corley v. United States, 556 U.S. 303,
314 (2009) (It is “one of the most basic interpretive
canons, that [a] statute should be construed so that
effect is given to all its provisions, so that no part will
be inoperative or superfluous, void or insignificant.”)
(cleaned up)); Duncan v. Walker, 533 U.S. 167, 174
(2001) (The Court is “especially unwilling to [adopt an
interpretation that nullifies a word in a statute] when
the term occupies so pivotal a place in the statutory
scheme.”).
2. EPA must set effluent limitations that
restrict permitholders’ discharges at
their point sources.
By requiring EPA to impose effluent limitations
under section 301(b)(1)(C), Congress directed EPA to
impose permit conditions that restrict the nature of
permitholders’ discharges at their point sources. The
Act defines an “effluent limitation” as “any restriction
established by a State or the Administrator on quantities, rates, and concentrations of chemical, physical,
biological, and other constituents which are discharged
from point sources,” 33 U.S.C. § 1362(11) (emphasis
added). Six months after the Act’s passage, EPA had
already begun interpreting this definition to demand
that the agency restrict the contents of a discharge at
the point source, rather than restrict the receiving
water conditions these discharges can cause. See EPA,
The National Water Permit Program, supra note 12,
at 7 (explaining how effluent limitations regulate “the
amount of pollutants in discharged wastewater or on
quality standards those limitations are supposed to help to
achieve.” ).
32
the volume of wastewater discharged”) (emphasis
added); see also infra at 41–42.
EPA’s “contemporaneous[]” and “consistent” interpretation is “especially useful in determining the
statute’s meaning,” Loper Bright, 144 S. Ct. at 2262,
and is confirmed by two components of the definition
of “effluent limitation.” First, the Act specifies that an
effluent limitation must restrict pollutants “which are
discharged,” indicating that the restriction must
restrain the release or emission of discharges prior to
leaving the point source and before their addition to a
navigable water. Although the Act does not define the
verb “discharge,” the term ordinarily refers to a fluid
being “emit[ted]. 20 The CWA itself also defines a
“discharge of pollutant”—which an effluent limitation
regulates—as an “addition of any pollutant to navigable
waters.” 33 U.S.C. § 1362(12)(A) (emphasis added);
see also Cnty. of Maui v. Hawaii Wildlife Fund, 590
U.S. 165, 189 (2020) (Thomas, J., dissenting) (word
“addition” in statutory definition of “discharge”
“denote[s] an augmentation or increase” such that the
meaning of “discharge” is “the augmentation of navigable waters”). Congress’ word choice thus directs
EPA to restrict the discharge of pollutants, rather
than prohibit the effects those (and other) pollutants
collectively can have once they have already entered
navigable waters.
Second, Congress’ instruction that EPA restrict
discharges “from point sources” reinforces that effluent
limitations must condition compliance at the
discharge’s point of origin, rather than in the receiving
20 “Discharge,” Webster’s Seventh New Collegiate Dictionary
237 (1971); “Discharge,” The Random House Dictionary of the
English Language 377 (1968).
33
water. As used in the definition, “from” functions to
“indicate a starting point” or the location “where an
actual physical movement . . . has its beginning.” 21
Moreover, the Act’s coupling of this preposition with
a source—a “point source”—“connote[s] an origin.”
Cnty. of Maui, 590 U.S. at 179. The definition thus
directs EPA to set restrictions that apply at their
origin—the point source—rather than in the receiving
water. 22
This reading also comports with how the statute
elsewhere characterizes effluent limitations as
restrictions on discharges rather than restrictions on
receiving water effects. In Section 304(b) of the Act,
Congress required EPA to establish “guidelines” for
“adopting or revising effluent limitations” and specified
that these guidelines “identify, in terms of amounts of
constituents and chemical, physical, and biological
characteristics of pollutants, the degree of effluent
reduction attainable” by point sources. 33 U.S.C.
§ 1314(b)(1)(A), (2)(A), (4)(A) (emphasis added). This
instruction confirms that effluent limitations should
restrict the contents of a permitholder’s discharge, not
21 “From,” Webster’s Third New Int’l Dictionary 913; “From,”
The Random House Dictionary of the English Language 570
(1968) (“used to specify a starting point”).
22 EPA is of course free to impose narrative (i.e., nonnumeric) effluent limitations so long as they restrict the nature
of a point source’s discharges. See Citizens Coal Council v. EPA,
447 F.3d 879, 865 (6th Cir. 2006) (EPA may impose narrative
requirements because “effluent limitations are not limited to
numeric discharge[ ] restrictions”); Waterkeeper All., Inc. v. EPA,
399 F.3d 486, 502 (2d Cir. 2005) (numeric effluent limitations in
the form of required management practices meet the CWA’s
definition of “effluent limitations”). Narrative requirements that
restrict the nature of a point source’s discharges—rather than
receiving water quality conditions—satisfy the Act’s definition.
34
its effect (in combination with other sources of
pollution) once in the receiving water.
B. The CWA’s structure reinforces that EPA
may not impose permit terms that measure
compliance based on exceedances of water
quality standards.
Numerous critical provisions in the Act reinforce
that section 301(b)(1)(C) cannot authorize EPA to
impose receiving-water-based restrictions like the
Generic Prohibitions. “It is a fundamental canon of
statutory construction that the words of a statute
must be read in their context and with a view to their
place in the overall statutory scheme.” West Virginia
v. EPA, 597 U.S. 697, 721 (2022) (cleaned up). Reading
section 301(b)(1)(C) to require EPA to restrict the
contents of permitholders’ discharges—as opposed to
the receiving water conditions caused by them—
honors Congress’ choice not to measure permitholders’
compliance based on whether waterbodies meet
applicable standards.
Four sets of provisions identify which of the Act’s
requirements bind individual permitholders, and
none contemplates that a permitholder’s compliance
can be conditioned on the quality of the receiving
waters. First, section 301(a) makes it unlawful for any
person to discharge a pollutant without complying
with effluent limitations set under section 301 and six
other sections of the Act, but Congress chose not to
condition compliance on section 303, 33 U.S.C. § 1313,
the Act’s water quality standards provision. 23 Second,
23 See 33 U.S.C. § 1311(a) (“Except as in compliance with
this section and sections 1312, 1316, 1317, 1328, 1342, and 1344
of this title, the discharge of any pollutant by any person shall be
unlawful.”).
35
section 402(a)(1) of the Act requires permitted discharges to meet the requirements of six other sections of
the Act, including section 301, but section 303 is notably
not among them. 24 Third, section 309, the Act’s
enforcement provision, identifies several different
ways permitholders may be held liable for violations
of particular sections of the CWA, but section 303 is
not included as a basis for liability in those lists. 25
Last, the Act’s citizen suit provision—section 505—
identifies sections of the CWA that impose requirements that can form the basis for a private enforcement (citizen suit) action, and Congress again omitted
section 303. 26 Congress’ omission of section 303 from
24 See id. § 1342(a)(1) (A discharge may only be permitted
“upon condition that such discharge will meet . . . all applicable
requirements under sections 1311, 1312, 1316, 1317, 1318, and
1343.”).
25 See, e.g., id. § 1319(c)(2)(A) (holding criminally liable any
person who “knowingly violates section 1311, 1312, 1316, 1317,
1318, 1321(b)(3), 1322(p), 1328, or 1345 of this title, or any
permit condition or limitation implementing any of such sections
in a[n NPDES] permit”); id. § 1319(d) (imposing civil penalties
on anyone “who violates section 1311, 1312, 1316, 1317, 1318,
1322(p), 1328, or 1345 of this title, or any permit condition or
limitation implementing any of such sections in [an NPDES]
permit”).
26 See id. § 1365(f) (identifying “(1) . . . an unlawful act under
subsection (a) of section 1311 of this title; (2) an effluent
limitation or other limitation under section 1311 or 1312 of this
title; (3) standard of performance under section 1316 of this title;
(4) prohibition, effluent standard or pretreatment standards
under section 1317 of this title; (5) a standard of performance or
requirement under section 1322(p) of this title; (6) a certification
under section 1341 of this title; (7) a permit or condition of a
permit issued under section 1342 of this title . . . ; or (8) a
regulation under section 1345(d) of this title”).
36
these provisions was no mistake. 27 Moreover, section
402 elsewhere references section 303, but does so in a
manner that instructs the agency on how to set
effluent limitations, rather than to make water
quality standards themselves enforceable against
dischargers. 28
Construing the Act to allow EPA to impose permit
terms that condition compliance on the quality of
receiving waters effectively rewrites sections 301(a),
402(a)(1), 309, and 505 to insert compliance
obligations under section 303 where Congress
expressly omitted them. By making permitholders
directly responsible for meeting water quality
standards—as opposed to effluent limitations—those
prohibitions would add section 303 to the list of
sections that the Act demands “compliance with” in
order to discharge lawfully. 33 U.S.C. § 1311(a). And
it would likewise function to add section 303 to Section
402(a)(1)’s list of sections “that [a] discharge will
meet,” despite Congress’ express declination to impose
any such requirement. Id. § 1342(a)(1). Further,
dischargers would be subject to civil liability (in an
action brought by EPA or a private citizen) as well as
A single subsection of 309 contemplates knowing
endangerment liability stemming from section 303’s requirements,
see 33 U.S.C. § 1319(c)(3)(A), which “clearly demonstrate[s] that
[Congress] knows how to impose such a requirement when it
wishes to do so.” Whitfield, 543 U.S. at 216.
27
28 See 33 U.S.C. § 1342(o)(1) (instructing EPA not to issue a
permit with “effluent limitations which are less stringent than
the comparable effluent limitations in the previous permit
[when] in compliance with section 1313(d)(4)”); id. §1342(o)(3)
(same, as to a permit with “a less stringent effluent limitation if
the implementation of such limitation would result in a violation
of a water quality standard under section 1313”).
37
criminal liability for violating Section 303 or permit
terms implementing that section, even though the
statute’s text provides otherwise.
See, e.g., id.
§ 1319(c)(2)(A), (d); id. § 1365(a)(1)(A), (f). In effect,
EPA asks this Court to insert a requirement Congress
expressly declined to add. See Whitfield, 543 U.S. at
217 (where Congress has demonstrated it knows how
to impose a requirement but “has chosen not to do so”
in a statute, “we will not override that choice”
(emphasis in original)); see also Antonin Scalia &
Bryan A. Garner, Reading Law: The Interpretation of
Legal Texts 94 (2012) (an “absent provision cannot be
supplied by the courts”).
The City’s reading of section 301(b)(1)(C) does no
such violence to the statute. Under the City’s interpretation, permitholders simply must comply with the
effluent limitations EPA is to impose to meet or
implement the water quality standards. Such a
requirement is consistent with how the Act expects
permitholders to comply with applicable provisions of
section 301. See 33 U.S.C. §§ 1311(a), 1342(a)(1),
1319, 1365(f); cf. United States v. Atl. Rsch. Corp., 551
U.S. 128, 136 (2007) (rejecting interpretation that
would “destroy the symmetry” and “render [the
statute] internally confusing”).
II. Pre- and post-enactment context confirms
that NPDES permits cannot condition
compliance on receiving water quality.
The CWA’s pre- and post-enactment context
confirms what the Act’s text makes clear: EPA may not
impose permit terms such as the Generic Prohibitions
that condition a permitholder’s compliance on receiving
water conditions. EPA seeks to revive—nearly word
for word—the prior regulatory scheme Congress
expressly chose to abandon when enacting the CWA.
38
And as EPA itself has recognized in its regulations,
section 301(b)(1)(C) allows the agency to impose only
effluent limitations, not restrictions based on the
quality of receiving waters.
A. Receiving water prohibitions resuscitate
the ineffective approach to environmental
protection Congress rejected in passing
the CWA.
Interpreting section 301(b)(1)(C) as allowing EPA
to impose only effluent limitations—not receiving
water prohibitions—ensures that the agency cannot
revive the regulatory approach that Congress discarded
in 1972 precisely because it “proved ineffective.”
California, 426 U.S. at 202. Were its text and structure
not already conclusive, the Act’s legislative history
removes any doubt that Congress never expected
NPDES permits to measure permitholders’ compliance
based on the overall quality of receiving waters. Instead,
members of Congress drafted section 301(b)(1)(C)
specifically so “that each point source shall be required
to meet effluent limitations.” 29
Congress understood that the effluent limitations
required by section 301(b)(1)(C) would require EPA to
restrict the content of permitholders’ discharges, not
make permitholders directly responsible for receiving
29 S. Comm. on Public Works, 93d Cong., 1 Legislative
History of the Water Pollution Control Act Amendments of 1972
(1 Legis. History), Serial No. 93-1, at 246 (1973) (statement of
floor manager Rep. Harsha concerning section 301(b)(1)(C)
during House consideration of the Conference Report) (emphasis
added); see also id. at 209 (CWA would require permitholders to
meet “effluent limitations sufficiently stringent” to meet water
quality standards (statement of Sen. Tunney during consideration
of the Conference Report) (emphasis added)).
39
water quality. The House Committee on Public Works
explained section 301(b)(1)(C) as follows in its Report:
[A]ll point sources could be required to
meet a more stringent effluent limitation
consistent with water quality standards of
the receiving waters if the effluent limitations set pursuant to subsection (b)(1)(A)
and subsection (b)(1)(B) of section 301 are
inadequate to meet those water quality
standards. In this case a more stringent
effluent limitation will be imposed.
H. Rep. No. 92-911 (Mar. 3, 1972), at 105 (emphases
added). Such an effluent limitation, the Report
continued, “will be set on the basis of that reduction
in the quantity and quality of the discharge of
pollutants” that is necessary to meet water quality
standards. Id. at 105–06 (emphasis added). 30 The
provision’s drafters understood section 301(b)(1)(C)
precisely as an ordinary reader of English does: to
require EPA to set restrictions on the content of point
sources’ discharges rather than the condition of the
receiving waters.
Congress imposed such a duty on EPA to restrict
pollutants at the point source to “prevent water quality
from falling below acceptable levels.” California, 426
U.S. at 205 n. 12 (emphasis added); see also Nat. Res.
Def. Council v. EPA, 808 F.3d 556, 579 (2d Cir. 2015)
(“The point of a permit is to prevent discharges that
30 The Committee’s Senate counterparts similarly understood
that effluent limitations would set “specific requirements . . . as
to the quantities, rates, and concentration of . . . constituents
discharged from point sources”—without reference to the receiving
water conditions. S. Rep. No. 92-414 (Oct. 28, 1971), at 77
(emphasis added).
40
violate
water
quality
standards before they
happen.” (emphasis in original)). When it properly
implements the Act, EPA need not wait for water
quality to be harmed—as under the CWA’s predecessor—before it can bring an enforcement action
against a discharger. See NPDES Manual at p. 6-11
(effluent limitations “allow[] for controlling individual
parameters [in a permitholder’s discharge] . . . before
a water quality impact has occurred” (emphasis
added)).
By contrast, reading the Act to authorize EPA to
impose the Generic Prohibitions would give the
agency license to recreate almost word-for-word the
“causing or contributing” regime that Congress
discarded in 1972. 33 U.S.C. § 1160(c)(5) (1970). By
allowing enforcement only after adverse effects occur,
receiving water prohibitions like the Generic Prohibitions inherently fail to keep pollution out of navigable
waters by again requiring regulators to “work backward” from an already-impaired waterbody to bring
enforcement actions. California, 426 U.S. at 204.
Section 301(b)(1)(C) cannot be interpreted to resuscitate this ineffective method of regulation that
Congress cast off. See Stone v. INS, 514 U.S. 386, 397
(1995) (“When Congress acts to amend a statute, we
presume it intends its amendment to have real and
substantial effect.”).
41
B. EPA developed a regulatory regime
premised on an interpretation of section
301(b)(1)(C)
that
aligns
with
San
Francisco’s.
EPA’s own regulations and guidance provide further
confirmation that section 301(b)(1)(C) allows EPA to
impose only effluent limitations, not restrictions that
condition permitholders’ compliance on the quality of
receiving waters. See Loper Bright, 144 S. Ct. at 2257–
58 (“due respect” for agency interpretations is “especially
warranted when an Executive Branch interpretation
was issued roughly contemporaneously with enactment
of the statute and remained consistent over time”).
Although EPA permit writers have imposed the Generic
Prohibitions and other receiving water prohibitions in
specific NPDES permits, the agency’s formal policies
memorialized in guidance and rulemakings have long
interpreted section 301(b)(1)(C) in the same way the
City does: to require EPA to set effluent limitations
restricting the content of permitholders’ discharges.
Moreover, EPA’s development of rules implementing
section 301(b)(1)(C) illustrate that the agency has all
the necessary regulatory tools at its disposal to protect
water quality and need not resort to the Generic
Prohibitions or similar provisions that impose liability
for causing or contributing to adverse receiving water
conditions. 31
Outside of this litigation, 32 EPA has long read
section 301(b)(1)(C) to require the agency to ensure
water quality standards are met by imposing “effluent
31 Indeed, in the City’s Oceanside Permit, EPA also imposed
a variety of specific narrative and numeric effluent limitations.
See supra at 15.
42
limitations” on discharges from point sources. In
1973, EPA issued a guide on the NPDES program
explaining how, in circumstances where technologybased controls are insufficient to protect water quality,
“more stringent effluent limitations are to be
imposed.” EPA, The National Water Permit Program
at 12 (emphasis added). 33 Such effluent limitations,
EPA explained, “are placed on the amount of
pollutants in discharged wastewater or on the volume
of wastewater discharged.” Id. at 7 (emphasis added).
EPA thus understood within months of the Act’s
passage that section 301(b)(1)(C) required the agency
to restrict the content of discharges at the point source.
This interpretation, “issued contemporaneously with
the statute at issue,” is “especially useful in
determining” the limits of EPA’s authority. Loper
Bright, 144 S. Ct. at 2262.
EPA developed a comprehensive regulatory regime
designed to execute on this long-held understanding
that “Section 301(b)(1)(C) . . . requires that water
quality standards be achieved through effluent
limitations.” 54 Fed. Reg. at 23,872 (emphasis added);
id. at 23,875 (“section 301(b)(1)(C) requires NPDES
In opposing certiorari, EPA argued that the term
“limitation” in section 301(b)(1)(C) referred to something other
than an effluent limitation. See EPA BIO 12.
32
33 This document is representative of multiple instances in
which EPA, shortly after the Act was passed, interpreted section
301(b)(1)(C) to require the agency to set effluent limitations. See
also supra note 13 and accompanying text; Decisions of the EPA
Administrator & Decisions of the General Counsel Vol. 1 at 373–
74 (concluding that section 301(b)(1)(C) required EPA “to establish effluent limitations to meet the more stringent state water
quality standards” (Oct. 14, 1975 decision of EPA’s General
Counsel)).
43
permits to contain any effluent limitations necessary
to meet all applicable water quality standards”
(emphasis added)). The relevant regulation, codified
at 40 C.F.R. § 122.44(d)(1), prescribes “procedures
for . . . identify[ing] those permits that must have
water quality-based effluent limits, and describe[s]
several principles for developing [them].” 54 Fed. Reg.
at 23,872. That regulation mandates the imposition
of effluent limitations to “control all pollutants or
pollutant parameters” that “are or may be discharged
at a level which will cause, have the reasonable
potential to cause, or contribute to an excursion above
any State water quality standard.” 40 C.F.R. § 122.44
(d)(1)(i).
EPA’s regulation does not allow permit writers
simply to require that permitholders not “cause or
contribute” to water pollution. The rule instead requires
permit writers to set effluent limitations “on point
sources” that must be “derived from” the relevant
water
quality
standards.
40
C.F.R.
34
§ 122.44(d)(1)(vii)(A) (emphasis added). Even by its
own rule, EPA must translate the relevant water
quality standard into a restriction on the contents of
a permitholder’s discharges that applies at the point
source.
EPA’s guidance likewise anticipates that an NPDES
permit restricts, at the point source, a permitholder’s
discharges to protect water quality. In the agency’s
34 Although these effluent limitations restrict discharges at
the point source, EPA’s regulations appropriately do not require
that they must always set numeric restrictions on pollutant
levels discharged. Permits may require best management practices
when “[n]umeric effluent limitations are infeasible.” 40 C.F.R.
§ 122.44(k)(3).
44
manual for drafting NPDES permits, EPA notes that
“CWA section 301(b)(1)(C) requires that permits include
any effluent limitations necessary to meet water
quality standards.”
NPDES Manual at p. 6-1
(emphasis added). That manual instructs permit
writers how to “model effluent and receiving water
interactions,” id. at p. 6-16, “determine[ ] whether
WQBELs [water quality-based effluent limitations]
are needed,” id. at p. 6-22, and “develop WQBELs for
[relevant] pollutant parameter[s],” id. at p. 6-31. The
effluent limitations that the manual instructs EPA to
impose must specify a particular “concentration of the
pollutant [at issue] in the effluent” that a permitholder
must achieve. Id. at p. 6-32; see also EPA, Technical
Support Document for Water Quality-Based Toxics
Control 95 (Mar. 1991) (effluent limitations must
prescribe a specific level of “acceptable effluent quality”).
The agency’s regulations and guidance at no point
suggest that NPDES permits can or should include
prohibitions that condition a permitholder’s compliance
on the quality of receiving waters. Instead, the
imposition of receiving water prohibitions like the
Generic Prohibitions has been an off-menu practice
that conflicts with EPA’s proper interpretations of the
statute. Reversing the Ninth Circuit’s decision will do
nothing more than require EPA to use the specific
tools that it has already developed—and the CWA
requires—to ensure navigable waters meet water
quality standards.
III. The City’s straightforward interpretation
of the CWA allows the Act’s enforcement
scheme to function fairly and as designed.
Reading section 301(b)(1)(C) consistent with EPA’s
longstanding interpretations and regulations ensures
that permitholders face the Act’s onerous enforcement
45
machinery only when their discharges exceed
benchmarks defined in their permits. The Act’s “permit
shield” and enforcement provisions work as Congress
intended only when the pollutant control requirements that permitholders must meet are defined ex
ante through effluent limitations at their point sources.
By contrast, permit conditions that tie permitholders’
obligations to the receiving water conditions they
must avoid inherently deprive them of advance notice
of their obligations, as evidenced by a lawsuit EPA
recently brought against the City.
A. Receiving water prohibitions undermine
the CWA’s permit shield by depriving
permitholders of regulatory certainty.
Reading section 301(b)(1)(C) to require that EPA
restrict the content of permitholders’ discharges at the
point source ensures that the CWA’s “permit shield,”
33 U.S.C. 1342(k), “serves the purpose of giving permits
finality.” E.I. du Pont de Nemours & Co. v. Train, 430
U.S. 112, 138 n.28 (1977). Under the permit shield,
“[c]ompliance with [an NPDES permit] shall be deemed
compliance, for purposes of sections 1319 and 1365 of
this title,” with various substantive provisions of the
Act. 33 U.S.C. § 1342(k). An NPDES permit “shield[s]
its holder from CWA liability” so long as the
permitholder complies with the permit’s terms. Piney
Run Pres. Ass’n v. Cnty. Comm’rs of Carroll Cnty., 268
F.3d 255, 266 (4th Cir. 2001); see also Nat. Res. Def.
Council, Inc. v. Cnty. of Los Angeles, 725 F.3d 1194,
1204 (9th Cir. 2013) (“Where a permittee discharges
pollutants in compliance with the terms of its NPDES
permit, the permit acts to ‘shield’ the permittee from
liability under the CWA.” (citation omitted)).
The permit shield thus assures permitholders that
they will not face the Act’s “crushing consequences”
46
unless they violate the requirements found within the
four corners of their permits. Sackett, 598 U.S. at 660
(cleaned up). Even unintentional violations of the Act
can lead to criminal punishments. See 33 U.S.C.
§ 1319(c)(1)(A). In civil enforcement actions, EPA can
bring lawsuits seeking civil penalties of over $66,000
per day for each permit violation, as well as injunctive
relief. Id. § 1319(b), (d); 40 C.F.R. § 19.4. For
municipalities like San Francisco, the cost of
injunctive relief in CWA enforcement cases can often
run into the hundreds of millions or even billions of
dollars. 35 Private plaintiffs may also bring lawsuits
seeking the same civil penalties and injunctive relief.
See 33 U.S.C. § 1365(a).
The Act’s severe penalties are warranted only
alongside “some measure of predictability,” 36 which is
why “Congress intended to establish clear and identifiable discharge standards” in permits that “provide
manageable
and
precise
benchmarks
for
performance.” Int’l Paper Co. v. Ouellette, 479 U.S.
481, 496 n.16 (1987) (cleaned up). Indeed, as EPA has
acknowledged, the permit shield, when properly
applied, allows a “facility [to] plan and operate with
knowledge of what rules apply.” 45 Fed. Reg. 33,290,
33,312 (May 19, 1980). Only when the Act’s enforcement provisions are balanced alongside the Act’s
permit shield can San Francisco and other
35 See EPA, EPA National Enforcement Initiative: Keeping
Raw Sewage and Contaminated Stormwater Out of Our Nation’s
Waters – Status of Civil Judicial Consent Decrees Addressing
Combined Sewer Systems (May 1, 2017), https://perma.cc/U7JU477C (estimating municipalities’ combined sewer compliance
costs under CWA consent decrees).
36 U.S. Army Corps of Eng’rs v. Hawkes, 578 U.S. 590, 602
(2016) (Kennedy, J., concurring).
47
permitholders “know what is required of them so they
may act accordingly,” as is consistent with basic
notions of due process. FCC v. Fox Television Stations,
Inc., 567 U.S. 239, 253 (2012).
When EPA complies with its statutory obligation
under section 301(b)(1)(C) to set effluent limitations
that restrict the quantities, rates, and concentrations
of discharges at the point source, permitholders can
know from the face of their permits what they must
do to comply. Permitholders need only look at the terms
of their permits, their activities, and effluent quality
to know whether they comply with their permits.
By contrast, when EPA conditions a permitholder’s
compliance on the quality of receiving waters, it is
impossible to know precisely “what rules apply.” 45
Fed. Reg. at 33,312. Contributions to a receiving
water from multiple sources prevent an individual
permitholder from knowing ex ante how much they
need to control their discharges to prevent a violation.
Such sources can include nonpoint source pollution
like runoff “not traceable to any single discrete
source.” League of Wilderness Defs., 309 F.3d at 1184.
Tens of thousands of “water bodies nationwide are
impaired [i.e., do not meet water quality standards]
primarily by such pollution,” Gov’t Accountability
Office, Nonpoint Source Pollution 1 (May 2012),
https://perma.cc/MQ6G-GLZB, and “[n]onpoint source
pollution of this kind is the largest source of water
pollution in the United States.” League of Wilderness
Defs., 309 F.3d at 1184 (citing EPA guidance). Other
factors, like seasonal variation in stream conditions,
48
can also affect whether a waterbody meets water
quality standards. 37
When restrictions on the quality of receiving
waters are included in a permit, a permitholder will
know only retrospectively whether their discharge—
in combination with those variables—resulted in
conditions that violate a water quality standard.
Under such permit terms, permitholders can no
longer ascertain from their permits how they must
control their discharges to avoid facing the risk of
enforcement actions. Permitholders can only be
certain they are not violating their permits by ceasing
to discharge altogether. See Pet. App. 65–66 (Collins,
J., dissenting) (“[I]n the event of excessive pollution
from another source, the immediate cessation of discharges involving the same pollutant from all other
sources [would be required], without regard to the
importance of those sources’ operations.” (emphasis in
original)); see also Arkansas, 503 U.S. at 108 (CWA
has never been construed to “mandate[ ] a complete
ban on discharges into a waterway that is [already] in
violation of [water quality] standards.”). Of course,
ceasing operations altogether is not an option for San
Francisco and permitholders around the Nation who
provide vital sanitary services, further illustrating the
untenable nature of EPA’s interpretation of the Act.
B. Enforcement actions demonstrate the
unfairness of prohibiting permitholders
from violating water quality standards.
Recent litigation confirms how permit terms like
the Generic Prohibitions make the Act’s enforcement
provisions and permit shield malfunction, illustrating
37 Gaba, supra note 14, at 441.
49
why Congress directed EPA specifically to set effluent
limitations. When NPDES permits include terms that
condition compliance on the quality of receiving waters
rather than permitholders’ discharges, permits lack
the finality the permit shield is supposed to provide,
and permitholders effectively risk liability for
discharging in excess of benchmarks not found in
their permits.
Defendants alleged to have violated receiving
water prohibitions like the Generic Prohibitions have
found themselves unable to assert permit shield
defenses based on their compliance with the specific
terms in their permits. 38 Instead, defendants have
had to proceed through judicial fact finding to
determine after the fact whether—and to what
extent—they should have further controlled their discharges to comply.
For example, in MWRD, the district court ruled
that it would need to hold a trial to determine “how
much phosphorus”—considering other sources’
38 See Ohio Valley Env’t Coal. v. Fola Coal Co. (Fola), 845
F.3d 133, 142–43 (4th Cir. 2017); Nat. Res. Def. Council v. Metro.
Water Reclamation Dist. of Greater Chicago (MWRD), 175 F.
Supp. 3d 1041, 1049–54 (N.D. Ill. 2016); Cnty. of Los Angeles,
725 F.3d at 1204–06 (defendants lacked a Permit Shield defense
based on alleged violations of a prohibition against
“discharges . . . that cause or contribute to a violation of water
quality standards”); Nw. Env’t Advocs. v. City of Medford, No.
1:18-cv-00856-CL, 2021 WL 2673126, at *5 (D. Or. June 9, 2021)
(allegation of violating a receiving water quality prohibition
negated ability to rely on Oregon regulation substantially
codifying the permit shield); see also Swartz v. Beach, 229 F.
Supp. 2d 1239, 1271 (D. Wyo. 2002) (permitholders are not
shielded from allegations of noncompliance with water quality
standards “when [such] standards are incorporated into a[n]
NPDES permit” by a receiving water prohibition).
50
contributions—the
permitholder
could
have
discharged without contributing to a violation of a
water quality standard. 175 F. Supp. 3d at 1062.
Similarly, the permitholder sued in Fola learned that
the level of ions in its discharges was “materially
contributing” to stream characteristics that violated
water quality standards only after a bench trial that
required “mountains of expert testimony, reports, and
charts.” 845 F.3d at 137–38; see also Petition for Writ
of Certiorari 31 n.17 (collecting similar cases). In
these cases, permitholders found that they could not
look to their permits to know in advance whether they
were discharging “too much” to comply. This critical
issue was instead adjudicated ex post, confirming that
conditioning permitholders’ compliance on whether
receiving waters meet water quality standards
nullifies the permit shield.
San Francisco itself now faces an enforcement
action that demonstrates how permit conditions like
the Generic Prohibitions require ex post adjudication
of permitholders’ discharge control obligations and
undermine the permit shield. On May 1, 2024, EPA
filed a lawsuit alleging that combined sewer overflows
from the City’s Bayside Facilities violate a provision
in those facilities’ NPDES permit that—like the
Generic Prohibitions—prohibits the City from
“causing a violation of any applicable water quality
standard for receiving waters.” EPA Complaint ¶ 100.
EPA’s complaint alleges that San Francisco has been
violating its permit since 2013 by causing receiving
waters to exceed applicable water quality standards.
Even after being sued, however, San Francisco does
not know the quantities, rates, and concentrations of
pollutants that are excessive in EPA’s view, or what
management practices EPA believes San Francisco
51
should have implemented to control its discharges and
avert a lawsuit. See id. ¶¶ 110–13. The agency seeks
daily civil penalties over the period of more than a
decade, as well as injunctive relief, while leaving San
Francisco in the dark about what it allegedly did
wrong. Id. ¶¶ 119–20, Prayer for Relief ¶¶ a–c.
And it is not just EPA that has sought to enforce
this receiving water quality prohibition in the Bayside
Facilities’ permit. Shortly after EPA filed suit, San
Francisco Baykeeper intervened, alleging that the
Bayside Facilities violate this same permit provision
by discharging unspecified but “elevated levels of
bacteria and other pollutants [that] adversely affect
the beneficial uses” of San Francisco Bay. 39 Baykeeper
claims that these violations occur “each time” San
Francisco experiences a rain event severe enough to
cause combined sewer overflows. Baykeeper Complaint
¶ 142. As with EPA’s complaint, San Francisco remains
unaware of the quantities, rates, and concentrations
of pollutants that Baykeeper deems excessive.
Like the permit terms they seek to enforce, Baykeeper and EPA’s allegations provide the City no
guidance on what—short of shutting down a sewer
system serving a major American city—it must do to
avoid the risk of liability. Consequently, the City
could spend billions more than it has already invested
in its combined sewer and stormwater system and still
not know whether it will face enforcement actions for
allegedly “violating” unspecified, unknown, and unknowable “requirements” based on receiving water
39 Complaint in Intervention ¶ 140, United States v. City &
Cnty. of San Francisco, No. 3:24-cv-02594 (N.D. Cal. May 31,
2024) (ECF No. 24) (Baykeeper Complaint), available at
https://perma.cc/L9LC-EM2S.
52
conditions that San Francisco cannot solely control.
See supra at 13–14.
Particularly for municipalities that build large
infrastructure projects like the Oceanside Facilities, it
is critical that they have clear notice of what their
permits require to ensure public expenditures are
appropriately invested. The permit shield is designed
to ensure that permitholders can look within the four
corners of their permits to ascertain the pollution
control benchmarks they must meet, so that they can
design and build infrastructure projects with
confidence that these capital investments will result
in compliance. By imposing the Generic Prohibitions,
EPA has left San Francisco in an impossible situation
—the City has invested billions in capital
improvements without knowing whether those
improvements will satisfy EPA, given the agency
seeks to impose obligations that depend on everchanging conditions in the receiving water.
Neither San Francisco nor any other permitholders
would face such a predicament if EPA obeyed section
301(b)(1)(C)’s command to set effluent limitations
instead of imposing prohibitions on causing or
contributing to undesirable receiving water quality.
Only that interpretation effectuates the permit shield’s
guarantee that an NPDES permit provides the final
word on a permitholder’s compliance obligations.
Effluent limitations define permitholders’ duties at
the point of discharge and clearly specify what
permitholders must do ex ante to control their
discharges.
Setting effluent limitations—rather
than receiving water prohibitions—also best protects
the environment by ensuring that EPA need not wait
until a waterbody has become “overpolluted” to bring
an enforcement action. California, 426 U.S. at 204.
53
CONCLUSION
The Court should reverse the judgment of the court
of appeals.
Respectfully submitted.
CITY AND COUNTY OF
SAN FRANCISCO
DAVID CHIU
San Francisco City Attorney
YVONNE R. MERÉ
Chief Deputy City Attorney
TARA M. STEELEY
Chief of Appellate Litigation
Counsel of Record
DAVID S. LOUK
JOHN S. RODDY
ESTIE M. KUS
Deputy City Attorneys
1 Dr. Carlton B. Goodlett Pl.
San Francisco, CA 94102
(415) 554-4655
tara.steeley@sfcityatty.org
July 19, 2024
BEVERIDGE & DIAMOND, P.C.
ANDREW C. SILTON
JOHN C. CRUDEN
RICHARD S. DAVIS
1900 N Street N.W., Suite100
Washington, DC 20036
(202) 789-6000
asilton@bdlaw.com
MACKENZIE S. SCHOONMAKER
825 3rd Avenue, 16th Floor
New York, NY 10022
Counsel for Petitioner
City and County of
San Francisco
Statutory and Regulatory Appendix
TABLE OF CONTENTS
33 U.S.C. § 1311 ........................................................ 1a
33 U.S.C. § 1319 ...................................................... 30a
33 U.S.C. § 1342(a), (k), (o) ..................................... 50a
33 U.S.C. § 1362(11), (12), (16) ............................... 56a
33 U.S.C. § 1365(a)(1), (f) ....................................... 57a
40 C.F.R. § 122.44(d)(1) .......................................... 59a
1a
33 U.S.C. § 1311
§ 1311. Effluent limitations
(a) Illegality of pollutant discharges except in
compliance with law
Except as in compliance with this section and
sections 1312, 1316, 1317, 1328, 1342, and 1344 of this
title, the discharge of any pollutant by any person
shall be unlawful.
(b) Timetable for achievement of objectives
In order to carry out the objective of this chapter
there shall be achieved—
(1)(A) not later than July 1, 1977, effluent limitations for point sources, other than publicly owned
treatment works, (i) which shall require the application of the best practicable control technology
currently available as defined by the Administrator
pursuant to section 1314(b) of this title, or (ii) in
the case of a discharge into a publicly owned
treatment works which meets the requirements
of subparagraph (B) of this paragraph, which
shall require compliance with any applicable
pretreatment requirements and any requirements
under section 1317 of this title; and
(B) for publicly owned treatment works in existence on July 1, 1977, or approved pursuant to
section 1283 of this title prior to June 30, 1974
(for which construction must be completed within
four years of approval), effluent limitations based
upon secondary treatment as defined by the
Administrator pursuant to section 1314(d)(1) of
this title; or,
2a
(C) not later than July 1, 1977, any more
stringent limitation, including those necessary to
meet water quality standards, treatment standards, or schedules of compliance, established
pursuant to any State law or regulations (under
authority preserved by section 1370 of this title)
or any other Federal law or regulation, or required
to implement any applicable water quality standard established pursuant to this chapter.
(2)(A) for pollutants identified in subparagraphs (C), (D), and (F) of this paragraph, effluent limitations for categories and classes of point
sources, other than publicly owned treatment
works, which (i) shall require application of the
best available technology economically achievable
for such category or class, which will result in reasonable further progress toward the national goal
of eliminating the discharge of all pollutants, as
determined in accordance with regulations issued
by the Administrator pursuant to section 1314(b)
(2) of this title, which such effluent limitations
shall require the elimination of discharges of all
pollutants if the Administrator finds, on the basis
of information available to him (including information developed pursuant to section 1325 of this
title), that such elimination is technologically and
economically achievable for a category or class of
point sources as determined in accordance with
regulations issued by the Administrator pursuant to section 1314(b)(2) of this title, or (ii) in the
case of the introduction of a pollutant into a
publicly owned treatment works which meets the
requirements of subparagraph (B) of this paragraph, shall require compliance with any applicable
3a
pretreatment requirements and any other requirement under section 1317 of this title;
(B) Repealed. Pub. L. 97–117, §21(b), Dec. 29,
1981, 95 Stat. 1632.
(C) with respect to all toxic pollutants referred
to in table 1 of Committee Print Numbered 95–30
of the Committee on Public Works and Transportation of the House of Representatives compliance
with effluent limitations in accordance with subparagraph (A) of this paragraph as expeditiously as
practicable but in no case later than three years
after the date such limitations are promulgated
under section 1314(b) of this title, and in no case
later than March 31, 1989;
(D) for all toxic pollutants listed under paragraph (1) of subsection (a) of section 1317 of this
title which are not referred to in subparagraph
(C) of this paragraph compliance with effluent
limitations in accordance with subparagraph (A)
of this paragraph as expeditiously as practicable,
but in no case later than three years after the
date such limitations are promulgated under
section 1314(b) of this title, and in no case later
than March 31, 1989;
(E) as expeditiously as practicable but in no
case later than three years after the date such
limitations are promulgated under section 1314
(b) of this title, and in no case later than March
31, 1989, compliance with effluent limitations for
categories and classes of point sources, other than
publicly owned treatment works, which in the
case of pollutants identified pursuant to section
1314(a)(4) of this title shall require application of
4a
the best conventional pollutant control technology
as determined in accordance with regulations
issued by the Administrator pursuant to section
1314(b)(4) of this title; and
(F) for all pollutants (other than those subject
to subparagraphs (C), (D), or (E) of this paragraph)
compliance with effluent limitations in accordance
with subparagraph (A) of this paragraph as
expeditiously as practicable but in no case later
than 3 years after the date such limitations are
established, and in no case later than March 31,
1989.
(3)(A) for effluent limitations under paragraph
(1)(A)(i) of this subsection promulgated after January 1, 1982, and requiring a level of control substantially greater or based on fundamentally
different control technology than under permits
for an industrial category issued before such date,
compliance as expeditiously as practicable but in
no case later than three years after the date such
limitations are promulgated under section 1314
(b) of this title, and in no case later than March
31, 1989; and
(B) for any effluent limitation in accordance
with paragraph (1)(A)(i), (2)(A)(i), or (2)(E) of this
subsection established only on the basis of section
1342(a)(1) of this title in a permit issued after
February 4, 1987, compliance as expeditiously as
practicable but in no case later than three years
after the date such limitations are established,
and in no case later than March 31, 1989.
5a
(c) Modification of timetable
The Administrator may modify the requirements of
subsection (b)(2)(A) of this section with respect to any
point source for which a permit application is filed
after July 1, 1977, upon a showing by the owner or
operator of such point source satisfactory to the
Administrator that such modified requirements (1)
will represent the maximum use of technology within
the economic capability of the owner or operator; and
(2) will result in reasonable further progress toward
the elimination of the discharge of pollutants.
(d) Review and revision of effluent limitations
Any effluent limitation required by paragraph (2)
of subsection (b) of this section shall be reviewed at
least every five years and, if appropriate, revised pursuant to the procedure established under such paragraph.
(e) All point discharge source application of
effluent limitations
Effluent limitations established pursuant to this
section or section 1312 of this title shall be applied to
all point sources of discharge of pollutants in accordance
with the provisions of this chapter.
(f) Illegality of discharge of radiological,
chemical, or biological warfare agents, highlevel radioactive waste, or medical waste
Notwithstanding any other provisions of this
chapter it shall be unlawful to discharge any radiological, chemical, or biological warfare agent, any
high-level radioactive waste, or any medical waste,
into the navigable waters.
6a
(g) Modifications for certain nonconventional pollutants
(1) General authority
The Administrator, with the concurrence of the
State, may modify the requirements of subsection (b)
(2)(A) of this section with respect to the discharge
from any point source of ammonia, chlorine, color,
iron, and total phenols (4AAP) (when determined by
the Administrator to be a pollutant covered by subsection (b)(2)(F)) and any other pollutant which the
Administrator lists under paragraph (4) of this subsection.
(2) Requirements for granting modifications
A modification under this subsection shall be
granted only upon a showing by the owner or operator
of a point source satisfactory to the Administrator
that—
(A) such modified requirements will result at a
minimum in compliance with the requirements of
subsection (b)(1)(A) or (C) of this section, whichever
is applicable;
(B) such modified requirements will not result
in any additional requirements on any other
point or nonpoint source; and
(C) such modification will not interfere with the
attainment or maintenance of that water quality
which shall assure protection of public water
supplies, and the protection and propagation of a
balanced population of shellfish, fish, and wildlife, and allow recreational activities, in and on
7a
the water and such modification will not result in
the discharge of pollutants in quantities which
may reasonably be anticipated to pose an unacceptable risk to human health or the environment because of bioaccumulation, persistency in
the environment, acute toxicity, chronic toxicity
(including carcinogenicity, mutagenicity or teratogenicity), or synergistic propensities.
(3) Limitation on authority to apply for
subsection (c) modification
If an owner or operator of a point source applies
for a modification under this subsection with respect
to the discharge of any pollutant, such owner or operator
shall be eligible to apply for modification under subsection (c) of this section with respect to such pollutant
only during the same time period as he is eligible to
apply for a modification under this subsection.
(4) Procedures
pollutants
for
listing
additional
(A) General authority
Upon petition of any person, the Administrator may add any pollutant to the list of pollutants for which modification under this section
is authorized (except for pollutants identified
pursuant to section 1314(a)(4) of this title, toxic
pollutants subject to section 1317(a) of this
title, and the thermal component of discharges)
in accordance with the provisions of this paragraph.
8a
(B) Requirements for listing
(i) Sufficient information
The person petitioning for listing of an
additional pollutant under this subsection
shall submit to the Administrator sufficient
information to make the determinations
required by this subparagraph.
(ii) Toxic criteria determination
The Administrator shall determine whether or not the pollutant meets the criteria
for listing as a toxic pollutant under section
1317(a) of this title.
(iii) Listing as toxic pollutant
If the Administrator determines that the
pollutant meets the criteria for listing as a
toxic pollutant under section 1317(a) of this
title, the Administrator shall list the pollutant
as a toxic pollutant under section 1317(a) of
this title.
(iv) Nonconventional criteria determination
If the Administrator determines that the
pollutant does not meet the criteria for listing
as a toxic pollutant under such section and
determines that adequate test methods and
sufficient data are available to make the determinations required by paragraph (2) of
this subsection with respect to the pollutant,
the Administrator shall add the pollutant to
the list of pollutants specified in paragraph
9a
(1) of this subsection for which modifications
are authorized under this subsection.
(C) Requirements for filing of petitions
A petition for listing of a pollutant under
this paragraph—
(i) must be filed not later than 270 days
after the date of promulgation of an applicable
effluent guideline under section 1314 of this
title;
(ii) may be filed before promulgation of
such guideline; and
(iii) may be filed with an application for a
modification under paragraph (1) with
respect to the discharge of such pollutant.
(D) Deadline for approval of petition
A decision to add a pollutant to the list of
pollutants for which modifications under this
subsection are authorized must be made within
270 days after the date of promulgation of an
applicable effluent guideline under section
1314 of this title.
(E) Burden of proof
The burden of proof for making the determinations under subparagraph (B) shall be on
the petitioner.
(5) Removal of pollutants
The Administrator may remove any pollutant
from the list of pollutants for which modifications are
authorized under this subsection if the Administrator
10a
determines that adequate test methods and sufficient
data are no longer available for determining whether
or not modifications may be granted with respect to
such pollutant under paragraph (2) of this subsection.
(h) Modification of
requirements
secondary
treatment
The Administrator, with the concurrence of the
State, may issue a permit under section 1342 of this
title which modifies the requirements of subsection (b)
(1)(B) of this section with respect to the discharge of
any pollutant from a publicly owned treatment works
into marine waters, if the applicant demonstrates to
the satisfaction of the Administrator that—
(1) there is an applicable water quality standard specific to the pollutant for which the modification is requested, which has been identified
under section 1314(a)(6) of this title;
(2) the discharge of pollutants in accordance
with such modified requirements will not interfere,
alone or in combination with pollutants from other
sources, with the attainment or maintenance of
that water quality which assures protection of
public water supplies and the protection and propagation of a balanced, indigenous population of
shellfish, fish, and wildlife, and allows recreational activities, in and on the water;
(3) the applicant has established a system for
monitoring the impact of such discharge on a
representative sample of aquatic biota, to the
extent practicable, and the scope of such monitoring
is limited to include only those scientific investi-
11a
gations which are necessary to study the effects
of the proposed discharge;
(4) such modified requirements will not result
in any additional requirements on any other
point or nonpoint source;
(5) all applicable pretreatment requirements
for sources introducing waste into such treatment
works will be enforced;
(6) in the case of any treatment works serving
a population of 50,000 or more, with respect to
any toxic pollutant introduced into such works by
an industrial discharger for which pollutant
there is no applicable pretreatment requirement
in effect, sources introducing waste into such works
are in compliance with all applicable pretreatment requirements, the applicant will enforce
such requirements, and the applicant has in
effect a pretreatment program which, in combination with the treatment of discharges from such
works, removes the same amount of such pollutant
as would be removed if such works were to apply
secondary treatment to discharges and if such
works had no pretreatment program with respect
to such pollutant;
(7) to the extent practicable, the applicant has
established a schedule of activities designed to
eliminate the entrance of toxic pollutants from
nonindustrial sources into such treatment works;
(8) there will be no new or substantially
increased discharges from the point source of the
pollutant to which the modification applies above
that volume of discharge specified in the permit;
12a
(9) the applicant at the time such modification
becomes effective will be discharging effluent
which has received at least primary or equivalent
treatment and which meets the criteria established under section 1314(a)(1) of this title after
initial mixing in the waters surrounding or
adjacent to the point at which such effluent is
discharged.
For the purposes of this subsection the phrase “the
discharge of any pollutant into marine waters” refers
to a discharge into deep waters of the territorial sea
or the waters of the contiguous zone, or into saline
estuarine waters where there is strong tidal movement and other hydrological and geological characteristics which the Administrator determines necessary to allow compliance with paragraph (2) of this
subsection, and section 1251(a)(2) of this title. For the
purposes of paragraph (9), “primary or equivalent
treatment” means treatment by screening, sedimentation, and skimming adequate to remove at least 30
percent of the biological oxygen demanding material
and of the suspended solids in the treatment works
influent, and disinfection, where appropriate. A municipality which applies secondary treatment shall be
eligible to receive a permit pursuant to this subsection
which modifies the requirements of subsection (b)(1)
(B) of this section with respect to the discharge of any
pollutant from any treatment works owned by such
municipality into marine waters. No permit issued
under this subsection shall authorize the discharge of
sewage sludge into marine waters. In order for a
permit to be issued under this subsection for the
discharge of a pollutant into marine waters, such marine
waters must exhibit characteristics assuring that
13a
water providing dilution does not contain significant
amounts of previously discharged effluent from such
treatment works. No permit issued under this subsection shall authorize the discharge of any pollutant
into saline estuarine waters which at the time of
application do not support a balanced indigenous population of shellfish, fish and wildlife, or allow recreation
in and on the waters or which exhibit ambient water
quality below applicable water quality standards
adopted for the protection of public water supplies,
shellfish, fish and wildlife or recreational activities or
such other standards necessary to assure support and
protection of such uses. The prohibition contained in
the preceding sentence shall apply without regard to
the presence or absence of a causal relationship
between such characteristics and the applicant’s current
or proposed discharge. Notwithstanding any other
provisions of this subsection, no permit may be issued
under this subsection for discharge of a pollutant into
the New York Bight Apex consisting of the ocean
waters of the Atlantic Ocean westward of 73 degrees
30 minutes west longitude and northward of 40
degrees 10 minutes north latitude.
(i) Municipal time extensions
(1) Where construction is required in order for a
planned or existing publicly owned treatment works
to achieve limitations under subsection (b)(1)(B) or (b)
(1)(C) of this section, but (A) construction cannot be
completed within the time required in such subsection,
or (B) the United States has failed to make financial
assistance under this chapter available in time to
achieve such limitations by the time specified in such
subsection, the owner or operator of such treatment
works may request the Administrator (or if appropri-
14a
ate the State) to issue a permit pursuant to section
1342 of this title or to modify a permit issued pursuant
to that section to extend such time for compliance.
Any such request shall be filed with the Administrator
(or if appropriate the State) within 180 days after February 4, 1987. The Administrator (or if appropriate
the State) may grant such request and issue or modify
such a permit, which shall contain a schedule of compliance for the publicly owned treatment works based
on the earliest date by which such financial assistance
will be available from the United States and construction can be completed, but in no event later than July
1, 1988, and shall contain such other terms and conditions, including those necessary to carry out subsections (b) through (g) of section 1281 of this title,
section 1317 of this title, and such interim effluent
limitations applicable to that treatment works as the
Administrator determines are necessary to carry out
the provisions of this chapter.
(2)(A) Where a point source (other than a publicly
owned treatment works) will not achieve the requirements of subsections (b)(1)(A) and (b)(1)(C) of this
section and—
(i) if a permit issued prior to July 1, 1977, to
such point source is based upon a discharge into
a publicly owned treatment works; or
(ii) if such point source (other than a publicly
owned treatment works) had before July 1, 1977,
a contract (enforceable against such point source)
to discharge into a publicly owned treatment
works; or
(iii) if either an application made before July 1,
1977, for a construction grant under this chapter
15a
for a publicly owned treatment works, or engineering or architectural plans or working drawings
made before July 1, 1977, for a publicly owned
treatment works, show that such point source
was to discharge into such publicly owned treatment works,
and such publicly owned treatment works is presently
unable to accept such discharge without construction,
and in the case of a discharge to an existing publicly
owned treatment works, such treatment works has an
extension pursuant to paragraph (1) of this subsection, the owner or operator of such point source
may request the Administrator (or if appropriate the
State) to issue or modify such a permit pursuant to
such section 1342 of this title to extend such time for
compliance. Any such request shall be filed with the
Administrator (or if appropriate the State) within 180
days after December 27, 1977, or the filing of a request
by the appropriate publicly owned treatment works
under paragraph (1) of this subsection, whichever is
later. If the Administrator (or if appropriate the State)
finds that the owner or operator of such point source
has acted in good faith, he may grant such request and
issue or modify such a permit, which shall contain a
schedule of compliance for the point source to achieve
the requirements of subsections (b)(1)(A) and (C) of
this section and shall contain such other terms and
conditions, including pretreatment and interim effluent limitations and water conservation requirements
applicable to that point source, as the Administrator
determines are necessary to carry out the provisions
of this chapter.
(B) No time modification granted by the Administrator (or if appropriate the State) pursuant to para-
16a
graph (2)(A) of this subsection shall extend beyond the
earliest date practicable for compliance or beyond the
date of any extension granted to the appropriate
publicly owned treatment works pursuant to paragraph (1) of this subsection, but in no event shall it
extend beyond July 1, 1988; and no such time modification shall be granted unless (i) the publicly owned
treatment works will be in operation and available to
the point source before July 1, 1988, and will meet the
requirements of subsections (b)(1)(B) and (C) of this
section after receiving the discharge from that point
source; and (ii) the point source and the publicly owned
treatment works have entered into an enforceable
contract requiring the point source to discharge into
the publicly owned treatment works, the owner or
operator of such point source to pay the costs required
under section 1284 of this title, and the publicly
owned treatment works to accept the discharge from
the point source; and (iii) the permit for such point
source requires that point source to meet all requirements under section 1317(a) and (b) of this title during
the period of such time modification.
(j) Modification procedures
(1) Any application filed under this section for a
modification of the provisions of—
(A) subsection (b)(1)(B) under subsection (h) of
this section shall be filed not later that1 the
365th day which begins after December 29, 1981,
except that a publicly owned treatment works
which prior to December 31, 1982, had a contractual
arrangement to use a portion of the capacity of an
1 So in original. Probably should be ‘‘than’’.
17a
ocean outfall operated by another publicly owned
treatment works which has applied for or received
modification under subsection (h), may apply for
a modification of subsection (h) in its own right
not later than 30 days after February 4, 1987, and
except as provided in paragraph (5);
(B) subsection (b)(2)(A) as it applies to pollutants identified in subsection (b)(2)(F) shall be filed
not later than 270 days after the date of promulgation of an applicable effluent guideline under
section 1314 of this title or not later than 270
days after December 27, 1977, whichever is later.
(2) Subject to paragraph (3) of this section, any
application for a modification filed under subsection
(g) of this section shall not operate to stay any requirement under this chapter, unless in the judgment of the
Administrator such a stay or the modification sought
will not result in the discharge of pollutants in
quantities which may reasonably be anticipated to
pose an unacceptable risk to human health or the
environment because of bioaccumulation, persistency in
the environment, acute toxicity, chronic toxicity (including carcinogenicity, mutagenicity, or teratogenicity),
or synergistic propensities, and that there is a substantial likelihood that the applicant will succeed on
the merits of such application. In the case of an application filed under subsection (g) of this section, the
Administrator may condition any stay granted under
this paragraph on requiring the filing of a bond or
other appropriate security to assure timely compliance with the requirements from which a modification
is sought.
(3) COMPLIANCE REQUIREMENTS UNDER
SUBSECTION (g).—
18a
(A) EFFECT OF FILING.—An application for
a modification under subsection (g) and a petition
for listing of a pollutant as a pollutant for which
modifications are authorized under such subsection
shall not stay the requirement that the person
seeking such modification or listing comply with
effluent limitations under this chapter for all
pollutants not the subject of such application or
petition.
(B) EFFECT OF DISAPPROVAL.—Disapproval of an application for a modification under subsection (g) shall not stay the requirement that the
person seeking such modification comply with all
applicable effluent limitations under this chapter.
(4) DEADLINE FOR SUBSECTION (g) DECISION.—An application for a modification with respect
to a pollutant filed under subsection (g) must be
approved or disapproved not later than 365 days after
the date of such filing; except that in any case in which
a petition for listing such pollutant as a pollutant for
which modifications are authorized under such subsection is approved, such application must be
approved or disapproved not later than 365 days after
the date of approval of such petition.
(5) EXTENSION OF APPLICATION DEADLINE.
(A) IN GENERAL.—In the 180-day period
beginning on October 31, 1994, the city of San
Diego, California, may apply for a modification
pursuant to subsection (h) of the requirements of
subsection (b)(1)(B) with respect to biological
oxygen demand and total suspended solids in the
effluent discharged into marine waters.
19a
(B) APPLICATION.—An application under
this paragraph shall include a commitment by
the applicant to implement a waste water reclamation program that, at a minimum, will¬
(i) achieve a system capacity of 45,000,000
gallons of reclaimed waste water per day by
January 1, 2010; and
(ii) result in a reduction in the quantity of
suspended solids discharged by the applicant
into the marine environment during the period of
the modification.
(C) ADDITIONAL CONDITIONS.—The Administrator may not grant a modification pursuant to
an application submitted under this paragraph
unless the Administrator determines that such
modification will result in removal of not less
than 58 percent of the biological oxygen demand
(on an annual average) and not less than 80
percent of total suspended solids (on a monthly
average) in the discharge to which the application
applies.
(D) PRELIMINARY DECISION DEADLINE.—
The Administrator shall announce a preliminary
decision on an application submitted under this
paragraph not later than 1 year after the date the
application is submitted.
(k) Innovative technology
In the case of any facility subject to a permit
under section 1342 of this title which proposes to
comply with the requirements of subsection (b)(2)(A)
or (b)(2)(E) of this section by replacing existing
production capacity with an innovative production
20a
process which will result in an effluent reduction significantly greater than that required by the limitation
otherwise applicable to such facility and moves
toward the national goal of eliminating the discharge
of all pollutants, or with the installation of an
innovative control technique that has a substantial
likelihood for enabling the facility to comply with the
applicable effluent limitation by achieving a significantly greater effluent reduction than that required
by the applicable effluent limitation and moves toward
the national goal of eliminating the discharge of all
pollutants, or by achieving the required reduction
with an innovative system that has the potential for
significantly lower costs than the systems which have
been determined by the Administrator to be economically achievable, the Administrator (or the State
with an approved program under section 1342 of this
title, in consultation with the Administrator) may
establish a date for compliance under subsection (b)
(2)(A) or (b)(2)(E) of this section no later than two
years after the date for compliance with such effluent
limitation which would otherwise be applicable under
such subsection, if it is also determined that such
innovative system has the potential for industrywide
application.
(l) Toxic pollutants
Other than as provided in subsection (n) of this
section, the Administrator may not modify any requirement of this section as it applies to any specific
pollutant which is on the toxic pollutant list under
section 1317(a)(1) of this title.
21a
(m) Modification
of
effluent
limitation
requirements for point sources
(1) The Administrator, with the concurrence of
the State, may issue a permit under section 1342 of
this title which modifies the requirements of subsections (b)(1)(A) and (b)(2)(E) of this section, and of
section 1343 of this title, with respect to effluent limitations to the extent such limitations relate to
biochemical oxygen demand and pH from discharges
by an industrial discharger in such State into deep
waters of the territorial seas, if the applicant demonstrates and the Administrator finds that—
(A) the facility for which modification is sought
is covered at the time of the enactment of this
subsection by National Pollutant Discharge
Elimination System permit number CA0005894
or CA0005282;
(B) the energy and environmental costs of
meeting such requirements of subsections (b)(1)
(A) and (b)(2)(E) and section 1343 of this title
exceed by an unreasonable amount the benefits
to be obtained, including the objectives of this
chapter;
(C) the applicant has established a system for
monitoring the impact of such discharges on a
representative sample of aquatic biota;
(D) such modified requirements will not result
in any additional requirements on any other
point or nonpoint source;
(E) there will be no new or substantially
increased discharges from the point source of the
22a
pollutant to which the modification applies above
that volume of discharge specified in the permit;
(F) the discharge is into waters where there is
strong tidal movement and other hydrological
and geological characteristics which are necessary to allow compliance with this subsection and
section 1251(a)(2) of this title;
(G) the applicant accepts as a condition to the
permit a contractural2 obligation to use funds in
the amount required (but not less than $250,000
per year for ten years) for research and development of water pollution control technology, including but not limited to closed cycle technology;
(H) the facts and circumstances present a
unique situation which, if relief is granted, will
not establish a precedent or the relaxation of the
requirements of this chapter applicable to similarly
situated discharges; and
(I) no owner or operator of a facility comparable to that of the applicant situated in the
United States has demonstrated that it would be
put at a competitive disadvantage to the applicant (or the parent company or any subsidiary
thereof) as a result of the issuance of a permit
under this subsection.
(2) The effluent limitations established under a
permit issued under paragraph (1) shall be sufficient
to implement the applicable State water quality standards, to assure the protection of public water supplies
and protection and propagation of a balanced, indigenous
2 So in original. Probably should be ‘‘contractual’’.
23a
population of shellfish, fish, fauna, wildlife, and other
aquatic organisms, and to allow recreational activities
in and on the water. In setting such limitations, the
Administrator shall take into account any seasonal
variations and the need for an adequate margin of
safety, considering the lack of essential knowledge
concerning the relationship between effluent limitations and water quality and the lack of essential
knowledge of the effects of discharges on beneficial
uses of the receiving waters.
(3) A permit under this subsection may be issued
for a period not to exceed five years, and such a permit
may be renewed for one additional period not to
exceed five years upon a demonstration by the applicant and a finding by the Administrator at the time of
application for any such renewal that the provisions
of this subsection are met.
(4) The Administrator may terminate a permit
issued under this subsection if the Administrator
determines that there has been a decline in ambient
water quality of the receiving waters during the
period of the permit even if a direct cause and effect
relationship cannot be shown: Provided, That if the
effluent from a source with a permit issued under this
subsection is contributing to a decline in ambient water
quality of the receiving waters, the Administrator shall
terminate such permit.
(n) Fundamentally different factors
(1) General rule
The Administrator, with the concurrence of
the State, may establish an alternative requirement under subsection (b)(2) or section 1317(b) of
24a
this title for a facility that modifies the requirements of national effluent limitation guidelines
or categorical pretreatment standards that would
otherwise be applicable to such facility, if the
owner or operator of such facility demonstrates to
the satisfaction of the Administrator that
(A) the facility is fundamentally different with
respect to the factors (other than cost) specified
in section 1314(b) or 1314(g) of this title and
considered by the Administrator in establishing
such national effluent limitation guidelines or
categorical pretreatment standards;
(B) the application—
(i) is based solely on information and supporting data submitted to the Administrator
during the rulemaking for establishment of
the applicable national effluent limitation
guidelines or categorical pretreatment standard specifically raising the factors that are
fundamentally different for such facility; or
(ii) is based on information and supporting
data referred to in clause (i) and information
and supporting data the applicant did not have
a reasonable opportunity to submit during
such rulemaking;
(C) the alternative requirement is no less
stringent than justified by the fundamental difference; and
(D) the alternative requirement will not result
in a non-water quality environmental impact
which is markedly more adverse than the impact
considered by the Administrator in establishing
25a
such national effluent limitation guideline or
categorical pretreatment standard.
(2) Time limit for applications
An application for an alternative requirement
which modifies the requirements of an effluent
limitation or pretreatment standard under this
subsection must be submitted to the Administrator within 180 days after the date on which
such limitation or standard is established or
revised, as the case may be.
(3) Time limit for decision
The Administrator shall approve or deny by
final agency action an application submitted
under this subsection within 180 days after the
date such application is filed with the Administrator.
(4) Submission of information
The Administrator may allow an applicant
under this subsection to submit information and
supporting data until the earlier of the date the
application is approved or denied or the last day
that the Administrator has to approve or deny
such application.
(5) Treatment of pending applications
For the purposes of this subsection, an application for an alternative requirement based on
fundamentally different factors which is pending
on February 4, 1987, shall be treated as having
been submitted to the Administrator on the 180th
day following February 4, 1987. The applicant
26a
may amend the application to take into account the
provisions of this subsection.
(6) Effect of submission of application
An application for an alternative requirement
under this subsection shall not stay the applicant’s obligation to comply with the effluent limitation guideline or categorical pretreatment standard which is the subject of the application.
(7) Effect of denial
If an application for an alternative requirement which modifies the requirements of an
effluent limitation or pretreatment standard
under this subsection is denied by the Administrator, the applicant must comply with such limitation or standard as established or revised, as
the case may be.
(8) Reports
By January 1, 1997, and January 1 of every oddnumbered year thereafter, the Administrator
shall submit to the Committee on Environment
and Public Works of the Senate and the Committee on Transportation and Infrastructure of the
House of Representatives a report on the status
of applications for alternative requirements which
modify the requirements of effluent limitations
under section 1311 or 1314 of this title or any
national categorical pretreatment standard under
section 1317(b) of this title filed before, on, or
after February 4, 1987.
27a
(o) Application fees
The Administrator shall prescribe and collect
from each applicant fees reflecting the reasonable
administrative costs incurred in reviewing and processing applications for modifications submitted to
the Administrator pursuant to subsections (c), (g), (i),
(k), (m), and (n) of this section, section 1314(d)(4) of
this title, and section 1326(a) of this title. All amounts
collected by the Administrator under this subsection
shall be deposited into a special fund of the Treasury
entitled “Water Permits and Related Services” which
shall thereafter be available for appropriation to carry
out activities of the Environmental Protection Agency
for which such fees were collected.
(p) Modified permit for coal remining operations
(1) In general
Subject to paragraphs (2) through (4) of this
subsection, the Administrator, or the State in any
case which the State has an approved permit
program under section 1342(b) of this title, may
issue a permit under section 1342 of this title
which modifies the requirements of subsection (b)
(2)(A) of this section with respect to the pH level
of any pre-existing discharge, and with respect to
pre-existing discharges of iron and manganese
from the remined area of any coal remining operation or with respect to the pH level or level of
iron or manganese in any pre-existing discharge
affected by the remining operation. Such modified
requirements shall apply the best available technology economically achievable on a case-by-case
28a
basis, using best professional judgment, to set
specific numerical effluent limitations in each
permit.
(2) Limitations
The Administrator or the State may only issue
a permit pursuant to paragraph (1) if the applicant demonstrates to the satisfaction of the
Administrator or the State, as the case may be,
that the coal remining operation will result in the
potential for improved water quality from the
remining operation but in no event shall such a
permit allow the pH level of any discharge, and
in no event shall such a permit allow the discharges of iron and manganese, to exceed the levels
being discharged from the remined area before
the coal remining operation begins. No discharge
from, or affected by, the remining operation shall
exceed State water quality standards established
under section 1313 of this title.
(3) Definitions
For purposes of this subsection—
(A) Coal remining operation
The term “coal remining operation” means a
coal mining operation which begins after
February 4, 1987 at a site on which coal mining
was conducted before August 3, 1977.
(B) Remined area
The term “remined area” means only that
area of any coal remining operation on which
29a
coal mining was conducted before August 3,
1977.
(C) Pre-existing discharge
The term “pre-existing discharge” means any
discharge at the time of permit application
under this subsection.
(4) Applicability of strip mining laws
Nothing in this subsection shall affect the
application of the Surface Mining Control and
Reclamation Act of 1977 [30 U.S.C. 1201 et seq.] to
any coal remining operation, including the application of such Act to suspended solids.
30a
33 U.S.C. § 1319
§ 1319. Enforcement
(a) State enforcement; compliance orders
(1) Whenever, on the basis of any information
available to him, the Administrator finds that any
person is in violation of any condition or limitation
which implements section 1311, 1312, 1316, 1317,
1318, 1328, or 1345 of this title in a permit issued by
a State under an approved permit program under
section 1342 or 1344 of this title he shall proceed
under his authority in paragraph (3) of this subsection
or he shall notify the person in alleged violation and
such State of such finding. If beyond the thirtieth day
after the Administrator’s notification the State has
not commenced appropriate enforcement action, the
Administrator shall issue an order requiring such
person to comply with such condition or limitation or
shall bring a civil action in accordance with subsection
(b) of this section.
(2) Whenever, on the basis of information available to him, the Administrator finds that violations of
permit conditions or limitations as set forth in paragraph (1) of this subsection are so widespread that
such violations appear to result from a failure of the
State to enforce such permit conditions or limitations
effectively, he shall so notify the State. If the Administrator finds such failure extends beyond the
thirtieth day after such notice, he shall give public
notice of such finding. During the period beginning
with such public notice and ending when such State
satisfies the Administrator that it will enforce such
conditions and limitations (hereafter referred to in
31a
this section as the period of “federally assumed
enforcement”), except where an extension has been
granted under paragraph (5)(B) of this subsection, the
Administrator shall enforce any permit condition or
limitation with respect to any person—
(A) by issuing an order to comply with such
condition or limitation, or
(B) by bringing a civil action under subsection
(b) of this section.
(3) Whenever on the basis of any information
available to him the Administrator finds that any
person is in violation of section 1311, 1312, 1316,
1317, 1318, 1322(p), 1328, or 1345 of this title, or is in
violation of any permit condition or limitation implementing any of such sections in a permit issued under
section 1342 of this title by him or by a State or in a
permit issued under section 1344 of this title by a
State, he shall issue an order requiring such person to
comply with such section or requirement, or he shall
bring a civil action in accordance with subsection (b)
of this section.
(4) A copy of any order issued under this subsection shall be sent immediately by the Administrator
to the State in which the violation occurs and other
affected States. In any case in which an order under
this subsection (or notice to a violator under paragraph (1) of this subsection) is issued to a corporation,
a copy of such order (or notice) shall be served on any
appropriate corporate officers. An order issued under
this subsection relating to a violation of section 1318
of this title shall not take effect until the person to
whom it is issued has had an opportunity to confer
32a
with the Administrator concerning the alleged violation.
(5)(A) Any order issued under this subsection
shall be by personal service, shall state with reasonable specificity the nature of the violation, and shall
specify a time for compliance not to exceed thirty days
in the case of a violation of an interim compliance
schedule or operation and maintenance requirement
and not to exceed a time the Administrator determines to be reasonable in the case of a violation of a
final deadline, taking into account the seriousness of
the violation and any good faith efforts to comply with
applicable requirements.
(B) The Administrator may, if he determines (i)
that any person who is a violator of, or any person who
is otherwise not in compliance with, the time requirements under this chapter or in any permit issued
under this chapter, has acted in good faith, and has
made a commitment (in the form of contracts or other
securities) of necessary resources to achieve compliance by the earliest possible date after July 1, 1977,
but not later than April 1, 1979; (ii) that any extension
under this provision will not result in the imposition
of any additional controls on any other point or
nonpoint source; (iii) that an application for a permit
under section 1342 of this title was filed for such
person prior to December 31, 1974; and (iv) that the
facilities necessary for compliance with such requirements are under construction, grant an extension of
the date referred to in section 1311(b)(1)(A) of this
title to a date which will achieve compliance at the
earliest time possible but not later than April 1, 1979.
(6) Whenever, on the basis of information available to him, the Administrator finds (A) that any person
33a
is in violation of section 1311(b)(1)(A) or (C) of this
title, (B) that such person cannot meet the requirements for a time extension under section 1311(i)(2) of
this title, and (C) that the most expeditious and appropriate means of compliance with this chapter by such
person is to discharge into a publicly owned treatment
works, then, upon request of such person, the Administrator may issue an order requiring such person to
comply with this chapter at the earliest date practicable,
but not later than July 1, 1983, by discharging into a
publicly owned treatment works if such works concur
with such order. Such order shall include a schedule
of compliance.
(b) Civil actions
The Administrator is authorized to commence a
civil action for appropriate relief, including a permanent
or temporary injunction, for any violation for which he
is authorized to issue a compliance order under subsection (a) of this section. Any action under this subsection may be brought in the district court of the
United States for the district in which the defendant
is located or resides or is doing business, and such
court shall have jurisdiction to restrain such violation
and to require compliance. Notice of the commencement of such action shall be given immediately
to the appropriate State.
(c) Criminal penalties
(1) Negligent violations
Any person who—
(A) negligently violates section 1311, 1312, 1316,
1317, 1318, 1321(b)(3), 1322(p), 1328, or 1345 of
34a
this title, or any permit condition or limitation
implementing any of such sections in a permit
issued under section 1342 of this title by the
Administrator or by a State, or any requirement
imposed in a pretreatment program approved
under section 1342(a)(3) or 1342(b)(8) of this title
or in a permit issued under section 1344 of this
title by the Secretary of the Army or by a State;
or
(B) negligently introduces into a sewer system
or into a publicly owned treatment works any
pollutant or hazardous substance which such
person knew or reasonably should have known
could cause personal injury or property damage
or, other than in compliance with all applicable
Federal, State, or local requirements or permits,
which causes such treatment works to violate any
effluent limitation or condition in any permit
issued to the treatment works under section 1342
of this title by the Administrator or a State;
shall be punished by a fine of not less than $2,500 nor
more than $25,000 per day of violation, or by
imprisonment for not more than 1 year, or by both. If
a conviction of a person is for a violation committed
after a first conviction of such person under this paragraph, punishment shall be by a fine of not more than
$50,000 per day of violation, or by imprisonment of not
more than 2 years, or by both.
(2) Knowing violations
Any person who—
(A) knowingly violates section 1311, 1312, 1316,
1317, 1318, 1321(b)(3), 1322(p), 1328, or 1345 of
35a
this title, or any permit condition or limitation
implementing any of such sections in a permit
issued under section 1342 of this title by the
Administrator or by a State, or any requirement
imposed in a pretreatment program approved
under section 1342(a)(3) or 1342(b)(8) of this title
or in a permit issued under section 1344 of this
title by the Secretary of the Army or by a State;
or
(B) knowingly introduces into a sewer system
or into a publicly owned treatment works any
pollutant or hazardous substance which such
person knew or reasonably should have known
could cause personal injury or property damage
or, other than in compliance with all applicable
Federal, State, or local requirements or permits,
which causes such treatment works to violate any
effluent limitation or condition in a permit issued
to the treatment works under section 1342 of this
title by the Administrator or a State;
shall be punished by a fine of not less than $5,000 nor
more than $50,000 per day of violation, or by
imprisonment for not more than 3 years, or by both. If
a conviction of a person is for a violation committed
after a first conviction of such person under this paragraph, punishment shall be by a fine of not more than
$100,000 per day of violation, or by imprisonment of
not more than 6 years, or by both.
(3) Knowing endangerment
(A) General rule
Any person who knowingly violates section
1311, 1312, 1313, 1316, 1317, 1318, 1321(b)(3),
36a
1322(p), 1328, or 1345 of this title, or any permit
condition or limitation implementing any of
such sections in a permit issued under section
1342 of this title by the Administrator or by a
State, or in a permit issued under section 1344
of this title by the Secretary of the Army or by
a State, and who knows at that time that he
thereby places another person in imminent
danger of death or serious bodily injury, shall,
upon conviction, be subject to a fine of not more
than $250,000 or imprisonment of not more
than 15 years, or both. A person which is an
organization shall, upon conviction of violating
this subparagraph, be subject to a fine of not
more than $1,000,000. If a conviction of a person
is for a violation committed after a first conviction of such person under this paragraph, the
maximum punishment shall be doubled with
respect to both fine and imprisonment.
(B) Additional provisions
For the purpose of subparagraph (A) of this
paragraph—
(i) in determining whether a defendant
who is an individual knew that his conduct
placed another person in imminent danger of
death or serious bodily injury—
(I) the person is responsible only for
actual awareness or actual belief that
he possessed; and
(II) knowledge possessed by a person
other than the defendant but not by the
37a
defendant himself may not be attributed to the defendant;
except that in proving the defendant’s possession of actual knowledge, circumstantial evidence may be used, including evidence that the
defendant took affirmative steps to shield
himself from relevant information;
(ii) it is an affirmative defense to prosecution that the conduct charged was consented
to by the person endangered and that the
danger and conduct charged were reasonably
foreseeable hazards of—
(I) an occupation, a business, or a
profession; or
(II) medical treatment or medical or
scientific experimentation conducted by
professionally approved methods and
such other person had been made
aware of the risks involved prior to
giving consent;
and such defense may be established under
this subparagraph by a preponderance of the
evidence;
(iii) the term “organization” means a legal
entity, other than a government, established
or organized for any purpose, and such term
includes a corporation, company, association,
firm, partnership, joint stock company, foundation, institution, trust, society, union, or
any other association of persons; and
(iv) the term “serious bodily injury” means
bodily injury which involves a substantial
38a
risk of death, unconsciousness, extreme physical pain, protracted and obvious disfigurement, or protracted loss or impairment of the
function of a bodily member, organ, or mental
faculty.
(4) False statements
Any person who knowingly makes any false
material statement, representation, or certification in
any application, record, report, plan, or other document filed or required to be maintained under this
chapter or who knowingly falsifies, tampers with, or
renders inaccurate any monitoring device or method
required to be maintained under this chapter, shall
upon conviction, be punished by a fine of not more
than $10,000, or by imprisonment for not more than 2
years, or by both. If a conviction of a person is for a
violation committed after a first conviction of such
person under this paragraph, punishment shall be by
a fine of not more than $20,000 per day of violation, or
by imprisonment of not more than 4 years, or by both.
(5) Treatment of single operational upset
For purposes of this subsection, a single operational upset which leads to simultaneous violations of
more than one pollutant parameter shall be treated as
a single violation.
(6) Responsible corporate officer as “person”
For the purpose of this subsection, the term “person” means, in addition to the definition contained in
section 1362(5) of this title, any responsible corporate
officer.
39a
(7) Hazardous substance defined
For the purpose of this subsection, the term “hazardous substance” means (A) any substance designated
pursuant to section 1321(b)(2)(A) of this title, (B) any
element, compound, mixture, solution, or substance
designated pursuant to section 9602 of title 42(C) any
hazardous waste having the characteristics identified
under or listed pursuant to section 3001 of the Solid
Waste Disposal Act [42 U.S.C. 6921] (but not including any waste the regulation of which under the Solid
Waste Disposal Act [42 U.S.C. 6901 et seq.] has been
suspended by Act of Congress), (D) any toxic pollutant
listed under section 1317(a) of this title, and (E) any
imminently hazardous chemical substance or mixture
with respect to which the Administrator has taken
action pursuant to section 2606 of title 15.
(d) Civil penalties; factors considered in
determining amount
Any person who violates section 1311, 1312, 1316,
1317, 1318, 1322(p), 13281, or 1345 of this title, or any
permit condition or limitation implementing any of
such sections in a permit issued under section 1342 of
this title by the Administrator, or by a State, or in a
permit issued under section 1344 of this title by a
State, or any requirement imposed in a pretreatment
program approved under section 1342(a)(3) or 1342(b)
(8) of this title, and any person who violates any order
issued by the Administrator under subsection (a) of
this section, shall be subject to a civil penalty not to
exceed $25,000 per day for each violation. In determining the amount of a civil penalty the court shall
1 So in original.
40a
consider the seriousness of the violation or violations,
the economic benefit (if any) resulting from the violation, any history of such violations, any good-faith
efforts to comply with the applicable requirements, the
economic impact of the
This text is long and has been trimmed here. Open the source document for the complete record.
This is a copy of a public record, reproduced as it was published. It is not legal advice, and it may not be the version a court would rely on. Check the official source before you cite it.