Petition for Writ of Certiorari — Tug Hill Operating, LLC, Petitioner v. Lastephen Rogers

Supreme Court briefDec 15, 2023

Ask Donna

What actually matters in this document.

Text

APPENDIX

TABLE OF APPENDICES

Appendix A

Opinion, United States Court of Appeals

for the Fourth Circuit, Rogers. v. Tug Hill

Operating, LLC, No. 22-1480 (Aug. 7,

2023)............................................................. App-1

Appendix B

Memorandum Opinion and Order

Granting Motion to Intervene and

Granting Motion to Dismiss, United

States District Court for the Northern

District of West Virginia, Rogers v. Tug

Hill Operating, LLC, No. 5:21-CV-199

(Apr. 12, 2022) ........................................... App-24

Appendix C

Independent Contractor Agreement (Jan.

25, 2019)..................................................... App-64

Appendix D

Excerpts From Terms of Service (Feb. 20,

2019)........................................................... App-75

App-1

Appendix A

UNITED STATES COURT OF APPEALS

FOR THE FOURTH CIRCUIT

________________

No. 22-1480

________________

LASTEPHEN ROGERS, Individually and for others

similarly situated,

v.

Plaintiff-Appellant,

TUG HILL OPERATING, LLC; RUSCO OPERATING, LLC,

Defendants-Appellees.

________________

Appeal from the United States District Court for the

Northern District of West Virginia, at Wheeling.

John Preston Bailey, District Judge. (5:21-cv-00199JPB)

________________

Argued: May 3, 2023

Decided: August 7, 2023

________________

Before NIEMEYER, KING, and HARRIS, Circuit

Judges.

________________

Reversed and remanded by published opinion.

Judge Niemeyer wrote the opinion, in which Judge

King and Judge Harris joined.

________________

App-2

ARGUED:

Richard

Jennings

Burch,

BRUCKNER BURCH PLLC, Houston, Texas, for

Appellant. John Barrick Bollman, MCDERMOTT

WILL & EMERY, LLP, Chicago, Illinois; Christian

Charles Antkowiak, BUCHANAN INGERSOLL &

ROONEY PC, Pittsburgh, Pennsylvania, for

Appellees. ON BRIEF: Anthony J. Majestro,

POWELL & MAJESTRO PLLC, Charleston, West

Virginia, for Appellant. Erin J. McLaughlin,

BUCHANAN INGERSOLL & ROONEY PC,

Pittsburgh, Pennsylvania, for Appellee Tug Hill

Operating, LLC. Rachel B. Cowen, MCDERMOTT

WILL & EMERY, LLP, Chicago, Illinois, for Appellee

RUSCO Operating, LLC.

________________

OPINION

________________

NIEMEYER, Circuit Judge:

Lastephen Rogers worked for Tug Hill Operating,

LLC, a Texas-based oil and natural gas exploration

and production company, for approximately a year

and a half at rig sites in West Virginia. He commenced

this action against Tug Hill under the Fair Labor

Standards Act (“FLSA”), alleging that while Tug Hill

formally classified him as an independent contractor,

he actually qualified as an employee for purposes of

the FLSA based on the degree of control that Tug Hill

exercised over his work. He therefore claimed that Tug

Hill was required to pay him overtime for those weeks

in which he worked more than 40 hours.

Tug Hill filed a motion to dismiss Rogers’ action

on the ground that Rogers was contractually required

App-3

to arbitrate his claim against it. The arbitration

clause, however, was not in any contract between

Rogers and Tug Hill, but rather in a contract between

Rogers and RigUp, Inc., 1 a third-party company that

had helped Rogers find the position with Tug Hill.

RigUp was in the business of connecting skilled

workers with oil and gas companies for a fee.

In addition, RigUp itself filed a motion to

intervene in order to seek the action’s dismissal in

favor of arbitration, despite language in RigUp’s

contract with Rogers that the arbitration specified in

their contract related only to disputes between Rogers

and RigUp and that “RigUp will not be a party to

disputes . . . between [Rogers] and [Tug Hill].”

The district court granted both motions —

allowing RigUp to intervene as a defendant and

granting Tug Hill’s motion to dismiss Rogers’ action

and compel arbitration. For the reasons that follow,

we reverse both rulings and remand for further

proceedings between Rogers and Tug Hill.

I

Rogers had experience working as a foreman at oil

rig sites — a position referred to in the oil and gas

industry as a “company man” — and he sought to find

work with oil and gas companies through RigUp, a

company in the business of connecting skilled workers

in the industry with companies looking for such

workers. To engage RigUp’s services, Rogers executed

1 RigUp, Inc., changed its name to Workrise Technologies, Inc.,

in 2021. That company, as well as its wholly owned subsidiary,

RUSCO Operating, LLC, are referred to herein as “RigUp.”

App-4

an agreement with RigUp in January 2019 that

governed their relationship, entitled “Agreement

Between Independent Professional & RigUp For Use

Of RigUp Service” (hereafter, “the Agreement”). The

Agreement stated that it was “a binding agreement

between [Rogers], an independent professional (‘you’)

and RUSCO Operating, LLC, a wholly owned

subsidiary of RigUp, Inc. . . . governing [Rogers’] use

of the Service (as defined in the RigUp Terms of

Service . . .) to provide freelance services to third party

companies (each a ‘Company’ or collectively the

‘Companies’).”

In signing the Agreement, Rogers represented to

RigUp that he was “an independent professional and

entrepreneur” who wanted to “be introduced to new

clients by RigUp . . . to provide [them] services . . . as

an independent professional, and not as an employee.”

The Agreement explained to Rogers, however, that

after RigUp helped match Rogers with a company, he

and that company would “solely negotiate and

determine . . . when and where [he would] perform

[p]rojects” and that “[a]ny interactions or disputes

between [him] and a Company [would be] solely

between [him] and that Company.” The Agreement

provided further that “RigUp . . . shall have no

liability, obligation or responsibility for any

interaction between you and any Company.” And it

expressly stated that “RIGUP WILL NOT BE A

PARTY TO DISPUTES OR NEGOTIATIONS OF

DISPUTES, BETWEEN YOU AND COMPANIES.”

The Agreement did provide, however, that Rogers

would “indemnify and hold the RigUp Parties and

Company harmless from and against all losses,

damages, liabilities, . . . actions, [and] judgments . . .

App-5

arising out of or resulting from” several occurrences,

one of which was “a determination by a court or agency

that [Rogers] [was] an employee of RigUp or a

Company.”

The Agreement incorporated RigUp’s Terms of

Service, and in a paragraph entitled “Dispute

Resolution,” it also specifically incorporated “Section

24 of the Terms.” That section contained an

arbitration provision, which stated:

In the interest of resolving disputes between

you and RigUp in the most expedient and cost

effective manner, you and RigUp agree that

every dispute arising in connection with these

Terms will be resolved by binding arbitration.

. . . This agreement to arbitrate disputes

includes all claims arising out of or relating to

any aspect of these Terms, whether based in

contract,

tort,

statute,

fraud,

misrepresentation, or any other legal theory,

and regardless of whether a claim arises

during or after the termination of these

Terms. YOU UNDERSTAND AND AGREE

THAT, BY ENTERING INTO THESE

TERMS, YOU AND RIGUP ARE EACH

WAIVING THE RIGHT TO A TRIAL BY

JURY OR TO PARTICIPATE IN A CLASS

ACTION.

(Emphasis added). Section 24 also provided that “[a]ny

arbitration between you and RigUp will be settled

under the Federal Arbitration Act” and “administered

by the [American Arbitration Association]” and that

“[t]he arbitrator has exclusive authority to resolve any

dispute relating to the interpretation, applicability, or

App-6

enforceability of this binding arbitration agreement.”

(Emphasis added).

In January 2019, pursuant to RigUp’s

matchmaking, Rogers began work as a “company

man” at a rig site operated by Tug Hill in West

Virginia. Tug Hill classified Rogers as an independent

contractor and assigned him to “oversee the rig site

and make sure the operations were being performed

in accordance with Tug Hill’s procedures and

instructions.” Rogers continued work for Tug Hill

through July 2020. According to Rogers, during that

year and a half, he worked exclusively for Tug Hill and

was paid a daily rate for his work.

In 2021, Rogers commenced this action against

Tug Hill, alleging that it had violated the FLSA by

failing to pay him any overtime even though he

“typically worked more than 80 hours a week.” He

alleged that he had been “misclassified as an

independent contractor by Tug Hill” when he actually

performed his work as an employee, based on the

degree of control that “Tug Hill exercised . . . over all

aspects of his job.” He brought the action on behalf of

himself and all other similarly situated workers, a

class he defined as “[a]ll company men employed by or

performing work on behalf of Tug Hill classified as

independent contractors and paid a day-rate without

overtime during the past three years.”

RigUp filed a motion to intervene in the action “as

of right” pursuant to Federal Rule of Civil Procedure

24(a)(2), or “by permission” pursuant to Rule

24(b)(1)(B), arguing that it was “in the business of

facilitating

relationships

between

oil-and-gas

operators and independent contractors who contract

App-7

to provide freelance services for those operators” and

that it had facilitated such a relationship between Tug

Hill and Rogers. RigUp argued that intervention was

warranted so that it could “represent . . . [its] unique

interest in preserving its business model by protecting

the independent-contractor status of the workers it

serves.” It also alleged that if Rogers’ action succeeded,

it might have some liability to Tug Hill “as a potential

indemnitor” under a contract it had with Tug Hill.

RigUp indicated that if its motion to intervene were

granted, it would thereafter file a motion to compel

arbitration and dismiss or stay the action.

After RigUp filed its motion to intervene, Tug Hill

filed a motion to dismiss Rogers’ action under Federal

Rules of Civil Procedure 12(b)(1), 12(b)(6), and

12(b)(7), contending that “this action should be

dismissed and [Rogers] should be compelled to

individual arbitration pursuant to the arbitration

clause to which he is contractually bound” in his

contract with RigUp. Tug Hill claimed that in the

Agreement between Rogers and RigUp, Rogers had

“entered into a valid and enforceable” agreement to

arbitrate “every dispute arising in connection with

these Terms,” including “all claims arising out of or

relating to any aspect of these Terms,” and it

maintained that this language covered Rogers’ FLSA

claim against it. Tug Hill asserted that the fact that it

was “not a signatory to the . . . Agreement” between

Rogers and RigUp was “a red herring” because the

arbitration clause delegated to the arbitrator the

“exclusive authority” to decide questions of

arbitrability. It argued alternatively that it could

enforce the arbitration agreement either “as a third-

App-8

party beneficiary . . . or pursuant to estoppel

principles.”

In response to RigUp’s motion to intervene,

Rogers pointed to specific language in his contract

with RigUp and argued that “RigUp contractually

disclaimed any right to be [a] party to . . . disputes”

between workers and operators and that his FLSA

suit against Tug Hill was such a dispute. And with

respect to Tug Hill’s motion to dismiss, Rogers argued

(1) that he never “agree[d] to arbitrate his claims

against Tug Hill”; (2) that the court, not an arbitrator,

“decides existence, validity, and enforceability of

arbitration agreements”; and (3) that “Tug Hill cannot

compel arbitration under the agreement” based on

either third-party beneficiary or estoppel principles.

In a memorandum opinion and order dated April

12, 2022, the district court granted RigUp’s motion to

intervene, concluding that RigUp was “entitled to

intervene in this matter by right” under Rule 24(a)

because it had “significantly protectible” interests in

the litigation that “could potentially [be] impair[ed]”

absent intervention. Rogers v. Tug Hill Operating,

LLC, 598 F. Supp. 3d 404, 417, 421 (N.D. W. Va. 2022).

It identified (1) RigUp’s “purely economic interest[]” in

its “business model,” (2) RigUp’s interest in “seeking

to enforce [its] arbitration agreement,” and (3) RigUp’s

“potential liability” to Tug Hill under an indemnity

provision in the contract between RigUp and Tug Hill.

Id. at 417–19, 421. The court concluded alternatively

that RigUp “would be entitled to permissive

intervention” under Rule 24(b). Id. at 421.

The court also granted Tug Hill’s motion to

dismiss and compel arbitration, concluding that the

App-9

language in Rogers’ arbitration agreement with RigUp

— providing that “all claims arising out of or relating

to any aspect of these Terms [of Service]” were subject

to arbitration — was broad enough to cover Rogers’

FLSA claim against Tug Hill. The district court

further concluded that “the fact [that] defendant Tug

Hill [was] not a signatory” to the RigUp Agreement

was “of no moment” because any question of

arbitrability had to be decided by the arbitrator based

on the “delegation clause” in the arbitration

agreement. Rogers, 598 F. Supp. 3d at 425.

Alternatively, the court concluded that Tug Hill was

“a third-party beneficiary” that was “permitted to

enforce” Rogers’ arbitration agreement with RigUp. 2

Id. at 427.

From the district court’s judgment, Rogers filed

this appeal, challenging both of the district court’s

rulings.

II

With respect to the district court’s dismissal

order, Rogers contends that he never agreed to

arbitrate anything with Tug Hill and that, as a result,

the district court erred in dismissing his action and

ordering him to arbitrate with Tug Hill on the ground

that his arbitration agreement with RigUp contained

a delegation clause authorizing the arbitrator to

2 Because the district court concluded that Tug Hill was a thirdparty beneficiary, it did not address Tug Hill’s alternative

argument that it was entitled to enforce the RigUp arbitration

agreement under estoppel principles. See Rogers, 598 F. Supp. 3d

at 427 n.7. Tug Hill has not raised estoppel on appeal, and the

issue therefore is not before us.

App-10

determine arbitrability. It cannot be, he maintains,

that a person like him who has “execut[ed] an

arbitration agreement containing a delegation clause”

with one party (RigUp) is required to arbitrate

whether he must arbitrate with a different party (Tug

Hill).

In defending the district court’s ruling, Tug Hill

contends that Rogers’ contract with RigUp contained

“a valid arbitration agreement”; that Rogers’ FLSA

claim against Tug Hill falls within the scope of that

arbitration agreement because Rogers agreed to serve

“as an independent professional, and not as an

employee”; and that the arbitration agreement

contained a delegation clause giving the arbitrator

“exclusive authority” over arbitrability issues, a

category that should be understood to include whether

the arbitration agreement is enforceable by a third

party. In other words, according to Tug Hill, because

Rogers and RigUp delegated “threshold questions to

the arbitrator (not a court),” the arbitrator is the one

“who must decide whether Rogers must arbitrate his

[FLSA] claim[] against Tug Hill.”

The parties’ positions thus present us with the

issue of whether a court or an arbitrator must decide

whether Tug Hill can enforce the arbitration clause in

the contract between Rogers and RigUp given that the

arbitration clause has a delegation provision.

As a foundational principle, the Federal

Arbitration Act (“FAA”) provides for the enforcement

of agreements to arbitrate when they are created by

contract, and such contracts must be treated like any

other contract under applicable state law. Thus, as

relevant to the issue presented in this case, the

App-11

Supreme Court has held that “[b]ecause ‘traditional

principles’ of state law allow a contract to be enforced

by or against nonparties to the contract through

‘assumption, piercing the corporate veil, alter ego,

incorporation by reference, third-party beneficiary

theories, waiver and estoppel,’” “those who are not

parties to a written arbitration agreement” may be

eligible for relief under the FAA. Arthur Andersen LLP

v. Carlisle, 556 U.S. 624, 629, 631 (2009) (quoting 21

Richard A. Lord, Williston on Contracts § 57:19, at 183

(4th ed. 2001)). What Arthur Andersen also makes

clear, however, is that it is a court, not an arbitrator,

that must initially decide whether a nonparty to an

arbitration agreement is entitled to enforce it. See id.

at 630–32. This emanates from the requirements of

the FAA.

The FAA grounds arbitration obligations in

contract law, as § 2 provides:

A written provision in . . . a contract

evidencing a transaction involving commerce

to settle by arbitration a controversy

thereafter arising out of such contract or

transaction . . . shall be valid, irrevocable, and

enforceable, save upon such grounds as exist

at law or in equity for the revocation of any

contract . . . .

9 U.S.C. § 2. And consistent with that proposition, § 4

provides that a party “aggrieved” by the failure “of

another to arbitrate under a written agreement for

arbitration may petition” a federal court “for an order

directing that such arbitration proceed in the manner

provided for in such agreement.” Id. § 4 (emphasis

added). That section adds that the court “shall” order

App-12

arbitration “upon being satisfied that the making of

the agreement for arbitration or the failure to comply

therewith is not in issue.” Id. (emphasis added); see

also id. § 3 (directing a court to stay a civil action if the

claim is “referable to arbitration under an agreement

in writing for such arbitration” (emphasis added)).

The Supreme Court has recognized explicitly and

repeatedly that arbitration obligations are grounded

in contract law, including by emphasizing recently

that under the FAA, “arbitration agreements [are] as

enforceable as other contracts, but not more so.”

Morgan v. Sundance, Inc., 142 S. Ct. 1708, 1713 (2022)

(cleaned up); see id. (explaining that the Court’s prior

recognition of a federal “policy favoring arbitration”

was “merely an acknowledgment of the FAA’s

commitment to overrule the judiciary’s longstanding

refusal to enforce agreements to arbitrate” and that

“the federal policy is about treating arbitration

contracts like all others, not about fostering

arbitration” (cleaned up)). Moreover, it is well

established that when a challenge to the existence of

a contractual obligation is properly raised, “the court

determines whether a valid arbitration agreement

exists” “before referring a dispute to an arbitrator.”

Henry Schein, Inc. v. Archer & White Sales, Inc., 139

S. Ct. 524, 530 (2019) (emphasis added); see also RentA-Center, West, Inc. v. Jackson, 561 U.S. 63, 71 (2010)

(“If a party challenges the validity under § 2 of the

precise agreement to arbitrate at issue, the federal

court must consider the challenge before ordering

compliance with that agreement under § 4” (emphasis

added)).

App-13

Thus, as a general matter, the relevant threshold

question that a court must address when being asked

to compel arbitration is whether “an arbitration

agreement exists between the parties.” Hightower v.

GMRI, Inc., 272 F.3d 239, 242 (4th Cir. 2001)

(emphasis added). But, as noted, there are

circumstances in which a nonparty to a contract may

nonetheless be entitled to enforce it under standard

contract principles, such as “through assumption,

piercing the corporate veil, alter ego, incorporation by

reference, third-party beneficiary theories, waiver and

estoppel.” Arthur Andersen, 556 U.S. at 631 (cleaned

up). Therefore, when an objection is properly raised

that the party seeking to enforce an arbitration

agreement is not itself a party to that agreement, the

district court must determine — as a condition

precedent to the entry of any § 3 stay or § 4 order

compelling arbitration — whether that party is

entitled to enforce the arbitration agreement under

state contract law. Otherwise, a party with no

contractual right to compel arbitration might be

permitted to do just that. And nothing in the FAA, or

the Supreme Court’s jurisprudence interpreting it,

allows such a counterintuitive result — a result that

would undermine the contractual foundation of the

order compelling arbitration.

This principle finds direct support in the Supreme

Court’s decision in Arthur Andersen. In that case, after

an accounting firm and others were sued by a group of

former clients, those defendants “moved to stay the

action, invoking § 3 of the FAA and arguing that the

principles of equitable estoppel demanded that [the

plaintiffs] arbitrate their claims” based on an

arbitration agreement the plaintiffs had entered into

App-14

with another defendant. Arthur Andersen, 556 U.S. at

626–27. While the Sixth Circuit had determined “that

those who are not parties to a written arbitration

agreement are categorically ineligible for relief” under

the FAA, the Supreme Court concluded that that

holding was incorrect. Id. at 629, 631 (emphasis

added). It reasoned that while § 2 “creates substantive

federal law regarding the enforceability of arbitration

agreements, requiring courts to place such

agreements upon the same footing as other contracts,”

neither it nor § 3 “purports to alter background

principles of state contract law regarding the scope of

agreements” — including the questions of “who is

bound by them” and who can enforce them. Id. at 630

(cleaned up). Thus, “a litigant who was not a party to

the relevant arbitration agreement may invoke § 3” to

obtain a stay from the district court “if the relevant

state contract law allows him to enforce the

agreement.” Id. at 632 (emphasis added). The Court

explained that this was so because “[i]f a written

arbitration provision is made enforceable against (or

for the benefit of) a third party under state contract

law, [§3’s] terms are fulfilled,” such that the court

would then be “require[d]” to grant a § 3 stay to the

third party. Id. at 631–32 (emphasis added).

Arthur Andersen thus stands for the principle

that if state contract law allows a person who was not

a party to an arbitration agreement to nonetheless

enforce it, then that nonparty is entitled to invoke the

FAA’s enforcement mechanisms in federal court. See

556 U.S. at 631–32; see also GE Energy Power

Conversion France SAS, Corp. v. Outokumpu

Stainless USA, LLC, 140 S. Ct. 1637, 1644 (2020). And

the necessary corollary to this principle is that when a

App-15

nonparty to an arbitration agreement seeks to enforce

it with a stay under § 3 or an order to compel

arbitration under § 4, it is the court that must first

determine that “the relevant state contract law allows

[that nonparty] to enforce the agreement” so as to

assure itself that the FAA’s “terms are fulfilled.”

Arthur Andersen, 556 U.S. at 631–32; see also GE

Energy Power, 140 S. Ct. at 1643 (recognizing that

“Chapter 1 of the [FAA] permits courts to apply statelaw doctrines related to the enforcement of arbitration

agreements,” including “doctrines that authorize the

enforcement of a contract by a nonsignatory”

(emphasis added)).

In this case, Tug Hill nonetheless contends that

under the terms of the arbitration clause —

particularly its delegation provision — the arbitrator,

not the court, must be the one to decide whether Tug

Hill can enforce the arbitration clause, even though it

is in a contract between Rogers and RigUp. It notes

that under the language of the delegation provision,

“[t]he arbitrator has exclusive authority to resolve any

dispute relating to the interpretation, applicability, or

enforceability” of the arbitration agreement. In

making that argument, however, Tug Hill fails to

address the contractual source of the arbitrator’s

authority. When the delegation provision is read in the

context of the arbitration clause as a whole, it is plain

that Rogers agreed to arbitrate issues — including

threshold issues — arising between him and RigUp.

But he did not enter into any agreement that allows

an arbitrator to decide whether a third party like Tug

Hill has rights under the arbitration agreement. See

Rent-A-Center, 561 U.S. at 68–70 (recognizing that a

delegation provision is simply “an agreement to

App-16

arbitrate threshold issues concerning the arbitration

agreement” and that “the FAA operates on this

additional[,] [antecedent] agreement just as it does on

any other”).

Of course, the fact that Tug Hill was not itself a

party to the arbitration agreement does not

categorically mean that Tug Hill is ineligible to obtain

relief from the district court under the FAA. See

Arthur Andersen, 556 U.S. at 629–32. But it does

mean that, as a precondition to granting Tug Hill the

right to enforce any portion of an arbitration clause to

which it was not a party, the district court was

required, when that right was challenged, to

determine whether “the relevant state contract law

allow[ed] [Tug Hill] to enforce [that] agreement,” so as

to ensure that the FAA’s terms “are fulfilled.” Id. at

631–32; cf. New Prime Inc. v. Oliveira, 139 S. Ct. 532,

536–38 (2019) (holding that even “[w]hen a contract

delegates questions of arbitrability to an arbitrator,”

“a court should decide for itself whether [the FAA’s]

‘contracts of employment’ exclusion applies before

ordering arbitration” because “to invoke its statutory

powers under §§ 3 and 4 to stay litigation and compel

arbitration according to a contract’s terms, a court

must first” resolve that “necessarily antecedent

statutory inquiry”).

Accordingly, we conclude that the district court

erred in ruling that it could use its statutory powers

under the FAA to grant Tug Hill’s motion to compel

arbitration without first resolving whether, as a

matter of state contract law, Tug Hill was authorized

to enforce the arbitration agreement between RigUp

and Rogers. Accord Newman v. Plains All Am.

App-17

Pipeline, L.P., 23 F.4th 393, 398–99 (5th Cir. 2022)

(holding that it is for the court, not an arbitrator, to

decide whether a litigant can enforce an arbitration

agreement between two other parties); see also CCC

Intelligent Solutions Inc. v. Tractable Inc., 36 F.4th

721, 723–24 (7th Cir. 2022) (affirming the district

court’s application of “the rule that a judge must

decide whether the parties have agreed to arbitrate”

and concluding that an exception to the “dominant

rule” that generally “C [cannot] claim rights under a

contract that has only A and B as parties” was not

applicable). But see, e.g., Becker v. Delek US Energy,

Inc., 39 F.4th 351, 355–56 (6th Cir. 2022) (holding that

the question of whether a third party could enforce a

delegation provision in an arbitration clause was for

the arbitrator, not the court).

III

While the district court simply allowed Tug Hill to

enforce the RigUp-Rogers arbitration agreement

without determining Tug Hill’s contractual authority

to do so, it also concluded alternatively that it would

apply West Virginia law and find that the RigUp

Agreement “demonstrates an intent to make . . . Tug

Hill a third-party beneficiary” by “provid[ing] specific

— and significant — benefits to . . . Tug Hill.” Rogers,

598 F. Supp. 3d at 427. Based on this, the court

concluded that “Tug Hill should be permitted to

enforce [Rogers’] agreement” to arbitrate “every

dispute” arising in connection with the Agreement. Id.

The court also explained that while it had found that

West Virginia law governed, it would reach the same

result under Texas law. Id. at 427 n.5.

App-18

While the parties dispute whether West Virginia

or Texas law applies, they agree that with respect to

the third-party beneficiary issue, the law in the two

states does not materially differ. Consequently, we

need not decide which law applies in resolving

whether Tug Hill may enforce the RigUp arbitration

agreement as a third-party beneficiary.

Both Texas and West Virginia apply a

presumption against finding that a contract confers

third-party beneficiary status. See First Bank v.

Brumitt, 519 S.W.3d 95, 103 (Tex. 2017) (“We must

begin with the presumption that the parties

contracted solely for themselves, and only a clear

expression of the intent to create a third-party

beneficiary can overcome that presumption” (cleaned

up)); Eastern Steel Constructors, Inc. v. City of Salem,

549 S.E.2d 266, 278 (W. Va. 2001) (“In the absence of

a provision in a contract specifically stating that such

contract shall inure to the benefit of a third person,

there is a presumption that the contracting parties did

not so intend and in order to overcome such

presumption the implication from the contract as a

whole and the surrounding circumstances must be so

strong as to be tantamount to an express declaration”

(quoting Syl. pt. 2, Ison v. Daniel Crisp Corp., 122

S.E.2d 553, 553–54 (W. Va. 1961))). And both Texas

and West Virginia law similarly include a requirement

that the parties must have intended to secure a benefit

to a third party. Under West Virginia law, “[a] thirdparty beneficiary may enforce a contract only if it is

made for its sole benefit.” Donna S. v. Travis S., 874

S.E.2d 746, 755 (W. Va. 2022) (emphasis added) (citing

W. Va. Code § 55-8-12). And Texas law provides that

“a person seeking to establish third-party-beneficiary

App-19

status must demonstrate” not only “that the

contracting parties intended to secure a benefit to that

third party” but also that they “entered into the

contract directly for the third party’s benefit.” First

Bank, 519 S.W.3d at 102 (emphasis added) (cleaned

up).

In this case, the Agreement between Rogers and

RigUp contains no provision stating specifically that it

was entered into for the sole benefit of Tug Hill or

directly for its benefit. Indeed, the language of the

Agreement indicates to the contrary. The Agreement

provides that its purpose was to govern only the legal

relationship between RigUp and Rogers. While

RigUp’s matchmaking service enabled Rogers to

connect with Tug Hill, the Agreement anticipated that

Rogers and Tug Hill would have to separately

“negotiate and determine . . . when and where [Rogers

would] perform Projects” for Tug Hill, as well as how

much Tug Hill would pay Rogers. Moreover, the

Agreement expressly disclaimed any “responsibility

for any interaction between [Rogers] and [Tug Hill]”

and distanced itself from any arrangement that

Rogers might reach with Tug Hill by providing that

“[a]ny interactions or disputes between [Rogers] and

[Tug Hill] are solely between [Rogers] and [Tug Hill].”

The Agreement also provided that “RigUp is not

responsible or liable for the actions or inactions of [Tug

Hill] or other third party in relation to Projects as

completed by [Rogers]” and that RigUp “will not be a

party to disputes or negotiations of disputes, between

[Rogers] and [Tug Hill].”

Finally, and perhaps most tellingly, the

arbitration clause itself limits its applicability to

App-20

disputes between Rogers and RigUp. It provides that

“[i]n the interest of resolving disputes between

[Rogers] and RigUp in the most expedient and cost

effective manner, [Rogers] and RigUp agree” to

arbitrate disputes, such that “by entering into these

terms, [Rogers] and RigUp are each waiving the right

to a trial by jury.” (Emphasis added). The remaining

provisions of the arbitration clause similarly

contemplate arbitration only between Rogers and

RigUp, not between Rogers and any company for

whom Rogers performed projects (here, Tug Hill).

Thus, it provided that “[a]ny arbitration between

[Rogers] and RigUp will be settled under the Federal

Arbitration Act,” and it included additional details of

how arbitration would proceed between “[Rogers] and

RigUp.” (Emphasis added).

These numerous provisions in the Agreement

preclude any conclusion that the Agreement was

entered into solely or directly for the benefit of Tug

Hill, such that Tug Hill could enforce it as a thirdparty beneficiary. Accordingly, the district court erred

in granting Tug Hill’s motion to dismiss and

compelling Rogers, under the arbitration agreement

between him and RigUp, to proceed to arbitration with

respect to his FLSA claim against Tug Hill.

IV

Rogers also contends that the district court

abused its discretion in granting RigUp’s motion to

intervene under Federal Rule of Civil Procedure 24.

We agree.

Rogers’ suit against Tug Hill is a claim for

overtime wages under the FLSA, which brings to issue

App-21

the terms and conditions under which Rogers actually

worked for Tug Hill over a period of some 18 months.

While RigUp acted as matchmaker in initially

connecting Rogers with Tug Hill, their subsequent

arrangement, as stated in the Agreement, was

independent of Rogers’ contract with RigUp. Indeed,

the Rogers-RigUp Agreement went to great lengths to

distance RigUp’s matchmaking service from the work

that Rogers would thereafter perform for the company

with which he was matched. And in its motion to

intervene, RigUp only claimed that its interest in

Rogers’ suit against Tug Hill was to protect its own

business model and to avoid or mitigate liability to

Tug Hill under the agreement governing their

business relationship. We might well question, simply

on that basis, whether RigUp has articulated a

sufficient interest under Rule 24 to justify

intervention in Rogers’ FLSA action.

Instead, however, we conclude that the district

court abused its discretion in allowing RigUp’s

intervention because it failed to recognize, as Rogers

had specifically argued, that “RigUp contractually

disclaimed any right to be [a] party to . . . disputes”

like this one.

In several specific provisions of the Agreement,

Rogers and RigUp agreed that RigUp would not be a

party to disputes between Rogers and the oil and gas

operator for whom he would work, which ended up

being Tug Hill. For example, the Agreement stated

broadly that “[a]ny interactions or disputes between

[Rogers] and [Tug Hill] [were] solely between [Rogers]

and [Tug Hill]” and that “RigUp and its licensors shall

have no liability, obligation or responsibility for any

App-22

interaction between [Rogers] and [Tug Hill].”

Elsewhere, the Agreement stated that “RigUp [was]

not responsible or liable for the actions or inactions of

[Tug Hill],” and Rogers agreed to “waive and release

RigUp from any and all liability, claims or damages

arising from or in any way related to projects or

companies.” The Agreement then provided, “RIGUP

WILL NOT BE A PARTY TO DISPUTES OR

NEGOTIATIONS OF DISPUTES, BETWEEN

[ROGERS] AND COMPANIES.”

RigUp thus expressly agreed with Rogers that it

would “not be a party to disputes” between Rogers and

any third-party company, such as Tug Hill. By doing

so, RigUp waived whatever right it might otherwise

have had to be a party to Rogers’ action against Tug

Hill, thus precluding its intervention under Rule 24.

Indeed, one of the requirements for intervention as of

right under Rule 24(a)(2) is that the would-be

intervenor be “situated [such] that disposing of the

action may as a practical matter impair or impede the

movant’s ability to protect its interest.” Fed. R. Civ. P.

24(a)(2). Because RigUp’s agreement with Rogers

expressly disclaimed any interest in any litigation

Rogers might have with a company in Tug Hill’s

position, making clear that RigUp would not be

involved in such disputes as a third party, RigUp

cannot now opportunistically claim that intervention

is necessary to protect its interest. Similarly, before

permitting a party to intervene under Rule 24(b), a

district court is required to “consider whether the

intervention will unduly delay or prejudice the

adjudication of the original parties’ rights,” Fed. R.

Civ. P. 24(b)(3), an inquiry that here required

consideration of the Agreement’s provision that

App-23

Rogers would litigate any dispute he had with a

company like Tug Hill without RigUp’s being “a party

to [that] dispute[].”

The district court accordingly abused its

discretion by allowing RigUp’s intervention

notwithstanding the Agreement’s plain terms.

*

*

*

The judgment of the district court is reversed, and

the case is remanded for further proceedings between

Rogers and Tug Hill, consistent with this opinion.

REVERSED AND REMANDED

App-24

Appendix B

IN THE UNITED STATES DISTRICT COURT

FOR THE NORTHERN DISTRICT OF

WEST VIRGINIA

Wheeling

________________

Civil Action No. 5:21-CV-199

Judge Bailey

________________

LASTEPHEN ROGERS, Individually and for Others

Similarly Situated,

v.

Plaintiff,

TUG HILL OPERATING, LLC,

Defendant.

________________

Filed: Apr. 12, 2022

________________

MEMORANDUM OPINION AND ORDER

GRANTING MOTION TO INTERVENE AND

GRANTING MOTION TO DISMISS

________________

Pending before this Court is a Motion to Intervene

[Doc. 15] filed by RUSCO Operating, LLC on January

27, 2022. Following a deadline extension, Defendant

Tug Hill Operating, LLC filed a Response to Motion to

Intervene [Doc. 23] on February 24, 2022. That same

day, plaintiff filed a Memorandum in Opposition to

Motion to Intervene [Doc. 24]. On March 10, 2022,

RUSCO Operating, LLC filed a Reply [Doc. 30].

App-25

Additionally, pending before this Court is

defendant Tug Hill Operating, LLC’s Motion to

Dismiss Plaintiff’s Complaint Pursuant to Federal

Rules of Civil Procedure 12(b)(1), (6), and (7) [Doc. 21]

and accompanying Memorandum in Support [Doc. 22],

filed on February 24, 2022. Following a deadline

extension, plaintiff filed a Response in Opposition

[Doc. 31] on March 17, 2022. Defendant Tug Hill

Operating, LLC filed a Reply [Doc. 32] on March 24,

2022.

Based on the extensive briefing on both Motions,

each is ripe for adjudication. For the reasons contained

herein, the Motion to Intervene will be granted, and

the Motion to Dismiss will be granted.

BACKGROUND

Plaintiff Lastephen Rogers (“plaintiff”) filed his

complaint [Doc. 1] on December 3, 2021, seeking to

recover alleged unpaid overtime wages and other

damages under the Fair Labor Standards Act

(“FLSA”) against defendant Tug Hill Operating, LLC

(“defendant Tug Hill”). [Id. at ¶ 1]. Plaintiff brings this

action on behalf of himself and all other similarly

situated workers paid by defendant Tug Hill’s dayrate system. [Id. at ¶ 9].

According to plaintiff, defendant Tug Hill

operates an oil and natural gas exploration and

production company operating in West Virginia and

Texas. [Id. at 17]. Plaintiff contends that while

working for defendant Tug Hill as a drilling and

completions consultant, he, along with similarly

situated workers, was paid a flat amount for each day

worked with no overtime for hours worked in excess of

App-26

40 hours in a workweek in violation of the FLSA. [Id.

at 9–13].

Non-party RUSCO Operating, LLC (“RUSCO”)

operates an online platform (“the application” or “the

app”), which is used by oil and gas operators and

independent contractors who provide freelance

services for those operators. [Doc. 15-1 at 1–2].

According to RUSCO, its app is used to facilitate and

connect independent contractors to particular projects

run by oil and gas operators nationwide. [Id.]. Beyond

the matchmaking function between operators and

independent contractors, RUSCO’s app also provides

independent

contractors

with

administrative

functions like payment, insurance, and recordkeeping. [Id. at 4]. After a contractor, like plaintiff,

performs work, RUSCO then pays the contractor in

accordance with an invoice submitted by the

contractor, less a percentage known as the “split” that

compensates RUSCO for its service. [Id.]. Operators

like defendant then pay RUSCO the balance invoiced.

[Id.].

Underlying the foregoing relationship between

plaintiff and RUSCO is an independent contractor

agreement, which states that the agreement between

RUSCO and plaintiff “constitutes a binding

agreement between you, an independent professional

. . . and [RUSCO] . . . governing your use of the Service

. . . to provide freelance services to third party

companies.” See [Doc. 15-4]. Throughout the

independent contractor agreement, plaintiff confers

several benefits on defendant and RUSCO, including:

•

Rights regarding the work to be performed: “You

and [Tug Hill] solely negotiate and determine (x)

App-27

when and where you perform Projects, (y) what you

wear while performing projects, and (z) any

additional bonuses or gratuities arising out of such

Projects.”

•

Waiver of workers compensation: “As an

independent professional, you are assuming the

responsibilities of an employer for the purpose of a

Project, and you hereby affirm you are not entitled

to, and are hereby waiving, any claim for workers

compensation benefits under either [RUSCO]’s or

[Tug Hill’s] workers’ compensation insurance

policy.”

•

Confidentiality: “You must keep [RUSCO]’s

confidential information absolutely confidential,

except as required or provided by law, including

but not limited to information about other [Tug

Hill] Projects . . .”

[Id.]. Plaintiff also agreed to abide by certain terms of

service, which contain a dispute resolution provision;

importantly, RUSCO’s dispute resolution provision

reads as follows:

Generally, in the interest of resolving

disputes between you and [RUSCO] in the

most expedient and cost effective manner,

you and [RUSCO] agree that every dispute

arising in connection with these Terms will be

resolved by binding arbitration. . . . This

agreement to arbitrate disputes includes all

claims arising out of or relating to any aspect

of these Terms, whether based in contract,

tort, statute, fraud, misrepresentation, or any

App-28

other legal theory, and regardless of whether

a claim arises during or after the termination

of these Terms. YOU UNDERSTAND AND

AGREE THAT, BY ENTERING INTO

THESE TERMS, YOU AND [RUSCO] ARE

EACH WAIVING THE RIGHT TO A TRIAL

BY JURY OR TO PARTICIPATE IN A

CLASS ACTION.

[Doc. 15-6]. Further, the terms state that claims will

be administered by and in accordance with the Rules

of the American Arbitration Association, and that

“[t]he arbitrator [shall have] exclusive authority to

resolve any dispute relating to the interpretation,

applicability, or enforceability of this binding

arbitration agreement.” [Id.].

LEGAL STANDARDS

I.

Intervention

“The Fourth Circuit favors ‘liberal intervention’

and preventing the ‘problem of absent interested

parties.’” Deutsche Bank v. Mountain West

Hospitality, LLC, 2017 WL 6420280, at *2 (N.D.

W.Va. Dec. 15, 2017) (Keeley, J.) (citing Friend v.

REMAC Am., Inc., 2014 WL 2440438, at *1 (N.D.

W.Va. May 30, 2014) (Groh, J.) (quoting Feller v.

Brock, 802 F.2d 722, 729 (4th Cir. 1986))).

“Prospective intervenors bear the burden of

demonstrating their right to intervene.” Deutsche

Bank, 2017 WL 6420280, at *2 (citing In re

Monitronics Int’l, Inc., 2015 WL 12748330, at *1

(N.D. W.Va. June 3, 2015) (Keeley, J.) (citing

Richman v. First Woman’s Bank, 104 F.3d 654, 658

(4th Cir. 1997))). Under Fed. R. Civ. Pro. 24, this Court

has discretion to allow intervention either as a matter

App-29

of right or on a permissive basis. Stuart v. Huff, 706

F.3d 345, 349 (4th Cir. 2013).

A. Intervention by Right

In the Fourth Circuit, “liberal intervention is

desirable to dispose of as much of a controversy

‘involving as many apparently concerned persons as is

compatible with efficiency and due process.’” Feller,

802 F.2d at 729 (4th Cir. 1986) (quoting Nuesse v.

Camp, 385 F.2d 694, 700 (D.C. Cir. 1967)).

This Court must grant a timely motion to

intervene if the movant “claims an interest relating to

the property or transaction that is the subject of the

action and is so situated that disposing of the action

may as a practical matter impair or impede the

movant’s ability to protect its interests, unless

existing parties adequately represent that interest.”

Fed. R. Civ. Pro. 24(a). The Fourth Circuit recognizes

that, to intervene as a matter of right, the movant

must satisfy four requirements:

(1) the application must be timely; (2) the

applicant must have an interest in the subject

matter sufficient to merit intervention; (3) the

denial of intervention would impair or impede

the applicant’s ability to protect its interest;

and (4) the applicant’s interest is not

adequately represented by the existing

parties to the litigation.

Scardelletti v. Debarr, 265 F.3d 195, 202 (4th Cir.

2001).

1.

Timeliness

Under either Rule 24(a) or 24(b), the application

for intervention must be timely. See Fed. R. Civ. Pro.

App-30

24(a) & 24(b) (requiring “timely application”); Gould

v. Alleco, Inc., 883 F.2d 281, 286 (4th Cir. 1989)

(“Both intervention of right and permissive

intervention require timely application.”). Although

Rule 24 “requires that the motion to intervene be

‘timely,’ it does not attempt to define the term or

specify rigid time limits.” United States v. South

Bend Community Sch. Corp., 710 F.2d 394, 396 (7th

Cir. 1983); see Black v. Central Motor Lines Inc.,

500 F.2d 407, 408 (4th Cir. 1974) (noting that “Rule 24

is silent as to what constitutes a timely application

and the question must therefore be answered in each

case by the exercise of the sound discretion of the

court”). “The purpose of the requirement is to prevent

a tardy intervenor from derailing a lawsuit within

sight of the terminal.” South Bend, 710 F.2d at 396.

“To determine whether an application for intervention

is timely, we examine the following factors: how far

the suit has progressed, the prejudice that delay might

cause other parties, and the reason for the tardiness

in moving to intervene.” Gould, 883 F.2d at 286.

Where intervention is of right, “the timeliness

requirement of Rule 24 should not be as strictly

enforced as in a case where intervention is only

permissive.” Brink v. DaLesio, 667 F.2d 420, 428

(4th Cir. 1981).

2.

Interest in Subject Matter

A potential intervenor’s interest in the subject

matter of the litigation must be “a significantly

protectable interest.” Teague v. Bakker, 931 F.2d

259, 261 (4th Cir. 1991) (citations omitted). An

interest is a “significantly protectable interest in an

action if [a party] ‘stand[s] to gain or lose by the direct

App-31

legal operation’ of a judgment in that action.”

Oplaihio Valley Envtl. Coal., Inc. v. McCarthy,

313 F.R.D. 10, 18 (S.D. W.Va. 2015) (Chambers, C.J.)

(quoting Teague, 931 F.2d at 261). But “[s]tanding to

gain or lose by direct operation of a judgment may not

be a necessary condition for an interest to be

significantly protectable.” Id. This Court has observed

that “it requires only that [the movant] show that the

disposition of the action ‘may as a practical matter’

impair their interests.” United States v.

Exxonmobil Corp., 264 F.R.D. 242, 245 (N.D. W.Va.

2010) (Keeley, J.) (quoting Little Rock Sch. Dist. v.

Pulaski Cty. Special Sch. Dist., 738 F.2d 82, 84 (8th

Cir. 1984)).

3.

Impaired Ability to Protect Interests

Courts in the context of this sort of litigation have

recognized that a signatory to an arbitration

agreement should have an ability to protect its

interests in the enforcement of the agreement

warranting intervention as of right. See, e.g., Nesser

v. MAC Acquisitions, LLC, 2021 WL 2636743, at *4

(W.D. N.C. 2021) (Whitney, J.) (“[T]his Court finds

[intervenor] as a contracting party with a significantly

protectable

interest

at

risk–the

arbitration

agreement–should be allowed to intervene to protect

said interest.”); Becker v. Delek US Energy, Inc.,

2020 WL 4604544, at *8 (M.D. Tenn. 2020) (Trauger,

J.) (staffing company permitted to intervene based on

“its interest in resolving the question of whether the

arbitration clause . . . extend[s] to [worker’s] claims

against [operator]”); Bock v. Salt Creek Midstream

LLC, 2020 WL 3989646, at *4 (D.N.M. July 15, 2020)

(“[S]eeking to vindicate it’s A[rbitration] A[greement]

App-32

with [workers] is a legitimate interest for [staffing

company] to protect.”); Altenhofen v. S. Star

Central Gas Pipeline, Inc., 2020 WL 3547947, at *4

(W.D. Ky. June 30, 2020) (same); Ferrell v.

SemGroup Corp., 2020 WL 4281302, at *3 (N.D.

Okla. June 12, 2020) (same).

4.

Adequacy of

Named Party

Representation

by

A potential intervenor’s burden to show that its

interests will not adequately be represented by a

named party is “‘minimal,’ and it is enough to show

that the representation ‘may be’ inadequate.” Kane

County, Utah v. United States, 928 F.3d 877,892

(10th Cir. 2019). “The possibility of divergence need

not be great in order to satisfy th[is] burden. An

intervenor need only show the possibility of

inadequate representation. Only when the objective of

the applicant for intervention is identical to that of one

of the parties is representation considered to be

adequate.” Barnes v. Security Life of Denver Ins.

Co., 945 F.3d 1112, 1124 (10th Cir. 2019).

B. Permissive Intervention

Fed. R. Civ. Pro. 24(b)(1) provides that, “[o]n

timely motion, the court may permit anyone to

intervene who . . . has a claim or defense that shares

with the main action a common question of law or

fact.” Although whether to allow permissive

intervention is within the sound discretion of the

district court, it must “consider whether the

intervention will unduly delay or prejudice the

adjudication of the original parties’ rights.” See Smith

v. Pennington, 352 F.3d 884, 892 (4th Cir. 2003);

Fed. R. Civ. Pro. 24(b)(3).

App-33

II. Motion to Dismiss

A. 12(b)(1)

A party may move to dismiss an action for lack of

subject matter jurisdiction under Federal Rule of Civil

Procedure 12(b)(1). The burden of proving subject

matter jurisdiction on a Rule 12(b)(1) motion to

dismiss is on the party asserting federal jurisdiction.

A trial court may consider evidence by affidavit,

deposition, or live testimony without converting the

proceeding to one for summary judgment. Adams v.

Bain, 697 F.2d 1213, 1219 (4th Cir. 1982); Mims v.

Kemp, 516 F.2d 21 (4th Cir. 1975). Because the court’s

very power to hear the case is at issue in a Rule

12(b)(1) motion, the trial court is free to weigh the

evidence to determine the existence of its jurisdiction.

No presumptive truthfulness attaches to the plaintiff’s

allegations, and the existence of disputed material

facts will not preclude the trial court from evaluating

for itself the merits of jurisdictional claims. See

Materson v. Stokes, 166 F.R.D. 368, 371 (E.D. Va.

1996). Whenever it appears by suggestion of the

parties or otherwise that the court lacks jurisdiction of

the subject matter, the court shall dismiss the action.

See Fed. R. Civ. P. 12(h)(3).

B. 12(b)(6)

A complaint must be dismissed if it does not allege

“enough facts to state a claim to relief that is plausible

on its face.” Bell Atl. Corp. v. Twombly, 550 U.S.

544, 570 (2007); see also Giarratano v. Johnson, 521

F.3d 298, 302 (4th Cir. 2008) (applying the Twombly

standard and emphasizing the necessity of

plausibility). When reviewing a motion to dismiss

pursuant to Rule 12(b)(6) of the Federal Rules of Civil

App-34

Procedure, the Court must assume all of the

allegations to be true, must resolve all doubts and

inferences in favor of the plaintiff, and must view the

allegations in a light most favorable to the plaintiff.

Edwards v. City of Goldsboro, 178 F.3d 231, 243–

44 (4th Cir. 1999).

When rendering its decision, the Court should

consider only the allegations contained in the

Complaint, the exhibits to the Complaint, matters of

public record, and other similar materials that are

subject to judicial notice. Anheuser-Busch, Inc. v.

Schmoke, 63 F.3d 1305, 1312 (4th Cir. 1995). In

Twombly, the Supreme Court, noted that “a plaintiff’s

obligation to provide the ‘grounds’ of his ‘entitle[ment]

to relief’ requires more than labels and conclusions,

and a formulaic recitation of the elements of a cause

of action will not do. . . .” Twombly, 550 U.S. at 555,

570 (upholding the dismissal of a complaint where the

plaintiffs did not “nudge[ ] their claims across the line

from conceivable to plausible.”).

This Court is well aware that “[M]atters outside

of the pleadings are generally not considered in ruling

on a Rule 12 Motion.” Williams v. Branker, 462 F.

App’x 348, 352 (4th Cir. 2012). “Ordinarily, a court

may not consider any documents that are outside of

the Complaint, or not expressly incorporated therein,

unless the motion is converted into one for summary

judgment.” Witthohn v. Fed. Ins. Co., 164 F. App’x

395, 396 (4th Cir. 2006). However, the Court may rely

on extrinsic evidence if the documents are central to a

plaintiff’s claim or are sufficiently referred to in the

Complaint. Id. at 396–97.

App-35

C. 12(b) and Arbitration

A motion to compel arbitration may be pursued

pursuant to Rule 12(b)(1) or 12(b)(6) of the Federal

Rules of Civil Procedure. In either instance, courts

should apply the dismissal (rather than summary

judgment standard) if the challenge is a facial attack

to the allegations of the complaint. Price v. West

Virginia Air National Guard, 130TH Airlift

Wing, 2016 WL 3094010, at *2 (S.D. W.Va. June 1,

2016) (Johnston, J.) (stating that a motion to dismiss

under Rule 12(b)(1) can be either facial or factual, with

the former challenging whether the allegations of the

complaint are facially sufficient to sustain the court’s

jurisdiction).

Where the challenge is facial, the court must

accept the allegations as true and proceed to consider

the motion as it would a motion to dismiss for failure

to state a claim under Rule 12(b)(6). Id. A challenge

can be facial and thus subject to the motion to dismiss

standard even if the defendants attach the arbitration

agreement to their filing. See Salmons v. CMH of

Ky., Inc., 2019 WL 3884038 (S.D. W.Va. Aug. 16,

2019) (Copenhaver, J.).

D. 12(b)(7)

A court may dismiss an action for failure to join a

party. See Fed. R. Civ. Pro. 12(b)(7) (stating that “a

party may assert the following defenses by motion . . .

failure to join a party under Rule 19”). The movant

bears the burden of demonstrating that dismissal for

non-joinder is appropriate.

In analyzing a motion to dismiss under Rule

12(b)(7), courts conduct a two-step inquiry. See West

Virginia Advocates, Inc. v. Mitchell, 2007 WL

App-36

1088850, at *3 (N.D. W.Va. Mar. 30, 2007) (Stamp, J.).

First, a court must determine whether a party is

necessary within the meaning of Rule 19(a). Id. Under

Rule 19(a)(1), a party is necessary where:

(A) in that person’s absence, the court cannot

accord complete relief among existing parties;

or

(B) that person claims an interest relating to

the subject of the action and is so situated

that disposing of the action in the person’s

absence may: (i) as a practical matter impair

or impede the person’s ability to protect the

interest; or (ii) leave an existing party subject

toa substantial risk of incurring double,

multiple,

or

otherwise

inconsistent

obligations because of the interest.

If the party is necessary but cannot feasibly be joined,

the court proceeds to the second prong of the inquiry,

which asks whether the action can continue absent the

party, or whether the party is “indispensable” under

Rule 19(b). Id.

In deciding whether a party is indispensable, the

court considers four factors: (1) the extent to which a

judgment rendered in the party’s absence might

prejudice that party or the other parties; (2) the extent

to which any prejudice could be ameliorated; (3)

whether a judgment rendered in the party’s absence

would be inadequate; and (4) whether the plaintiff

would have an adequate remedy if the action were

dismissed for non-joinder. Fed. R. Civ. Pro. 19(b). If

the absent party is both necessary and indispensable,

then the litigation should be dismissed. Fed. R. Civ. P.

12(b)(7).

App-37

DISCUSSION

As noted above, there are two pending Motions,

which have been briefed extensively by the parties.

Accordingly, this Court will first address the Motion

to Intervene before turning to a discussion of the

Motion to Dismiss.

I.

RUSCO’s Motion to Intervene

RUSCO argues that plaintiff has improperly

excluded it from the pending litigation through

selective pleading despite the fact that plaintiff had an

actual agreement concerning his independent

contractor status with RUSCO. [Doc. 15-1 at 1].

According to RUSCO, plaintiff signed this contract

including the aforementioned arbitration agreement

in which plaintiff promised to arbitrate claims like the

ones asserted here. [Id.]. RUSCO avers that

intervention is warranted as a right because RUSCO’s

contractual right to arbitration cannot be fully

protected if it is absent from this litigation. [Id. at 2].

Absent intervention, RUSCO states that it could

potentially be liable to defendant Tug Hill based on

the outcome of the case. [Id.]. Alternatively, RUSCO

argues it should be granted permissive intervention

because the enforcement of its contractual rights

share common questions of law and fact raised herein,

and an inability to participate in this lawsuit could

impair its business model and subject it to liability.

[Id.].

Defendant Tug Hill filed a Response to the Motion

to Intervene. See [Doc. 23]. Therein, defendant Tug

Hill joins in RUSCO’s request, and further argues that

RUSCO must be joined in the ongoing litigation based

App-38

on, inter alia, the language of the aforementioned

arbitration clause. [Id. at 1–2].

Plaintiff filed a Memorandum in Opposition to

Motion to Intervene [Doc. 24] advancing several

arguments against RUSCO’s intervention 1. First,

plaintiff contends that RUSCO does not have a

significantly protectible interest in this lawsuit

against defendant Tug Hill. [Id. at 8]. In support of

this position, plaintiff asserts that RUSCO’s business

model is not at issue, its interest in arbitration alone

is not significantly protectible, and it cannot be liable

for the result of this lawsuit either as a joint employer

or a potential indemnitor to defendant Tug Hill. [Id. at

8–14]. Further, plaintiff argues that resolving his

claims against defendant Tug Hill will not impair or

impede RUSCO’s alleged interests. [Id. at 16].

Further, plaintiff avers that defendant Tug Hill

adequately represents RUSCO’s alleged interest in

this matter. [Id. at 17]. As a final, alternative

argument, plaintiff contends that permissive

intervention is also inappropriate. [Id. at 18].

RUSCO filed a Reply in which it reasserts its

arguments for both intervention by right and

permissive intervention. [Doc. 30].

1 Plaintiff identifies that RUSCO is a wholly owned subsidiary

of Workrise Technologies, Inc. f/k/a RigUp, Inc., and uses the two

interchangeably. For the sake of clarity, this Court will identify

the entity as “RUSCO.”

App-39

A. RUSCO is entitled to intervention as a

matter of right.

Based on consideration of the arguments asserted

by the parties, this Court concludes that RUSCO is

entitled to intervene in this matter by right.

1.

The Motion is timely.

Turning to the first factor under the Fourth

Circuit’s analysis, the subject Motion is clearly timely.

In fact, plaintiff does not assert an argument that the

Motion is somehow untimely in his Response. Here,

plaintiff filed his original complaint on December 3,

2021. See [Doc. 1]. Defendant Tug Hill has not even

filed a responsive pleading to the complaint pending

the resolution of its Motion to Dismiss. Further, no

discovery has taken place, and this Court has yet to

issue even an initial scheduling order. Accordingly,

there can be no question that RUSCO’s motion is

timely considering these facts, and it therefore

satisfies the first prong to intervene by right.

2.

RUSCO’s Interest in this Litigation

is Significantly Protectible.

RUSCO argues that its interest in this litigation

is significantly protectible because it has a legitimate

interest in the enforcement of its arbitration

agreement with plaintiff. [Doc. 15-1 at 10]. Plaintiff

concedes that RUSCO identified at least three

interests it seeks to protect by intervening, but

plaintiff contends that none of these three interests

are “significantly protectible.” This Court disagrees.

a. The Business Model

First, and as previously mentioned, RUSCO

contends that its business model is directly challenged

App-40

by the potential outcome of this litigation. [Id. at 10–

11]. In Response, plaintiff raises virtually identical

arguments to those raised in New Mexico litigation

involving RUSCO, which were rejected by that Court.

See Martin v. Tap Rock Resources, LLC, 2022 WL

278874, at *2 (D.N.M. Jan. 31, 2022) (granting

RUSCO’s motion to intervene and rejecting the same

arguments raised by the same plaintiff’s counsel

here). 2 As the Martin court noted, “no matter how

Plaintiffs’ characterize the situation, they cannot

reasonably argue that an adverse decision would not

adversely impact RUSCO’s business model.” 2022 WL

278874, at *7. Looking at the economic realities of the

case, the Martin court recognized the significance of

2 ln fact, the Martin court noted in footnote 4:

As the Court previously recognized in Bock v. Salt Creek

Midstream LLC, “there is a growing body of intervention

jurisprudence among district courts in similar cases, with the

trend decidedly in favor of granting intervention.” 2020 WL

3989646, at *7 (D.N.M. July 15, 2020) (same Plaintiff’s counsel

as instant action) (listing several additional cases with same

Plaintiff’s counsel), adopted by 2020 WL 5640669 (D.N.M. Sept.

22, 2020); see also Becker v. Delek US Energy, Inc., 2020 WL

4604544 (M.D. Tenn. Aug. 11, 2020); Altenhofen v. S. Star

Cent. Gas Pipeline, Inc., No. 4:20CV-00030-JHM, 2020 WL

3547947, at *1 (W.D. Ky. June 30, 2020) (intervention granted to

staffing agency that employed plaintiffs pursuant to arbitration

agreements, but which was not named in FLSA class action)

(plaintiff’s counsel included Plaintiffs’ counsel in instant action);

Ferrell v. SemGroup Corporation, et al., 485 F.Supp.3d 1334

(N.D. Ok. 2020) (same) (counsel again overlap), overruled on

other grounds at 2021 WL 5576677 (10th Cir. Nov. 30, 2021);

Robertson v. Enbridge (U.S.) Inc., 2020 WL 2104911, at *1

(W.D. Pa. May 1, 2020) (same) (counsel again overlap); Snow v.

Silver Creek Midstream Holdings, LLC, 467 F.Supp.3d 1168

(D. Wyo. 2020) (same) (counsel again overlap).

App-41

RUSCO’s interest and noted “[a] determination

against Tap Rock classifying Plaintiffs as ‘employees’

and not ‘independent contractors’ would turn that

same business model on its head and arguably

threaten RUSCO’s financial security. From its

standpoint, RUSCO has asserted a financial interest

worth protecting.” Id.

Again, plaintiff makes the same rejected

arguments here. Plaintiff minimizes, but never

particularly disputes, the ongoing relationship

between himself and RUSCO, which continues after

an independent contractor accepts a project. This is

especially critical here, where defendant Tug Hill

indicated the possibility of seeking indemnification

from RUSCO based on plaintiff’s claims. See [Doc. 151 at 6].

The only law relied upon by plaintiff in his

argument against RUSCO’s interest in the litigation

is that “Tug Hill has an independent duty, separate

and apart from the duty owed by [RUSCO].” [Doc. 24

at 11]. But this contention, while correct, is not

relevant to the inquiry on the pending Motion, i.e.

whether RUSCO has a significant interest in this

dispute. Though its conclusions are broad, plaintiff’s

Response fails to demonstrate plaintiff’s claims do not

impact the contractual relationship between RUSCO

and defendant Tug Hill. In fact, defendant Tug Hill

has affirmatively confirmed RUSCO’s possible

liability based on the alleged failure of RUSCO’s

representations as to plaintiff’s independent

contractor status. See [Doc. 22].

As identified by RUSCO, the Fourth Circuit

permits intervention where, as here, the prospective

App-42

intervenor has advocated purely economic interests in

ongoing litigation. See, e.g., Feller v. Brock, 802 F.2d

722, 729–30 (4th Cir. 1986) (potential for increased

wages was sufficient interest to allow apple pickers

intervention of right in case seeking to compel United

States Department of Labor to issue permits for

foreign workers); JLS, Inc. v. Public Service

Comm’n of West Virginia, et al., 321 F.App’x 286,

289–90 (4th Cir. 2009) (potential for increased

competition was sufficient interest to support

intervention by motor transport companies in suit to

determine proper regulator for the transportation of

railroad employees.).

Plaintiff’s Response seeks to divert this Court

from this conclusion by citing two cases for the

proposition that a “vague” or “remote” possibility that

an interest may be affected is not sufficient to warrant

intervention. See [Doc. 24 at 12–13]. First, plaintiff

cites Ohio Valley Env’t Coalition v. McCarthy, 313

F.R.D. 10, 22 (S.D. W.Va. 2015) (Chambers, C.J.). In

McCarthy, the court denied the West Virginia Coal

Association’s request to intervene in an environmental

advocacy group’s litigation against the Environmental

Protection Agency because there were “too many steps

involving nebulous goals and discretion of EPA and

state agency between potential judgment in

organizations’ favor and any possible adverse

consequence to association members’ interests in

property, coal reserves, or water treatment costs from

potentially more stringent effluent limitations on

members’ national pollution discharge elimination

system (NPDES) permits.” Id. at 20. The McCarthy

court noted that “[i]n ruling on motions for

intervention of rights, courts could not function

App-43

properly if they were required to find significantly

protectable interests based on multiple layers of

contingency.” Id. at 25. This case is inopposite to the

subject analysis because there are no layers of

contingency here. Both defendant Tug Hill and

RUSCO have detailed specific and direct possible

consequence they may face as a result of the outcome

of litigation.

Plaintiff also cites Talbot 2002 Underwriting

Cap. Ld. v. Old White Charities, Inc. 2015 WL

6680892 (S.D. W.Va. Oct. 30, 2015) (Berger, J.) for the

proposition that RUSCO’s interest is too vague. [Doc.

24 at 13]. This Court is not persuaded by plaintiff’s

argument based on Talbot, where Judge Berger

granted intervention by finding the economic interest

asserted sufficient for purposes of intervention by

right. More specifically, the Talbot court found that

“if the Plaintiff succeeds in obtaining a declaratory

judgment, [intervenor] will face a greater likelihood of

claims for indemnification, and findings of the Court

in this case may limit the ability of [intervenor] to

defend such claims.” Id., at *2.

b. Arbitration

In addition to the possible effects on its business

model, RUSCO argues, throughout its briefing, that

its interest in arbitration constitutes a significantly

protectible interest. See [Doc. 15-1]. In Response,

plaintiff contends that arbitration alone is not a

significantly protectible interest and relies on a

variety of cases in support. [Doc. 24 at 13–16]. This

Court is not persuaded by plaintiff’s argument in this

regard.

App-44

Initially, and as previously discussed, arbitration

is but one of RUSCO’s asserted interests in this case.

Next, as noted in the “Legal Standards” section of this

Order, various courts in this context have found that

seeking to enforce an arbitration agreement

constitutes a significantly protectible interest thereby

warranting intervention.

Further, this Court finds the legal support offered

by plaintiff to deviate from the aforementioned

opinions to be unpersuasive. First, plaintiff cites to

Field v. Anadarko Petro. Corp., 2022 WL 203256

(S.D. Tex. Jan. 24, 2022) against intervention. There,

the Court ultimately denied RUSCO’s motion to

intervene; however, the decision in Field was based

on circumstances different from the case at bar,

because

[RUSCO did] not argue that it faces potential

liability under either a joint-employer theory

or an agreement to indemnify Anadarko.

Hinkle v. Phillips 66 Co., No. PE:20-CV00022-DC-DF, 2020 WL 10352346, at (4

(W.D. Tex. Nov. 13, 2020) (granting

intervention as a of right under similar

circumstances because, inter alia, “the

specter of joint and several liability hanging

over” the intervenor’s relationship with the

defendant warranted a “place at the table

because any liability assessed to Defendant

may have a direct impact on intervenor).”

Field, at *4. The situation here is exactly opposite,

where defendant Tug Hill has demanded indemnity

fro RUSCO, thus making the potential for RUSCO’s

liability clear.

App-45

Similarly, plaintiff cites Hiser v. Nzone

Guidance, LLC, 799 F.App’x 247 (5th Cir. 2020) in

support of its argument against intervention based on

arbitration. [Doc 24 at 8]. However, in Hiser, RUSCO

did not attempt to intervene; rather, RUSCO’s

customer attempted to enforce the arbitration

agreement as a third-party beneficiary. Id. at 248.

Here, RUSCO is seeking to intervene and enforce its

own agreement. As Hiser demonstrates, intervention

is a proper avenue for RUSCO to protect its interest in

arbitration.

c. Liability

Plaintiff argues that RUSCO cannot intervene on

the basis that it might be liable as his joint employer.

[Doc. 24 at 16]. However, defendant Tug Hill’s demand

for indemnity provides RUSCO an interest in this

litigation sufficient to intervene. See Ferrell v.

SemGroup Corp., 2020 WL 4281302, at *4 (N.D.

Okla. June 12, 2020) (granting intervention as of

right; “[Intervenor’s] potential obligation constitutes a

direct financial interest in this litigation, which may

be impaired if [intervenor] is not permitted to

intervene and defend itself”); Altenhofen v.

Southern Star Cent. Gas Pipeline, Inc., 2020 WL

3547947, at *4 (W.D. Ky. June 30, 2020) (granting

intervention as of right; “Courts agree that an

intervenor has a sufficient interest in the litigation

where it may be required to indemnify a customer”);

Bock v. Salt Creek Midstream LLC, 2020 WL

3989646 (D.N.M. July 15, 2020) (granting

intervention as of right; “[B]ecause of the specter of

potential indemnification . . . this Court finds that

[intervenor] has a sufficiently direct economic interest

App-46

in this case and impairment of its interest is possible

if intervention is denied”); Becker v. Delek US

Energy, 2020 WL 4604544, at *10 (M.D. Tenn. Aug.

11, 2020) (granting intervention as of right; find an

indemnity demand “amplified” the propriety of

intervention); Hinkle v. Phillips 66 Co., 2020 WL

10352346, at *4 (W.D. Tex. Nov. 13, 2020) (granting

intervention as of right and holding “the undersigned

finds [intervenor] has adequately stated an interest in

this suit based on potential indemnity to Defendant”).

Despite this persuasive authority, plaintiff goes

on to argue against defendant Tug Hill’s potential

indemnity case and declares “[c]ourts around the

Country (including this Court) have rejected

employers’ attempts to seek contractual contribution

or indemnification for FLSA claims.” [Doc. 24 at 17].

This argument is misplaced.

First, plaintiff cites to Gustafson v. Bell

Atlantic, 171 F.Supp. 2d 311 (S.D. N.Y. 2001). In

Gustafson, the district court, relying on Herman v.

RSR Security Services, 172 F.3d 132, 143 (2d Cir.

1999), held that even in a joint employment situation,

a claim for contractual indemnification underthe

FLSA is “still absent.” Id. at 328. However, in

Herman, the Second Circuit held only that no

common law right to indemnification or contribution

exists under the FLSA absent a contract. Herman,

172 F.3d at 144. Here, a contract exists giving rise to

the indemnification claim and defendant Tug Hill is

not claiming a common law right.

Notably, plaintiff’s citations to Fourth Circuit

precedence fair no better for his argument. In Lyle v.

Food Lion, 954 F.2d 984 (4th Cir. 1992), defendant

App-47

Food Lion filed a third-party complaint against its own

employee on the grounds that he breached his contract

with defendant Food Lion and his fiduciary duty to the

company by himself violating and allowing plaintiff

Lyle to violate company policy while under

supervision. Id. Essentially, defendant Food Lion

sought to indemnify itself for its own violation of the

FLSA by shifting the blame to its employee, which is

distinguishable from the allegations here.

Similarly, McDougal v. G & S Tobacco

Dealers, L.L.C., 712 F.Supp.2d 488 (N.D. W.Va.

2010) (Kaull, M.J.) is not persuasive. In McDougal,

the issue before the court was whether the prior

employer owed a duty to the successor employer to

defend against FLSA claims made concerning wages

paid before the business changed hands. Ultimately,

the court in McDougal granted the successor

employer’s motion for summary judgment, finding

that the original employer owed a duty of indemnity

for FLSA claims prior to the sale of the business. Id.

at 500–01.

Plaintiff’s recitation of McDougal comes from an

earlier part of the decision where the court determined

the original employer was not liable to indemnify

damages after the date of closing. In any event, this

Court is not persuaded by McDougal because RUSCO

does not need to try its case to support intervention.

Accordingly, this Court finds that RUSCO’s

potential liability in this matter weighs in favor of

intervention by right.

App-48

3.

RUSCO’s Interest Will be Impaired

Absent intervention.

As identified, a nonparty seeking intervention as

of right must establish that the instant lawsuit could

potentially impair its interests. Having found that the

litigation affects RUSCO’s interests (namely, its

business model, interest in arbitration, and potential

liability), RUSCO clearly satisfies this prong in favor

of intervention by right.

4.

Defendant

adequately

interests.

Tug

Hill

cannot

represent

RUSCO’s

Having found at least three potential interests in

this matter, this Court too finds that Defendant Tug

Hill cannot adequately represent RUSCO’s interests

in the event this Court were to disallow intervention

by right. Plaintiff argues that allowing RUSCO to

intervene would effectively render the “adequate

representation” element of the prerequisite threshold

to intervene superfluous. [Doc. 24 at 20]. Plaintiff

further states that defendant Tug Hill and RUSCO’s

interests are fundamentally aligned. [Id.]. This Court

cannot agree.

As articulated by RUSCO, a finding of liability

against defendant Tug Hill alone would implicate

RUSCO in several ways. For example, if plaintiff were

to establish liability, RUSCO could be required to

indemnify defendant Tug Hill on plaintiff’s

substantive claims. Further, if plaintiff were to

succeed on his substantive claims against defendant

Tug Hill, plaintiff could theoretically pursue RUSCO

for damages as a joint employer. In this circumstance,

plaintiff would undoubtedly make every attempt to

App-49

leverage findings of fact in this litigation in the

hypothetical RUSCO litigation, even though RUSCO

would not have had an opportunity to contest those

facts here. Moreover, if plaintiff is ultimately

unsuccessful in this litigation against Tug Hill absent

RUSCO as a party, plaintiff could theoretically pursue

virtually the same claims against RUSCO in a second

stage of litigation. Additionally, and as a practical

matter, discovery in this matter would necessarily

require disclosure of facts and circumstances surround

the signing of the independent contractor agreement

between plaintiff and RUSCO, the terms of the

agreement, the negotiations and/or discussions

between the parties, and evidence of the parties’

intent. It would also require the disclosure of the hours

work by plaintiff and the fee remitted to him, both of

which are matters known exclusively to RUSCO.

Based on the foregoing, this Court finds that

RUSCO is entitled to intervention as a matter of right

pursuant to Fed. R. Civ. Pro. 24(a).

B. Even

assuming

arguendo

that

intervention by right is improper,

RUSCO would be entitled to permissive

intervention.

The parties agree that in order to permissibly

intervene, a non-party must timely show either that it

has a conditional right to intervene by a federal

statute, or that it has a claim or defense that shares a

common question of law or fact with the main action.

See Fed. R. Civ. Pro. 24(b). In exercising its discretion

to permit a party to intervene, “the court must

consider whether the intervention will unduly delay or

prejudice the adjudication of the original parties’

App-50

rights.” Fed. R. Civ. Pro. 24(b)(3). “[A] challenge to the

court’s discretionary decision to deny leave to

intervene must demonstrate a clear abuse of

discretion in denying the motion.” N. Carolina State

Conf. of NAACP v. Berger, 999 F.3d 915, 938 (4th

Cir. 2021) (quoting McHenry v. Comm’r, 677 F.3d

214, 219 (4th Cir. 2012)).

Here, RUSCO does not claim it has a conditional

right to intervene by federal statute. See [Doc. 15-1 at

15–16]. Instead, RUSCO’s timely motion asserts,

correctly, that intervention in this matter will not

prejudice either party, and that the matter involves

common questions of fact and law–namely, whether

plaintiff is an independent contractor under the FLSA.

Plaintiff and Rusco have a written contractual

agreement on this very issue, and finds on that

question could potentially subject RUSCO to liability

as either a joint employer or indemnitor. Accordingly,

and in addition to intervention by right, RUSCO is

entitled to permissive intervention.

II. Defendant Tug Hill’s Motion to Dismiss

Defendant Tug Hill asserts this matter should be

dismissed based on Fed. R. Civ. P. 12(b)(1), 12(b)(6),

and 12(b)(7). This Court will examine each basis for

dismissal in turn.

A. Dismissal pursuant to Fed. R. 12(b)(1) is

warranted because plaintiff entered into

a valid and enforceable arbitration

agreement covering the claims at issue

in this case.

Defendant Tug Hill begins its argument by

asserting that plaintiff voluntarily agreed to pursue

any disputes in arbitration arising out of his

App-51

relationship with RUSCO or the work performed for

the benefit of defendant Tug Hill. [Doc. 22 at 12–13].

Plaintiff counters by asserting that plaintiff never

agreed to arbitrate his claims against defendant Tug

Hill when he entered into the subject agreement with

RUSCO concerning arbitration. [Doc. 31 at 6–7].

Moreover, plaintiff contends that the language in

RUSCO’s arbitration agree does not confer upon

defendant Tug Hill the right to compel arbitration. [Id.

at 7].

1.

Arbitration in the Fourth Circuit

This Court notes that arbitration, for better or

worse, is highly favored by federal courts. Adkins v.

Labor Ready, Inc., 303 F.3d 496, 500 (4th Cir. 2002)

(citing Moses H. Cone Mem’l Hosp. v. Mercury

Constr. Corp., 460 U.S. 1, 24 (1983). “Motions to

compel arbitration . . . should not be denied unless it

may be said with positive assurance that the

arbitration clause is not susceptible of an

interpretation that covers the asserted dispute.

Doubts should be resolved in favor of coverage.”

Zandford v. Prudential-Bache Sec., Inc., 112 F.3d

723, 727 (4th Cir. 1997) (citations omitted). Unless the

“scope of the arbitration clause is open to question, a

court must decide the question in favor of arbitration.”

Peoples Sec. Life. Ins. Co. v. Monumental Life Ins.

Co., 867 F.2d 809, 812 (4th Cir. 1989) (citing United

Steelworkers of Am. v. Warrior & Gulf

Navigation Co., 363 U.S. 574, 582 (1960)). The

“liberal

federal

policy

favoring

arbitration

agreements” applies equally in the employment

context. Cf. Shadahan v. Macy’s Corp. Servs., LLC,

App-52

2021 WL 4304698, at *2 (N.D. W.Va. Sept. 21, 2021)

(Groh, C.J.).

Courts in the Fourth Circuit look to see if the

party seeking to compel arbitration can satisfy each of

the following four factors: (1) whether there is a

dispute between the parties; (2) whether there exists

a written agreement that includes an arbitration

provision which purports to cover the dispute; (3) the

relationship of the transaction, which is evidence by

the agreement, to interstate or foreign commerce; and

(4) the failure, neglect or refusal of [a party] to

arbitrate the dispute. Id., at *2 3. When a court

considers these factors, it must be “mindful of the

‘clear federal directive in support of arbitration.’” See

Hightower v. GMRI, Inc., 272 F.3d 239, 241 (4th Cir.

2001).

2.

The Claims at Issue

Plaintiff’s agreement to arbitrate with RUSCO

expressly states that “every dispute arising in

connection with these Terms will be resolved by

binding arbitration. . . . This agreement to arbitrate

disputes includes all claims arising out of or relating

to any aspect of these Terms. . . .” See [Doc. 15-6].

Courts have found the use of these key phrases–

“every dispute” and “arising out of”–evidences the

parties’ intent to give their arbitration clause an

expansive reach. See Polyflow, LLC v. Specialty

RTP, LLC, 993 F.3d 295, 303–04 (5th Cir. 2021)

3 This Order does not address the first and fourth factor, as the

satisfaction of these considerations is evidenced by the simple

fact that plaintiff has filed a complaint against defendant Tug

Hill.

App-53

(finding that “arising out of” demonstrated that the

arbitration clause had expansive reach); Altenhofen

v. Southern Star Central Gas Pipeline, Inc., 2020

WL 6877575, at *6 (W.D. Ky. Nov. 23, 2020) (finding

that an agreement to arbitrate “all claims that have

arisen or will arise out of Employee’s employment with

or termination from [his employer]” encompassed

FLSA claims that were later prused not against the

employer but against its customer); Snow v. Silver

Creek Midstream Holdings, LLC, 467 F.Supp.3d

1168, 1170 (D. Wyo. 2020) (same).

Here, without entering into the independent

contractor agreement, which expressly incorporates

the terms of service including the arbitration

provision, plaintiff would not have performed work on

defendant Tug Hill’s projects through RUSCO. This

agreement not only services as the condition precedent

to work with customers, like defendant Tug Hill, who

contract with RUSCO; it also defines all of the parties’

respective commitments, rights, and obligations

related to the performance of that work. For example,

with regard to his classification, the agreement

provides: “[RUSCO] and you intend for you to provide

services to [defendant Tug Hill] strictly as an

independent professional and not as an employee,

worker, agent, joint venture, partner, or franchisee of

[RUSCO] or [Tug Hill].” See [Doc. 15-4]. With regard

to his compensation for services rendered, “[t]he fee

charged to [defendant Tug Hill] on your behalf shall

be the fee described in the Project Details unless you

and [defendant Tug Hill] notify [RUSCO] in writing

prior to the completion of the Project that you and

[defendant Tug Hill] have negotiated a different fee. .

. . [RUSCO’s] role in the payment process is solely

App-54

limited to payment processing and transmission

between you and [defendant Tug Hill]. [Id.]. Plaintiff

even agreed to indemnify defendant Tug Hill if a court

were to find that he was–as he now alleges–an

employee. [Id.]. Most notably, the terms of service

provided a mechanism to resolve disputes over these

commitments, rights, and obligations–plaintiff agreed

that every dispute arising in connection with these

terms would be resolved by binding arbitration.

According to the Supreme Court of the United

States, even if there is ambiguity as to the scope of the

arbitration provision, the ambiguity must be resolved

in favor of arbitration. See Moses H. Cone Mem’l

Hosp. v. Mercury Constr. Corp., 460 U.S. 1, 24–25

(1983) (explaining that “[a]ny doubts concerning the

scope of arbitrable issues should be resolved in favor

of arbitration,” including questions about the

“construction of the contract language itself”).

Here, plaintiff’s claim arises out of work

performed through RUSCO on defendant Tug Hill’s

projects. Plaintiff’s agreement to the aforementioned

terms, including the arbitration provision, was a

precondition to the performance of work on defendant

Tug Hill’s projects. Thus, the claims that relate or

refer to the work that plaintiff performed or the terms

under which he agreed to perform such work are

subject to arbitration.

3.

Interstate Commerce

The arbitration agreement here also evidences a

transaction involving interstate commerce. The

Supreme Court of the United States has broadly

interpreted the Federal Arbitration Act’s requirement

that, to fall within its purview, a contract must

App-55

“evidence a transaction involving commerce.” 9 U.S.C.

§ 2. “The word ‘involving,’ the Supreme Court said, is

indeed the functional equivalent of ‘affecting.’” See

King v. IBEX Glob., 2015 WL 6159492 (S.D. W.Va.

Oct. 20, 2015) (Goodwin, J.) (citing Allied-Bruce

Terminix Cos. v. Dobson, 513 U.S. 265, 274 (1995)).

Congress thus intended to “provide for the

enforcement of arbitration agreements within the full

reach of the Commerce Clause.” Perry v. Thomas,

482 U.S. 483, 490 (1987).

Here, plaintiff has indisputably alleged a link to

interstate commerce by averring that he worked for

defendant Tug Hill in Marshall and Wetzel Counties

in West Virginia, that defendant Tug Hill is a “Texas

company,” and that plaintiff was engaged in commerce

or in the production of goods for commerce. Here, it

would seem, that defendant Tug Hill has clearly

satisfied the aforementioned factors to warrant

compelled arbitration.

B. Plaintiff’s

valid

and

enforceable

arbitration

agreement

delegates

threshold questions of arbitrability to

the arbitrator.

The Supreme Court of the United States instructs

that “if a valid agreement exists, and if the agreement

delegates the arbitrability issue to an arbitrator, a

court may not decide the arbitrability issue.” Henry

Schein, Inc. v. Archer and White Sales, Inc., 139

S.Ct. 524, 530 (2019). This is so even in extreme cases

where “the court thinks that the argument that the

arbitration agreement applies to a particular dispute

is wholly groundless.” Id. at 529.

App-56

Here, the arbitration provision found in the terms

of service contains an express delegation clause,

stating “[t]he arbitrator has exclusive authority to

resolve any dispute relating to the interpretation,

applicability, or enforceability of this binding

agreement.” [Doc. 15-6]. This Court declines to usurp

the parties’ delegation of authority in this respect.

In support of this conclusion, this Court finds the

opinion of Judge Volk highly persuasive. “Our Court

of Appeals and a majority of its colleague tribunals

have held that the incorporation of the American

Arbitration Association Rules or similar” constitutes

the “clear and unmistakable” evidence required to

conclude that the parties agreed to have an arbitrator

decide issues of arbitrability. Brown v. Equitrans

Midstream Corp., 2020 WL 7409533, at *7 (S.D. W.

Va. Dec. 17, 2020) (Volk, J.) (citations omitted).

According to Judge Volk, a clause providing that the

arbitration panel “shall have exclusive authority to

resolve disputes of any kind or nature, including

enforcement of this Arbitration Agreement” is an

“explicit directive reserving questions of arbitrability

to the arbitrator.” Id. at 11.

Here, because the parties have expressly

delegated threshold questions to the arbitrator, this

Court is of the opinion to grant defendant Tug Hill’s

Motion to Dismiss and to compel arbitration.

C. Defendant Tug Hill does not need to be a

signatory for the threshold question of

arbitrability to be delegated.

In consideration of the arguments asserted by the

parties and the respective authorities associated

therewith, this Court finds that the fact defendant

App-57

Tug Hill is not a signatory to the independent

contractor agreement to be of no moment. “[T]he

question of whether a purported nonsignatory can

enforce an arbitration agreement concerns a question

of arbitrability and, thus, must be decided by the

arbitrator.” Grabowski v. PlatePass, LLC, 2021 WL

1962379, at *4 (N.D. Ill. May 17, 2021) (citing Swiger

v. Rosette, 989 F.3d 501, 507 (6th Cir. 2021);

Eckert/Wrodell Architects v. FJM Props. of

Willmar, LLC, 756 F.3d 1098, 1110 (8th Cir. 2014)).

To be clear, numerous courts have had

opportunity to consider whether a delegation clause

applies to non-signatories. In Robertson v. Enbridge

(U.S.) Inc., 2020 WL 5751641, at *5 (W.D. Pa. July

31, 2020), report and recommendation adopted, 2020

WL 5702419 (Sept. 24, 2020), the court emphatically

rejected the assertion to the contrary:

This Court is unpersuaded by Plaintiff’s

arguments which would necessarily require

the Court to do an end run around their

agreements with [the inspection company]

and deprive the [inspection company] of the

benefit of its bargain. Instead of initially

suing [the inspection company], Plaintiffs sue

[the customer of the inspection company].

Plaintiff may only recover against [the

customer] if they can show that it acted as the

Plaintiffs’ ‘joint employer’ under the FLSA

and was responsible for [the inspection

company]’s alleged failure to pay overtime.

Yet, Plaintiffs attempt to downplay their

relationship with [the inspection company] in

an apparent effort to avoid their agreement to

App-58

arbitrate. In light of Henry Schein and the

clear language of the Arbitration Agreement,

whether [the customer] may enforce the

Arbitration Agreement against Plaintiffs is a

question for the arbitrator.

See also Doucet v. Boardwalk Pipelines, L.P., 2021

WL 3674975 (S.D. Tex. Mar. 18, 2021) (finding that

the question of whether a non-signatory could enforce

the arbitration agreement was one of arbitrability

which had been delegated to the arbitrator);

Altenhofen v. Energy Transfer Partners, LP, 2020

WL 7336082, at *1 (W.D. Pa. Dec. 14, 2020) (holding,

in FLSA case where plaintiffs sued non-signatory

client of their employer: “[w]hether [client defendant]

may enforce the agreements, as a non-signatory, is a

question reserved for arbitration,” and that “Plaintiffs

cannot avoid their arbitration agreements by omitting

claims against CIS, CEM-TIR or any like ‘staffing’

company”); Snow v. Silver Creek Midstream

Holdings, LLC, 467 F.Supp. 3d 1168, 1170 (D. Wyo.

2020) (holding that the worker’s arbitration

agreement “as a matter of law . . . covers [the worker’s]

claim against [defendant],” even though defendant

was a non-signatory, because the claim arose out of his

employment).

In determining that defendant Tug Hill can

enforce the independent contractor agreement and the

arbitration provision therein, this Court is required to

examine state law contract principles. 4 First Options

4 Courts should “apply ordinary state law principles that

govern the formation of contracts . . . and the federal substantive

law of arbitrability.” Int’l Paper Co. v. Schwabedissen

Maschinen & Anlagen GMBH, 206 F.3d 411, 417 n.4 (4th Cir.

App-59

of Chicago, Inc. v. Kaplan, 514 U.S. 938, 944 (1995);

Hightower v. GMRI, Inc., 272 F.3d 239, 242 (4th Cir.

2001); Hightower v. GMRI, Inc., 272 F.3d 239, 242

(4th Cir. 2001).

Here, the independent contractor agreement does

not contain a choice of law or venue provision.

Accordingly, this Court must determine which law

applies to the contract enforcement question, just as it

would if this Court’s jurisdiction was based on

diversity of citizenship. Since the case was filed in

federal court in West Virginia, West Virginia’s choice

of law principles for contracts dictate which state law

applies. See Klaxon Co. v. Stentor Elec. Mfg. Co.,

313 U.S. 487, 496 (1941), superseded by statute on

other grounds.

The Supreme Court of Appeals of West Virginia

states that in contract cases: “[o]ur traditional

contract conflict rule gives substantial deference to the

state where the contract is made and where it is to be

performed, assuming both incidents occurred in the

same state.” Joy v. Chessie Employees Fed. Credit

Union, 186 W.Va. 118, 411 S.E.2d 261 (1991). The

rule is subject to two qualifications: (1) that the parties

have not made a choice of applicable law in the

contract itself; and (2) the law of the other state does

not offend West Virginia’s public policy. Id.

Here, plaintiff electronically signed the

arbitration agreement and subsequently performed

work in West Virginia. When the subject dispute

2000). In other words, federal substantive law applies to

questions of arbitrability, while state law governs questions of

contract formation.

App-60

emerged, he sought relief in federal court in West

Virginia. Therefore, West Virginia law should govern

whether defendant Tug Hill, a non-signatory, can

enforce the arbitration agreement.

1.

Defendant Tug Hill is a third-party

beneficiary to the underlying

agreement.

Third-party beneficiaries have standing to recover

under a contract clearly intended for their benefit.

West Virginia law provides that if a “covenant or

promise be made for the sole benefit of a person with

whom it is not made . . . such person may maintain, in

his own name, any action thereon which he might

maintain in case it had been made with him only, and

the consideration had moved from him to the party

making such covenant or promise.” W.Va. Code § 558-12. See Ohio Cty. Dev. Auth. v. Pederson &

Pederson, Inc., 2010 WL 391616 (N.D. W.Va. Jan. 26,

2010) (Stamp, J.) (refusing to dismiss on standing

grounds where it was alleged that the defendant

contractor would provide services and materials to

another contractor for the benefit of plaintiff-owner).

Even if a contract is not made specifically for the

benefit of a non-party, the non-party may enforce it

where the surrounding circumstances suggest that

there was no other reason for the contract to have been

made. Hatfield v. Wilson, 2012 WL 2888686, at *3

(S.D. W.Va. July 13, 2012) (Chambers, J.).

Furthermore, the contract does not need to be

made only for the benefit of the third-party

beneficiary; rather, a party may be a third-party

beneficiary to a contract if the contract was made and

intended to be for the benefit of a class of persons

App-61

definitely and clearly shown to come within the terms

of the contract and the third-party beneficiary party is

a member of that class. Slone v. State Auto Prop. &

Cas. Ins. Co., 2021 WL 190938 (S.D. W.Va. Jan. 19,

2021) (Copenhaver, J.) (finding that a provision in an

insurance contract allowing for recovery of medical

expenses in the event of injury on property owner’s

premises benefitted the non-policy holding guest

injured on the property). 5

Here, the independent contractor agreement

demonstrates an intent to make defendant Tug Hill a

third-party beneficiary. 6 The very first sentence in the

independent contractor agreement establishes as

much. “This Agreement . . . constitutes a binding

agreement . . . to provide freelance services to third

party companies (each a ‘Company’ or collectively the

‘Companies’)” with whom RUSCO contracted. [Doc.

15-4]. Moreover, defendant Tug Hill is provided

numerous rights and benefits by virtue of the

5 The parties, as well as RUSCO, are engaged in a quibble as to

whether West Virginia law or Texas law should apply on this

point. While this Court has found that West Virginia law governs,

the same result would be reached in the event this Court were to

apply Texas law. See First Bank v. Brumitt, 519 S.W.3d 95, 102

(Tex. 2017) (finding where the signatories intended to secure a

benefit to a third party and entered into a contract for the third

party’s benefit, the third party may enforce the agreement as a

third-party beneficiary).

This Court finds plaintiff’s reliance on Hiser v. Nzone

Guidance, LLC, 799 F.App’x 247 (5th Cir. 2020) in an attempt

to refute this finding to be unpersuasive. Notably, that case is

distinguishable because RUSCO did not attempt to intervene and

the client there, Nzone Guidance, LLC, raised different

arguents–most notably, the issue of arbitrability was not even

before the court.

6

App-62

agreement, which only defendant Tug Hill could

enforce, including work performance, indemnification

rights, and rights related to confidentiality. [Id.].

Because the independent contractor agreement

provides

specific–and

significant–benefits

to

defendant Tug Hill, it is a third-party beneficiary

under West Virginia law. Accordingly, defendant Tug

Hill should be permitted to enforce plaintiff’s

agreement to resolve “every dispute” arising out of his

work on defendant Tug Hill projects, through RUSCO,

in binding arbitration. 7 8

CONCLUSION

For the foregoing reasons, the Motion to Intervene

[Doc. 15] is GRANTED. The Clerk is instructed to

note RUSCO Operating, LLC as a defendant party in

this matter. Additionally, defendant Tug Hill

Operating, LLC’s Motion to Dismiss Plaintiff’s

Complaint Pursuant to Federal Rules of Civil

Procedure 12(b)(1), (6), and (7) [Doc. 21] is

GRANTED. Accordingly, this matter is hereby

DISMISSED, and the parties are hereby

7 Defendant Tug Hill also raises the argument that the doctrine

of estoppel prevents plaintiff from circumventing his obligation

to arbitrate wage and hour claims. See [Doc. 22 at 24]. Having

found arbitration required and appropriate on the other grounds

addressed herein, this Court need not evaluate the propriety of

this argument.

8 Defendant Tug Hill argues that the above-captioned matter

should be subject to dismissal for plaintiff’s failure to join an

indispensable party pursuant to Fed. R. Civ. Pro. 12(b)(7).

Having granted RUSCO’s Motion to Intervene, this argument is

moot.

App-63

COMPELLED TO ARBITRATION for resolution of

the subject claims.

It is so ORDERED.

The Clerk is directed to transmit copies of this

Order to all counsel of record in this matter.

DATED: April 12, 2022.

/s/ John Preston Bailey

John Preston Bailey

United States District Judge

App-64

Appendix C

AGREEMENT BETWEEN INDEPENDENT

PROFESSIONAL & RIGUP FOR USE OF

RIGUP SERVICE

This

Agreement

Between

Independent

Professional & RigUp For Use Of RigUp Service (the

“Agreement”) constitutes a binding agreement

between you, an independent professional (“you”) and

RUSCO Operating, LLC, a wholly owned subsidiary of

RigUp, Inc. (“RigUp” “us” or “we”) governing your use

of the Service (as defined in the RigUp Terms of

Service at https://www.rigup.com/tos) to provide

freelance services to third party companies (each a

“Company” or collectively the “Companies”). You

hereby agree: (a) to comply with this Agreement; and

(b) that you have read, understand, and agree to (i) the

RigUp

Terms

of

Service

located

at

https://www.rigup.com/tos (“Terms”), (ii) the RigUp

Privacy

Policy

located

at

https://www.rigup.com/privacy (the “Privacy Policy”),

each of which are incorporated into this Agreement by

reference. If there is a conflict between this Agreement

and the Terms or Privacy Policy, then this Agreement

will govern with respect to the conflicting terms only.

Capitalized terms used but not defined in this

Agreement have the meaning specified in the Terms.

The parties hereby agree as follows:

1. Independent Professional. By signing this

Agreement, you are asserting that you are an

independent professional and entrepreneur

who wishes to: (a) digitize and modernize your

business; (b) be introduced to new clients by

App-65

RigUp; and (c) engage RigUp for its Service to

accomplish these entrepreneurial goals.

2. General. RigUp provides the Service to digitize

and market your business, including connecting

you with Companies. RigUp does not provide

professional services. RigUp offers information

and a method for Companies to obtain, and you

to provide, services, but does not and does not

intend to provide such services. RigUp and you

intend for you to provide services to Companies

strictly as an independent professional, and not

as an employee, worker, agent, joint venture,

partner or franchisee of RigUp or any Company

for any purpose.

3. Project.

1. From time to time, Companies will post

proposed projects via the Service, setting

forth the nature of the services required (the

“Project”). A Project proposed may include

desired skills, location, date, start time (as

applicable), project length (as applicable),

proposed pay rate, invoicing terms and any

required certifications (“Project Details”). If

a Project becomes available in the location

you have indicated on the Service, then you

may be notified of the availability of the

Project via the Service. You may express

interest in such Project and if the Company

accepts your expression of interest, then you

will be notified via the Service and you will

be responsible for completing the Project at

App-66

the time, on the date, and at the place

specified in the Project Details, unless

otherwise agreed between you and the

Company. RigUp does not guarantee any

minimum number of Projects will be

available to you at any time during the term

of this Agreement.

2. You agree that your name, phone number,

and other contact information will be made

available to Company by RigUp after the

Project is confirmed. Projects may not last

for as long as originally set forth in the

Project Details.

3. RigUp is here to serve you – not vice-versa.

Accordingly, RigUp has no control or any

right to determine (a) when you use the

Service, (b) if and when you log into the

Service, (c) for which Projects you express

interest or accept, if any, (d) what you

charge for Projects (unless you fail to

designate a fee, in which case the default fee

is used), and (e) the manner or means by

which you complete Projects. You and the

Company solely negotiate and determine (x)

when and where you perform Projects, (y)

what you wear while performing projects,

and (z) any additional bonuses or gratuities

arising out of such Projects. You are solely

responsible for costs or expenses incurred by

you in connection with the performance of

Projects.

App-67

4. Fees. The fee charged to a Company on your

behalf shall be the fee described in the Project

Details unless you and the Company notify

RigUp in writing prior to the completion of the

Project that you and the Company have

negotiated a different fee (“Professional Fee”).

Separate from, or in addition to, the

Professional Fee, RigUp may also charge a fee

for using the Services. You are responsible for

the costs of any background checks, drug tests,

or other similar expense items required by

Companies in order for you to work on a Project,

and such fees shall be deducted from any

amounts owed to you. Unless otherwise

directed by you in writing, RigUp will invoice

the Company on your behalf for the

Professional Fee according to the terms agreed

to in the Project Details. RigUp will forward you

the Professional Fee minus RigUp’s service

charge for your use of the Service (the “Service

Fee”). The Service Fee shall be a percentage of

the invoice amount. The applicable percentage

can be found in your onboarding packet for the

applicable project, unless you and RigUp

negotiate and memorialize in a signed writing a

different service charge. RigUp’s role in the

payment process is solely limited to payment

processing and transmission between you and

the Company. Accordingly, you accept the sole

risk that a Company will not pay the

Professional Fee for Projects completed.

5. Interactions

with

Companies.

Any

interactions or disputes between you and a

App-68

Company are solely between you and that

Company. RigUp and its licensors shall have no

liability, obligation or responsibility for any

interaction between you and any Company.

6. License. You grant RigUp a license to use your

name, image, voice and/or likeness in

connection with RigUp’s Services to advertise

and promote the Service, in order to identify

you to Companies, and for any other purpose

deemed appropriate by RigUp in its reasonable

discretion (except to the extent prohibited by

law).

7. Text Messaging. You agree to RigUp’s sending

SMS text messages directly to you in order to

facilitate the performance of Projects. Standard

call or message charges or other charges from

your phone carrier may apply to calls or text

(SMS) messages RigUp sends to you. You may

opt-out of receiving text (SMS) messages from

RigUp by replying with the word "STOP" to a

text message from RigUp, but you acknowledge

that opting out of text (SMS) messages may

impact your ability to use the Service.

8. Relationship. Neither this Agreement, nor

your completion of Projects will create an

association, partnership, joint venture, or

relationship of principal and agent, master and

servant, or employer and employee, between

you and RigUp. Without limiting the generality

of the foregoing, you are not authorized to bind

RigUp to any liability or obligation or to

App-69

represent that you have any such authority.

You acknowledge and agree that you are

obligated to report as income all compensation

received by you from Companies arising out of

or related to the Service. You agree to and

acknowledge the obligation to pay all selfemployment and other taxes on such income.

9. Representations and Warranties. You

represent and warrant to RigUp that (a) you

have the legal right to perform Projects as

contemplated by this Agreement in the United

States, (b) you are fully-licensed and/or certified

(to the extent required by law) and authorized

to complete Projects within the jurisdiction in

which you intend to work, and have the

required skill, experience, and qualifications to

complete Projects, (c) you will perform Projects

in a professional and diligent manner in

accordance with best industry standards for

similar services, and (d) you will perform

Projects in accordance with all applicable laws,

rules, and regulations. You affirm under

penalty of perjury that you are an incorporated

entity or sole proprietorship that operates an

independent business performing work the

same as or similar to the Projects offered via the

Service and, prior to engaging RigUp for the

Service, you had multiple clients for which you

performed projects the same as or similar to the

Projects offered via the Service. As an

independent professional, you are assuming the

responsibilities of an employer for the

performance of a Project, and you hereby affirm

App-70

you are not entitled to, and are hereby waiving,

any claim for workers compensation benefits

under either RigUp’s or a Company’s workers’

compensation insurance policy.

10. Indemnification. You will indemnify and hold

the RigUp Parties and Company harmless from

and against all losses, damages, liabilities,

deficiencies, actions, judgments, interest,

awards, penalties, fines, costs or expenses

(including reasonable legal fees) arising out of

or resulting from (a) bodily injury, death of any

person, theft or damage to real or tangible,

personal property resulting from your acts or

omissions, (b) bodily injury, death or property

damage suffered by you or your employees, (c)

your breach of any representation or warranty

in this Agreement, (d) any negligent, reckless or

intentionally wrongful act by you or your

assistants, employees, contractors or agents, (e)

a determination by a court or agency that you

are an employee of RigUp or a Company, or (f)

any claim by a Company arising from or related

to you or your assistants, employees,

contractors or agents services for such

Company.

11. Disclaimer. You are solely responsible for

completing Projects. RigUp is not responsible or

liable for the actions or inactions of a Company

or other third party in relation to Projects as

completed by you. You understand, therefore,

that by using the Service, you will be introduced

to third parties for whom RigUp has not

App-71

conducted any background check, that may be

potentially dangerous, and that you use the

Service at your own risk. RIGUP HAS BEEN

ENGAGED

BY

COMPANIES

TO

INTRODUCE YOU TO THEM FOR THE

PURPOSES OF COMPLETING PROJECTS.

RIGUP

WILL

NOT

ASSESS

THE

SUITABILITY, LEGALITY OR ABILITY OF

ANY PROJECTS OR COMPANIES AND YOU

EXPRESSLY WAIVE AND RELEASE RIGUP

FROM ANY AND ALL LIABILITY, CLAIMS

OR DAMAGES ARISING FROM OR IN ANY

WAY

RELATED

TO

PROJECTS

OR

COMPANIES. RIGUP WILL NOT BE A

PARTY TO DISPUTES OR NEGOTIATIONS

OF DISPUTES, BETWEEN YOU AND

COMPANIES. RESPONSIBILITY FOR THE

DECISIONS YOU MAKE REGARDING

PROJECTS OFFERED VIA THE SERVICE

(WITH ALL THEIR IMPLICATIONS) RESTS

SOLELY WITH YOU. RIGUP WILL NOT

ASSESS THE SUITABILITY, LEGALITY OR

ABILITY OF ANY SUCH THIRD PARTIES

AND YOU EXPRESSLY WAIVE AND

RELEASES RIGUP FROM ANY AND ALL

LIABILITY, CLAIMS, CAUSES OF ACTION,

OR DAMAGES ARISING FROM YOUR USE

OF THE SERVICE, OR IN ANY WAY

RELATED TO THE THIRD PARTIES

INTRODUCED TO YOU BY THE SERVICE.

12. Term; Termination. This Agreement will be

effective as of the date you indicate your

acceptance by clicking “I AGREE”, and will

App-72

remain in effect until terminated as set forth in

this Section. You or RigUp may terminate this

Agreement by deleting your account on the

Service, with or without notice. Sections 1, 2,

and 8 – 16 will survive termination of this

Agreement.

13. Assignment. You may not assign this

Agreement without RigUp’s prior, written

consent. RigUp may assign its rights and

obligations under this Agreement at any time.

14. Dispute Resolution. You acknowledge and

agree that the terms of this Agreement are

subject to Section 24 of the Terms.

15. Confidential Information. You must keep

RigUp’s confidential information absolutely

confidential, except as required or provided by

law, including but not limited to information

about other Companies, Projects, Project

Details and RigUp’s business model. This

section does not apply to information that: (a)

was publicly known and made generally

available in the public domain prior to the time

of disclosure by RigUp; (b) becomes publicly

known and made generally available after

disclosure by RigUp to you through no action or

inaction on your part, (c) is already in your

possession at the time of disclosure, as shown

by your files and records; or (d) is obtained by

you from a third party without a breach of the

third party’s obligations of confidentiality.

App-73

16. Miscellaneous. If any provision of the

Agreement is held to be invalid or

unenforceable, such provision shall be struck

and the remaining provisions will be enforced to

the fullest extent under law. RigUp’s failure to

enforce any right or provision in this Agreement

will not constitute a waiver of such right or

provision unless acknowledged and agreed to by

RigUp in writing. This Agreement, with the

Terms and the Privacy Policy, comprises the

entire agreement between you and RigUp and

supersedes all prior or contemporaneous

negotiations, discussions or agreements,

whether written or oral, between the parties

regarding the subject matter contained in this

Agreement.

App-74

Workrise™

Digital Record of Independent Professional

Agreement Acceptance

Name

Lastephen

Email

stevodrillingconsultant93@yahoo.com

Sign Up

January 25, 2019

On January 25, 2019, Lastephen C. Rogers reviewed

and agreed to the Workrise Independent Professional

Agreement (Version 2) through the Workrise platform.

App-75

Appendix D

EXCERPTS FROM TERMS OF SERVICE

*

*

*

24. Dispute Resolution and Arbitration

a. Generally. In the interest of resolving disputes

between you and RigUp in the most expedient and cost

effective manner, you and RigUp agree that every

dispute arising in connection with these Terms will be

resolved by binding arbitration. Arbitration is less

formal than a lawsuit in court. Arbitration uses a

neutral arbitrator instead of a judge or jury, may allow

for more limited discovery than in court, and can be

subject to very limited review by courts. Arbitrators

can award the same damages and relief that a court

can award. This agreement to arbitrate disputes

includes all claims arising out of or relating to any

aspect of these Terms, whether based in contract, tort,

statute, fraud, misrepresentation, or any other legal

theory, and regardless of whether a claim arises

during or after the termination of these Terms. YOU

UNDERSTAND AND AGREE THAT, BY ENTERING

INTO THESE TERMS, YOU AND RIGUP ARE EACH

WAIVING THE RIGHT TO A TRIAL BY JURY OR

TO PARTICIPATE IN A CLASS ACTION.

*

*

*

h. Enforceability. The arbitrator has exclusive

authority to resolve any dispute relating to the

interpretation, applicability, or enforceability of this

binding arbitration agreement. If Section 24.f. is found

to be unenforceable or if the entirety of this Section 24

is found to be unenforceable, then the entirety of this

Section 24 will be null and void, the remaining

App-76

provisions of these Terms will remain in effect in

accordance with Section 26, and the exclusive

jurisdiction and venue described in Section 23 will

govern any action arising out of or related to these

Terms.

*

*

*

This is a copy of a public record, reproduced as it was published. It is not legal advice, and it may not be the version a court would rely on. Check the official source before you cite it.

A word about cookies

We need a few to keep you signed in and the library working. The rest help us see which pages people use and where they get stuck. They stay off unless you say yes.