Opposition Brief — Interim Storage Partners, LLC, Petitioner v. Texas, et al.
Supreme Court briefAug 21, 2024
Ask Donna
What actually matters in this document.
Text
Nos. 23-1300 and 23-1312
In the Supreme Court of the United States
UNITED STATES NUCLEAR REGULATORY COMMISSION AND
UNITED STATES OF AMERICA, PETITIONERS
v.
STATE OF TEXAS, ET AL.
INTERIM STORAGE PARTNERS, LLC, PETITIONER
v.
STATE OF TEXAS, ET AL.
ON PETITIONS FOR A WRIT OF CERTIORARI
TO THE UNITED STATES COURT OF APPEALS
FOR THE FIFTH CIRCUIT
BRIEF IN OPPOSITION FOR THE STATE
RESPONDENTS
KEN PAXTON
Attorney General of Texas
BRENT WEBSTER
First Assistant Attorney
General
OFFICE OF THE
ATTORNEY GENERAL
P.O. Box 12548 (MC 059)
Austin, Texas 78711-2548
AARON L. NIELSON
Solicitor General
Counsel of Record
LANORA C. PETTIT
Principal Deputy Solicitor
General
BENJAMIN W. MENDELSON
Assistant Solicitor General
J. ANDREW MACKENZIE
Assistant Attorney General
Aaron.Nielson@oag.texas.gov
(512) 936-1700
Counsel for State Respondents
QUE STIONS P RES ENTED
The Nuclear Regulatory Commission, an independent agency already insulated from executive oversight,
asks this Court to hold that its own rules insulate it from
judicial review of its compliance with a legislative mandate on where to store the nation’s nuclear waste—a
question Congress has already answered. Indeed, decades ago, Congress denied the Commission’s former
chairman’s request for the very authority the Commission now claims. The questions presented are:
1. Whether the State whose very land, water, and air
stand to be polluted by spent nuclear waste may challenge a license to store that waste either as a “party aggrieved” under, or in accord with an ultra vires exception
to, the Administrative Orders Review Act, commonly
called the Hobbs Act. 28 U.S.C. §2344.
2. Whether the Atomic Energy Act and the Nuclear
Waste Policy Act, which never mention temporary offsite
storage of spent nuclear fuel by private parties, nonetheless authorize the Commission to license such a facility,
notwithstanding Congress’s express command that the
nation’s nuclear waste is to be stored in Yucca Mountain,
Nevada.
(I)
TABL E OF C O NTENTS
Page
Questions Presented .......................................................... I
Table of Authorities ........................................................ III
Introduction ........................................................................ 1
Statement ............................................................................ 2
I. Statutory Background ........................................... 2
II. ISP’s Application and License for a
“Consolidated Interim Storage Facility” ............. 5
III. Proceedings in the Court of Appeals .................... 6
Reasons for Denying the Petition .................................... 8
I. Whether the Rarely Litigated Hobbs Act
Contains an Ultra Vires Exception Does Not
Merit the Court’s Attention................................... 8
A. This is a poor vehicle to resolve whether
there is an ultra vires exception to the
Hobbs Act .......................................................... 8
B. In applying the ultra vires “exception,”
the Fifth Circuit merely declined to
read into the Hobbs Act an atextual
exhaustion rule ................................................ 17
C. Any circuit split is old and recurs too
infrequently to require this Court’s
attention ........................................................... 18
II. The Commission’s Claimed Authority To
License Privately Owned, Off-Site Nuclear
Storage Facilities Is Also Uncertworthy ........... 20
A. The Commission lacks authority to issue
the license ........................................................ 20
B. Petitioners’ alleged circuit split is based
on non-adjudicated assumptions ................... 32
Conclusion ......................................................................... 34
(II)
III
TABLE OF AUTHORITIE S
Page(s)
Cases:
Abbott Labs. v. Gardner,
387 U.S. 136 (1967) ........................................................ 12
Abramski v. United States,
573 U.S. 169 (2014) .......................................................... 9
In re Aiken County,
645 F.3d 428 (D.C. Cir. 2011) ..................................... 1, 5
Ala. Ass’n of Realtors v. HHS,
594 U.S. 758 (2021) (per curiam) ................................. 21
Ala. Power Co. v. FCC,
311 F.3d 1357 (11th Cir. 2002) ................................14-15
Am. Trucking Ass’ns v. ICC,
673 F.2d 82 (1982) .................................................... 14, 17
Axon Enterprises, Inc. v. FTC,
598 U.S. 175 (2023) .................................................. 13, 17
State ex rel. Balderas v. NRC,
59 F.4th 1112 (10th Cir. 2023) ................................ 12, 19
Biden v. Nebraska,
143 S.Ct. 2355 (2023) ................................... 21, 25, 26, 32
Brown v. Gardner,
513 U.S. 115 (1994) ........................................................ 32
Bullcreek v. NRC,
359 F.3d 536 (D.C. Cir. 2004) ............................22, 32-33
In re Chi., Milwaukee, St. Paul & Pac. R.R. Co.,
799 F.2d 317 (7th Cir. 1986) ......................................... 19
Consolo v. Fed. Mar. Comm’n,
383 U.S. 607 (1966) ........................................................ 19
Corner Post, Inc. v. Board of Governors,
144 S.Ct. 2440 (2024) ..................................................... 11
IV
County of Rockland v. NRC,
709 F.2d 766 (2d Cir. 1983) ............................................. 2
Darby v. Cisneros,
509 U.S. 137 (1993) ........................................................ 11
Don’t Waste Mich. v. NRC,
No. 21-1048, 2023 WL 395030
(D.C. Cir. Jan. 25, 2023) ........................................... 12-13
Edward Hines Yellow Pine Tr. v. United States,
263 U.S. 143 (1923) ........................................................ 17
Env’t Def. v. Duke Energy Corp.,
549 U.S. 561 (2007) ........................................................ 15
Erie-Niagara Rail Steering Comm. v.
Surface Transp. Bd.,
167 F.3d 111 (2d Cir. 1999) ........................................... 19
Fasken Land & Minerals, Ltd. v. NRC,
No. 23-60377, 2024 WL 3175460
(5th Cir. Mar. 27, 2024) ................................................. 20
FDA v. Brown & Williamson Corp.,
529 U.S. 120 (2000) .................................................. 21, 26
FEC v. Cruz,
596 U.S. 289 (2022) .................................................... 2, 32
Fed. Maritime Comm’n v.
S.C. State Ports Authority,
535 U.S. 743 (2002) .................................................. 15, 16
Fischer v. United States,
144 S.Ct. 2176 (2024) ....................................................... 9
Fla. Power & Light Co. v. Lorion,
470 U.S. 729 (1985) .................................................. 10, 18
Fla. Power & Light Co. v. Westinghouse Elec. Corp.,
826 F.2d 239 (4th Cir. 1987) ......................................... 23
Gage v. U.S. Atomic Energy Comm’n,
479 F.2d 1214 (D.C. Cir. 1973) ..................................... 10
V
Gutierrez de Martinez v. Lamagno,
515 U.S. 417 (1995) .......................................................... 9
Henson v. Santander Consumer USA Inc.,
582 U.S. 79 (2017) .......................................................... 14
IBB, Inc. v. Alvarez,
546 U.S. 21 (2005) .......................................................... 14
ICC v. Bhd. of Locomotive Eng’rs,
482 U.S. 270 (1987) ........................................................ 19
Idaho v. DOE,
945 F.2d 295 (9th Cir. 1991) ................................. 2, 3, 23
Ind. Mich. Power Co. v. DOE,
88 F.3d 1272 (D.C. Cir. 1996) ................................. 21, 26
Izumi Seimitsu Kogyo Kabushiki Kaisha v.
U.S. Philips Corp.,
510 U.S. 27 (1993) .......................................................... 16
Kontrick v. Ryan,
540 U.S. 443 (2004) ........................................................ 12
Kucana v. Holder,
558 U.S. 233 (2010) .................................................8-9, 12
Loper Bright Enterprises v. Raimondo,
144 S.Ct. 2244 (2024) ......................................... 12, 18, 20
Lujan v. Nat’l Wildlife Fed’n,
497 U.S. 871 (1990) ........................................................ 13
Nat. Res. Def. Council v. NRC,
582 F.2d 166 (2d Cir. 1978) ........................................... 23
Nat’l Ass’n of Regul. Util. Comm’rs v. DOE,
680 F.3d 819 (D.C. Cir. 2012) ....................................... 23
Nat’l Ass’n of Regul. Util. Comm’rs v. DOE,
736 F.3d 517 (D.C. Cir. 2013) ............................. 4, 24, 27
Nat’l Ass’n of State Util. Consumer Advocs. v. FCC,
457 F.3d 1238 (11th Cir. 2006) ..................................... 19
VI
New York v. NRC,
681 F.3d 471 (D.C. Cir. 2012) ......................................... 3
Ohio Nuclear-Free Network v. NRC,
53 F.4th 236 (D.C. Cir. 2022) ....................................... 12
Pac. Gas & Elec. Co. v. State Energy Res.
Conservation & Dev. Comm’n,
461 U.S. 190 (1983) ........................................................ 21
PDR Network, LLC v. Carlton & Harris
Chiropractic, Inc.,
588 U.S. 1 (2019) ............................................................ 19
Port of Boston Marine Terminal Ass’n v.
Rederiaktiebolaget Transatlantic,
400 U.S. 62 (1970) .......................................................... 19
Pulsifer v. United States,
601 U.S. 124 (2024) ........................................................ 29
Rapanos v. United States,
547 U.S. 715 (2006) ........................................................ 32
Reytblatt v. NRC,
105 F.3d 715 (D.C. Cir. 1997) ......................................... 9
Rodriguez v. United States,
480 U.S. 522 (1987) ....................................................... 32
SEC v. Jarkesy,
144 S.Ct. 2117 (2024) ..................................................... 11
Simmons v. ICC,
716 F.2d 40 (D.C. Cir. 1983) ................................... 13, 14
Skinner & Eddy Corp. v. United States,
249 U.S. 557 (1919) .................................................. 17, 18
Skull Valley Band of Goshute Indians v. Nielson,
376 F.3d 1223 (10th Cir. 2004) ..................................... 33
Sturgeon v. Frost,
139 S.Ct. 1066 (2019) ..................................................... 32
Texas v. United States,
891 F.3d 553 (5th Cir. 2018) ....................................... 4, 5
VII
United States v. Jicarilla Apache Nation,
564 U.S. 162 (2011) ........................................................ 30
Util. Air Regul. Grp. v. EPA,
573 U.S. 302 (2014) .................................................. 21, 25
Water Transp. Ass’n v. ICC,
819 F.2d 1189 (D.C. Cir. 1987) ..................................9-10
West Virginia v. EPA,
597 U.S. (2022) ............................................................... 32
Yates v. United States,
574 U.S. 528 (2015) .......................................................... 9
Statutes and Rules:
Sup. Ct. R. 10(a) ................................................................... 20
5 U.S.C. §702 ........................................................................ 13
7 U.S.C. §6912(e) ................................................................. 11
28 U.S.C.:
§2112(a) ........................................................................... 14
§2342 .................................................................................. 9
§2342(1)-(7) ..................................................................... 19
§2344 .................................................... I, 6, 8, 9, 11, 17, 18
§2348 ................................................................................ 14
42 U.S.C.:
§1997e(a) ......................................................................... 11
§§2011 et seq. .................................................................... 2
§2013 ................................................................................ 21
§2014(aa) ......................................................................... 22
§2014(cc) ............................................................. 22. 28, 30
§2014(e) ........................................................................... 22
§2014(ee) ................................................................... 22, 29
§2014(v) ..................................................................... 22, 28
§2014(z) ........................................................................... 22
VIII
§2051 ................................................................................ 31
§2051(a) ........................................................................... 31
§2073 .......................................................................... 27, 30
§2073(a) ........................................................................... 22
§2073(a)(1) ...................................................................... 31
§2073(a)(2) ...................................................................... 31
§2073(a)(3) ...................................................................... 31
§2093 .......................................................................... 27, 30
§2093(a) ........................................................................... 22
§2093(a)(1) ...................................................................... 31
§2093(a)(2) ...................................................................... 31
§2093(a)(3) ...................................................................... 31
§2111 .......................................................................... 27, 28
§2111(a) ..................................................................... 22, 31
§2111(b)(1) ...................................................................... 28
§2133 .......................................................................... 22, 28
§2134 .................................................................... 22, 28, 31
§2210h(2)(B) ................................................................... 29
§2210i(b) .......................................................................... 29
§2239(a)(1)(A) ........................................................... 11, 15
§2239(b)(1) ...................................................................... 11
§10101 .............................................................................. 29
§10101(23) ................................................................. 29, 30
§10131(a)(2) .......................................................3-4, 21, 23
§10131(a)(7) ...................................................... 4, 7, 21, 26
§10131(b)(2) .................................................................... 23
§10132 ................................................................................ 4
§§10133-34 ...................................................................... 23
§10134 ................................................................................ 4
§§10151-10157 .................................................................. 4
§10151(a) ......................................................................... 24
IX
§10151(a)(1) .................................................................... 24
§10151(b) ......................................................................... 24
§10155(b)(1)(B)(i) ........................................................... 24
§10155(h) ......................................................................... 24
§10162(b) ......................................................................... 24
§10168(d)(1) .......................................................... 4, 24, 27
§10172 .............................................................................. 24
§10172(a) ........................................................................... 4
§10172(a)(1) ...................................................................... 1
§10222(a)(5)(B) ................................................................. 4
10 C.F.R.:
§2.1(a) .............................................................................. 15
§2.1(d) .............................................................................. 15
§2.805(b) .......................................................................... 15
§2.1500............................................................................. 15
Miscellaneous:
ANTONIN SCALIA & BRYAN A. GARNER, READING
LAW: THE INTERPRETATION OF LEGAL TEXTS
(2012) ................................................................... 25, 26, 30
BLACK’S LAW DICTIONARY (4th ed. 1951) .................... 9, 10
EPA, Radioactive Waste,
https://perma.cc/U8D7-DG2T.................................... 5, 6
Natural Resources Defense Council Denial of
Petition for Rulemaking,
42 Fed. Reg. 34,391 (July 5, 1977) ................................. 3
NRC, Spent Fuel Storage: Intent to Prepare
Generic Environmental Impact Statement
on Handling and Storage of Spent Light
Water Power Reactor Fuel,
40 Fed. Reg. 42,801 (Sept. 16, 1975) .......................... 2-3
X
NUREG-0527, Regulation of Federal Radioactive
Waste Activities: Report to Congress on
Extending the Nuclear Regulatory
Commission’s Licensing or Regulatory
Authority to Federal Radioactive Waste
Storage and Disposal Activities (Sept. 1979),
https://perma.cc/3ASZ-CCQW ...................................... 3
THE OXFORD ENGLISH DICTIONARY (2d. ed. 1989) .......... 9
RANDOM HOUSE DICTIONARY OF THE ENGLISH
LANGUAGE (2d unabridged ed. 1987) ........................... 9
I N T RO D U C T IO N
Decades ago, Congress decided that the federal government should store the nation’s nuclear waste deep underground in a facility located in Yucca Mountain, Nevada. See In re Aiken County, 645 F.3d 428, 431 (D.C.
Cir. 2011). For various reasons—mostly political, some
practical—construction of that facility has stalled. Congress, however, has not revisited its command. See
42 U.S.C. §10172(a)(1). Rather than complying, the Commission has now determined that up to 40,000 metric tons
of nuclear waste should be stored above-ground in
Texas’s Permian Basin, the site of the world’s most productive oil field and the only source of safe water for hundreds of miles. The Commission and its licensee also declare that without the Commission’s consent during
agency proceedings, neither Texas nor local landowners
can complain about such brazen disregard of statutory
law. The Fifth Circuit correctly rejected both contentions, and this Court’s review is not warranted.
To start, the Fifth Circuit correctly rejected petitioners’ attempts to insulate the Commission’s decision from
judicial review. Digging up a decades-old, rarely implicated circuit split, the Commission complains that the
Fifth Circuit improperly relied on an “ultra vires exception” to the Hobbs Act. Yet the Fifth Circuit has explained why even if there were no ultra vires exception,
Texas would still be a “party aggrieved,” NRC.Pet.
App.17a, and thus enjoy a statutory right of judicial review. Thus, even if petitioners were correct about an ultra vires exception—and they are not—an entirely independent ground supports the judgment below.
The Court similarly need not get involved in the merits of this dispute. Under our constitutional system, a
federal agency—independent or otherwise—“literally
(1)
2
has no power to act ... unless and until Congress authorizes it to do so by statute.” FEC v. Cruz, 596 U.S. 289,
301 (2022). Here, Congress specified that the nation
would dispose of its nuclear waste at a governmentowned facility at Yucca Mountain. Petitioners cannot
point to a single provision in the Atomic Energy Act or
the Nuclear Waste Policy Act that the Fifth Circuit overlooked and that permits the Commission to evade that
requirement by re-labeling disposal long-term “storage.” As Interim Storage Partners (ISP) is conspicuously not the federal government, and Yucca Mountain
is indisputably not in Texas, the Commission cannot license ISP to operate a de facto disposal facility in Texas.
By no means can the Commission solve its Yucca Mountain problem by disregarding clear statutory language.
S TA TEM ENT
I. Statutory Background
In 1954, Congress enacted the Atomic Energy Act,
granting regulatory authority over nuclear energy to the
Atomic Energy Commission that has since been redistributed to the Nuclear Regulatory Commission and the
Department of Energy. 42 U.S.C. §§2011 et seq. Under
the current division of power, the Commission “retains
jurisdiction over nuclear plant licensing and regulation,”
while the Department is charged with “energy research
and development.” County of Rockland v. NRC, 709 F.2d
766, 769 n.2 (2d Cir. 1983).
“Prior to the late 1970’s,” there was little concern
over the disposal of nuclear waste because “it was accepted that spent fuel would be reprocessed.” Idaho v.
DOE, 945 F.2d 295, 298-99 (9th Cir. 1991). Nuclear power
plants were thus built to store spent fuel for later reprocessing. See NRC, Spent Fuel Storage: Intent to Prepare
Generic Environmental Impact Statement on Handling
3
and Storage of Spent Light Water Power Reactor Fuel,
40 Fed. Reg. 42,801, 42,801 (Sept. 16, 1975). In the “mid70’s,” the reprocessing concept “collapsed” for technological and political reasons. Idaho, 945 F.2d at 298-99.
Because spent nuclear fuel remains radioactive and cannot truly be gotten rid of, it must be stored “for time
spans seemingly beyond human comprehension.” New
York v. NRC, 681 F.3d 471, 474 (D.C. Cir. 2012).
During the debate over how to address this problem,
the Commission conceded it would need new statutory
authority from Congress to license “waste management
facilities as a third category [of facility] in addition to
production and utilization facilities.”1 In asking for this
authority, the Commission’s chairman admitted to Congress that “waste facilities are neither production nor
utilization facilities as defined by the Atomic Energy
Act,” and that no other statutory authority provided a
basis for the Commission’s licensing authority over a private waste facility. Id. “[T]he Commission’s regulations,”
it explained, “deal[t] with the handling of spent fuel and
other high-level wastes ... only to the extent that such activities are related to on-site activities carried on by the
licensee.” Natural Resources Defense Council Denial of
Petition for Rulemaking, 42 Fed. Reg. 34,391, 34,392
(July 5, 1977) (emphasis added).
In 1982, Congress responded by enacting the Nuclear
Waste Policy Act (NWPA) to comprehensively address
what it acknowledged was “a national problem” and a
“major subject[] of public concern.” 42 U.S.C.
See NUREG-0527, Regulation of Federal Radioactive Waste
Activities: Report to Congress on Extending the Nuclear Regulatory Commission’s Licensing or Regulatory Authority to Federal
Radioactive Waste Storage and Disposal Activities at G-10 (Sept.
1979), https://perma.cc/3ASZ-CCQW.
1
4
§10131(a)(2), (7). The NWPA tasked the Department
with establishing a suitable location for a permanent geologic repository to indefinitely store the nation’s radioactive waste and spent nuclear fuel deep below the
Earth’s surface. 42 U.S.C. §10132. And it made the Commission responsible for licensing that repository, ensuring that it is safe and environmentally benign. Id. §10134.
Conspicuously absent from the NWPA is the authority
sought by the Commission to license private, off-site
storage facilities.
Congress amended the NWPA in 1987 to direct the
Department to consider Yucca Mountain—and only
Yucca Mountain, id. §10172(a)—as the site for the nation’s first permanent geologic repository, id. §10134.
True, the NWPA provided limited interim measures to
deal with spent nuclear fuel, such as temporary storage
at a federal facility if necessary to avoid a commercial reactor shut-down. Id. §§10151-10157. But “[t]he statute is
obviously designed to prevent the Department from delaying the construction of Yucca Mountain as the permanent facility while using temporary facilities.” Nat’l
Ass’n of Regul. Util. Comm’rs v. DOE, 736 F.3d 517, 519
(D.C. Cir. 2013); see also 42 U.S.C. §10168(d)(1).
Progress on the Yucca Mountain facility has been
halting at best. “[B]y the mid-1990s, the Department of
Energy made clear that it could not meet” a statutory
deadline to begin accepting waste by January 31, 1998,
and that deadline “came and went without the federal
government accepting any waste.” Texas v. United
States, 891 F.3d 553, 555-56 (5th Cir. 2018) (discussing
42 U.S.C. §10222(a)(5)(B)). In 2008, the Department submitted a license application for the Yucca Mountain facility. Id. at 556. But the Commission, “by its own admission,” refused to follow the instruction to evaluate that
5
application, stating it “has no current intention of complying with the law.” Aiken County, 725 F.3d at 258. That
led the D.C. Circuit to order the Commission to
“promptly continue with the legally mandated licensing
process.” Id. at 267. Yet the licensing process remains
stalled. Texas, 891 F.3d at 557. Congress has never revised its directive that Yucca Mountain is the appropriate repository for the nation’s nuclear waste.
II. ISP’s
Application
and
License
for
“Consolidated Interim Storage Facility”
a
In 2016, ISP—a private party—applied for a license
to operate a “consolidated interim storage facility,”
where it could store up to 40,000 metric tons of spent nuclear fuel in dry-cask, above-ground storage in Andrews
County, Texas. C.I.No.5.1.2 The license would be valid
for 40 years, but it could be renewed for an additional 20,
see C.I.No.1148. Nuclear waste, of course, can remain radioactive for “hundreds of millions of years.” EPA, Radioactive Waste, https://perma.cc/U8D7-DG2T.
Many stakeholders, including Texas, objected to the
issuance of such a license. Consistent with longstanding
precedent regarding how to comply with the Hobbs Act,
Governor Greg Abbott submitted a comment letter addressing problems with the ISP facility. C.I.No.1128.
The Texas Commission on Environmental Quality
(TCEQ) similarly objected to the “unprecedented implications” of the license and the “significant unease” it created. C.I.No.1148. TCEQ warned that because “the U.S.
Department of Energy has been unsuccessful in developing a permanent geologic repository,” a consolidated
“C.I._” refers to the Revised Certified Index of Records, the
cited portions of which can be found in the appendices at docket
numbers. 101-1 and 103-1 in the Fifth Circuit.
2
6
interim storage facility in Texas “will become the permanent solution for dispositioning the nation’s spent nuclear fuel.” Id. In September 2021, the Commission overrode these objections and licensed ISP’s proposed facility. NRC.Pet.App.53a.
III. Proceedings in the Court of Appeals
Texas, Governor Abbott, and TCEQ petitioned for review in the Fifth Circuit. NRC.Pet.App.9a. ISP intervened to defend its license. NRC.Pet.App.9a. The Fifth
Circuit made three rulings relevant here.
First, applying longstanding circuit precedent, the
Fifth Circuit held that Texas did not need to have participated in proceedings before the Commission because
Texas fit within an “ultra vires exception to the [Act’s]
party-aggrieved status requirement.” NRC.Pet.App.18a
(italicization altered); see NRC.Pet.App.18a-20a. Alternatively, the Fifth Circuit explained why Texas would be
a “party aggrieved” even without an ultra vires exception. NRC.Pet.App.17a-18a. The Hobbs Act permits a
“party aggrieved by the final order” to “file a petition to
review the order in the court of appeals wherein venue
lies.” 28 U.S.C. §2344. To be a “party aggrieved,” the
Hobbs Act “requires only that a petitioner have participated—in some way—in the agency proceedings.”
NRC.Pet.App.17a. Texas easily satisfied that requirement by submitting comments. NRC.Pet.App.17a.
Second, on the merits, the Fifth Circuit held the Commission is not entitled to deference because “[w]hat to do
with the nation’s ever-growing accumulation of nuclear
waste is a major question that—as the history of the
Yucca Mountain repository shows—has been hotly politically contested for over half a century.” NRC.Pet.App.
29a-30a. Congress said as much, emphasizing that “highlevel radioactive waste and spent nuclear fuel have
7
become major subjects of public concern, and appropriate precautions must be taken to ensure that such waste
and spent fuel do not adversely affect the public health
and safety and the environment for this or future generations.” 42 U.S.C. §10131(a)(7); NRC.Pet.App.29a-30a.
The Commission thus needs clear statutory authorization to license private facilities to store nuclear waste
offsite. NRC.Pet.App.30a. Here, the AEA does not
clearly delegate such authority, and the NWPA affirmatively “belies the Commission’s arguments to the contrary.” NRC.Pet.App.30a.
Third, the Fifth Circuit rejected the Commission’s
assertion that because it has the authority to issue licenses for the possession of nuclear material, it “has
broad authority to license storage facilities for spent nuclear fuel.” NRC.Pet.App.21a (emphasis added). Looking to the AEA’s text, the Fifth Circuit concluded the
Commission may issue such licenses to possess specified
material “only for certain enumerated purposes—none
of which encompass storage or disposal of material as radioactive as spent nuclear fuel.” NRC.Pet.App.22a. The
Commission’s contrary argument, the Fifth Circuit explained, “cannot be reconciled with the [NWPA],”
NRC.Pet.App.25a, which “creates a comprehensive statutory scheme for addressing spent nuclear fuel accumulation,” NRC.Pet.App.29a. “[P]rioritiz[ing] construction
of the permanent repository,” that scheme “plainly contemplates that, until there’s a permanent repository,
spent nuclear fuel is to be stored onsite at-the-reactor or
in a federal facility.” NRC.Pet.App.29a.
The Fifth Circuit declined to rehear the case en banc.
NRC.Pet.App.31a. Judge Higginson dissented and argued that the Fifth Circuit’s ultra vires exception should
be eliminated. NRC.Pet.App.45a-52a. In response,
8
Judge Jones, joined by five other judges, explained why
the State would be a “party aggrieved” regardless of any
ultra vires exception. NRC.Pet.App.33a-44a.
REA SO NS F OR DE NY ING TH E P ETITION
I. Whether the Rarely Litigated Hobbs Act
Contains an Ultra Vires Exception Does Not
Merit the Court’s Attention.
According to the Commission (at I, 11-19), this case
merits certiorari because the Fifth Circuit improperly
added an ultra vires exception to the Hobbs Act—in
1982. But this case presents a poor vehicle to determine
whether such an exception exists because it would not affect the judgment below: The Fifth Circuit also correctly
explained why it would conclude that Texas is a “party
aggrieved” under the Hobbs Act even without an ultra
vires exception. NRC.Pet.App.20a. In any event, the
Commission’s arguments would allow the very agency
that acts unlawfully to bar the courthouse door.
A. This is a poor vehicle to resolve whether there
is an ultra vires exception to the Hobbs Act.
1. The Fifth Circuit correctly explained why Texas
is a party aggrieved under the Hobbs Act. This conclusion flows directly from “the plain text of the Hobbs Act,”
NRC.Pet.App.17a, which permits a “party aggrieved by
the final order” to “file a petition to review the order in
the court of appeals wherein venue lies,” 28 U.S.C. §2344,
but imposes no specific limitations on how an individual
may become a “party.” “When a statute is ‘reasonably
susceptible to divergent interpretation,’” courts are to
“adopt[] the reading that accords with traditional understandings and basic principles: that executive determinations generally are subject to judicial review,” absent
“clear and convincing evidence” to the contrary. Kucana
9
v. Holder, 558 U.S. 233, 251, 252 (2010) (quoting
Gutierrez de Martinez v. Lamagno, 515 U.S. 417, 434
(1995)).
Because the term “party” is undefined, courts look to
its ordinary meaning as defined not just by “dictionary
definitions of its component words” but also “the specific
context in which that language is used, and the broader
context of the statute as a whole.” Yates v. United States,
574 U.S. 528, 537 (2015); see also Fischer v. United
States, 144 S.Ct. 2176, 2183 (2024). Courts thus do not
“interpret each word in a statute with blinders on” because a word that “may seem ambiguous in isolation is
often clarified by the remainder of the statutory
scheme.” Abramski v. United States, 573 U.S. 169, 179
n.6 (2014).
Here, Congress chose the broad term “party aggrieved.” 28 U.S.C. §2344. As contemporaneous dictionaries show, “party” was understood since the time of the
Hobbs Act to include any “person concerned or having or
taking part in any affair, matter, transaction or proceeding.” BLACK’S LAW DICTIONARY 1278 (4th ed. 1951); accord, e.g., RANDOM HOUSE DICTIONARY OF THE ENGLISH
LANGUAGE 1416 (2d unabridged ed. 1987); THE OXFORD
ENGLISH DICTIONARY XI, 281-82 (2d. ed. 1989).
This broad understanding of “party” is confirmed by
statutory context. After all, the Hobbs Act uses the term
“party aggrieved” in a single sentence that covers both
agency adjudications and rulemakings. 28 U.S.C. §2344;
see Reytblatt v. NRC, 105 F.3d 715, 720-21 (D.C. Cir.
1997). The Commission admits as much. NRC.Pet.19 n.2.
Yet no one disputes that someone who submits comments in a rulemaking from one of the handful of agencies subject to the Hobbs Act, see 28 U.S.C. §2342, may
seek review. See, e.g., NRC.Pet.19 n.2 (citing Water
10
Transp. Ass’n v. ICC, 819 F.2d 1189, 1192 (D.C. Cir.
1987)).
Such a broad understanding is also consistent with
the purpose of the requirement—namely, “to ensure that
the agency had the opportunity to consider the issue that
petitioners are concerned with.” NRC.Pet.App.17a; see
also Gage v. U.S. Atomic Energy Comm’n, 479 F.2d
1214, 1219 (D.C. Cir. 1973). The “focal point for judicial
review should be the administrative record already in existence, not some new record made initially in the reviewing court.” Fla. Power & Light Co. v. Lorion, 470 U.S.
729, 743 (1985). By imposing a “party aggrieved” requirement, the Hobbs Act facilitates “[t]he task of the
reviewing court” in “apply[ing] the appropriate APA
standard of review,” id. at 743-44, by ensuring that the
future petitioner’s grievances are made part of the administrative record. As the Commission admits, this case
presents no such concerns: Texas made its views of the
ISP license known to the Commission using the process
that the Fifth Circuit blessed 42 years ago. See
NRC.Pet.6-7.
2. In contending that the Fifth Circuit nonetheless
lacked jurisdiction, the Commission insists that “party”
“‘has a precise meaning in legal parlance’ and generally
means ‘he or they by or against whom a suit is brought.’”
NRC.Pet.12 (quoting BLACK’S, supra, at 1278). The
Commission’s own authority, however, states that
“party” “is not restricted to strict meaning of plaintiff or
defendant in a lawsuit.” BLACK’S, supra, 1278 (emphasis
added). Those concepts are given a different name with
which Congress was doubtless familiar: “litigant.” Id. at
1082. Because Congress chose to use the general term
party rather than the specific term litigant, the Hobbs
Act “requires only that a petitioner have participated—
11
in some way—in the agency proceedings, which Texas
did through comments.” NRC.Pet.App.17a.
The Commission’s view that one must nonetheless be
a “recognized party to the underlying agency proceeding,” NRC.Pet.12, presents another problem: It is effectively an administrative exhaustion requirement that appears nowhere in the Hobbs Act, 28 U.S.C. §2344, and
that the agency controls. NRC.Pet.5 (summarizing Commission processes). On the Commission’s view, a challenger must intervene to exhaust—but the Commission
may simply deny intervention. Thus, no judicial review.
Congress knows how to draft mandatory exhaustion
requirements. See, e.g., 7 U.S.C. §6912(e); 42 U.S.C.
§1997e(a). Courts must not create one that does not exist
in the statute, see, e.g., Darby v. Cisneros, 509 U.S. 137,
154 (1993), especially where the agency may make them
impossible to fulfill. And, as the Fifth Circuit explained,
“neither the Hobbs Acts nor the Atomic Energy Act impose a mandatory exhaustion requirement.” NRC.Pet.
App.16a n.2. To the contrary, the AEA states the “Commission shall grant a hearing upon the request of any
person whose interest may be affected by the proceeding, and shall admit any such person as a party to such
proceeding.” 42 U.S.C. §2239(a)(1)(A). (emphases
added). It also states that “[a]ny final order entered in
any proceeding of the kind” is subject to judicial review,
id. §2239(b)(1). Tellingly absent is any language requiring an interested party to seek a hearing in the first instance.
Just months ago, this Court held that: (1) a party may
sue a federal agency when it is injured, Corner Post, Inc.
v. Board of Governors, 144 S.Ct. 2440 (2024); (2) challengers may be entitled to have a jury decide facts, SEC
v. Jarkesy, 144 S.Ct. 2117 (2024); and (3) the agency gets
12
no deference on the law it administers, Loper Bright Enterprises v. Raimondo, 144 S.Ct. 2244 (2024). Those decisions would have little value if an agency may reach an
agreement with the beneficiary of a challenged action
while preventing those harmed by that action from ever
having a day in court. The “traditional tools of statutory
construction” do not permit the Commission to arrogate
to itself authority to limit who can access the federal
courts. Id. at 2264. Certainly, nothing in the Hobbs Act
overcomes the general presumption in favor of judicial
review of administrative decisions. See Kucana, 558 U.S.
at 237.
The Commission points (at 19) to two lower-court
cases agreeing that under agency rules, States are not a
party aggrieved merely because they submitted comments. Decided before Loper Bright, these cases “evaluate” a party’s level of participation—and thereby its aggrieved status—“based on the practices of the agency”
and the agency’s rules. State ex rel. Balderas v. NRC, 59
F.4th 1112, 1117 (10th Cir. 2023); Ohio Nuclear-Free
Network v. NRC, 53 F.4th 236, 238-40 (D.C. Cir. 2022).
But agencies have never had the power to determine a
court’s jurisdiction through rulemaking, see, e.g., Kontrick v. Ryan, 540 U.S. 443, 452 (2004), and they certainly
don’t now, see Loper Bright, 144 S.Ct. at 2273; accord
NRC.Pet.App.34a-35a (Jones, J.). This point is particularly true for rules that would negate the presumption of
reviewability. See, e.g., Abbott Labs. v. Gardner, 387 U.S.
136, 141 (1967).
It is no response that Texas could have obtained review had it sought and been denied leave to intervene because the agency would have asserted that the State was
not aggrieved in the larger agency proceedings. Cf. Don’t
Waste Mich. v. NRC, No. 21-1048, 2023 WL 395030, at *3
13
(D.C. Cir. Jan. 25, 2023). Not only was such a box-checking exercise not required by Fifth Circuit precedent
when Texas had to decide whether to ask the Commission’s permission to intervene, but it further highlights
the self-serving nature of the Commission’s position:
Only leave to intervene could authorize Texas to seek judicial review, but only the Commission could grant leave
to intervene. The Commission effectively contends that
it may act as its own overseer. Contra Axon Enterprises,
Inc. v. FTC, 598 U.S. 175, 180 (2023).
3. In a tacit acknowledgment that any ruling by this
Court on the ultra vires exception will not save the permit at hand, the Commission makes four additional arguments why litigation is required to transform a participant in the agency process into a “party aggrieved.”
NRC.Pet.12-14. All are wrong.
First, relying on Simmons v. ICC, 716 F.2d 40, 43
(D.C. Cir. 1983), the Commission insists that the Fifth
Circuit conflates the term “person ... aggrieved” as used
in the APA and the term “party aggrieved” as used in the
Hobbs Act. Not so. As noted above, those are not the only
options available to Congress. Supra pp.10-11. Moreover, the term “person ... aggrieved” in the APA, 5 U.S.C.
§702, imposes only two requirements: (1) that the plaintiff “identify some ‘agency action,’” and (2) that he “show
that he has suffered legal wrong” as a result. Lujan v.
Nat’l Wildlife Fed’n, 497 U.S. 871, 882-83 (1990). The
“person ... aggrieved” language in the APA does not require participation in an agency proceeding like the term
“party aggrieved” does in the Hobbs Act.
Simmons is not to the contrary. There, the petitioner
commented on only the first of two rulemakings of which
it later sought judicial review under the Hobbs Act. 716
F.2d at 42. To preserve the distinction between “party”
14
and “person,” the court held that the Hobbs Act must
have used “party aggrieved” to mean “a party before the
agency, not a party to the judicial proceeding,” id. at
43—relying on the very Fifth Circuit decision to which
petitioners attribute the circuit split, id. at 42 (citing, inter alia, Am. Trucking Ass’ns v. ICC, 673 F.2d 82, 84
(1982) (per curiam)). But, as Judge Jones noted, it “was
uncontested” that the petitioner was a “party aggrieved”
by the first rulemaking in which he participated,
NRC.Pet.App.37a—underscoring that “party aggrieved” and “litigant” are not synonymous in this context, supra pp.10-11.
Second, the Commission insists (at 13) that “party aggrieved” should nonetheless be treated like a party to a
court proceeding because the Hobbs Act affords intervention rights to a “party in interest in the proceeding”
not afforded to “[c]ommunities, associations, corporations, firms, and individuals, whose interests are affected
by the order of the agency.” 28 U.S.C. §2348. But §2348
supports the State’s view. Courts presume “that ‘identical words used in different parts of the same statute’
carry ‘the same meaning.’” Henson v. Santander Consumer USA Inc., 582 U.S. 79, 85 (2017) (quoting IBB,
Inc. v. Alvarez, 546 U.S. 21, 34 (2005)). And only individuals who participated in the agency proceeding are called
“parties”—no matter whether their interests would be
affected. It would also make sense to give such participants intervention as of right if they are also parties aggrieved who can initiate a separate suit that must, as a
matter of law, be transferred to and consolidated with
the earlier-filed suit. 28 U.S.C. §2112(a).
The State’s interpretation is consistent with the cases
the Commission cites. For example, Alabama Power Co.
v. the Federal Communications Commission, 311 F.3d
15
1357 (11th Cir. 2002), correctly recognizes that a “‘party
aggrieved’ is one who participated in the agency proceeding, id. at 1366 (emphasis added). In that case, multiple adjudications occurred. Id. at 1365-67. The court
found that being a participant in one adjudication does
not make one a party aggrieved by a different adjudication. Id. Whether the petitioner could have sought review
had it participated in some other way in the agency proceeding was not at issue. Id. at 1366-67.
Third, the Commission makes much (at 12) of the fact
that the AEA’s hearing provision uses both “person” and
“party.” But it is the Hobbs Act, not the AEA’s hearing
provision, that is at issue, and it is always perilous to try
to extrapolate meanings across statutes. Env’t Def. v.
Duke Energy Corp., 549 U.S. 561, 574 (2007). That is particularly so because the AEA’s hearing provision applies
to both licensing proceedings and rulemaking proceedings. 42 U.S.C. §2239(a)(1)(A); see 10 C.F.R. §§2.1(a), (d)
2.805(b); 2.1500. Accordingly, when the AEA states that
the Commission shall “grant a hearing upon the request
of any person whose interest may be affected by the proceeding, and shall admit any such person as a party to
such proceeding,” 42 U.S.C. §2239(a)(1)(A) (emphasis
added), it means that a “person” is one interested in the
Commission’s actions who becomes a “party” when he
participates in some way in the agency proceeding,
whether a rulemaking or an adjudication.
Fourth, the Commission is wrong (at 14) to rely on
Federal Maritime Commission v. South Carolina State
Ports Authority, 535 U.S. 743, 762 (2002) (FMC). That
case asked whether sovereign immunity precluded the
Federal Maritime Commission from adjudicating a private party’s complaint against a State, id. at 792—a context that inherently uses the term “party” to mean
16
“litigant.” But see supra pp.10-11. As a result, ordinary
rules of issue preservation and appellate procedure
would hold that “if a party fails to appear before the
[Commission], it may not then argue the merits of its position in an appeal of the Commission’s determination
filed under [the Hobbs Act]. FMC, 535 U.S. at 762.
Here, by contrast, the State is not “seeking to contest
the merits of a complaint filed against it by a private
party” where it “must defend itself in front of the [Commission] or substantially compromise its ability to defend
itself at all.” Id. at 762. Instead, it is challenging a license
that risks a public-health disaster by enabling the storage of up to 40,000 metric tons of nuclear waste in aboveground vessels over the world’s most productive oil field,
as well as the water supply for Midland-Odessa (among
others). The issuance of that license over Texas’s objections “aggrieves” Texas by any ordinary meaning of the
term—regardless of whether the Hobbs Act contains an
ultra vires exception.
4. Regardless, petitioners have not sought clarification of what it takes to be a “party aggrieved” within the
terms of the Hobbs Act—only whether an ultra vires exception allows a stranger to the agency proceeding to
seek judicial review. Because the Fifth Circuit’s alternative analysis that Texas is a party aggrieved under the
Hobbs Act even absent an ultra vires exception falls outside the scope of the question presented, this is a poor
vehicle to decide that question. See, e.g., Izumi Seimitsu
Kogyo Kabushiki Kaisha v. U.S. Philips Corp.,
510 U.S. 27, 31-32 (1993).
17
B. In applying the ultra vires “exception,” the
Fifth Circuit merely declined to read into the
Hobbs Act an atextual exhaustion rule.
Even were Texas not a party aggrieved, review would
be uncalled for because while the Commission (at 11),
and ISP (at 1, 22-24) make much of the Fifth Circuit’s
“ultra vires” exception, it really is no exception at all. In
1982, the Fifth Circuit observed that this Court has recognized “two rare instances” in which a stranger to an
agency proceeding could nonetheless appeal: (1) if the
agency action is “attacked as exceeding the power of the
Commission,” or (2) the appellant “challenges the constitutionality of the statute conferring authority on the
agency.” Am. Trucking, 673 F.2d at 85 n.4 (citing, inter
alia, Edward Hines Yellow Pine Tr. v. United States,
263 U.S. 143, 147 (1923); Skinner & Eddy Corp. v. United
States, 249 U.S. 557, 563-64 (1919)). In other words, this
is not an exception at all because the Hobbs Act is about
reviewing agency orders—not challenges to the “statute
conferring authority on the agency.” Compare id., with
28 U.S.C. §2344. Instead, the putative “exception” is
nothing more than a rule that appearing in a Commission
proceeding is not required to challenge whether the
Commission exceeded its authority by holding that proceeding in the first place. That is not the same thing as
challenging an agency’s use of authority. Cf. Axon, 598
U.S. at 185-88.
Nor is the term “ultra vires” a synonym for “wrong.”
Contra NRC.Pet.15. As Judge Jones explained, “the
term literally refers to being ‘outside’ the agency’s
power, i.e., in defiance of the limits placed by Congress
in the agency’s governing statute or the Constitution.”
NRC.Pet.App.43a. To the extent the Fifth Circuit has
applied the rule, but see infra Part I.C., it has done so
18
only in cases involving an absence of statutory or constitutional authority. NRC.Pet.App.43a. This Court has
done the same. See, e.g., Skinner & Eddy Corp., 249 U.S.
at 562.
Apart from precedent, such a rule makes sense for
two reasons. First, as explained above, unlike other statutes, the Hobbs Act contains no exhaustion requirement.
See 28 U.S.C. §2344; NRC.Pet.App.16a n.2. If Congress
had wanted to require a petitioner to make statutory interpretation and constitutional arguments to an agency,
it could have done so. Supra p.11.
Second, it would make little sense to imply an administrative-exhaustion requirement in a post-Chevron
world. After all, courts “must exercise their independent
judgment in deciding whether an agency has acted
within its statutory authority.” Loper Bright, 144 S.Ct.
at 2273. The “focal point for [that] judicial review” remains the “administrative record” to which “the reviewing court is to apply the appropriate … standard of review.” Lorion, 470 U.S. at 743-44. But now the Court has
made clear that courts are “to conduct a de novo inquiry
into the matter being reviewed and to reach its own conclusions” rather than deferring to the agency’s judgment. Id. at 744. Under such a regime, it would be upside
down to imply (let alone allow an agency to create) an
exhaustion requirement not required by Congress. The
Fifth Circuit was thus entirely correct to prevent the
Commission from imposing an exhaustion requirement
on Texas.
C. Any circuit split is old and recurs too
infrequently to require this Court’s attention.
Even were the Fifth Circuit wrong to apply the supposed ultra vires exception (and it wasn’t), and even if
that error would affect the outcome of this case (and it
19
wouldn’t), that error still would not merit the Court’s
time. So far as Texas can determine, the Hobbs Act has
resulted in only four decisions from this Court in over 70
years. The circuit split to which NRC (at 28) and ISP (at
23) pin their hopes of a fifth has existed for almost 40
years without intervention of this Court or problems to
the handful of federal agencies to whom the Hobbs Act
applies. That is hardly the recipe for a certworthy issue.
The Hobbs Act is far from a controversial statute. It
applies to a small fraction of the hundreds of federal
agencies that form the Executive Branch, see 28 U.S.C.
§2342(1)-(7), and this Court has adjudicated only four
cases interpreting the statute. See PDR Network, LLC
v. Carlton & Harris Chiropractic, Inc., 588 U.S. 1, 3
(2019); ICC v. Bhd. of Locomotive Eng’rs, 482 U.S. 270,
277 (1987); Port of Boston Marine Terminal Ass’n v.
Rederiaktiebolaget Transatlantic, 400 U.S. 62, 69 (1970);
Consolo v. Fed. Mar. Comm’n, 383 U.S. 607, 613 (1966).
The circuit split at issue has existed for nearly 40 of
those 70 years. As noted above, the Fifth Circuit decided
American Trucking in 1982. In 1986, the Seventh Circuit
announced its disagreement. See In re Chi., Milwaukee,
St. Paul & Pac. R.R. Co., 799 F.2d 317, 334-35 (7th Cir.
1986). The Second Circuit followed suit in 1999, see ErieNiagara Rail Steering Comm. v. Surface Transp. Bd.,
167 F.3d 111, 112 (2d Cir. 1999) (per curiam), the Eleventh in 2006, see Nat’l Ass’n of State Util. Consumer Advocs. v. FCC, 457 F.3d 1238, 1249 (11th Cir. 2006), and
the Tenth last year in a case involving the same license
at issue here, see Balderas, 59 F.4th at 1123-24.
As Fasken explains in its concurrently filed response
(at Part II.A), the Fifth Circuit has no occasion to apply
the ultra vires “exception” with any frequency. To the
contrary, as the Commission admits (at 29), the Fifth
20
Circuit applied the ultra vires exception here “for the
first time since 1984.” The only other recent example is
an unpublished opinion holding that the decision below
(unsurprisingly) determined the outcome of a related
case. Compare Fasken Land & Minerals, Ltd. v. NRC,
No. 23-60377, 2024 WL 3175460, at *1 (5th Cir. Mar. 27,
2024) (per curiam), with ISP.Pet.iii (acknowledging the
cases to be related).
Thus, even if “a United States court of appeals has
entered a decision in conflict with the decision of another
United States court of appeals,” it could hardly be considered an “important matter” requiring this Court’s attention. Sup. Ct. R. 10(a). This is particularly true because certiorari is a discretionary writ. Texas participated in the proceedings here by filing substantive comments—a point the Commission does not (and cannot)
dispute. Under Fifth Circuit precedent, that was sufficient to secure Texas’s right to challenge the lawfulness
of the Commission’s decision. The Court should not grant
review where a party has acted consistent with circuit
precedent, especially because under any plausible standard Texas is a “party aggrieved” regardless.
II. The Commission’s Claimed Authority To License
Privately Owned, Off-Site Nuclear Storage
Facilities Is Also Uncertworthy.
It is also unnecessary for this Court to address the
merits. Congress has already answered the question: the
nation’s nuclear waste must be stored in Nevada, not
Texas. Petitioners’ contrary arguments miss the mark.
A. The Commission lacks authority to issue the
license.
Even before Loper Bright, this Court “expect[ed]
Congress to speak clearly when authorizing an agency to
21
exercise powers of ‘vast economic and political significance.’” Ala. Ass’n of Realtors v. HHS, 594 U.S. 758, 764
(2021) (per curiam) (quoting Util. Air Regul. Grp. v.
EPA, 573 U.S. 302, 324 (2014)). And it has been particularly skeptical of such assertions of power on issues with
uniquely fraught “political histor[ies]” or comprehensive
“regulatory scheme[s].” Biden v. Nebraska, 143 S.Ct.
2355, 2382 (2023) (Barrett, J., concurring) (quoting FDA
v. Brown & Williamson Tobacco Corp., 529 U.S. 120,
159-60 (2000)); accord Ind. Mich. Power Co. v. DOE, 88
F.3d 1272, 1273 (D.C. Cir. 1996).
This is a textbook example of such a case: Congress
identified the “problem.” 42 U.S.C. §10131(a)(2), (7). And
Congress provided the solution—a “comprehensive statutory scheme for addressing spent nuclear fuel accumulation.” NRC.Pet.App.29a. That scheme not only requires storage in Yucca Mountain, but it “plainly contemplates that” there may be pushback to the Yucca Mountain site and provides that “until there’s a permanent repository, spent nuclear fuel is to be stored onsite at-thereactor or in a federal facility.” NRC.Pet.App.29a. That
scheme does not include granting the Commission authority to issue offsite-storage licenses.
1. The Commission attempts to locate its authority
in the licensing provisions of the AEA, which were enacted to “‘encourage[] the private sector’ to develop
‘atomic energy for peaceful purposes under a program of
federal regulation and licensing.’” NRC.Pet.2 (quoting
Pac. Gas & Elec. Co. v. State Energy Res. Conservation
& Dev. Comm’n, 461 U.S. 190, 207 (1983)); see 42 U.S.C.
§2013. To that end, the AEA delegates the Commission
authority to issue two types of licenses to private entities: “materials licenses” and “facilities licenses.”
22
NRC.Pet.2 & n.1. Neither type, however, relates to temporary offsite storage of spent nuclear fuel.
Materials licenses entitle licensees to possess specified nuclear materials for statutorily defined ends. Section 2073(a), for example, authorizes licensees to possess
“special nuclear material” for categories of “research
and development,” “medical therapy,” and use under a
facilities license. 42 U.S.C. §2073(a). Section 2093(a) does
the same for “source material.” Id. §2093(a). And
§2111(a) licenses may be issued “to applicants seeking to
use byproduct material for research or development purposes, for medical therapy, industrial uses, agricultural
uses, or such other useful applications as may be developed.” Id. §2111(a).
Despite defining the term “spent nuclear fuel,” the
AEA nowhere authorizes issuance of a materials license
to possess spent nuclear fuel for any reason, let alone for
the sole purpose of storing such material in a standalone
facility. Compare id. §§2014 (aa) (defining “special nuclear material”), (z) (“source material”), (e) (“byproduct
material”), with id. §2014(ee) (“spent nuclear fuel”).
The AEA’s facilities license provisions don’t supply
that authority either. Facilities licenses may be issued to
private entities seeking to construct “utilization” and
“production” facilities. 42 U.S.C. §§2133, 2134. The definitions of neither terms contemplate “storage” of spent
nuclear material. Id. §2014 (cc) (defining “utilization facility”), (v) (defining “production facility”)—as ISP
acknowledges (at 17).
In short, as the Commission’s own authority confirms, the AEA “does not specifically refer to the storage
or disposal of spent nuclear fuel.” Bullcreek v. NRC, 359
F.3d 536, 538 (D.C. Cir. 2004).
23
2. This straightforward textual analysis is bolstered
by historical and statutory context. It was “clear that
from the very beginning of commercial nuclear power [in
the 1950s] the Congress was aware of the absence of a
permanent waste disposal facility,” Nat. Res. Def. Council v. NRC, 582 F.2d 166, 170 (2d Cir. 1978), but indefinite
private storage was not then regarded “as a feasible and
acceptable method of disposal ... of spent [nuclear] fuel,”
Fla. Power & Light Co. v. Westinghouse Elec. Corp., 826
F.2d 239, 244 (4th Cir. 1987). Instead, “Government and
industry accepted reprocessing as the only practical
method of disposing of spent fuel.” Id. at 246. The AEA’s
failure to anticipate the need for repositories for spent
nuclear fuel reflects that “widespread belief.”
NRC.Pet.App.4a.
It was not until the 1970s, when “the private reprocessing industry collapsed” that “the nuclear industry
was confronted with an unanticipated accumulation of
spent nuclear fuel, inadequate private facilities for the
storage of the spent fuel, and no long term plans for managing nuclear waste.” NRC.Pet.App.26a (quoting Idaho,
945 F.2d at 298). “This led Congress to pass the [NWPA]
in 1982” to “provide[] a comprehensive scheme to address the accumulation of nuclear waste.” NRC.Pet.
App.26a. Recognizing that “a national problem ha[d]
been created,” 42 U.S.C. §10131(a)(2), Congress adopted
a national solution: “Federal responsibility, and a definite Federal policy, for the disposal of such waste and
spent fuel,” id. §10131(b)(2), “within a rock formation
where the waste would be placed, permanently stored,
and isolated from human contact.” Nat’l Ass’n of Regul.
Util. Comm’rs v. DOE, 680 F.3d 819, 821 (D.C. Cir.
2012); see 42 U.S.C. §§10133-34. The NWPA was
amended a few years later to identify Yucca Mountain
24
“as the only suitable site” for this purpose.
NRC.Pet.App.27a; 42 U.S.C. §10172.
But the NWPA did not stop there. Recognizing the
need for interim measures pending completion of the
Yucca Mountain project, the Act takes pains to emphasize that “primary responsibility for providing interim
storage of spent nuclear fuel” remains on “the persons
owning and operating civilian nuclear power reactors.”
42 U.S.C. §10151(a)(1). Section 10155(b)(1)(B)(i), for example, expressly directs reactor owners to pursue “expansion of storage facilities at the site of [their] power
reactor[s]” should existing storage reach capacity before
a permanent geologic repository becomes available. Id.
§10155(b)(1)(B)(i) (emphasis added). Only if that proves
impossible may reactor owners access limited federal
storage. Id. §10151(a), (b).
Nowhere does the NWPA provide for private, off-site
storage. To the contrary, §10155(h) punctuates that
“nothing in this chapter shall be construed to encourage,
authorize, or require the private ... use ... of any storage
facility located away from the site of any civilian nuclear
power reactor and not owned by the Federal Government.” Id. §10155(h).
The NWPA also provides that the government may
operate one “monitored retrievable storage” center, id.
§10162(b), but only after the Commission has licensed
the repository at Yucca Mountain, id. §10168(d)(1). This
provision is “obviously designed to prevent the Department from delaying the construction of Yucca Mountain
as the permanent facility while using temporary facilities.” Nat’l Ass’n of Regul. Util. Comm’rs, 736 F.3d at
519. The NWPA thus “prioritizes construction of the permanent repository and limits temporary storage to private at-the-reactor storage or at federal sites.”
25
NRC.Pet.App.29a. Nothing in the NWPA’s structure or
history supports anything like what the Commission is
attempting to do here.
Notably, the Commission (at 23-24) and ISP (at 21)
assure the Court that it need not bother with the NWPA,
which they insist deals primarily with where the federal
government, rather than private entities, may store nuclear waste. Yet the NWPA contains a welter of provisions dealing directly with private waste storage, including the issue of where to put privately produced waste
pending completion of the Yucca Mountain project. A
court cannot ignore the fact that Congress has clearly
addressed this specific issue.
3. The statutory history surrounding the Yucca
Mountain project is more evidence that this is one of
those instances in which “commonsense principles of
communication” dictate that we “‘expect Congress to
speak clearly if it wishes to assign [that task] to an
agency.’” Biden, 143 S.Ct. at 2380 (Barrett, J., concurring) (quoting Util. Air Regul. Grp., 573 U.S. at 324).
Far from clearly providing the authority asserted
here, reading the AEA to authorize the Commission to
license private off-site storage facilities would render the
NWPA almost nonsensical—and would fly in the face of
representations made by the Commission’s former
Chairman during the debates leading to the passage of
the NWPA. Supra p.3. It is a bedrock principle that
“[a]ny word or phrase that comes before a court for interpretation is part of” the “corpus juris.” ANTONIN
SCALIA & BRYAN A. GARNER, READING LAW: THE INTERPRETATION OF LEGAL TEXTS 252 (2012)). “It is a logical consequence of this contextual principle that the
meaning of” an earlier provision may be clarified or even
26
“change in light of a subsequent enactment.” Id. at 25455.
Here, the entire point of the NWPA is to create “a
comprehensive scheme for the interim storage and permanent disposal of” spent nuclear fuel, which is irreconcilable with the authority that the Commission claims.
Ind. Mich. Power, 88 F.3d at 1273 (emphasis added).
That scheme “plainly contemplates that, until there’s a
permanent repository, spent nuclear fuel is to be stored
onsite at-the-reactor or in a federal facility.”
NRC.Pet.App.29a.
Furthermore, the history of the Yucca Mountain project also makes plain why the Commission now retreats
from what the scheme clearly contemplates. The Commission doesn’t think that Yucca Mountain is politically
feasible, so it has shifted its focus elsewhere. Yet “no
matter how important, conspicuous, and controversial
the issue, and regardless of how likely the public is to
hold the Executive Branch politically accountable, an administrative agency’s power to regulate ... must always
be grounded in a valid grant of authority from Congress.” Brown & Williamson, 529 U.S. at 161 (citation
omitted).
Indeed, the Court need not rely on political and historical context alone. In the NWPA itself Congress expressly identified “high-level radioactive waste and
spent nuclear fuel” as “major subjects of public concern.”
42 U.S.C. §10131(a)(7). That is, this case doesn’t just present a major question: It presents an answered major
question. To borrow from Justice Barrett’s hypothetical
in Biden v. Nebraska, because the proverbial parent has
specified how the weekend should go, the babysitter is
not at liberty to make different plans. 143 S.Ct. at 237980 (Barrett, J., concurring).
27
That same principle rebuts the insistence of both the
Commission (at 27) and ISP (at 2) that even if the question of where the nation’s nuclear waste should be permanently stored is a major question, the issue of temporary storage is not. Assuming a 60-year license can be
deemed temporary, Congress was “obviously” concerned
about temporary storage when it enacted the NWPA because of the tendency for temporary storage to become
permanent. Nat’l Ass’n of Regul. Util. Comm’rs., 736
F.3d at 519. That is why, for example, Congress conditioned the stop-gap measure of monitored retrievable
storage on the issuance of a license for the construction
of a repository in Yucca Mountain. Id.; 42 U.S.C.
§10168(d)(1). Furthermore, given that nuclear waste is
hazardous for thousands of years, the prospect that such
waste will be moved from a “temporary” site 60 years
from now through an inherently dangerous transport
process does nothing to lessen the political and economic
significance.
4. Nevertheless, the Commission insists (at 20-21)
that its authority to issue licenses for the possession of
“special nuclear material,” 42 U.S.C. §2073, “source material,” id. §2093, and “byproduct material,” id. §2111,
“plainly allow the Commission to grant licenses for
offsite storage of spent nuclear fuel” because special nuclear material, source material, and byproduct material
are “the three components of spent nuclear fuel for purposes connected to generating nuclear power.” But that
argument conflates distinct statutory powers and ignores the limited statutory purpose for which those authorities may be invoked.
To begin, the Commission conflates its authority to
license nuclear facilities with its separate authority to license possession of certain nuclear materials. The AEA
28
authorizes the Commission to license only two types of
facilities: “utilization” and “production” facilities. Id.
§§2133, 2134. These are carefully defined terms that do
not contemplate a standalone facility to store spent nuclear fuel far away from a nuclear reactor. See id.
§2014(v), (cc). The Commission has neither contended
otherwise nor claimed the license at issue falls within
some other kind of facility license.3
That alone should have foreclosed issuance of the ISP
license. ISP’s predecessor-in-interest candidly applied
for a license to “construct and operate a Consolidated Interim Storage Facility.” C.I.No. 5.1. (emphasis added).
Although the Commission ultimately issued something it
styled as a “license for independent storage,” NRC.Pet.
App.53a, that document authorizes the possession of
spent nuclear fuel only at an “[a]uthorized [p]lace of
[u]se,” detailed technical specifications for which are appended to the license, NRC.Pet.App.56a. As the putative
use was, in fact, storage, NRC.Pet.App.53a, the ISP license is an extra-statutory storage-facilities license masquerading as a materials license.
Furthermore, as the Fifth Circuit recognized, the
Commission’s invocation of the AEA’s materials-licensing provisions “ignores the fact that the Act authorizes
the Commission to issue such licenses only for certain
enumerated purposes—none of which encompass storage or disposal of material as radioactive as spent nuclear fuel.” NRC.Pet.App.22a.
Section 2111 arguably permits a disposal facility for certain
types of significantly less hazardous “byproduct materials” specified in “paragraphs (3) and (4) of section 2014(e).” 42 U.S.C.
§2111(b)(1). Petitioners seem to disclaim any reliance on this provision, which would not extend to the materials ISP seeks to store. See
ISP.Pet.16.
3
29
That is, even if the ISP license could somehow be construed as a materials license, the AEA does not provide
the Commission the power to possess “spent nuclear
fuel” by conferring the authority to license possession of
“byproduct material,” “source material,” and “special
nuclear material”—even if they are “constituent materials of spent nuclear fuel.” NRC.Pet.App.21a. “In a given
statute,” especially one like the AEA involving “terms
with some heft and distinctiveness,” “the same term usually has the same meaning[,] and different terms usually
have different meanings.” Pulsifer v. United States, 601
U.S. 124, 149 (2024).
Here, “spent nuclear fuel” is separately defined as
“fuel that has been withdrawn from a nuclear reactor following irradiation, the constituent elements of which
have not been separated by reprocessing.” 42 U.S.C.
§10101(23) (emphasis added); see id. §2014(ee) (defining
“spent nuclear fuel” by cross reference to §10101). A
neighboring provision further distinguishes “byproduct
material,” “source material,” and “special nuclear material,” from “spent nuclear fuel” by separately listing “byproduct materials, source materials, special nuclear
materials, high-level radioactive waste, spent nuclear
fuel, transuranic waste, and low-level radioactive waste.”
Id. §2210i(b) (emphasis added); see also id. §2210h(2)(B)
(similar). It is thus quite wrong to treat “spent nuclear
fuel” as merely the sum of its component parts. See Pulsifer, 601 U.S. at 149.
ISP counters (at 17) that limiting the Commission’s
authority to issue materials licenses to those materials
enumerated by the AEA would prevent nuclear power
plants from handling (as they must) spent nuclear fuel.
But a nuclear power plant is differently situated in that
it operates pursuant to a utilization facility license. See
30
id. §2014(cc). Common sense—not to mention statutory
text—dictates that a license to operate a nuclear power
plant entails government permission to “withdraw[]
[fuel] from a nuclear reactor following irradiation.”
42 U.S.C. §10101(23) (defining “spent nuclear fuel”). And
the NWPA expressly allows such facilities to store spent
nuclear waste on-site. Supra p.21. But neither law nor
logic suggests that by authorizing the Commission to license possession of one type of material, Congress must
have authorized it to license possession of an entirely different and separately defined material. Quite the opposite. Cf. SCALIA & GARNER, supra at 107 (explaining the
expressio unius canon).
Moving on, both the Commission (at 21-23) and ISP
(at 15-18) twice try to expand the permissible purposes
for which a materials license may be issued by ignoring
the enumerated provisions in favor of selective quotes
from the relevant sections’ catchall provisions. Each ignores that “[w]hen Congress provides specific statutory
obligations, [courts] will not read a ‘catchall’ provision to
impose general obligations that would include those specifically enumerated.” NRC.Pet.App.22a (quoting
United States v. Jicarilla Apache Nation, 564 U.S. 162,
185 (2011)).
First, both the Commission (at 22) and ISP (at 15, 18)
accuse the Fifth Circuit of violating the rule against superfluity by narrowing the catchall provisions of §2073
(addressing “special nuclear material”) and §2093
(“source material”) to such a degree that they are coterminous with preceding enumerated provisions allowing
possession of separately defined nuclear materials for
research and development purposes. But Congress did
not authorize licensure of possession of “special nuclear
material” and “source material” “for the conduct of” all
31
“research and development activities”—only those “of
the types specified in section 2051.” 42 U.S.C.
§§2073(a)(1), 2093(a)(1). Section 2051, in turn, specifies
six fields of nuclear research. Id. §2051(a). Similarly,
§2073(a)(2) and §2093(a)(2) authorize licensure of possession of “special nuclear material” and “source material”
for use “under a license issued pursuant to section 2134.”
Id. §§2073(a)(2), 2093(a)(2). And §2134 refers to particular medical, industrial, and commercial purposes carried
out under a facilities license—which ISP conspicuously
doesn’t have. Id. §2134. Notably, the Commission does
not dispute the Fifth Circuit’s interpretation of
§§2073(a)(3) and 2093(a)(3). See NRC.Pet.App.23a.
Second, the Commission (at 23) and ISP (at 16-17)
fault the Fifth Circuit for failing to heed the “plain text”
of §2111(a), which governs licenses to possess byproduct
material. But the Commission understands §2111(a) to
“authorize[] the Commission to license possession of byproduct materials for industrial purposes and other useful applications.” NRC.Pet.23. It is hard to find daylight
between that reading and the Fifth Circuit’s conclusion—which largely consists of quoting the statute—that
Congress has “authorize[d] the Commission ‘to issue
general or specific licenses to applicants seeking to use
byproduct material for research or development purposes, for medical therapy, industrial uses, agricultural
uses, or such other useful applications as may be developed.’” NRC.Pet.App.23a (quoting 42 U.S.C. §2111(a)).
Both refer to byproduct material rather than spent nuclear fuel, and neither says anything about offsite storage.
Finally, the Commission reverts (at 23) to the AEA’s
overarching purpose of “facilitating the generation of nuclear power.” Because “that would be impossible without
32
storage of spent nuclear fuel,” the Commission reasons
(at 23) that the AEA must permit it. But “[t]he question
here is not whether something should be done; it is who
has the authority to do it.” Biden, 143 S.Ct. at 2372. Because “an agency literally has no power to act ... unless
and until Congress confers power upon it,” Cruz, 596
U.S. at 301, the operative question is “whether Congress
in fact meant to confer the power the agency has asserted,” West Virginia v. EPA, 597 U.S. at 687, 721
(2022). That cannot be inferred from general purposes
because “no legislation pursues its purposes at all costs.”
Rodriguez v. United States, 480 U.S. 522, 525-26 (1987)
(per curiam). Agencies thus cannot rely on statements of
purpose for substantive authority. See, e.g., Sturgeon v.
Frost, 139 S.Ct. 1066, 1086 (2019)
The Commission similarly maintains (at 22) that its
longstanding regulatory practice of issuing licenses for
temporary offsite storage “reinforces” its reading of the
Atomic Energy Act. See also ISP.Pet.19 (similar). But
both the major and the minor premise are wrong. As
Fasken explains in its response (at 22), the Commission
has no such practice. And even if it did, there is no “adverse possession” rule of administrative law that “insulates [agency] disregard of statutory text.” Rapanos v.
United States, 547 U.S. 715, 752 (2006) (plurality op.). “A
regulation’s age is no antidote to clear inconsistency with
a statute.” Brown v. Gardner, 513 U.S. 115, 122 (1994).
B. Petitioners’ alleged circuit split is based on
non-adjudicated assumptions.
The Commission (at 30) and ISP (at 16, 20) are also
wrong that this Court’s intervention is necessary to correct a circuit split regarding whether the AEA authorizes licensure of temporary, offsite storage facilities. In
Bullcreek v. NRC, the D.C. Circuit held that the NWPA
33
did “not repeal or supersede” what it assumed to be the
Commission’s “authority under the [AEA] to license private away-from-reactor storage facilities.” 359 F.3d at
537-38. But in doing so, as the Fifth Circuit summarized,
the D.C. Circuit “provided no textual basis for its assumption,” instead relying on inapposite authorities.
NRC.Pet.App.25a. The other case cited by the Commission—Skull Valley Band of Goshute Indians v. Nielson,
376 F.3d 1223 (10th Cir. 2004)—“is just as unhelpful” because it “merely relies on Bullcreek.” Id. The Fifth Circuit was under no obligation to adopt such an unreasoned
position, and this Court need not step in to correct it.
This case, moreover, is not about assumed power—it
is about an actual license. Petitioners do not claim that
cases like Bullcreek arise in this posture, nor could they.
The Court should thus wait to grant certiorari until a
split arises about a license—which is unlikely to ever
arise, given Congress’s express directives regarding
Yucca Mountain and the fact that the Commission itself
has previously disclaimed the authority it now asserts.
34
C O NCL USI O N
The petitions should be denied.
Respectfully submitted.
KEN PAXTON
Attorney General of Texas
BRENT WEBSTER
First Assistant Attorney
General
OFFICE OF THE
ATTORNEY GENERAL
P.O. Box 12548 (MC 059)
Austin, Texas 78711-2548
Aaron.Nielson@oag.texas.gov
AARON L. NIELSON
Solicitor General
Counsel of Record
LANORA C. PETTIT
Principal Deputy Solicitor
General
BENJAMIN W. MENDELSON
Assistant Solicitor General
J. ANDREW MACKENZIE
Assistant Attorney General
(512) 936-1700
AUGUST 2024
Counsel for the State
Respondents
This is a copy of a public record, reproduced as it was published. It is not legal advice, and it may not be the version a court would rely on. Check the official source before you cite it.