Nos. 23-1300, 23-1312
In the
Supreme Court of the United States
NUCLEAR REGULATORY COMMISSION, et al.,
Petitioners,
v.
TEXAS, et al.,
Respondents.
INTERIM STORAGE PARTNERS, LLC,
Petitioner,
v.
TEXAS, et al.,
Respondents.
On Writs of Certiorari to the United States
Court of A ppeals for the Fifth Circuit
BRIEF FOR AMICUS CURIAE
HOLTEC INTERNATIONAL
IN SUPPORT OF PETITIONERS
A nne R. Leidich
Counsel of Record
Jay E. Silberg
Pillsbury Winthrop Shaw Pittman LLP
1200 Seventeenth Street, NW
Washington, DC 20036
(202) 663-8707
anne.leidich@pillsburylaw.com
Counsel for Amicus Curiae
334455
A
(800) 274-3321 • (800) 359-6859
i
TABLE OF CONTENTS
TABLE OF CONTENTS ............................................. i
TABLE OF AUTHORITIES....................................... ii
INTEREST OF AMICUS CURIAE............................ 1
SUMMARY OF ARGUMENT .................................... 2
ARGUMENT .............................................................. 5
I. The Fifth Circuit’s Hobbs Act Ruling Has
Subjected Holtec To Unnecessary And
Repetitive Multi-Circuit Litigation. ..................... 5
A. Fasken Has Subjected The Holtec License To
Repetitive And Unnecessary Litigation Across
Multiple Circuit Courts. .................................. 5
B. The Fifth Circuit’s Ultra Vires Exception Gave
Life To Fasken’s Excessive Multiple Circuit
Court Challenge. ............................................ 10
II. Legislative History Demonstrates That The
Commission Has Acted Well Within Its
Statutory Authority. ........................................... 14
A. The History Of The Atomic Energy Act Shows
That The Commission Has The Authority To
Issue Licenses For Spent Fuel Storage. ....... 14
B. The History Of The Nuclear Waste Policy Act
Further Demonstrates The Commission’s
Authority To Issue Licenses For Spent Fuel
Storage. .......................................................... 24
CONCLUSION ......................................................... 29
ii
TABLE OF AUTHORITIES
Page(s)
Cases:
Beyond Nuclear, Inc. v. NRC,
113 F.4th 956 (D.C. Cir. 2024) ...... 3, 7, 8, 10, 12, 13
Bullcreek v. NRC,
359 F.3d 536 (D.C. Cir. 2004) .......................... 10, 29
Carpenter v. DOT,
13 F.3d 313 (9th Cir. 1994).................................... 11
Edwards’ Lessee v. Darby,
12 Wheat. 206, 6 L. Ed. 603 (1827) ....................... 24
Epic Sys. Corp. v. Lewis,
584 U.S. 497 (2018) ................................................ 28
Fasken Land & Minerals, Ltd. v. NRC,
No. 21-1147 (D.C. Cir. July 25, 2021) ............. 2, 7-8
Fasken Land & Minerals, Ltd. v. NRC,
No. 23-60377, 2024 WL 3175460
(5th Cir. Mar. 27, 2024) ............................. 1, 3, 9, 13
Henson v. Santander Consumer USA Inc.,
582 U.S. 79 (2017) .................................................. 17
Illinois v. NRC,
591 F.2d 12 (7th Cir. 1979).................................... 25
In re Holtec Int’l,
CLI-20-04, 91 NRC 167 (Apr. 23, 2020) .............. 6, 7
Loper Bright Enters. v. Raimondo,
603 U.S. ___, 144 S. Ct. 2244 (2024) ..................... 24
N. States Power Co. v. Minnesota,
447 F.2d 1143 (8th Cir. 1971), aff’d,
405 U.S. 1035 (1972).............................................. 15
iii
Oklahoma v. Castro-Huerta,
597 U.S. 629 (2022) ................................................ 17
Parker Drilling Mgmt. Servs., Ltd. v. Newton,
587 U.S. 601 (2019) ................................................ 28
Simmons v. ICC,
716 F.2d 40 (D.C. Cir. 1983) .................................. 11
Skull Valley Band of Goshute Indians v. Nielson,
376 F.3d 1223 (10th Cir. 2004).............................. 29
Statutes and Other Authorities:
28 U.S.C. § 2133 ........................................................ 19
28 U.S.C. § 2134 .................................................. 19, 21
28 U.S.C. § 2341 .......................................................... 5
28 U.S.C. § 2343 ........................................................ 13
28 U.S.C. § 2344 .................................................... 5, 11
42 U.S.C. § 2013(c) .................................................... 18
42 U.S.C. § 2014(aa) .................................................. 22
42 U.S.C. § 2014(e)(1) ................................................ 23
42 U.S.C. § 2014(e)(3) ................................................ 22
42 U.S.C. § 2014(e)(4) ................................................ 23
42 U.S.C. § 2014(v) .................................................... 21
42 U.S.C. § 2021 ........................................................ 19
42 U.S.C. § 2021(b) .................................................... 20
42 U.S.C. § 2073(a) .............................................. 16, 20
42 U.S.C. § 2073(a)(1) ............................................... 17
42 U.S.C. § 2073(a)(2) ............................................... 17
42 U.S.C. § 2073(a)(3) ............................................... 17
iv
42 U.S.C. § 2073(a)(4) ....................... 16, 17, 18, 19, 21
42 U.S.C. § 2093(a)(4) ......................................... 17, 19
42 U.S.C. § 2111(b) .............................................. 22, 23
42 U.S.C. § 2111(b)(2) ............................................... 23
42 U.S.C. § 2201(m) ................................................... 19
10 C.F.R. Part 70 ....................................................... 25
10 C.F.R. Part 72 ................................................. 25, 26
39 Fed. Reg. 32,345 (Sept. 6, 1974) .......................... 25
43 Fed. Reg. 46,309 (Oct. 6, 1978) ............................ 25
45 Fed. Reg. 74,693 (Nov. 12, 1980) ......................... 25
47 Fed. Reg. 20,231 (May 11, 1982) .......................... 25
69 Fed. Reg. 52,314 (Aug. 25, 2004) ......................... 28
71 Fed. Reg. 10,068 (Feb. 28, 2006) .......................... 28
72 Fed. Reg. 55,864 (Oct. 1, 2007) ............................ 22
78 Fed. Reg. 12,034 (Mar. 18, 2024) ....................... 5-6
83 Fed. Reg. 13,802 (Mar. 30, 2018) ...........................6
83 Fed. Reg. 14,897 (Apr. 6, 2018) ..............................6
83 Fed. Reg. 22,714 (May 16, 2018) ............................6
83 Fed. Reg. 39,919 (Jul. 16, 2018) .............................6
83 Fed. Reg. 42,527 (Aug. 22, 2018) ......................... 28
88 Fed. Reg. 30,801 (May 12, 2023) ............................8
128 Cong. Rec. 32,560 (1982) .................................... 27
Amending the Atomic Energy Act and Authorization
of Stanford Accelerator Project, Hearing before the
Joint Committee on Atomic Energy, 86th Cong.,
2d Sess. (1959) ....................................................... 18
v
Backgrounder on Radioactive Waste: High-Level
Waste, U.S. Nuclear Reg. Comm’n,
https://www.nrc.gov/reading-rm/doccollections/fact-sheets/radwaste.html ................... 15
H.R. Rep. No. 1569 .................................................... 11
H.R. Rep. No. 85-2272 ............................................... 17
Licensing Uranium Enrichment Plants: Oversight
Hearing Before the Subcommittee on Energy and
the Environment of the Committee on Interior
and Insular Affairs, 101st Cong., 2d Sess.
(Mar. 6, 1990) ......................................................... 21
Pub. L. 86-300, 73 Stat. 574 (1959) .......................... 19
Pub. L. 88-489, §§ 5-8, 78 Stat. 603 (1964)............... 20
Pub. L. No. 83-703, 68 Stat. 919 (1954) ........ 16, 17, 23
Pub. L. No. 109-58, 119 Stat. 594 ............................. 23
Radioactive Waste Legislation: Hearings on
H.R. 1993, H.R. 2800, H.R. 2840, H.R. 2881,
and H.R. 3809 Before the Subcomm. On
Energy and the Environment of the House
Comm. On Interior and Insular Affairs,
97th Cong., 1st Sess. (July 9, 1981) ...................... 26
S. Rep. No. 500 .......................................................... 11
Sup. Ct. R. 37.6 ............................................................1
1
INTEREST OF AMICUS CURIAE
Holtec International (Holtec) 1 is the owner and
licensee of a spent fuel storage facility license issued
by the Nuclear Regulatory Commission (the
“Commission” 2 or “NRC”) and vacated by the Fifth
Circuit in Fasken Land & Minerals, Ltd. v. NRC, No.
23-60377, 2024 WL 3175460, at *1 (5th Cir. Mar. 27,
2024) (per curiam).
Holtec and the Federal
Government have filed pending petitions for certiorari
on that decision. See Docket Nos. 23-1341, 23-1352.
The Fifth Circuit decision vacating Holtec’s license
was a summary decision based entirely on the
erroneous decision in Texas v. NRC, ISP. Pet. App. 1a31a,3 on review here. As a result, resolution of this
case will also decide whether the Fifth Circuit had the
right to hear the case challenging Holtec’s license and
whether Holtec has a valid Commission license for its
own facility.
Holtec is filing this amicus brief for two reasons:
first, to explain how the Fifth Circuit decision in this
case has subjected Holtec’s license to needlessly
1 Pursuant to Supreme Court Rule 37.6, amicus curiae states
that no counsel for a party authored this brief in whole or in part,
and no such counsel or party made a monetary contribution
intended to fund the preparation or submission of this brief. No
person other than the amicus curiae or its counsel made a
monetary contribution to its preparation or submission.
2 Both the NRC and its predecessor, the Atomic Energy
Commission, are referred to as the “Commission” herein.
3 This amicus brief incorporates by reference the appendix filed
by Petitioner Interim Storage Partners in conjunction with its
Petition for Review. All citations to “ISP. Pet. App.” refer to such
appendix submitted by the Petitioner found within Docket No.
23-1312.
2
duplicative litigation in multiple circuit courts, and
second, to provide legislative history and historical
context behind both the Atomic Energy Act and the
Nuclear Waste Policy Act beyond that included in the
Interim Storage Partners’ (“ISP’s”) and the Federal
Petitioners’ briefs.
SUMMARY OF ARGUMENT
For over six years, a single challenger has forced
Holtec to defend its spent fuel storage license in
repeated and often meritless litigation spanning
multiple jurisdictions. Fasken Land and Minerals
and Permian Basin Land and Royalty Owners
(“Fasken”) first filed a procedurally-improper motion
with the Commission to dismiss Holtec’s license
application on September 14, 2018—asserting that
the Commission lacked the authority to issue Holtec’s
license.
Fasken then filed numerous other
contentions against the license over the next several
years,
continually
disregarding
Commission
procedures while polishing and reusing repetitive and
untimely claims, before pursuing Commission appeals
in an equally haphazard fashion. The Commission
rightfully rejected each of Fasken’s challenges, and
Fasken sought review of these Commission’s decisions
in the D.C. Circuit in July 2021 as allowed under the
Hobbs Act. See Petition for Review, Fasken Land &
Minerals, Ltd. v. NRC, No. 21-1147 (D.C. Cir. July 25,
2021), ECF No. 1904236.
The D.C. Circuit independently reviewed and
affirmed these Commission decisions on appeal,
finding that “the Commission reasonably determined
that Fasken did not meet [the Commission’s]
regulatory criteria because the contentions were
procedurally defective, untimely, and immaterial.”
3
Beyond Nuclear, Inc. v. NRC, 113 F.4th 956, 970 (D.C.
Cir. 2024). Fasken did not seek rehearing or petition
for certiorari of this decision.
This should have marked an end to Fasken’s
litigation on the Holtec license. But Fasken did not
rest upon its Hobbs Act challenge in the D.C. Circuit.
Fasken took another bite at the apple, pursuing a
second, parallel circuit court challenge—two years
after initiating the first—in the Fifth Circuit. There,
Fasken finally freed itself from its numerous
procedural and substantive failings before the
Commission and succeeded in vacating the Holtec
license. Fasken Land & Mins., 2024 WL 3175460 at
*1.
“If at first you don’t succeed, try, try again,” should
not be a viable litigation strategy for judicial review of
Commission decisions under the Hobbs Act. The
Hobbs Act has a number of procedural guardrails
intended to prevent multiple, staggered proceedings
in the circuit courts. The only reason that Fasken was
able to take its opportunistic approach in Holtec’s case
is because the Fifth Circuit decision in Texas
jettisoned those guardrails in cases where a litigant
alleges that the agency has exceeded its statutory
authority.
That cannot be right. The Hobbs Act does not turn
off when a litigant challenges an agency’s
interpretation of its statutory authority. To decide
otherwise would engender chaos. If this Fifth Circuit
decision were to become governing law for the circuit
courts, then a litigant like Fasken could always file
two challenges in parallel, limited only by the
generous venue provision of the Hobbs Act which
allows litigation in either the D.C. Circuit or the
4
petitioner’s home circuit. In cases with multiple
litigants, even more circuit courts could be brought
into the fray. Multiple courts would then have to hear
the case based solely on an allegation that the agency
acted outside its statutory bounds.
Such a system would risk causing a
disproportionate number of circuit splits, as different
circuits hearing simultaneous challenges may come to
differing conclusions on the extent of an agency’s
authority—as happened to Holtec. While the Fifth
Circuit decided that the Commission acted outside its
statutory authority under the Atomic Energy Act, the
D.C. Circuit ruled the opposite when deciding the
first-filed proceeding on the Holtec license. For this
reason alone, the decision below should be overturned.
The Texas decision cannot be further justified by
claiming that the Commission acted well outside of its
statutory authority. In fact, the legislative histories
of both the Atomic Energy Act and the Nuclear Waste
Policy Act demonstrate that the Commission was
acting well within the bounds of its statutory
authority in issuing licenses for spent fuel storage.
This brief includes a detailed recounting of those
legislative histories supporting the Commission’s
authority to issue licenses for uses like spent fuel
storage, well beyond the history incorporated into
ISP’s and the Federal Petitioners’ briefs.
For these reasons, the decision below should be
overturned.
5
ARGUMENT
I. The Fifth Circuit’s Hobbs Act Ruling Has
Subjected Holtec To Unnecessary And
Repetitive Multi-Circuit Litigation.
The Hobbs Act, 28 U.S.C. 2341 et seq., governs
judicial review of the orders of several federal
agencies, including the Commission, and allows
“part[ies] aggrieved by [a] final [agency] order” to “file
a petition to review . . . in the court of appeals” of the
agency order “within 60 days after” the order is
issued. 28 U.S.C. § 2344. In this case, however, the
Fifth Circuit applied “an exception” to these
requirements “where ‘the agency action is attacked as
exceeding [its] power.’” See ISP. Pet. App. 19a. The
Fifth Circuit then applied this exception to Holtec’s
case, allowing Fasken to challenge the Commission’s
issuance of the Holtec license despite Fasken’s
ongoing Hobbs Act challenge in the D.C. Circuit. This
result demonstrates how the Fifth Circuit’s ultra vires
exception to the Hobbs Act was (and can be) used as
an end run around the requirements of the Hobbs Act.
Fasken was allowed to pursue multiple claims against
a single agency action in multiple circuit courts, with
no regard for the Hobbs Act’s 60-day filing deadline,
subjecting the Holtec license to unnecessary litigation
and creating an open conflict between two circuits on
the license itself.
A. Fasken Has Subjected The Holtec License
To Repetitive And Unnecessary Litigation
Across Multiple Circuit Courts.
1. Holtec’s licensing journey started in early 2018,
when the Commission first docketed its spent fuel
storage license application in the Federal Register. 78
6
Fed. Reg. 12,034 (Mar. 18, 2024). Shortly after, the
Commission started the public engagement process
needed to develop an environmental impact
statement, soliciting comments and holding public
meetings. See, e.g., 83 Fed. Reg. 13,802 (Mar. 30,
2018); 83 Fed. Reg. 14,897 (Apr. 6, 2018); 83 Fed. Reg.
22,714 (May 16, 2018).
After months of public engagement, the
Commission started the adjudicatory proceeding for
the Holtec license on July 16, 2018, by publishing a
notice in the Federal Register. See 83 Fed. Reg.
39,919 (Jul. 16, 2018). This notice provided the public
an opportunity to participate by: (1) requesting a
formal evidentiary hearing to challenge Holtec’s
application; and (2) petitioning for leave to intervene
in the proceeding. Id.
Fasken responded to this notice on September 14,
2018, by filing a procedurally improper motion to
dismiss Holtec’s license application based on the
Commission’s asserted lack of authority to issue the
Holtec license. The Secretary of the Commission
generously treated this motion as a petition to
intervene, a hearing request, and a proposed
contention. Thus, Fasken’s first proffered contention
in the Commission proceeding alleged that the Holtec
application should be rejected because it purportedly
contemplated storage contracts with the U.S.
Department of Energy and such contracts would be
illegal under the Nuclear Waste Policy Act. In re
Holtec Int’l, CLI-20-04, 91 NRC 167, 173-174 (Apr. 23,
2020). Other organizations, Beyond Nuclear and
Sierra Club filed similar claims. Id.
An Atomic Safety and Licensing Board appointed
by the Commission rejected Fasken’s contention, and
7
Fasken appealed that decision to the Commission
itself. Id. at 175-176. On April 23, 2020, the
Commission affirmed the Board decision rejecting
these claims because “the license itself would not
violate the [Nuclear Waste Policy Act] by transferring
the title to the fuel” to Department of Energy and that
Act “does not prohibit a nuclear power plant licensee
from transferring spent nuclear fuel to another
private entity.” Id. at 176.
After the Board decided these initial contentions
and terminated the adjudicatory proceeding, Fasken
attempted to file several new contentions “primarily
claiming that Holtec’s application did not adequately
disclose the control of subsurface mineral rights at the
facility nor the extent of extraction operations in the
vicinity of the facility.” Beyond Nuclear, 113 F.4th at
969-970. The Board rejected these contentions, and
Fasken appealed some of the Board decisions to the
Commission. The Commission decided that these
contentions “were procedurally defective, untimely,
and immaterial.” Id. “[A]ny challenge to Holtec’s
assertions about the ownership of subsurface mineral
rights should have been made when Holtec’s initial
environmental report was published,” and Fasken
could not justify its belated attempts having “fail[ed]
to demonstrate that [any purportedly new]
information was previously unavailable or materially
different from information available during the
licensing proceeding.” Id.
2. Shortly after its claims were rejected by the
Commission, Fasken filed its first circuit court
challenge to the Holtec licensing proceeding via a
procedurally-appropriate Hobbs Act challenge in the
D.C. Circuit. See Petition for Review, Fasken Land &
8
Minerals, Ltd. v. NRC, No. 21-1147 (D.C. Cir. June 25,
2021), ECF No. 1904236. Holtec had been in the D.C.
Circuit since 2020, when Don’t Waste Michigan and
Beyond Nuclear first filed their petitions for review
under the Hobbs Act. These petitions, a subsequent
petition from Sierra Club, and the Fasken petition
described above, were consolidated by the D.C. Circuit
into one proceeding. Beyond Nuclear, 113 F.4th at
961.
This D.C. Circuit proceeding included challenges
to the Commission’s authority to issue the Holtec
license. Fasken itself initially sought review of the
Commission’s disposition of its statutory authority
claims by challenging the Commission’s decision on
that issue in its petition for review. Petition for
Review, Fasken Land & Minerals, Ltd., No. 21-1147
(D.C. Cir. June 25, 2021), ECF No. 1904236
(petitioning for review of CLI-20-04). But Fasken
later chose to abandon its statutory authority claims,
instead focusing only on its geological and mineral
rights concerns. See Beyond Nuclear, 113 F.4th at
969-70. Two other parties, however, continued to
challenge the Commission’s statutory authority to
issue the Holtec license.
Id. at 963-65.
The
proceeding was put into abeyance at the request of the
Commission, pending issuance of the Holtec license,
id. at 962, which was later issued on May 9, 2023. 88
Fed. Reg. 30,801 (May 12, 2023).
3. Two months after the Commission issued
Holtec’s license, and two years after it initiated its
first challenge in the D.C. Circuit, Fasken filed
another challenge in the Fifth Circuit. Fasken
reiterated its underlying claims against the
Commission’s authority to issue the license but did
9
not explain the timeliness of pursuing these claims
years after the Commission had first rejected them.
See generally, Initial Brief of Fasken, No. 23-60377
(5th Cir. Oct. 2, 2023), ECF No. 51. Nor did Fasken
justify its pursuit of claims in two separate courts of
appeals. Id. Instead, Fasken filed its claims under
the cloak of a challenge to the Commission’s
purportedly ultra vires issuance of the Holtec license,
id. at 14, relying on the Fifth Circuit’s ultra vires
exception applied in the Texas case. ISP. Pet. App.
19a, 41a-45a.
The Federal Government moved to transfer
Fasken’s Fifth Circuit challenge to the D.C. Circuit in
light of the ongoing D.C. Circuit proceeding. See
Fasken Land & Mins., 2024 WL 3175460 at *1. In
addition, Holtec argued that venue was improper in
the Fifth Circuit given Fasken’s non-Hobbs Act
claims. Brief of Holtec, Fasken Land & Minerals,
Ltd., No. 23-60377 at 23-25 (5th Cir. Dec. 8, 2023),
ECF No. 74. However, in briefing the parties all
recognized that a decision in the Texas case would
bind a Fifth Circuit panel regarding the substantive
issues on the Commission’s authority to issue the
Holtec license and the existence of an ultra vires
exception to the Hobbs Act. Fasken Land & Mins.,
2024 WL 3175460 at *1.
After a final decision was rendered in Texas, the
Fifth Circuit found that because the Holtec proceeding
involved a “materially identical license in a materially
identical procedural posture” that absent the “[c]ourt
granting rehearing en banc,” Texas controlled the
decision on the Holtec license. Id. Consequently, the
court granted Fasken’s petition for review and
vacated Holtec’s spent fuel storage facility license,
10
while also denying the Federal Government’s motion
to transfer the case to the D.C. Circuit as moot. Id.
The Fifth Circuit, however, did not address the
propriety of allowing Fasken two bites at the apple in
two separate circuit courts against a single
Commission licensing proceeding.
4. After the Fifth Circuit issued its decision, the
D.C. Circuit issued a decision on Fasken’s earlier-filed
claims and the claims filed by other challengers in the
Holtec licensing proceeding. This decision, and the
Fifth Circuit decision, reached diametrically opposite
conclusions as to the Commission’s authority to issue
the Holtec license. The D.C. Circuit correctly found
that “[t]he [Atomic Energy Act] ‘authorized the NRC
to regulate the possession, use, and transfer of the
constituent materials of spent nuclear fuel’ and to
license the storage of spent nuclear fuel at onsite and
away-from-reactor storage facilities.”
Beyond
Nuclear, 113 F.4th at 964 (citing Bullcreek v. NRC,
359 F.3d 536, 538, 542-43 (D.C. Cir. 2004)). “[T]he
[Nuclear Waste Policy Act] does not affect ‘the NRC’s
authority under the [Atomic Energy Act] to license
and regulate private use of private away-from-reactor
spent fuel storage facilities.’” Beyond Nuclear, 113
F.4th at 964. The D.C. Circuit also rejected Fasken’s
various other claims regarding the geology and
mineral rights at the Holtec site. Id. at 969-70.
B. The Fifth Circuit’s Ultra Vires Exception
Gave Life To Fasken’s Excessive Multiple
Circuit Court Challenge.
The Hobbs Act sets the procedures for appealing
decisions of several administrative agencies,
including the Commission. Congress intended that
11
the Hobbs Act would ensure the “elimination of
multiple suits challenging the same [agency] order
[and] limitation of the time for filing review to 60 days
after entry of the order.” Simmons v. ICC, 716 F.2d
40, 44 (D.C. Cir. 1983) (citing H.R. Rep. No. 1569, at
4-6, 93d Cong., 2d Sess. (1974), S. Rep. No. 500, at 34, 93d Cong., 1st Sess. (1973)). “By creating a strict
time frame for review and bypassing district courts,
Congress hoped [the Hobbs Act would] increase the
speed, efficiency and consistency of judicial review.”
See also Carpenter v. DOT, 13 F.3d 313, 316 (9th Cir.
1994).
Among other requirements, the Hobbs Act only
allows litigation from a “party aggrieved by [a] final
[agency] order.” 28 U.S.C. § 2344. Because Congress
in the Hobbs Act chose the phrase “party aggrieved,”
circuit courts other than the Fifth Circuit have only
allowed challenges from either: (1) parties to the
agency’s underlying proceeding, or (2) non-parties
challenging an agency decision denying the litigant
party status. See ISP. Pet. App. 15a-18a. In short, a
non-party must challenge the agency’s decision
denying its petition to intervene and denying it party
status. And a challenger like Fasken must justify its
numerous procedural failings and untimely and
immaterial claims before the agency on judicial
review.
The Fifth Circuit, however, uniquely relied on “an
exception”
to
this
“party-aggrieved
status
requirement” “where ‘the agency action is attacked as
exceeding [its] power.’” See ISP. Pet. App. 19a. This
exception, as applied to Holtec’s case, allowed Fasken
to challenge the Commission’s issuance of the Holtec
license without addressing its party-aggrieved status.
12
The result demonstrates how the Fifth Circuit’s ultra
vires exception to the Hobbs Act was (and can be) used
as an end run around the requirements of the Hobbs
Act, as Fasken was allowed to pursue multiple claims
against a single agency proceeding in multiple circuit
courts, with no regard for the Hobbs Act’s 60-day filing
deadline.
Fasken participated in the Commission’s licensing
proceeding on the Holtec license by filing a petition to
intervene that was ultimately rejected, and Fasken
never gained party status. Fasken nevertheless
initiated a procedurally-proper Hobbs Act appeal of
the Commission’s decision rejecting its petition to
intervene and its potential party status in the D.C.
Circuit. That court ultimately faulted Fasken for its
numerous, repeated procedural and substantive
failings in the Commission’s proceeding below.
Beyond Nuclear, 113 F.4th at 969-970.
Years after filing in accordance with the Hobbs Act
in the D.C. Circuit, Fasken filed its second circuit
court petition in the Fifth Circuit again challenging
the Holtec licensing proceeding, this time under the
cloak of a challenge to the Commission’s purportedly
ultra vires issuance of the Holtec license. Fasken was
thus able to side-step its first-filed Hobbs Act petition
in the D.C. Circuit and escape its underlying claims
that failed before the Commission. And Holtec was
burdened with litigation in multiple circuit courts,
initiated years apart, on its spent fuel storage license.
Having flouted the requirements of the Hobbs Act,
Fasken initiated duplicate judicial reviews in the hope
of improving its chance of success, not as a means to
ensure judicial review in the first instance.
13
In the end, two irreconcilable decisions were issued
on the Holtec license. The Fifth Circuit vacated the
Holtec license based on the decision in Texas. Fasken
Land & Mins., 2024 WL 3175460 at *1. The D.C.
Circuit then issued its own decision upholding the
Commission’s authority to issue the Holtec license.
Beyond Nuclear, Inc., 113 F.4th at 956, 969-70. It
cannot be that Congress intended for the Hobbs Act to
allow such an incongruous result. Yet, the Fifth
Circuit’s ultra vires exception almost guarantees more
duplicative, tardy, and unnecessary litigation and the
creation of numerous incompatible circuit court
decisions going forward.
If this Court were to affirm the Fifth Circuit’s ultra
vires exception, making it the standard across all
circuit courts, any challenger to a Commission
proceeding could disregard the need to participate as
a party before the Commission and simply wait until
after the eleventh hour to file challenges. Or, like
Fasken, a challenger could use the ultra vires
exception to escape an inconvenient record below. The
challenger could then initiate litigation in more than
one circuit court, just like Fasken, since the Hobbs Act
venue provision allows for two possible venues (the
D.C. Circuit and the circuit where the challenger
resides or has its principal office). 28 U.S.C. § 2343.
The addition of other challengers, residing in other
circuits, could extend the litigation even further to
encompass even more circuit courts.
A mere
allegation that the agency has exceeded its statutory
authority could scatter litigation across the circuit
courts, leading to more circuit splits like the Holtec
proceeding and eliminating any benefits to the speed,
efficiency and consistency of judicial review through
the Hobbs Act.
14
For this reason, the Fifth Circuit’s decision
allowing an ultra vires exception should be rejected
and overturned.
II. Legislative History Demonstrates That The
Commission Has Acted Well Within Its
Statutory Authority.
There also was no ultra vires action in this case.
The Fifth Circuit’s finding that the Commission was
acting outside its statutory authority is simply wrong
and contrary to decades of legislative history
underpinning both the Atomic Energy Act and the
Nuclear Waste Policy Act.
A. The History Of The Atomic Energy Act
Shows That The Commission Has The
Authority To Issue Licenses For Spent
Fuel Storage.
In the decision on review, the Fifth Circuit claimed
that the Atomic Energy Act “authorizes the
Commission to issue such [special nuclear material]
licenses only for certain enumerated purposes,” and
particularly that the Commission could only issue
licenses “for various types of research and
development,” or “utilization and production
facilities.” ISP. Pet. App. 22a-23a. According to the
Fifth Circuit, the Commission cannot issue licenses
for “storage or disposal of material as radioactive as
spent nuclear fuel.” ISP. Pet. App. 22a.
This is, however, simply contrary to both basic
logic and the history of the Atomic Energy Act.
Congress enacted the Atomic Energy Act to ensure
federal government regulation of the nuclear
industry, including special nuclear material—which
is used to produce nuclear fission—and the other
15
highly radioactive materials that are in spent fuel. 4 It
is backwards for the Fifth Circuit to claim that the
federal government should lose authority as nuclear
materials become more radioactive. It makes far more
sense that Congress would expect the Commission to
extend its authority over nuclear materials to cover
any postulated regulatory gaps, particularly over
special nuclear material or especially radioactive
materials. The plain text of the statute and legislative
history support the latter interpretation.
1. There is no doubt that the Commission exercises
expansive authority over special nuclear materials.
As first enacted in 1946, the Atomic Energy Act
“created a government monopoly for the production
and use of fissionable material.” N. States Power Co.
v. Minnesota, 447 F.2d 1143, 1148 (8th Cir. 1971),
aff’d, 405 U.S. 1035 (1972). While Congress amended
the Act in 1954 to end the government’s total
monopoly over special nuclear material, initially by
allowing leasing of special nuclear material to
Commission licensees, the revised Act continued to
demonstrate Congress’ intent that the federal
government would exercise complete regulatory
Fresh nuclear fuel is composed of source material (uranium)
enriched with a limited quantity of special nuclear material
(uranium-235) capable of producing nuclear fission. Once
nuclear fuel is used, nuclear fission and radiation exposure cause
spent fuel to be comprised of the original source and special
nuclear material, plus fission products from split atoms (which
are considered byproduct material) and new special nuclear
material like plutonium. See Backgrounder on Radioactive
Waste: High-Level Waste, U.S. Nuclear Reg. Comm’n,
https://www.nrc.gov/reading-rm/doc-collections/factsheets/radwaste.html (last updated Jan. 26, 2024). These
various nuclear materials are intermingled throughout spent
fuel and cannot be separated without significant effort.
4
16
control over special nuclear material. These 1954
amendments added a provision to the Act setting forth
the conditions under which the Commission could
lease special nuclear material:
The Commission is authorized to issue
licenses for the possession of, to make
available for the period of the license, and to
distribute special nuclear material within the
United States to qualified applicants
requesting such material—(1) for the conduct
of research and development activities of the
types specified in section 31; (2) for use in the
conduct of research and development
activities or in medical therapy under a
license issued pursuant to section 104; or (3)
for use under a license issued pursuant to
section 103.
42 U.S.C. § 2073(a), Pub. L. No. 83-703, § 53, 68 Stat.
919, 930 (1954).
There is no indication that Congress initially
intended for this licensing system to have any
regulatory gap in federal authority over special
nuclear material. In fact, there could be no gap since
special nuclear material was all owned by the federal
government and leased out pursuant to § 2073(a).
However, to the extent any gap existed, Congress
deliberately closed it four years later by adding
§ 2073(a)(4) and delegating authority to the
Commission to self-identify any such gaps in its
licensing authority. Specifically, Congress authorized
the Commission to issue licenses and lease material
“for such other uses as the Commission determines to
be appropriate to carry out the purposes of [the
Atomic Energy Act].” 42 U.S.C. § 2073(a)(4). This
17
expansion of authority was intended “to authorize the
Commission to issue licenses for the possession of
special nuclear material . . . for uses which do not fall
expressly within the present provisions of subsection
53a [42 U.S.C. § 2073(a)(1)-(3)],” allowing the
Commission to issue “licenses for incipient new
[i]ndustrial uses.”
Joint Committee on Atomic
Energy, Amending the Atomic Energy Act of 1954,
H.R. Rep. No. 85-2272, at 1 (2d Sess. 1958). Thus,
Congress intended for the Commission to issue
licenses under 42 U.S.C. § 2073(a)(4) for purposes
beyond those already enumerated in § 2073(a)(1)-(3).
When Congress gave the Commission broad
authority to issue licenses for special nuclear material
under § 2073(a)(4), the 1954 Act already had a similar,
but not identical, provision allowing the Commission
to issue licenses for source material “for any other use
approved by the Commission as an aid to science or
industry.” 68 Stat. 933 (Aug. 30, 1954); 42 USC
§ 2093(a)(4). The Fifth Circuit uses a canon of
statutory interpretation to equate these catch-all
source material and special nuclear material licensing
provisions. ISP. Pet. App. 22a. But the special
nuclear material authority uses broader terms, and
this Court assumes that “the legislature says what it
means and means what it says.” Oklahoma v. CastroHuerta, 597 U.S. 629, 642 (2022) (quoting Henson v.
Santander Consumer USA Inc., 582 U.S. 79 (2017)
(cleaned up)).
The textual difference between these two
provisions is easily explained. The broad authority
under § 2073(a)(4) allows the Commission to fill
licensing gaps for special nuclear material where it is
appropriate “to carry out the purposes of [the Atomic
18
Energy Act].” One of those purposes is to maintain
federal government control over special nuclear
material. See 42 U.S.C. § 2013(c) (“It is the purpose
of [the Atomic Energy Act] to … provid[e] for—a
program for Government control of the possession,
use, and production of . . . special nuclear material.”).
Thus, the Commission can issue a § 2073(a)(4) license
so long as it is appropriate to maintain government
control over special nuclear material. Requiring the
Commission to identify an aid to science or industry
would undermine that broader goal.
Shortly after the addition of § 2073(a)(4), the
Commission described, in testimony before the Joint
Committee on Atomic Energy, how it could use this
authority for a variety of fuel-cycle related purposes—
including the accumulation and storage of spent fuel
by a middleman like Holtec. As the Commission
explained, when the Atomic Energy Act was enacted
Congress expected that most fuel cycle services would
be rendered by the Commission “because of
commercial unavailability.” See Amending the Atomic
Energy Act and Authorization of Stanford Accelerator
Project, Hearing before the Joint Committee on Atomic
Energy, at 4, 86th Cong., 2d Sess. (1959). Thus,
whenever a reactor group needed fuel cycle services,
“the reactor group would deal directly with the
Commission.” Id.
This did not occur. Instead, “the Commission
assisted and witnessed the growth of an industry
capable of performing many of the services previously
furnished by the Commission.”
Id. With this
expansion of private industry, the Commission
expected that “[a] natural outgrowth” would be an
arrangement “whereby a given fuel cycle supplier [i.e.
19
a § 2073(a)(4) or § 2093(a)(4) licensee], not a section
103 or 104 licensee, would furnish or arrange for all
steps in the fuel cycle for a given reactor operator.” Id.
This would include collecting and accumulating
spent fuel before its return to the U.S. government.
The Commission explained to Congress that “there
would be considerable merit” “in having the fuel from
a number of reactors delivered in a single batch to the
Commission for processing,” and “[t]he most
convenient manner in so doing would be to have a
middle-man accumulate the [irradiated] fuel under a
section 53 a. (4) [i.e. § 2073(a)(4)] or a section 63 a. (4)
[i.e. § 2093(a)(4)] license at his own financial
responsibility and deliver to [the Commission] for his
own account.” Id. In short, Congress has known,
since 1959, that the Commission could license spent
fuel storage by middlemen like Holtec under
§ 2073(a)(4).5
Further emphasizing the lack of any gap in the
Commission’s authority over special nuclear material,
in 1959, Congress added a new section to the Atomic
Energy Act, 42 U.S.C. § 2021, to allow states to
assume limited responsibilities over some nuclear
materials upon entering into an agreement with the
Commission. This Agreement State program did not,
however, allow the Commission to delegate any
authority over quantities of special nuclear material
5 This conversation arose regarding a proposed modification to
the Act allowing the Commission to directly enter into service
contracts with § 2073(a)(4) and § 2093(a)(4) licensees. Congress
subsequently passed this modification. Pub. L. 86–300, § 1, 73
Stat. 574 (1959); 42 U.S.C. § 2201(m) (allowing contracts with
“persons licensed under section 2133, 2134, 2073(a)(4), or
2093(a)(4) of this title”).
20
sufficient to form a critical mass. 42 U.S.C. § 2021(b).
All special nuclear material in sufficient quantities
(like spent fuel) must be licensed and regulated by the
Commission, as there is no other regulator with
authority.
In the sixty years since creating the Agreement
State program, Congress has never reduced the
Commission’s authority over special nuclear material.
Congress has, however, advanced the Commission’s
special nuclear material authority two times: first,
when ending the government monopoly over special
nuclear materials ownership, and second, when
privatizing uranium enrichment.
First, in a change meant to enable private
ownership of special nuclear material, Congress
expanded the Commission’s authority to issue special
nuclear material licenses under § 2073(a) beyond the
mere “possession of” special nuclear material to allow
private entities to hold “licenses to transfer or receive
in interstate commerce, transfer, deliver, acquire,
possess, own, receive possession of or title to . . .
special nuclear material.” Pub. L. 88-489, §§ 5-8, 78
Stat. 603, 604 (1964). This expansion filled a gap
created when the government ended its monopoly
over the ownership of special nuclear material, but it
did not alter the activities licensed by the
Commission.
Years later, Congress in 1990 expanded the
Commission’s special nuclear material licensing
authority to cover uranium enrichment facilities.
Congress did not do this by adding a new subpart for
enrichment to the Commission’s authority under
§ 2073(a) or by revising § 2073(a) to clearly allow the
Commission to issue facility licenses for special
21
nuclear material. Instead, Congress only needed to
remove uranium enrichment from the definition of a
production facility in 42 U.S.C. § 2014(v). This single
change reallocated the Commission’s licensing
authority over uranium enrichment facilities from a
§ 2134 production facility license to the broad special
nuclear material licensing authority in § 2073(a)(4).
See Licensing Uranium Enrichment Plants: Oversight
Hearing Before the Subcommittee on Energy and the
Environment of the Committee on Interior and Insular
Affairs, at 13, 123, 101st Cong., 2d Sess. (Mar. 6, 1990)
(addressing proposed changes to the Act and
explaining the differences in requirements for
licensing production and utilization facilities as
contrasted to licensing materials). This was possible
because the Commission had the preexisting
authority to license facilities with special nuclear
material under § 2073(a)(4).
In the seventy years since the Atomic Energy Act’s
enactment, Congress has consistently maintained the
Commission’s licensing authority to close any
potential gaps in regulating special nuclear material,
including over the nuclear fuel cycle and spent fuel
storage. The Commission has used that authority
accordingly.
There is nothing to suggest that
Congress ever intended to limit the Commission’s
authority over special nuclear material to only a
subset of potential licensees or uses. The Fifth
Circuit’s decision otherwise is entirely inconsistent
with this seventy-year history.
2. Contrary to the Fifth Circuit’s decision, there is
also nothing to suggest that the Commission somehow
lost its authority over spent fuel due to the presence
of material “with half-lives much longer than radium-
22
226.” ISP. Pet. App. 24a. The Fifth Circuit engaged
in a series of mental gymnastics to conclude that a
disposal provision for byproduct material in § 2111(b)
“cross-references the definition of byproduct materials
in § 2014(e)(3)–(4), which refers to radium-226 and
other material that ‘would pose a threat similar to the
threat posed by . . . radium-226 to the public health
and safety.’” ISP. Pet. App. 23a-24a. “[B]ecause some
of the isotopes in spent nuclear fuel [like plutonium2396] have much longer half-lives than radium-226,”
there is “no plausible argument that spent nuclear
fuel” “is the type [of] radioactive material
contemplated in the disposal provision in § 2111(b).”
ISP. Pet. App. 24a.
This tortured analysis is inconsistent with the
history (and plain language) of the Atomic Energy Act.
First, the Fifth Circuit’s reliance on the Commission’s
authority over “types of byproduct material [that] may
be disposed” under 42 U.S.C. § 2111(b), ISP. Pet. App.
23a, to establish the extent of Commission authority
has it backwards. This provision of the Atomic Energy
Act exists to clarify that the Commission’s recently
added (in 2005) authority over naturally occurring
radioactive material would not alter the ability “to
dispose of the newly added byproduct material at a
disposal facility in accordance with [non-nuclear
hazardous waste laws].” 72 Fed. Reg. 55,864, 55,880
(Oct. 1, 2007). As a result, materials like radium-226
“as defined in paragraphs (3) and (4) of [§ 2014(e)],”
may be disposed of “at a disposal facility in accordance
with any Federal or State solid or hazardous waste
Contrary to the Fifth Circuit decision, plutonium is
specifically defined as special nuclear material in the Atomic
Energy Act. 42 U.S.C. § 2014(aa).
6
23
law, including the Solid Waste Disposal Act.” 42
U.S.C. § 2111(b)(2).
This provision essentially
removes these lower-impact materials from the more
heightened requirements applied to the disposal of
Commission-regulated materials like spent nuclear
fuel.
The disposal provision in 42 U.S.C. § 2111(b) also
has no relevance to the agency’s foundational
authority over other byproduct materials, like
materials irradiated in a nuclear reactor found in
spent fuel. Such material has been under Commission
authority since the Atomic Energy Act’s enactment in
1954, when byproduct material was first defined as
“any radioactive material (except special nuclear
material) yielded in or made radioactive by exposure
to the radiation incident to the process of producing or
utilizing special nuclear material.” Pub. L. No. 83703, 68 Stat. 923 (Aug. 30, 1954).
Radium-226 was added to the definition of
byproduct material decades later to cover naturally
occurring radioactive material. Pub. L. No. 109-58,
119 Stat. 594, 806, 807 (Aug. 8, 2005). See 42 U.S.C.
§ 2014(e)(4) (granting the Commission authority over
materials “similar to” radium-226 for “discrete
source[s] of
naturally
occurring
radioactive
material”). This expansion of Commission authority
into naturally occurring radioactive material, which
only came about in the Energy Policy Act of 2005, was
not intended to, and did not, reduce the Commission’s
long-standing authority over materials irradiated in a
nuclear reactor. Id. at § 2014(e)(1).
The Fifth Circuit’s decision never addresses the
Commission’s authority over materials irradiated in a
nuclear reactor, set forth in § 2014(e)(1), reading that
24
clause out of existence in favor of the 2005 additions
regarding naturally occurring radioactive material.
This is another reason that the Fifth Circuit decision
is contrary to the plain language of the Act and should
not be upheld.
B. The History Of The Nuclear Waste Policy
Act
Further
Demonstrates
The
Commission’s Authority To Issue Licenses
For Spent Fuel Storage.
This Court extends “‘great respect’ to the
‘contemporaneous’ and consistent views of the
coordinate branches about the meaning of a statute’s
terms.” Loper Bright Enters. v. Raimondo, 603 U.S.
___, 144 S. Ct. 2244, 2283 (2024). And this Court has
upheld the “contemporaneous construction” of a law
by “those who were called upon to act under the law
and were appointed to carry its provisions into effect,”
where “that construction seems to have received, very
shortly after, the sanction of the legislature.”
Edwards’ Lessee v. Darby, 12 Wheat. 206, 210, 6 L.
Ed. 603 (1827).
This is such a case. The Commission has licensed
spent fuel storage facilities for fifty years and
enshrined its ability to issue such licenses in a
rulemaking over forty years ago.
Congress
subsequently recognized that history, and the
existence of an already-licensed and operating spent
fuel storage facility, and left the Commission’s
authority intact while developing the Nuclear Waste
Policy Act. In the decades since, the Commission has
issued numerous licenses for spent fuel storage, and
two circuit courts have upheld that authority. Yet,
Congress has never acted to revoke the Commission’s
authority to issue these licenses.
Clearly the
25
“‘contemporaneous’ and consistent view” from the
agency, Congress, and the Circuit Courts is that the
Commission has the authority to license spent fuel
storage facilities under the Atomic Energy Act.
The Commission started issuing licenses for spent
fuel storage in the 1970s, when General Electric
Company was issued a special nuclear materials
license under 10 C.F.R. pt. 70, “Domestic Licensing of
Special Nuclear Material,” to store spent fuel at its
away-from-reactor Morris, Illinois facility. See 39
Fed. Reg. 32,345, 32,456 (Sept. 6, 1974) (regarding
continuation of special nuclear materials license to
receive and possess spent fuel); see also Illinois v.
NRC, 591 F.2d 12 (7th Cir. 1979) (rejecting Illinois’
challenge to the Morris special nuclear materials
license).
Within a few years, however, the
Commission recognized that its special nuclear
material licensing regulations, including Part 70,
were “designed for relatively short-term possession in
conjunction with operations,” and there was a “need
for a new regulation covering the requirements for
extended spent fuel storage under static storage
conditions involving no operations on such materials.”
43 Fed. Reg. 46,309 (Oct. 6, 1978) (proposed 10 C.F.R.
pt. 72). This led to the promulgation of 10 C.F.R. Part
72 to enable the Commission to review applications
and issue licenses for spent fuel storage. 45 Fed. Reg.
74,693 (Nov. 12, 1980) (final 10 C.F.R. pt. 72).7
Years after the GE Morris facility was first
licensed and the Commission promulgated Part 72,
7 The GE Morris facility license was transitioned from a Part
70 license to a Part 72 license after issuance of Part 72. See 47
Fed. Reg. 20,231 (May 11, 1982) (noting docket and license
number change).
26
Congress passed the Nuclear Waste Policy Act in an
effort to address the question of the Federal
Government’s role in the final disposition of spent
fuel. During consideration of the Nuclear Waste
Policy Act, Congress explicitly recognized that the
Commission was already licensing privately-owned
away-from-reactor storage facilities.
As the
Commission’s Executive Director for Operations
testified during Congress’ development of the Act:
The Commission has stated with the issuance
of its regulation, 10 C.F.R. Part 72, which
provides
the
licensing
criteria
for
independent spent fuel storage installations,
that there are no compelling safety or
environmental reasons generally favoring
either reactor sites or away-from-reactor
sites. Thus, Part 72 establishes the licensing
framework for such storage either at reactor
sites or away-from-reactors using either wet
or dry storage technologies.
Radioactive Waste Legislation: Hearings on H.R.
1993, H.R. 2800, H.R. 2840, H.R. 2881, and H.R. 3809
Before the Subcomm. On Energy and the Environment
of the House Comm. On Interior and Insular Affairs,
at 326, 97th Cong., 1st Sess. (July 9, 1981). Nowhere
do the hearings or debates suggest that these Part 72
licenses would become invalid after the Nuclear
Waste Policy Act was enacted or that new licenses
would not be issued. In fact, during the debates, Rep.
Corcoran of Illinois recognized that the alreadyexisting Morris, Illinois away-from-reactor storage
facility would continue to operate and that delays in
permanent disposal would “put[] even greater
pressure on the [away-from-reactor] facility at
27
Morris.” 128 Cong. Rec. 32,945 (1982). There is no
hint that after the Nuclear Waste Policy Act became
law, the GE Morris facility was expected to close or
become the last of its kind.
The focus instead was on ownership of the Morris
facility, as Rep. Corcoran worked to prevent the
Federal Government from taking over the facility.
See 128 Cong. Rec. 32,560 (1982) (expressing pleasure
that “the compromise bill prohibits the Federal
Government from taking over the interim spent fuel
storage facility in Morris, Ill.”).
A Senate bill
preceding the Nuclear Waste Policy Act would have
“grant[ed] the Secretary of Energy the authority to
‘construct, acquire or lease one or more [away-fromreactor] facilities.’” 128 Cong. Rec. 32,946 (1982).
Rep. Corcoran objected and a provision was added to
the Act (Section 10155(h)) to address “the heart of the
problem that many of us have, that is, the concern
about whether or not private [away-from-reactor]
storage facilities would be vulnerable to a federal
takeover under [the Act].” 128 Cong. Rec. 28,033
(1982). Thus, the Nuclear Waste Policy Act would
limit the “use, purchase, lease, or other acquisition” of
away-from-reactor storage facilities not already
owned by the Federal Government. See 128 Cong.
Rec. 32,560 (1982). It would also “prohibit the
Secretary [of Energy] from providing capacity for the
storage of spent nuclear fuel” at private facilities like
Morris, Ill., see 128 Cong. Rec. 32,560 (1982),
constraining the Federal Government’s ability to
provide storage at away-from-reactor facilities. It
would not alter the ability of private parties to store
spent fuel.
28
Congress is expected to “legislate against the
backdrop of existing law,” Parker Drilling Mgmt.
Servs., Ltd. v. Newton, 587 U.S. 601, 611 (2019)
(citation omitted), and is “ ‘presum[ed]’ ” not to
“repeal[]” a statute “by implication,” Epic Sys. Corp. v.
Lewis, 584 U.S. 497, 510 (2018) (citation omitted).
Congress was aware of the Commission’s existing
licenses for offsite spent fuel storage. Yet, after all of
this discussion, the Nuclear Waste Policy Act neither
explicitly nor implicitly repealed the Commission’s
existing authority to license privately-owned interim
storage of spent fuel, whether at new facilities or
already-existing facilities like GE Morris.
Since the issuance of the Nuclear Waste Policy Act,
the Commission has issued numerous licenses for
spent fuel storage facilities. See 69 Fed. Reg. 52,314
(Aug. 25, 2004) (listing thirty-eight Part 72 licenses as
of date of publication). These licenses have been
issued for spent fuel storage facilities both at and
away-from-reactor sites and decommissioned reactor
sites (where a reactor no longer exists). See, e.g., 83
Fed. Reg. 42,527 (Aug. 22, 2018) (regarding spent fuel
storage facility at decommissioned reactor site); 71
Fed. Reg. 10,068 (Feb. 28, 2006) (issuing materials
license for away-from-reactor spent fuel storage
facility).
One of these facilities was subject to extensive
litigation in the courts, leading both the D.C. Circuit
and the Tenth Circuit to find that the Commission has
the statutory authority to issue licenses for privatelyowned away-from-reactor spent fuel storage because
the Atomic Energy Act unambiguously grants the
Commission such authority, and the Nuclear Waste
Policy Act did not revoke that authority.
See
29
Bullcreek v. NRC, 359 F.3d 536, 538 (D.C. Cir. 2004),
Skull Valley Band of Goshute Indians v. Nielson, 376
F.3d 1223, 1232 (10th Cir. 2004). Thus, in addition to
long-standing
Commission
practice,
and
Congressional assent, the Commission has also for
decades exercised the unassailable, court-approved
authority to license privately-owned, away-fromreactor spent fuel storage facilities, until the Fifth
Circuit decided otherwise in this case and Holtec’s
case.
In summary, for decades, the three coordinate
branches of U.S. government have all agreed on one
thing: the Commission has the authority to issue
licenses for spent fuel storage. The Fifth Circuit’s
decision in the underlying case is insufficient to alter
that well established allocation of authority, and the
Fifth Circuit’s rationale must be overturned.
CONCLUSION
For the foregoing reasons, this Court should
overturn the Fifth Circuit’s decision in the underlying
case and find that there is no ultra vires exception to
the Hobbs Act and that the Commission has the
authority to issue licenses for spent fuel storage.
30
Respectfully submitted,
ANNE R. LEIDICH
Counsel of Record
JAY E. SILBERG
PILLSBURY WINTHROP SHAW
PITTMAN LLP
1200 Seventeenth St., NW
Washington, DC 20036
(202) 663-8707
anne.leidich@pillsburylaw.com
Counsel for Amicus Curiae
DECEMBER 2024
This is a copy of a public record, reproduced as it was published. It is not legal advice, and it may not be the version a court would rely on. Check the official source before you cite it.