No. 22-743

In the Supreme Court of the United States

NEVADA IRRIGATION DISTRICT, ET AL., PETITIONERS

v.

CALIFORNIA STATE WATER RESOURCES

CONTROL BOARD, ET AL.

ON PETITION FOR A WRIT OF CERTIORARI

TO THE UNITED STATES COURT OF APPEALS

FOR THE NINTH CIRCUIT

BRIEF FOR THE FEDERAL RESPONDENT

IN OPPOSITION

MATTHEW R. CHRISTIANSEN

General Counsel

ROBERT H. SOLOMON

Solicitor

JARED B. FISH

Attorney

Federal Energy Regulatory

Commission

Washington, D.C. 20426

ELIZABETH B. PRELOGAR

Solicitor General

Counsel of Record

Department of Justice

Washington, D.C. 20530-0001

SupremeCtBriefs@usdoj.gov

(202) 514-2217

QUESTION PRESENTED

The Federal Energy Regulatory Commission (Commission) has authority to issue licenses for the construction, operation, and maintenance of hydroelectric projects on jurisdictional waters. See 16 U.S.C. 797(e). Under the Clean Water Act, 33 U.S.C. 1251 et seq., an applicant for a hydroelectric license from FERC is required to apply for a certification from the State in

which the licensed project may result in a discharge into

navigable waters. 33 U.S.C. 1341(a)(1). The Commission generally cannot issue a federal license until the

applicant obtains the requisite state water-quality certification. The Clean Water Act provides, however, that

“[i]f the State * * * fails or refuses to act on a request

for certification, within a reasonable period of time

(which shall not exceed one year) after receipt of such

request, the certification requirements of this subsection shall be waived with respect to such Federal application.” Ibid. In these consolidated cases, the Commission found that a California state agency had coordinated with petitioners to withdraw and resubmit the

same requests over and over again, as a means of circumventing the statutory one-year period for acting on

a pending certification request. The Commission relied

on its findings of coordination to determine that the

state agency had waived its certification authority. The

question presented is as follows:

Whether the court of appeals erred in holding that

the administrative record lacks substantial evidence to

support the Commission’s findings of coordination.

(I)

TABLE OF CONTENTS

Page

Opinions below .............................................................................. 1

Jurisdiction .................................................................................... 2

Statement ...................................................................................... 2

Argument..................................................................................... 13

Conclusion ................................................................................... 23

TABLE OF AUTHORITIES

Cases:

Alcoa Power Generating Inc. v. FERC,

643 F.3d 963 (D.C. Cir. 2011) ............................................... 4

Biestek v. Berryhill, 139 S. Ct. 1148 (2019) .................. 16, 17

Citizens of Goleta Valley v. Board of Supervisors,

801 P.2d 1161 (Cal. 1990) ..................................................... 5

City of Carmel-by-the-Sea v. United States Dep’t of

Transp., 123 F.3d 1142 (9th Cir. 1997) ............................... 5

Clean Water Act Rulemaking, In re,

60 F.4th 583 (9th Cir. 2023) ............................................... 23

Consolidated Edison Co. v. NLRB,

305 U.S. 197 (1938).............................................................. 17

Escondido Mut. Water Co. v. La Jolla Band

of Mission Indians, 466 U.S. 765 (1984) ............................ 3

Hoopa Valley Tribe v. FERC,

913 F.3d 1099 (D.C. Cir.), cert. denied,

140 S. Ct. 650 (2019) ....................................................... 7, 15

Louisiana v. American Rivers,

142 S. Ct. 1347 (2022) ......................................................... 23

New York State Dep’t of Envtl. Conservation

v. FERC, 884 F.3d 450 (2d Cir. 2018) ......................... 19, 20

New York State Dep’t of Envtl. Conservation

v. FERC, 991 F.3d 439 (2d Cir. 2021) ......................... 19, 20

(III)

IV

Cases—Continued:

Page

North Carolina Dep’t of Envtl. Quality v. FERC,

3 F.4th 655 (4th Cir. 2021) ............................................ 20-22

PUD No. 1 v. Washington Dep’t of Ecology,

511 U.S. 700 (1994)................................................................ 3

S. D. Warren Co. v. Maine Bd. of Envtl. Prot.,

547 U.S. 370 (2006)................................................................ 3

Turlock Irrigation Dist. v. FERC,

36 F.4th 1179 (D.C. Cir. 2022), petition for cert.

pending, No. 22-616 (filed Jan. 4, 2023) ............................ 22

Statutes, regulations, and rule:

Clean Water Act, 33 U.S.C. 1251 et seq. ................................ 3

33 U.S.C. 1251(b) ............................................................... 4

33 U.S.C. 1341 (§ 401) ....................................... 3-17, 19-23

33 U.S.C. 1341(a) (§ 401(a)) ........................................ 4, 14

33 U.S.C. 1341(a)(1) .....................................3, 4, 13, 14, 21

33 U.S.C. 1341(d) ........................................................... 3, 4

Federal Power Act, 16 U.S.C. 791a et seq. ............................ 2

16 U.S.C. 797(e) ............................................................. 2, 3

16 U.S.C. 803 ...................................................................... 2

16 U.S.C. 808(a)(1)............................................................. 2

16 U.S.C. 808(e) ................................................................. 2

16 U.S.C. 811 ...................................................................... 3

16 U.S.C. 825l(b) .............................................................. 16

National Environmental Policy Act of 1969,

42 U.S.C. 4321 et seq. ............................................................ 5

California Environmental Quality Act of 1970,

Cal. Pub. Res. Code §§ 21000 et seq. (West 2016) ............. 5

Cal. Water Code § 13160(b)(2) (West Supp. 2022) ............... 6

18 C.F.R.:

Section 4.34(b)(5)(iii) ......................................................... 4

V

Regulations and rule—Continued:

Page

Section 16.18 ...................................................................... 2

Cal. Code Regs. tit. 14 (Oct. 14, 2022):

§ 15050(a)............................................................................ 6

§ 15051 ................................................................................ 6

§ 15084(a)............................................................................ 6

Sup. Ct. R. 10 ......................................................................... 17

Miscellaneous:

85 Fed. Reg. 42,210 (July 13, 2020) ...................................... 22

86 Fed. Reg. 29,541 (June 2, 2021) ....................................... 23

87 Fed. Reg. 35,318 (June 9, 2022) ....................................... 23

In the Supreme Court of the United States

No. 22-743

NEVADA IRRIGATION DISTRICT, ET AL., PETITIONERS

v.

CALIFORNIA STATE WATER RESOURCES

CONTROL BOARD, ET AL.

ON PETITION FOR A WRIT OF CERTIORARI

TO THE UNITED STATES COURT OF APPEALS

FOR THE NINTH CIRCUIT

BRIEF FOR THE FEDERAL RESPONDENT

IN OPPOSITION

OPINIONS BELOW

The opinion of the court of appeals (Pet. App. 1a-30a)

is reported at 43 F.4th 920. The court’s opinion addressed consolidated petitions for review of three sets

of orders by the Federal Energy Regulatory Commission. The orders of the Commission in Nevada Irrigation District (Pet. App. 31a-46a, 47a-52a) are reported

at 171 F.E.R.C. ¶ 61,029 and 172 F.E.R.C. ¶ 61082,

respectively. The orders of the Commission in Yuba

County Water Agency (Pet. App. 53a-71a, 72a-76a) are

reported at 171 F.E.R.C. ¶ 61,139 and 172 F.E.R.C.

¶ 61,080, respectively. The order of the Commission in

Merced Irrigation District (Pet. App. 77a-97a) is reported at 171 F.E.R.C. ¶ 61,240.

(1)

2

JURISDICTION

The judgment of the court of appeals was entered on

August 4, 2022. A petition for rehearing was denied on

October 7, 2022 (Pet. App. 99a-102a). On December 21,

2022, Justice Kagan extended the time within which to

file a petition for a writ of certiorari to and including

February 6, 2023, and the petition was filed on that

date. The jurisdiction of this Court is invoked under 28

U.S.C. 1254(1).

STATEMENT

1. The Federal Power Act, 16 U.S.C. 791a et seq.,

provides the Federal Energy Regulatory Commission

(FERC or Commission) with the authority to issue licenses for the construction, operation, and maintenance

of non-federal hydroelectric projects on jurisdictional

waters. 16 U.S.C. 797(e). The Commission may issue

hydroelectric licenses for up to 50 years. 16 U.S.C.

808(e). In deciding whether to issue or reissue a license,

the Commission is required to consider “the power and

development purposes for which licenses are issued,”

and to “give equal consideration to the purposes of energy conservation, the protection, mitigation of damage

to, and enhancement of, fish and wildlife * * * , the protection of recreational opportunities, and the preservation of other aspects of environmental quality.” 16

U.S.C. 797(e). If a new license is not granted prior to

the expiration of an existing license, the Commission

may issue to the licensee an annual license to operate

the project from year to year, “under the terms and conditions of the existing license until * * * a new license

is issued.” 16 U.S.C. 808(a)(1); see 18 C.F.R. 16.18.

The Commission generally operates under a broad

mandate to specify the conditions on which a license is

granted. See 16 U.S.C. 803. In certain circumstances,

3

however, the Commission can be required to include licensing terms established by other agencies. 16 U.S.C.

797(e), 811; see Escondido Mut. Water Co. v. La Jolla

Band of Mission Indians, 466 U.S. 765, 772 (1984).

These consolidated cases concern one such situation, in

which the Commission can be required to incorporate

into the terms of a federal license certain water-quality

measures established by state agencies under the Clean

Water Act, 33 U.S.C. 1251 et seq.

Section 401 of the Clean Water Act provides that any

applicant seeking a federal license for activities “which

may result in any discharge into the navigable waters”

must provide the federal licensing authority with a “certification from the State in which the discharge originates or will originate” that certain effluent limitations

and water-quality requirements will be met. 33 U.S.C.

1341(a)(1). Operating a dam to produce hydroelectricity may result in a “discharge” into navigable waters,

ibid., and FERC licensing or relicensing proceedings

for such a project therefore generally trigger Section

401’s water-quality certification process. See S. D.

Warren Co. v. Maine Bd. of Envtl. Prot., 547 U.S. 370,

373-374 (2006); see also id. at 377 (explaining that the

term “ ‘discharge’ ” bears its “plain meaning” in this context and includes the release of water from a hydroelectric dam) (citation omitted).

A State may condition its certification under Section

401 “upon any limitations necessary to ensure compliance with state water quality standards or any other

‘appropriate requirement of State law.’ ” PUD No. 1 v.

Washington Dep’t of Ecology, 511 U.S. 700, 713-714

(1994) (quoting 33 U.S.C. 1341(d)); see id. at 705 (explaining that the Clean Water Act permits States to

“impose more stringent water quality controls” than

4

federal law would otherwise prescribe). FERC, in turn,

is required to incorporate any limitations or conditions

specified in a State’s water-quality certification into

any license the Commission ultimately grants for the

project at issue. 33 U.S.C. 1341(d). If the State denies

the requested Section 401 certification, then “[n]o [federal] license or permit shall be granted.” 33 U.S.C.

1341(a)(1).

By interposing the States in the process for granting

federal licenses, Section 401 furthers the Clean Water

Act’s policy to “recognize, preserve, and protect the primary responsibilities and rights of States to prevent, reduce, and eliminate pollution.” 33 U.S.C. 1251(b). At

the same time, Section 401 is not designed to be a vehicle for States to “indefinitely delay[]” federal licensing

proceedings. Alcoa Power Generating Inc. v. FERC,

643 F.3d 963, 972 (D.C. Cir. 2011). Congress therefore

specified that the water-quality certification requirements set forth in Section 401(a) are deemed to be

“waived” for a given federally licensed activity if a State

“fails or refuses to act on a request for certification[]

within a reasonable period of time (which shall not exceed one year) after receipt of [a] request” for certification. 33 U.S.C. 1341(a)(1); cf. 18 C.F.R. 4.34(b)(5)(iii)

(FERC regulation treating the statutory maximum oneyear period as the applicable deadline). If a State

waives certification, FERC may proceed to act on a licensing application. See 33 U.S.C. 1341(a)(1) (“No license or permit shall be granted until the certification

required by this section has been obtained or has been

waived.”) (emphasis added).

2. Petitioners are California public agencies that operate hydroelectric projects in California. Pet. App. 9a10a. In the 1960s, the Commission’s predecessor

5

agency granted long-term licenses to operate the projects. Id. at 10a, 13a, 15a-16a. As those licenses have

expired in recent years, petitioners have sought new

long-term licenses from the Commission. The projects

are currently being operated under annual licenses issued by the Commission to maintain the status quo during the relicensing proceedings. See ibid. The Commission has yet to issue a new long-term license for any

of the projects.

Petitioners’ licensing applications triggered Section

401’s requirement for state water-quality certifications

for each project. Petitioners each applied for a certification from the relevant California state agency, the

California State Water Resources Control Board (State

Board or Board). Pet. App. 10a, 13a, 16a.

Under California law at the time, the State Board

could not grant a Section 401 certification until the

Board received an environmental impact report under

the California Environmental Quality Act of 1970

(CEQA), Cal. Pub. Res. Code §§ 21000 et seq. (West

2016). See Pet. App. 6a-7a. CEQA is the state-law analogue to the National Environmental Policy Act of 1969

(NEPA), 42 U.S.C. 4321 et seq. Much like NEPA,

CEQA “sets procedural requirements,” including the

preparation of an “Environment Impact Report,” to ensure that state and local officials take into account “ ‘the

environmental consequences of their decisions before

they are made.’ ” City of Carmel-by-the-Sea v. United

States Dep’t of Transp., 123 F.3d 1142, 1163 (9th Cir.

1997) (quoting Citizens of Goleta Valley v. Board of Supervisors, 801 P.2d 1161, 1167 (Cal. 1990)). If an environmental report is required under CEQA for a project

involving multiple public agencies, California law designates a “lead agency” that is responsible for preparing

6

the report. Cal. Code Regs. tit. 14, § 15084(a) (Oct. 14,

2022); see id. §§ 15050(a), 15051.1

As a practical matter, it was “often not feasible” for

the report required by CEQA to be completed within

the one-year period established by Section 401 for a

State to act on a pending certification request. Pet.

App. 8a. Over time, a practice developed in California

(and elsewhere) in which applicants submitted certification requests, withdrew them before the end of Section

401’s one-year period, and then “resubmit[ted] them as

new requests.” Ibid. The theory behind the practice

was that “a withdrawn-and-resubmitted request” would

restart Section 401’s one-year clock, “affording the project applicant more time to comply with procedural and

substantive prerequisites to certification and the state

more time to decide whether and under what conditions

it will grant the certification request.” Ibid. Although

the Commission “expressed misgivings” about potential

delay of federal licensing proceedings through such

practices, it accepted for many years that withdrawal

and resubmission of an application operated to restart

Section 401’s one-year period. Id. at 8a-9a.

In 2019, however, the D.C. Circuit held that that two

States had waived their Section 401 authority by agreeing with project applicants to withdraw and resubmit

the same certification requests over an extended period

After the events at issue here, California amended its laws to

permit the State Board to grant certification before the CEQA process is complete. Pet. App. 6a n.2. Specifically, the Board may now

grant a certification request under Section 401 “before completion

of the [CEQA] environmental review,” when the Board determines

that “waiting until completion of that environmental review * * *

poses a substantial risk of waiver of the state board’s certification

authority.” Cal. Water Code § 13160(b)(2) (West Supp. 2022).

1

7

of time. See Hoopa Valley Tribe v. FERC, 913 F.3d

1099, 1104, cert. denied, 140 S. Ct. 650 (2019). In that

case, a FERC relicensing application for a project consisting of a network of hydroelectric dams had triggered a requirement for the applicant to request waterquality certifications from both California and Oregon.

Id. at 1101. The applicant proposed to relicense only

some of the existing dams in the project and to decommission others; in the course of negotiations about decommissioning, the applicant and the States “agreed to

defer the one-year statutory limit for Section 401 approval by annually withdrawing-and-resubmitting the

water quality certification requests.” Ibid. A third

party challenged that agreement in proceedings before

FERC, arguing that the States had waived their Section

401 authority. Id. at 1102. The Commission found no

waiver, ibid., but the D.C. Circuit disagreed. The D.C.

Circuit viewed the case as concerning “a written agreement with the reviewing states to delay water quality

certification,” and held that Section 401’s statutory oneyear period for acting on a certification request does not

permit such a tolling arrangement. Id. at 1104.

3. The Commission applied Hoopa Valley Tribe in

petitioners’ licensing proceedings and found in each

case that the State Board had waived its water-quality

certification authority by “coordinating” with petitioners in a scheme to withdraw and resubmit the same requests multiple times to circumvent Section 401’s oneyear deadline. Pet. App. 9a. For each project, petitioners were responsible under state law for preparing the

environmental reports required by CEQA, and petitioners did not do so. See id. at 10a-17a. Petitioners instead

withdrew and resubmitted their requests over a period

of years while their CEQA obligations remained unmet.

8

After Hoopa Valley Tribe, the State Board denied the

most recently refiled certification requests for each project, within one year of receiving those requests. Petitioners sought relief from the Commission, which found

waiver.

a. Nevada Irrigation District. Petitioner Nevada

Irrigation District first submitted a certification request for the Yuba-Bear Project to the State Board in

2012. Pet. App. 10a. In 2013, two weeks before the expiration of Section 401’s one-year period, petitioner

filed a letter with the Board seeking to withdraw and

resubmit the request. Id. at 11a. The Board obliged

and treated the resubmitted request as triggering a

new one-year period under Section 401. Ibid. Petitioner again withdrew and resubmitted its certification

request each year from 2014 to 2018. Id. at 12a.

In 2019, on the same day that the D.C. Circuit issued

its decision in Hoopa Valley Tribe, the State Board

acted on petitioner’s most recently filed request—

within one year of the most recent resubmission of that

request—by denying the request without prejudice for

failure to have completed the CEQA process. Pet. App.

12a; see id. at 36a. Petitioner did not resubmit its request to the Board after the request was denied without

prejudice; instead, petitioner asked FERC to find

waiver in light of Hoopa Valley Tribe. Id. at 37a.

The Commission found that the State Board had

waived its Section 401 certification authority for the

Yuba-Bear Project. Pet. App. 31a-46a; see id. at 47a52a (rehearing). The Commission acknowledged that

the State Board and petitioner had never entered into

any “explicit written agreement” on withdrawal and resubmittal as a means of evading Section 401’s one-year

period. Id. at 41a. But the Commission viewed the par-

9

ticular facts here as included within the rationale of

Hoopa Valley Tribe, relying in part on a filing the Board

had submitted to FERC indicating that the Board itself

fully “expected [petitioner] to withdraw and refile its

application,” which petitioner did. Ibid. The Commission emphasized that the certification proceedings had

lasted “nearly six years beyond” the one-year deadline

triggered by petitioner’s initial request. Id. at 42a.

b. Yuba County Water Agency. Petitioner Yuba

County Water Agency first submitted a Section 401 certification request for the Yuba River Project to the State

Board in 2017. Pet. App. 13a. Shortly before the oneyear period would have expired for petitioner’s request,

an employee of the Board emailed petitioner a reminder

about the upcoming deadline, noting that petitioner had

not prepared the CEQA report (and that the Board

therefore could not grant the request), and stating:

“Please submit a withdraw/resubmit of the certification

application as soon as possible.” Id. at 14a (quoting

email). Petitioner complied. Ibid. In 2019, after Hoopa

Valley Tribe, the Board denied the resubmitted request

without prejudice, based on petitioner’s “failure to begin

the CEQA process.” Id. at 15a.

The Commission determined that the State Board

had waived its certification authority under Section 401

for the Yuba River Project. Pet. App. 53a-71a; see id. at

72a-76a (rehearing). Although the Board found no “explicit written agreement to withdraw and refile,” id. at

63a, it relied on the email described above (and related

later correspondence) to find that petitioner’s “withdrawal and refiling of its application was in response to

the Board’s request that it do so.” Ibid. The Commission

stated that such “coordination” was itself “sufficient evidence that the California Board sought the withdrawal

10

and resubmittal * * * to circumvent the one-year statutory deadline for the state agency to act.” Id. at 64a.

c. Merced Irrigation District. Petitioner Merced Irrigation District first submitted a water-quality certification request for the Merced River Project in May 2014.

Pet. App. 16a. In 2015, about one month before the end

of Section 401’s one-year period for the State Board to

act on that request, a staff member for the Board sent an

email to petitioner regarding the upcoming deadline,

stating: “Please withdraw the [request] and simultaneously resubmit an application for water quality certification prior to May 13, 2015.” Ibid. (quoting email). Petitioner withdrew and resubmitted its request in 2015—

and again in 2016, 2017, and 2018. Id. at 17a.

A similar process played out for the Merced Falls

Project. The original licensee for that project was Pacific

Gas & Electric (PG&E). Pet. App. 15a-16a. PG&E submitted a certification request to the State Board for the

Merced Falls Project in May 2014; PG&E withdrew and

resubmitted that request in 2015 and again in 2016. Id.

at 79a, 81a-82a. In 2017, PG&E transferred its license

for the project to petitioner, Merced Irrigation District,

which then became the lead agency under California law

for preparing the CEQA report. Id. at 16a n.10, 94a n.74.

In 2017 and 2018, petitioner withdrew and resubmitted a

certification request for the project. Id. at 82a-83a.

After Hoopa Valley Tribe, the State Board denied petitioners’ certification requests for both projects without

prejudice to resubmission, relying in each case on petitioner’s “failure to comply with CEQA.” Pet. App. 17a.

Petitioner sought relief from the Commission, which

found that the Board had waived its Section 401 authority. Id. at 77a-97a. In particular, the Commission found

that, “based on the four years of the applicants with-

11

drawing and resubmitting their applications with nearly

identical two-page letters and without filing a new application or any new supporting information,” the Board

had “de facto consented” to the repeated withdrawals

and resubmissions “for the purpose of avoiding [Section

401’s] one-year deadline.” Id. at 93a. In the Commission’s view, the Board’s “actions, whether implied or explicit, constituted a failure to act within the one-year

deadline.” Ibid.

4. The State Board and several environmental

groups petitioned the Ninth Circuit for review of the

Commission’s orders. Pet. App. 18a. The court of appeals consolidated the petitions. 20-72432 C.A. Order

(May 20, 2021). In a unanimous opinion, the court

granted the petitions and vacated the Commission’s orders with respect to each project. Pet. App. 1a-30a.

The court of appeals recognized that, after Hoopa

Valley Tribe, the Commission had begun finding waiver

in cases “where project applicants had withdrawn and

resubmitted certification requests,” even in the absence

of any “express agreement[] to delay certification.”

Pet. App. 20a. Those cases involved what the Commission described as “coordinated schemes” to evade the

one-year period in Section 401, even though the coordination was “informal” rather than explicit. Ibid. The

Commission had distinguished cases of informal coordination from others involving “an applicant’s unilateral

withdrawal and resubmittal,” which the Commission

viewed as “not trigger[ing] a waiver.” Id. at 20a-21a.

The court of appeals declined to address whether the

“coordination standard” that the Commission had begun to apply after Hoopa Valley Tribe “is consistent

with the text of Section 401.” Pet. App. 22a. The court

instead agreed with the State Board’s alternative argu-

12

ment that “FERC’s findings of coordination are not

supported by substantial evidence.” Ibid.

For example, in Nevada Irrigation District, the

Commission had found that the Board had coordinated

with the Nevada Irrigation District to evade the oneyear deadline in part based on certain comments the

Board had submitted to FERC during the federal environmental review process for the Yuba-Bear Project.

Pet. App. 23a. The court of appeals, however, viewed

that evidence as failing to warrant an inference of coordination, stating that the comments “show[ed] merely

that the State Board predicted that [the Nevada Irrigation District] would decide to withdraw and resubmit.”

Ibid. The court did not view the Board’s comments as

suggesting that the Board was “working to engineer” a

withdrawal and resubmission. Ibid. Likewise, the court

was unpersuaded by the emails on which the Commission had relied to find coordination in Yuba County Water Agency and Merced Irrigation District. The court

viewed the emails as showing only that the Board had

“predict[ed]” that petitioners would avail themselves of

the opportunity to withdraw and resubmit, not that the

Board was coordinating with petitioners to circumvent

Section 401’s one-year period. Id. at 25a.

The court of appeals also emphasized other evidence

in the record which it viewed as tending to undercut the

Commission’s findings of coordination. The court noted

that the Board was apparently prepared to deny petitioners’ certification requests without prejudice, within

the one-year period for acting, had petitioners not withdrawn and resubmitted them. Pet. App. 25a-26a. The

court further noted that petitioners, as the parties that

had “failed to comply with CEQA,” appeared to have a

“motive for delay.” Id. at 24a. By contrast, the court

13

viewed the Board as having “an interest in moving [the

process] along,” so that the Board could exercise its authority under Section 401 to impose water-quality conditions on any long-term licenses the Commission may

issue. Id. at 26a. The projects are currently operating

under annual licenses that do not incorporate such conditions. See ibid.; see also p. 5, supra.

Petitioners sought rehearing en banc, which the

court of appeals denied without any noted dissent. Pet.

App. 99a-102a.

ARGUMENT

Petitioners contend (Pet. 27-33) that the court of appeals incorrectly decided an important question concerning the circumstances in which a State waives its

certification authority under Section 401 of the Clean

Water Act, 33 U.S.C. 1341(a)(1). But petitioners largely

fail to grapple with the actual holding of the decision below. The Ninth Circuit held that, on the particular record here, substantial evidence did not support the Commission’s findings that the State Board had coordinated

with petitioners in a withdrawal-and-resubmission

scheme to evade Section 401’s one-year deadline for the

Board to act on a pending request. That highly factbound decision does not warrant further review. Petitioners further contend (Pet. 19-26) that the decision

below implicates a conflict of authority in the courts of

appeals regarding Section 401 and waiver. But petitioners fail to demonstrate any substantial disagreement

that would warrant review at this time. Accordingly,

the petition for a writ of certiorari should be denied.2

A related question concerning Section 401 and waiver is pending

before the Court in Turlock Irrigation District v. FERC, No.

22-616 (filed Jan. 4, 2023).

2

14

1. In these consolidated cases, the Commission held

that the State Board had waived its certification authority under Section 401 by coordinating with petitioners

in a scheme to withdraw and resubmit the same certification requests multiple times as a means of evading

Section 401’s one-year period for the Board to act on a

pending request. The court of appeals, in turn, held that

the Commission’s findings of coordination lacked a basis in substantial evidence. Pet. App. 22a. Although the

Commission disagrees with that holding, the decision

below does not satisfy this Court’s ordinary criteria for

certiorari. The question whether substantial evidence

supported the Commission’s findings of coordination is

highly fact-bound, lacks prospective significance, and

does not otherwise warrant further review.

a. Section 401 provides that, if a State “fails or refuses to act on a request for certification, within a reasonable period of time (which shall not exceed one year)

after receipt of such request,” then the water-quality

certification requirements of Section 401(a) “shall be

waived with respect to” the federal licensing or permit

application that triggered the Section 401 certification

process. 33 U.S.C. 1341(a)(1). By the express terms of

the statute, the one-year period in Section 401 begins to

run upon “receipt” of the relevant certification request.

Ibid. When an applicant submits a request but then

withdraws it before the one-year mark, there is no request pending before the State and thus nothing for the

State to grant or deny. A State does not “fail[] or refuse[] to act” on a certification request when the applicant’s unilateral withdrawal of the request deprives the

State of an opportunity to address it. Ibid.

Harder questions may arise when an applicant withdraws a certification request and then resubmits the

15

same or a substantially similar request. Historically,

the Commission had declined to look behind any particular withdrawal and had treated each refiling of a certification request as restarting the one-year period prescribed in Section 401. See Pet. App. 8a-9a (collecting

decisions). The Commission began to take a different

approach only after the D.C. Circuit’s decision in Hoopa

Valley Tribe v. FERC, 913 F.3d 1099, cert. denied, 140

S. Ct. 650 (2019), which marked the first occasion when

any court of appeals had found a Section 401 waiver

based on a pattern of withdrawals and resubmissions.

As explained above (at pp. 6-7), Hoopa Valley Tribe

involved a settlement agreement between a licensee and

two States that “explicitly required” the licensee to

withdraw and resubmit the same Section 401 certification requests over and over again as a way of purportedly holding the Section 401 proceedings in “abeyance”

while the parties negotiated over decommissioning certain dams. 913 F.3d at 1101; see id. at 1101-1102. The

D.C. Circuit viewed that aspect of the settlement agreement as an impermissible effort to “toll[]” Section 401’s

one-year period for a State to act on a pending request.

Id. at 1103. The court held that a State waives its Section 401 certification authority when it agrees with an

applicant to engage in such a “coordinated withdrawaland-resubmission scheme.” Ibid.

In a series of orders after Hoopa Valley Tribe, including the orders at issue here, the Commission has

determined that a State waives its Section 401 authority

when it “coordinate[s]” with an applicant to withdraw

and resubmit the same certification request, even in the

absence of any explicit agreement. Pet. App. 9a. The

Commission has thus viewed the logic and rationale of

Hoopa Valley Tribe as extending to some informal or

16

implicit forms of coordination to circumvent Section

401’s one-year period. See id. at 38a (explaining that a

“formal agreement” is not “necessary to support a finding of waiver,” given other evidence of coordinated action); see also id. at 40a-45a, 63a-66a, 89a-94a.

b. Here, the court of appeals reserved judgment on

whether “the coordination standard” reflected in the

Commission’s orders “is consistent with the text of Section 401.” Pet. App. 22a. The court thus expressly declined to “reach the statutory-interpretation issue” of

whether or under what circumstances a State’s informal

or implicit coordination on withdrawal and resubmittal

can give rise to waiver. Id. at 22a n.11. The court instead held only that, even if coordination is a permissible basis for finding waiver, the Commission’s “findings

of coordination [were] not supported by substantial evidence in the record.” Id. at 22a.

Petitioners assert (Pet. 3) that the court of appeals

committed a “clear error of law” when it did not “defer

to FERC’s assessment” that the State Board had coordinated with petitioners. But petitioners do not dispute

that the Commission’s findings of fact are reviewed under the substantial-evidence standard. See 16 U.S.C.

825l(b) (“The finding of the Commission as to the facts,

if supported by substantial evidence, shall be conclusive.”) (emphasis added). As this Court has recently reiterated, “[t]he phrase ‘substantial evidence’ is a ‘term

of art’ used throughout administrative law to describe

how courts are to review agency factfinding.” Biestek

v. Berryhill, 139 S. Ct. 1148, 1154 (2019) (citation omitted). An agency’s findings are supported by substantial

evidence if the agency had before it “such relevant evidence as a reasonable mind might accept as adequate to

17

support a conclusion.” Ibid. (quoting Consolidated Edison Co. v. NLRB, 305 U.S. 197, 229 (1938)).

The court of appeals correctly identified the governing substantial-evidence standard for review of the

Commission’s factfinding. See Pet. App. 18a (recognizing that substantial evidence “means such relevant evidence as a reasonable mind might accept as adequate to

support a conclusion”) (citation omitted). In the Commission’s view, the court erred when applying that

standard to this record. But a “petition for a writ of

certiorari is rarely granted when the asserted error

consists of erroneous factual findings or the misapplication of a properly stated rule of law.” Sup. Ct. R. 10.

And petitioners identify no sound basis for departing

from the Court’s traditional approach here.

Petitioners contend (Pet. 20) that the decision below

necessarily addressed “a legal issue” rather than a

“substantial evidence question,” on the theory that the

decision “reflects an interpretation of what” it means

for a State to fail or refuse to act under Section 401. As

already explained, however, the court of appeals declined to address the statutory-interpretation question.

See Pet. App. 22a. The court instead proceeded on the

assumption that FERC is correct that a State fails or

refuses to act when it coordinates with an applicant on

a withdrawal-and-resubmission scheme to evade Section 401’s one-year period, but the court found that this

particular administrative record lacks substantial evidence of coordination. See ibid.

Petitioners further contend (Pet. 30) that the court

of appeals failed to take account of “established * * *

practice” in California, which they describe as having

created “a legal regime where the State’s [Section 401]

decision necessarily takes more than a year.” But the

18

court of appeals acknowledged the historical practices

that petitioners invoke, including the ways in which California law had previously contributed to those practices by requiring that the State Board receive a CEQA

report before granting certification. See Pet. App. 8a9a. Those historical practices do not establish that all

withdrawals and resubmissions in California during the

relevant period necessarily occurred in coordination

with the Board, rather than as a result of the applicant’s

independent decisionmaking—including, for example, a

judgment by the applicant that it would prefer to withdraw and resubmit its request rather than have the

Board be compelled to deny the request on CEQA

grounds. And petitioners agree (Pet. 30) that a “State

does not waive its authority if applicants independently

withdraw their requests for certification and then later

resubmit those requests.”

In these cases, the Commission found that petitioners had not acted independently but had instead acted

in coordination with the Board; the court of appeals disagreed, holding that the record lacks substantial evidence of coordination; and the substantial-evidence

holding does not warrant further review.

2. The decision below does not conflict with any decision of this Court or another court of appeals, nor does

it otherwise warrant review. Petitioners’ contention

that the decision below “deepens” an existing conflict of

authority lacks merit. Pet. 19 (capitalization and emphasis omitted); see Pet. 19-27. Petitioners do not identify any substantial conflict of authority and fail to show

that these cases would have come out differently in another circuit.

a. Petitioners principally contend (Pet. 19-22) that

the decision below conflicts with the D.C. Circuit’s deci-

19

sion in Hoopa Valley Tribe. As the Ninth Circuit explained, however, these cases are a step removed from

the facts of Hoopa Valley Tribe, because these cases do

not involve any “express agreement[] to delay certification through withdrawal-and-resubmission.” Pet. App.

20a. These cases instead involve what the Commission

found to be “informal” or implicit coordination between

the State Board and petitioners. Ibid. The D.C. Circuit

has not yet had occasion to address how Hoopa Valley

Tribe applies to a case involving such coordination. And

in any event, the Ninth Circuit did not actually resolve

whether coordination warrants a finding of waiver even

in the absence of an express agreement; the court held

only that this record lacks substantial evidence of coordination. See p. 18, supra.

Petitioners maintain (Pet. 22) that Hoopa Valley

Tribe and the decision below are necessarily in conflict

because a settlement agreement is “no different” than

what petitioners describe as California’s “established

regime” of anticipating and encouraging withdrawaland-resubmission practices. In general, the Commission has taken the position that the critical question is

not whether an explicit agreement exists but rather

whether the State coordinated with the applicants in the

scheme or was otherwise complicit in an effort to evade

Section 401’s one-year period. See FERC C.A. Br. 5253. As described above, however, the Ninth and D.C.

Circuits have yet to definitely address FERC’s position,

and petitioners thus fail to demonstrate any conflict.

b. Petitioners likewise err in contending (Pet. 22-24)

that the decision below conflicts with a pair of Second

Circuit decisions: New York State Dep’t of Envtl. Conservation v. FERC, 991 F.3d 439 (2021) (New York II),

and New York State Dep’t of Envtl. Conservation v.

20

FERC, 884 F.3d 450 (2018) (New York I). In both cases,

the Second Circuit rejected efforts by a New York state

agency to evade Section 401’s one-year period by altering the date on which a certification request was

deemed to have been received by the agency (and thus

the start of Section 401’s one-year clock)—either by unilaterally declaring the request to have been received

only when the agency considered it complete, see New

York I, 884 F.3d at 455-456, or by agreeing with the applicant to alter the date of receipt, see New York II, 991

F.3d at 447-448. Because the Second Circuit rejected

those efforts, it agreed with the Commission that both

cases involved a State failing to take action on a pending

request at the one-year mark, which is an express basis

for finding waiver under Section 401. See id. at 444,

447-450; New York I, 884 F.3d at 455-456.

Petitioners invoke general language in both decisions about the “bright-line rule” established by Section

401. Pet. 23 (citation omitted). But the relevant bright

line to which the Second Circuit was referring was the

requirement that a State act on a pending request

within one year of receiving it. See, e.g., New York II,

991 F.3d at 450. The two decisions did not involve withdrawal of a request before the one-year deadline and

subsequent resubmission of the same request, and they

do not demonstrate any conflict of authority between

the Second and Ninth Circuits.

c. Petitioners lastly contend (Pet. 25) that the Second and D.C. Circuit decisions described above are in

conflict with the Fourth Circuit’s decision in North Carolina Dep’t of Envtl. Quality v. FERC, 3 F.4th 655

(2021). That contention is incorrect and, in any event,

would not support further review here, in a case arising

21

from the Ninth Circuit that does not itself implicate or

create any circuit conflict.

In North Carolina, the Commission found that a

State had waived its Section 401 authority by coordinating with an applicant on a scheme to withdraw and resubmit the same request in order to give the State more

time for considering the request. 3 F.4th at 667. FERC

had relied on Hoopa Valley Tribe in finding waiver. Id.

at 668. The Fourth Circuit reviewed Hoopa Valley

Tribe and described it as a “very narrow decision flowing from a fairly egregious set of facts.” Id. at 669. Ultimately, however, the Fourth Circuit declined to “definitively resolve” the circumstances under which a coordinated withdrawal-and-resubmission scheme might

warrant a finding of waiver. Id. at 671. The Fourth Circuit instead “assume[d] for purposes of [its] opinion that

FERC’s approach to the issue is correct, such that a finding of waiver under § 401 is appropriate if the applicant

and state agency, in order to avoid the one-year review

period, coordinate on a withdrawal-and-resubmission

scheme.” Ibid. The Fourth Circuit went on to hold that

the administrative record in North Carolina lacked

substantial evidence of coordination. See id. at 671-676.

The Ninth Circuit charted a similar analytical path

in the decision below. See Pet. App. 30a (relying on

North Carolina and describing the Fourth Circuit as

having “reached the same conclusion in a case with similar facts”). Accordingly, both circuits have not yet definitively resolved whether or when coordination is a

permissible basis for finding waiver under Section 401.3

In a portion of the Fourth Circuit’s decision in North Carolina

that petitioners do not invoke, the court hypothesized that a State

may “act” on a pending certification request for purposes of Section

401, 33 U.S.C. 1341(a)(1), by taking “significant and meaningful”

3

22

3. Further review is unwarranted for two additional

reasons. First, in 2020, after the events at issue here,

California amended its laws to permit the State Board

to grant Section 401 certification without first receiving

a completed CEQA report. See Pet. App. 6a n.2; p. 6

n.1, supra. Petitioners acknowledge (Pet. 9 n.3) those

changes but speculate that the Board will continue to

“evade[]” Section 401 through “withdrawal-and-refile

procedure[s].” Yet petitioners fail to explain why the

Board would have any incentive to do so. If the Board

wishes to grant a request before the CEQA process is

complete, it may now do so (subject to the requirements

of state law as amended). See, e.g., Turlock Irrigation

Dist. v. FERC, 36 F.4th 1179, 1182 (D.C. Cir. 2022), petition for cert. pending, No. 22-616 (filed Jan. 4, 2023).

State law also permits the Board to deny a request without prejudice to resubmission, as the Board ultimately

did here for all the projects. See pp. 8-10, supra.

Second, further review is unwarranted at this time

because the procedures for granting or denying certification under Section 401 are currently the subject of ongoing federal rulemaking proceedings. In 2020, the Environmental Protection Agency (EPA) promulgated a

rule setting forth requirements for Section 401 certifications, including provisions to address waiver. See 85

Fed. Reg. 42,210, 42,286 (July 13, 2020). The Section

401 proceedings at issue here predated the effective

steps with regard to the request short of granting or denying it,

North Carolina, 3 F.4th at 670. That reading of the statute would

be incorrect and anomalous. See FERC C.A. Br. 40-45; cf. North

Carolina, 3 F.4th at 670 n.5 (acknowledging that no other circuit

“has adopted this interpretation”). But the relevant discussion was

dicta and was not endorsed by the Ninth Circuit here.

23

date of the 2020 rule and thus do not reflect the changes

made by that rule.4

EPA has also since announced a new rulemaking

with regard to Section 401, 86 Fed. Reg. 29,541, 29,542

(June 2, 2021), and those rulemaking proceedings remain pending, see 87 Fed. Reg. 35,318, 35,377-35,381

(June 9, 2022) (proposed rule). EPA’s proposed rule

would not specifically address withdrawals and resubmissions. See id. at 35,341.

CONCLUSION

The petition for a writ of certiorari should be denied.

Respectfully submitted.

MATTHEW R. CHRISTIANSEN

General Counsel

ROBERT H. SOLOMON

Solicitor

JARED B. FISH

Attorney

Federal Energy Regulatory

Commission

ELIZABETH B. PRELOGAR

Solicitor General

APRIL 2023

The 2020 rule has been the subject of several challenges. When

EPA announced its intent to engage in further rulemaking, it invited the district court in which one of those challenges had been

brought to remand the 2020 rule to the agency without vacatur. The

district court instead remanded with vacatur in an order that this

Court later stayed pending further litigation. Louisiana v. American Rivers, 142 S. Ct. 1347 (2022); see Gov’t Mem. in Opp. at 6-12,

American Rivers, supra (No. 21A539) (procedural history). The

Ninth Circuit recently held that the district court erred in vacating

the rule and reversed that aspect of the court’s order. See In re

Clean Water Act Rulemaking, 60 F.4th 583, 593-596 (2023). The

2020 rule thus remains in force, although it does not apply here for

the reasons explained above.

4

This is a copy of a public record, reproduced as it was published. It is not legal advice, and it may not be the version a court would rely on. Check the official source before you cite it.

A word about cookies

We need a few to keep you signed in and the library working. The rest help us see which pages people use and where they get stuck. They stay off unless you say yes.