No. 22-743
IN THE
Supreme Court of the United States
NEVADA IRRIGATION DISTRICT, ET AL.,
Petitioners,
v.
CALIFORNIA STATE WATER RESOURCES
CONTROL BOARD, ET AL.,
Respondents.
?
On Petition for a Writ of Certiorari to the
United States Court of Appeals for the Ninth Circuit
NON-GOVERNMENTAL RESPONDENTS’
BRIEF IN OPPOSITION
SCOTT L. NELSON
Counsel of Record
MICHAEL MIGIEL-SCHWARTZ
PUBLIC CITIZEN
LITIGATION GROUP
1600 20th Street NW
Washington, DC 20009
(202) 588-1000
snelson@citizen.org
JULIE GANTENBEIN
WATER AND POWER
LAW GROUP PC
2140 Shattuck Avenue
Suite 801
Berkeley, CA 94704
(510) 296-5588
ANDREW MCALEER HAWLEY
WESTERN ENVIRONMENTAL
LAW CENTER
1037 NE 65th Street, No. 343
Seattle, WA 98115
(206) 487-7250
SANJAY NARAYAN
SIERRA CLUB
2101 Webster Street
Suite 1300
Oakland, CA 94612
(415) 977-5769
(for Sierra Club only)
Attorneys for Non-Governmental Respondents
April 2023
i
QUESTION PRESENTED
In this case, the United States Court of Appeals for
the Ninth Circuit set aside orders of the Federal Energy Regulatory Commission (FERC) because they
were not supported by substantial evidence. FERC’s
orders had concluded that the State of California
waived its authority under the Clean Water Act, 33
U.S.C. § 1341(a)(1), to issue water quality certifications for the relicensing of four major hydropower projects by “fail[ing] or refus[ing] to act” by the statutory
deadline. The Ninth Circuit found that the record
demonstrated that California was prepared to take
timely action by denying the certification requests
without prejudice, but that the applicants chose to
withdraw their requests to avoid denials. The question presented is:
Whether the court of appeals correctly found that
FERC’s orders concluding that California waived its
authority under § 1341(a)(1) were not supported by
substantial evidence.
ii
RULE 29.6 STATEMENT
The non-governmental respondents joining in this
brief are the South Yuba River Citizens League, California Sportfishing Protection Alliance, Friends of the
River, and the Sierra Club (including its Mother Lode
and Tehipite Chapters). All are nonprofit, non-stock
corporations that do not offer shares to the public and
have no parent corporations, and no publicly held corporation holds an ownership interest in any of them.
iii
TABLE OF CONTENTS
QUESTION PRESENTED .......................................... i
RULE 29.6 STATEMENT .......................................... ii
TABLE OF AUTHORITIES ...................................... iv
INTRODUCTION ....................................................... 1
STATEMENT .............................................................. 4
A. Legal Background ............................................ 4
B. Facts and Decision Below ................................ 7
REASONS FOR DENYING THE WRIT .................. 12
I.
There is no conflict among the circuits. ............ 12
A. The decision below accords with D.C. Circuit
precedent. ....................................................... 13
B. Second Circuit precedent also supports the
decision below. ................................................ 17
II. The court of appeals’ decision is correct. ........... 19
III. Accepting petitioners’ arguments would
undermine the certification process by
allowing applicants to game the system. .......... 22
IV. A number of factors make review of the
question posed by the petition unnecessary
and inappropriate at this time. ......................... 24
CONCLUSION.......................................................... 28
iv
TABLE OF AUTHORITIES
Cases
Page(s)
In re Clean Water Act Rulemaking,
60 F.4th 583 (9th Cir. 2023) ................................ 26
Hoopa Valley Tribe v. FERC,
913 F.3d 1099 (D.C. Cir.),
cert. denied sub nom.
Cal. Trout v. Hoopa Valley Tribe,
140 S. Ct. 650 (2019) ............... 2, 4, 6, 9, 10, 13–17
22–25, 27
N.C. Dep’t of Envtl. Quality v. FERC,
3 F.4th 655 (4th Cir. 2021) .................. 2, 13, 16, 17
N.Y. State Dep’t of Envtl. Conservation v. FERC,
991 F.3d 439 (2d Cir. 2021) ....................... 3, 17–19
N.Y. State Dep’t of Envtl. Conservation v. FERC,
884 F.3d 450 (2d Cir. 2018) ....................... 3, 17–19
Turlock Irrig. Dist. v. FERC,
36 F.4th 1179 (D.C. Cir. 2022),
pet. for cert. pending, No. 22-616
(U.S. filed Jan. 4, 2023) ......... 2, 3, 4, 15–17, 22, 25
Village of Morrisville, Vt.,
174 FERC ¶ 61,141 (2021) .................................... 6
Statutes and Rules
16 U.S.C. § 825l(b) ................................................ 1, 10
33 U.S.C. § 1341 .................................... 1, 5, 16, 22, 26
33 U.S.C. § 1341(a)(1) ..................... 1, 3–5, 7, 9, 15–18
20, 25, 27
33 U.S.C. § 1341(d) ..................................................... 5
40 C.F.R. § 121.6 ................................................. 25–26
v
40 C.F.R. § 121.6(e) ................................................... 26
Cal. Pub. Res. Code § 21083.7(a) ................................ 8
Cal. Water Code § 13160(b)(2).................................. 24
S. Ct. R. 10 ................................................................ 19
Other
Black’s Law Dictionary (11th ed. 2019) ................... 20
EPA, Clean Water Act Section 401 Water Quality
Certification Improvement Rule, 87 Fed. Reg.
35,318 (proposed June 9, 2022) ........................... 26
Turlock Irrig. Dist. v. FERC, No. 22-616, Br. for Fed.
Resp. in Opp. (U.S. filed Mar. 8, 2023) ............... 17
INTRODUCTION
The petition in this case asks this Court to review
an intrinsically factbound decision: The Ninth Circuit
found that there was no substantial evidence to support rulings of the Federal Energy Regulatory Commission (FERC) that the State of California had
waived its right to certify water-quality compliance of
four hydropower projects under the Clean Water Act.
As to each of the projects, FERC erroneously held that
California coordinated with the license applicants to
delay certification and thus “fail[ed] or refuse[d] to act
on [the] request[s] for certification” within one year of
the certification requests, as required by the Act, 33
U.S.C. § 1341(a)(1). Carefully reviewing the factual
record of each proceeding, the court of appeals determined that undisputed evidence established that the
state made clear that it was prepared to act on each of
the requests for certification within the one-year deadline—by denying them without prejudice because the
applicants had not provided analyses of the projects’
environmental impacts. The applicants then chose to
withdraw their requests prior to the deadline and resubmit them, rather than have the state deny them.
The court of appeals held that, under FERC’s stated
view of § 1341(a)(1), the state’s “acquiesce[nce]” in the
applicants’ “own decisions to withdraw and resubmit
their applications rather than have them denied” was
not a coordinated refusal to act on the requests and
did not waive certification. Pet. App. 22a. The court,
therefore, vacated the orders and remanded the matters to the agency. The record-based determination
that, even applying FERC’s own view of § 1341,
FERC’s orders are unsustainable under the Federal
Power Act’s substantial evidence standard, 16 U.S.C.
§ 825l(b), does not merit review by this Court.
2
The applicants’ petition for certiorari rests on the
false assertion that the court of appeals’ decision implicates a conflict among the circuits. No court of appeals, however, has held that a state waives its Clean
Water Act certification authority by allowing an applicant to withdraw and resubmit a certification request
when, as in this case, the record shows the state is
fully prepared to timely act on an inadequate request
by denying it without prejudice if the applicant does
not withdraw it. The D.C. Circuit’s decision in Hoopa
Valley Tribe v. FERC, 913 F.3d 1099 (D.C. Cir. 2019),
on which petitioners principally rely, holds that a
state waives certification if it expressly agrees with an
applicant not to act on a certification request. The decision below does not contest that proposition.
As the Fourth Circuit has recognized, “Hoopa Valley is a very narrow decision,” finding a waiver where
state agencies and a license applicant “entered into a
written agreement that obligated the state agencies,
year after year, to take no action at all on [a] certification request”; Hoopa Valley does not apply where an
applicant withdraws and resubmits a request that the
state would otherwise deny. N.C. Dep’t of Envtl. Quality v. FERC, 3 F.4th 655, 669 (4th Cir. 2021) (NCDEQ)
(emphasis in original). Petitioners baldly assert that
the Fourth Circuit’s characterization of Hoopa Valley
“conflicts with … the D.C. Circuit’s view of its own
precedent.” Pet. 26. In fact, the D.C. Circuit has explicitly stated that “[t]he Fourth Circuit accurately described Hoopa Valley” and has held that, absent the
circumstances described by the Fourth Circuit, Hoopa
Valley does not compel a finding of waiver. Turlock Irrig. Dist. v. FERC, 36 F.4th 1179, 1183 (D.C. Cir.
2022).
3
Petitioners’ assertion that the decision below conflicts with rulings of the Second Circuit is equally off
the mark. The Second Circuit has held that the plain
language of the Clean Water Act precludes states from
altering the one-year deadline triggered by “receipt” of
a request for certification, 33 U.S.C. § 1341(a)(1), by
counting from a different starting point. See N.Y. State
Dep’t of Envtl. Conservation v. FERC, 884 F.3d 450,
456 (2d Cir. 2018) (NYDEC I); N.Y. State Dep’t of Envtl. Conservation v. FERC, 991 F.3d 439, 447–48 (2d
Cir. 2021) (NYDEC II). In this case, there was no manipulation of the one-year deadline: The applicants
withdrew their requests before the deadline in the face
of California’s stated intention to act by that deadline.
The Second Circuit’s decisions explicitly acknowledge
that such circumstances do not amount to a waiver.
See NYDEC I, 884 F.3d at 456; NYDEC II, 991 F.3d at
450 n.11.
Absent a conflict, there is no reason for review of
the decision below. The court of appeals correctly held
that a state that has informed an applicant that it is
prepared to act on its certification request by the deadline, and that does not do so only because the applicant chooses to withdraw the request, has not failed
or refused to act on the certification request. A contrary approach would reward “gamesmanship,” Turlock, 36 F.4th at 162, by finding waiver by the state
where an applicant acted to prevent a timely denial of
an inadequate request by withdrawing it just before
the deadline.
Moreover, there are abundant other reasons to
deny review. The issue raised is unlikely to recur because of changes in California law that increase the
state’s discretion to issue merits determinations on
certification even when, as in this case, applicants
4
have failed to complete all necessary environmental
analyses within a year of submitting their waiver requests. In addition, since Hoopa Valley, when an applicant has failed to provide the information necessary
to support a certification request, California has routinely acted on the request by denying it without prejudice rather than allowing the applicant to withdraw
the request. As the D.C. Circuit held in Turlock, a
state that denies a request without prejudice has, under the plain meaning of § 1341(a)(1), “act[ed] on a request.” 36 F.4th at 1183–84. Further, ongoing Environmental Protection Agency (EPA) rulemaking proceedings are likely to lend greater precision to determination of the circumstances in which a state’s actions with respect to a request for certification amount
to waiver of certification authority. Although the outcome of the regulatory process will not control this
case or others involving requests made before the issuance of the regulations, the regulations will apply
prospectively and minimize still further the importance of the resolution of this case.
STATEMENT
A. Legal Background
The Clean Water Act’s embrace of cooperative federalism gives states a significant role in the federal licensing of facilities that may result in discharges into
navigable waters. Under the Act, an applicant for a
license or permit from a federal agency to construct or
operate such a facility must provide the agency a certification from the state where the discharge will originate that the discharge will comply with various provisions of the Act, including those that incorporate
state water-quality standards. 33 U.S.C. § 1341(a)(1).
The state’s certification is required to specify
5
conditions necessary to assure compliance with effluent limitations and other requirements of the Act, as
well as with “any other appropriate requirement of
State law set forth in such certification,” which “shall
become a condition on any Federal license or permit
subject to the provisions of this section.” Id. § 1341(d).
If a project will not comply with applicable clean-water requirements even with conditions, the state must
deny certification and the project may not be licensed.
Id. § 1341(a)(1).
Hydroelectric power projects that FERC licenses
and relicenses—for lengthy terms of 30 to 50 years—
typically are subject to the certification requirements
of § 1341 because they result in discharges into navigable waters. State certification for the relicensing of
hydropower projects originally licensed decades ago,
before advances in water-quality protections offered
under the Clean Water Act and the state laws that
work hand-in-hand with it, often requires significant
new conditions to protect water quality and assure the
availability of clean water for fish and wildlife habitat,
recreation, and drinking water.
Section 1341(a)(1) provides that if a state “fails or
refuses to act on a request for certification, within a
reasonable period of time (which shall not exceed one
year) after receipt of such request, the certification requirements of this subsection shall be waived with respect to such Federal application.” Nothing in the provision, however, requires that a state act on a request
that has been withdrawn by the applicant. As a result,
FERC for many years took the view that, regardless of
surrounding circumstances, an applicant’s withdrawal and resubmission of a certification request restarted the one-year period for certification as long as
the withdrawal took place within a year of the state’s
6
receipt of the request. See Pet. App. 8a–9a (citing
FERC orders from 1994–2018).
In 2019, the D.C. Circuit held in Hoopa Valley that
a formal agreement between states and an applicant
obligating the states to take no action on a certification request and the applicant to continually withdraw and resubmit the request to extend the deadline
for action indefinitely was a failure or refusal by the
states to take action and waived the certification requirement. 913 F.3d at 1104–05. The court described
such a “coordinated withdrawal-and-resubmission
scheme” as an attempt by both the states and the license applicant to circumvent FERC’s authority. Id.
at 1103. The court expressly stated that the case presented only “the set of facts in which a licensee entered
a written agreement with the reviewing states to delay water quality certification,” id. at 1104, and it decided only the question whether a state waived its certification authority when an applicant withdrew and
resubmitted its certification request “pursuant to an
agreement between the state and applicant,” id. at
1103.
Nonetheless, FERC subsequently extended Hoopa
Valley to find waiver in cases where, although a state
and an applicant had not entered into a formal agreement to delay certification, FERC found evidence of an
“informal, coordinated schem[e]” to put off certification through repeated withdrawals and resubmissions. Pet. App. 20a (citing FERC orders). Under
FERC’s standard, however, a state does not waive authority whenever an applicant withdraws and resubmits a certification request to restart the one-year
clock. Rather, where the state’s course of conduct does
not have the “motivation to restart the one-year
clock,” and the applicant “acted unilaterally and in its
7
own interest” in withdrawing and resubmitting its request, the state has not failed or refused to take action, and there is no waiver. Village of Morrisville, Vt.,
174 FERC ¶ 61,141, at P12 (2021), cited in Pet. App.
21a. Under FERC’s view, “the motivations of the licensee and especially of the certifying agencies” are critical to “whether the states waived their … authority”
by engaging in “deliberate idleness.” Id. at P10, P12.
B. Facts and Decision Below
The court of appeals’ opinion describes accurately
and at length the four relicensing proceedings and certification requests that give rise to this case. Pet. App.
9a–18a. Each involves a California hydroelectric project originally licensed in the 1960s for a term expiring
in 2013 or, in one instance, 2014. The current licensees for each project are public bodies that are political
subdivisions of the state: two irrigation districts and a
county water agency. In each case, the licensee applied to FERC for relicensing and, during the pendency of the relicensing proceedings, has continued to
operate its project(s) under a series of one-year interim licenses that lack the water-quality conditions
that will inevitably be imposed when the projects are
certified by the relevant California agency, the State
Water Resources Control Board, under § 1341(a)(1).1
The applicants submitted their initial requests for
certification to the state at various times between
2012 and 2017. California law requires that environmental impact reports under the California Environmental Quality Act (CEQA) be prepared and provided
to the State Water Resources Control Board in
––––––––––––––––––––––––
1 Among other things, the projects’ effects on native fisheries
require numerous conditions on relicensing to improve instream
habitat.
8
connection with certification requests, and, at the
time of these requests, further required the Board to
deny any certification request that was not supported
by such a report. When an applicant seeking approval
of a project requiring environmental review under
CEQA is a public agency, the applicant is designated
as the “lead agency” responsible to perform the environmental impact report. See Pet. App. 6a–7a. In each
case, the Board informed the public-agency applicants
that they were responsible for preparing the required
CEQA evaluation and that failure to submit it would
result in denial of their certification request, without
prejudice to refiling.2
None of the applicants prepared the required
CEQA evaluations, despite the state’s repeated reminders that certification could not be granted without them.3 Instead, they repeatedly chose to withdraw
––––––––––––––––––––––––
For one of the two Merced Irrigation District projects,
Merced Falls, a private entity was the licensee when certification
was first requested, and the Board was the lead agency under
CEQA until the license was transferred to the Merced Irrigation
District, but neither FERC’s orders nor the petition suggest that
that distinction affects the issues here. See Pet. App. 26a n.14.
2
3 Petitioners suggest that their failure to do so is attributable
to the state because an applicant cannot initiate the CEQA review process until FERC completes its own final environmental
impact statement (FEIS) under the National Environmental Policy Act for the projects. Pet. 10. That assertion is legally unfounded. See Cal. Pub. Res. Code § 21083.7(a) (applicant should
use the federal FEIS when “possible”). It also flies in the face of
the facts of this case. For the Yuba-Bear River project, FERC’s
FEIS was completed in December 2014, Pet. App. 35a, but the
Nevada Irrigation District had not yet even begun the CEQA process five years later. Id. 11a. Similarly, FERC issued the FEIS
for the two Merced projects in December 2015, id. 82a, but the
responsible agency, the Merced Irrigation District, had still not
commenced the CEQA process four years later. Id. 17a.
9
and resubmit their certification requests to drag out
the process while the projects continued to operate under interim licenses without the additional requirements that would be imposed if the projects were certified and relicensed. In each case, the Board communicated its readiness to comply with the state-law requirement that it deny each successive, inadequate request for certification without prejudice within a year
of its submission if it were not withdrawn by the applicant first. Although the Board predicted the applicants would choose withdrawal and resubmission over
denial without prejudice, and asked the applicants to
do so in a timely manner, it made clear in each case
that it would deny the certification requests if they
were not withdrawn based on the applicants’ failure
to provide the required environmental evaluation.
After the D.C. Circuit issued its opinion in Hoopa
Valley in January 2019, the Board issued decisions
denying without prejudice the then-pending request
for certification for each of the projects. By that time,
each of the applicants had already dragged out the
process for years by not completing the required
CEQA analyses, and each had benefited from the ability to continue operating the projects in the meantime
without additional conditions aimed at water-quality
protection. Sensing the opportunity to free themselves
completely from the prospect of conditional certification, the applicants petitioned FERC for declaratory
orders determining that California had waived certification under § 1341(a)(1) by engaging in a coordinated
scheme with them to delay certification beyond the
one-year deadline.
Purporting to apply the standard announced in its
previous decisions extending Hoopa Valley to informal
coordination schemes—but not to acquiescence in an
10
applicants’ own choice to withdraw and resubmit a
certification request—FERC ruled that the state had
waived certification with respect to each project. The
substantively similar orders relied heavily on the
state’s expectation that it would be in the applicants’
interest to refile and on communications from the
state requesting that the applicants submit withdrawals, if that was indeed their preferred course of action,
before the Board was forced to deny the requests.
FERC’s orders also wrongly stated that the state had
failed to dispute that the Board “had all of the information it needed to act,” Pet. App. 45a, 67a, when in
fact it was undisputed that the applicants had failed
to provide the necessary CEQA environmental impact
reports. The orders also ignored that the state had repeatedly made clear its readiness to act on the requests by denying them without prejudice because of
the applicants’ recalcitrance. Finally, FERC’s orders
failed to address the point—deemed decisive in prior
orders—that the applicants had the motive to delay
and benefited from the delay.
The Board, and the environmental organizations
that had intervened to support it in the FERC proceedings, filed petitions for review of each order in the
Ninth Circuit. The court of appeals vacated each of
FERC’s orders on the ground that they were unsupported by substantial evidence—the applicable standard of review under the Federal Power Act, 16 U.S.C.
§ 825l(b). See Pet. App. 4a.
The court of appeals’ decision did not question the
correctness of either Hoopa Valley or FERC’s extension of that decision to informal coordinated schemes
to delay certification. Instead, assuming the correctness of FERC’s legal standard, the court held that the
record did not support FERC’s conclusion that the
11
proceedings involved a coordinated delay scheme rather than the state’s acquiescence in the applicants’
own decision to withdraw and resubmit their requests—which FERC agreed would not constitute a
waiver. Thoroughly examining the record of each proceeding, the court found that the state had not “sought
a withdrawal-and-resubmission for its own purposes”;
rather, “the evidence shows only that the State Board
acquiesced in the Project Applicants’ own decisions to
withdraw and resubmit their applications rather than
have them denied.” Pet. App. 21a–22a.
The court pointed out that FERC had wrongly
treated the Board’s statements about what it predicted the applicants would do as evidence of the
Board’s own intentions; that FERC had overlooked the
Board’s repeated statements that it was prepared to
deny the applications without prejudice if they were
not withdrawn; that FERC had mischaracterized California regulations as “ ‘codify[ing] [the] practice’ of
withdrawal-and-resubmission,” Pet. App. 27a, when
they in fact prescribed denial of certification without
prejudice when an applicant failed to comply with
CEQA, unless the applicant withdrew its request; and
that FERC had erroneously stated that the Board did
not dispute that the applicants had supplied all information needed to act on their requests, when it was
undisputed that the requests could not be granted under then-applicable law because of the applicants’ failure to provide CEQA environmental impact reports.
See id. 23a–29a. And critically, the court pointed out
that FERC had identified no basis for concluding that
delays that benefited the applicants were in the state’s
interest. Rather, “the State Board, unlike the Project
Applicants, would have had an interest in moving
along the environmental-review process.” Id. 26a. In
12
sum, “nothing in the record shows that the State
Board encouraged” the applicants to choose withdrawal-and-resubmission over denial of certification
by the Board. Id. 29a.
For these reasons, the court vacated FERC’s orders
and remanded to the agency. That action leaves the
applicants free to continue operating the projects under interim permits while pursuing relicensing, subject to state certification and any conditions that may
be imposed as a result to ensure that they will not continue operating those projects for decades to come in a
manner that adversely affects water quality. For each
project, the state has now granted certification, subject to numerous water-quality conditions, and the
certification orders are subject to ongoing administrative and/or state-court proceedings. Meanwhile, FERC
must in any event complete Endangered Species Act
consultations with other federal agencies before the
projects can be relicensed.
REASONS FOR DENYING THE WRIT
I.
There is no conflict among the circuits.
Because a factbound court decision that a FERC
waiver determination lacks support in the administrative record obviously does not merit review by this
Court, petitioners assert that this case presents something more: a conflict among the circuits. That assertion is transparently incorrect. No court of appeals has
held that a state waived certification under circumstances comparable to those here, where the record
demonstrates the state was prepared to act on the requests—by denying them without prejudice because of
the applicants’ failure to meet the requirements for
certification under applicable state law—but instead
acquiesced in the applicants’ decisions to withdraw
13
their requests before the expiration of the one-year
deadline. Indeed, petitioners concede that the only
case they cite that involved such facts—the Fourth
Circuit’s decision in NCDEQ, 3 F.4th 655—is “consistent” with the decision below. Pet. 25. Petitioners’
invocation of D.C. and Second Circuit decisions finding waivers under very different factual circumstances does not demonstrate inter-circuit conflict.
A. The decision below accords with D.C.
Circuit precedent.
Petitioners rest their claim of conflict mainly on
the D.C. Circuit’s decision in Hoopa Valley. Their contention that the Ninth Circuit’s decision in this case
conflicts with the law applied by the D.C. Circuit, however, is untenable for multiple reasons.
First, unlike this case, Hoopa Valley did not involve a state that was willing to act on a request for
certification within the one-year deadline but had no
need to do so because of an applicant’s own decision to
withdraw the request. Rather, the relevant states in
Hoopa Valley (California and Oregon) had entered
into a “formal agreement” with the applicant to “defer
the one-year statutory limit for [certification] by annually withdrawing-and-resubmitting the water quality certification requests.” 913 F.3d at 1101. That
agreement “explicitly required abeyance of all state
permitting reviews” unless and until federal funding
for the project was secured. Id. The court emphasized
that the “single issue” it resolved was “whether a state
waives its [certification] authority when, pursuant to
an agreement between the state and applicant, an applicant repeatedly withdraws-and-resubmits its request for water quality certification over a period of
time greater than one year.” Id. at 308 (emphasis
14
added). The court held that such an agreement constituted a waiver because it reflected the state’s “deliberate and contractual idleness.” Id. at 310. The court
emphasized that it was not addressing the consequences of withdrawal and resubmission of requests
on other facts. See id.
Here, by contrast, California did not enter into an
agreement not to act on any certification request. Rather, in each case, the state explicitly stated that it
was prepared to act within one year of the submission
of each pending request, by denying it without prejudice, unless the applicant preferred to withdraw and
resubmit the request. See Pet. App. 12a, 14a, 16a, 23a,
25a, 26a. As the court of appeals found, the state had
no reason to prefer one or the other of these two “functionally equivalent” courses of action as long as one or
the other occurred before the one-year deadline. Id.
29a n.16. Nor did the state have reasons to delay the
relicensing proceedings. It was the applicants who
were responsible for the failure to carry out the steps
required for the state to grant certification; the applicants who benefited from delay because it allowed
them to continue operating the projects pending relicensing without additional water-quality protections;
and the applicants who preferred to withdraw and resubmit their certification requests rather than have
them denied without prejudice to resubmission. Id.
28a–29a & n.16. Under such circumstances, Hoopa
Valley’s rationale—that the statute aims “to curb a
state’s ‘dalliance or unreasonable delay,’ ” 913 F.3d at
1104 (emphasis in original)—is not implicated.
Second, nothing in the Ninth Circuit’s opinion suggests any disagreement with either the reasoning or
result of Hoopa Valley. The court of appeals described
the circumstances of Hoopa Valley and the holding of
15
the case without criticizing any aspect of the decision’s
analysis. See Pet. App. 9a, 19a–20a. The court further
noted that, following Hoopa Valley, FERC had gone
one step beyond that case’s holding by ruling that
waiver occurs not only where states enter into express
agreements to delay certification, but also where they
are parties to “more informal, coordinated schemes.”
Id. 20a. The court did not disagree even with FERC’s
extension of Hoopa Valley’s holding; rather, it assumed the correctness of the legal standard that
FERC applied. Id. 22a (“We need not decide whether
the coordination standard FERC advances is consistent with the text of [§ 1341(a)(1)].”). The court held
that, even under FERC’s expansive view of Hoopa Valley—under which a “coordinated” withdrawal-and-resubmission scheme constitutes a waiver, but a states’
“acquiesce[nce] in a project applicant’s own decision to
withdraw and refile” does not, id. 21a—there was no
substantial evidence supporting a finding of waiver.
Id. 22a.
Third, the D.C. Circuit’s subsequent decision in
Turlock—which petitioners barely mention, see Pet.
26 n.8, 29—makes clear that there is no conflict between its approach and that of the Ninth and Fourth
Circuits. In Turlock, as in this case, California was
presented with requests for certification for two hydropower projects from applicants that had not carried out their responsibility to prepare an environmental impact evaluation, which at the time was a
state-law prerequisite to the state’s grant of certification. California denied each request in Turlock without prejudice within one year of its submission. The
applicants resubmitted the requests; California again
denied the requests without prejudice within a year,
and the applicants again resubmitted the requests.
16
The applicants then asked FERC to rule that the state
had waived certification, but FERC declined to find a
waiver. On review, the D.C. Circuit held that under
§ 1341(a)(1)’s plain terms, the state’s timely denial of
a request, without prejudice to its resubmission, is not
a failure or refusal to act that constitutes a waiver. 36
F.4th at 1183. That is, Turlock held that there was no
waiver where California took the exact action it was
prepared to take in this case, and where the consequences of the state’s action were functionally identical to what it did in this case.
In reaching its holding in Turlock, the D.C. Circuit
emphasized the limits of its holding in Hoopa Valley.
The court rejected the applicants’ argument that, because the effect of the state’s action in both cases was
to delay certification of the projects, Hoopa Valley required a finding of waiver under the circumstances in
Turlock as well. Id. at 1183–84. In so doing, the court
adopted the Fourth Circuit’s explanation in NCDEQ
of why Hoopa Valley does not require waiver where a
state acquiesces in an applicant’s decision to withdraw
and resubmit its certification request: “The Fourth
Circuit accurately described Hoopa Valley as a case in
which ‘the state agencies and the license applicant entered into a written agreement that obligated the
state agencies, year after year, to take no action at all
on the applicant’s § [1341] certification request.’ ” Id.
at 1183. The court confirmed the Fourth Circuit’s view
that Hoopa Valley does not control where “[t]hose circumstances are not present.” Id.
Turlock directly contradicts petitioners’ assertion
that the Fourth Circuit’s “understanding of Hoopa
Valley … conflicts with … the D.C. Circuit’s view of its
own precedent.” Pet. 26. Petitioners support that
statement only with a footnote that in turn cites a
17
footnote in Turlock characterizing a FERC order, see
id. 26 n.8, not the D.C. Circuit’s precedent. They completely ignore the explicit endorsement in Turlock’s
text of NCDEQ’s understanding of D.C. Circuit precedent. Turlock leaves no doubt that that same understanding is shared by each of the circuits that have
addressed the scope of Hoopa Valley: the Fourth Circuit in NCDEQ, the D.C. Circuit in Turlock, and the
Ninth Circuit below. See also Turlock Irrig. Dist. v.
FERC, No. 22-616, Br. for Fed. Resp. in Opp., at 18
(U.S. filed Mar. 8, 2023) (noting consistency of Turlock
with the decision below in this case).
B. Second Circuit precedent also supports
the decision below.
Petitioners’ fallback claim that decisions of the
Second Circuit would require a finding of waiver in
this case is likewise groundless. Neither of the two decisions that petitioners cite, NYDEC I and II, holds
that a state that is prepared to act on a certification
request within a year of its submission waives certification if it acquiesces in an applicant’s decision to
withdraw the request and resubmit it, starting the
clock anew. The cited decisions stand instead for the
unremarkable proposition that under the statute’s
plain language—which provides that a state waives
certification if it “fails or refuses to act on a request for
certification, within … one year ... after receipt of such
request,” 33 U.S.C. § 1341(a)(1)—the state cannot
count the one-year period from a date other than the
date on which a request was received. NYDEC I, 884
F.3d at 456; NYDEC II, 991 F.3d at 447–48. This case
involves no similar disregard of the statutory terms
governing the commencement of the one-year period:
18
California was always prepared to act on each certification request within one year of receiving it.
Grasping at straws, petitioners argue that the
NYDEC decisions reflect the view that § 1341(a)(1),
establishes a “bright-line rule” intended to “reduce
flexibility,” Pet. 23 (quoting NYDEC II, 991 F.3d at
449, 450), and that similar policy concerns require
rejection of the Ninth Circuit’s decision in this case.
That argument fails for several reasons.
To begin, petitioners’ projection of the Second Circuit’s supposed policy concerns onto the different circumstances of this case does not establish a conflict
between the holdings of the cases. The Second Circuit’s holdings rested on the statutory language triggering the one-year period based on the date of “receipt” of a request. The “bright-line rule” dictated by
that language is not implicated here, where the triggering of the one-year period is not at issue.
Moreover, the circumstances of this case, unlike
those of the NYDEC cases, do not involve dalliance by
the state, which was prepared to act on the requests in
this case within one year of receipt. It was petitioners
who failed to supply the information needed for the
state to grant the certification requests and who chose
to withdraw and resubmit their requests to avoid the
state’s denials.
Most tellingly, petitioners’ speculation about how
the Second Circuit’s view of the statute would lead it
to rule in the circumstances of this case ignores the
best evidence on that point—what the Second Circuit
said: “If a state deems an application incomplete, it
can simply deny the application without prejudice—
which would constitute ‘acting’ on the request under
the language of Section [1341(a)(1)]. It could also
19
request that the applicant withdraw and resubmit the
application.” NYDEC I, 884 F.3d at 456; see also NYDEC II, 991 F.3d at 450 n.11 (similar). Recognizing
that the Second Circuit’s statements support the decision below, petitioners belittle them as “dicta.” Pet. 24
n.7. That the sentences were dicta, however, only underscores that the NYDEC cases did not present and
did not decide the question presented here—which is
why their holdings cannot conflict with the decision
below. At the same time, that the statements are not
holdings does not alter the point that they contradict
petitioners’ assertions that the NYDEC opinions
demonstrate that the Second Circuit would reach a result opposed to the Ninth Circuit’s on the facts of this
case.
II. The court of appeals’ decision is correct.
Beyond their erroneous claim of conflict among the
circuits, petitioners argue that the court below erred
in holding that the record lacked substantial evidence
to support FERC’s conclusion that California waived
certification by failing or refusing to act on petitioners’
requests within a year of receiving them. Absent a
conflict, such a factbound claim of error would “rarely”
support a request for review by this Court, even if it
were arguably meritorious. S. Ct. R. 10. And here,
there is no merit to petitioners’ assertion that the
court of appeals’ decision was wrong.
As the court of appeals carefully explained, the record evidence in each proceeding showed that California was prepared to act on each of petitioners’ requests for certification within one year of receiving it,
and would have denied each request without prejudice
based on petitioners’ undisputed failure to perform
and submit an environmental evaluation as required
20
by state law at the time. Pet. App. 22a–26a. As the
court also explained, the undisputed evidence of petitioners’ prolonged failure to comply with this requirement clearly contradicted FERC’s statements that
California “had all of the information it needed” to rule
on the certification requests. Rather, the evidence
showed that the state had “continually reminded” the
applicants “that it did not have the information it
would need to grant a request—namely, the [environmental] evaluation that California law required.” Id.
28a. In light of petitioners’ failure to submit the information needed for a grant of certification, California
predicted that they would prefer to withdraw their requests rather than have them denied, and it requested
that they submit such withdrawals in advance of the
one-year deadline if they did not want the requests to
be denied without prejudice. Id. 23a–26a. It was the
applicants’ choice to withdraw their requests, and it
was their own interest in not having their requests denied—not any interest of the state in delaying a decision—that led them to make that choice. Id. 28a–29a.
Under such circumstances, the plain language of
§ 1341(a)(1) forecloses any finding of waiver. California certainly did not “refuse” to act on the requests:
The record leaves no doubt that California was willing
and prepared to deny each request without prejudice
within a year of receiving it. And a state does not “fail”
to act on a request when it has been withdrawn before
the statutory deadline for action. To “fail” means “[t]o
be deficient or unsuccessful; to fall short of achieving
something expected or hoped for.” Black’s Law Dictionary 739 (11th ed. 2019). Because the statute imposes no obligation to act on requests that have been
withdrawn, not acting on them is not a “failure” to
take any required or expected action. See Pet. 30
21
(acknowledging that a state is not required to act on a
voluntarily withdrawn request to avoid waiver).
Petitioners try to sidestep this point by suggesting
at various points in the petition that California’s former prohibition on granting certification before completion of an environmental evaluation under CEQA
was itself improper because it prevented certification
within the one-year deadline. Petitioners’ attacks on a
requirement that California law no longer imposes,
however, offer no issue of importance for this Court to
resolve. And in any event, the lawfulness of that requirement is not included in the petition’s question
presented and would not properly be before the Court
even if it were, because it was not decided by FERC or
by the court below.4
Had petitioners wished to challenge the lawfulness
of the requirement that they complete an environmental evaluation before certification could be granted,
they could have declined to withdraw their certification requests, received denials without prejudice
based on their failure to comply with the requirement,
and challenged the lawfulness of the denials in a California state court. They did not take that course. The
only question presented here is whether an applicant
who withdraws a request for certification in order to
avoid an inevitable denial without prejudice under
state law can successfully claim that the state waived
certification just by acquiescing in the withdrawal and
allowing the applicant to resubmit the request. Because such proceedings involve no failure or refusal to
act by the state, the answer to that question is no.
––––––––––––––––––––––––
4 Indeed, FERC expressly stated that the reason for the with-
drawal and resubmission was “immaterial.” Pet. App. 45a.
22
III. Accepting petitioners’ arguments would
undermine the certification process by allowing applicants to game the system.
Petitioners’ arguments seek to transform their own
derelictions and delays into a waiver by the state.
That result is unsupported by the statutory language
and would have pernicious consequences. As Judge
Randolph observed in rejecting similar arguments by
the applicants in the Turlock case, petitioners’ approach “could lead to gamesmanship. Applicants could
file certification requests lacking sufficient documentation. That would leave the State in an untenable position. … The State would be stuck with the Hobson’s
choice of either granting certification without necessary information or waiving its power to decide.” 36
F.4th at 1184 (cleaned up). In effect, applicants could
negate state-law certification requirements by refusing to comply with them and then withdrawing their
first requests for certification just in time to avoid denial by the state.
The potential for gamesmanship is magnified
when, as in this case, applicants have benefited for
years from their failure to provide the state with the
information needed to make a merits determination
on certification. As the court of appeals explained, the
consequence of petitioners’ decision to withdraw and
resubmit their requests has been that they have been
able to continue to operate the projects under interim
licenses that are not subject to the water-quality protective conditions that the state would impose through
§ 1341 certification. See Pet. App. 26a–27a. Only after
Hoopa Valley led them to believe that they might be
able to parlay their actions into a permanent exemption from imposition of such conditions did petitioners
change course and ask FERC to find that the state had
23
waived certification by purportedly colluding with
them to delay their licensing proceedings.
Petitioners’ invocation of Hoopa Valley, however,
overlooks that if the circumstances of this case really
placed it within the scope of Hoopa Valley’s holding,
the consequence would not be just that the state had
waived certification, but also that the applicants
themselves had failed “to diligently prosecute [their]
licensing application[s].” Hoopa Valley, 913 F.3d at
1103. Hoopa Valley, after all, was not a case where an
applicant who colluded to delay certification was allowed to benefit by being freed from the Clean Water
Act’s requirements. Rather, in that case, a third party
who opposed relicensing of the project at issue argued
that the agreement between the state and the applicant to delay certification constituted both a waiver of
certification and a failure of the applicant to prosecute
its relicensing application. See id. at 1100. The D.C.
Circuit explicitly recognized that the waiver and failure to prosecute arguments were intimately “connected” and that both turned on whether the agreement between the states and the applicant was permissible. Id. at 1103. If (as the court ultimately concluded) it was not permissible, “then the states’ and
licensee’s actions were an unsuccessful attempt to circumvent FERC’s regulatory authority of whether and
when to issue a federal license.” Id. (emphasis added).
By asserting that Hoopa Valley applies here, petitioners necessarily accuse themselves, as well as California, of scheming to delay their own relicensing proceedings. But contrary to Hoopa Valley’s implication
that an applicant’s participation in such an agreement
to delay certification jeopardizes the license application because it amounts to failure to prosecute, petitioners seek to benefit from what, under their own
24
theory, is their own wrongdoing. Petitioners cannot
have it both ways: If Hoopa Valley applied here, they
would have to accept the consequences of their own
participation in what they call an “impermissible
scheme.” Pet. 3. Accepting petitioners’ invitation to
apply only the aspect of Hoopa Valley’s holding that
would benefit them (its finding of waiver), while allowing them to enjoy the benefits of their self-described
scheming, would greatly compound the ill consequences of extending that decision to the different circumstances of this case.
IV. A number of factors make review of the
question posed by the petition unnecessary and inappropriate at this time.
A. Petitioners complain that California’s “resistance” to FERC licensing proceedings, Pet. 28 n.12,
leads to a “high volume” of delays, resulting from withdrawal and resubmission of certification requests attributable to California’s former requirement that environmental evaluations be completed before certification can be granted, id. 29. They gloss over, however,
the fact that California law has changed, and now permits the state to grant certification prior to completion
of an environmental evaluation if necessary to further
avoid the possibility that FERC will find that the state
waived certification by refusing or failing to take
timely action. See Cal. Water Code § 13160(b)(2).
Even without regard to the change in California
law, the agreement between FERC and the courts of
appeals that states do not waive certification if they
deny certification without prejudice has already led
states, including California, to rely on such denials out
of an abundance of caution rather than acquiescing in
withdrawal and resubmission of requests by
25
applicants. The Turlock case is illustrative: There,
with concerns about waiver raised by the pendency of
Hoopa Valley in the forefront, California acted on a
deficient certification request by denying it without
prejudice rather than allowing the applicants an opportunity to withdraw it.
Together, these two factors will relegate withdrawal and resubmission to a greatly diminished role
in certification proceedings, regardless of the outcome
of this case. The change in California law makes it less
likely that applicants’ failure to perform environmental evaluations will delay water-quality certification,
and D.C. Circuit precedent makes it more likely that
the state will issue denials without prejudice when
certification cannot be granted by the one-year deadline. Accordingly, addressing the consequences of
withdrawal and resubmission is a matter of little or
no ongoing importance. Reviewing that subject in this
case would thus do nothing to streamline future licensing proceedings. It would, however, potentially
cause further delay to the relicensing proceedings in
this case, which would best be advanced by resolution
of pending administrative and state-court challenges
to the state’s certification of each project and completion of the relicensing process subject to valid waterquality conditions imposed by the state.
B. Ongoing rulemaking activity is likely to have a
significant bearing on how courts address waiver issues under § 1341(a)(1) and, therefore, could render
any merits decision this Court might issue if it were
to grant certiorari obsolete or academic. EPA, which
has rulemaking authority under the Clean Water Act,
promulgated a rule in 2020 addressing the determination of the “reasonable period of time” for acting on a
certification request under § 1341(a)(1). See 40 C.F.R.
26
§ 121.6. The rule provides, among other things, that a
“certifying authority is not authorized to request the
project proponent to withdraw a certification request.”
Id. § 121.6(e). That provision, which was inapplicable
to the proceedings in this case but has now gone into
effect, see In re Clean Water Act Rulemaking, 60 F.4th
583 (9th Cir. 2023), would, assuming its validity, inform any determination of whether California could
engage in the kinds of communications with applicants that the petitioners here cite to support their
claim of waiver, in the unlikely event that similar circumstances were to arise in the future.
In 2022, EPA issued a new notice of proposed rulemaking to amend the reasonable-time rule and other
parts of the 2020 rules implementing § 1341. See 87
Fed. Reg. 35,318 (2022). If adopted, the new rule
would delete the provision preventing states from asking applicants to withdraw certification requests and
allow states “to determine on a case-by-case basis
whether and when withdrawal and resubmittal of a
certification request is appropriate.” Id. at 35,342. In
addition, EPA’s rulemaking notice requests comment
on whether it should “establish[ ] regulations specifically authorizing withdrawals and resubmissions in
certain factual situations.” Id. Finalization of the current proposal, or of a possible rule explicitly authorizing withdrawal and resubmission would, like the current rule, affect the outcome if future cases were to
present circumstances similar to those in this case.
Whatever the outcome of the rulemaking—issuance of a new rule allowing states to request withdrawal of certification requests, or retention of the
current rule limiting such requests—EPA regulations
will likely have a substantial effect on the outcome of
any future cases involving circumstances similar to
27
those here. The Court should not reach out to address
the issue in a case that predates the finalization of the
regulatory framework that will govern the issue going
forward. Given the ongoing regulatory process, a decision by the Court in this case could well prove to be
outdated even before it is issued.
C. Finally, the existence of alternative grounds for
affirmance not reached by the court of appeals in light
of its holding that FERC’s orders were not supported
by substantial evidence provides yet another reason
for leaving the decision below undisturbed. The Ninth
Circuit’s decision made it unnecessary for the court to
consider whether the standard announced by FERC in
the wake of Hoopa Valley—that informally coordinated efforts by states and applicants to delay certification amount to waiver under § 1341(a)(1)—is correct
and may be applied retroactively to requests that were
withdrawn and resubmitted before FERC formulated
that rule. See Pet. App. 22a & n.12. If the Court were
to take up this case, those significant questions would
also require consideration.
In addition, the court of appeals did not address
the argument of the environmental-organization respondents that FERC erred by failing to consider
whether petitioners’ unclean hands—as participants
in and principal beneficiaries of the “scheme” to delay
certification that they challenged—should bar them
from benefiting further by escaping the possible imposition of state water-quality conditions on the relicensing of their projects. Given that Hoopa Valley condemns applicants who collude to delay certification as
much as it condemns states, see supra 23–24, that failure would have been fatal to FERC’s orders had the
court needed to address it. Similarly, the court of appeals had no need to address the environmental
28
organizations’ arguments, that, under the circumstances here (including FERC’s application of a new
legal standard and the applicants’ role in preventing
the state from issuing a certification within one year
of the initial request), FERC was required to consider
whether the one-year limit was equitably tolled.
* * *
In short, for several independent reasons, the outcome in this case should and would be the same even
in the unlikely event that the Court were to resolve
petitioners’ question presented in their favor. That
consideration—on top of the absence of any compelling
reason to address the question to begin with—would
make granting certiorari in this case an especially improvident use of this Court’s decisional resources.
CONCLUSION
For the foregoing reasons, the petition for a writ of
certiorari should be denied.
29
Respectfully submitted,
SCOTT L. NELSON
Counsel of Record
MICHAEL MIGIEL-SCHWARTZ
PUBLIC CITIZEN
LITIGATION GROUP
1600 20th Street NW
Washington, DC 20009
(202) 588-1000
snelson@citizen.org
JULIE GANTENBEIN
WATER AND POWER
LAW GROUP PC
2140 Shattuck Avenue
Suite 801
Berkeley, CA 94704
(510) 296-5588
SANJAY NARAYAN
ANDREW MCALEER HAWLEY
WESTERN ENVIRONMENTAL
SIERRA CLUB
LAW CENTER
2101 Webster Street
1037 NE 65th Street, No. 343 Suite 1300
Seattle, WA 98115
Oakland, CA 94612
(206) 487-7250
(415) 977-5769
(for Sierra Club only)
Attorneys for Non-Governmental Respondents
April 2023
This is a copy of a public record, reproduced as it was published. It is not legal advice, and it may not be the version a court would rely on. Check the official source before you cite it.