Respondents Brief — George Sheetz, Petitioner v. County of El Dorado, California

Supreme Court briefJul 5, 2023

Ask Donna

What actually matters in this document.

Text

No. 22-1074

In the Supreme Court of the United States

GEORGE SHEETZ,

Petitioner,

v.

COUNTY OF EL DORADO,

Respondent.

On Petition for Writ of Certiorari

to the California Court of Appeal

Third Appellate District

OPPOSITION TO PETITIONER’S PETITION

FOR WRIT OF CERTIORARI

GLEN C. HANSEN

*Counsel of Record

Abbott & Kindermann, Inc.

2100 21st Street, Ste. A

Sacramento, California 95818

Tel: 916-456-9595

Email: ghansen@aklandlaw.com

Counsel for Respondent

i

TABLE OF CONTENTS

STATUTORY PROVISIONS THAT ARE NOT SET

OUT IN THE PETITION ............................................ 1

INTRODUCTION ........................................................ 4

STATEMENT OF THE CASE .................................... 5

REASONS FOR DENYING THE PETITION ............ 6

I.

The Petition Seeks An Advisory Opinion

Divorced From The Facts In This Case ........... 6

II.

The Petition Fails To Present Any Split Of

Authority On The Dispositive Issue In This

Case ................................................................... 7

A.

The “Reasonable Relationship” Test In

California’s Mitigation Fee Act

Satisfies The Constitutional Purposes

Of Nollan/Dolan For Legislative

Exactions. ............................................... 8

B.

The TIM Fees Here Satisfy The

“Reasonable Relationship” Test For

Legislative Exactions Under

California Law. .................................... 16

C.

The TIM Fees In This Case Were

Applied Without Discretion. ................ 19

ii

D.

None Of The Case Law Cited By Mr.

Sheetz Address The Application Of

The Nollan/Dolan Test To A

Legislatively Mandated, NonDiscretionary, Broadly-Applied Impact

Fee That Satisfies The MFA’s

“Reasonable Relationship” Test. ......... 20

III.

This Court Should Deny The Petition

Because Mr. Sheetz Essentially Challenges

The Constitutionality Of The MFA, Which

Was Never Raised Or Decided Below ............ 24

IV.

The Court Of Appeal’s Decision Below Is Not

In Tension With Koontz Or This Court’s

Recent Takings Precedents ............................ 26

A.

The Decision Below Is Not In Tension

With Koontz. .......................................... 26

B.

The Discretion Applied In Nollan And

Dolan Does Not Exist Here. ................. 30

C.

The Decision Below Is Not In Tension

With Cedar Point And Pakdel. ............. 35

CONCLUSION .......................................................... 37

iii

TABLE OF AUTHORITIES

CASES

Adarand Constructors, Inc. v. Mineta

534 U.S. 103, 109, 151 L. Ed. 2d 489, 122 S. Ct. 511

(2001) ...................................................................... 25

Amoco Oil Co. v. Village of Schaumburg

661 N.E.2d 380, 390 (Ill. Dist. Ct. App. 1995) ....... 21

Anderson Creek Partners, L.P. v. Cnty. Of Harnett

876 S.E.2d 476, 480-481, 497, 500, 503 n. 17 (N.C.

2022)........................................................................ 21

Better Housing for Long Beach v. Newsom

452 F.Supp.3d 921, 932 (C.D.Ca. 2020)................. 27

California Bldg. Indus. Ass’n v. City of San Jose,

Calif., 577 U.S. 1179 (2016) ................................... 20

California Building Industry Assn. v. City of San Jose

351 P.3d 974, 990 fn. 11 (Cal. 2015) ...................... 27

Camreta v. Greene, 563 U.S. 692, 717 ......................... 7

Cedar Point Nursery v. Hassid

141 S.Ct. 2063 (2021) ............................................. 35

Centex Real Estate Corp. v. City of Vallejo

(1993) 19 Cal.App.4th 1358...................................... 9

City of San Diego v. Board of Trustees of California

State University352 P.3d 883, 893-894 (Cal. 2015)

................................................................................. 12

iv

Conway v. California Adult Authority

396 U.S. 107.............................................................. 7

Cresta Bella, LP v. Poway Unified School Dist., 218

Cal.App.4th 438, 447 (Cal. Ct. App. 2013) .............. 9

CRST Van Expedited, Inc. v. EEOC, 578 U.S. 419,

420 (2016) ............................................................... 25

Dolan v. City of Tigard (1994) 512 U.S. 374 ..... passim

Eastern Enterprises v. Apfel

(1998) 524 U.S. 498, 540 (1998) ............................. 28

EEOC v. Federal Labor Relations Authority

476 U.S. 19, 24 (1986) ............................................ 26

Ehrlich v. City of Culver City, 911 P.2d 429, 436, 12

Cal.4th 854 (Cal. 1996) .................................. passim

General Talking Pictures Corp. v. Western Electric

Co., 304 U.S. 175, 178-179 (1938) ............................ 5

Grupe v. California Coastal Com.

166 Cal.App.3d 148 (Cal. Ct.App. 1985) ................ 30

Heritage at Pompano Hous. Partners, L.P. v. City of

Pompano Beach2021 U.S. Dist. LEXIS 239647,

2021 WL 8875658 (S.D.Fla.. Dec. 15, 2021) .......... 21

Highlands-In-The-Woods, L.L.C. v. Polk Cnty.

217 So.3d 1175, 1178 (Fla. Dist. Ct. App. 2017) ... 21

Home Builders Ass’n of Dayton and the Miami Valley

v. City of Beavercreek

729 N.E.2d 349, 350-356 (Ohio 2000) .................... 23

v

Home Builders Assn. of Tulare/Kings Counties, Inc.

v. City of Lemoore (2010) 185 Cal.App.4th 554 ....... 9

Knight v. Metro. Gov’t of Nashville & Davidson Cnty.,

67 F.4th 816 (6th Cir. 2023) ............................. 33, 34

Koontz v. St. Johns River Water Management District

(2013) 570 U.S. 595 ........................................ passim

La Costa Beach Homeowners' Assn. v. California

Coastal Com.

101 Cal.App.4th 804, 817 (Cal. Ct. App. 2002) ..... 32

Landgate, Inc. v. California Coastal Com.

953 P.2d 1188, 1198 (Cal. 1998) ............................ 19

Lingle v. Chevron U.S.A., Inc.

544 U.S. 528, 546 (2005) ........................................ 30

Matsushita Elec. Industrial Co. v. Epstein

516 U.S. 367, 399 (1996) ........................................ 25

Nollan v. California Coastal Commission

(1987) 483 U.S. 825 ........................................ passim

Pakdel v. City & County of San Francisco

(2021) 141 S.Ct. 2226 ................................. 35, 36, 37

R. Simpson & Co. v. Commissioner

321 U.S. 225, 227 (1944) .......................................... 5

Rogers Mach., Inc. v. Washington County

45 P.3d 966, 978 n.13 (Or. Ct. App. 2002) ............. 23

San Remo Hotel v. City and County of San Francisco,

41 P.3d 87, 105 (Cal.2002) ..................................... 19

vi

Tower of Flower Mound v. Stafford Estates Ltd.

P’ship, 135 S.W.3d 620, 641-643 (Tex. 2004) ........ 22

Walker v. City of San Clemente

(2015) 239 Cal.App.4th 1350,................................... 9

Webster v. Cooper, 558 U.S. 1039, 1041 (2009) ......... 26

Zacchini v. Scripps-Howard Broadcasting Co.

433 U.S. 562, 566 (1977) .......................................... 7

STATUTES

California Government Code § 66468 (Deerings 2020)

................................................................................... 1

Gov. Code, § 66001 ............................................. passim

OTHER AUTHORITIES

CDC § 18.134.010 ....................................................... 33

Shapiro, et al., Supreme Court Practice (11th Ed.

2019), Ch. 6.37(i)(1), p. 6-148 ................................. 24

1

STATUTORY PROVISIONS THAT ARE NOT

SET OUT IN THE PETITION

California Government Code § 66001 (Deerings

2023).

(a) In any action establishing, increasing, or imposing

a fee as a condition of approval of a development

project by a local agency, the local agency shall do all

of the following:

(1) Identify the purpose of the fee.

(2) Identify the use to which the fee is to be put. If the

use is financing public facilities, the facilities shall be

identified. That identification may, but need not, be

made by reference to a capital improvement plan as

specified in Section 65403 or 66002, may be made in

applicable general or specific plan requirements, or

may be made in other public documents that identify

the public facilities for which the fee is charged.

(3) Determine how there is a reasonable relationship

between the fee’s use and the type of development

project on which the fee is imposed.

(4) Determine how there is a reasonable relationship

between the need for the public facility and the type

of development project on which the fee is imposed.

(b) In any action imposing a fee as a condition of

approval of a development project by a local agency,

the local agency shall determine how there is a

reasonable relationship between the amount of the

fee and the cost of the public facility or portion of the

public facility attributable to the development on

which the fee is imposed.

(c) Upon receipt of a fee subject to this section, the

local agency shall deposit, invest, account for, and

expend the fees pursuant to Section 66006.

2

(d)

(1) For the fifth fiscal year following the first deposit

into the account or fund, and every five years

thereafter, the local agency shall make all of the

following findings with respect to that portion of the

account or fund remaining unexpended, whether

committed or uncommitted:

(A) Identify the purpose to which the fee is to be put.

(B) Demonstrate a reasonable relationship between

the fee and the purpose for which it is charged.

(C) Identify all sources and amounts of funding

anticipated to complete financing in incomplete

improvements identified in paragraph (2) of

subdivision (a).

(D) Designate the approximate dates on which the

funding referred to in subparagraph (C) is expected

to be deposited into the appropriate account or fund.

(2) When findings are required by this subdivision,

they shall be made in connection with the public

information required by subdivision (b) of Section

66006. The findings required by this subdivision need

only be made for moneys in possession of the local

agency, and need not be made with respect to letters

of credit, bonds, or other instruments taken to secure

payment of the fee at a future date. If the findings are

not made as required by this subdivision, the local

agency shall refund the moneys in the account or

fund as provided in subdivision (e).

(e) Except as provided in subdivision (f), when

sufficient funds have been collected, as determined

pursuant to subparagraph (F) of paragraph (1) of

subdivision (b) of Section 66006, to complete

financing on incomplete public improvements

identified in paragraph (2) of subdivision (a), and the

public improvements remain incomplete, the local

3

agency shall identify, within 180 days of the

determination that sufficient funds have been

collected, an approximate date by which the

construction of the public improvement will be

commenced, or shall refund to the then current

record owner or owners of the lots or units, as

identified on the last equalized assessment roll, of the

development project or projects on a prorated basis,

the unexpended portion of the fee, and any interest

accrued thereon. By means consistent with the intent

of this section, a local agency may refund the

unexpended revenues by direct payment, by

providing a temporary suspension of fees, or by any

other reasonable means. The determination by the

governing body of the local agency of the means by

which those revenues are to be refunded is a

legislative act.

(f) If the administrative costs of refunding

unexpended revenues pursuant to subdivision (e)

exceed the amount to be refunded, the local agency,

after a public hearing, notice of which has been

published pursuant to Section 6061 and posted in

three prominent places within the area of the

development project, may determine that the

revenues shall be allocated for some other purpose for

which fees are collected subject to this chapter and

which serves the project on which the fee was

originally imposed.

(g) A fee shall not include the costs attributable to

existing deficiencies in public facilities, but may

include the costs attributable to the increased

demand for public facilities reasonably related to the

development project in order to (1) refurbish existing

facilities to maintain the existing level of service or

4

(2) achieve an adopted level of service that is

consistent with the general plan.

INTRODUCTION

Respondent County of El Dorado, California,

respectfully requests that this Court deny Petitioner

George Sheetz’s Petition For Writ Of Certiorari

(“Petition”) which seeks review of the judgment of the

California Court of Appeal, Third Appellate District.

The question presented in the Petition is

“whether a permit exaction is exempt from the

unconstitutional-conditions doctrine as applied in

Nollan [v. California Coastal Commission (1987) 483

U.S. 825] and Dolan [v. City of Tigard (1994) 512 U.S.

374] simply because it is authorized by legislation.”

But that is not what this case is about. The Court of

Appeal did not decline to apply the Nollan/Dolan test

“simply because it is authorized by legislation.” While

that may be true of some of the case law and

commentary cited in the Petition, it is not true here.

Mr.

Sheetz’

simplistic

distinction

between

“legislative” and “administrative” exactions, as well as

his discussion of the purported “legislative/

administrative loophole,” does not encompass the

totality of what the California Court of Appeal

concluded in the Decision below.

The question presented in the Petition ignores

the fact that the legislatively mandated, formulaic,

nondiscretionary and broadly-applied fees under the

County’s Traffic Impact Mitigation (“TIM”) Fee

Program that Mr. Sheetz challenges here were found

by the trial court and the Court of Appeal to fully

5

satisfy the “reasonable relationship” test for legislative

exactions under California’s Mitigation Fee Act, Govt.

Code 66000 et seq. (“MFA”). App. A-6 – A-7, A-23 – A27. No case cited in the Petition or in any of the amici

curiae briefs, or found by Respondent, has ever held

that impact fees that meet the reasonable relationship

test for legislative exactions in the MFA must also

satisfy the Nollan/Dolan test. Thus, there is no split of

authority for this Court to resolve in this case. The

Petition should therefore be denied. See e.g.,

R. Simpson & Co. v. Commissioner, 321 U.S. 225, 227

(1944) [“There appearing to be no conflict of decision

between circuits, we on November 9, 1942 denied

certiorari”]; General Talking Pictures Corp. v. Western

Electric Co., 304 U.S. 175, 178-179 (1938) [“Nor would

the writ be granted to review the questions of

anticipation and invention that petitioner argues, for

as to them there is no conflict between decisions of

circuit courts of appeals.”]

Furthermore, the Petition essentially challenges

the constitutionality of the distinction between

legislative exactions and adjudicatory exactions in the

MFA. But that issue was never raised or decided

below. For that additional reason, the Petition should

be denied.

STATEMENT OF THE CASE

Respondent hereby incorporates by reference

the “Factual And Procedural Background” in the Court

of Appeal’s Decision, below. App. A-2 to A-7.

The Superior Court denied Mr. Sheetz’ petition

for writ of mandamus. App. B-1. Mr. Sheetz timely

6

appealed. App. A-7. The Court of Appeal denied that

appeal, finding (1) that the Nollan/Dolan test did not

apply to the challenged TIM fees, and (2) that the TIM

fees complied with the MFA. App. A-7 to A-20, A-23 to

A-27. Mr. Sheetz timely petitioned the California

Supreme Court for review of the Court of Appeal’s

decision, and the California Supreme Court denied

that petition. C-1.

REASONS FOR DENYING THE PETITION

I.

The Petition Seeks An Advisory Opinion

Divorced From The Facts In This Case

The question presented in the Petition avoids

the actual facts in this case, and therefore seeks an

advisory opinion from this Court. Because this is an

“as applied” challenge to the TIM fees, App. A-5 – A-6,

Mr. Sheetz framed the question to the California

Supreme Court as whether a legislative exaction “like

the one imposed by the County” is subject to

heightened scrutiny under the unconstitutional

conditions doctrine set forth in Nollan, Dolan and

Koontz v. St. Johns River Water Management District

(2013) 570 U.S. 595. But now in this Court, Mr. Sheetz

strips out from the question presented any reference to

the facts regarding the actual exaction imposed by the

County on his building project in this case. Instead,

Mr. Sheetz asks this Court to determine the

constitutionality of generic legislatively imposed

impact fees under Nollan/Dolan, and not the actual

7

fees at issue here. 1 Petitioner essentially invites this

Court to issue an advisory opinion, which this Court is

not permitted to render. Zacchini v. Scripps-Howard

Broadcasting Co., 433 U.S. 562, 566 (1977). See

Camreta v. Greene, 563 U.S. 692, 717 (KENNEDY, J.

dissenting) [“The ‘ “judicial Power” is one to render

dispositive judgments,’ not advisory opinions.”] This

Court should therefore deny the Petition. See e.g.,

Conway v. California Adult Authority, 396 U.S. 107,

110 (1969) [where Court would “in effect be rendering

an advisory opinion” if it passed upon the “purely

artificial and hypothetical issue tendered by the

petition for certiorari,” the Court dismissed the writ of

certiorari as improvidently granted.]

II.

The Petition Fails To Present Any Split

Of Authority On The Dispositive Issue In

This Case

Mr. Sheetz asserts that “governments have

turned to cloaking their exactions in legislation –

knowing that, in doing so, their exactions can escape

Nollan/Dolan scrutiny. That’s precisely what

happened to Mr. Sheetz in this case.” (Petition, 6.)

But that is not what happened here. The development

impact fee imposed on Mr. Sheetz was legislatively

adopted by the County pursuant to the procedures and

processes set forth in California’s legislatively enacted

MFA. The Petition (1) omits any discussion about the

1 The facial challenge that is now presented to this Court, if it

was separated from the “as-applied” challenge, would be barred

by the applicable statute of limitations. App. B-7 to B-16.

8

“reasonable relationship” test in the MFA, which test

applies to all legislatively imposed development

impact fees in California; (2) omits any discussion

about how the courts below found that the TIM fees at

issue here satisfy that reasonable relationship test;

(3) omits any discussion that the TIM fees were

applied to Mr. Sheetz’ building project without any

administrative discretion; and (4) omits the fact that

no court has ever held that legislatively mandated,

formulaic, nondiscretionary and broadly applied

impact fees that satisfy that reasonable relationship

test under the MFA must also satisfy the

Nollan/Dolan standard.

As a result of such

omissions, the Petition fails to present any split of

authority on the dispositive issue in this case.

Certiorari should therefore be denied here.

A.

The “Reasonable Relationship” Test In

California’s Mitigation Fee Act Satisfies The

Constitutional Purposes Of Nollan/Dolan For

Legislative Exactions.

The

public

policy

considerations

and

constitutional concerns of developers and property

owners raised in the Petition and in the several

amicus briefs were specifically addressed by the

California Legislature when it enacted the MFA. The

California Supreme Court explained that the MFA

“was passed by the [California] Legislature ‘in

response to concerns among developers that local

agencies were imposing development fees for purposes

unrelated to development projects.’” Ehrlich v. City of

Culver City, 911 P.2d 429, 436, 12 Cal.4th 854 (Cal.

1996) (“Ehrlich”) (citation omitted). To that end, the

MFA “establishes a variety of requirements to ensure

9

local agencies timely use these fees to pay for public

facilities that serve those very developments rather

than divert the fees for general revenue purposes.”

Walker v. City of San Clemente, 239 Cal.App.4th 1350,

1356 (Cal. Ct. App. 2015). The MFA creates “uniform

procedures for local agencies to follow in establishing,

imposing, collecting, accounting for, and using

development fees.” Centex Real Estate Corp. v. City of

Vallejo,19 Cal.App.4th 1358, 1361–1362 (Cal. Ct. App.

1993).

When a local agency legislatively establishes a

development fee, the MFA requires in subdivision (a),

of section 66001 of the California Government Code,

that “the local agency to identify the purpose of the fee

and the use to which the fee will be put. The local

agency must also determine that both ‘the fee’s use’

and ‘the need for the public facility’ are reasonably

related to the type of development project on which

the fee is imposed.” Home Builders Assn. of

Tulare/Kings Counties, Inc. v. City of Lemoore, 185

Cal.App.4th 554, 561-565 (Cal. Ct. App. 2010) (“City

of Lemoore”). Specifically, section 66001(a) of the

MFA requires that, for legislatively imposed fees, the

legislative body must find that “there is a reasonable

relationship between the fee’s use and the type of

development project on which the fee is imposed.”

App. A-13. A local agency must engage “in a reasoned

analysis designed to establish the requisite connection

between the amount of the fee imposed and the

burden created.” (Cresta Bella, LP v. Poway Unified

School Dist., 218 Cal.App.4th 438, 447 (Cal. Ct. App.

2013).) As the Court of Appeal explained in the

Decision below:

10

“[T]he local agency has the initial

burden

of

producing

evidence

sufficient to demonstrate that it used

a valid method for imposing the fee in

question, one that established a

reasonable relationship between the

fee charged and the burden posed by

the development.” “However, the

figures upon which the public agency

relies

will

necessarily

involve

predictions

regarding

population

trends and future building costs, and

they need not be exact. ‘As a practical

matter it will not always be possible to

fashion a precise accounting allocating

the costs, and consequent benefits, of

particular

building

projects

to

particular portions of the population.

All that is required of the [agency] is

that it demonstrate that development

contributes to the need for the

facilities, and that its choices as to

what will adequately accommodate

the [new population] are reasonably

based.’ ” App. A-24 (citations omitted).

Justice Mosk of the California Supreme Court

described the constraints that the “reasonable

relationship” test imposes on legislatively imposed

impact fees as follows:

Government Code section 66000 et seq.

extensively regulates the imposition of

development

fees,

including

requirements that the purpose of the

11

fee must be identified with specificity,

and that a “reasonable relationship”

must exist between the fee’s use and

the type of development project on

which the fee is imposed. The

statutory scheme also mandates a

public hearing process for the adoption

of a fee, and a procedure for the refund

of unused portions of the fee.

Moreover, a development fee which

exceeds the burdens and benefits of

development will be found to be a

special tax that requires two-thirds

voter approval under article XIII A,

section

4

of

the

California

Constitution. [¶] Even under more

deferential review, a court’s inquiry

into the validity of the reasonable

relationship between a development

fee and a development impact will not

be a “rubber stamp.” [Ehrlich, supra,

911 P.2d at 458-459 (MOSK, J.

concur).]

Thus, the MFA proves the truth of Justice

Kagan’s point in Koontz that courts can use “state law

to protect against monetary demands.” Koontz, supra,

570 U.S. at p. 629 (KAGAN, J. dissenting). This

Court’s majority agreed: “[T]he dissent is correct that

state law normally provides an independent check on

excessive land use permitting fees.” Koontz, supra,

570 U.S. at p. 629. As the Court of Appeal explained

in the Decision below, “legislatively imposed

development impact fees that are not subject to the

Nollan/Dolan test remain subject to the means-end

12

judicial review under the Mitigation Fee Act.” App. A15. Accordingly, the Petition and the amicus briefs

are surprisingly silent regarding the present

application of the reasonable relationship test in the

MFA, which governs every legislatively imposed

exaction in California.

The reasonable relationship test in section

66001(a) of the MFA was designed by the California

Legislature to not only protect the interest of

developers, as discussed above, but also to satisfy the

constitutional purposes underlying the “rough

proportionality” test in Dolan. This Court concluded

in Dolan that the “reasonable relationship” test used

by the states, such as the MFA, was the closest to the

federal constitutional norm. Dolan, supra, 512 U.S. at

391. This Court adopted the term “rough

proportionality” to describe that norm, explaining

that such a formulation entails “some sort of

individualized determination that the required

dedication is related both in nature and extent to the

impact of the proposed development.” Ibid. (fn.

omitted.) Although no “precise mathematical

calculation is required,” a local agency must

nevertheless “make some effort to quantify its

findings in support of the dedication” beyond mere

conclusory statements that it will mitigate or offset

some anticipated burden created by the project. Id. at

395-396. That is also what the MFA’s “reasonable

relationship” test was designed to do in regard to

legislative exactions. See City of San Diego v. Board

of Trustees of California State University, 352 P.3d

883, 893-894 (Cal. 2015) [“mitigation fees imposed on

a project must be reasonably related and roughly

proportional to that project's impacts” (citing Gov.

13

Code, § 66001, subds. (a)(3)–(4), (b) & (g); Ehrlich,

supra, 911 P.2d at 437-438; and Dolan, supra, 512

U.S. at 391].

The MFA requirements therefore prevent

legislative exactions in California from being

arbitrary, oppressive, and unjust, which amicus

curiae admits is “the sort of review provided by Nollan

and Dolan.” Brief of The Cato Institute As Amicus

Curiae etc. (“CATO Brief”), 10.

The MFA

requirements for legislative exactions follows the

constitutional requirements in Nollan/Dolan. The

California Supreme Court explained:

[T]he Legislature incorporated into

Government Code section 66001,

subdivision (a)(3) of the Act a standard

that generally corresponds to the one

reflected in the high court’s takings

jurisprudence (see Dolan, supra, 512

U.S. at [391] [“We think the

‘reasonable relationship’ test adopted

by a majority of the state courts is

closer to the federal constitutional

norm . . . . [W]e do not adopt it as such,

partly because the term . . . seems

confusingly similar to the term

‘rational basis’ . . .”]), it is appropriate

for this court to interpret the statutory

standard in a manner consistent with

the high court’s decisions in Nollan

and Dolan so that a development fee

imposed pursuant to the act, and that

satisfies its requirements, will not be

subject to challenge on constitutional

14

grounds.

By

interpreting

the

“reasonable relationship” standard

adopted by Government Code section

66001 as imposing a requirement

consistent with the Nollan/Dolan

standard, we serve the legislative

purpose of protecting developers from

disproportionate and excessive fees,

and carry out the legislative intent of

imposing a statutory relationship

between monetary exaction and

development project that accurately

reflects the prevailing takings clause

standard.

We must, in other words, recognize

that in the wake of Dolan the term

“reasonable relationship” [in the

MFA] embraces both constitutional

and statutory meanings which, for all

practical purposes, have merged to the

extent that the Dolan decision applies

to development fees--an issue we

address below. Thus, developers who

wish to challenge a development fee on

either statutory or constitutional

grounds must do so via the statutory

framework

provided

by

the

[Mitigation Fee] Act. [Ehrlich, supra,

911 P.2d at 437-438 (ARABIAN, J.

plur. opn.]

In his concurrence in Ehrlich, Justice Mosk similarly

added: “Nollan and Dolan in most cases impose no

additional constitutional burden on the government to

15

justify development fees beyond the burden it already

bears under the state constitution and statute.”

Ehrlich, supra, 911 P.2d at 459 (MOSK, J. concur). In

short, the reasonable relationship test in the MFA

that applies to legislative exactions satisfies the same

constitutional concerns articulated in Nollan/Dolan.

The only difference in the Nollan/Dolan test

and the MFA’s reasonable relationship standard for

legislative exactions is that, whereas Dolan prescribes

“some sort of individualized determination that the

required dedication is related both in nature and

extent to the impact of the proposed development,”

512 U.S. at 391, the “required nexis” for legislative

exactions under the MFA “is established based on the

justifiable imposition of fees on a class of development

rather than particular projects.” App. A-21 (emphasis

added). However, the constitutional purposes

underlying the individualized determination element

in Dolan are nevertheless satisfied by the reasonable

relationship test for legislative exactions under the

MFA. Whereas Dolan seeks to ensure that the

development fee is related “both in nature and extent

to the impact of the proposed development” Dolan, 512

U.S. at 391, the trial court in this case, reviewing the

County’s compliance with the MFA, found that the

administrative record established that “the fee bore a

reasonable relationship, in both intended use and

amount, to the deleterious public impact of the

project.” App. A-6. The Court of Appeal affirmed and

similarly concluded that “Sheetz has failed to show

that the record before the County clearly did not

support the County’s determinations regarding the

reasonableness of the relationship between the fee

and his development project.” App. A-27.

16

Furthermore, the considerations in Dolan that

governments cannot circumvent constitutional

requirements with mere “conclusory statement[s]”

about the public interest, Dolan, 512 U.S. at 395, and

that the government must “make some effort to

quantify its findings,” id., were satisfied by the

County’s compliance with the MFA’s reasonable

relationship test, as discussed below.

B.

The TIM Fees Here Satisfy The “Reasonable

Relationship” Test For Legislative Exactions

Under California Law.

In response to Mr. Sheetz’ arguments on the

merits, the trial court held, and the Court of Appeal

affirmed, that the County’s TIM Fee Program

satisfied the reasonable relationship test for

legislative exactions required in section 66001(a) of

the MFA. Petition, 10-11 (citing App. A-16). When the

County adopted new TIM fee rates in February 2012,

the County’s Board of Supervisors explained that,

“starting in 1984 and continuing until the present

time, the Board has adopted and updated various fee

resolutions to ensure that new development on the

western slope pay to fund its fair share of the costs of

improving the county and state roadways necessary to

serve that new development ….” App. D-1 (emphasis

added); see also App. A-3; Petition, 8. The trial court

concluded the County met its burden of producing

evidence that it used a valid method for imposing the

TIM fee in 2012, one that established a reasonable

relationship between the fee charged and the burden

posed by Sheetz’s development project. App. A-6. The

Court of Appeal affirmed. App. A-27. Thus, amici

17

curiae’s assertion that, under Nollan/Dolan, “[t]he

County may be entitled to demand that new

development contribute a fair, and proportionate,

share to the costs of improved roads made necessary

by development, but no more,” Brief of Amici Curiae

California Building Industry Association, etc. (“CBIA

Brief”), 29, is exactly what happened here because of

the County’s compliance with the MFA when it

adopted the TIM fees.

Like the Petition, all of the amici curiae briefs

in support of the Petition ignore the County’s

compliance with the reasonable relationship test in

the MFA.

Rather, such briefs are filled with

misleading and out of context statements about

legislatively adopted fees in general without reference

to the TIM fees that are actually at issue here. Such

misleading statements, unsupported by any citation

to the record here, include the following: “The exaction

for road funding is unrelated to Mr. Sheetz’s activity

and far out of proportion to any costs that the County

of El Dorado might incur as a result of it,” Brief of

Amicus Curiae The Buckeye Institute, etc. (“Buckeye

Brief”), 2; the County “extract[s] payments from

individual property owners for conduct disconnected

from those roads,” Buckeye Brief, 6; local government

may impose “unjustified fees that admittedly lack

even ‘rough proportionality’ to the impacts of new

development as in this case,” CBIA Brief, 23; the TIM

fees here are “arbitrary property confiscations in the

land-use permit process,” Brief of Amicus Curiae

Pacific Legal Foundation (“PLF Brief”), 28; “there is

no limit to the amount of money or property that the

government can demand as a permit condition,” PLF

Brief, 4; “there is no end to the types of social burdens

18

the government can place on an individual permitseeker,” PLF Brief, 4; and “a least in California, there

is no effective state court review of fees if they are

characterized as ‘legislative,’ as plainly shown in

Sheetz.” Brief of Amici Curiae California Building

Industry Association, etc. (“CBIA Brief”), 20. Because

there is no supporting evidence whatsoever in the

record in this case for these conclusory and misleading

statements, their inclusion in the amicus briefs

further demonstrate that Mr. Sheetz and amici curiae

are seeking a conclusory opinion from this Court.

Mr. Sheetz and amici curiae’s avoidance of the

County’s compliance with the MFA’s reasonable

relationship test also makes inapposite the public

policy arguments raised in the amicus briefs

regarding the “politics of takings” and “majoritarian

processes,” CATO Brief, 15-22, “majoritarian

oppression,” PLF 16-17, and the “adverse

consequences of development fees on equity, housing

affordability, and other “serious drawbacks” if fees are

not proportionate to impacts.” CBIA Brief, 22. In

short, the complete lack of any consideration of the

MFA’s requirements make the arguments of Mr.

Sheetz and the amici curiae merely hypothetical and

advisory in the case at bar, thereby precluding this

Court’s review.

19

C.

The TIM Fees In This Case Were Applied

Without Discretion.

The Nollan/Dolan test does not apply here

because the formulaic TIM fees are applied without

any discretion on the part of the County’s

administrative officials. The California Supreme

Court recognized that adjudicative discretion is the

key to determining when Nollan/Dolan applies. See

Ehrlich, supra, 911 P.2d at 444 (ARABIAN, J. plur.

opn.) [heightened scrutiny of the Nollan/Dolan test is

appropriate “[w]hen such exactions are imposed . . .

neither generally nor ministerially, but on an

individual and discretionary basis” (emphasis added)];

San Remo Hotel v. City and County of San Francisco,

41 P.3d 87, 105 (Cal.2002) [ “The ‘sine qua non’ for

application of Nollan/Dolan scrutiny is thus the

‘discretionary deployment of the police power’ in ‘the

imposition of land-use conditions in individual cases’”

(quoting Ehrlich, supra, 911 P.2d at 439 (ARABIAN,

J plur. opn..) (emphasis added)); Landgate, Inc. v.

California Coastal Com., 953 P.2d 1188, 1198 (Cal.

1998) [Nollan/Dolan applies to “development fees

imposed on a property owner on an individual and

discretionary basis.”

(emphasis added)]; In the

Decision below, the Court of Appeal recognized that

there was no discretion in the application of the TIM

Fees:

“We conclude the trial court properly

determined that the TIM fee is not subject to the

heightened scrutiny of the Nollan/Dolan test. The fee

is not an “ad hoc exaction” imposed on a property

owner on an individual and discretionary basis.” App.

A-16.

20

D.

None Of The Case Law Cited By Mr. Sheetz

Address

The

Application

Of

The

Nollan/Dolan Test To A Legislatively

Mandated, Non-Discretionary, BroadlyApplied Impact Fee That Satisfies The

MFA’s “Reasonable Relationship” Test.

The Petition simplistically presents the

question here as whether there is “a constitutional

difference between legislative and administrative

exactions for purposes of Nollan/Dolan review”

Petition, 2. But the Decision below is not simply about

“whether the Nollan/Dolan test applies in cases

where the alleged taking arises from a legislatively

imposed condition rather than an administrative one.”

California Bldg. Indus. Ass’n v. City of San Jose,

Calif., 577 U.S. 1179 (2016) (THOMAS, J. concurring

in denial of certiorari). Merely framing the issue as a

generic ‘legislative’ exaction versus a generic

‘administrative’ exaction does not accurately describe

the dispositive issue in this case. The simplistic

distinction that permeates the entire Petition fails to

account for (1) the formulaic and generally applied

legislative exactions at issue in this case; (2) the

reasonable relationship” requirements that are

satisfied by the TIM fees here; (3) the state courts’

ruling that the TIM fees complied with the

requirements of the MFA; and (4) the lack of any

discretion in the County’s application of the TIM Fees.

Because none of the case law cited in the Petition (or

the amicus briefs) ever applied the Nollan/Dolan test

to legislative exactions that meet such criteria, there

is no split of authority for this Court to resolve and

therefore certiorari should be denied.

21

Several cases relied on by Mr. Sheetz did not

involve formulaic and generally applied legislative

exactions. See Highlands-In-The-Woods, L.L.C. v.

Polk Cnty., 217 So.3d 1175, 1178 (Fla. Dist. Ct. App.

2017) [“We are not convinced that the County’s

decision regarding Highlands was only legislative in

nature and not adjudicative,” and the County

ordinance requiring the connection to a reuse system

“may also apply to other subdivisions in the county”

(emphasis added)]; Amoco Oil Co. v. Village of

Schaumburg, 661 N.E.2d 380, 390 (Ill. Dist. Ct. App.

1995) [“the so-called ‘ordinance’ at issue here did not

itself reflect a uniformly applied legislative policy.

Indeed, the dedication requirement was clearly sitespecific and adjudicative in character.”]

Several of the cases relied on by Mr. Sheetz

address legislatively adopted exactions, but there is

no discussion in those cases as to whether the

exactions were required to satisfy a “reasonable

relationship” test such as that which is mandated by

the MFA in California. For example, there is no

indication in Anderson Creek Partners, L.P. v. Cnty.

Of Harnett, 876 S.E.2d 476, 480-481, 497, 500, 503 n.

17 (N.C. 2022) that the sewer hook-up fee mandated

by local ordinance in that case was ever subjected to a

“reasonable relationship” test when it was enacted.

The same is true of the governmental requirements at

issue in Heritage at Pompano Hous. Partners, L.P. v.

City of Pompano Beach, 2021 U.S. Dist. LEXIS

239647, 2021 WL 8875658 (S.D.Fla.. Dec. 15, 2021);

Highlands-In-The-Woods, L.L.C. v. Polk Cnty., supra;

and Amoco Oil Co. v. Village of Schaumburg, supra.

Because the TIM Fees in the case at bar were

governed by (and satisfied) the “reasonable

22

relationship” test in the MFA, but the legislative

exactions in the case law cited by Mr. Sheetz did not,

the Petition does not present a split of authority for

this Court to resolve.

Even though there is no administrative

discretion in the application of the TIM fees here, Mr.

Sheetz relies on case law where there was substantial

discretion in the application of legislatively mandated

exactions. Petition, 14-15. For example, in Tower of

Flower Mound v. Stafford Estates Ltd. P’ship, 135

S.W.3d 620, 641-643 (Tex. 2004), the Texas Supreme

Court applied Nollan/Dolan to a local ordinance that

required all developers to construct concrete streets.

However, the ordinance contained an exception to

that requirement if the Town’s Council found and

determined “that such standards work a hardship”

due to the “costs” and “other related factors” resulting

from the imposition of that requirement in individual

cases. Id. at 624. In the Stafford Estates case, the

Town denied the request by the plaintiff developer for

an exception to that requirement, even though the

Town “had exercised its discretion to grant exceptions

to other developers on a project-by-project basis.” Id.

Thus, the Stafford Estates case addressed a

discretionary application of a legislatively adopted

exaction, similar to that in Dolan. However, because

there is no discretion in the application of the TIM

Fees by the County in the case at bar, Stafford Estates

is materially different case, and Mr. Sheetz therefore

fails to establish the existence of any split of authority

between the Texas case and the Decision below.

Mr. Sheetz even relies upon case law that

actually supports California’s position. Mr. Sheetz

23

points out that in Home Builders Ass’n of Dayton and

the Miami Valley v. City of Beavercreek, 729 N.E.2d

349, 350-356 (Ohio 2000), the Ohio Supreme Court

applied a “dual rational nexus test” purportedly under

Nollan/Dolan to a legislative exaction. Petition, 1213. However, that “dual rational nexus test” did not

actually follow Nollan/Dolan because it omitted the

“individualized

determination”

component

of

Nollan/Dolan. As the Oregon Court of Appeals

accurately explained, the Dayton decision “made no

individualized assessment of proportionality at all but

instead reviewed the legislation from a facial

perspective as it applied to developers generally.”

Rogers Mach., Inc. v. Washington County, 45 P.3d 966,

978 n.13 (Or. Ct. App. 2002). Thus, Dayton is actually

contrary to Mr. Sheetz’ position and essentially

supports the position taken by the California courts.

Therefore, none of the authorities cited by

Mr. Sheetz are similar to the case at bar, where the

legislatively imposed, formulaic and nondiscretionary

impact fees were found to comply with the “reasonable

relationship” requirement in the MFA. None of the

cases cited in the Petition hold that legislative

exactions that comply with the “reasonable

relationship” standard in the MFA (or a similar

standard) must also satisfy the “individualized

determination” component of the Nollan/Dolan test.

None of the case law cited in the Petition disagrees

with, or even discusses, whether the MFA’s

“justifiable imposition of fees on a class of

development rather than particular projects,” App.

A-21, is consistent with Nollan/Dolan. This is not the

proper case for this Court to explore such issues. “The

more important an issue is, the more the Court would

24

benefit by allowing the issue to percolate so it can

avail itself of the wisdom of other courts before

settling a momentous matter. This argument is

especially appropriate if the issue is inadequately

explored in the opinions below.” Shapiro, et al.,

Supreme Court Practice (11th Ed. 2019), Ch. 6.37(i)(1),

p. 6-148.

In short, no split of authority exists on the key

dispositive issues here. This Court should deny

certiorari in this case.

III.

This Court Should Deny The Petition

Because

Mr.

Sheetz

Essentially

Challenges The Constitutionality Of The

MFA, Which Was Never Raised Or Decided

Below

Mr. Sheetz argues that the “individualized

determination” in the Nollan/Dolan standard must

apply to the legislatively imposed TIM fees. Petition,

8. Because the MFA distinguishes between legislative

fees in subdivision (a) of Government Code section

66001, and adjudicatory fees in subdivision (b) of

section 66001, Mr. Sheetz’ Petition essentially asks

this Court to decide whether that distinction in the

MFA is constitutional under Nollan/Dolan. As the

Court of Appeal explained,

Section 66001, subdivision (a) applies to

quasi-legislative decisions to impose

development impact fees on a class of

development projects, whereas section

66001, subdivision (b) applies to

25

adjudicatory, case-by-case decisions to

impose a development impact fee on a

particular development project. The

difference between these subdivisions is

that only subdivision (b) of section 66001

requires an individualized more specific

determination of reasonableness for each

particular project. [App. A-20 - A-21.]

Citing numerous California cases, the Court of Appeal

concluded that subdivision (a) applies to the TIM fees

here, and not subdivision (b), because “California law

does not require an individualized or site-specific

determination of reasonableness for each particular

project subject to the [TIM] fee.” App. A-21, A-23. The

Petition essentially asks this Court to determine

whether that distinction in the MFA between

subdivisions (a) and (b), of Government Code section

66001, is constitutional under Nollan/Dolan. The

arguments of amicus curiae further demonstrate that

the Petition is, in fact, a challenge to the

constitutionality of “California law,” i.e., the MFA.

CBIA Brief, 8.

However, that constitutional issue was never

raised or considered below, and “[it is not this Court's

usual practice to adjudicate either legal or predicate

factual questions in the first instance.” CRST Van

Expedited, Inc. v. EEOC, 578 U.S. 419, 420 (2016).

“Mindful that this is a court of final review and not

first view," Matsushita Elec. Industrial Co. v. Epstein,

516 U.S. 367, 399 (1996) (GINSBURG, J. concurring

in part and dissenting in part), this Court ordinarily

“do[es] not decide in the first instance issues not

decided below." Adarand Constructors, Inc. v. Mineta,

534 U.S. 103, 109, 151 L. Ed. 2d 489, 122 S. Ct. 511

26

(2001) (per curiam) (internal quotation marks

omitted).

Accordingly, this Court should deny

certiorari here. See e.g., Webster v. Cooper, 558 U.S.

1039, 1041 (2009) (SCALIA, J. dissenting) [“Since he

did not argue that ground to the Court of Appeals, and

since that court did not address it, we would almost

certainly deny certiorari”]; EEOC v. Federal Labor

Relations Authority, 476 U.S. 19, 24 (1986) [where

petitioner failed to raised issues in the Court of

Appeals, “[u]nder these circumstances, several central

issues on which resolution of the question presented

may well turn cannot be reached or resolved.

Accordingly, we dismiss the writ of certiorari as

improvidently granted.”]

IV.

The Court Of Appeal’s Decision Below Is

Not In Tension With Koontz Or This

Court’s Recent Takings Precedents

A.

The Decision Below Is Not In Tension With

Koontz.

Contrary to Mr. Sheetz’s argument, the

Decision below is not in tension with Koontz because

Koontz simply did not address the issue raised in his

Petition. Mr. Sheetz argues that Koontz concluded

“that the Nollan/Dolan standard applies to all permit

exactions, including legislative ones,” and affirmed

that “all exactions in the land-use permitting context,

whether or not garbed in legislation, are subject to

scrutiny under the unconstitutional-conditions

doctrine.” Petition, 19, 20, 24. That is incorrect. As

Justice Kagan correctly observed, the majority

27

opinion in Koontz did not address that issue. Koontz,

supra, 570 U.S. at 628 (KAGAN, J. dissenting). The

Court of Appeal made a similar observation:

We have carefully reviewed Koontz and

agree with our Supreme Court [of

California] that [Koontz] “does not

purport to decide whether the

Nollan/Dolan test is applicable to

legislatively

prescribed

monetary

permit conditions that apply to a broad

class of proposed developments.”

Koontz involved an adjudicative,

individual and discretionary land-use

determination, and the majority

opinion does not address whether the

Nollan/Dolan

test

applies

to

legislatively

mandated,

generally

applicable formulaic development fees.

[App. A-17 (citing California Building

Industry Assn. v. City of San Jose, 351

P.3d 974, 990 fn. 11 (Cal. 2015).]

See also Better Housing for Long Beach v. Newsom,

452 F.Supp.3d 921, 932 (C.D.Ca. 2020) [“Koontz itself

involved an adjudicative, individual determination,

and the majority never addressed Nollan/Dolan’s

application to general legislation.”] Therefore, the

Court of Appeal was correct in concluding that,

“because the monetary exaction in Koontz was not a

generally applicable development impact fee, the

decision, in our view, cannot be read as compelling the

application of the Nollan/Dolan test to the fee at issue

here.” App. A-18.

28

The Decision below is also not in tension with

Koontz because the Decision conforms to the

constitutional considerations discussed by this Court

in Koontz. This Court explained in Koontz that

government can impose two different kinds of

financial burdens on property owners. One kind

“‘operate[s] upon or alter[s] an identified property

interest’ by directing the owner of a particular piece of

property to make a monetary payment.” Koontz,

supra, 570 U.S. at 613 (quoting Eastern Enterprises v.

Apfel (1998) 524 U.S. 498, 540 (1998) (KENNEDY, J.

opinion)). This kind of financial demand “burdens

petitioner’s ownership of a specific parcel of land.” Id.

A “per se takings” approach under Nollan/Dolan is

proper for this kind of financial burden because “the

government commands the relinquishment of funds

linked to a specific, identifiable property interest.” Id.

at 613-614. Thus, the “fulcrum” of the Court’s decision

to apply Nollan/Dolan in Koontz was “the direct link

between the government’s demand and a specific

parcel of real property.” Id. at 614. Here, no such

direct link applies. The TIM fees are broadly applied

based on geographic areas and the type of

construction involved, which is akin to the “legislative

classifying areas of a jurisdiction” that Mr. Sheetz

admits does not fall within Dolan. Petition, 23.

The second kind of financial burden imposed on

property owners by government involves “property

taxes, user fees, and similar laws and regulations that

may impose financial burdens on property owners.”

Koontz, supra, 570 U.S. at 615-616. Such financial

burdens are not governed by Nollan/Dolan. Id.

Because generally applied and non-discretionary

legislative exactions do not target an “identified,”

29

“particular,” or “specific parcel of real property,” but

instead apply generally to parcels of land, they are

similar to “property taxes, user fees, and similar laws

and regulations” for which Nollan/Dolan does not

apply. As Justice Mosk opined in Ehrlich: “[I]f a

municipality

can

constitutionally

impose

a

development tax as long as it is rationally based, why

is a higher level of constitutional scrutiny required

when, as in the case of generally applicable

development fees, the ‘tax’ is earmarked for use in

alleviating specific development impacts rather than

for the general fund?” Ehrlich, supra, 12 Cal.4th at

894 (MOSK, J. concurring.)

Additionally, the dual objectives of “landowners

internaliz[ing] the negative externalities of their

conduct” and preventing the government from

“engaging in out-and-out extortion,” Koontz, supra,

570 U.S. at 605-06, are satisfied in this case because,

as the Court of Appeal properly concluded, “the

County met its initial burden to demonstrate that it

used a valid method for imposing the TIM fee, one that

established a reasonable relationship between the fee

charged and the burden posed by Sheetz’s

development of a single-family residence in

geographic Zone 6.” App. A-27

Thus,

the

constitutional

considerations

expressed in Koontz are satisfied by broadly applied,

nondiscretionary legislative exactions that meet the

“reasonable relationship” standard in the MFA, such

as the TIM fees here, even where Nollan/Dolan is not

applied. Surprisingly, none of that is discussed in the

Petition. And that is not raised or discussed in any of

the case law cited in the Petition.

30

B.

The Discretion Applied In Nollan And

Dolan Does Not Exist Here.

The Decision below is also not in tension with

Koontz because Nollan and Dolan involved

discretionary,

adjudicatory

application

of

governmental exactions. Mr. Sheetz’s argument that

Nollan and Dolan “did not involve administrative or

ad hoc decision-making” Petition, 21, is contradicted

not only by this Court’s statement in Lingle v. Chevron

U.S.A., Inc., 544 U.S. 528, 546 (2005), that “[b]oth

Nollan and Dolan involved Fifth Amendment takings

challenges to adjudicative land-use exactions,” but

also by the facts in the Nollan and Dolan cases.

In his discussion of Nollan, Mr. Sheetz

highlights the role of the legislative enactment of

California Public Resources Code section 30212,

which statute requires the property owners in that

case to obtain a coastal development permit from the

California Coastal Commission.

Petition, 21.

However, Mr. Sheetz ignores the fact that there was

significant adjudicative discretion on the part of the

Commission in the application of that statute. Such

discretion not only is inherent in the language of

section 30212, see Grupe v. California Coastal Com.,

166 Cal.App.3d 148 (Cal. Ct.App. 1985) [quoting

section 30212], but is also shown in this Court’s

discussion in Nollan about the individual permit that

was sought in that case:

[T]he Commission held a public

hearing, after which it made further

factual findings and reaffirmed its

imposition of the condition. It found

that the new house would increase

31

blockage of the view of the ocean, thus

contributing to the development of “a

‘wall’ of residential structures” that

would

prevent

the

public

“psychologically . . . from realizing a

stretch of coastline exists nearby that

they have every right to visit.”

[Citation.] The new house would also

increase private use of the shorefront.

[Citation.]

These

effects

of

construction of the house, along with

other area development, would

cumulatively “burden the public's

ability to traverse to and along the

shorefront.” [Citation.] Therefore the

Commission could properly require

the Nollans to offset that burden by

providing additional lateral access to

the public beaches in the form of an

easement across their property.

[Nollan, supra, 483 U.S. at 828-829.]

This Court also pointed out,

[t]he Nollans’ new house, the

Commission found, will interfere with

“visual access” to the beach. That in

turn (along with other shorefront

development) will interfere with the

desire of people who drive past the

Nollans’ house to use the beach, thus

creating a “psychological barrier” to

“access.” The Nollans’ new house will

also, by a process not altogether clear

from the Commission’s opinion but

32

presumably potent enough to more

than offset the effects of the

psychological barrier, increase the use

of the public beaches, thus creating

the need for more “access.” These

burdens on “access” would be

alleviated by a requirement that the

Nollans provide “lateral access” to the

beach. [Id. at 838.]

Thus, the Commission’s findings in Nollan involved

significant adjudicative discretion on the part of the

Commission in determining how to apply the public

access requirement in section 30212. See e.g., La Costa

Beach Homeowners' Assn. v. California Coastal Com.,

101 Cal.App.4th 804, 817 (Cal. Ct. App. 2002)

[discusses “Commission’s exercise of discretion in this

case” regarding how public beach access is to be

provided under section 30212.] Such administrative

discretion in the application of the exaction warrants

Nollan/Dolan review. But no such discretion exists

in the application of the TIM fees here. That fact is

nowhere mentioned in the Petition.

The exaction imposed on the property owner in

Dolan was similarly applied through the local

agency’s discretion. Mr. Sheetz discusses the role of

the City of Tigard (Oregon) Community Planning

Commission in granting the petitioner’s permit

application in the Dolan case subject to conditions

imposed by the Community Development Code

(“CDC”). Petition, 22-23. However, Mr. Sheetz fails to

discuss the adjudicatory and discretionary application

of the CDC by the Commission. This Court explained:

33

Petitioner requested variances from

the CDC standards. Variances are

granted only where it can be shown

that, owing to special circumstances

related to a specific piece of the land,

the literal interpretation of the

applicable zoning provisions would

cause “an undue or unnecessary

hardship” unless the variance is

granted. CDC § 18.134.010, App. to

Brief for Respondent B-47. Rather

than posing alternative mitigating

measures to offset the expected

impacts of her proposed development,

as allowed under the CDC, petitioner

simply argued that her proposed

development would not conflict with

the policies of the comprehensive plan.

Id., at E-4. The Commission denied

the request. [Dolan, supra, 512 U.S.

at 380-381 (emphasis added).]

Thus, Dolan involved wide adjudicative discretion

given to the administrative staff and City officials in

deciding whether to exempt the property owner from

the legislatively adopted standards of the CDC

through the variance process.

The recent decision by the Sixth Circuit Court

of Appeals in Knight v. Metro. Gov’t of Nashville &

Davidson Cnty., 67 F.4th 816 (6th Cir. 2023), relied

upon by Mr. Sheetz and amicus curiae, applied the

Nollan/Dolan standard to an ordinance that imposed

as conditions for building permits the obligations to

either build a sidewalk or pay an in-lieu fee, and to

34

dedicate a right-of-way and/or public pedestrian

easement across the property. However, unlike

property owners in El Dorado County under the TIM

fees here, a landowner could be exempted from the

right-of-way and/or easement in Knight either

through a “waiver” by a zoning administrator or

through a “variance” granted by the Board of Zoning

Appeals. Id. at 820-821. Indeed, the plaintiff in that

case sought such a waiver and variance, which were

denied. Id. Thus, the exaction in Knight was

ultimately applied to the landowner because of the

discretionary decisions of local zoning officials. That

discretionary application of the exaction in Knight is

akin to the adjudicative and ad-hoc exaction in Dolan,

and unlike the non-discretionary application of the

TIM fees to Mr. Sheetz’ project. As discussed above,

that distinction is fundamental to the application of

Nollan/Dolan in Koontz. But the amicus briefs omit

any discussion of that key distinction. See e.g.,

Buckeye Brief, 10-15.

Because the discretionary and adjudicatory

application of the exactions by administrative officials

that was present in Koontz, Nollan and Dolan did not

exist in the County’s application of the TIM fees to Mr.

Sheetz’ building project, the Decision below is not in

tension with those precedents of this Court. Again,

that key fact is simply avoided in the Petition and in

the amicus briefs in support of the Petition.

35

C.

The Decision Below Is Not In Tension With

Cedar Point And Pakdel.

Mr. Sheetz’s reliance on Cedar Point Nursery v.

Hassid, 141 S.Ct. 2063 (2021), is misplaced. Petition,

24-25. In Cedar Point, a California regulation allowed

representatives of a labor organization to enter an

agricultural employer’s property to solicit support for

unionization for up to three hours per day, 120 days

per year. Id. at 2069. This Court held that the

regulation violated the takings clause because it

“appropriate[d] a right to invade the growers’ property

and therefore constitute[d] a per se physical taking.”

Id. at 2072. This Court reasoned that the regulation

violated the right to exclude, which is “ ‘one of the most

treasured’ rights or property ownership.” Id. In

concluding that the regulation constituted a physical

taking as opposed to a regulatory taking, the court

explained that the “essential question is not . . .

whether the government action at issue comes garbed

as a regulation (or statute, or ordinance, or

miscellaneous decree). It is whether the government

has physically taken property for itself or someone

else—by whatever means—or has instead restricted a

property owner’s ability to use his own property.” Id.

But Cedar Point is distinguishable from the Decision

below. Cedar Point involved a state regulation that

only applied to property owned by agricultural

employers. Cedar Point does not purport to address

whether the heightened scrutiny of the Nollan/Dolan

test applies to the circumstances presented here – a

legislatively

mandated,

formulaic

and

nondiscretionary development impact fee that applies to

a broad class of proposed developments, and that

meets the “reasonable relationship” test of the MFA

36

(or a similar requirement). Therefore, the general

observation by this Court in Cedar Point that

Mr. Sheetz and amicus curiae rely upon – “whether

the government action at issue comes garbed as a

regulation (or statute, or ordinance, or miscellaneous

decree)” – Petition, 25; PLF Brief, 9 – is not the

dispositive issue in this case. The Decision below is not

in tension with Cedar Point.

Mr. Sheetz’s argument that the Decision below

is “in tension” with Pakdel v. City & County of San

Francisco, 141 S.Ct. 2226 (2021), is similarly

incorrect. In his description of the City of

San Francisco’s lifetime lease requirement in that

case, Mr. Sheetz admits that petitioners in that case

asked the city “to either excuse them from executing

the lifetime lease or compensate them for the lease.”

Petition, 26 (quoting Pakdel, supra, 141 S.Ct. at 2228

(emphasis added). In fact, the city “twice denied their

requests for the exemption.” Pakdel, supra, 141 S.Ct.

at p. 2229 (emphasis added). The Ninth Circuit in

Pakdel held that the City’s decision was not truly

“final” for purposes of a federal takings action

“because petitioners had made a belated request for

an exemption at the end of the administrative process

instead of timely seeking one ‘through the prescribed

procedures.’ ” Id. (citation omitted) (emphasis added).

In other words, the Ninth Circuit held that “a

conclusive decision is not really ‘final’ if the plaintiff

did not give the agency the ‘opportunity to exercise its

“flexibility or discretion” ‘ in reaching the decision.”

Id. (citation omitted) (emphasis added). This Court

reversed and remanded the case because “the Ninth

Circuit’s view of finality is incorrect.” Id. at pp. 22302231. There is no discussion in Pakdel regarding

37

whether the heightened scrutiny of the Nollan/Dolan

test applies to the circumstances presented here - a

legislatively

mandated,

formulaic

and

nondiscretionary development impact fee that applies to

a broad class of proposed developments, and meets the

“reasonable relationship” test in the MFA. While

Pakdel involved an adjudicative determination of an

“excuse” or “exemption” to the lifetime lease

requirement, the case at bar does not involve such an

adjudicative decision by a local agency regarding an

ad hoc determination of an excuse or exemption to a

generally applied legislative requirement. Thus, the

Decision below is not in tension with Pakdel.

CONCLUSION

For the reasons stated above, Respondent

requests that this Court deny Mr. Sheetz’s Petition

For Writ Of Certiorari in its entirety.

Respectfully submitted,

/s/ Glen C. Hansen

Glen C. Hansen

Counsel of Record

Abbott & Kindermann, Inc.

Counsel for Respondent