No. 21-848
In the Supreme Court of the United States
SPIRE MISSOURI INC., ET AL.,
Petitioners,
v.
ENVIRONMENTAL DEFENSE FUND, ET AL.,
Respondents.
ON PETITION FOR WRIT OF CERTIORARI
TO THE UNITED STATES COURT OF APPEALS
FOR THE DISTRICT OF COLUMBIA CIRCUIT
BRIEF OF AMICI CURIAE
AMERICAN GAS ASSOCIATION,
INTERSTATE NATURAL GAS ASSOCIATION OF
AMERICA, NATIONAL ASSOCIATION OF
MANUFACTURERS, AND AMERICAN PUBLIC
GAS ASSOCIATION
IN SUPPORT OF PETITIONERS
Joshua P. Morrow
LEHOTSKY KELLER LLP
919 Congress Ave
Austin, TX 78701
Steven P. Lehotsky
Counsel of Record
Michael B. Schon
LEHOTSKY KELLER LLP
200 Massachusetts Ave. NW
Washington, DC 20001
(512) 693-8350
steve@lehotskykeller.com
TABLE OF CONTENTS
Table of Authorities ............................................................... ii
Interest of Amici Curiae ...................................................... 1
Summary of Argument ......................................................... 3
Argument ................................................................................ 5
I. Millions Of Americans Depend On The
Predictable, Disruption-Free Supply Of
Natural Gas From Interstate Pipelines. ............... 5
A. Local distribution companies are the
bridge between pipelines and end users. ....... 6
B. Spire STL transports the gas that Spire
Missouri currently provides to end
users. ................................................................... 8
II. The D.C. Circuit’s Approach All But
Eliminates Disruption As A Factor
Weighing Against Vacatur. ..................................... 9
A. Residential consumers face drastic
disruptions when a local distribution
company’s supply of natural gas is
interrupted. ........................................................ 9
B. Industrial users and electric generators
depend on reliable natural gas service. ....... 12
C. Disruptions in already-operational
pipelines significantly increase the cost
of capital. .......................................................... 13
D. The D.C. Circuit failed to consider
these significant disruptive
consequences of vacatur................................. 15
III. Review Is Imperative Because The D.C.
Circuit Hears The Vast Majority Of Cases
Involving Interstate Pipeline Permitting. .......... 16
Conclusion ............................................................................. 17
(i)
ii
TABLE OF AUTHORITIES
Page(s)
CASES
Allied-Signal, Inc. v. U.S. Nuclear
Regulatory Comm’n,
988 F.2d 146 (D.C. Cir. 1993) ................................... 4, 14
Comcast Corp. v. F.C.C.,
579 F.3d 1 (D.C. Cir. 2009) ............................................15
Dep’t of Homeland Sec. v. Regents of the
University of Cal.,
140 S. Ct. 1891 (2020) .....................................................15
Envtl. Def. Fund v. FERC,
2 F.4th 953 (D.C. Cir. 2021) .................................passim
Duquesne Light Co. v. Barasch,
488 U.S. 299 (1989) .........................................................13
Fed. Power Comm’n v. Hope Nat. Gas Co.,
320 U.S. 591 (1944) .........................................................13
United Fuel Gas Co. v. R.R. Comm’n of
Kentucky,
278 U.S. 300 (1929) ...........................................................6
STATUTE
15 U.S.C. § 717f .................................................................. 8, 9
Mo. Rev. Stat. § 393.130.1 ......................................................7
66 Pa. Cons. Stat. § 2207 ........................................................7
iii
OTHER AUTHORITIES
American Gas Association, Frequently
Asked Questions About Natural Gas
Market Trends: Natural Gas Pipeline
Safety (2018) ....................................................................10
Elizabeth Sendich, The Importance of
Natural Gas in the Industrial Sector,
U.S. Energy Information Administration Working Paper Series (Feb. 28,
2014)..................................................................................11
Federal Energy Regulatory Commission,
Energy Primer: A Handbook for
Energy Market Basics (Apr. 2020) ......................... 7, 13
FERC & NERC Staff Report, The February 2021 Cold Weather Outages in
Texas and the South Central United
States (Nov. 2021) .............................................................9
John D. Quackenbush, A Cost of Capital
and Capital Markets Primer for Utility
Regulators (April 2020) .................................................14
Letter from Adolphus M. Pruitt, St. Louis
City NAACP, to FERC regarding
Spire STL Pipeline (Nov. 2, 2021) ................................12
Letter from Roy W. Brown, Vice President,
Curiam, to FERC regarding Spire STL
Pipeline (Oct. 12, 2021) ...................................................12
Melissa N. Diaz, Cong. Research Ser.,
R46723, U.S. Energy in the 21st
Century: A Primer (2021) .......................................... 5, 6
Texas Comptroller of Public Accounts, The
Economic Impact of the Storm, 2021
Fiscal Notes: Special Edition (Oct. 2021) ....................12
iv
U.S. Energy Information Administration,
Natural Gas Explained (Dec. 7, 2021) ..........................9
U.S. Pipeline and Hazardous Materials
Safety Admin., General Pipeline FAQs,
(Nov. 6, 2021) .....................................................................3
INTEREST OF AMICI CURIAE
Amici Curiae American Gas Association, Interstate
Natural Gas Association of America, National Association
of Manufacturers, and American Public Gas Association1
represent hundreds of companies that together transport
and distribute the vast majority of the Nation’s residential
and commercial natural gas supply—and thousands of
companies that rely on that supply. Amici and their members have a substantial interest in the continued development and operation of interstate natural gas pipelines.
These companies’ customers depend on the predictable
and reliable service of natural gas to heat their homes and
to run their businesses. Amici urge review because the decision below, by all but ignoring potential disruption as a
factor weighing against vacatur, reduces reliability in the
natural gas transmission and distribution system.
The American Gas Association (“AGA”) was founded
in 1918 and represents more than 200 local energy companies that deliver clean natural gas throughout the United
States. AGA’s members operate critical infrastructure:
there are more than 74 million residential, commercial,
and industrial natural gas customers in the Nation, of
which 95% receive their gas from AGA members. AGA advocates for natural gas utility companies and their customers, and it provides a broad range of programs and services for member natural gas pipelines, marketers, gatherers, international natural gas companies, and industry
associates. Today, natural gas meets more than 30% of the
Pursuant to this Court’s Rule 37.6, amici affirm that no counsel for
a party authored this brief in whole or in part or made a monetary
contribution intended to fund the preparation or submission of this
brief, and that no person other than amici and their counsel made
such a monetary contribution. Counsel of record for all parties received timely notice of amici’s intent to file this brief, and all parties
have consented to its filing. See this Court’s Rule 37.2(a).
1
(1)
2
Nation’s energy needs. The local distribution companies
that AGA represents own and operate natural gas pipeline
systems that typically receive natural gas that has been
transported on the interstate pipeline system. These companies deliver natural gas to end users, including residential and commercial users as well as industrial customers
and electric generators.
The Interstate Natural Gas Association of America
(“INGAA”) is a trade organization that advocates for regulatory and legislative positions of importance to the natural gas pipeline industry in North America. INGAA’s 26
members represent the vast majority of the interstate natural gas transmission pipeline companies in the United
States. These companies operate 200,000 miles of pipelines and serve as an indispensable link between natural
gas producers and consumers.
The National Association of Manufacturers
(“NAM”) is the largest manufacturing association in the
United States, representing small and large manufacturers in every industrial sector and in all 50 States. Manufacturing employs more than 12 million men and women,
contributes $2.3 trillion to the U.S. economy annually, has
the largest economic impact of any major sector, and accounts for nearly two-thirds of all private-sector research
and development in the Nation. NAM is the voice of the
manufacturing community and the leading advocate for a
policy agenda that helps manufacturers compete in the
global economy and create jobs across the United States.
The American Public Gas Association (“APGA”) is
the trade association for approximately 1,000 communities
across the U.S. that own and operate retail natural gas distribution entities. These include municipal gas distribution
systems, public utility districts, county districts, and other
public agencies, all locally accountable to the citizens they
serve. Public gas systems operate as not-for-profits and
3
focus on providing safe, reliable, and affordable natural
gas to their customers while supporting their communities
by delivering gas to be used for cooking food, drying
clothes, heating space and water, and transportation.
These fuels are also used for various commercial and industrial applications, including electricity generation.
SUMMARY OF ARGUMENT
Interstate natural gas pipelines are “[t]he arteries of
the Nation’s energy infrastructure.” U.S. Pipeline and
Hazardous Materials Safety Admin., General Pipeline
FAQs, https://www.phmsa.dot.gov/faqs/general-pipelinefaqs (last updated Nov. 6, 2018). They move gas that heats
millions of American homes and that generates approximately 40% of the Nation’s electricity. Demand for natural
gas continues to increase because it is an abundant, affordable, and reliable energy source. Investment in and development of this critical infrastructure will be needed for the
foreseeable future. Meeting this demand requires the existence of predictable and consistent policies and regulations affecting pipeline operations.
Federal law allows a natural gas pipeline to operate
only if the pipeline operator first obtains a Certificate of
Public Convenience and Necessity (“Certificate”) from the
Federal Energy Regulatory Commission (“FERC”).
These Certificates are required before construction can
begin on a pipeline. FERC’s decisionmaking regarding
such Certificates is subject to judicial review under the
Administrative Procedure Act. But a Certificate may go
into effect even before judicial review concludes, and may
require, as did the Certificate in this case, that the developer complete construction within a fixed period of time.
Once a Certificate is effective, pipelines are entitled to rely
on it by beginning construction and by using the pipeline
to deliver natural gas. Stakeholders across the supply
chain make long-term plans in reliance on FERC’s
4
Certificates, which significantly affect individuals, businesses, and the companies that serve pipelines.
Any uncertainty regarding the effectiveness of a Certificate for a pipeline that is already operational (such as
Spire STL) and delivering gas to a local distribution company (such as Spire Missouri) jeopardizes individuals’ ability to obtain the gas needed to heat their homes, and it will
ultimately increase the price of natural gas to individuals
and businesses. The D.C. Circuit’s decision brushed aside
these potentially devastating effects and reduced to a near
nullity the role that potential “disruptive consequences”
play in the analysis of whether to vacate an agency action
as opposed to remand. Allied-Signal, Inc. v. U.S. Nuclear
Regul. Comm’n, 988 F.2d 146, 151 (D.C. Cir. 1993).
FERC’s subsequent intervention, granting a temporary
Certificate, has prevented these calamitous effects from
occurring. Pet. Supp. 3-4. But that does not excuse the
D.C. Circuit’s failure to consider them in the first place.
Vacatur of operational authority threatens residential
and commercial consumers with drastic and unpredictable
disruptions in service. When a pipeline shuts down, alternative sources of natural gas supply can take months to
secure. In the end, however, a viable alternative source of
energy may not even be available for the pipeline’s customers. Even if consumers are able to secure an alternate
supply of energy, the process of doing so can take substantial time, and the consumers typically must pay a substantial premium to do so. In the interim, homes go without
heat (creating especially dangerous conditions in the winter months) and businesses shut down (often sending
workers home without a paycheck).
No court should take such an extreme step—vacating
of a Certificate for an already operational pipeline—without fully considering the potential ramifications of its action. The decision below did not weigh, however, and in
5
fact hardly even acknowledged, the deleterious consequences of vacatur. If disruption of such magnitude does
not require serious consideration before vacatur of a Certificate providing operating authority, then the disruption
factor itself is meaningless.
Equally concerning, as Petitioners emphasize, there is
no uniform standard by which courts can evaluate the disruptive effects of their orders. Pet. 13-14. That citizens in
one area of the country may lose access to natural gas under the same set of facts that would leave citizens in another area undisturbed is a powerful factor favoring review by this Court.
ARGUMENT
Amici submit this brief to underscore how dangerous
it is to the operation of critical infrastructure that supplies
natural gas to America’s homes and businesses for courts
to do what the D.C. Circuit did below: treat disruptive consequences as an afterthought in analyzing whether to shut
down a pipeline while FERC considers challenges to the
pipeline’s legal authority to operate on remand.
Although the decision below directly affects a single
pipeline that supplies natural gas to only one (important)
market in the country, the principle at stake is of immense
importance. If courts are free to brush aside the disruptive
consequences that vacatur of an agency action may have
on an operating business, then interstate pipelines and local distribution companies inevitably will have greater difficulty providing a steady and cost-effective supply of natural gas to American homes and businesses. The millions
of customers that Amici’s members serve cannot afford
that result, and this Court should intervene to prevent it.
I. MILLIONS OF AMERICANS DEPEND ON THE
PREDICTABLE, DISRUPTION-FREE SUPPLY OF
NATURAL GAS FROM INTERSTATE PIPELINES.
The Nation’s “natural gas transmission network
6
consists of around 300,000 miles of pipeline.” Melissa N.
Diaz, Cong. Research Ser., R46723, U.S. Energy in the
21st Century: A Primer at 13 (2021), https://crsreports.congress.gov/product/pdf/R/R46723. “These natural
gas lines feed around 2.3 million miles of regional pipelines
in some 1,500 local distribution networks which serve
nearly 70 million customers.” Id. Together, these pipelines
form a system that safely and efficiently links natural gas
production sources to millions of residential, commercial,
and industrial consumers. See id. As part of that system,
large, typically interstate, pipelines transport natural gas
from the companies that produce natural gas to local distribution companies and to community owned natural gas
distribution entities who deliver the gas to end users.
A. Local distribution companies are the bridge
between pipelines and end users.
The disruptive effects to companies, consumers, and
the economy of shutting down an operating pipeline because of an agency’s error are perhaps most apparent at
the end of the natural gas supply chain. Local distribution
companies are local—they operate in specific geographies, within which they are the last link in the natural gas
supply system. They bring the gas from interstate pipelines to the local consumers (families, and industrial and
commercial users), generally through smaller, local pipelines. Retail customers usually have access to natural gas
only through a single local distribution company that
serves a specific area. Not only are interstate pipelines the
primary source of supply for many local distribution companies, but for many such companies, there is not even a
viable alternative. End-users thus feel the impact of any
failures in the upstream transportation system on which
local distribution companies depend.
Because natural gas service is so important to individual Americans and to the businesses that employ them,
7
local distribution companies are highly regulated at both
the state and local levels. State law generally charges
those companies with an obligation to serve. See, e.g., Mo.
Rev. Stat. § 393.130.1; 66 Pa. Cons. Stat. § 2207. “The primary duty of a public utility is to serve on reasonable
terms all those who desire the service it renders.” United
Fuel Gas Co. v. R.R. Comm’n of Kentucky, 278 U.S. 300,
309 (1929). This obligation means that the highest priority
for a local distribution company is the delivery of natural
gas to its customers safely, reliably, responsibly, and at
just and reasonable rates. See Federal Energy Regulatory Commission, Energy Primer: A Handbook for Energy Market Basics at 127 (Apr. 2020) (hereinafter “FERC
Energy
Primer”),
https://www.ferc.gov/sites/default/files/2020-06/energy-primer-2020_Final.pdf
(“A[]
[local distribution company] * * * is concerned with obtaining sufficient volumes of natural gas to serve variable
customer demand at the lowest possible price.”).
Local distribution companies cannot satisfy their obligation to serve—they cannot provide cost effective and reliable service—unless they can depend on safe and reliable
transportation of natural gas over interstate pipelines.
They thus work with interstate transporters (and with
suppliers) to ensure reliable delivery of adequate volumes
of natural gas. A local distribution company’s supply must
always be sufficient to meet demand not only on ordinary
days but also on “peak-days,” when demand for natural
gas is at the maximum.
Meeting peak and ordinary demand requires longterm coordination and planning. Natural gas cannot be
easily “shifted” across long distances when demand in one
part of the country spikes. Accordingly, local distribution
companies must predict (often through sophisticated models) how much gas their customers will need and when.
This culminates in long-term supply plans between the
distributors and the transporters aimed at, once again,
8
cost effective and reliable service.
Through these agreements, local distribution companies can commit to using a pipeline to transport natural
gas before a pipeline is built and thus serve as “anchor
shippers” for interstate pipelines. This arrangement creates mutual benefit because it brings both local distribution companies and interstate pipelines a measure of confidence regarding future supply and demand.
B. Spire STL transports the gas that Spire Missouri currently provides to end users.
This case is an illustrative example. Spire Missouri, the
local distribution company for the St. Louis area, entered
into a long-term, 20-year agreement for natural gas from
Spire STL’s pipeline. That pipeline, in turn, received a Certificate from FERC, which authorized the pipeline’s construction and operation under Section 7(c) of the Natural
Gas Act, 15 U.S.C. § 717f(c). In reliance on the long-term
contract (and the Certificate, which required the pipeline to
be built in two years), Spire Missouri allowed some of its
transportation contracts with other pipelines to expire, and
one of the previous physical delivery points that was used
under those contracts is no longer operational.
The Spire STL pipeline is a necessary component in
the system that enables Spire Missouri to satisfy the obligation to serve that it owes to its customers. For example,
Spire Missouri estimates that “without [the] STL Pipeline,
up to 133,000 homes and business[es] would have been
without gas service as a result of Winter Storm Uri” in
February 2021. Pet. App. 392a. Even if alternative supply
had been available during the storm, it would have come
with a “$300 million” price tag. Id. These avoided disruptions and costs are “concrete historical evidence of the
supply security and cost benefits that STL Pipeline provides” now that it is in operation. Pet. App. 394a.
Spire STL’s arrangement with Spire Missouri is not
9
unique, but rather one example of the countless arrangements between interstate natural gas pipelines and local
distribution companies across the country. If other courts
follow the precedent established below and vacate Certificates for operational pipelines without due regard for the
disruptive consequences thereof, then millions of Americans will face the same damaging service losses and cost
increases that are now threatening Spire Missouri and its
customers.
II. THE D.C. CIRCUIT’S APPROACH ALL BUT
ELIMINATES DISRUPTION AS A FACTOR WEIGHING
AGAINST VACATUR.
The D.C. Circuit should have considered, but did not,
the gravity of the disruptions that vacatur could cause to
Spire Missouri and to its customers. Similar disruptions
are threatened anytime a court vacates a Certificate of
Public Convenience and Necessity for an operational pipeline, because the Certificate is required for both construction and operation. 15 U.S.C. § 717f(c)(1)(A). Each local
distribution company’s mission to provide cost effective
and reliable service to consumers usually requires longterm contracts with pipelines that rely on such Certificates.
A. Residential consumers face drastic disruptions when a local distribution company’s
supply of natural gas is interrupted.
Disruptions to natural gas supply result in significant
consequences for the individuals and families that depend
on local distribution companies for residential service. Approximately “half of the homes in the United States use
natural gas for space heating.” U.S. Energy Information
Administration,
Natural
Gas
Explained,
https://www.eia.gov/energyexplained/natural-gas/use-ofnatural-gas.php (last updated Dec. 7, 2021). Families and
individuals also use natural gas “to heat their homes and
10
prepare warm meals for their families.” Letter from Adolphus M. Pruitt, St. Louis City NAACP, to FERC regarding Spire STL Pipeline at 1 (Nov. 2, 2021), https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20211104-5006 (click “Generate PDF”) (hereinafter
“NAACP Letter”).
The reliable supply of natural gas is something that
many Americans cannot do without. Because customers in
many markets have access to supply only through a single
local distribution company, the company mission to plan
for and provide cost effective and reliable supply is imperative. When supply is unexpectedly interrupted, people
suffer. “After the city of Denton, Texas, lost its gas supply,
it was forced to cut power to nursing homes and water
pumping stations.” FERC & NERC Staff Report, The
February 2021 Cold Weather Outages in Texas and the
South Central United States at 10 (Nov. 2021),
https://www.ferc.gov/media/february-2021-cold-weatheroutages-texas-and-south-central-united-states-ferc-nercand. In the St. Louis area in particular, “the thousands of
households who are living at or below the poverty line”
would feel a “disproportionate impact” of supply disruptions due to the “daily inequities” that they already face.
NAACP Letter, supra, at 1.
The severity of a natural gas disruption cannot be
cured instantaneously. Unlike electric outages, natural
gas service does not return after a few minutes with the
flicker of a bulb. Instead, when there is a disruption (or
outage) in gas service, the local distribution company must
take several steps to ensure the safety of gas consumers
and restore service, a process that may take several
days—or even weeks depending on the scope of the outage. Before reinstating service, the local distribution company generally must send a qualified service technician
into each home to perform a series of safety inspections to
help ensure that there is no risk involved in restoring gas
11
service to the home or building. See American Gas Association, Frequently Asked Questions About Natural Gas
Market Trends: Natural Gas Pipeline Safety at 3 (2018),
https://www.aga.org/globalassets/research--insights/pipeline-safety-faq_final.pdf. This process must be performed
individually for every home that loses service. Id. Once it
is safe, a technician then must relight each customer’s pilot
lights. Id. Disruption can therefore cause ripple effects
that last long after the initial disruption is itself cured.
The decision below did not specifically consider (or
even mention) these disruptive effects to American families and businesses. Pet. App. 39a. Petitioners recognize
that these effects have not arisen, but that is solely because FERC has granted Spire STL a temporary Certificate. Pet. Supp. 3-4. Amici emphasize, however, that the
D.C. Circuit’s refusal to meaningfully engage with the risk
that vacatur of the Certificate poses is an error that could
lead to customers losing access to natural gas during the
winter months. See Pet. 39a. Instead of discussing those
risks, the court held that the undefined potential for “some
disruption” could not outweigh the supposedly “serious
deficiencies” that the court identified in the record (i.e., in
FERC’s error). Id. But “some disruption,” id., of service
by Spire STL could result in tens of thousands of customers facing life-threatening cold conditions without heat for
their homes. FERC’s use of emergency authority does not
excuse the D.C. Circuit’s failure to properly analyze the
disruptive effects caused by vacatur of a Certificate for an
operational pipeline.
An analysis that weighs the gravity—the “serious[ness],” id.—of the agency’s error must also weigh the
gravity of the disruptive consequences of vacatur. Otherwise, the mismatch all but eliminates potential disruptive
consequences as a factor weighing against vacatur. The
decision below falls into exactly this trap. See id. The D.C.
Circuit discussed the “serious[ness]” of what it considered
12
to be an error in exhaustive detail, Pet. 31a-38a, but then
it failed to consider the seriousness of the disruptive consequences of vacatur, id. at 39a. This error is especially
striking when the potential disruptions at issue included
leaving families without heat during winter.
B. Industrial users and electric generators depend on reliable natural gas service.
Demand for natural gas comes from a variety of industrial sectors, including electric generators, and also “manufacturing, construction, agriculture, and mining,” all of
which also contribute to “economic activity broadly.” Elizabeth Sendich, The Importance of Natural Gas in the Industrial Sector at 2, U.S. Energy Information Administration Working Paper Series (Feb. 28, 2014),
https://www.eia.gov/workingpapers/pdf/natgas_indussector.pdf. When supply is unexpectedly interrupted, so too
are the critical industrial and manufacturing processes
that depend directly on natural gas or indirectly on the
electricity that generators supply. Reliable industrial supply is particularly important at present, when supply
chains are already stretched thin and many companies use
just-in-time delivery and inventory systems.
For example, Curiam, a pharmaceutical company,
commented in the FERC proceeding below that it manufactures its “potentially life-saving diagnostic” radiopharmaceuticals “in suburban St. Louis” at a facility that receives natural gas from Spire Missouri. Letter from Roy
W. Brown, Vice President, Curiam, to FERC regarding
Spire STL Pipeline at 1-2 (Oct. 12, 2021), https://elibrary.ferc.gov/eLibrary/filelist?accession_number=2021
1013-5190 (click “Generate PDF”). The natural gas that
Curiam receives allows it to operate the “critical equipment” without which it is “unable to produce product” for
its more than “14 million patients around the world.” Id.
The disruptive effects that interruptions in industrial
13
supply can cause do not stop at a business’s walls. Instead,
these effects ripple, at minimum, into the local economy.
When supply interruptions force businesses to close,
hourly and other non-salaried employees risk losing their
ability to earn a paycheck. Further, where reliable access
to natural gas is less secure, businesses are less likely to
open or maintain facilities. And where disruptions affect a
large number of users or affect an industry that is particularly important, the negative effects can be felt on an
even broader scale.
For example, Winter Storm Uri caused major interruptions of natural gas supply in Texas, and these caused
particularly severe disruptions to the “chemical plants[]
[that] make up nearly 75 percent of U.S. chemical production and contribute to the manufacture of ingredients necessary for disinfectants, plastic bottles, fertilizer, pesticides and packaging.” Texas Comptroller of Public Accounts, The Economic Impact of the Storm, 2021 Fiscal
Notes: Special Edition at 5 (Oct. 2021), https://comptroller.texas.gov/economy/fiscal-notes/2021/oct/docs/fn.pdf.
As is typical, these disruptions were not solved the moment that upstream service was restored. See id. (describing “damaged equipment” and “slowing supply lines”).
The decision below did not expressly consider, much
less weigh, any of the disruptions that vacatur could cause
to industrial sectors that rely on natural gas. Pet. 39a. Nor
did the decision mention the effects that residential users
must endure when they lose electricity due to a disruption
in the supply of natural gas to generators. That failure sets
a troubling precedent that warrants this Court’s review.
C. Disruptions in already-operational pipelines
significantly increase the cost of capital.
Interstate pipelines, like other large infrastructure
projects, are often financed via debt. The cost of that capital is reflected in the debt’s interest rate and in the terms
14
that lenders impose on construction projects. When a project’s overall risk increases, the cost of capital for the project increases, too, as lenders demand a return that reflects the risk they bear. See Fed. Power Comm’n v. Hope
Nat. Gas Co., 320 U.S. 591, 603 (1944) (“[R]eturn * * *
should be sufficient to assure confidence in the financial
integrity of the enterprise, so as to * * * attract capital.”).
When the durability of FERC’s Certificates of Public
Convenience and Necessity becomes less certain, lenders
are willing to provide capital for pipelines only at increased rates. Put differently, overall project-finance
costs for interstate pipelines will increase if pipelines that
are already operational are subject to disruptive shutdowns based on FERC’s remediable errors during the
certification process. See Duquesne Light Co. v. Barasch,
488 U.S. 299, 312 (1989) (warning against risks that
“imped[e] [a utility’s] ability to raise future capital”).
Local distribution companies also feel the effects of increased capital costs, first in the prices for transport and
supply, but also in their own capital costs. This is because
any additional risk in the interstate pipelines that local distribution companies depend on makes investment in those
companies that much riskier. “Credit quality * * * is dependent both on the amount of debt issued by a company
as well as the stability of a company’s cash flow.” FERC
Energy Primer at 130 (emphasis added).
Nor do these costs stop with the companies. Instead,
“risks faced by utility investors are important to utility
customers because risks to investors get reflected in the
capital costs to the utility which are ultimately paid for by
customers.” John D. Quackenbush, A Cost of Capital and
Capital Markets Primer for Utility Regulators at 8 (April
2020),
https://pubs.naruc.org/pub.cfm?id=CAD801A0155D-0A36-316A-B9E8C935EE4D. Even where consumers can bear these increases, prohibitively high capital
15
costs stifle competition by making it harder for new companies to enter the market. This can dampen innovation
and, again, ultimately lead to higher prices for consumers.
D. The D.C. Circuit failed to consider these significant disruptive consequences of vacatur.
The D.C. Circuit acknowledged that “[t]he decision
whether to vacate depends on the seriousness of the order’s deficiencies * * * and the disruptive consequences of
an interim change that may itself be changed.’” Pet. App.
39a (quoting Allied-Signal, 988 F.2d at 150-51). Although
it considered the “serious[ness]” of the errors that it identified in some detail, Pet. App. 31a-38a, the decision effectively gave no consideration to the potential consequences
of vacatur. Instead, the court stated that it understood
that “there may be some disruption,” but that disruption
“is weighty only insofar as the agency may rehabilitate its
rationale.” Id. at 39a (quotation omitted).
The court’s unbalanced test—weighing the “serious[ness]” of the error, but ignoring the seriousness of any
disruptive consequences—results in a two-factor analysis
that only considers one factor. See id. The D.C. Circuit’s
decision did not address the customers who might go without gas. It did not address impacts on local distribution
companies and their long-term supply plans. It did not address industrial users that will face increased costs. It did
not address the natural gas utilities that will face higher
capital costs. And it did not address the homes and families
that risk losing electricity if electric generators do not
have access to a reliable supply of natural gas. That failure
reduces Allied Signal’s second factor to a nullity. See id.
The decision below defended its unbalanced test on the
theory that disruption on any scale “is weighty only insofar as the agency may be able to rehabilitate its rationale.”
Id. (citing Comcast Corp. v. FCC, 579 F.3d 1, 9 (D.C. Cir.
2009)). But Comcast Corp. addressed only “whether
16
vacatur is likely to be unduly disruptive of the agency’s
regulatory program”—not whether and when a court
should consider how disruption would affect hundreds of
thousands of citizens that are outside the agency’s direct
regulatory authority. 579 F.3d at 9 (emphasis added). In
any event, because the decision below did not foreclose
FERC from rehabilitating its rationale on remand, Pet.
App. 39-40a, the D.C. Circuit should have meaningfully
weighed vacatur’s disruptive consequences rather than
brushing them aside.
Amici fear that natural gas companies and the customers that rely on them will face severe disruptions across
the country if courts do not adequately address the significant negative impacts that can occur when an agency decision that private parties reasonably relied on gets overturned. Just as the agencies themselves must consider reliance interests before changing course, Dep’t of Homeland Sec. v. Regents of the University of Cal., 140 S. Ct.
1891 (2020), so too should the courts.
III. REVIEW IS IMPERATIVE BECAUSE THE D.C.
CIRCUIT HEARS THE VAST MAJORITY OF CASES
INVOLVING INTERSTATE PIPELINE PERMITTING.
As Petitioners emphasize, the D.C. Circuit hears an
outsized majority of administrative law cases. Pet. 25.
Cases raising the question presented are unlikely to arise
in other circuits. It is therefore imperative that the D.C.
Circuit give proper consideration to the potential for disruption before ordering vacatur—especially for critical infrastructure that affects hundreds of thousands of citizens.
Finally, FERC’s Temporary Certificate Order does
not change the need for review. See Pet. Supp. at 3-7. The
possibility of a temporary Certificate played no part in the
D.C. Circuit’s analysis, and therefore it cannot justify that
analysis. On the contrary, FERC’s extraordinary intervention occurred only because of the “emergency” that the
17
court’s vacatur caused. But there is no guarantee that
FERC will always intervene so actively. This leaves the
pipeline industry and those who depend on it, including
families, businesses, and others who reasonably rely on final orders like the one at hand facing calamitous risk.
CONCLUSION
The Court should grant the petition for a writ of certiorari.
Respectfully submitted,
Joshua P. Morrow
LEHOTSKY KELLER LLP
919 Congress Ave
Austin, TX 78701
January 6, 2022
Steven P. Lehotsky
Counsel of Record
Michael B. Schon
LEHOTSKY KELLER LLP
200 Massachusetts Ave. NW
Washington, DC 20001
(512) 693-8350
steve@lehotskykeller.com
This is a copy of a public record, reproduced as it was published. It is not legal advice, and it may not be the version a court would rely on. Check the official source before you cite it.