Petition for Writ of Certiorari — Joseph R. Biden, Jr., President of the United States, et al., Petitioners v. Sierra Club, et al.
Supreme Court briefNov 17, 2020
Ask Donna
What actually matters in this document.
Text
No.
In the Supreme Court of the United States
DONALD J. TRUMP, PRESIDENT OF THE UNITED STATES,
ET AL., PETITIONERS
v.
SIERRA CLUB, ET AL.
ON PETITION FOR A WRIT OF CERTIORARI
TO THE UNITED STATES COURT OF APPEALS
FOR THE NINTH CIRCUIT
PETITION FOR A WRIT OF CERTIORARI
JEFFREY B. WALL
Acting Solicitor General
Counsel of Record
JEFFREY BOSSERT CLARK
Acting Assistant Attorney
General
HASHIM M. MOOPPAN
Counselor to the Solicitor
General
SOPAN JOSHI
Senior Counsel to the
Assistant Attorney General
MATTHEW GUARNIERI
Assistant to the Solicitor
General
H. THOMAS BYRON III
EDWARD HIMMELFARB
MICHAEL SHIH
Attorneys
Department of Justice
Washington, D.C. 20530-0001
SupremeCtBriefs@usdoj.gov
(202) 514-2217
QUESTIONS PRESENTED
If the President declares “a national emergency in accordance with the National Emergencies Act (50 U.S.C.
1601 et seq.) that requires use of the armed forces,” the
Secretary of Defense has express statutory authority to
“undertake military construction projects * * * not
otherwise authorized by law that are necessary to support such use of the armed forces.” 10 U.S.C. 2808(a).
“Such projects may be undertaken only within the total
amount of funds that have been appropriated for military
construction, including funds appropriated for family
housing, that have not been obligated.” Ibid. In 2019,
following the President’s declaration of a national emergency requiring the use of the armed forces at the
southern border, the then-Secretary of Defense authorized 11 military construction projects involving border
barriers pursuant to Section 2808. The questions presented are as follows:
1. Whether respondents have a cognizable cause of
action to obtain review of the Secretary’s compliance
with Section 2808 in reprioritizing appropriated but unobligated funds for the military construction projects
being authorized.
2. Whether the Secretary exceeded his statutory authority under Section 2808 in reprioritizing appropriated funds for the military construction projects being
authorized.
(I)
PARTIES TO THE PROCEEDING
Petitioners are Donald J. Trump, in his official capacity as President of the United States; Steven T.
Mnuchin, in his official capacity as Secretary of the
Treasury; Christopher C. Miller, in his official capacity
as Acting Secretary of Defense; David Bernhardt, in his
official capacity as Secretary of the Interior; Chad F.
Wolf, in his official capacity as Acting Secretary of
Homeland Security; Ryan D. McCarthy, in his official
capacity as Secretary of the Army; Kenneth J.
Braithwaite, in his official capacity as Secretary of the
Navy; Barbara M. Barrett, in her official capacity as
Secretary of the Air Force; the United States; the Department of the Treasury; the Department of Defense;
the Department of the Interior; and the Department of
Homeland Security. *
Respondents are the Sierra Club; the Southern Border Communities Coalition; and the States of California, Colorado, Hawaii, Maryland, New Mexico, New
York, Oregon, Virginia, and Wisconsin.
Acting Secretary Miller and Secretaries Braithwaite and Barrett are substituted as parties for their predecessors in office pursuant to Rule 35.3 of the Rules of this Court.
*
(II)
RELATED PROCEEDINGS
United States District Court (N.D. Cal.):
Sierra Club v. Trump, No. 19-cv-892 (May 24, 2019)
(preliminary injunction in Section 8005 litigation)
Sierra Club v. Trump, No. 19-cv-892 (June 28, 2019)
(partial final judgment in Section 8005 litigation)
California v. Trump, No. 19-cv-872 (June 28, 2019)
(same)
Sierra Club v. Trump, No. 19-cv-892 (Dec. 11, 2019)
(partial final judgment in Section 2808 litigation)
California v. Trump, No. 19-cv-872 (Dec. 11, 2019)
(same)
United States Court of Appeals (9th Cir.):
Sierra Club v. Trump, Nos. 19-16102 and 19-16300
(July 3, 2019) (denying stay pending appeal of
Section 8005 injunction)
Sierra Club v. Trump, Nos. 19-16102 and 19-16300
(June 26, 2020) (affirming in Section 8005 appeal)
California v. Trump, Nos. 19-16299 and 19-16336
(June 26, 2020) (same)
Sierra Club v. Trump, Nos. 19-17501, 19-17502, and
20-15044 (Oct. 9, 2020) (affirming in consolidated
Section 2808 appeals)
Supreme Court of the United States:
Trump v. Sierra Club, No. 19A60 (July 26, 2019)
(granting stay of Section 8005 injunction)
Trump v. Sierra Club, No. 20-138 (Oct. 19, 2020)
(granting certiorari in Section 8005 litigation)
(III)
TABLE OF CONTENTS
Page
Opinions below .............................................................................. 1
Jurisdiction ................................................................................... 2
Statutory provisions involved ...................................................... 2
Statement ...................................................................................... 2
A. Statutory background ............................................... 4
B. The challenged projects............................................ 4
C. Prior proceedings ...................................................... 8
1. The Section 8005 litigation................................. 8
2. The Section 2808 litigation............................... 11
Reasons for granting the petition ............................................. 16
I. The decision below is incorrect .................................... 17
A. Respondents lack any cause of action to obtain
judicial review of whether the Secretary
exceeded his authority under Section 2808 .......... 17
B. The Secretary fully complied with Section 2808 ... 28
II. The questions presented warrant review.................... 32
Conclusion ................................................................................... 34
Appendix A — Court of appeals opinion (Oct. 9, 2020) ......... 1a
Appendix B — District court order granting in part and
denying in part plaintiffs’ motions for
partial summary judgment and denying
defendants’ motions for partial
summary judgment (Dec. 11, 2019) ....... 104a
Appendix C — Court of appeals order (Oct. 26, 2020) ...... 173a
Appendix D — Court of appeals order (Dec. 30, 2019) ..... 175a
Appendix E — Constitutional and statutory provisions .... 177a
TABLE OF AUTHORITIES
Cases:
Armstrong v. Exceptional Child Ctr., Inc.,
575 U.S. 320 (2015).......................................18, 19, 26, 27, 32
Ayestas v. Davis, 138 S. Ct. 1080 (2018) ....................... 15, 31
(V)
VI
Cases—Continued:
Page
Bennett v. Spear, 520 U.S. 154 (1997)................ 25, 26, 27, 28
Bond v. United States, 564 U.S. 211 (2011) ........................ 25
Boston Stock Exch. v. State Tax Comm’n,
429 U.S. 318 (1977).............................................................. 26
Clarke v. Securities Indus. Ass’n, 479 U.S. 388
(1987) .............................................................................. 19, 27
Commissioner v. Heininger, 320 U.S. 467 (1943) .............. 31
Dalton v. Specter, 511 U.S. 462 (1994)........................... 23, 24
Gonzaga Univ. v. Doe, 536 U.S. 273 (2002)......................... 27
Grupo Mexicano de Desarrollo, S. A. v. Alliance
Bond Fund, Inc., 527 U.S. 308 (1999) ............................... 26
Hernandez v. Mesa, 140 S. Ct. 735 (2020) .......................... 27
Lexmark Int’l, Inc. v. Static Control Components,
Inc., 572 U.S. 118 (2014) ......................................... 18, 25, 26
Lujan v. National Wildlife Fed’n, 497 U.S. 871
(1990) .................................................................................... 28
Match-E-Be-Nash-She-Wish Band of Pottawatomi
Indians v. Patchak, 567 U.S. 209 (2012) ........ 13, 18, 21, 22
Thompson v. North Am. Stainless, LP, 562 U.S. 170
(2011) .............................................................................. 18, 27
Trump v. Sierra Club, 140 S. Ct. 1 (2019),
mot. to lift stay denied, 140 S. Ct. 2620 (2020) ..... 3, 7, 9, 10
United States v. Apel, 571 U.S. 359 (2014) .......................... 30
Valley Forge Christian Coll. v. Americans United
for Separation of Church & State, Inc.,
454 U.S. 464 (1982).............................................................. 26
Winter v. Natural Res. Def. Council,
555 U.S. 7 (2008) ................................................................. 32
Youngstown Sheet & Tube Co. v. Sawyer,
343 U.S. 579 (1952).............................................................. 24
Ziglar v. Abbasi, 137 S. Ct. 1843 (2017) ........................ 20, 27
VII
Constitution, statutes, regulation, and rules:
Page
U.S. Const.:
Art. I:
§ 8, Cl. 3 (Dormant Commerce Clause) ................... 26
§ 9, Cl. 7 (Appropriations Clause) ................... passim
Art. III .............................................................................. 20
Art. VI, § 9 (Supremacy Clause) .................................... 26
Amend. I (Establishment Clause) ................................. 26
Administrative Procedure Act, 5 U.S.C. 701
et seq. .................................................................................... 10
5 U.S.C. 702 ...................................................................... 18
Department of Defense Appropriations Act, 2019,
Pub. L. No. 115-245, Div. A, Tit. VIII, § 8005,
132 Stat. 2999 ............................................................. passim
National Emergencies Act, 50 U.S.C. 1601 et seq. ............... 4
50 U.S.C. 1631 .................................................................... 5
10 U.S.C. 284 .....................................................3, 6, 8, 17, 177a
10 U.S.C. 284(a) ..................................................................... 17
10 U.S.C. 284(b)(7) ................................................... 6, 17, 180a
10 U.S.C. 2801(a) ................................................4, 14, 29, 186a
10 U.S.C. 2801(c)(4) ......................................4, 14, 29, 30, 187a
10 U.S.C. 2808 ...................................................... passim, 182a
10 U.S.C. 2808(a) ................................................. passim, 188a
10 U.S.C. 2808(b) ..................................................... 4, 20, 188a
31 U.S.C. 9705(g)(4)(B) ........................................................... 6
25 C.F.R. 151.10(f ) ................................................................. 22
Fed. R. Civ. P. 54(b) ............................................................. 12
Fed. R. App. P. 41(d)(2)(B) ................................................... 16
Fed. R. App. P. 41(d)(2)(B)(ii) .............................................. 15
Sup. Ct. R. 10(c) .................................................................... 32
VIII
Miscellaneous:
Page
84 Fed. Reg. 4949 (Feb. 20, 2019) ...................................... 4, 5
Gov’t Accountability Office, Department of
Defense—Availability of Appropriations for
Border Fence Construction, B-330862, 2019 WL
4200949 (Comp. Gen. Sept. 15, 2019) .................................. 5
H.R. Rep. No. 200, 103d Cong., 1st Sess. (1993) .................. 6
Memorandum on Securing the Southern Border of
the United States, 2018 Daily Comp. Pres. Doc.
(Apr. 4, 2018) ......................................................................... 5
In the Supreme Court of the United States
No.
DONALD J. TRUMP, PRESIDENT OF THE UNITED STATES,
ET AL., PETITIONERS
v.
SIERRA CLUB, ET AL.
ON PETITION FOR A WRIT OF CERTIORARI
TO THE UNITED STATES COURT OF APPEALS
FOR THE NINTH CIRCUIT
PETITION FOR A WRIT OF CERTIORARI
The Acting Solicitor General, on behalf of Donald J.
Trump, President of the United States, et al., respectfully petitions for a writ of certiorari to review the judgment of the United States Court of Appeals for the
Ninth Circuit in this case.
OPINIONS BELOW
The opinion of the court of appeals (App., infra, 1a103a) is reported at 977 F.3d 853. The order of the district court (App., infra, 104a-172a) is reported at 407
F. Supp. 3d 869. Additional related opinions and orders
are described in the government’s petition for a writ of
certiorari in Trump v. Sierra Club, cert. granted,
No. 20-138 (Oct. 19, 2020) (20-138 Pet.), and reproduced
in the appendix to that petition.
(1)
2
JURISDICTION
The judgment of the court of appeals was entered on
October 9, 2020. The jurisdiction of this Court is invoked under 28 U.S.C. 1254(1).
STATUTORY PROVISIONS INVOLVED
Section 2808 of Title 10 of the United States Code
provides in pertinent part:
In the event of a declaration of war or the declaration by the President of a national emergency in
accordance with the National Emergencies Act
(50 U.S.C. 1601 et seq.) that requires use of the armed
forces, the Secretary of Defense, without regard to any
other provision of law, may undertake military construction projects, and may authorize the Secretaries
of the military departments to undertake military construction projects, not otherwise authorized by law
that are necessary to support such use of the armed
forces. Such projects may be undertaken only within
the total amount of funds that have been appropriated
for military construction, including funds appropriated
for family housing, that have not been obligated.
10 U.S.C. 2808(a). Other pertinent constitutional and
statutory provisions are reproduced in the appendix to
this petition. App., infra, 177a-191a.
STATEMENT
In February 2019, the President declared a national
emergency requiring the use of the armed forces at the
southern border. In the event of such a declaration,
Congress has expressly authorized the Secretary of Defense to use previously appropriated but unobligated
military construction funds to undertake military construction that is, in the Secretary’s judgment, necessary
to support the use of the armed forces in the emergency.
3
10 U.S.C. 2808(a). Here, the Secretary determined that
11 military construction projects—building barriers at
the border with respect to military installations—are
necessary to support the use of the armed forces in connection with the national emergency. The district court
held that respondents have a cause of action to challenge the Secretary’s Section 2808 determinations and
that the projects the Secretary authorized are unlawful.
The court permanently enjoined the government from
“using military construction funds appropriated for
other purposes” for the projects, but stayed the injunction pending appeal in deference to this Court’s order
staying the same district court’s injunction in earlier
related litigation. App., infra, 172a; see Trump v. Sierra Club, 140 S. Ct. 1 (2019), mot. to lift stay denied,
140 S. Ct. 2620 (2020). A divided panel of the court of
appeals affirmed. App., infra, 1a-103a.
The same panel of the court of appeals had also previously affirmed the same district court’s judgments in
litigation between the same parties but concerning different construction projects, undertaken pursuant to
10 U.S.C. 284 using funds transferred under Section
8005 of the Department of Defense Appropriations Act,
2019 (DoD Appropriations Act), Pub. L. No. 115-245,
Div. A, Tit. VIII, 132 Stat. 2999. On October 19, 2020,
this Court granted the government’s petition for a writ
of certiorari to review the judgments in those cases.
Trump v. Sierra Club, No. 20-138. This petition seeks
plenary review of the Ninth Circuit’s follow-on judgment concerning the Section 2808 projects; in the alternative, the government respectfully requests that this
petition be held pending the Court’s disposition of the
Section 8005 case and then disposed of as appropriate.
4
A. Statutory Background
Section 2808 authorizes the Secretary of Defense to
reprioritize appropriated military construction funds
that “have not been obligated,” in order to undertake
certain military construction projects that are “not otherwise authorized by law,” when the President declares
a “national emergency * * * that requires use of the
armed forces.” 10 U.S.C. 2808(a). Pursuant to such a
declaration, the Secretary, “without regard to any other
provision of law, may undertake military construction
projects * * * that are necessary to support such use
of the armed forces.” Ibid.
As used here, the term “military construction”
means “any construction, development, conversion, or
extension of any kind carried out with respect to a military installation,” as well as “any acquisition of land.”
10 U.S.C. 2801(a). The term “military installation”
means a “base, camp, post, station, yard, center, or
other activity under the jurisdiction of the Secretary of
a military department.” 10 U.S.C. 2801(c)(4).
When the Secretary decides to undertake military
construction under Section 2808, the statute requires
the Secretary to “notify * * * the appropriate committees of Congress of the decision,” and of “the estimated
cost of the construction projects.” 10 U.S.C. 2808(b).
B. The Challenged Projects
1. a. This case arises from actions taken by the Department of Homeland Security (DHS) and the Department of Defense (DoD) in the wake of the President’s
declaration of a national emergency on the southern
border under the National Emergencies Act, 50 U.S.C.
1601 et seq. See 84 Fed. Reg. 4949 (Feb. 20, 2019). In
that declaration, the President determined that “[t]he
5
current situation at the southern border presents a border security and humanitarian crisis that threatens core
national security interests” of the United States. Ibid.
The President explained that the border is “a major entry point for criminals, gang members, and illicit narcotics,” and that the federal government continues to be
unable to stem the tide of “large-scale unlawful migration” across the border. Ibid. The President had previously ordered DoD to support DHS in securing operational control of the southern border, including through
the deployment of the National Guard. See Memorandum on Securing the Southern Border of the United
States, 2018 Daily Comp. Pres. Doc. 2 (Apr. 4, 2018). In
his February 2019 declaration, the President determined that “it is necessary for the Armed Forces to provide additional support to address the crisis,” and he
specifically made 10 U.S.C. 2808 available to allow the
Secretary of Defense to undertake military construction as necessary to support the use of the armed forces
in connection with the emergency. 84 Fed. Reg. at 4949;
see 50 U.S.C. 1631.
The President’s determination that the crisis at the
southern border warranted using the armed forces and
authorizing the Secretary of Defense to undertake military construction projects was in keeping with a substantial history of DoD assistance at the border, including through the construction of physical barriers. Congress has “long vested [DoD] with authority to construct fences” along the border. Gov’t Accountability
Office, Department of Defense—Availability of Appropriations for Border Fence Construction, B-330862,
2019 WL 4200949, at *13 (Comp. Gen. Sept. 15, 2019).
For example, military personnel were integral to building the first modern border barrier near San Diego,
6
California, in the early 1990s. See H.R. Rep. No. 200,
103d Cong., 1st Sess. 330-331 (1993) (describing DoD’s
role).
Military personnel deployed to the southern border
during the current emergency have performed a broad
range of administrative, logistical, and operational
tasks in support of DHS. Gov’t C.A. E.R. 128-131.
These activities include installing vehicle and pedestrian barriers; placing concertina wire along the border
and at ports of entry; and operating aerial and mobile
surveillance equipment to detect activity along the border. Id. at 212-213, 216-218. As of August 2019, DoD
had approximately 5540 personnel supporting DHS’s
border-security mission. Id. at 125.
b. After the President’s declaration, the government
took a number of steps in sequence to address the emergency at the southern border through the construction
of physical barriers.
First, the Secretary of the Treasury authorized the
use of certain asset-forfeiture funds for border-barrier
construction, pursuant to his authority to obligate such
funds for “law enforcement activities.” 31 U.S.C.
9705(g)(4)(B). Those actions are not at issue here.
Second, DHS submitted a request to DoD for DoD’s
assistance pursuant to 10 U.S.C. 284, which authorizes
DoD to provide “support for the counterdrug activities”
of other departments or agencies upon request. See 20138 Pet. 6-7. Section 284 authorizes DoD to provide assistance in the form of “[c]onstruction of roads and
fences and installation of lighting to block drug smuggling corridors across international boundaries of the
United States.” 10 U.S.C. 284(b)(7). The then-Acting
Secretary of Defense approved DHS’s request with respect to several high-priority construction projects in
7
drug-smuggling corridors. 20-138 Pet. 7-8. To ensure
adequate funds to complete the projects, he also invoked his authority under Section 8005 of the DoD Appropriations Act to transfer funds between DoD appropriations. Ibid. The Section 8005 transfers are the subject of the injunction that this Court stayed in Sierra
Club, 140 S. Ct. at 1, and are at issue in the recently
granted case, Trump v. Sierra Club, supra (No. 20-138).
Third, the then-Secretary of Defense authorized certain military construction projects under 10 U.S.C.
2808—the provision at issue here. Specifically, on September 3, 2019, the Secretary determined that undertaking 11 barrier-construction projects along the southern border was necessary to support the use of the
armed forces in connection with the President’s declaration of a national emergency. Gov’t C.A. E.R. 89, 9293. Based on the advice of the Chairman of the Joint
Chiefs of Staff, see id. at 202-207—and after input from
DHS, the U.S. Army Corps of Engineers, and the Department of the Interior—the Secretary determined
that constructing barriers in the specified areas will
“deter illegal entry, increase the vanishing time of those
illegally crossing the border” (i.e., the time that passes
before a person who illegally crosses the border can no
longer be apprehended), and “channel migrants to ports
of entry,” id. at 92. The Secretary further determined
that the barriers will support the use of the armed
forces by reducing “demand for DoD personnel and assets at the locations where the barriers are constructed
and [will] allow the redeployment of DoD personnel and
assets to other high-traffic areas on the border without
barriers.” Ibid. The Secretary accordingly found that
the barriers will serve as “force multipliers” that will
8
enhance military capabilities and allow DoD to support
DHS more efficiently and effectively. Ibid.
To fund the Section 2808 projects, the Secretary approved the use of up to $3.6 billion in previously appropriated but unobligated military construction funds.
Gov’t C.A. E.R. 93. The 11 projects, which involve 175
miles of border-barrier construction, include (1) two
projects on the Barry M. Goldwater Range, a longstanding military installation in Arizona that is used for livefire and weapons exercises by U.S. military pilots;
(2) seven projects on federal land transferred to Army
jurisdiction; and (3) two projects on non-public land,
which has not yet been acquired. App., infra, 6a. The
projects are located in Arizona, California, New Mexico,
and Texas. Ibid.
C. Prior Proceedings
Respondents are two groups of plaintiffs that brought
suit in the Northern District of California to challenge
the government’s construction of physical barriers
along the southern border. The Sierra Club, a national
environmental group, and the Southern Border Communities Coalition, an organization focused on border
issues (collectively, Sierra Club), brought one of the
suits; California and several other States brought the
other. The district court addressed the plaintiffs’ allegations on a rolling basis.
1. The Section 8005 litigation
The district court first addressed the Section 284
projects that were funded through transfers under Section 8005. In June 2019, the court granted Sierra Club’s
request for a permanent injunction barring use of the
transferred funds for the Section 284 projects. See 20-
9
138 Pet. App. 174a-188a. The court reasoned that Sierra Club has an equitable cause of action to pursue its
challenge, and therefore (in the court’s view) need not
satisfy the zone-of-interests requirement, and that the
Acting Secretary exceeded his authority under Section
8005. See 20-138 Pet. 9-10. The court also entered a
declaratory judgment in favor of California and New
Mexico on essentially the same basis, while declining to
grant a duplicative injunction. Id. at 13.
A divided panel of the court of appeals declined to
stay the district court’s Section 8005 injunction. 20-138
Pet. App. 206a-299a. The majority characterized Sierra
Club’s claims as “alleging a constitutional violation,” id.
at 234a, on the theory that any use of funds improperly
transferred under Section 8005 would violate the Appropriations Clause, id. at 236a & n.16 (citing U.S.
Const. Art. I, § 9, Cl. 7). The majority reasoned that
“[t]o the extent” the zone-of-interests requirement applies to Sierra Club’s claims, “it requires [the court] to
ask whether [p]laintiffs fall within the zone of interests
of the Appropriations Clause, not of [S]ection 8005,” id.
at 264a. The court then found that Sierra Club’s
claimed aesthetic and recreational interests were within
the zone of interests protected by the Appropriations
Clause. Id. at 266a-267a. The majority also agreed with
the district court that Section 8005 likely did not permit
the disputed transfers. Id. at 236a-237a. Judge N.R.
Smith dissented. Id. at 274a-299a.
On July 26, 2019, this Court granted the government’s application for a stay of the injunction pending
appeal and, if necessary, certiorari. 140 S. Ct. at 1. The
Court stated that “[a]mong the reasons” for granting
the stay “is that the Government has made a sufficient
showing at this stage that [Sierra Club has] no cause of
10
action to obtain review of the Acting Secretary’s compliance with Section 8005.” Ibid. Justice Breyer concurred in part and dissented in part, and Justices Ginsburg, Sotomayor, and Kagan dissented. Id. at 1-2.
A divided (and different) panel of the court of appeals
later affirmed in the Section 8005 litigation, issuing two
substantially similar opinions addressing Sierra Club’s
challenge and the parallel challenge by California and
New Mexico. See 20-138 Pet. App. 1a-77a (Sierra Club);
id. at 78a-173a (California). The panel majority concluded that Sierra Club “has both a constitutional and
an ultra vires cause of action” to challenge the Section
8005 transfers, based on reasoning analogous to that in
the motions panel’s earlier opinion denying a stay. Id.
at 19a. The majority also concluded that California and
New Mexico have a cause of action under the Administrative Procedure Act (APA), 5 U.S.C. 701 et seq., after
determining that those States’ asserted environmental
and sovereign interests are within the zone of interests
protected by Section 8005. 20-138 Pet. App. 100a-106a.
In both cases, the majority concluded that the challenged transfers did not comply with a proviso in Section 8005. See id. at 17a, 109a-117a. Judge Collins dissented in both cases. Id. at 40a-77a, 119a-173a.
On October 19, 2020, this Court granted the government’s petition for a writ of certiorari to consider the
Ninth Circuit’s judgments in both of the parallel Section
8005 challenges. The questions presented are:
1. Whether [Sierra Club, California, and New
Mexico] have a cognizable cause of action to obtain
review of the Acting Secretary’s compliance with
Section 8005’s proviso in transferring funds internally between DoD appropriations accounts.
11
2. Whether the Acting Secretary exceeded his
statutory authority under Section 8005 in making the
transfers at issue.
20-138 Pet. I.
2. The Section 2808 litigation
a. On December 11, 2019, in a single opinion, the district court granted partial final judgment to Sierra Club
and to California, Colorado, Hawaii, Maryland, New
Mexico, New York, Oregon, Wisconsin, and Virginia
(collectively, the States) in their parallel challenges to
the Section 2808 projects. App., infra, 104a-172a; see
id. at 105a n.1.
The district court first determined that respondents
may “seek equitable relief through an implied cause of
action under the Constitution” to challenge the Section
2808 projects. App., infra, 118a-119a. The court based
that determination on the reasoning of the Ninth Circuit motions panel that had declined to stay the district
court’s earlier injunction—notwithstanding this Court’s
order granting a stay of the same injunction. See id. at
119a-123a. In particular, the district court reasoned
that respondents’ challenge “is ‘fundamentally a constitutional’ claim,” premised on the allegation that expending funds for military construction in violation of Section 2808 would in turn violate the Appropriations
Clause. Id. at 123a (citation omitted). And the court
found that respondents’ asserted “environmental, professional, aesthetic, and recreational interests” are
within the zone of interests protected by the Appropriations Clause. Id. at 124a (citation omitted).
The district court then determined that the challenged projects violate Section 2808 because, in the
court’s view, nine of the projects are not being carried
out with respect to a military installation, as Section
12
2808 requires. App., infra, 136a-144a. 1 The court also
held that, contrary to the judgment of the Secretary of
Defense, the projects are not “necessary” to support the
use of the armed forces, as Section 2808 also requires.
Id. at 145a-151a.
The district court granted Sierra Club’s request for
an injunction and permanently enjoined DoD and DHS
from “using military construction funds appropriated
for other purposes to build a border wall in the” specified project areas. App., infra, 172a. In deference to
this Court’s stay, however, the district court stayed its
Section 2808 injunction pending appeal. Ibid.; see id. at
169a. The court denied the States’ “duplicative request”
for an injunction as “moot,” id. at 157a, and entered partial final judgment under Federal Rule of Civil Procedure 54(b), see App., infra, 169a-171a.
b. The government appealed in both cases, and the
States cross-appealed the denial of their request for an
injunction. App., infra, 9a. The court of appeals consolidated the appeals for briefing and argument. 19-17501
C.A. Doc. 32, at 3 (Jan. 24, 2020). The court also denied
Sierra Club’s request to lift the stay of the Section 2808
injunction. App., infra, 175a-176a.
c. On October 9, 2020, a divided panel of the court of
appeals—the same panel that had decided the earlier
Section 8005 merits appeals—affirmed in the consolidated Section 2808 appeals. App., infra, 1a-64a. Judge
Collins again dissented. See id. at 65a-103a.
The panel majority held that the States have a cause
of action under the APA to challenge the Secretary’s actions. App., infra, 34a. The majority recognized that
Respondents do not dispute that the two Section 2808 projects
occurring on the Barry M. Goldwater Range are being carried out
with respect to a military installation. See App., infra, 51a n.10.
1
13
“Section 2808 constitutes the relevant statute for the
zone of interests test” for that APA claim. Id. at 35a. It
concluded that the zone of interests protected by Section 2808 includes the States’ asserted “economic interests” in the military construction projects from which
the Secretary redirected money to fund the Section 2808
projects. Id. at 37a. The majority also understood this
Court’s decision in Match-E-Be-Nash-She-Wish Band
of Pottawatomi Indians v. Patchak, 567 U.S. 209 (2012),
to establish that “neighbors” are generally within the
zone of interests protected by a statute that “deals with
land use”—a principle it took to support finding that at
least California and New Mexico have a cause of action,
as States neighboring the “border wall construction
projects.” App., infra, 38a. The majority also held that
Sierra Club has a cause of action “under the Appropriations Clause,” ibid., and it reasoned that Sierra Club’s
asserted interests are within the zone of interests protected by the Appropriations Clause, “[t]o the extent”
the zone-of-interests test applies, id. at 40a, because
“Sierra Club is an organization within the United States
that is protected by the Constitution,” id. at 41a.
On the merits, the panel majority concluded that the
Section 2808 projects were not “necessary to support”
the “use of the armed forces,” as the statute requires,
because the projects were purportedly designed only to
make it more “efficient” for the military to assist
“DHS—a civilian law enforcement agency.” App., infra, 46a-47a. The majority declined to defer to the Secretary of Defense’s contrary judgment about military
necessity, stating that the projects were not “actually
necessary” even if they were “designed to improve effectiveness and efficiency.” Id. at 48a. The majority
also agreed with the district court’s conclusion that nine
14
of the projects did not qualify as “military construction”
under Section 2808 because they were not “carried out
with respect to a military installation,” as the statute
requires. Id. at 49a (citation omitted). The majority
recognized that the statute defines a “military installation” to include “a base, camp, post, station, yard, center, or other activity under the jurisdiction of the Secretary of a military department.” Ibid. (quoting
10 U.S.C. 2801(a) and (c)(4)) (emphasis added). The
government maintained that “the land on which the projects would be built has been brought under military jurisdiction and assigned to a military installation—Fort
Bliss in El Paso, Texas.” Id. at 50a. But the majority
dismissed that assignment as merely an “administrative
convenience,” id. at 52a, insufficient to satisfy Section
2808. The majority further reasoned that the definition
of “military installation” in Section 2801(c)(4) indicates
that any “ ‘other activity’ ” must be “similar to bases,
camps, posts, stations, yards, or centers” in order to
qualify as a military installation, id. at 54a-55a—a limitation the majority found not satisfied here, see id. at
55a-58a.
Judge Collins dissented. App., infra, 65a-103a. Like
the majority, he would have held that respondents have
a cause of action, although he would have located the
cause of action for both Sierra Club and the States
solely in the APA. Id. at 77a-84a. Unlike the majority,
however, he would have held that respondents’ “claims
fail on the merits because DoD properly invoked § 2808
in undertaking these 11 projects.” Id. at 84a. He explained that the projects will be carried out with respect
to “ ‘military installation[s]’ ” because they “involve an
‘activity under the jurisdiction’ of a military Secretary,”
id. at 89a (citation omitted), having been placed under
15
the jurisdiction of the Secretary of the Army as part of
Fort Bliss. See id. at 89a-94a.
Judge Collins would have further held that “the Secretary properly determined that the construction projects here are ‘necessary to support such use of the
armed forces.’ ” App., infra, 97a (citation omitted). He
explained that “necessary” as used in Section 2808 does
not connote “absolutely needed” but rather “ ‘important
or strongly desired.’ ” Id. at 95a (quoting Ayestas v. Davis, 138 S. Ct. 1080, 1093 (2018)). And he found that
standard “easily satisfied” because the President had
declared a national emergency requiring the use of the
armed forces to support DHS at the border and the Section 2808 projects will “permit ‘DoD to provide support
to DHS more efficiently and effectively,’ ” as the Secretary had determined. Id. at 97a.
d. In its opinion, the court of appeals stated that the
district court’s stay of its own injunction pending appeal
“is terminated,” and the court of appeals dismissed a renewed motion to lift the stay, filed by Sierra Club, as
“moot.” App., infra, 62a. Sierra Club subsequently
moved to “clarify” that the court of appeals intended
those directives to take effect before the issuance of the
mandate. 19-17501 C.A. Doc. 112-1, at 1 (Oct. 15, 2020).
The government opposed that motion and filed a crossmotion to stay issuance of the mandate pending the filing and disposition of a petition for a writ of certiorari,
which the government committed to filing by November
18, 2020. 19-17501 C.A. Doc. 113-1, at 1 (Oct. 19, 2020).
The government noted in its cross-motion that, pursuant
to Federal Rule of Appellate Procedure 41(d)(2)(B)(ii),
“such a stay [of the mandate] would then remain in effect until the Supreme Court’s final disposition” of the
petition. 19-17501 C.A. Doc. 113-1, at 15; see Fed. R.
16
App. P. 41(d)(2)(B) (providing that a stay pending certiorari may be extended beyond 90 days by giving notice
to the circuit clerk of the filing of a petition, “in which
case the stay continues until the Supreme Court’s final
disposition”). On October 26, 2020, the court of appeals
denied Sierra Club’s motion and granted the government’s cross-motion to stay the mandate. App., infra,
173a-174a.
REASONS FOR GRANTING THE PETITION
Congress has empowered the Secretary of Defense,
during a national emergency requiring the use of the
armed forces, to authorize “military construction projects * * * not otherwise authorized by law,” funded
through reprioritization of amounts appropriated for
military construction, if the Secretary determines that
the projects “are necessary to support such use of the
armed forces.” 10 U.S.C. 2808(a). After the President
declared a national emergency at the southern border
requiring the use of the armed forces and made Section
2808 available, the Secretary determined that 11 military construction projects to build barriers at the border were necessary to support the use of the armed
forces during the emergency. The court of appeals
erred in holding that respondents have a cause of action
to obtain judicial review of those national-security
spending determinations and further erred in holding
that the Secretary’s determinations exceeded his authority under Section 2808.
The court of appeals’ reasoning with respect to
whether respondents have a cause of action paralleled
the reasoning that the same panel employed in the prior
proceedings involving Sierra Club, California, and New
Mexico. The court concluded there that the plaintiffs
have a cause of action to obtain judicial review of the
17
Secretary’s transfers of funds between DoD appropriations accounts, pursuant to Section 8005 of the DoD Appropriations Act, to fund border-barrier construction
projects undertaken in response to DHS’s request for
counterdrug assistance, see 10 U.S.C. 284(a) and (b)(7).
This Court recently granted the government’s petition
for a writ of certiorari to review the court of appeals’
judgments in those Section 8005 cases. Trump v. Sierra
Club, No. 20-138 (Oct. 19, 2020). The same course is
warranted here. At a minimum, the Court should hold
this petition pending its disposition of the Section 8005
dispute, which is likely to shed significant light on
whether respondents have a viable cause of action.
I. THE DECISION BELOW IS INCORRECT
A. Respondents Lack Any Cause Of Action To Obtain
Judicial Review Of Whether The Secretary Exceeded
His Authority Under Section 2808
Respondents are not proper parties to bring suit
claiming that the Secretary exceeded his authority under Section 2808 in reprioritizing appropriated military
construction funds for the military construction projects he authorized. Respondents cannot invoke any express or implied cause of action to do so because their
asserted interests are not even arguably within the zone
of interests protected by Section 2808. Section 2808 authorizes the Secretary of Defense, in the event of a presidential declaration of a national emergency requiring
the use of the armed forces, to use unobligated military
construction funds to “undertake military construction
projects, not otherwise authorized by law that are necessary to support such use of the armed forces.”
10 U.S.C. 2808(a). The recreational, aesthetic, environmental, and sovereign interests that respondents assert
are entirely outside the contemplation of Section 2808.
18
Nor can respondents avoid that conclusion by invoking
the Appropriations Clause. Respondents have no constitutional claim distinct from their challenge to whether
the Secretary exceeded the statutory authority conferred in Section 2808. In any event, the zone-of-interests requirement would apply no differently to an implied equitable cause of action asserting a violation of the
Appropriations Clause premised on non-compliance with
Section 2808.
1. The “zone-of-interests” requirement limits the
plaintiffs who “may invoke [a] cause of action” authorized by Congress. Lexmark Int’l, Inc. v. Static Control
Components, Inc., 572 U.S. 118, 129-130 (2014). It reflects the common-sense intuition that Congress does
not intend to extend a cause of action to “plaintiffs who
might technically be injured in an Article III sense but
whose interests are unrelated to the statutory prohibitions” they seek to enforce. Thompson v. North Am.
Stainless, LP, 562 U.S. 170, 178 (2011). “Congress is
presumed to ‘legislate against the background of ’ the
zone-of-interests limitation,” which excludes putative
plaintiffs whose interests do not “ ‘fall within the zone of
interests protected by the law invoked.’ ” Lexmark, 572
U.S. at 129 (brackets and citations omitted).
Under this Court’s interpretation of the APA’s express cause of action, 5 U.S.C. 702, a plaintiff ’s asserted
interest need only be “arguably within the zone of interests” of the provision to be enforced; suit is foreclosed
only where the asserted interest is “marginally related
to or inconsistent with the purposes implicit in the [provision].” Match-E-Be-Nash-She-Wish Band of Pottawatomi Indians v. Patchak, 567 U.S. 209, 224, 225
(2012) (citations omitted). But where a plaintiff asserts
an implied cause of action in equity, see Armstrong v.
19
Exceptional Child Ctr., Inc., 575 U.S. 320, 327-328
(2015), this Court has suggested that a heightened zoneof-interests standard applies, requiring the plaintiff to
be the intended beneficiary of the provision to be enforced. See Clarke v. Securities Indus. Ass’n, 479 U.S.
388, 400 n.16 (1987).
Here, under either the APA or an implied cause of
action, respondents are not proper plaintiffs because
their asserted interests are entirely unrelated to their
claim that the Secretary’s determination under Section
2808 violated the statute. Sierra Club has asserted that
construction of fencing and roads on land under military
jurisdiction along the southern border, using military
construction funds made available under Section 2808,
will impair its members’ “environmental, aesthetic, and
recreational interests” in the project areas. App., infra,
41a. The States have asserted that construction of the
challenged military construction projects will harm the
environment in California and New Mexico and will impair the States’ “quasi-sovereign interests” in the enforcement of state law. Id. at 18a, 20a.
Nothing about Section 2808’s text or context suggests that Congress even arguably intended to permit
enforcement of the statute by parties who, like respondents here, assert that the challenged military construction projects would indirectly result in harm to their
recreational, aesthetic, environmental, scientific, or
quasi-sovereign interests. Section 2808 does not require the Secretary to consider those kinds of interests
before using military construction funds. Indeed, it expressly empowers the Secretary to use these funds for
specific types of military construction projects that are
“not otherwise authorized by law” and to do so “without
regard to any other provision of law.” 10 U.S.C. 2808(a).
20
Moreover, Congress conditioned the Secretary’s authority on judgments about national security that are
uniquely within the Executive Branch’s expertise and
that courts and third parties are ill-suited to second
guess—e.g., that the projects “are necessary to support
such use of the armed forces.” Ibid.; see Ziglar v. Abbasi, 137 S. Ct. 1843, 1861 (2017) (cautioning that courts
should be “reluctant to intrude upon the authority of the
Executive in military and national security affairs”) (citation omitted).
Section 2808(b)’s congressional-notification requirement confirms that the statute is primarily, if not exclusively, intended to protect Congress’s interests in the
appropriations process. For example, if Congress disagrees with a particular use of funds under the statute
after receiving notice of it, Congress may enact legislation to prohibit such a use, restrict funding for such projects in future appropriations acts, or modify DoD’s authority under Section 2808.
Permitting any private party who meets the bare
minimum of Article III injury to bring suit to challenge
a project under Section 2808 could often be antithetical
to the interests of Congress. Opportunistic litigation by
private parties (or States) may frustrate the flexibility
that Congress intended to confer in granting Section
2808 authority to the Secretary. Private enforcement
of Section 2808 also runs the risk of excessive courtordered remedies even for minor or technical violations—
which Congress itself may well have viewed as inconsequential, or at least insufficient to warrant the wastefulness of bringing to a halt projects for which funds have
already been expended.
2. The court of appeals erred in holding that the
States satisfy the zone-of-interests requirement for
21
Section 2808. App., infra, 34a-38a. The States contend
that they are within the zone of interests because the
Secretary’s invocation of Section 2808 has led to a diversion of funding from other projects in those States, and
the panel majority concluded that the States are therefore “either the intended beneficiaries of [Section 2808],
or at the very least, their interests are unlikely to frustrate the purpose of the statute.” Id. at 37a. The panel
majority also held that because Section 2808 involves
land use, the States are “neighbors to the use,” id. at
38a (citation omitted), who are within the zone of interests under Patchak, 567 U.S. at 227-228.
Both conclusions are mistaken. Section 2808 allows
only the expenditure of unobligated funds—i.e., funds
for which no prior binding commitment existed. Moreover, even with respect to planned military construction
projects for which funds had not yet been obligated, the
States in which those projects would occur have no particular vested interest in the projects; the funds would
not have gone to the States themselves. And nothing in
the text or context of Section 2808 suggests that Congress intended to permit enforcement of the statute’s
limitations by States who assert that reprioritization of
military construction funds under Section 2808 during a
national emergency would, for example, indirectly diminish the States’ tax revenue. Section 2808 gives the
Secretary broad authority to authorize military construction projects when the Secretary determines that
the projects will meet the needs of the armed forces,
without regard to the effect on any third party’s aesthetic, recreational, or environmental interests. Indeed, Section 2808(a)’s “without regard to” clause expressly authorizes DoD to bypass all other legal
22
requirements—including federal and state environmental statutes—that might otherwise limit DoD’s exercise
of its military construction authority.
The court of appeals’ reliance on this Court’s decision in Patchak was also misplaced. In Patchak, this
Court was careful to identify the particular category of
plaintiffs whose interests were sufficiently related to
the context and purpose of the statute at issue to allow
litigation to enforce the statute’s provisions. The plaintiff there was “a nearby property owner” whose own
property would be damaged by the contemplated use of
nearby land acquired for an Indian tribe to operate a
casino. Patchak, 567 U.S. at 224. Because the “context
and purpose” of the relevant statute served “to foster
Indian tribes’ economic development,” this Court concluded that the statute required the Secretary of the Interior to “take[] title to properties” on behalf of Indian
tribes “with at least one eye directed toward how tribes
will use those lands.” Id. at 226. The Court also emphasized that the governing regulations “require[d] the
Secretary to consider * * * the ‘potential conflicts of
land use which may arise.’ ” Ibid. (quoting 25 C.F.R.
151.10(f )). Only because the government was obligated,
before acquiring land to benefit Indian tribes, to consider potential conflicts that could result from the range
of possible land uses, did the Court conclude that “a
neighboring landowner” was within the zone of interests “to bring suit to enforce the statute’s limits.” Id. at
227. Section 2808 imposes no similar constraints with
respect to neighboring land owners. 2
For similar reasons, Judge Collins erred in concluding, in his
dissenting opinion, that the interests asserted by respondents are
within the zone of interests protected by the limitations in Section
2808 that respondents allege were violated. Judge Collins observed
2
23
3. As for Sierra Club, neither the district court nor
the court of appeals actually determined that its asserted recreational and aesthetic interests in the project areas are within the zone of interests protected by
Section 2808. The lower courts instead reasoned that
Sierra Club has a cause of action under the Appropriations Clause and need only come within the zone of interests protected by that Clause. See App., infra, 38a41a, 123a-124a. That reasoning is fatally flawed.
a. Sierra Club does not and cannot allege any distinct constitutional violation in this case. The Appropriations Clause prohibits expenditures only if not “made
by Law,” U.S. Const. Art. I, § 9, Cl. 7, and thus the gravamen of its claim is necessarily that DoD exceeded the
limits of Section 2808 in using previously appropriated
but unobligated funds for the challenged military construction projects. That claim is nothing more than a
statutory claim recast as a constitutional claim.
The panel majority’s attempt to characterize Sierra
Club’s claim as sounding in the Constitution is contrary
to this Court’s decision in Dalton v. Specter, 511 U.S.
462 (1994). There, the plaintiffs “sought to enjoin the
Secretary of Defense * * * from carrying out a decision
by the President” to close a military facility pursuant to
a federal statute. Id. at 464. The court of appeals had
permitted the suit to proceed on the assumption that
the plaintiffs were effectively seeking “review [of ] a
that, “[o]n its face, § 2808 authorizes the Secretary to undertake
emergency military construction ‘without regard to any other provision of law,’ ” including environmental laws, which he understood
to mean that environmental interests are among the interests protected by Section 2808. App., infra, 82a. But the “without regard
to” clause demonstrates quite the opposite: Congress expressly authorized the Secretary to act without regard to any state or private
interest in the enforcement of environmental laws.
24
presidential decision.” Id. at 467 (citation omitted). After this Court held that the President is not an “agency”
for APA purposes, see id. at 468-469, the court of appeals
adhered to its decision on constitutional grounds—
reasoning, based on Youngstown Sheet & Tube Co. v.
Sawyer, 343 U.S. 579 (1952), “that whenever the President acts in excess of his statutory authority, he also violates the constitutional separation-of-powers doctrine.” Dalton, 511 U.S. at 471.
This Court unanimously rejected that theory. The
Court explained that not “every action by the President,
or by another executive official, in excess of his statutory authority is ipso facto in violation of the Constitution.” Dalton, 511 U.S. at 472. Instead, this Court has
carefully “distinguished between claims of constitutional violations and claims that an official has acted in
excess of his statutory authority.” Ibid. (collecting
cases). The Constitution is implicated if an executive
official relies on it as an independent source of authority
to act, as in Youngstown, or if the official relies on a
statute that itself violates the Constitution. See id. at
473 & n.5. But claims alleging simply that an official has
“exceeded his statutory authority are not ‘constitutional’ claims.” Id. at 473.
The same reasoning fully applies here. This dispute
concerns whether the Secretary “exceeded his statutory authority” in reprioritizing appropriated funds for
the disputed construction projects authorized under
Section 2808, and “no ‘constitutional question whatever’
is raised,” “ ‘only issues of statutory interpretation.’ ”
Dalton, 511 U.S. at 473-474 & n.6 (citation omitted).
The Secretary did not invoke the Constitution as a basis
to transfer funds, and although Sierra Club has argued
that the government’s interpretation of Section 2808
25
would raise constitutional issues, it does not challenge
the constitutionality of Section 2808.
The court of appeals did not discuss Dalton in the
decision below. And the court erred in relying instead
on this Court’s decision in Bond v. United States, 564
U.S. 211 (2011), to support the notion that Sierra Club
may assert a claim directly under the Appropriations
Clause. See App., infra, 39a-40a. In Bond, the defendant in a criminal prosecution raised a separation-ofpowers challenge to the prosecution. 564 U.S. at 222224. The Court did not suggest that the defendant also
had an affirmative cause of action to initiate a suit to
challenge government action. Moreover, the Court emphasized that “[a]n individual who challenges federal
action on [federalism] grounds” is subject to “prudential rules[] applicable to all litigants and claims.” Id. at
225. At the time, the zone-of-interests was characterized
as a “prudential standing rule,” Bennett v. Spear,
520 U.S. 154, 161 (1997), and it remains a generally applicable limitation on the right to sue, Lexmark, 572 U.S.
at 125.
On Sierra Club’s own theory of the case, no violation
of the Appropriations Clause has occurred unless the
Secretary exceeded his authority under Section 2808.
See App., infra, 40a-41a (“Because the diversion of
funds was not authorized by the terms of Section 2808,
it is unconstitutional.”). As the panel majority noted,
“[a]lthough the terms of Section 2808 are different from
Section 8005, Section 2808’s role here is analogous to
the role of Section 8005 in the prior appeal.” Id. at 39a.
Thus, as in the Section 8005 litigation, Dalton is controlling on this issue. Sierra Club’s claim is a statutory
claim, not a constitutional claim.
26
b. In any event, the Appropriations Clause itself
“certainly does not create a cause of action,” Armstrong,
575 U.S. at 325, much less one that lacks a zone-ofinterests requirement. Like the Supremacy Clause—the
provision at issue in Armstrong—the Appropriations
Clause “is silent regarding who may enforce [it] in court,
and in what circumstances they may do so.” Ibid. Rather than flowing from the Appropriations Clause itself,
“[t]he ability to sue to enjoin unconstitutional actions by
* * * federal officers is the creation of courts of equity.”
Id. at 327.
The panel majority was mistaken to suggest that the
zone-of-interests requirement does not “appl[y] at all”
to judicially implied causes of action. App., infra, 40a.
To the contrary, the zone-of-interests requirement is
“ ‘of general application,’ ” reflecting a limitation on appropriate plaintiffs that “Congress is presumed” to intend in authorizing suit in federal court. Lexmark, 572
U.S. at 129 (quoting Bennett, 520 U.S. at 163). This
Court’s statement in Lexmark that the requirement applies to all “statutorily created” causes of action, ibid.,
encompasses judicially implied equitable causes of action, because the equitable powers of federal district
courts are themselves conferred by statute, see Grupo
Mexicano de Desarrollo, S. A. v. Alliance Bond Fund,
Inc., 527 U.S. 308, 318 (1999). Lexmark therefore did
not silently abrogate this Court’s precedents recognizing that the zone-of-interests requirement applies to equitable actions seeking to enjoin constitutional violations. See, e.g., Valley Forge Christian Coll. v. Americans United for Separation of Church & State, Inc., 454
U.S. 464, 469, 475 (1982) (Establishment Clause); Boston Stock Exch. v. State Tax Comm’n, 429 U.S. 318, 320
n.3 (1977) (Dormant Commerce Clause).
27
Implied equitable suits are instead subject to “express and implied statutory limitations,” Armstrong,
575 U.S. at 327, and the zone-of-interests requirement
reflects Congress’s presumed refusal to accept the “absurd consequences [that] would follow” “[i]f any person
injured in the Article III sense by a [statutory or constitutional] violation could sue,” even where the person’s interests are entirely unrelated to the provision
being enforced, Thompson, 562 U.S. at 176-177. Congress would be even less likely to accept such absurd
results under its statutory grant of equity jurisdiction
than under the APA. See Hernandez v. Mesa, 140
S. Ct. 735, 747 (2020) (“It would be ‘anomalous to impute
. . . a judicially implied cause of action beyond the
bounds Congress has delineated for a comparable express cause of action.’ ”) (brackets and citation omitted).
If anything, this Court has indicated that, in light of the
heightened separation-of-powers concerns with judicially implied causes of action, see Abbasi, 137 S. Ct. at
1855-1858, it would be appropriate to apply a more rigorous zone-of-interests standard requiring that the provision at issue be intended for the “especial benefit” of
the plaintiff seeking to enforce it, Clarke, 479 U.S. at
400 n.16 (citation omitted); see Gonzaga Univ. v. Doe,
536 U.S. 273, 283-285 (2002).
c. Finally, neither the Appropriations Clause nor an
equitable “ultra vires” theory alters the conclusion that
the focus of the zone-of-interests requirement is Section
2808. The zone-of-interests requirement must be applied “by reference to the particular provision of law
upon which the plaintiff relies.” Bennett, 520 U.S. at
175-176. The Appropriations Clause provides that appropriations must be “made by Law,” U.S. Const. Art.
28
I, § 9, Cl. 7, and respondents do not dispute that the obligation of funds properly used for military construction
under Section 2808 would satisfy that requirement. Because a violation of Section 2808 is thus a necessary element of their claim, that is the “provision whose violation forms the legal basis for [the] complaint.” Bennett,
520 U.S. at 176 (quoting Lujan v. National Wildlife
Fed’n, 497 U.S. 871, 883 (1990)) (emphasis omitted).
In concluding otherwise, the panel majority ruled
that the constitutionality of the challenged executive action turns on whether the Secretary complied with Section 2808. App., infra, 40a-41a. But that is precisely the
point: whether the Secretary’s conduct was unlawful
turns entirely on his compliance with Section 2808, not
the Appropriations Clause. Sierra Club’s (and the
States’) asserted interests must fall within the zone of
interests protected by Section 2808 to maintain this
suit. They do not.
B. The Secretary Fully Complied With Section 2808
In any event, the court of appeals erred in holding
that the challenged construction violates Section 2808.
In light of the President’s declaration of a national
emergency requiring the use of the armed forces at the
southern border, Section 2808 authorizes the Secretary
to use appropriated but unobligated military construction funds for the 11 projects at issue. Each project will
take place with respect to a military installation, and the
Secretary of Defense has concluded—after consultation
with the Chairman of the Joint Chiefs of Staff—that
these projects are necessary to support the use of the
armed forces deployed in connection with the national
emergency. The court of appeals erred in secondguessing those determinations.
29
1. The panel majority erred in concluding that the
projects were not “military construction” under Section
2808 on the ground that they were not being “carried
out with respect to a military installation.” 10 U.S.C.
2801(a). That phrase “means a base, camp, post, station, yard, center, or other activity under the jurisdiction of the Secretary of a military department or, in the
case of an activity in a foreign country, under the operational control of the Secretary of a military department or the Secretary of Defense, without regard to the
duration of operational control.” 10 U.S.C. 2801(c)(4).
Two of the projects at issue here will be built on the
Barry M. Goldwater Range, an Air Force and Marine
Corps bombing range, that is indisputably a military installation. Gov’t C.A. E.R. 94. The remaining projects
will be built on land under the jurisdiction of the Secretary of the Army, assigned to and made a part of Fort
Bliss, id. at 75, which is an existing military “base,”
10 U.S.C. 2801(c)(4). Although the project areas are not
contiguous to the existing lands that comprise Fort
Bliss, military installations often include non-contiguous
property. For example, the Special Forces site in Key
West, Florida, is assigned to and therefore part of Fort
Bragg, North Carolina, while the Green River Test
Complex in Utah is assigned to and part of the White
Sands Missile Range in New Mexico. Gov’t C.A. E.R.
69 (listing additional examples). DoD has long administered Fort Bragg and the White Sands Missile Range
as single “military installation[s].” Ibid.
The panel majority dismissed the military assignment of the project areas to Fort Bliss as a mere “administrative convenience” and stated that no “functional nexus” exists here to support the assignment.
App., infra, 52a. But Section 2808 does not require any
30
“functional nexus,” a term that appears nowhere in the
statute. Moreover, even if the lands assigned to Fort
Bliss were not part of a “base,” the term “military installation” includes any “other activity under the jurisdiction of the Secretary of a military department.”
10 U.S.C. 2801(c)(4). While the panel majority read the
phrase “or other activity” to mean something that had
to be akin to a base, camp, post, station, yard, or center,
App., infra, 54a-55a, Judge Collins correctly pointed
out that an “activity” simply refers to “places under military jurisdiction, because activities under military jurisdiction necessarily occur there,” id. at 90a (dissenting opinion). As this Court explained in United States
v. Apel, 571 U.S. 359 (2014), the statutory term “ ‘military installation’ ” is generally “synonymous with the
exercise of military jurisdiction,” id. at 368 (citation
omitted). The project areas are thus military installations as this Court has understood that term.
2. The panel majority also erred in concluding that
the projects were not “necessary” to support the use of
the armed forces for purposes of Section 2808. That
conclusion was based on two mistaken rationales.
First, the panel majority reasoned that the projects
are intended to support DHS, “a civilian agency,” rather than the military. App., infra, 42a. That reasoning
takes an unduly narrow view of the purpose of the projects. The military has long had a role in helping law
enforcement agencies to secure the border. As Judge
Collins observed in his dissenting opinion, “military
support for DHS’s mission is the relevant ‘use of the
armed forces’ that has been declared by the President,”
and “the fact that the construction furthers that mission
weighs decidedly in favor of finding that it is ‘necessary
to support such use of the armed forces.’ ” Id. at 98a
31
(quoting 10 U.S.C. 2808(a)). A federal court does not
“get[] to substitute its own view of when the armed
forces are needed in a national emergency for the view
of the President as stated in [an] emergency declaration.” Ibid.
Second, the panel majority reasoned that “necessary” means “ ‘absolutely needed.’ ” App., infra, 43a (citation omitted). That too was error. The Secretary
found that the projects are “force multipliers” that allow the armed forces to be used more efficiently, Gov’t
C.A. E.R. 92, and his finding satisfies the necessity requirement. As this Court explained in Ayestas v. Davis,
138 S. Ct. 1080 (2018), the term “ ‘necessary’ ” need not
mean “ ‘essential,’ ” and “in ordinary speech, the term is
often used more loosely to refer to something that is
merely important or strongly desired.” Id. at 1093; cf.
Commissioner v. Heininger, 320 U.S. 467, 468, 471 (1943)
(construing the statutory term “ ‘necessary’ ” business
expenses to include expenses that are “appropriate and
helpful” to a business). And imposing a judicially enforceable strict necessity requirement in this context
would be anomalous. The task of assessing how a particular military construction project will benefit military forces during an ongoing deployment is exactly the
kind of judgment that the Secretary is uniquely equipped
to make, and that courts have routinely refused to overrule. See App., infra, 98a (Collins, J., dissenting) (criticizing the panel majority’s interpretation as “rest[ing]
on the implicit view that this court gets to substitute its
own view” of military necessity, and stating that
“[n]othing in § 2808(a) assigns us that task”).
At a minimum, the Secretary’s assessment of military necessity is entitled to substantial deference. See
App., infra, 96a (Collins, J., dissenting) (citing Winter
32
v. Natural Res. Def. Council, 555 U.S. 7, 24 (2008)). The
Secretary of Defense determined that the military construction projects at issue here are important to support the use of the armed forces in connection with the
national emergency, in which DoD is assisting DHS in
securing the southern border. That is all the term “necessary” requires.
II. THE QUESTIONS PRESENTED WARRANT REVIEW
This case warrants further review for the same reasons that supported the Court’s decision to grant review
in the Section 8005 litigation. The decision below conflicts with relevant decisions of this Court. See Sup. Ct.
R. 10(c). As in its earlier Section 8005 decisions, the
panel majority in this case transformed Sierra Club’s
statutory claim into a constitutional violation, contrary
to this Court’s decision in Dalton. As Judge Collins put
it in his dissent, “any such constitutional violations here
can be said to have occurred only if the construction efforts violated the limitations set forth in § 2808.” App.,
infra, 80a. Recognizing a cause of action under the Appropriations Clause itself would also be contrary to this
Court’s decision in Armstrong, which confirmed that
implied suits to enjoin alleged constitutional violations
by public officials are “the creation of courts of equity”
and are therefore subject to “express and implied statutory limitations.” 575 U.S. at 327. As to the States,
nothing in this Court’s precedents supports finding that
a party who objects to the Secretary’s reprioritizing of
appropriated but unobligated military construction
funds is within the zone of interests of the limits of the
statute invoked by the Secretary to authorize his action.
In addition, the decision below, if allowed to stand,
would frustrate the goals of both the President’s declaration of a national emergency that requires the use of
33
the armed forces and also the reprioritization of military construction funds, which the Secretary determined were “necessary to support such use of the armed
forces.” 10 U.S.C. 2808(a). The Secretary found that
these projects will act as “force multipliers” and will
permit more efficient use of the armed forces. Gov’t
C.A. E.R. 92. Whether the Secretary exceeded his authority under Section 2808 when he authorized the projects at issue is a question of significant practical importance to the Executive Branch’s authority to make
decisions concerning military priorities. Accordingly,
the petition for a writ of certiorari should be granted.
At a minimum, given the overlapping issues presented
here and in the Section 8005 litigation concerning
whether the plaintiffs have a cognizable cause of action
to challenge military spending, the Court should hold
this petition for its decision in the Section 8005 case and
then dispose of the petition as appropriate.
34
CONCLUSION
The petition for a writ of certiorari should be granted.
Alternatively, the petition should be held pending disposition of Trump v. Sierra Club, cert. granted, No. 20-138
(Oct. 19, 2020).
Respectfully submitted.
JEFFREY B. WALL
Acting Solicitor General
JEFFREY BOSSERT CLARK
Acting Assistant Attorney
General
HASHIM M. MOOPPAN
Counselor to the Solicitor
General
SOPAN JOSHI
Senior Counsel to the
Assistant Attorney General
MATTHEW GUARNIERI
Assistant to the Solicitor
General
H. THOMAS BYRON III
EDWARD HIMMELFARB
MICHAEL SHIH
Attorneys
NOVEMBER 2020
APPENDIX A
UNITED STATES COURT OF APPEALS
FOR THE NINTH CIRCUIT
No. 19-17501
D.C. No. 4:19-cv-00892-HSG
SIERRA CLUB; SOUTHERN BORDER COMMUNITIES
COALITION, PLAINTIFFS-APPELLEES
v.
DONALD J. TRUMP, IN HIS OFFICIAL CAPACITY AS
PRESIDENT OF THE UNITED STATES; MARK T. ESPER,
IN HIS OFFICIAL CAPACITY AS ACTING SECRETARY OF
DEFENSE; CHAD. F. WOLF, IN HIS OFFICIAL CAPACITY
AS ACTING SECRETARY OF HOMELAND SECURITY;
STEVEN TERNER MNUCHIN, IN HIS OFFICIAL CAPACITY
AS SECRETARY OF THE TREASURY,
DEFENDANTS-APPELLANTS
No. 19-17502
D.C. No. 4:19-cv-00872-HSG
STATE OF CALIFORNIA; STATE OF COLORADO; STATE OF
HAWAII; STATE OF MARYLAND; STATE OF NEW
MEXICO; STATE OF NEW YORK; STATE OF OREGON;
STATE OF WISCONSIN; COMMONWEALTH OF VIRGINIA,
PLAINTIFFS-APPELLEES,
AND
STATE OF CONNECTICUT; STATE OF DELAWARE; STATE
OF MAINE; STATE OF MINNESOTA; STATE OF NEW
JERSEY; STATE OF NEVADA; STATE OF ILLINOIS; DANA
NESSEL, ATTORNEY GENERAL, ON BEHALF OF THE PEOPLE OF MICHIGAN; STATE OF MASSACHUSETTS; STATE
OF VERMONT; STATE OF RHODE ISLAND,
PLAINTIFFS
(1a)
2a
v.
DONALD J. TRUMP, IN HIS OFFICIAL CAPACITY
AS PRESIDENT OF THE UNITED STATES OF AMERICA;
UNITED STATES OF AMERICA; UNITED STATES
DEPARTMENT OF DEFENSE; MARK T. ESPER, IN HIS
OFFICIAL CAPACITY AS ACTING SECRETARY OF
DEFENSE; RYAN D. MCCARTHY, IN HIS OFFICIAL
CAPACITY AS THE SECRETARY OF THE ARMY; KENNETH
J. BRAITHWAITE, IN HIS OFFICIAL CAPACITY AS
SECRETARY OF THE NAVY; BARBARA M. BARRETT,
IN HER OFFICIAL CAPACITY AS SECRETARY OF THE
AIR FORCE; UNITED STATES DEPARTMENT OF THE
TREASURY; STEVEN TERNER MNUCHIN, IN HIS
OFFICIAL CAPACITY AS SECRETARY OF THE
DEPARTMENT OF THE TREASURY; U.S. DEPARTMENT
OF THE INTERIOR; DAVID BERNHARDT, IN HIS OFFICIAL
CAPACITY AS SECRETARY OF THE INTERIOR; U.S.
DEPARTMENT OF HOMELAND SECURITY; CHAD
F. WOLF, IN HIS OFFICIAL CAPACITY AS ACTING
SECRETARY OF HOMELAND SECURITY,
DEFENDANTS-APPELLANTS
No. 20-15044
D.C. No. 4:19-cv-00872-HSG
STATE OF CALIFORNIA; STATE OF COLORADO; STATE OF
HAWAII; STATE OF MARYLAND; STATE OF NEW YORK;
STATE OF NEW MEXICO; STATE OF OREGON; STATE OF
COMMONWEALTH OF VIRGINIA; WISCONSIN,
PLAINTIFFS-APPELLANTS,
AND
STATE OF CONNECTICUT; STATE OF DELAWARE; STATE
OF MAINE; STATE OF MINNESOTA; STATE OF NEW
JERSEY; STATE OF NEVADA; STATE OF ILLINOIS; DANA
NESSEL, ATTORNEY GENERAL, ON BEHALF OF THE
PEOPLE OF MICHIGAN; STATE OF MASSACHUSETTS;
STATE OF VERMONT; STATE OF RHODE ISLAND,
PLAINTIFFS
3a
v.
DONALD J. TRUMP, IN HIS OFFICIAL CAPACITY
AS PRESIDENT OF THE UNITED STATES OF AMERICA;
UNITED STATES OF AMERICA; UNITED STATES
DEPARTMENT OF DEFENSE; MARK T. ESPER, IN HIS
OFFICIAL CAPACITY AS ACTING SECRETARY OF
DEFENSE; RYAN D. MCCARTHY, SENIOR OFFICIAL
PERFORMING THE DUTIES OF THE SECRETARY OF THE
ARMY; KENNETH J. BRAITHWAITE, IN HIS OFFICIAL
CAPACITY AS SECRETARY OF THE NAVY; BARBARA M.
BARRETT, IN HER OFFICIAL CAPACITY AS SECRETARY
OF THE AIR FORCE; UNITED STATES DEPARTMENT
OF THE TREASURY; STEVEN TERNER MNUCHIN, IN
HIS OFFICIAL CAPACITY AS SECRETARY OF THE
DEPARTMENT OF THE TREASURY; U.S. DEPARTMENT
OF THE INTERIOR; DAVID BERNHARDT, IN HIS OFFICIAL
CAPACITY AS SECRETARY OF THE INTERIOR; U.S.
DEPARTMENT OF HOMELAND SECURITY; CHAD F.
WOLF, IN HIS OFFICIAL CAPACITY AS ACTING
SECRETARY OF HOMELAND SECURITY,
DEFENDANTS-APPELLEES
[Filed:
Oct. 9, 2020]
Appeal from the United States District Court
for the Northern District of California
Haywood S. Gilliam, Jr., District Judge, Presiding
Before: THOMAS, Chief Judge, and WARDLAW and COLLINS, Circuit Judges
Opinion by Chief Judge SIDNEY R. THOMAS; Dissent by
Judge COLLINS
4a
THOMAS, Chief Judge:
This appeal presents the question of whether the
emergency military construction authority provided by
10 U.S.C. § 2808 (“Section 2808”) authorized eleven border wall construction projects on the southern border of
the United States. We conclude that it did not. We
also consider whether the district court properly granted
the Organizational Plaintiffs a permanent injunction and
whether the district court improperly denied the State
Plaintiffs’ request for a separate permanent injunction.
We affirm the decision of the district court on both
counts.
I
Following the longest partial government shutdown
in United States history, Congress passed the 2019 Consolidated Appropriations Act (“2019 CAA”) on February
14, 2019. Pub. L. No. 116-6, div. A, 133 Stat. 13 (2019).
Although the President requested $5.7 billion for border
wall construction, the 2019 CAA made available only
$1.375 billion “for the construction of primary pedestrian fencing . . . in the Rio Grande Valley Sector [in
Texas].” On February 15, 2019 the President signed the
2019 CAA into law, but announced that he was “not
happy” with the amount of border wall funding he had
obtained. Remarks by President Trump on the National Security and Humanitarian Crisis on Our Southern Border, White House at 12 (Feb. 15, 2019), https://
perma.cc/5SE7-FS7F (“Rose Garden Remarks”).
On the same day, the President invoked his authority
under the National Emergencies Act, 50 U.S.C. § 1601
et seq. (the “NEA”) to declare that “a national emergency exists at the southern border of the United
5a
States.” See Proclamation No. 9844, 84 Fed. Reg.
4,949 (Feb. 15, 2019). The national emergency proclamation also “declare[d] that this emergency requires
use of the Armed Forces,” and made available “the construction authority provided in [Section 2808].” Id.
The President explained that, even though he had obtained some border wall funding, he declared a national
emergency because although he “could do the wall over
a longer period of time” by going through Congress, he
would “rather do it much faster.” Rose Garden Remarks at 12.
Since February 2019, Congress has attempted to terminate the national emergency on two separate occasions. On March 14, 2019, Congress passed a joint resolution to terminate the emergency declaration, but it
was vetoed the next day by the President, and Congress
failed to override the Presidential veto. See H.R.J.
Res. 46, 116th Cong. (2019); 165 Cong. Rec. H2799,
H2814-15 (2019). On September 27, 2019, Congress
passed a second joint resolution to terminate the emergency declaration, but once again, the President vetoed
this resolution, and Congress failed to override the veto.
See S.J. Res. 54, 116th Cong. (2019); 165 Cong. Rec.
S5855, S5874-75 (2019).
Congress has an ongoing obligation to consider
whether to terminate the emergency every six months,
but the President renewed the declaration of a national
emergency on February 13, 2020. Message to Congress on the Continuation of the National Emergency
with Respect to the Southern Border of the United
States, White House (Feb. 13, 2020).
6a
Although the President’s declaration of a national
emergency was issued in February 2019, the administration did not announce that it had made a decision to
divert the funds until September 3, 2019, when the Secretary of Defense announced that it was necessary to divert $3.6 billion from military construction projects to
border wall construction projects.
The Secretary of Defense announced that the funds
would be diverted to fund eleven specific border wall construction projects in California, Arizona, New Mexico,
and Texas. Altogether, the projects include 175 miles
of border wall. The projects fall into three basic categories: (1) two projects on the Barry M. Goldwater
Range military installation in Arizona, (2) seven projects
on federal public domain land that is under the jurisdiction of the Department of the Interior, and (3) two projects on non-public land that would need to be acquired
through either purchase or condemnation before construction could begin. The first two projects would be
built on the Goldwater Range, and “the remaining nine
will be built on land assigned to Fort Bliss, an Army
base,” with its headquarters in El Paso, Texas.
On September 5, 2019, the Secretary of Defense identified which military construction projects the Department of Defense (“DoD”) intended to defer in order to
fund border wall construction. The Secretary authorized the diversion of funding from 128 military construction projects, 64 of which are located within the United
States, and 17 of which are located within the territory
of the Plaintiff States—California, Colorado, Hawai’i,
Maryland, New Mexico, Oregon, Virginia, and Wisconsin
7a
—totaling over $500 million in funds. 1 Pursuant to
Section 2808, the Secretary authorized the Federal Defendants to proceed with construction without complying with environmental laws.
II
The Organizational Plaintiffs in this case, Sierra Club
and the Southern Border Communities Coalition (“SBCC”)
(collectively, “Sierra Club”) and the State Plaintiffs 2
filed separate suits challenging the Federal Defendants’ 3 anticipated diversion of federal funds to fund border wall construction pursuant to various statutory authorities, including Section 2808. See Sierra Club v.
Trump, No. 19-cv-00892-HSG; California v. Trump, No.
19-cv-00872-HSG.
In both cases, the parties first litigated the claims
challenging the Federal Defendants’ transfer of funds
pursuant to Section 8005 and Section 9002 of the Department of Defense Appropriations Act of 2019, Pub. L. No.
115-245, 132 Stat. 2981 (2018) (“Section 8005”)—the
Although there are 19 total defunded projects within the Plaintiff
States, the States only assert harms from 17 of these projects.
2
Specifically, the action was filed by the following states: California, Colorado, Connecticut, Delaware, Hawai’i, Illinois, Maine,
Maryland, Minnesota, Nevada, New Jersey, New Mexico, New York,
Oregon, the Commonwealth of Virginia, and Attorney General Dana
Nessel on behalf of the People of Michigan. The complaint was
later amended to add the following states: Rhode Island, Vermont,
Wisconsin, and the Commonwealth of Massachusetts.
3
Both lawsuits named as defendants Donald J. Trump, President
of the United States, Patrick M. Shanahan, Former Acting Secretary of Defense, Kirstjen M. Nielsen, former Secretary of Homeland
Security, and Steven Mnuchin, Acting Secretary of the Treasury in
their official capacities, along with numerous other Executive Branch
officials (collectively referenced as “the Federal Defendants”).
1
8a
claims that were the subject of the prior appeals considered by this panel. The parties agreed that while litigating the Section 8005 claims, they would stay the summary judgment briefing schedule as to the Section 2808
funds until the Acting Secretary of Defense and U.S.
Customs and Border Protection (“CBP”) reached a final
decision to fund specific border wall projects using Section 2808. The Secretary of Defense reached this final
decision on September 3, 2019, and the Federal Defendants filed a Notice of Decision in both cases pending before the district court.
Nine states, including California, Colorado, Hawai’i,
Maryland, New Mexico, New York, Oregon, Wisconsin,
and the Commonwealth of Virginia (collectively, the
“States”), filed a motion for partial summary judgment
on their Section 2808 claims on October 11, 2019 in California v. Trump. On the same day, Sierra Club filed
a motion for partial summary judgment on its Section
2808 claims in Sierra Club v. Trump.
On December 11, 2019, in a single opinion addressing
the claims of both State and Sierra Club Plaintiffs, the
district court granted summary judgment and a declaratory judgment to the Plaintiffs on their Section 2808
claims with respect to the eleven border wall construction projects. It granted Sierra Club’s request for a
permanent injunction, enjoining “Defendants Mark T.
Esper, in his official capacity as Secretary of Defense;
and Chad F. Wolf, in his official capacity as Acting Secretary of Homeland Security” as well as “all persons acting under their direction” “from using military construction funds appropriated for other purposes to build a
border wall” in the areas identified as “Yuma Project 2;
Yuma Project 10/27; Yuma Project 3; Yuma Project 6;
9a
San Diego Project 4; San Diego Project 11; El Paso Project 2; El Paso Project 8; Laredo Project 5; Laredo Project 7; El Centro Project 5; and El Centro Project 9.”
The district court denied the States’ “duplicative request for a permanent injunction as moot.” However,
the district court sua sponte stayed the Sierra Club permanent injunction pending appeal pursuant to Fed. R.
Civ. P. 62(c). It explained that “the Supreme Court’s
stay of this Court’s prior injunction order appears to reflect the conclusion of a majority of that Court that the
challenged construction should be permitted to proceed
pending resolution of the merits.” Therefore, the district court determined that “the lengthy history of this
action; the prior appellate record; and the pending appeal before the Ninth Circuit on the merits of Plaintiffs’
Section 8005 claim . . . warrant a stay.” The district court properly considered the relevant factors and
certified its order for immediate appeal pursuant to Fed.
R. Civ. P. 54(b).
The Federal Defendants timely appealed the district
court’s grant of summary judgment and declaratory relief to Sierra Club and the States and the grant of a permanent injunction to Sierra Club. The States timely
cross-appealed the district court’s denial of their request for a permanent injunction.
III
We first provide a brief background of the statutory
framework at issue: the National Emergencies Act.
The NEA empowers the President to declare national
emergencies. It states that “[w]ith respect to Acts of
Congress authorizing the exercise, during the period of
a national emergency, of any special or extraordinary
10a
power, the President is authorized to declare such a national emergency.” 50 U.S.C. § 1621(a). The statute
invoked by the Federal Defendants is one such Act of
Congress that authorizes military construction in the
event of a national emergency. 10 U.S.C. § 2808 provides that
In the event of a declaration of war or the declaration
by the President of a national emergency in accordance with the National Emergencies Act (50 U.S.C.
1601 et seq.) that requires use of the armed forces,
the Secretary of Defense, without regard to any
other provision of law, may undertake military construction projects, and may authorize the Secretaries
of the military departments to undertake military
construction projects, not otherwise authorized by law
that are necessary to support such use of the armed
forces.
Although the NEA empowers presidential action in
national emergencies, it also empowers Congress to check
that action. The NEA’s legislative history makes clear
that it was passed to “[e]nsure that the powers now in
the hands of the Executive will be utilized only in time
of genuine emergency and then only under safeguards
providing for Congressional review,” and that it “[was]
not intended to enlarge or add to Executive power.”
The National Emergencies Act (Public Law 94-412),
Source Book: Legislative History, Text, and Other
Documents 50, 292 (1976) (“NEA Source Book”). Instead it was “an effort by the Congress to establish clear
procedures and safeguards for the exercise by the President of emergency powers conferred upon him by other
statutes.” Id. at 292.
11a
As originally enacted, the NEA allowed Congress to
terminate any national emergency declared by the President by concurrent resolution. See Pub. L. 94-412, 90
Stat. 1255, §202(a)(1) (1976) (“Any national emergency
declared by the President in accordance with this title
shall terminate if . . .
Congress terminates the
emergency by concurrent resolution.”). However, the
landmark Supreme Court decision, INS v. Chadha, 462
U.S. 919, 959 (1983), held that concurrent resolutions are
unconstitutional, thus invalidating Congress’s strongest
check on the President’s emergency powers. In response, Congress amended the NEA to allow for the termination of an emergency declaration if “there is enacted into law a joint resolution terminating the emergency.” 10 U.S.C. § 1622(a)(1). Chadha, therefore,
made it more difficult for Congress to check the President’s use of emergency powers than originally intended.
Until now, Chadha had little impact because, prior to
the President’s declaration of a national emergency on
the southern border, Congress had never once voted to
terminate a declaration of a national emergency. Indeed, Section 2808 has only been invoked once to fund
construction on American soil, and it has never been
used to fund projects for which Congress withheld appropriations. Thus, this case operates against the background of the first serious clash between the political
branches over the emergency powers since the passage
of the NEA in 1976. 4
The U.S. House of Representatives is also involved in this litigation as an amicus curiae supporting the Plaintiffs.
4
12a
IV
We first consider whether Plaintiffs are the proper
parties to challenge the Federal Defendants’ actions.
We conclude that Plaintiffs have Article III standing
and a cause of action to challenge the border wall construction projects.
A
Although the Federal Defendants do not challenge
either the States’ or Sierra Club’s Article III standing,
we have “an independent obligation to assure that
standing exists, regardless of whether it is challenged
by any of the parties.” Summers v. Earth Island Inst.,
555 U.S. 488, 499 (2009). In order to establish Article
III standing, a plaintiff must have (1) suffered an injury
in fact, (2) fairly traceable to the challenged conduct of
the defendant, and (3) likely to be redressed by a favorable judicial decision. Lujan v. Defs. of Wildlife, 504
U.S. 555, 560-61 (1992). When there are multiple plaintiffs, “[a]t least one plaintiff must have standing to seek
each form of relief requested in the complaint.” Town
of Chester, N.Y. v. Laroe Estates, Inc., 137 S. Ct. 1645,
1651 (2017). At summary judgment, a plaintiff cannot
rest on mere allegations, but “must set forth by affidavit
or other evidence specific facts.” Clapper v. Amnesty
Int’l. USA, 568 U.S. 398, 412 (2013) (internal quotations
and citations omitted). However, these specific facts
“for purposes of the summary judgment motion will be
taken to be true.” Lujan, 504 U.S. at 561.
1
The States put forth three different injuries in support of Article III standing. We conclude that border
13a
wall construction will inflict environmental and quasisovereign injuries in fact upon California and New Mexico and economic injuries in fact upon the remaining
states. We conclude that all nine states have standing.
a
California and New Mexico will suffer injuries similar to those asserted in the prior appeals. States are
“entitled to special solicitude in our standing analysis.”
Massachusetts v. EPA, 549 U.S. 497, 520 (2007). As a
quasi-sovereign, a state “has an interest independent of
and behind the titles of its citizens, in all the earth and
air within its domain.” Georgia v. Tenn. Copper Co.,
206 U.S. 230, 237 (1907). Thus, a state may sue to assert its “quasi-sovereign interest in the health and wellbeing—both physical and economic—of its residents in
general.” Alfred L. Snapp & Son, Inc. v. Puerto Rico,
ex rel., Barez, 458 U.S. 592, 607 (1982). In addition,
“[d]istinct from but related to the general well-being of
its residents, the State has an interest in securing observance of the terms under which it participates in the
federal system.” Id. at 607-08.
California will suffer an injury in fact based on its environmental injuries. California asserts that it “has an
interest in the natural resources of [its] State—such as
wildlife, fish, and water—that are held in trust by the
State for its residents and are protected by state and
federal laws.” If construction occurs, “dozens of sensitive plant and animal species that are listed as ‘endangered,’ ‘threatened,’ or ‘rare’ will be seriously at risk,”
and construction will “create environmental harm.”
For instance, the border wall construction projects will
undermine the recovery of several federally listed en-
14a
dangered species and California Species of Special Concern 5 and damage those species’ habitats. San Diego
Project 4 and 11 fall within the California Floristic Province, one of the world’s biodiversity hotspots, which contains plants not found elsewhere in the United States,
construction will likely have detrimental effects on the
Quino Checkerspot Butterfly, the Coastal California
Gnatcatcher, the Western Burrowing Owl, and vernal
pool habitat and species, among other species.
California has adequately set forth facts and other
evidence, which, taken as true, support these allegations
for the purpose of Article III standing. It has demonstrated that border wall construction will injure its environmental interests.
The proposed construction areas for San Diego Projects 4 and 11 “would cut through designated critical
habitat for the endangered Quino Checkerspot Butterfly,” which has “been documented immediately adjacent
to the border fence and on the surrounding slopes to the
north, well within the proposed project area.” The
A species of special concern is “a species, subspecies, or distinct
population of an animal native to California that currently satisfies
one or more of the following (but not necessarily mutually exclusive)
criteria: is extirpated from the State . . . ; is listed as Federally-,
but not State-, threatened or endangered; meets the State definition
of threatened or endangered but has not formally been listed; is experiencing, or formerly experienced, serious (noncyclical) population declines or range retractions (not reversed) that, if continued or
resumed, could qualify it for State threatened or endangered status;
has naturally small populations exhibiting high susceptibility to risk
from any factor(s), that if realized, could lead to declines that would
qualify it for State threatened or endangered species.” CAL. DEPT.
OF FISH AND WILDLIFE, SPECIES OF SPECIAL CONCERN, https://
wildlife.ca.gov/Conservation/SSC.
5
15a
“proposed work, including resurfacing of the roadways
where the butterfly and its host plants have been found,
will crush and bury diapausing larvae and host plant
seed bank in the area,” causing “irreparable harm to the
Quino Checkerspot Butterfly population and its critical
habitat on Otay Mesa.”
Gnatcatchers are found within the project area for
San Diego Project 4, and construction activities “will result in significant displacement of California gnatcatchers into already diminished and limited habitat areas.”
Because the species is “restricted to coastal southern
California in areas of open coastal sage scrub,” and gnatcatcher “territories average approximately 9 acres,”
gnatcatchers affected by construction “will either be required to move or challenge adjacent pairs for their occupied territories,” ultimately resulting in “a substantial
reduction of the population in the area, and irreparable
harm to the species and its habitat.”
San Diego Project 4 would also harm the Western
Burrowing Owl. The owl is “restricted to the western
U.S. and northern Mexico,” owls occur in the project
area, and eastern Otay Mesa, where San Diego Project
4 is expected to occur, “is the last stronghold for the species in the County.” The “loss of both occupied burrows
and foraging habitat [where construction takes place]
will only hasten [the owl’s] decline.” The owl will be
further impacted because it is “especially sensitive to
construction due to [its] unique behavior,” and it is “easily flushed [from its burrows] by adjacent human disturbance or activities.” “Repeated flushing during periods of incubation or while feeding chicks has extremely
16a
negative effects, including cooling of eggs, reduced feeding of chicks, or increased exposure to predators, reducing the percentage of chicks surviving to adulthood.”
San Diego Project 4 will also impact and harm delicate vernal-pool habitats, which are home to a number
of endangered species, like the San Diego Fairy Shrimp.
The landscape “leading to San Diego 4[] supports numerous vernal pools,” and “[s]everal of these pools occur
within and adjacent to dirt roads that will be utilized by
heavy equipment, and where additional grading, vegetation clearing and filling may occur,” which “would damage vernal pools and cause irreparable harm to the fairy
shrimp and other vernal pool species.”
New Mexico will also suffer an injury in fact based on
its environmental injuries. If the New Mexico Projects
are built, they will “impose environmental harm to the
State” and the damage “would include the blocking of
wildlife migration, flooding, and habitat loss.” The
New Mexico Projects will be built primarily in the “Bootheel” of New Mexico in the Animas and Playas Valleys,
an area in southwestern New Mexico that is a “pinch
point for ecological diversity, migration, and dispersal in
the western North American continent.” Border wall
construction “for the New Mexico Projects will create
fragmented habitat and block wildlife corridors for numerous protected species” such as the white-sided jackrabbit, a rare and threatened species under New Mexico
law, and the jaguar, a federally endangered species.
New Mexico has also adequately set forth facts and
other evidence, which, taken as true, support these allegations for the purpose of Article III standing. It has
demonstrated that border wall construction will injure
its environmental interests.
17a
“Currently, the only area that the white-sided jackrabbit . . . inhabits in the United States is in the
Animas and Playas Valleys, where the proposed El Paso
2 and 8 Projects are being constructed.” The “species
is already in distress and its numbers are falling due to
habitat loss and roadkill incidents from U.S. Border Patrol vehicles which increased dramatically after Customs and Border Protection completed road improvements in 2008.” The current population “is estimated
to be 61 hares.” The hares “cross back and forth”
across the US-Mexico border “to avoid predators, and
to access food, water and mates,” but construction
would block crossings because the border wall’s “steel
concrete-filled bollards [are] spaced four inches apart,”
and “jackrabbits cannot fit through the 4-inch gaps.”
El Paso Project 8 and the eastern portion of El Paso
Project 2 block important habitat corridors for the hare,
including “the sole route the hares can utilize to access
habitat on both sides of the border because they cannot
navigate the mountainous terrain that surrounds the
Animas and Playas Valleys.” Construction would therefore “cut off the last remaining population of the whitesided jackrabbit in the United States,” and “[t]he outlook for the jackrabbit’s survival in New Mexico and the
United States [would be] dismal if El Paso 2 and 8 are
built.”
Likewise, “[c]onstruction of El Paso 2 and 8 will also
harm the federally endangered jaguar . . . as both
projects are immediately adjacent to the jaguar’s critical habitat.” Jaguars have been documented in the region, including on “lands that directly adjoin the location
of El Paso 2 Project in the Animas Valley.” “Habitat
connectivity is critical to the jaguar’s survival,” because
18a
“[t]he jaguar’s survival depends on it being able to access habitat on both sides of the U.S.-Mexican border to
access prey, mate and suitable habitat,” but the “El Paso
Projects impede the jaguar’s recovery by blocking a key
wildlife corridor.”
In addition, California will suffer an injury in fact to
its quasi-sovereign interests. California has alleged that
it has “an interest in its exercise of sovereign power over
individuals and entities within the State, including enforcement of its legal code.” The Federal Defendants
ordinarily would have to comply with various California
laws designed to protect public health and the environment to proceed with construction, but Section 2808 authorizes construction “without regard to any other provision of law,” and the Secretary of Defense has explicitly directed that the projects be undertaken “without
regard to any other provision of law that could impede
. . . expeditious construction.” This impacts California’s ability to enforce its state laws, including, among
others, the Porter-Cologne Water Quality Control
Act, Cal. Water Code §§ 13000-16104, the California
Endangered Species Act, Cal. Fish and Game Code
§§ 2050-2089.26, and California’s state implementation
program under the Clean Air Act, see 42 U.S.C.
§ 7506(c)(1). Thus, California will suffer an injury to
its quasi-sovereign interest in enforcing its own laws, interfering with the terms under which it participates in
the federal system.
California has adequately set forth facts and other
evidence, which, taken as true, support these allegations
for the purpose of Article III standing.
19a
Under California law, the California State Water Resources Control Board and nine regional boards establish water quality objectives and standards, and, for the
California Projects, where the discharge of dredged or
fill material into waters of the United States is expected
to occur, a regional board must ordinarily certify compliance with water quality standards. The record indicates that El Centro Projects 5 and 9 and Yuma Project
6 are “to be constructed, at least in part, in areas under
the jurisdiction of the Colorado River Basin Water
Board.” Therefore, absent the use of Section 2808 authority, these projects “could normally not proceed
without a Section 404 dredge and fill permit issued by
the United States Army Corp of Engineers, which would
in turn compel a Section 401 water quality certification”
by the Colorado River Basin Water Board. The record
further indicates that, “[d]ue to their nature and location
of construction, El Centro Projects 5 and 9, and Yuma
Project 6 normally would also require enrollment in the
State Water Board’s statewide [National Pollutant Discharge Elimination System (NPDES) General Permit
for Storm Water Discharges Associated with Construction and Land Disturbance Activities.]”
Additionally, but for the use of Section 2808, the Federal Defendants would be required to comply with the
Endangered Species Act, which protects species threatened, endangered, or of special concern under California
law and allows California to continue implementing habitat conservation agreements with federal agencies that
impose limitations on habitat-severing projects like the
border wall construction projects. The use of Section
2808 therefore undermines California’s ability to enforce the California Endangered Species Act and the
20a
“policy of the state to conserve, protect, restore, and enhance any endangered species or any threatened species
and its habitat.” Cal. Fish & Game Code § 2052.
Likewise, the use of Section 2808 authority undermines California’s enforcement of its air quality standards. In particular, the Clean Air Act prohibits any
construction within California that does not conform to
California’s State Implementation Program (“SIP”).
40 C.F.R. § 93.150(a). Moreover, local air districts with
jurisdiction over the California Project areas enforce
rules to reduce the amount of fine particulate matter
generated from construction projects by requiring those
responsible to develop and implement a dust control
plan. Although the Federal Defendants assert they “will
implement control measures,” implementing control measures is not the same as implementing a complete dust
control plan, and there is no indication that the Federal
Defendants intend to comply fully with California’s air
quality laws.
New Mexico will also suffer an injury in fact to its
quasi-sovereign interests. The Federal Defendants
would ordinarily have to comply with various New Mexico laws designed to protect public health and the environment. Such laws include the dust control plan New
Mexico adopted under the Clean Air Act and its Wildlife
Corridors Act, N.M. Stat. Ann. §§ 17-9-1-17-9-4. Thus,
New Mexico too suffers an injury to its quasi-sovereign
interest in enforcing its own laws, interfering with the
terms under which it participates in the federal system.
New Mexico has adequately set forth facts and other
evidence, which, taken as true, support these allegations
for the purpose of Article III standing.
21a
Absent the use of Section 2808 authority, the Federal
Defendants would normally be required to comply with
New Mexico’s fugitive dust control rule and the High
Wind Fugitive Dust Mitigation Plan that New Mexico
adopted under the Clean Air Act in order to construct
El Paso Project 2. 40 C.F.R. § 51.930(b); see N.M. Admin. Code §§ 20.2.23.109-112 (mandating that “[n]o person . . . shall cause or allow visible emissions from
fugitive dust sources that: . . . pose a threat to public health . . . interfere with public welfare, including animal or plant injury or damage, visibility or the
reasonable use of property” and “[e]very person subject
to this part shall utilize one or more dust control measures . . . as necessary to meet the requirements of
[this section]”). Although the Federal Defendants assert that they plan to implement control measures, they
have not indicated that they intend to be bound in any
way by New Mexico’s law.
Likewise, the Federal Defendants’ use of Section 2808
authority impedes New Mexico’s ability to implement its
Wildlife Corridors Act, which aims to protect large
mammals’ habitat corridors from human-caused barriers such as roads and walls and requires New Mexico
agencies to create wildlife corridors action plans to protect species’ habitat. 2019 N.M. Laws Ch. 97. Several
important wildlife corridors run through, or adjacent to,
the New Mexico Projects in Hidalgo and Luna Counties.
“El Paso Projects 2 and 8 will . . . block habitat corridors,” in these counties for “wildlife species that currently cross back and forth over the border to access
habitat, vegetation, water and other resources.” “[P]articularly when viewed cumulatively with other recent
border-barrier projects such as El Paso Project 1,” the
22a
loss of wildlife corridors will impede species’ “access to
resources necessary for their survival.”
Moreover, the New Mexico Projects will harm species that New Mexico’s laws were enacted to protect,
such as the white-sided jackrabbit, as previously explained. The Projects will bisect important habitats,
impairing the access of the Mexican wolf to those habitats. In sum, California and New Mexico have adequately shown one or more injuries in fact supported by
facts and evidence.
Turning to the causation requirement, we conclude
that California and New Mexico will suffer both environmental and sovereign injuries that are fairly traceable
to the Federal Defendants’ conduct. The declarations
in support of the environmental harms clearly demonstrate how the proposed construction will harm species,
and Section 2808 itself provides the authority for the
Secretary of Defense to override state environmental
laws.
It is also clear that a favorable judicial decision would
redress California and New Mexico’s asserted injuries.
Without Section 2808 authorization, DoD has no authority to undertake border wall construction, and, if construction is prohibited, California and New Mexico will
not suffer the alleged harms. We therefore conclude
California and New Mexico have Article III standing to
challenge the construction projects on their borders.
b
The remaining states assert theories of economic loss
and the loss of tax revenues as the basis for standing.
Economic loss and the loss of tax revenues can be sufficient to establish Article III injury in fact. See, e.g.,
23a
Wyoming v. Oklahoma, 502 U.S. 437, 447 (1992) (holding that the loss of specific tax revenues conferred
standing); City of Oakland v. Lynch, 798 F.3d 1159,
1163-64 (9th Cir. 2015) (recognizing that an expected
loss of tax revenues constitutes a “constitutionally sufficient” injury for Article III standing); City of Sausalito
v. O’Neill, 386 F.3d 1186, 1194, 1198-99 (9th Cir. 2004)
(recognizing financial harm from decreased tax revenues as a cognizable injury). It may be appropriate to
deny standing where a state claims only that “actions
taken by United States Government agencies . . .
injured a State’s economy and thereby caused a decline
in general tax revenues.” Wyoming v. Oklahoma, 502
U.S. at 448 (citing Pennsylvania v. Kleppe, 533 F.2d 668
(D.C. Cir. 1976), cert. denied, 429 U.S. 977 (1976), as an
example). But where there is “some fairly direct link
between the state’s status as a collector and recipient of
revenues and the legislative or administrative action being challenged,” lost tax revenues can support Article
III standing. Kleppe, 533 F.2d at 672.
The States have each individually alleged that the
Section 2808 diversion of funds will result in economic
losses, including lost tax revenues. The loss of tax revenues here is analogous to those in Wyoming v. Oklahoma. There, Wyoming challenged an Oklahoma law
requiring Oklahoma utility companies using coal-fired
generating plants to blend ten percent Oklahoma coal
with their existing coal sources, which had been purchased almost entirely from Wyoming. Id. at 443, 445.
Wyoming did not sell coal directly, but it imposed a severance tax on any person or company extracting coal
from within its borders. Id. at 442. The Supreme
Court agreed that Wyoming had standing because there
was “a direct injury in the form of a loss of specific tax
24a
revenues.” Id. at 448, 451. Here, the States have alleged analogous, direct injuries in the form of lost tax
revenues resulting from the cancellation of specific military construction projects.
Colorado has standing based on its economic injury
and loss of tax revenues because it faces the defunding
of a Space Control Facility at the Peterson Air Force
Base resulting in an estimated loss of $1 million in state
and local tax revenues.
Hawai’i has standing based on its economic injury
and loss of tax revenues because it faces the defunding
of two projects—a consolidated training facility at the
Joint Base Pearl Harbor-Hickam and security improvements at the Marine Corps base at Kaneohe Bay—
resulting in an estimated loss of $2.5 million in state and
local tax revenues.
Maryland has standing based on its economic injury
and loss of tax revenues because it faces the defunding
of three projects—an expansion of cantonment area
roads at Fort Meade, construction of a hazardous cargo
loading and unloading pad and an explosive ordinance
disposal training range at Joint Base Andrews, and construction of a child development center at Joint Base
Andrews—resulting in an estimated loss of $5 million in
state and local tax revenues.
New Mexico also has standing based on its economic
injury and loss of tax revenues because it faces defunding of two projects—the construction of an air combat
training facility for unmanned vehicles at Holloman Air
Force Base and an Information Systems Facility at
White Sands Missile Range—resulting in an estimated
loss of $9 million in state and local tax revenues.
25a
New York has standing based on its economic injury
and loss of tax revenues because it faces the defunding
of two projects—an Engineering Center and Parking
Structure at the U.S. Military Academy at West Point—
resulting in an estimated loss of $13 million in state and
local tax revenues.
Oregon has standing based on its economic injury
and loss of tax revenues because it faces the defunding
of the construction of an indoor small arms training
range at the Klamath Falls International Airport resulting in an estimated loss of $600,000 in state and local tax
revenues.
Virginia has standing based on its economic injury
and loss of tax revenues because it faces the defunding
of four projects—the construction of a cyber operations
facility at Joint Base Langley-Eustis, the replacement
of two different Hazardous Materials Warehouses at
Norfolk Naval Station in Norfolk and the Norfolk Naval
Shipyard in Portsmouth, and the conversion and repair
of a major Ships Maintenance Facility at the Naval Support Station in Portsmouth—resulting in an estimated
loss of $5 million in state and local tax revenues.
Wisconsin has standing based on its economic injury
and loss of tax revenues because it faces the defunding
of the construction of an indoor small arms training
range at Truax Field resulting in an estimated loss of
$600,000 in state and local tax revenues.
The injuries are “fairly traceable” to the Federal Defendants’ conduct. The States have illustrated that
there is a “line of causation between the [Federal Defendants’] action and [their] harm” that is “more than
attenuated.” Wash. Envtl. Council v. Bellon, 732 F.3d
26a
1131, 1141 (9th Cir. 2013) (citation omitted). The States
have illustrated that the lost revenues stem from identifiable projects, directly linking the States’ statuses as
collectors and recipients of revenues to the challenged
actions. Moreover, the States’ expert calculated the
estimated loss of tax revenues with the widely-used
IMPLAN economic model that takes into account specific details about each defunded military construction
project from the Federal Defendants’ own information
regarding each project. The expert’s “analysis conservatively included only projects within the plaintiff states’
boundaries because the diversion of those projects would
have primary effects on the plaintiff states,” and the
analysis did not consider “the secondary effects of defendants’ diversion of military construction projects located in other states and counties,” thus ensuring that
the calculated losses accounted for here are not too attenuated for purposes of Article III.
A favorable judicial decision barring Section 2808
construction would prevent the military construction
funds at issue from being transferred from projects
within the States to border wall construction projects,
thereby preventing the alleged injuries. Therefore,
the States’ losses, as outlined here, satisfy the demands
of Article III standing. We conclude that all nine states
have standing to challenge the border wall construction
projects.
2
Sierra Club and SBCC also have standing. An organization has standing to sue when “its members would
otherwise have standing to sue in their own right,” and
when “the interests it seeks to protect are germane to
27a
the organization’s purpose.” United Food and Commercial Workers Union Local 751 v. Brown Grp., Inc.,
517 U.S. 544, 553 (1996) (quoting Hunt v. Wash. State
Apple Advert. Comm’n, 432 U.S. 333, 343 (1977)). An
organization may also have standing to sue on its own
behalf when it suffers “both a diversion of its resources
and a frustration of its mission.” La Asociacion de
Trabajadores de Lake Forest v. City of Lake Forest, 624
F.3d 1083, 1088 (9th Cir. 2010) (quoting Fair Housing
of Marin v. Combs, 285 F.3d 899, 905 (9th Cir. 2002)).
The organization “must . . . show that it would have
suffered some other injury if it had not diverted resources to counteracting the problem.” Id.
Sierra Club has standing to sue on behalf of its members. It has alleged that the Federal Defendants’ actions will cause particularized and concrete injuries to
its members. Sierra Club has more than 400,000 members in California, over 9,700 of whom belong to its San
Diego Chapter. Sierra Club’s Grand Canyon Chapter,
which covers the State of Arizona, has more than 16,000
members. Sierra Club’s Rio Grande Chapter includes
over 10,000 members in New Mexico and West Texas.
Sierra Club’s Lone Star Chapter, which covers the State
of Texas, has over 26,100 members, more than 440 of
whom live in the Lower Rio Grande Valley.
These members visit border areas such as: the Tijuana Estuary (California), the Otay Mountain Wilderness (California), the Jacumba Wilderness Area (California), the Sonoran Desert (Arizona), Cabeza Prieta
National Wildlife Refuge (Arizona), the Chihuahan Desert (New Mexico), Santa Ana National Wildlife Refuge
(Texas), the Lower Rio Grande Valley National Wildlife
Refuge (Texas), Bentsen-Rio Grande Valley State Park
28a
(Texas), La Lomita Historical Park (Texas), and the National Butterfly Center (Texas).
Sierra Club’s members obtain recreational, professional, scientific, educational, and aesthetic benefits from
their activities along the U.S.-Mexico border, and from
the wildlife dependent upon the habitat in these areas.
The construction of a border wall and related infrastructure will acutely injure these interests because the Department of Homeland Security (“DHS”) is proceeding
with border wall construction without ensuring compliance with any federal or state environmental regulations
designed to protect these interests.
Sierra Club has adequately set forth facts and other
evidence, which, taken as true, support these allegations
for the purpose of Article III standing.
For instance, Sierra Club member Bill Broyles has a
“substantial professional and personal connection to the
lands identified for construction as projects Yuma 2 and
10/27 (on the Goldwater Range) and Yuma 3 (on Cabeza
Prieta).” He has “written and edited several books and
articles on Cabeza Prieta and the Goldwater Range,”
and he “also co-wrote and co-published a visitor’s guide
to the historic trail, El Camino del Diablo, that the proposed wall parallels and crosses, and that would be
harmed by construction vehicle traffic.” He participated in many meetings sponsored by the Range and
Refuge concerning their management plans over the
years. He believes that the “proposed wall is antithetical to [the] successful cooperative efforts of the Range
and Refuge partners,” and it would “desecrate” the historic El Camino del Diablo. He asserts that harm to
wildlife species, “the incessant lighting associated with
the wall and its construction,” and the “attendant noise
29a
and dust” of construction will harm his enjoyment of
these areas.
Sierra Club member Orson Bevins lives near the
U.S.-Mexico border and states that Yuma Sector Project 6 would “fragment” the vista he usually enjoys.
He also states that the “tall and intrusive pedestrian
barrier would disrupt the desert views and inhibit [him]
from fully appreciating this area,” and that a border wall
“would greatly degrade [his] experience visiting and living in this area.”
Richard Guerrero is a Sierra Club member who resides in San Diego, California, and he hikes the trails in
and around the Otay Open Space Preserve “about once
a month,” and “often hike[s] in areas that are within the
sightline of where [he] understand[s] the government
plans to construct San Diego Project 4.” The “wall
would directly impact [his] ability to enjoy recreating in
this area” by adding “a destructive human-created element to this otherwise peaceful open desert landscape.”
Likewise, Sierra Club member Daniel Watman, who
leads “border tours” through the Otay Mountain Wilderness, will be harmed by San Diego Project 4 and San
Diego Project 11. If San Diego Project 4 is built, he will
“no longer be able to lead [his] border tours because the
purpose of the tours—to see nature continuing unimpeded across the border—would be lost.” Moreover,
he enjoys visiting the bi-national town of Tecate, and he
believes “San Diego 11 project would seriously reduce
the enjoyment [he] get[s] from the area, because seeing
this large, out-of-place wall would mar [his] views of the
beautiful mountain range on the American side” and
“cause extensive and possibly irreparable damage to the
native flora” in the area.
30a
Sierra Club member Robert Ardovino “currently recreate[s] in what [he] understand[s] to be the El Paso
Project 2 and 8 areas,” and has “done so for several decades.” He claims that construction will “drastically
change [his] ability to appreciate [the] views” of the
“sprawling vistas near Antelope Wells,” because the
lighting planned for the construction projects “would
completely change the landscape,” and the construction
would harm the species he appreciates while camping,
“permanently ruin[ing]” his “use and enjoyment of these
areas.”
Thomas Miller is a Sierra Club member who works at
Laredo College conducting environmental research with
students in the Rio Grande Valley, and he asserts that
Laredo Project 7 will injure him “professionally, recreationally, and aesthetically.” For the last 15 years, his
“research has largely focused on the now endangered
Texas Hornshell Mussel.” He is “concerned that [Laredo Project 7] and its construction will destroy essential habitat for freshwater mussels and other species of
plants and animals,” because the “construction process
and the existence of a wall would lead to river siltation
when parts of the desert soil and rocks are displaced”
and could potentially lead to “chemicals polluting the
water sources” in the area. Likewise, Jerry Thompson, a Sierra Club member and Professor of History at
Texas A&M International University, whose research
focuses on “Texas history, border history, and the history of the American Civil War” asserts that Laredo
Project 7 “would be extremely detrimental to [his] research and career as it would foreclose [his] ability to do
site visits and visualize the area before writing about it.”
He has written numerous books about the Texas-Mexico
border, has visited the Laredo 7 Project area around
31a
twenty times in the course of his research, intends to return within the next few years to view the section of the
Rio Grande where Laredo 7 project is slated for construction, and “plan[s] to continue to write about the
Texas-Mexico border.”
Carmina Ramirez is a Sierra Club member who “will
be harmed culturally and aesthetically” if construction
proceeds for El Centro Projects 5 and 9 because she has
spent her entire life in the area surrounding the U.S.Mexico Border, including the El Centro Sector, and she
believes that border wall construction would “obstruct
[the] view [of the Valley area],” “divide [her community],” “further militariz[e] the border,” and “drastically
impact [her] ability to enjoy the local natural environment.” Construction will make her “less likely to hike
Mount Signal and enjoy outdoor recreational activities;
and when [she does] undertake those activities, [her] enjoyment of them will be irreparably diminished.”
Lastly, the interests of Sierra Club’s members in this
lawsuit are germane to the organization’s purpose. Sierra Club is “a national organization . . . dedicated
to exploring, enjoying, and protecting the wild places of
the earth; to educating and enlisting humanity to protect
and restore the quality of the natural and human environment; and to using all lawful means to carry out these
objectives.” Sierra Club’s organizational purpose is at
the heart of this lawsuit, and it easily satisfies this secondary requirement.
SBCC has also alleged facts that support its standing
to sue on behalf of itself and its member organizations.
SBCC alleged that, since the Federal Defendants proposed border wall construction, it has had to “mobilize[]
its staff and its affiliates to monitor and respond to the
32a
diversion of funds and the construction caused by and
accompanying the national emergency declaration.”
These “activities have consumed the majority of SBCC
staff’s time, thereby interfering with SBCC’s core advocacy regarding border militarization, Border Patrol lawenforcement activities, and immigration reform,” but it
has had no choice because it “must take these actions in
furtherance of its mission to protect and improve the
quality of life in border communities.”
SBCC has adequately set forth facts and other evidence, which, taken as true, support these allegations
for the purpose of Article III standing. SBCC Director Vicki Gaubeca has confirmed that the border wall
construction projects have “caused [SBCC] to reduce
the time that [it] devote[s] to [its] core projects,” and
“frustrated SBCC’s mission of advancing the dignity
and human rights of border communities.” SBCC has
“been forced to expend resources on countering the
emergency instead of on [its] other initiatives, including
Border Patrol accountability, community engagement
on local health and education issues, and public education about immigration policies more broadly.”
Moreover, Southwest Environmental Center (“SWEC”),
an organization that forms part of the SBCC, has also
been harmed by the proposed construction. SWEC
was founded “to reverse the accelerating loss of plants
and animals worldwide through protection and restoration of native wildlife and their habitats in the southwest,” and it “has been actively involved in restoring riparian and aquatic habitats along the Rio Grande in
southern New Mexico and west Texas. Border wall
construction projects, however, have “required SWEC
to shift its focus to more urgent, defensive campaigns,”
33a
and “[s]taff time and resources that would normally go
towards [its] longer-term restoration efforts to protect
landscapes and wildlife species . . . are instead being channeled to immediate border wall advocacy.”
Without such defensive efforts, however, the wall will
“cause[] irreversible damage to border lands that
SWEC’s members enjoy and cherish.”
The Texas Civil Rights Project (“TCRP”) is also a
member organization of the SBCC and is comprised of
separate programs, including a Racial and Economic
Justice Program, a Voting Rights Program, and a Criminal Justice Reform Program. The “announcement of
imminent land seizure and ‘military construction’ across
52 miles of borderlands in Laredo, Texas has caused and
will continue to cause TCRP to divert scarce resources
in protection of Texas landowners.” TCRP has had to
expand its operations into Laredo, Texas, even though
Laredo is “a substantial distance from the nearest
TCRP office” in Alamo, Texas, and it is “prohibitive to
directly represent anyone in a region where [TCRP]
do[es] not have a physical TCRP office.” TCRP has
had no choice but to take on this additional burden because declining to represent these landowners would undermine the organization’s goal to fight for a “Texas
where all communities thrive with dignity and justice
and without fear.”
These allegations are sufficient to establish that, if
funds are diverted to the border wall construction projects, Sierra Club members and SBCC will suffer injuries in fact.
Sierra Club and SBCC have also shown that such injuries are “fairly traceable to the challenged action[s] of
34a
the [Federal Defendants], and not the result of the independent action of some third party not before the court.”
Mendia v. Garcia, 768 F.3d 1009, 1012 (9th Cir. 2014)
(quoting Bennett v. Spear, 520 U.S. 154, 167 (1997)).
Section 2808 is the statutory authorization for the construction, and it is therefore the direct cause of the alleged injury.
The injury to Sierra Club and SBCC is likely to be
redressed by a favorable judicial decision. The Federal Defendants have no authority to undertake the border wall projects if the Court holds that Section 2808
does not authorize construction. Thus, Sierra Club and
SBCC have established that they satisfy the demands of
Article III standing to challenge the Federal Defendants’ actions.
B
The Federal Defendants assert that the Plaintiffs do
not have a cause of action. We hold that the States
have a cause of action under the APA and Sierra Club
has a constitutional cause of action.
1
The APA provides for judicial review of “final agency
action for which there is no other adequate remedy in a
court.” 5 U.S.C. § 704. Where a statute imposes obligations on a federal agency but the obligations do not
“give rise to a ‘private’ right of action against the federal
government[,] [a]n aggrieved party may pursue its remedy under the APA.” San Carlos Apache Tribe v.
United States, 417 F.3d 1091, 1099 (9th Cir. 2005). The
States must, however, establish that they fall within the
zone of interests of the relevant statute to bring an APA
35a
claim. See Match-E-Be-Nash-She-Wish Band of Pottawatomi Indians v. Patchak, 567 U.S. 209, 224 (2012)
(“This Court has long held that a person suing under the
APA must satisfy not only Article III’s standing requirements, but an additional test: The interest he asserts must be ‘arguably within the zone of interests to
be protected or regulated by the statute’ that he says
was violated.” (quoting Ass’n of Data Processing Serv.
Org., Inc. v. Camp, 397 U.S. 150, 153 (1970))).
Section 2808 does not confer a private right of action.
Instead, like Section 8005, it delegates a narrow slice of
Congress’s power of the purse to DoD so that it can react quickly in the event of a declaration of war or a declaration of a national emergency. In doing so, the statute imposes certain obligations upon DoD—i.e., DoD
cannot invoke Section 2808 except for military construction that is necessary to support the use of the armed
forces in the event of a declaration of a national emergency that requires the use of the armed forces. The
States argue that DoD did not satisfy these obligations,
and therefore, as aggrieved parties, they may pursue a
remedy under the APA, so long as they fall within Section 2808’s zone of interests.
As a threshold matter, Section 2808 constitutes the
relevant statute for the zone of interests test.
“Whether a plaintiff’s interest is ‘arguably . . . protected . . . by the statute’ within the meaning of the
zone-of-interests test is to be determined not by reference to the overall purpose of the Act in question . . .
but by reference to the particular provision of law upon
which the plaintiff relies.” Bennett, 520 U.S. at 175-76
(emphasis added). Because the States invoke Section
36a
2808’s limitations in asserting their APA claim, this statute defines the relevant zone of interests.
The Supreme Court has clarified that, in the APA
context, the zone of interests test does “not require any
‘indication of congressional purpose to benefit the
would-be plaintiff.’ ” Patchak, 567 U.S. at 225 (quoting
Clarke v. Sec. Indus. Ass’n, 479 U.S. 388, 399-400
(1987)). Furthermore, the Court has repeatedly emphasized that the zone-of-interest test is “not ‘especially
demanding.’ ” Lexmark Int’l Inc. v. Static Control
Components, Inc., 572 U.S. 118, 130 (2014) (quoting
Patchak, 567 U.S. at 225). Instead, for APA challenges, a plaintiff can satisfy the test in either one of two
ways: (1) “if it is among those [who] Congress expressly or directly indicated were the intended beneficiaries of a statute,” or (2) “if it is a suitable challenger
to enforce the statute—that is, if its interests are sufficiently congruent with those of the intended beneficiaries that the litigants are not more likely to frustrate than
to further . . . statutory objectives.” Scheduled
Airlines Traffic Offices, Inc. v. Dep’t of Def., 87 F.3d
1356, 1359 (D.C. Cir. 1996) (alterations in original) (citations omitted). “We apply the test in keeping with
Congress’s ‘evident intent’ . . . ‘to make agency action presumptively reviewable,’ ” and note that “the benefit of any doubt goes to the plaintiff.” Patchak, 567
U.S. at 225 (quoting Clarke, 479 U.S. at 399).
Section 2808’s restrictions constrain DoD’s ability to
fund emergency military construction projects while deferring other military construction projects. The Federal Defendants concede as much, noting that the “limitations in the statute at most reflect constraints on the
37a
decision to fund certain projects while deferring others.” 6
The States are suitable challengers to enforce Section 2808’s limitations because they have asserted such
economic interests here and thus they are either the intended beneficiaries of the statute, or at the very least,
their interests are unlikely to frustrate the purpose of
the statute. Absent the invocation of Section 2808, the
States stood to benefit significantly from federal military construction funding. The Federal Defendants diverted funding from 17 separate military construction
projects within the borders of the Plaintiff States, totaling over $493 million. According to the States’ expert,
the diversion of funds “would result in a total of $366
million in total lost business sales within the States for
the next three calendar years, 2020-2022,” even taking
“into consideration the offsetting benefits to the States
caused by the $1.0 billion of U.S. funds that would be
spent in California and New Mexico to build the proposed border barriers.” 7 Moreover, “the gross regional product (GRP) of the States would be reduced by
When considering the analogous role played by Section 8005,
Judge N.R. Smith, in dissent, acknowledged that a plaintiff who suffered an economic injury as a result of a statutory diversion of funds
would likely have a cause of action to challenge whether the diversion satisfied the terms of the statute. See Sierra Club v. Trump,
929 F.3d 670, 715 (9th Cir. 2019) (N.R. Smith, J., dissenting) (“This
statute [Section 8005] arguably protects Congress and those who
would have been entitled to the funds as originally appropriated; and
as a budgetary statute regarding the transfer of funds among DoD
accounts, it arguably protects economic interests.”).
7
Excluding California from this analysis, the expert estimates
that total would be much greater: the total lost business sales within the remaining states would be $789 million.
6
38a
$165 million as a result of this diversion of military
funds,” and the tax revenues for state and local governments would be reduced by over $36 million. Section
2808’s restrictions ensure that, ordinarily, its authority
cannot be used to divert funding for military construction projects unless the construction satisfies certain
criteria. Therefore, the States fall within the statute’s
zone of interests and can enforce its criteria.
Moreover, Patchak establishes that when a statute
deals with land use, the “neighbors to the use” may sue
and their “interests, whether economic, environmental,
or aesthetic, come within [the statute’s] regulatory ambit.” 567 U.S. at 227-28. Here, Section 2808 is a construction statute. It allows the Secretary of Defense to
“undertake military construction projects,” in “the event
of a declaration of war or the declaration by the President of a national emergency.” 10 U.S.C. § 2808. Construction of this sort naturally requires land use, and
California and New Mexico, as border states immediately adjacent to the border wall construction projects,
are quasi-sovereign neighbors to that use and plainly
fall within its zone of interests.
Therefore, the States fall within Section 2808’s zone
of interests and they have a cause of action to challenge
the construction.
2
The Supreme Court’s decision in Bond, and our decisions in McIntosh and the prior Sierra Club appeal, provide ample support that Sierra Club has a cause of action under the Appropriations Clause to challenge the
39a
Federal Defendants’ use of Section 2808 for border wall
construction. 8
“[I]ndividuals, too, are protected by the operations of
separation of powers and checks and balances; and they
are not disabled from relying on those principles in otherwise justiciable cases and controversies.” Bond v.
United States, 564 U.S. 211, 223 (2011). “[B]oth federalism and separation-of-powers constraints in the Constitution serve to protect individual liberty, and a litigant in a proper case can invoke such constraints ‘[w]hen
government acts in excess of its lawful powers.’ ”
United States v. McIntosh, 833 F.3d 1163, 1174 (9th Cir.
2016) (discussing and quoting Bond, 564 U.S. at 222).
“[The Appropriations Clause] constitutes a separationof-powers limitation that [litigants] can invoke to challenge” actions that cause justiciable injuries. Id. at
1175.
Although the terms of Section 2808 are different
from Section 8005, Section 2808’s role here is analogous
to the role of Section 8005 in the prior appeal: Section
2808 permits DoD to fund construction outside the normal appropriations process, if certain criteria are met,
but it operates against the backdrop of the Appropriations Clause. Because, as explained below, we conclude that the Federal Defendants have not satisfied
statute’s criteria, any construction undertaken purportedly using its authority violates the explicit prohibition
of the Appropriations Clause that “[n]o Money shall be
We address only whether Sierra Club has a constitutional cause
of action because Sierra Club did not argue in any detail that it has
a cause of action under the APA in its opening brief.
8
40a
drawn from the Treasury, but in Consequence of Appropriations made by Law. . . . ” U.S. Const. art.1, §
9, cl. 7. Sierra Club has invoked this prohibition.
If the zone of interests test applies at all here, the
Appropriations Clause of the Constitution defines the
zone of interests because it is the “particular provision
of law upon which [Sierra Club] relies” in seeking relief.
Bennett, 520 U.S. at 175-76. Section 2808 is relevant
only because, to the extent it applies, it authorizes executive action that otherwise would be unconstitutional or
ultra vires. That a statute is relevant does not transform a constitutional claim into a purely statutory one.
Sierra Club’s cause of action stems from the Federal Defendants’ violation of the Appropriations Clause because
Sierra Club seeks to enforce the Clause’s express prohibition.
To the extent the zone of interests test ever applies
to constitutional causes of action, it asks only whether a
plaintiff is “arguably within the zone of interests to be
protected . . . by the . . . constitutional guarantee in question.” Boston Stock Exch. v. State Tax
Comm’n, 429 U.S. 318, 320 n.3 (1977) (quoting Data Processing Serv., 397 U.S. at 153). This renders the test
nearly superfluous: so long as a litigant is asserting an
injury in fact to his or her constitutional rights, he has a
cause of action. See ERWIN CHEMERINSKY, FEDERAL
JURISDICTION 112 (7th ed. 2016) (citing LAURENCE
TRIBE, AMERICAN CONSTITUTIONAL LAW 446 (3d ed.
2000)).
Applying that generous formulation of the test here,
Sierra Club falls within the Appropriations Clause’s
zone of interests. Because the diversion of funds was
41a
not authorized by the terms of Section 2808, it is unconstitutional. See City and Cty. of San Francisco v.
Trump, 897 F.3d 1225, 1233-34 (9th Cir. 2018) (“[W]hen
it comes to spending, the President has none of ‘his own
constitutional powers’ to ‘rely’ upon.” (quoting Youngstown Sheet & Tube Co. v. Sawyer, 343 U.S. 579, 637
(1952) (Jackson, J., concurring)). Sierra Club is an organization within the United States that is protected by
the Constitution. The unconstitutional transfer of funds
here infringed upon Sierra Club’s members’ liberty interests, harming their environmental, aesthetic, and
recreational interests. Thus, Sierra Club falls within
the Clause’s zone of interests and has a cause of action
to challenge the transfers.
V
Next, we consider whether the terms of Section 2808
authorize the challenged border wall construction projects. We conclude that the projects fail to satisfy two
of the statutory requirements: they are neither necessary to support the use of the armed forces, nor are they
military construction projects. Although the statute
supplies other limitations, we do not address them because we conclude that these two limitations are more
than sufficient to render the border wall construction
projects unlawful.
A
Section 2808 allows the Secretary of Defense to undertake military construction projects in the event of a
national emergency requiring the use of the armed forces,
but the statute specifies that such projects must be “necessary to support such use of the armed forces.” The
district court’s analysis is persuasive on this issue, and
42a
we hold that border wall construction is not necessary
to support the use of the armed forces with respect to
the national emergency on the southern border. The
Federal Defendants have not established that the projects are necessary to support the use of the armed
forces because: (1) the administrative record shows
that the border wall projects are intended to support
and benefit DHS—a civilian agency—rather than the
armed forces, and (2) the Federal Defendants have not
established, or even alleged, that the projects are, in
fact, necessary to support the use of the armed forces.
First, the record illustrates that the border wall projects are intended to benefit DHS and its subagencies,
CBP and U.S. Border Patrol (“USBP”), not the armed
forces. The record demonstrates that DoD primarily
considered the many benefits to these civilian agencies
in determining that physical barriers are necessary.
DoD determined that physical barriers would “[i]mprove CBP’s detection, identification, classification, and
response capabilities,” “[r]educe vulnerabilities in key
border areas and the time it takes Border Patrol agents
to apprehend illegal migrants,” “improv[e] CBP force
allocation,” “reduce the challenges to CBP,” “effectively
reduce the enforcement footprint and compress USBP
operations to the immediate border area,” “serve to
channel illegal immigrants towards locations that are
operationally advantageous to DHS,” “enable CBP agents
to focus less on the rugged terrain,” and “give a distinct
and enduring advantage to USBP as a force multiplier.”
To the extent DoD decision-makers believed that
construction would benefit DoD at all, the record demonstrates that the construction is merely expected to help
DoD help DHS. DoD determined that the barriers
43a
would serve as “force multipliers,” by allowing military
personnel to cover other high-traffic border areas without existing barriers, a benefit plainly intended to assist
DHS, which, by statute, is tasked with “[s]ecuring the
borders, territorial waters, ports, terminals, waterways,
and air, land, and sea transportation systems of the
United States.” 6 U.S.C. § 202. Moreover, border wall
construction would “enable more effective and efficient
use of DoD personnel, which could ultimately reduce the
demand for DoD support at the southern border over
time.” Thus, the record makes clear that the primary
objective of border wall construction is to benefit a civilian agency, DHS, and that the construction strives to ultimately eliminate the need for DoD support to DHS altogether.
Second, the Federal Defendants have not even alleged, let alone established as a matter of fact, that the
border wall construction projects are “necessary” under
any ordinary understanding of the word. See MERRIAMWEBSTER ONLINE DICTIONARY (defining “necessary”
as “absolutely needed: required”); OXFORD ENGLISH
DICTIONARY ONLINE (defining “necessary” as “[i]ndispensable, vital, essential”). In assessing the necessity
of the border wall construction projects, the Federal Defendants concluded: “In short, these barriers will allow DoD to provide support to DHS more efficiently and
effectively. In this respect the contemplated construction projects are force multipliers.” Efficiency and efficacy are not synonymous with necessity.
The Federal Defendants contend that “Section 2808’s
reference to necessity does not entail the stringent level
of indispensability,” assumed by the district court, and
44a
they request that the Court adopt a more relaxed definition of the term here. The Federal Defendants cite
United States v. Comstock, 560 U.S. 126, 133-34 (2010),
for the proposition that the word “necessary” “often
means merely” “convenient, or useful,” or “conducive.”
But Comstock provides little support for that proposition. The Court in Comstock considered what powers
were entrusted to Congress by the Necessary and Proper
Clause of the United States Constitution. Examining
the import of the entire clause, the Court observed that
“the Necessary and Proper Clause makes clear that the
Constitution’s grants of specific federal legislative authority are accompanied by broad power to enact laws
that are ‘convenient, or useful’ or ‘conducive’ to the authority’s ‘beneficial exercise.’ ” Comstock, 560 U.S. at
133-34 (quoting M’Culloch v. Maryland, 17 U.S. 316,
413, 418 (1819)). The Court noted that in the specific
context of the Necessary and Proper Clause, “the word
‘necessary’ does not mean ‘absolutely necessary.’ ” Id.
at 134. Contrary to the Federal Defendants’ assertion,
however, the Court in Comstock did not set forth a universal definition of the word “necessary,” but instead,
one narrowly cabined to its constitutional context. The
Federal Defendants provide no reason why we must apply the logic of the Court’s approach in that specific context to the military construction authority at issue here.
The Federal Defendants also cite Commissioner v.
Heininger, 320 U.S. 467, 471 (1943). In Heininger, the
Court interpreted a Revenue Act provision allowing for
the deduction of “ordinary and necessary expenses paid
or incurred during the taxable year in carrying on any
trade or business.” Id. at 468 n.1. There, not only
was the word “necessary” coupled with “ordinary,” suggesting that a more relaxed definition of “necessary”
45a
may be appropriate, but the Court was interpreting the
language of a business expense tax deduction provision.
Within that context, dealing with a statutory provision
intended to foster business development and growth, it
makes sense to interpret the term in a more relaxed
fashion in furtherance of that purpose. Again, the Federal Defendants provide no explanation why Heininger’s
logic applies to the very different statutory context at
issue in this case.
“Necessary” as it appears in Section 2808 is best understood as retaining its plain meaning, which means, at
the very least, “required,” or “needed.” 9 The fact that
border wall construction might make DoD’s support
Ayestas v. Davis, 138 S. Ct. 1080, 1093 (2018) is not to the contrary. In Ayestas, the Supreme Court interpreted the use of the
term “necessary” within the context of 18 U.S.C. § 3599, a statute
that “authorizes federal courts to provide funding to a party who is
facing the prospect of a death sentence and is ‘financially unable to
obtain adequate representation or . . . other reasonably necessary services.’ ” Ayestas, 138 S. Ct. at 1092 (emphasis added). The
Court acknowledged that “necessary” may have one of two meanings: either “essential” or “something less than essential.” Id. at
1093. It concluded that “necessary” carried the latter meaning in
Section 3599 because it would “make[] little sense to refer to something as being ‘reasonably essential.’ ” Id. In other words, the
Court’s interpretation hinged on the fact Section 3599 did not merely
use the standalone term “necessary,” but used the phrase “reasonably necessary.” Thus, here, where “necessary” is a part of no such
statutory phrase, it makes little sense to follow the Court’s approach
in Ayestas. Moreover, Section 3599’s statutory context—the provision of funding to ensure the adequate defense of individuals facing
the prospect of a death penalty—additionally supports the sensibility of a more flexible definition to serve that statutory purpose.
That context is unrelated to emergency military construction authority, however, and so Ayestas does not alter our decision to adopt
the plain meaning of “necessary” here.
9
46a
more efficient and effective does not rise to the level of
“required” or “needed”—and the Federal Defendants
have failed to show that it does. That Congress declined to provide more substantial funding for border
wall construction and voted twice to terminate the President’s declaration of a national emergency underscores
that the border wall is not, in fact, required or needed.
Thus, the Federal Defendants fail to satisfy the statutory requirement that the construction projects be “necessary to support the use of such armed forces.”
The remainder of the Federal Defendants’ arguments do not compel an opposite conclusion. First, the
Federal Defendants assert that the determination of
whether military construction is necessary to support
the use of the armed forces is “committed to the discretion of the Secretary of Defense by law.” They argue
that questions of military necessity turn on “a complicated balancing of a number of factors which are peculiarly within [the Secretary’s] expertise” and that the
Court should defer to such expertise. Heckler v. Chaney,
470 U.S. 821, 831 (1985).
“[T]he claim of military necessity will not, without
more, shield governmental operations from judicial review.” Koohi v. United States, 976 F.2d 1328, 1331 (9th
Cir. 1992). A decision is generally committed to an
agency decision by law only when a court would have “no
meaningful standard against which to judge the agency’s
exercise of discretion.” Perez Perez v. Wolf, 943 F.3d
853, 860 (9th Cir. 2019) (quoting Pinnacle Armor, Inc.
v. United States, 648 F.3d 708, 719 (9th Cir. 2011)).
As we have explained, the Federal Defendants have
simply claimed “military necessity” without more, and
47a
this alone cannot shield their actions from judicial review. Further, as we have noted, the judgment at issue
here is not a military one. The border wall construction projects further the goals of DHS—a civilian law
enforcement agency—and the determination that the
projects are necessary, in any sense, is a law enforcement calculation, not a military one. Such determinations involve distinctly different calculations than those
present in the military deference cases cited by the Federal Defendants, like Gilligan v. Morgan, which involved
the ongoing judicial oversight of the Ohio National
Guard. See Gilligan v. Morgan, 413 U.S. 1, 6 (1973) (considering whether the district court should “assume and
exercise a continuing judicial surveillance over the Guard
to assure compliance with whatever training and operations procedures may be approved by [the] court.”).
The determinations at issue here, while important, are
lawmaking decisions that are “a job for the Nation’s lawmakers, not for its military authorities.” Youngstown,
343 U.S. at 587. Thus, the Federal Defendants cannot
evade judicial review of these determinations by simply
labeling them “military” ones.
What is more, nothing in the language of the statute
suggests that this determination is committed to the discretion of the Secretary of Defense. Here, the phrase
“that are necessary to support such use of the armed
forces,” provides standards against which to judge that
exercise of discretion; as demonstrated above, the statutory language is susceptible to basic statutory interpretation. If Congress had committed these issues to
the unfettered discretion of the Secretary, we would—
of course—defer. But it did not, so it is our task to determine whether the Secretary has complied with the
statutory requirements.
48a
Further, judicial review of statutes conferring specific emergency powers to the President is critical because, as explained by the Senate Committee on Government Operations in passing the NEA, the NEA left “the
definition of when a President is authorized to declare a
national emergency . . . to the various statutes which
give him extraordinary powers.” NEA Source Book at
292. Therefore, the President’s emergency authority
is conferred only by statute. Were we to conclude that
judicial review of such a statute was precluded, the President’s emergency authority would be effectively unbounded, contravening the purpose of the NEA. Thus,
the language of Section 2808 is not only susceptible to
judicial review, but its statutory context requires it.
Alternatively, the Federal Defendants assert that
“[e]ven if the Secretary’s military-necessity determinations were reviewable, this Court . . . should defer
to the Secretary’s conclusion that the challenged projects are necessary to improve the effectiveness and efficiency of DoD personnel deployed to the border.”
But, as we have discussed, it does not follow from the
idea that a project is designed to improve effectiveness
and efficiency that a project is necessary in any ordinary
sense. And absent from the record is any determination by the Secretary that the projects are actually necessary. Under these circumstances, deference, in the
classic administrative law sense, is not appropriate.
In sum, based on the record, we conclude that the construction of the challenged border wall projects does not
comply with the statutory requirements of Section 2808.
Therefore, because the Federal Defendants’ construction exceeds the authority provided by Section 2808 and
49a
is unlawful, and we affirm the declaratory judgment of
the district court.
B
Section 2808 permits the Secretary of Defense to “undertake military construction projects.” Section 2801
defines the term “military construction” “as used in this
chapter or any other provision of law” as “any construction, development, conversion, or extension of any kind
carried out with respect to a military installation,
whether to satisfy temporary or permanent requirements, or any acquisition of land or construction of a defense access road.” 10 U.S.C. § 2801(a). It further
defines “military installation” as “a base, camp, post,
station, yard, center, or other activity under the jurisdiction of the Secretary of a military department.” Id.
at § 2801(c)(4).
Because the border wall construction projects plainly
qualify as “construction,” the key inquiry here is whether
they are being “carried out with respect to a military installation.” “Interpretation of a statute must begin
with the statute’s language.” Rumsey Indian Rancheria of Wintun Indians v. Wilson, 64 F.3d 1250, 1257 (9th
Cir. 1994) (citations omitted). “[S]tatutory language
must always be read in its proper context,” and courts
must look to the “design of the statute as a whole and to
its object and policy,” UMG Recordings, Inc. v. Shelter
Capital Partners LLC, 718 F.3d 1006, 1026 (9th Cir.
2013) (quotations omitted), for “the words of a statute
must be read in their context and with a view to their
place in the overall statutory scheme,” Home Depot
U.S.A., Inc. v. Jackson, 139 S. Ct. 1743, 1748 (2019).
50a
The Federal Defendants make two separate arguments that border wall construction satisfies the requirements of Section 2808 based on one key fact: the land
on which the projects would be built has been brought
under military jurisdiction and assigned to a military
installation—Fort Bliss in El Paso, Texas. First, the
Federal Defendants argue that the individual border
wall construction projects are actually one and the same
as Fort Bliss because according to the Assistant Secretary of the Army, Alex A. Beehler, when a “site is assigned to a military installation for real property accountability purposes,” it “is considered to be part of
that installation, even if remotely located from the Army
Garrison [of that installation].” Alternatively, they argue that because the projects have been brought under
military jurisdiction, the construction projects are “other
activity under the jurisdiction of the Secretary of a military department.” 10 U.S.C. § 2801.
We must, then, determine (1) whether administratively assigning the projects to Fort Bliss renders them
one and the same as Fort Bliss for purposes of the statute, and if not, (2) whether bringing land under military
jurisdiction for real property accountability purposes
renders the border wall “other activity under the jurisdiction of the Secretary of a military department.”
We hold that, for purposes of the emergency construction authority provided by Section 2808, the border
wall construction projects are distinct from Fort Bliss
itself, and that the border wall construction projects at
51a
issue here do not satisfy the meaning of “other activity.” 10
1
Although the border wall construction projects may
be considered part of Fort Bliss for purposes of real
property accounting, we find that a number of reasons
support that the projects should not be considered a
part of Fort Bliss for purposes of Section 2808.
First, we state the most obvious reason why the border wall construction projects need not be considered a
part of Fort Bliss in this context. To begin, the projects are not physically connected to Fort Bliss—on
their face, they are not “part” of that military installation. In fact, most projects are hundreds of miles away
from Fort Bliss.
Moreover, the projects are not functionally part of
Fort Bliss. The Federal Defendants cite no operational
ties between the projects and any of the military activities conducted at Fort Bliss. This is contrary to other
examples of sites which are geographically separate from
the military installation to which they have been assigned. For example, the Federal Defendants highlight that the Green River Test Complex site in Utah is
considered part of the White Sands Missile Range in
New Mexico, even though the two are in different states
and located hundreds of miles apart. But these sites
The Plaintiffs do not challenge that the projects on the Goldwater Range satisfy the definition of “military construction,” and we do
not consider this issue; therefore, our holding is limited only to the
remaining nine construction projects. Our determination that the
funding of the projects is not necessary to support the use of the
armed forces is sufficient to hold all eleven projects unlawful.
10
52a
share a close functional connection. Throughout the
1960s, the military tested Athena missiles by launching
them from the Green River Test Complex to detonate on
the White Sands Missile Range. No such functional
nexus exists, or has even been alleged, here. Although
a functional nexus may not be required for administrative assignment, it matters for purposes of Section 2808.
Additionally, the Federal Defendants cite no other
purpose underlying the administrative assignment, besides pure administrative convenience, that compels the
conclusion that the projects should be considered part
of Fort Bliss for purposes of Section 2808. The Federal Defendants state that the projects were assigned to
Fort Bliss “because it is the largest, most capable active
Army installation in the vicinity of the southern border”;
it “has a sizable existing installation management office”; it has “experience working with the U.S. Army
Corps of Engineers on military construction projects”;
“it is more efficient for command of all the real property
associated with the projects undertaken pursuant to
§ 2808 to be vested in one Army installation”; and it has
an “existing support relationship with the U.S. Border
Patrol.” While these are, of course, practical reasons
for administratively assigning the land to Fort Bliss,
they convey no underlying purpose more significant
than administrative convenience. They signify no reason why the border wall construction projects must be
considered part of Fort Bliss for any reason beyond administrative assignment.
Further, reading the words of Section 2808 “in their
context and with a view to their place in the overall statutory scheme,” it would make little sense to equate the
53a
requirements of Section 2808 with the administrative assignment process in order to conclude that the projects
are a part of Fort Bliss. Home Depot U.S.A., Inc., 139
S. Ct. at 1748. The text of Section 2808 supplies boundaries for the authority provided—such as, that construction be conducted with respect to a military installation,
meaning a base, camp, station, yard, center, or other activity under military jurisdiction. By contrast, there
appear to be no boundaries whatsoever restricting when
the government can administratively assign a geographically distant site to a military installation. The Federal Defendants even specify that “[t]here is no legal,
regulatory, or policy requirement [that] geographically
separate sites . . . be assigned to a ‘nearby’ military
installation,” nor a requirement that the “sites or lands
that comprise a given military installation . . . be located in the same State or within a certain distance of
other sites associated with the military installation.”
And a site may exist as “land only, where there are no
facilities present,” “facility or facilities only, where the
underlying land is neither owned nor controlled by the
government,” or “land and facilities thereon.” To construe the limited text of Section 2808 to incorporate a
wholly unlimited process would be contrary to its structure and context.
Moreover, to construe the statute so broadly would
also be contrary to the purpose of the statutory scheme
of which Section 2808 is a part—the NEA. See Brooks
v. Donovan, 699 F.2d 1010, 1011 (9th Cir. 1983) (rejecting a literal interpretation that “would thwart the purpose of the over-all statutory scheme or lead to an absurd result” (quotations and citations omitted)); see generally NEA Source Book at 50. Because “[t]he National Emergencies Act is not intended to enlarge or add
54a
to Executive power,” it would make little sense to interpret the constrained definition of “military installation”
supplied by Section 2808 to encompass a process with no
limitations whatsoever. NEA Source Book at 292.
This would undoubtedly have the effect of enlarging the
President’s emergency powers because it would allow a
less stringent Executive Branch administrative process
to circumvent the limits of the statutory authority.
This would allow the Executive Branch to undertake any
construction project it wants by merely assigning any
piece of land to a military installation, thus permitting
more construction than authorized by the statute and
granting the President more emergency authority.
2
The Federal Defendants’ second argument fails for
similar reasons. To hold that the border wall construction projects constitute “other activity” under military
jurisdiction would transform the definition of “military
installation” to include not just “other activity,” but “any
activity” under military jurisdiction, contradicting the
text of the statute. The terms “base, camp, post, station, yard, [or] center” supply meaning and provide
boundaries to the term “other activity,” and they are not
mere surplusage. See Yates v. United States, 135 S. Ct.
1074, 1087 (2015) (“Had Congress intended ‘tangible object’ in § 1519 to be interpreted so generically as to capture physical objects as dissimilar as documents and
fish, Congress would have had no reason to refer specifically to ‘record’ or ‘document.’ The Government’s unbounded reading of ‘tangible object’ would render those
words misleading surplusage.”). The Federal Defendants do not explain how the border wall construction
projects are similar to bases, camps, posts, stations,
55a
yards, or centers, and we find that they are not. The
failure to illustrate a connection between the border wall
projects and the other statutory examples is sufficient
to reject this argument because we avoid construing statutes to allow one general word to render specific words
me