Petition for Writ of Certiorari — Metro-North Commuter Railroad Co., Petitioner v. Jamey Murphy

Supreme Court briefDec 6, 2019

Ask Donna

What actually matters in this document.

Text

No. 19In the

Supreme Court of the United States

METRO-NORTH COMMUTER

RAILROAD CO.,

Petitioner,

v.

JAMEY MURPHY,

Respondent.

On Petition for a Writ of Certiorari to the

Supreme Court of Connecticut

PETITION FOR A WRIT OF CERTIORARI

Charles A. Deluca

Robert O. Hickey

Beck S. Fineman

Ryan Ryan Deluca LLP

1000 Lafayette Blvd.

Suite 800

Bridgeport, CT 06604

Charles G. Cole

A lice E. Loughran

Mark C. Savignac

Counsel of Record

Steptoe & Johnson LLP

1330 Connecticut Ave., N.W.

Washington, D.C. 20036

(202) 429-3000

msavignac@steptoe.com

Counsel for Petitioner

i

QUESTION PRESENTED

The Federal Railroad Safety Act declares that

“[l]aws, regulations, and orders related to railroad

safety … shall be nationally uniform to the extent

practicable.” 49 U.S.C. § 20106(a)(1). The Act

empowers the Secretary of Transportation to

“prescribe regulations and issue orders for every area

of railroad safety.” Id. § 20103(a). And it expressly

preempts state-law claims whenever the Secretary

has prescribed a regulation “covering the subject

matter of the State requirement.” Id. § 20106(a)(2).

Pursuant to the Act, the Secretary has prescribed

regulations providing criteria for determining the

class of each track and fixing maximum operating

speeds for each class. See 49 C.F.R. § 213.9. In CSX

Transportation, Inc. v. Easterwood, this Court held

that § 213.9 “should be understood as covering the

subject matter of train speed with respect to track

conditions.” 507 U.S. 658, 675 (1993). The Court

accordingly concluded that the Act preempts state-law

claims that a train “was traveling too quickly given

the time and place.” Id. at 675 & n.15 (internal

quotation marks omitted).

The question presented is:

Does the Federal Railroad Safety Act preempt a

state-law claim that a train may not travel on a track

next to a passenger platform at the operating speed

set by 49 C.F.R. § 213.9?

ii

PARTIES TO THE PROCEEDING,

CORPORATE DISCLOSURE STATEMENT,

AND LIST OF RELATED PROCEEDINGS

The caption contains the names of all of the parties

to the proceeding in the court whose judgment is

sought to be reviewed. Two other entities—Wilton

Enterprises, Inc., and the Town of Darien,

Connecticut—were initially named as defendants in

the state trial court, but they were dismissed prior to

the proceeding in the state supreme court. See Pet.

App. 2a n.1.

Petitioner Metro-North Commuter Railroad

Company is a public benefit corporation created by

New York law and a wholly owned subsidiary of the

Metropolitan Transportation Authority, which is a

public benefit corporation of the State of New York.

The only directly related proceedings within the

meaning of this Court’s Rule 14.1(b)(iii) are the

proceedings below:

Murphy v. Town of Darien, FBTCV 136039787,

Superior Court of Connecticut, Fairfield at

Bridgeport. Judgment entered April 10, 2017.

Murphy v. Town of Darien, SC 19983, Supreme

Court of Connecticut. Judgment entered July

9, 2019.

iii

TABLE OF CONTENTS

QUESTION PRESENTED................................ i

PARTIES TO THE PROCEEDING,

CORPORATE DISCLOSURE STATEMENT,

AND LIST OF RELATED PROCEEDINGS ... ii

TABLE OF CONTENTS ................................. iii

TABLE OF APPENDICES ............................. iv

TABLE OF AUTHORITIES ............................. v

OPINIONS BELOW ......................................... 1

JURISDICTION ............................................... 1

STATUTORY AND REGULATORY

PROVISIONS INVOLVED .............................. 1

STATEMENT OF THE CASE ......................... 2

A. Legal Background .................................. 2

B. Factual and Procedural Background .... 7

REASONS FOR GRANTING THE

PETITION ...................................................... 11

I. The decision below contravenes

Easterwood ................................................ 12

II. The decision below infringes upon the

federal interest in railroad safety ............ 17

CONCLUSION ............................................... 19

iv

TABLE OF APPENDICES

APPENDIX A — OPINION OF THE

SUPREME COURT OF CONNECTICUT,

DATED JULY 9, 2019 .................................... 1a

APPENDIX B — OPINION OF THE

SUPERIOR COURT OF CONNECTICUT,

FAIRFIELD AT BRIDGEPORT, DATED

APRIL 10, 2017 ............................................ 33a

APPENDIX C — RELEVANT STATUTORY

AND REGULATORY PROVISIONS ........... 51a

v

TABLE OF AUTHORITIES

Cases

Anderson v. City of Bessemer City,

470 U.S. 564 (1985) .............................................. 13

Bashir v. Amtrak,

119 F.3d 929 (11th Cir. 1997) ................................ 9

Bashir v. National Railroad Passenger Corp.,

929 F. Supp. 404 (S.D. Fla. 1996) ................ passim

Bouchard v. CSX Transportation, Inc.,

196 F. App’x 65 (3d Cir. 2006) ............................... 6

Consolidated Edison Co. v. NLRB,

305 U.S. 197 (1938) .............................................. 13

Cooper v. Harris,

137 S. Ct. 1455 (2017) .......................................... 12

Cox Broadcasting Corp. v. Cohn,

420 U.S. 469 (1975) ................................................ 1

CSX Transportation, Inc. v. Easterwood,

507 U.S. 658 (1993) ...................................... passim

Dresser v. Union Pacific Railroad Co.,

809 N.W.2d 713 (Neb. 2011) ........................ passim

Goodyear Atomic Corp. v. Miller,

486 U.S. 174 (1988) ................................................ 1

vi

Herndon v. National Railroad Passenger Corp.,

814 A.2d 934 (D.C. 2003) ....................................... 6

Hightower v. Kansas City Southern Railway Co.,

70 P.3d 835 (Okla. 2003)........................................ 6

Illinois Central Gulf Railroad Co. v. Travis,

106 So. 3d 320 (Miss. 2012) ................................... 6

Lane v. R.A. Sims, Jr., Inc.,

241 F.3d 439 (5th Cir. 2001) .................................. 6

Ludwig v. Norfolk Southern Railway Co.,

50 F. App’x 743 (6th Cir. 2002) ............................. 6

Macfarlane v. Canadian Pacific Railway Co.,

278 F.3d 54 (2d Cir. 2002) ..................................... 6

Michael v. Norfolk Southern Railway Co.,

74 F.3d 271 (11th Cir. 1996) .................................. 6

Norfolk Southern Railway Co. v. Shanklin,

529 U.S. 344 (2000) .............................................. 18

Pierce v. Underwood,

487 U.S. 552 (1988) .............................................. 13

St. Louis Southwestern Railway Co. v. Pierce,

68 F.3d 276 (8th Cir. 1995) .................................... 6

U.S. Bank N.A. ex rel. CWCapital Asset Mgmt.

LLC v. Village at Lakeridge, LLC,

138 S. Ct. 960 (2018) ............................................ 13

vii

Veit ex rel. Nelson v.

Burlington Northern Santa Fe Corp.,

249 P.3d 607 (Wash. 2011) .................................... 6

Waymire v. Norfolk & Western Railway Co.,

218 F.3d 773 (7th Cir. 2000) .................................. 6

Zimmerman v. Norfolk Southern Corp.,

706 F.3d 170 (3d Cir. 2013) ................................... 7

Statutes & Other Authorities:

28 U.S.C. § 1257 .......................................................... 1

49 C.F.R. § 1.89 ........................................................... 2

49 C.F.R. § 213.9 ............................................... passim

49 C.F.R. §§ 213.51-213.143........................................ 3

49 C.F.R. § 213.57 ....................................................... 3

49 C.F.R. § 213.59 ....................................................... 3

49 C.F.R. § 213.113 ..................................................... 3

49 C.F.R. § 213.137 ..................................................... 3

49 U.S.C. § 20101 .............................................. 1, 2, 18

49 U.S.C. § 20103 ........................................................ 2

49 U.S.C. § 20106 ............................................ 2, 12, 18

49 U.S.C. § 20134 ...................................................... 17

63 Fed. Reg. 33,992 ......................................... 4, 17, 18

OPINIONS BELOW

The opinion of the Supreme Court of Connecticut

is reported at 332 Conn. 244, 210 A.3d 56. The opinion

of the Superior Court of Connecticut is reported at 64

Conn. L. Rptr. 267. Both opinions are reproduced in

the appendix to this petition. Pet. App. 1a-50a.

JURISDICTION

The Supreme Court of Connecticut entered

judgment on July 9, 2019. Pet. App. 1a. On

September 26, 2019, Justice Ginsburg extended the

time to file this petition to December 6, 2019.

This Court has jurisdiction under 28 U.S.C.

§ 1257. The decision below conclusively rejects MetroNorth’s federal preemption defense; further

proceedings below might insulate the federal question

from review in the future; reversal on this federal

issue would put an end to this litigation; and failure

to immediately review the decision below might

seriously erode the federal policy favoring uniform

standards for railroad safety. The judgment below is

therefore “final” under Cox Broadcasting Corp. v.

Cohn, 420 U.S. 469, 482-83 (1975). See, e.g., Goodyear

Atomic Corp. v. Miller, 486 U.S. 174, 178-80 (1988)

(holding that a state court ruling rejecting federal

preemption was final under Cox Broadcasting’s

“pragmatic approach” to § 1257 finality).

STATUTORY AND REGULATORY

PROVISIONS INVOLVED

The relevant provisions of the Federal Railroad

Safety Act of 1970, as amended, 49 U.S.C. § 20101 et

seq., and regulations promulgated thereunder are set

forth in the appendix. Pet. App. 51a-55a.

2

STATEMENT OF THE CASE

A.

Legal Background

1. Congress enacted the Federal Railroad Safety

Act (FRSA) “to promote safety in every area of

railroad operations and reduce railroad-related

accidents.” 49 U.S.C. § 20101. FRSA empowers the

Secretary of Transportation to “prescribe regulations

and issue orders for every area of railroad safety.” Id.

§ 20103(a). The Secretary has in turn delegated

regulatory authority to the Federal Railroad

Administrator. 49 C.F.R. § 1.89.

FRSA directs that “[l]aws, regulations, and orders

related to railroad safety … shall be nationally

uniform to the extent practicable.”

49 U.S.C.

§ 20106(a)(1). To that end, FRSA expressly preempts

state law whenever the Secretary “prescribes a

regulation or issues an order covering the subject

matter of the State requirement.” Id. § 20106(a)(2);

see also id. § 20106(b).1

2. Exercising the powers conferred by FRSA, the

Secretary has promulgated regulations sorting tracks

into numbered classes and setting maximum

operating speeds for each class. The regulations

classify tracks based on a range of attributes that the

1 The preemption provision contains an exception for certain

state laws that are “necessary to eliminate or reduce an

essentially local safety or security hazard.”

49 U.S.C.

§ 20106(a)(2). This exception is not at issue here. The

preemption provision also allows state-law claims alleging

breach of a standard of care established by or pursuant to federal

law. See id. § 20106(b). There is no such allegation in this case.

Pet. App. 11a, 28a.

3

Secretary deemed relevant to operating speed,

including gage, track alinement, track surface, and

number of crossties per segment of track. See 49

C.F.R. §§ 213.51-213.143. The maximum speeds for

trains operating on track in Classes 1 through 5 are

codified at 49 C.F.R. § 213.9.

Section 213.9 also specifies a limited number of

exceptions to its maximum operating speeds. These

exceptions apply where the track fails to meet all of

the requirements for the lowest class of track, id.

§ 213.9(b); where the track curves, id. §§ 213.57(b),

213.59(a); where the rail contains certain specified

defects, id. § 213.113; and where railroad “frogs”

(equipment used where two tracks cross) are in poor

condition, id. § 213.137(b) and (c).

Two of these exceptions to § 213.9(a)’s maximum

operating speeds prohibit train operation at any

speed. First, trains may only operate on track that

“does not at least meet the requirements for Class 1

track … for a period of not more than 30 days.” Id.

§ 213.9(b). Second, “operation over the … rail is not

permitted” if the track “contains any of the defects

listed in” § 213.113(c). Id. § 213.113(a).

Under the regulations, the class of a segment of

track does not turn on whether it runs adjacent to a

passenger platform. Nor do the regulations recognize

any exception to § 213.9’s operating speeds for track

that runs adjacent to a platform. In short, while the

Secretary deemed numerous features relevant to the

maximum operating speed consistent with railroad

safety, the proximity of the track to an area where

people might be (such as a passenger platform) is not

among them.

4

“This omission is intentional”: The “current

regulations governing train speed do not afford any

adjustment of train speeds in urban settings or at

grade crossings.” 63 Fed. Reg. 33,992, 33,999 (June

22, 1998). The decision to set maximum operating

speeds on the basis of a discrete set of considerations,

to the exclusion of other considerations, does not

merely advance efficiency and national uniformity. It

also advances the fundamental interest in railroad

safety:

FRA believes that locally established speed

limits may result in hundreds of individual

speed restrictions along a train’s route,

increasing safety hazards and causing train

delays. The safest train maintains a steady

speed. Every time a train must slow down and

then speed up, safety hazards, such as buff and

draft forces, are introduced. These kinds of

forces can enhance the chance of derailment with

its attendant risk of injury to employees, the

traveling public, and surrounding communities.

Id.

3. This Court addressed the preemptive effect of

FRSA and § 213.9 in CSX Transportation, Inc. v.

Easterwood, 507 U.S. 658 (1993).

Interpreting

FRSA’s preemption provision, the Easterwood Court

held that “pre-emption will lie only if the federal

regulations substantially subsume the subject matter

of the relevant state law.” Id. at 664. The Court then

applied that standard to an excessive speed claim

under state law. See id. at 673-75.

The decedent in Easterwood was killed when a

train hit his truck at a railroad crossing. Id. at 661.

5

The train was operating on Class 4 track, and the

plaintiff conceded that it did not exceed the maximum

operating speed for Class 4 track under § 213.9. Id. at

673. Nonetheless, the plaintiff claimed that CSX had

“breached its common-law duty to operate its train at

a moderate and safe rate of speed” at the crossing. 507

U.S. at 673. CSX responded that the claim was

preempted “because the federal speed limits are

regulations covering the subject matter of the common

law of train speed.” Id.

The Court began by acknowledging that, “[o]n

their face, the provisions of § 213.9(a) address only the

maximum speeds at which trains are permitted to

travel given the nature of the track on which they

operate.” Id. at 674. But the Court also recognized

that “related safety regulations adopted by the

Secretary reveal that the limits were adopted only

after the hazards posed by track conditions were

taken into account.” Id. “Understood in the context of

the overall structure of the regulations, the speed

limits must be read as not only establishing a ceiling,

but also precluding additional state regulation.” Id.

Having concluded that “§ 213.9(a) should be

understood as covering the subject matter of train

speed with respect to track conditions, including the

conditions posed by grade crossings,” the Court held

that FRSA preempted the plaintiff’s claim that the

“train was traveling too quickly given the time and

place.” Id. at 675 & n.15 (internal quotation marks

omitted). Easterwood thus stands for the proposition

that state-law “excessive speed claim[s] cannot stand

in light of the Secretary’s adoption of the regulations

in § 213.9.” Id. at 675.

6

In a footnote that is significant here, the

Easterwood Court identified one limit to its ruling:

“[T]his case does not present, and we do not address,

the question of FRSA’s pre-emptive effect on” statelaw claims “for breach of … the duty to slow or stop a

train to avoid a specific, individual hazard.” Id. at 675

n.15. Easterwood presented an “excessive speed”

claim, not an “imminent collision” claim. See id. at

661, 673.

4. In this case, the court below has deviated from

the rules of preemption every other court has followed

since Easterwood. With the exception of the decision

now at issue, the lower courts have applied the

holding of Easterwood faithfully, frequently rejecting

excessive speed claims as precluded in light of § 213.9.

See, e.g., Macfarlane v. Canadian Pacific Railway Co.,

278 F.3d 54, 57-59 (2d Cir. 2002); Bouchard v. CSX

Transportation, Inc., 196 F. App’x 65, 72 (3d Cir.

2006); Lane v. R.A. Sims, Jr., Inc., 241 F.3d 439, 44344 (5th Cir. 2001); Ludwig v. Norfolk Southern

Railway Co., 50 F. App’x 743, 747-49 (6th Cir. 2002);

Waymire v. Norfolk & Western Railway Co., 218 F.3d

773, 775-76 (7th Cir. 2000); St. Louis Southwestern

Railway Co. v. Pierce, 68 F.3d 276, 278 (8th Cir. 1995);

Michael v. Norfolk Southern Railway Co., 74 F.3d 271,

273-74 (11th Cir. 1996); Herndon v. Nat’l Railroad

Passenger Corp., 814 A.2d 934, 936-38 (D.C. 2003);

Illinois Central Gulf Railroad Co. v. Travis, 106 So.3d

320, 332 (Miss. 2012); Hightower v. Kansas City

Southern Railway Co., 70 P.3d 835, 844-49 (Okla.

2003); Veit ex rel. Nelson v. Burlington Northern

Santa Fe Corp., 249 P.3d 607 (Wash. 2011).

7

By the same token, courts have also recognized

that state law cannot “supplement” the factors that

the federal regulations look to in determining track

class, which would permit state law to indirectly

influence the speeds at which trains may operate. See

Zimmerman v. Norfolk Southern Corp., 706 F.3d 170,

186-87 (3d Cir. 2013).

B.

Factual and Procedural Background

1. The train tracks through the Noroton Heights

station in Darien, Connecticut, are Class 4 tracks.

Pet. App. 47a. Section 213.9 sets the maximum

operating speed for passenger trains on Class 4 tracks

at 80 miles per hour. 49 C.F.R. § 213.9(a).

In March 2013, a Metro-North commuter train on

an express route to Stamford was approaching the

Noroton Heights station on the track next to the

platform. Pet. App. 2a-3a. The train, which is

referred to as a “through train” because it was not

making a stop at the station, was traveling at around

70 miles per hour. Pet. App. 3a, 47a. As the train

approached the station, the engineer saw that there

was a man on the track. Pet. App. 3a. The engineer

sounded the horn and applied the emergency brake,

but he was unable to stop the train from hitting and

killing the man. Id.

The decedent’s widow, Respondent Jamey

Murphy, filed this suit in Connecticut state court.

Pet. App. 2a. The operative complaint claims that

Metro-North breached a duty imposed by state tort

law “by moving a through train traveling in excess of

70 miles per hour on the track immediately adjacent

to the platform” rather than “an interior track away

from the platform.” Pet. App. 29a. Metro-North

8

moved for summary judgment on the basis of FRSA

preemption. Pet. App. 4a.

2. The trial court granted Metro-North’s motion,

reasoning that Respondent’s claim “is inherently an

excessive speed claim” and is thus preempted under

this Court’s decision in Easterwood. Pet. App. 47a.

The court explained that “the speed of the train is an

intrinsic part of the plaintiff’s negligence allegation.”

Id. And “the plaintiff’s railroad safety expert …

continuously references train speed and the specific

speed of the train in question in his opinion for why

the train should have been routed on an interior

track.” Id.; see also id. (noting that the expert witness

“discusses through trains versus trains making a

scheduled stop and the different speeds in which they

enter the station, to explain why faster moving and/or

through trains should be placed on tracks that are not

alongside platforms”).

The trial court recognized that what distinguishes

through trains from trains making a stop at a given

station is the speed at which they operate through

that station. Id. After all, “trains must stop alongside

a platform to discharge and pick up passengers.” Id.

And “it is the fact that a track adjacent to a platform

was used for a train traveling at a high speed that is

objected to” in Respondent’s complaint. Id.

Because “[t]he speed of the train is a necessary

corollary to the plaintiff’s claim” and the train was

undisputedly operating below the federal maximum

speed, the trial court concluded that the claim “is

expressly preempted” by FRSA. Pet. App. 47a; see

also id. (“the train was traveling between 60-73 miles

per hour, which is below the speed limit set forth for a

9

Class 4 track, which is 80 miles per hour for a

passenger train” (citing 49 C.F.R. § 213.9(a))).

3. The Supreme Court of Connecticut took the

appeal directly from the trial court and reversed. Pet.

App. 2a, 4a n.4. The court asserted that FRSA does

not preempt state law “unless the subject matter is

clearly subsumed by the regulations” such that “there

is a federal regulation that thoroughly addresses the

safety concern.” Pet. App. 22a, 28a (emphases added).

The court ruled for Respondent after concluding that

“the claim in this case is not based on an area that is

clearly covered by the federal regulations.” Pet. App.

24a (emphasis added).

In rejecting Metro-North’s argument that

Respondent’s excessive speed claim is preempted, the

court relied heavily on two “imminent collision” cases,

Dresser v. Union Pacific Railroad Co., 809 N.W.2d 713

(Neb. 2011), and Bashir v. National Railroad

Passenger Corp., 929 F. Supp. 404 (S.D. Fla. 1996),

aff’d sub nom. Bashir v. Amtrak, 119 F.3d 929 (11th

Cir. 1997). See Pet. App. 29a-32a. Dresser and Bashir

concerned state-law negligence claims alleging that

the defendants had “fail[ed] to exercise ordinary care

once it appeared that a collision would probably

occur.” Dresser, 809 N.W.2d at 723 (emphasis added).

For instance, the complaint in Dresser “alleged that

the train crew was negligent in failing to maintain a

proper lookout, failing to slow or stop the train to

avoid the collision, and failing to sound the horn.” Pet.

App. 29a (citing Dresser, 809 N.W.2d at 717).

Dresser and Bashir held that such “imminent

collision” claims are not preempted under FRSA. See

Dresser, 809 N.W.2d at 723 (“we are not presented

10

with any federal regulations that cover a railroad’s

duty to exercise ordinary care in situations where

collisions are imminent”); Bashir, 929 F. Supp. at 412

(§ 213.9 “is silent as to the instances in which a train

must stop to avoid colliding with an obstruction on the

tracks”). The court in Bashir reasoned that, if

imminent collision claims were preempted, then

“railroads would be insulated from state tort liability

regardless of whether a train attempted to stop to

avoid even the most obvious obstructions, simply

because federal law prescribes the speed at which

they may travel absent obstructions.” Id.

The court below conceded that, “[b]ecause the

plaintiff’s claim relates to the fact that the train did

not stop at the Noroton Heights station, the speed of

that train is tangentially related to the plaintiff’s

claim.” Pet. App. 31a. Analogizing to Dresser and

Bashir, however, the court concluded that § 213.9

“prescribes only the maximum speed at which trains

may operate on certain track classifications,” and thus

does not preempt state-law claims asserting that “it is

negligent to operate a through train on a track

immediately adjacent to the platform when another

track is available.” Pet. App. 32a.

11

REASONS FOR GRANTING THE PETITION

Under regulations issued by the Secretary of

Transportation, the Metro-North train in this case

was entitled to operate at up to 80 miles per hour on

the Class 4 track through the Noroton Heights

station. 49 C.F.R. § 213.9(a); see Pet. App. 47a. It is

undisputed that the train was operating consistent

with federal law, at around 70 miles per hour. See

Pet. App. 28a, 47a.

Despite forswearing any claim based on federal

law (see Pet. App. 28a), Respondent argues as a

matter of Connecticut law that the Class 4 track by

the platform should be restricted to trains coming to a

stop at the station, and thus operating well below the

federal maximum speed, and that the train in this

case was required to come to a stop or keep off of the

track entirely. Pet. App. 29a. Respondent effectively

seeks to designate tracks adjacent to passenger

platforms within the State of Connecticut as state-law

“slow lanes,” even where federal law designates them

as Class 4 tracks. But § 213.9 “cover[s]” this subject

matter within the meaning of FRSA and makes clear

that the train was entitled to operate at up to 80 miles

per hour.

Therefore, under this Court’s decision in

Easterwood—which is on all fours with this case—

Respondent’s state-law claim that the “train was

traveling too quickly given the time and place” is

preempted. 507 U.S. at 675 n.15 (internal quotation

marks omitted). In rejecting Metro-North’s assertion

of federal preemption, the court below blatantly

disregarded Easterwood.

12

This Court should grant certiorari and reverse.

Indeed, summary reversal of the decision below would

be appropriate.

I.

The decision below contravenes Easterwood

A. The court below founded its decision in this

case on manifestly erroneous statements of the

applicable rule of law. The court said that FRSA

preempts state law only when “the subject matter is

clearly subsumed by the regulations” and “there is a

federal regulation that thoroughly addresses the

safety concern” underlying the plaintiff’s claim. Pet.

App. 22a, 28a (emphases added). Purporting to apply

this standard, the court concluded that “the claim in

this case is not based on an area that is clearly covered

by the federal regulations” and held that Respondent’s

claim is not preempted by FRSA. Pet. App. 24a

(emphasis added).

The rule of law stated and applied below is directly

contrary to this Court’s decision in Easterwood. FRSA

preempts state law whenever a federal regulation

“cover[s] the subject matter of the State requirement.”

49 U.S.C. § 20106(a)(2). As this Court explained in

Easterwood, this language means that FRSA

preempts state law “if the federal regulations

substantially subsume the subject matter of the

relevant state law.” 507 U.S. at 664.

A vast gulf divides this Court’s “substantially

subsumes” standard from the “clearly subsumes”

standard applied by the court below. The state court’s

phrasing implies that it would find preemption only if

“left with the definite and firm conviction” that the

federal regulations subsumed the subject matter of

the state-law claim. Cooper v. Harris, 137 S. Ct. 1455,

13

1474 (2017) (quoting Anderson v. City of Bessemer

City, 470 U.S. 564, 573 (1985)). The state court’s

“clearly subsumes” standard plainly placed “a serious

thumb on the scale” against preemption. U.S. Bank

N.A. ex rel. CWCapital Asset Mgmt. LLC v. Village at

Lakeridge, LLC, 138 S. Ct. 960, 966 (2018). Indeed,

the court below acknowledged as much when it said

that FRSA preemption applies only when “there is a

federal regulation that thoroughly addresses the

safety concern.” Pet. App. 28a (emphasis added).

The legal standard applied below was manifestly

improper, and it will continue to work mischief in

future cases. As this Court used the term in

Easterwood, “substantially” does not mean anything

like “clearly” or even “entirely” or “mostly.” Rather, it

merely means “in substance or in the main.” Pierce v.

Underwood, 487 U.S. 552, 565 (1988) (Scalia, J.); cf.

Consolidated Edison Co. v. NLRB, 305 U.S. 197, 229

(1938) (the Administrative Procedure Act’s phrase

“substantial evidence” means “such relevant evidence

as a reasonable mind might accept as adequate to

support a conclusion”).

In this case, even if the plaintiff’s claim is not

“clearly” covered by the regulation, it is certainly

covered by it “in substance.” If the court below had

understood the proper legal standard as established

by this Court in Easterwood, then it would not have

rejected Metro-North’s preemption argument. And if

the decision below is permitted to stand, future

litigants could avoid preemption simply by recasting

their speed claims as something else, even where, as

here, the claim cannot logically be understood without

considering the speed of the train.

14

B. Relatedly, the state court also premised its

ruling on its belief that § 213.9 “prescribes only the

maximum speed at which trains may operate on

certain track classifications.” Pet. App. 32a. This was

another blatant legal error, because Easterwood

considered and rejected that precise view:

On their face, the provisions of § 213.9(a)

address only the maximum speeds at which

trains are permitted to travel given the nature of

the track on which they operate. Nevertheless,

related safety regulations adopted by the

Secretary reveal that the limits were adopted

only after the hazards posed by track conditions

were taken into account. Understood in the

context of the overall structure of the

regulations, the speed limits must be understood

as not only establishing a ceiling, but also

precluding additional state regulation ….

507 U.S. at 674. The Court concluded that “§ 213.9

should be understood as covering the subject matter

of train speed with respect to track conditions,

including the conditions posed by grade crossings.” Id.

at 675.

The same goes for the conditions posed by train

stations and passenger platforms. The Secretary has

made a judgment about the appropriate classification

and maximum operating speed for the track passing

through the Noroton Heights station. As Easterwood

makes clear, there is no room for a state court,

applying the state law of negligence, to second-guess

that expert judgment.

To the contrary, FRSA

preempts any claim that a train “was traveling too

15

quickly given the time and place.” Easterwood, 507

U.S. at 675 n.15.

C. The court below went astray when it based its

decision on two “imminent collision” decisions,

Dresser, 809 N.W.2d 713, and Bashir, 929 F. Supp.

404. See Pet. App. 29a-32a. The question in those

cases was whether FRSA preempts state-law claims

based on the “duty to exercise ordinary care to avoid

an accident … when it [would] appear[] to a

reasonably prudent person that to proceed would

probably result in a collision.” Dresser, 809 N.W.2d at

720 (internal quotation marks omitted). The courts

held that FRSA does not preempt state-law imminent

collision claims. See id. at 723 (“The mere fact that

the speed the train is traveling is tangentially related

to how quickly it can be stopped does not transform

the claim into an excessive speed claim.”); Bashir, 929

F. Supp. at 412 (§ 213.9 “is silent as to the instances

in which a train must stop to avoid colliding with an

obstruction on the tracks”).

Unlike the decision below, Dresser and Bashir are

not inconsistent with Easterwood. As discussed

above, Easterwood expressly reserved the question of

FRSA’s preemptive effect on the state-law “duty to

slow or stop a train to avoid a specific, individual

hazard.” 507 U.S. at 675 n.15; see also Dresser, 809

N.W.2d at 723 (observing that this “issue was not

presented [or] decided by the Court”); Bashir, 929

F. Supp. at 412 n.4 (same). But the duty to take action

in the face of an imminent collision simply is not at

issue in this case: Respondent does not allege that the

Metro-North engineer failed to act reasonably to stop

the train once he saw that there was a man on the

16

track. Rather, her claim is that the Metro-North train

should not have been “traveling in excess of seventy

miles per hour on the track immediately adjacent to

the platform,” regardless of whether there was an

obstruction on the track or not. Pet. App. 29a. This is

not an imminent collision case. Like Easterwood, it is

an excessive speed case.

The distinction between excessive speed claims

and imminent collision claims makes good sense. The

imminent collision claims in Dresser and Bashir

“relate[d] to an event which is not a fixed condition or

feature of the railroad crossing and was not capable of

being taken into account by the Secretary of

Transportation in the promulgation of uniform,

national speed regulations.” Dresser, 809 N.W.2d at

723; see also Bashir, 929 F. Supp. at 412 (“State laws

that direct a train to stop when, for instance, a child

is standing on the tracks do not conflict with federal

speed limits that prescribe the speed at which the

same train may travel in normal circumstances on the

same track.”).

By contrast, the claims in this case and

Easterwood seek to impose special speed-based duties

on trains operating in the proximity of permanent

conditions—railroad crossings in Easterwood and

passenger platforms in this case—where accidents

may be more likely to occur. But Easterwood makes

clear that the federal “limits were adopted only after

the hazards posed by track conditions were taken into

account.” 507 U.S. at 674. That is why “§ 213.9

should be understood as covering the subject matter

of train speed with respect to track conditions,

including the conditions posed by grade crossings,” id.

17

at 675—and the conditions posed by passenger

platforms. Easterwood controls this excessive speed

case, where Respondent alleges that Metro-North’s

“train was traveling too quickly given the time and

place.” 507 U.S. at 675 n.15 (internal quotation marks

omitted). Dresser and Bashir are inapposite.

II.

The decision below infringes upon the federal

interest in railroad safety

The Secretary’s failure to impose lower speed

limits for more heavily trafficked, potentially higherrisk areas was no oversight. The Federal Railroad

Administration has made this clear: “FRA’s current

regulations governing train speed do not afford any

adjustment of train speeds in urban settings or at

grade crossings. This omission is intentional.” 63

Fed. Reg. at 33,999.

“The safest train maintains a steady speed.” Id.

Thus, the most effective means of mitigating the risk

of railroad collisions is to attempt to keep people and

vehicles off of train tracks, rather than to require

trains to “slow down and then speed up” “in urban

settings or at grade crossings” in the hope of giving

the train enough time to come to a complete stop if the

engineer sees an obstruction on the track. Id. That is

why federal law heavily regulates railroad crossings

to ensure that drivers are aware of the risks and will

not pull onto the track in front of an oncoming train.

See, e.g., 49 U.S.C. § 20134; Easterwood, 507 U.S. at

674 (“Because the conduct of the automobile driver is

the major variable in grade crossing accidents, and

because trains offer far fewer opportunities for

regulatory control, the safety regulations established

by the Secretary concentrate on providing clear and

18

accurate warnings of the approach of oncoming trains

to drivers.”); Norfolk Southern Railway Co. v.

Shanklin, 529 U.S. 344, 348-49, 352-59 (2000).

While these means of mitigating risk are not

perfect, requiring trains to slow down and then speed

up frequently would be no panacea and, according to

the Federal Railroad Administration, would

“increas[e] safety hazards.” 63 Fed. Reg. at 33,999.

“Every time a train must slow down and then speed

up, safety hazards, such as buff and draft forces, are

introduced. These kinds of forces can enhance the

chance of derailment with its attendant risk of injury

to employees, the traveling public, and surrounding

communities.” Id.

Congress intended FRSA “to promote safety in

every area of railroad operations and reduce railroadrelated accidents,” and directed that “[l]aws,

regulations, and orders related to railroad safety …

shall be nationally uniform to the extent practicable.”

49 U.S.C. §§ 20101, 20106(a)(1). By threatening to

superimpose a hodge-podge of speed restrictions

created by state-court judges and inconsistent jury

verdicts atop the federal agency’s carefully considered

national scheme, the decision below endangers both

national uniformity and railroad safety.

19

CONCLUSION

The petition for a writ of certiorari should be

granted. Because the decision below plainly conflicts

with a decision of this Court on an important question

of federal law, summary reversal would be

appropriate.

Respectfully submitted,

CHARLES A. DELUCA

CHARLES G. COLE

ROBERT O. HICKEY

ALICE E. LOUGHRAN

BECK S. FINEMAN

MARK C. SAVIGNAC

RYAN RYAN DELUCA LLP

Counsel of Record

1000 Lafayette Blvd.

STEPTOE & JOHNSON LLP

Suite 800

1330 Connecticut Ave., N.W.

Bridgeport, CT 06604

Washington, D.C. 20036

(202) 429-3000

December 6, 2019

msavignac@steptoe.com

APPENDIX

1a

Appendix OF

A THE SUPREME

APPENDIX A — OPINION

COURT OF CONNECTICUT, DATED JULY 9, 2019

SUPREME COURT OF CONNECTICUT

332 Conn. 244

JAMEY MURPHY et al.

v.

TOWN OF DARIEN et al.

(SC 19983)

Argued November 5, 2018

Officially released July 9, 2019

Synopsis

Background: Commuter’s wife brought action

against railroad company alleging negligence in track

selection arising from commuter’s slip and fall from train

station boarding platform and death on track that was

immediately adjacent to platform when he was struck by

a “through train” that was en route to another destination.

The Superior Court, Judicial District of Fairfield, Kamp,

J., 2017 WL 1656911, granted railroad company’s motion

for summary judgment. Wife appealed.

As a matter of first impression, the Supreme Court,

Mullins, J., held that Federal Railroad Safety Act did not

preempt wife’s negligence claims.

2a

Appendix A

Reversed and remanded with direction.

OPINION

MULLINS, J.

The sole issue in this appeal is whether the Federal

Railroad Safety Act of 1970 (railroad act), 49 U.S.C.

§ 20101 et seq., preempts the negligence claims brought by

the plaintiff, Jamey Murphy, individually and as executrix

of the estate of her late husband, Kevin Murphy (decedent),

against the defendant Metro-North Commuter Railroad

Company.1 We conclude that the railroad act does not

preempt the plaintiff’s negligence claims and, accordingly,

reverse the judgment of the trial court rendered in favor

of the defendant on that ground. 2

The following facts and procedural history are

relevant to this appeal. On March 4, 2013, at approximately

6:30 a.m., the decedent, was walking on the platform

adjacent to the westbound tracks at the Noroton Heights

train station in Darien. The decedent was awaiting his

commuter train to New York City. On that morning,

1. Although the plaintiff also brought claims against the town

of Darien and Wilton Enterprises, Inc., she has subsequently

withdrawn those claims. For the sake of simplicity, we refer to

Metro-North Commuter Railroad Company as the defendant.

2. During the underlying proceedings, the defendant asserted

that the Interstate Commerce Commission Termination Act, 49

U.S.C. § 10101 et seq., also preempted the plaintiff’s negligence

claims. The defendant has withdrawn that claim, and, therefore,

we do not address it in the present appeal.

3a

Appendix A

there was a patch of ice on the platform, which measured

approximately nine feet long and approximately one

foot wide. As the decedent was walking on the platform,

he encountered the ice patch, slipped and fell onto the

westbound track closest to the platform.

At that time, one of the defendant’s trains was coming

around a curve and approaching the Noroton Heights

station on the track closest to the westbound platform.

This train was scheduled to travel through the Noroton

Heights station without stopping and to do the same

through four other commuter stations before completing

its express route to Stamford. This type of train is

referred to as a “through train.”

As the train approached the Noroton Heights station,

the engineer sounded the train’s horn. He then saw an

object on the track. When the engineer realized it was

a person, he sounded the horn again and applied the

emergency brake. Nevertheless, the train struck the

decedent. As a result of the collision, the decedent suffered

severe trauma and was pronounced dead at the scene.

The plaintiff subsequently brought this action against

the defendant. See footnote 1 of this opinion. Specifically,

the operative complaint3 alleges that the decedent’s injuries

and death were proximately caused by the negligence of

the defendant when “it violated practices and customs

with respect to track selection by moving a through train

3. We note that the plaintiff amended her complaint five times.

The operative complaint was filed on March 21, 2017.

4a

Appendix A

traveling in excess of seventy miles per hour on the track

immediately adjacent to the platform when reasonable

care and general practice of [the defendant] required that

train to be on an interior track away from the platform.”

The plaintiff also alleges that the defendant’s negligence

caused her to suffer loss of spousal consortium. After

discovery, the defendant filed a motion for summary

judgment, and the plaintiff filed an objection.

In support of that motion, the defendant asserted

that the plaintiff’s negligence claims were preempted

by federal law. Specifically, the defendant asserted, in

pertinent part, that the plaintiff’s claims were barred by

the railroad act. The trial court agreed with the defendant,

concluding that, “[t]o the extent that the plaintiff’s claim

is viewed as relating to rail safety, it is preempted by the

[railroad act].” Accordingly, the trial court granted the

motion for summary judgment and rendered judgment

thereon in favor of the defendant. This appeal followed.4

On appeal, the plaintiff asserts that the trial court

incorrectly concluded that her claims were preempted

by the railroad act. Specifically, the plaintiff asserts

that the railroad act only preempts claims where a

federal regulation covers the subject matter, and no such

regulation exists for track selection. In response, the

defendant asserts that the trial court properly granted

its motion for summary judgment because the plaintiff’s

claims are preempted by the railroad act. Specifically,

4. The plaintiff appealed from the judgment of the trial court

to the Appellate Court, and we transferred the appeal to this court

pursuant to General Statutes § 51-199 (c) and Practice Book § 65-1.

5a

Appendix A

the defendant asserts that the subject matter of the

plaintiff’s claim is covered by federal regulation—namely,

regulations addressing speed and track classification. We

agree with the plaintiff.

“The standard of review of a trial court’s decision

granting summary judgment is well established. Practice

Book § 17-49 provides that summary judgment shall be

rendered forthwith if the pleadings, affidavits and any

other proof submitted show that there is no genuine

issue as to any material fact and that the moving party is

entitled to judgment as a matter of law…. Our review of

the trial court’s decision to grant the defendant’s motion

for summary judgment is plenary…. On appeal, we must

determine whether the legal conclusions reached by the

trial court are legally and logically correct and whether

they find support in the facts set out in the memorandum

of decision of the trial court.” (Citation omitted; internal

quotation marks omitted.) Lucenti v. Laviero, 327 Conn.

764, 772–73, 176 A.3d 1 (2018). “[T]he use of a motion for

summary judgment to challenge the legal sufficiency of

a complaint is appropriate when the complaint fails to set

forth a cause of action and the defendant can establish that

the defect could not be cured by repleading.” (Internal

quotation marks omitted.) Ferri v. Powell-Ferri, 317 Conn.

223, 236, 116 A.3d 297 (2015).

In the present case, the trial court granted the

defendant’s motion for summary judgment on the ground

that the plaintiff’s complaint was insufficient because

the negligence claims raised therein were preempted by

the railroad act. Accordingly, resolution of this appeal

6a

Appendix A

requires us to examine the trial court’s conclusion that

the plaintiff’s negligence claims are preempted by the

railroad act.

In doing so, we note that the question of whether

the plaintiff’s negligence claims are preempted by the

railroad act is one of law, and, therefore, our review is

plenary. “Whether state causes of action are preempted

by federal statutes and regulations is a question of law

over which our review is plenary.” Byrne v. Avery Center

for Obstetrics & Gynecology, P.C., 314 Conn. 433, 447, 102

A.3d 32 (2014); see also Hackett v. J.L.G. Properties, LLC,

285 Conn. 498, 502–504, 940 A.2d 769 (2008) (whether

trial court’s conclusion that municipal zoning regulations

were preempted by federal law was a question of law over

which court exercised plenary review). “[T]here is a strong

presumption against federal preemption of state and local

legislation…. This presumption is especially strong in

areas traditionally occupied by the states ….” (Citation

omitted; internal quotation marks omitted.) Dowling v.

Slotnik, 244 Conn. 781, 794, 712 A.2d 396, cert. denied

sub nom. Slotnik v. Considine, 525 U.S. 1017, 119 S. Ct.

542, 142 L. Ed. 2d 451 (1998).

“The ways in which federal law may [preempt] state

law are well established and in the first instance turn

on congressional intent…. Congress’ intent to supplant

state authority in a particular field may be express[ed] in

the terms of the statute…. Absent explicit [preemptive]

language, Congress’ intent to supersede state law in a

given area may nonetheless be implicit if a scheme of

federal regulation is so pervasive as to make reasonable

7a

Appendix A

the inference that Congress left no room for the [s]tates

to supplement it, if the [a]ct of Congress … touch[es] a

field in which the federal interest is so dominant that the

federal system will be assumed to preclude enforcement

of state laws on the same subject, or if the goals sought to

be obtained and the obligations imposed reveal a purpose

to preclude state authority….

“The question of preemption is one of federal law,

arising under the supremacy clause of the United States

constitution…. Determining whether Congress has

exercised its power to preempt state law is a question of

legislative intent…. [A]bsent an explicit statement that

Congress intends to preempt state law, courts should infer

such intent where Congress has legislated comprehensively

to occupy an entire field of regulation, leaving no room for

the [s]tates to supplement federal law … or where the state

law at issue conflicts with federal law, either because it is

impossible to comply with both … or because the state law

stands as an obstacle to the accomplishment and execution

of congressional objectives ….” (Citation omitted; internal

quotation marks omitted.) Hackett v. J.L.G. Properties,

LLC, supra, 285 Conn. at 503–504, 940 A.2d 769.

Furthermore, the United States Supreme Court has

explained that “[w]here a state statute conflicts with, or

frustrates, federal law, the former must give way. U.S.

Const., [a]rt. VI, cl. 2; Maryland v. Louisiana, 451 U.S.

725, [746, 101 S. Ct. 2114, 68 L. Ed. 2d 576] (1981). In the

interest of avoiding unintended encroachment on the

authority of the [s]tates, however, a court interpreting

a federal statute pertaining to a subject traditionally

8a

Appendix A

governed by state law will be reluctant to find [preemption].

Thus, [preemption] will not lie unless it is ‘the clear and

manifest purpose of Congress.’ Rice v. Santa Fe Elevator

Corp., 331 U.S. 218, [230, 67 S. Ct. 1146, 91 L. Ed. 1447]

(1947). Evidence of [preemptive] purpose is sought in the

text and structure of the statute at issue. Shaw v. Delta

Air Lines, Inc., 463 U.S. 85, [95, 103 S. Ct. 2890, 77 L.

Ed. 2d 490] (1983). If the statute contains an express

[preemption] clause, the task of statutory construction

must in the first instance focus on the plain wording of

the clause, which necessarily contains the best evidence

of Congress’ [preemptive] intent.” CSX Transportation,

Inc. v. Easterwood, 507 U.S. 658, 663–64, 113 S. Ct. 1732,

123 L. Ed. 2d 387 (1993); see also Id., at 673–75, 113 S. Ct.

1732 (concluding that negligence claim relating to failure

to maintain adequate warning devices at rail crossing

was not preempted by railroad act, but negligence claim

alleging excessive speed was preempted by railroad act).

A brief review of the railroad act provides context

for our analysis. The railroad act “was enacted in 1970 to

promote safety in all areas of railroad operations and to

reduce [railroad related] accidents, and to reduce deaths

and injuries to persons …. [Under the railroad act], the

Secretary [of Transportation] is given broad powers to

prescribe, as necessary, appropriate rules, regulations,

orders, and standards for all areas of railroad safety ….”

(Citations omitted; internal quotation marks omitted.) Id.,

at 661–63, 113 S. Ct. 1732; see also 49 U.S.C. § 20101 (2012)

(statement of legislative purpose); 49 U.S.C. § 20103 (a)

(2012) (delegating regulatory authority to Secretary of

Transportation).

9a

Appendix A

The railroad act contains an express preemption

clause, codified at 49 U.S.C. § 20106, entitled “Preemption.”

That statute provides in relevant part: “(a) National

Uniformity of Regulation.—(1) Laws, regulations, and

orders related to railroad safety and laws, regulations,

and orders related to railroad security shall be nationally

uniform to the extent practicable.

“(2) A State may adopt or continue in force a law,

regulation, or order related to railroad safety or security

until the Secretary of Transportation (with respect to

railroad safety matters), or the Secretary of Homeland

Security (with respect to railroad security matters),

prescribes a regulation or issues an order covering the

subject matter of the State requirement. A State may

adopt or continue in force an additional or more stringent

law, regulation, or order related to railroad safety or

security when the law, regulation, or order—

“(A) is necessary to eliminate or reduce an essentially

local safety or security hazard;

“(B) is not incompatible with a law, regulation, or

order of the United States Government; and

“(C) does not unreasonably burden interstate

commerce.” 49 U.S.C. § 20106 (a) (2012).

In 2007, Congress amended the railroad act preemption

clause by adding subsection (b). See Implementing

Recommendations of the 9/11 Commission Act of 2007,

Pub. L. No. 110-53, § 1528, 121 Stat. 266, 453. That

10a

Appendix A

subsection, which is entitled “Clarification Regarding

State Law Causes of Action,” provides in relevant part:

“Nothing in this section shall be construed to preempt

an action under State law seeking damages for personal

injury, death, or property damage alleging that a party—

“(A) has failed to comply with the Federal standard

of care established by a regulation or order issued by the

Secretary of Transportation (with respect to railroad

safety matters), or the Secretary of Homeland Security

(with respect to railroad security matters), covering the

subject matter as provided in subsection (a) of this section;

“(B) has failed to comply with its own plan, rule, or

standard that it created pursuant to a regulation or order

issued by either of the Secretaries; or

“(C) has failed to comply with a State law, regulation,

or order that is not incompatible with subsection (a) (2).”

49 U.S.C. § 20106 (b) (1) (2012).

As a result of this amendment, federal courts have

concluded that “the preemption analysis under the

amended [railroad act] requires a two step process.

We first ask whether the defendant allegedly violated

either a federal standard of care or an internal rule

that was created pursuant to a federal regulation. If so,

the plaintiff’s claim avoids preemption. [See 49 U.S.C.

§ 20106 (b) (1) (A) and (B) (2012)]. Other wise, we

move to the second step and ask whether any federal

regulation covers the plaintiff’s claim. [See 49 U.S.C.

§ 20106 (a) (2) (2012)]. A regulation covers—and thus

11a

Appendix A

preempts—the plaintiff ’s claim if it ‘substantially

subsume[s] the subject matter’ of that claim. [CSX

Transportation, Inc. v. Easterwood, supra, 507 U.S. at

664, 113 S.Ct. 1732] (noting that the regulation must do

more than ‘touch upon or relate to [the] subject matter’).”

Zimmerman v. Norfolk Southern Corp., 706 F.3d 170, 178

(3d Cir.), cert. denied, 571 U.S. 826, 134 S. Ct. 164, 187 L.

Ed. 2d 41 (2013); see also Grade v. BNSF Railway Co., 676

F.3d 680, 686 (8th Cir. 2012); Henning v. Union Pacific

Railroad Co., 530 F.3d 1206, 1214–16 (10th Cir. 2008). 5

The parties agree that the plaintiff’s claim does not

allege that the defendant violated any regulation or order,

or failed to comply with its own plan, rule, or standard

of care that it adopted pursuant to a federal regulation.

Accordingly, the parties agree that the appropriate

preemption analysis is contained within 49 U.S.C.

§ 20106 (a) (2). This provision provides that a state

law cause of action is preempted if the Secretary of

Transportation or the Secretary of Homeland Security

has “prescribe[d] a regulation or issue[d] an order

5. To the extent that the trial court’s decision can be read

to conclude that the plaintiff’s negligence claim relating to track

selection is preempted by the railroad act solely because “there

is no federal standard of care for the defendant to have violated,”

we disagree. Instead, we conclude that, under the two part test

adopted by federal courts, if there is no express regulation governing

the subject area of the plaintiff’s complaint, the court must next

consider whether there is a federal regulation or order covering the

subject matter of state law related to the plaintiff’s claim in order

to resolve the question of preemption. Indeed, both parties agree

on the applicable test.

12a

Appendix A

covering the subject matter of the State requirement”

on which the plaintiff ’s negligence claim is based.

(Emphasis added.) 49 U.S.C. § 20106 (a) (2) (2012). Thus,

the issue before this court is whether the Secretary of

Transportation or the Secretary of Homeland Security

has promulgated regulations covering the same subject

matter as Connecticut negligence law pertaining to the

selection of an interior track for a through train.

As the United States Supreme Court has explained,

“[t]o prevail on the claim that the regulations have

[preemptive] effect, [a] petitioner must establish more

than that they ‘touch upon’ or ‘relate to’ that subject

matter … for ‘covering’ is a more restrictive term which

indicates that [preemption] will lie only if the federal

regulations substantially subsume the subject matter

of the relevant state law. [See Webster’s Third New

International Dictionary (1961) p. 524] (in the phrase

‘policy clauses covering the situation,’ cover means ‘to

comprise, include, or embrace in an effective scope of

treatment or operation’). The term ‘covering’ is in turn

employed within a provision that displays considerable

solicitude for state law in that its express [preemption]

clause is both prefaced and succeeded by express saving

clauses.” (Citation omitted.) CSX Transportation, Inc. v.

Easterwood, supra, 507 U.S. at 664–65, 113 S.Ct. 1732.

In the present case, the plaintiff’s claim alleges

that the defendant was negligent in selecting the track

immediately adjacent to the platform to run a “through

train.” As we have explained, in order to resolve the

plaintiff’s appeal, we must determine whether there is a

13a

Appendix A

federal regulation that covers, or substantially subsumes,

the plaintiff’s claim. The defendant does not point to any

federal regulation that expressly governs track selection.

Indeed, the trial court recognized that, “[a]s both parties

have conceded, there is no federal rule or regulation that

specifically governs track selection.”

Never theless, the tr ial cou r t reasoned that ,

“[al]though there is not a federal regulation that specifically

covers track selection, the federal regulations in regards

to tracks is extensive and, therefore, subsume the subject

matter of the plaintiff’s claim.” In support of its conclusion,

the trial court relied on several specific regulations

contained within part 213 of title 49 of the Code of Federal

Regulations, which is entitled “Track Safety Standards.”

See 49 C.F.R. § 213.9 (2012) (setting speed limits for

trains operating on each class of track); 49 C.F.R. § 213.53

(2012) (measuring gage of track); 49 C.F.R. § 213.57 (2012)

(establishing speed limitations based on curvature and

elevation of track); 49 C.F.R. § 213.109 (2012) (establishing

requirements for crossties); 49 C.F.R. § 213.121 (2012)

(establishing requirements for rail joints); 49 C.F.R.

§ 213.231 et seq. (2012) (establishing requirements for track

inspection). The trial court reasoned that, “[a]s part of an

overall scheme to standardize railroad transportation and

specifically as a scheme that expansively covers railroad

track safety … the subject matter of the plaintiff’s claim

is clearly ‘covered’ and ‘substantially subsumed’ by these

federal regulations.” (Citation omitted; emphasis omitted.)

We disagree.

We first turn to the regulations on which the trial

court relied, namely, part 213 of title 49 of the Code of

14a

Appendix A

Federal Regulations. The scope of these regulations is

explained as follows: “This part prescribes minimum

safety requirements for railroad track that is part of the

general railroad system of transportation. In general, the

requirements prescribed in this part apply to specific track

conditions existing in isolation. Therefore, a combination of

track conditions, none of which individually amounts to a

deviation from the requirements in this part, may require

remedial action to provide for safe operations over that

track. This part does not restrict a railroad from adopting

and enforcing additional or more stringent requirements

not inconsistent with this part.” 49 C.F.R. § 213.1 (a) (2012).

Accordingly, part 213 of title 49 of the Code of Federal

Regulations expressly states that it provides minimum

safety requirements and that conditions may be present

that require a greater standard of care.

Indeed, although the regulations cited by the trial

court touch upon tracks, nothing in those regulations

indicates that they subsume the subject matter of selecting

tracks for through trains. Those regulations set forth how

the gage of a track is to be measured and the required

size for various tracks. See 49 C.F.R. § 213.53 (2012).

Another regulation regulates the maximum elevation of

the outer rail on a curve. See 49 C.F.R. § 213.57 (2012).

Other regulations regulate the components of a rail—i.e.

crossties and rail joints. See 49 C.F.R. §§ 213.109 and

213.121 (2012). Yet another regulation delineates the speed

a train can travel on tracks of various classes. See 49

C.F.R. § 213.9 (2012). Each of these regulations covers a

different subject matter than that raised by the plaintiff’s

claim—namely, selection of an interior or exterior track

15a

Appendix A

for operation of a through train. None of the regulations

relied on by the defendant or cited by the trial court

even mentions selection of an interior or exterior track.

Accordingly, the express terms of these provisions support

a conclusion that the plaintiff’s claim is not covered by the

regulations.

Although no court has addressed a track selection

claim similar to the plaintiff’s claim in this case, a review

of the case law regarding preemption of state law claims

under the railroad act is instructive. For instance, in

CSX Transportation, Inc. v. Easterwood, supra, 507 U.S.

at 667–68, 113 S.Ct. 1732,6 the United States Supreme

Court held that the railroad act did not preempt a state

common-law negligence claim regarding the railroad’s

duty to maintain warning devices at a railroad crossing.

In doing so, the United States Supreme Court rejected the

railroad’s claim that the subject matter of the plaintiff’s

claim was covered by regulations requiring that all traffic

control devices installed comply with the Federal Highway

Administration’s manual on uniform traffic control

devices. Id., at 665–66, 113 S. Ct. 1732. Instead, the United

States Supreme Court explained that, although the states

were required to employ warning devices that conformed

to standards set forth in the regulations in order to obtain

6. We recognize that CSX Transportation, Inc. v. Easterwood,

supra, 507 U.S. at 661–65, 113 S.Ct. 1732, was decided prior to

the 2007 amendment to the preemption provision in the railroad

act. Nevertheless, it is well established that the interpretation of

the preemption provision in Easterwood remains good law for the

purpose of interpreting 49 U.S.C. § 20106 (a). See, e.g., Zimmerman

v. Norfolk Southern Corp., supra, 706 F.3d at 177–78.

16a

Appendix A

federal funding, state negligence law always played a role

in maintaining safety at railroad crossings, and “there

is no explicit indication in the regulations … that the

terms of the [f]ederal [g]overnment’s bargain with the

[s]tates require modification of this regime of separate

spheres of responsibility.” Id., at 668, 113 S. Ct. 1732.

Accordingly, the United States Supreme Court reasoned

that, “[i]n light of the relatively stringent standard set by

the language of [the railroad act’s preemption provision]

and the presumption against preemption, and given that

the regulations provide no affirmative indication of their

effect on negligence law, [the court is] not prepared to

find [preemption] solely on the strength of the general

mandates of [regulations governing warning devices at

railroad crossings].” Id.

On the other hand, in Norfolk Southern Railway Co.

v. Shanklin, 529 U.S. 344, 352–53, 120 S. Ct. 1467, 146 L.

Ed. 2d 374 (2000), the United States Supreme Court did

conclude that a state law negligence claim alleging that

there were inadequate warning signs at a railroad crossing

was preempted when the federal regulations applicable

to that railroad crossing required the installation of a

particular warning device at a particular railway crossing.

Accordingly, the United States Supreme Court concluded

that, “[b]ecause those regulations establish requirements

as to the installation of particular warning devices …

when [those regulations] are applicable, state tort law

is [preempted]…. Unlike the [regulations at issue in

Easterwood, these regulations], displace state and private

[decision-making] authority by establishing a [federal law]

requirement that certain protective devices be installed or

17a

Appendix A

federal approval obtained…. As a result, those regulations

effectively set the terms under which railroads are to

participate in the improvement of crossings.” (Citations

omitted; internal quotation marks omitted.) Id.7

The United States Court of Appeals for the Second

Circuit also has examined whether a state law claim was

preempted by the railroad act. In Island Park, LLC v.

CSX Transportation, 559 F.3d 96, 108 (2d Cir. 2009),

the Second Circuit concluded that a state agency order

to close a private rail crossing was not preempted by

the railroad act. Although it concluded that the closure

order implicated railroad safety, it concluded that it was

not preempted by the railroad act because the railroad

act “allows states to impose rail safety requirements as

long as they are not inconsistent with federal mandates.

[The plaintiff] points to no federal rail safety regulation

that covers rail crossing closures. Accordingly, the state

closure order is not [preempted] by [the railroad act].” Id.

In Strozyk v. Norfolk Southern Corp., 358 F.3d 268,

269 (3d Cir. 2004), the United States Court of Appeals

for the Third Circuit concluded that a state common-law

negligence claim against a railroad alleging poor visibility

at a railroad crossing was not preempted by the railroad

act. The railroad asserted that the plaintiff’s claim was

preempted by the regulations because the regulations

7. As noted subsequently in this opinion, a separate claim that

the railroad had failed to remove excessive vegetation from the area

surrounding the crossing was the subject of further proceedings on

remand. See Shanklin v. Norfolk Southern Railway Co., 369 F.3d

978, 987 (6th Cir. 2004).

18a

Appendix A

addressing the installation of warning devices at railroad

crossings mentioned limited visibility. Id., at 273. The

Third Circuit rejected the railroad’s claim and concluded

that a regulation’s “bare mention” of limited visibility did

“not indicate an intent to regulate” that condition. Id.

Similarly, the United States Court of Appeals for the

Sixth Circuit concluded that a state law negligence claim

alleging that vegetative growth on railroad property

obstructed the motorist’s view of an oncoming train was

not preempted. Shanklin v. Norfolk Southern Railway

Co., 369 F.3d 978, 987 (6th Cir. 2004); see also footnote 8

of this opinion. The railroad asserted that the plaintiff’s

claim was preempted by regulations under the railroad

act that addressed the installation of warning devices and

one that provided that “[v]egetation on railroad property

which is on or immediately adjacent to [the] roadbed shall

be controlled so that it does not … [o]bstruct visibility

of railroad signs and signals,” preempted the plaintiff’s

claim. (Internal quotation marks omitted.) Id. The Sixth

Circuit explained that the regulation regarding vegetation

preempts any state law claim “regarding vegetative

growth that blocks a sign immediately adjacent to a

crossing, but it does not impose a broader duty to control

vegetation so that it does not obstruct a motorist’s visibility

of oncoming trains.” (Internal quotation marks omitted.)

Id. Accordingly, the Sixth Circuit concluded that the

plaintiff’s claim was not preempted because, although

these regulations touched upon vegetation, they did not

substantially subsume the subject matter of the plaintiff’s

claim. Id., at 988; see also 49 C.F.R. § 213.37 (b) (1993).

19a

Appendix A

The Third Circuit addressed preemption under the

railroad act again in MD Mall Associates, LLC v. CSX

Transportation, Inc., 715 F.3d 479, 491 (3d Cir. 2013),

cert. denied, 571 U.S. 1126, 134 S. Ct. 905, 187 L. Ed. 2d

778 (2014). In that case, the Third Circuit concluded that

a mall owner’s state law claim against a railroad owner

alleging negligence and storm water trespass was not

preempted by the railroad act. Id., at 490–91. In doing so,

the Third Circuit rejected the railroad owner’s claim that

a regulation promulgated under the railroad act, which

requires that a railroad’s drainage facilities “under or

immediately adjacent” to the track “be maintained and

kept free of obstruction” preempted the mall owner’s state

law claims. (Internal quotation marks omitted.) Id.; see

also 49 C.F.R. § 213.33 (2010). The Third Circuit explained

that it could not “read the silence of [49 C.F.R.] § 213.33

on a railroad’s duties to its neighbors when addressing

track drainage as an express abrogation of state storm

water trespass law. Given that the [railroad act] provides

no express authorization for disposing of drainage onto

an adjoining property, the presumption must be that state

laws regulating such action survive ….” (Citation omitted.)

MD Mall Associate, LLC v. CSX Transportation, Inc.,

at 491.

Another instructive case is Haynes v. National

Railroad Passenger Corp., 423 F. Supp. 2d 1073 (C.D. Cal.

2006). In Haynes, the estate and children of a passenger

who suffered a deep vein thrombosis after traveling on

an Amtrak train from Chicago to Los Angeles brought

an action in state court alleging that Amtrak violated

common-law and statutory duties of care that common

20a

Appendix A

carriers must exercise with respect to their passengers.

Id., at 1077. Specifically, the plaintiffs alleged that

dangerous seats and seating configurations in Amtrak

trains and Amtrak’s failure to warn passengers about

deep vein thrombosis caused the decedent to suffer deep

vein thrombosis and die. Id., at 1078.

The railroad filed a motion to dismiss for failure to

state a claim on which relief can be granted. Id., at 1077.

In its motion, the railroad claimed, inter alia, that the

plaintiffs’ claims were preempted by the railroad act. Id.,

at 1081. Specifically, the railroad claimed that the federal

regulations addressing seats and their configuration

on passenger trains covered the subject matter of the

plaintiffs’ complaint, thereby rendering the plaintiff’s

claim preempted by the railroad act. Id., at 1082. The

United States District Court for the Central District of

California explained that federal regulations addressed

safe passenger seats, how seats must be fastened to the

car body, the load the seats must be able to withstand, and

the inspection process for train seats. Id., at 1082.

Nevertheless, the court explained that “[t]he

regulations relied upon by the [railroad] govern seat safety

for circumstances involving train crashes and broken

seats. There is no discussion in the regulations of leg

room, seat pitch, or ensuring that seats do not contribute

to discomfort or illnesses like [deep vein thrombosis]. The

[c]ourt finds that there are no federal safety or security

regulations that substantially subsume state tort actions

regarding potential of [deep vein thrombosis] from poorly

designed seats or seating arrangements.” Id.

21a

Appendix A

The court also concluded that there were no federal

regulations that substantially subsumed the plaintiffs’

claims based on a duty to warn passengers about deep

vein thrombosis. Id. The court reasoned that, although

there are federal regulations regarding passenger safety

on trains in an emergency situation, because deep vein

thrombosis arises in nonemergency situations, the safety

regulations did not subsume the subject matter of deep

vein thrombosis warnings. Id.

The rationale employed in Haynes is instructive in

the present case because it demonstrates that, even when

courts have found an extensive regulatory scheme in a

particular area—such as passenger seating on trains—

the breadth of regulation does not mean that the subject

matter of a complaint is substantially subsumed by the

regulations. 8

A review of the case law regarding preemption under

the railroad act demonstrates that courts have been reticent

to find that a regulatory scheme covers or substantially

8. In Haynes v. National Railroad Passenger Corp., supra,

423 F. Supp. 2d at 1073, the railroad also asserted that the plaintiffs’

claims were preempted under the commerce clause of the United

States constitution because allowing states to regulate these areas

would place an undue burden on the flow of commerce across state

borders. See U.S. Const., art. I, § 8, cl. 3. The court concluded that

the plaintiffs’ claims regarding seats and seat configuration were

preempted under a dormant commerce clause analysis but that the

plaintiffs’ claims relating to the railroad’s duty to warn passengers

were not. Haynes v. National Railroad Passenger Corp., supra, at

1083–84.

22a

Appendix A

subsumes the subject matter of a plaintiff’s claim. Indeed,

even when regulations form a broad regulatory scheme

or mention the subject of a plaintiff’s claim, courts have

not found preemption unless the subject matter is clearly

subsumed by the regulations. This construction of the

railroad act is consistent with the principle that, “[i]n

the interest of avoiding unintended encroachment on the

authority of the [s]tates … a court interpreting a federal

statute pertaining to a subject traditionally governed

by state law will be reluctant to find [preemption]. Thus,

[preemption] will not lie unless it is ‘the clear and manifest

purpose of Congress.’ ” CSX Transportation, Inc. v.

Easterwood, supra, 507 U.S. at 663–64, 113 S.Ct. 1732.

Furthermore, the limited application of preemption of the

railroad act is also consistent with the express preemption

provision contained in the railroad act, which “displays

considerable solicitude for state law ….” Id., at 665, 113

S. Ct. 1732.

In the present case, the defendant asserts that the

trial court correctly concluded that, although there is

no regulation expressly addressing the selection of an

interior or exterior track for trains, the general regulatory

scheme of track classification substantially subsumes the

subject matter of the plaintiff’s claim. We disagree.

The defendant claims, and trial court concluded, that

Zimmerman v. Norfolk Southern Corp., supra, 706 F.3d at

170, supports the defendant’s contention that the plaintiff’s

claim is preempted by the act. In Zimmerman, the

plaintiff was a motorcyclist who was partially paralyzed

in a collision with a train at a railroad crossing. Id., at 175.

23a

Appendix A

The plaintiff claimed, inter alia, that the railroad should

have been liable for misclassification of the track. Id., at

186–87. Specifically, the plaintiff claimed that the railroad

violated a federal standard of care established by part

213 of title 49 of the Code of Federal Regulations, which

contains regulations for each class of tracks. Id., at 187.

The plaintiff claimed that, under these regulations, the

railroad was obligated to classify the track as class two or

higher due to the limited sight distance on the track. Id.

The Third Circuit rejected the plaintiff’s claim that there

was a federal standard of care regarding classification of

the tracks based on sight distance. Id. Instead, the Third

Circuit concluded that no regulation established the sight

distance necessary for each class of tracks, so no relevant

federal standard of care existed. Id.

The Third Circuit further explained that, “[d]espite

the absence of a federal standard of care, [the plaintiff]

may still avoid preemption if his claim falls outside the

scope of the original [railroad act] preemption provision….

As we have previously made clear, state claims are within

the scope of this provision if federal regulations ‘cover’ or

‘substantially subsume’ the subject matter of the claims….

The regulations must do more than ‘touch upon or relate

to that subject matter.’ ” (Citations omitted.) Id. The Third

Circuit then concluded that the regulations in part 213 of

title 29 of the Code of Federal Regulations “subsume[d]

[the plaintiff’s] misclassification claim. These regulations

establish varying requirements for each class of tracks—

governing everything from gage, alinement, and elevation,

to crossties, curve speed, and rail joints.” Id.

24a

Appendix A

The trial court in this case relied on the following

language from Zimmerman: “The regulations are

part of a broad scheme to standardize railroad tracks.

Admittedly, there is no regulation that classifies tracks

based on sight distance. But the breadth of the scheme

implies a decision not to classify on that basis. At the

very least, it implies that the federal government did not

want states to decide how tracks would be classified. We

doubt that the federal government would create a detailed

system with the expectation that states would impose

extra classification requirements—especially given the

risk that the requirements would vary from state to

state. This regulatory scheme preempts [the plaintiff’s]

misclassification claim.” Id. The trial court in this case

then concluded that, “[a]s in Zimmerman, the plaintiff’s

track selection claim is subsumed by this regulatory

scheme. Although there is no regulation that classifies

tracks on the basis of track selection, such as the choice

of using an exterior or interior track, ‘the breadth of the

scheme implies a decision not to classify on that basis.’ …

As part of an overall scheme … that expansively covers

railroad track safety … the subject matter of the plaintiff’s

claim is clearly ‘covered’ and ‘substantially subsumed’ by

these federal regulations…. The plaintiff’s track selection

claim is therefore preempted by this regulatory scheme.”

(Citations omitted; emphasis in original.)

We disagree that the foregoing analysis from

Zimmerman is applicable to the plaintiff’s claim in the

present case. Unlike Zimmerman, the claim in this case is

not based on an area that is clearly covered by the federal

regulations. In Zimmerman, it was undisputed that the

25a

Appendix A

regulations dictate whether a track is classified as class one,

two or three on the basis of various factors set forth in those

regulations. Zimmerman v. Norfolk Southern Corp., supra,

706 F.3d at 179. It was also undisputed in Zimmerman that

the basis of the claim at issue was whether the defendant

properly classified the track. Id., at 187. In Zimmerman,

the plaintiff’s claim essentially sought to impose another

factor into the decision of how to classify tracks—namely,

the sight distance of a particular track. Id. In concluding

that the claim in Zimmerman was preempted, the Third

Circuit concluded that the regulations already covered and

subsumed the factors by which a track should be classified

as class one, two or three. Id.

Indeed, as the United States Court of Appeals for the

Fifth Circuit has explained, preemption under the railroad

act “is even more disfavored than preemption generally….

The restrictive terms of its preemption provision [indicate]

that [preemption] will lie only if the federal regulations

substantially subsume the subject matter of the relevant

state law…. When applying [railroad act] preemption, the

[c]ourt eschews broad categories such as railroad safety,

focusing instead on the specific subject matter contained

in the federal regulation…. In sum, when deciding

whether the [railroad act] preempts state laws designed to

improve railroad safety, we interpret the relevant federal

regulations narrowly to ensure that the careful balance

that Congress has struck between state and federal

regulatory authority is not improperly disrupted in favor

of the federal government.” (Citations omitted; emphasis

in original; footnote omitted; internal quotation marks

omitted.) United Transportation Union v. Foster, 205

F.3d 851, 860 (5th Cir. 2000).

26a

Appendix A

In the present case, the regulations do not differentiate

between interior or exterior tracks and, most certainly, do

not provide a set of factors by which interior or exterior

tracks are chosen. Accordingly, the regulations do not

cover the selection of interior or exterior tracks. Unlike

the trial court, we are not persuaded that the failure to

address the selection of interior or exterior tracks implies

a decision not to differentiate between the two. As the case

law we have discussed herein demonstrates, in light of the

limited preemption provision in the railroad act, the mere

exclusion of a topic from the federal regulations does not

imply an intent to preempt state law on that topic.

On the basis of the foregoing, although we agree with

the trial court that there are extensive federal regulations

that address various topics related to tracks, we cannot

conclude that the subject matter of the plaintiff ’s

negligence claim—namely, the selection of an exterior

track for operating a through train—is “covered by” a

federal regulation. To the contrary, the federal regulations

relating to tracks touch upon, but do not substantially

subsume, the subject matter of the plaintiff’s complaint.9

9. We also note that, in California, the California High-Speed

Train Project regulates track selection for through trains and has

done so for almost ten years. See California High-Speed Train

Project, “Technical Memorandum 2.2.4: High-Speed Train Station

Platform Geometric Design” (2010) p. 11, available at http://www.hsr.

ca.gov/docs/programs/eir_memos/Proj_Guidelines_TM2_2_4R01.

pdf (last visited July 3, 2019). This memorandum provides that,

“[w]here practical, do not locate the platform adjacent to mainline

high-speed tracks. If this is not possible, passenger access to

platforms adjacent to tracks where trains may pass through stations

27a

Appendix A

Our conclusion is further buttressed by a review of

cases in which a court has found that a federal regulation

covers, or substantially subsumes, the subject matter of

a complaint. For instance, in In re Derailment Cases,

416 F.3d 787, 794 (8th Cir. 2005), the United States

Court of Appeals for the Eighth Circuit concluded that

the plaintiff’s claim alleging negligent inspection of

freight cars was preempted by the railroad act. The

Eighth Circuit concluded that the plaintiff’s claim was

preempted under the railroad act because “[i]t is clear

that the [federal railway administration’s] regulations are

intended to prevent negligent inspection by setting forth

minimum qualifications for inspectors, specifying certain

aspects of freight cars that must be inspected, providing

agency monitoring of the inspectors, and establishing a

civil enforcement regime. These intentions are buttressed

by the [federal railway administration] inspection manual

for federal and state inspectors.” Id.; see also BNSF

Railway Co. v. Swanson, 533 F.3d 618, 619–20 (8th Cir.

2008) (concluding that state statute making it illegal to,

inter alia, “discipline, harass or intimidate [a railroad]

employee to discourage the employee from receiving

medical attention” was preempted by federal regulation

mandating that railroads adopt policy statement declaring

that “harassment or intimidation of any person that is

calculated to discourage or prevent such person from

receiving proper medical treatment or from reporting such

accident, incident, injury or illness will not be permitted

without stopping may require mitigation ….” Id. The existence of the

regulatory scheme in California further supports our conclusion

that the railroad act does not preempt state law governing track

selection.

28a

Appendix A

or tolerated” [emphasis omitted; internal quotation marks

omitted] ), citing 49 C.F.R. § 225.33 (a) (1) (2008). As these

cases demonstrate, courts have found preemption under

the railroad act only when there is a federal regulation

that thoroughly addresses the safety concern raised

in the plaintiff’s complaint, not merely mentions it or

tangentially relates to it. See CSX Transportation, Inc.

v. Easterwood, supra, 507 U.S. at 664–65, 113 S.Ct. 1732

(regulations cover subject matter of plaintiff’s complaint

when they “comprise, include, or embrace [that concern]

in an effective scope of treatment or operation” [internal

quotation marks omitted]).

The defendant further asserts that the plaintiff’s

claim is preempted because, although framed as a claim

relating to track selection, it is essentially an excessive

speed claim, which is preempted by the railroad act. We

disagree.

It is well established that there are federal regulations

that cover the subject matter of train speed with

respect to track conditions. See Id., at 675, 113 S. Ct.

1732 (“concluding that relevant regulation “should be

understood as covering the subject matter of train speed

with respect to track conditions, including the conditions

posed by grade crossings”), citing 49 C.F.R. § 213.9 (a)

(1992). To be clear, the plaintiff in this case does not

assert that the defendant violated a federal standard of

care because the train was not traveling above the speed

limit. Cf. Zimmerman v. Norfolk Southern Corp., supra,

706 F.3d at 179. Accordingly, if the plaintiff’s claim was

based on the speed of the train, it would be preempted by

29a

Appendix A

the railroad act because all parties agree that the train

was traveling within the established speed limit.10

The plaintiff claims that the defendant “violated

practices and customs with respect to track selection by

moving a through train traveling in excess of seventy

miles per hour on the track immediately adjacent to the

platform when reasonable care and general practice of [the

defendant] required that train to be on an interior track

away from the platform.” The defendant asserts that this

“can only be characterized as a speed claim.” We disagree.

We find Dresser v. Union Pacific Railroad Co., 282

Neb. 537, 809 N.W.2d 713 (2011), instructive. In Dresser,

a motor vehicle passenger who was injured in a collision

with a train brought a state law negligence action against

the railroad company. Id., at 538, 809 N.W.2d 713. The

complaint alleged that the train crew was negligent in

failing to maintain a proper lookout, failing to slow or

stop the train to avoid the collision, and failing to sound

the horn. Id., at 540, 809 N.W.2d 713. The trial court

10. The plaintiff’s initial complaint included a claim that the

defendant “failed to maintain a proper operating speed of the

train ….” The defendant subsequently filed motions in limine

seeking to preclude the plaintiff from offering any evidence,

testimony, or argument regarding a claim of negligence based on

the speed of the train and any evidence, testimony, or argument

regarding any claim preempted by the railroad act or the Interstate

Commerce Commission Termination Act. The trial court granted

the defendant’s motions. Thereafter, the plaintiff filed the operative

complaint, which does not contain any claim related to the speed of

the train. Indeed, the plaintiff concedes that “the sole remaining

theory of negligence is limited to track selection.”

30a

Appendix A

concluded that the plaintiff’s claim was preempted. Id.,

at 541, 809 N.W.2d 713. The trial court reasoned that the

engineer’s failure to exercise ordinary care to avoid the

accident by failing to slow or stop the train was essentially

an excessive speed claim, which was preempted by the

railroad act. Id., at 549, 809 N.W.2d 713.

The Supreme Court of Nebraska reversed the

judgment of the trial court. Id., at 553, 809 N.W.2d 713.

In doing so, the Supreme Court of Nebraska reasoned:

“We do not agree with the [trial] court that appellants’

state law negligence claim based on [the railroad’s] alleged

failure to exercise ordinary care once it appeared that a

collision would probably occur is speed based and thus

preempted. State tort law is not preempted ‘until’ a federal

regulation ‘cover[s]’ the same subject matter, and we are

not presented with any federal regulations that cover a

railroad’s duty to exercise ordinary care in situations where

collisions are imminent. The mere fact that the speed the

train is traveling is tangentially related to how quickly

it can be stopped does not transform the claim into an

excessive speed claim. Nebraska tort law duties to exercise

reasonable care could be violated even if the federal train

speed limits are being followed.” (Footnote omitted.) Id.

Similarly, in Bashir v. National Railroad Passenger

Corp., 929 F. Supp. 404, 412 (S.D. Fla. 1996), aff’d sub nom.

Bashir v. Amtrak, 119 F.3d 929 (11th Cir. 1997), the United

States District Court for the Southern District of Florida

concluded that a plaintiff’s state law negligence claims

based on a failure to stop was not preempted by the railroad

act. The railroad had asserted that the failure to stop

31a

Appendix A

claims were covered by the federal regulations on excessive

speed. Id. The court rejected that claim, reasoning that the

railroad was “quite correct” that the relevant regulation;

see 49 C.F.R. § 213.9 (1993); “preempts inconsistent state

laws regarding speed. As the [c]ourt understands [the]

[p]laintiff’s negligent failure to stop claims, however, they

are not necessarily inconsistent with [that regulation].

This section simply prescribes the maximum speed at

which trains may operate given certain track types and

conditions. It is silent as to the instances in which a train

must stop to avoid colliding with an obstruction on the

tracks. State laws that direct a train to stop when, for

instance, a child is standing on the tracks do not conflict

with federal speed limits that prescribe the speed at which

the same train may travel in normal circumstances on the

same track. Indeed, if [the railroad’s] position were correct,

railroads would be insulated from state tort liability

regardless of whether a train attempted to stop to avoid

even the most obvious obstructions, simply because federal

law prescribes the speed at which they may travel absent

obstructions. Easterwood does not support this result.”

Bashir v. National Railroad Passenger Corp., supra, at 412.

Like the claims in Dresser and Bashir, the speed of

the train in the present case is tangentially related to

the plaintiff’s claim. In other words, the plaintiff’s claim

alleges that the defendant was negligent in choosing to

operate a train that did not stop at the Noroton Heights

station on the track immediately adjacent to the platform.

Because the plaintiff’s claim relates to the fact that the

train did not stop at the Noroton Heights station, the speed

of that train is tangentially related to the plaintiff’s claim.

32a

Appendix A

As the courts in Dresser and Bashir explained, title 49

of the Code of Federal Regulations, § 213.9, prescribes

only the maximum speed at which trains may operate on

certain track classifications. Nothing in that regulation

covers the subject of the plaintiff’s claim—namely,

whether it is negligent to operate a through train on a

track immediately adjacent to the platform when another

track is available. Accordingly, we disagree that the

plaintiff’s claim is essentially an excessive speed claim

that is preempted by the railroad act.

In light of the presumption against preemption,

the narrow preemption provision in the railroad act,

the express acknowledgment in title 49 of the Code of

Federal Regulations, § 213.1, that the federal regulations

provide the minimum safety standards, and the lack of a

regulatory provision expressly addressing track selection,

we cannot conclude that the defendant has met its burden

of demonstrating that the plaintiff’s claim was preempted

under the railroad act. Accordingly, we conclude that the

trial court improperly granted the defendant’s motion for

summary judgment.

The judgment is reversed and the case is remanded

with direction to deny the defendant’s motion for summary

judgment and for further proceedings according to law.

In this opinion the other justices concurred.

All Citations

332 Conn. 244, 210 A.3d 56

33a

AppendixOF

B THE SUPERIOR

APPENDIX B — OPINION

COURT OF CONNECTICUT, FAIRFIELD AT

BRIDGEPORT, DATED APRIL 10, 2017

SUPERIOR COURT OF CONNECTICUT,

FAIRFIELD AT BRIDGEPORT.

JAMEY MURPHY, INDIVIDUALLY AND

EXECUTRIX OF THE ESTATE OF

KEVIN MURPHY,

v.

TOWN OF DARIEN, et al.

April 10, 2017

OPINION

KAMP, J.

Pending before the court is the defendant Metro–

North Commuter Railroad Company’s motion for

summary judgment on the ground that the plaintiff’s

sole cause of action sounding in common-law negligence

is barred because it is preempted by federal law. For the

reasons set forth below, the defendant’s motion is granted.

FACTS

On December 2, 2013, the plaintiff, Jamey Murphy,

individually and as executrix of the estate of Kevin

Murphy, commenced this wrongful death action against the

34a

Appendix B

defendants, Metro–North Commuter Railroad Company

(Metro–North), Wilton Enterprises, Inc., and Town of

Darien. On October 25, 2016, the plaintiff withdrew as

to the defendants Wilton Enterprises, Inc. and Town

of Darien. In the plaintiff’s fifth amended complaint

(docket entry no. 253), the plaintiff alleges the following

facts. On March 4, 2013, the plaintiff’s decedent, Kevin

Murphy, was struck and killed by a Metro–North train.

While walking on the southbound platform at the Noroton

Heights station, Mr. Murphy slipped on an accumulation of

ice which caused him to fall onto the tracks, where he was

then struck and killed. The train that struck Mr. Murphy

was a Metro–North train which was not scheduled to stop

at Noroton Heights and was operating on the exterior

track closest to the platform. Because the train was not

scheduled to stop at Noroton Heights it was referred to as

a “through train.” The plaintiff alleges in the first count

that Metro–North was negligent in that it operated the

through train on a track immediately adjacent to the

platform when reasonable care required Metro–North

to select an interior track away from the platform. In the

second count the plaintiff, individually, asserts a claim for

loss of spousal consortium.

On October 24, 2016, Metro–North filed two motions

in limine. The first sought an order “precluding any other

party to this action from introducing evidence, testimony

or argument in advance of any claim of negligence

based on the speed of the train which struck plaintiff’s

decedent.” (Docket entry no. 213.) The second motion in

limine sought an order “precluding any other party to this

action from introducing evidence, testimony or argument

35a

Appendix B

that ‘through trains,’ including the train that struck the

plaintiff’s decedent, should not be run on tracks adjacent

to station platforms.” (Docket entry no. 214.)

On March 4, 2017, after hearing oral argument on

the motions in limine, this court granted Metro–North’s

motion in limine with regard to the speed of the train.

Specifically, this court held that “the Federal Railroad

Safety Act (FRSA), 49 U.S.C. § 20101, specifically § 20106

and 49 C.F.R. § 213.9 preempt all state law claims.”

(Docket entry no. 213.10.) On that same date, this court

granted the defendant’s motion in limine with regard to

the choice of track selection allegations. The court held

that any such claims are preempted by the Interstate

Commerce Commission Termination Act, 49 U.S.C.

§ 10101 (ICCTA). (Docket entry no. 214.10.)

On March 23, 2017, Metro–North filed a motion for

summary judgment and accompanying memorandum

in support, along with several supporting exhibits.1 The

plaintiff filed an objection to the defendant’s motion on

March 24, 2017. 2 The parties waived oral argument on

the motion and objection thereto. 2

1. The defendant’s exhibits included (A) the M.T.A. Police

Department Incident Report; (B) excerpts from the deposition

of Peter Navarra; (C) excerpts from the deposition of George

Gavalla; and (D) the safety analysis report prepared by George

Gavalla dated July 20, 2016.

2. The plaintiff’s exhibits included (A) the affidavit of George

Gavalla and his safety analysis report dated July 20, 2016; (B)

excerpts from the deposition of James Brandt; (C) technical

memorandum California High–Speed Train Project; (C) excerpts

36a

Appendix B

DISCUSSION

I

SUMMARY JUDGMENT STANDARD

AND ARGUMENTS

“Summary judgment is a method of resolving

litigation when pleadings, affidavits, and any other proof

submitted show that there is no genuine issue as to any

material fact and that the moving party is entitled to

judgment as a matter of law ... The motion for summary

judgment is designed to eliminate the delay and expense

of litigating an issue when there is no real issue to be tried

... However, since litigants ordinarily have a constitutional

right to have issues of fact decided by a jury ... the

moving party for summary judgment is held to a strict

standard ... of demonstrating his entitlement to summary

judgment.” (Citation omitted; footnote omitted; internal

quotation marks omitted.) Grenier v. Commissioner of

Transportation, 306 Conn. 523, 534–35, 51 A.3d 367

(2012). “[T]he use of a motion for summary judgment to

challenge the legal sufficiency of a complaint is appropriate

when the complaint fails to set forth a cause of action and

the defendant can establish that the defect could not be

cured by repleading.” (Internal quotation marks omitted.)

Ferri v. Powell–Ferri, 317 Conn. 223, 236, 116 A.3d 297

(2015).

from the deposition of George Gavalla; (D) a copy of Battley v.

Great West Casualty Ins. Co., United States District Court,

Docket No. 14–494–JJB–SCR (M.D.La. January 12, 2015); and (D)

a copy of Battley v. Great West Casualty Ins. Co., United States

District Court, Docket No. 14–494–JJB (M.D.La. March 18, 2015).

37a

Appendix B

In the present case, the defendant asserts that as

a result of the court’s ruling on the motion in limine

regarding track selection, the plaintiff no longer has

a viable claim based upon Connecticut common-law

negligence. 3 In response, the plaintiff maintains that the

court’s ruling that the track selection claim is expressly

preempted by federal law was in error. More specifically,

the plaintiff argues that unless there is a federal rule,

regulation or statute that expressly dictates or mandates

train track selection, claims based on Connecticut common

law are not preempted.4

II

INTERSTATE COMMERCE COMMISSION

TERMINATION ACT 49 U.S.C. § 10101

“In determining the nature and reach of federal

preemption, Congress’s intent is the ultimate touchstone

... Congress can indicate its preemptive intent either

expressly through a statute’s plain language, or impliedly

through a statute’s structure and purpose ... Regardless

of how Congress indicates its intent, [courts] begin with

the assumption that the historic police powers of the

States are not to be superseded by the Federal Act unless

3. The plaintiff has withdrawn its negligence claim regarding

the speed of the train that was the subject of the court’s ruling on

the defendant’s motion in limine. (Docket no. 213.10.)

4. Unlike the issue regarding the speed of the train both

the plaintiff and defendant agree that there is no federal rule,

regulation or statute that expressly governs train track selection.

38a

Appendix B

that was the clear and manifest purpose of Congress ...

[This] assumption applies with less force when Congress

legislates in a field with a history of significant federal

presence.” (Citations omitted; internal quotation marks

omitted.) Elam v. Kansas City Southern Railway Co.,

635 F.3d 796, 803–04 (5th Cir. 2011).

Congress has exercised broad regulatory authority

over rail transportation for 130 years, since the Interstate

Commerce Act (ICA) created the Interstate Commerce

Commission (ICC) in 1887. “The ICA was ‘among the

most pervasive and comprehensive of federal regulatory

schemes and has consequently presented recurring

pre-emption questions from the time of its enactment.’”

Island Park, LLC v. CSX Transportation, Inc., 559

F.3d 96, 102 (2d Cir. 2009). In 1995, Congress enacted

the Interstate Commerce Commission Termination Act

(ICCTA), 49 U.S.C. § 10101. The ICCTA abolished the

Interstate Commerce Commission and created a new

Surface Transportation Board (STB) to regulate rail

transportation. 49 U.S.C. § 10501(a)(1). The ICCTA creates

exclusive federal regulatory jurisdiction and exclusive

federal remedies. Specifically, the ICCTA provides:

The jurisdiction of the [STB] over—

(1) transportation by rail carriers, and the

remedies provided in this part with respect

to rates, classifications, rules (including car

service, interchange, and other operating

rules), practices, routes, services, and facilities

of such carriers; and

39a

Appendix B

(2) the construction, acquisition, operation,

abandonment, or discontinuance of spur,

industrial, team, switching, or side tracks,

or facilities, even if the tracks are located, or

intended to be located, entirely in one State,

is exclusive. Except as otherwise

provided in this part, the remedies

provided under this part with respect

to regulation of rail transportation

are exclu sive an d p reempt th e

remedies provided under Federal

or State law. (Emphasis added.) 49

U.S.C. § 10501(b).

Rail “transportation” is expansively defined to

include: (A) a locomotive, car, vehicle, vessel ... property,

facility, instrumentality, or equipment of any kind related

to the movement of passengers or property, or both, by

rail ... and (B) services related to that movement ...” 49

U.S.C. § 10102(9).

There is no reported Connecticut appellate authority

regarding federal preemption pursuant to the ICCTA.

In addition, the court was unable to find any reported

authority either in the federal court system or any state

court decisions regarding ICCTA preemption regarding a

claim involving track selection. The present case appears

to be one of first impression. Numerous courts other than

in Connecticut, however, have spoken on the question of

the scope of preemption under the ICCTA.

40a

Appendix B

“[T]he plain language of Section 10501 reflects clear

congressional intent to preempt state and local regulation

of integral rail facilities. It is difficult to imagine a

broader statement of Congress’s intent to preempt state

regulatory authority over railroad operations.” (Internal

quotation marks omitted.) Green Mountain Railroad

Corp. v. Vermont, 404 F.3d 638, 645 (2d Cir. 2005).

Accordingly, “the ICCTA completely preempts state law

tort actions that ‘fall squarely’ under § 10501(b).” Elam

v. Kansas City Southern Railway Co., supra, 635 F.3d

806. A state law will fall “squarely under” § 10501(b) if it

“may reasonably be said to have the effect of managing or

governing rail transportation ...” Island Park, LLC v. CSX

Transportation, Inc., supra, 559 F.3d 102; see also Elam

v. Kansas City Southern Railway Co., supra, 806–07

(“a state law tort remedy that would directly regulate

a railroad’s switching rates and services falls squarely

under § 10501[b]”).

In Island Park, LLC v. CSX Transportation, Inc.,

the Second Circuit concluded that New York State’s rail

crossing closure order was not preempted under the

ICCTA. Island Park, LLC v. CSX Transportation, Inc.,

supra, 559 F.3d 103–05. In that case, New York sought

to terminate the use of a private roadway that traversed

railroad tracks, which was used by Island Park to

transport farm equipment to a field on the other side of

the tracks. Id., 99. New York, however, “[did] not seek to

impose its authority over the tracks themselves or over

‘rail carriers’ that use the tracks. Rather, the result of the

state regulation at issue ... [was] the termination of Island

Park’s use of the crossing.” Id., 103. “[A]lthough ICCTA’s

41a

Appendix B

pre-emption language is unquestionably broad, it does not

categorically sweep up all state regulation that touches

upon railroads-interference with rail transportation must

always be demonstrated.” Id., 104. Closing a rail crossing

to a non-rail carrier, that did not move passengers or

property by rail; see 49 U.S.C. § 10102(9)(A); did not

interfere with or burden rail operations. Island Park,

LLC v. CSX Transportation, Inc., supra, 105. This case

was thus distinguishable from the situations in Green

Mountain Railroad Co. v. Vermont, supra, 404 F.3d 643–

45, where a permit requirement was preempted because it

interfered with rail operations, such as the construction of

facilities, and in Friberg v. Kansas City Southern Railway

Co., 267 F.3d 439 (5th Cir. 2001), where an anti-blocking

statute was preempted because of its interference with

how a railroad operated its trains. Id., 443. In that case,

the court found that Texas’s Anti–Blocking Statute, which

regulated how long a train could occupy a rail crossing,

was preempted, because “[r]egulating the time a train

can occupy a rail crossing impacts, in such areas as train

speed, length and scheduling, the way a railroad operates

its trains, with concomitant economic ramifications ...” Id.

The STB itself, in CSX Transportation, Inc.—

Petition for Declaratory Order, SBT Finance Docket

No. 34662 (March 14, 2005) (CSX I ), has discussed the

scope of ICCTA preemption and recognized that its

preemptive effect is “broad and sweeping.” CSX I, supra,

p. 7. In that decision, the STB granted CSXT’s petition

for a declaratory order that a D.C. Act, which placed

restrictions on the transportation of certain classes of

hazardous materials as well as empty hazardous materials

42a

Appendix B

rail cars, was preempted by § 10501(b). Id., pp. 2, 5.

“[S]ection 10501(b) does not leave room for state and local

regulation of activities related to rail transportation,

including routing matters. As the courts have observed,

[i]t is difficult to imagine a broader statement of Congress’

intent to preempt state regulatory authority over railroad

operations’ than that contained in section 10501(b) ...

Every court that has examined the statutory language has

concluded that the preemptive effect of section 10501(b) is

broad and sweeping, and that it blocks actions by states or

localities that would impinge on the Board’s jurisdiction

or a railroad’s ability to conduct its rail operations.”

(Citations omitted.) Id., p. 7. “By enacting section 10501(b),

Congress foreclosed state or local power to determine

how a railroad’s traffic should be routed.” Id., p. 8; see

also CSX Transportation, Inc.—Petition for Declaratory

Order, SBT Finance Docket No. 34662 (May 3, 2005) (CSX

II ) (reaffirming prior decision and denying requests for

reconsideration) (“under the plain language of the statute,

any state or local attempt to determine how a railroad’s

traffic should be routed is preempted”).

In the present case, the plaintiff argues that her

claims are not expressly preempted because there is no

direct federal regulation or statute that governs track

selection. Rather, the plaintiff argues that the defendant

must submit competent evidence to establish that track

selection issues are impliedly preempted which the

defendant has failed to do. The existence or lack thereof

of a federal regulation or statute regarding track selection

is not necessary for the plaintiff’s claims to be expressly

preempted by § 10501(b). That statute provides the STB

43a

Appendix B

with exclusive jurisdiction over the transportation of rail

carriers and the remedies provided under that part with

respect to rules, including operating rules, practices, and

routes; see 49 U.S.C. § 10501(b)(1); as well as with respect

to the operation of “spur, industrial, team, switching, or

side tracks.” See 49 U.S.C. § (b)(2). The selection of which

track to use would clearly go to the heart of a railroad’s

operation of its rails and involves consideration of such

things as routing and scheduling, operational decisions

that a state cannot interfere with. See e.g., Friberg v.

Kansas City Southern Railway Co., supra, 267 F.3d 443;

CSX I, Docket No. 34662, supra, p. 7.

The plaintiff cites to the Connecticut Superior Court

decision of Lin v. National Railroad Passenger Corp.,

Superior Court, judicial district of New Haven, Docket No.

CV–99–0431868–S (February 11, 2002, Zoarski, J.T.R.)

[31 Conn. L. Rptr. 380], as authority for her argument

that preemption should not apply. In Lin, the estate of

a pedestrian brought a wrongful death action against

the railroad arising from an accident in which the train

struck the plaintiff’s decedent while she was walking

across a railroad trestle. Lin v. National Railroad

Passenger Corp., supra. The court concluded that the

plaintiff’s claims with regards to inadequate walkways

and fencing were not preempted because there was no

clear congressional intent or mandate to preempt such

causes of action. Id. This case is inapposite because it

dealt with preemption under the Federal Railroad Safety

Act, 49 U.S.C. § 20101, rather than the ICCTA, and

involved claims not related to rail operation, or that would

only incidentally effect rail transportation. See Island

44a

Appendix B

Park, LLC v. CSX Transportation, supra, 559 F.3d 102.

Furthermore, as will be discussed below, the plaintiff’s

claim would also be preempted under the FRSA.

Because the ICCTA completely preempts state law

or actions that would attempt to manage rail operations

or determine how a railroad’s traffic should be routed,

the plaintiff’s claims with regards to track selection are

expressly preempted.

III

FEDERAL RAILROAD SAFETY ACT

49 U.S.C. § 20101

The plaintiff’s objection to the defendant’s motion for

summary judgment primarily focuses on the lack of a

federal regulation or rule with regards to track selection

and preemption under the Federal Railroad Safety Act of

1970 (FRSA), 49 U.S.C. § 20101 et seq. The plaintiff argues

that her claim does not seek to manage rail operations, but

rather, concerns rail safety, specifically with regards to

the choice to use a track adjacent to a platform for a fast

moving through train. To the extent that the plaintiff’s

claim is viewed as relating to rail safety, it is preempted

by the FRSA.

“The purpose of [the FRSA] is to promote safety in

every area of railroad operations and reduce railroadrelated accidents and incidents.” 49 U.S.C. § 20101.

The FRSA confers authority upon the Secretary of

Transportation to “prescribe regulations and issue

45a

Appendix B

orders for every area of railroad safety.” 49 U.S.C.

§ 20103(a). Preemption is specifically addressed by the

FRSA and subsection (a)(1) sets forth the scope: “Laws,

regulations, and orders related to railroad safety ... shall

be nationally uniform to the extent practicable ...” 49

U.S.C. § 20106(a)(1). Subsection (a)(2) provides in relevant

part that: “A State may adopt or continue in force a law,

regulation, or order related to railroad safety ... until the

Secretary of Transportation ... prescribes a regulation or

issues an order covering the subject matter of the State

requirement. A state may adopt or continue in force an

additional or more stringent law, regulation, or order

related to railroad safety ... when the law, regulation, or

order—

(A) is necessary to eliminate or reduce an

essentially local safety ... hazard;

(B) is not incompatible with a law, regulation,

or order of the United States Government; and

(C) does not unreasonably burden interstate

commerce. 49 U.S.C. § 20106(a) (2).

Congress amended this provision in 2007 and added

subsection (b) which provides in relevant part: (1) Nothing

in this section shall be construed to preempt an action

under State law seeking damages for personal injury,

death, or property damage alleging that a party—

(A) has failed to comply with the Federal

standard of care established by a regulation or

46a

Appendix B

order issued by the Secretary of Transportation

... covering the subject matter as provided in

subsection (a) of this section;

(B) has failed to comply with its own plan,

rule, or standard that it created pursuant to a

regulation or order issued by [the Secretary

of Transportation]; or

(C) has failed to comply with a State law,

regulation, or order that is not incompatible

with subsection (a)(2).

(Emphasis added.) 49 U.S.C. § 20106(b)(1).

Courts have concluded that “the preemption analysis

under the amended FRSA requires a two-step process.

[A court] first ask[s] whether the defendant allegedly

violated either a federal standard of care or an internal

rule that was created pursuant to a federal regulation. If

so, the plaintiff’s claim avoids preemption ... Otherwise,

[courts] move to the second step and ask whether any

federal regulation covers the plaintiff ’s claim ... A

regulation covers—and thus preempts—the plaintiff’s

claim if it ‘substantially subsume[s] the subject matter’ of

that claim.” (Citations omitted.) Zimmerman v. Norfolk

Southern Corp., 706 F.3d 170, 178 (3d Cir. 2013).

The plaintiff claims that the defendant was negligent in

using a track adjacent to the platform for a through-train

traveling in excess of 70 miles per hour. The defendant

argues that this is actually an excessive speed claim in

47a

Appendix B

disguise. The defendant’s contention that the plaintiff’s

negligent track selection claim is inherently an excessive

speed claim is persuasive. First, the speed of the train is

an intrinsic part of the plaintiff’s negligence allegation

in her fifth amended complaint. Second, the plaintiff’s

railroad safety expert, George Gavalla, continuously

references train speed and the specific speed of the train

in question in his opinion for why the train should have

been routed on an interior track. See Def.’s Mem. Summ.

J., Ex. D. Gavalla discusses through trains versus trains

making a scheduled stop and the different speeds in which

they enter the station, to explain why faster moving and/

or through trains should be placed on tracks that are not

alongside platforms. Id.

It is therefore apparent that the track choice, by itself,

is not the sole basis for negligence. Such a claim would

of course be illogical, as trains must stop alongside a

platform to discharge and pick up passengers. Rather, it

is the fact that a track adjacent to a platform was used for

a train traveling at a high speed that is objected to. The

speed of the train is a necessary corollary to the plaintiff’s

claim. Accordingly, to the extent that the plaintiff’s claim

can be characterized as an excessive speed claim, it is

expressly preempted because the train was traveling

between 69–73 miles per hour, which is below the speed

limit set forth for a Class 4 track, which is 80 miles per

hour for a passenger train. See 49 C.F.R. § 213.9(a). There

are clearly regulations that “cover the subject matter

of train speed with respect to track conditions”; CSX

Transportation, Inc. v. Easterwood, 507 U.S. 658, 675,

113 S.Ct. 1732, 123 L.Ed.2d 387 (1993); and the defendant

48a

Appendix B

did not violate a federal standard of care, because the train

was not traveling above the speed limit. See Zimmerman

v. Norfolk Southern Corp., supra, 706 F.3d 179.

To the extent, however, that the plaintiff’s claim

cannot be characterized as an excessive speed claim,

it would still be subject to express preemption under

the FRSA. As both parties have conceded, there is no

federal rule or regulation that specifically governs track

selection. Accordingly, there is no federal standard of

care for the defendant to have violated. Although the

plaintiff alleges that the defendant “violated practices and

customs” and argues in its objection to the defendant’s

motion that the defendant violated its “general practice”

to operate through trains on interior tracks that does not

equate to “an internal rule created pursuant to a federal

regulation.” See 49 U.S.C. § 20106(b)(1); see also Middle

River Tract, LLC v. Central of Georgia Railroad Co.,

339 Ga.App. 546, 549 (2016) (“[t]he flaw in this reasoning

... is that [the plaintiff’s] claims are preempted unless

Standard 425 was ‘created pursuant to a regulation or

order issued by [the Secretary of Transportation]’ ... and

the record fails to establish that it was” [citation omitted];

Zimmerman v. Norfolk Southern Corp., supra, 706

F.3d 192 n.17 (“Zimmerman also identifies a number of

internal rules that Norfolk Southern supposedly violated.

These supposed violations do not help Zimmerman avoid

preemption because he fails to show the internal rules

were ‘created pursuant to a regulation or order’ ”).

Finally, even though there is not a federal regulation

that specifically covers track selection, the federal

49a

Appendix B

regulations in regards to tracks is extensive and,

therefore, subsume the subject matter of the plaintiff’s

claim. See Zimmerman v. Norfolk Southern Corp.,

supra, 706 F. 3d 187. In the absence of a federal

standard of care, a plaintiff may still avoid preemption

if their claim falls outside the scope of the first section

of the FRSA preemption provision. See 49 U.S.C.

§ 20106(a)(2); see also Zimmerman v. Norfolk Southern

Corp., supra, 187. Claims fall within the scope of this

section “if federal regulations ‘cover’ or ‘substantially

subsume’ the subject matter of the claims.” Zimmerman

v. Norfolk Southern Corp., supra, 187. In Zimmerman,

the court found that the plaintiff’s claim that the track at

issue had been misclassified because of the limited sight

distance was preempted because although there was no

federal standard of care, the regulations of 49 C.F.R.

§ 213 et seq., subsumed his claim. Id. “The regulations

are part of a broad scheme to standardize railroad tracks.

Admittedly, there is no regulation that classifies tracks

based on sight distance. But the breadth of the scheme

implies a decision not to classify on that basis. At the very

least, it implies that the federal government did not want

states to decide how tracks would be classified.” Id.

The regulations in this part establish requirements

for each class of tracks, governing everything from speed

limits, gage, alignment, and elevation to crossties, curve

speed, and rail joints, as well as how tracks should be

inspected. See 49 C.F.R. § 213.9 (establishing operating

speed limits for each class of track); § 213.53 (explaining

proper method for measuring gage); § 213.55 (creating

alignment standards); § 213.57 (establishing maximum

50a

Appendix B

speed based on track elevation and curvature); § 213.109

(requiring more crossties for higher track classes);

§ 213.121 (noting rail joints must “be of a structurally sound

design”); § 213.231 (subpart prescribing requirements

for frequency and manner of track inspections). As in

Zimmerman, the plaintiff’s track selection claim is

subsumed by this regulatory scheme. Although there is

no regulation that classifies tracks on the basis of track

selection, such as the choice of using an exterior or interior

track, “the breadth of the scheme implies a decision not to

classify on that basis.” Zimmerman v. Norfolk Southern

Corp., supra, 706 F.3d 187. As part of an overall scheme

to standardize railroad transportation and specifically as

a scheme that expansively covers railroad track safety;

see 49 U.S.C. § 213.1 (“[t]his part prescribes minimum

safety requirements for railroad track that is part of the

general railroad system of transportation”); the subject

matter of the plaintiff’s claim is clearly “covered” and

“substantially subsumed” by these federal regulations.

See Zimmerman v. Norfolk Southern Corp., supra, 187.

The plaintiff’s track selection claim is therefore preempted

by this regulatory scheme.

CONCLUSION

For the foregoing reasons, the defendant’s motion for

summary judgment is granted.

51a

C STATUTORY

APPENDIX C —Appendix

RELEVANT

AND REGULATORY PROVISIONS

49 U.S.C. § 20101

Purpose

The purpose of this chapter is to promote safety in every

area of railroad operations and reduce railroad-related

accidents and incidents.

52a

Appendix C

49 U.S.C. § 20106

Preemption

(a) National uniformity of regulation.-(1) Laws, regulations, and orders related to railroad

safety and laws, regulations, and orders related to

railroad security shall be nationally uniform to the

extent practicable.

(2) A State may adopt or continue in force a law,

regulation, or order related to railroad safety or

security until the Secretary of Transportation

(with respect to railroad safety matters), or the

Secretary of Homeland Security (with respect to

railroad security matters), prescribes a regulation

or issues an order covering the subject matter

of the State requirement. A State may adopt or

continue in force an additional or more stringent

law, regulation, or order related to railroad safety

or security when the law, regulation, or order-(A) is necessary to eliminate or reduce an

essentially local safety or security hazard;

(B) is not incompatible with a law, regulation,

or order of the United States Government; and

(C) does not unreasonably burden interstate

commerce.

53a

Appendix C

(b) Clarification regarding State law causes of action.-(1) Nothing in this section shall be construed

to preempt an action under State law seeking

damages for personal injury, death, or property

damage alleging that a party-(A) has failed to comply with the Federal

standard of care established by a regulation or

order issued by the Secretary of Transportation

(with respect to railroad safety matters), or the

Secretary of Homeland Security (with respect

to railroad security matters), covering the

subject matter as provided in subsection (a) of

this section;

(B) has failed to comply with its own plan,

rule, or standard that it created pursuant to

a regulation or order issued by either of the

Secretaries; or

(C) has failed to comply with a State law,

regulation, or order that is not incompatible

with subsection (a)(2).

(2) This subsection shall apply to all pending

State law causes of action arising from events or

activities occurring on or after January 18, 2002.

(c) Jurisdiction.--Nothing in this section creates a

Federal cause of action on behalf of an injured party

or confers Federal question jurisdiction for such State

law causes of action.

54a

Appendix C

49 C.F.R. § 213.9

Classes of track: operating speed limits

(a) Except as provided in paragraph (b) of this section

and §§ 213.57(b), 213.59(a), 213.113(a), and 213.137(b)

and (c), the following maximum allowable operating

speeds apply—

[In miles per hour]

Over track that

The maximum

meets all of the

allowable

requirements

operating speed

prescribed in this

for freight

part for—

trains is—

Excepted track

Class 1 track

Class 2 track

Class 3 track

Class 4 track

Class 5 track

10

10

25

40

60

80

The

maximum

allowable

operating

speed for

passenger

trains is—

N/A

15

30

60

80

90

(b) If a segment of track does not meet all of the

requirements for its intended class, it is reclassified to

the next lowest class of track for which it does meet all of

the requirements of this part. However, if the segment

of track does not at least meet the requirements for

55a

Appendix C

Class 1 track, operations may continue at Class 1

speeds for a period of not more than 30 days without

bringing the track into compliance, under the authority

of a person designated under § 213.7(a), who has at

least one year of supervisory experience in railroad

track maintenance, after that person determines that

operations may safely continue and subject to any

limiting conditions specified by such person.

This is a copy of a public record, reproduced as it was published. It is not legal advice, and it may not be the version a court would rely on. Check the official source before you cite it.

A word about cookies

We need a few to keep you signed in and the library working. The rest help us see which pages people use and where they get stuck. They stay off unless you say yes.

Petition for Writ of Certiorari — Metro-North Commuter Railroad Co., Petitioner v. Jamey Murphy | Frix