Petition for Writ of Certiorari — California Trout, et al., Petitioners v. Hoopa Valley Tribe, et al.

Supreme Court briefAug 26, 2019

Ask Donna

What actually matters in this document.

Text

No. 19-________

================================================================================================================

In The

Supreme Court of the United States

-----------------------------------------------------------------CALIFORNIA TROUT & TROUT UNLIMITED,

Petitioners,

v.

HOOPA VALLEY TRIBE & FEDERAL

ENERGY REGULATORY COMMISSION, et al.,

Respondents.

-----------------------------------------------------------------On Petition For A Writ Of Certiorari

To The United States Court Of Appeals

For The District Of Columbia Circuit

-----------------------------------------------------------------PETITION FOR A WRIT OF CERTIORARI

-----------------------------------------------------------------RICHARD ROOS-COLLINS

JULIE GANTENBEIN

WATER AND POWER

LAW GROUP PC

2140 Shattuck Avenue,

Suite 801

Berkeley, CA 94704

Counsel for Petitioner

California Trout

BRIAN JOHNSON

TROUT UNLIMITED

5950 Doyle Street,

Suite 2

Emeryville, CA 94608

Counsel for Petitioner

Trout Unlimited

ANDREW H. ERTESCHIK

Counsel of Record

SAAD GUL

JOHN MICHAEL DURNOVICH

COLIN R. MCGRATH

NATHANIEL C. ZINKOW

POYNER SPRUILL LLP

Post Office Box 1801

Raleigh, NC 27602

(919) 783-2895

aerteschik@poynerspruill.com

Counsel for Petitioners

================================================================================================================

COCKLE LEGAL BRIEFS (800) 225-6964

WWW.COCKLELEGALBRIEFS.COM

i

QUESTION PRESENTED

The federal government licenses projects that

affect the nation’s waters, but the role of ensuring that

these projects comply with water-quality requirements

is reserved for the states. Under the Clean Water Act,

applicants for these projects must request and obtain

a certification from the affected states that any

discharges into the water will comply with federal and

state water-quality requirements.

States must “act” within one year of a request, or

under section 401 of the Clean Water Act, they waive

their authority to certify the applicant’s compliance

with water-quality requirements. 33 U.S.C. § 1341. In

complex cases, however, applicants and states alike

require more than a year to develop the record that

states need to make a decision. Thus, applicants often

withdraw and resubmit their request before the oneyear period expires to avoid forcing the state to decide

the request prematurely.

In the decision below, however, the D.C. Circuit

held that when applicants take this approach, it

results in a waiver of the states’ Clean Water Act

authority. In doing so, the court deepened a circuit

conflict, and it struck a significant blow to the states’

role in ensuring the quality of our nation’s waters.

The question presented is: Do states waive their

authority under section 401 of the Clean Water Act if

they do not approve or deny a certification request

within one year, even when an applicant withdraws

and resubmits the request before that one year ends?

ii

PARTIES

Petitioners California Trout and Trout Unlimited

were intervenors in the proceedings below.

California Trout is a nonprofit organization

dedicated to protecting California’s water resources

while balancing the needs of wild fish and people.

Trout Unlimited is a national nonprofit organization

dedicated to conserving, protecting, and restoring North

America’s coldwater fisheries and their watersheds.

The Hoopa Valley Tribe was the petitioner in the

proceedings below and is therefore a respondent here.

The Federal Energy Regulatory Commission was a

respondent in the proceedings below and is therefore a

respondent here.

American Rivers, Klamath Water Users Association,

PacifiCorp, Upper Klamath Water Users Association,

and Siskiyou County were intervenors in the proceedings

below and are therefore respondents here.

RULE 29.6 DISCLOSURE

California Trout is a nonprofit corporation organized

under the laws of the State of California. It has no

parent company, and no publicly traded corporation

owns ten percent or more of any of its stock.

Trout Unlimited is a nonprofit corporation organized

under the laws of the State of Michigan. It has no

parent company, and no publicly traded corporation

owns ten percent or more of any of its stock.

iii

RELATED CASES

•

PacifiCorp, Project No. 2082-058, Federal Energy

Regulatory Commission. Judgment entered June

19, 2014.

•

Hoopa Valley Tribe v. Federal Energy Regulatory

Commission, No. 14-1271, U.S. Court of Appeals

for the District of Columbia Circuit. Judgment

entered January 25, 2019.

iv

TABLE OF CONTENTS

OPINIONS BELOW .....................................................1

JURISDICTION ...........................................................1

STATUTORY PROVISIONS INVOLVED....................1

INTRODUCTION..........................................................2

STATEMENT................................................................8

I.

The States’ Role Under the Clean Water

Act.......................................................................8

II.

The Klamath Project..................................... 10

III.

The Klamath Settlement Agreement ...........10

IV.

The Proceedings Below .................................13

REASONS FOR GRANTING THE PETITION .........16

I.

The decision below exacerbated a circuit

conflict...............................................................16

A. Three circuits now have different

approaches to section 401 waiver ...........17

1. The Fourth Circuit’s Approach ..........17

2. The Second Circuit’s Approach ..........18

3. The D.C. Circuit’s Approach...............20

B. The decision below is already encouraging

forum shopping between the circuits......21

II.

The question presented has significant

implications for the states and the

environment..................................................23

A. The question presented has significant

implications for the states.........................23

v

B. The decision below threatens significant

and lasting environmental harm .............26

III.

Strong merits arguments support reversing

the decision below.............................................29

CONCLUSION ........................................................32

APPENDIX

United States Court of Appeals for the District

of Columbia Circuit, Opinion, January 25,

2019..........................................................................1a

United States Court of Appeals for the District

of Columbia Circuit, Order Denying Petition

for Panel Rehearing, April 26, 2019......................17a

United States Court of Appeals for the District

of Columbia Circuit, Order Denying Petition

for Rehearing En Banc, April 26, 2019.................19a

Federal Energy Regulatory Commission, Order

Denying Petition for Declaratory Order, June

19, 2014..................................................................21a

Federal Energy Regulatory Commission, Order

Denying Rehearing, October 16, 2014 ..................30a

Section 401 of the Clean Water Act,

33 U.S.C. § 1341.....................................................43a

vi

TABLE OF AUTHORITIES

Cases

AES Sparrows Point LNG v. Wilson, 589 F.3d

721 (4th Cir. 2009) ............................................. 17, 18

Alcoa Power Generating, Inc. v. FERC, 643 F.3d

963 (D.C. Cir. 2011)..................................................30

Arkansas v. Oklahoma, 503 U.S. 91 (1992).................31

California v. FERC, 966 F.2d 1541 (9th Cir.

1992).........................................................................19

Constitution Pipeline Co. v. N.Y. State Dep’t of

Envtl. Conserv., 868 F.3d 87 (2d Cir. 2017).............19

Constitution Pipeline Co., LLC, 162 FERC ¶ 61,014

(Jan. 11, 2018)............................................................4

First Iowa Hydro-Electric Coop. v. Federal Power

Comm’n, 328 U.S. 152 (1946)............................... 6, 23

Hoopa Valley Tribe v. FERC, 913 F.3d 1099 (D.C.

Cir. 2019)........................................................ 6, 10, 15

N.Y. Dep’t of Envtl. Conservation v. FERC, 884

F.3d 450 (2d Cir. 2018) ................................ 18, 19, 22

Pub. Util. Dist. No. 1 of Jefferson County v.

Washington Dep’t of Ecology, 511 U.S. 700

(1994) ............................................................. 6, 23, 24

Ridgewood Maine Hydro Partners, L.P., 77

FERC ¶ 62,201, 64,425 (Dec. 27, 1996).....................4

S.D. Warren Co. v. Me. Bd. of Envtl. Protection,

547 U.S. 370 (2006) ......................................... passim

vii

Statutes

15 U.S.C. § 717f(e) .......................................................28

16 U.S.C. § 797..................................................... passim

16 U.S.C. § 797(e) ..........................................................8

16 U.S.C. § 799 ............................................................28

16 U.S.C. § 825l(b) .......................................................21

28 U.S.C. § 1254(1) ........................................................1

33 U.S.C. § 1251(b) ......................................................23

33 U.S.C. § 1341(a)(1).......................................... passim

33 U.S.C. § 1341(d) .................................................... 2, 8

33 U.S.C. § 1342 ............................................................9

33 U.S.C. § 1344 ............................................................9

33 U.S.C. § 1362(3) ........................................................2

33 U.S.C. § 1369(b)(1)..................................................21

33 U.S.C. § 1377(e) ........................................................2

Cal. Water Code § 13160.............................................11

Other Authorities

116 Cong. Rec. 8984 (1970) ...........................................3

FERC, Hydropower: Commission’s Responsibilities .......27

H.R. Rep. No. 91-940 (1970)........................................30

Policy Statement on Hydropower Licensing

Settlements, 116 FERC ¶ 61,270 (Sept. 21,

2006).........................................................................25

S. Rep. No. 92–414 (1971) ...........................................29

viii

U.S. Envtl. Prot. Agency, EPA Actions on Tribal

Water Quality Standards and Contacts ...................2

U.S. Envtl. Prot. Agency, Water Quality Certification: A Water Quality Protection Tool for

States and Tribes.......................................................8

OPINIONS BELOW

The opinion of the D.C. Circuit (App. 1a) is

reported at 913 F.3d 1099 (D.C. Cir. 2019). The D.C.

Circuit’s order denying rehearing (App. 17a) is

reported at 2019 WL 3928669 (D.C. Cir. April 26, 2019),

and its order denying rehearing en banc (App. 19a) is

reported at 2019 WL 3958147 (D.C. Cir. April 26, 2019).

The decision of the Federal Energy Regulatory

Commission (App. 21a) is reported at 147 FERC

¶ 61,216 (June 19, 2014). The Commission’s order

denying rehearing (App. 30a) is reported at 149 FERC

¶ 61,038 (October 16, 2014).

JURISDICTION

Petitioners respectfully seek a writ of certiorari to

review a decision of the D.C. Circuit under 28 U.S.C.

§ 1254(1).

The D.C. Circuit issued its opinion on January 25,

2019. Petitioners’ timely petition for rehearing and

rehearing en banc was denied on April 26, 2019.

On July 23, 2019, Chief Justice Roberts extended

the time to file this petition until August 26, 2019. See

California Trout v. Hoopa Valley Tribe, No. 19A92.

STATUTORY PROVISIONS INVOLVED

Section 401 of the Clean Water Act, 33 U.S.C.

§ 1341, is reproduced in full in Appendix A to the

petition. App. 43a.

2

INTRODUCTION

This case involves when and how a state waives

its authority under the Clean Water Act to ensure that

a federally licensed project complies with waterquality requirements.

Section 401 of the Clean Water Act serves as a

critical tool for states, U.S. territories, and many

Native American tribes to protect the quality of the

waters within their boundaries.1 Under section 401, a

federal agency cannot issue a permit or license for “any

activity” that “may result in any discharge into the

navigable waters” until the state has certified that the

applicant has met certain water-quality requirements.

33 U.S.C. § 1341(a)(1). Those water-quality requirements

include EPA-approved federal requirements, as well as

the certifying states’ water-quality requirements. Id.

§ 1341(d).

As this Court has noted, “state certifications under

section 401 are essential in the scheme to preserve

state authority to address the broad range of pollution”

that threatens our nation’s waters. S.D. Warren Co. v.

1

U.S. territories are considered “states” under the Clean

Water Act. 33 U.S.C. § 1362(3). Native American tribes may also

exercise section 401 certification authority if they receive

“treatment as a State” status from the EPA. Id. § 1377(e). As of

June 2019, 45 tribes have been granted this status. See U.S.

Envtl. Prot. Agency, EPA Actions on Tribal Water Quality

Standards and Contacts (June 24, 2019), https://perma.cc/E4659GPS.

For brevity, this petition uses the term “states” to refer

collectively to the states, U.S. territories, and any tribe that has

received “treatment as a State” status.

3

Me. Bd. of Envtl. Protection, 547 U.S. 370, 386 (2006).

Congress provided the states with this power to ensure

that “[n]o State water pollution control agency will be

confronted with a fait accompli by an industry that has

built a plant without consideration of water quality

requirements.” Ibid. (quoting 116 Cong. Rec. 8984

(1970)).

Under section 401, when a license applicant

submits a request for water-quality certification, the

certifying state has one year to “act” on the request.

33 U.S.C. § 1341(a)(1). After completing its review, a

state can grant the request for certification, grant it

with conditions, or deny it. Ibid. A state waives its

certification authority only if it “fails or refuses to act

on a request for certification, within a reasonable

period of time (which shall not exceed one year).” Ibid.

In many complex cases, however, applicants and

states alike require more than a year to develop the

record that states need to make a decision on the request,

including preparing sufficient plans, measures, and

adaptive management. Complex federal licensing

proceedings typically take upwards of five years, and

not unlike the federal process, the state process requires

following procedures under state administrative

procedure acts—procedures that are necessary to

ensure the proper implementation of section 401.

Thus, applicants in complex cases often withdraw

and resubmit their request before the one-year period

expires to avoid forcing the states to decide the request

4

prematurely. That common practice reflects the fact

that the applicant is in control of their own application:

They decide when to make the request, whether to

withdraw the request, and whether to resubmit the

request.

In view of these realities, license applicants,

certifying states, and the Federal Energy Regulatory

Commission (“FERC”) have long operated under a

common understanding: that an applicant’s decision to

withdraw and resubmit a section 401 request triggers

a new one-year deadline for the certifying state to act,

and does not result in a waiver of the state’s authority.

See, e.g., Constitution Pipeline Co., LLC, 162 FERC

¶ 61,014 at 23 (Jan. 11, 2018); App. 40a; Ridgewood

Maine Hydro Partners, L.P., 77 FERC ¶ 62,201, 64,425

(Dec. 27, 1996).

The decision below, however, upends that decadeslong practice. The D.C. Circuit held that if states do not

approve or deny a certification request within one year,

even when the applicant withdraws and resubmits the

request before the one-year period, states waive their

section 401 authority.

That holding deepened an existing circuit conflict.

Now, the Second Circuit, Fourth Circuit, and D.C.

Circuit all have their own, different approaches to

determining when and how states waive their Clean

Water Act authority under section 401:

5

•

In the Fourth Circuit, states waive their

Clean Water Act authority if they fail to act

within one year of the date that the

applicant’s section 401 request is deemed

complete.

•

In the Second Circuit, states waive their

Clean Water Act authority if they fail to act on

a request (whether complete or incomplete)

within one year, but not if the applicant

triggers a new review period by withdrawing

the request and resubmitting a request in its

place within the one-year period.

•

In the D.C. Circuit, under the decision below,

states waive their Clean Water Act authority

if they do not approve or deny a certification

request within one year, even when the applicant

withdraws and resubmits the request within

the one-year period.

This division of authority at the circuit level, by

itself, shows the need for this Court’s review. As

described below, in the immediate wake of the D.C.

Circuit’s decision, litigants are already forum shopping

between the circuits.

The D.C. Circuit’s decision also has serious

implications for state interests, and, more broadly, for

federalism principles. Under the Federal Power Act,

FERC reviews license applications, see 16 U.S.C. § 797,

but under the Clean Water Act, the role of ensuring

that proposed projects satisfy state water-quality

6

requirements is reserved for the states, see 33 U.S.C.

§ 1341.

As this Court has repeatedly recognized, these

laws preserve important federalism principles. See,

e.g., S.D. Warren Co., 547 U.S. at 386 (observing that

the section 401 certification process is “essential in

the scheme to preserve state authority”); Pub. Util.

Dist. No. 1 of Jefferson County v. Washington Dep’t of

Ecology, 511 U.S. 700, 704 (1994) [hereinafter PUD

No. 1] (noting that, under the Clean Water Act, there

are “distinct roles for the Federal and State

Governments”); First Iowa Hydro-Electric Coop. v.

Federal Power Comm’n, 328 U.S. 152, 174 (1946)

(noting that the Federal Power Act reflects a “careful

preservation of the separate interests of the States”).

The decision below undermines those federalism

principles. Under the D.C. Circuit’s approach, states

cannot fulfill their duty to complete meaningful

environmental reviews for complex federally licensed

projects. Instead, states hoping to preserve their

section 401 authority face an untenable choice: They

can issue premature certifications without an

adequate record and analysis—a tactic that invites

environmental harm lasting for many decades. Or they

can reflexively deny every certification request for a

complex project—a preservation measure that would

embroil the states in unnecessary litigation and

frustrate settlement efforts like the ones in this case.

For these and other reasons, a diverse group of

eighteen states submitted amicus briefs siding with

7

Petitioners on the state-waiver issue before the

D.C. Circuit: Alaska, California, Hawaii, Idaho,

Maine, Massachusetts, Michigan, Minnesota, New

Hampshire, New Jersey, New York, Oregon, Rhode

Island, South Dakota, Utah, Vermont, Washington,

and Wyoming. The implications of the decision below

on state interests—as evidenced by more than a third

of the states participating in this case—further shows

the need for this Court’s review.

Finally, the D.C. Circuit’s decision threatens to

create serious consequences for the quality of our

nation’s waters. FERC is already applying the D.C.

Circuit’s decision retroactively. As a result, states may

be deemed to have unknowingly waived their

certification authority on dozens of projects with

pending federal-license applications—despite FERC’s

longstanding

position

that

withdrawal

and

resubmission starts a new one-year certification

period. The result would be to exempt these projects

from critical water-quality requirements that the

states would otherwise require.

Because federal licenses for dams are typically

granted for periods ranging from thirty to fifty

years, and pipeline licenses are permanent, allowing

significant projects to bypass water-quality certifications

poses an environmental threat that would last for

generations.

In sum, the circuit conflict, as well as the broad

implications of the decision below, call for this Court’s

intervention.

8

STATEMENT

I.

The States’ Role Under the Clean Water Act

As described above, section 401 of the Clean Water

Act applies broadly to any federally permitted or

licensed “activity” that “may result in any discharge

into the navigable waters.” 33 U.S.C. § 1341(a)(1). A

common example of such an activity is a hydropower

project, like the one in this case, which requires a

license from FERC.2 See 16 U.S.C. § 797(e).

Although FERC is responsible for licensing

hydropower projects, see ibid., section 401 of the

Clean Water Act reserves for the states the role of

ensuring that the project satisfies EPA-approved

federal requirements, as well as the water-quality

requirements of the certifying state. 33 U.S.C. § 1341(d).

Section 401 of the Act requires that the license

applicant request a water-quality certification from the

state where the discharge originates. Id. § 1341(a)(1).

After the state completes its review, it has the

authority to grant, grant with conditions, or deny

certification. Ibid.

2

Section 401 certifications are required for a wide array of

federally licensed projects. Other federal licenses and permits

subject to section 401 certification include: pipelines subject to the

Natural Gas Act, National Pollutant Discharge Elimination

System permits, dredge or fill material permits, and Rivers and

Harbors Act permits for activities that have a potential discharge

in navigable waters. See U.S. Envtl. Prot. Agency, Water Quality

Certification: A Water Quality Protection Tool for States and

Tribes 1–2 (April 2010).

9

When a state grants certification (with or without

conditions), it allows the federal agency to issue

the permit or license, subject to any conditions of

the state’s certification. Ibid. When a state denies

certification, the federal agency is prohibited from

issuing the permit or license. Ibid. In other words, the

state’s decision is binding on the federal agency.

A state waives its certification authority only if it

“fails or refuses to act on a request for certification,

within a reasonable period of time (which shall not

exceed one year).” Ibid.

If a state is deemed to have waived its section

401 authority, the consequences for the nation’s waters

are extremely serious. If waiver occurs, the federal

licensing process continues without any certification

whatsoever from the state that a project will satisfy

federal or state water-quality requirements.3 Ibid.

Because hydropower projects are not up for

relicensing for many decades, a project could operate

in a manner that harms water quality for half a

century. See infra at 28. For pipeline projects, which

receive permanent licenses, a state’s section 401

waiver means that the state has waived its authority

forever.

3

Narrow exceptions exist for circumstances where, despite a

state’s section 401 waiver, an applicant must satisfy otherwise

applicable Clean Water Act requirements, such as requirements

related to dredging activity, 33 U.S.C. § 1344, or requirements

related to the discharge of pollutants, id. § 1342.

10

II. The Klamath Project

In 1954, the Federal Power Commission (now

FERC) issued a fifty-year license to operate the 169megawatt Klamath Hydroelectric Project. App. 31a.

The Klamath Project follows a path along the Klamath

River through Oregon and California. The project has

seven hydroelectric facilities and one non-generating

dam. App. 31a.

The PacifiCorp company now operates the Klamath

Project. In 2004, PacifiCorp began the relicensing

process for the project. App. 5a. At first, PacifiCorp’s

relicensing application sought to relicense the project’s

primary generating facilities. App. 31a. But after

extensive studies and negotiations with stakeholders,

PacifiCorp ultimately agreed to decommission the

primary facilities, which would involve removing four

dams. App. 31a–32a. Removing the dams would

restore fisheries, reconnecting more than 400 miles of

salmon and steelhead habitat that the dams currently

block. Ibid.

III. The Klamath Settlement Agreement

PacifiCorp’s decision to remove the dams emerged

from lengthy settlement negotiations. See Joint

Appendix at 1–5, Hoopa Valley Tribe v. FERC, 913

F.3d 1099 (D.C. Cir. 2019) [hereinafter D.C. Cir. J.A.].

Those negotiations culminated in a settlement,

which established a process and a timeline for

decommissioning four dams within the Klamath

Project. PacifiCorp filed a copy of the principal

11

settlement agreement in March 2010 with FERC.

App. 31a.

The settlement agreement was signed by

PacifiCorp and 47 other parties. D.C. Cir. J.A. at 409–

18. Those other parties included the Governors of

California and Oregon, the U.S. Department of the

Interior, the U.S. Department of Commerce’s National

Marine Fisheries Services, the Karuk Tribe, the Yurok

Tribe, the Klamath Tribes (comprising the Klamath,

Modoc, and Yahooskin tribes), several local counties,

and conservation groups, including California Trout

and Trout Unlimited.4 Ibid.

The target date for decommissioning the Klamath

Project was 2020. App. 32a. Given the unprecedented

scale and complexity of the decommissioning, however,

the settlement agreement included certain preconditions.

Among these preconditions, the settlement

agreement required: (a) the enactment of federal legislation, which involved federal funding obligations;

(b) California voters’ approval of a $250 million bond;

(c) an affirmative determination by the Secretary of

the Interior that dam removal is in the public interest;

and (d) separate concurrences by the Governors of

California and Oregon that dam removal is in the

public interest. D.C. Cir. J.A. at 351–63, 403–04.

4

The California State Water Resources Control Board is the

agency that provides water-quality certification for hydroelectric

projects in California. See Cal. Water Code § 13160. That entity

was not a party to the settlement. D.C. Cir. J.A. at 409–18.

12

While the negotiations over the Klamath

settlement agreement were proceeding, PacifiCorp’s

relicensing application remained pending at FERC.

The potential realization of the settlement on the

horizon, however, called into question the desirability

of proceeding with a federal relicensing application.

After all, the federal relicensing application—and

the state section 401 certifications necessary to

approve that relicensing application—would become

unnecessary if the settlement was fully realized,

because an application for license surrender (requiring

new section 401 certifications) would follow. Conversely,

if the settlement was not fully realized—for example,

if the preconditions above were not satisfied—then the

original relicensing application would be heard by

FERC, and the states would act on section 401

requests for the purpose of relicensing the project on

the original application.

Accordingly, FERC stayed action on the relicensing

application while the various stakeholders negotiated

and implemented the settlement agreement. App.

28a–29a. For the same reasons, PacifiCorp withdrew

its section 401 requests to California and Oregon each

year and resubmitted section 401 requests in their

place, to ensure that California and Oregon would

not be forced to decide the requests prematurely. App.

26a–27a. PacifiCorp agreed to do so under the terms of

the settlement agreement. Ibid. All of the parties

understood that California and Oregon were not

waiving their section 401 authority, but rather, were

expressly preserving that authority. See ibid.

13

IV. The Proceedings Below

The Hoopa Valley Tribe is a tribe that resides

downstream from the Klamath Project in northwestern

California. Because the Klamath settlement agreement

contemplates removing dams that affect fisheries,

the tribe stands to gain from the increase in salmon

available for them to fish. See D.C. Cir. J.A. at 343.

But the tribe did not want the Klamath Project to

be decommissioned under the terms that PacifiCorp,

the states, the federal government, the conservation

groups, and all of the other tribes had established in

the settlement agreement. Instead, the Hoopa Valley

Tribe sought declaratory relief aimed at terminating

PacifiCorp’s relicensing application and the associated

proceedings before FERC and the states.

To that end, the tribe petitioned FERC for

declaratory relief in 2012, seeking to end relicensing.

The tribe argued that California and Oregon had

waived their section 401 authority by not granting or

denying PacifiCorp’s first certification request within

one year, even though PacifiCorp had withdrawn and

resubmitted its request. See id. at 547–54. In other

words, the tribe argued that the one-year clock started

from the first certification request. See ibid.

FERC rejected Hoopa’s argument. App. 39a–40a.

FERC noted that section 401 “speaks solely to state

action or inaction, rather than the repeated withdrawal

and refiling of applications.” App. 40a. Thus, FERC

concluded that “[b]y withdrawing its applications

before a year has passed, and presenting the states

14

with new applications,” PacifiCorp gave the states

“new deadlines.” Ibid. FERC further noted that “[t]he

record does not reveal that either state has in any

instance failed to act on an application that has been

before it for more than one year.” Ibid.

Hoopa appealed FERC’s decision to the D.C.

Circuit, and the D.C. Circuit reversed.

The D.C. Circuit held that when PacifiCorp

withdrew and resubmitted its certification requests,

it resulted in a waiver of California’s and Oregon’s

section 401 authority. App. 3a.

The D.C. Circuit first voiced agreement with

PacifiCorp, FERC, and Petitioners that “[i]mplicit

in the statute’s reference ‘to act on a request for

certification,’ the provision applies to a specific

request.” App. 11a (quoting 33 U.S.C. § 1341(a)(1)). The

court also agreed that the waiver provision “cannot be

reasonably interpreted to mean that the period of

review for one request affects that of any other

request.” App. 11a–12a.

In the court’s view, however, PacifiCorp’s decision

to withdraw the request from the states was

inconsequential. Emphasizing what it perceived to

be improper coordinated action between PacifiCorp

and the states, the court held that the new requests

were subject to the same period of review as the

first, withdrawn request. App. 12a. The court thus

concluded that the States waived their section 401

authority by failing to act on PacifiCorp’s first

request within one year. Ibid.

15

Petitioners sought rehearing en banc. Multiple

states supported Petitioners as amici at the rehearing

stage, making for a total of eighteen states that

supported Petitioners on the state-waiver issue before

the D.C. Circuit.5 See supra at 6–7.

The D.C. Circuit denied the petition for rehearing

on April 26, 2019.

5

The following states filed briefs with the D.C. Circuit

opposing Hoopa Valley’s petition for review: California, Hawaii,

Idaho, Maine, New Hampshire, New York, Oregon, Utah,

Washington, and Wyoming. Hoopa Valley Tribe, 913 F.3d 1099,

No. 14-1271, ECF Nos. 1586196, 1586214, 1589071. The following

states filed briefs supporting Petitioners’ request for rehearing:

Alaska, California, Hawaii, Idaho, Maine, Massachusetts,

Michigan, Minnesota, New Jersey, Oregon, Rhode Island, South

Dakota, Vermont, Washington, and Wyoming. Id. at ECF Nos.

1778292, 1778274.

16

REASONS FOR GRANTING THE PETITION

I.

The decision below exacerbated a circuit

conflict.

In the decision below, the D.C. Circuit deepened an

existing circuit conflict on the question of when and

how states waive their Clean Water Act certification

authority. Now, there are three distinct approaches:

•

In the Fourth Circuit, states waive their

Clean Water Act authority if they fail to act

within one year of the date that the

applicant’s section 401 request is deemed

complete.

•

In the Second Circuit, states waive their

Clean Water Act authority if they fail to act on

a request (whether complete or incomplete)

within one year, but not if the applicant

triggers a new review period by withdrawing

the request and resubmitting a request in its

place within the one-year period.

•

In the D.C. Circuit, under the decision below,

states waive their Clean Water Act authority

if they do not approve or deny a certification

request within one year, even when the

applicant withdraws and resubmits the

request within the one-year period.

As described below, this division of authority

warrants this Court’s review.

17

A. Three circuits now have different

approaches to section 401 waiver.

1.

The Fourth Circuit’s Approach

In AES Sparrows Point LNG v. Wilson, 589 F.3d

721 (4th Cir. 2009), the Fourth Circuit held that section

401 waiver occurs if the state fails to act within one

year of the date the request is deemed complete.

There, the court considered whether Maryland

waived its right to certify a natural gas project’s

compliance with the state’s water-quality requirements.

Id. at 728. When the applicant submitted its

initial section 401 request, Maryland “deem[ed]” it

incomplete and requested additional information. Ibid.

More than a year passed as Maryland “continu[ed]

to deem [the request] incomplete,” and the applicant

continued responding “with a series of submissions” to

supplement its original request. Id. at 725. Ultimately,

more than two years after the request was submitted

(but less than one year after Maryland deemed the

request complete), Maryland denied certification. Id.

at 726.

The applicant challenged Maryland’s denial. The

applicant argued that Maryland waived its right to

deny certification by failing to do so within one year of

its first submission.

The Fourth Circuit disagreed. Noting that section

401 “is ambiguous on the issue[,]” the court found that

“only a valid request . . . will trigger” the one-year

waiver period. Id. at 729. Reasoning that a request

18

must be completed to be valid, the court held that the

waiver period was not triggered by the applicant’s

earlier, incomplete submissions. Ibid. Consequently,

Maryland had not waived its section 401 authority.

Thus, in the Fourth Circuit, states waive their

Clean Water Act authority only if they fail to act within

one year of the date that the applicant’s section 401

request is deemed complete.

2.

The Second Circuit’s Approach

In N.Y. Dep’t of Envtl. Conservation v. FERC, 884

F.3d 450 (2d Cir. 2018), the Second Circuit concluded

that waiver occurs if states fail to act on a request

(whether complete or incomplete) within one year, but

not if the applicant triggers a new review period by

withdrawing the request and resubmitting a request

in its place within the one-year period.

The case involved facts similar to those of the

Fourth Circuit’s decision in AES Sparrows Point LNG

v. Wilson, 589 F.3d 721, described above. See supra at

17–18. New York deemed the applicant’s section 401

request incomplete, and the applicant supplied

additional information to support its request. New

York ultimately denied certification more than a year

after the request was submitted, but less than a year

after New York deemed the request complete. Id. at

453.

19

Unlike the Fourth Circuit, the Second Circuit

found waiver on these facts.6 Id. at 455. Critically,

however, the Second Circuit indicated that this harsh

result could be avoided if states simply “request that

the applicant withdraw and resubmit the application.”

Id. at 456.

As the court explained, if the applicant agreed to

resubmit the request, the resubmission would trigger

a new period of review. See ibid. The court also cited

with approval one of its decisions where the “applicant

for a Section 401 certification had withdrawn its

application and resubmitted at the Department’s

request—thereby restarting the one-year review period.”

Id. at 456 n.35 (citing Constitution Pipeline Co. v. N.Y.

State Dep’t of Envtl. Conserv., 868 F.3d 87, 94 (2d Cir.

2017), cert. denied, 138 S. Ct. 1697 (2018)).

Thus, in the Second Circuit, states waive their

Clean Water Act authority if they fail to act on a

request (whether complete or incomplete) within one

year, but not if the applicant starts a new one-year

period by withdrawing the request and resubmitting a

request in its place.

6

Also contrary to the Fourth Circuit’s approach, the Ninth

Circuit in California v. FERC, 966 F.2d 1541, 1552–53 (9th Cir.

1992), held that the one-year period begins when the request is

submitted, not when it is “complete.” Cf. supra at 17–18. Unlike

the Second Circuit, however, the Ninth Circuit did not address

whether a state waives its section 401 authority when an

applicant withdraws and resubmits a request within the one-year

period. California, 966 F.2d at 1552–53.

20

3.

The D.C. Circuit’s Approach

In the decision below, the D.C. Circuit adopted a

third approach, deepening the divide among the

circuits.

Notably, the court acknowledged that section 401’s

use of the language “to act on a request for certification”

suggests that “the provision applies to a specific

request.” App. 10a. The court further recognized that

the waiver provision “cannot be reasonably interpreted

to mean that the period of review for one request

affects that of any other request.” Ibid.

Nevertheless, the D.C. Circuit held that waiver

occurs if a state fails to act on a request within one year

of its first submission—even if, within the one-year

period, the applicant withdraws and resubmits the

request. App. 3a. The court also held that when an

applicant takes this approach, it does not start a new

period for review. Ibid.

The court condemned the decades-long practice

described above of withdrawing and resubmitting

certification requests—a practice that applicants and

certifying states had long followed, and which FERC

had repeatedly endorsed. See supra at 3–4. Referring

to the parties’ actions under the settlement agreement

as a “scheme” designed to “circumvent” the Clean

Water Act, the D.C. Circuit held instead that

PacifiCorp’s attempts to resubmit its certification

requests were ineffective. App. 3a.

21

Consequently, in the D.C. Circuit, states waive

their Clean Water Act authority if they do not approve

or deny a certification request within one year, even

when the applicant withdraws and resubmits the

request within the one-year period.

B. The decision below is already encouraging

forum shopping between the circuits.

In addition to deepening the circuit conflict, the

D.C. Circuit’s decision also created forum-shopping

opportunities.

This forum shopping is widely available, because

litigants in these cases generally have the option of

seeking appellate review in either: (1) the circuit court

of appeals in which the federally licensed project or

applicant is located; or (2) the D.C. Circuit. See 16

U.S.C. § 825l(b) (Federal Power Act); 33 U.S.C. § 1369(b)(1)

(Clean Water Act).

In the immediate wake of the D.C. Circuit’s

decision, litigants have already begun forum shopping.

One example involves a nearly half-billion-dollar

pipeline project to carry natural gas to New York.

See Order Granting Abandonment and Issuing

Certificates, Northern Access 2016 Project, 158 FERC

¶ 61,145, at 5, 9 (Feb. 3, 2017). A few months after the

D.C. Circuit’s decision below, FERC relied on the

decision to conclude that New York had waived its

section 401 authority. See Order Denying Rehearing,

22

Northern Access 2016 Project, 167 FERC ¶ 61,007

(April 2, 2019).

New York petitioned the Second Circuit to review

FERC’s decision. N.Y. Dep’t of Envtl. Conservation v.

FERC, No. 19-1610 (2d Cir. filed May 28, 2019). Relying

on the Second Circuit’s decision in N.Y. Dep’t of Envtl.

Conservation v. FERC, 884 F.3d 450, supra at 18–19,

New York contends that it did not waive its Clean

Water Act authority.

The pipeline company, on the other hand, argues

that the decision below controls, and, therefore, New

York waived its authority. In an effort to gain the

benefit of the D.C. Circuit’s approach and avoid the

Second Circuit’s approach, the pipeline company has

moved to transfer the case to the D.C. Circuit. See

Intervenors’ Motion to Transfer, N.Y. Dep’t of Envtl.

Conservation v. FERC, No. 19-1610, ECF 2596470 (2d

Cir. filed June 27, 2019).

As this example shows, unless the Court resolves

the conflict among the circuits, litigants in these cases

involving projects worth hundreds of millions of

dollars will forum shop for the circuit that applies their

desired approach.

These forum-shopping litigants have every

incentive to do so: The differences between the circuits’

approaches are dramatic, and they produce different

outcomes. To be sure, they would have produced

different outcomes in this case.

In sum, the circuit conflict, and the problems

associated with it, warrant this Court’s review.

23

II. The question presented has significant

implications for the states and the

environment.

The question presented has significant implications

in at least two respects. First, the question presented

implicates important state interests and, more broadly,

principles of federalism. Second, the decision below

threatens to cause immediate and lasting harm to the

environment.

A. The question presented has significant

implications for the states.

Federal law strikes a balance between the role

of the federal government and the role of the states

in addressing water pollution for federally licensed

projects. Under the Federal Power Act, FERC

reviews license applications, see 16 U.S.C. § 797, but

under the Clean Water Act, Congress explicitly sought

“to recognize, preserve, and protect the primary

responsibilities and rights of States to prevent, reduce,

and eliminate pollution” in waters within their

boundaries. 33 U.S.C. § 1251(b).

This Court has repeatedly recognized the

federalism principles underlying that balance. See

S.D. Warren Co., 547 U.S. at 386 (observing that the

section 401 certification process is “essential in the

scheme to preserve state authority”); PUD No. 1, 511

U.S. at 704 (noting that, under the Clean Water Act,

there are “distinct roles for the Federal and State

Governments”); First Iowa Hydro-Electric Coop., 328

24

U.S. at 174 (noting that the Federal Power Act reflects

a “careful preservation of the separate interests of the

States”).

The states’ section 401 certification power is the

statutory vehicle through which the states exercise

their “primary responsibilities and rights . . . to

prevent, reduce, and eliminate [water] pollution.” 33

U.S.C. § 1251(b). In other words, section 401 is what

gives states their “distinct role” under the Clean Water

Act. PUD No. 1, 511 U.S. at 704.

The decision below undermines that distinct role

for the states, and it does so in a way that compromises

the federalism principles described above.

Under the decision below, states will be unable to

fulfill their duty to complete a meaningful review and

analysis for large and complex projects, like the one in

this case. Instead, states wishing to preserve their

section 401 authority over a complex project for which

they lack an adequate record or analysis will face

an untenable choice: They can render premature

certifications without an adequate record or analysis,

or they can reflexively deny certification requests until

a certification decision is possible. That is not the

scheme Congress designed, and either approach would

embroil the states in protracted and unnecessary

litigation.

Perhaps worse, the D.C. Circuit’s decision will

frustrate the states’ ability to pursue an important

third option: cooperative settlement agreements, like

25

the one here, which could take longer than a year to

fully realize.

Strong policy reasons counsel in favor of settling

water-quality disputes, rather than litigating them.

FERC itself has made clear that it “looks with great

favor on settlements in licensing cases” because

“hydroelectric licensing proceedings . . . are multifaceted and complex,” involving “the balancing of many

public interest factors, as well as consideration of the

views of all interested groups and individuals.” Policy

Statement on Hydropower Licensing Settlements, 116

FERC ¶ 61,270 (Sept. 21, 2006).

Yet if the only way for states to preserve their

section 401 authority is to prematurely grant or

reflexively deny certification requests, it will significantly

frustrate the states’ ability to negotiate long-term

settlement agreements, like the one here. The one-year

clock—which, under the D.C. Circuit’s approach, starts

running from the first certification request, even if the

applicant withdraws and resubmits that request—will

expire before a settlement can be reached.

Thus, as a practical matter, the decision below will

prevent states, tribes, and other interested parties

from settling the myriad water-pollution issues that

arise from complex projects—an outcome that erodes

the states’ ability to effectively address water pollution

within their boundaries.

Acting on these and other concerns, more than

one-third of all the states submitted amicus briefs to

the D.C. Circuit in support of Petitioners. These states

26

have a wide array of environmental policies and

concerns, which are as diverse as one might imagine—

for example, those of Utah versus those of Hawaii. Yet

all of these states supported Petitioners. No state took

an opposite view.

This unified and significant level of state amicus

participation only confirms that the question

presented has enormous implications for the states.

Those implications further show the need for this

Court’s review.

B. The decision below threatens significant

and lasting environmental harm.

In addition to the state interests implicated, the

decision below threatens to create consequences for the

environment that are too serious to disregard.

The D.C. Circuit did not say whether its decision

would only apply prospectively. But FERC has already

rejected such an argument, describing it as “not

convincing.” Declaratory Order on Waiver of Water

Quality Certification, Middle Fork American Project,

167 FERC ¶ 61,056 (April 18, 2019).

As a result, states may be deemed to have

unknowingly waived their certification authority

on dozens of federally licensed projects—despite

FERC’s longstanding position that withdrawal and

resubmission started a new one-year period.

27

There are 87 hydropower projects currently

undergoing licensing proceedings before FERC.7 Many

of those projects have been pending for more than a

year and, therefore, are now at great risk for a

retroactive application of the decision below.

Indeed, in the few months since the decision below

was issued, FERC has received a surge of requests

seeking a finding that states had waived their

authority in pending license applications.8 FERC has

already granted two of these requests, finding waiver

by California in a hydropower case, and waiver by New

York in a pipeline case. See Declaratory Order on

Waiver of Water Quality Certification, Middle Fork

American Project, 167 FERC ¶ 61,056; see also Order

Denying Rehearing, Northern Access 2016 Project, 167

FERC ¶ 61,007 (April 2, 2019).

7

See FERC, Hydropower: Commission’s Responsibilities, https://

www.ferc.gov/industries/hydropower.asp (follow the “Pending

Licenses, Relicenses, and Exemptions” hyperlink under the

“Licensing” column).

8

See, e.g., Southern California Edison Company’s Petition for

Declaratory Order, Six Big Creek Hydroelectric Projects, FERC

Project Nos. 67, 120, 2085, 2086, 2174, 2175 (filed June 17, 2019);

Pacific Gas and Electric Company’s Petition for Declaratory

Order, Kilarc-Cow Creek Hydroelectric Project, FERC Project No.

606 (filed May 15, 2019); Exelon Generation Company, LLC’s

Petition for Declaratory Order, Conowingo Hydroelectric Project,

FERC Project No. P-405 (filed February 28, 2019); Nevada

Irrigation District’s Request for Waiver, Yuba-Bear Hydroelectric

Project, FERC Project No. P-2266 (filed February 19, 2019).

28

Such retroactive findings of waiver, if allowed to

stand, will make for grim prospects for our nation’s

waters. Federal licenses are often granted for many

decades. For hydropower projects, like the one in this

case, federal licenses are often granted for fifty years.

See 16 U.S.C. § 799. Natural gas pipeline licenses are

permanent. See 15 U.S.C. § 717f(e).

Thus, by exempting major projects from waterquality certifications for fifty years—or, in some cases,

forever—the D.C. Circuit’s approach could result in

environmental harm that will last for generations.

29

III. Strong merits arguments support reversing

the decision below.

Regardless of which side is right on the merits,

certiorari is needed to resolve the circuit conflict. The

strength of Petitioners’ merits arguments, however,

underscores the need for this Court’s review.

On the merits, Petitioners are supported by

section 401’s text, as well as its purpose.

First, the text of section 401 provides that a state’s

authority is waived only “[i]f the State . . . fails or

refuses to act on a request for certification, within a

reasonable period of time (which shall not exceed one

year).” 33 U.S.C. § 1341(a)(1) (emphasis added).

Nothing in the text prohibits an applicant from

submitting and then choosing to withdraw its request

for certification before the one-year period expires.

Likewise, nothing in the text equates an applicant’s

choice to withdraw and resubmit a request with the

state’s failure or refusal to “act.” By holding otherwise,

the D.C. Circuit’s decision expanded section 401’s

waiver provision beyond its plain language.

Second, the D.C. Circuit’s interpretation of section

401 is contrary to the purpose of that provision. Section

401 “recast pre-existing law and was meant to

‘continu[e] the authority of the State . . . to act to deny

a permit.’ ” S.D. Warren Co., 547 U.S. at 380 (quoting

S. Rep. No. 92–414, p. 69 (1971)). As described above,

the D.C. Circuit’s decision undermines the “broad

reach” of state power envisioned by section 401. S.D.

Warren Co., 547 U.S. at 380.

30

Furthermore, when Congress enacted section

401’s waiver provision, it sought to prevent “sheer

inactivity by the State”—that is, it sought to prevent

states from “frustrat[ing] the Federal application”

process. H.R. Rep. No. 91-940, at 56 (1970) (emphasis

added); see also Alcoa Power Generating, Inc. v. FERC,

643 F.3d 963, 972 (D.C. Cir. 2011) (“[T]he purpose of

the waiver provision is to prevent a State from

indefinitely delaying a federal licensing proceeding by

failing to issue a timely water quality certification.”)

(emphasis added). Congress was not focused on the

prospect of an applicant choosing to withdraw and

resubmit its own request to improve its chances of

achieving a desired result in the federal licensing

process.

As in other withdraw-and-resubmit situations,

that is what occurred here. PacifiCorp chose to

withdraw and resubmit its own certification requests

to provide time to implement a complex settlement

agreement—a settlement agreement that PacifiCorp

entered into of its own volition, and which it desired

for its own reasons. Thus, when the D.C. Circuit

adopted its approach to section 401 waiver, it

effectively nullified a decision by the applicant—the

party that Congress intended to protect.

As these points show, there are strong reasons for

reversing the decision below. Those reasons further

demonstrate that the D.C. Circuit’s decision warrants

this Court’s review.

*

*

*

31

Section 401 of the Clean Water Act is an

“essential” federal statute that empowers the states to

address water pollution within their boundaries. S.D.

Warren Co., 547 U.S. at 386. Such an essential federal

statute should not have different meanings for states

in different parts of the country. See Arkansas v.

Oklahoma, 503 U.S. 91, 110 (1992) (noting that the

Clean Water Act was intended “to create and manage

a uniform system of interstate water pollution

regulation”). Especially given the opportunities to

forum shop, the circuit conflict calls for this Court’s

intervention.

Nor can this issue wait until the conflict worsens.

The threat to state interests is too great, as evidenced

by more than a third of all the states participating

before the D.C. Circuit as amici. And without the

Court’s intervention, the decision below will create an

environmental threat of the first magnitude.

The question presented warrants this Court’s

review.

------------------------------------------------------------------

32

CONCLUSION

The petition should be granted.

Respectfully submitted,

ANDREW H. ERTESCHIK

Counsel of Record

SAAD GUL

JOHN MICHAEL DURNOVICH

COLIN R. MCGRATH

NATHANIEL C. ZINKOW

POYNER SPRUILL LLP

Post Office Box 1801

Raleigh, NC 27602

(919) 783-2895

Counsel for Petitioners

RICHARD ROOS-COLLINS

JULIE GANTENBEIN

WATER AND POWER

LAW GROUP PC

2140 Shattuck Avenue,

Suite 801

Berkeley, CA 94704

Counsel for Petitioner

California Trout

BRIAN JOHNSON

TROUT UNLIMITED

5950 Doyle Street,

Suite 2

Emeryville, CA 94608

Counsel for Petitioner

Trout Unlimited

August 26, 2019