No. _____
IN THE
Supreme Court of the United States
————
INDIAN RIVER COUNTY, FLORIDA; INDIAN RIVER
COUNTY EMERGENCY SERVICES DISTRICT,
Petitioners,
v.
UNITED STATES DEPARTMENT OF TRANSPORTATION;
ELAINE L. CHAO, IN HER OFFICIAL CAPACITY AS
SECRETARY OF TRANSPORTATION; UNDER SECRETARY
OF TRANSPORTATION FOR POLICY; FEDERAL
RAILROAD ADMINISTRATION; PAUL NISSENBAUM,
IN HIS OFFICIAL CAPACITY AS ASSOCIATE
ADMINISTRATOR OF THE FEDERAL RAILROAD
ADMINISTRATION; AAF HOLDINGS LLC,
Respondents.
————
On Petition for a Writ of Certiorari
to the United States Court of Appeals
for the District of Columbia Circuit
————
PETITION FOR A WRIT OF CERTIORARI
————
DYLAN REINGOLD
County Attorney
INDIAN RIVER COUNTY
1801 27th St.
Vero Beach, FL 32960
J. MICHAEL LUTTIG*
728 West Lionshead Cir.
Vail, CO 81657
*
Admitted only in Virginia and
the District of Columbia
JEFFREY A. LAMKEN
Counsel of Record
JAMES A. BARTA
MOLOLAMKEN LLP
The Watergate, Suite 500
600 New Hampshire Ave., N.W.
Washington, D.C. 20037
(202) 556-2000
jlamken@mololamken.com
(Additional Counsel Listed on Inside Cover)
:,/621(3(635,17,1*&2,1&± ±:$6+,1*721'&
LAUREN F. DAYTON
MOLOLAMKEN LLP
430 Park Ave., 6th Floor
New York, NY 10022
(212) 607-8160
ELIZABETH K. CLARKE
MOLOLAMKEN LLP
300 N. LaSalle St., Suite 5350
Chicago, IL 60654
(312) 450-6700
Counsel for Petitioners
QUESTION PRESENTED
The Internal Revenue Code authorizes the issuance of
tax-exempt bonds to finance “qualified highway or surface freight transfer facilities.” 26 U.S.C. § 142(a)(15).
That term is defined, in relevant part, to mean “any surface transportation project which receives Federal assistance under title 23.” Id. § 142(m)(1)(A). The Department of Transportation has taken the position that a
facility is a project “which receives Federal assistance
under title 23” so long as it “benefits from” federal Title
23 expenditures, even if the facility does not receive, has
never received, and is not even eligible to receive such
assistance. In this case, the court of appeals deferred to
the Department of Transportation’s view under Skidmore v. Swift & Co., 323 U.S. 134 (1944). The court did
not, however, find that the statute was ambiguous or
discuss the meaning of the statutory term “receives”
before doing so. The question presented is:
Whether the court of appeals properly deferred to the
agency’s informal views under Skidmore, without finding
the statute ambiguous or applying (much less exhausting) traditional interpretive tools.
(i)
ii
PARTIES TO THE PROCEEDINGS BELOW
Indian River County, Florida, and Indian River
County Emergency Services District were plaintiffs in
the district court and appellants in the court of appeals.
The United States Department of Transportation;
Elaine L. Chao, in her official capacity as Secretary of
Transportation; Derek Kan, in his official capacity as
Under Secretary of Transportation for Policy; the
Federal Railroad Administration; and Paul Nissenbaum,
in his official capacity as Associate Administrator of the
Federal Railroad Administration, were defendants in the
district court and appellees in the court of appeals.
Derek Kan resigned as Under Secretary of Transportation for Policy in June 2019, and a successor has not
been appointed. Joel Szabat, the Assistant Secretary for
Aviation & International Affairs, currently performs the
functions and duties of the Under Secretary.
AAF Holdings LLC intervened on behalf of the
defendants in the district court and was an appellee in
the court of appeals.
Martin County, Florida, and Citizens Against Rail
Expansion in Florida were plaintiffs in the district court.
They dismissed their claims during the district court
proceedings and did not participate in the court of
appeals proceedings below.
iii
STATEMENT OF RELATED PROCEEDINGS
The proceedings directly related to this petition within
the meaning of Rule 14.1(b)(iii) are:
x Indian River County, et al. v. Dep’t of Transp., et
al., No. 19-5012 (D.C. Cir.), judgment entered on
December 20, 2019; and
x Martin County, et al. v. Dep’t of Transp., et al.,
No. 1:18-cv-00333 (D.D.C.), judgment entered on
December 24, 2018.
TABLE OF CONTENTS
Page
Opinions Below.............................................................
Statement of Jurisdiction ...........................................
Statutory Provisions Involved ...................................
Preliminary Statement ...............................................
Statement ......................................................................
I. Statutory and Regulatory Background .......
A. Private Activity Bonds...........................
B. “Qualified Highway or Surface
Freight Transfer Facilities”
Under 26 U.S.C. § 142 ............................
C. The Department of
Transportation’s Implementation
of § 142(m) ................................................
II. Proceedings Below ..........................................
A. The Planned Passenger Rail Line .......
B. The Bond Allocations .............................
C. District Court Proceedings ...................
D. Court of Appeals Proceedings ..............
Reasons for Granting the Petition ............................
I. The Court of Appeals Deferred Under
Skidmore to an Informal Agency
Interpretation That Contradicts the
Statute’s Plain Meaning .................................
A. The Court of Appeals’ Decision
Defies the Statute’s Text .......................
B. The Court of Appeals Converted
Skidmore Deference into Judicial
Abdication ................................................
(v)
2
2
2
2
4
4
4
5
6
7
7
7
8
11
12
15
16
21
vi
TABLE OF CONTENTS—Continued
Page
II. As This Case Illustrates, the Lower
Federal Courts Are in Disarray Over
Skidmore .......................................................... 25
A. This Court’s Guidance Regarding
Skidmore Has Been Inconsistent ........ 25
B. This Court’s Inconsistent
Decisions Have Contributed to
Disarray in Lower Federal Courts ...... 28
III. The Question Presented Is Important
and Recurring .................................................. 30
Conclusion ..................................................................... 33
Appendix A – Opinion of the Court
of Appeals (December 20, 2019) ............................ 1a
Appendix B – Judgment of the Court
of Appeals (December 20, 2019) ............................ 33a
Appendix C – Opinion of the District Court
(December 24, 2018) ............................................... 35a
Appendix D – Relevant Statutory Provisions.......... 116a
Appendix E – Letter of Edward V.A. Kussy
(October 7, 2015)...................................................... 128a
Appendix F – Declaration of Paul Baumer
(May 15, 2015) .......................................................... 133a
vii
TABLE OF AUTHORITIES
Page(s)
CASES
Air Transp. Ass’n of Am., Inc. v. FAA,
921 F.3d 275 (D.C. Cir. 2019) ........................... 31
Alaska Dep’t of Envtl. Conservation
v. EPA, 540 U.S. 461 (2004) ........................... 27, 28
Allentown Mack Sales & Serv., Inc.
v. NLRB, 522 U.S. 359 (1998) ........................... 22
Ammex, Inc. v. United States,
367 F.3d 530 (6th Cir. 2004) ...........................
29
Auer v. Robbins, 519 U.S. 452 (1997) ......... 14, 31, 32
Baylor Cty. Hosp. Dist. v. Price,
850 F.3d 257 (5th Cir. 2017) .............................. 31
Cervantes v. Holder,
597 F.3d 229 (4th Cir. 2010) .............................. 28
Chevron U.S.A. Inc. v. Nat. Res. Def.
Council, Inc., 467 U.S. 837 (1984) .............. passim
Christopher v. SmithKline Beecham
Corp., 567 U.S. 142 (2012) .............................. 31, 33
Davis v. Mich. Dep’t of Treasury,
489 U.S. 803 (1989) ............................................. 19
Delaware v. Surface Transp. Bd.,
859 F.3d 16 (D.C. Cir. 2017) ............................. 31
E.I. Du Pont De Nemours & Co.
v. Smiley, 138 S. Ct. 2563 (2018) ...................... 24
Epic Sys. Corp. v. Lewis,
138 S. Ct. 1612 (2018)......................................... 32
Estrada-Rodriguez v. Lynch,
825 F.3d 397 (8th Cir. 2016) .............................. 29
FDIC v. Meyer, 510 U.S. 471 (1994) ..................... 27
viii
TABLE OF AUTHORITIES—Continued
Page(s)
Fed. Express Corp. v. Holowecki,
552 U.S. 389 (2008) ....................................... passim
Gen. Dynamics Land Sys., Inc.
v. Cline, 540 U.S. 581 (2004) ................... 21, 22, 27
Gonzales v. Oregon,
546 U.S. 243 (2006) ............................ 22, 23, 26, 33
Gross v. FBL Fin. Servs., Inc.,
557 U.S. 167 (2009) .......................................... 16, 23
Hayes v. Harvey,
903 F.3d 32 (3d Cir. 2018) ................................. 31
Hughes Aircraft Co. v. Jackson,
525 U.S. 432 (1999) .......................................... 15, 22
INS v. Cardoza-Fonseca,
480 U.S. 421 (1987) .......................................... 22, 32
Kasten v. Saint-Gobain Performance
Plastics Corp., 563 U.S. 1 (2011) ...................... 33
Kisor v. Wilkie,
139 S. Ct. 2400 (2019)............................... 26, 31, 32
Kucana v. Holder,
558 U.S. 233 (2010) ............................................. 18
Landmark Legal Found. v. IRS,
267 F.3d 1132 (D.C. Cir. 2001) ......................... 26
Lopez v. Terrell,
654 F.3d 176 (2d Cir. 2011) ............................... 31
Mansour v. Holder,
739 F.3d 412 (8th Cir. 2014) .............................. 31
Marbury v. Madison,
5 U.S. (1 Cranch) 137 (1803) ................ 3, 4, 12, 32
ix
TABLE OF AUTHORITIES—Continued
Page(s)
Massachusetts v. Mellon,
262 U.S. 447 (1923) .......................................... 12, 15
McMaster v. United States,
731 F.3d 881 (9th Cir. 2013) .............................. 31
Miller v. Clinton,
687 F.3d 1332 (D.C. Cir. 2012) ......................... 26
Nat’l Ass’n of Mfrs. v. Dep’t of Def.,
138 S. Ct. 617 (2018) ........................................... 19
Raymond B. Yates, M.D., P.C. Profit
Sharing Plan v. Hendon,
541 U.S. 1 (2004) ................................................. 26
Ross v. Blake, 136 S. Ct. 1850 (2016) .................... 15
Seaview Trading, LLC v. Comm’r,
858 F.3d 1281 (9th Cir. 2017) ............................ 28
Sebelius v. Cloer, 569 U.S. 369 (2013) .................. 23
Sec’y of Labor v. Am. Future Sys., Inc.,
873 F.3d 420 (3d Cir. 2017) ............................... 31
Skidmore v. Swift & Co.,
323 U.S. 134 (1944) ....................................... passim
United States v. Mead Corp.,
533 U.S. 218 (2001) .......................................... 25, 30
United States v. Miller,
833 F.3d 274 (3d Cir. 2016) ............................... 29
Unified Turbines, Inc. v. U.S. Dep’t of
Labor, 581 F. App’x 16 (2d Cir. 2014) ............. 28
Univ. of Tex. Sw. Med. Ctr. v. Nassar,
570 U.S. 338 (2013) .......................................... 22, 26
Valent v. Comm’r of Soc. Sec.,
918 F.3d 516 (6th Cir. 2019) .............................. 30
x
TABLE OF AUTHORITIES—Continued
Page(s)
Varsity Brands, Inc. v. Star Athletica,
LLC, 799 F.3d 468 (6th Cir. 2015).................... 31
Warner-Lambert Co. v. United States,
407 F.3d 1207 (Fed. Cir. 2005) ......................... 26
STATUTES
Administrative Procedure Act,
5 U.S.C. § 701 et seq. ..........................................
9
National Environmental Policy Act,
42 U.S.C. § 4321 et seq. ......................................
9
Safe, Accountable, Flexible, Efficient
Transportation Equity Act: A Legacy
for Users, Pub. L. 109-59,
119 Stat. 1144 (2005) ..........................................
5
23 U.S.C. § 101(a)(21) (2006) .......................... 6, 17, 19
23 U.S.C. § 103 (2006) ........................................... 5, 17
23 U.S.C. § 104 (2006) ............................................. 17
23 U.S.C. § 106 .........................................................
6
23 U.S.C. § 106(a)(2) (2006) .................................... 17
23 U.S.C. § 130 (2006) ................................. 5, 6, 17, 18
23 U.S.C. § 130(a) (2006)............................ 6, 18, 19, 20
23 U.S.C. § 130(e)(1) (2006) ....................................
6
23 U.S.C. § 133 (2006) ........................................... 5, 17
23 U.S.C. § 145 ......................................................... 23
23 U.S.C. § 145(a) (2006)......................................... 23
23 U.S.C. § 148(b) (2006) ........................................
6
23 U.S.C. § 149 (2006) ........................................... 5, 17
23 U.S.C. § 601(a)(8)(C) (2006) ........................... 17, 20
xi
TABLE OF AUTHORITIES—Continued
Page(s)
23 U.S.C. § 602 (2006) .......................................... 17, 20
26 U.S.C. § 103(b)(1) ...............................................
4
26 U.S.C. § 141(a) ....................................................
4
26 U.S.C. § 141(b) ....................................................
4
26 U.S.C. § 141(c) ....................................................
4
26 U.S.C. § 141(d) ....................................................
4
26 U.S.C. § 141(e)(1)(A) ..........................................
5
26 U.S.C. § 142 ................................................... passim
26 U.S.C. § 142(a) .............................................. passim
26 U.S.C. § 142(a)(11).............................................. 18
26 U.S.C. § 142(a)(15)............................................ 7, 16
26 U.S.C. § 142(i) .....................................................
5
26 U.S.C. § 142(i)(1)................................................. 18
26 U.S.C. § 142(m) ............................................. passim
26 U.S.C. § 142(m)(1)(A) ................................... passim
26 U.S.C. § 142(m)(1)(C) ......................................... 20
26 U.S.C. § 142(m)(2)(A) .........................................
5
26 U.S.C. § 142(m)(2)(C) .........................................
5
26 U.S.C. § 147 .........................................................
9
28 U.S.C. § 1254(1) ..................................................
2
OTHER AUTHORITIES
Kent Barnett & Christopher J. Walker,
Chevron in the Circuit Courts, 116 Mich.
L. Rev. 1 (2017)................................................... 32
xii
TABLE OF AUTHORITIES—Continued
Page(s)
Lisa Schultz Bressman, How Mead Has
Muddled Judicial Review of Agency
Action, Vand. L. Rev. 1443 (2005) ................... 29
The Compact Oxford English Dictionary
(2d ed. 1996) ..................................................... 18, 19
Michael Herz, Chevron Is Dead; Long Live
Chevron, 115 Colum. L. Rev. 1867 (2015) ....... 30
Kristin E. Hickman & Matthew D. Krueger,
In Search of the Modern Skidmore
Standard, 107 Colum. L. Rev. 1235 (2007) ..... 29
Steven Maguire & Joseph S. Hughes, Cong.
Research Serv., Private Activity Bonds:
An Introduction (2018) .....................................
4
Nina A. Mendelson, Regulatory
Beneficiaries and Informal Agency
Policymaking, 92 Cornell L. Rev.
397 (2007)............................................................. 33
Staff of the Joint Committee on Taxation,
General Explanation of the Tax Reform
Act of 1986, 99th Cong. 1151 (1986) ............... 4, 14
Webster’s New Int’l Dictionary
(2d ed. 1954) ..................................................... 18, 19
IN THE
Supreme Court of the United States
————
INDIAN RIVER COUNTY, FLORIDA; INDIAN RIVER
COUNTY EMERGENCY SERVICES DISTRICT,
Petitioners,
v.
UNITED STATES DEPARTMENT OF TRANSPORTATION;
ELAINE L. CHAO, IN HER OFFICIAL CAPACITY AS
SECRETARY OF TRANSPORTATION; UNDER SECRETARY
OF TRANSPORTATION FOR POLICY; FEDERAL
RAILROAD ADMINISTRATION; PAUL NISSENBAUM,
IN HIS OFFICIAL CAPACITY AS ASSOCIATE
ADMINISTRATOR OF THE FEDERAL RAILROAD
ADMINISTRATION; AAF HOLDINGS LLC,
Respondents.
————
On Petition for a Writ of Certiorari
to the United States Court of Appeals
for the District of Columbia Circuit
————
PETITION FOR A WRIT OF CERTIORARI
————
Indian River County, Florida, and Indian River County Emergency Services District (collectively, “Indian
River County” or the “County”) respectfully petition for
a writ of certiorari to review the judgment of the United
States Court of Appeals for the District of Columbia
Circuit in this case.
2
OPINIONS BELOW
The court of appeals’ opinion (App., infra, 1a-32a) is
reported at 945 F.3d 515. The district court’s opinion
(App., infra, 35a-115a) is reported at 348 F. Supp. 3d 17.
STATEMENT OF JURISDICTION
The court of appeals entered judgment on December
20, 2019. On March 10, 2020, the Chief Justice extended
the time in which to file a petition for a writ of certiorari
to and including May 18, 2020. No. 19A995. This Court
has jurisdiction under 28 U.S.C. § 1254(1).
STATUTORY PROVISIONS INVOLVED
Relevant provisions of Title 23 and Title 26 of the U.S.
Code are set forth in the appendix. App., infra, 116a127a.
PRELIMINARY STATEMENT
This case reflects an extreme example—bordering on
abdication of the judicial role—of deference to an agency’s informal interpretation of statutory text. It arises in
a case with profound implications for the federal fisc,
redirecting scarce federal resources to fund private
commercial ventures that do not qualify for federal assistance. The statute here authorizes the issuance of taxexempt bonds for a “project which receives Federal
assistance under title 23.” 26 U.S.C. § 142(m)(1)(A)
(emphasis added). Notwithstanding that clear statutory
provision, the court of appeals held that a project can be
said to “receive[ ] Federal assistance” even where it has
never received—and is not qualified to receive—a dime
of federal money.
In reaching that atextual result, the court of appeals
uncritically accepted the Department of Transportation’s
informal position that a “ ‘project * * * receives Federal
assistance under title 23’ ” as long as it “benefits from
3
assistance under Title 23” provided to others, App., infra,
26a (emphasis added)—even where, as here, the project
does not receive assistance under Title 23 and is not even
eligible for it. The court of appeals thus held that a
proposed passenger railway was eligible for a $2.1 billion
bond allocation to finance more than 160 miles of new
track because a freight railway with an adjacent track
was awarded $9 million in highway funds to improve
railway-highway crossings.
To reach that result, the court invoked Skidmore v.
Swift & Co., 323 U.S. 134 (1944), to defer to the agency’s
informal interpretation. But the court did not itself undertake an effort to engage in statutory construction, let
alone determine, after doing so, that the statute was
ambiguous. Worse, the court of appeals ended up deferring to an agency “construction” that did nothing to reconcile itself with the statute’s clear text. That surrender
of the judiciary’s constitutional role “to say what the law
is” is an extreme example, Marbury v. Madison, 5 U.S.
(1 Cranch) 137, 177 (1803)—and a perfect vehicle for
addressing the disarray in the federal courts over when,
and what is required before, the judiciary may defer to
an agency’s interpretation of the law under Skidmore.
Skidmore instructs courts to give “respect” to an
agency position if the statute is ambiguous and the agency’s position is well-founded, consistent, and persuasive.
323 U.S. at 140. But federal courts are in wide disagreement as to whether, under Skidmore, they need to
employ the customary tools of statutory construction to
interpret the statute for themselves before deciding
whether to defer to the agency’s interpretation, or
whether they may simply declare an agency’s interpretation reasonable without resort to and irrespective of
the statute’s language. This Court cannot long afford to
4
allow this disagreement to persist. The failure to obey
Skidmore’s prescriptions threatens judicial surrender of
the constitutional responsibility “to say what the law is.”
Marbury, 5 U.S. (1 Cranch) at 177.
STATEMENT
This case arises from the allocation of more than $2
billion dollars in tax-exempt private activity bonds to
finance a passenger railway in Florida.
I. STATUTORY AND REGULATORY BACKGROUND
A. Private Activity Bonds
States and local governments issue private activity
bonds, or “PABs,” to finance non-governmental activities
that putatively benefit the public, such as construction of
private airports, docks, and schools. See 26 U.S.C.
§§ 141(a)-(d), 142(a). Ordinarily, interest on bonds is subject to federal income tax. See id. § 103(b)(1). But
interest on qualified bonds is tax-exempt, which allows
issuers to offer lower interest rates. App., infra, 5a. The
savings can be significant. See Steven Maguire and Joseph S. Hughes, Cong. Research Serv., Private Activity
Bonds: An Introduction 3 (2018).
Because of the financial incentives, Congress has long
been concerned about abuse. See Staff of the Joint Committee on Taxation, General Explanation of the Tax
Reform Act of 1986, 99th Cong. 1151 (1986). During the
1986 overhaul of the Internal Revenue Code, Congress
tightened restrictions on tax-exempt private activity
bonds. See id. at 1152-1156. Congress sought in part to
ensure that “tax-exempt bonds for nongovernmental
persons should be used, to the extent possible, only for an
activity for which financing specifically has been approved.” Id. at 1154.
5
B. “Qualified Highway or Surface Freight Transfer Facilities” Under 26 U.S.C. § 142
The Internal Revenue Code authorizes issuance of
tax-exempt private activity bonds to finance 15 types of
“exempt” facilities. 26 U.S.C. § 142(a). Those facilities
include airports, docks, “high-speed intercity rail facilities” (i.e., passenger railways where trains can travel in
excess of 150 miles per hour), and—most relevant here—
“qualified highway or surface freight transfer facilities.”
26 U.S.C. § 142(a), (i); see id. § 141(e)(1)(A). At least 95%
of the net proceeds of any bond issued under § 142 must
be “used to provide” those facilities. Id. § 142(a).
The statute establishes eligibility requirements for
each type of facility, including “qualified highway or
surface freight transfer facilities.” 26 U.S.C. § 142(m).1
Under § 142(m), “any surface transportation project
which receives Federal assistance under title 23, United
States Code (as in effect on [August 10, 2005])” is a
qualified facility. Id. § 142(m)(1)(A).
In turn, Title 23—titled “Highways”—authorizes the
federal government to provide financial assistance to various projects, such as highways, bridges, and bus terminals. See 23 U.S.C. §§ 103, 130, 133, 149 (2006).2 A
“project,” for purposes of Title 23, encompasses “any
1
Enacted as part of the Safe, Accountable, Flexible, Efficient Transportation Equity Act: A Legacy for Users (“SAFTEA-LU”), Pub. L.
109-59, 119 Stat. 1144 (2005), § 142(m)(2)(A) authorizes the issuance
of up to $15 billion of tax-exempt private activity bonds for such
facilities. The Secretary of Transportation must allocate that
amount among eligible facilities. 26 U.S.C. § 142(m)(2)(C).
2
Although the petition cites the version of Title 23 in effect on
August 10, 2005, no intervening amendments materially alter the
relevant language.
6
* * * undertaking eligible for assistance under th[at]
title.” Id. § 101(a)(21) (2006).
One source of eligible projects is the Railway-Highway
Crossings Program. See 23 U.S.C. § 130 (2006). That
program authorizes the Secretary of Transportation to
use funds from the Highway Safety Improvement Program—a federal-state program to improve safety “on
public roads,” id. § 148(b) (2006)—to pay up to the “entire
cost of construction of projects for the elimination of hazards of railway-highway crossings,” id. § 130(a), (e)(1)
(2006).
C. The Department of Transportation’s Implementation of § 142(m)
The Department of Transportation (“DOT”) has not
issued formal regulations construing 26 U.S.C. § 142(m),
but its officials have offered informal views.
For example, the Acting Chief Counsel of the Federal
Highway Administration, Edward V.A. Kussy, authored
a letter concerning § 142(m). App., infra, 128a-132a. The
letter acknowledged that § 142(m) defines a “qualified
highway or surface freight transfer facilit[y]” as “any
surface transportation project [which] receives Federal
assistance under title 23, United States Code.” Id. at
129a. The letter also acknowledged that Title 23 defines
the term “project.” Id. at 130a-131a. But the letter took
the position that an “entire transportation facility” is
eligible for financing through § 142(m) “even though only
a portion of that facility receives Federal assistance
under title 23.” Id. at 130a (emphasis added).
The Kussy letter expressed concern about the consequences of limiting PAB financing to only the portions of
a highway “actually subject to a funding agreement
under 23 U.S.C. § 106.” App., infra, 131a. Doing so, the
7
letter stated, “would induce State grantees to ‘sprinkle’
title 23 funds to every separate project or contract of an
entire facility to make full use of PAB proceeds.” Ibid.
The letter therefore stated that “any qualified facility
that includes a project funded with Federal-aid highway
funds made available under title 23” may be funded with
tax-exempt PABs, even if other elements of the facility
are not eligible for Title 23 funds. Id. at 132a. As a DOT
official later told Congress, even “a dollar” of Title 23
spending on any portion of a facility renders the whole
facility eligible for tax-exempt PABs. C.A. App. 299.
II. PROCEEDINGS BELOW
A. The Planned Passenger Rail Line
In 2011, AAF Holdings, Inc. (“AAF”) announced plans
to build a privately owned passenger railroad in Florida,
originally named All Aboard Florida and since renamed
Brightline, to connect Miami and Orlando. C.A. App.
4363. In Phase I, AAF added passenger service between
Miami and West Palm Beach. Ibid. Now, in Phase II,
AAF is building a line between West Palm Beach and
Orlando. Ibid.
Over 128 miles of track AAF is building for Phase II
will use an existing railroad right-of-way owned by the
Florida East Coast Railway (“FECR”). C.A. App. 43624363. That right-of-way already contains track that
FECR uses for freight trains. C.A. App. 4362. AAF is
adding a second track for passenger trains alongside the
existing freight track. C.A. App. 4363.
B. The Bond Allocations
In August 2014, AAF applied to DOT for an allocation
of tax-exempt private activity bonds under 26 U.S.C.
§ 142(a)(15) to finance Brightline. App., infra, 12a. That
provision authorizes bonds for a “surface transportation
8
project which receives Federal assistance under title 23.”
26 U.S.C. §142(m)(1)(A) (emphasis added).
AAF, however, had not received federal funds under
Title 23 to build Brightline. See App., infra, 59a-60a;
C.A. App. 308. AAF thus invoked prior improvements to
highway-railway crossings made by FECR along
FECR’s right-of-way, which were supported by about
$21 million in Title 23 funds. C.A. App. 4496-4510. Those
funds had been “awarded to the FE[C]R, not A[A]F,”
and the improvements were “built to accommodate the
heavy weight requirements of rail freight not passenger.”
C.A. App. 308. But DOT nonetheless provisionally approved AAF’s application for $1.75 billion in tax-exempt
PABs based on FECR’s prior improvements to crossings. C.A. App. 4511-4513. That provisional allocation
was later replaced with a final allocation of $600 million in
tax-exempt bonds for Phase I. C.A. App. 4517-4520.
To finance Phase II, AAF sought another $1.15 billion
in tax-exempt bonds. C.A. App. 4521-4539. AAF represented that its rail line had “received financial assistance
under Title 23 of the U.S. Code” because “approximately
$9 million” of Title 23 funds “ha[d] been invested in the
entire corridor” since the “planning process for All
Aboard Florida started in December 2011.” C.A. App.
4536 (emphasis added). DOT approved that application
as well. App. infra, 12a. It later increased the Phase II
allocation to $2.1 billion, bringing DOT’s total bond allocation to AAF to $2.7 billion. Ibid.
C. District Court Proceedings
1. Petitioner Indian River County is a local government on Florida’s Treasure Coast. The new Brightline
track would traverse the County, bisecting roads and
paths that residents regularly cross. App., infra, 38a;
C.A. App. 1736. Indian River County challenged the
9
Phase II bond allocation under the Administrative Procedure Act, 5 U.S.C. § 701 et seq. C.A. App. 14. The allocation was arbitrary, capricious, and contrary to law, the
County argued, because AAF’s passenger railroad had
not received federal assistance under Title 23. C.A. App.
15. The construction of AAF’s passenger railroad, the
County alleged, is not even “eligible for funding under
Title 23.” C.A. App. 96.3
Defending the bond allocation, DOT argued that it
“has never required a project sponsor to show that it has
received” Title 23 assistance; DOT instead deems projects eligible merely if they are “directly benefitted by
expenditures of Title 23 funds.” D. Ct. Dkt. 36-1 at 23-24
(emphasis added) (citing a declaration from an agency
official). According to DOT, it had allocated $1.34 billion
in bonds to an intermodal logistics park in Illinois “based
on” Illinois’s plans “to spend Title 23 funds to improve a
bridge near the facility and to widen and reconstruct a
nearby interstate freeway.” App., infra, 135a-136a (emphasis added). DOT also urged it had allocated $1.3 billion in PABs to a Maryland light-rail facility “based on”
Maryland’s “plans to spend $1 million in Title 23 funds to
upgrade” a “shared use trail adjacent to the planned rail
line.” Id. at 135a (emphasis added).
2. The district court granted summary judgment to
the defendants. App., infra, 37a. The court rejected
DOT’s challenge to the County’s standing, finding that
the County’s interests fall within the zone protected by
26 U.S.C. § 142(m). Id. at 47a-52a. But the court upheld
3
The County’s challenges under the National Environmental Policy
Act, 42 U.S.C. § 4321 et seq., and to DOT authorizations under 26
U.S.C. § 147, see C.A. App. 14, 16, are no longer at issue.
10
the challenged bond allocation, deferring to DOT’s position under Chevron U.S.A. Inc. v. Natural Resources
Defense Council, Inc., 467 U.S. 837 (1984). App., infra,
45a, 52a. “The court,” it reasoned, “must defer to any
reasonable agency interpretation, which need not be the
one ‘deemed most reasonable by the courts.’ ” Id. at 45a
(internal citations omitted).
The district court accepted DOT’s view that § 142(m)
“allow[s] for PAB allocation to projects based on direct
benefits from” prior “Title 23 spending” on a separate
project by a different entity. App., infra, 59a (emphasis
added). The court thought bond allocations could not
rest on “incidental and unintentional benefit[s].” Id. at
60a. But it held that a facility “receives Federal assistance under title 23” if “funds [a]re disbursed to benefit
the project.” Ibid. Applying that construction, the court
observed that “approximately $9 million” had been disbursed to improve highway crossings on a right of way
that AAF’s rail line would use. Ibid. The court admitted
that the $9 million had been disbursed to “FECR rather
than AAF.” Id. at 59a-60a. And it recognized that the
upgrades were to accommodate “planned increases in
FECR freight traffic.” Id. at 60a. While no evidence
showed that Florida had disbursed Title 23 funds to
FECR to benefit AAF’s passenger line, the court was
“skeptical” that Florida had “disbursed” the “Title 23
funding without the knowledge—if not purpose—of ” doing so. Ibid. The court thus held that AAF’s line had
“received” Title 23 assistance despite it never having received (or been eligible for) a single federal dollar. Ibid.
The court also rejected the argument that “Phase II of
the AAF railway” is not a “project” within the meaning of
§ 142(m). App., infra, 61a. Relying on the Kussy letter,
the court held that the “expenditure of Title 23 funds for
11
discrete highway-rail crossings * * * sufficed to render
the whole [rail] corridor eligible for PAB allocation.”
Ibid. The Kussy letter’s analysis, the court stated, “reflects a reasonable assessment of congressional intent
and the statutory text.” Ibid. The court did not identify
any statutory provisions that, in its view, supported the
letter’s assessment.
D. Court of Appeals Proceedings
The D.C. Circuit affirmed. App., infra, 4a.4 Like the
district court, the D.C. Circuit acknowledged that, to
qualify for PABs, the project must be one that “receives
Federal assistance.” Id. at 24a. Like the district court,
however, it deferred to DOT’s view that a facility need
not “receive[ ]” a single federal dollar—or even qualify
for federal money—to be a “project which receives
Federal assistance.” Instead, it accepted DOT’s position
that a “ ‘project * * * receives Federal assistance under
title 23’ ” if it merely, “in whole or part[,]” “benefits from
assistance under Title 23.” Id. at 26a (emphasis added).
The D.C. Circuit did not decide whether DOT’s informally expressed view of § 142(m) warrants deference
under Chevron. Instead, the court invoked Skidmore v.
Swift & Co., 323 U.S. 134 (1944). App., infra, 25a. “When
an agency’s interpretation of a statute has been binding
on agency staff for a number of years, and it is reasonable and consistent with the statutory framework,” the
court stated, “deference to the agency’s position is due
under Skidmore.” Ibid. (citing Fed. Express Corp. v.
Holowecki, 552 U.S. 389, 399-402 (2008)).
4
The court of appeals agreed that the County had standing. App.,
infra, 17a-23a.
12
The court found that DOT’s position was “consistent”
and “eminently reasonable.” App., infra, 25a-26a. The
court found “persuasive” the Kussy letter’s statement
that a “narrow reading of the word ‘project’ would ‘distort the longstanding way in which facilities are actually
funded’ ” and have other adverse impacts. Id. at 26a.
The court stated that it had “no reason to question”
DOT’s view because the “statute does not require an applicant for PABs to be the direct recipient of Federal
assistance under Title 23; rather, the ‘project’ at issue
must receive assistance under Title 23.” Id. at 26a-27a.
The court, however, did not point to any passage from
the Kussy letter addressing the meaning of “receive.”
Nor did it cite any other legal authority to support the
view that a “project which receives” Title 23 funding
means a “project which benefits from” Title 23 assistance
“received” by a different project.
Having deferred to DOT’s view, the court of appeals
upheld the (now) $2.1 billion bond allocation for Phase II
of AAF’s passenger railroad based on the “benefits” it
enjoyed from $9 million previously disbursed to another
company, FECR, to improve crossings along the right-ofway used by FECR’s freight trains. App., infra, 24a,
27a-28a. Observing that about $2.2 million of the funds
were used to upgrade crossings that AAF’s Phase II rail
line will traverse, the court stated that “the benefits
afforded to” AAF’s rail line “are obvious.” Id. at 24a, 28a.
REASONS FOR GRANTING THE PETITION
The Framers understood that “[i]t is emphatically the
province and duty of the judicial department to say what
the law is.” Marbury v. Madison, 5 U.S. (1 Cranch) 137,
177 (1803). The Constitution commits “to the judiciary
the duty of interpreting and applying” the written laws.
Massachusetts v. Mellon, 262 U.S. 447, 488 (1923). This
13
case represents an unconscionable abdication of that duty
under Skidmore v. Swift & Co., 323 U.S. 134 (1944).
The statute at issue here sets aside tax-exempt bonds
to finance surface-transportation facilities that are “project[s] which receive[ ] Federal assistance under title 23.”
26 U.S.C. § 142(m)(1)(A) (emphasis added). The statute
is unambiguous: To be eligible, the facility must receive
federal funds under Title 23. The court of appeals
reached the opposite result by deferring to the agency’s
counter-textual view that a facility need not “receive[ ]” a
dollar of federal assistance—or even qualify for federal
money—to be a “project which receives Federal assistance.” It accepted DOT’s position that a “ ‘project * * *
receives Federal assistance under title 23’ ” if it merely
“benefits from assistance under Title 23,” including from
Title 23 assistance afforded other applicants and projects. App., infra, 26a (emphasis added).
The court of appeals thus gave judicial imprimatur to a
$2.1 billion bond allocation to finance the construction of
more than 160 miles of a new passenger railroad based
on putative benefits “received” when $9 million was
awarded to a different railroad to eliminate hazards from
highway-railway crossings on a shared right-of-way.
App., infra, 28a. Under the court’s view, and the agency’s, a facility can be said to “receive” federal assistance
by “benefit[ing] from” federal spending nearby. In this
very case, DOT touted its allocation of $1.3 billion in taxexempt PABs to another rail facility “based on * * * plans
to spend $1 million in Title 23 funds to upgrade” a “trail
adjacent to the planned rail line.” Id. at 135a (emphasis
added).
Worse, the court of appeals did not even suggest the
statute was ambiguous before it embraced the agency’s
effort to rewrite it. The court did not ask what the
14
statute means using the traditional tools of statutory
construction. It did not inquire what it means to “receive[ ] Federal assistance,” as a matter of ordinary parlance or within Title 23 specifically. The court did not
discuss the legislative context or purpose of the statute—
a statute designed to restrict PABs to a defined set of
eligible facilities for “which financing specifically has
been approved.” Staff of the Joint Committee on Taxation, supra, at 1154. Rather, the court summarized a
letter from an agency official that offered a few policy
rationales for another point altogether, without addressing the relevant statutory terms and structural
considerations. See App., infra, 25a-26a. The court then
declared that the agency’s informal views were sufficiently “long-standing” and “reasonable” to warrant
“deference” under Skidmore. Ibid.
This Court has, in recent years, increasingly emphasized that deference under Chevron U.S.A. Inc. v. Natural
Resources Defense Council, Inc., 467 U.S. 837 (1984), and
Auer v. Robbins, 519 U.S. 452 (1997), do not displace the
judiciary’s responsibility to interpret and apply the text
that Congress has enacted into law. Skidmore deference
is not a license to abdicate those judicial responsibilities,
let alone an exemption from the requirement that courts
apply the traditional tools of statutory interpretation
before deferring to agency views.
Skidmore simply allows courts to give “respect” to an
agency’s construction of an ambiguous statute if the
agency’s position is well-founded, consistent, and persuasive. Skidmore, 323 U.S. at 140. Before deferring to an
agency’s interpretation, a court at least must examine the
statute and conclude that it is ambiguous. Yet the courts
of appeals are in disarray on whether, under Skidmore,
they must interpret the statute themselves before defer-
15
ring to agencies’ interpretations. The disarray in the federal courts promises to grow. The decision below is an
extreme example of the view that no judicial interpretation is called for or required.
As such, this case highlights the enormity of the constitutional problem that has developed in the lower
courts. Contrary to Congress’s intent, clearly expressed
in statutory text, billions of dollars of federally subsidized
bonds are being allocated to a manifestly ineligible
private commercial enterprise based on the notion that
Skidmore authorizes uncritical deference to an agency’s
informal interpretation without any judicial inquiry into
whether the statute is clear on its face or unambiguous.
Review of this important case from the D.C. Circuit is
warranted.
I. THE COURT OF APPEALS DEFERRED UNDER SKIDMORE TO AN INFORMAL AGENCY INTERPRETATION
THAT CONTRADICTS THE STATUTE’S PLAIN MEANING
In our system of government, “the duty of making
laws” lies with Congress and “the duty of interpreting
and applying them” lies with the courts. Mellon, 262 U.S.
at 488. Statutory interpretation “always” must “begin[ ]
with the text,” Ross v. Blake, 136 S. Ct. 1850, 1856 (2016),
and “end[ ] there as well” if “the statutory language provides a clear answer,” Hughes Aircraft Co. v. Jackson,
525 U.S. 432, 438 (1999). “The judiciary is the final
authority on issues of statutory construction and must
reject administrative constructions which are contrary to
clear congressional intent.” Chevron, 467 U.S. at 843 n.9.
The court below abdicated the judicial duty to apply
unambiguous statutory text. Section 142 authorizes DOT
to allocate tax-exempt private activity bonds only to
facilities that are “projects which receive Federal assistance under title 23.” 26 U.S.C. § 142(m)(1)(A) (emphasis
16
added). Invoking Skidmore, however, the decision below
deferred to a DOT construction of “projects which receive Federal assistance” so expansive that it encompasses facilities that do not receive, have never received,
and are not eligible for, Title 23 assistance. Rather than
require a project to “receive Federal assistance,” the
court accepted the agency’s view that § 142(m) extends to
any facility that happens to “benefit[ ] from” a project
funded under Title 23. App., infra, 26a. The court thus
upheld a $2.1 billion allocation of tax-exempt bonds to
finance the construction of AAF’s new passenger rail
line—which receives no Title 23 funds—based on the
claim that the line derives “benefits from” $9 million in
Title 23 funds received by another entity to spend on
railway-highway crossing improvements. Id. at 26a-28a.
A. The Court of Appeals’ Decision Defies the
Statute’s Text
1 . It is axiomatic that “ ‘[s]tatutory construction must
begin with the language employed by Congress and the
assumption that the ordinary meaning of that language
accurately expresses the legislative purpose.’ ” Gross v.
FBL Fin. Servs., Inc., 557 U.S. 167, 175 (2009). Here, the
statutory language could not be clearer. Under § 142,
tax-exempt private activity bonds may be issued “to
provide” a “qualified highway or surface freight transfer
facilit[y].” 26 U.S.C. § 142(a)(15). Such facilities include a
“surface transportation project which receives Federal
assistance under title 23.” Id. § 142(m)(1)(A) (emphasis
added). Thus, unless the “surface transportation project
* * * receives Federal assistance” under Title 23, it is not
eligible for a bond allocation. Ibid. Indeed, 95% of the
bond allocation must be dedicated “to provide” the “project which receives Federal assistance under title 23.”
Id. § 142(a), (m)(1)(A).
17
Section 142’s clear text should have made resolution of
this case straightforward. It was undisputed that no
Title 23 monies were provided to AAF to build the 168.5mile, $2.1 billion stretch of passenger rail line, or otherwise. The only identified projects that received Title 23
funds were improvements, costing about $9 million, that
another company, FECR, made to railway-highway
crossings along its right-of-way. See C.A. App. 309, 4536;
AAF C.A. Br. 34 n.7 (“FECR * * * was the direct
recipient of the Title 23 funds.”). The facility AAF seeks
to provide here, a new passenger railroad, thus was not a
“project which receives Federal assistance under title
23.” 26 U.S.C. § 142(m)(1)(A). Nor were the bonds allocated to AAF dedicated “to provid[ing]” the highwayrailway crossings that had received assistance. Id.
§ 142(a), (m)(1)(A). AAF obtained tax-exempt bonds to finance a facility that does not receive and has never
received a single federal dollar.5
In fact, AAF’s miles of new rail line were not even
eligible to receive Federal assistance under Title 23.
Title 23 defines “project” as an “undertaking eligible for
assistance under this title.” 23 U.S.C. § 101(a)(21) (2006).
It then defines eligible undertakings in detail. See, e.g.,
id. §§ 103, 104, 130, 133, 149 (2006). Section 130, for
example, authorizes the government to cover the cost of
“projects for the elimination of hazards of railway5
Title 23 contains mechanisms to avoid confusion about what is receiving assistance. For every project, “the State transportation department” must execute a “project agreement.” 23 U.S.C. § 106(a)(2)
(2006). Crossing upgrades cannot be confused with a new rail line.
Title 23 recognizes that those are different: While § 130 provides
assistance to crossings only, other provisions provide assistance to
“intercity * * * rail facilities” that meet different requirements. 23
U.S.C. § 601(a)(8)(C) (2006); see id. § 602 (2006).
18
highway crossings.” Id. § 130(a) (2006). It provides illustrative examples of what is encompassed within those
projects (e.g., “the reconstruction of existing railroad
grade crossing structures”). Ibid. But the bonds here
were not issued to finance projects eligible under § 130;
all of those projects were completed by 2014—three
years before the bonds here were allocated, see App.,
infra, 27a, 40a. The bonds here were issued to finance
the construction of 168.5 miles of new rail line in Phase
II, a project not eligible for funding under Title 23. See
C.A. App. 4524-4525, 4564-4565.
Other statutory provisions confirm that AAF’s passenger railroad is not eligible for federal funding. Section 142 makes “high-speed intercity rail facilities” eligible. 26 U.S.C. § 142(a)(11) (emphasis added). But that
category is limited to passenger rail lines supporting
speeds that exceed 150 miles per hour. Id. § 142(i)(1).
AAF’s lower-speed passenger line does not qualify. Had
Congress wished to finance such lower-speed lines
through tax-exempt bonds, “Congress could easily have
said so.” Kucana v. Holder, 558 U.S. 233, 248 (2010).
But it did not. To the contrary, Congress deliberately
excluded facilities like AAF’s lower-speed line.
2. The court of appeals reached the opposite result
only by “defer[ring]” to DOT’s view that a facility
“receives” Title 23 funding if it merely “benefits from
assistance under Title 23.” App., infra, 26a. As a matter
of ordinary English, the term “receives” does not mean
“benefits.” To “receive” something means to “take in
one’s hand, or into one’s possession,” or “to take delivery
of (a thing) from another.” The Compact Oxford English
Dictionary 1524 (2d ed. 1996); see Webster’s New Int’l
Dictionary 2076 (2d ed. 1954) (“To take, as something
that is offered, * * * paid, or the like”; “To come into
19
possession of, get, acquire, or the like”). By contrast, to
“benefit” is capacious. It means “[t]o receive benefit,” “to
get advantage,” or “to profit” from something. Oxford
English, supra, at 126; see Webster’s, supra, at 253 (“To
gain advantage; to receive benefit; to profit”). The concepts are different. If a city spends money on a beautification project, local merchants and their shops might
“benefit” from that. But no ordinary English speaker
would say they or their shops “received” city funds. Nor
would Congress. The court of appeals did not even
attempt to explain why the word “receives” can be
rewritten as “benefits from.”
Nor did the court explain how AAF’s construction of a
new railroad line is a “project” that “receives” funding
“under title 23.” The term “project” has a specific
meaning within Title 23, referring to “undertaking[s]
eligible for assistance under th[at] title.” 23 U.S.C.
§ 101(a)(21) (2006) (emphasis added). Those undertakings include the construction of railway-highway crossings; they do not include building rail lines like AAF’s.
See pp. 17-18, supra. Section 142(m), moreover, requires
that the facility receive funding “under”—i.e., “ ‘by
reason of the authority of ’ ”—Title 23. Nat’l Ass’n of
Mfrs. v. Dep’t of Def., 138 S. Ct. 617, 630 (2018). An
undertaking that is not eligible for Title 23 money cannot
possibly be said to receive assistance “under” Title 23.
The court also did not pause to grapple with § 142’s
“place in the overall statutory scheme.” Davis v. Mich.
Dep’t of Treasury, 489 U.S. 803, 809 (1989). DOT’s interpretation of § 142 is irreconcilable with the entire statutory framework. Section 142 delineates specific facilities
eligible for tax-exempt bonds. See 26 U.S.C. § 142(a).
Similarly, Title 23 distinguishes among “projects for the
elimination of hazards of railway-highway crossings,” 23
20
U.S.C. § 130(a) (2006), “project[s] for intercity * * * rail
facilities” meeting particular requirements, id.
§§ 601(a)(8)(C), 602 (2006), and other undertakings. But
DOT’s view, adopted below, renders those careful
restrictions illusory: It authorizes PAB allocations for
activities that are not projects eligible for Title 23
assistance so long as they “benefit[ ] from” assistance
provided to eligible projects.
DOT’s position in the courts below underscores the
extraordinary breadth of its view embraced by the court
of appeals. Defending the bond allocation here, DOT
touted that it had allocated $1.3 billion in PABs to a rail
line in Maryland “based on * * * plans to spend $1 million
in Title 23 funds to upgrade” a “trail adjacent to the
planned rail line.” App., infra, 135a (emphasis added).
DOT stated that it had allocated $1.34 billion in bonds to
an intermodal logistics park “based on” state plans “to
spend Title 23 funds to improve a bridge near the
facility” and “a nearby interstate freeway.” Id. at 135a136a (emphasis added).6 But § 142(m) does not authorize
the issuance of tax-exempt bonds for facilities that
happen to be “nearby” or “adjacent” to projects receiving
Title 23 assistance. It requires, in language that could
not be clearer, that the facilities actually “receive[ ]” Title
23 assistance.
By rewriting the statutory language, DOT and the
court of appeals denuded it of all intended meaning. The
resulting construction of § 142(m) is so broad that billions
of dollars in tax-exempt bonds can be allocated to
6
The bond allocation there was under 26 U.S.C. § 142(m)(1)(C),
which likewise requires the facility to “receive[ ] Federal assistance
under either title 23 or title 49.”
21
facilities that do not receive and are not even eligible to
receive Title 23 funding. In this case, for example, it
permitted DOT to allocate $1.15 billion—later increased
to $2.1 billion—in bonds to build a 168.5-mile stretch of
passenger rail line based on $9 million disbursed to a
different company, a freight-train operator, to improve a
few dozen railway-highway crossings along the same
right-of-way.
B. The Court of Appeals Converted Skidmore
Deference into Judicial Abdication
The court of appeals justified its atextual holding by
invoking Skidmore. App., infra, 25a-26a. The court,
however, did not construe the relevant text, let alone find
it ambiguous, before resorting to deference. Nor did the
court make any effort to resolve any putative ambiguity
through the traditional “devices of judicial construction.”
Gen. Dynamics Land Sys., Inc. v. Cline, 540 U.S. 581,
600 (2004). Instead, the court pronounced DOT’s view of
§ 142(m) to be “long-standing,” “consistent,” and “eminently reasonable.” App., infra, 25a-26a.
But Skidmore does not permit courts to so completely
jettison customary principles of interpretation or
abdicate their duty to say what the law is. In reading
Skidmore to sanction abandonment of statutory text—or
even an effort to construe that text—the court of appeals
fundamentally erred. This Court’s decision in Skidmore
recognizes that “respect” may be accorded an agency’s
views of a statute if those views have the “power to
persuade.” 323 U.S. at 140. But that power is not a
power to persuade in the abstract, but rather under the
language of the statute. Nowhere does Skidmore abrogate the constitutional imperative that courts construe
statutory text, a process that begins and ends with
statutory text if that “statutory language provides a clear
22
answer.” Hughes, 525 U.S. at 438. “Even for an agency
able to claim all the authority possible under Chevron,
deference to its statutory interpretation is called for only
when the devices of judicial construction have been tried
and found to yield no clear sense of congressional intent.”
Gen. Dynamics, 540 U.S. at 600 (citing INS v. CardozaFonseca, 480 U.S. 421, 446-447 (1987)). Nothing less is
tolerable under Skidmore’s less deferential standard.
See ibid.
Skidmore, moreover, permits a court to “follow an
agency’s rule only to the extent it is persuasive.” Gonzales v. Oregon, 546 U.S. 243, 269 (2006). Courts thus ask
whether the agency has considered “specific provisions”
of the statute, “the thoroughness evident in its consideration, the validity of its reasoning, [and] its consistency with earlier and later pronouncements.” Skidmore,
323 U.S. at 140. But certain considerations matter more
than others. An agency’s failure to consider “specific
provisions of [a] statutory scheme” should be disqualifying even if that failure to consider the text is
“longstanding.” Univ. of Tex. Sw. Med. Ctr. v. Nassar,
570 U.S. 338, 360-361 (2013). A consistent and longstanding error is still an error. See Allentown Mack Sales &
Serv., Inc. v. NLRB, 522 U.S. 359, 374 (1998).
In this case, the court did not even ask or consider
whether DOT had anchored its position in the statute’s
text and structure. Instead, the court recited the Kussy
letter’s statement that the agency’s construction would
avoid undesirable outcomes, crediting (without explanation) the letter’s assertion “that a narrow reading of the
word ‘project’ would ‘distort the longstanding way in
which facilities are actually funded’ ” and “ ‘create needless red tape.’ ” App., infra, 25a-26a. Such “policy arguments,” however, cannot overcome a statute’s clear text.
23
Sebelius v. Cloer, 569 U.S. 369, 381 (2013). And while the
court echoed the letter’s statement that the agency’s
reading accorded with Congress’s intent, App., infra,
26a, the court nowhere explained why it so believed,
much less why the statute’s text did not “ ‘accurately express[ ] the legislative purpose,’ ” Gross, 557 U.S. at 175.7
Moreover, the Kussy letter does not even address
what it means to “receive[ ] Federal assistance under title
23,” 26 U.S.C. § 142(m)(1)(A) (emphasis added), as the
court’s description makes clear, see App., infra, 26a. The
letter nowhere suggests that a project that “benefits”
from “nearby” federally funded improvements can be
said to “receive” Federal assistance. The letter merely
explains why DOT believes tax-exempt bonds can be
issued to support an entire facility if part of that facility
constitutes a “project funded with Federal-aid highway
funds.” Id. at 128a-132a. The Kussy letter cannot support the contention that, because FECR was awarded
funds to improve crossings along FECR’s right-of-way,
Brightline—which never received a federal dollar under
Title 23—can be deemed to have “received Federal assistance.” The Kussy letter’s failure to address key parts of
§ 142’s “text and design” deprives it of any “power to
persuade” on the actual issue—the meaning of “receives
Federal assistance.” Gonzales, 546 U.S. at 269-270.
The court’s textual analysis consisted of its conclusory
observation that it had “no reason to question” the
agency’s position “because the statute does not require
7
The Kussy letter cites 23 U.S.C. § 145, App., infra, 130a, but that
provision has no bearing on the phrase a “project which receives
Federal assistance under title 23.” It says the States can “determine
which projects shall be federally financed” under Title 23. 23 U.S.C.
§ 145(a) (2006).
24
an applicant for PABs” (like AAF) “to be the direct
recipient of Federal assistance.” App., infra, 26a-27a.
That misses the point. The issue is not whether Title 23
funds were “directly” or “indirectly” spent on AAF’s rail
line. The issue is whether AAF’s enterprise to build a
new rail line “receives” funds under Title 23. It does
not—and never has.
The court of appeals did emphasize that DOT’s position was “long-standing” and “consistent.” App., infra,
25a-26a. That alone does not make a position “persuasive.” See p. 22, supra. Moreover, DOT’s view that
“receives” means “benefits from” does not trace to the
Kussy letter, which says no such thing. It traces to a
declaration DOT filed in 2015 in related litigation over
the bond allocation for Phase I of AAF’s rail line. See
D. Ct. Dkt. 36-1 at 24 (citing D. Ct. Dkt. 19-2 in Martin
County v. Dep’t of Transp., No. 1:15-cv-00632-CRC
(D.D.C.) (filed May 15, 2015)). That DOT’s view traces
not to the statutory text, or even the Kussy letter, but
instead to a recent DOT litigation position, should have
rendered it utterly unpersuasive. See E.I. Du Pont De
Nemours & Co. v. Smiley, 138 S. Ct. 2563 (2018) (Gorsuch, J., statement respecting the denial of certiorari).
*
*
*
Regrettably, the decision below is just one example—
albeit an extreme one—of a now-familiar pattern: Courts
regularly invoke Skidmore to avoid judicial interpretation of a statute entirely. The result is deference to
agency interpretations that are not even arguably
persuasive. Although the court of appeals acknowledged
that an agency’s views under Skidmore are only “entitled
to a level of deference commensurate with their power to
persuade,” App., infra, 25a, its opinion relied on an impoverished concept of persuasion. The court did not
25
interrogate at all the “validity” of DOT’s reasoning or ask
whether DOT employed the sort of considerations a court
would in exercising independent judgment. Skidmore,
323 U.S. at 140. The court did not question the “thoroughness” of a letter that was silent on the critical statutory phrase. Ibid. Nor did the court even begin to exhaust the full suite of traditional interpretive tools to
determine the statute’s meaning. The court did little
more than recite the operative language from Skidmore
and declare that the agency’s informal policy rationale
for its atextual interpretation was “eminently reasonable.” App., infra, 25a-26a. That cannot be what Skidmore contemplates. If it is, the judiciary will have little
role to play in the interpretation and application of
congressional statutes.
II. AS THIS CASE ILLUSTRATES, THE LOWER FEDERAL
COURTS ARE IN DISARRAY OVER SKIDMORE
The uncritical deference the court of appeals extended
to DOT’s informal position below is tantamount to abdication of the court’s role. Unfortunately, the decision is
not an outlier. It is one (particularly egregious) example
of disarray in the lower federal courts regarding
Skidmore deference—disarray fueled in part by this
Court’s inconsistent guidance. As this Court has recognized, Skidmore “has produced a spectrum of judicial
responses, from great respect at one end, to near
indifference at the other.” United States v. Mead Corp.,
533 U.S. 218, 228 (2001) (citations omitted). This Court’s
clarification and correction is necessary.
A. This Court’s Guidance Regarding Skidmore
Has Been Inconsistent
Some of this Court’s decisions emphasize that judges
must “decide cases based on their independent judgment
and ‘follow [an] agency’s [view] only to the extent it is
26
persuasive.’ ” Kisor v. Wilkie, 139 S. Ct. 2400, 2447
(2019) (Gorsuch, J., concurring) (quoting Gonzales, 546
U.S. at 269) (second brackets in original); see, e.g.,
Nassar, 570 U.S. at 361-362; Raymond B. Yates, M.D.,
P.C. Profit Sharing Plan v. Hendon, 541 U.S. 1, 16
(2004). Put another way, Skidmore requires a court to
“proceed to determine the meaning of the [statute] the
old-fashioned way: * * * ‘decid[ing] for [itself ] the best
reading.’ ” Miller v. Clinton, 687 F.3d 1332, 1342 (D.C.
Cir. 2012); see Warner-Lambert Co. v. United States, 407
F.3d 1207, 1209 (Fed. Cir. 2005); Landmark Legal
Found. v. IRS, 267 F.3d 1132, 1136 (D.C. Cir. 2001).
Nassar illustrates that approach. There, the Court
considered the “plain language,” “structure,” and “design” of Title VII to decide whether the statute required
but-for causation. 570 U.S. at 352-353. Only then did it
consider agency views. See id. at 361-362. Although the
agency had a “longstanding” view that found support in
lower-court decisions, the Court rejected it as unpersuasive. Id. at 360-361. One of the agency’s rationales,
the Court explained, “fail[ed] to address the specific
provisions of this statutory scheme,” and another had
“circular” reasoning. Id. at 361-362. The longevity of the
agency’s view was secondary to what the statute said.
At other times, this Court has provided very different
guidance. In Federal Express Corp. v. Holowecki, 552
U.S. 389 (2008), this Court “defer[red]” under Skidmore
to the agency’s reading of the statutory term “charge.”
Id. at 395, 402. The statute “d[id] not define charge,” and
the agency’s regulations lacked sufficient content. Id. at
395. As the dissent noted, however, the Court did not
resolve the uncertainty by employing the usual presumption that undefined terms carry their ordinary
meaning. See id. at 408-409 (Thomas, J., dissenting)
27
(citing FDIC v. Meyer, 510 U.S. 471, 476 (1994)). Nor did
it ask whether the agency had conducted a similar
analysis or found the statute’s best reading. Instead, the
Court “defer[red]” to an informal agency position (despite admitted inconsistencies in application) because it
had “been binding on [agency] staff for at least five
years” and was “consistent with the design and purpose”
of the statute. Id. at 399, 402 (majority opinion).
Holowecki’s emphasis on longevity and consistency
with general goals can be read—as it was in this case—to
suggest that agency views deserve deference without
resort to “regular interpretive method[s]” to resolve statutory ambiguities. Gen. Dynamics, 540 U.S. at 600. In
“defer[ring],” moreover, this Court suggested that, under
Skidmore, courts are absolved from seeking the best
reading of a statute. When a statute contains a gap, the
Court stated, an “agency may choose among reasonable
alternatives.” Holowecki, 552 U.S. at 403. While there
might be “reasonable” alternatives to the agency’s position, the statute’s implementation was, in the Court’s
view, “a matter for the agency to decide.” Id. at 403, 407.
That decision could be read to depart from the view that
Skidmore requires courts to employ their independent
judgment, permitting deference to an agency’s considered view only after traditional interpretive tools fail to
supply answers.
Holowecki does not stand alone. In Alaska Department of Environmental Conservation v. EPA, 540 U.S.
461 (2004), the Court accepted the Environmental Protection Agency’s view that it had authority to review
state permitting decisions, again without examining the
ordinary meaning of the statutory terms—“requirement”
and “determine.” Id. at 488-495; compare id. at 503-517
(Kennedy, J., dissenting). The Court, moreover, describ-
28
ed Skidmore in terms that contemplate a diminished
judicial role. Skidmore, the Court stated, permits deference to agency constructions that are “permissible” and
“rational.” Id. at 493 (majority opinion). As in Holowecki, the decision nowhere suggested that courts should
search for the best reading of a statute. Rather, as the
dissent observed, the majority opinion “hid behind Chevron’s vocabulary” of reasonableness while invoking
Skidmore’s “less deferential” standard. Id. at 517-518
(Kennedy, J., dissenting).
B. This Court’s Inconsistent Decisions Have Contributed to Disarray in Lower Federal Courts
Lacking clear guidance from this Court, lower courts
have taken the example of Holowecki—and Skidmore
deference—to their unintended extremes. Here, for
example, the court of appeals seized on Holowecki’s
reasoning that “deference to [an] agency’s position is
due” when it is “binding on agency staff for a number of
years, and it is reasonable and consistent with the statutory framework.” App., infra, 25a (citing Holowecki, 552
U.S. at 399-402). The court below then applied that
formulation to avoid independent, judicial consideration
of statutory text and structure. The court of appeals
instead focused almost exclusively on DOT’s policy
rationales, without attempting to determine for itself
whether DOT’s informal views captured the statute’s
unambiguous meaning. See pp. 22-23, supra.
Other federal courts have likewise understood Skidmore to allow courts to emphasize consistency, longevity,
or policy to the virtual exclusion of statutory text. See,
e.g., Seaview Trading, LLC v. Comm’r, 858 F.3d 1281,
1287 (9th Cir. 2017) (deferring to agency’s “consistent
position”); Unified Turbines, Inc. v. U.S. Dep’t of Labor,
581 F. App’x 16, 18-19 (2d Cir. 2014); Cervantes v. Hol-
29
der, 597 F.3d 229, 234-235 & n.7 (4th Cir. 2010) (deferring
to agency that “consistently adhered to that reading”);
Ammex, Inc. v. United States, 367 F.3d 530, 535 (6th Cir.
2004). Some decisions even declare that “obviously some
level of deference” is due an agency’s longstanding view.
Ammex, 367 F.3d at 535.
Consistent with that understanding, some courts
proceed directly from the fact that the statute leaves a
term or phrase undefined to deferring to an agency construction, without themselves examining the language to
determine the statute’s meaning. See, e.g., EstradaRodriguez v. Lynch, 825 F.3d 397, 404-406 (8th Cir.
2016); Ammex, 367 F.3d at 535. For example, in United
States v. Miller, 833 F.3d 274 (3d Cir. 2016), the Third
Circuit noted that the relevant statutory phrase, “in the
business [of advising others],” was not defined and that
the court had not “previously interpreted the phrase.”
Id. at 281. But rather than construe that phrase, the
court treated a definition from an SEC interpretive release—a release that “represent[ed] only the views of the
SEC staff ”—as controlling. Ibid. Without analyzing the
statutory language, the court declared that “ ‘[n]o clearer
alternatives’ ” were within its “ ‘authority or expertise to
adopt.’ ” Ibid. (quoting Holowecki, 552 U.S. at 402).8
8
Scholars have remarked on lower courts’ inconsistent approaches to
Skidmore. “It is apparent,” a leading article states, that courts “lack
a coherent conception of how Skidmore’s sliding scale should
function.” Kristin E. Hickman & Matthew D. Krueger, In Search of
the Modern Skidmore Standard, 107 Colum. L. Rev. 1235, 1291
(2007); see id. at 1271 (courts split over whether Skidmore requires
exercise of “independent judgment”); Lisa Schultz Bressman, How
Mead Has Muddled Judicial Review of Agency Action, 58 Vand. L.
Rev. 1443, 1464-1465 (2005). A common misconception, another observes, is that Skidmore simply requires “ ‘weak deference’ ” and
30
These decisions illustrate how far courts have departed from the judicial role that Skidmore contemplates.
The courts have “become habituated to defer to the interpretive views of executive agencies, not as a matter of
last resort but first.” Valent v. Comm’r of Soc. Sec., 918
F.3d 516, 525 (6th Cir.) (Kethledge, J., dissenting)
(discussing Chevron), cert. dismissed sub nom. Valent v.
Saul, 140 S. Ct. 450 (2019). The judicial role begins with
the court’s interpretation of the statute, and urges
deference to the agency’s interpretation only to the
extent that interpretation has power to persuade. This
Court’s intervention is needed to clarify Skidmore’s injunction that courts must employ the tools of statutory
construction first to determine the statute’s meaning,
thereafter deferring only insofar as an agency’s interpretation is persuasive.
III. THE QUESTION PRESENTED IS IMPORTANT AND
RECURRING
Whether Skidmore requires courts to independently
interpret the statute—employing the usual tools of statutory interpretation—before invoking deference is an important and recurring question. Skidmore holds a prominent place in the law. Courts of appeals have invoked
Skidmore more than 1,300 times in the 19 years since this
Court’s Mead decision revitalized Skidmore. District
courts have cited Skidmore more than 1,700 additional
Chevron “ ‘strong deference.’ ” Michael Herz, Chevron Is Dead;
Long Live Chevron, 115 Colum. L. Rev. 1867, 1879 & n.59 (2015).
That “misconceives the distinction as one of degree when it is in fact
a difference in kind.” Ibid.
31
times. The subject matter of the decisions applying Skidmore is as varied as federal agencies themselves.9
The frequency with which courts confront questions
about Skidmore’s meaning and scope is destined to accelerate. Last term, this Court “reinforc[ed]” significant
“limits” on Auer deference. Kisor, 139 S. Ct. at 2415; see
id. at 2415-2418. The Court made clear, for example, that
courts “must make a conscientious effort to determine,
based on indicia like text, structure, history, and purpose,
whether the regulation really has more than one
reasonable meaning.” 139 S. Ct. at 2423-2424. But the
Court did not foreclose courts from applying Skidmore in
lieu of Auer deference, see Christopher v. SmithKline
Beecham Corp., 567 U.S. 142, 159 (2012) (taking that
approach)—now an increasingly likely scenario.
How courts apply Skidmore has predictably casedispositive effects. When courts exercise independent
judgments to determine the meaning of statutes, agen9
See, e.g., Air Transp. Ass’n of Am., Inc. v. FAA, 921 F.3d 275, 279
(D.C. Cir. 2019) (FAA construction of airport-development grant assurance statute); Hayes v. Harvey, 903 F.3d 32, 46 (3d Cir. 2018)
(HUD construction of § 8 housing statute); Sec’y of Labor v. Am.
Future Sys., Inc., 873 F.3d 420, 426 (3d Cir. 2017) (DOL construction
of FLSA); Baylor Cty. Hosp. Dist. v. Price, 850 F.3d 257, 264 (5th
Cir. 2017) (HHS construction of Medicare Rural Hospital Flexibility
Program Act); Delaware v. Surface Transp. Bd., 859 F.3d 16, 20
(D.C. Cir. 2017) (Board construction of Interstate Commerce
Commission Termination Act of 1995); Varsity Brands, Inc. v. Star
Athletica, LLC, 799 F.3d 468, 478 (6th Cir. 2015), aff ’d on other
grounds, 137 S. Ct. 1002 (2017) (Copyright Office construction of
Copyright Act); Mansour v. Holder, 739 F.3d 412, 417 (8th Cir. 2014)
(BIA construction of Immigration and Nationality Act); McMaster v.
United States, 731 F.3d 881, 892 (9th Cir. 2013) (DOI construction of
federal California Wilderness Act); Lopez v. Terrell, 654 F.3d 176,
185 (2d Cir. 2011) (BOP construction of good-time-credit statute).
32
cies prevail about 38.5% of the time. See Kent Barnett &
Christopher J. Walker, Chevron in the Circuit Courts,
116 Mich. L. Rev. 1, 6 (2017). The more deference courts
extend to agencies, the more agencies win, with the win
rate increasing to 77.4% under Chevron. Ibid. Whether
Skidmore requires courts to search for the best reading
of a statute or apply a more deferential standard under
which “reasonable” (or even atextual) views can prevail
thus makes an enormous difference—as this case bears
out.
The issue is also critical to the separation of powers.
The Constitution gives courts the authority—and responsibility—to interpret the law. See Marbury, 5 U.S. (1
Cranch) at 177. Doctrines that allow for consideration of
agencies’ views must be kept in check to preserve the
constitutional structure. This Court has “reinforc[ed]”
traditional constraints on deference, even for laws entrusted to agencies for administration. Kisor, 139 S. Ct.
at 2415. Chevron is explicit that courts must exhaust the
“traditional tools of statutory construction.” 467 U.S. at
843 n.9. “[D]eference is not due” to an agency’s construction, this Court has held, unless the application of
those tools leaves “an unresolved ambiguity.” Epic Sys.
Corp. v. Lewis, 138 S. Ct. 1612, 1630 (2018); see CardozaFonseca, 480 U.S. at 446-447. Similarly, in the context of
Auer deference, courts must conclude a regulation is
“genuinely ambiguous” and “exhaust all the ‘traditional
tools’ of construction” before deferring to agencies’
positions. Kisor, 139 S. Ct. at 2415.
Those limits, however, serve to constrain little if
courts do not similarly scrutinize informal agency interpretations. Agencies will be discouraged from undertaking laborious notice-and-comment processes to
promulgate formal rules if courts defer to informal
33
agency positions without scrutinizing them. Cf. Nina A.
Mendelson, Regulatory Beneficiaries and Informal
Agency Policymaking, 92 Cornell L. Rev. 397, 408, 420433 (2007). And they will prefer to “promulgate vague
and open-ended regulations that they can later interpret
as they see fit,” using informal positions to do so.
Christopher, 567 U.S. at 158.
This case illustrates the stark consequences that
result when Skidmore is invoked to disregard statutory
text. Statutes reflect deliberate and deliberated legislative judgments about how to allocate scarce resources
and balance competing public interests. Here, Congress
enacted a law that provides $15 billion in tax-exempt—
essentially taxpayer-subsidized—bonds for a carefully
defined list of projects. See 26 U.S.C. § 142(m). AAF’s
passenger rail line is not among them. Whatever DOT’s
reasons for wanting to finance that rail line, it evaded the
statute to allocate $2.7 billion in bonds to an undertaking
that Congress made ineligible—depriving eligible and
worthy facilities of more than $2 billion dollars in taxexempt bonds that Congress intended to make available
to them.10
CONCLUSION
Because AAF’s railroad did not receive and has never
received federal assistance under Title 23, it is ineligible
for tax-exempt private activity bonds under 26 U.S.C.
§ 142(m)(1)(A). The court of appeals’ contrary decision
rests on a conception of Skidmore deference that all but
10
The disarray is particularly intolerable given that many civil
statutes for which agencies may seek Skidmore deference also carry
criminal consequences. See Kasten v. Saint-Gobain Performance
Plastics Corp., 563 U.S. 1, 16 (2011); Gonzales, 546 U.S. at 261-262.
34
eliminates the judicial role in construing the law. It
represents an egregious example of the disarray in the
lower federal courts over Skidmore. Neither it, nor the
disarray it reflects, can be allowed to stand. The petition
should be granted, so that the Court can clarify what
courts must do before deferring to an agency’s informal
interpretation under Skidmore—and prevent displacement of the judiciary’s constitutional duty to construe
statutes and to say what the law is.
Respectfully submitted.
DYLAN REINGOLD
County Attorney
INDIAN RIVER COUNTY
1801 27th St.
Vero Beach, FL 32960
J. MICHAEL LUTTIG*
728 West Lionshead Cir.
Vail, CO 81657
*
Admitted only in Virginia and
the District of Columbia
JEFFREY A. LAMKEN
Counsel of Record
JAMES A. BARTA
MOLOLAMKEN LLP
The Watergate, Suite 500
600 New Hampshire Ave., N.W.
Washington, D.C. 20037
(202) 556-2000
jlamken@mololamken.com
LAUREN F. DAYTON
MOLOLAMKEN LLP
430 Park Ave., 6th Floor
New York, NY 10022
(212) 607-8160
ELIZABETH K. CLARKE
MOLOLAMKEN LLP
300 N. LaSalle St., Suite 5350
Chicago, IL 60654
(312) 450-6700
Counsel for Petitioners
MAY 2020
APPENDIX
APPENDIX A
UNITED STATES COURT OF APPEALS
FOR THE DISTRICT OF COLUMBIA CIRCUIT
————
No. 19-5012
————
INDIAN RIVER COUNTY, FLORIDA AND INDIAN RIVER
COUNTY EMERGENCY SERVICES DISTRICT,
Appellants,
v.
UNITED STATES DEPARTMENT OF
TRANSPORTATION, ET AL.,
Appellees.
————
Appeal from the United States District Court
for the District of Columbia
(No. 1:18-cv-00333)
————
OPINION
————
Argued September 24, 2019
Decided December 20, 2019
————
Philip E. Karmel argued the cause and filed the briefs
for appellants.
(1a)
2a
Steven L. Brannock and Tracy S. Carlin were on the
brief for amicus curiae Indian River Neighborhood
Association in support of appellants.
Joan M. Pepin, Attorney, U.S. Department of Justice,
argued the cause for federal appellees. With her on the
brief were Jeffrey Bossert Clark, Assistant Attorney
General, Eric Grant, Deputy Assistant Attorney General,
Kevin W. McArdle, Attorney, Steven G. Bradbury,
General Counsel, U.S. Department of Transportation,
Paul M. Geier, Assistant General Counsel for Litigation
and Enforcement, and Charles E. Enloe, Trial Attorney.
Eugene E. Stearns argued the cause for intervenorappellee. With him on the brief were David H. Coburn,
Cynthia L. Taub, and Matthew Buttrick.
————
Before: GARLAND, Chief Judge, SRINIVASAN, Circuit
Judge, and EDWARDS, Senior Circuit Judge.
Opinion for the Court filed by Senior Circuit Judge
EDWARDS.
————
EDWARDS, Senior Circuit Judge: In 2011, Intervenor
AAF Holdings LLC (“AAF”) announced plans to construct and operate express passenger railway service
connecting Orlando and Miami, Florida. Phase I of the
All Aboard Florida Intercity Passenger Rail Project (also
“AAF Project” or “Project”), connecting Miami to West
Palm Beach, has been completed. Phase II, which will
extend service to Orlando, is presently under construction. In 2014, AAF applied for an allocation of taxexempt qualified Private Activity Bond (“PAB”) authority to partially finance Phase II of the Project. In
December 2017, the Department of Transportation
(“DOT”) allocated $1.15 billion in tax-exempt PABs to be
3a
issued by the Florida Development Finance Corporation
to finance Phase II of the Project. AAF, the sponsor of
the Project, received the proceeds of the bond sales to
fund the Project and is responsible for repaying them.
In February 2018, Indian River County, the Indian
River County Emergency Services District (together
“County” or “Appellant”), and other parties filed a complaint in the District Court claiming that DOT exceeded
its authority under 26 U.S.C. § 142(m)(1)(A) when it
allocated $1.15 billion in PABs to fund Phase II of the
AAF Project. The complaint further alleged that the
allocation violated 26 U.S.C. § 147(f ), which requires
certain state or local governmental approvals before taxexempt PABs may be issued. Finally, the complaint
challenged the adequacy of the Environmental Impact
Statement (“EIS”) prepared by the Federal Railway
Administration (“FRA”) pursuant to the requirements of
the National Environmental Policy Act (“NEPA”). See
42 U.S.C. § 4332. With respect to all of its claims, Indian
River County raised causes of action under the
Administrative Procedure Act (“APA”). See 5 U.S.C.
§ 706(2)(A) (an agency action may be set aside if found “to
be . . . arbitrary, capricious, an abuse of discretion, or
otherwise not in accordance with law”); id. § 706(2)(C) (an
agency action may be set aside if it is “in excess of
statutory jurisdiction, authority, or limitations, or short
of statutory right”). On December 24, 2018, the District
Court rejected Appellant’s claims and granted summary
judgment to the federal defendants. Indian River Cty. v.
Dep’t of Transp., 348 F. Supp. 3d 17 (D.D.C. 2018).
The District Court ruled that because the complaint
arguably fell within the zone-of-interests protected or
regulated by § 142, Indian River County was among the
class of parties authorized by Congress to pursue a cause
4a
of action under the APA. However, the District Court
found no merit in Indian River County’s claims. The
court ruled that the disputed Project constituted a
“surface transportation project” under § 142(m)(1)(A), as
required for DOT’s allocation of PABs qualifying for taxexempt status. The District Court also ruled that the use
of the disputed PABs did not violate 26 U.S.C. § 147(f ).
And, finally, the District Court ruled that the FRA’s
preparation of the EIS as required by NEPA was neither
arbitrary, nor capricious, nor an abuse of discretion, nor
otherwise in violation of the law. On appeal, Indian River
County challenges only the District Court’s rulings with
respect to § 142 and NEPA. DOT and Intervenor AAF,
in turn, contend that Appellant’s claims should be
dismissed because its interests are not within the zoneof-interests protected by 26 U.S.C. § 142(m). In the
alternative, they seek affirmance of the District Court’s
judgments on the merits.
For the reasons explained below, we affirm the
judgments of the District Court. We agree that Indian
River County’s interests are within the zone-of-interests
protected by 26 U.S.C. § 142 and, therefore, the
complaint raises claims that are cognizable under the
APA. However, we hold that DOT permissibly and
reasonably determined that the Project qualifies for taxexempt PAB financing under 26 U.S.C. § 142(m). We also
hold that the EIS for the Project adheres to the
commands of NEPA.
I. BACKGROUND
A. Statutory Background
1. Private Activity Bonds
Under 26 U.S.C. § 103(a) of the Internal Revenue
Code (“Code”), interest on state or local bonds is
generally not subject to federal taxation. 26 U.S.C.
5a
§ 103(a). However, a PAB issued by state or local governments to finance private activities is not tax-exempt
unless it is a “qualified bond.” Id. § 103(b)(1). As the
District Court explained:
Congress has authorized interest earned on certain
types of PABs to be exempted from federal
taxation. See 26 U.S.C. §§ 103, 141. Because this
exemption allows the bondholder to keep all the
interest, bond issuers can sell the bond at a lower
interest rate. . . .
Section 141 outlines certain types of PABs that can
constitute “qualified bond[s],” including “exempt
facility bond[s].” Id. § 141(e)(1)(A). Under § 142(a),
a bond is an “exempt facility bond” if at least 95% of
proceeds from its issue are used to finance one of
fifteen enumerated categories of projects. Id.
§ 142(a). One such category is “qualified highway or
surface freight transfer facilities.” Id. § 142(a)(15).
Section 142(m) defines “qualified highway or
surface freight transfer facilities,” id. § 142(m)(1),
and authorizes the Secretary of Transportation, “in
such manner as [she] determines appropriate,” id.
§ 142(m)(2)(C), to allocate up to $15 billion of PAB
authority to eligible projects, id. § 142(m)(2)(A).
Put simply, Congress has enacted a mechanism
through which the Secretary can allocate tax
exemptions to bonds used to finance construction
of, or improvements to, certain types of facilities.
These exemptions lower the cost of selling the
bonds, better enabling state and local governments
to finance the projects.
The Secretary’s allocation is necessary . . . for a
bond to be tax-exempt because it finances a “quali-
6a
fied highway or surface freight transfer facilit[y].”
Id. § 142(m)(2)(A).
Indian River Cty., 348 F. Supp. 3d at 28 (alterations in
original)
As noted, an “exempt facility bond” includes a bond
whose proceeds from its issue are used to finance “qualified highway or surface freight transfer facilities.” 26
U.S.C. § 142(a)(15). Section 142(m)(1)(A) defines “qualified highway or surface freight transfer facilities” as “any
surface transportation project which receives Federal
assistance under title 23, United States Code.” Title 23,
in turn, authorizes federal funding for, inter alia, “the
elimination of hazards of railway-highway crossings.” 23
U.S.C. § 130(a).
2. National Environmental Policy Act
As we recently explained in Mayo v. Reynolds, 875
F.3d 11 (D.C. Cir. 2017), Congress enacted NEPA in part
“to promote efforts which will prevent or eliminate
damage to the environment and biosphere and . . . enrich
the understanding of the ecological systems and natural
resources important to the Nation.” Id. at 15 (internal
quotation marks omitted) (quoting 42 U.S.C. § 4321). To
achieve these ends,
NEPA requires all federal agencies to include a
detailed environmental impact statement (“EIS”)
“in every recommendation or report on . . . major
Federal actions significantly affecting the quality of
the human environment.” Id. § 4332(2)(C). This
process ensures that an agency will consider every
significant aspect of the environmental impact of a
proposed action and inform the public of its
analysis. In other words, agencies must take a hard
look at [the] environmental consequences of their
7a
actions, and provide for broad dissemination of
relevant environmental information.
....
Where NEPA analysis is required, its role is
primarily information-forcing. As the Supreme
Court has explained, “[t]here is a fundamental
distinction . . . between a requirement that mitigation be discussed in sufficient detail to ensure that
environmental consequences have been fairly
evaluated, on the one hand, and a substantive
requirement that a complete mitigation plan be
actually formulated and adopted, on the other.”
Robertson v. Methow Valley Citizens Council, 490
U.S. 332, 352 (1989). NEPA is not a suitable vehicle
for airing grievances about the substantive policies
adopted by an agency, as NEPA was not intended
to resolve fundamental policy disputes.
It is now well-established that NEPA imposes
only procedural requirements on federal agencies
with a particular focus on requiring agencies to
undertake analyses of the environmental impact of
their proposals and actions. It is equally clear that
NEPA does not impose a duty on agencies to
include in every EIS a detailed explanation of
specific measures which will be employed to
mitigate the adverse impacts of a proposed action.
875 F.3d at 15-16 (alterations in original) (citations and
quotation marks omitted).
In sum, because NEPA’s requirements are “essentially procedural,” the statute does “not mandate particular
substantive environmental results.” Theodore Roosevelt
Conservation P’ship v. Salazar, 661 F.3d 66, 68 (D.C.
Cir. 2011) (internal quotation marks and citations
8a
omitted). Instead, NEPA “focus[es] Government and
public attention on the environmental effects of proposed
agency action.” Id. (alteration in original) (internal
quotation marks omitted). Those requirements “simply
. . . ensure that the agency has adequately considered and
disclosed the environmental impact of its actions.”
WildEarth Guardians v. Jewell, 738 F.3d 298, 308 (D.C.
Cir. 2013) (internal quotation marks and citation
omitted).
B. Factual Background
The dispute in this case emanates from financial and
environmental concerns relating to the construction and
operation of an express passenger railway service
connecting Miami, Fort Lauderdale, West Palm Beach,
and Orlando, Florida. The rail service, known as the All
Aboard Florida Intercity Passenger Rail Project, has
been spearheaded by AAF. The new rail service will run
along an existing rail corridor designed in the late 1800s
by the Florida East Coat Railway (“FECR”). The
FECR corridor accommodated both passenger and
freight rail service until 1968, when passenger rail
service was terminated. The AAF Project is designed to
restore portions of the existing rail corridor between
Miami and Cocoa and construct a new segment between
Cocoa and Orlando. The ultimate goal is to establish
speedy rail passenger service along a significant segment
of the east coast of Florida.
AAF announced its plans for the Project in 2011.
According to AAF, the high-speed passenger service will
include 32 daily departures that will cover the 235-mile
trip in about three hours. Phase I of the Project,
connecting Miami to West Palm Beach, with a stop in
Fort Lauderdale, was completed in January 2018. Phase
II, connecting West Palm Beach to Orlando, is still under
9a
construction. When Phase II is completed, passenger
trains will run north from West Palm Beach to Cocoa,
turn west, and run inland along State Road 528 to
Orlando International Airport.
The record indicates that, in both Phases of the
Project, AAF is improving the existing rail corridor by:
(i) replacing portions of the existing mainline tracks
and reinstalling a second set of tracks where the
historic second track was previously removed; (ii)
adding a third track in certain locations within the
corridor to allow for more efficient service; (iii)
replacing or repairing existing bridges across
waterways; (iv) installing Positive Train Control
systems which will provide integrated command
and control of passenger and freight train
operations; and (v) upgrading railway-roadway
crossing safety features per federal regulations and
requirements, as well as specific requests from
counties and municipalities along the Project route.
JA1831-44. . . . In addition, AAF has been helping
counties and municipalities convert existing
crossings into “Quiet Zones,” which eliminates the
requirement for warning horns to be sounded as
trains approach. JA2291.
Intervenor’s Br. at 3.
10a
Id. at 5.
In 2013, an AAF subsidiary applied to FRA for a $1.6
billion loan pursuant to the Railroad Rehabilitation and
Improvement Financing program to help finance the
Project. Because projects benefiting from such loans are
subject to NEPA, FRA conducted an environmental
review of the entire AAF Project. The agency prepared
an Environmental Assessment and Section 4(f ) Evaluation for Phase I, which resulted in a Finding of No Significant Impact. FRA also commenced preparing an EIS
for Phase II, with the assistance of the U.S. Coast Guard
and U.S. Army Corps of Engineers. In 2015, AAF
withdrew its loan application, so FRA did not issue a
11a
Record of Decision on its EIS. In 2017, however, after
AAF resubmitted its loan application, FRA completed
the NEPA review process.
The NEPA review lasted over two years and included
an extensive period for public comment, including
numerous public meetings in counties along the Project
corridor. Over 15,400 written comments were received
from interested parties, including Indian River County.
FRA responded to comments in its Final EIS, which was
published on August 5, 2015. The Final EIS is over 600
pages in length, includes an additional 70 appendices, and
concludes that the existing FECR corridor was the only
feasible alternative for the north-south segment of the
Project. FRA also concluded that “[t]he Project would
have an overall beneficial effect on public health, safety,
and security in the rail corridor,” J.A. 1658, as well as
“beneficial cumulative impacts” on “transportation, air
quality, and economic resources,” id. at 1662. Finally,
the EIS set forth significant mitigation measures relating
to public safety, vehicular traffic, navigation, noise and
vibration, water resources, biological resources, essential
fish habitat, wetlands and other ecological systems,
threatened and endangered species, and historic
properties. Id. at 2503-21. After receiving additional
public comments, FRA issued a Record of Decision on
December 15, 2017. This included the agency’s analyses
regarding alternatives, environmental impacts, and
mitigation, id. at 4357-4412, and a separate addendum in
which it evaluated and responded to the comments on the
Final EIS, id. at 4414-48.
In the end, the loan that had been sought by AAF was
never made.
As explained below, AAF obtained
financing through the sale of tax-exempt PABs and
withdrew its loan application in February 2019.
12a
The allocation of the PABs in support of the Project
occurred as follows:
In 2014, AAF applied [to DOT] for an allocation
of tax-exempt PABs to partially finance the project.
To demonstrate that the Project is indeed a
“surface transportation project which receives
Federal assistance under title 23,” 26 U.S.C.
§ 142(m)(1)(A), AAF submitted documentation
showing that more than $9 million in Title 23funded improvements had been made to 72
separate grade crossings (railway-highway intersections) since 2012 along the N-S corridor and the
Miami to West Palm Beach corridor.
DOT
determined that the Project was eligible for PAB
funding and provisionally allocated $1.75 billion in
tax-exempt PABs to the project. In September
2016, however, AAF submitted a new request for a
$600 million allocation for Phase I only, and it asked
that the previous allocation be withdrawn. DOT
granted both requests in November 2016. The $600
million in PABs for Phase I were subsequently
issued by the Florida Development Finance
Corporation and sold to private investors.
A year later, AAF submitted a new application
for an allocation of PABs to finance Phase II. DOT
allocated $1.15 billion for Phase II in December
2017. The Florida Development Finance Corporation’s authority to issue those bonds was set to
expire at the end of 2018, but it was extended to
June 30, 2019. While this appeal has been pending,
DOT granted AAF’s request to modify the Phase II
allocation to allow for the issuance of an additional
$950 million in PABs. All $2.1 billion in bonds have
13a
been issued. See https://www.transportation.gov/
buildamerica/programs-services/pab.
DOT Br. at 6-7 (citations omitted).
C. Procedural History
In 2015, Indian River County filed a lawsuit
challenging DOT’s December 2014 allocation of $1.75
billion in PABs. Martin County filed a similar action, in
which it additionally claimed that the Project was not
eligible to receive an allocation of PABs under 26 U.S.C.
§ 142(m). The District Court denied a motion to dismiss
both Counties’ environmental claims, but granted
dismissal of Martin County’s claim that DOT exceeded its
authority under § 142. See Indian River Cty. v. Rogoff,
201 F. Supp. 3d 1, 20-21 (D.D.C. 2016). After AAF
requested that the initial PAB allocation be withdrawn,
the two cases pending in the District Court were
dismissed as moot. See Indian River Cty. v. Rogoff, 254
F. Supp. 3d 15, 17-18, 22 (D.D.C. 2017).
The litigation in the present case was initiated in
February 2018. Three claims were raised: First, the
complaint alleged that DOT exceeded its authority under
26 U.S.C. § 142(m) when it allocated $1.15 billion in PABs
to fund Phase II of the AAF Project. Second, the
complaint asserted that the allocation violated 26 U.S.C.
§ 147(f ), which requires certain state or local governmental approvals before tax-exempt PABs may be
issued. Finally, the complaint challenged the adequacy of
DOT’s NEPA review of the Project prior to allocating the
disputed PABs. AAF intervened to defend against the
complaint. Martin County and Citizens Against Rail
Expansion in Florida were originally named as coplaintiffs, along with Indian River County. However,
before this appeal was filed, they reached a settlement
14a
with AAF and stipulated to the dismissal of their claims
with prejudice.
In December 2018, the District Court granted
summary judgment to the federal defendants and AAF.
See Indian River Cty. v. Dep’t of Transp., 348 F. Supp.
3d 17 (D.D.C. 2018). As noted above, the District Court
ruled that because the complaint arguably fell within the
zone-of-interests protected or regulated by § 142, Indian
River County was among the class of parties authorized
by Congress to pursue a cause of action under the APA.
The court also ruled that the disputed allocation of PABs
did not violate § 142 or § 147(f ). As to Appellant’s claim
under § 142, the District Court upheld DOT’s determination that the Project is a “surface transportation
project” that has received federal assistance under Title
23 of the U.S. Code, as required by 26 U.S.C.
§ 142(m)(1)(A). With respect to the § 147(f ) claim, the
District Court ruled that DOT lawfully allocated the
disputed PABs after obtaining the State of Florida’s
approval, thus concluding that DOT was not obligated to
seek the approval of each local governmental authority in
areas through which Phase II will run.
Finally, the District Court found that FRA’s environmental review of the Project satisfied NEPA’s requirements. The District Court rejected Appellant’s claims
relating to pedestrian safety, noting the EIS’s thorough
study of every grade crossing along the entire corridor;
the extensive safety improvements that AAF is
mandated to make; and the record demonstrating that
the EIS considered the safety of trespassers who cut
across the tracks between formal crossings and addressed the safety problems posed by these situations.
The District Court also rejected Appellant’s claim that a
complete mitigation plan, detailing the location and
15a
design of fencing along the railway, was required in the
EIS. Finally, the District Court held that the EIS
adequately examined noise impacts.
Indian River County now appeals the District Court’s
grant of summary judgment with respect to its claims
under § 142 and NEPA, but it no longer presses its claim
under § 147(f ). DOT and AAF contend that the case
should be dismissed because Indian River County’s
asserted interests fall outside the zone-of-interests protected by § 142. In the alternative, DOT and AAF seek
affirmance of the District Court’s judgments on the
merits.
II. ANALYSIS
A. Standard of Review
“This court reviews the District Court’s ruling on
summary judgment de novo.” Feld v. Fireman’s Fund
Ins. Co., 909 F.3d 1186, 1193 (D.C. Cir. 2018). In
reviewing a summary judgment motion, courts are
required to “ ‘examine the facts in the record and all
reasonable inferences derived therefrom in a light most
favorable to’ the non-moving party.” Id. (quoting Robinson v. Pezzat, 818 F.3d 1, 8 (D.C. Cir. 2016)). We must
then determine whether “there are any genuine factual
issues that properly can be resolved only by a finder of
fact because they may reasonably be resolved in favor of
either party.” Anderson v. Liberty Lobby, Inc., 477 U.S.
242, 250 (1986). The District Court’s conclusion that
Appellant has a cause of action under the APA for its
§ 142(m) claim is also reviewable de novo, because it is a
question of law. Zuza v. Office of High Representative,
857 F.3d 935, 938 (D.C. Cir. 2017).
When, as in this case, the appeal is from a final
judgment issued by the District Court, we do not defer to
the District Court’s review of the agency action. Novicki
16a
v. Cook, 946 F.2d 938, 941 (D.C. Cir. 1991). Rather, “[w]e
review the administrative action directly, according no
particular deference to the judgment of the District
Court.” Mingo Logan Coal Co. v. EPA, 829 F.3d 710, 718
(D.C. Cir. 2016) (internal quotation marks and citation
omitted). The reason is that, under well-established law,
“when an agency acts pursuant to congressionallydelegated authority and the action has the force of law,
‘the agency itself is typically owed deference with respect
to its fact-finding, see NLRB v. Brown, 380 U.S. 278, 292
(1965), its application of law to facts, see Citizens to Pres.
Overton Park, Inc. v. Volpe, 401 U.S. 402, 416 (1971), and
its interpretation of the governing statute or regulation,
see Chevron U.S.A., Inc. v. Natural Res. Def. Council,
Inc., 467 U.S. 837, 843 (1984).’ ” EDWARDS & ELLIOTT,
FEDERAL STANDARDS OF REVIEW 145 (3d ed. 2018)
(quoting Novicki, 946 F.2d at 941).
Because neither NEPA nor 26 U.S.C. § 142 supplies a
private right of action, judicial review under both
statutes is governed by the APA. The APA requires that
we “hold unlawful and set aside agency action” that is
“arbitrary, capricious, an abuse of discretion, or
otherwise not in accordance with law.”
5 U.S.C.
§ 706(2)(A). Agency action is arbitrary and capricious “if
the agency has relied on factors which Congress has not
intended it to consider, entirely failed to consider an
important aspect of the problem, [or] offered an
explanation for its decision that runs counter to the
evidence before the agency.” Motor Vehicle Mfrs. Ass’n
v. State Farm Mut. Auto. Ins. Co., 463 U.S. 29, 43 (1983).
In evaluating contested agency action, the court must
“not . . . substitute its [own] judgment for that of the
agency.” Id.
17a
In reviewing NEPA challenges, we must be “mindful
that our role is not to ‘flyspeck’ an agency’s environmental analysis, looking for any deficiency no matter how
minor. Rather, it is simply to ensure that the agency has
adequately considered and disclosed the environmental
impact of its actions and that its decision is not arbitrary
or capricious.” WildEarth Guardians, 738 F.3d at 308
(citation and internal quotation marks omitted); see also
Robertson v. Methow Valley Citizens Council, 490 U.S.
332 (1989) (making it clear that the courts must give
deference to agency judgments as to how best to prepare
an EIS).
B. Appellant’s Interests Fall Within the “Zone of
Interests” Protected by § 142
In Lexmark International, Inc. v. Static Control
Components, Inc., 572 U.S. 118, 129 (2014), the Supreme
Court explained the “lenient approach” that the courts
must follow in determining whether a party has stated a
cause of action under the APA:
First, we presume that a statutory cause of action
extends only to plaintiffs whose interests “fall
within the zone of interests protected by the law
invoked.” The modern “zone of interests” formulation originated in Association of Data Processing
Service Organizations, Inc. v. Camp, 397 U.S. 150
(1970), as a limitation on the cause of action for
judicial review conferred by the Administrative
Procedure Act (APA). We have since made clear,
however, that it applies to all statutorily created
causes of action; that it is a “requirement of general
application”; and that Congress is presumed to
“legislate against the background of” the zone-ofinterests limitation, “which applies unless it is
18a
expressly negated.” Bennett v. Spear, 520 U.S. 154,
163 (1997). . . .
We have said, in the APA context, that the test is
not “ ‘especially demanding,’ ” Match-E-Be-NashShe-Wish Band of Pottawatomi Indians v.
Patchak, 567 U.S. 209, 225 (2012). In that context
we have often “conspicuously included the word
‘arguably’ in the test to indicate that the benefit of
any doubt goes to the plaintiff,” and have said that
the test “forecloses suit only when a plaintiff ’s
‘interests are so marginally related to or inconsistent with the purposes implicit in the statute that
it cannot reasonably be assumed that’ ” Congress
authorized that plaintiff to sue. Id. That lenient
approach is an appropriate means of preserving the
flexibility of the APA’s omnibus judicial-review provision, which permits suit for violations of numerous
statutes of varying character that do not themselves include causes of action for judicial review.
Id. at 129-30 (citations and brackets omitted).
DOT and Intervenor AAF argue that this case should
be dismissed because Appellant’s interests are not within
the zone-of-interests of 26 U.S.C. § 142. In pressing this
position, DOT argues that the District Court erred in
concluding that “the interests at stake in § 142 . . . are
illuminated by § 147(f ), which requires State or local
government approval for certain PABs to qualify for tax
exemption.” Indian River Cty., 348 F. Supp. 3d at 29. In
DOT’s view, “the arguable existence of a cause of action
under Section 147( f ) does not give Plaintiffs a cause of
action to sue for an alleged violation of Section 142.”
DOT Br. at 16. DOT’s position is shortsighted, and it
reflects a distorted view of the District Court’s decision.
19a
What the District Court said was this:
In applying the zone-of-interests test, courts do not
look at the specific provision said to have been
violated in complete isolation. At the same time,
courts must police the extent to which they look
beyond the provision invoked to ensure that casting
a wider net does not deprive the zone-of-interests
test of virtually all meaning. Accordingly, a court
must limit its analysis to the provision invoked for
suit, as clarified by any provisions to which it bears
an integral relationship. In this case, then, the
Court must first determine whether § 147(f ) bears
an integral relationship with § 142, the provision
upon which Indian River County sues.
The Court concludes that the two provisions do
bear an integral relationship. They form adjacent
requirements for PABs used to finance certain
categories of facilities to qualify for tax-exempt
status: § 142 enumerates the types of facilities, and
§ 147(f ) ensures public approval and democratic
accountability for their construction.
Absent
§ 147(f ) approval, PABs used to finance a § 142
facility cannot be tax-exempt; and PABs approved
pursuant to § 147(f ) are not tax-exempt unless they
are used to finance a § 142 facility.
Most importantly, each requirement evinces a
common purpose: ensuring that when the public fisc
forgoes revenue through tax-exempt bonds, those
bonds are used to benefit the public.
Indian River Cty., 348 F. Supp. 3d at 29-30 (footnote,
citations, quotation marks, and brackets omitted). This is
a perfectly reasonable construction of the zone-ofinterests test. The simple point made by the District
Court is that “[b]y demonstrating that § 142 and § 147(f )
20a
bear an integral relationship, the County has illuminated
§ 142 in a way that suggests Congress’s intent was indeed
to allow State and local governments to ensure public
benefit would accrue from projects financed by taxexempt bonds.” Id. at 31. The District Court did not say,
as DOT suggests, that the arguable existence of a cause
of action under § 147(f ) gives Appellant a cause of action
to sue for an alleged violation of § 142.
In any event, we need not tarry further over the
District Court’s decision because we hold that Appellant
is within the zone-of-interests of 26 U.S.C. § 142(m) for
reasons analogous to those discussed in Match-E-BeNash-She-Wish Band of Pottawatomi Indians, 567 U.S.
at 224-28. Just as the Court noted in that case, we note
here that there is no dispute over the fact that
Appellant’s environmental and safety concerns are
matters of the sort that DOT surely will have “in mind”
when exercising its authority to allocate PABs pursuant
to § 142. Id. at 227. This alone is enough to show that
Appellant’s asserted interests at least arguably fall
within the zone-of-interests protected by § 142.
DOT has discretion under the statute to allocate PABs
to qualified facilities. 26 U.S.C. § 142(m)(2)(C). And
nothing in the statute precludes DOT from considering
local government concerns and environmental issues
when evaluating PAB allocations under § 142(m). Indeed,
DOT instructs PAB applicants to “[i]ndicate the current
status of milestones on [the estimated timeline provided],
including all necessary permits and environmental approvals.” Notice of Solicitation and Request for Comments, Applications for Authority for Tax-Exempt
Financing of Highway Projects and Rail-Truck Transfer
Facilities, 71 Fed. Reg. 642, 643 (Jan. 5, 2006) (emphasis
added). DOT also instructs applicants to “[p]rovide a
21a
copy of a resolution adopted in accordance with state or
local law authorizing the issuance of a specific issue of
obligations [as required by section 147(f )].” Id. AAF’s
application provided all of this required information. J.A.
4522, 4532-34, 4545.
DOT’s position regarding the zone-of-interests inquiry
is obviously wanting because it fails to take account of the
fact that Appellant’s cause of action arises under the
APA, not under the Code. As noted above, the zone-ofinterests test is not “especially demanding” with respect
to matters arising under the APA, and “the benefit of any
doubt goes to the plaintiff.” Match-E-Be-Nash-She-Wish
Band of Pottawatomi Indians, 567 U.S. at 225 (citation
omitted). Furthermore, the Supreme Court has “consistently held that for a plaintiff ’s interests to be arguably
within the zone of interests to be protected by a statute,
there does not have to be an indication of congressional
purpose to benefit the would-be plaintiff.” Nat’l Credit
Union Admin. v. First Nat. Bank & Tr. Co., 522 U.S.
479, 492 (1998) (internal quotation marks and citation
omitted). And a plaintiff certainly need not be expressly
listed as a beneficiary of a statutory provision in order to
be within its protected zone-of-interests. Finally, the
Supreme Court has emphasized that the zone-ofinterests test “forecloses suit only when a plaintiff ’s
‘interests are so marginally related to or inconsistent
with the purposes implicit in the statute that it cannot
reasonably be assumed that Congress intended to permit
the suit.’ ” Match-E-Be-Nash-She-Wish Band of Pottawatomi Indians, 567 U.S. at 225 (citation omitted).
That certainly is not this case.
In assessing whether a plaintiff ’s interests fall within
the zone-of-interests protected by a statute, we must
consider the “context and purpose” of the relevant
22a
statutory provisions and regulations at issue. Match-EBe-Nash-She-Wish Band of Pottawatomi Indians, 567
U.S. at 226. “ ‘[W]e do not look at the specific provision
said to have been violated in complete isolation[,]’ but
rather in combination with other provisions to which it
bears an ‘integral relationship.’ ” Nat’l Petrochemical &
Refiners Ass’n v. EPA, 287 F.3d 1130, 1147 (D.C. Cir.
2002) (second alteration in original) (citation omitted). In
applying these principles, it is quite clear that Appellant—a local government entity whose citizens will be
directly affected by the AAF Project—has compelling
interests that fall within the zone-of-interests protected
by the statute. The statutory context and purpose make
this clear.
26 U.S.C. § 141(e)(1)(A) outlines certain types of PABs
that can constitute “qualified bond[s],” including “exempt
facility bond[s].” An “exempt facility bond” includes a
bond whose proceeds from its issue are used to finance
“qualified highway or surface freight transfer facilities.”
26 U.S.C. § 142(a)(15). Section 142(m)(1)(A) then defines
“qualified highway or surface freight transfer facilities”
as “any surface transportation project which receives
Federal assistance under title 23, United States Code.”
Title 23, in turn, authorizes federal funding for, inter
alia, “the elimination of hazards of railway-highway
crossings.” 23 U.S.C. § 130(a). It cannot be doubted that
Indian River County is seriously concerned about the
effects of any surface transportation project that cuts
through the County. Nor can it be doubted that Indian
River County has a strong interest in limiting or
removing any hazards posed by railway-highway crossings in the County. Therefore, on the record in this case,
it is not difficult to conclude that DOT’s allocation of
PABs pursuant to § 142(m) implicates important interests
23a
of Indian River County. The County is a “reasonable—
indeed, predictable—challenger[ ] of the Secretary’s
decisions” regarding PAB allocations in a case of this
sort. Match-E-Be-Nash-She-Wish Band of Pottawatomi
Indians, 567 U.S. at 227.
Given this context, we reject the suggestion made by
DOT and Intervenor AAF that Indian River County’s
interests are only “marginally related to” DOT
allocations of tax-exempt qualified Private Activity Bonds
pursuant to 26 U.S.C. § 142(m)(1)(A). We therefore
affirm the judgment of the District Court that Indian
River County’s interests are within the zone-of-interests
of 26 U.S.C. § 142.
C. DOT Lawfully and Reasonably Allocated
Private Activity Bonds to the AAF Project
The principal issue on the merits is whether DOT
permissibly allocated PABs to the AAF Project.
Appellant’s argument on this point is straightforward:
The AAF passenger rail project is eligible to be
financed with private activity bonds only if it
“receives Federal assistance under title 23.” 26
U.S.C. § 142(m)(1)(A). The AAF project has not
received such funding. DOT approved the use of
PABs for the project on the theory that it will
indirectly benefit from highway safety projects on
railway-highway crossings that received federal
funding under 23 U.S.C. § 130. These highway
safety projects were made on the pre-existing
freight corridor to be utilized by the AAF project.
But a supposed benefit to the AAF project, even if
proven, would not satisfy the statutory language
that the AAF project itself receive federal
assistance under title 23. Not only has the project
not received such funding, it would not have been
24a
eligible for such funding because the only type of
project eligible to receive funding under 23 U.S.C.
§ 130 is a project to improve the safety of railwayhighway crossings. The AAF project is not a
project to improve the safety of railway-highway
crossings.
Appellant’s Br. at 10. We find no merit in Appellant’s
argument.
Section 142(m)(1)(A) authorizes allocations of PABs
for “any surface transportation project which receives
Federal assistance under title 23, United States Code.”
DOT has followed a consistent interpretation of the
statute that a project “receives assistance” for purposes
of § 142(m) even if only a constituent portion was directly
financed with Title 23 funds. Applying that interpretation here, railroad grade crossings are part of a
railroad “project” on any ordinary understanding, and
the record adequately supports the District Court’s
conclusion that crossing improvements were made in
contemplation of the All Aboard Florida initiative. See
Indian River Cty., 348 F. Supp. 3d at 34-35.
After the Project was announced, AAF received $9
million in Title 23 funds that were used to upgrade
railway-highway crossings on the Project corridor.
About $2.2 million of those funds were used to upgrade
39 crossings in Phase II of the Project. The Title 23
funds used to improve the safety of the grade crossings
clearly benefit the AAF Project and are important to
“eliminat[ing] hazards of railway-highway crossings” as
required by the statute. 23 U.S.C. § 130. Therefore,
DOT permissibly and reasonably determined that the
Project qualified for tax-exempt PABs under 26 U.S.C.
§ 142(m).
25a
In opposition, AAF argues that DOT’s interpretation
of the statute rests on an “informal document” written in
2005 by the then-Acting Chief Counsel of the Federal
Highway Administration and, therefore, it “does not
warrant deference under Chevron U.S.A., Inc. v. NRDC,
467 U.S. 837 (1984) (“Chevron”), and at most is entitled to
respect only to the extent it has the ‘power to persuade.’
Skidmore v. Swift & Co., 323 U.S. 134, 140 (1944).”
Appellant’s Br. at 17; see also EDWARDS & ELLIOTT,
FEDERAL STANDARDS OF REVIEW 211-16, 248-51 (3d ed.
2018) (discussing Chevron and Skidmore). DOT, in
response, contends that “Chevron deference is appropriate in light of ‘the interstitial nature of the legal
question, the related expertise of the Agency, the
importance of the question to administration of the
statute, the complexity of that administration, and the
careful consideration the Agency has given the question
over a long period of time.’ ” DOT Br. at 25 n.4 (quoting
Barnhart v. Walton, 535 U.S. 212, 222 (2002)). We need
not decide whether Chevron deference is due because it
is clear on the record before us that DOT’s position easily
survives review under Skidmore.
When an agency’s interpretation of a statute has been
binding on agency staff for a number of years, and it is
reasonable and consistent with the statutory framework,
deference to the agency’s position is due under Skidmore. See, e.g., Fed. Express Corp. v. Holowecki, 552
U.S. 389, 399-402 (2008). This is because an agency’s
views that are within its area of expertise are entitled to
a level of deference commensurate with their power to
persuade. United States v. Mead Corp., 533 U.S. 218, 228
(2001).
DOT’s position has not only been consistent; it is also
eminently reasonable. After the enactment of § 142(m),
26a
DOT sent a letter, dated October 7, 2005, to the Internal
Revenue Service, explaining that “the most reasonable
reading of [the statute] permits the proceeds of [PABs]
authorized by this provision to be used on the entire
transportation facility that is being financed and
constructed even though only a portion of that facility
receives Federal assistance under title 23.” J.A. 4494.
The letter further explained that Title 23 grantees
typically build some segments of the facility with Title 23
funds and other segments with state or local funds, even
if the entire facility is eligible for Title 23 funding. Id. at
4493. The letter goes on to say that a narrow reading of
the word “project” would “distort the longstanding way
in which facilities are actually funded, create needless red
tape, and artificially result in the extension of Federal
requirements that have nothing to do with the bonding of
transportation facilities.” Id. at 4495. “This would result
in doing exactly what the Congress indicated it did not
intend to do. In summary, our view is that PAB proceeds
may be used on any qualified facility that includes a
project funded with Federal-aid highway funds made
available under title 23.” Id. DOT’s long-standing
position is based on persuasive considerations that are
consistent with the statute. It is therefore due deference.
Appellant contends that DOT’s position in this case
should be rejected because the disputed PABs were
approved for a surface transportation project that has
not received federal assistance under Title 23. We find
no merit in this claim. DOT has reasonably interpreted
“project which receives Federal assistance under title 23”
to mean a project which—in whole or part—benefits
from assistance under Title 23. We have no reason to
question this position because the statute does not
require an applicant for PABs to be the direct recipient
27a
of Federal assistance under Title 23; rather, the “project”
at issue must receive assistance under Title 23.
Appellant also insists that it is not enough that the
AAF Project received some assistance under Title 23;
rather, according to Appellant, in order to qualify for
PABs under § 142(m)(1)(A), the entire proposed Project
must be funded by Title 23. See Appellant’s Br. at 20.
However, there is nothing in the statute to support this
interpretation. In this case, DOT reasonably construed
§ 142 to authorize an allocation of PABs to a project that
has indisputably gained significant benefits from Title 23funded improvements to grade crossings throughout the
rail line.
Finally, Appellant argues that DOT’s approval of
PABs for the AAF project is arbitrary and capricious
because the federally funded highway safety improvement projects were not intended to benefit the AAF
project. Assuming without deciding that such intent is
required, the District Court correctly concluded that
sufficient evidence of intent was present here.
The District Court found that:
[T]he record indicates that a disproportionate
amount of the Title 23 funding was disbursed only
after the AAF project began. Over the ten-year
period from 2005 through 2014, the railway
received approximately $21 million dollars in Title
23 funding, approximately 43% of which came in the
three years following the commencement of AAF’s
planning. Given that the AAF project received
substantial attention in Florida, the Court is
skeptical that the State’s Department of
Transportation disbursed (and increased) this Title
23 funding without the knowledge—if not
purpose—of benefitting the project. In short, the
28a
record indicates that this is not an instance in which
the AAF project was such an ancillary or
unintended beneficiary of the funds as to prevent
the Secretary from concluding that it had
“receive[d] Federal assistance under title 23[.]” 26
U.S.C. § 142(m)(1)(A).
Indian River Cty., 348 F. Supp. 3d at 35 (second and
third alteration in original) (citation omitted). These
findings and the District Court’s conclusion are
supported by the record.
A large portion of the disputed Title 23 funds were
disbursed after the Project was announced and they
provided federal assistance to the Project by improving
grade crossings all along the corridor. The financial
assistance provided has been substantial, and the
benefits afforded to the Project are obvious. We
therefore affirm the judgment of the District Court.
D. The Environmental Impact Statement for the
AAF Project Complied with the Requirements
of NEPA
Finally, Appellant contends that the EIS prepared for
the Project does not comply with the requirements of
NEPA. Appellant argues that the EIS did not take a
“hard look” at the effects of the Project on public safety;
that it did not adequately disclose and mitigate safety
risks to trespassers cutting across the tracks at locations
other than at legal grade crossings; and that it did not
sufficiently analyze the noise impacts caused by both the
higher speeds of the freight trains on the improved
tracks and the train horns at grade crossings. The
record belies these claims.
The Supreme Court has emphasized that “inherent in
NEPA and its implementing regulations is a ‘rule of
29a
reason.’ ” Dep’t of Transp. v. Pub. Citizen, 541 U.S. 752,
767 (2004) (citation omitted). This standard “ensures
that agencies determine whether and to what extent to
prepare an EIS based on the usefulness of any new
potential information to the decisionmaking process.” Id.
“NEPA does not impose a duty on agencies to include in
every EIS a detailed explanation of specific measures
which will be employed to mitigate the adverse impacts
of a proposed action.” Mayo, 875 F.3d at 16 (internal
quotation marks and citation omitted). And once an
agency has taken a “hard look” at “every significant
aspect of the environmental impact” of a proposed major
federal action, it is not required to repeat its analysis
simply because the agency makes subsequent discretionary choices in implementing the program. Baltimore
Gas & Elec. Co. v. Nat. Res. Def. Council, Inc., 462 U.S.
87, 97 (1983) (quoting Vermont Yankee Nuclear Power
Corp. v. Nat. Res. Def. Council, Inc., 435 U.S. 519, 553
(1978)). In sum, the Supreme Court has made it clear
that we must give deference to agency judgments as to
how best to prepare an EIS. See Robertson, 490 U.S.
332.
As the District Court’s decision shows, the
environmental review process conducted by FRA was
thorough and it complied fully with the commands of
NEPA. The District Court aptly noted that “[a]gency
action is rarely perfect. But NEPA does not demand
perfection. Instead, it requires that an agency take a
‘hard look’ at the reasonably foreseeable impacts of a
proposed major federal action. The extensive Final EIS,
appendices, common responses, and Record of Decision
together demonstrate that FRA met that requirement
here.” Indian River Cty., 348 F. Supp. 3d at 61-62. We
agree.
30a
As noted above, FRA prepared an EIS, covering more
than 600 pages, examining the environmental impacts of
the Project. J.A. 1635-2574. This process also included
multiple public meetings and opportunities for public
comment. Id. at 2559-74. In September 2014, FRA
released a draft EIS and received more than 15,400
comments from a wide range of stakeholders. The public
commentary was then considered by FRA when it
prepared the Final EIS. Id. at 2569. In early August
2015, the Final EIS was released. Id. at 1667.
The EIS examines the Project’s impacts on land use,
transportation, navigation, air quality, noise and
vibration, farmland soils, hazardous material disposal,
coastal zone management, climate change, water
resources, wild and scenic rivers, wetlands, floodplains,
wildlife habitat, threatened and endangered species,
social and economic effects (including impacts on lowincome communities), public health and safety, parks,
and historic properties, as well as the Project’s
cumulative impacts when combined with other past,
present, or reasonably foreseeable future actions. See id.
at 1635-2574. The EIS also sets forth a host of mitigation
measures to ameliorate those negative impacts. Id.
The EIS additionally includes a thorough discussion of
pedestrian safety, at both formal and informal crossings.
And it examines and discusses mitigation of risks to
pedestrians, including those using informal crossings.
With respect to formal crossings, the EIS relies on a
survey of every grade crossing on the rail corridor. This
survey was conducted by FRA’s Office of Safety,
Highway Rail Crossing and Trespasser Program
Division, and it includes an accompanying analysis
summarized in engineering reports which are included in
the EIS as Appendix 3.3.5-B. Id. at 2604-19.
31a
The EIS further acknowledges that informal crossings
do occur and that this form of trespassing was “an
epidemic along this corridor.” Id. at 2607 (Appendix
3.3.5-B); see also id. at 1762. The EIS recognizes that
these informal crossings are illegal and unsafe, id. at
1762, and that the arrival of AAF’s passenger rail service
could increase the frequency of accidents involving trains
and pedestrians, id. at 2397, 2400.
To mitigate these risks, the EIS describes a twopronged approach: (1) AAF must discourage the use of
informal crossings by installing fencing, and (2) AAF
must encourage the use of formal crossings by adding
sidewalks. Id. at 1763-64. This mitigation approach also
includes a public information campaign, which will be
conducted in coordination with the rail-safety organization, Operation Lifesaver. Id.
Moreover, the EIS notes that the rail corridor is
already fenced in at certain locations, id. at 2199, and
that AAF will conduct field surveys along the right-ofway to determine where additional fencing and other
preventative measures are needed to prevent trespassing, id. at 2400. The EIS provides that the “corridor
will be fenced where an FRA hazard analysis review
determines that fencing is required for safety; this will be
in populated areas where restricting access to the rail
corridor is necessary for safety.” Id. at 1900. “Fencing
on the N-S Corridor would be upgraded based on
existing public access locations and the potential for
conflicts with the increased train frequency.” Id. at 2400.
In addition, the EIS takes a “hard look” at noise
impacts from the Project. It finds that, if left unmitigated, these noises (principally from the warning horns
that the trains, both freight and passenger, are required
to sound at public highway-rail grade crossings) could
32a
cause adverse impacts. To mitigate these impacts, AAF
committed to installing pole-mounted horns at 117
intersections in the Phase II corridor, id. at 2291,
including 23 in Indian River County, id. at 2671. To
further reduce horn noise, AAF is cooperating with local
governments that wish to establish “quiet zones” that
allow both passenger and freight trains to pass through
grade crossings without sounding horns. Id. at 2291.
It is unnecessary for us to detail other parts of the
EIS or the environmental review process. The District
Court’s opinion, which offers an impressively thorough
and thoughtful examination of the record, and which we
endorse, is more than sufficient. Indian River Cty., 348
F. Supp. 3d at 42-62. The bottom line is that the Final
EIS for the AAF Project clearly complies with the
requirements of NEPA.
CONCLUSION
For the reasons set forth above, we affirm the judgments of the District Court.
So ordered.
33a
APPENDIX B
UNITED STATES COURT OF APPEALS
FOR THE DISTRICT OF COLUMBIA CIRCUIT
————
No. 19-5012
————
INDIAN RIVER COUNTY, FLORIDA AND INDIAN RIVER
COUNTY EMERGENCY SERVICES DISTRICT,
Appellants,
v.
UNITED STATES DEPARTMENT OF
TRANSPORTATION, ET AL.,
Appellees.
————
Appeal from the United States District Court
for the District of Columbia
(No. 1:18-cv-00333)
————
September Term, 2019
Filed On: December 20, 2019
————
Before: GARLAND, Chief Judge, SRINIVASAN, Circuit
Judge, and EDWARDS, Senior Circuit Judge.
JUDGMENT
This cause came on to be heard on the record on
appeal from the United States District Court for the
District of Columbia and was argued by counsel. On
consideration thereof, it is
34a
ORDERED and ADJUDGED that the judgments of
the District Court appealed from in this cause are hereby
affirmed, in accordance with the opinion of the court filed
herein this date.
Per Curiam
FOR THE COURT:
Mark J. Langer, Clerk
BY:
Michael C. McGrail
Deputy Clerk
Date: December 20, 2019
Opinion for the court filed by Senior Circuit Judge
Edwards.
35a
APPENDIX C
UNITED STATES DISTRICT COURT
FOR THE DISTRICT OF COLUMBIA
————
NO. 18-CV-00333 (CRC)
————
INDIAN RIVER COUNTY FLORIDA1 et al,
Plaintiffs,
v.
DEPARTMENT OF TRANSPORTATION et al,
Defendants.
————
MEMORANDUM OPINION
————
December 24, 2018
————
TABLE OF CONTENTS
I.
1
Background ...................................................
[37a]
A. Factual Background ............................
[37a]
1. The proposed project .......................
[37a]
2. The Secretary’s bond allocation ......
[38a]
3. The environmental review
process ...............................................
[40a]
This case was captioned Martin County et al v. Department of
Transportation et al in all previous filings. The Court has adjusted
the case name to reflect Martin County’s voluntary dismissal. See
Joint Stipulation of Dismissal, ECF No. 48.
36a
B. Procedural Background ......................
[42a]
Analysis .........................................................
[44a]
A. The Bond Allocation ............................
[44a]
1. Section 142(m)...................................
[47a]
2. Section 147(f ) ....................................
[62a]
B. NEPA Compliance ..............................
[75a]
1. Public-safety effects of the
project ................................................
[77a]
2. Effects of vessel queuing at railroad bridges over navigable
waters ................................................
[91a]
3. Alternatives to the route and the
use of moveable bridges ...................
[97a]
4. Noise impacts ...................................
[102a]
5. Changes to freight operations........
[109a]
III. Conclusion ....................................................
[115a]
II.
————
AAF Holdings, Inc. (“AAF”) plans to construct and
operate an express passenger railway connecting Orlando and Miami, Florida. The initial segment of the line between Miami and West Palm Beach is currently operational. The extension of the line to Orlando is still in the
planning stages. To help AAF finance the extension, the
U.S. Department of Transportation has allocated $1.15
billion in federally tax-exempt bonds to be issued by a
Florida economic development agency.
The planned extension of the railway will run through
Indian River County on Florida’s Treasure Coast. The
County and its Emergency Services District (together,
“Indian River County” or “Plaintiff ”) have long objected
to the project. In this, its second lawsuit challenging the
37a
project, Indian River County seeks summary judgment
on two grounds. First, it contends that the Department
of Transportation exceeded its authority in allocating the
bonds because the project is not eligible to receive taxexempt funding under two separate provisions of the Internal Revenue Code. Second, the County maintains that
the Federal Railway Administration (“FRA”) violated
the Administrative Procedure Act (“APA”) and the National Environmental Policy Act (“NEPA”) by conducting a flawed and incomplete review of the public health
and safety consequences of the project. Defendants the
Department of Transportation, its component FRA, and
several of its officers (together, “federal Defendants,”
“the Department,” or “FRA”) filed a cross motion for
summary judgment, as did AAF, which has intervened as
a defendant. Because the Department’s allocation met
the tax code’s requirements and the FRA’s review complied with NEPA, the Court will deny Indian River
County’s motion for summary judgment and grant the
federal Defendants’ and AAF’s.
I. Background
A. Factual Background
1. The proposed project
AAF is in the process of constructing a private passenger train service that will ultimately provide service
between Miami and Orlando. Phase I of the project currently operates from Miami to West Palm Beach. AR
65115-16. Phase II will run from West Palm Beach north
along Florida’s east coast to Cocoa and then west and inland to Orlando. Id. AAF plans to lay a second track
along a 128.5 mile stretch of single-track train corridor
owned by the Florida East Coast Railway (“FECR”)
from West Palm Beach north to Cocoa. AR 65115. This
track is currently used only by freight trains, some of
38a
which carry hazardous materials, but historically was
used by both freight and passenger trains. AR 73914.
This corridor is referred to in the record and by the parties as either the FECR Corridor or the N-S Corridor.
AR 65115. The N-S Corridor bisects Indian River County. AR 73572. AAF also proposes constructing a new 40mile track that would connect Cocoa and Orlando. This
stretch of track is referred to as the E-W Corridor. AR
65115.
AAF plans to operate thirty-two passenger trains per
day in addition to the FECR freight trains that now run
along the N-S Corridor. AR 65116. These trains would
run through Indian River County for twenty-one miles.
AR 73753. There are thirty “grade crossings” in the
County. Id. A grade crossing is an intersection where
the railway crosses a road or path at the same level or
grade, rather than an intersection where trains cross
over or under the road using an overpass or tunnel. In
addition to these grade crossings, the trains will traverse
bridges that are either fixed or moveable (i.e., draw
bridges). Two of these moveable bridges are at issue in
this case: the St. Lucie River Bridge and the Loxahatchee River Bridge. AR 73915. When these bridges
are in the “down” position, trains can cross over but boats
on the river cannot cross under.
2. The Secretary’s bond allocation
AAF is partially financing the railway project through
private activity bonds (“PABs”) issued by the Florida
Development Finance Corporation (“FDFC”), an agency
of the State of Florida. Congress has authorized the
United States Department of Transportation to allocate
tax-exempt authority to PABs used to finance specific
types of transportation projects.
See 26 U.S.C.
§ 142(m)(2)(C). AAF initially applied for a PAB allocation
39a
in August 2014. In December 2014, the Department of
Transportation approved that application and provisionally allocated $1.75 billion in tax-exempt PABs for the
project. See Indian River Cty. v. Rogoff (“Indian River
Cty. I ”), 110 F. Supp. 3d 59, 65 (D.D.C. 2015). AAF
planned to use these PABs to finance both phases of the
railway.
In November 2016, the Department, at AAF’s request,
withdrew the provisional allocation and replaced it with a
$600 million allocation of PAB authority to finance only
Phase I of the project. See Indian River Cty. v. Rogoff
(“Indian River Cty. III ”), 254 F. Supp. 3d 15, 17-18
(D.D.C. 2017). Then, in December 2017, AAF applied for
a new allocation of $1.15 billion in PAB authority to finance Phase II of the project. See AR 74220-62. As part
of its application, AAF represented that the project had
received $9 million in Title 23 federal funds, disbursed by
Florida’s Department of Transportation for highway-rail
crossings along the rail corridor. AR 74235. AAF included in its application a resolution by FDFC approving
the issue of bonds to finance the project. AR 74240-53.
That resolution concluded that the bond issue had received requisite public approval for tax-exempt status
because a designee of the State’s Governor had approved
their issue after a properly noticed public hearing. AR
74242-44. AAF’s application highlighted that the bonds
had already received this public approval. AR 74221.
Further, AAF included in its application a bond counsel
validity opinion, by the law firm Greenberg Traurig,
which concluded that “interest on the Bonds . . . is excludable from gross income for purposes of federal income taxation under existing laws as enacted and construed[.]” AR 74256.
40a
The Department approved the application and provisionally allocated $1.15 billion in PAB authority on December 20, 2017. AR 74324-26. Its provisional allocation
letter conditioned final allocation on several requirements, including compliance with all applicable federal
laws, as well as “a final bond counsel tax and validity
opinion . . . issued at the time of the closing of the bond
issue in substantially the form provided with the application.” AR 74324. While FDFC will issue the bonds, AAF
is responsible for marketing and selling them to investors. The parties have represented that the bonds will be
marketed in the next several weeks.
3. The environmental review process
AAF originally sought federal loan funding for the
project through the Railroad Rehabilitation and Improvement Financing (“RRIF”) program. RRIF loans
are subject to NEPA review. 49 C.F.R. § 260.35. FRA
reviewed the potential environmental impacts of the project under NEPA. AR 73636. With respect to Phase I,
FRA issued a Finding of No Significant Impact in 2013.
AR 73570. FRA then began preparing an Environmental
Impact Statement (“EIS”) for Phase II. AR 73571. It
held five public scoping meetings in May 2013 and received 248 comments in response to those meetings and
more than 160 comments in the subsequent seventeen
months. AR 74155-56. As required, FRA coordinated
with federal, state, local, and tribal governments, including Indian River County. AR 74157-59.
FRA completed a draft EIS in September 2014. AR
74164. The draft attracted some 15,400 public comments.
Id. During the comment period, FRA also held eight
public meetings, id., which were attended by over 2,500
people, AR 74165. FRA issued a Final Environmental
Impact Statement (“FEIS”) in August 2015. See AR
41a
73568. FRA subsequently received additional comments
on the FEIS, including from Plaintiff. AR 65154. When
AAF withdrew its RRIF loan application in 2015, FRA
decided to not issue a Record of Decision (“ROD”). AR
65118. After AAF re-filed an RRIF application in 2017,
FRA resumed the NEPA process and published the
ROD in December 2017. AR 65109-65. Appendix C to
the ROD provides responses to the comments on the
FEIS. See AR 65154; AR 65266-300.
The FEIS selects AAF’s preferred route as the best
alternative for the project and determines that no further
environmental review is necessary. AR 73578. The
FEIS itself is 646 pages long and separately includes
numerous appendices including maps and analyses of
noise impacts, navigation patterns, and more. The FEIS
and ROD outline the purpose of and need for the project,
the alternatives considered, the affected environment,
the potential environmental consequences of the project
and reasonable alternatives, and the historic properties
affected by the project. The FEIS also includes a chapter on measures that would avoid, minimize, or mitigate
impacts that would result from the project. AAF has
committed to implementing a series of mitigation
measures during both the construction and operation
phases of the project.
As part of the NEPA process, AAF retained the environmental consulting firm Vanasse Hangen Brustlin
(“VHB”) as a third-party advisor to FRA. This arrangement was memorialized in an agreement between FRA,
VHB, and AAF. See AR 1045-62. Under that agreement, VHB’s “scope of work, approach, and activities
shall be under the sole supervision, direction, and control
of the FRA.” AR 1046. AAF also hired its own consultant, Amec Foster Wheeler (“Amec”). In general, Amec
42a
conducted initial technical work, which it then submitted
to VHB and FRA for review and comment. AR 897-98;
see also AR 1062. The record includes a series of technical memoranda produced by Amec on issues like noise
and vibration. See, e.g., AR 61081-238 (Amec’s “Technical Memorandum No. 5 Noise and Vibration for AAF
Passenger Rail Project”). The record also reflects significant back-and-forth regarding those memoranda between VHB and FRA on the one hand and Amec and
AAF on the other. See, e.g., AR 1083-87, 1305-43, 156162, 7302-06, 7349-51 (charts setting forth VHB/FRA
comments on Amec technical memoranda and Amec/AAF
responses).
B. Procedural Background
As noted above, this is the second time Indian River
County has sued in this Court to prevent or delay the
Secretary of Transportation’s allocation of tax-exempt
bond issuance authority to finance the AAF project. In
2015, both Indian River County and nearby Martin
County, through which the proposed railway would also
run, sought (among other relief) a preliminary injunction
vacating the Secretary’s authorization of the tax exemption, which allocated PAB authority for both phases of
the project. See Indian River Cty. I, 110 F. Supp. 3d at
66. Both counties alleged violations of NEPA, the National Historic Preservation Act (“NHPA”), and the Department of Transportation Act (“DTA”), each of which
sets forth certain procedural requirements for major federal actions. Martin County also alleged a violation of
§ 142 of the Internal Revenue Code. There, as here, AAF
intervened as a defendant. Initially, the Court concluded
that the counties had failed to show that their asserted
injuries—public-safety hazards and harms to environmental and historic sites from the construction and oper-
43a
ation of the railway—were traceable to the Secretary’s
action or redressable by the Court. Specifically, while
the counties had shown that the cost of financing the project would increase without the Secretary’s allocation of
tax-exemptions, they were unable to show “that these
costs would significantly increase the likelihood that
AAF would abandon the project[.]” Id. at 71. In short,
the plaintiffs had failed to show that if the Court were to
grant them precisely what they asked for, the project
would cease and their harms would be remedied. The
Court also held that the counties’ alleged procedural injury—stemming from the purported failure to conduct an
appropriate environmental review—was insufficient to
confer standing absent some tethering to a substantive
injury sufficient for standing. Id. at 73. The Court thus
denied the counties’ motions because they had not established standing to sue. See id.
Following Indian River County I, the Court granted
the counties permission to conduct jurisdictional discovery to demonstrate that, but for the PAB allocation, AAF
would not complete the railway. Subsequently, the Department of Transportation moved to dismiss the counties’ suits. The Court concluded that through jurisdictional discovery, the counties had shown “that invalidating [the Department’s] decision to authorize . . . PABs
would significantly increase the likelihood that AAF
would not complete . . . the project.” Indian River Cty. v.
Rogoff (“Indian River Cty. II”), 201 F. Supp. 3d 1, 4
(D.D.C. 2016). Further, the Court found that the plaintiffs had alleged sufficient facts to demonstrate that the
AAF project qualified as “major federal action” triggering certain requirements under NEPA, NHPA, and
DTA. Id. at 20. Consequently, it denied the motion to
dismiss those claims. It did, however, dismiss Martin
44a
County’s claim that the PAB allocation violated § 142 of
the Internal Revenue Code, concluding that the County’s
asserted injuries fell outside the zone of interests that
Congress sought to protect in § 142. Id. at 21.
Following the Court’s decision in Indian River County II that the counties had stated valid claims, AAF withdrew its application for a PAB allocation. It replaced
that application, which had sought to use the bonds to finance both phases of the project, with an application for a
smaller allocation to be used only for Phase I. Because
Phase I dealt only with a portion of the proposed railway
that did not run through the plaintiff counties, the Court
dismissed the cases at moot. Indian River Cty. III, 254
F. Supp. 3d at 22.
Since then, AAF applied for an allocation to help finance Phase II, which the Department of Transportation
provisionally approved. Indian River County, initially
joined by Martin County and a group of concerned citizens, has again sued. They contend that the PAB allocation violated two provisions of the Internal Revenue Code
and that FRA did not comply with its requirements under NEPA. AAF again intervened as a defendant. The
parties all moved for summary judgment. The Court
held a hearing on these motions on November 27, 2018.
Shortly before this hearing, Martin County and the citizens group reached a settlement with the federal Defendants and AAF and, therefore, are no longer plaintiffs
in the case.
II. Analysis
A. The Bond Allocation
To facilitate Phase II of the AAF railway, the Secretary of Transportation provisionally allocated tax-exempt
authority to $1.15 billion in PABs to be issued to finance
the project. The Secretary of Transportation’s allocation
45a
is subject to review under the APA. 5 U.S.C. §§ 702, 706.
Chevron, U.S.A. v. NRDC, 467 U.S. 837 (1984), establishes a two-part inquiry to determine whether an agency
has arrived at a permissible interpretation of the law it is
charged with administering. First, if a law directly addresses the precise question at issue, Congress’s directive controls. Id. at 842-43. Second, if the statute is silent or ambiguous regarding the matter at hand, “the
question for the court is whether the agency’s interpretation is based on a permissible construction of the statute
in light of its language, structure, and purpose.” Nat’l
Treasury Emps. Union v. Fed. Labor Relations Auth.,
754 F.3d 1031, 1042 (D.C. Cir. 2014) (quoting AFL-CIO v.
Chao, 409 F.3d 377, 384 (D.C. Cir. 2005)). The court must
defer to any reasonable agency interpretation, Loving v.
IRS, 742 F.3d 1013, 1016 (D.C. Cir. 2014), which need not
be the one “deemed most reasonable by the courts[,]”
Entergy Corp. v. Riverkeeper, Inc., 556 U.S. 208, 218
(2009).
Indian River County contends that the Secretary’s allocation violated two provisions of the Internal Revenue
Code. A brief overview of the statutory scheme contextualizes these challenges and the Department and AAF’s
responses. Congress has authorized interest earned on
certain types of PABs to be exempted from federal taxation. See 26 U.S.C. §§ 103, 141. Because this exemption
allows the bondholder to keep all the interest, bond issuers can sell the bond at a lower interest rate. A PAB
must be a “qualified bond” in order for it to be taxexempt. Id. § 103. Section 141 outlines certain types of
PABs that can constitute “qualified bond[s],” including
“exempt facility bond[s].” Id. § 141(e)(1)(A). Under
§ 142(a), a bond is an “exempt facility bond” if at least
95% of proceeds from its issue are used to finance one of
46a
fifteen enumerated categories of projects. Id. § 142(a).
One such category is “qualified highway or surface
freight transfer facilities.” Id. § 142(a)(15). Section
142(m) defines “qualified highway or surface freight
transfer facilities,” id. § 142(m)(1), and authorizes the
Secretary of Transportation, “in such manner as [she]
determines appropriate,” id. § 142(m)(2)(C), to allocate
up to $15 billion of PAB authority to eligible projects, id.
§ 142(m)(2)(A). Put simply, Congress has enacted a
mechanism through which the Secretary can allocate tax
exemptions to bonds used to finance construction of, or
improvements to, certain types of facilities. These exemptions lower the cost of selling the bonds, better enabling state and local governments to finance the projects.
The Secretary’s allocation is necessary, but not sufficient, for a bond to be tax-exempt because it finances a
“qualified highway or surface freight transfer facilit[y].”
Id. § 142(m)(2)(A). The Internal Revenue Code also establishes other requirements for PABs to be considered
“qualified” and thus tax-exempt. See id. § 141(e)(3).
These include a requirement that bonds used to finance a
facility must be approved by both “the governmental unit
. . . which issued such bond,” id. § 147(f )(2)(A)(i), and
“each governmental unit having jurisdiction over the area” in which any bond-financed facility is located, id.
§ 147(f )(2)(A)(ii).
In this case, Indian River County alleges first that the
Secretary violated the statute because the AAF passenger railway is ineligible for a PAB allocation under
§ 142(m). The County also contends that, in any event,
because it has not approved the bond issue as § 147(f ) requires, the PABs cannot be tax exempt. The Court turns
to each of these statutory provisions.
47a
1. Section 142(m)
Indian River County alleges that the Secretary’s allocation of PAB authority to the AAF railway violated 26
U.S.C. § 142(m). It contends that because the project is
not an eligible “qualified highway or surface freight
transfer facilit[y],” the Secretary exceeded her statutory
powers in allocating PAB authority to the project. In the
last round of litigation, Martin County raised a similar
argument, which the Court rejected as going beyond the
“zone of interests” protected by § 142. See Indian River
Cty. II, 201 F. Supp. 3d at 20-21. Both the federal Defendants and Intervenor-Defendant ask the Court to
reach the same result this time around. Alternatively,
they argue that the allocation complied with § 142. For
the following reasons, the Court concludes that Indian
River County has shown that its asserted interests arguably fall within the zone of interests Congress sought to
protect in § 142, but that its claim fails on the merits.
a. Zone of Interests
Before the Court reaches the substance of Indian River County’s § 142 claim, it “must . . . inquire whether the
plaintiff [ ] fall[s] within the class of persons whom Congress has authorized to sue under the Administrative
Procedure Act.” Mendoza v. Perez, 754 F.3d 1002, 1016
(D.C. Cir. 2014). To do so, it must determine whether Indian River County’s “grievance . . . arguably fall[s] within
the zone of interests protected or regulated by the statutory provision . . . invoked in the suit,” in this case § 142.
Id. (quoting Bennett v. Spear, 520 U.S. 154, 162 (1997)).
This inquiry “is not meant to be especially demanding”
and “forecloses suit only when a plaintiff ’s ‘interests are
so marginally related to or inconsistent with the purposes
implicit in the statute that it cannot reasonably be assumed that Congress intended to permit the suit.’ ”
48a
Match-E-Be-Nash-She-Wish Band of Pottawatomi Indians v. Patchak, 567 U.S. 209, 225 (2012) (quoting
Clarke v. Sec. Industry Ass’n, 479 U.S. 388, 399 (1987)).
When Martin County advanced its § 142 claim in the
last round of litigation, the Court concluded that it had
not cleared this hurdle. In that instance, like Indian River County does here, Martin County asserted interests in
public safety, environmental protection, and historic
preservation. Indian River Cty. II, 201 F. Supp. 3d at
21. It relied on SAFETEA, Pub. L. 109-59, 119 Stat.
1144 (2005)—the legislation through which Congress
amended § 142 to add PAB authorization for “qualified
highway or surface freight transfer facilities”—to contend that Congress sought to protect these interests
when it amended § 142. See Indian River Cty. II, 201 F.
Supp. 3d at 20-21. But as the Court explained at the
time, SAFETEA is a “massive statute with many objectives” and its relevant amendments to § 142 were “but a
tiny component of the overall legislation.” Id. at 21. As
such, it would have been—and remains—too dilutive of
the zone of interests test to allow a plaintiff to challenge
an allocation under § 142(m) based on an interest advanced anywhere in SAFETEA. Id. at 20 (citing Tax
Analysts & Advocates v. Blumenthal, 566 F.2d 130, 141
(D.C. Cir. 1977)). Instead, “the relevant unit of analysis”
for conducting the inquiry is § 142 itself. Id. And because “Martin County present[ed] no real argument that
its interests [were] more than marginally related [to]
those protected or regulated by Section 142 itself,” but
rather “place[d] all its eggs in the SAFETEA basket instead,” id. at 21, the Court dismissed the claim.
In this litigation, Indian River County has advanced
stronger arguments, focusing appropriately on the interests at stake in § 142 itself. Indian River County con-
49a
tends that these interests are illuminated by § 147(f ),
which requires State or local government approval for
certain PABs to qualify for tax exemption. “In applying
the zone-of-interests test, [courts] do not look at the specific provision said to have been violated in complete isolation[.]” Fed’n for Am. Immigration Reform, Inc.
(“FAIR”) v. Reno, 93 F.3d 897, 903 (D.C. Cir. 1996). At
the same time, courts must police the extent to which
they look beyond the provision invoked to ensure that
casting a wider net does not “deprive the zone-ofinterests test of virtually all meaning.” Air Courier Conference of Am. v. Am. Postal Workers Union, 498 U.S.
517, 530 (1991). Accordingly, a court must limit its analysis to the provision invoked for suit, as clarified by any
provisions to which it bears an “integral relationship.”
See, e.g., FAIR, 93 F.3d at 904. In this case, then, the
Court must first determine whether § 147(f ) bears an integral relationship with § 142, the provision upon which
Indian River County sues.
The Court concludes that the two provisions do bear
an integral relationship. They form adjacent requirements for PABs used to finance certain categories of facilities to qualify for tax-exempt status: § 142 enumerates
the types of facilities, and § 147(f ) ensures public approval and democratic accountability for their construction. 2
2
The fact that each provision specifically deals with “facilities” is important. Indian River County relies in part on the fact that § 142 and
§ 147 share a common subpart of the Internal Revenue Code, which
governs PABs eligibility. Courts have often found provisions contained in a common subsection to be integrally related. See, e.g.,
Int’l Union of Bricklayers & Allied Craftsmen v. Meese, 761 F.2d
798, 804-05 (D.C. Cir. 1985); Save Jobs USA v. DHS, 210 F. Supp. 3d
1, 11-12 (D.D.C. 2016). But a common subpart is less instructive
where, as here, the PABs subpart has multifarious purposes and covers several different types of bonds. But § 142 and § 147 each gov-
50a
Absent § 147(f ) approval, PABs used to finance a § 142
facility cannot be tax-exempt; and PABs approved pursuant to § 147(f ) are not tax-exempt unless they are used
to finance a § 142 facility. Cf. Wash. All. of Tech. Workers
v. DHS, 156 F. Supp. 3d 123, 135 (D.D.C 2015) (holding
that provisions share an integral relationship in part because they perform an “interlocking task”).
Most importantly, each requirement evinces a common purpose: ensuring that when the public fisc forgoes
revenue through tax-exempt bonds, those bonds are used
to benefit the public. As the Court explained in Indian
River County II: “Congress enacted 26 U.S.C. § 142 in
general, and Sections 142(a)(1) and 142(m) in particular,
to create a tax benefit to support the development and
construction of certain kinds of projects with significant
public benefits and a demonstrated need for financial assistance.” 201 F. Supp. 3d at 21. When Congress added
§ 142(m) to the Internal Revenue Code in 2005, it did so
against the backdrop of § 147(f ), which it had first added
to the Code in 1982 in a clear effort to ensure public benefit from tax-exempt bonds. As the Senate Finance
Committee Report explained at the time:
The committee believes that new restrictions are
needed on [bonds] to help eliminate inappropriate
uses and to help restore the benefit of tax-exempt
erns the use of bonds to finance facilities in particular, evincing a
closer relationship than § 142 shares with, for example, the rules
governing mortgage bonds that are also contained in that subpart.
The Court’s conclusion is not that the two bear an integral relationship simply because they share a common subpart, but because they
both deal with a common activity regulated by that subpart. Thus,
contrary to Defendants’ contentions, the Court’s conclusion that the
two provisions bear an integral relationship does not license any
plaintiff whose interests are protected by any provision within the
subpart to challenge a § 142(m) allocation.
51a
financing for traditional governmental purposes.
However, the committee believes that, in general,
state and local governments are best suited to determine the appropriate uses of [bonds]. The
committee believes that providing tax exemptions
for the interest on certain [bonds] may serve legitimate purposes in some instances provided
that the elected representatives of the state or local governmental unit determine after public input that there will be substantial public benefit
from issuance of the obligations[.]
S. Rep. No. 97-494(I), at 168 (1982).
This suggests a common purpose: § 142 reflects congressional judgment about the types of projects that
benefit the public enough to warrant tax-exempt financing, and § 147(f ) creates a mechanism of democratic accountability by which the public can confirm that a particular project does indeed confer public benefit. Cf.
Nat’l Petrochemical & Refiners Ass’n v. EPA, 287 F.3d
1130, 1148 (D.C. Cir. 2002) (holding that provisions
shared an integral relationship because one helped “accomplish[ ] one of the express goals” of the other).
The same legislative history and interlocking purpose
compel the Court to reconsider its holding in Indian River County II that local governments fall outside § 142’s
zone of interests. Indian River County has properly focused its attention not on SAFETEA as a whole, but on
§ 142 itself and its purpose of “support[ing] the development and construction of certain kinds of projects with
significant public benefits[.]” Indian River Cty. II, 201
F. Supp. 3d at 21. By demonstrating that § 142 and
§ 147(f ) bear an integral relationship, the County has illuminated § 142 in a way that suggests Congress’s intent
was indeed to allow State and local governments to en-
52a
sure public benefit would accrue from projects financed
by tax-exempt bonds. And because it appears from the
legislative history that Congress gave some deference to
State and local governments’ assessment of public benefit, Indian River County’s asserted interests at least arguably fall within the zone of interests protected by § 142.
Accordingly, the Court concludes that Indian River
County has plausibly stated a claim under that provision.
b. The merits of the County’s Section 142(m)
claim
Moving to the merits of Indian River County’s § 142
claim, the County contends that the Secretary’s allocation is inconsistent with the statute because Phase II is
not a “qualified highway or surface freight transfer facilit[y],” 26 U.S.C. § 142(a)(15), and thus is ineligible for
an allocation of PAB authority. The Court concludes that
the Secretary’s allocation conformed to the statutory requirements and was a reasonable exercise of her discretion. It will therefore grant summary judgment on this
issue to the Department and AAF.
Section 142 defines “qualified highway or surface
freight transfer facilities” to include “any surface transportation project which receives Federal assistance under title 23, United States Code[.]” Id. § 142(m)(1)(A).
The Secretary allocated PAB authority after concluding
that the project fell within this definition. Indian River
County challenges that allocation, contending that
§ 142(m)(1)(A) does not encompass the project and it was
thus ineligible for an allocation. Specifically, the County
contends that, when read in proper context, a “surface
transportation project” means only a highway project,
which necessarily precludes an allocation to any rail project. It also maintains that if the term “any surface
transportation project” did encompass rail projects, the
53a
AAF project has not received Title 23 federal assistance.
The Court addresses each point in turn.
i. Whether the AAF project is a “surface
transportation project” within the
meaning of § 142(m)(1)(A)
The plain meaning of § 142(m)(1)(A) is unambiguous.
It defines “qualified highway or surface freight transfer
facilities” to include “any surface transportation project[.]” 26 U.S.C. § 142(m)(1)(A). Because Congress did
not specify what “surface transportation” means, the ordinary meaning of the phrase controls. See, e.g., Johnson
v. United States, 559 U.S. 133, 138 (2010). The dictionary
definition of “surface transport” is “the movement of
people or goods by road, train, or ship, rather than by
plane.” Cambridge Business English Dictionary (2011).
This plainly includes rail projects. Defining “surface
transportation” to include rail comports with its use
elsewhere in federal law. For example, in SAFTEA, the
legislation through which Congress enacted § 142(m), a
provision in another portion of the bill defined “surface
transportation system” to include “freight and intercity
passenger bus and rail infrastructure and facilities.”
SA