App. 1
United States Court of Appeals
FOR THE DISTRICT OF COLUMBIA CIRCUIT
-----------------------------------------------------------------------
NO. 15-1173
September Term, 2017
FILED ON: NOVEMBER 27, 2017
BEYOND NUCLEAR, INC.,
PETITIONER
V.
U.S. NUCLEAR REGULATORY COMMISSION
AND UNITED STATES OF AMERICA,
RESPONDENTS
DTE ENERGY COMPANY,
INTERVENOR
-----------------------------------------------------------------------
On Petition for Review of an Order
of the Nuclear Regulatory Commission
-----------------------------------------------------------------------
Before: GARLAND, Chief Judge, HENDERSON,
Circuit Judge, and EDWARDS, Senior
Circuit Judge.
JUDGMENT
This petition for review was considered on the record from the Nuclear Regulatory Commission (NRC)
and on the briefs filed by the parties. See FED. R. APP.
P. 34(a)(2); D.C. CIR. R. 34(j). The court has accorded
App. 2
the issues full consideration and determined that they
do not warrant a published opinion. See D.C. CIR. R.
36(d). It is
ORDERED AND ADJUDGED that the petition
for review be denied.
Petitioner Beyond Nuclear challenges the NRC’s
decision to grant DTE Electric Company a combined
license to construct and operate a nuclear power plant.
Specifically, it challenges NRC’s denial of petitioner’s:
(1) request to admit for an adjudicatory proceeding an
untimely contention challenging the NRC’s Environmental Impact Statement (EIS); (2) request to consider
that untimely contention at a contested hearing on a
sua sponte basis; and (3) challenge to the adequacy of
DTE’s quality-assurance program. Each argument is
unsuccessful.
We owe an agency’s interpretations of its own procedural regulations substantial deference, giving them
“controlling weight” unless “plainly erroneous or inconsistent with the regulation.” Thomas Jefferson
Univ. v. Shalala, 512 U.S. 504, 512 (1994) (citation
omitted). The NRC did not plainly err in determining
that Beyond Nuclear’s contention regarding the EIS
was untimely under its regulations and was not based
on information that was “not previously available,” 10
C.F.R. § 2.309. Nor did it abuse its discretion in deciding that the issue presented by the contention was
not so “serious” as to warrant sua sponte review in
a contested hearing under 10 C.F.R. § 2.340, because
the EIS did consider the issues presented by the
App. 3
contention and because the NRC had already scheduled a hearing to review the overall sufficiency of the
EIS. See Lorion v. NRC, 785 F.2d 1038, 1042 (D.C. Cir.
1986).
Finally, we reject Beyond Nuclear’s claim that
the NRC was arbitrary and capricious in accepting
DTE’s quality-assurance program. The record does not
support the claim that the NRC ignored undisputed
evidence regarding the program. Rather, the record indicates that the NRC rationally considered all relevant
facts before denying Beyond Nuclear’s challenge to the
program. Nor do the NRC’s regulations support Beyond Nuclear’s assertion that the NRC acted unlawfully in ruling that DTE could rely on the qualityassurance program of its contractor while preparing
its license application, as long as DTE retained responsibility for that work. To the contrary, the regulations
expressly permit an applicant to “delegate to others . . .
the work of establishing and executing” a quality-assurance program, so long as the applicant retains final
responsibility over the program. 10 C.F.R. Pt. 50 App.
B.
Pursuant to D.C. Circuit Rule 36, this disposition
will not be published. The Clerk is directed to withhold
issuance of the mandate herein until seven days after resolution of any timely petition for rehearing or
App. 4
petition for rehearing en banc. See FED. R. APP. P. 41(b);
D.C. CIR. R. 41.
Per Curiam
FOR THE COURT:
Mark J. Langer, Clerk
BY: /s/
Ken Meadows
Deputy Clerk
App. 5
UNITED STATES OF AMERICA
NUCLEAR REGULATORY COMMISSION
COMMISSIONERS:
Stephen G. Burns, Chairman
Kristine L. Svinicki
William C. Ostendorff
Jeff Baran
)
)
DTE ELECTRIC COMPANY )
Docket No. 52-033-COL
(Fermi Nuclear Power Plant, )
)
Unit 3)
)
In the Matter of
CLI-15-01
MEMORANDUM AND ORDER
(Filed Jan. 13, 2015)
Today we rule on the Atomic Safety and Licensing Board’s request to review, sua sponte, issues relating to the environmental impacts of the proposed
transmission-line corridor for Fermi Unit 3.1 For the
reasons set forth below, we deny the Board’s request
for sua sponte review. In addition, we deny Intervenors’
petition for review of the Board’s dismissal of Contention 23, also relating to transmission-corridor environmental impacts.2
1
LBP-14-9, 80 NRC ___ (July 7, 2014) (slip op.).
Intervenors’ Petition for Review of Atomic Safety and Licensing Board’s Dismissal of Contention 23 for Lack of Timeliness (Oct. 6, 2014) (Petition). Intervenors are Beyond Nuclear,
2
App. 6
I.
BACKGROUND
This proceeding concerns DTE’s combined license
application to construct and operate a GE-Hitachi Economic Simplified Boiling Water Reactor (ESBWR) on
the Fermi site in Monroe County, Michigan.3 Intervenors sought a hearing and originally proposed fourteen
contentions; the Board granted a hearing and admitted
four of those contentions.4 Since their entry into the
Citizens for Alternatives to Chemical Contamination, Citizens
Environmental Alliance of Southwestern Ontario, Don’t Waste
Michigan, Sierra Club, Keith Gunter, Edward McArdle, Henry
Newman, Derek Coronado, Sandra Bihn, Harold L. Stokes, Michael J. Keegan, Richard Coronado, George Steinman, Marilyn R.
Timmer, Leonard Mandeville, Frank Mantei, Marcee Meyers, and
Shirley Steinman.
3
See Detroit Edison Company; Notice of Hearing, and Opportunity To Petition for Leave To Intervene and Order Imposing
Procedures for Access to Sensitive Unclassified Non-Safeguards
Information and Safeguards Information for Contention Preparation on a Combined License for Fermi 3, 74 Fed. Reg. 836 (Jan. 8,
2009).
4
The Board admitted Contentions 3, 5, 6, and 8. LBP-09-16,
70 NRC 227, 306 (2009). In three separate opinions, the Board
granted summary disposition of Contentions 3, 5, and 6 in favor
of DTE. See Order (Granting Motion for Summary Disposition
of Contention 3) (July 9, 2010) (unpublished); Order (Granting
Motion for Summary Disposition of Contention 5) (Mar. 1, 2011)
(unpublished); LBP-12-23, 76 NRC 445, 452 (2012) (among other
things, granting summary disposition of Contention 6). After an
evidentiary hearing, the Board ruled on the merits of Contention
8 in favor of the NRC Staff and ruled on the merits of a new admitted contention pertaining to quality assurance, Contention 15,
in favor of DTE. LBP-14-7, 79 NRC 451 (2014). In a separate decision, we denied Intervenors’ petition for review of the Board’s
ruling on the merits of Contention 15. See CLI-14-10, 80 NRC ___
(Dec. 16, 2014) (slip op.).
App. 7
proceeding in July 2009, Intervenors have proposed
several additional contentions, including Contention
23, their challenge to the NRC Staff ’s compliance with
the National Environmental Policy Act of 1969 (NEPA)
as it pertains to the anticipated environmental impacts of the proposed transmission line corridor for
Fermi Unit 3, the subject of our decision today.
Intervenors first proposed Contention 23 after the
Staff issued the draft Environmental Impact Statement (EIS) for DTE’s application.5 Later, after the
Board dismissed the contention as late, Intervenors resubmitted Contention 23 in response to the Staff ’s final EIS.6 The Board again dismissed the contention as
late.7 In Contention 23, both as originally proposed and
resubmitted, Intervenors challenged the adequacy of
the Staff ’s consideration of the environmental impacts
of building new transmission lines for Fermi Unit 3.8
5
See Motion for Resubmission of Contention 10, to Amend/
Resubmit Contention 13, and for Submission of New Contentions
17 through 24 (Jan. 11, 2012), at 1-2, 41-52 (Original Contention
23).
6
See LBP-12-12, 75 NRC 742, 776-80 (2012); Motion for Resubmission of Contentions 3 and 13, for Resubmission of Contention 23 or its Admission as a New Contention, and for Admission
of New Contentions 26 and 27 (Feb. 19, 2013), at 2, 21-53 (Resubmitted Contention 23).
7
Licensing Board Memorandum and Order (Denying Intervenors’ Motion for Resubmission of Contentions 3 and 13, for
Resubmission of Contention 23 or its Admission as a New Contention, and for Admission of New Contentions 26 and 27) (Apr.
30, 2013), at 21 (unpublished) (Second Board Ruling).
8
Compare Original Contention 23 at 41-52, with Resubmitted Contention 23 at 21-53.
App. 8
Although the Board did not admit Contention 23,
it found some merit to Intervenors’ arguments.9 In its
first ruling dismissing the contention, the Board suggested that the contention might have been admissible
if not for its tardiness and recommended that the Staff
consider Intervenors’ concerns when preparing the final EIS.10 In its second ruling, the Board again found
the contention to be unjustifiably late, but it reiterated
its view that Intervenors had raised “a substantial . . .
issue that might have been admissible had it been
timely filed.”11 The Board further observed that the adequacy of the Staff ’s review of transmission-corridor
impacts might be appropriate for the Board’s consideration sua sponte, pursuant to 10 C.F.R. § 2.340(b).12
The Board thus sought briefing from the parties on the
appropriateness of the Board’s taking review of the issues raised in Contention 23 on its own motion.13 Intervenors supported sua sponte review; DTE and the
Staff opposed it.14
9
See LBP-12-12, 75 NRC at 776-80; Second Board Ruling at
22-23.
10
LBP-12-12, 75 NRC at 776, 780.
Second Board Ruling at 23.
12
See id.
13
Id. at 23-24.
14
Intervenors’ Memorandum in Support of Sua Sponte ASLB
Referral of Transmission Line Corridor NEPA Compliance Issue
(May 30, 2013); Applicant’s Brief Opposing Sua Sponte Review of
Environmental Impacts in the Offsite Transmission Corridor
(May 30, 2013); NRC Staff Response to Board Order Concerning
Proposed Sua Sponte Review of Contention 23 (May 30, 2013).
11
App. 9
As it considered the parties’ views on sua sponte
review, the Board proceeded to hearing on Intervenors’
then-pending admitted contentions and issued an initial decision ruling on those contentions in favor of
the Staff and DTE.15 The Board returned to the sua
sponte issue shortly thereafter. In LBP-14-9, the Board
determined that the issues raised in Contention 23
merited sua sponte review.16 In accordance with section
2.340(b), the Board requested our approval to undertake that review.17
We now have before us the briefs that we invited
from the parties in response to the Board’s sua sponte
request,18 as well as a motion from the Nuclear Energy
15
See supra note 4.
LBP-14-9, 80 NRC at ___ (slip op. at 4).
17
Id. at ___ (slip op. at 16-17, 58).
18
Applicant’s Opposition to Sua Sponte Consideration of
Transmission Corridor Issues (July 28, 2014) (DTE Brief); NRC
Staff Response to Commission’s Order Inviting Comments on the
Board’s Request for Approval to Conduct Sua Sponte Review of
Contention 23 (Transmission Lines) (July 28, 2014) (NRC Staff
Brief ); Intervenors’ Motion for Commission Approval of LBP-1409 (Memorandum Determining that Issues Related to Intervenors’
Proposed Contention 23 Merit Sua Sponte Review Pursuant to 10
C.F.R. § 2.340(b) and Requesting Commission Approval) (e-mailed
July 28, 2014 and re-filed on July 30, 2014); Applicant’s Reply
Brief Opposing Sua Sponte Consideration of Transmission Issues
(Aug. 7, 2014); NRC Staff Reply to Other Parties’ Pleadings Related to the Board’s Request for Approval to Conduct Sua Sponte
Review of Contention 23 (Transmission Lines) (Aug. 7, 2014); Intervenors’ Corrected Reply Memorandum in Support of Motion for
Commission Approval of LBP-14-09 (Aug. 8, 2014) (Intervenors’
Reply Brief). Intervenors apparently experienced technical difficulties that prevented their use of the agency’s e-filing system on
July 28, 2014. They e-mailed their reply on July 28, 2014, and
16
App. 10
Institute (NEI) to file a brief as amicus curiae in this
matter.19 Also pending before us is Intervenors’ petition for review of the Board’s dismissal of Contention
23.20 It makes sense for us to review first whether the
then properly re-filed the document on July 30, 2014. Although
they did not request leave to file their reply out of time, we note
that counsel for Intervenors also filed the same day a declaration
that detailed these technical difficulties in the context of a separate filing in this proceeding. See Intervenors’ Motion for Enlargement of Time to Reply in Support of Petition for Review (July 30,
2014); see also Intervenors’ Reply to DTE Answer Opposing Petition for Review of LBP-14-07 (Ruling for Applicant on Quality Assurance) (July 30, 2014), at n.1; Intervenors’ Reply to NRC Staff
Answer to Petition for Review of LBP-14-07 (Ruling for Applicant
on Quality Assurance) (July 30, 2014), at n.1. We therefore will
consider Intervenors' reply for good cause shown. The same is
true for Intervenors’ re-filed reply dated August 8, 2014 (in which
only the caption appears to have been corrected from what was
filed on August 7, 2014). But see CLI-14-10, 80 NRC at (slip op. at
10 n.41) (observing that failure to comply with agency procedural
rules could result in disciplinary action).
19
Motion of the Nuclear Energy Institute, Inc. for Leave to
File Amicus Curiae Brief in Response to the Commission’s July 11,
2014 Briefing Order (July 28, 2014); Amicus Curiae Brief of the
Nuclear Energy Institute, Inc. in Response to the Commission’s
July 11, 2014 Briefing Order (July 28, 2014). Our rules of practice
permit persons who are not parties to file a brief amicus curiae “if
a matter is taken up by the Commission under [10 C.F.R.] § 2.341
or sua sponte.” 10 C.F.R. § 2.315(d). Although this rule does not
squarely apply here, it is within our discretion to grant leave for
participation as amicus curiae. See Calvert Cliffs 3 Nuclear Project, LLC and UniStar Operating Services, LLC (Calvert Cliffs
Nuclear Power Plant, Unit 3), CLI-13-4, 77 NRC 101, 104 n.9
(2013). NEI’s motion is unopposed, and we find that its brief
would further contribute to the record. We exercise our discretion
and consider NEI’s brief.
20
See generally Petition; Order of the Secretary (Sept. 10,
2014) (unpublished) (amending the deadline to file a petition for
App. 11
Board properly dismissed the contention to determine
whether the transmission-corridor impacts issue is litigable in the traditional sense – as a contested matter
between the parties – before turning to the Board’s sua
sponte request. Therefore, we rule on both Intervenors’
petition for review and the Board’s sua sponte request
in today’s decision.21
II.
DISCUSSION
A. Intervenors’ Petition for Review
We will grant a petition for review at our discretion, upon a showing that the petitioner has raised a
substantial question as to whether
review of the Board’s ruling on Contention 23 “[b]ecause the issues raised . . . in [that contention] are intertwined with the
Board’s [sua sponte] request”). DTE and the Staff oppose Intervenors’ petition for review. Applicant’s Opposition to Petition for Review on Contention 23 (Oct. 31, 2014) (DTE Response to Petition);
NRC Staff Response to Intervenors’ Petition for Review of Atomic
Safety and Licensing Board’s Dismissal of Contention 23 for Lack
of Timeliness (Oct. 30, 2014) (NRC Staff Response to Petition).
Intervenors filed a reply. Intervenors’ Reply in Support of Petition
for Review of Atomic Safety and Licensing Board’s Dismissal of
Contention 23 for Lack of Timeliness (Nov. 10, 2014) (Reply).
21
Intervenors expressed concern in their petition for review
that we would treat their contention as “legally intertwined” with
the Board’s request. Petition at 11-13; Reply at 1-5. We clarify
that we do not view the two matters as legally intertwined but
rather factually (and procedurally) intertwined. Although we address both matters in this decision, we consider them separately.
App. 12
(i)
a finding of material fact is clearly erroneous
or in conflict with a finding as to the same fact
in a different proceeding;
(ii) a necessary legal conclusion is without governing precedent or is a departure from or
contrary to established law;
(iii) a substantial and important question of law,
policy, or discretion has been raised;
(iv) the conduct of the proceeding involved a prejudicial procedural error; or
(v) any other consideration that we may deem to
be in the public interest.22 Intervenors seek
review of the Board’s dismissal of the resubmitted version of Contention 23; they do not
request review of the Board’s dismissal of the
contention as originally proposed.23
Intervenors claim that the Board erred when it
found late the version of Contention 23 that was submitted in response to the Staff ’s final EIS.24 Intervenors focus their argument on dicta in the Board’s first
ruling in which the Board recommended that the Staff
consider Intervenors’ transmission-corridor claims when
preparing the final EIS.25 They assert that the Board’s
recommendation to the Staff constituted new information, a new “dispute” with the draft EIS, that cured
22
10 C.F.R. § 2.341(b)(4)(i)-(v).
See Petition at 1. We discuss both Board decisions here,
however, for completeness.
24
Id. at 2-3.
25
Id. at 2-3, 6-11.
23
App. 13
the contention’s lateness the second time around.26 Intervenors also assert that language in the final EIS
relating to the transmission corridor is materially different from that in the draft EIS. They argue that this
language raises an issue suitable for a new contention.27
Intervenors acknowledge that they could have
raised Contention 23 at the outset of this proceeding.28
They assert that they purposely waited to see whether
the Staff would supplement the analysis provided in
DTE’s environmental report at the draft EIS stage and
that they again waited to see whether the Staff would
take on the Board’s recommendation in the final EIS.
But our rules of practice require contentions to be
raised at the earliest possible opportunity.29 And although environmental contentions are, in essence,
26
Id. at 7-8.
Id. at 8-11.
28
See id. at 3-4, 6.
29
See 10 C.F.R. § 2.309(b)(3)(i), (c). We amended our rules of
practice in 2012, including the provision governing new or amended
contentions in section 2.309(c). The standard for admitting a new
or amended contention, however, was simplified rather than overhauled. See Final Rule, Amendments to Adjudicatory Process
Rules and Related Requirements, 77 Fed. Reg. 46,562, 46,571
(Aug. 3, 2012) (Part 2 Amendment). Both before and after the
2012 amendment, proponents of new or amended contentions
were, and are, required to demonstrate “good cause” for their filing, which includes a demonstration that the information on which
the new or amended contention is based is materially different
from information previously available. See 10 C.F.R. § 2.309(c)(1)(i)(iii); Part 2 Amendment, 77 Fed. Reg. at 46,571 (focusing the requirements on the factor given the most weight – “good cause”).
27
App. 14
challenges to the Staff ’s compliance with NEPA, those
contentions must be raised, if possible, in response to
an applicant’s environmental report.30 Petitioners who
choose to wait to raise contentions that could have
been raised earlier do so at their peril. They risk the
possibility that there will not be a material difference
between the application and the Staff ’s review documents, thus rendering any newly proposed contention
on previously available information impermissibly
late.31
Contrary to Intervenors’ claims, the Board’s recommendation to the Staff in its first decision did not
create a new reference point for determining whether
the information raised in the second iteration of Contention 23 was timely raised. Our rules of practice require a material difference between the information
on which the contention is based and the information
that was previously available – for example, a difference between the environmental report and the draft
EIS or the draft EIS and the final EIS.32 In both of
its contention admissibility decisions the Board noted
Intervenors’ failure to point to any material difference between DTE’s or the Staff ’s environmental
documents. The Board was “satisfied that each of the
30
10 C.F.R. § 2.309(f)(2); see also Part 2 Amendment, 77 Fed.
Reg. at 46,566-67.
31
See 10 C.F.R. § 2.309(c); see also Entergy Nuclear Generation Co. and Entergy Nuclear Operations, Inc. (Pilgrim Nuclear
Power Station), CLI-12-10, 75 NRC 479, 492-94 (2012).
32
10 C.F.R. § 2.309(c), (f)(2); see also Pilgrim, CLI-12-10, 75
NRC at 488-89; Pa’ina Hawaii, LLC, CLI-10-18, 72 NRC 56, 8788 (2010).
App. 15
issues that comprise the subject matter of the contention was discussed in the [Environmental Report]” and
that “[t]he same issues were also reviewed in the
[draft] EIS.”33 We see nothing that would cause us to
disturb the Board’s rulings on the timeliness of Contention 23 in this regard.
On appeal, Intervenors point to language in the final EIS that they claim is materially different from information in the draft EIS.34 But as the Staff and DTE
point out, Intervenors compare language from two distinct sections of the Staff ’s review documents.35 When
the same sections of both documents are properly
aligned, there is in fact no difference between the draft
EIS and the final EIS, let alone a material difference.36
Therefore, this claim must fail. Because Intervenors
have not demonstrated a substantial question warranting review of the Board’s dismissal of their contention, we deny their petition for review.
33
Second Board Ruling at 21; see also LBP-12-12, 75 NRC at
775-76.
34
See Petition at 8-11.
35
NRC Staff Response to Petition at 13-14; DTE Response to
Petition at 10-12.
36
Compare “Draft Environmental Impact Statement for
Combined License (COL) for Enrico Fermi Unit 3” (Draft Report
for Comment), NUREG-2105 (Oct. 2011), at 2-45, 3-17 (ADAMS
accession no. ML13274A468 (package)) (DEIS), with “Environmental Impact Statement for the Combined License (COL) for Enrico Fermi Unit 3” (Final Report), NUREG-2105, Vols. 1-4 (Jan.
2013), at 2-46, 3-18 (ML12307A172, ML12307A176, ML12307A177,
and ML12347A202) (FEIS).
App. 16
B. The Board’s Request for Sua Sponte Review
We turn now to whether issues pertaining to
transmission-corridor environmental impacts should
nevertheless be litigated in a contested proceeding before the Board. The Board specifically requests our approval to review two issues sua sponte:
(1) “[w]hether the building of offsite transmission
lines intended solely to serve . . . Fermi Unit 3
qualifies as a connected action under NEPA
and, therefore, requires the Staff to consider
its environmental impacts as a direct effect of
the construction of Fermi Unit 3”; and
(2) “[w]hether the Staff ’s consideration of environmental impacts related to the transmission corridor, performed as a cumulative
impact review, satisfied NEPA’s hard look requirement.”37
Section 2.340(b) sets forth the standard for sua
sponte review in a combined license proceeding. With
our express approval, a licensing board may make findings on a “serious safety, environmental, or common
defense and security matter” not put into controversy
by the parties.38 This authority shall be used only in
extraordinary circumstances.39 We find that the two
37
LBP-14-9, 80 NRC at ___ (slip op. at 16).
10 C.F.R. § 2.340(b).
39
Statement of Policy on Conduct of Adjudicatory Proceedings, CLI-98-12, 48 NRC 18, 22-23 (1998). The Board notes the
absence of an express regulatory requirement that the authority
for sua sponte review be used “sparingly” or in “extraordinary
38
App. 17
issues identified by the Board do not merit sua sponte
review.
The Board appears to have focused on the distinctions between a direct impacts analysis and a cumulative impacts analysis, with the underlying conclusion
that a cumulative impacts analysis will yield a shallower analysis than a direct impacts analysis. While
that may be true in other cases, here the Staff has included what appears to be a comprehensive analysis of
transmission-corridor impacts throughout the final
EIS. Without commenting on the sufficiency of the
Staff ’s review, we note that the Staff discussed transmission-corridor impacts in Chapters 2, 3, 4, 5, 9, and
10 of the final EIS, in addition to referencing those impacts in the cumulative impacts analysis in Chapter
7.40
circumstances.” LBP-14-9, 80 NRC at ___ (slip op. at 17-19). But
our 1998 Policy Statement, which instructs boards to limit their
use of sua sponte review, remains valid. Further, section 2.340(b)
references the standard for Commission review in sections 2.323
and 2.341, both of which, we have held, require a heightened
showing to prevent overuse, including a demonstration of “extraordinary circumstances.” See 10 C.F.R. §§ 2.323(f), 2.341(f )(1)
(governing referred rulings or certified questions that raise “significant and novel legal or policy issues” or issues whose early resolution “would materially advance the orderly disposition of the
proceeding”); Pacific Gas and Electric Co. (Diablo Canyon Nuclear
Power Plant), CLI-12-13, 75 NRC 681, 685 (2012); cf. Diablo Canyon, CLI-12-13, 75 NRC at 687 (regarding the standard for interlocutory review). The Board correctly notes that “a request to
engage in sua sponte review should not be undertaken lightly.”
LBP-14-9, 80 NRC at ___ (slip op. at 19).
40
See FEIS at M-1 to M-2.
App. 18
The final EIS itself is a source of minor confusion.
Despite the final EIS’s introductory statement that
preconstruction activities (which would include transmission-line development) are not part of the proposed
action and are discussed in the context of cumulative
impacts,41 the Staff further stated that it included “pertinent information related to . . . potential impacts
from the transmission lines” as part of its “integrated
evaluations of potential environmental impacts from
the proposed Fermi 3 facilities.”42 Consequently, the
Board’s discussion as to whether development of the
transmission corridor is a “connected action” under
NEPA, while thorough, is inapposite.43 The Board’s
treatment of this issue does not acknowledge that the
Staff did discuss the proposed transmission corridor in
the final EIS, across multiple chapters, together with
the impacts of constructing and operating Fermi Unit
3.44 The first issue proposed for review would therefore
appear to be moot.45
41
FEIS at 1-7. The Board referenced this statement in its
sua sponte request. See LBP-14-9, 80 NRC at ___ (slip op. at 15).
42
FEIS at M-1.
43
See LBP-14-9, 80 NRC at ___ (slip op. at 20-42).
44
See, e.g., FEIS at 4-3 (explaining that due to its collaboration with the United States Army Corps of Engineers in the environmental review, “the combined impacts of . . . preconstruction
and construction activities . . . are presented in [Chapter 4]” even
though “the environmental effects of preconstruction activities on
each resource area would be addressed as cumulative impacts
normally presented in Chapter 7”).
45
In any event, the Board apparently has already established a position on this issue – after briefing from the parties –
that the transmission corridor is “connected” to the licensing
App. 19
Moreover, much of the Board’s request fundamentally challenges the agency’s Limited Work Authorization Rule.46 For example, the Board takes issue with
the Staff ’s classification of the proposed transmission
lines as a “preconstruction activity” rather than “construction.”47 In the Limited Work Authorization Rule,
however, we expressly excluded transmission lines
from the delineated “construction” activities that would
require NRC approval before being undertaken.48 We
would not allow a litigant to challenge a rule in an
NRC adjudicatory proceeding absent a showing of special circumstances;49 we likewise will not allow the
Board to do the same.50
decision for Fermi Unit 3. See LBP-14-9, 80 NRC at ___ (slip op.
at 27-28) (opining, “based on the information . . . before the
Board,” that the transmission corridor appears to be a proposed
action and that it has “ ‘no discernible purpose’ apart from connecting Fermi 3 to the grid”). For these reasons, further litigation
of this issue would not significantly inform the record on the “connected action” question.
46
See, e.g., LBP-14-9, 80 NRC at ___ (slip op. at 30-41); see
generally Final Rule, Limited Work Authorizations for Nuclear
Power Plants, 72 Fed. Reg. 57,416 (Oct. 9, 2007) (Limited Work
Authorization Rule).
47
LBP-14-9, 80 NRC at ___ (slip op. at 28-29).
48
See 10 C.F.R. §§ 50.10(a)(2)(vii), 51.4 (defining “construction”); see also Limited Work Authorization Rule, 72 Fed. Reg. at
57,417 (requiring NRC authorization “only before undertaking activities that have a reasonable nexus to radiological health and
safety and/or common defense and security”).
49
See 10 C.F.R. § 2.335(a), (b).
50
See LBP-14-9, 80 NRC ___ (slip op. at 31-32).
App. 20
The Board’s second issue proposed for review,
aside from its reference to cumulative impacts, is in essence a concern about the overall sufficiency of the
Staff ’s transmission-corridor analysis. But this is a potentially amorphous issue that does not appear to lend
itself well to a contested proceeding, and the Board has
not given us the benefit of a roadmap of what specifically would be litigated with regard to the Staff ’s analysis. For example, the Board opines that the Staff must
evaluate reasonable alternatives as well as measures
to mitigate any detrimental environmental impacts.51
But again, without making a sufficiency finding, the
Staff discussed the proposed transmission corridor in
its alternatives analysis (including alternative sources
of electricity and alternative sites) and also discussed
potential mitigation measures for constructing new
transmission lines in its main analysis of the impacts
of constructing and operating Fermi Unit 3.52 Our rules
51
See id. at ___ (slip op. at 23-25, 51).
See, e.g., FEIS at 4-60 (noting “that the small streams that
would be crossed by the proposed transmission line corridor could
be easily spanned without placing structures in stream channels
and that [best management practices] would be implemented to
protect water quality in streams during building activities”); id.
at 9-7 (noting that “new transmission lines would be needed to
deliver power from the alternative coal-fired plant and that these
lines would be identical in both capacity and location to the lines
being proposed to support Fermi 3”); id. at 9-87 (noting that
“[e]nvironmental conditions along the transmission line corridor
[for the alternative Belle River-St. Clair site] are similar to those
of the site, with a mixture of cropland, wooded areas, and some
wetlands”).
52
App. 21
of practice are designed to avoid such an unfocused inquiry in contested proceedings.53
In February of this year, we will be holding the uncontested hearing on the Fermi combined license application. The uncontested hearing will provide us with
an opportunity to review the sufficiency of the Staff ’s
environmental (and safety) analyses. Given that the
Board’s request, at bottom, questions the sufficiency of
the Staff ’s consideration of the environmental impacts
of the proposed new transmission lines for Fermi Unit
3, the issue whether the Staff has taken a “hard look”
at the environmental impacts of the transmission corridor is among the range of issues that are appropriately before us in the uncontested hearing.54 Thus, as
53
See 10 C.F.R. § 2.309(f )(1)(i)-(vi). The Board, to be sure, is
not strictly bound by the contention admissibility rules when requesting approval to review issues sua sponte. But our contested
proceedings must be governed by some level of specificity to ensure the proceeding is conducted efficiently, with fairness to all of
the parties. Cf. Final Rule, Rules of Practice in Domestic Licensing Proceedings – Procedural Changes in the Hearing Process, 54
Fed. Reg. 33,168, 33,179 (Aug. 11, 1989) (amending the rules of
practice to “ensure[ ] that the resources of all participants in NRC
proceedings are focused on real issues and disputes among the
parties”).
54
We reject Intervenors’ argument that the uncontested
hearing “is not a serious avenue of relief.” Intervenors’ Reply Brief
at 10. As the Intervenors note, compliance with NEPA is the responsibility of the NRC. See Petition at 3, 6. In the uncontested
hearing it is our duty to ensure, among other things, that we have
adhered to our obligations under that statute. See 10 C.F.R.
§ 51.107(a). We therefore find the uncontested proceeding to
be an appropriate venue in which to address the transmissioncorridor issue.
App. 22
part of this hearing, we will take the Board’s concerns
regarding examination of the environmental impacts
of the transmission corridor in the final EIS under advisement.
III. CONCLUSION
Intervenors have failed to raise a substantial
question warranting review of the Board’s dismissal of
Contention 23. We therefore deny the petition for review. In addition, we deny the Board’s request for sua
sponte review. We will review the adequacy of the
Staff ’s environmental review, including consideration
of transmission-corridor environmental impacts, as
part of the uncontested hearing.
IT IS SO ORDERED.
For the Commission
NRC Seal
/s/
/RA/
Annette L. Vivetti-Cook
Secretary of the Commission
Dated at Rockville, Maryland,
this 13th day of January, 2015.
Concurring Opinion of Commissioner Baran
I concur in the result of the memorandum and order but write separately to respectfully express my disagreement with the majority’s treatment of the
Board’s request for sua sponte review in section IIB. In
my view, this portion of the opinion would benefit from
App. 23
a more tailored discussion of only those issues necessary to reach a decision. I do not believe it is necessary
for the opinion to characterize the Board’s request for
sua sponte review as “fundamentally challeng[ing]” the
Limited Work Authorization Rule, the Board as having
“already established a position” on the question of
whether the transmission corridor construction is a
connected action under NEPA, or the requested review
of the Staff ’s transmission corridor analysis as “potentially amorphous” and “unfocused.” I also do not believe that it makes sense for the opinion to state that
“the Staff has included what appears to be a comprehensive analysis of transmission-corridor impacts
throughout the final EIS.” This description of the
Staff ’s analysis as “comprehensive” could leave readers with the impression that the Commission is prejudging the sufficiency of the final EIS in advance of
the uncontested hearing. The juxtaposition of this description with the subsequent statement that the Commission is not “commenting on the sufficiency of the
Staff ’s review” may also confuse readers.
For these reasons, this section of the memorandum and order could simply state:
With respect to whether the building of offsite
transmission lines for Fermi Unit 3 qualifies
as a connected action under NEPA, the Board’s
request for sua sponte review appears relevant only to determining if an analysis of the
direct effects of such activities is warranted.
However, the Staff examined the impacts of
the proposed transmission corridor on land
App. 24
use, terrestrial ecology, aquatic ecology, historic and cultural resources, and nonradiological health in Chapters 2, 3, 4, 5, 9, and 10 of
the final EIS, in addition to referencing those
impacts in the cumulative impacts analysis in
Chapter 7. Without commenting on the sufficiency of the review, there is no question that
the Staff discussed the environmental impacts of the proposed transmission corridor
in multiple chapters of the final EIS. Consequently, a sua sponte review by the Board of
the legal question of whether a direct effects
analysis was required is unnecessary. At their
core, both issues raised by the Board relate to
the sufficiency of the Staff ’s consideration of
the environmental impacts of the proposed
new transmission corridor for Fermi Unit 3.
The upcoming uncontested hearing is a natural time for the Commission to examine
whether the Staff has taken the requisite
“hard look” at the environmental impacts of
the transmission corridor in its final EIS.
[Certificate Of Service Omitted]
App. 25
LBP-14-09
UNITED STATES OF AMERICA
NUCLEAR REGULATORY COMMISSION
ATOMIC SAFETY AND LICENSING BOARD
Before Administrative Judges:
Ronald M. Spritzer, Chairman
Dr. Anthony J. Baratta
Dr. Randall J. Charbeneau
In the Matter of
Docket No. 52-033-COL
DETROIT EDISON
COMPANY
ASLBP No.
09-880-05-COL-BD01
(Fermi Nuclear Power
Plant, Unit 3)
July 7, 2014
MEMORANDUM
(Determining that Issues Related to Intervenors’
Proposed Contention 23 Merit Sua Sponte
Review Pursuant to 10 C.F.R. § 2.340(b)
and Requesting Commission Approval)
[2] Table of Contents
I. BACKGROUND................................................. - 4 A.
The Fermi 3 Transmission Corridor ........ .- 4 -
B. The Draft Environmental Impact Statement .................................................................. - 6 C. The NRC’s changing position on its authority to impose environmental restrictions
App. 26
on transmission lines that serve nuclear
power plants ..................................................... - 7 D.
Contention 23 .......................................... - 10 -
E. The Board’s Ruling on Proposed Contention 23 ............................................................. - 12 F.
EPA comments on the DEIS .................... - 13 -
G. The Final Environmental Impact Statement ................................................................ - 14 H. The Board’s ruling on re-submitted Contention 23 ........................................................ - 15 II. BOARD DETERMINATION, SUPPORTING
ANALYSIS, AND REQUEST FOR COMMISSION
APPROVAL ............................................................ - 16 A.
The Standard for Sua Sponte Review .... - 17 -
B.
NEPA Requirements ............................... - 19 1. The Scope of an EIS .......................... - 20 2. The FEIS must evaluate all reasonably foreseeable environmental impacts of
the proposed action ................................. - 22 3. The FEIS must evaluate alternatives
to the proposed action, including mitigation ........................................................... - 23 4. Cumulative Impacts ......................... - 24 5.
Limitation on actions ........................ - 24 -
C. There is a serious question whether the
building of an offsite transmission corridor intended solely to serve the new Fermi Unit 3
qualifies as a connected action under NEPA
and, therefore, requires the Staff to consider
App. 27
its environmental impacts as a direct effect of
the construction of Fermi Unit 3 ................... - 25 1. Proposed Action ................................ - 26 2.
Independent Utility .......................... - 27 -
3.
Federal Control and Responsibility ... - 28 -
4. The 2007 LWA Rule and Statement of
Considerations ......................................... - 34 5. Impact of Excluding Transmission
Corridor from the Scope of Proposed Action ........................................................... - 39 6. Conclusion ......................................... - 42 [3] D. There is a serious question whether
the Staff ’s consideration of environmental
impacts related to the transmission corridor,
performed as a cumulative impact review, satisfies NEPA’s hard look requirement ............ - 42 1. Unavailable or Incomplete Information ........................................................... - 48 2. Reliance on Anticipated Certifications ......................................................... - 49 3.
Inadequate Analysis of Mitigation ... - 51 -
4. Conclusion ......................................... - 52 E.
Sua Sponte Review is Warranted ........... - 52 -
III. CONCLUSION ............................................. - 58 [4] Before the Licensing Board is the question we
raised in our Order of April 30, 2013: whether Intervenors’ proposed Contention 23, although untimely filed,
is appropriate for sua sponte Board review pursuant to
App. 28
10 C.F.R. § 2.340(b).1 Contention 23 alleged that the
Staff ’s Draft and Final Environmental Impact Statements for the Fermi Unit 3 project failed to adequately
evaluate the environmental impacts of the new highvoltage transmission line corridor that will be constructed to serve the Project. For the reasons explained
below, the Board determines that two issues arising
from the contention merit sua sponte review.2 The
Board therefore respectfully requests that the Commission approve the Board’s determination that sua
sponte review is warranted pursuant to § 2.340(b).
I.
BACKGROUND
A. The Fermi 3 Transmission Corridor
This combined license (“COL”) contested proceeding involves the application of DTE Electric Company
(formerly the Detroit Edison Company) (“Applicant” or
“DTE”) under 10 C.F.R. Part 52, Subpart C, to construct
and operate a GE-Hitachi Economic Simplified Boiling
Water Reactor (“ESBWR”), designated Unit 3, on its
existing Fermi nuclear facility site in Monroe County,
Michigan.3
1
Licensing Board Order (Denying Intervenors’ Motion for
Resubmission of Contentions 3 and 13, for Resubmission of Contention 23 or its Admission as a New Contention, and for Admission of New Contentions 26 and 27), at 22-24 (Apr. 30, 2013)
(unpublished) [hereinafter Denial Order].
2
The two specific issues are identified infra Section II.
3
Letter from Jack M. Davis, DTE, to NRC, Detroit Edison
Company Submittal of a Combined License Application for Fermi
App. 29
[5] Fermi Unit 3 will require the construction and
operation of transmission lines to connect it to the grid.
The Final Environmental Impact Statement (“FEIS”)
explains the current status of plans for the transmission lines and the transmission corridor4 in which the
lines will be located:
ITC Transmission has not yet formally announced a route for the offsite portion of the
proposed new transmission line serving Fermi
3. Detroit Edison expects that the proposed
new transmission line would be built within
the existing Fermi 2 transmission corridor for
approximately 18.6 mi extending outward
from the Fermi site boundary. Detroit Edison
expects that the remaining 10.8 mi, extending
to the Milan Substation, would be built within
an undeveloped right-of- way (ROW) possessed but not yet used by ITC Transmission.5
The FEIS estimates the total acreage to be occupied by the new transmission corridor as 1069.2 acres,
assuming a 300-foot-wide corridor.6 The FEIS states
that the Fermi 3 site includes 1260 acres.7 The latter
3 (NRC Project No. 757) (Sept. 18, 2008) (ADAMS Accession No.
ML082730763).
4
We will refer to the transmission lines and the corridor in
which they will be constructed as “the transmission corridor.”
5
Division of New Reactor Licensing, Office of New Reactors,
Final Environmental Impact Statement for the Combined Licensed (COL) for Enrico Fermi Unit 3, NUREG-2015, at 2-10
(Jan. 2013) [hereinafter FEIS] (citations omitted).
6
FEIS at 2-47 (Table 2-7).
7
Id. at 2-5.
App. 30
figure includes the entire Fermi tract owned by DTE,
including, but not limited to, the land where Fermi
Unit 3 would be constructed.8 The FEIS further reports:
The western 10.8-mi segment of the proposed
transmission corridor, which does not follow
previously cleared and regularly maintained
corridors, crosses a mosaic of pastures and forest, including forested wetlands, shrub/scrub,
cropland, and developed land. Forested and
emergent wetlands are present, and three
wetlands extend more than 900 ft along the
corridor. It is possible that towers may need to
be placed in these wetlands in order to construct crossings. The proposed Milan Substation site is located entirely in an area of
cropland and planted grassland.9
[6]
B.
The Draft Environmental Impact Statement
On October 28, 2011, the NRC Staff and the U.S.
Army Corps of Engineers (“USACE” or “the Corps”)
published the Draft Environmental Impact Statement
(“DEIS”) for the Fermi Unit 3 COL.10 The DEIS states
that the new transmission corridor for Fermi Unit 3
will be built and operated by ITC Transmission.11 ITC
8
Id.
Id. at 2-46 to 2-47 (citations omitted).
10
Office of New Reactors, Draft Environmental Impact
Statement for Combined License (COL) for Enrico Fermi Unit 3,
NUREG 2015, Vol. 1 (Oct. 2011) (ADAMS Accession No.
ML11287A108) [hereinafter DEIS].
11
Id. at 2-10.
9
App. 31
Transmission operated as a wholly owned subsidiary
of DTE until 2004.12
The DEIS further explained that the NRC categorizes the construction of transmission lines as a “preconstruction activity.”13 Preconstruction activities
include various actions required to construct a nuclear
power plant that, as the result of changes to agency
regulatory policy made by the 2007 limited work authorization rule (“2007 LWA Rule”), the NRC now defines as outside its regulatory authority and therefore
not part of the NRC action to license the proposed new
plant.14 Such preconstruction activities include, in addition to the construction of transmission lines, “clearing and grading, excavating, dredging, discharge of fill,
erection of support buildings . . . , and other associated
activities.”15 Because preconstruction activities are no
longer included within the scope of the proposed NRC
action, the Staff concluded it was not [7] required to
evaluate their impacts as a direct effect of the NRC action. “Rather, the impacts of the preconstruction
12
Applicant’s Brief Opposing Sua Sponte Review of Environmental Impacts in the Offsite Transmission Corridor (May 30,
2013) unnumbered attach. at 2 (Affidavit of Peter Smith on
Transmission Corridor Topics (May 30, 2013) [hereinafter Smith
Affidavit]) [hereinafter Applicant Brief].
13
DEIS at 1-6.
14
Id. (citing Final Rule, Limited Work Authorizations for
Nuclear Power Plants, 72 Fed. Reg. 57416 (Oct. 9, 2007)).
15
Id.
App. 32
activities are considered in the context of cumulative
impacts.”16
[7]
C. The NRC’s changing position on its authority
to impose environmental restrictions on transmission lines that serve nuclear power plants
The Commission’s position on the regulation of
transmission lines for nuclear power plants has
changed over several decades.
Prior to the 1969 enactment of [the National
Environmental Policy Act (“NEPA”)], the
Commission perceived its duties under the
Atomic Energy Act primarily in terms of protecting the public from radiation hazards.
NEPA, however, made “environmental protection a part of the mandate of every federal
agency and department . . . (The Commission)
is not only permitted, but compelled, to take
environmental values into account” in carrying out its regular functions. Under NEPA,
federal agencies must “use all practicable
means” to avoid environmental “degradation”
to the extent consistent with “other essential
considerations of national policy.” Thus, in the
early 1970’s the Commission began to consider the environmental implications of proposed nuclear facilities.17
16
Id.
Detroit Edison Co. v. NRC, 630 F.2d 450, 451 (6th Cir.
1980) (footnote and citations omitted) (quoting Calvert Cliffs Coordinating Comm., Inc. v. Atomic Energy Comm’n, 449 F.2d 1109,
1112 (D.C. Cir. 1971) and 42 U.S.C. § 4331(b)).
17
App. 33
In 1972, following enactment of NEPA,18 the Commission adopted a major amendment to the definition
of construction in 10 C.F.R. § 50.10(c) that generally
prohibited, absent an NRC construction permit, “any
clearing of land, excavation, or other substantial action
that would adversely affect the natural environment of
a site and construction of non-nuclear facilities (such
as turbogenerators and turbine buildings) for use in
connection with the facility. . . .”19 This prohibition ensured that environmentally damaging activities related to construction of a new nuclear power plant
would not occur before the agency’s EIS was completed
and the agency had balanced the benefits of all aspects
of the project against their environmental costs. The
Commission explained that this expansion of its permitting authority was
[8] consistent with the direction of the Congress, as expressed in Section 102 of the
NEPA, that, to the fullest extent possible, the
policies, regulations, and public laws of the
United States shall be interpreted and administered in accordance with the policies set
forth in that Act. Since site preparation
constitutes a key point from the standpoint
of environmental impact, in connection with
the licensing of nuclear facilities and materials, these amendments will facilitate consideration and balancing of a broader range of
realistic alternatives and provide a more
18
National Environmental Policy Act of 1969, 42 U.S.C
§ 4321 (2012).
19
37 Fed. Reg. 5745, 5748 (Mar. 21, 1972).
App. 34
significant mechanism for protecting the environment during the earlier stages of a project for which a facility or materials license is
being sought.20
Thus, “[b]y 1974, the Commission had adopted an
aggressive approach to its environmental responsibilities in the context of transmission line siting.”21 In that
year, an Atomic Safety and Licensing Appeal Board, rejecting a legal challenge by Detroit Edison, ruled that
the Commission could, as a condition of licensure, insist that off-site transmission lines built solely to serve
a nuclear facility be designed to minimize environmental disturbance.22 The United States Court of Appeals
for the Sixth Circuit, whose jurisdiction includes Michigan, subsequently upheld the Commission’s policy.23
In 2007, however, the NRC altered its regulatory
approach, stating that changes were needed to allow
some non-safety related activities to begin earlier than
allowed under the regulations then in effect.24 The preamble to the 2007 LWA Rule explains:
[T]he nuclear power industry has reviewed
the overall construction process based upon
lessons learned from the construction and licensing process used for currently operating
reactors. The industry submitted what is
20
Id. at 5746.
Detroit Edison, 630 F.2d at 451.
22
Detroit Edison Co. (Greenwood Energy Ctr., Units 2 & 3),
ALAB-247, 8 AEC 936 (1974).
23
Detroit Edison, 630 F.2d at 450.
24
72 Fed. Reg. at 57426.
21
App. 35
essentially a petition for rulemaking seeking
changes to the LWA process, reflecting those
lessons learned and their understanding of
the current state of NEPA law. The NRC has
reviewed the applicable law, and for the reasons stated elsewhere in this [statement of
considerations], agrees with the petitioner
that the current definition of construction and
the current LWA requirements in § 50.10 are
not compelled by NEPA or the Atomic Energy
Act (AEA) of 1954, as amended. While the [9]
agency’s regulations on construction and
LWAs were a reasonable implementation of
NEPA as understood in 1972, the NRC believes that, with more than 30 years experience in implementing NEPA and the evolving
jurisprudence, the time is appropriate for reconsideration and revamping of these NRC
requirements.25
Accordingly, the 2007 LWA Rule revised 10 C.F.R.
§ 50.10 and made conforming changes in 10 C.F.R.
Parts 2, 51, and 52. The rule narrowed the scope of
activities requiring permission from the NRC in the
form of an LWA by eliminating the concept of “commencement of construction” formerly described in
§ 50.10(c) and the authorization formerly described in
§ 50.10(e)(1).26
Instead, under the final LWA rule, NRC authorization would only be required before undertaking activities that have a reasonable
25
26
Id. at 57420.
Id. at 57426.
App. 36
nexus to radiological health and safety and/or
common defense and security for which regulatory oversight is necessary and/or most effective in ensuring reasonable assurance of
adequate protection to public health and
safety or common defense and security.27
Thus, the building of transmission lines to serve a nuclear power plant is no longer classified as a construction activity and no longer requires authorization from
the NRC.28 The agency’s NEPA regulations (10 C.F.R.
Part 51) also exclude the building of transmission lines
from the definition of “construction.”29
An NRC Staff member, commenting on the proposed 2007 LWA Rule, contended that the proposal was
inconsistent with NEPA:
The impacts of the construction of a nuclear
power plant that NRC now proposes to exclude from NRC regulations are probably 90
percent of the true environmental impacts of
construction. Before even talking to the NRC,
a power company can clear and grade the
land, build roads and railroad spurs, erect permanent and temporary buildings, build numerous plant structures (e.g., cooling water
intake and discharge, cooling towers), and
build switchyards and [10] transmission lines.
After potentially doing all of that, THEN the
company would come to the NRC and ask
27
Id.
10 C.F.R. § 50.10(a)(2)(vii).
29
Id. § 51.4(1)(ii)(G).
28
App. 37
permission to build the power plant for which
all of this work was done. How does this comply with NEPA?30
In response, the NRC stated that
the pre-construction private actions of clearing, grading, access road construction, etc.,
will be considered in the cumulative impacts
analysis in the LWA EIS as the baseline for
analyzing the environmental impacts associated with the Federal action authorizing LWA
activities. This information will be used when
evaluating the environmental impacts of construction and operation of the proposed nuclear power plant.31
D. Contention 23
Intervenors filed a number of proposed new contentions in response to the DEIS. Among these was
proposed Contention 23, which alleged that:
The high-voltage transmission line portion of
the project involves a lengthy corridor which
is inadequately assessed and analyzed in the
Draft Environmental Impact Statement.32
Intervenors claimed that the DEIS’s discussion of
“the environmental impacts to the approximately
30
72 Fed. Reg. at 57420.
Id.
32
Motion for Resubmission of Contention 10, to Amend/Resubmit Contention 13, and for Submission of New Contentions 17
through 24, at 41 (Jan. 11, 2012).
31
App. 38
1,000 acres of transmission corridor is deficient in a
host of ways.”33 For example, Intervenors emphasized
that substantial construction will take place in undeveloped wetlands, forests, and grasslands:
NRC reports that “the final western 10.8
miles of transmission lines would be built in
an undeveloped segment of an existing transmission ROW . . . Some transmission tower
footings were installed there as part of earlier
plans but were never used.” NRC reports that
the proposed new Fermi 3 transmission line
corridor would cross open water, deciduous
forest, evergreen forest, mixed forest, grassland, 93.4 acres of woody wetlands, and 13
acres of emergent herbaceous wetland. (Table
2-7, Vegetative Cover Types in the Proposed
29.4 mi. Transmission Corridor, page 2-46).
This shows what is at stake – major impacts,
or perhaps even complete destruction, to irreplaceable habitat, vital for the viability of endangered and threatened species, as well as
overall ecosystem [11] health. . . . DEIS Table
4-2 repeats the sensitive vegetative cover
forms at risk from the proposed Fermi 3 transmission corridor: 170 acres of deciduous forest, 74 acres of woody wetlands, and 9 acres of
herbaceous emergent wetlands.34
Intervenors maintained that the DEIS failed to adequately assess the impacts to these areas. For example,
they criticized the DEIS for failing to provide any
33
34
Id.
Id. at 44-45.
App. 39
quantitative information about impacts to wetlands,
such as the acreage that will be filled and/or destroyed.35
Intervenors also stressed potential impacts to
threatened and endangered species:
NRC’s DEIS section 2.4.1.4 Important Terrestrial Species and Habitats – Transmission
Lines (page 2-60) also reports the high biological stakes. Important species may occur
along transmission lines, “but because the exact route of the corridor has not been finally
determined, no surveys have yet been conducted to confirm the presence of any species.”
. . . [T]able 2-9 (page 2-61) shows state-listed
and federally-listed species which inhabit the
counties (Monroe, Washtenaw, Wayne) that
would be crossed, including over 80 plant species, 8 insect species, 2 amphibian species, 4
reptile species (including the Eastern Fox
Snake), a dozen bird species, and 2 mammal
species. The Michigan Dept. of Natural Resources (MDNR/now DNRE) has not provided
concurrence for the project to proceed, because DTE has provided no details about the
transmission line corridor route for determining the damage that would be done to threatened and endangered species and their
habitats. MDNR has identified five Statelisted species likely present on the Fermi site,
which could also be present along the proposed Fermi 3 transmission corridor. In
35
Id. at 45.
App. 40
addition to all of the above, the U.S. Fish and
Wildlife Service has identified the eastern
massasauga snake as a candidate species potentially inhabiting Washtenaw and Wayne
Counties, and thus, at risk along the proposed
new transmission corridor.36
Intervenors argued that the DEIS failed to provide sufficient information concerning transmission corridor
impacts on threatened and endangered species.37
Intervenors further argued that maintenance of
the transmission corridor will continue to impact wetlands and other environmental resources after construction is completed. They noted that, according to
the DEIS, “ ‘[d]uring operation of Fermi 3, the power
transmission line [12] system would need to be maintained free of vegetation by ITC Transmission. Vegetation removal activities would include trimming and
application of herbicides periodically and on an asneeded basis along the transmission line corridor.”38
Intervenors complained of the failure to analyze the
environmental consequences of these actions:
It is clear that the deforestation will be an indefinitely long, or even permanent, condition.
Although herbicides designed for use in wetlands are mentioned, no specifics are given.
The impact of these biocides on species inhabiting the corridor is thus impossible to analyze, given the lack of specificity. The
36
Id. at 45-46.
Id. at 44-48.
38
Id. at 49 (quoting DEIS at 3-31).
37
App. 41
downgrade in the ecological quality and quantity (or even permanent loss and complete destruction) of forested wetlands in an extended
area along the Fermi 3 transmission line corridor is a major ecosystem impact, which currently goes unreflected.39
E. The Board’s Ruling on Proposed Contention 23
In its June 12, 2012 Order ruling on the DEIS contentions, the Board agreed with DTE and the Staff that
proposed Contention 23 was untimely because the deficiencies Intervenors alleged were also present in
DTE’s Environmental Report. Thus, Intervenors had
failed to establish that the contention was based on
any data or conclusions in the DEIS that are significantly different from those in the ER.40
The Board stated, however, that while Contention
23 was untimely, “it raises substantial questions concerning the adequacy of the DEIS that the NRC Staff
should carefully consider in preparing the FEIS.”41 Intervenors criticized the DEIS for, among other things,
an inadequately defined route for the corridor,42 a failure to identify endangered or threatened species along
the corridor,43 an inadequate discussion of impacts on
39
Id. at 48.
LBP-12-12, 75 NRC 742, 775-76 (2012).
41
Id. at 776.
42
Id. at 777-78.
43
Id. at 776-77.
40
App. 42
wetlands and vegetation,44 and a failure to [13] adequately investigate historic or cultural resources that
may be affected.45 The Board concluded that, “[g]iven
the very limited analysis in the DEIS of [the environmental impacts] arising from the transmission line
corridor, these claims may have been admissible had
they been filed in a timely manner.”46
The Board further observed that, even though the
transmission corridor is a preconstruction activity and
therefore not included in the COL application, construction and maintenance of the transmission corridor are sufficiently closely connected with Fermi Unit
3 that its environmental consequences must be fully
analyzed in the FEIS as direct impacts of the proposed
action.47 Because the Staff must comply with NEPA regardless of whether Intervenors filed a timely contention, the Board recommended that “the NRC Staff
consider the issues raised by Intervenors when it prepares the FEIS.”48
F.
EPA comments on the DEIS
The Board was not alone in recommending that
transmission corridor impacts be fully evaluated in the
FEIS as direct impacts of the proposed action. Like the
Board, the United States Environmental Protection
44
Id. at 776-78.
Id. at 778.
46
Id.
47
Id. at 778-80.
48
Id. at 780.
45
App. 43
Agency (“EPA”), concluded that, even though the NRC
may regard preconstruction activities as outside the
scope of the COL application, “these activities are
within the scope of the NEPA review because they are
all connected actions, per 40 CFR 1508.25(a)(1)(iii).”49
Specifically addressing the DEIS’s failure to analyze
the construction of the [14] transmission lines and the
expansion of the substation as direct impacts of the
proposed action, EPA commented:
Transmission Lines and Substation
EPA understands that NRC analyzes impacts
from the lengthening of the transmission
lines and expansion of the Milan Substation
as cumulative impacts and outside the scope
of the COL permit application and accompanying NEPA document. However, per NEPA,
EPA views these actions as connected to the
granting of the license and, therefore, should
be analyzed as direct impacts as a result of
the proposed action. The Draft EIS even
acknowledges the connectedness of the building of Fermi 3 and the expansion of the Substation on page 3-17, lines 31-21, among other
locations: “The 350-ft-by-ft-500-ft Milan Substation may be expanded to an area about
1000 ft by 1000 ft to accommodate the Fermi
3 expansion (Detroit Edison 2011 b).” Therefore, because the lengthening of the
49
Letter from Kenneth Westlake, EPA, to Cindy Bladey,
NRC, Re: Draft Environmental Impact Statement for the Combined License (COL) for Enrico Fermi Unit 3, Monroe County,
Michigan, CEQ# 20110364, attach. 1, at 2 (Jan. 10, 2012) (ADAMS Accession No. ML12023A034).
App. 44
transmission lines and the expansion of the
Substation are only necessitated by granting
the COL license for Fermi 3, the Final EIS
should analyze impacts from these two actions as direct impacts.
Recommendation: The Final EIS should analyze the construction of the transmission
lines and the expansion of the Substation as
actions part of the proposed action; any unavoidable impacts should be accounted and
mitigated for.50
EPA also expressed concern
about the amount of habitat lost in the transmission corridor and due to the proposed expansion of the Substation, at 1,069 and 21
acres, respectively. As outlined under Transmission Corridor and Substation, EPA views
these developments as connected actions.
Therefore, estimated impacts should be considered when preparing mitigation plans.
This includes wetlands mitigation ratios.51
G. The Final Environmental Impact Statement
The FEIS for the Fermi Unit 3 COL was published
in January 2013.52 As it had done in the DEIS, the Staff
defined the construction of the transmission corridor
50
Id. at 14.
Id. at 7.
52
FEIS at i.
51
App. 45
as a “preconstruction activity.”53 Again relying upon
the 2007 LWA Rule, the Staff maintained that the NRC
lacks [15] regulatory authority over construction of the
transmission corridor because it is a preconstruction
activity.54 The Staff again stated that “[b]ecause the
preconstruction activities are not part of the NRC action, their impacts are not reviewed as a direct effect
of the NRC action. Rather, the impacts of the preconstruction activities are considered in the context of
cumulative impacts.”55 With respect to the environmental impacts raised by proposed Contention 23, the
analysis in the FEIS is much like that in the DEIS.
In its comments on the FEIS, the EPA reiterated
its earlier criticism, stating that “impacts resulting
from the construction and maintenance of the new
transmission lines and substations should be considered as direct impacts and mitigated for as part of the
proposed project. Total impacts are estimated to be
over 1000 acres of habitat, including over 93 acres of
impacts to forested wetlands.”56
53
Id. at 1-6.
Id. at 1-6 to 1-7.
55
Id. at 1-7.
56
Letter from Kenneth Westlake, EPA, to Cindy Bladey,
NRC, Re: Comments on the Final Environmental Impact Statement for the Combined License for Enrico Fermi Unit 3, Monroe
County, Michigan, CEQ No. 20130006, attach. 1, at 1 (Feb. 19,
2013) (ADAMS Accession No. ML13063A434) [hereinafter EPA
Comments on FEIS].
54
App. 46
H. The Board’s ruling on re-submitted Contention
23
On February 19, 2013, Intervenors re-submitted
proposed Contention 23, together with various other
new and re-submitted contentions filed in response to
the FEIS.57 Intervenors summarized their claim as follows:
The FEIS for a combined operating license for
Fermi 3 fails to satisfy the requirements of
NEPA because it does not address the environmental effects of the associated transmission line corridor extending nearly thirty (30)
miles from the proposed plant site, despite the
fact that the transmission lines are indispensable to completion of the power plant project,
and the NRC Staff was ordered to analyze the
transmission corridor within the FEIS by the
Atomic Safety and Licensing Board. The FEIS
fails to disclose what the U.S. Army Corps of
[16] Engineers has determined to be the least
environmentally damaging practical alternatives (LEDPAs) under the Clean Water Act,
for some 30 jurisdictional wetlands and other
water bodies within the transmission corridor,
and there is no detailed discussion of mitigation measures which would be implemented
57
Motion for Resubmission of Contentions 3 and 13, for Resubmission of Contention 23 or its Admission as a New Contention, and for Admission of the New Contentions 26 and 27 (Feb.
19, 2013).
App. 47
to compensate for the water resource and upland damage.58
The Board again rejected Contention 23 as untimely. But the Board also concluded that, because the
FEIS had been issued and the Board had ruled that
Contention 23 remains procedurally defective, this was
an appropriate point for Board consideration of
whether Contention 23 merits sua sponte review under
10 C.F.R. § 2.340(b).59 The Board allowed the parties to
file briefs on the issue. Intervenors supported sua
sponte review, while DTE and the Staff opposed it.60
II. BOARD DETERMINATION,
SUPPORTING ANALYSIS, AND REQUEST
FOR COMMISSION APPROVAL
The Board has determined that the following two
related issues arising from Contention 23 merit sua
sponte review, and requests Commission approval to
undertake such review:
(1) Whether the building of offsite transmission
lines intended solely to serve the new Fermi Unit 3
qualifies as a connected action under NEPA and, therefore, requires the Staff to consider its environmental
58
Id. at 22.
Denial Order at 21-24.
60
See Intervenors’ Memorandum in Support of Sua Sponte
ASLB Referral of Transmission Line Corridor NEPA Compliance
Issue, at 1 (May 30, 2013). See also Applicant Brief at 1; NRC
Staff Response to Board Order Concerning Proposed Sua Sponte
Review of Contention 23, at 2 (May 30, 2013) [hereinafter Staff
Response].
59
App. 48
impacts as a direct effect of the construction of Fermi
Unit 3.
(2) Whether the Staff ’s consideration of environmental impacts related to the transmission corridor,
performed as a cumulative impact review, satisfied
NEPA’s hard look requirement.
Below, we explain the reasons that support our determination. First, we discuss the regulatory standard
for sua sponte review. Second, we review the NEPA requirements most [17] relevant to the environmental
analysis of the transmission corridor. Next, we analyze
the two specific issues and explain why they raise serious legal and factual questions that merit further review by the Board. Finally, we explain why the issues
we have determined to be appropriate for sua sponte
review can be distinguished from those likely to arise
in the ordinary case. On the basis of this analysis, the
Board respectfully requests that the Commission approve its determination.
A. The Standard for Sua Sponte Review
Under 10 C.F.R. § 2.340(b), a licensing board may
request Commission approval to consider the merits of
a serious environmental issue even when, as with Contention 23, it was excluded from the proceeding for procedural reasons.61 This sua sponte regulation provides
that the presiding officer shall
61
See Cleveland Electric Illuminating Co. (Perry Nuclear
Power Plant, Units 1 & 2), LBP-82-79, 16 NRC 1116, 1119 (1982).
App. 49
make findings of fact and conclusions of law
on any matter not put into controversy by the
parties, but only to the extent that the presiding officer determines that a serious safety,
environmental, or common defense and security matter exists, and the Commission approves of an examination of and decision on
the matter upon its referral by the presiding
officer. . . .62
The regulation does not define what constitutes a serious environmental issue, leaving that determination to
the presiding officer subject to the Commission’s approval.
Section 2.340(b)’s predecessor, unlike the current
version, did not require Commission approval before a
presiding officer could exercise sua sponte authority. It
did, however, instruct presiding officers that their sua
sponte review authority should only be used “sparingly” and in “extraordinary circumstances.”63 These
terms were removed from the regulation in 1979.64 The
[18] Commission subsequently stated, in a 1998 policy
statement, that licensing boards should only use sua
62
10 C.F.R. § 2.340(b)(1).
10 C.F.R. § 2.760a (1979) (“Matters not put into controversy by the parties will be examined and decided by the presiding officer only in extraordinary circumstances where he
determines that a serious safety, environmental, or common defense and security matter exists. This authority is to be used sparingly.”)
64
See 44 Fed. Reg. 67088 (Nov. 23, 1979) (stating that the
“amended rules eliminate an apparent constraint on boards”).
63
App. 50
sponte review in extraordinary circumstances,65 but
the terms “sparingly” and “extraordinary circumstances” have never been reinserted into the regulations.66
In 2004, the Commission “codif[ied] appropriate
portions of the [1998] Policy Statement,” noting that
the statement was developed “as a foundation for possible rule changes.”67 The 2004 rule codified the requirement that licensing boards request approval from
the Commission prior to conducting sua sponte review
65
Policy on Conduct of Adjudicatory Proceedings, 63 Fed.
Reg. 41872, 41874 (Aug. 5, 1998) (stating that sua sponte “authority is to be exercised only in extraordinary circumstances”).
66
In 1984, the NRC published a series of proposals developed
by a Regulatory Reform Task Force that included reinsertion of
the word “sparingly” and a requirement that any proposed use of
sua sponte review be approved by a licensing board established to
screen such proposals, though “[t]he individual proposals [were]
not Commission proposals.” See 49 Fed. Reg. 14698, 14703 (Apr.
12, 1984) (“Section 2.760a is revised to revoke the 1979 relaxation
of the sua sponte rule for review of uncontested matters by adjudicatory boards. Experience under the relaxed standard has indicated that issues have been raised sua sponte which do not
warrant such consideration. . . . the sua sponte authority of presiding officers to raise new issues will be limited to extraordinary
circumstances and is to be used sparingly.”). This document did
not, as NRC Staff suggest, constitute a revocation of the 1979 rule
change. Staff Response at 6 n.19. Two years later, the Commission published a proposed rule that “identified five proposals
which merit continued consideration for possible inclusion in . . .
the Commission’s Rules of Practice,” none of which addressed sua
sponte review. 51 Fed. Reg. 24365, 24366 (July 3, 1986).
67
69 Fed. Reg. 2182, 2182, 2186 (Jan. 14, 2004) (emphasis
added).
App. 51
of a matter not put into controversy.68 Notably absent,
however, was any requirement that the presiding officer’s determination or the Commission’s approval be
limited to issues presenting “extraordinary circumstances.” Evidently the Commission concluded that
that particular aspect of the 1998 policy statement was
not “appropriate” for inclusion in the new rule.
The 2012 rule revision, which clarified that sua
sponte authority extends to Board review of combined
license applications, states only that review “is limited
to . . . serious matters not [19] put into controversy by
the parties that concern safety, common defense and
security, or the environment that the Commission has
approved for review upon the presiding officer’s referral of the matter.”69 Again, there is no requirement of
“extraordinary circumstances.”
Given the historical development of the sua sponte
provision and that Commission approval is now required prior to sua sponte consideration of an issue, the
Commission is not constrained to approve only those
issues that arise under “extraordinary circumstances.”
Still, a request to engage in sua sponte review should
not be undertaken lightly. And it has not been. Recent
years have seen sparing use of sua sponte review.70 In
2011, in what would have been the first such request
68
Id. at 2210.
77 Fed. Reg. 46562, 46584 (Aug. 3, 2012).
70
Shaw AREVA MOX Services (Mixed Oxide Fuel Fabrication Facility), LBP-11-9, 73 NRC 391, 422 (2011) (J. McDade, dissenting) (noting that “no Board has attempted to invoke sua
sponte review in the past 20 years”).
69
App. 52
in twenty years, all members of the Licensing Board in
Shaw AREVA MOX Services determined that extraordinary circumstances existed such that sua sponte review would have been warranted had the serious
safety issue raised been deemed untimely.71 Here also,
the issues we have determined to be appropriate for
sua sponte review are “extraordinary” in that they differ from those likely to arise in the ordinary case.72
B.
NEPA Requirements
“The centerpiece of environmental regulation in
the United States, NEPA requires federal agencies to
pause before committing resources to a project and
consider the likely environmental impacts of the preferred course of action as well as reasonable alternatives.”73 When an agency proposes a major Federal
action significantly affecting the quality of the [20] human environment, NEPA requires the preparation of
an EIS concerning the proposed action.74 The requirement to prepare an EIS is a procedural mechanism
designed to assure that agencies give proper consideration to the environmental consequences of their
71
Id. at 412, 422.
See infra Section II(E).
73
N.M. ex rel. Richardson v. Bureau of Land Mgmt., 565 F.3d
683, 703 (10th Cir. 2009) (citing 42 U.S.C. § 4331(b) (congressional declaration of national environmental policy); Pub. Citizen,
541 U.S. at 756-57; Marsh v. Or. Natural Res. Council, 490 U.S.
360, 371 (1989); and Forest Guardians v. U.S. Forest Serv., 495
F.3d 1162, 1172 (10th Cir. 2007)).
74
42 U.S.C. § 4332.
72
App. 53
actions.75 However, NEPA does not require agencies to
elevate environmental concerns over other appropriate
considerations.76
The following NEPA requirements are particularly relevant here.
1.
The Scope of an EIS
The “scope” of an EIS is defined as “the range of
actions, alternatives, and impacts to be considered in
an environmental impact statement.”77 The NRC regulation governing the scope of the EIS states that the
agency should use the provisions of a CEQ regulation,
40 C.F.R. § 1502.4, for that purpose.78 Section 1502.4 in
turn directs that
[a]gencies shall use the criteria for scope
(§ 1508.25) to determine which proposal(s)
shall be the subject of a particular statement.
Proposals or parts of proposals which are related to each other closely enough to be, in effect, a single course of action shall be
evaluated in a single impact statement.79
Under the referenced CEQ regulation, the proposed action that is the subject of the EIS must include all
75
See Vt. Yankee Nuclear Power v. Natural Res. Def. Council,
435 U.S. 519, 558 (1978).
76
Strycker’s Bay Neighborhood Council, Inc. v. Karlen, 444
U.S. 223, 227 (1980).
77
40 C.F.R. § 1508.25.
78
10 C.F.R. § 51.29(a)(1).
79
40 C.F.R. § 1502.4(a).
App. 54
“connected actions.”80 The definition of “connected
actions” in § 1508.25 is also adopted by 10 C.F.R.
§ 51.14(b). Under § 1508.25, separate actions are “connected” if, among other things, they “[c]annot or will
not proceed unless other actions are taken previously
or simultaneously,” or they “[a]re interdependent parts
of a larger action and depend on the larger [21] action
for their justification.”81 Thus, all connected actions as
defined in § 1508.25 must be included within the scope
of the proposed action evaluated in the NRC’s FEIS.
In general, NEPA case law defines “connected actions” as those that lack “independent utility.”82 The
Sixth Circuit applies that test.83 Projects lack independent utility when it would be irrational, or at least
unwise, to build one without the other.84 For example,
the Ninth Circuit held that the construction of a road
to facilitate logging and the sale of timber from the logging were “connected actions” that had to be addressed
in a single EIS.85 The court pointed out that “the timber
sales cannot proceed without the road, and the road
80
Id. § 1508.25(a)(1).
Id. § 1508.25(a)(1)(ii) and (iii). NRC’s NEPA regulations
specifically adopt this definition. See 10 C.F.R. § 51.14(b).
82
See Soc’y Hill Towers Owners’ Ass’n v. Rendell, 210 F.3d
168, 181 (3d Cir. 2000) (collecting cases); Nw. Res. Info. Ctr. v.
Nat’l Marine Fisheries Serv., 56 F.3d 1060, 1067-69 (9th Cir.
1995) (collecting cases).
83
Communities, Inc. v. Busey, 956 F.2d 619, 627 (6th Cir.
1992).
84
Trout Unlimited v. Morton, 509 F.2d 1276 (9th Cir. 1974).
85
Thomas v. Peterson, 753 F.2d 754, 758 (9th Cir. 1985).
81
App. 55
would not be built but for the contemplated timber
sales.”86
The failure to include all connected actions within
the scope of the proposed action is generally referred
to as “segmentation.” “ ‘Segmentation’ or ‘piecemealing’ occurs when an action is divided into component
parts, each involving action with less significant environmental effects.”87 “Segmentation is to be avoided in
order to ‘insure that interrelated projects[,] the overall
effect of which is environmentally significant, not be
fractionalized into smaller, less significant actions.’ ”88
[22]
2. The FEIS must evaluate all reasonably
foreseeable environmental impacts of the proposed action.
Once the NRC has properly defined the scope of
the proposed action, including any connected actions,
the agency’s EIS must evaluate the environmental
effects of the proposed action.89 The NRC uses this information to “[d]etermine, after weighing the environmental, economic, technical, and other benefits against
environmental and other costs . . . whether the combined license should be issued, denied, or appropriately
86
Id.
Town of Huntington v. Marsh, 859 F.2d 1134, 1142 (2d Cir.
1988) (citing City of W. Chi. v. NRC, 701 F.2d 632, 650 (7th Cir.
1983)).
88
Id. (quoting Taxpayers Watchdog, Inc. v. Stanley, 819 F.2d
294, 298 (D.C. Cir. 1987)).
89
10 C.F.R. §§ 51.71(d), 51.90; 40 C.F.R. § 1508.25(a)(1).
87
App. 56
conditioned to protect environmental values.”90 “The
EIS must address all reasonably foreseeable environmental impacts . . . even if the probability of such an
occurrence is low.”91 NEPA requirements, however, are
subject to a rule of reason, and an EIS need not address
“remote and highly speculative consequences.”92
In 10 C.F.R. § 51.14(b), the NRC adopted the
CEQ’s definition of “effects” in 40 C.F.R. § 1508.8. Under the CEQ rule, effects include both direct effects,
“which are caused by the action and occur at the same
time and place,” and indirect effects, “which are caused
by the action and are later in time or farther removed
in distance, but are still reasonably foreseeable.” The
CEQ regulation further provides:
Effects and impacts as used in these regulations are synonymous. Effects includes ecological (such as the effects on natural resources
and on the components, structures, and functioning of affected ecosystems), aesthetic, historic, cultural, economic, social, or health,
whether direct, indirect, or cumulative.93
When information relevant to a reasonably foreseeable environmental effect is [23] incomplete or unavailable, CEQ regulations require an agency to obtain
90
10 C.F.R. § 51.107(a)(3).
Blue Ridge Envtl. Def. League v. NRC, 716 F.3d 183, 188
(D.C. Cir. 2013) (citing 40 C.F.R. § 1502.22(b)).
92
Deukmejian v. NRC, 751 F.2d 1287, 1300 (D.C. Cir. 1984)
(quoting Trout Unlimited, 509 F.2d at 1283). See also Blue Ridge
Envtl. Def. League, 716 F.3d at 189.
93
40 C.F.R. § 1508.8.
91
App. 57
the unavailable information and include it in the EIS
so long as the costs are not exorbitant.94 If the cost of
obtaining the information is exorbitant, the agency
must still include in the EIS a statement that the information is unavailable, the relevance of the unavailable information, a summary of existing credible
scientific evidence, and the agency’s evaluation of the
impacts that might be caused.95
3.
The FEIS must evaluate alternatives to the
proposed action, including mitigation.
An EIS must include a detailed statement of reasonable alternatives to the proposed action.96 When
considering alternatives, agencies are to:
(a) Rigorously explore and objectively evaluate all reasonable alternatives, and for alternatives which were eliminated from detailed
study, briefly discuss the reasons for their
having been eliminated.
(b) Devote substantial treatment to each alternative considered in detail including the
proposed action so that reviewers may evaluate their comparative merits. . . .97
The CEQ regulation itself and numerous courts have
recognized that the alternatives analysis is the “heart
94
See id. § 1502.22(a).
See id. § 1502.22(b).
96
42 U.S.C. § 4332(2)(C)(iii). See also La. Energy Servs., L.P.
(Claiborne Enrichment Ctr.), CLI-98-3, 47 NRC 77, 104 (1998).
97
40 C.F.R. § 1502.14.
95
App. 58
of the environmental impact statement.”98 “The existence of reasonable but unexamined alternatives renders an EIS inadequate.”99
The NRC’s NEPA regulation governing preparation of a DEIS directs that it “include a preliminary
analysis that considers and weighs the environmental
effects of the proposed action; [24] the environmental
impacts of alternatives to the proposed action; and alternatives available for reducing or avoiding adverse
environmental effects. . . .”100 The NRC’s regulation
governing preparation of an FEIS imposes the same
requirement by directing that the NRC Staff “prepare
a final environmental impact statement in accordance
with the requirements of . . . [10 C.F.R. § 51.71] for a
draft environmental impact statement.”101
4.
Cumulative Impacts
Activities excluded from the scope of the proposed
action may still be relevant to the NRC’s NEPA analysis to the extent they affect the environmental baseline
for the evaluation of cumulative impacts. Under CEQ
regulations, “cumulative impact” is defined as the “impact on the environment that results from the
98
Id. See also Alaska v. Andrus, 580 F.2d 465, 474 (D.C.
Cir.), vacated in part as moot sub nom. W. Oil & Gas Ass’n v.
Alaska, 439 U.S. 922 (1978).
99
Friends of Se.’s Future v. Morrison, 153 F.3d 1059, 1065
(9th Cir. 1998).
100
10 C.F.R. § 51.71(d) (emphasis added).
101
Id. § 51.90.
App. 59
incremental impact of the [proposed] action when
added to other past, present, and reasonably foreseeable future actions regardless of what agency (Federal
or non-Federal) or person undertakes such other actions.”102
In the FEIS, the Staff treated the construction of
the transmission corridor as a separate non-federal action rather than a connected action. The Staff therefore
evaluated the transmission corridor solely as a reasonably foreseeable future action that forms part of the
environmental baseline for evaluating the cumulative
impact of the proposed action, i.e., the licensing of the
construction and operation of Fermi Unit 3.
5.
Limitation on actions
An important consequence of the decision whether
to include new construction within the scope of the proposed action is that, if it is included, it will be subject
to the limitation on actions in 10 C.F.R. § 51.101(a).
Under that provision, when the Staff prepares an EIS
under 10 C.F.R. § 51.20, then until a record of decision
is issued “[n]o action concerning the proposal [25] may
be taken by the Commission which would (i) have an
adverse environmental impact, or (ii) limit the choice
of reasonable alternatives.”103 Also, “[a]ny action concerning the proposal taken by an applicant which
would (i) have an adverse environmental impact, or (ii)
limit the choice of reasonable alternatives may be
102
103
40 C.F.R. § 1508.7.
10 C.F.R. § 51.101(a)(1).
App. 60
grounds for denial of the license.”104 For separate activities, on the other hand, there is no obligation on the
Commission to avoid regulatory action before the record of decision is issued that would allow the activity
to proceed, regardless of its environmental impact or
its effect on the range of alternatives. And the applicant may proceed with (or allow its contractor to proceed with) an activity outside the scope of the proposal
that would have an adverse environmental impact or
limit the choice of reasonable alternatives even though
the NEPA review is ongoing or has not even begun.
This was precisely the point that the NRC Staff commenter made about the proposed 2007 LWA Rule.105
C.
There is a serious question whether the building
of an offsite transmission corridor intended
solely to serve the new Fermi Unit 3 qualifies as
a connected action under NEPA and, therefore,
requires the Staff to consider its environmental
impacts as a direct effect of the construction of
Fermi Unit 3.
Given that the transmission corridor’s sole apparent purpose is to serve the Fermi Unit 3 project and
the new nuclear power plant would be useless without
the new transmission lines, Intervenors (and the EPA)
have raised a serious question whether the construction of the new transmission corridor should have been
analyzed as a connected action in the FEIS.
104
105
Id. § 51.101(a)(2).
72 Fed. Reg. at 57420.
App. 61
In order for construction of the transmission corridor to constitute a connected action under 40 C.F.R.
§ 1508.25, three requirements must be met. First, the
transmission corridor must be a proposed action rather
than one that is merely conceivable.106 Second, the
transmission corridor must lack independent utility,
that is, its sole purpose must be serving [26] Fermi
Unit 3.107 Third, for an action such as the transmission
corridor that will not be constructed by or expressly
permitted by the federal agency preparing the EIS,
there must be sufficient federal control and responsibility that the action qualifies as a federal action.108 We
review each of these issues in turn.
1.
Proposed Action
The FEIS states that “ITC Transmission has not
yet formally announced a route for the offsite portion
of the proposed new transmission line serving Fermi
3,” but it also states that “Detroit Edison expects that
the proposed new transmission line would be built”
along the corridor identified in the FEIS.109 The FEIS
106
See Kleppe v. Sierra Club, 427 U.S. 390, 410 & n.20
(1976).
107
See Thomas, 753 F.2d at 759-60 (citing Trout Unlimited,
509 F.2d at 1276 (stating that an EIS must address interdependent projects when “[t]he dependency is such that it would be irrational, or at least unwise, to undertake the first phase if
subsequent phases were not also undertaken.”)).
108
See Sw. Williamson Cnty. Cmty. Ass’n, Inc. v. Slater, 243
F.3d 270, 278-80 (6th Cir. 2001).
109
FEIS at 2-10.
App. 62
repeatedly refers to the “proposed” transmission corridor.110 For example, the FEIS includes a map identifying the “Proposed Transmission Corridor from Fermi 3
to the Milan Substation.”111 The FEIS reports that
“[t]hree new 345-kV transmission lines have been proposed to serve Fermi 3.”112 The FEIS also refers to “the
proposed route from the Fermi 3 site in Monroe County
to the existing Milan Substation in Washtenaw
County.”113 Furthermore, in response to written questions propounded by the Board, DTE informed the
Board that it is unaware of any other transmission corridor route [27] currently under consideration.114 An
action with potential impacts subsequent to the initial
federal action may not constitute a proposed action if
it is insufficiently certain.115 Here, by contrast, there is
no doubt that offsite transmission lines would be built
to serve Fermi 3 and no suggestion of any plan to build
them anywhere but along the proposed route identified
in the FEIS. Therefore, based on the information now
110
See, e.g., id. at 2-61, 2-126, and 3-18 to 3-19. The fact that
the Staff declares the transmission lines to be a proposed action
is significant, as under CEQ regulations “[a] proposal may exist
in fact as well as by agency declaration that one exists.” 40 C.F.R.
§ 1508.23.
111
FEIS at 2-11 (emphasis added).
112
Id. at 4-8 (emphasis added).
113
Id. at 2-208 (emphasis added).
114
Applicant Brief at 8; Smith Affidavit at 5.
115
See Webster v. U.S. Dep’t of Ag., 2011 WL 8788223, at *8
(N.D.W. Va. June 13, 2011) (finding that the building of a water
treatment plant to serve a proposed dam was not sufficiently certain and any attempt to determine environment impacts would
be “speculative and contingent”).
App. 63
before the Board, it appears that the transmission corridor identified in the FEIS is a proposed action.116
2.
Independent Utility
The FEIS clearly shows that the purpose of the
new transmission corridor is to serve Fermi Unit 3 (i.e.,
to transmit electrical energy from Fermi Unit 3 to the
grid).117 No party has identified any other function that
the corridor is intended to serve. Just as the construction of a road to facilitate logging and the sale of timber
that would result from that logging were connected actions,118 so too the construction of a new nuclear power
plant and the transmission corridor that will transmit
the newly generated power to the grid are also connected actions.
116
Whether a project qualifies as a “proposal” is somewhat
intertwined with the “independent utility” question. CEQ’s regulations state that a “[p]roposal exists at that stage in the development of an action when an agency subject to the Act has a goal
and is actively preparing to make a decision on one or more alternative means of accomplishing that goal and the effects can be
meaningfully evaluated. Preparation of an environmental impact
statement on a proposal should be timed so that the final statement may be completed in time for the statement to be included
in any recommendation or report on the proposal.” 40 C.F.R.
§ 1508.23. In a situation such as this, where the granting of a license makes the building of offsite transmission lines inevitable,
an evaluation of their direct environmental impacts will only be
meaningful if engaged in before the license issuance.
117
FEIS at 2-10 to 2-11, 3-17 to 3-19.
118
Thomas, 753 F.2d at 758.
App. 64
DTE stated in response to a question from the
Board that the new transmission lines [28] might possibly serve some as yet unidentified source of electrical
energy if Fermi 3 is not constructed.119 Absent additional evidence, this theoretical possibility is too speculative to establish that the transmission corridor
actually has independent utility. Our view is supported
by the Appeal Board’s ruling in Greenwood upholding
the NRC’s authority to impose environmental restrictions on new transmission lines intended to serve
two new Detroit Edison nuclear power plants.120 The
Licensing Board had described the new transmission
lines “as an integral part of nuclear generating plants,
observing that ‘[a] power plant without transmission
lines is like an airplane that can’t fly.’ ”121 The Appeal
Board agreed. As in this case, in Greenwood, DTE
“could not represent that identical power lines along
identical routes would be erected irrespective of the
Greenwood nuclear facility.”122 The Appeal Board
therefore had
no hesitation in concurring in the Licensing
Board’s assumption that the lines are a foreseeable consequence of licensing construction
of the nuclear power units. Indeed, no other
conclusion is reasonable. Without transmission lines the Greenwood facility would be little more than a very expensive double boiler
119
Applicant Brief at 8; Smith Affidavit at 5-6.
Greenwood Energy Ctr., ALAB-247, 8 AEC at 936.
121
Id. at 937.
122
Id. at 939.
120
App. 65
serving no discernible purpose. It is scarcely
likely that Detroit Edison would embark upon
such an enterprise even if given the green
light by the regulatory bodies which oversee
its operations.123
Here also, the proposed transmission corridor is an integral part of the Fermi 3 project with “no discernible
purpose” apart from connecting Fermi 3 to the grid.
3.
Federal Control and Responsibility
The FEIS does not refer to any purpose of the new
transmission corridor other than serving Fermi 3. But
the Staff did not analyze the transmission corridor as
a connected action. Instead, it defined the construction
of the transmission corridor as a “preconstruction activity,” [29] and excluded it from the scope of the proposed action because of the 2007 LWA Rule narrowing
the definition of “construction” and disclaiming NRC
regulatory authority over all preconstruction activities.124 Thus, the Staff evaluated the impacts of the
transmission corridor solely “in the context of cumulative impacts.”125 In substance, the Staff concluded that
the scope of the proposed federal action should include
only the power plant and not the transmission corridor
necessary to make the plant serve its intended purpose
because, in the Staff ’s view, the transmission corridor
is outside the scope of the federal action.
123
Id.
FEIS at 1-6 to 1-7.
125
Id. at 1-7.
124
App. 66
The requirement to prepare an EIS applies to “major Federal actions,” not to private or state actions.126
Thus, only those activities that have sufficient federal
involvement to qualify as federal actions need be included in the scope of the proposed action evaluated in
an EIS.127 But this does not necessarily mean that the
action in question must be taken or expressly authorized by a federal agency. In Southwest Williamson
County Community Ass’n, Inc. v. Slater, the court defined the test for determining when a non-federal project should be analyzed under NEPA as a major federal
action:
With the CEQ regulations and case law in
mind, we conclude that there are two alternative bases for finding that a non-federal project constitutes a “major Federal action” such
that NEPA requirements apply: (1) when the
non-federal project restricts or limits the statutorily prescribed federal decision-makers’
choice of reasonable alternatives; or (2) when
the federal decision-makers have authority to
exercise sufficient control or responsibility
over the non-federal project so as to influence
the outcome of the project. If either test is
satisfied, the non-federal project must be
126
42 U.S.C. § 4332(2)(C).
See Sw. Williamson Cnty., 243 F.3d at 278-80. But see
Colo. Wild, Inc. v. U.S. Forest Serv., 523 F.Supp.2d 1213, 1224-25
(D. Colo. 2007) (rejecting the U.S. Forest Service’s claim that road
construction and development planned by a private party seeking
access rights-of-way over national forest land “cannot be ‘connected actions’ under NEPA’s regulations because the Forest Service lacks authority to control them”).
127
App. 67
considered a major federal action. Both tests
require a situation-specific and fact-intensive
analysis.128
[30] We understand that construction of the transmission corridor has not begun. Therefore, the first test
is not satisfied. This is not an instance where, at least
thus far, “the non-federal project restricts or limits the
statutorily prescribed federal decision-makers’ choice
of reasonable alternatives.”129 On the other hand, in
this case “the federal decision-makers have authority
to exercise sufficient control or responsibility over the
non-federal project so as to influence the outcome of
the project.”130 In Southwest Williamson County, the
court held that the second test was not satisfied because the authority of the Federal Highway Administration (“FHWA”) was limited to certain
interchanges between a federally financed highway
project and a state highway. “No part of the statute
confers jurisdiction on the FHWA . . . to oversee the
construction of the highway corridor that runs between the interchanges unless the state attempts to
comply with federal regulations in order to seek federal reimbursement for construction costs.”131
Here, by contrast, the NRC long interpreted its
statutory authority under the Atomic Energy Act
128
Sw. Williamson Cnty., 243 F.3d at 281 (footnote omitted).
Id. at 281-83.
130
Id. at 283-84.
131
Id. at 283.
129
App. 68
(“AEA”)132 to include conditioning approval of nuclear
power plant licenses on environmentally acceptable
routing of transmission lines.133 The United States
Court of Appeals for the First Circuit upheld the NRC’s
authority to regulate offsite transmission lines under
the AEA, affirming a licensing board decision conditioning approval of permits to the Seabrook Nuclear
Power Station on the rerouting of two offsite transmission lines to avoid environmental [31] impacts on
marshlands, tree species, and migratory waterfowl.134
Two years later, the Sixth Circuit also upheld the Commission’s authority, unequivocally holding that “1) the
regulation of off-site transmission lines is within the
Commission’s authority under Section 101 of the
Atomic Energy Act; and 2) that nothing in the Atomic
Energy Act precludes the Commission from implementing, through the issuance of conditional licenses,
NEPA’s environmental mandate.”135
The holdings of the First and Sixth Circuits continue to be the law in those jurisdictions. Under those
rulings, the NRC may consistently with the AEA and
NEPA impose environmental restrictions on transmission lines built to serve nuclear power plants should it
choose to do so. The NRC’s regulations, including 10
C.F.R. §§ 50.36(b) and 51.107(a)(3), authorize the
agency to impose environmental conditions in a license
132
Atomic Energy Act of 1954, 42 U.S.C. § 2011 et seq. (2012).
Pub. Serv. Co. of N.H. v. NRC, 582 F.2d 77, 82 (1st Cir.
1978). See discussion supra Section I(C).
134
Pub. Serv. Co. of N.H., 582 F.2d at 80.
135
Detroit Edison, 630 F.2d at 452.
133
App. 69
to prevent or mitigate adverse environmental impacts
that might otherwise be caused by the construction or
operation of a nuclear power plant.136 “Environmental
protection is a central part of NRC’s core mission and
is in its mission statement.”137 Thus, under Sixth Circuit precedent, “the federal decision-makers have authority to exercise sufficient control or responsibility
over the non-federal project so as to influence the outcome of the project.”138
To be sure, in the 2007 LWA Rule the NRC decided
that the building of transmission lines to serve a nuclear power plant would no longer be classified as a
construction activity and would no longer require authorization from the NRC.139 Intervenors have not
challenged the Rule and we would be precluded from
hearing such a challenge had they done so, absent a
[32] showing of special circumstances.140 But an
agency’s narrowed construction of its statutory authority, as distinct from an express prohibition by Congress, may not be used to limit the agency’s obligations
under NEPA.141 “NEPA’s legislative history reflects
136
Progress Energy Fla., Inc. (Levy Cnty. Nuclear Plant,
Units 1 & 2), LBP-13-4, 77 NRC 107, 217 (2013).
137
Id.
138
Sw. Williamson Cnty., 243 F.3d at 281.
139
10 C.F.R. § 50.10(a)(2)(vii).
140
10 C.F.R. § 2.335.
141
Ctr. for Biological Diversity v. Nat’l Highway Traffic
Safety Admin., 538 F.3d 1172, 1213 (9th Cir. 2008); Sierra Club
v. Mainella, 459 F. Supp. 2d 76, 105 (D.D.C. 2006) (distinguishing
agency NEPA responsibilities in situations where “an agency has
‘no ability’ because of lack of ‘statutory authority’ to address the
App. 70
Congress’s concern that agencies might attempt to
avoid any compliance with NEPA by narrowly construing other statutory directives to create a conflict with
NEPA. Section 102(2) of NEPA therefore requires government agencies to comply ‘to the fullest extent possible.’ ”142 The Supreme Court has explained that this
statutory directive was “neither accidental nor hyperbolic.”143 Thus, courts have held that NEPA obligations
supplement existing statutory authority and “must be
complied with to the fullest extent, unless there is a
clear conflict of statutory authority.”144 In short, absent
clear conflict an agency cannot interpret its way out of
its NEPA responsibilities.
Also, although the NRC now takes the position
that it lacks authority to impose environmental restrictions on transmission corridors, Border Power
Plant Working Group supports the view that the transmission corridor impacts should have been analyzed as
a direct effect of the NRC action even under that new
impact” with situations where an agency “is only constrained by
its own regulation from considering impacts”).
142
Ctr. for Biological Diversity, 538 F.3d at 1213 (quoting
Forelaws on Bd. v. Johnson, 743 F.2d 677, 683 (9th Cir.1985)).
See also Flint Ridge Dev. Co. v. Scenic Rivers Ass’n of Okla., 426
U.S. 776, 787 (1976) (quoting House and Senate Conferees, who
inserted the “fullest extent possible” language into NEPA, to say
that “no agency shall utilize an excessively narrow construction
of its existing statutory authorizations to avoid compliance”).
143
Flint Ridge Dev. Co., 426 U.S. at 787.
144
Calvert Cliffs, 449 F.2d at 1115.
App. 71
interpretation.145 In that case, an environmental group
challenged two federal agencies’ issuance of permits
and rights-of-way allowing two [33] utilities to build
electricity transmission lines to connect new power
plants in Mexico with the power grid in southern California. The Mexican plants were outside the jurisdiction of the federal agencies. Nevertheless, the district
court held that increased air pollution in California resulting from two “export turbines” at one of the Mexican plants was a direct effect of the new transmission
lines, and that DOE therefore had to evaluate the air
pollution impacts under NEPA.146 The same analysis
applies here. Although the NRC has renounced regulatory jurisdiction over the transmission lines, the construction of the lines and the resulting environmental
impacts will be a direct effect of the COL, should it be
issued, and must be analyzed as such under NEPA.
Both the Staff and Applicant emphasize that the
offsite transmission lines will be owned and operated
by ITC Transmission and not by DTE.147 For this reason, Applicant notes, “Staff relied on publicly available
information and reasonable expectations of the configurations that ITC Transmission would likely use for
the offsite corridor based on standard industry practice.”148 But the significance placed on this fact by Staff
and Applicant appears misplaced. Multiple projects
145
See Border Power Plant Working Grp. v. U.S. Dep’t of Energy, 260 F. Supp. 2d 997, 1012-18 (S.D. Cal. 2003).
146
Id.
147
Staff Response at 10; Applicant Brief at 5.
148
Applicant Brief at 5.
App. 72
are often deemed connected actions despite being undertaken by separate entities.149 In fact, projects undertaken by separate entities may still be considered
connected actions even in the absence of formal agreement between the parties.150 After all, “NEPA [34]
mandates a case-by-case balancing judgment on the
part of federal agencies,” not the private parties seeking federal action.151 If it is established that ITC Transmission’s proposed new transmission corridor lacks
independent utility, the Staff should have included it
within the scope of the proposed action, analyzed its
impacts as direct effects of the NRC action, and evaluated alternatives available for reducing or avoiding
any adverse environmental effects.152
149
See, e.g., Hammond v. Norton, 370 F. Supp. 2d 226, 24753 (D.D.C. 2005) (ruling that the Bureau of Land Management
improperly segmented consideration of two pipeline projects being constructed by two separate companies despite evidence that
they lacked independent utility and thus qualified as connected
actions); Natural Res. Def. Council v. Hodel, 865 F.2d 288 (D.C.
Cir. 1988) (rejecting as inadequate an FEIS that failed to consider
the cumulative impacts on migratory species caused by multiple
outer-continental lease sales in the California and Alaska regions).
150
See Hammond, 370 F. Supp. 2d at 245, 251 (making clear
that a determination that actions are connected does not rest
upon formal agreement between the entities undertaking the actions, and noting EPA’s argument that “CEQ does not require a
formal agreement in order for two projects to be defined as connected actions”).
151
Calvert Cliffs, 449 F.2d at 1123.
152
We note, additionally, that nothing in the FEIS suggests
that the NRC Staff gave much, if any, consideration to EPA’s suggestion that offsite transmission lines should have been
App. 73
4.
The 2007 LWA Rule and Statement of Considerations
According to DTE, “the Commission has specifically directed, by regulation, that the impacts of ‘preconstruction’ activities be addressed cumulatively
with the impacts authorized by a combined license,”
and that “[t]his is precisely the approach taken by the
NRC Staff.”153 That argument would have merit only if
the provision cited by DTE, 10 C.F.R. § 51.45(c), repealed, materially altered, or directed the Staff to ignore the NRC and CEQ regulations previously
described which require that the proposed action that
is the subject of an agency EIS include all “connected
actions” as defined in 40 C.F.R. § 1508.25.154 Section
51.45(c) contains no language to that effect. Concerning preconstruction activities, it merely provides that
considered as a connected action. See FEIS, app. E, at E-42 to E43. While NEPA does not require “an agency preparing an EIS to
respond to EPA concerns, [an agency’s] failure even to address
them in the EIS at the very least brings into question the sufficiency of the agency’s analysis.” Hammond, 370 F. Supp. 2d at
251 (citing Citizens Against Burlington v. Busey, 938 F.2d 190,
201 (D.C. Cir. 1991) (stating that an agency “does not have to follow the EPA’s comments slavishly – it just has to take them seriously.”); Natural Res. Def. Council v. Hodel, 865 F.2d at 297-99
(stating that the court considered the failure to meaningfully address EPA concerns in its decision that FEIS did not comply with
NEPA); and Alaska v. Andrus, 580 F.2d at 475 (stating that EPA’s
determination that the EIS was unsatisfactory “did give rise to a
heightened obligation on [the lead agency’s] part to explain
clearly and in detail its reasons for proceeding”)).
153
Applicant Brief at 12.
154
See supra Section II(B)(1).
App. 74
[35] [a]n environmental report prepared at the
. . . combined license stage under § 51.50(c)
must include a description of impacts of the
preconstruction activities performed by the
applicant at the proposed site (i.e., those activities listed in paragraph (1)(ii) in the definition of ‘construction’’ contained in § 51.4),
necessary to support the construction and operation of the facility which is the subject of
the . . . combined license application. The environmental report must also contain an analysis of the cumulative impacts of the activities
to be authorized by the . . . combined license
in light of the preconstruction impacts described in the environmental report.155
This direction concerns the content of the ER, a document prepared by the applicant. The definition of the
scope of the EIS, however, is the responsibility of the
NRC Staff.156 For the purpose of defining the scope of
the proposed action that is to be the subject of an EIS,
the Staff is instructed to use 40 C.F.R. § 1502.4, which
directs that “[p]roposals or parts of proposals which
are related to each other closely enough to be, in effect,
a single course of action shall be evaluated in a single
impact statement.”157 Section 51.45(c) does not alter
that obligation or the obligation to include within the
155
10 C.F.R. § 51.45(c).
Id. §§ 51.28, 51.29.
157
40 C.F.R. § 1502.4. Under 10 C.F.R. § 51.29(a)(1), the
Staff is directed to use that provision to determine the scope of
the proposed action that is the subject of an agency EIS.
156
App. 75
scope of the proposed action all connected actions as
defined in § 1508.25.
DTE also relies on the Statement of Considerations for the 2007 LWA Rule (the “SOC”).158 Courts regularly rely upon the preamble in interpreting an
agency rule.159 Similarly, the Commission often refers
to the Statement of Considerations as an aid in interpreting the agency’s regulations.160 But the preamble,
unlike the rule itself, does not have the force of law [36]
and may not be used to expand the reach of the regulations.161 Thus, the SOC, while it may be used to interpret any ambiguous text of the 2007 LWA Rule, cannot
add new requirements or prohibitions. As we have explained, § 51.45(c) contains no language modifying the
Staff ’s obligation under NRC and CEQ regulations to
include connected actions in the scope of the proposed
action, and the SOC cannot interpret what the regulation itself does not contain.
158
See Applicant Brief at 11-12.
See Nat’l Mining Ass’n v. EPA, 59 F.3d 1351, 1355 n.7
(D.C. Cir. 1995).
160
Pa’ina Haw., LLC (Materials License Application), CLI08-3, 67 NRC 151, 163 n.46 (2008) (quoting Duke Energy Corp.
(Catawba Nuclear Station, Units 1 & 2), CLI-04-11, 59 NRC 203,
208 n.12 (2004)).
161
See A & E Coal Co. v. Adams, 694 F.3d 798, 802 (6th Cir.
2012) (explaining that the preamble “merely explains why the
regulations were amended” and did “not expand their reach”). See
also Curators of the University of Missouri (TRUMP-S Project),
CLI-95-1, 41 NRC 71, 98 (1995) (stating that NRC guidance cannot prescribe requirements).
159
App. 76
The SOC also does not invalidate the reasoning
underlying the decisions of the First and Sixth Circuits
that upheld the NRC’s authority to impose environmentally protective restrictions on transmission lines.
The SOC discusses the Commission’s reasons for
changing its interpretation of its statutory authority,
but it did not address those rulings of the courts of appeal. The Commission acknowledged that its previous
broad assertion of regulatory jurisdiction over activities now classified as “preconstruction” was “a reasonable implementation of NEPA as understood in
1972. . . .”162 The SOC also stated that the NRC’s broad
definition of “construction” in the pre-2007 version of
the 10 C.F.R. § 50.10(c) was originally added to Part 50
“due to the interpretation that the enactment of NEPA
required the NRC to expand its permitting/licensing
authority.”163 But the Commission stated that “subsequent judicial decisions have made it clear that NEPA
is a procedural statute and does not expand the jurisdiction delegated to an agency by its organic statute.”164
Although the NRC concluded it had overestimated
NEPA’s legal effect, the federal courts of appeal decisions upholding the NRC’s authority to impose environmental restrictions on transmission lines were not
premised on the theory that NEPA had expanded the
jurisdiction [37] delegated to the NRC by its organic
162
72 Fed. Reg. at 57420.
Id. at 57427.
164
Id.
163
App. 77
statute (the AEA). In Detroit Edison, the Sixth Circuit
upheld the Commission’s authority to regulate transmission lines in order to prevent environmental damage, making clear that this authority was founded
upon the AEA:
The Commission is empowered by [the AEA]
to regulate off-site transmission lines; in the
exercise of that power it must pursue the objectives of the Atomic Energy Act and NEPA
simultaneously. Under the Atomic Energy
Act, the Commission can issue conditional licenses for regulatory purposes. There can be
no objection to its use of the same means to
achieve environmental ends as well.165
In its brief in Detroit Edison, the NRC argued that
NEPA requires consideration of all significant environmental impacts of a proposed action, including off-site
transmission lines that are solely attributable to a proposed nuclear power plant.166 The NRC also argued
that the Commission is required “to administer the
Atomic Energy Act in accordance with the ‘national
policy of environmental protection’ ” and, therefore,
“must have the authority to use its license conditioning
power when necessary to protect the environment.”167
Additionally, the NRC asserted that the AEA and
NEPA provide independent sources of authority to
165
Detroit Edison, 630 F.2d at 454.
Brief for Respondents at 10, Detroit Edison, 630 F.2d 450
(No. 78-3196). The Brief was also filed on behalf of the United
States, represented by the Department of Justice.
167
Id. at 19.
166
App. 78
condition licenses based upon the environmental impacts related to off-site transmission lines. But the
court of appeals, in ruling that the NRC had appropriately interpreted the AEA to include regulatory authority over attendant transmission lines, made clear
that “[w]e need not, and do not, decide whether NEPA
is an independent source of substantive jurisdiction.”168 Thus, the court did not base its holding on the
theory that NEPA had expanded the NRC’s jurisdiction beyond that already provided in the AEA.
[38] Similarly, the First Circuit did not assume
that NEPA had expanded the NRC’s jurisdiction. Rather, the court of appeals understood that NEPA required the NRC to construe its existing statutory
authority consistently with NEPA’s goals:
NEPA’s mandate has been given strict enforcement in the courts, with frequent admonitions that it is insufficient to give mere lip
service to the statute and then proceed in
blissful disregard of its requirements. Section
102(2)(C) is an “action forcing” provision,
which imposes a duty upon federal agencies
to act so as to effectuate the purposes of the
statute to the fullest possible degree. The directive to agencies to minimize all unnecessary adverse environmental impact obtains
except when specifically excluded by statute or
when existing law makes compliance with
NEPA impossible. As stated by the court in
Calvert Cliffs, “Unless (specific statutory)
168
Detroit Edison, 630 F.2d at 452.
App. 79
obligations are plainly mutually exclusive
with the requirements of NEPA, the specific
mandate of NEPA must remain in force.” Unless there are specific statutory provisions
which necessarily collide with NEPA, the
Commission was under a duty to consider
and, to the extent within its authority, minimize environmental damage resulting from
Seabrook and its transmission lines.169
The First Circuit found no “inevitable clash” between the NRC’s broad regulatory authority under the
AEA and the action-forcing provisions of NEPA.
Both the Atomic Energy Act of 1954 and the
Energy Reorganization Act of 1974 confer
broad regulatory functions on the Commission and specifically authorize it to promulgate rules and regulations it deems necessary
to fulfill its responsibilities under the Acts. In
a regulatory scheme where substantial discretion is lodged with the administrative agency
charged with its effectuation, it is to be expected that the agency will fill in the interstices left vacant by Congress. The Atomic
Energy Act of 1954 is hallmarked by the
amount of discretion granted the Commission
in working to achieve the statute’s ends. The
Act’s regulatory scheme “is virtually unique
in the degree to which broad responsibility is
reposed in the administering agency, free of
close prescription in its charter as to how it
169
Pub. Serv. Co. of N.H., 582 F.2d at 81 (emphasis added)
(footnotes and citations omitted) (quoting Calvert Cliffs, 449 F.2d
1109, 1125 (D.C. Cir. 1971)).
App. 80
shall proceed in achieving the statutory objective.” The agency’s interpretation of what is
properly within its jurisdictional scope is entitled to great deference, and will not be overturned if reasonably related to the language
and purposes of the statute.170
Based on this understanding, the First Circuit upheld the agency’s decision to include transmission
lines that serve a nuclear power plant within the definition of “utilization facility” in [39] 42 U.S.C.
§ 2014(cc).171 It further held that the NRC could, consistent with its authority under the AEA, impose permit conditions on the routing of the transmission lines
in order to further NEPA’s mandate.172 Thus, the First
Circuit’s ruling, like that of the Sixth Circuit, was not
premised on the theory that NEPA had expanded the
jurisdiction delegated to the NRC in the AEA.
The SOC states that “the elimination of the blanket inclusion of site preparation activities [including
transmission lines] in the definition of construction . . .
170
Id. at 82 (citations omitted) (quoting Siegel v. Atomic Energy Comm’n, 400 F.2d 778, 783 (D.C. Cir. 1968)).
171
See id. at 82-83.
172
Id. at 86 (“In this instance, the Commission used one of
its statutory powers in the furtherance of NEPA, whose mandate
the Commission must follow. The Commission is under a dual obligation: to pursue the objectives of the Atomic Energy Act and
those of the National Environmental Policy Act. ‘The two statutes
and the regulations promulgated under each must be viewed in
Para (sic) Materia.’ We find that the Commission correctly discharged its responsibilities here.” (citation omitted) (quoting Citizens for Safe Power, Inc. v. NRC, 524 F.2d 1291, 1299 (D.C. Cir.
1975))).
App. 81
does not violate NEPA.”173 As we have already stated,
we have no authority to consider that issue. But we
find nothing in either the text of the LWA Rule or the
SOC that prohibits inclusion of the construction and
maintenance of a specific transmission line within the
scope of the proposed NRC action when those activities
qualify as a connected action under the applicable regulations and case law, as they likely do in this instance.
This may be an appropriate opportunity for the Commission to clarify whether, in the event of a conflict between general statements in the SOC and the specific
law that applies in the jurisdiction where the proposed
facility will be located, the Staff and licensing boards
should follow the controlling law in the jurisdiction
when defining or reviewing the scope of the proposed
action.
5.
Impact of Excluding Transmission Corridor
from the Scope of Proposed Action
DTE and the Staff maintain that the question
whether the transmission corridor should have been
analyzed as a connected action rather than as part of
the cumulative impact analysis [40] is merely of academic interest because, they maintain, the Staff took
the required hard look at the corridor’s impacts.174 For
several reasons, we are not persuaded that the issue is
merely a matter of semantics.
173
174
72 Fed. Reg. at 57427.
Applicant Brief at 13; Staff Response at 11.
App. 82
First, excluding the transmission corridor from
the scope of the proposed action also removes it from
the limitation on actions in 10 C.F.R. § 51.101(a).175
When an activity is excluded from the scope of the proposed action, the effect is to allow construction to begin
– or even be completed – before the agency has completed its NEPA review. But NEPA’s purpose “is to influence the decision making process ‘by focusing the
[federal] agency’s attention on the environmental consequences of a proposed project,’ so as to ‘ensure . . .
that important effects will not be overlooked or underestimated only to be discovered after resources have
been committed or the die otherwise cast.’ ”176 “[W]hen
a decision to which NEPA obligations attach is made
without the informed environmental consideration
that NEPA requires, the harm that NEPA intends to
prevent has been suffered.”177 Thus, the NEPA analysis
of the proposed action must be completed before, not
after, construction begins. In this case, the Staff has
completed the FEIS for Fermi 3 and, as far as the
Board is aware, construction of the transmission corridor has not started. But the record of decision has not
been issued and, accordingly, the § 51.101(a) limitation
on actions remains in effect. Therefore, excluding the
transmission corridor from the scope of the proposed
action may allow construction of the corridor to begin
175
See supra Section II(B)(5).
Colo. Wild, Inc., 523 F.Supp.2d at 1219 (quoting Robertson v. Methow Valley Citizens Council, 490 U.S. 332, 349 (1989)).
177
Id. (emphasis omitted) (quoting Sierra Club v. Marsh, 872
F.2d 497, 500 (1st Cir. 1989) (Breyer, J.)).
176
App. 83
before the NRC has balanced the benefits of the Fermi
3 project against all of its environmental costs, despite
NEPA’s goal of a fully informed agency decision before
the [41] proposed action is authorized.
We are also not persuaded that excluding the
transmission corridor from the proposed action had no
effect on the depth of the environmental analysis. In
Colorado Wild, where the defendants made the same
argument as DTE and the Staff, the district court
found “fair grounds for litigation regarding Defendants’ assertion that the treatment of the highway interchanges and Village development as cumulative
impacts in the FEIS was sufficient under NEPA even
if these actions should have been treated as ‘connected
actions’ under the statute’s implementing regulations.”178 The administrative record reflected “a heated
debate” on that issue, and the court concluded that
“this debate would not have occurred unless the label
attached to these actions made a difference to the content, scope and/or depth of analysis.”179 We similarly
find that the Staff ’s refusal to evaluate the transmission corridor as a connected action may have “made a
difference to the content, scope and/or depth of analysis.” As we explain in Section II(D) below, the FEIS provided very limited information concerning the
transmission corridor’s impacts to wetlands, streams,
threatened and endangered species, and historical and
cultural resources. By contrast, the FEIS provides a far
178
179
Colo. Wild, Inc., 523 F.Supp.2d at 1225.
Id. at 1225-26.
App. 84
more in-depth analysis of the impact of the construction and operation of Fermi Unit 3 on those resources.180 It is likely that the Staff ’s decision to
exclude the transmission corridor from the scope of the
proposed action influenced the far more limited analysis it received.
[42]
6.
Conclusion
There is a serious question whether the transmission corridor is a connected action under NEPA and
whether the Staff should have evaluated its environmental impacts as a direct effect of the proposed action.
D. There is a serious question whether the Staff ’s
consideration of environmental impacts related
to the transmission corridor, performed as a cumulative impact review, satisfies NEPA’s hard
look requirement.
Although the Staff did not consider the transmission corridor to be part of the proposed action, it
included some information about the corridor’s environmental impacts in its evaluation of cumulative impacts. The Staff and DTE claim that this analysis was
sufficient to satisfy NEPA requirements. We find,
180
See, e.g., FEIS at 2-33 to 2-44 and 2-66 to 2-78 (describing
impacts on wetlands and aquatic resources); id. at 2-48 to 2-59
and 2-82 to 2-125 (describing impacts on terrestrial and aquatic
species and habitats); id. at 2-195 to 2-207 (describing impacts on
historic and cultural resources).
App. 85
however, a serious question whether those requirements were satisfied.
“The principal goals of an FEIS are twofold: to
force agencies to take a ‘hard look’ at the environmental consequences of a proposed project, and, by making
relevant analyses openly available, to permit the public a role in the agency’s decision-making process.”181
The FEIS must comply with Sections 102(2)(A), (C),
and (E) of NEPA and the agency’s Part 51 regulations.182 NEPA Section 102(2)(C) requires that an EIS
provide a detailed statement concerning among other
things, “the environmental impact of the proposed action,” “any adverse environmental effects which cannot
be avoided should the proposal be implemented,” and
“any irreversible and irretrievable commitments of resources which would be involved in the proposed action
should it be implemented.”183 The Part 51 regulations
impose equivalent requirements.184 There is a serious
question whether the Staff satisfied those requirements [43] regarding transmission corridor impacts on
wetlands, streams, threatened and endangered species, and historical and cultural resources. The Staff
acknowledged that, in those areas, it lacked the
181
Claiborne, CLI-98-3, 47 NRC at 87 (citing Robertson, 490
U.S. at 349-50; Hughes River Watershed Conservancy v. Glickman, 81 F.3d 437, 443 (4th Cir. 1996)).
182
See 10 C.F.R. § 51.107(a)(1).
183
42 U.S.C. §§ 4332(C)(i), (ii), (v).
184
10 C.F.R. §§ 51.45(b)(1), (2), (5) (listing ER requirements);
id. § 51.71 (requiring that the DEIS address the matters specified
in § 51.45); id. § 51.90 (requiring that the Staff prepare the FEIS
in accordance with the requirements of § 51.71 for a DEIS).
App. 86
necessary surveys to determine the extent of impacts
to federally and state-listed species, wetlands, and
other resources. But, rather than obtaining the necessary information or explaining why it could not be obtained, the Staff assumed that the necessary surveys
would be conducted by other agencies in their regulatory reviews, that adequate mitigation to prevent environmental damage would be imposed by those other
agencies, and that accordingly the environmental impacts would be minimal. In so doing, the Staff effectively deferred the analysis required by NEPA until a
later date and delegated the NRC’s NEPA responsibilities to other agencies. An impact statement cannot fulfill its role of providing “a springboard for public
comment”185 if it defers indefinitely and delegates to
other agencies the duty to inform the public of the environmental impacts of the proposed action and potential measures to mitigate those impacts.
For example, concerning impacts of the transmission lines on “Important Terrestrial Species,” the FEIS
acknowledges that the United States Fish and Wildlife
Service (“FWS”) “identified several terrestrial species
that are listed under the [Endangered Species Act] or
candidates for listing that could occur in the area of the
proposed transmission line corridor, some of which are
not known to occur at the Fermi site.”186 The FEIS includes a table listing numerous federally and statelisted species that “[m]ay occur with the Transmission
185
186
Robertson, 490 U.S. at 349 (citation omitted).
FEIS at 2-61.
App. 87
Line Corridor.”187 But the FEIS fails to identify the species that do in fact occur within the corridor and the
potential impacts to those species. Instead, it states
that “[f ]ield surveys of the corridor [44] route have not
yet been conducted to confirm the presence of any species,”188 and that no additional monitoring is planned
along the proposed transmission line corridor.189 The
FEIS reports that “[p]rior to installation of the offsite
transmission line, FWS and [the Michigan Department of Natural Resources] would need to review detailed information on the transmission line corridor.
The agencies may, at that time, require surveys of the
proposed transmission line corridor for the presence of
important species and habitat.”190 In other words, the
surveys necessary to determine whether the transmission corridor will harm “important species and habitat”
were not conducted during preparation of the FEIS,
but may be conducted by other agencies at unknown
future dates, which may not be until after the NRC has
issued the COL. The Staff failed to explain why it did
not require such surveys to assist in preparation of the
FEIS.
Similarly, with regard to endangered or threatened freshwater species that may occur in streams
crossed by the transmission corridor, the FEIS fails to
provide the information necessary to determine either
187
Id. at 2-62.
Id. at 2-61.
189
Id. at 2-65.
190
Id. at 2-61.
188
App. 88
the species that will be affected or the extent of the
impacts. For example, concerning the Northern
Riffleshell, a federally listed endangered freshwater
mussel species, the FEIS explains that “[t]he survival
of this species depends on the protection and preservation of suitable habitat host fish species,” but that “it
is currently unknown if appropriate habitats are present in stream areas that are crossed by the proposed
transmission line corridor.”191 Concerning the Purple
Lilliput, a freshwater mussel species listed as endangered by the State of Michigan, the FEIS reports that
“it is currently unknown if appropriate habitats [45]
are present in stream areas that are crossed by the
proposed transmission line corridor.”192 As with terrestrial species, the FEIS includes a table (Table 2-16)
identifying “Federally and State- listed aquatic species
that have a potential to occur along the new transmission line route. . . .”193 But the Staff reported that “it is
not known whether suitable habitat or populations of
species identified in Table 2-16 occur in portions of the
drainage that would be crossed by the proposed transmission route.”194 Again, rather than identifying the
species that the transmission corridor will impact and
the nature of the impacts, the FEIS defers the analysis
until some unknown future date, informing the reader
that “[t]he [Michigan Department of Environmental
Quality (“MDEQ”)] and/or USACE may require
191
Id. at 2-104.
Id. at 2-105.
193
Id. at 2-101, 2-126.
194
Id. at 2-126.
192
App. 89
surveys of the proposed transmission line corridor to
evaluate the presence of important species and habitat.”195 As with terrestrial species, the Staff failed to
explain why it did not require such surveys so that the
necessary information could have been included in the
FEIS.
The East Lansing Field Supervisor of the FWS, in
his comments on the DEIS, was unable to concur in the
Staff ’s conclusions regarding the impact of the transmission corridor on threatened and endangered species:
You have also made a determination of effects
for the 29.4 miles of proposed transmission
lines associated with the project. We are not
able to concur with your effects determinations for the proposed transmission lines at
this time. Your evaluation indicates that
terrestrial and/or aquatic surveys for listed
species will be conducted once the location of
the transmission line corridors have been
finalized. We will defer concurrence with
your determinations until corridor locations
are finalized and we have reviewed the results of future surveys. We also recommend
that future surveys include those for the Indiana bat and for listed mussel species at
stream crossings when the stream bottom is
to be disturbed. Future consultation should be
completed prior to submission of Michigan
Department of Environmental Quality and/
or the Army Corps of Engineers permit
195
Id. at 2-126.
App. 90
applications for stream crossings or wetland
fill associated with [46] the transmission line
towers.196
The FEIS also states that the NRC, in conjunction
with the USACE, chose to comply with the National
Historic Preservation Act (“NHPA”) through the NEPA
process.197 As the lead Federal Agency in this process,
the NRC has responsibility for determining potential
impacts on the cultural environment under NEPA and
on historic and cultural resources that may qualify for
the National Register of Historic Places (“NRHP”) under NHPA § 106.198 However, as with other impacts, the
FEIS fails to fully evaluate the impact of offsite transmission lines on these historic and cultural resources.
Despite acknowledgement that “[t]he proposed new
approximately 11 mi transmission line route . . . has
been assessed as having a moderate to high potential
for identifying archaeological resources . . . , no Phase
I cultural resource investigations were conducted” during DTE’s preparation of the ER.199 Though NRC subsequently conducted 106 consultations with interested
federal, state, and tribal entities, the NRC did not consult on the impact of offsite transmission lines because
it does not consider “the building of transmission lines
[to be] an NRC-authorized activity” and considers the
“proposed transmission lines to be outside the NRC’s
196
Id., app. F, at F-23.
Id. at 2-193.
198
Id. at 5-91.
199
Id. at 2-207.
197
App. 91
[area of potential effects].”200 Thus, the Staff states only
that there is an “approximately 11-mi portion of the
proposed offsite transmission line route [that] will require a new transmission line route and may result in
impacts on historic and/or cultural resources” that
“could be minor” or “could be greater.”201
Despite the lack of essential information in these
and other areas, the Staff concluded [47] that the environmental impacts of the transmission corridor would
be minimal. In large part, it relied on permits and certifications it assumed would be issued and enforced by
other federal and state agencies. For example, concerning impacts on federally and state-listed aquatic species, the Staff stated that
[b]uilding of offsite transmission lines could
affect Federally and State-listed organisms in
the vicinity of stream crossings in the same
ways as described in the previous section for
commercially and recreationally important
species. Additional regulatory review of proposed plans for construction of the needed
transmission lines, which would be built,
owned, and maintained by ITC Transmission,
may be conducted by the MDEQ and/or
USACE, and potential impacts on Federally
and State-listed aquatic species are expected
to be addressed through mitigation measures
200
201
Id. at 2-212.
Id. at 4-101 to 4-102.
App. 92
and [Best Management Practices (“BMPs”)]
required under issued permits.202
The Staff ’s conclusion that wetland impacts would
be “minimal” similarly relied on permits and mitigation it assumed would be required by other agencies:
A conceptual transmission line corridor has
been identified, but wetland delineation
surveys have not yet been conducted to determine the precise locations and extent of
wetlands. Permanent impacts on wetland
areas would be mitigated according to a wetland mitigation plan ITC Transmission would
develop in coordination with the MDEQ and/
or USACE, as necessary. Any mitigation
measures required for the impacts are expected to be determined by ITC Transmission
in coordination with applicable regulatory
agencies, which may include the MDEQ
and/or USACE, at the time permit applications are submitted.203
The Staff also stated:
Offsite hydrological alterations are associated
with the proposed new or expanded transmission line corridors where the lines cross
wetlands and drainages. The impacts of hydrological alterations resulting from both onsite and offsite construction activities would
be localized and reduced with the implementation of BMPs and mitigation measures
202
203
Id. at 4-56 (emphasis added).
Id. at 4-44 to 4-45 (emphasis added).
App. 93
required by the necessary permits and certifications. Any impacts on USACE jurisdictional
water resources associated with the compensatory mitigation construction activities proposed by Detroit Edison would be evaluated
by the USACE during its permit evaluation
process.204
[48] As to impacts on historic and cultural resources, the Staff declared that “any further investigations to identify the presence of cultural and historic
resources and to evaluate the NRHP-eligibility of such
resources would be the responsibility of ITC Transmission, who would conduct such investigations in accordance with applicable regulatory and industry
standards to assess impacts.”205
Based on the foregoing review of the FEIS, the
Board has identified the following probable deficiencies.
1.
Unavailable or Incomplete Information
The FEIS repeatedly states that the NRC lacked
the information necessary to fully evaluate the environmental impacts associated with offsite transmission lines. The FEIS failed to address CEQ’s NEPA
regulation requiring an agency to do more than simply
state that necessary information is unavailable206 –
204
Id. at 4-15 (emphasis added).
Id. at 4-102.
206
40 C.F.R. § 1502.22. The regulation requires an agency to
acquire the information that is lacking if it is “essential to a
205
App. 94
a regulation that “clearly contemplates original research if necessary.”207 A determination of minimal environmental impact would make little sense when an
agency lacks essential information and has not sought
to compile it through independent research. To rule
otherwise “would turn NEPA on its head, making ignorance into a powerful factor in favor of immediate action where the agency lacks sufficient data.”208 The [49]
FEIS makes no effort to explain why the NRC could
not obtain the information, spurning analysis in favor
of conclusory statements about the lack of environmental impact and assurances that any potential impacts will be remedied in the future. But, as the First
Circuit has stated, “[a] conclusory statement unsupported by . . . explanatory information of any kind not
only fails to crystallize issues, but affords no basis for
reasoned choice” and “costs of obtaining it are not exorbitant.” If
the costs are exorbitant, the regulation still requires the agency
to state that the information is unavailable, explain the relevance
of the unavailable information, summarize existing credible scientific evidence, and evaluate potential impacts.
207
Save Our Ecosystems v. Clark, 747 F.2d 1240, 1249 (9th
Cir. 1984) (“Federal agencies routinely either do their own studies
or commission studies of the particular area in which a proposed
project is to be located. Almost every EIS contains some original
research. And, almost every time an EIS is ruled inadequate by a
court it is because more data or research is needed.”). The court
cited district court interpretations that have imposed the same
NEPA requirement to conduct original research, if necessary. See,
e.g., Montgomery v. Ellis, 364 F. Supp. 517, 528 (N.D. Ala.1973)
(stating that “NEPA requires each agency to undertake research
needed adequately to expose environmental harms”).
208
Sierra Club v. Norton, 207 F. Supp. 2d 1310, 1334-35
(S.D. Ala. 2002).
App. 95
a comparison of the problems involved with the proposed project and the difficulties involved in the alternatives.”209
2.
Reliance on Anticipated Certifications
As previously described, the Staff assumed in the
FEIS that because the transmission corridor will require permits from various federal and state agencies,
the construction and operation of the transmission corridor will have only small or minimal impacts on wetlands, streams, and endangered or threatened species.
There is a significant question whether such blanket
reliance on predicted future action by other regulatory
agencies is sufficient to satisfy NEPA’s hard look requirement.
In Calvert Cliffs Coordinating Committee, Inc. v.
Atomic Energy Commission, the D.C. Circuit explained
why merely referencing an actual or anticipated certification by another agency fails to satisfy NEPA requirements:
Certification by another agency that its own
environmental standards are satisfied involves an entirely different kind of judgment
[from that required by NEPA]. Such agencies,
without overall responsibility for the particular federal action in question, attend only to
one aspect of the problem: the magnitude of
certain environmental costs. They simply
209
Silva v. Lynn, 482 F.2d 1282, 1285 (1st Cir. 1973) (citations omitted).
App. 96
determine whether those costs exceed an allowable amount. Their certification does not
mean that they found no environmental damage whatever. In fact, there may be significant
environmental damage (e.g., water pollution),
but not quite enough to violate applicable
(e.g., water quality) standards. Certifying
agencies do not attempt to weigh that damage
against the opposing benefits. Thus the balancing analysis remains to be done. It may be
that the environmental costs, though passing
prescribed standards, are nonetheless great
enough to outweigh the particular economic
and technical benefits involved in the planned
action. The only agency in a [50] position to
make such a judgment is the agency with
overall responsibility for the proposed federal
action-the agency to which NEPA is specifically directed.210
The D.C. Circuit’s analysis is fully applicable to
the present case. For example, the Staff assumed that
damage to wetlands and other jurisdictional waters of
the United States would be minimal because permits
from the Corps would be required. But the Corps’ regulations do not require that it reduce all impacts to a
minimal level. When reviewing an application for a 404
permit under the Clean Water Act, the Corps evaluates
whether the issuance of the permit is in the public interest, weighing all relevant factors, including economic, environmental, and aesthetic concerns.211 The
210
211
Calvert Cliffs, 449 F.2d at 1123.
33 C.F.R. §§ 320.4(a)(1), 323.3(g).
App. 97
Corps may not issue a permit if there exists a “practicable alternative . . . which would have less adverse
impact on the aquatic system,” the permit would cause
“significant degradation of the water of the United
States,” or “appropriate and practicable” mitigation
has not been undertaken.212 However, the regulations
governing Corps review do not require that mitigation
measures insure minimal environmental impacts, as
the FEIS seems to suggest.
Moreover, the NRC’s Part 51 regulations prohibit
such blanket reliance on Clean Water Act permits:
Compliance with the environmental quality
standards and requirements of the Federal
Water Pollution Control Act (imposed by EPA
or designated permitting states) is not a substitute for, and does not negate the requirement for NRC to weigh all environmental
effects of the proposed action, including the
degradation, if any, of water quality, and to
consider alternatives to the proposed action
that are available for reducing adverse effects.213
[51] The Staff ’s reliance on predicted future regulation is also similar to the argument that the D.C. Circuit rejected in New York v. NRC.214 The NRC argued
that its environmental assessment did not need to deal
with the potential impacts of leaks from spent fuel
212
40 C.F.R. §§ 230.10(a), (c), (d).
10 C.F.R. § 51.71(d) & n.3.
214
New York v. NRC, 681 F.3d at 481.
213
App. 98
pools because its monitoring and regulatory compliance program would prevent such leaks. The court
stated:
That argument . . . amounts to a conclusion
that leaks will not occur because the NRC is
“on duty.” With full credit to the Commission’s
considerable enforcement and inspection efforts, merely pointing to the compliance program is in no way sufficient to support a
scientific finding that spent-fuel pools will not
cause a significant environmental impact during the extended storage period.215
Similarly, in the FEIS, the Staff relied on compliance programs of other federal and state agencies to
support its findings that the impact of the transmission corridor upon environmental resources will be
small or minimal. Such blanket reliance is subject to
serious question.
3.
Inadequate Analysis of Mitigation
The FEIS’s limited discussion of mitigation suffers
from the same problem as its analysis of environmental consequences. Courts have held that an EIS must
include “a serious and thorough evaluation of environmental mitigation options.”216 “Mitigation must
be discussed in sufficient detail to ensure that
215
Id.
Miss. River Basin Alliance v. Westphal, 230 F.3d 170, 178
(5th Cir. 2000).
216
App. 99
environmental consequences have been fairly evaluated.”217 Rather than identifying and evaluating potential mitigation options, the FEIS merely assumes that
mitigation for the transmission corridor’s impacts to
wetlands, streams, and threatened and endangered
species will be adequately addressed in permit reviews
to be conducted by other agencies. As a result, the FEIS
fails to provide a detailed evaluation of potential mitigation [52] measures, as required, but only a series of
predictions that the issue will be adequately addressed
in other reviews.
4.
Conclusion
There is a serious question whether the analysis
of transmission corridor impacts in the FEIS satisfies
NEPA’s hard look requirement.
E. Sua Sponte Review is Warranted
We have explained that the two issues the Board
has identified raise serious factual and legal questions
regarding the Staff ’s compliance with NEPA. Those issues can readily be distinguished from those likely to
arise in the ordinary case. First, the Staff ’s failure to
include the transmission corridor as part of the proposed action significantly reduced its scope, both in
terms of the total area affected and the environmental
resources that would be impacted. The Staff effectively
eliminated from the proposal nearly half of the total
217
Id. at 176-77 (quoting Robertson, 490 U.S. at 352).
App. 100
acreage that will be affected by the entire project.218
The Staff ’s narrow definition also meant that potential
impacts to important environmental resources were
excluded from the scope of the proposed federal action.
For example, as EPA noted in its comments on the
FEIS, the construction and maintenance of the new
transmission lines and substations are estimated to
impact “over 1000 acres of habitat, including over 93
acres of impacts to forested wetlands.”219 The construction and maintenance of the new transmission lines
will also potentially impact streams, threatened and
endangered species, and historic and cultural resources. Given the size of the transmission corridor
and the environmental resources it will affect, the corridor clearly represents a major component of the environmental impact of the Fermi Unit 3 project.
[53] The Staff might have compensated for its narrow definition of the proposed action by including in
the FEIS a thorough analysis of the potential environmental impacts of the transmission corridor, as the
agency committed to do in the SOC.220 But the Staff
instead deferred major components of the required
analysis to other agencies that it assumed would eventually undertake the necessary surveys and develop
218
The FEIS estimates the total acreage of the transmission
corridor as 1069.2 acres. FEIS at 2-47 (Table 2-7). The Fermi site
as defined in the FEIS (which includes the entire property owned
by DTE, not just the site of Fermi Unit 3) is 1260 acres. FEIS at
2-5.
219
EPA Comments on FEIS at 1.
220
72 Fed. Reg. at 57417, 57421.
App. 101
appropriate mitigation – even though such regulatory
actions, even if they occur as predicted, may not take
place until after the COL is issued. This gives rise to
the problem that the rule against segmentation seeks
to avoid, “when the environmental impacts of projects
are evaluated in a piecemeal fashion and, as a result,
the comprehensive environmental impacts of the entire Federal action are never considered or are only
considered after the agency has committed itself to
continuation of the project.”221
The Appeal Board observed that “in inquiring on
its own initiative into the transmission line question,
that Board was discharging an important function assigned to it. Licensing boards have independent responsibilities in the realm of the enforcement of the
NEPA command; i.e., their role is not confined to the
arbitration of those environmental controversies as
may happen to have been placed before them by the
litigants in the particular case.222 Though this responsibility has changed – now requiring Commission approval before a board may exercise its responsibility –
the authority still exists, as the Commission has made
clear.223 This authority [54] cannot reasonably be
221
72 Fed. Reg. at 57427-28.
Tenn. Valley Auth. (Hartsville Nuclear Power Plant,
Units 1A, 2A, 1B & 2B) ALAB-380, 5 NRC 572, 575 (1977).
223
Cincinnati Gas & Electric Co. (William H. Zimmer Nuclear Power Station, Unit 1), CLI-82-20, 16 NRC 109 (1982). The
Appeal Board has likewise stressed the need for licensing boards
to judiciously exercise the sua sponte authority when faced with
a serious, and unraised, issue. La. Power & Light Co. (Waterford
Steam Electric Station, Unit 3), ALAB-732, 17 NRC 1076 1111222
App. 102
limited to only a situation which “involves a significant
environmental impact of a type not considered previously” and “could destabilize an environmental resource or . . . involve[s] severe adverse environmental
impacts.”224 A serious environmental issue also exists
when an FEIS only cursorily deals with important environmental issues and concludes that impacts will be
small based largely on unavailable and incomplete information and predicted future certifications from
other agencies. A serious issue is also presented when
the Staff ’s NEPA analysis significantly understates
the scope of the proposed federal action, particularly
when it does so on a basis that conflicts with the law of
the federal judicial circuit where the new facility will
be located. Moreover, as justification for the agency’s
rule change excluding transmission lines and other
pre-construction activities from the scope of its proposed action, the NRC committed that “the effects of
the non-Federal activities would be considered during
any subsequent ‘cumulative impacts’ analysis.”225 It is
at least questionable whether the Staff ’s analysis of
the impact of offsite transmission lines satisfies this
commitment. The Staff ’s alleged failure to live up to a
commitment the NRC made to justify a significant
change in policy is a serious issue that a board should
be permitted to address.
12 (1983) (noting that Zimmer should not be read to present an
“insurmountable barrier” to the exercising of sua sponte authority).
224
Applicant Brief at 9.
225
72 Fed. Reg. at 57417.
App. 103
Although the FEIS may be deficient in significant
respects, a contested hearing may enable the Board to
cure those deficiencies and thus bring the agency into
compliance with NEPA and 10 C.F.R. Part 51. “Boards
frequently hold hearings on contentions challenging
the staff ’s final environmental review documents. . . .
In such cases, ‘[t]he adjudicatory record and Board decision (and . . . any Commission appellate decisions)
become, in effect, part of the FEIS.’ ”226 Thus, the Staff ’s
FEIS, along with the adjudicatory record, becomes the
relevant [55] record of decision for the environmental
portion of the proceeding.227 Federal courts of appeal
have approved of this process in which an EIS is effectively amended through the adjudicatory process.228
The Board’s review would encompass all pertinent information properly before it, including the FEIS and
the witness testimony and exhibits that were received
into evidence at the evidentiary hearing. The Board
would base its decision on whether the FEIS complies
with NEPA on those sources of information, and that
226
Nuclear Innovation N. Am. LLC (S. Tex. Project, Units 3
& 4) CLI-11-06, 74 NRC 203, 208-09 (2011) (citing Claiborne, CLI98-3, 47 NRC at 89 and Phila. Electric Co. (Limerick Generating
Station, Units 1 & 2), ALAB-819, 22 NRC 681, 705-07 (1985)).
227
See, e.g., Pac. Gas & Electric Co. (Diablo Canyon Power
Plant Indep. Spent Fuel Storage Installation), CLI-08-26, 68 NRC
509, 526 (2008), petition for review denied on other grounds, San
Luis Obispo Mothers for Peace v. NRC, 635 F.3d 1109 (9th Cir.
2011).
228
New England Coal. on Nuclear Pollution v. NRC, 582
F.2d 87, 93-94 (1st Cir. 1978); Citizens for Safe Power, 524 F.2d
at 1294 n.5. See also Ecology Action v. Atomic Energy Comm’n,
492 F.2d 998, 1001-02 (2d Cir. 1974).
App. 104
decision, along with the rest of the record for this proceeding, would in effect become part of the FEIS.
The Staff and DTE maintain, however, that if any
further inquiry needs to be made concerning the issue
raised by Contention 23, it should be made by the Commission during the mandatory hearing (also referred
to as an “uncontested hearing”) rather than in a contested hearing.229 But the mandatory hearing ordinarily takes place at the end of the licensing proceeding.230
If the FEIS is found deficient at that point, the need to
cure the deficiencies through amendment of the FEIS
could substantially delay the licensing process. The
Board, by contrast, can minimize the potential delay
by taking up the issue as soon as the Commission authorizes sua sponte review.231
[56] Furthermore, the uncontested hearing, unlike
a contested hearing, would make it more difficult to
cure deficiencies in the FEIS through the hearing process. Although several federal courts of appeal have
229
See Staff Response at 3, 12-16; Applicant Brief at 2 n.5.
The Staff’s target for completing the FSER is July 2015,
so the mandatory hearing will not take place before mid-2015 at
the earliest. Application Review Schedule, http://www.nrc.gov/
reactors/new-reactors/col/fermi/review-schedule.html.
231
In Zimmer, the Commission ordered a Licensing Board
not to exercise sua sponte authority because the Commission had
already initiated an “ongoing investigation” to deal with the issues raised. Zimmer, CLI-82-20, 16 NRC at 110. Here, by contrast, the NRC Staff has completed the FEIS, it has provided no
indication of any intent to revise the document, and the Commission has not instructed the Staff to reconsider the transmission
line issue.
230
App. 105
accepted that a contested hearing may cure deficiencies in the FEIS,232 no court of appeals has given the
same effect to an uncontested hearing. The function of
the uncontested hearing is only to review the adequacy
of the Staff ’s work, not to make a de novo inquiry into
NEPA issues.233 Thus, an uncontested hearing would
make it more difficult to cure deficiencies in the FEIS
by, for example, developing relevant information on the
environmental impacts of the transmission corridor
that the Staff omitted.
In addition, the uncontested hearing excludes
public participation in the review of the FEIS. Because
“[t]he scope of the Intervenors’ participation in adjudications is limited to their admitted contentions,” they
are “barred from participation in the uncontested portion of the hearing.”234 Thus, unlike contested proceedings, there is no public participation in an uncontested
(i.e., mandatory) hearing. The only participants would
be DTE and the Staff, with no opportunity for the Intervenors to offer evidence or to argue their position.
Thus, in substance, the Staff and DTE would limit any
further inquiry to a hearing in which they will participate but from which the Intervenors will be excluded.
But public participation is essential to the justification for allowing amendment of an FEIS through an
agency hearing. In the Limerick licensing proceeding,
232
See supra note 228 and accompanying text.
Dominion Nuclear N. Anna, LLC (Early Site Permit for
N. Anna ESP Site), CLI-05-17, 62 NRC 5, 35-36, 39 (2005).
234
Id. at 49.
233
App. 106
the Appeal Board had to determine whether the
presiding officer’s findings and conclusions modified
the FEIS in the absence of the agency regulation
that had previously required that they be given that
effect.235 The NRC’s NEPA regulations require a request for public comment on a DEIS and a [57] supplement to a DEIS distributed in accordance with 10
C.F.R. § 51.74,236 and on any supplement to the FEIS
prepared pursuant to 10 C.F.R. § 51.92(a) or (b).237 The
intervenor in the Limerick proceeding therefore argued that “NEPA’s purpose in providing the opportunity for public comment on an environmental
statement [would be] thwarted by board amendment
of an [FEIS].”238 The Appeal Board disagreed because
the licensing board’s hearing “arguably allows for additional and a more rigorous public scrutiny of the
[FEIS] than does the usual ‘circulation for comment.’ ”239 Given that the opportunity for rigorous public scrutiny of the FEIS was essential to the Appeal
Board’s decision that the FEIS could be amended
through the hearing process, eliminating such public
participation would weaken the rationale of that determination.
If the FEIS violates NEPA and Part 51, the Intervenors’ failure to file Contention 23 in response to
DTE’s ER will not excuse the agency’s violation. The
235
Id.
10 C.F.R. § 51.73.
237
Id. § 51.92(f)(1).
238
Limerick, ALAB-819, 22 NRC at 707.
239
Id.
236
App. 107
“primary responsibility for compliance with NEPA lies
with the Commission.”240 The issues here concern the
scope of the FEIS and its failure to adequately assess
the environmental impacts of a critical component of
the Fermi 3 project, basic issues that the Staff must
correctly evaluate whether or not they were raised by
Intervenors.241 Moreover, Intervenors previously notified the NRC of their concern by filing proposed Contention 23 in response to the DEIS. EPA raised the
same concern, arguing that the environmental impacts
of the transmission corridor should have been evaluated as direct effects of the proposed action. And the
Board itself raised the same issue in its ruling [58]
holding that the DEIS version of Contention 23 was
untimely.242 The Staff therefore had both the legal obligation to correctly define the scope of the FEIS and
ample notice that Intervenors, the EPA, and the Board
questioned whether the Staff had adequately fulfilled
that obligation. Thus, if Intervenors are correct that
the Staff should have analyzed the transmission corridor as a connected action and that the FEIS is materially deficient, Intervenors’ failure to file Contention 23
in response to the Applicant’s ER will not excuse the
agency’s potential violation of NEPA and Part 51.243
240
New York v. NRC, 681 F.3d at 482 (citing Pub. Citizen,
541 U.S. at 764). Accord Pa’ina Haw., LLC (Materials License Application), CLI-10-18, 72 NRC 56, 82 (2010).
241
See 10 C.F.R. § 51.29(a)(1).
242
See supra Section I(E).
243
See Vt. Dep’t of Pub. Serv. v. United States, 684 F.3d 149,
156 (D.C. Cir. 2012) (stating that, in an action under the Hobbs
Act for review of an NRC final order, exhaustion of remedies is
not a jurisdictional requirement).
App. 108
It would therefore be in the public interest to address
the issues now rather than postponing their resolution
indefinitely.
III.
CONCLUSION
For these reasons, the Board determines that sua
sponte review of the two issues previously described is
warranted and respectfully requests that the Commission authorize such review.
THE ATOMIC SAFETY
AND LICENSING BOARD
/RA/
Ronald M. Spritzer, Chairman
ADMINISTRATIVE JUDGE
/RA/
Dr. Anthony J. Baratta
ADMINISTRATIVE JUDGE
/RA/
Dr. Randall J. Charbeneau
ADMINISTRATIVE JUDGE
R