Federal Register / Vol. 71, No. 227 / Monday, November 27, 2006 / Notices

DEPARTMENT OF ENERGY

Federal Energy Regulatory

Commission

[Project Nos. 12688–000, 12689–000, 12690–

000, and 12692–000]

Public Utility District No. 1 of

Snohomish County, WA; Notice

Granting Late Intervention

November 16, 2006.

On June 22, 2006, the Commission

issued a notice in each above-captioned

proceeding of the preliminary permit

application filed by Public Utility

District No. 1 of Snohomish County,

Washington, in the proceeding.1 The

notices established August 21, 2006, as

the deadline for filing motions to

intervene.

On August 23 and 28, 2006,

respectively, the Tulalip Tribes and the

Whidbey Environmental Action

Network filed late motions to intervene

in the proceedings. Granting the

motions to intervene will not unduly

delay or disrupt the proceedings, or

prejudice other parties to them.

Therefore, pursuant to Rule 214,2 the

motions to intervene filed by the Tulalip

Tribes and Whidbey Environmental

Action Network are granted, subject to

the Commission’s rules and regulations.

Magalie R. Salas,

Secretary.

[FR Doc. E6–19924 Filed 11–24–06; 8:45 am]

DEPARTMENT OF ENERGY

Federal Energy Regulatory

Commission

[Project Nos. 12689–000, 12692–000]

Public Utility District No. 1 of

Snohomish County, WA; Notice

Granting Late Intervention

November 16, 2006.

sroberts on PROD1PC70 with NOTICES

On June 22, 2006, the Commission

issued separate notices of the

preliminary permit applications filed by

Public Utility District No. 1 of

Snohomish County, Washington, for the

1 The applications seek separate preliminary

permits for: (1) The Rich Passage Tidal Energy

Project No. 12688, to be located in Rich Passage in

Puget Sound, Kitsap County, Washington; (2) the

Spieden Channel Tidal Energy Project No. 12689,

to be located in Spieden Channel in San Juan

County, Washington; (3) the Admiralty Inlet Tidal

Energy Project No. 12690, to be located in

Admiralty Inlet in Jefferson, Kitsap, and Island

Counties, Washington; and (4) the San Juan

Channel Tidal Energy Project No. 12692, to be

located in San Juan Channel in San Juan County,

Washington.

2 18 CFR 385.214 (2006).

16:58 Nov 24, 2006

Magalie R. Salas,

Secretary.

[FR Doc. E6–19925 Filed 11–24–06; 8:45 am]

BILLING CODE 6717–01–P

DEPARTMENT OF ENERGY

Federal Energy Regulatory

Commission

[Project No. 12698–000]

Public Utility District No. 1 of

Snohomish County, WA; Notice

Granting Late Intervention

November 16, 2006.

BILLING CODE 6717–01–P

VerDate Aug<31>2005

Spieden Channel Tidal Energy Project

No. 12689, to be located in Spieden

Channel in San Juan County,

Washington, and the San Juan Channel

Tidal Energy Project No. 12692, to be

located in San Juan Channel in San Juan

County, Washington. The notices

established August 21, 2006, as the

deadline for filing motions to intervene.

On August 24, 2006, Pomona Grange

#50 San Juan County, Washington, filed

a late motion to intervene in the

proceedings.1 Granting the motion to

intervene will not unduly delay or

disrupt the proceedings, or prejudice

other parties to them. Therefore,

pursuant to Rule 214,2 the motion to

intervene filed by the Pomona Grange

#50 San Juan County, Washington, is

granted, subject to the Commission’s

rules and regulations.

Jkt 211001

On July 3, 2006, the Commission

issued a notice of the application for

preliminary permit filed by Public

Utility District No. 1 of Snohomish

County, Washington, for the Guemes

Channel Tidal Energy Project No. 12698,

to be located in Guemes Channel in San

Juan County, Washington. The notice

established September 1, 2006 as the

deadline for filing motions to intervene.

On September 22, 2006, the City of

Anacortes, Washington, filed a late

motion to intervene in the proceeding.

Granting the motion to intervene will

not unduly delay or disrupt the

proceeding, or prejudice other parties to

it. Therefore, pursuant to Rule 214,1 the

motion to intervene filed by the City of

1 Pomona Grange #50 San Juan County,

Washington, filed its motion at 5:54 p.m. on August

23, 2006. Pursuant to 18 CFR 385.2001(a)(2)(2006),

any document received after regular business hours

is considered filed on the next business day. The

Commission’s regular business hours end at 5 p.m.,

U.S. Eastern Time. See http://www.ferc.gov/contactus/build-access.asp. See also, 18 CFR

375.101(c)(the offices of the Commission are open

each day, except Saturdays, Sundays, and Holidays,

from 8:30 a.m. to 5 p.m.)

2 18 CFR 385.214 (2006).

1 18 CFR 385.214 (2006).

PO 00000

Frm 00065

Fmt 4703

Sfmt 4703

68593

Anacortes, Washington, is granted,

subject to the Commission’s rules and

regulations.

Magalie R. Salas,

Secretary.

[FR Doc. E6–19926 Filed 11–24–06; 8:45 am]

BILLING CODE 6717–01–P

DEPARTMENT OF ENERGY

Federal Energy Regulatory

Commission

[Docket Nos. ER07–30–000; ER07–30–001]

RC Cape May Holdings, LLC; Notice Of

Issuance Of Order

November 17, 2006.

RC Cape May Holding, LLC (RC Cape

May) filed an application for marketbased rate authority, with an

accompanying rate schedule. The

proposed market-based rate schedule

provides for the sale of energy, capacity

and ancillary services at market-based

rates. RC Cape May also requested

waivers of various Commission

regulations. In particular, RC Cape May

requested that the Commission grant

blanket approval under 18 CFR Part 34

of all future issuances of securities and

assumptions of liability by RC Cape

May.

On November 16, 2006, pursuant to

delegated authority, the Director,

Division of Tariffs and Market

Development—West, granted the

requests for blanket approval under Part

34. The Director’s order also stated that

the Commission would publish a

separate notice in the Federal Register

establishing a period of time for the

filing of protests. Accordingly, any

person desiring to be heard or to protest

the blanket approvals of issuances of

securities or assumptions of liability by

Cape May should file a motion to

intervene or protest with the Federal

Energy Regulatory Commission, 888

First Street, NE., Washington, DC 20426,

in accordance with Rules 211 and 214

of the Commission’s Rules of Practice

and Procedure. 18 CFR 385.211, 385.214

(2004).

Notice is hereby given that the

deadline for filing motions to intervene

or protest is December 18, 2006.

Absent a request to be heard in

opposition by the deadline above, RC

Cape May is authorized to issue

securities and assume obligations or

liabilities as a guarantor, indorser,

surety, or otherwise in respect of any

security of another person; provided

that such issuance or assumption is for

some lawful object within the corporate

purposes of RC Cape May, compatible

E:\FR\FM\27NON1.SGM

27NON1

68594

Federal Register / Vol. 71, No. 227 / Monday, November 27, 2006 / Notices

with the public interest, and is

reasonably necessary or appropriate for

such purposes.

The Commission reserves the right to

require a further showing that neither

public nor private interests will be

adversely affected by continued

approvals of RC Cape May’s issuance of

securities or assumptions of liability.

Copies of the full text of the Director’s

Order are available from the

Commission’s Public Reference Room,

888 First Street, NE., Washington, DC

20426. The Order may also be viewed

on the Commission’s Web site at http://

www.ferc.gov, using the eLibrary link.

Enter the docket number excluding the

last three digits in the docket number

filed to access the document.

Comments, protests, and interventions

may be filed electronically via the

internet in lieu of paper. See 18 CFR

385.2001(a)(1)(iii) and the instructions

on the Commission’s web site under the

‘‘e-Filing’’ link. The Commission

strongly encourages electronic filings.

Magalie R. Salas,

Secretary.

[FR Doc. E6–19943 Filed 11–24–06; 8:45 am]

BILLING CODE 6717–01–P

DEPARTMENT OF ENERGY

Federal Energy Regulatory

Commission

[Docket No. RP07–60–000]

Southern Star Central Gas Pipeline,

Inc.; Notice of Filing of Operational

Flow Order Penalty Report

sroberts on PROD1PC70 with NOTICES

November 16, 2006.

Take notice that on November 9,

2006, Southern Star Central Gas

Pipeline, Inc. (Southern Star) tendered

for filing, pursuant to Section 10.3 of the

General Terms and Conditions of its

FERC Gas Tariff, its report of

Operational Flow Order (OFO) penalty

revenues and refunds.

Southern Star states that pursuant to

the Operational Flow Order mechanism

contained in Section 10 of the General

Terms and Conditions of Southern

Star’s tariff, they did not issue any

OFOs. Therefore no penalties were

assessed or collected and no refunds are

required for the twelve-month period

ending September 30, 2006.

Southern Star states that copies of the

filing were served on all jurisdictional

customers and interested state

commissions.

Any person desiring to intervene or to

protest this filing must file in

accordance with Rules 211 and 214 of

the Commission’s Rules of Practice and

VerDate Aug<31>2005

16:58 Nov 24, 2006

Jkt 211001

Procedure (18 CFR 385.211 and

385.214). Protests will be considered by

the Commission in determining the

appropriate action to be taken, but will

not serve to make protestants parties to

the proceeding. Any person wishing to

become a party must file a notice of

intervention or motion to intervene, as

appropriate. Such notices, motions, or

protests must be filed on or before the

date as indicated below. Anyone filing

an intervention or protest must serve a

copy of that document on the Applicant.

Anyone filing an intervention or protest

on or before the intervention or protest

date need not serve motions to intervene

or protests on persons other than the

Applicant.

The Commission encourages

electronic submission of protests and

interventions in lieu of paper using the

‘‘eFiling’’ link at http://www.ferc.gov.

Persons unable to file electronically

should submit an original and 14 copies

of the protest or intervention to the

Federal Energy Regulatory Commission,

888 First Street, NE., Washington, DC

20426.

This filing is accessible online at

http://www.ferc.gov, using the

‘‘eLibrary’’ link and is available for

review in the Commission’s Public

Reference Room in Washington, DC.

There is an ‘‘eSubscription’’ link on the

Web site that enables subscribers to

receive e-mail notification when a

document is added to a subscribed

docket(s). For assistance with any FERC

Online service, please e-mail

FERCOnlineSupport@ferc.gov, or call

(866) 208–3676 (toll free). For TTY, call

(202) 502–8659.

Intervention and Protest Date: 5 p.m.

Eastern Time, November 24, 2006.

Magalie R. Salas,

Secretary.

[FR Doc. E6–19930 Filed 11–24–06; 8:45 am]

BILLING CODE 6717–01–P

DEPARTMENT OF ENERGY

Federal Energy Regulatory

Commission

[Docket No. EF07–4011–000]

Southwestern Power Administration;

Notice of Filing

November 15, 2006.

Take notice that on October 2, 2006,

the Deputy Secretary, U.S. Department

of Energy, pursuant to the authority

vested in the Deputy Secretary by

sections 301(b), 302(a), 402(e), 641, 642,

643, and 644, of the Department of

Energy Organization Act (Pub. L. 95–91)

and by Delegation Order Nos. 00–

PO 00000

Frm 00066

Fmt 4703

Sfmt 4703

037.000, effective December 21, 2001,

and 00.001–00B, effective July 28, 2005,

submitted for confirmation and

approval on an interim basis, Rate Order

No. SWPA–56, along with the following

Southwestern Power Administration

Integration System Rates: Rate Schedule

P–06—Wholesale Rates for Hydro

Peaking Power, Rate Schedule NFTS–

06—Wholesale Rates for Non-Federal

Transmission/Interconnection Facilities

Service, and Rate Schedule EE–06—

Wholesale Rate for Excess Energy,

effective October 1, 2006 through

September 30, 2010.

Any person desiring to intervene or to

protest this filing must file in

accordance with Rules 211 and 214 of

the Commission’s Rules of Practice and

Procedure (18 CFR 385.211, 385.214).

Protests will be considered by the

Commission in determining the

appropriate action to be taken, but will

not serve to make protestants parties to

the proceeding. Any person wishing to

become a party must file a notice of

intervention or motion to intervene, as

appropriate. Such notices, motions, or

protests must be filed on or before the

comment date. On or before the

comment date, it is not necessary to

serve motions to intervene or protests

on persons other than the Applicant.

The Commission encourages

electronic submission of protests and

interventions in lieu of paper using the

‘‘eFiling’’ link at http://www.ferc.gov.

Persons unable to file electronically

should submit an original and 14 copies

of the protest or intervention to the

Federal Energy Regulatory Commission,

888 First Street, NE., Washington, DC

20426.

This filing is accessible on-line at

http://www.ferc.gov, using the

‘‘eLibrary’’ link and is available for

review in the Commission’s Public

Reference Room in Washington, DC.

There is an ‘‘eSubscription’’ link on the

Web site that enables subscribers to

receive e-mail notification when a

document is added to a subscribed

docket(s). For assistance with any FERC

Online service, please e-mail

FERCOnlineSupport@ferc.gov, or call

(866) 208–3676 (toll free). For TTY, call

(202) 502–8659.

Comment Date: 5 p.m. Eastern Time

on November 24, 2006.

Magalie R. Salas,

Secretary.

[FR Doc. E6–19917 Filed 11–24–06; 8:45 am]

BILLING CODE 6717–01–P

E:\FR\FM\27NON1.SGM

27NON1