Federal Register / Vol. 70, No. 248 / Wednesday, December 28, 2005 / Notices

Agency decision

Ask Donna

What actually matters in this document.

Text

76796

Federal Register / Vol. 70, No. 248 / Wednesday, December 28, 2005 / Notices

DEPARTMENT OF ENERGY

DEPARTMENT OF ENERGY

Federal Energy Regulatory

Commission

Federal Energy Regulatory

Commission

[Docket No. ER06–143–000]

[Docket No. ER02–1021–006]

Pepperell Realty, LLC; Notice of

Issuance of Order

Ontario Energy Trading International

Corporation; Notice of Filing

December 16, 2005.

wwhite on PROD1PC65 with NOTICES

December 19, 2005.

Take notice that on December 1, 2005,

Ontario Energy Trading International

Corporation (Ontario Energy) tendered

for filing developments constituting a

non-material change in status related to

market rate authority. Ontario Energy

states this is pursuant to Order No. 652.

Any person desiring to intervene or to

protest this filing must file in

accordance with Rules 211 and 214 of

the Commission’s Rules of Practice and

Procedure (18 CFR 385.211, 385.214).

Protests will be considered by the

Commission in determining the

appropriate action to be taken, but will

not serve to make protestants parties to

the proceeding. Any person wishing to

become a party must file a notice of

intervention or motion to intervene, as

appropriate. Such notices, motions, or

protests must be filed on or before the

comment date. Anyone filing a motion

to intervene or protest must serve a copy

of that document on the Applicant and

all the parties in this proceeding.

The Commission encourages

electronic submission of protests and

interventions in lieu of paper using the

‘‘eFiling’’ link at http://www.ferc.gov.

Persons unable to file electronically

should submit an original and 14 copies

of the protest or intervention to the

Federal Energy Regulatory Commission,

888 First Street, NE., Washington, DC

20426.

This filing is accessible on-line at

http://www.ferc.gov, using the

‘‘eLibrary’’ link and is available for

review in the Commission’s Public

Reference Room in Washington, DC.

There is an ‘‘eSubscription’’ link on the

Web site that enables subscribers to

receive e-mail notification when a

document is added to a subscribed

docket(s). For assistance with any FERC

Online service, please e-mail

FERCOnlineSupport@ferc.gov, or call

(866) 208–3676 (toll free). For TTY, call

(202) 502–8659.

Comment Date: 5 p.m. eastern time on

December 27, 2005.

Magalie R. Salas,

Secretary.

[FR Doc. E5–7918 Filed 12–27–05; 8:45 am]

BILLING CODE 6717–01–P

VerDate Aug<31>2005

17:37 Dec 27, 2005

Jkt 208001

Pepperell Realty, LLC (Pepperell)

filed an application for market-based

rate authority, with an accompanying

rate tariff. The proposed rate tariff

provides for the sales of energy and

capacity at market-based rates.

Pepperell also requested waiver of

various Commission regulations. In

particular, Pepperell requested that the

Commission grant blanket approval

under 18 CFR Part 34 of all future

issuances of securities and assumptions

of liability by Pepperell.

On December 13, 2005, pursuant to

delegated authority, the Director,

Division of Tariffs and Market

Development—South, granted the

request for blanket approval under Part

34. The Director’s order also stated that

the Commission would publish a

separate notice in the Federal Register

establishing a period of time for the

filing of protests. Accordingly, any

person desiring to be heard or to protest

the blanket approval of issuances of

securities or assumptions of liability by

Liberty Power New York and Liberty

Power District should file a motion to

intervene or protest with the Federal

Energy Regulatory Commission, 888

First Street, NE., Washington, DC 20426,

in accordance with Rules 211 and 214

of the Commission’s Rules of Practice

and Procedure. 18 CFR 385.211, 385.214

(2004).

Notice is hereby given that the

deadline for filing motions to intervene

or protest is January 12, 2006.

Absent a request to be heard in

opposition by the deadline above,

Liberty Power New York and Liberty

Power District are authorized to issue

securities and assume obligations or

liabilities as a guarantor, indorser,

surety, or otherwise in respect of any

security of another person; provided

that such issuance or assumption is for

some lawful object within the corporate

purposes of Liberty Power New York

and Liberty Power District, compatible

with the public interest, and is

reasonably necessary or appropriate for

such purposes.

The Commission reserves the right to

require a further showing that neither

public nor private interests will be

adversely affected by continued

approval of Liberty Power New York’s

PO 00000

Frm 00062

Fmt 4703

Sfmt 4703

and Liberty Power District’s issuances of

securities or assumptions of liability.

Copies of the full text of the Director’s

Order are available from the

Commission’s Public Reference Room,

888 First Street, NE., Washington, DC

20426. The Order may also be viewed

on the Commission’s Web site at

http://www.ferc.gov, using the eLibrary

link. Enter the docket number excluding

the last three digits in the docket

number filed to access the document.

Comments, protests, and interventions

may be filed electronically via the

internet in lieu of paper. See, 18 CFR

385.2001(a)(1)(iii) and the instructions

on the Commission’s Web site under the

‘‘e-Filing’’ link. The Commission

strongly encourages electronic filings.

Magalie R. Salas,

Secretary.

[FR Doc. E5–7906 Filed 12–27–05; 8:45 am]

BILLING CODE 6717–01–P

DEPARTMENT OF ENERGY

Federal Energy Regulatory

Commission

[Docket No. RP05–525–003]

Tennessee Gas Pipeline Company;

Notice of Refund Report

December 20, 2005.

Take notice that on December 14,

2005, Tennessee Gas Pipeline Company

(Tennessee) tendered for filing with the

Commission its Statement of Refunds

Report (Refund Report), which reflects

refunds owed to shippers for

Tennessee’s collection of the GSR

interruptible transportation surcharge.

Tennessee states that the Refund

Report includes: (a) Schedule 1

reflecting the name of each shipper

receiving a refund, the GSR revenue

contributed by each applicable shipper,

the principal amount owed to each

applicable shipper, and the total interest

on each principal refund amount; and

(b) Schedule 2, which illustrates the

calculation of interest.

Any person desiring to protest this

filing must file in accordance with Rule

211 of the Commission’s Rules of

Practice and Procedure (18 CFR

385.211). Protests to this filing will be

considered by the Commission in

determining the appropriate action to be

taken, but will not serve to make

protestants parties to the proceeding.

Such protests must be filed on or before

the date as indicated below. Anyone

filing a protest must serve a copy of that

document on all the parties to the

proceeding.

E:\FR\FM\28DEN1.SGM

28DEN1

Federal Register / Vol. 70, No. 248 / Wednesday, December 28, 2005 / Notices

The Commission encourages

electronic submission of protests in lieu

of paper using the ‘‘eFiling’’ link at

http://www.ferc.gov. Persons unable to

file electronically should submit an

original and 14 copies of the protest to

the Federal Energy Regulatory

Commission, 888 First Street, NE.,

Washington, DC 20426.

This filing is accessible On-line at

http://www.ferc.gov, using the

‘‘eLibrary’’ link and is available for

review in the Commission’s Public

Reference Room in Washington, DC.

There is an ‘‘eSubscription’’ link on the

Web site that enables subscribers to

receive e-mail notification when a

document is added to a subscribed

docket(s). For assistance with any FERC

Online service, please e-mail

FERCOnlineSupport@ferc.gov, or call

(866) 208–3676 (toll free). For TTY, call

(202) 502–8659.

Comment Date: 5 p.m. eastern time on

December 28, 2005.

Magalie R. Salas,

Secretary.

[FR Doc. E5–7928 Filed 12–27–05; 8:45 am]

BILLING CODE 6717–01–P

DEPARTMENT OF ENERGY

Federal Energy Regulatory

Commission

[Docket No. CP06–36–000]

Texas Gas Transmission, LLC; Notice

of Application

wwhite on PROD1PC65 with NOTICES

December 16, 2005.

Take notice that on December 12,

2005, Texas Gas Transmission, LLC

(Texas Gas), 3800 Frederica Street,

Owensboro, Kentucky 42301, filed with

the Federal Energy Regulatory

Commission an application under

section 7(b) of the Natural Gas Act to

abandon by sale to Natural Gas Pipeline

Company of America (NGPL) certain

supply lateral facilities and

appurtenances consisting of the NGPLLowery Receipt Meter Station and the

Lowery-NGPL 10-inch diameter tie-over

pipeline, located near Mile 11.16 on the

Roanoke-Grand Cheniere 12-inch and

20-inch diameters pipeline system, in

Cameron Parish, Louisiana, all as more

fully set forth in the application which

is on file with the Commission and open

to public inspection. This filing may be

also viewed on the Web at http://

www.ferc.gov using the ‘‘eLibrary’’ link.

Enter the docket number excluding the

last three digits in the docket number

field to access the document. For

assistance, please contact FERCOnline

Support at

VerDate Aug<31>2005

17:37 Dec 27, 2005

Jkt 208001

FERCOnlineSupport@ferc.gov or toll

free at (866) 208–3676, or TTY, contact

(202) 502–8659.

Any questions regarding this

application should be directed to Kathy

D. Fort, Manager of Certificates and

Tariffs, Texas Gas Transmission, LLC,

P.O. Box 20008, Owensboro, Kentucky,

42304, at (270) 688–6825.

There are two ways to become

involved in the Commission’s review of

this project. First, any person wishing to

obtain legal status by becoming a party

to the proceedings for this project

should, on or before the comment date

stated below, file with the Federal

Energy Regulatory Commission, 888

First Street, NE., Washington, DC 20426,

a motion to intervene in accordance

with the requirements of the

Commission’s Rules of Practice and

Procedure (18 CFR 385.214 or 385.211)

and the Regulations under the NGA (18

CFR 157.10). A person obtaining party

status will be placed on the service list

maintained by the Secretary of the

Commission and will receive copies of

all documents filed by the applicant and

by all other parties. A party must submit

14 copies of filings made with the

Commission and must mail a copy to

the applicant and to every other party in

the proceeding. Only parties to the

proceeding can ask for court review of

Commission orders in the proceeding.

However, a person does not have to

intervene in order to have comments

considered. The second way to

participate is by filing with the

Secretary of the Commission, as soon as

possible, an original and two copies of

comments in support of or in opposition

to this project. The Commission will

consider these comments in

determining the appropriate action to be

taken, but the filing of a comment alone

will not serve to make the filer a party

to the proceeding. The Commission’s

rules require that persons filing

comments in opposition to the project

provide copies of their protests only to

the party or parties directly involved in

the protest.

Persons who wish to comment only

on the environmental review of this

project should submit an original and

two copies of their comments to the

Secretary of the Commission.

Environmental commenters will be

placed on the Commission’s

environmental mailing list, will receive

copies of the environmental documents,

and will be notified of meetings

associated with the Commission’s

environmental review process.

Environmental commenters will not be

required to serve copies of filed

documents on all other parties.

However, the non-party commenters

PO 00000

Frm 00063

Fmt 4703

Sfmt 4703

76797

will not receive copies of all documents

filed by other parties or issued by the

Commission (except for the mailing of

environmental documents issued by the

Commission) and will not have the right

to seek court review of the

Commission’s final order.

The Commission strongly encourages

electronic filings of comments, protests

and interventions via the Internet in lieu

of paper. See, 18 CFR 385.2001(a)(1)(iii)

and the instructions on the

Commission’s Web site (www.ferc.gov)

under the ‘‘e-Filing’’ link.

Comment Date: January 6, 2006.

Magalie R. Salas,

Secretary.

[FR Doc. E5–7905 Filed 12–27–05; 8:45 am]

BILLING CODE 6717–01–P

DEPARTMENT OF ENERGY

Federal Energy Regulatory

Commission

[Docket No. CP06–34–000]

Transcontinental Gas Pipe Line

Corporation; Notice of Filing

December 16, 2005.

Take notice that on December 7, 2005,

Transcontinental Gas Pipe Line

Corporation (Transco), Post Office Box

1396, Houston, Texas 77251, filed an

abbreviated application, pursuant to

Section 7(c) of the Natural Gas Act

(NGA) and Part 157 of the Commission’s

Rules and Regulations for a certificate of

public convenience and necessity

authorizing Transco to construct and

operate its Leidy to Long Island

Expansion Project (Project). The Project

is an expansion of Transco’s existing

pipeline system under which Transco

will provide 100,000 dekatherms per

day (dt/day) of incremental firm

transportation service to KeySpan Gas

East Corporation (KeySpan).

The application is on file with the

Commission and open for public

inspection. This filing is available for

review at the Commission in the Public

Reference Room or may be viewed on

the Commission’s Web site at http://

www.ferc.gov using the ‘‘eLibrary’’ link.

Enter the docket number excluding the

last three digits in the docket number

field to access the document. For

assistance, please contact FERC Online

Support at

FERCOnlineSupport@ferc.gov or toll

free at (866)208–3676, or for TTY,

contact (202) 502–8659.

Transco requests authorization to

construct and operate the following

facilities:

E:\FR\FM\28DEN1.SGM

28DEN1

This is a copy of a public record, reproduced as it was published. It is not legal advice, and it may not be the version a court would rely on. Check the official source before you cite it.

A word about cookies

We need a few to keep you signed in and the library working. The rest help us see which pages people use and where they get stuck. They stay off unless you say yes.