jlentini on PROD1PC65 with NOTICES

Agency decision

Ask Donna

What actually matters in this document.

Text

jlentini on PROD1PC65 with NOTICES

Federal Register / Vol. 71, No. 119 / Wednesday, June 21, 2006 / Notices

On June 12, 2006, pursuant to

delegated authority, the Director,

Division of Tariffs and Market

Development—West, granted the

request for blanket approval under part

34. The Director’s order also stated that

the Commission would publish a

separate notice in the Federal Register

establishing a period of time for the

filing of protests. Accordingly, any

person desiring to be heard or to protest

the blanket approval of issuances of

securities or assumptions of liability by

the Receiver should file a motion to

intervene or protest with the Federal

Energy Regulatory Commission, 888

First Street, NE., Washington, DC 20426,

in accordance with Rules 211 and 214

of the Commission’s Rules of Practice

and Procedure. 18 CFR 385.211, 385.214

(2004).

Notice is hereby given that the

deadline for filing motions to intervene

or protest is July 12, 2006.

Absent a request to be heard in

opposition by the deadline above, the

Receiver is authorized to issue securities

and assume obligations or liabilities as

a guarantor, indorser, surety, or

otherwise in respect of any security of

another person; provided that such

issuance or assumption is for some

lawful object within the corporate

purposes of the Receiver, compatible

with the public interest, and is

reasonably necessary or appropriate for

such purposes.

The Commission reserves the right to

require a further showing that neither

public nor private interests will be

adversely affected by continued

approval of the Receiver’s issuances of

securities or assumptions of liability.

Copies of the full text of the Director’s

Order are available from the

Commission’s Public Reference Room,

888 First Street, NE., Washington, DC

20426. The Order may also be viewed

on the Commission’s Web site at

http://www.ferc.gov, using the eLibrary

link. Enter the docket number excluding

the last three digits in the docket

number field to access the document.

Comments, protests, and interventions

may be filed electronically via the

Internet in lieu of paper. See, 18 CFR

385.2001(a)(1)(iii) and the instructions

on the Commission’s Web site under the

‘‘e-Filing’’ link. The Commission

strongly encourages electronic filings.

Magalie R. Salas,

Secretary.

[FR Doc. E6–9790 Filed 6–20–06; 8:45 am]

BILLING CODE 6717–01–P

VerDate Aug<31>2005

18:26 Jun 20, 2006

Jkt 208001

DEPARTMENT OF ENERGY

Federal Energy Regulatory

Commission

[Docket Nos. ER06–301–000, ER06–301–

001]

Xcel Energy Services Inc.; Notice

Allowing Post-Technical Conference

Comments

June 13, 2006.

A technical conference was convened

on Monday, June 12, 2006, from 10 a.m.

to 11:30 p.m. at the offices of the

Federal Energy Regulatory Commission,

888 First Street, NE., Washington, DC

20426. The technical conference

addressed, among other things, the two

issues related to Xcel Energy Services

Inc.’s (XES) proposed Service Schedules

H and I, as discussed in the

Commission’s order issued on May 5,

2006.1 Prior to the technical conference,

a notice was issued on May 31, 2006,

that set forth two questions; namely,

why the transfer price proposed in

Service Schedule H is different from the

transfer price proposed in Service

Schedule I, and why XES needs both

service schedules. These questions were

discussed at the technical conference.

Take notice that the Commission will

accept comments pursuant to the

discussion at the technical conference.

Initial comments are due no later than

5 p.m. Eastern Time on Wednesday, July

19, 2006. Reply comments are due no

later than 5 p.m. Eastern Time on

Friday, August 4, 2006.

For further information please contact

Christopher Daignault at (202) 502–8286

or e-mail

christopher.daignault@ferc.gov.

Magalie R. Salas,

Secretary.

[FR Doc. E6–9772 Filed 6–20–06; 8:45 am]

BILLING CODE 6717–01–P

DEPARTMENT OF ENERGY

Federal Energy Regulatory

Commission

Combined Notice of Filings #1

June 12, 2006.

Take notice that the Commission

received the following electric corporate

filings:

Docket Numbers: EC06–128–000.

Applicants: RockGen OL–4, LLC;

RockGen OL–1, LLC, RockGen OL–2,

LLC; RockGen OL–3, LLC; RockGen

Energy, LLC.

1 Xcel Energy Services Inc., 115 FERC ¶ 61,148

(2006).

PO 00000

Frm 00037

Fmt 4703

Sfmt 4703

35643

Description: RockGen OL–1, LLC,

RockGen OL–2, LLC, et al. submit their

application for approval and expedited

consideration under Section 203 of the

Federal Power Act and Part 33 of the

Regulations.

Filed Date: 5/26/2006.

Accession Number: 20060609–0113.

Comment Date: 5 p.m. Eastern Time

on Friday, June 23, 2006.

Take notice that the Commission

received the following electric rate

filings:

Docket Numbers: ER98–2783–009;

ER99–3822–008; ER00–3696–005;

ER99–2602–005; ER96–1947–019;

ER05–1266–003; ER98–2682–011;

ER01–1619–008; ER02–443–007; ER98–

2681–011; ER98–2680–011; ER99–1785–

010.

Applicants: Bridgeport Energy LLC;

Casco Bay Energy Company; Griffith

Energy LLC; LSP–Kendall Energy, LLC;

LS Power Marketing, LLC; Ontelaunee

Power Operating Company, LLC; LSP

Oakland, LLC; LSP Mohave, LLC; LSP

Arlington Valley, LLC; LSP Morro Bay,

LLC; LSP Moss Landing; LSP South Bay,

LLC.

Description: Bridgeport Energy LLC et

al., submit a notice of non-material

change in status with respect to the

characteristics that the Commission

previously relied upon in granting

market-based rate authority.

Filed Date: 6/2/2006.

Accession Number: 20060608–0623.

Comment Date: 5 p.m. Eastern Time

on Friday, June 23, 2006.

Docket Numbers: ER06–194–001.

Applicants: Midwest Independent

Transmission System Operator, Inc.

Description: Midwest Independent

Transmission System Operator, Inc

submits a Large Generator

Interconnection Agreement with

American Transmission Co., LLC in

compliance with FERC’s 1/9/06 Order.

Filed Date: 6/5/2006.

Accession Number: 20060608–0593.

Comment Date: 5 p.m. Eastern Time

on Monday, June 26, 2006.

Docket Numbers: ER06–717–001.

Applicants: Southern California

Edison Company.

Description: Southern California

Edison Co. submits a compliance refund

report pursuant to the Commission’s

Order issued 5/8/06.

Filed Date: 6/7/2006.

Accession Number: 20060609–0153.

Comment Date: 5 p.m. Eastern Time

on Wednesday, June 28, 2006.

Docket Numbers: ER06–883–001.

Applicants: American Electric Power

Service Corporation.

Description: American Electric Power

Service Corp. as agent for its affiliate

E:\FR\FM\21JNN1.SGM

21JNN1

This is a copy of a public record, reproduced as it was published. It is not legal advice, and it may not be the version a court would rely on. Check the official source before you cite it.

A word about cookies

We need a few to keep you signed in and the library working. The rest help us see which pages people use and where they get stuck. They stay off unless you say yes.