Federal Register / Vol. 71, No. 116 / Friday, June 16, 2006 / Notices

Agency decision

Ask Donna

What actually matters in this document.

Text

34924

Federal Register / Vol. 71, No. 116 / Friday, June 16, 2006 / Notices

comments within the time specified for

filing comments, it will be presumed to

have no comments. One copy of an

agency’s comments must also be sent to

the Applicants’ representatives.

Magalie R. Salas,

Secretary.

[FR Doc. E6–9380 Filed 6–15–06; 8:45 am]

BILLING CODE 6717–01–P

DEPARTMENT OF ENERGY

Federal Energy Regulatory

Commission

Notice of Application To Amend

License and Soliciting Comments,

Motions To Intervene, and Protests

wwhite on PROD1PC61 with NOTICES

June 8, 2006.

Take notice that the following

hydroelectric application has been filed

with the Commission and is available

for public inspection:

a. Application Type: Non-project use

of project lands and waters.

b. Project No.: 271–095.

c. Date Filed: May 23, 2006.

d. Applicant: Entergy Arkansas, Inc.

(Entergy).

e. Name of Project: Carpenter-Remmel

Project.

f. Location: The project is located on

the Quachita River in Hot Springs and

Garland Counties, Arkansas on

Hamilton Lake. The project does not

occupy any Federal or tribal lands.

g. Filed Pursuant to: Federal Power

Act 16 U.S.C. 791(a)–825(r).

h. Applicant Contact: Blake Hogue,

Hydro Operations, Entergy Arkansas,

Inc., 141 West County Line Road,

Malvern, AR 72104. Phone: (501) 844–

2197.

i. FERC Contact: Gina Krump,

gina.krump@ferc.gov, 202–502–6704.

j. Deadline for filing comments and or

motions: July 7, 2006.

All documents (original and eight

copies) should be filed with Ms. Magalie

R. Salas, Secretary, Federal Energy

Regulatory Commission, 888 First

Street, NE., Washington, DC 20426.

Comments, protests, and interventions

may be filed electronically via the

Internet in lieu of paper. See, 18 CFR

385.2001(a)(1)(iii) and the instructions

on the Commission’s Web site under the

‘‘e-Filing’’ link. Please reference

‘‘Carpenter-Remmel Project, FERC

Project No. 271–095’’ on any comments

or motions filed.

k. Description of the Application:

Entergy requests Commission approval

to permit John Carter to construct three

docks with a total of 13 slips, one fuel

dock with 6 double-wide slips, and a

600-foot-long boardwalk along the

VerDate Aug<31>2005

18:25 Jun 15, 2006

Jkt 208001

perimeter of the island for use as a

commercial marina. Fueling facilities

will contain both above and belowground fuel tanks with a total of six fuel

dispensers. All facilities will be

handicap accessible.

l. Locations of the Application: This

filing is available for review at the

Commission in the Public Reference

Room or may be viewed on the

Commission’s Web site at http://

www.ferc.gov using the ‘‘E-library’’ link.

Enter the docket number excluding the

last three digits in the docket number

field to access the document. For

assistance, please contact FERC Online

Support at

FERCOnlineSupport@ferc.gov or tollfree at (866) 208–3676, or for TTY,

contact (202) 502–8659. A copy is also

available for inspection and

reproduction at the address in item (h)

above.

m. Individuals desiring to be included

on the Commission’s mailing list should

so indicate by writing to the Secretary

of the Commission.

n. Comments, Protests, or Motions to

Intervene: Anyone may submit

comments, a protest, or a motion to

intervene in accordance with the

requirements of Rules of Practice and

Procedure, 18 CFR 385.210, .211, .214.

In determining the appropriate action to

take, the Commission will consider all

protests or other comments filed, but

only those who file a motion to

intervene in accordance with the

Commission’s Rules may become a

party to the proceeding. Any comments,

protests, or motions to intervene must

be received on or before the specified

comment date for the particular

application.

o. Filing and Service of Responsive

Documents: Any filings must bear in all

capital letters the title ‘‘COMMENTS’’,

‘‘RECOMMENDATIONS FOR TERMS

AND CONDITIONS’’, ‘‘PROTEST’’, OR

‘‘MOTION TO INTERVENE’’, as

applicable, and the Project Number of

the particular application to which the

filing refers. Any of the above-named

documents must be filed by providing

the original and the number of copies

provided by the Commission’s

regulations to: The Secretary, Federal

Energy Regulatory Commission, 888

First Street, NE., Washington, DC 20426.

A copy of any motion to intervene must

also be served upon each representative

of the Applicant specified in the

particular application.

p. Agency Comments: Federal, state,

and local agencies are invited to file

comments on the described application.

A copy of the application may be

obtained by agencies directly from the

Applicant. If an agency does not file

PO 00000

Frm 00055

Fmt 4703

Sfmt 4703

comments within the time specified for

filing comments, it will be presumed to

have no comments. One copy of an

agency’s comments must also be sent to

the Applicant’s representatives.

Magalie R. Salas,

Secretary.

[FR Doc. E6–9381 Filed 6–15–06; 8:45 am]

BILLING CODE 6717–01–P

DEPARTMENT OF ENERGY

Federal Energy Regulatory

Commission

[Docket No. RP05–422–000]

El Paso Natural Gas Company; Notice

of Revised Date and Time of

Settlement Conference

June 9, 2006.

On June 7, 2006, the Commission

issued a ‘‘Notice of Informal Settlement

Conference’’ in the above-referenced

docket for the purpose of exploring a

possible settlement. A new date and

time has been established for the

informal settlement conference as

follows:

Date: June 14, 2006.

Time: 9 a.m. (EST).

The settlement conference will be

held in Hearing Room 1, at the

Commission’s offices, 888 First Street,

NE., Washington, DC 20426.

Magalie R. Salas,

Secretary.

[FR Doc. E6–9396 Filed 6–15–06; 8:45 am]

BILLING CODE 6717–01–P

DEPARTMENT OF ENERGY

Federal Energy Regulatory

Commission

[Docket No. ER96–1551–013; ER96–1551–

014; ER96–1551–015; ER01–615–009; ER01–

615–010; ER01–615–011; EL05–2–000]

Public Service Company of New

Mexico; Notice of Technical

Conference and Denial of Motion for

Extension of Time

June 9, 2006.

On June 6, 2006, Public Service

Company of New Mexico (PNM) filed a

motion requesting that the Commission

convene a technical conference to

discuss issues related to the possible

mitigation of PNM’s market-based rates

in the El Paso Electric Company (El

Paso) control area as provided for in an

order issued on April 21, 2006, in these

proceedings.1 PNM also asks the

1 Public Service Company of New Mexico, 115

FERC ¶ 61,090 (2006) (April 21 Order).

E:\FR\FM\16JNN1.SGM

16JNN1

Federal Register / Vol. 71, No. 116 / Friday, June 16, 2006 / Notices

Commission to grant a 30-day extension

of time to comply with Ordering

Paragraph C of the April 21 Order.

PNM’s motion for technical

conference is granted. However, PNM’s

motion for extension of time to comply

with the April 21 Order is denied.

Take notice that the Federal Energy

Regulatory Commission will hold a

technical conference to discuss

mitigation for the El Paso control area.

This technical conference will be held

on June 14, 2006, in Hearing Room 2 of

the Federal Energy Regulatory

Commission, 888 First Street, NE.,

Washington, DC, from approximately 9

a.m. until approximately 1 p.m. (EST).

Federal Energy Regulatory

Commission conferences are accessible

under section 508 of the Rehabilitation

Act of 1973. For accessibility

accommodations please send an e-mail

to accessibility@ferc.gov or call toll free

(866) 208–3372 (voice) or 202–208–1659

(TTY), or send a FAX to 202–208–2106

with the required accommodations.

All interested parties and staff are

permitted to attend the technical

conference. For additional information

regarding the meeting, please contact

Cynthia Henry at

Cynthia.Henry@ferc.gov no later than 5

p.m. (EST), Tuesday, June 13, 2006.

Magalie R. Salas,

Secretary.

[FR Doc. E6–9390 Filed 6–15–06; 8:45 am]

BILLING CODE 6717–01–P

DEPARTMENT OF ENERGY

Federal Energy Regulatory

Commission

[Docket No. AD06–9–000]

RTO Border Utility Issues; Notice of

Technical Conference on RTO Border

Utility Issues

wwhite on PROD1PC61 with NOTICES

June 8, 2006.

Take notice that on July 10, 2006, staff

of the Federal Energy Regulatory

Commission will convene a technical

conference on RTO border utility issues.

The conference will be held at the

Federal Energy Regulatory Commission,

888 First Street, NE., Washington, DC

20426. The conference will be open to

the public. Commission staff will lead

the conference and the Commissioners

plan to attend.

In a recent Commission proceeding,

parties raised the issue of an electric

utility’s ability to benefit from an RTO/

ISO’s regional markets while avoiding

some or all of the costs attributable to

VerDate Aug<31>2005

18:25 Jun 15, 2006

Jkt 208001

membership in the RTO/ISO.1 The

Commission found that the issues raised

‘‘generic concerns with implications

applicable to all RTOs and ISOs and to

all market participants with whom they

interact, whether directly or indirectly.’’

The Commission then announced its

intention to establish a technical

conference to hear from interested

parties concerning this issue.

Conference participants are asked to

identify discrete concerns and

contrasting views, establish which

specific market services, reliability

functions, and other features of RTO/

ISO markets provide non-members with

benefits for which they may not bear an

appropriate share of the respective

costs, or otherwise should not be

entitled to, and propose solutions to

identified problems. The Commission

wishes to be informed about this issue

across the country and invites

representatives of all regions to

participate.

Persons wishing to participate as

panelists in the conference are asked to

e-mail the following information to

Commission staff by June 15, 2006:

Name, organizational affiliation name

and mailing address, title, voice and fax

telephone numbers, e-mail address,

brief bio, and a description of the

proposed topic of presentation. Persons

interested in attending the conference as

a member of the audience are

encouraged to e-mail their name and

affiliation to facilitate security check in

and to estimate meeting room needs.

Both prospective panelists and audience

members should e-mail their

information to Kristine.Bailey@ferc.gov.

In the body of the e-mail, please identify

yourself as a potential panelist or

audience member, and use ‘‘RTO Border

Utility Conference’’ on the e-mail

subject line. If you do not have access

to e-mail, you may call Ms. Bailey at

202–502–6072.

An agenda will be issued prior to the

conference. You may use the

Commission’s e-subscription service to

be notified of future notices in this

proceeding. Please visit http://

www.ferc.gov/docs-filing/

esubscription.asp.

A free webcast of this event will be

available through http://www.ferc.gov.

Anyone with Internet access who

desires to view this event can do so by

navigating to http://www.ferc.gov’s

Calendar of Events and locating this

event in the Calendar. The event will

contain a link to its webcast. The

Capitol Connection provides technical

support for the webcasts. It also offers

1 Louisville Gas and Electric Company, et al., 114

FERC ¶ 61,282 (2006) at P 64–65.

PO 00000

Frm 00056

Fmt 4703

Sfmt 4703

34925

access to open meetings via television in

the DC area and via phone bridge for a

fee. Visit http://

www.CapitolConnection.org or contact

Danelle Perkowski or David Reininger at

703–993–3100.

During the summer months,

Commission employees adopt business

casual dress, and the Commission

encourages conference participants and

attendees to do the same.

Commission conferences are

accessible under section 508 of the

Rehabilitation Act of 1973. For

accessibility accommodations please

send an e-mail to accessibility@ferc.gov

or call toll free 866–208–3372 (voice) or

202–208–1659 (TTY), or send a Fax to

202–208–2106 with the required

accommodations.

For further information on this

conference, please contact: Udi Helman,

Office of Energy Markets and Reliability,

Federal Energy Regulatory Commission,

888 First Street, NE., Washington, DC

20426. 202–502–8080.

Udi.Helman@ferc.gov.

Magalie R. Salas,

Secretary.

[FR Doc. E6–9383 Filed 6–15–06; 8:45 am]

BILLING CODE 6717–01–P

DEPARTMENT OF ENERGY

Southwestern Power Administration

Integrated System Power Rates

AGENCY: Southwestern Power

Administration, DOE.

ACTION: Notice of public review and

comment.

SUMMARY: The Administrator,

Southwestern Power Administration

(Southwestern), has prepared Current

and Revised 2006 Power Repayment

Studies which show the need for an

increase in annual revenues to meet cost

recovery criteria. Such increased

revenues are needed primarily to cover

increased investments and replacements

in hydroelectric generating facilities and

increased purchased power expenses.

The Administrator has developed

proposed Integrated System rates, which

are supported by a rate design study, to

recover the required revenues. The May

2006 Revised Study indicates that the

proposed rates would increase annual

system revenues approximately 25.9

percent from $136,267,400 to

$171,505,848, over a three-year period

to meet projected annual expenses and

repay the investments in facilities over

the required number of years.

DATES: The consultation and comment

period will begin on the date of

E:\FR\FM\16JNN1.SGM

16JNN1

This is a copy of a public record, reproduced as it was published. It is not legal advice, and it may not be the version a court would rely on. Check the official source before you cite it.

A word about cookies

We need a few to keep you signed in and the library working. The rest help us see which pages people use and where they get stuck. They stay off unless you say yes.