Federal Register / Vol. 71, No. 158 / Wednesday, August 16, 2006 / Notices

Agency decision

Ask Donna

What actually matters in this document.

Text

47200

Federal Register / Vol. 71, No. 158 / Wednesday, August 16, 2006 / Notices

(866) 208–3676 (toll free). For TTY, call

(202) 502–8659.

Magalie R. Salas,

Secretary.

[FR Doc. E6–13430 Filed 8–15–06; 8:45 am]

instructions on the Commission’s Web

site under the ‘‘eFiling’’ link.

DEPARTMENT OF ENERGY

Federal Energy Regulatory

Commission

Magalie R. Salas,

Secretary.

[FR Doc. E6–13370 Filed 8–15–06; 8:45 am]

[Project No. 405–068]

BILLING CODE 6717–01–P

BILLING CODE 6717–01–P

Susquehanna Power Company and

PECO Energy Power Company; Notice

of Availability of Environmental

Assessment

DEPARTMENT OF ENERGY

Federal Energy Regulatory

Commission

August 9, 2006.

[Project No. 459–128]

Union Electric Company, dba

AmerenUE; Notice of Availability of

Final Environmental Assessment

August 8, 2006.

jlentini on PROD1PC65 with NOTICES

In accordance with the National

Environmental Policy Act of 1969 and

the Federal Energy Regulatory

Commission’s (Commission)

regulations, 18 CFR part 380 (Order No.

486, 52 FR 47897), the Office of Energy

Projects’ staff has reviewed the

application for new license for the

Osage Project, located on the Osage

River in south central Missouri, and has

prepared a final Environmental

Assessment (EA) for the project. In the

final EA, Commission staff analyzed the

potential environmental effects of

relicensing the project and concluded

that issuing a new license for the

project, with appropriate environmental

measures, would not constitute a major

Federal action that would significantly

affect the quality of the human

environment.

A copy of the final EA is available for

review in the Public Reference Room or

may be viewed on the Commission’s

Web site at http://www.ferc.gov, using

the ‘‘eLibrary’’ link. Enter the docket

number, excluding the last three digits

in the docket number field to access the

document. You may register online at

http://www.ferc.gov/docs-filing/

esubscription.asp to be notified via email of new filings and issuances

related to this or any other pending

projects. For assistance, contact FERC

Online Support at

FERCOnlineSupport@ferc.gov or tollfree at 1–866–208–3676, or for TTY,

(202) 502–8659.

Magalie R. Salas,

Secretary.

[FR Doc. E6–13363 Filed 8–15–06; 8:45 am]

BILLING CODE 6717–01–P

VerDate Aug<31>2005

20:24 Aug 15, 2006

Jkt 208001

In accordance with the National

Environmental Policy Act of 1969 and

the Federal Energy Regulatory

Commission’s regulations, 18 CFR part

380 (Order No. 486, 52 FR 47879), the

Office of Energy Projects has reviewed

an application for non-project use of

project lands and waters and has

prepared an environmental assessment

(EA) for public review. The licensees

seek Commission approval to permit use

of the Conowingo Hydroelectric Project,

FERC No. 405, reservoir and lands to

withdraw and discharge water. The EA

analyzes the environmental impacts of

the proposed water withdrawal and

discharge. The project is located on the

Susquehanna River in Hartford and

Cecil Counties in Maryland, and York

and Lancaster Counties in Pennsylvania.

The EA was written by staff in the

Office of Energy Projects, Federal

Energy Regulatory Commission

(Commission). A copy of the EA is

attached to a Commission order titled

‘‘Order Modifying and Approving NonProject Use of Project Lands and

Waters’’ issued August 8, 2006 and is

available for review at the Commission

or may be viewed on the Commission’s

Web site at http://www.ferc.gov using

the ‘‘eLibrary’’ link. Enter the docket

number excluding the last three digits in

the docket number field to access

documents. For assistance, contact

FERC Online Support at

FERCOnlineSupport@ferc.gov or tollfree at 1–866–208–3676, or for TTY,

(202) 502–8659.

Any comments on the EA should be

filed within 30 days from the issuance

date of this notice, and should be

addressed to the Secretary, Federal

Energy Regulatory Commission, 888

First Street NE., Room 1–A,

Washington, DC 20426. Please affix

‘‘Conowingo Project No. 405–068’’ to all

comments. Comments may be filed

electronically via Internet in lieu of

paper filings. The Commission strongly

encourages electronic filings. See 18

CFR 385.20011(a)(1) (iii) and the

PO 00000

Frm 00038

Fmt 4703

Sfmt 4703

DEPARTMENT OF ENERGY

Federal Energy Regulatory

Commission

Notice of Application Tendered for

Filing With the Commission and

Soliciting Additional Study Requests

August 8, 2006.

Take notice that the following

hydroelectric application has been filed

with the Commission and is available

for public inspection.

a. Type of Application: Major License.

b. Project No.: 12429–001.

c. Date filed: August 1, 2006.

d. Applicant: Clark Canyon Hydro,

LLC.

e. Name of Project: Clark Canyon Dam

Hydroelectric Project.

f. Location: On the Beaverhead River,

18 miles southwest of the Town of

Dillon, Beaverhead County, Montana.

The project would occupy 3.5 acres of

Federal land administered by the

Bureau of Reclamation.

g. Filed Pursuant to: Federal Power

Act, 16 U.S.C. 791(a)–825(r).

h. Applicant Contact: Brent L. Smith,

Northwest Power Services, Inc., P.O.

Box 535, Rigby, ID 83442, (208) 745–

0834 or Dr. Vincent Lamarra,

Ecosystems Research Institute, Inc., 975

South State Highway, Logan, UT 84321.

i. FERC Contact: Dianne Rodman,

(202) 502–6077,

Dianne.rodman@ferc.gov.

j. Cooperating agencies: We are asking

Federal, state, local, and tribal agencies

with jurisdiction and/or special

expertise with respect to environmental

issues to cooperate with us in the

preparation of the environmental

document. Agencies who would like to

request cooperating status should follow

the instructions for filing comments

described in item l below. Cooperating

agencies should note the Commission’s

policy that agencies that cooperate in

the preparation of the environmental

document cannot also intervene. See, 94

FERC ¶ 61,076 (2001).

k. Pursuant to section 4.32(b)(7) of 18

CFR of the Commission’s regulations, if

any resource agency, Indian Tribe, or

person believes that an additional

scientific study should be conducted in

order to form an adequate factual basis

for a complete analysis of the

application on its merit, the resource

E:\FR\FM\16AUN1.SGM

16AUN1

jlentini on PROD1PC65 with NOTICES

Federal Register / Vol. 71, No. 158 / Wednesday, August 16, 2006 / Notices

agency, Indian Tribe, or person must file

a request for a study with the

Commission not later than 60 days from

the date of filing of the application, and

serve a copy of the request on the

applicant.

l. Deadline for filing additional study

requests and requests for cooperating

agency status: October 2, 2006.

All documents (original and eight

copies) should be filed with: Magalie R.

Salas, Secretary, Federal Energy

Regulatory Commission, 888 First

Street, NE., Washington, DC 20426.

Additional study requests and

requests for cooperating agency status

may be filed electronically via the

Internet in lieu of paper. The

Commission strongly encourages

electronic filings. See 18 CFR

385.2001(a)(1)(iii) and the instructions

on the Commission’s Web site (http://

www.ferc.gov) under the ‘‘e-Filing’’ link.

m. The application is not ready for

environmental analysis at this time.

n. The proposed project would utilize

the existing Bureau of Reclamation’s

Clark Canyon dam, and would consist of

the following new facilities: (1) A steel

liner in the existing 9-foot-diameter

concrete outlet conduit; (2) a new outlet

gate structure; (3) a 9-foot-diameter steel

penstock bifurcating into an 8-foot

diameter and a 6-foot diameter steel

penstock directing flow to the turbine

units about 70 feet from the bifurcation;

(4) a powerhouse containing two

generating units with a combined

capacity of 4.75 megawatts; (5) a 300foot-long access road; (6) a switchyard;

(7) about 0.1 mile of transmission line

connecting the project to the local

utility’s transmission system; and (8)

about 11 miles of existing transmission

line that would be upgraded. The

average annual generation is estimated

to be 16.5 gigawatthours.

o. A copy of the application is

available for review at the Commission

in the Public Reference Room or may be

viewed on the Commission’s Web site at

http://www.ferc.gov using the

‘‘eLibrary’’ link. Enter the docket

number excluding the last three digits in

the docket number field to access the

document. For assistance, contact FERC

Online Support at

FERCOnlineSupport@ferc.gov or tollfree at 1–866–208–3676, or for TTY,

(202) 502–8659. A copy is also available

for inspection and reproduction at the

address in item h above.

You may also register online at

http://www.ferc.gov/docs-filing/

esubscription.asp to be notified via

e-mail of new filings and issuances

related to this or other pending projects.

For assistance, contact FERC Online

Support.

VerDate Aug<31>2005

20:24 Aug 15, 2006

Jkt 208001

p. With this notice, we are initiating

consultation with the Montana State

Historic Preservation Officer (SHPO), as

required by § 106, National Historic

Preservation Act, and the regulations of

the Advisory Council on Historic

Preservation, 36 CFR, at § 800.4.

q. Procedural schedule: The

application will be processed according

to the following Hydro Licensing

Schedule. Revisions to the schedule will

be made as appropriate.

Issue Deficiency Letter: September

2006.

Issue Acceptance Letter: December

2006.

Issue Scoping Document 1 for

comments: January 2007.

Request Additional Information:

March 2007.

Issue Scoping Document 2: April

2007.

Notice of application is ready for

environmental analysis: April 2007.

Notice of the availability of the EA:

October 2007.

Ready for Commission’s decision on

the application: January 2008.

Magalie R. Salas,

Secretary.

[FR Doc. E6–13364 Filed 8–15–06; 8:45 am]

BILLING CODE 6717–01–P

DEPARTMENT OF ENERGY

Federal Energy Regulatory

Commission

Notice of Application for Amendment

of License and Soliciting Comments,

Motions To Intervene, and Protests

August 8, 2006.

Take notice that the following

hydroelectric application has been filed

with the Commission and is available

for public inspection:

a. Application Type: Amendment of

license to upgrade the installed

capacity.

b. Project No: 2077–055.

c. Date Filed: June 27, 2006.

d. Applicant: TransCanada Hydro

Northeast, Inc.

e. Name of Project: Fifteen Mile Falls.

f. Location: The project is located on

the Connecticut River near the Town of

Littleton, Grafton County, New

Hampshire, and Caledonia County,

Vermont.

g. Filed Pursuant to: Federal Power

Act, 16 U.S.C. 791a–825r.

h. Applicant Contact: Mr. John

Ragonese, TransCanada Northeast, Inc.,

4 Park Street, Suite 402, Concord, NH

03301–3260. Tel: (603) 225–3260.

i. FERC Contact: Any questions on

this notice should be addressed to

PO 00000

Frm 00039

Fmt 4703

Sfmt 4703

47201

Vedula Sarma at (202) 502–6190 or

vedula.sarma@ferc.gov.

j. Deadline for filing comments and/

or motions: September 8, 2006.

k. Description of Filing: TransCanada

Northeast, Inc. proposes to replace

turbine runners at the Comerford

Development of the project. The project

consists of three developments: the

Moore, Comerford and McIndoes

developments with a current authorized

installed capacity of 291,360 kilowatts

(kW) and total hydraulic capacity of

37,400 cfs. The licensee proposes to

replace existing four turbine runners of

the Comerford Development in two

phases. Phase 1 involves immediate

replacement of turbine runner of Unit 1,

and in phase 2 the turbine runners of

the remaining three units would be

replaced over a period of four years. The

proposed changes would increase the

project’s total installed capacity by

28,600 kW and the hydraulic capacity

would be reduced from 37,400 cfs to

37,235 cfs.

l. Locations of Applications: A copy of

the application is available for

inspection and reproduction at the

Commission in the Public Reference

Room, located at 888 First Street, NE.,

Room 2A, Washington, DC 20426, or by

calling (202) 502–8371. This filing may

also be viewed on the Commission’s

Web site at http://www.ferc.gov using

the ‘‘eLibrary’’ link. Enter the docket

number excluding the last three digits in

the docket number field to access the

document. You may also register online

at http://www.ferc.gov/docs-filing/

esubscription.asp to be notified via email of new filings and issuances

related to this or other pending projects.

For assistance, call toll-free 1–866–208–

3676 or e-mail

FERCOnlineSupport@ferc.gov. For TTY,

call (202) 502–8659. A copy is also

available for inspection and

reproduction at the address in item (h)

above.

m. Individuals desiring to be included

on the Commission’s mailing list should

so indicate by writing to the Secretary

of the Commission.

n. Comments, Protests, or Motions to

Intervene: Anyone may submit

comments, a protest, or a motion to

intervene in accordance with the

requirements of Rules of Practice and

Procedure, 18 CFR 385.210, .211, .214.

In determining the appropriate action to

take, the Commission will consider all

protests or other comments filed, but

only those who file a motion to

intervene in accordance with the

Commission’s Rules may become a

party to the proceeding. Any comments,

protests, or motions to intervene must

be received on or before the specified

E:\FR\FM\16AUN1.SGM

16AUN1

This is a copy of a public record, reproduced as it was published. It is not legal advice, and it may not be the version a court would rely on. Check the official source before you cite it.

A word about cookies

We need a few to keep you signed in and the library working. The rest help us see which pages people use and where they get stuck. They stay off unless you say yes.