Federal Register / Vol. 73, No. 5 / Tuesday, January 8, 2008 / Notices

information, contact Timothy Konnert at

(202) 502–6359.

Kimberly D. Bose,

Secretary.

[FR Doc. E8–44 Filed 1–7–08; 8:45 am]

BILLING CODE 6717–01–P

DEPARTMENT OF ENERGY

Federal Energy Regulatory

Commission

[Docket No. CP07–207–000]

Colorado Interstate Gas Company;

Notice of Availability of the Final

Environmental Impact Statement for

the Proposed High Plains Expansion

Project

pwalker on PROD1PC71 with NOTICES

December 28, 2007.

The staff of the Federal Energy

Regulatory Commission (FERC or

Commission) has prepared this Final

Environmental Impact Statement (EIS)

for the natural gas pipeline facilities

proposed by Colorado Interstate Gas

Company (CIG) under the abovereferenced docket. CIG’s High Plains

Expansion Project (Project) would be

located in Weld, Morgan, and Adams

Counties, Colorado.

The Final EIS was prepared to satisfy

the requirements of the National

Environmental Policy Act. The FERC

staff concludes that the proposed

Project, with the appropriate mitigation

measures as recommended, would have

limited adverse environmental impact.

The purpose of the Project is to

expand CIG’s existing pipeline system

along Colorado’s Front Range in order to

provide additional transportation

services to this rapidly growing market.

CIG is proposing to construct about

163.7 miles of 24-inch and 30-inchdiameter pipeline in four separate

pipeline segments and associated

ancillary facilities.

The Final EIS addresses the potential

environmental impacts resulting from

the construction and operation of the

following facilities:

• Line 250A: 64.5 miles of 30-inchdiameter pipeline and 20.3 miles of 24inch-diameter pipeline that would

extend from CIG’s existing Cheyenne

Compressor Station to an interconnect

point on the proposed Line 251A in

northeast Adams County;

• Line 251A: 57.9 miles of 24-inchdiameter pipeline between CIG’s

existing Watkins and Fort Morgan

Compressor Stations;

• Line 252A: 14.9 miles of 30-inchdiameter pipeline extending westward

from a point on the proposed Line 250A

about one mile north of the existing

VerDate Aug<31>2005

17:32 Jan 07, 2008

Jkt 214001

Hudson Power Plant in the Town of

Hudson, Colorado, to a new

interconnect with Public Service

Company of Colorado’s existing TriTown facilities in Weld County,

Colorado;

• Line 253A: 6.1 miles of 24-inchdiameter pipeline extending westward

from the Watkins Compressor Station to

CIG’s existing East Denver measurement

facility in Adams County, Colorado;

• Ten new meter stations and 19 new

block valves; and

• Twelve pig launcher/receivers.

The entire project would be capable of

transporting about 899,000 decatherms

of gas per day. CIG proposes to begin

construction in January 2008. It would

put each pipeline segment into service

as it is completed, and the entire Project

would be in service by October 2008.

The Final EIS has been placed in the

public files of the FERC and is available

for public inspection at: Federal Energy

Regulatory Commission, Public

Reference Room, 888 First Street NE.,

Room 2A, Washington, DC 20426, (202)

502–8371.

A limited number of copies of the

Final EIS are available from the Public

Reference Room identified above. In

addition, CD copies of the Final EIS

have been mailed to affected

landowners; various federal, state, and

local government agencies; elected

officials; environmental and public

interest groups; Native American tribes;

local libraries and newspapers;

intervenors; and other individuals that

expressed an interest in the proposed

Project. Hard-copies of the Final EIS

have also been mailed to those who

requested that format during the scoping

and comment periods for the proposed

Project.

Additional information about the

proposed Project is available from the

Commission’s Office of External Affairs,

at 1–866–208–FERC or on the FERC

Internet Web site (http://www.ferc.gov).

To access information via the FERC

Web site click on the ‘‘eLibrary’’ link

then click on ‘‘General Search’’ and

enter the docket number excluding the

last three digits in the Docket Number

field. Be sure you have selected an

appropriate date range. The ‘‘eLibrary’’

link provides access to the texts of

formal documents issued by the

Commission, such as orders, notices,

and rulemakings. For assistance with

‘‘eLibrary’’, please contact FERC Online

Support at FercOnlineSupport@ferc.gov

or toll free at 1–866–208–3676, or for

TTY, contact (202) 502–8659.

In addition, the Commission now

offers a free service called eSubscription

which allows you to keep track of all

formal issuances and submittals in

PO 00000

Frm 00021

Fmt 4703

Sfmt 4703

specific dockets. This can reduce the

amount of time you spend researching

proceedings by automatically providing

you with notification of these filings,

document summaries and direct links to

these documents. To learn more about

eSubscription and to sign-up for this

service please go to http://www.ferc.gov/

esubscribenow.htm.

Kimberly D. Bose,

Secretary.

[FR Doc. E8–68 Filed 1–7–08; 8:45 am]

BILLING CODE 6717–01–P

DEPARTMENT OF ENERGY

Federal Energy Regulatory

Commission

[Docket No. CP08–38–000]

East Tennessee Natural Gas, LLC;

Notice of Request Under Blanket

Authorization

December 21, 2007.

Take notice that on December 18,

2007, East Tennessee Natural Gas, LLC

(East Tennessee), P.O. Box 1642,

Houston, Texas 77251–1642, filed in

Docket No. CP08–38–000 a prior notice

request pursuant to sections 157.205

and 157.210 of the Commission’s

regulations under the Natural Gas Act

(NGA) and East Tennessee’s blanket

certificate issued in Docket No. CP82–

412, for authorization to acquire

approximately 72 miles of transmission

pipeline. East Tennessee proposes to

acquire approximately 72 miles of

Spectra Energy Virginia Pipeline

Company’s 8-inch line, in Smyth and

Washington Counties, Virginia, all as

more fully set forth in the application,

which is on file with the Commission

and open to public inspection. The

filing may also be viewed on the Web

at http://www.ferc.gov using the

‘‘eLibrary’’ link. Enter the docket

number excluding the last three digits in

the docket number field to access the

document. For assistance, contact FERC

at FERCOnlineSupport@ferc.gov or call

toll-free, (886) 208–3676 or TTY, (202)

502–8659.

Any questions regarding the

application should be directed to Garth

Johnson, General Manager, Certificates

& Reporting, East Tennessee Natural

Gas, LLC, P.O. Box 1642, Houston,

Texas 77251–1642 at (713) 627–5415.

Any person or the Commission’s Staff

may, within 60 days after the issuance

of the instant notice by the Commission,

file pursuant to Rule 214 of the

Commission’s Procedural Rules (18 CFR

385.214) a motion to intervene or notice

of intervention and, pursuant to section

E:\FR\FM\08JAN1.SGM

08JAN1

Federal Register / Vol. 73, No. 5 / Tuesday, January 8, 2008 / Notices

157.205 of the Commission’s

Regulations under the Natural Gas Act

(NGA) (18 CFR 157.205) a protest to the

request. If no protest is filed within the

time allowed therefore, the proposed

activity shall be deemed to be

authorized effective the day after the

time allowed for protest. If a protest is

filed and not withdrawn within 30 days

after the time allowed for filing a

protest, the instant request shall be

treated as an application for

authorization pursuant to section 7 of

the NGA.

The Commission strongly encourages

electronic filings of comments, protests

and interventions in lieu of paper using

the ‘‘eFiling’’ link at http://

www.ferc.gov. Persons unable to file

electronically should submit an original

and 14 copies of the protest or

intervention to the Federal Energy

Regulatory Commission, 888 First

Street, NE., Washington, DC 20426.

This filing is accessible on-line at

http://www.ferc.gov, using the

‘‘eLibrary’’ link and is available for

review in the Commission’s Public

Reference Room in Washington, DC.

There is an ‘‘eSubscription’’ link on the

Web site that enables subscribers to

receive e-mail notification when a

document is added to a subscribed

docket(s). For assistance with any FERC

Online service, please e-mail

FERCOnlineSupport@ferc.gov, or call

(866) 208–3676 (toll free). For TTY, call

(202) 502–8659.

Comment Date: January 11, 2008.

Kimberly D. Bose,

Secretary.

[FR Doc. E8–48 Filed 1–7–08; 8:45 am]

Kimberly D. Bose,

Secretary.

[FR Doc. E8–98 Filed 1–7–08; 8:45 am]

BILLING CODE 6717–01–P

BILLING CODE 6717–01–P

DEPARTMENT OF ENERGY

DEPARTMENT OF ENERGY

Federal Energy Regulatory

Commission

[Docket Nos. ER08–25–000; ER08–25–001;

ER08–26–000; ER08–26–001]

Federal Energy Regulatory

Commission

[Docket No. AC08–20–000]

Ocean State Power; Ocean State

Power II; Notice of Issuance of Order

Enbridge Pipelines (Patoka), LLC;

Notice of Filing

December 27, 2007.

January 2, 2008.

pwalker on PROD1PC71 with NOTICES

appropriate action to be taken, but will

not serve to make protestants parties to

the proceeding. Any person wishing to

become a party must file a notice of

intervention or motion to intervene, as

appropriate. Such notices, motions, or

protests must be filed on or before the

comment date. On or before the

comment date, it is not necessary to

serve motions to intervene or protests

on persons other than the Applicant.

The Commission encourages

electronic submission of protests and

interventions in lieu of paper using the

‘‘eFiling’’ link at http://www.ferc.gov.

Persons unable to file electronically

should submit an original and 14 copies

of the protest or intervention to the

Federal Energy Regulatory Commission,

888 First Street, NE., Washington, DC

20426.

This filing is accessible on-line at

http://www.ferc.gov, using the

‘‘eLibrary’’ link and is available for

review in the Commission’s Public

Reference Room in Washington, DC.

There is an ‘‘eSubscription’’ link on the

Web site that enables subscribers to

receive e-mail notification when a

document is added to a subscribed

docket(s). For assistance with any FERC

Online service, please e-mail

FERCOnlineSupport@ferc.gov, or call

(866) 208–3676 (toll free). For TTY, call

(202) 502–8659.

Comment Date: February 1, 2008.

Take notice that on November 28,

2007, Enbridge Pipelines (Patoka), LLC,

submitted a request for waiver of the

requirement to file the FERC Form No.

6 for the last two months of the 2004

calendar year.

Any person desiring to intervene or to

protest this filing must file in

accordance with Rules 211 and 214 of

the Commission’s Rules of Practice and

Procedure (18 CFR 385.211 or 385.214).

Protests will be considered by the

Commission in determining the

VerDate Aug<31>2005

17:32 Jan 07, 2008

Jkt 214001

Ocean State Power and Ocean State

Power II (collectively, Ocean State) filed

an application for market-based rate

authority, with an accompanying rate

tariff. The proposed market-based rate

schedule provides for the sale of energy,

capacity and ancillary services at

market-based rates. Ocean State also

requested waivers of various

Commission regulations. In particular,

Ocean State requested that the

Commission grant blanket approval

under 18 CFR Part 34 of all future

issuances of securities and assumptions

of liability by Ocean State.

PO 00000

Frm 00022

Fmt 4703

Sfmt 4703

1335

On December 18, 2007, pursuant to

delegated authority, the Director,

Division of Tariffs and Market

Development-West, granted the requests

for blanket approval under Part 34

(Director’s Order). The Director’s Order

also stated that the Commission would

publish a separate notice in the Federal

Register establishing a period of time for

the filing of protests. Accordingly, any

person desiring to be heard concerning

the blanket approvals of issuances of

securities or assumptions of liability by

Ocean State, should file a protest with

the Federal Energy Regulatory

Commission, 888 First Street, NE.,

Washington, DC 20426, in accordance

with Rules 211 and 214 of the

Commission’s Rules of Practice and

Procedure. 18 CFR 385.211, 385.214

(2004).

Notice is hereby given that the

deadline for filing protests is January 18,

2008.

Absent a request to be heard in

opposition to such blanket approvals by

the deadline above, Ocean State is

authorized to issue securities and

assume obligations or liabilities as a

guarantor, indorser, surety, or otherwise

in respect of any security of another

person; provided that such issuance or

assumption is for some lawful object

within the corporate purposes of Ocean

State, compatible with the public

interest, and is reasonably necessary or

appropriate for such purposes.

The Commission reserves the right to

require a further showing that neither

public nor private interests will be

adversely affected by continued

approvals of Ocean State’s issuance of

securities or assumptions of liability.

Copies of the full text of the Director’s

Order are available from the

Commission’s Public Reference Room,

888 First Street, NE., Washington, DC

20426. The Order may also be viewed

on the Commission’s Web site at

http://www.ferc.gov, using the eLibrary

link. Enter the docket number excluding

the last three digits in the docket

number filed to access the document.

Comments, protests, and interventions

may be filed electronically via the

internet in lieu of paper. See, 18 CFR

385.2001(a)(1)(iii) and the instructions

on the Commission’s Web site under the

‘‘e-Filing’’ link. The Commission

strongly encourages electronic filings.

Kimberly D. Bose,

Secretary.

[FR Doc. E8–53 Filed 1–7–08; 8:45 am]

BILLING CODE 6717–01–P

E:\FR\FM\08JAN1.SGM

08JAN1