Federal Register / Vol. 72, No. 205 / Wednesday, October 24, 2007 / Notices

DEPARTMENT OF ENERGY

Federal Energy Regulatory

Commission

[Docket No. CP07–457–000]

Iroquois Gas Transmission System,

L.P.; Notice of Filing

yshivers on PROD1PC62 with NOTICES

October 16, 2007.

Take notice that on September 28,

2007, and supplemented on October 15,

2007, Iroquois Gas Transmission

System, L.P. (Iroquois), One Corporate

Drive, Suite 600, Shelton, CT 06484–

6211, filed an abbreviated application

pursuant to section 7(c) of the Natural

Gas Act (NGA) and part 157 of the

Commission’s Rules and Regulations,

for a certificate of public convenience

and necessity to construct and operate

the 08/09 Expansion Project (Project) in

New York and Connecticut. This filing

is available for review at the

Commission in the Public Reference

Room or may be viewed on the

Commission’s Web site at http://

www.ferc.gov using the ‘‘eLibrary’’ link.

Enter the docket number excluding the

last three digits in the docket number

field to access the document. For

assistance, please contact FERC Online

Support at

FERCOnlineSupport@ferc.gov or toll

free at (866) 208–3676, or for TTY,

contact (202) 502–8659.

Iroquois requests authority to

construct and operate: (1) Three sections

of new, 36-inch diameter pipeline

looping and associated above ground

facilities along its existing mainline in

New York and Connecticut; (2) a new

compressor station, 10,300 horsepower,

in Milford, Connecticut; and (3)

additional compression, 10,300

horsepower, and cooling facilities at the

Brookfield compressor station in

Brookfield, Connecticut. Iroquois also

seeks a predetermination that the rates

applicable to the 08/09 Expansion

project to be rolled in with Iroquois’

existing Eastchester Expansion Project

rate case following the in-service date

for the proposed facilities in which the

Eastchester rates are subject to change.

The estimated cost of the Project is

approximately $163,000,000. Iroquois

proposes the in-service date, under

Phase I, of November 1, 2008.

Any questions regarding the

application are to be directed to Paul W.

Diehl, Senior Attorney, Iroquois

Pipeline Operating Company, One

Corporate Drive, Suite 600, Shelton, CT

06484, phone number (203) 925–7228.

On March 23, 2007, the Commission

staff granted Iroquois’s request to utilize

the National Environmental Policy Act

(NEPA) Pre-Filing Process and assigned

VerDate Aug<31>2005

15:33 Oct 23, 2007

Jkt 214001

Docket No. PF07–7–000 to staff

activities involving the Market Access

Project. Now, as of the filing of this

application on September 28, 2007, the

NEPA Pre-Filing Process for this project

has ended. From this time forward, this

proceeding will be conducted in Docket

No. CP07–457–000, as noted in the

caption of this Notice.

Pursuant to section 157.9 of the

Commission’s rules, 18 CFR 157.9,

within 90 days of this Notice the

Commission staff will either: Complete

its environmental assessment (EA) and

place it into the Commission’s public

record (eLibrary) for this proceeding, or

issue a Notice of Schedule for

Environmental Review. If a Notice of

Schedule for Environmental Review is

issued, it will indicate, among other

milestones, the anticipated date for the

Commission staff’s issuance of the final

environmental impact statement (FEIS)

or EA for this proposal. The filing of the

EA in the Commission’s public record

for this proceeding or the issuance of a

Notice of Schedule for Environmental

Review will serve to notify federal and

state agencies of the timing for the

completion of all necessary reviews, and

the subsequent need to complete all

federal authorizations within 90 days of

the date of issuance of the Commission

staff’s FEIS or EA.

Any person desiring to intervene or to

protest this filing must file in

accordance with Rules 211 and 214 of

the Commission’s Rules of Practice and

Procedure (18 CFR 385.211 and

385.214). Protests will be considered by

the Commission in determining the

appropriate action to be taken, but will

not serve to make protestants parties to

the proceeding. Any person wishing to

become a party must file a notice of

intervention or motion to intervene, as

appropriate. Such notices, motions, or

protests must be file on or before the

comment date. Anyone filing a motion

to intervene or protest must serve a copy

of that document on the Applicant. On

or before the comment date, it is not

necessary to serve motions to intervene

or protests on persons other than the

Applicant.

However, a person does not have to

intervene in order to have comments

considered. The second way to

participate is by filing with the

Secretary of the Commission, as soon as

possible, an original and two copies of

comments in support of or in opposition

to this project. The Commission will

consider these comments in

determining the appropriate action to be

taken, but the filing of a comment alone

will not serve to make the filer a party

to the proceeding. The Commission’s

rules require that persons filing

PO 00000

Frm 00025

Fmt 4703

Sfmt 4703

comments in opposition to the project

provide copies of their protests only to

the party or parties directly involved in

the protest.

Persons who wish to comment only

on the environmental review of this

project should submit an original and

two copies of their comments to the

Secretary of the Commission.

Environmental commenters will be

placed on the Commission’s

environmental mailing list, will receive

copies of the environmental documents,

and will be notified of meetings

associated with the Commission’s

environmental review process.

Environmental commenters will not be

required to serve copies of filed

documents on all other parties.

However, the non-party commenters

will not receive copies of all documents

filed by other parties or issued by the

Commission (except for the mailing of

environmental documents issued by the

Commission) and will not have the right

to seek court review of the

Commission’s final order.

The Commission encourages

electronic submission of protests and

interventions in lieu of paper using the

‘‘eFiling’’ link at http://www.ferc.gov.

Persons unable to file electronically

should submit an original and 14 copies

of the protest or intervention to the

Federal Energy Regulatory Commission,

888 First Street, NE., Washington, DC

20426.

Comment Date: 5 p.m. Eastern Time

on November 6, 2007.

Kimberly D. Bose,

Secretary.

[FR Doc. E7–20877 Filed 10–23–07; 8:45 am]

BILLING CODE 6717–01–P

DEPARTMENT OF ENERGY

Federal Energy Regulatory

Commission

[Docket Nos. ER07–1157–000; ER07–1157–

001]

Logan Wind Energy LLC; Notice of

Issuance of Order

October 17, 2007.

Logan Wind Energy LLC (Logan Wind

Energy) filed an application for marketbased rate authority, with an

accompanying rate schedule. The

proposed market-based rate schedule

provides for the sale of energy, capacity

and ancillary services at market-based

rates. Logan Wind Energy also requested

waivers of various Commission

regulations. In particular, Logan Wind

Energy requested that the Commission

grant blanket approval under 18 CFR

E:\FR\FM\24OCN1.SGM

24OCN1

yshivers on PROD1PC62 with NOTICES

Federal Register / Vol. 72, No. 205 / Wednesday, October 24, 2007 / Notices

part 34 of all future issuances of

securities and assumptions of liability

by Logan Wind Energy.

On October 16, 2007, pursuant to

delegated authority, the Director,

Division of Tariffs and Market

Development—West, granted the

requests for blanket approval under Part

34 (Director’s Order). The Director’s

Order also stated that the Commission

would publish a separate notice in the

Federal Register establishing a period of

time for the filing of protests.

Accordingly, any person desiring to be

heard concerning the blanket approvals

of issuances of securities or assumptions

of liability by Logan Wind Energy,

should file a protest with the Federal

Energy Regulatory Commission, 888

First Street, NE., Washington, DC 20426,

in accordance with Rules 211 and 214

of the Commission’s Rules of Practice

and Procedure. 18 CFR 385.211, 385.214

(2004).

Notice is hereby given that the

deadline for filing protests is November

15, 2007.

Absent a request to be heard in

opposition to such blanket approvals by

the deadline above, Logan Wind Energy

is authorized to issue securities and

assume obligations or liabilities as a

guarantor, indorser, surety, or otherwise

in respect of any security of another

person; provided that such issuance or

assumption is for some lawful object

within the corporate purposes of Logan

Wind Energy, compatible with the

public interest, and is reasonably

necessary or appropriate for such

purposes.

The Commission reserves the right to

require a further showing that neither

public nor private interests will be

adversely affected by continued

approvals of Logan Wind Energy’s

issuance of securities or assumptions of

liability.

Copies of the full text of the Director’s

Order are available from the

Commission’s Public Reference Room,

888 First Street, NE., Washington, DC

20426. The Order may also be viewed

on the Commission’s Web site at

http://www.ferc.gov, using the eLibrary

link. Enter the docket number excluding

the last three digits in the docket

number filed to access the document.

Comments, protests, and interventions

may be filed electronically via the

internet in lieu of paper. See, 18 CFR

385.2001(a)(1)(iii) and the instructions

on the Commission’s Web site under the

VerDate Aug<31>2005

15:33 Oct 23, 2007

Jkt 214001

‘‘e-Filing’’ link. The Commission

strongly encourages electronic filings.

Kimberly D. Bose,

Secretary.

[FR Doc. E7–20890 Filed 10–23–07; 8:45 am]

BILLING CODE 6717–01–P

DEPARTMENT OF ENERGY

Federal Energy Regulatory

Commission

[Docket No. QF04–132–001]

North Texas Wind Center, LLC; Notice

of Filing

October 16, 2007.

Take notice that on October 11, 2007,

North Texas Wind Center, LLC, c/o

Noble Environmental Power, LLC, 8

Railroad Avenue, Suite 8, Essex, CT

06426, on behalf of the NTWC–4 Project

(NTWC–4) filed with the Federal Energy

Regulatory Commission (Commission)

an application for recertification of a

facility as a qualifying small power

production facility pursuant to 18 CFR

292.207(b) of the Commission’s

regulations. No determination has been

made that the submittal constitutes a

complete filing.

NTWC–4 is small power production

wind facility currently in development

that consists of multiple wind turbine

generators with an approximate net

power production capacity of 78.3 MW.

The facility will be located in Hansford

County, Texas.

Interconnection of NTWC–4 will be

with a transmission line owned by Xcel

Energy, Inc. and operated by its

operating subsidiary Southwestern

Public Service Company (SPS). NTWC–

4 also expects that SPS will be the

electric utility that will provide the

facility with supplementary, back-up

and maintenance power.

Any person desiring to intervene or to

protest this filing must file in

accordance with Rules 211 and 214 of

the Commission’s Rules of Practice and

Procedure (18 CFR 385.211, 385.214).

Protests will be considered by the

Commission in determining the

appropriate action to be taken, but will

not serve to make protestants parties to

the proceeding. Any person wishing to

become a party must file a notice of

intervention or motion to intervene, as

appropriate. Such notices, motions, or

protests must be filed on or before the

comment date. On or before the

comment date, it is not necessary to

serve motions to intervene or protests

on persons other than the Applicant.

The Commission encourages

electronic submission of protests and

PO 00000

Frm 00026

Fmt 4703

Sfmt 4703

60335

interventions in lieu of paper using the

‘‘eFiling’’ link at http://www.ferc.gov.

Persons unable to file electronically

should submit an original and 14 copies

of the protest or intervention to the

Federal Energy Regulatory Commission,

888 First Street, NE., Washington, DC

20426.

This filing is accessible on-line at

http://www.ferc.gov, using the

‘‘eLibrary’’ link and is available for

review in the Commission’s Public

Reference Room in Washington, DC.

There is an ‘‘eSubscription’’ link on the

Web site that enables subscribers to

receive e-mail notification when a

document is added to a subscribed

docket(s). For assistance with any FERC

Online service, please e-mail

FERCOnlineSupport@ferc.gov, or call

(866) 208–3676 (toll free). For TTY, call

(202) 502–8659.

Comment Date: 5 p.m. Eastern Time

on November 13, 2007.

Kimberly D. Bose,

Secretary.

[FR Doc. E7–20870 Filed 10–23–07; 8:45 am]

BILLING CODE 6717–01–P

DEPARTMENT OF ENERGY

Federal Energy Regulatory

Commission

[Docket No. QF03–11–001]

North Texas Wind Center, LLC; Notice

of Filing

October 16, 2007.

Take notice that on October 9, 2007,

North Texas Wind Center, LLC, c/o

Noble Environmental Power, LLC, 8

Railroad Avenue, Suite 8, Essex, CT

06426, on behalf of the NTWC–1 Project

(NTWC–1) filed with the Federal Energy

Regulatory Commission (Commission)

an application for recertification of a

facility as a qualifying small power

production facility pursuant to 18 CFR

292.207(b) of the Commission’s

regulations. No determination has been

made that the submittal constitutes a

complete filing.

NTWC–1 is small power production

wind facility currently in development

that consists of multiple wind turbine

generators with an approximate net

power production capacity of 76.7 MW.

The facility will be located in Hansford

County, Texas.

Interconnection of NTWC–1 will be

with a transmission line owned by Xcel

energy, Inc. and operated by its

operating subsidiary Southwestern

Public Service Company (SPS). NEWC–

1 also expects that SPS will be the

electric utility that will provide the

E:\FR\FM\24OCN1.SGM

24OCN1