Administrative Review Board
200 Constitution Ave. NW
Washington, DC 20210-0001
U.S. Department of Labor
In the Matter of:
KIRTLEY CLEM and
MATTHEW SPENCER,
ARB CASE NO.
2020-0025
ALJ CASE NO.
2015-ERA-00003
2015-ERA-00004
COMPLAINANTS,
v.
DATE: March 10, 2021
COMPUTER SCIENCES
CORPORATION,
RESPONDENT.
Appearances:
For the Complainants:
Stephani L. Ayers, Esq.; Law Offices of S.L. Ayers, Medford Oregon;
Nikolas F. Peterson, Esq.; Hanford Challenge, Seattle, Washington
For the Respondent:
Rachel Linzy, Esq., Joseph R. Ward, III, Esq., Stephen L. Scott, Esq.,
The Kullman Firm, Birmingham, Alabama
Before: James D. McGinley, Chief Administrative Appeals Judge; Thomas
H. Burrell and Randel K. Johnson, Administrative Appeals Judges
DECISION AND ORDER
PER CURIAM. This case arises under the Energy Reorganization Act of 1974
(ERA), as amended, 42 U.S.C. § 5851 (2005), as implemented by regulations codified
at 29 C.F.R. Part 24 (2020). Kirtley Clem and Matthew Spencer (Complainants)
filed complaints alleging that their former employer, Computer Sciences
Corporation (CSC), violated the whistleblower protection provisions of the ERA.
2
Consolidating the appeals, the Administrative Law Judge (ALJ) found for Clem and
Spencer and awarded damages. CSC appealed the ALJ’s decision, and the Board
vacated and remanded with instructions for the ALJ. On remand, the ALJ again
found for Complainants and awarded damages. We affirm.
BACKGROUND
We fully incorporate the background facts from the ALJ’s initial Decision and
Order,1 the Board’s Decision and Remand Order,2 and the ALJ’s Decision and Order
on Remand.3 We will give an overview of the parties and actions at issue that are
necessary for discussion, with an emphasis on the facts relied on by the parties for
their arguments.
CSC hired Complainants as Senior Programmer Analysts in the summer of
2011.4 At the time, CSC was a prime contractor for the Department of Energy
(DOE) to provide occupational medical services at DOE’s Hanford Site and National
Laboratory (Hanford) in eastern Washington.5 It subcontracted some of its
obligations to HPM Corporation (HPM).6 CSC’s main duty was to provide IT
services for the medical clinic at Hanford.7 The IT team, which was led by Eric
Elsethagen, consisted of Complainants, Michael Johnston, Polly Riley, and Ray
Matthews.8 Kim Conley directed the clinic and reported to George Baxter, the
principal manager of the clinic.9 Both reported to Lisa Poulter, CSC’s Public Health
Sciences Manager.10
In 2011, CSC began producing an electronic records management program
called Occupational Health Management (OHM), which integrated clearances and
Clem v. Comput. Scis. Corp., ALJ Nos. 2015-ERA-00003, -00004 (ALJ Sept. 12, 2016)
(D. & O.).
1
Clem v. Comput. Scis. Corp., ARB No. 2016-0096, ALJ Nos. 2015-ERA-00003, -00004
(ARB Sept. 17, 2019) (ARB D. & O.).
2
Clem v. Comput. Scis. Corp., ALJ Nos. 2015-ERA-00003, -00004 (ALJ Jan. 9, 2020)
(D. & O. on Remand).
3
4
CX 9-10.
5
CX 2.
6
D. & O. on Remand at 3.
7
ARB D. & O. at 2.
8
Id.
9
Id.
10
Id.
3
medical records to manage worker assignments.11 Clem was responsible for
converting applications to operate with OHM.12 CSC’s IT employees worked with
HPM employees to implement the program, which was scheduled to go live on
August 20, 2012.13
In 2012, CSC’s contract with DOE expired, and HPM won the new prime
contract.14 The companies agreed for CSC to serve as subcontractor on the new
contract.15 In July 2012, Cleve Mooers, HPM’s transition manager, announced that
CSC needed to lay off three programmers by October 1.16 On August 7, Conley
offered the positions to Elsethagen, Johnston, and Spencer.17 Elsethagen and
Spencer, however, resigned from their positions before the new contract began.18 On
September 18, Conley offered the open spots to Riley, an off-site worker, and
Matthews, a junior developer.19
During the time leading up to the new contract, CSC and HPM employees
worked cooperatively on a daily basis. Spencer stated that employees from both
companies were indistinguishable unless they were asked who employed them.20
Joe Vela, the head of Performance Assurance for HPM, met with Complainants
about the transition.21
Complainants made ongoing complaints about the functionality of OHM and
were concerned that it would not perform reliably by the go-live date. In July 2012,
Complainants expressed their concerns to Elsethagen, who responded, “it’s our jobs
to fix issues like this . . . so, to me, it’s go out and do your job.”22 At some point, Lisa
Zaccaria, a Business Process Analyst for CSC, told Spencer to stop raising his
concerns at IT staff meetings.23
11
D. & O. on Remand at 3.
12
D. & O. at 4.
13
D. & O on Remand at 3.
14
Id. at 2.
15
Id.
16
D. & O on Remand at 3.
17
ARB D. & O. at 3.
18
Id.
19
D. & O. 24-25; Hearing Transcript (Tr.) 193.
20
D. & O. 5; Tr. 496-97.
21
D. & O. 5.
22
Tr. 986-87.
23
ARB D. & O. at 4.
4
Clem asked Vela for his opinion on the issue, who encouraged Complainants
to bring their complaints to DOE.24 On August 10, 2012, Complainants
anonymously emailed a complaint to the DOE employee-concerns program.25 The
DOE met with Complainants that day and later performed an inquiry at the site on
August 15.26
Clem also sent an anonymous email to Riley on August 10, informing her of
the complaint and asking if she would discuss the issue with DOE.27 Riley
forwarded Clem’s email to Elsethagen soon after.28 Clem subsequently identified to
Riley that he and Spencer were the employees who complained to DOE.29 Riley
replied that she was “shocked, saddened and disappointed” about the email and
lamented their “secretive enrollment of co-conspirators to derail the project.”30
Riley subsequently forwarded Clem’s message and her response to
Elsethagen, noting her disdain for Complainants’ “corporate backstabbing.”31 On
the same day, CSC sent out an email stating that CSC staff should not be
supporting HPM-identified transition work unless directed by Baxter or Conley, and
if an employee had a question as to whether work was CSC transition or HPM
transition, to talk to Conley or Baxter.32
Johnston had expressed concern to Conley about Spencer discussing OHM
with HPM and Lockheed Martin Services, Inc. (LM), the IT contractor for Hanford’s
operations outside of the clinic.33 On September 6, Spencer met with Conley about
Johnston’s concerns. Conley advised Spencer not to speak with Vela about OHM.34
On September 14, Johnston emailed Conley to express concerns about
Complainants spending a lot of time “behind closed doors.”35
24
Id.
25
Id.
26
Id.; D. & O. on Remand at 4.
27
ARB D. & O. at 4.
28
CX 31.
29
D. & O. at 10.
30
CX 37.
31
Id.
32
CX 29; ARB D. & O. at 5.
33
ARB D. & O. at 2-3, 5-6.
34
D. & O. on Remand at 5.
35
Id.
5
Because OHM was not ready by August 20, CSC delayed its go-live date until
September 17.36 After OHM went live, Spencer notified Elsethagen that he received
213,000 error messages from the new system, which had crashed three times in the
first two days.37
On September 18, at HPM’s request, Complainants met with Mooers and
Vela at an off-site restaurant.38 Mooers and Vela requested IT information, and
Complainants discussed their concerns with OHM, including issues that HPM
might need to be aware of during the transition, such as the crashes and the
staffing issues.39 Mooers offered to pay Clem for a transition write-up on staffing
and risk assessment.40 Clem also inquired about a rumor that LM was bidding on
the IT scope for the clinic, which Mooers confirmed.41 All attendees of the meeting
denied that they discussed any CSC proprietary information.42
On September 19, Baxter, Poulter, and Conley received an email chain
between HPM and DOE revealing HPM’s effort to switch from a fixed-price to costreimbursable contract.43 Mooers testified that the switch would replace CSC with
LM for the clinic’s IT work.44
On September 20, Complainants initiated a meeting with Conley to discuss
their ongoing concerns with OHM.45 Conley described the meeting in a statement to
CSC’s Employee Relations office (ER).46 The meeting began with Complainants
voicing their concerns with OHM.47 They also informed Conley that they had met
with Mooers and Vela and discussed CSC’s IT systems and staffing, that LM was
bidding on the IT component, and that HPM had requested Clem to provide
36
Id.
37
Tr. 546-47; D. & O. at 15.
38
ARB D. & O. at 7.
39
D. & O. on Remand at 5.
40
ARB D. & O. at 7.
41
D. & O. at 17.
42
D. & O. on Remand at 12.
43
ARB D. & O. at 7.
44
Mooers Dep. 19-20.
45
D. & O. on Remand at 6; CX 66.
46
Id.
47
Id.
6
consulting on OHM and staffing for HPM’s transition.48 Conley then asked how long
and how often they met with HPM, the information they shared, why HPM met
with them instead of management, and why they thought the meeting was
acceptable.49 Conley also asked Clem whether LM had offered him a job, which he
denied.50 Spencer admitted that “he had talked with a number of LM employees at
all levels.”51
Conley stated that Complainants believed that OHM would suffer
catastrophic failures in the upcoming weeks because no “key staff” would be
retained after the transition.52 Complainants believed the meeting was acceptable
because HPM would become the new prime contractor in October.53
In his statement to ER, Clem said that the purpose of the meeting with
Conley was to make sure she knew the risks from the IT staff being cut.54 He
explained that Elsethagen had told the IT group in July 2012 that they could assist
an HPM employee that had questions regarding the IT systems for transition
purposes “unless it was going to take more than an hour or so.”55
After the meeting, Conley informed Baxter of the meeting and called Poulter
to discuss.56 Conley reported the meeting and that Complainants had provided
information to aid LM in their bidding, knowing that the risk assessment HPM
requested was for LM to take over the subcontract.57
Later in the day, Conley suspended Complainants without pay.58 Conley later
claimed that Poulter had directed her to suspend Complainants to prevent them
from sabotaging the system, but Poulter stated that ER decided to suspend them. 59
48
Id.
49
Id.
50
Tr. 430-32.
51
CX 66.
ARB D. & O. at 7. Most of CSC’s staff, including Conley, believed the reduction in
staff was an unwise decision. Tr. 322-23, 1146.
52
53
CX 66.
54
D. & O. on Remand at 6.
55
CX 66.
56
ARB D. & O. at 8.
57
Id.
58
D. & O. on Remand at 6.
59
Id.
7
Baxter did not recall the details of the suspension and only remembers that he had
not made the decision.60 In her summary of the incident, Kobra Martinez, the ER
employee assigned to the case, detailed that “Conley stated that she will not
terminate the employees because they were already schedule[d] for termination but
wanted them immediately removed from the work site.”61 Clem recalls that Conley
told them they were suspended for “for aiding the competition and supplying
confidential business sensitive information to a competitor.”62
On the same day, Poulter informed Mooers in an email that HPM should
contact Conley to coordinate if HPM needed assistance from a CSC worker.63
Mooers replied asking if CSC had fired IT professions for “aiding the competition,”
to which Poulter responded “no.”64 Later that day, Mooers responded that he was
“told that [Poulter] prohibited any of [her] IT professionals from talking with
HPMC,” and asked her that “if discussing IT with the current IT folks is
troublesome to [her, to] please let [him] know.”65
In a call between Martinez, her supervisor, and CSC’s legal counsel regarding
the incident, counsel said that “only but so much information could have been
shared with HPM” and because “HPM already has access to the meetings, CSC
employees and the client, it’s not unusual for employees to talk among themselves
about work related subjects.”66 ER never reached a conclusion as to wrongdoing.67
After the suspension decision, CSC did not retain Clem for employment in
the follow-on contract, and CSC did not pay Clem and Spencer special pay promised
60
D. & O. at 20; Tr. 139-41.
61
CX 66.
62
Tr. 137.
63
D. & O. on Remand at 7; CX 60.
CX 60. Poulter, however, testified that she believed Complainants had improperly
shared information with HPM. When asked if she believed that they aided the competition,
Poulter responded that Complainants “certainly undermined CSC’s competitive position in
the course of negotiating the subcontract with the prime.” Poulter Dep. 81. Poulter stated
that HPM was not honoring its agreement for the follow-on contract because it was trying
to remove CSC from the follow-on contract: “CSC’s business interests were at risk based on
HPM’s performance or behavior, and certainly that was not helped by Mr. Clem and Mr.
Spencer going and talking to HPM clandestinely, if that’s the word.” Dep. 49-50, 53-54.
Poulter testified that Clem and Spencer should not have been “colluding” with HPM and
sharing proprietary information “outside of the normal management chain.” Dep. 58.
64
65
CX 60.
66
CX 66. Martinez documented the call in her summary of the incident. D. & O. at 7.
67
Martinez Dep. 42.
8
to CSC staff for additional or overtime hours worked during OHM’s
implementation.68 Clem applied for a job with CSC in December 2012 and October
2013 but was not selected for employment.69 Spencer, who was offered a position on
the next contract on August 7 but resigned from the position, took a job at another
company.70
Complainants filed complaints with the Occupational Safety and Health
Administration (OSHA), alleging that CSC unlawfully retaliated against them
under the ERA.71 On November 18, 2014, OSHA found for Complainants.72 CSC
filed objections with the Office of Administrative Law Judges. The ALJ held a
hearing for six days and thereafter ruled for Complainants.73
In his D. & O., the ALJ found that Complainants engaged in protected
activity, that CSC was aware of that protected activity, and that Complainants
suffered adverse actions.74 The ALJ further found that a totality of factors
supported a reasonable inference that the protected activity contributed to their
suspension, CSC’s failure to pay them special pay for overtime work, and CSC’s
decision not to retain or rehire Clem for employment.75 For each of the adverse
actions, the ALJ found that CSC could not prove by clear and convincing evidence
that it was justified in taking its actions.76
The ALJ awarded damages to Complainants. Both were awarded their
salaries for the period of suspension, compensatory damages for their suffering, and
40 hours of “special pay” CSC did not provide.77 The ALJ further awarded Clem for
his lost wages and employer contributions to his 401(k).78
CSC petitioned for review of the ALJ’s decision. The Board affirmed the
ALJ’s findings that Complainants engaged in protected activity, that CSC was
aware of the protected activity, and that CSC took adverse employment actions
68
ARB D. & O. at 9.
69
Id.
70
Tr. 487-88.
71
D. & O. at 21.
72
ARB D. & O. at 10.
73
Id.
74
D. & O. at 22-23.
75
Id. at 23-25.
76
Id. at 26-28.
77
Id. at 35.
78
Id.
9
against them.79 The Board, however, held that the ALJ erred in describing the
contributing-factor casual standard and same-action defense standard and by
failing to adequately engage the parties’ arguments and evidentiary record.80 The
Board therefore vacated the decision and damages award and remanded for the ALJ
to apply the correct standards on remand.81 The Board also provided the ALJ with
several instructions to fully analyze the record, weigh evidence, and make findings
of fact by a preponderance of the evidence on the issues.82
In his D. & O. on Remand, the ALJ discussed the Board’s instructions on
remand and re-analyzed the contributing-factor causal and same-action defense
issues.
The ALJ first discussed the contributing factor element of the whistleblower
claim using the correct standard: whether Complainants demonstrated by a
preponderance of the evidence that their protected activity was a contributing factor
to the adverse actions against them.83 For this factor, the ALJ first considered
whether the protected activity contributed to the suspension.
The ALJ found temporal proximity between the protected activity and the
suspension and determined that Complainants’ disclosure of the restaurant meeting
was not an intervening event that would negate the circumstantial value of the
temporal proximity.84 The ALJ concluded that it was implausible that a meeting
with HPM employees would suddenly result in suspension, noting CSC’s and HPM’s
history of working cooperatively, especially during transition, Elsethagen’s
79
ARB D. & O. at 11-14.
80
ARB D. & O. at 15-16.
81
Id. at 22-23.
Specifically, the Board ordered the ALJ to (1) analyze the record and address CSC’s
argument and evidence that CSC was concerned with HPM attempting to substitute LM for
CSC and suspended Complainants under the belief that they were colluding with HPM, (2)
evaluate CSC’s arguments and supporting evidence that CSC warned employees not to
work with HPM on transition-related activities without permission, (3) assess the
testimony of Conley, Baxter, and Poulter concerning the meetings and decision-making that
took place on September 20 and explain why or why not he disbelieves their testimony, (4)
explain how the ALJ’s findings that CSC’s stated reasons are pretexual support his
ultimate findings of contribution and the CSC’s inability to prove its same-action defense,
(5) analyze the evidence concerning the role that ER played in the investigation and
disciplinary process, and (6) weigh Poulter’s denial to Mooers that Complainants were
suspended for aiding the competition with the remainder of the email conversation and the
record in general. ARB D. & O. at 21-22.
82
83
D. & O. on Remand at 8-9.
84
Id. at 9-11.
10
permission for CSC employees to provide IT information to HPM, and the fact that
Complainants were not in a position to provide proprietary information.85
The ALJ also found CSC’s stated reasons for the suspension were pretextual,
concluding that CSC did not have a good-faith belief that Complainants had shared
proprietary business information with HPM.86 The ALJ found that testimony from
Mooers and Conley established that Complainants had no access to proprietary
information and that CSC had no reason to think otherwise.87 ER documented that
“only but so much information could have been shared with HPM.” The high level of
cooperation between the two companies further made it unlikely that CSC believed
the meeting violated company policy, and Complainants’ persistent complaints
about OHM distinguished them from the rest of the staff.88 The ALJ also
highlighted that none of CSC’s personnel took responsibility for the suspension,
concluding that an employer would presumably be willing to admit to such a
decision if it had a legitimate basis.89 The ALJ, therefore, concluded that
Complainants’ protected activity contributed to their suspension.
Next, the ALJ considered whether the protected activity led to the decision
not to provide special pay to Complainants. The ALJ noted that CSC promised
special pay to staff for overtime work but then alleged that the pay was withheld
because Complainants were not “giving 100%.”90 The pay however was for extra
hours, not effort, and no other employees were denied it for lack of effort.91 The ALJ
thus found contribution.
The ALJ then considered whether the protected activity contributed to the
decision not to retain Clem for the next contract. The ALJ found choosing a lessexperienced person for a short-staffed team counterintuitive.92 Further, the decision
not to retain Clem was made after Clem made ongoing complaints about OHM and
before the Conley meeting.93 The ALJ therefore found the protected activity
contributed to the decision.
85
Id. at 10-11.
86
D. & O. on Remand at 11.
87
Tr. 1109; Mooers’ Dep. 15.
88
D. & O on Remand at 13.
89
Id.
90
Id.
91
Id.
92
Id. at 14.
93
Id.
11
Lastly, the ALJ found that the protected activity contributed to the failure to
rehire Clem. The ALJ found CSC’s proffered reason for not rehiring him, that they
received stronger resumes, not credible and unsupported.94 The ALJ also found
contribution supported by temporal proximity because Clem was not rehired in
December 2012 or October 2013, both within approximately one year of the
protected activity and the suspension.95
Because Complainants had proven that their protected activities contributed
to the adverse employment actions, the ALJ then analyzed CSC’s same-action
defense to determine whether CSC demonstrated by clear and convincing evidence
that CSC would have taken the same adverse actions if there were no protected
activity. The ALJ noted that the question in this case was whether CSC would have
taken the same adverse action against Complainants if it had only learned about
the off-site meeting with HPM, without any connection to complaints about OHM.96
For the suspension, CSC argued that Complainants’ disavowed knowledge of
the proper protocol for speaking with HPM was not credible because Complainants
knew LM was a direct competitor and that they knew that CSC was deliberately
withholding information from HPM.97 The ALJ found that the assertion was on
shaky evidential ground when considering the whole record, citing the evidence of
close collaboration between the companies during transition and Elsethagen
permitting IT staff to provide information to HPM on transition matters.98 Further,
Mooers had asked Poulter to inform him if discussing IT staff with CSC was
troublesome to her after she suspended Complainants, which suggested there was
no well-known policy that CSC employees could not exchange information with
HPM.99
The ALJ further opined that the discrepancies in testimony regarding the
decision-making process undermined CSC’s defense, highlighting that no CSC
employee would admit to or identify who made the decision to suspend.100 Poulter’s
denial to Mooers that she suspended the employees for aiding the competition also
weakened CSC’s defense, and Mooers’ surprise by the suspension of Complainants
94
Id.
95
Id.
96
Id. at 15.
97
Id. at 17.
98
Id.
99
Id. at 18.
100
Id.
12
suggests that Complainants’ concerns with OHM played a role in the adverse
actions against them.101
The ALJ then addressed the meeting between Conley and Spencer on
September 6, in which she advised Spencer not to speak with Vela about OHM.102
The ALJ opined that the meeting was the strongest evidence supporting CSC’s
argument that Spencer knew not to speak to HPM about OHM and that providing
information to HPM was suspension-worthy.103 The ALJ’s issue with the evidence,
however, was that the command was directed at restricting Spencer’s protected
activity, expressing concern about OHM, not protecting proprietary business
information.104 The ALJ found the evidence supported a conclusion that CSC’s main
concern regarding Complainants’ discussions with HPM was their complaints about
OHM.105 The ALJ therefore found that CSC failed to prove their same-action
defense for the suspensions.
The ALJ next found that CSC failed to demonstrate with clear and
convincing evidence that it would not have given Complainants special pay absent
their protected activity. Even if such pay were discretionary, as argued by CSC, the
ALJ determined that CSC would have provided Complainants special pay if they
had not made the complaints, as their colleague Johnston received special pay after
working the same hours and not engaging in protected activity.106
The ALJ then found that CSC failed to prove that it would not have retained
Clem absent the protected activity, concluding that it was counterintuitive to select
a more junior developer and remote worker for an IT team with low staffing and
highlighting that the initial three selections were all senior programmers like
Clem.107 The ALJ noted that CSC was likely aware of Complainants’ protected
activity when the selections were made because DOE had already investigated their
complaints and Conley had already told Spencer not to discuss OHM with HPM.108
Last, the ALJ found that CSC failed to prove its defense regarding rehiring
Clem. Conley claimed that she did not hire Clem because of reliability and trust
issues from his conversations with HPM, despite finding him eligible. The ALJ
101
Id. at 19.
102
Id. at 19-20.
103
Id.
104
Id. at 20.
105
Id.
106
Id.
107
Id. at 21.
108
Id.
13
found that her explanations failed to show it was highly probable she would not
have hired him despite his protected activity.109
Because CSC failed to prove its affirmative defense, the ALJ then discussed
damages. Observing that the Board vacated the award in the initial decision but did
not suggest any error, the ALJ fully incorporated his analysis and findings in his
initial damage award.110
CSC filed a timely petition for review of the ALJ’s findings thereafter.
JURISDICTION AND STANDARD OF REVIEW
Congress authorized the Secretary of Labor to issue final agency decisions
with respect to claims of discrimination and retaliation filed under the ERA.111 The
Secretary has delegated that authority to the Administrative Review Board.112 The
ARB will affirm an ALJ’s findings of fact when supported by substantial
evidence.113 “Substantial evidence is “‘more than a mere scintilla.’ It means . . . such
relevant evidence as a reasonable mind might accept as adequate to support a
conclusion.’”114 The threshold for this “evidentiary sufficiency is not high.”115 This
test “limits the reviewing court from ‘deciding the facts anew, making credibility
determinations, or re-weighing the evidence.’”116
DISCUSSION
The ERA’s whistleblower statute provides that, “No employer may discharge
any employee or otherwise discriminate against any employee with respect to his
compensation, terms, conditions, or privileges of employment because the employee”
109
Id.
110
D. & O. on Remand at 22.
111
42 U.S.C. § 5851.
Secretary’s Order No. 01-2020 (Delegation of Authority and Assignment of
Responsibility to the Administrative Review Board (Secretary’s discretionary review of ARB
decisions)), 85 Fed. Reg. 13186 (Mar. 6, 2020); see 29 C.F.R. § 24.110 (2020).
112
29 C.F.R. § 24.110(b) (2020) (“The ARB will review the factual findings of the ALJ
under the substantial evidence standard.”).
113
Biestek v. Berryhill, 139 S. Ct. 1148, 1154 (2019) (quoting Consol. Edison Co. v.
NLRB, 305 U.S. § 197, 229 (1938)).
114
115
Id.
Stone v. Webster Const., Inc, v. U.S. Dep’t of Labor, 684 F.3d 1127, 1133 (11th Cir.
2012) (quoting Moore v. Barnhart, 405 F.3d 1208, 1211 (11th Cir. 2005)).
116
14
engaged in protected activity,117 including any “action [designed] to carry out the
purposes of [the nuclear safety statutes].”118 Courts interpret the statute broadly to
implement its “broad, remedial purpose.”119
On remand, the Board tasked the ALJ with re-evaluating two of the required
findings in an ERA whistleblower claim.120 First, whether Complainants
demonstrated by a preponderance of the evidence121 that their protected activity
was a contributing factor to the adverse actions against them. Second, whether CSC
demonstrated by clear and convincing evidence122 that it would have taken the
same unfavorable personnel action in the absence of protected activity. In his initial
decision, the ALJ also made findings regarding damages awards after finding
Complainants prevailed on their claim, which he incorporated into his decision on
remand as the ARB did not address those findings in its remand order. On appeal,
CSC challenges the ALJ’s findings in favor of the Complainants for each adverse
action on remand and the damages awards provided to Clem and Spencer. We
address each issue in turn.
1. Contributing Factor
CSC argues that the record does not support the ALJ’s finding that
Complainants’ protected activity contributed to the adverse actions against them.
Under this element of an ERA whistleblower claim, a complainant can meet this
“rather light burden” by demonstrating that their protected activities “tended to
117
42 U.S.C. § 5851(a)(1).
118
Am. Nuclear Res., Inc. v. U.S. Dep’t of Labor, 134 F.3d 1292, 1295 (6th Cir. 1998).
119
Id. (quoting Mackowiak v. Univ. Nuclear Sys., Inc., 735 F.2d 1159, 1163 (9th Cir.
1984)).
To prevail on an ERA whistleblower complaint, a complainant must prove by a
preponderance of the evidence that he engaged in protected activity, suffered an
unfavorable or adverse personnel action, and that his protected activity was a contributing
factor in the unfavorable personnel action taken against him. If the complainant’s protected
activity was a contributing factor in the adverse action, the employer may avoid liability
and damages only if it demonstrates “by clear and convincing evidence that it would have
taken the same unfavorable personnel action” in the absence of the protected activity. See
Clem v. Comput. Scis. Corp., ARB No. 2016-0096, ALJ Nos. 2015-ERA-00003, -00004, slip
op. at 11 (ARB Sept. 17, 2019); 42 U.S.C. § 5851(b); 29 C.F.R. § 24.109(b).
120
Preponderance of the evidence requires the ALJ to determine whether the party
with the burden has proven that the fact is more likely than not. Clem, ARB No. 2016-0096,
slip op. at 19.
121
An employer satisfies the clear and convincing burden when it shows that it is
“highly probable” that it would have taken the same action in the absence of protected
activity. Id.
122
15
affect [the adverse action] in at least some way.”123 A contributing factor may be
“any factor, small or big, that actually influenced the employer’s actions, regardless
of how many other influences there were,” so “once an ALJ decides that protected
activity contributed, no number of legitimate reasons can undo that finding.”124
CSC challenged the ALJ’s finding that Complainants’ protected activity
contributed to the suspension, arguing that the ALJ disregarded or
mischaracterized evidence supporting CSC’s position. For instance, though CSC and
HPM workers routinely worked on matters together at Hanford, Complainants’
September 18 restaurant meeting was not with front-line clinic employees but with
higher level managers at HPM. CSC had learned that HPM managers had been
working to replace CSC with LM and was aware of Complainants’ interaction with
HPM and LM staff at the clinic in early September. Mooers was HPM’s owner’s
husband and a transition manager and admitted that he did not routinely speak
with CSC IT staff.125 Vela was the quality insurance manager for HPM. While there
was a high level of interaction between employees of both companies, the ALJ
conflated the interactivity with clinic workers and with managerial level employees
in concluding that the restaurant meeting was typical and to be expected.
CSC also argues that the July 2012 email from Elsethagen permitting CSC
employees to assist HPM employees was incorrectly cited to support a finding that
the restaurant meeting was an authorized part of transition. First, the email
limited assistance to “an hour or so” and does not logically permit an after-hours
meeting at an off-site location. Further, the approval was in response to a specific
request regarding inquiries from HPM regarding a certain IT system and did not
translate into a general rule allowing CSC staff to discuss IT information with
anyone at HPM at any time.126
Any notion of a general rule permitting meetings between HPM and CSC
staff is rebutted by other actions by CSC, including Baxter’s email to HPM in July
2012 to confirm that “all requests for contract transition support (meeting requests,
data requests, etc.) be sent to CSC management” and Riley’s demand that HPM and
LM elevate their request for access to a patient database to her management in
September 2012.127 Most notably, the email sent by CSC on August 10, 2012, which
informed staff that they should not be working to support HPM-identified transition
Deltek v. Dep’t of Labor, 649 Fed. Appx. 320, 329 (4th Cir. 2016) (quoting Feldman v.
Law Enf’t Assocs. Corp., 752 F.3d 339, 348 (4th Cir. 2014)).
123
Palmer v. Canadian Nat’l Ry., ARB No. 2016-0035, ALJ No. 2014-FRS-00154, slip
op. at 64 (Jan. 4, 2017) (Corchado, J., concurring).
124
125
CSC Brief (Br.) at 13.
126
CSC Br. at 11-12.
127
CSC Br. at 12.
16
work unless directed by Baxter or Conley, set boundaries for CSC staff that logically
did not authorize a meeting such as the one at the restaurant. These actions, as
CSC points out, were not discussed by the ALJ.
CSC further argues that the record demonstrates that Complainants were
aware of the boundaries for interacting with HPM staff. After Johnston had notified
Conley of suspicious closed-door meetings with HPM and LM personnel in the
clinic, Conley spoke with Spencer. Spencer noted in his daily journal that Conley
had advised him not to speak with HPM about OHM and informed Clem about the
counseling. In his statement to HR, Clem wrote that “[w]e were told you don’t
discuss CSC scope (IT) with HPM.”128
CSC’s arguments are persuasive and present support for reaching a finding
that differs with the ALJ’s. Under the pertinent standard of review, however, “the
possibility of drawing two inconsistent conclusions from the evidence does not
prevent an administrative agency’s finding from being supported by substantial
evidence.”129 In our review, we are unable to determine the facts anew, make
credibility judgments, or re-weigh the evidence in the record.130 Even if a reviewing
court disagrees with the ALJ’s factual findings, the court will still uphold the
findings if substantial evidence supports the conclusion.131
Here, several pieces of evidence in the record support the ALJ’s finding. First,
the temporal proximity between the protected activity, namely voicing concerns to
Conley about OHM, and the suspension provided circumstantial evidence towards
128
CX 71.
Consolo v. Fed. Mar. Comm’n, 383 U.S. 607, 620 (1966) (citing NLRB v. Nevada
Consol. Copper Corp., 316 U.S. 105, 106 (1942)).
129
Stone & Webster Const., Inc., 684 F.3d at 1133 (quoting Moore v. Barnhart, 405 F.3d
1208, 1211 (11th Cir. 2005)).
130
See Sharpe v. Supreme Auto Transp., ARB No. 2017-0077, ALJ No. 2016-STA-00073,
slip op. at 5 (ARB Dec. 23, 2019) (“We must uphold an ALJ’s factual finding that is
supported by substantial evidence, even if there is also substantial evidence for the other
party, and even if we ‘would justifiably have made a different choice had the matter been
before us de novo.’”); see also Bonet ex rel. T.B. v. Colvin, 523 F. App’x 58, 59 (2d Cir. 2013)
(“It may well be that reasonable minds would disagree as to [the finding], but it is clear
from the record that the ALJ . . . simply reached a conclusion, supported by substantial
evidence.”); Yi Teng Zheng v. Bd. of Immigr. Appeals, 235 F. App’x 757, 758-59 (2d Cir.
2007) (“Although we do not agree with” the finding, “we need not remand on that basis
because we can confidently predict that the agency would adhere to its adverse credibility
finding on remand.”); Dema v. Gonzales, 193 F. App’x 109, 110 (2d Cir. 2006) (“Although we
do not agree with all of the [factual findings], remand is not required because we can
confidently predict that the decision-maker would reach the same conclusion on remand.”).
131
17
finding contribution.132 Second, Conley admitted in her testimony that Poulter
informed her to immediately suspend Complainants because CSC management was
worried that Complainants could cause the failure of OHM that they had warned
management about, suggesting that Complainants’ protected activity had some
effect on their suspension.133 Further, Mooers’ reaction to Complainants’ suspension
and Elsethagen’s email permitting CSC staff to assist HPM staff on transition
demonstrate that there was no clear or well-known policy against discussing IT
matters with HPM staff. These facts all indicate that Complainants’ OHM
complaints at least played a part in their suspension.
While evidence in the record supports Complainants’ position, it is entirely
possible that a reasonable mind could have come to a different finding than the
ALJ’s, given the strong evidence favoring CSC’s position. However, at this point, the
egg in this case has been scrambled, as we are unable to substitute our judgment
with the ALJ’s under the applicable standard of review. We therefore hold that
substantial evidence supports the ALJ’s finding that Complainants’ protected
activity contributed to their suspension.
CSC also objects to the ALJ’s finding that the protected activity contributed
to the failure to retain or rehire Clem.134 CSC argues that the ALJ was improperly
acting as a “super-personnel department” when opining that CSC’s reasons for not
retaining or rehiring Clem were insufficient. CSC notes that Spencer was offered a
job on the new contract prior to the suspension and that the ALJ failed to consider
all of CSC’s reasons why it did not rehire Clem.
Given that substantial evidence supports the ALJ’s finding regarding the
suspension, however, CSC’s arguments do not persuade us that Clem’s protected
activity did not also contribute to the decision not to retain or rehire him. Along
with the evidence supporting the suspension finding, the ALJ cited evidence that
Clem had made complaints about OHM prior to the decision not to retain him, that
the decision to hire a less experienced IT worker for a short-staffed team was
counterintuitive, and that the decisions not to hire Clem occurred within a year of
the suspension. Though CSC proffered several reasons why they did not retain or
Temporal proximity between an adverse action and protected activity may
constitute circumstantial evidence of retaliation, though the causal connection may be
severed “where the protected activity and the adverse action are separated by an
intervening event that independently could have caused the adverse action.” Robinson v.
Nw. Airlines, Inc., ARB No. 2004-0041, ALJ No. 2003-AIR-00022, slip op. at 9 (ARB Nov.
30, 2005).
132
133
Tr. 1147-49.
CSC does not present an argument against the ALJ’s finding that the OHM
complaints contributed to the failure to provide Complainants special pay.
134
18
rehire Clem,135 they do not negate a finding that the protected activity also
contributed to the decision not to employ Clem. Further, the ALJ is not “required to
discuss every piece of evidence submitted” in its decision, and his “failure to cite
specific evidence does not indicate that such evidence was not considered.”136
Accordingly, we shall not disturb the ALJ’s findings.
2. Same-Action Defense
CSC argues that it had proven that it would have suspended and withheld
special pay from Complainants and declined to retain or rehire Clem absent their
protected activity. If an ALJ determines a complainant’s protected activity
contributed to an adverse employment action, an employer may avoid liability by
proving by clear and convincing evidence that it would have committed the adverse
action in the absence of the protected activity.137 Clear and convincing evidence
demonstrates “that a fact is ‘highly probable’ and ‘immediately tilts’ the evidentiary
scales in one direction.”138 This “is a tough standard [for employers], and not by
accident,” as “Congress appears to have intended that companies in the nuclear
industry face a difficult time defending themselves.”139
As directed by the Board, the ALJ discussed on remand CSC’s argument that
it had a good-faith belief that Complainants violated company policy by meeting
and sharing proprietary information with HPM, which CSC contends would have
warranted the adverse actions against Complainants.140 The ALJ found that CSC
did not have such a belief, noting that Complainants were not in a position to share
proprietary information and that testimony indicated that no proprietary
information was discussed at the restaurant meeting.
CSC argues that the ALJ improperly focused on what actually happened, as
opposed to what CSC believed to have happened, and failed to address the evidence
regarding the attempt to replace CSC with LM on the IT subcontract. CSC cites to
Conley’s documentation of the September 20 meeting, in which she noted that
CSC did not list these reasons, however, in the section of its brief discussing
contribution for failure to retain and rehire Clem.
135
Brault v. Soc. Sec. Admin., Comm’r, 683 F.3d 443, 448 (2d Cir. 2012) (citations
omitted).
136
Speegle v. Stone & Webster Constr., Inc., ARB No. 2013-0074, ALJ No. 2005-ERA00006, slip op. at 9 (ARB Apr. 25, 2014).
137
138
Id. at 11 (quoting Colorado v. New Mexico, 467 U.S. 310, 316 (1984)).
Id. at 9 (quoting Stone & Webster Eng’g Corp. v. Herman, 115 F.3d 1568, 1572 (11th
Cir. 1997)).
139
Martinez, the ER employee, testified that sharing information with a competitor
would be considered a serious offense under CSC policy. ARB D. & O. at 9.
140
19
Spencer had provided information to LM for a pricing proposal and that
Complainants had provided information about the IT systems to HPM, which
demonstrated her understanding of the conversation with Complainants.141 A day
before the suspension, an email informed CSC that HPM was attempting to change
the contract with the DOE from fixed-firm costs to cost-reimbursable, which would
replace CSC with LM. HPM had also been delaying the execution of the subcontract
with CSC.142 CSC staff knew that Complainants had met with HPM and LM, and
HPM’s proposal to switch the contract noted that it included “more technical
information.”143 Spencer also informed Conley that he had met with all levels of LM
in their meeting. CSC contends that this evidence proves that it believed at the time
that Complainants had shared proprietary information with a “direct competitor.”
CSC is correct that this evidence is sufficient for the ALJ to have found it had
a good-faith belief that Complainants gave away proprietary information and that
the ALJ’s decision lacked discussion of LM’s role in the events. As discussed supra,
however, our main concern on review is whether substantial evidence supports the
ALJ’s finding that CSC did not have a good-faith belief. CSC conceded indirectly
that Complainants’ complaints about OHM were a factor in the suspension decision.
CSC believed that they might sabotage the program. Evidence in the record
demonstrated that Complainants did not have access to pricing data, which was
stored on a separate server, and that CSC knew so, as counsel for CSC stated that
“only but so much information” Complainants could have shared. Indeed, Conley
could not say what proprietary information Complainants could have used or how
they undermined CSC’s competitive position. Further, Poulter denied to Mooers
that CSC suspended Complainants for “aiding the competition.” This evidence
supports the ALJ’s finding.
Evidence that there was not a well-established policy for speaking with HPM
employees further undermines CSC’s defense. Employees from both companies
interacted with each other frequently before and during transition. Elsethagen gave
permission to staff to assist HPM employees with transition matters. After the
suspension, Mooers sent an email asking Poulter to let him know if she had an issue
with HPM staff discussing IT with CSC staff. On the other hand, CSC points to its
email to HPM asking that “all requests for contract transition support be sent
through CSC management” and the notice sent on the day of the suspension
reminding CSC employees to coordinate transition through CSC management.
CSC further cites Spencer’s September 6 meeting with Conley, in which she
warned him not to discuss OHM with HPM, as evidence that CSC warned staff not
141
CSC Br. 22-23; CX 66.
142
Tr. 1516-17.
143
CSC Br. 22.
20
to meet with HPM regarding transition and that Complainants were aware of this
policy. The ALJ acknowledged that this was CSC’s “strongest evidence” of their
contention. Complainants argue that this meeting attempted to limit their protected
activity, discussing OHM, rather than protect CSC’s proprietary business
information. The ALJ found this to demonstrate that CSC was more concerned
with Complainants’ complaints about OHM than them meeting with HPM staff.
While this evidence may adequately support a finding in favor of either party,
our review is limited to whether the ALJ’s finding that CSC failed to prove its
defense by clear and convincing evidence is supported by substantial evidence. We
hold that it is and, therefore, shall affirm this finding.
The ALJ was unpersuaded by CSC’s arguments that the remaining adverse
actions would have occurred in the absence of Complainants’ protected activity. For
the special pay, the ALJ noted that CSC’s explanation that Complainants were not
paid for failing to “give 100%” was unconvincing, given that other CSC workers who
did not engage in protected activity but worked similar hours were provided the
pay. For failure to retain Clem, the ALJ was unpersuaded by CSC’s argument that
it hired Matthews over Clem to have an “available mix of skills,” considering the
original three selections were all senior programmers. Last, the ALJ found CSC’s
explanation that Clem was not rehired because of reliability and trust issues,
despite Conley finding him eligible, to be ambiguous. Because substantial evidence
supports the ALJ’s finding for the suspension, it is hardly possible to conclude that
substantial evidence does not support the ALJ’s findings for the subsequent adverse
actions.
3. Damages Award
CSC contests several aspects of the ALJ’s damages award, arguing that it
was not supported by substantial evidence.144 Incorporating the damages award
from the initial D. & O., the ALJ awarded Clem $172,889.21 in back pay145 and
$30,000 in compensatory damages and awarded Spencer $3,191.12 in back pay146
Complainants also contest the damages award, arguing that the ALJ should have
awarded higher compensatory damages to Complainants and more special pay to Spencer.
We shall not consider Complainants’ arguments, however, as they did not file a petition for
review of the damages award. See Talukdar v. U.S. Dep’t of Veteran Affs., ARB No. 20040100, ALJ No. 2002-LCA-00025, slip op. at 8 (ARB Jan. 31, 2007); Adm’r, Wage and Hour
Div., USDOL v. Doctor’s Help, Inc., ARB No. 2018-0038, ALJ No. 2017-LCA-00024, slip op.
at 5 (ARB Dec. 9, 2020).
144
Clem’s back pay included: $2,716.95 in pay lost because of his suspension; $1,728.80
in special pay withheld; $7,884.24 in employer contributions to his 401(k); and $160,559.22
in lost wages. D. & O. on Remand at 22.
145
21
and $10,000 in compensatory damages. Damages awards are factual findings and
must be supported by substantial evidence.147
CSC first contests the ALJ’s reward of loss of contribution from CSC to
Clem’s 401(k) retirement account. CSC argues that the only evidence of the
contribution, pay stubs from 2012, was insufficient and that the award should be
totally reversed.148 That year, however, was the year Clem was suspended, meaning
it was the most recent evidence of what CSC was contributing for him, and
testimony established that CSC employees were still receiving “full benefits” at the
time of the hearing.149 This award is supported by substantial evidence.
CSC next argues that Clem’s special pay award should be reduced because
evidence demonstrates that Clem had already received 36 of 61 overtime hours he
submitted for special pay.150 Complainants respond that Clem asserted that he did
not receive a portion of the special pay for hours he did work, rather than no special
pay at all.151 Because the record lacked documentary evidence for the precise
number of hours, the ALJ awarded the lowest of Clem’s estimate from his
testimony. We decline to disturb the ALJ’s award.
Last, CSC argues that Complainants are not entitled to any compensatory
damages. During the hearing, two psychologists who had treated Clem testified
about the suspension’s emotional impact. Dr. Dan Lowe, who Clem saw for
treatment four times, testified that Clem’s history of psychological issues
contributed to the reason he sought treatment in 2014. Dr. Lowe did not believe
that Clem suffered any mental health conditions directly related to the
suspension.152 Dr. Naughne Boyd, who Clem saw at least 28 times, connected
emotional trauma experienced by Clem to the retaliation.153
Spencer’s back pay included: $1,701.92 in pay lost because of his suspension; and
$1,489.20 in special pay withheld. D. & O. on Remand at 23.
146
See Rudolph v. Nat’l R.R. Passenger Corp. (AMTRAK), ARB Nos. 2014-0053, -0056,
ALJ No. 2009-FRS-00015, slip op. at 14 (ARB Apr. 5, 2016); Youngerman v. United Parcel
Serv., Inc., ARB No. 2011-0056, ALJ No. 2010-STA-00047, slip op. at 10 (ARB Feb. 27,
2013).
147
148
CSC Initial Br. 27.
149
Tr. 1284.
CSC cites to a 158 page exhibit (CX 117) in support of this contention but fails to
include the precise page number in the exhibit where such documentation can be found.
CSC Initial Br. 27.
150
151
Tr. 189-90.
152
Tr. 199; Lowe Dep. 86, 92-93.
153
Tr. 298-99, 304.
22
CSC contends that Complainants did not prove causation between Clem’s
emotional distress and the adverse employment actions. CSC cites Dr. Lowe’s
testimony that Clem already had a history of mental health conditions and that the
suspension did not lead to any further conditions. CSC also cites Rodriguez v.
Bowen, 154 which it claims states that the ALJ must accept Dr. Lowe’s testimony
because the opinion of a treating physician is subject to special weight.
Under the ERA, however, a complainant needs only to prove that the adverse
action caused emotional pain and suffering or mental anguish, not a diagnosed
mental health condition.155 Further, while Rodriguez does give a treating health
professional’s opinion special weight, the expert opinion is not necessarily
conclusive and may be disregarded for specific, legitimate reasons.156 Here, Dr.
Boyd, who had treated Clem many more times than Dr. Lowe, opined that the
suspension caused Clem emotional distress, including sleep issues, lack of
confidence, anxiety, and depression.157 Dr. Lowe did not deny that the retaliation
caused Clem emotional distress, so his testimony did not negate Dr. Boyd’s. Clem’s
compensatory damages award, therefore, is supported by substantial evidence.
For Spencer’s compensatory damages award, CSC argues for reversing the
award because Spencer had already resigned and found a new job, did not seek
mental health treatment, and any stress he experienced came from the job’s long
hours.158 The ALJ cited to Spencer’s testimony that he had sleeping issues after the
suspension and his worries that his suspension will prevent him from getting a job
in the future.159 The ALJ also cited Spencer’s wife’s testimony that Spencer became
withdrawn, lacked energy, and had difficulty sleeping.160 Because Spencer did not
experience the same effects as Clem, the ALJ awarded Spencer a smaller award.
This evidence is adequate to support the award.
CONCLUSION
154
Rodriguez v. Bowen, 876 F.2d 759 (9th Cir. 1989).
Gutierrez v. Regents of the Univ. of California, ARB No. 1999-0116, ALJ No. 1998ERA-00019, slip op. at 10 (ARB Nov. 13, 2002) (citing Blackburn v. Martin, 982 F.2d 125,
131 (4th Cir. 1992)) (“To recover compensatory damages under the [ERA], a complainant
must show by a preponderance of the evidence that he or she experienced mental suffering
or emotional anguish and that the unfavorable personnel action caused the harm.”).
155
156
Rodriguez, 876 F.2d at 761-62.
157
Tr. 291-92, 298-99.
158
CSC Initial Br. 30.
159
Tr. 577-82.
160
Tr. 766-67.
23
Because substantial evidence supports the ALJ’s findings, we AFFIRM the
ALJ’s Decision and Order on Remand.
SO ORDERED.