Opinion

MacKinaw Area Tourist Bureau Inc v. Village of MacKinaw City

Court
Michigan Court of Appeals
Filed
May 23, 2024
Status
Published
Cited by
0 cases
Authority
More cited than 16.2%

The opinion

If this opinion indicates that it is “FOR PUBLICATION,” it is subject to

revision until final publication in the Michigan Appeals Reports.

STATE OF MICHIGAN

COURT OF APPEALS

MACKINAW AREA TOURIST BUREAU, INC., FOR PUBLICATION

doing business as MACKINAW AREA VISITORS May 23, 2024

BUREAU, AMERICAN BOUTIQUE INN, 9:00 a.m.

AMERICA’S BEST VALUE, BAYMONT INN &

SUITES, BAYSIDE HOTEL MACKINAC,

BEACHCOMBER MOTEL, BEST WESTERN

DOCKSIDE, BRIDGE VISTA BEACH HOTEL,

BRIGADOON BED & BREAKFAST, BUDGET

INN MACKINAW, CABINS OF MACKINAC,

CAPRI MOTEL, CLARION HOTEL

BEACHFRONT, COMFORT INN–LAKESIDE,

COURT PLAZA INN & SUITES, CROWN

CHOICE INN & SUITES, DAYS INN–

LAKEVIEW, ECONO LODGE BAYVIEW,

FAIRVIEW BEACHFRONT INN, GREAT LAKES

INN, HAMILTON INN SELECT, KNIGHTS INN,

LAMPLIGHTER MOTEL, LIGHTHOUSE VIEW

MOTEL, MACKINAW BEACH & BAY MOTEL,

PARKSIDE INN–BRIDGEVIEW, QUALITY INN

& SUITES, RAINBOW MOTEL, RAMADA INN

WATERFRONT, STARLITE BUDGET INN,

SUPER 8–BEACHFRONT MOTEL, SUPER 8–

BRIDGEVIEW MOTEL, THUNDERBIRD INN

MACKINAW, TRAILSEND MOTEL, VINDEL

MOTEL, WATERFRONT INN, WELCOME INN,

MACKINAC BAY TRADING COMPANY,

MACKINAW CROSSINGS, MACKINAW

COFFEE, INC., FRANK & STUFF, INC., DIXIE

SALOON, INC., RUM RUNNERS ISLAND, INC.,

ANNA LIEGHIO, INC., MACKINAC BAY

WATER, INC., MACKINAC BAY WATER PARK,

INC., TBWC RESTAURANT, INC., and

MACKINAW DEPOT, INC.,

Plaintiffs-Appellees/Cross-Appellants,

v No. 361625

-1-

Cheboygan Circuit Court

VILLAGE OF MACKINAW CITY, LC No. 19-008746-CZ

Defendant-Appellant/Cross-Appellee.

Before: O’BRIEN, P.J., and K. F. KELLY and M. J. KELLY, JJ.

O’BRIEN, P.J.

Defendant, Village of Mackinaw City (the Village), was informed by the Michigan

Department of Environmental Quality (DEQ)1 that it was out of compliance with the Michigan

Safe Drinking Water Act, MCL 325.1001 et seq. (Act 399), due to insufficient water storage

capacity, and that the Village’s current funding structure for its water and sewer systems was not

sufficient to adequately support the systems’ needs. To remedy these deficiencies, the Village

increased its water and sewer rates. This led plaintiffs, Mackinaw Area Tourist Bureau, doing

business as Mackinaw Area Visitors Bureau,2 to file suit, claiming that the water- and sewer-rate

increases were a disguised tax levied without voter approval contrary to Const 1963, art 9, § 31 of

the Headlee Amendment.3 The Village filed a motion for summary disposition, and plaintiffs

responded by arguing that the trial court should deny the Village’s motion and grant summary

disposition in plaintiffs’ favor. The trial court sided with plaintiffs. It reasoned that the Village’s

rate increases constituted a tax because a portion of the water-rate increase would be used to fund

the construction of a new water tower. The court believed that “new infrastructure” could never

be funded through a user fee, so the water-rate increase must be a tax. This was error. Increasing

water and sewer rates to generate revenue to fund necessary capital improvements to the systems

serves a regulatory purpose. There is no bright-line rule prohibiting water rates from being

increased to fund “new infrastructure” necessary for the water-supply system’s continued safe

operation. Applying the three-factor test from Bolt v City of Lansing, 459 Mich 152; 587 NW2d

264 (1998), we conclude that the disputed rates did not constitute a tax. We accordingly reverse

the trial court’s order granting plaintiff’s motion for summary disposition and remand for the trial

court to enter an order granting summary disposition in favor of the Village.

I. BACKGROUND

The Village was established under the Michigan General Law Village Act, MCL 61.1 et

seq. and operates a municipal water and sanitary sewer system. The Village was not required to

1

Shortly before this lawsuit commenced, the DEQ was renamed the Department of Environment,

Great Lakes, and Energy, see EO 2019-06, but this opinion will refer to the department as the DEQ

for consistency.

2

The Mackinaw Area Tourist Bureau is a domestic nonprofit corporation comprising the named

privately owned businesses.

3

The Headlee Amendment is the popular name for Const 1963, art 9, §§ 25-34.

-2-

operate a water system,4 but by electing to do so, it became a “supplier of water,”5 subject to Act

399.6

In 2014, the Village entered into a Stormwater, Asset Management, and Wastewater

(SAW) grant agreement with the DEQ and the Michigan Finance Authority under which the state

provided 90 percent of the total cost for the Village to obtain a storm and wastewater asset

management plan. The agreement provided, in part:

SAW grant recipients for wastewater system management are required to

make significant progress on the funding structure. Significant progress is defined

as a 5-year plan to eliminate the gap with a minimum initial rate increase to close

at least 10 percent of the funding gap. The first rate increase must be implemented

within three years of the executed grant. The applicant will need to certify that all

grant activities have been completed at the end of three years. Asset management

plans for stormwater systems are to be implemented.[7]

On May 15, 2015, the DEQ, after conducting a sanitary survey and evaluating the Village’s

water system with respect to the regulatory requirements in Act 399, notified the Village’s interim

manager of a deficiency with respect to finished water storage.8 The DEQ said that the following

deficiency constituted a violation of Act 399 and “must be resolved in order to return the water

system to compliance”:

1. The Village has deficient storage capacity. Part 11, Distribution Systems

and Storage Tanks, of Act 399 requires the Village to have sufficient distribution

system capacity to meet peak flows and emergency conditions while maintaining

minimum pressures throughout the entire distribution system. Page 7 of the

enclosed Sanitary Survey form provides more detailed information. Also, the

Village’s March 2012 Reliability Study discusses this deficiency in greater depth.

Please provide a compliance schedule to address this on-going deficiency.

The DEQ also made recommendations in the “financial” area. The DEQ stated that “the

following recommendations will prove useful in enhancing the operation and maintenance of the

Village’s water supply”:

4

See MCL 71.1.

5

MCL 325.1002

6

MCL 325.1003.

7

A rate study was conducted as part of the asset management plan, which is referenced later in

this opinion.

8

MCL 325.1003 of Act 399 provides in relevant part that “[t]he director may enter upon the

waterworks system of a supplier of water at reasonable times for the purpose of inspecting the

system and carrying out this act and rules promulgated under this act.”

-3-

1. The Village needs to evaluate its staffing plan to ensure continued

compliance with Act 399. The Village has a good preventative maintenance

program started for valves and hydrants, is collecting data for its Asset Management

Program, and working on a comprehensive cross-connection control program. All

of these programs take staff hours to keep them updated and functioning. The DEQ

highly encourages the Village to continue all of these programs to continue to

provide high quality drinking water to its residents and visitors.

2. The Village needs to evaluate its current security plan for effectiveness

in keeping water system facilities safe and deterring malicious activity. DEQ staff

recommends the Village consider adding fencing and signage around source and

tower facilities. The Village needs to ensure adequate security is provided for all

of its facilities.

3. Provide a detailed 20-year Capital Improvements Plan along with budget

information by no later than December 31, 2015, to meet the requirements of Act

399; specifically, Rule 1606, publicly owned or operated community water

supplies; additional general plan requirements.

Later, in a May 4, 2017 letter to the Village’s interim manager, the DEQ addressed the

Village’s “aging water supply system” and the “complexity” of the Village’s service area. The

letter stated in relevant part:

[T]he census population remains relatively constant. The [V]illage has four wells,

a firm treatment capacity of 1.7 million gallons per day, and one elevated tank with

a proposal for a second tank. In addition, it currently serves a commercial district

with 3,300 hotel rooms in 38 different hotels. Based on this information, the [DEQ]

Drinking Water and Municipal Assistance Division (DWMAD), is reclassifying the

distribution level from an S-4 to S-3. The S-3 classification covers distribution

systems serving a population of less than 4,000. This reclassification shall be

effective on November 5, 2017. The Village’s operator-in-charge is certified to one

level above this classification. So, no action is needed by the [V]illage.

. . . The Village is also working with its engineering firm and Michigan

Rural Water Association [MRWA] staff to revise its water and sewer rate structure

and Asset Management Program. Based on the complexity of the Village’s water

supply system, and the fact it routinely serves a population greater than 1,000, the

Village is required to have an Asset Management Program in place beginning

January 1, 2018.

The letter included an attachment—DEQ’s “Asset Management Guidance.” The

attachment referenced Mich Admin Code, R 325.11606, which requires a community water supply

that serves more than 1,000 people to implement an asset management program as defined in Rule

325.10102 beginning January 1, 2018. The rule stated that asset management plans shall include,

among other requirements:

-4-

(d) A capital improvements plan that identifies waterworks system needs

for 5-year and 20-year planning periods. . . .

(e) A summary detailing the funding structure and rate methodology that

provides sufficient resources to implement the asset management program.

On September 12, 2017, the DEQ sent yet another letter to the Village’s manager

summarizing the DEQ’s review of the Village’s water-supply facilities for compliance with Act

399. The DEQ acknowledged that the Village had addressed some of the deficiencies and

recommendations since the DEQ’s last sanitary study, but identified two deficiencies that

amounted to continuing violations of Act 399—“Finished Water Storage” and “Financial.” The

DEQ explained these deficiencies as follows:

1. The Village needs to expand upon its current water storage capacity. The

current capacity is in violation of Act 399; specifically, Rule 1105, as it is not of

sufficient capacity to provide for the fire flow needs of the service area while

continuously maintaining acceptable pressure levels throughout the system. The

Village council will need to increase revenue to address the water storage capacity

deficiency.

2. The rates need to be reviewed and increased in order to adequately

support the water supply. Act 399 requires that a community water supply have

adequate technical, financial, and managerial capacity to maintain compliance with

the act. The issue of inadequate funding can further infringe on Part 12, Reliability,

of Act 399, which establishes the requirements for maintaining the reliability of

public water supply systems to assure a continuous supply of water, including the

system capacity, number of wells, and equipment meant to protect against

interruptions in service. Current rates are too low to meet the required financial

needs to sustainably operate the system. Rate increases are recommended to allow

for the current Capital Improvement Plan to be actionable.

The DEQ offered the following recommendation to “enhance the operation and maintenance of

the Village’s water supply”:

Part of the Village’s responsibility is ensuring a secure financial future for

the operation of the water supply. The current rate structure does not allow for this.

The Village council needs to take action to increase revenue to ensure proper

financial and managerial capacity is available to operate, maintain, and replace the

Village’s existing infrastructure, as well as add new infrastructure when needed.

Both the revision of the rate structure and pursuit of additional funding

opportunities are recommended.

The DEQ concluded the September letter by asking the Village to submit a plan to address the

identified deficiencies in its water-supply system.

An engineering firm, C2AE, prepared a capital improvement plan for the Village in

October 2017. The plan concluded that, although existing rates were sufficient to pay for some

-5-

short-term improvements and repairs of the wastewater and stormwater systems, a rate adjustment

was needed to fund the replacement of equipment and some capital improvements for the Village

wastewater system.

Rate expert John Holland of the MRWA assisted the Village in the creation of a rate

structure for its water and sewer rates. At some point early in the process, the MRWA gave a rate-

structure presentation to the Village council in which the MRWA sought to “receive direction from

[the council] as to how to further proceed in the development of the rate structure for the Village.”9

The MRWA noted that, while the current population of the village was 860, the system was sized

for a population of 12,000 to 13,000 because of the tourist industry. It explained that three or four

hotel rooms are the equivalent of one house and that there were an estimated 2,800 to 3,000 hotel

rooms in the village. “The large hotels require the community to have a large capacity for flows

and fire protection,” the MRWA claimed. Turning to how the Village could determine rates, the

MRWA explained that rates in general should consider asset management, budget (including day-

to-day operation and maintenance costs), payroll, debt payments and reserves (for both present

and future), and capital improvements. For the customer base that would be charged the rates, the

MRWA focused on (1) the number of meters and the size of those meters for both water and sewer

and (2) the amount of water sold and to whom that water was sold. According to the MRWA, the

Village sold 23,312,199 gallons of water per year to customers using less than 50,000 gallons per

quarter, and 45,706,282 gallons of water per year to customers using more than 50,000 gallons per

quarter. Using one quarter as an example, the MRWA claimed that there were 654 customers; 534

customers used less than 50,000, and 120 customers used more than 50,000 gallons. “This means

that 18% of your customers use 66% of your water,” the MRWA explained. Turning to ways in

which the Village could structure its rates, the MRWA stated that the Village could use an

ascending rate—which “is a rate where the commodity charge increases as the customer usage

increases”—or a non-ascending rate. The MRWA noted that an ascending-rate structure “pushes

the cost of the large system to the larger users.” For the preliminary meeting, the MRWA used a

50,000-gallon cutoff and a 50% markup as an example. At the end of the presentation, the MRWA

stated that it needed to know whether the Village council wanted the MRWA to use an ascending

or non-ascending rate structure in its rate study and, if an ascending rate structure was desired,

whether the MRWA should “use 50% mark up on commodity charge over 50,000 gallons.”

After this meeting but before recommending a new rate structure, Holland considered all

of the future capital improvements recommended in the capital improvement plan. Then,

according to minutes from a Village council meeting on January 4, 2018, Holland gave a

presentation to the Village council “summarizing the conclusion of the rate study and asset

management they performed for the Village along with engineering firm C2AE.” The minutes

from the meeting stated:

Mr. Holland noted every community has unique circumstances to address when

providing safe water and sewer services. The Village has to have infrastructure in

9

This quote and the remaining discussion of the MRWA’s presentation come from a PowerPoint

presentation included in the record. The details of the actual discussions that occurred during and

following the presentation are not included in the lower court record.

-6-

place for not only the 850 year-round residents but to service the demand of

thousands of seasonal visitors. On hand to explain the need for a second water tank

to accommodate water suppression assurance for firefighting multiple story

buildings was MI DEQ District Supervisor, Brian Thurston, P.E.

Following this presentation, the Village council voted to approve the rate structure as presented

and a two percent increase. The January 4, 2018 resolution resulted in a tiered (or ascending) rate

structure—water and sewage charges per 1,000 gallons up to 50,000 gallons were charged one

rate, and water and sewer charges per 1,000 gallons over 50,000 were charged at a higher rate.

A. THE ENSUING LITIGATION

Plaintiffs’ complaint, while not a model of clarity, challenged the water and sewer rates

adopted on January 4, 2018, claiming that the increase in rates was “actually a disguised tax”

implemented without voter approval in violation of the Headlee Amendment, Const 1963, art 9,

§ 31. Plaintiffs alleged that the rate increase was to fund a “capital improvement plan for necessary

infrastructure improvements and/or replacements.” Citing Bolt, plaintiffs claimed that this

rendered the rate increase “a disguised tax because it is disproportionate to the necessary cost of

providing service, involuntary, and imposed to raise revenue rather than for a regulatory purpose.”

Following discovery, the Village moved for summary disposition under MCR

2.116(C)(10), arguing that plaintiffs could not meet their burden of proving that the Village’s

increased water and sewer rates contained a charge that qualified as a tax. According to the

Village, the increased rates constituted user fees because they satisfied all three of the criteria from

Bolt—the rates (1) served a regulatory purpose, (2) were proportionate to the necessary cost of the

services, and (3) were voluntary.

As to the first Bolt factor, the Village argued that the operation of water and sewer systems

is a regulatory activity, and that the Village’s increased water and sewer rates are a valid user fee

because they serve the regulatory purpose of providing water and sewer service to the Village’s

residents. That the water and sewer rates generated revenue “doesn’t matter,” according to the

Village, because the revenue generated from the rates was used for the underlying regulatory

purpose of operating and maintaining the water and sewer systems. The Village claimed that all

revenue generated from the water and sewer rates was allocated solely to the operation of the water

and sewer system, and that plaintiffs had not suggested otherwise.

Turning to the second Bolt factor, the Village contended that its increased rates were

reasonable, which was “highly relevant” to whether the rates were proportionate. Caselaw, the

Village said, requires courts to start with a presumption that municipal utility rates are reasonable.

Plaintiff bore the burden of overcoming this presumption, and the Village argued that plaintiff had

not presented any evidence to rebut the presumption. “Plaintiff’s bare and speculative assertions

that the rates are unreasonable are without weight,” the Village contended.

Contrasting itself to plaintiff, the Village said that it had engaged an independent expert in

ratemaking, Mark Beauchamp, who analyzed the Village’s water and sewer rates. Beauchamp

testified that the Village’s choice to charge high-volume users of water a higher rate was justified

based on the Village’s “very unusual pattern” of water usage, where the summer peak usage was

-7-

2.8 times the average usage; in most communities, according to Beauchamp, summer usage is only

1.2 to 1.7 time higher than the average use. Beauchamp further opined that both (1) using a break

point of 50,000 gallons for the step-up pricing and (2) the stepped-up rate of a 50-percent increase

were reasonable. In fact, Beauchamp thought that the 50-percent step-up amount should be higher.

The Village additionally directed the court’s attention to community comparison charts, which

showed, according to the Village, that “the Village’s rate structure puts its customer in the middle

of the pack” because customers of all meter sizes “would have paid more in total charges in at least

one third of the other communities.” All of this evidence, the Village argued, refuted plaintiffs’

“unsubstantiated assertion that the Village’s rates are unreasonable.”

The Village acknowledged that, in response to interrogatories, plaintiffs had contended that

the Villages water and sewer rates were unreasonable because the rates raised money for future

capital improvements. The Village argued that this did not make the rates unreasonable because

(1) the Court of Appeals had held that revenue generated by water and sewer rates could be used

to fund future capital improvements, (2) Beauchamp testified that using revenue generated by

water rates to fund necessary capital improvements was standard, not only based on his experience

but according to the main ratemaking manual for water and sewer systems, (3) the DEQ required

the Village to generate capital reserves through increased rates, and (4) plaintiffs’ argument was

based on the misconception that the capital improvements were only necessary if the Village

sought to expand the system, when in reality, “[t]he capital improvements are required for the

continued operation of the system for the current users.”

Lastly, regarding the third Bolt factor, the Village relied on established caselaw to argue

that water and sewer charges are voluntary because users can control how much water they use.

In response, plaintiffs clarified that, in their opinion, the Village violated the Headlee

Amendment because a portion of the water- and sewer-rate increase was “for the express purpose

of funding construction of new infrastructure,” namely an additional water tower. Plaintiffs argued

that, with this understanding of the Village’s purpose for increasing water and sewer rates,

application of the Bolt criteria showed that (1) the purpose of the new rates was to raise revenue

for future improvements; (2) the rates were not proportional to the current costs of service; and (3)

the rates were compulsory upon users.

For the first Bolt factor, plaintiffs argued that increasing the water and sewer rates to raise

revenue for future improvements, as opposed to defraying the costs of a regulatory activity,

amounted to a revenue-raising purpose. Plaintiffs emphasized that the “crux of the Village’s

Headlee violation” was the “distinction between construction of infrastructure improvements and

operation/maintenance of improved infrastructure[.]” The deficiency in the Village’s water-

storage capacity, according to plaintiffs, could only be addressed by “adding to the existing

infrastructure, i.e. making capital improvements,” which was distinct from any “operational costs

for existing infrastructure.” Plaintiffs summarized that the increase in the water and sewer rates

crossed the line from a regulatory fee to a revenue-raising tax because the increase was intended

to generate revenue to pay for the construction of new infrastructure, but “fees can only be used to

cover current costs of operating a regulated activity.”

Turning to the second Bolt factor, plaintiffs claimed that the Village’s concession that a

portion the revenue generated from the increase in water and sewer rates would “be used to pay

-8-

for future capital improvements” amounted to “per se proof of a disproportionate rate scheme.”

They maintained that the increased rates “cannot be said to be proportionate to the current

necessary costs because, by definition, they serve to afford the cost of future servicing.” Plaintiffs

additionally argued that the tiered rate structure was disproportionate because the high-volume

users did not receive a greater benefit, despite being charged a higher rate.

Regarding the third Bolt factor, plaintiffs argued that the Village’s contention that users

can control how much water they use and its recommendations on how plaintiffs could reduce

water consumption “contrast with the spirit of Bolt, and the assertion within that forcing a utility

user to sacrifice the full potential of a property to avoid unreasonable fees is a de facto deprivation

of property rights.” They argued that “where every resident . . . bears the right to reap the

maximum possible benefit of their property, water and sewer usage is compulsory.”

In their request for relief, plaintiffs asked the court to deny the Village’s motion for

summary disposition, grant summary disposition to plaintiffs under MCR 2.116(I)(2), and declare

that the Village’s increased water and sewer rates represented a tax on users in violation of § 31 of

the Headlee Amendment.

At a hearing on the parties’ competing motions, the trial court noted that caselaw supported

that some costs for capital improvements were allowed to be included in user fees without the fees

“being a tax.” It said, however, that a “very important question in this case” was whether that

caselaw would allow “recouping money through user fees to build newly constructed infrastructure

beyond just repair and replacing the existing” systems.

After this hearing, the court ordered supplemental briefing to address the following

questions: “(1) what portion of the rate increase is allocated to finance the construction of an

additional water tower; (2) what portion of the costs of construction of the additional water tower

are financed by the rate increase; [and] (3) when the costs of construction of the additional water

tower are fully paid, for what purposes will that portion of the rate increase that had been allocated

to finance those costs be thereafter allocated[.]”

With respect to the first question, the Village in a supplemental brief represented that the

portion of the rate increase allocated to finance the construction of the additional water tower was

“approximately 13.9% annually for the first five years the new rate is in effect and none of the rate

increase will be specifically allocated to the additional water tower thereafter.” It estimated that

the rate increase would generate additional water revenue of over $363,000 per year and additional

sewer revenue of over $97,000 per year. Beginning with fiscal year 2018, the Village put over

$50,000 of those revenues toward the cost of the additional water tower. The Village said that

after five years of such reserves, no portion of the rate increase would be allocated toward the

additional water tower.

As to the court’s second question, the Village estimated that it would pay 14.3 percent of

the anticipated cost of the new water tower with increased revenue from the new rate structure.

According to the Village, the DEQ was requiring it to create additional storage capacity of 150,000

gallons, as long as additional power generators were installed at municipal wells. The cost of this

project was $1.4 million. The Village said that it recently secured a community block grant of

$1,350,000, of which $1,160,000 was allocated to the new water tower, but the grant required a

-9-

$450,000 contribution from the Village. The Village intended that $200,000 of its contribution

would come from water revenue generated by the increased rate.

In answer to the court’s third question, the Village said that the revenues generated by the

increased rate would be used for a reserve fund for other capital-improvement needs once the

additional water tower was completed. With respect to water revenue, the Village anticipated that

revenue would be used to pay the Village’s loan obligations for 40 years at the approximate rate

of $220,000 per year. It said that revenue would also be used for various projects and expenses

not addressed with loan proceeds. The Village provided a detailed description of the projects.

B. THE TRIAL COURT’S OPINION

The court issued a 12-page opinion and order in which it denied the Village’s motion for

summary disposition and granted summary disposition in favor of plaintiffs. The court said that

the question before it was limited to determining whether the increased water and sewer rates were

a user fee or a tax, which necessitated an analysis of the Bolt criteria.

For the first Bolt factor, the court observed that it was undisputed that one of the reasons

for the rate increase was the need to construct an additional water tower to increase the water

storage capacity of the system. The court, citing Shaw v Dearborn, 329 Mich App 640, 643; 944

NW2d 153 (2019), reasoned that “[a] unit of local government may not fund a public works project

through increased user fees under the Headlee Amendment.” With this understanding of the law,

the court believed that the Village’s increase to its water and sewer rates had “a flaw embedded in

it, in that it was intended for and used for the funding of construction of new infrastructure . . . ,

that being an additional, second water tower.” In short, because some of the revenue generated

from the increased water and sewer rates was intended to fund the construction of an additional

water tower, the court concluded that the increase to the water and sewer rates had a primarily

revenue-raising purpose, so the first Bolt factor favored plaintiffs.

Addressing the second Bolt factor, the court thought it “yield[ed] mixed results.” On the

one hand, the court agreed with plaintiffs that “[t]he tiered rate structure may well be problematic

in that the high-volume users do not receive a greater benefit proportionate to their greater rate.”

On the other hand, the court agreed with the Village that the high-volume users drive the need for

the additional water. But the court found two faults with the Village’s argument: (1) the court

believed that “charging a user fee to fund the construction of that water tower [was] itself

impermissible” and (2) the Village did not explain “how the high-volume users drive the necessary

costs of the water and sewer system in a way that would make the tiered rate structure proportionate

as to those users.” Still, the court credited the Village’s argument that, even after the increases, its

rates were reasonable compared to other similar utility systems in Michigan. Ultimately, while

this factor “yield[ed] mixed results,” the court concluded that it favored finding that the increased

rates were a tax.

For the third Bolt factor, the court found that, based on caselaw, water and sewer rates are

generally voluntary because each user decides the amount and frequency of the usage, and variable

rates based on usage generally satisfy the voluntariness factor. This caselaw, the court explained,

did not support plaintiffs’ argument that the fees were involuntary because high-volume users

would have to alter their use of their properties to avoid paying the stepped-up fees. The court

-10-

accordingly concluded that the third Bolt factor favored a finding that the rate structure was a user

fee and not a disguised tax.

Overall, the court found that the first and second Bolt factors weighed heavily because the

Village

is funding new construction by charging ratepayers rather than taxpayers. The

increased rate will continue long after the new construction is completed, and the

stepped-up rate that high-volume users are charged will continue long after the

justification for that tiered structure (the need for the second water tower) has

passed. However, one of the major reasons for adopting the increased rate was to

fund the construction of an additional water tower. This violates Shaw’s

admonition that a fee may not be used to raise revenue to finance a public works

project.

While the court believed that “this is not a clear-cut case one way or the other,” it concluded that

the Village’s rate increase constituted a tax because a portion of the revenue generated by the

increased water and sewer rates was intended “to fund new infrastructure.” This, the court

reasoned, was “impermissible under Shaw and a violation of the Headlee Amendment’s taxpayer

protections.” The court accordingly held that the Village violated the Headlee Amendment by

increasing its water and sewer rates.

II. STANDARD OF REVIEW

The principal issue on appeal is whether the increase to the Village’s water and sewer rates

as part of its January 4, 2018 resolution constitutes a valid user fee or a tax. This presents a

question of law, reviewed de novo. See Bolt, 459 Mich at 158.

III. ANALYSIS

The Village argues that the trial court misread Shaw. This Court in Shaw, according to the

Village, simply did not reach the issue of whether “new infrastructure” could be funded through

user fees. And with the misunderstanding of Shaw out of the way, the Village continues, plaintiff

cannot establish that the increase to the Village’s water and sewer rates constituted a tax in

violation of the Headlee Amendment. The Village is correct.

A. HEADLEE VIOLATIONS GENERALLY

Const 1963, art 9, § 31 of the Headlee Amendment states in relevant part:

Units of Local Government are hereby prohibited from levying any tax not

authorized by law or charter when this section is ratified or from increasing the rate

of an existing tax above that rate authorized by law or charter when this section is

ratified, without the approval of a majority of the qualified electors of that unit of

Local Government voting thereon.

-11-

Application of § 31 is triggered by the levying of a tax. Jackson Co v City of Jackson, 302 Mich

App 90, 98; 836 NW2d 903 (2013), citing Bolt, 459 Mich at 158-159. “Section 31 prohibits units

of local government from levying any new tax or increasing any existing tax above authorized

rates without the approval of the unit’s electorate.” Durant v Michigan, 456 Mich 175, 182-183;

566 NW2d 272 (1997). But § 31 does not prohibit a local unit of government from instituting a

user fee without voter approval. Wheeler v Shelby Charter Twp, 265 Mich App 657, 664; 697

NW2d 180 (2005). See also Bolt, 459 Mich at 159. The central question in this case is whether

the charge that resulted from the increased water and sewer rates constituted a valid user fee or a

tax. Plaintiffs bear the burden of proving that the charge constituted a tax in violation of the

Headlee Amendment. Shaw, 329 Mich App at 653.

“There is no bright-line test for distinguishing between a valid user fee and a tax that

violates the Headlee Amendment.” Bolt, 459 Mich at 160. At the most basic, “a fee is exchanged

for a service rendered or a benefit conferred, and some reasonable relationship exists between the

amount of the fee and the value of the service or benefit,” whereas “[a] tax . . . is designed to raise

revenue.” Id. at 161. The seminal case addressing this distinction is Bolt, in which our Supreme

Court identified “three primary criteria” for courts to consider when distinguishing a user fee from

a tax: (1) a user fee primarily serves a regulatory purpose, (2) a user fee is proportionate to the

necessary cost of the service, and (3) a user fee is voluntary. Id. at 161-162. “These criteria are

not to be considered in isolation, but rather in their totality, such that a weakness in one area would

not necessarily mandate a finding that the charge is not a fee.” Shaw, 329 Mich App at 653

(quotation marks and citation omitted).

B. SHAW

In Shaw, the city of Dearborn had operated a combined sewer system whereby the raw

sewage from homes and businesses entered the same pipes as stormwater. Shaw, 329 Mich App

at 644. The combined sewage was sent to the Detroit Water and Sewerage Department for

treatment before it could be released back into the environment. Id. Sometimes, a heavy rainstorm

resulted in a combined-sewage-overflow event, releasing the combined sewage into a natural

waterway before treatment. Id. As federal and state environmental regulations became more

“stringent,” the city was required “to plan and implement measures to reduce combined-sewage-

overflow events.” Id. The city’s initial plan—funded by a millage with voter approval—was to

construct 12 retention facilities, called caissons, that could store combined sewage. Id. at 644-645.

Difficulties arose during the construction of the planned caissons, however, and only four caissons

were in operation, serving a fraction of the city. Id. at 645. In some areas not served by the

caissons, the city was undertaking a different abatement plan—it was separating the sewer system

by providing separate pipes for sewage and stormwater. Id. Some of the areas had already been

separated, while in the areas not yet separated, “the city is either installing a new pipe for

stormwater and using the existing one for sewage or vice versa.” Id. at 645-646. Coincident with

the construction project required to separate the sewer system, the city chose to repair and replace

some existing underground infrastructure, such as replacing old or deteriorated water and sewer

lines. Id. at 646. The city scheduled this ancillary work at the same time as the sewer separation

project to save money. Id. Some of the cost of this ancillary work was paid with revenue generated

from the water and sewer rates the city charged its water and sewer customers. Id.

-12-

The plaintiff brought suit, arguing that hidden charges in the city’s water and sewer rates

were being used to fund these various projects, and that these charges amounted to taxes instituted

without voter approval in violation of the Headlee Amendment. As relevant to the instant case,

the plaintiff in Shaw argued that the city was using revenue generated by its water and sewer rates

to fund some of the infrastructure costs of the city’s sewer-separation project (what the plaintiff

called the “CSO-capital charge”). Id. at 648. The trial court rejected the plaintiff’s challenge, and

the plaintiff appealed. Id. at 650-651.

This Court affirmed. This Court, accepting plaintiff’s terminology, defined the CSO-

capital charge as “the imposition on water and sewer ratepayers of some of the infrastructure costs

of the city’s sewer-separation project.” Id. at 656. Rejecting the plaintiff’s claim related to the

CSO-capital charge, this Court reasoned that the plaintiff had failed to carry her burden of proving

that the city used revenue generated by its water and sewer rates to pay for the city’s sewer-

separation project. The plaintiff, we explained, “simply has not presented evidence establishing

that any funds obtained from water and sewer rates were used to pay for the mandatory sewer-

separation project itself.” Id. at 663. See also id. at 657 (“[A]fter ample time and significant

discovery, plaintiff has presented no evidence that the city actually charged the costs of the sewer-

separation work to its ratepayers . . . .”).

C. “NEW INFRASTRUCTURE”

Relying on Shaw, the trial court in the present case held that user fees cannot be used to

raise revenue to finance “new infrastructure.”10 As recounted above, Shaw held no such thing.

Concluding differently, the trial court reasoned:

[I]n other areas of Dearborn, the city constructed retention facilities, called

caissons, to store the combined sewage to avoid overflow events during heavy

storms. Id. at 645. The manner of financing this project is noteworthy here. The

panel in Shaw described it as follows: “Although the city funded the construction

of the caissons through the millage, it currently pays the cost of operating and

maintaining the caissons with revenue generated by sewer rates charged to the

city’s sewer customers. In other words, taxpayers built the four caissons,

ratepayers operate and maintain them. Id. at 645 (emphasis added). This suggests

that the initial construction of the new infrastructure, even when performed in

response to regulatory requirements, could not be funded through increased rates

to taxpayers. Rather, the funding of such new constructions involves taxes. In

Dearborn’s case, they submitted a millage proposal to the voters to approve the city

to incur debt and use the increased millage rate to service the debt. Id. at 644-645.

10

The trial court used the term “new infrastructure” synonymously with “new construction,”

“public works project,” and “capital improvements.” Plaintiffs do the same on appeal, saying for

instance, “That deficiency could only be addressed by adding to the existing infrastructure i.e.,

making capital improvements. Capital improvements create new elements of infrastructure, they

are not operational costs for existing infrastructure.”

-13-

Such an option was available and open to defendant in this case. Instead, defendant

is funding new construction through increased rates.

The portions of Shaw relied on by the trial court were in the opinion’s statement of facts.

See Shaw, 329 Mich App at 643-647. While Shaw’s facts are obviously relevant to understanding

that case, there is no basis to think that Shaw was declaring a rule of law by recounting the facts

of the case before it. That “taxpayers built the four caissons [and] ratepayers operate and maintain

them,” id. at 645, was a fact. It did not “suggest” anything. And, as previously explained, Shaw

did not reach the issue of whether the water and sewer rates at issue could be used to fund “new

infrastructure.” Rather, this Court concluded that the plaintiff did not present evidence establishing

that the city used funds obtained from water and sewer rates to pay for the sewer-separation project.

Id. at 663. In short, the trial court misread Shaw to conclude “that it is impermissible under Shaw

to fund new infrastructure.” Shaw simply did not address that issue.

Still, Shaw did say, “The purpose of the amendment would be thwarted if a local authority

could charge higher utility rates to raise revenue and then use some of the excess funds to finance

a public-works project.” Shaw, 329 Mich App at 643. Rather than parsing this statement (made

in Shaw’s introductory paragraph) to decipher precisely what Shaw meant, it is enough to observe

that the statement can be true. For instance, if the plaintiff in Shaw had been able to establish that

the city was using funds obtained from water and sewer rates to pay for the sewer-separation

project, she may well have been able to establish a Headlee violation—a sewer-separation project

like the one in Shaw tends to benefit the general public instead of only those paying water and

sewer rates. Accord Bolt, 459 Mich at 166; Jackson Co, 302 Mich App at 108-109. But this

statement from Shaw should not be read as standing for the proposition that a user fee can never

be used to fund “new infrastructure” or “capital improvements.”

Doing so would contradict caselaw decided both before and after Shaw. Bolt itself states,

“Where the charge for either storm or sanitary sewers reflects the actual costs of use, metered with

relative precision in accordance with available technology, including some capital investment

component, sewerage may properly be viewed as a utility service for which usage-based charges

are permissible, and not as a disguised tax.” Bolt, 459 Mich at 164-165 (emphasis added, citation

omitted).11 Shortly after Bolt was decided, this Court in Graham v Kochville Twp, 236 Mich App

141, 152; 599 NW2d 793 (1999), held that a charge constituted a valid user fee even though the

11

Bolt also said that the charge at issue in that case “constitute[d] an investment in infrastructure

as opposed to a fee designed simply to defray the costs of a regulatory activity,” Bolt, 459 Mich at

163, but this statement does not support the trial court’s rule. First, Bolt itself recognized that a

valid user fee could include a capital-investment component, as noted above. Id. at 165. Second,

the charge in Bolt had a substantial capital-investment component—the city intended to fund 50

percent of a $176 million project through the disputed charge, and 63 percent of that cost

“constitute[d] capital expenditures.” Id. at 163. Lastly, and most importantly, the charge in Bolt

was a tax not solely because some portion of it constituted an investment in infrastructure but

because, among other things, the charge (1) had a revenue-raising purpose, (2) was not

proportionate to the cost of the service provided, and (3) was involuntary. Id. at 163-169.

-14-

charge would “pay for an investment in infrastructure.” This Court explained that this did not

render the charge a special assessment12 because (1) the infrastructure that the charge was used to

build would “not benefit the general public” and (2) the purpose of the charge was mainly

regulatory. Id. at 152-153. More recently, this Court in Youmans v Charter Twp of Bloomfield,

336 Mich App 161, 229; 969 NW2d 570 (2021), held that an increase to water and sewer rates

intended to, among other things, increase revenue to fund “necessary capital improvements”

served a primarily regulatory purpose and did not violate the Headlee Amendment. See id. at 233.

The statement from Bolt and the holdings in Graham and Youmans all support that revenue

generated by a user fee can be used to fund new infrastructure or capital improvements. That said,

the ultimate determination of whether any charge is a valid user fee or a tax does not turn on

whether the charge will be used to fund “new infrastructure.” Rather, courts apply the “three

primary criteria” to distinguish between a fee and a tax identified in Bolt, 459 Mich at 161-162.

D. APPLYING THE BOLT CRITERIA

1. FIRST BOLT CRITERION

The first criterion identified in Bolt looks to a charge’s purpose. Courts are to consider

whether the charge primarily serves a regulatory or a revenue-raising purpose. Id. at 161. If the

charge primarily serves a regulatory purpose, it tends to support that the charge is a user fee. If

the charge primarily serves a revenue-raising purpose, it tends to support that the charge is a tax.

Generally speaking, “it is beyond dispute” that water and sewer rates serve the regulatory

purpose of providing water and sewer services to ratepayers. Shaw, 329 Mich App at 666. Such

rates “fund the operational and capital expenses” of the water and sewer systems, which likewise

“serves the primary function of providing water and sewer services” to ratepayers. Youmans, 336

Mich App at 228.

It is undoubtedly true, as plaintiffs contend, that the increase to the Village’s water rates

was intended in part to raise revenue to partially fund the construction of a new water tower. But

a fee can “raise money as long as it is in support of the underlying regulatory purpose.” Graham,

236 Mich App at 151, citing Merrilli v St Clair Shores, 355 Mich 575, 583; 96 NW2d 144 (1959).

Raising money for the construction of the second water tower plainly served the underlying

regulatory purpose of providing water services to ratepayers. The Village’s water-supply system

was out of compliance with Act 399, as demonstrated by the correspondences from the DEQ to

the Village. To bring its water-supply system into compliance with Act 399 and ensure that it

could continue delivering potable water to ratepayers, the Village needed to increase its water

storage capacity. It sought to accomplish this by constructing an additional water tower. The

construction of the additional water tower was thus done in an effort to comply with the Village’s

obligations under Act 399 and the DEQ’s regulation of that act. Raising money to partially fund

this construction, in turn, served the underlying regulatory purpose of providing water services to

12

The issue in Graham was not whether the charge was a user fee or a tax but whether it was a

user fee or a special assessment. See Graham, 236 Mich App at 150-151.

-15-

ratepayers. “Categorically, obligations arising out of administrative-agency regulations serve a

regulatory purpose.” Youmans, 336 Mich App at 228-229.13

The amount of revenue from the increased rates going to fund the second tower, moreover,

represented a mere fraction of the revenue generated by the increased water and sewer rates.

According to the Village, only 13.9 percent of the revenue generated by the increased water rates

would go towards the second water tower for the first five years, and then none of the rate increase

would be allocated to the water tower thereafter.14 The remainder of the revenue generated was

intended to be used for various projects, fund capital and operational reserves, and pay for

maintenance and operational expenses related to the systems. Plaintiffs do not appear to dispute

that the use of the rate revenue in this way served a regulatory purpose. Even if they did, the

argument would be meritless. This Court has repeatedly held that using funds generated by water

and sewer rates to pay for the operation and maintenance of the water and sewer systems, including

using the funds to increase capital and operational reserves, serves a regulatory purpose. Shaw,

329 Mich App at 666; Youmans, 336 Mich App at 229. On this record, the Village’s act of

increasing water and sewer rates to, among other things, pay for necessary capital improvements

to those systems (including the construction of a second water tower), primarily served a regulatory

purpose.

Plaintiffs insist that the rate increases must serve a revenue-raising purpose because high-

volume users in the tiered (or ascending) rate structure do not receive a greater corresponding

benefit. High-volume users, plaintiffs say, will generate most of the new revenue under the

increased water and sewer rates but “will not realize any greater benefit from the infrastructure

improvements than any other member of the general public.” This argument is unpersuasive. As

the Villages rightly observes, high-volume users burden the system more, contributing to its wear

and tear and driving the need to invest in capital. It is not serving a revenue-raising purpose to ask

users of a system to pay for capital infrastructure that will directly benefit those users. That the

high-volume users will bear a greater portion of this cost reflects the fact that such users use the

system more.15 Those users will, contrary to plaintiffs’ suggestion, certainly realize a greater

benefit from infrastructure improvements to the Village’s water and sewer systems compared to

the general public. Not all members of the general public use the Village’s water and sewer

13

The Village on appeal repeatedly asserts that the DEQ ordered the Village to construct the

additional water tower, while plaintiffs and the DEQ in an amicus brief dispute this

characterization. Regardless of whether the Village was ordered or simply encouraged to construct

the second water tower, the fact remains that the Village needed to construct the second water

tower to bring its water-supply system into compliance with Act 399.

14

There is no suggestion that the Village planned to use revenue generated by the increased sewer

rates to pay for the water tower. The construction of the second water tower, according to the

Village, was to be funded with revenue generated by the increased water rates.

15

Relatedly, it bears remembering that every user of the Village’s water and sewer systems is

subject to the same rates—everyone pays one rate up to 50,000 gallons per quarter, and then a

stepped-up rate for every gallon over 50,000. That high-volume users pay the increased rates

reflects that they choose to use more water, which relates to the third Bolt factor—voluntariness.

-16-

systems, whereas the high-volume users, as users of those systems, benefit from the systems

directly. For these reasons, application of the first Bolt factor clearly favors concluding that the

Village’s increased water and sewer rates constituted a valid user fee because the rates were

increased primarily to serve a regulatory purpose.

2. SECOND BOLT CRITERION

The second criterion identified in Bolt looks to the proportionality of the charge; it asks

courts to consider whether the charge is proportionate to the necessary cost of the service provided.

Bolt, 459 Mich at 161-162. If so, it supports that the charge is more likely a user fee.

Municipal utility rates, such as water and sewer rates, are presumed reasonable. City of

Novi v City of Detroit, 433 Mich 414, 428; 446 NW2d 118 (1989). This presumption can be

“overcome by a proper showing of evidence.” Trahey v City of Inkster, 311 Mich App 582, 594;

876 NW2d 582 (2015). The reasonableness of municipal utility rates is relevant when considering

the second Bolt criterion. Youmans, 336 Mich App at 227. This is because a reasonable rate is

more likely to be proportionate to the cost of providing the service. See Jackson Co, 302 Mich

App at 109. The proportionality of a charge is not a question of mathematic precision. Shaw, 329

Mich App at 667. When a charge reflects actual use, “metered with relative precision,” it “may

properly be viewed as a utility service for which usage-based charges are permissible.” Bolt, 459

Mich at 164-165. See also Shaw, 329 Mich App at 667.

Plaintiffs bore the burden of establishing that the Village’s water and sewer rates were not

proportionate to the necessary cost of providing those services, which included overcoming the

presumption that the Village’s utility rates were reasonable. Attempting to carry their burden,

plaintiffs observe that the Village’s water and sewer rates were intended to partially fund the

construction of the second water tower.16 From this, plaintiffs conclude that “the costs of the new

rates cannot be said to be proportionate to the current necessary costs of service because, by

definition, they serve to afford the cost of future servicing.”

Besides being factually wrong,17 plaintiffs’ argument attempts to make a distinction

between “current” and “future” costs when it is not apparent that such a distinction is relevant. It

would be absurd to conclude that the Village could never plan for “future servicing” without

rendering its rates disproportionate. Planning for the future health of water and sewer systems is

plainly part of providing those services. Caselaw supports this conclusion. For instance, in

Youmans, the rates were increased in part to fund (1) additional capital and operational reserves

and (2) necessary capital improvements, and this Court held that the rates were proportionate.

Youmans, 336 Mich App at 229-230. More generally, plaintiffs’ argument is unconvincing

16

Both plaintiffs and the trial court focused on this fact when considering the second Bolt factor.

As explained in Part III.C of this opinion, however, there is no bright-line rule that that a user fee

can never be used to fund “new infrastructure” or “capital improvements.”

17

The Village’s water-supply system needed additional water storage capacity to bring it into

compliance with Act 399, so constructing an additional water tower was part of “the current

necessary cost” of providing water to ratepayers.

-17-

because they do not point to a shred of evidence suggesting that the Village’s rates were

unreasonable or disproportionate, regardless of whether the rates were funding “current” or “future

servicing.”

The trial court, for its part, found the Village’s tiered rate structure problematic when

considering the proportionality of the increased rates. The court faulted the Village for “not

explain[ing] how the high-volume users drive the necessary costs of the water and sewer system

in a way that would make the tiered rate structure proportionate to those users.” But this reasoning

flips the burden on its head. The Village did not need to establish that its rate structures were

proportionate; plaintiff bore the burden of establishing both that the Village’s rates were

unreasonable and disproportionate. While the trial court may have questioned the wisdom of the

Village’s tiered rate structure, it was not the court’s “role to determine whether a municipal

government has chosen the best, wisest, most efficient, or most fair system for funding a municipal

improvement or service.” Shaw, 329 Mich App at 668. The mere fact that the Village used a

tiered rate structure is not per se evidence that the rate is disproportionate. Plaintiffs must offer

evidence to support their position, and they failed to do so. Id.

Even putting all of this aside, the only evidence in the record related to the reasonableness

of the Village’s rates supports that the rates were reasonable. The Village presented a

comprehensive rate study, a review of the rates by a ratemaking expert (Beauchamp), and a

comparison of water rates from other northern Michigan municipalities. Beauchamp testified that

the Village’s tiered rate structure was justified based on the Village’s “very unusual pattern” of

water usage, where the summer peak usage was 2.8 times the average usage. Beauchamp also

opined that the break-point of 50,000 gallons and the stepped-up rate of a 50-percent increase were

reasonable. And the Village’s community comparison charts, which were not disputed, showed

that the Village’s rate structure was in the average among similarly situated communities—the

Village’s ratepayers of all meter sizes “would have paid more in total charges in at least one third

of the other communities.” Plaintiffs presented no evidence to dispute any of this or to rebut the

presumption that the Village’s water and sewer fees were reasonable and proportionate to the costs

of service.

As one final point, it is uncontested that the Village determines its water and sewer rates

based on metered-water usage. Plaintiffs have not argued, nor does any evidence in the record

suggest, that plaintiffs’ water usage is not accurately metered. This distinguishes this case from

Bolt and Jackson. In those cases, the local units of government charged a stormwater fee to

residential parcels of two acres or less a flat rate rather than a rate based on the parcel’s individual

characteristics. See Bolt, 459 Mich at 156; Jackson Co, 302 Mich App at 110. This case is more

akin to Shaw. There, this Court reasoned that the city’s water and sewer rates were proportionate

to the necessary cost of the services in part because it was uncontested that the city “determine[d]

its water and sewer rates based on metered-water usage,” and nothing in the record suggested that

the metered-water usage was “an insufficiently precise measurement of the actual costs of using

the city’s water and sewer systems . . . .” Shaw, 329 Mich App at 667.

For all of these reasons, the Village is correct that application of the second Bolt criterion

“decisively” weighs in favor of concluding that the disputed portion of the rates was a user fee

rather than a tax. The only evidence in the record supports that the Village’s water and sewer rates

are proportionate to the necessary cost of providing the services.

-18-

3. THIRD BOLT CRITERION

The third criterion identified in Bolt considers the voluntariness of a charge. If the charge

is compulsory, then it is more likely a tax. Bolt, 459 Mich at 167. If the charge is only compulsory

for those who use the service, and if the user can choose how much of the service to use, then the

charge is more likely a user fee. Id.

Our Supreme Court has repeatedly explained:

The water rates paid by consumers are in no sense taxes, but are nothing more than

the price paid for water as a commodity, just as similar rates are payable to gas

companies, or to private water works, for their supply of gas or water. No one can

be compelled to take water unless he chooses, and the lien, although enforced in

the same way as a lien for taxes, is really a lien for an indebtedness, like that

enforced on mechanics’ contracts, or against ships and vessels. The price of water

is left to be fixed by the board in their discretion, and the citizens may take it or not

as the price does or does not suit them. [Bolt, 459 Mich at 162, quoting Ripperger

v City of Grand Rapids, 338 Mich 682, 686; 62 NW2d 585 (1954), quoting Jones

v Detroit Water Com’rs, 34 Mich 273, 275 (1876) (quotation marks omitted).]

Here, like in Shaw, 329 Mich App at 669, “[e]ach individual user decides the amount and

frequency of usage, i.e., each user decides how much water to draw from the tap.” This in turn

supports that the charges at issue are voluntary because each user of the Village’s water and sewer

system can control how much water they use. See id.

Plaintiffs resist this conclusion. They argue that concluding that water and sewer rates are

voluntary goes against “the spirit of Bolt” and would “forc[e] a utility user to sacrifice the full

potential of a property to avoid unreasonable fees,”18 amounting to a “de facto deprivation of

property rights.” This argument misses the mark. Water and sewer rates are voluntary because

users like plaintiffs have the option of limiting how much they use the services. They retain full

control of their property rights, including how much water they use. The only caveat is that they

have to pay for that usage. But just because a charge is voluntary does not necessarily mean it is

a user fee. See Bolt, 459 Mich at 162 n 12 (explaining that Ripperger does not “stand[] for the

proposition that sewage charges are always user fees” but “articulated relevant criteria for

determining whether a charge is a fee or a tax”). The Bolt criteria are to be considered in their

totality, and a finding that a charge is voluntary does not necessitate finding that the charge is a

fee. See Shaw, 329 Mich App at 653. The problem for plaintiffs is that, after applying the Bolt

criteria, nothing suggests that the Village’s increased water and sewer rates constituted a tax.

IV. CONCLUSION

The Village was informed by the DEQ that its water-supply system was in violation of Act

399 due to insufficient water storage capacity, and that the Village’s current rate structure was

18

As explained above, plaintiffs have not presented any evidence in support of their assertion that

the water and sewer rates are unreasonable.

-19-

inadequate to support its water and sewer systems. The DEQ explained that the inadequate funding

could affect the reliability of the systems if the Village was unable to pay for expenses needed to

“sustainably operate the system,” which included operational, maintenance, and replacement

expenses, as well as “new infrastructure when needed.” To remedy these deficiencies, the Village

increased its water and sewer rates.

The increased rates primarily served the regulatory purpose of providing reliable and

sustainable water and sewer services to ratepayers. True, the water-rate increase was intended to

partially fund the construction of an additional water tower. But the construction of that water

tower served the underlying regulatory purpose of providing water services—the additional water

storage capacity was needed to bring the Village’s water-supply system into compliance with Act

399. Ensuring that water delivered to ratepayers is and remains potable serves a regulatory

purpose. The construction of the second water tower was a necessary cost to continue delivering

this service, so raising money to partially fund that construction served the underlying regulatory

purpose. The increased water and sewer rates were also necessary to fund various projects and

increase operational and capital reserves, as well as pay for maintenance and operational expenses

related to the water and sewer systems. All of this served the regulatory purpose of providing

water and sewer services to ratepayers.

Nothing in the record suggests that the increased water and sewer rates were

disproportionate to the cost of providing the services, nor is there any evidence in the record

rebutting the presumption that the Village’s increased water and sewer rates were reasonable. In

fact, all of the record evidence supports finding that the Village’s increased water and sewer rates

were reasonable and proportionate. While the Village uses a tiered rate structure for its water and

sewer rates, that was a policy choice to ensure that users who burden the system more bear the

brunt of the cost for maintaining the system. It does not per se render the rates disproportionate or

unreasonable; plaintiffs must still present evidence to that effect, and there is no such evidence in

the record. The Village, moreover, ensures that users only pay for what they actually use through

metered-water usage. And finally, the Village’s water and sewer rates are only compulsory for

those who choose to use the services, and those users can choose how much of the service to use.

All of this, taken together, makes clear that the Village’s increased water and sewer rates

constituted a valid user fee, not a tax.19 The trial court’s order granting plaintiffs’ motion for

summary disposition is reversed, and the case is remanded for the trial court to enter an order

granting summary disposition in favor of the Village.

Reversed and remanded. We do not retain jurisdiction.

/s/ Colleen A. O’Brien

/s/ Michael J. Kelly

19

In light of this conclusion, it is unnecessary to address plaintiffs’ cross-appeal that the trial court

abused its discretion by denying monetary damages to plaintiffs.

-20-