Opinion

20240215_C364826_29_364826.Opn.Pdf

Court
Michigan Court of Appeals
Filed
Feb 15, 2024
Status
Unpublished
Cited by
0 cases
Authority
More cited than 15.2%

damages may include the value of the trees cut to the contemplated or existing use of the land, including the costs of replacement or restoration when the property destroyed had a unique value of its own

How later courts described this case

  • damages may include the value of the trees cut to the contemplated or existing use of the land, including the costs of replacement or restoration when the property destroyed had a unique value of its own
  • replacement costs of trees allowed when the plaintiff had used the property to derive aesthetic and spiritual satisfaction

Written by the judges who cited it.

The opinion

If this opinion indicates that it is “FOR PUBLICATION,” it is subject to

revision until final publication in the Michigan Appeals Reports.

STATE OF MICHIGAN

COURT OF APPEALS

STANLEY SIMMONS and PATRICIA SIMMONS, UNPUBLISHED

February 15, 2024

Plaintiffs-Appellants,

v No. 364826

Gratiot Circuit Court

ROGER A. RYDER and PAM BENTLEY, LC No. 21-000433-CH

Defendants-Appellees.

Before: LETICA, P.J., and CAVANAGH and SWARTZLE, JJ.

PER CURIAM.

Plaintiffs prevailed in a bench trial on their claims to quiet title and for civil trespass

regarding a 31-foot-wide strip of their real property that defendant Roger A. Ryder wrongfully

claimed he had acquired when he purchased an adjoining property from defendant Pam Bentley.

Following an evidentiary hearing on damages—damages which allegedly resulted from Ryder’s

removal of some trees, shrubs, and plants, as well as from altering the soil, foliage, and

undergrowth—the trial court awarded plaintiff monetary damages in the amount of $1,995, which

was the cost of installing 21 arrowwood viburnum trees. The trial court also ordered that (1) a

remedial survey be completed—with plaintiffs splitting the $4,350 cost with Ryder; (2) Ryder

could reenter the property and complete the remedial excavation work; (3) plaintiffs were not

entitled to damages for the installation of a fence; and (4) plaintiffs were not entitled to recover

their costs and attorney fees incurred in prosecuting this legal action.

Plaintiffs appeal as of right, challenging the amount of damages awarded, and the holdings

that Ryder could perform the remedial excavation work and that the parties were to split the cost

of a remedial survey to reestablish the boundary between their properties. We affirm.

I. BACKGROUND

On February 24, 2021, plaintiffs filed their complaint against defendants Ryder and

Bentley to quiet title and for civil trespass, averring that (1) plaintiffs owned real property

commonly known as 312 W. Polk Road, Ithaca, Michigan since 1987; (2) Ryder owned real

property commonly known as 216 W. Polk Road, Ithaca, Michigan; and (3) Bentley owned real

property commonly known as 2025 N. State Road, Ithaca, Michigan. Ryder’s property was a

-1-

triangular piece of property in the middle of, and bordering, both plaintiffs’ property and Bentley’s

property. The dispute involved the location of the boundary line between the parties’ properties—

a boundary line, plaintiffs averred, which was clearly marked and delineated with a fence. More

specifically, in 2020 Ryder commissioned a survey of Bentley’s property to be performed by

Tingley & Associates P.C., for the purpose of splitting Bentley’s parcel into two parts—one parcel

of which Ryder proposed to purchase. According to plaintiffs’ complaint, the Tingley survey

depicted the boundary line between plaintiffs’ property and Bentley’s property so that it

inaccurately and erroneously encroached 31 feet onto plaintiffs’ property. And Ryder purchased

that parcel from Bentley in December 2020. Ryder then proceeded to remove the boundary-line-

fence, as well as trees, shrubs, plants, foliage, vegetation, and undergrowth. Ryder also excavated

and moved a substantial amount of soil so as to change the topography and elevation of the land.

Count I of plaintiffs’ complaint sought to quiet title to the 31-foot strip of real property that

was wrongfully appropriated. Alternate claims of adverse possession and acquiescence were

stated in Counts II and III, but were subsequently waived by plaintiffs. And Count IV was a claim

of civil trespass against Ryder only, seeking damages for the diminution in value of plaintiffs’

property, the cost of remediation and restoration of their property, the loss of the value of the trees

destroyed, and other damages, as well as treble damages under MCL 600.2919, plus attorney fees,

costs, and interest. Plaintiffs attached numerous documents to their complaint, including pictures,

maps, property descriptions, deeds, and the Tingley survey.

A two-day bench trial was conducted beginning on April 12, 2022. Plaintiffs’ first witness

was Gilbert Barish, a professional surveyor for 22 years who testified as an expert in surveying

and land descriptions. Barish concluded that the Tingley survey incorrectly established the far

westerly boundary line. That survey failed to identify the fence that was located in the disputed

area of property which depicts a line of occupation, and also overran a controlling line depicted on

previous surveys and adjoining deeds. Barish particularly referred to a 1902 deed which conveyed

the west half of the southwest quarter of the southeast quarter and noted that the deed established

the controlling line.

Plaintiff Stanley Simmons testified that he owned the property at issue since 1987, and he

knew where the boundary lines of the property were located. Remnants of fence lines existed at

his west and east boundary lines, and the triangular property next to him, which was defendant

Ryder’s property, was fenced in its entirety. A survey that had been done in 1990 showed that the

boundary was 1288.5 feet west of the southeast quarter of section 24, which is the boundary line

between his parcel and Ryder’s triangular parcel; they had a common boundary line. The Tingley

survey claimed the boundary line to be 1319.54 feet west of the southeast corner. But there had

been no dispute about that boundary line until the Tingley survey came up—which provided for a

31-foot gap west of the Ryder triangle. The boundary line at issue had years of scrub growth, pine

trees, and other foliage which clearly depicted the line of occupation or possession.

Around January 2022, Stanley testified, he heard Ryder “plowing down my land.” Ryder

was removing the trees, shrubs, and foliage at that boundary line area, but about 31 feet west of

Ryder’s triangular parcel. Ryder was also flattening out the land, which left pretty steep cliffs on

plaintiffs’ property. Ryder’s excavation cut into the slope of a hill on plaintiffs’ property—leaving

a 7-foot ledge—and thereby removed the lateral support for the higher land and trees located there,

causing trees to fall. Stanley went to confront Ryder but, by the time he got there, Ryder “had

-2-

basically annihilated that 30 foot” of land. Plaintiffs have a single-family home on their property.

Ryder has a farming operation on his property, and is involved in cattle farming. The 31-foot strip

of land at issue had mature trees on it that “created a complete buffer zone between my land and

Ryder property.” The growth on that strip of land provided a visual, wind, and noise buffer zone

between his residential property and this commercial operation. Now plaintiffs could see

everything going on at Ryder’s property. Prior to that, he could only see the peak of Ryder’s pole

barn. Stanley testified that he got a quote from Miller Brothers to excavate, fill, and grade about

700 feet of his property and he also got a quote from Snyder Landscaping for the planting of trees

and ground cover for erosion control. These quotes were to restore his property and they amounted

to over $100,000.

Plaintiff Patricia Simmons also testified that Ryder’s clearing of the east side of plaintiffs’

property eliminated the visual, wind, and noise barrier or screen that they had always enjoyed.

Patricia testified that Ryder had a lot of industrial or commercial activity on his property related

to his farming operation. She was devastated when defendant ruined their property. They had

enjoyed walking through the woods and the aesthetics of their natural property for almost 35 years.

The second day of the bench trial commenced on May 26, 2022, and began with the court

conducting a site visit. Defendants then called their first witness, Douglas Merchant, the assessor

and supervisor of Arcadia Township. Douglas testified that the township required that a survey

be performed when Ryder was going to purchase some of defendant Bentley’s property and he did

not review the survey for accuracy but had no reason to believe the survey performed was

inaccurate. He was aware the west-side boundary line was moved on the Tingley survey and

created a 31-foot strip gap-parcel between plaintiffs’ property and Ryder’s triangular property that

had never existed. Douglas testified that the value of agricultural property in 2022 was about

$5,450 an acre and the value of a residential wooded lot was about $3,500 to $3,800 an acre.

William Tingley, the surveyor who completed the Tingley survey also testified. He had

been employed as a surveyor since 1970. Tingley admitted that he was unaware of a 1902 survey

which would have affected the drafting of his survey. Tingley also admitted that he saw fragments

of a fence on the disputed western border but did not note that on his survey, although usually such

monuments are noted. He admitted that his survey was wrong in that it depicted the western

boundary line incorrectly—it should have been shown to be 31-feet westerly of where he depicted

it so that plaintiffs continued to own that property and not defendants.

Defendant Ryder testified that the Tingley survey did not depict the western boundary of

the property line where he thought it was; instead, it was placed 31-feet more westerly and onto

plaintiffs’ property. Ryder had been on that property his whole life and he and his family always

believed the disputed property was plaintiffs’ property. He knew there was an old fence which he

understood was the boundary line. After he completed purchasing Bentley’s property in December

2020, he started making it usable for his farming and cattle operation. He used a brush hog on a

skid steer to clear the thick underbrush on the property and hired an excavator to fill in low areas.

He also removed some trees. He installed two catch basins with underground tiles just west of his

original triangular piece of land. When plaintiff Stanley came over to complain about the clearing

of the property, Ryder gave him a copy of the Tingley survey. He knew plaintiffs were upset that

he was clearing that land. Ryder also had his attorney send plaintiffs a cease and desist letter,

advising them not to contact him or come on his property.

-3-

On June 10, 2022, the trial court issued its oral opinion on this matter. The trial court

concluded that title to the disputed 31-foot strip of land should be quieted in plaintiffs’ favor.

Further, plaintiffs established their claim of civil trespass against defendant Ryder under

MCL 600.2919(1). However, because Ryder believed he was improving his own property, and

such belief was reasonable and credible, plaintiffs were not entitled to treble damages. The court

scheduled a future hearing to determine damages.

On September 12, 2022, the trial court entered an order (1) quieting title to the disputed

property in favor of plaintiffs and against any right or interest claimed by defendants; (2) finding

defendant Ryder liable for civil trespass but not for treble damages; and (3) stating that an

evidentiary hearing would be conducted to determine damages.

Thereafter, plaintiffs filed a memorandum of law for the evidentiary hearing on damages

for civil trespass. Plaintiffs explained that the real property at issue measured about 31 feet by

1,320 feet, i.e., approximately 40,920 square feet or .93 acres. And that defendant Ryder caused

substantial damage to that property “as he essentially completely leveled and cleared an

approximately one-acre strip of land that historically [had] been a wooded boundary that provided

effective visual, wind, odor, and noise screen between Plaintiffs’ residence and the farming

operation on Ryder’s property.” In brief, plaintiffs stated that their request for damages included:

(1) the cost of a survey and expert testimony by Gilbert Barish of $6,444 to reestablish the

boundary line; (2) the cost for excavation work to partially remediate the damage at a range of

$66,414 to $81,550; (3) the cost for landscaping work to partially remediate the damage at a range

of $30,151 to $58,005; (4) the cost of a fence at $7,546; and (5) court courts, recording fees, and

attorney fees associated with the matter at $35,000. The amount of damages totaled in the range

of $151,355 to $200,145. In support of their claim of damages, plaintiffs relied on the cases of

Schankin v Buskirk, 354 Mich 490, 494-495; 93 NW2d 293 (1958) (damages may include the

value of the trees cut to the contemplated or existing use of the land, including the costs of

replacement or restoration when the property destroyed had a unique value of its own); Szymanski

v Brown, 221 Mich App 423, 429-431; 562 NW2d 212 (1997) (replacement costs of trees allowed

when the plaintiff had used the property to derive aesthetic and spiritual satisfaction); and Thiele

v Detroit Edison Co, 184 Mich App 542, 545; 458 NW2d 655 (1990) (“The loss of aesthetic value,

the actual monetary value of the trees lost and the cost of their replacement constitute evidence of

the diminution in value of the freehold estate.”). Plaintiffs also attached photographs and quoted

estimates to support their request of damages.

Defendant Ryder filed a response to plaintiffs’ memorandum of law, arguing that he

obtained a topographic survey1 through D & M Site, Inc. and had a remediation quote prepared by

Merchant Excavating, Inc. which estimated the cost of remediation to be about $30,750. Ryder

argued that the quotes plaintiffs received and damages requested were grossly inflated. Ryder

argued that the soil that was displaced from plaintiffs’ property remains on the property so no fill

dirt or topsoil was required. Further, Ryder had the equipment and ability to move that dirt back

into its original location in compliance with the D & M Site recommendation. Moreover, Ryder

1

“A topographical survey indicates ground elevations and any adjacent structures on or near the

property.” Heath Twp v Sall, 442 Mich 434, 442, n 8; 502 NW2d 627 (1993).

-4-

had the ability to remove the logs, firewood, and other debris upon being granted permission to do

so. Defendant Ryder argued that plaintiffs were pursuing grossly excessive damages “vindictively

and self-servingly.” And plaintiffs were actually seeking to improve their landscape—not simply

remediate it—by adding additional trees and a fence that did not previously exist. Further, Ryder

argued, plaintiffs were not entitled to court costs and attorney fees because Ryder reasonably relied

on the Tingley survey and plaintiffs failed to get their own survey before resorting to filing this

lawsuit.

On September 27, 2022, the hearing on plaintiffs’ damages commenced. Plaintiffs’ first

witness was Bruce Waldron, an expert in the field of excavation and owner of Bruce Waldron

Excavating. Plaintiffs had requested an estimate on putting their property back the way it was,

i.e., for restoration. He determined the amount of material that had been removed from the

property and the amount of material it would take to get that property back to a natural state where

vegetation would grow. His estimate is dated August 3, 2022. In his estimate, Waldron included

a culvert and would raise the grade in an area where plaintiffs used to access their property, but

had become washed out with the Ryder changes. He would also dig up the catch basin and tiles

that were placed by Ryder and cap them. Ryder had also placed crushed concrete on the property

for a parking area which would be removed and replaced with a heavy subsoil and then topsoil.

Waldron saw piles of rocks and logs on plaintiffs’ property and he would remove the logs and

firewood and place them on Ryder’s property. While there was a pile of topsoil remaining on

plaintiffs’ property, it was only about 150 to 200 yards of topsoil and much more had been

removed. He proposed to bring in about 850 yards of subsoil and 1400 yards of topsoil. When he

walked the property, Waldron noted several places where two to four feet of soil was removed.

He determined the amount of material that was needed to make the natural lay of the land; in other

words, to build the grade back up to match the contour of the hills and slopes. About 12 inches of

topsoil was needed throughout so that trees and vegetation could take root. The total estimated

cost of the project was $66,550, which included about $14,600 for labor and equipment. Topsoil

costs $28.40 a cubic yard and subsoil costs $12.40 a cubic yard so the cost of materials was more

than $50,000. And if he could not access plaintiffs’ property through Ryder’s property, it would

cost an additional $15,000 to build an access road and then remove that access road after the project

was completed. Waldron acknowledged a previous estimate by Miller Brothers Excavating from

April 2022 which estimated the cost of the project at $66,414—very close to his estimate. And

Waldron admitted that he had never been on plaintiffs’ property before the purported damage was

done.

Plaintiffs’ next witness was an expert in landscaping, Mark Hahn, who works at Twin City

Landscaping and had worked there for 40 years. He prepared an estimate that was dated August

2, 2022, to restore plaintiffs’ property the best they could but it would take time for the growth to

occur. The southern 700-feet of land would be larger trees and larger cover items and the northern

620 feet of land would be more ground cover, brush, and shrubs. The total for the most-minimum

quote was $30,151, but when larger trees are added the maximum quote was $42,961. Hahn

testified that this would be the “bare minimum” to provide for a screen or cover between plaintiffs’

property and Ryder’s farming operation. Hahn admitted that he had not visited the property before

the damage was done, and was relying on plaintiffs’ representations as to what the property had

been like before the damage.

-5-

On December 2, 2022, the damages hearing continued with plaintiff Stanley Simmons

testifying that he wanted to have his property resurveyed to get an accurate drawing and

description, and he wanted to reestablish his fence line and wooded area, which would require

excavation and landscaping. Stanley received a quote from Gilbert Barish, the surveyor who

testified at the bench trial, as to the cost of reestablishing his boundary line and the quote was for

$4,350. Stanley testified that he had already paid Barish $2,094.24 to date for his surveying work.

Thus, the total cost to reestablish his boundary line was $6,444. Stanley also obtained a quote

from Bruce Waldron Excavating for remediation excavation work totaling $66,550. He had

previously obtained a quote from Miller Brothers Excavating for remediation work which totaled

$66,414. Stanley also obtained a quote from Twin City Landscape for remediation work totaling

between $30,151 and $42,961. He had previously obtained a quote from Snyder’s Landscape and

Design for remediation work totaling $58,005. Before his property was damaged by Ryder,

Stanley testified, he enjoyed a visual, wind, odor, and noise screen between his residential property

and Ryder’s farming operation. And Stanley’s goal was to provide that cover or screen that was

previously enjoyed between their properties. He and his wife found the wooded portion that was

destroyed to be aesthetically pleasing and that privacy was basically why they had purchased that

property. The fence posts and fence wire that were on his property were also removed by Ryder.

Stanley obtained a quote from Mount Pleasant Fence Sash and Door for the purpose of

reestablishing the fence line between his property and Ryder’s property and it totaled $7,546.74.

Stanley also testified that he had incurred court costs and attorney fees to that date in the amount

of $35,000, which he was seeking to be reimbursed by Ryder. On cross-examination, Stanley was

apprised of a quote for remediation of plaintiffs’ property that Ryder obtained from Merchant

Excavating which totaled $30,750. Stanley testified that he had worked with David Merchant in

the past; he was a competent excavator and did a good job. Stanley would not have a problem

with David doing the remediation work.

Defendant then called David Merchant, who was qualified as an expert witness, and he

owns Merchant Excavating. Ryder obtained an engineered print related to the remediation of

plaintiffs’ property, which were drawings and plans that offered a detailed guide to move the dirt

and put the property back to previous grades and slopes. David’s quote was based on that

engineered print, to “build it to the print,” and totaled $30,750. David had worked with Ryder in

a professional capacity and thought that Ryder was capable of doing this project himself. David

was willing to supervise such a project and would be willing to provide an affidavit to the court in

that regard for an estimated cost of $500.

David further testified that he had told Stanley to get an engineered print, i.e., topographic

survey, and that he would not provide plaintiffs an estimate without a print. David agreed that the

only pile of dirt remaining on plaintiffs’ property was about 200 cubic yards. And he agreed that

subsoil and topsoil would be required to remediate plaintiffs’ property. But he intended to use the

soil that was on site, as well as on Ryder’s property, and so his quote did not include any additional

subsoil or topsoil—the $30,750 was for equipment and labor, as well as probably grass seed.

David knew of Bruce Waldron and had no issues with his work. David agreed that Waldron’s

quote of $12.40 for subsoil and $28.40 for topsoil were good quotes. And Waldron’s quote that

included needing 850 cubic yards of subsoil and 148 yards of topsoil was accurate if he was not

taking dirt from Ryder’s property.

-6-

Defendant Ryder testified that he mistakenly messed up plaintiffs’ property and he wanted

the opportunity to fix it. That is why he commissioned the engineering plans at a cost of about

$2,500 so they could all be on the same page. He did not feel that he should be financially ruined

over an honest mistake. To avoid any remediation, he was willing to purchase plaintiffs’ property.

He knew that David Merchant would be supervising him if he was allowed to remediate plaintiffs’

property himself. And he has all of the equipment necessary at his home to perform that task. He

thought it would take him about two weeks. But Ryder knew that plaintiffs did not want him to

perform the remediation work and they did not want him on their property. Ryder did not believe

the quotes presented by plaintiffs were reasonable, particularly the need for fill material because

he never removed any dirt offsite—he merely moved it around the property. He cut between five

and ten dead ash trees down on the disputed strip of property. The fence that has been referred to

was not really a fence—there were posts and some pieces of wire. So if he had to install a fence

on plaintiffs’ property that would actually be an improvement, not a remediation. Further, he

disagreed with the landscaping estimate because he did not remove that many trees—not even

close. There was some brush but there was a significant portion that had no trees. “They’re asking

for trees to be planted in an area that was standing water before I moved the dirt.” He would be

willing to plant a few trees but not as many as the estimate quoted. Ryder testified that a lot of

plaintiffs’ property had been wet and had gotten wetter over the years. It was not because of

anything he did. He actually tried to improve it so that it was not so wet when he thought it was

his property.

At the conclusion of witness testimony and closing arguments, the trial court rendered its

opinion on plaintiffs’ damages. First, the court reiterated its conclusion that Ryder was liable for

trespass, but the trespass was casual and involuntary, i.e., he had probable cause to believe that the

land on which the trespass was committed was his own. Second, the court referred to the holding

in Schankin, 354 Mich at 492, that generally damages for trespass are measured by the difference

in the value of the land before and after the harm. The court noted that there was no testimony

regarding any difference in the value of the land. But the Schankin Court also stated that there is

no fixed, inflexible rule for determining damages; thus, the trial court turned to the damages

requested by plaintiffs. The court noted that plaintiffs requested $6,444 for a survey, but had

already spent $2,094 and an additional $4,350 was needed to complete the survey. The court held

that the remaining cost of $4,350 to complete the survey would be split between the parties so that

each paid for half, or $2,175. The $2,094 that plaintiffs had already paid was considered “to be a

cost of defending this action,” and would be addressed later in the ruling. But Ryder was also to

pay the cost of recording the appropriate documents with the Register of Deeds associated with

the new survey and ensuring title was quieted in plaintiffs’ favor.

Next, the trial court denied plaintiffs’ request for construction of a fence because what had

been on their property was in a state of extreme disrepair. But the court ordered that the cost of

staking the land by the surveyor be split between the two parties. The court then considered

plaintiffs’ request for excavating services. The court noted that the evidence showed that Ryder

had not removed any of the dirt from the property, it had merely been moved around. Therefore,

the quotes plaintiffs presented that included the hauling in of dirt to plaintiffs’ property were

inappropriate. David Merchant had testified that the dirt that was already on the property was

sufficient to fill in the disputed property. And the court held that Ryder would be given the

opportunity to fix plaintiffs’ property, with David present to supervise the excavation work. David

-7-

must also sign off on the work performed by Ryder, and Ryder must pay any cost associated with

David’s supervision.

The trial court next considered the issue of landscaping as damages and noted that the court

had performed a site visit. The court further noted that, during that site visit in the spring of 2021,

the Ryder property was not visible from plaintiffs’ land. The court also considered photographs

that were admitted as exhibits and concluded that a majority of the property at issue did not contain

a large number of hardwood trees before Ryder’s trespass. Therefore, the quotes presented by

plaintiffs with regard to requested landscaping were designed more to improve the property than

to restore the property to its previous state. The court recalled seeing “scrub trees” or trees that

were embedded in a swampy area in some places and not mature, high quality trees. Accordingly,

the court ordered Ryder to pay, as set forth in the Twin City Landscaping estimate, the cost of

installing 21 arrowwood viburnum trees which was $1,995.

As for plaintiffs’ request for costs and attorney fees, the trial court noted that MCL

600.2591 provides for an award of cost and fees for a frivolous action. However, the court noted

that Ryder reasonably believed the property at issue was his rightful property based on the Tingley

survey. Therefore, the court held, each party was to bear the cost of their own defense and

prosecution of this matter, including their own attorney fees.

On January 19, 2023, the trial court entered an order following the hearing on damages for

civil trespass. The court ordered: (1) a survey to be completed by Gilbert Barish, and the parties

shall each pay $2,175 in that regard; (2) defendant Ryder to pay the recording fee associated with

the survey; (3) defendant Ryder to perform the remedial excavation with plaintiffs’ permission,

under the supervision of David Merchant, and at Ryder’s cost, and within six months of getting

the requisite permission; (4) defendant Ryder to pay the cost of installing 21 Arrowwood

Viburnum trees for a total of $1,995; (5) each party to bear their own costs and attorney fees; and

(6) a money judgment was entered in favor of plaintiffs and against Ryder in the amount of $1,995.

Plaintiffs appeal, arguing that (1) the trial court erred in awarding only $1,995 in

damages—the cost of planting 21 Arrowwood Viburnum trees—when the evidence showed that

Ryder destroyed about one acre of plaintiffs’ mature woods; (2) the trial court erred in permitting

Ryder to perform remedial excavation work instead of awarding damages to plaintiffs for the cost

of that work; and (3) the trial court erred in holding that the parties must split the cost of a remedial

survey and associated field work to reestablish the appropriate boundary line required to correct

the errors created by the Tingley survey.

II. ANALYSIS

A. STANDARD OF REVIEW

This Court reviews a trial court’s findings of fact in a bench trial for clear error and its

conclusions of law de novo. MCR 2.613(C); Ligon v Detroit, 276 Mich App 120, 124; 739 NW2d

900 (2007). A trial court’s determination of damages following a bench trial is also reviewed for

clear error. Alan Custom Homes, Inc v Krol, 256 Mich App 505, 513; 667 NW2d 379 (2003).

Clear error exists where, after reviewing the entire record, the reviewing court is left with a firm

and definite conviction that a mistake has been made. Walters v Snyder, 239 Mich App 453, 456;

-8-

608 NW2d 97 (2000). But to the extent that the proper measure of damages involves a question

of law, our review is de novo. See 2000 Baum Family Trust v Babel, 488 Mich 136, 143; 793

NW2d 633 (2010); see also MCL 600.2919(1). This Court is deferential to the trial court’s special

opportunity to judge the credibility of the witnesses. MCR 2.613(C); Smith v Straughn, 331 Mich

App 209, 215; 952 NW2d 521 (2020).

B. APPLICABLE LAW

MCL 600.2919(1) provides:

Any person who:

(a) cuts down or carries off any wood, underwood, trees, or timber or despoils or

injures any trees on another’s lands, or

(b) digs up or carries away stone, ore, gravel, clay, sand, turf, or mould or any root,

fruit, or plant from another’s lands, or

(c) cuts down or carries away any grass, hay, or any kind of grain from another’s

lands

without permission of the owner of the lands . . . is liable to the owner of the land .

. . for 3 times the amount of actual damages. If upon the trial of an action under

this provision or any other action for trespass on lands it appears that the trespass

was casual and involuntary, or that the defendant had probable cause to believe that

the land on which the trespass was committed was his own . . . judgment shall be

given for the amount of single damages only.

In this case, plaintiffs prevailed in their action to quiet title brought under MCL 600.2932, and

thus, were entitled to seek damages for injury to their land under MCL 600.2919(1). But the trial

court concluded that Ryder’s trespass was casual and involuntary, and that he had probable cause

to believe the land at issue was his own based on the Tingley survey; therefore, plaintiffs were

only entitled to single damages and not treble damages. That holding has not been challenged on

appeal. However, plaintiffs challenge the damages awarded thus we turn to the law on the issue

of damages under these circumstances.

It is a well-established principle of law that a plaintiff asserting a claim “has the burden of

proving damages with reasonable certainty, and damages predicated on speculation and conjecture

are not recoverable. Damages, however, are not speculative simply because they cannot be

ascertained with mathematical precision.” Health Call of Detroit v Atrium Home & Health Care

Servs, Inc, 268 Mich App 83, 96; 706 NW2d 843 (2005) (citation omitted). “It is sufficient if a

reasonable basis for computation exists, although the result be only approximate.” Berrios v Miles,

Inc, 226 Mich App 470, 478; 574 NW2d 677 (1998).

In the case of trespass and injury to land, our Supreme Court in Kratze v Independent Order

of Oddfellows, Garden City Lodge No 11, 442 Mich 136, 149; 500 NW2d 115 (1993), stated:

-9-

Where the wrong consists of a trespass to property resulting in an injury to

the land, the general measure of damages is the diminution in value of the property

if the injury is permanent or irreparable. If the injury is reparable, or temporary,

the proper measure of damages is the cost of restoration of the property to its

original condition, if less than the value of the property before the injury. The rule

is, however, flexible in its application. The ultimate goal is compensation for the

harm or damage done. Thus, whatever method is most appropriate to compensate

a plaintiff for the loss may be used. [Id. (citations and footnote omitted).]

In other words, there are two methods that may be used to determine damages for the injury to

land: the injured party may seek compensation for the lost market value of the land, i.e., the

diminution in value method, or the injured party may seek the cost of restoration of the land, i.e.,

the restoration method. That is so because, while the property’s value may not have been

diminished by the injury (and may actually have been enhanced), that property may have had a

unique value to its owner that was negatively impacted. For example, the property may have been

purchased or particularly enjoyed because of the beauty of its trees that were wrongfully cut down.

Consequently, our Supreme Court in Schankin v Buskirk, 354 Mich 490, 494; 93 NW2d

293 (1958), had previously recognized that “there is no fixed, inflexible rule for determining, with

mathematical certainty, what sum shall compensate for the invasion of the interests of the owner.

Whatever approach is most appropriate to compensate him for his loss in the particular case should

be adopted.” Likewise, in Thiele v Detroit Edison Co, 184 Mich App 542, 545; 458 NW2d 655

(1990), this Court had also noted that “courts should apply whatever approach is more appropriate

to compensate the plaintiff for the losses incurred based on the facts of the individual case,” and

concluded in that case that the “loss of aesthetic value, the actual monetary value of the trees lost

and the cost of their replacement constitute[d] evidence of the diminution in value of the freehold

estate.” However, as this Court noted in Szymanski v Brown, 221 Mich App 423; 562 NW2d 212

(1997), while it is permissible to apply the restoration method of computing damages to which the

injured party is entitled, those damages “must not exceed the value of the property before the

injury.” Id. at 430-431, citing Kratze, 442 Mich at 149. Therefore, in Szymanski the defendant—

who had “destroyed more than five hundred mature trees, removed topsoil, and otherwise scarred

the earth”—was entitled to remittitur in the amount of $9,500 because the jury’s award of $37,000

exceeded the market value of the property, which was $27,500. Id. at 426, 431-432.

C. APPLICATION OF LAW TO THE FACTS

Plaintiffs argue on appeal that the trial court erred in awarding only $1,995 in damages—

the cost of 21 arrowwood viburnum trees—when the evidence demonstrated that Ryder excavated

and destroyed about one acre of plaintiffs’ mature woods. We disagree.

Plaintiffs assert that they presented evidence substantiating their request for damages in the

range of $151,355 to $200,145, which included remedial excavation and landscaping, a survey,

new fencing, and attorney fees and costs. Nevertheless, plaintiffs argue, the trial court only

awarded the cost of installing 21 arrowwood viburnum trees—which was $1,995.

As the trial court noted, plaintiffs did not present any evidence as to the diminution in value

of their property resulting from Ryder’s actions. In other words, plaintiffs did not seek damages

-10-

for the lost market value of their land. No evidence was presented in that regard. Rather, plaintiffs

sought damages for the cost of restoration of their property as evidenced by the estimates for

remedial excavation and landscaping submitted, as well as witness testimony in support of those

estimates and plaintiffs’ loss. However, as our Supreme Court held in Kratze, “the proper measure

of damages is the cost of restoration of the property to its original condition, if less than the value

of the property before the injury.” Kratze, 442 Mich at 149 (emphasis added); see also Szymanski,

221 Mich App at 430-431. Plaintiffs did not present any evidence as to “the value of the property

before the injury.” But in the bench trial, Douglas Merchant, the assessor and supervisor of

Arcadia Township, testified that the value of agricultural property in 2022 was about $5,450 an

acre and a residential wooded lot was about $3,500 to $3,800 an acre. The property that was

allegedly damaged by Ryder’s actions was a 31-foot-wide strip of land that amounted to a bit less

than one acre of land. Accordingly, plaintiffs could not have been entitled to the amount of

restoration damages they sought, as set forth in their memorandum of law submitted before the

evidentiary hearing on damages, i.e., excavation work totaling between $66,414 to $81,550, and

landscaping work totaling between $30,151 to $58,005. The value of the disputed property, at

most, was about $5,450, according to the record evidence.

Further, with regard to plaintiffs’ landscaping estimate, plaintiffs failed to present evidence

as to the number, types, sizes, and condition of trees that Ryder removed from their property—

despite claims that a “mature woods” was cut down. Plaintiffs’ landscaping expert, Hahn, admitted

that he had never been to plaintiffs’ property before the damage had occurred, and thus, he was

relying on plaintiffs’ representations as to what had been on the property. And Hahn did not testify

that he saw a large number of stumps from mature trees having been cut down on the property,

i.e., evidence that an acre of mature woods was cut down as plaintiffs had claimed. Waldron,

plaintiffs’ excavation expert, also did not testify that he saw evidence that an acre of mature woods

was cut down on the property. Ryder admitted to cutting down between five and ten dead ash

trees, removing thick underbrush, and moving dirt from high to low spots because some of the

disputed property was low-lying and very wet. The trial court noted that, at its site visit to the

property, “scrub trees” or trees that were located in swampy areas—and not mature or high-quality

trees—were seen on plaintiffs’ property. And the photographs that had been admitted as exhibits,

the court noted, also showed that a majority of the property at issue did not contain a large number

of hardwood trees before Ryder’s actions. Moreover, while plaintiffs had testified that they could

see into Ryder’s property because of the number of trees that he had cut down, the trial court noted

that—at its site visit—Ryder’s property could not be seen from plaintiffs’ property. In summary,

plaintiffs failed to prove, with reasonable certainty, entitlement to damages for about an acre of

“mature woods” that was allegedly cut down. See Health Call of Detroit, 268 Mich App at 96.

And, with regard to plaintiffs’ excavating estimate—particularly as to the expense of

subsoil and topsoil, plaintiffs’ excavation expert, Waldron, admitted that he had never been to

plaintiffs’ property before the damage had occurred and was relying on plaintiffs’ representations

as to the grade, slopes, and elevations of the property. Ryder admitted to moving dirt from high

to low spots because some of the disputed property was low-lying and very wet, but he testified

that no dirt was removed offsite. And Ryder commissioned a topographic survey at a cost of about

$2,500 so that there would be a detailed guide to restore the disputed property back to previous

grades and slopes. David Merchant testified that, while subsoil and topsoil would be required to

remediate plaintiffs’ property, it existed onsite—either on the disputed property or on Ryder’s

property—and would be a sufficient amount to complete the work. Plaintiffs presented no

-11-

evidence to suggest that Ryder removed the dirt to another location inaccessible for remediation

work.

Considering the record evidence, we cannot conclude that the trial court clearly erred in

holding that plaintiffs’ excavation estimate was inaccurate for including the cost of hauling in

topsoil and subsoil—over $50,000. Further, we cannot conclude that the trial court clearly erred

in holding that plaintiffs were entitled to the cost of 21 arrowwood viburnum trees, which was

$1,995, in damages for restoration of the property at issue. Plaintiffs request for damages in the

amount of more than $66,000 for remedial excavation work and up to almost $60,000 for remedial

landscaping work was unsupported by the record evidence and far exceeded the value of the

property according to the record evidence.

We also reject plaintiffs’ argument that Ryder should not be permitted to perform the

excavation work, as ordered by the trial court. While this remedy is a bit unconventional, it appears

to be the best solution under the circumstances presented in this case. The record evidence

demonstrated that Ryder has both the equipment and expertise to perform the remediation work.

But to confirm that the work is done properly, the court ordered that excavation expert, David

Merchant, whom both parties know, supervise and sign off on the remediation work performed by

Ryder. And to ensure that plaintiffs’ property is restored properly, Ryder has the topographic

survey, which provides a detailed guide to put plaintiffs’ property back to previous grades and

slopes. David Merchant testified that his quoted estimate to conform to that topographic survey,

or to “build to the print,” totaled $30,750—and that was for equipment and labor, only. Ryder

would be providing that equipment and labor free of charge and under the direct supervision of an

expert excavator, at Ryder’s cost, who must report to the trial court that the work was done

properly. And, again, the damages that could be awarded to plaintiffs for the restoration of their

property cannot exceed the value of that property before the injury. See Kratze, 442 Mich at 149;

Szymanski, 221 Mich App at 430-431. Consequently, not only would Ryder’s excavation work in

remediation of this property be the most cost effective, it is the only manner by which the property

could be fully remediated through this litigation under the facts of this case considering the

constraints of the applicable damages law. Of course, plaintiffs may choose to decline this award

by the trial court and do nothing or arrange for remediation at their own cost. Therefore, under the

circumstances presented in this case, we cannot conclude that the trial court clearly erred by

ordering Ryder to perform the remediation work on plaintiffs’ property under the supervision of

David Merchant.

Finally, plaintiffs argue that the trial court erred in holding that the parties must split the

cost of a remedial survey and associated field work to reestablish the appropriate boundary line

required to correct the errors created by the Tingley survey. We disagree.

The trial court’s decision to split the cost of a remedial survey between the parties arises

more directly from plaintiffs’ action to quiet title brought under MCL 600.2932(1), and not from

their trespass action brought under MCL 600.2919(1) for damage to plaintiffs’ land. An action to

quiet title is equitable in nature. MCL 600.2932(5). And here, as in the Kratze case, the expense

to be incurred for the cost of a remedial survey was not caused by Ryder’s trespass; rather, it was

caused by the erroneous Tingley survey which was drafted by William Tingley. See Kratze, 442

Mich at 152. Defendant Ryder was no more at fault for the erroneous survey than plaintiffs—both

were innocent parties in this regard. Although Ryder hired Tingley—who had been a surveyor

-12-

since 1970—to conduct the survey, there was no evidence that Ryder had any involvement in the

manner or methods Tingley employed in that regard. Under these circumstances we cannot

conclude that the trial court clearly erred in holding that the parties must split the cost to reestablish

the appropriate boundary between their properties. “A trial court must be accorded considerable

latitude in fashioning remedies commensurate with the equities of the case.” Governale v City of

Owosso, 59 Mich App 756, 762; 229 NW2d 918 (1975).2

In summary, it appears that the trial court was fully aware of the issues presented in this

case, correctly applied the law, and awarded damages consistent with the record evidence. See

Alan Custom Homes, Inc, 256 Mich App at 516 (citation omitted). Accordingly, we affirm the

trial court’s decision.

Affirmed.

/s/ Anica Letica

/s/ Mark J. Cavanagh

/s/ Brock A. Swartzle

2

Cases decided before November 1, 1990 are not binding precedent but they may be considered

persuasive authority. In re Stillwell Trust, 299 Mich App 289, 298-299 n 1; 829 NW2d 353 (2012),

citing MCR 7.215(J)(1).

-13-