Opinion

Westlands Water Dist. v. All Persons Interested

Court
California Court of Appeal
Filed
Sep 1, 2023
Status
Published
Cited by
0 cases
Authority
More cited than 12.3%

The opinion

Filed 8/7/23; Modified and Certified for Pub. 9/1/23 (order attached)

IN THE COURT OF APPEAL OF THE STATE OF CALIFORNIA

FIFTH APPELLATE DISTRICT

WESTLANDS WATER DISTRICT,

F083632 & F084202

Plaintiff and Appellant,

(Super. Ct. No. 19CECG03887)

v.

ALL PERSONS INTERESTED etc., et al., OPINION

Defendants and Respondents.

APPEALS from a judgment of the Superior Court of Fresno County. Alan M.

Simpson and D. Tyler Tharpe, Judges.

Stradling Yocca Carlson & Rauth, Allison E. Burns and Douglas S. Brown for

Plaintiff and Appellant.

Freeman Firm, Thomas H. Keeling; Law Office of Roger B. Moore, Roger B.

Moore; Mohan Harris Ruiz and S. Dean Ruiz for Defendants and Respondents County of

San Joaquin, County of Trinity, Central Delta Water Agency and South Delta Water

Agency.

Law Offices of Stephan C. Volker, Stephan C. Volker, Alexis E. Krieg,

Stephanie L. Clarke and Jamey M.B. Volker for Defendants and Respondents North

Coast Rivers Alliance, Winnemem Wintu Tribe, California Sportfishing Protection

Alliance, Institute for Fisheries Resources, Pacific Coast Federation of Fishermen’s

Associations and San Francisco Crab Boat Owners Association.

Law Office of Adam Keats, Adam Keats; and John Buse for Defendants and

Respondents California Water Impact Network, California Indian Water Commission,

AquAlliance, Planning and Conservation League and Center for Biological Diversity.

-ooOoo-

“An action under the validation statutes permits a public agency to obtain a

judgment upholding its handling of an agency matter.” (Davis v. Fresno Unified School

Dist. (2023) 14 Cal.5th 671, 684.) Westlands Water District (Westlands) appeals from a

judgment of dismissal entered in a validation action filed pursuant to, inter alia, Code of

Civil Procedure section 860 et seq. The subject matter was an anticipated contract

between Westlands and the United States concerning the ongoing delivery of federal

reclamation project water and repayment of certain financial obligations.

We say “anticipated contract” because Westlands filed the action several months

prior to executing a finalized agreement with the United States. Westlands presented the

superior court with a working draft of the contract, requesting a judicial decree validating

(1) the authorization given by its governing body to execute a contract “in substantially

the [same] form” at a later date and (2) the legality and enforceability of the contract

under California law. Several public entities, nonprofit organizations, public interest

groups, and others participated in the lawsuit by opposing any and all such relief, making

them the defendants in the action. The federal government is not a party to the case. 1

1Three sets of respondents’ briefs have been filed in this appeal. The first was jointly

submitted by the County of San Joaquin, the County of Trinity, the Central Delta Water Agency,

and the South Delta Water Agency. The second was jointly submitted by the North Coast Rivers

Alliance, Pacific Coast Federation of Fishermen’s Associations, San Francisco Crab Boat

Owners Association, California Sportfishing Protection Alliance, Institute For Fisheries

Resources, and the Winnemem Wintu Tribe. The third was jointly submitted by the California

Water Impact Network, the California Indian Water Commission, AquAlliance, the Planning and

2.

The superior court declined to grant relief, and ultimately dismissed Westlands’

validation action, for multiple reasons. Most pertinently, the draft was found to be

materially deficient in its failure to specify Westlands’ financial obligations under the

anticipated contract. We affirm the judgment.

FACTUAL AND PROCEDURAL BACKGROUND

Overview

“California’s two largest rivers, the Sacramento and the San Joaquin Rivers, meet

to form a delta (California Delta or Delta) near the City of Sacramento, and their

combined waters, if not diverted, flow through the Delta, Suisun Bay, and San Francisco

Bay, to the Pacific Ocean. The flow of water through this region, commonly known as

the Bay-Delta, forms the largest estuary on the West Coast of the United States. It is also

the hub of California’s two largest water distribution systems, supplying drinking water

for two-thirds of California’s residents and irrigation water for seven million acres of

agricultural land.” (In re Bay-Delta etc. (2008) 43 Cal.4th 1143, 1151.)

“In an effort to manage the increasing and conflicting demands placed on the

water flowing through the [Bay-Delta], California and the United States have embarked

on two massive projects. First, in 1933, California proposed the Central Valley Project

(CVP), a plan to transfer water from the Sacramento River to water-deficient areas in the

San Joaquin Valley and from the San Joaquin River to the southern regions of the Central

Valley.” (San Luis & Delta-Mendota Water Authority v. Jewell (9th Cir. 2014) 747 F.3d

581, 594.) “In 1951, California approved what is known as the State Water Project,”

which primarily “serves the domestic water needs” of Southern California. (Ibid.)

Due to “pervasive unfavorable economic conditions during the Great Depression,

California turned to the federal government for assistance to finance and construct the

CVP.” (Westlands Water Dist. v. U.S. (E.D.Cal. 2001) 153 F.Supp.2d 1133, 1142.)

Conservation League, and the Center for Biological Diversity. These parties are collectively

referred to as “respondents.”

3.

Acting pursuant to federal reclamation law, the United States “assumed the role of

building and operating the CVP.” (Ibid.) The project is currently administered by the

Bureau of Reclamation (Bureau), an agency within the Department of the Interior. (San

Luis Unit Food Producers v. U.S. (9th Cir. 2013) 709 F.3d 798, 800–801.) The federal

government holds CVP water rights, and direct access to CVP water requires a contract

with the Bureau. (Tehama-Colusa Canal Authority v. U.S. Department (9th Cir. 2013)

721 F.3d 1086, 1091; Westlands Water Dist. v. U.S., supra, at p. 1144; see In re Bay-

Delta etc., supra, 43 Cal.4th at p. 1154 [noting the Bureau operates the CVP under rights

granted by the California State Water Resources Control Board].)

The CVP is now “a system of dams, reservoirs, levees, canals, pumping stations,

hydropower plants, and other infrastructure.” (Orff v. United States (2005) 545 U.S. 596,

598.) “With total storage capacity of more than 12 million acre-feet, the CVP delivers

approximately seven million acre-feet of water annually to over 250 water contractors,

primarily for agricultural use in the Central Valley. [Citation.] The CVP ‘“supplies two

hundred water districts, providing water for about thirty million people, irrigating

California’s most productive agricultural region and generating electricity at [numerous]

powerplants.”’” (North Coast Rivers Alliance v. Westlands Water Dist. (2014) 227

Cal.App.4th 832, 840.)

“The contemporary CVP consists of nine distinct geographic areas, known as

‘divisions.’ [Citation.] These are the: (1) Trinity; (2) Shasta; (3) Sacramento; (4)

American River; (5) Delta; (6) Eastside; (7) San Felipe; (8) West San Joaquin; and (9)

Friant Divisions.” (Westlands Water Dist. v. U.S., supra, 153 F.Supp.2d at p. 1142.)

Each division “has at least one subset ‘unit,’ which itself is comprised of various

facilities, e.g., a dam and a power plant.” (Id. at p. 1144.) For example, the West San

Joaquin Division includes the San Luis Unit, which comprises “‘the San Luis Dam and

the San Luis Reservoir, together with a number of smaller facilities.’” (Id. at p. 1145, fn.

omitted.) “Water from the San Luis Unit of the CVP is delivered to contractors,” who in

4.

turn “provide water to the end users such as farmers on the west side of the Central

Valley.” (North Coast Rivers Alliance v. Westlands Water Dist., supra, 227 Cal.App.4th

at p. 841.)

Appellant Westlands is a public agency formed “for the purpose of receiving CVP

water and distributing that water to end users (i.e., farmers) for beneficial use (i.e.,

irrigation to grow crops) on lands within [its service area].” (North Coast Rivers Alliance

v. Westlands Water Dist., supra, 227 Cal.App.4th at p. 839.) It is both “the largest

contractor for water from the San Luis Unit” (Westlands Water Dist. v. U.S. (9th Cir.

2003) 337 F.3d 1092, 1097) and the largest of all CVP contractors in the state.

Westlands delivers CVP water to over 600,000 acres of farmland in Fresno and Kings

Counties.

Respondents are a diverse group of litigants with shared concerns about the

environmental impacts of various CVP operations. “Competition for the Bay-Delta’s

resources, pollution of Bay-Delta water, draining and filling of tidal marshes and other

wetlands, and diversion of Bay-Delta water for urban and agricultural uses throughout the

state have … resulted in a decline in Bay-Delta wildlife habitat, the threatened extinction

of plant and animal species, an increasing risk of failure of Bay-Delta levees, and

degradation of the Bay-Delta as a reliable source of high quality water.” (In re Bay-Delta

etc., supra, 43 Cal.4th at p. 1151.) “Water quality and land use conflict because water

returned to the Bay-Delta after urban and agricultural use contains pollutants and

contaminants that degrade water quality.” (Id. at p. 1158.) “The pollutants of upstream

urban and agricultural uses cause problems for downstream fish and water diverters

alike.” (Delta Stewardship Council Cases (2020) 48 Cal.App.5th 1014, 1035.)

Respondents allege that Westlands’ operations harm fish and wildlife and

“exacerbate[] the existing contamination of the soils, groundwater and surface waters of

5.

the San Joaquin Valley and downstream.” 2 These allegations are heavily emphasized in

some of the briefing, but this appeal is resolved on other grounds and we express no

views regarding those contentions. As in prior cases involving these parties, this

overview and all additional background information are provided “so that the issues

before us may be seen within their larger context.” (North Coast Rivers Alliance v.

Westlands Water Dist., supra, 227 Cal.App.4th at p. 840.)

Prior and Contemporaneous Contract Litigation

“With the Reclamation Act of 1902, Congress committed itself to the task of

constructing and operating dams, reservoirs, and canals for the reclamation of the arid

lands in 17 western states.” (Peterson v. U.S. Dept. of Interior (9th Cir. 1990) 899 F.2d

799, 802.) Those projects were to be funded by the sale of federal land, but “almost

immediately the funds proved inadequate, and Congress had to restructure the program’s

financing. In a series of amendments to the Act, Congress provided that a portion of the

capital costs of the projects, as well as a portion of their operating and maintenance costs,

would be charged to the users.” (Id. at p. 804.) Since that time, “reclamation law has

been based on the concept of project repayment—reimbursement of federal construction

costs—by project water and power users.” (Stern, Congressional Research Service,

2“Any water project that brings fresh water to an agricultural area must take the salty

water remaining after the crops have been irrigated away from the service area.” (Firebaugh

Canal Co. v. U.S. (9th Cir. 2000) 203 F.3d 568, 571.) Inadequate drainage of CVP water from

the San Luis Unit was recognized as a potential problem when Congress authorized its

construction in the 1960’s. (Id. at pp. 570–571.) As discussed in North Coast Rivers Alliance v.

Westlands Water Dist., supra, 227 Cal.App.4th 838, a “statutory obligation to provide for such

drainage was placed squarely on the United States Department of the Interior,” but the obligation

“remains unfulfilled.” (Id. at pp. 841–842; see Stern et al., Congressional Research Service,

Central Valley Project: Issues and Legislation (Apr. 20, 2023) p. 31, at

<https://crsreports.congress.gov/product/pdf/R/R45342> [stating Westlands is currently

“involved in a major proposed settlement” with the Bureau regarding the Bureau’s

“responsibility to construct drainage facilities to deal with toxic runoff associated with naturally

occurring metals in area soils”].)

6.

Accelerated Repayment of Bureau of Reclamation Construction Costs (Sept. 30, 2015) p.

1, at <https://crsreports.congress.gov/product/pdf/IF/IF10295>.)

There are two relevant types of contracts for federal reclamation project water:

repayment contracts and water service contracts. “Repayment contracts are generally

made for terms of 40 years, with capital costs amortized over the long-term period and

repaid in annual installments …. Costs are repaid annually in fixed amounts to the U.S.

Treasury by project beneficiaries (contractors), along with costs for project operations

and maintenance. For water service contracts, contractors pay a combined capital

repayment and operations and maintenance (O&M) rate for each acre-foot of water

actually delivered (i.e., water service).” (Stern, Accelerated Repayment of Bureau of

Reclamation Construction Costs, supra, at p. 1; accord, 43 U.S.C. § 485h(d), (e); Grant

County Black Sands Irrigation Dist. v. U.S. (Fed.Cir. 2009) 579 F.3d 1345, 1351–1354.)

Because the CVP “includes many multipurpose facilities benefiting different

contractors that were built over many decades,” most CVP contractors have historically

operated under water service contracts. (Stern, Accelerated Repayment of Bureau of

Reclamation Construction Costs, supra, at p. 1.) Such contracts “establish the rates and

other terms for [(1)] water delivery, [(2)] to produce sufficient revenue to recover an

appropriate share of the federal government’s capital investment, and [(3)] to repay the

Bureau’s annual operation and maintenance costs.” (North Coast Rivers Alliance v.

Westlands Water Dist., supra, 227 Cal.App.4th at p. 844.) They are “the mechanisms

used to recover each contractor’s share of these costs as a condition for receiving CVP

water.” (Ibid.)

In 1963, Westlands and the Bureau entered into a 40-year water service contract

for the delivery of CVP water from the San Luis Unit (hereafter “the 1963 contract” or

“contract No. 14-06-200-495-A”). “Since 1978, the contract has generated extensive

litigation.” (Orff v. United States, supra, 545 U.S. at p. 599; see O’Neill v. U.S. (9th Cir.

1995) 50 F.3d 677, 680–682 [chronicling pertinent litigation history].) In 1986, a

7.

stipulated judgment in a lawsuit concerning the 1963 contract recognized Westlands’

right to receive up to 1.15 million acre-feet of CVP water per year, subject to water

availability and other contingencies. (North Coast Rivers Alliance v. Westlands Water

Dist., supra, 227 Cal.App.4th at pp. 839, 844.) The stipulated judgment also extended

the 1963 contract through the end of 2007. (U.S. v. Westlands Water Dist. (E.D.Cal.

2001) 134 F.Supp.2d 1111, 1142, fn. 70.) An original provision allowing for subsequent

40-year renewal periods remained in effect. (See North Coast Rivers Alliance, at p. 844

& fn. 16.)

“In 1992, in what was seen as a victory for environmentalists, Congress passed the

Central Valley Project Improvement Act (Pub.L. No. 102-575 (Oct. 30, 1992) 106 Stat.

4706), which elevated fish and wildlife protection and restoration to the status of a

primary purpose of the CVP, reserved 800,000 acre-feet of CVP water for environmental

and wildlife protection purposes, and prohibited new water contracts.” (In re Bay-Delta

etc., supra, 43 Cal.4th at p. 1154.) The Central Valley Project Improvement Act

(CVPIA) allowed for the renewal of existing long-term water service contracts, but only

for periods of up to 25 years. (CVPIA, § 3404(c).) Such renewals were further

conditioned upon the Bureau’s “completed preparation of a programmatic environmental

impact statement (EIS) that examined the effects on the environment….” (North Coast

Rivers Alliance v. Westlands Water Dist., supra, 227 Cal.App.4th at pp. 844–845, citing

CVPIA, §§ 3404(c), 3409.) “Until that environmental documentation was completed, the

Bureau was authorized by the CVPIA to enter into interim renewal contracts of up to

three years on the first occasion, and for successive interim periods of up to two years in

length thereafter.” (North Coast Rivers Alliance, at p. 845.)

By late 2007, when the 1963 contract was about to expire, “the Bureau had not yet

completed its environmental documentation necessary for the execution of a long-term

(25-year) renewal of the water service contract with Westlands Water District.” (North

Coast Rivers Alliance v. Westlands Water Dist., supra, 227 Cal.App.4th at p. 845.) The

8.

parties entered into an interim renewal contract (contract No. 14-06-200-495A-IR1),

which provided for the delivery of water from the San Luis Unit and Delta Division of

the CVP for a period of approximately 26 months (Jan. 1, 2008 through Feb. 28, 2010).

Five additional interim renewal contracts were executed between 2010 and 2018,

successively labeled as contract Nos. 14-06-200-495A-IR2, 14-06-200-495A-IR3, 14-06-

200-495A-IR4, 14-06-200-495A-IR5, and 14-06-200-495A-IR6.

The Bureau also entered into multiple interim renewal contracts with Westlands

Water District Distribution District No. 1 (Westlands DD #1) and Westlands Water

District Distribution District No. 2 (Westlands DD #2). The history and purpose of those

distribution districts is explained in North Coast Rivers Alliance v. Westlands Water

Dist., supra, 227 Cal.App.4th at pages 839 and 845–846. Although closely related to

Westlands, they are distinct public entities. (Id. at pp. 838–839 & fn. 1; see Wat. Code,

§ 36460 [“Land within a water district, which need not be contiguous, may be formed

into a distribution district for the purpose of contracting with the United States”].)

Westlands DD #1 and Westlands DD #2 are not parties to this appeal, but their contracts

with the Bureau are discussed elsewhere in the opinion and have relevance to the issues

in dispute.

The interim renewal contracts between Westlands and the Bureau sparked

protracted legal battles initiated by many of the respondents herein, e.g., the “coalition of

environmental organizations led by the North Coast Rivers Alliance.” (N. Coast Rivers

Alliance v. U.S. Dept. of Interior (E.D.Cal. 2018) 313 F.Supp.3d 1199, 1200.) In 2010,

for example, North Coast Rivers Alliance and others filed a petition for writ of mandate

and a complaint for declaratory and injunctive relief in the Fresno Superior Court

regarding, inter alia, interim renewal contract No. 14-06-200-495A-IR2. The case

concerned the applicability of the California Environmental Quality Act (Pub. Resources

Code, § 21000 et seq.) (CEQA). The superior court ruled that a statutory exemption for

ongoing projects applied to the contract, and the plaintiffs’ appeal was dismissed as moot

9.

because the contract expired while the appeal was pending. (North Coast Rivers Alliance

v. Westlands Water Dist. (Apr. 11, 2012, F062357) [nonpub. opn.].)

In 2012, North Coast Rivers Alliance and others petitioned the Fresno Superior

Court for a writ of mandate regarding, inter alia, the third interim renewal contract

between Westlands and the Bureau, i.e., contract No. 14-06-200-495A-IR3. (North

Coast Rivers Alliance v. Westlands Water Dist., supra, 227 Cal.App.4th at pp. 845, 847.)

This contract was also determined to be exempt from CEQA. (227 Cal.App.4th at p.

848.) The plaintiffs appealed and, despite the same issue of mootness, this court

exercised its discretion to hear the case on the merits. (Id. at p. 849.) Westlands

prevailed.

In early 2016, North Coast Rivers Alliance and others filed a lawsuit in the United

States District Court for the Eastern District of California (case No. 1:16-cv-00307;

hereafter the “federal court action”) challenging the legality of multiple interim renewal

contracts between the Bureau and CVP water contractors, including the fifth interim

renewal contract between the Bureau and Westlands, i.e., contract No. 14-06-200-495A-

IR5. (N. Coast Rivers Alliance v. U.S. Dept. of Interior, supra, 313 F.Supp.3d at p.

1200.) As initially filed, the federal court action concerned whether the Bureau’s

approval of the interim renewal contracts violated the National Environmental Policy Act

(42 U.S.C. § 4321 et seq.) and/or the Administrative Procedure Act (5 U.S.C. §§ 701–

706). The case is ongoing. (See further discussion, post).

In late 2016, Congress enacted the Water Infrastructure Improvements for the

Nation Act (Pub.L. No. 114-322 (Dec. 16, 2016) 130 Stat. 1628) (WIIN Act). As

relevant here, the WIIN Act authorized a limited-time opportunity for water contractors

to convert their existing water service contracts with the Bureau to repayment contracts.

(WIIN Act, § 4011; see id., § 4013 [“This subtitle shall expire on the date that is 5 years

after the date of its enactment”].) Such conversions were contingent, however, upon the

repayment of all outstanding project construction cost obligations in a “lump sum,” or “in

10.

approximately equal installments, no later than 3 years after the effective date of the

repayment contract ….” (Id., § 4011(a)(2)(A).)

“[P]rior to the WIIN Act, no such blanket authority for accelerated repayment

existed for [federal reclamation] projects in general.” (Stern et al., Congressional

Research Service, Water Infrastructure Improvements for the Nation (WIIN) Act: Bureau

of Reclamation and California Water Provisions (Dec. 14, 2018) p. 23, at

<https://crsreports.congress.gov/product/pdf/R/R44986>.) “Generally speaking, one of

the advantages to such conversion is that once [the capital costs] are repaid in full,

contractors are not subject to certain acreage limitations” and related pricing provisions

of federal reclamation law. (Ibid.; accord, Hoopa Valley Tribe v. U.S. Bureau of

Reclamation (E.D.Cal. Dec. 29, 2022, No. 1:20-cv-1814-JLT-EPG) __ F.Supp.3d __, __,

fn. 1 [2022 U.S. Dist. LEXIS 232992, *2; 2022 WL 17994327, *1]; see WIIN Act,

§ 4011(c)(1).) But just as those incentives are viewed positively by contractors such as

Westlands, respondents are strongly opposed to them. 3

3“Another early tenet of reclamation law still in existence is a limit on how much land

one can irrigate with water provided from federal reclamation projects. The idea behind the

limitation was to prevent speculation and monopolies in western land holdings and to promote

development and expansion of the American West through establishment of family farms.”

(Stern, Accelerated Repayment of Bureau of Reclamation Construction Costs, supra, at p. 1.)

“Instead, through leasing arrangements and other devices, the water districts and large farming

interests, with the acquiescence of the [Bureau], ‘found ways to circumvent the [original] 160-

acre limitation,’ [citation], resulting in the enormous federal subsidies involved in supplying

reclamation water being provided very large farming operations.” (Natural Resources Defense

Council v. Duvall (E.D.Cal. 1991) 777 F.Supp. 1533, 1535.) In 1982, by enactment of the

Reclamation Reform Act (43 U.S.C. § 390aa et seq.) (RRA), “‘Congress redefined completely

who could receive subsidized reclamation water and the price they would pay.’ [Citation.] The

160-acre limitation ‘was discarded as incompatible with modern farming techniques. In its

place, Congress authorized the sale of project water at the new, though still subsidized, rates to

“qualified recipients” for land holdings up to 960 acres and to “limited recipients” for land

holdings up to 320 acres.’” (Natural Resources Defense Council, at p. 1535.) The acreage

limitation “has remained, on one hand, an unpopular provision among large landholders who do

not want limits on their land, particularly in the Central Valley, where large industrial farms are

more common than other areas of the West. On the other hand, it has been a key rallying point

for taxpayer groups, environmentalists, and others who have opposed using federally subsidized

11.

In March 2019, the Bureau gave notice in the federal court action that it “‘no

longer intend[ed] to pursue the issuance of new long-term water service contracts to

Westlands under the authority of [the] CVPIA’” but did intend to “‘convert Westlands’

existing water service contracts into repayment contracts’” as authorized by the WIIN

Act. Approximately one year later, on or about February 28, 2020, Westlands and the

Bureau executed an agreement labeled contract No. 14-06-200-495A-IR1-P and entitled

“Contract Between the United States and Westlands Water District Providing For Project

Water Service San Luis Unit and Delta Division and Facilities Repayment” (underscoring

and some capitalization omitted; hereafter the “WIIN Act contract”).

The WIIN Act contract refers to a previously “Existing Contract,” i.e., the sixth

interim renewal contract between Westlands and the Bureau (contract No. 14-06-200-

495A-IR6), and it converts that water service contract to a repayment contract. Although

executed in February 2020, the terms of the WIIN Act contract postponed its effective

date until June 1, 2020. Due to the expiration of the prior “Existing Contract” on

February 29, 2020, Westlands and the Bureau entered into a seventh interim renewal

contract (contract No. 14-06-200-495A-IR7), to cover the period of March 1, 2020

through May 31, 2020. On June 11, 2020, after the WIIN Act contract had taken effect,

Westlands made a “payment of $209,436,667” to the Bureau “to pay off Westlands’

capital repayment obligation for the construction of CVP facilities.” (This quoted

water to irrigate large swaths of land.” (Stern, Accelerated Repayment of Bureau of Reclamation

Construction Costs, supra, at p. 1.)

The WIIN Act did not eliminate the acreage limits, but it did provide a mechanism for

obtaining benefits historically available through repayment contracts but not water service

contracts. (See WIIN Act, § 4011(c)(1); 42 U.S.C. § 390mm.) “[O]nce a repayment contract is

paid out, contractors continue to receive project benefits but are no longer subject to the 960-acre

limit or to other provisions of RRA (e.g., full-cost pricing for water under certain circumstances).

However, under water service contracts, the acreage limitation and other requirements of

reclamation law continue, unless otherwise exempted by law.” (Stern, Accelerated Repayment of

Bureau of Reclamation Construction Costs, supra, at p. 1.)

12.

statement is taken from a declaration in the record signed by Westlands’ chief operating

officer in September 2021.)

Execution of the WIIN Act contract between Westlands and the Bureau did not

resolve the federal court action. Although claims pertaining to the earlier interim renewal

contracts were dismissed, the plaintiffs were permitted to amend their complaint to assert

claims regarding the WIIN Act contract. (North Coast Rivers Alliance v. U.S. Dept. of

Interior (E.D.Cal. Aug. 12, 2022, No. 1:16-cv-00307-JLT-SKO) [2022 U.S. Dist. LEXIS

144401, p. *7; 2022 WL 4126085, p. *2] [order denying Bureau’s motion to stay action

pending rulings in “several similar though not identical [federal] cases concerning WIIN

Act Repayment Contracts”].) As of July 2023, the case is active and pending.

The Present Matter

To fully explain the context in which this case arose, we briefly discuss one more

aspect of federal reclamation law. “In 1922, Congress enacted legislation expanding the

United States’ options to allow it to contract not only with individual water users, but also

with ‘any legally organized irrigation district.’ [Citation].” (San Luis Unit Food

Producers v. U.S. (E.D.Cal. 2011) 772 F.Supp.2d 1210, 1233.) The century-old law

provides, in relevant part, “That no contract with an irrigation district under this Act shall

be binding on the United States until the proceedings on the part of the district for the

authorization of the execution of the contract with the United States shall have been

confirmed by decree of a court of competent jurisdiction, or pending appellate action if

ground for appeal be laid.” (43 U.S.C. § 511.)

In short, federal reclamation contracts with irrigation districts “are not binding

upon the United States unless and until they are validated by state court decree.” (Hoopa

Valley Tribe v. U.S. Bureau of Reclamation, supra, __ F.Supp.3d at p. __, citing 43

U.S.C. § 511 [2022 U.S. Dist. LEXIS 232992, *3; 2022 WL 17994327, *1].) Recitals of

this principle appear to be standard, or at least common, in contracts between the Bureau

and water contractors like Westlands. Such a provision was included in the 1963 contract

13.

between Westlands and the Bureau. The WIIN Act contract likewise contains, in a

paragraph labeled Article 47, the following language:

“Promptly after the execution of this amended Contract, the Contractor

[Westlands] will provide to the Contracting Officer [the Bureau] a certified

copy of a final decree of a court of competent jurisdiction in the State of

California, confirming the proceedings on the part of the Contractor for the

authorization of the execution of this amended Contract. This amended

Contract shall not be binding on the United States until the Contractor

secures a final decree.”

This appeal concerns Westlands’ failed attempt to satisfy the above-quoted

provision, which was originally labeled as Article 46 in the draft version of the contract

presented to the superior court below. However, as Westlands has previously

acknowledged, case law holds that “[e]ven if the United States is not bound by the

[repayment] contract because it was not judicially confirmed, the contract is not

necessarily invalid.” (Concerned Irrigators v. Belle Fourche Irr. Dist. (8th Cir. 2001)

235 F.3d 1139, 1144.) Put differently, “‘even when an executed water repayment

contract may be voidable by one party, this does not mean that it is void.’” (Hoopa

Valley Tribe v. U.S. Bureau of Reclamation, supra, __ F.Supp.3d at p. __ [2022 U.S.

Dist. LEXIS 232992, *7; 2022 WL 17994327, *3].)

Westlands is appealing from a judgment of dismissal, not a judgment that

determines the validity or legality of the WIIN Act contract. (See Olwell v. Hopkins

(1946) 28 Cal.2d 147, 149 [“Ordinarily, a judgment of dismissal is not a judgment on the

merits”].) Westlands and the Bureau have been performing under that contract for the

past three years. The Bureau accepted Westlands’ lump sum repayment of its capital

costs obligation, and the Bureau continues to defend the contract in federal court. As

noted in a related case, “there is no suggestion that the United States disclaims its

contractual obligations to Westlands (or any other WIIN Act repayment contract

holder).” (Hoopa Valley Tribe v. U.S. Bureau of Reclamation, supra, __ F.Supp.3d at p.

__ [2022 U.S. Dist. LEXIS 232992, *9; 2022 WL 17994327, *4].) The Bureau has

14.

reportedly taken the position that the WIIN Act contract “‘will govern the rights and

obligations of the United States and [Westlands] … notwithstanding [Westlands’]

inability to obtain a final decree confirming its proceedings to authorize the execution of

[the WIIN Act contract].” (Ibid.) It is thus unclear what practical effect, if any, the

outcome of this appeal may have on the contractual relationship between Westlands and

the Bureau. With that being said, we now summarize the underlying proceedings.

On October 25, 2019, Westlands filed a validation complaint in the Fresno

Superior Court pursuant to Code of Civil Procedure section 860 et seq., Government

Code section 53510 et seq., and Water Code section 35855. The complaint named as

defendants “All Persons Interested in the Matter of the Contract Between the United

States and Westlands Water District Providing for Project Water Service, San Luis Unit

and Delta Division and Facilities Repayment.” (Some capitalization omitted.) Service of

the complaint and summons was accomplished by publication. The summons stated, in

relevant part: “All persons interested in this matter may contest the legality or validity of

the matter by appearing and filing a written answer to the complaint not later than

December 16, 2019.”

As explained above, the WIIN Act contract was not executed until February 28,

2020, i.e., four months after the validation action was filed. An unsigned and unfinalized

draft version of the contract was attached to the complaint as an exhibit. Also attached

was a copy of “Resolution No. 119-19,” memorializing actions taken by Westlands’

Board of Directors (Board) at a meeting held on October 15, 2019. The Board had

authorized execution of the anticipated WIIN Act contract “in substantially the form

presented to [it],” i.e., in substantially the same form as the draft attached to the

validation complaint, “with such additional changes and/or modifications as are approved

by the President of [Westlands], its General Manager, and its General Counsel.” The

Board further authorized the issuance of notices of exemption from CEQA.

Westlands’ validation complaint included the following prayer for relief:

15.

“That judgment be entered determining that: (a) the Converted Contract,

[i.e., the draft attached as an exhibit] and each and every provision of said

Converted Contract, is valid under applicable California law; (b) that

[Westlands] has, and at all times relevant has had, the authority to enter into

said Converted Contract under California Water District Law, including

Water Code sections 35851 and 35875; (c) that all of the proceedings of

[Westlands] and its Board of Directors leading up to and including the

making and approval of said Converted Contract were in all respects legal

and valid; (d) that said Converted Contract is in all respects valid under

applicable California law and binding upon the respective parties thereto;

and (e) that said Converted Contract, and each and every provision thereof,

is, and are, in all respects valid and authorized by applicable California

law.” (Italics added.)

Respondents collectively filed four verified answers to the complaint. Together

they asserted dozens of “affirmative defenses,” the most pertinent of which were as

follows.

Nearly all respondents characterized the lawsuit as premature. They claimed the

Bureau had not yet completed its “review and decision-making” on the matter and had

“extended an initial 60-day comment period on Westlands’ ‘draft repayment contract’

until January 8, 2020.” In related contentions, respondents County of San Joaquin and

County of Trinity (hereafter Counties) asserted that “Westlands’ haste to approve and

validate a converted contract appears to be prompted, at least in part, to moot [the claims

in the federal court action] over environmental review of its [sixth interim renewal

contract with the Bureau].”

The group of respondents led by North Coast Rivers Alliance alleged the actions

taken by Westlands’ Board violated state and federal environmental laws. Those

respondents further alleged violations of the Ralph M. Brown Act (Gov. Code, § 54950 et

seq.) (Brown Act), specifically claiming that “[n]one of the Exhibits to the Contract were

provided to the public, preventing informed public review and comment.”

The Counties also focused on the missing exhibits, but for a different reason,

alleging their absence rendered the working draft “materially incomplete.” The Counties

16.

noted that “[t]imelines relating to Westlands’ payment obligations” could not be

determined because the relevant provisions contained bracketed “placeholder references,”

e.g., a sentence reading, “The Repayment Obligation is due in lump sum by [Month Day,

Year] as provided by the WIIN Act.” The amount of Westlands’ repayment obligation

was purported to be set forth in an exhibit (“Exhibit D”), but none of the exhibits

referenced in the draft were attached to the complaint.

On December 30, 2019, Westlands filed a “Motion for Validation of Contract,”

seeking entry of a judgment in its favor on all issues (hereafter the “December 2019

motion”). The motion was partially supported by the declaration of Balbina Ormonde,

Westlands’ “Deputy General Manager of Finance & Administration and Secretary.” The

general purpose of her declaration and its attachments was to show compliance with the

Brown Act.

The December 2019 motion was also supported by the (first) declaration of Jose

Gutierrez, Westlands’ Chief Operating Officer. The Gutierrez declaration explained that

Westlands had contacted the Bureau in April 2018 to request conversion of its then

existing water service contract (the sixth interim renewal contract) to a repayment

contract pursuant to the WIIN Act. The declaration also addressed the issue of the

missing exhibits (original text broken into smaller paragraphs for readability):

“There will be four exhibits to the Converted Contract. Although the

Bureau of Reclamation has not yet finalized the exhibits, each exhibit is

described in the Converted Contract and three of the four exhibits remain as

they are within the existing water service contract.

“Exhibit A to the Converted Contract will be a map of the Westlands Water

District service area. The service area will be the same as illustrated in the

map that Exhibit A to Westlands’ existing water service contract [sic].

“Exhibit B to the Converted Contract will be a listing of the rates and

charges applicable to Westlands upon execution of the Converted Contract.

As is set forth in the Converted Contract and consistent with the

requirements of the existing water service contract, the rates and charges

17.

will be updated annually, as calculated by the Bureau of Reclamation to

meet the requirements of reclamation law.

“Exhibit C to the Converted Contract will be a document explaining the

purpose and methodology of water needs assessments performed by the

Bureau of Reclamation. This document will be the same as the Exhibit C

to Westlands Water District’s existing water service contract.

“Exhibit D to the Converted Contract is the only new exhibit. It will be a

document showing the amount of Westlands’ repayment obligation as of

the date it enters the Converted Contract. The obligation is determined

through a ministerial calculation by the Bureau of Reclamation based on

reclamation law and policy. In a June 18, 2018 letter, as required by the

WIIN Act, the Bureau of Reclamation informed Westlands that its then

existing repayment obligation was approximately $362,079,612. Westlands

anticipates that the total amount of its repayment obligation that will be

included in Exhibit D to the Converted Contract will be lower than the

estimate it was provided in 2018, because over the course of the last

approximate 18 months, Westlands has continued to make payments

towards its share of the CVP’s capital costs. Exhibit D could not be

provided until the date of execution is known.” 4

Respondents collectively filed four oppositions to the December 2019 motion,

with most arguing the draft agreement was materially incomplete. The Counties alleged

that the absence of exhibit D was “[p]articularly alarming” in light of “a history of

differing views of what Westlands would owe under the conversion contract.” North

Coast Rivers Alliance similarly argued that the “amount of Westlands’ existing capital

obligation is an essential contract term, … [b]ut nowhere in the Converted Contract does

Westlands disclose how much money it must pay to the Bureau.”

On January 21, 2020, Westlands filed replies to the opposition papers, along with

a second declaration of Jose Gutierrez. The latter document contained the following

statements:

4The estimate allegedly provided by the Bureau in June 2018 was not otherwise

substantiated, though it appears the date of “June 18, 2018” was a typographical error and the

correct date was June 29, 2018. However, as discussed post, it is unclear how the declarant

concluded the repayment obligation specific to Westlands’ sixth interim renewal contract was in

excess of $362 million based on the information provided in the Bureau’s June 2018 letter.

18.

“In my prior declaration, I referenced a letter from [the Bureau] to

Westlands, dated June 29, 2018. I explained that Exhibit D to the

Converted Contract will consist of a current update of the repayment

obligation listed in that letter, but this updated amount cannot be provided

until the date of contract execution is known since Westlands continues to

make payments on its share of capital costs. A true and correct copy of the

June 29, 2018 letter is attached hereto …. [The Bureau’s] estimate of

Westlands’ capital repayment obligation was known and discussed with the

Westlands Board of Directors well before the October 15, 2019 meeting in

which the Westlands Board of Directors approved the Converted Contract.

“[The Bureau] will calculate the capital repayment obligation

amount. It is not an item that is to be negotiated between Westlands and

[the Bureau].”

The June 2018 letter referenced in, and attached to, the second declaration of Jose

Gutierrez consisted of two pages of correspondence and three pages of enclosures. The

subject line of the Bureau’s letter referenced not only the sixth interim renewal contract

with Westlands (contract No. 14-06-200-495A-IR6), but also six other contracts—many

of which were between the Bureau and Westlands DD #1 and Westlands DD #2. 5 The

letter did not contain a specific repayment estimate, but instead advised that multiple

“water service contracts … currently have estimated unpaid costs for construction as

outlined in the enclosed schedules.” It was noted the estimated costs took into account

“water service construction costs currently being allocated to Westlands Water District

that are unpaid as of September 30, 2016.”

The enclosures to the Bureau’s June 2018 letter provided repayment estimates

specific to certain contractors, facilities, and contracts. The first page identified the

5Several of the additional contracts referenced in the Bureau’s June 2018 letter were the

subject of separate validation actions filed by Westlands DD #1 and Westlands DD #2 in Fresno

Superior Court cases Nos. 20CECG01011 and 20CECG01012, respectively. The distribution

districts have filed appeals in those cases, and the appeals are currently pending before this court

in cases Nos. F084291 and F084294. The Counties, along with respondent South Delta Water

Agency, have jointly filed a request for judicial notice of certain rulings by the Fresno Superior

Court in those cases. The unopposed request is hereby granted. We note those same cases are

discussed by Westlands in footnote 2 of its opening brief in the present appeal.

19.

contractor as “Westlands Water District,” the facility as “Delta Mendota Pool,” and the

contract as “14-06-200-495A-IR6,” i.e., the sixth interim renewal contract. This

document provided a lump sum repayment estimate of $1,520,987 and an installment

estimate of $1,579,414 (four equal payments of $394,853).

The second page of enclosures facially pertained to contractor “Westlands Water

District DD #1,” identified the facility as “San Luis Canal,” and referenced contracts “14-

06-200-495A-IR6 [the sixth interim renewal contract], 14-06-200-7823J, 14-06-200-

8092-IR16, 7-07-20-W0055-IR16-B[,] 14-06-200-8018-IR16-B, [and] 14-06-200-365A-

IR16[.]” This document provided a lump sum repayment estimate of $320,445,400 and

an installment estimate of $332,754,826 (four equal payments of $83,188,707).

The third page of enclosures facially pertained to contractor “Westlands Water

District DD #2,” identified the facility as “San Luis Canal,” and the contract as “14-06-

200-336C-IR16.” This document provided a lump sum repayment estimate of $531,258

and an installment estimate of $551,666 (four equal payments of $137,916). 6

For reasons not explained by the record, the superior court postponed the motion

hearing from the original date of January 28, 2020, until February 27, 2020. Westlands

filed an ex parte application to advance the hearing date, noting its sixth interim renewal

contract with the Bureau was set to expire on February 29, 2020. The application was

denied.

6As stated in footnote 4, ante, it is unclear how Westlands interpreted the Bureau’s June

2018 letter and its three pages of enclosures as providing a repayment estimate of $362,079,612

to convert the sixth interim renewal contract to a repayment contract. One might assume the

calculation was based on all three enclosures, notwithstanding the references to multiple

contractors and multiple contracts, but even with that assumption the numbers do not add up.

The total lump sum estimate across all three enclosures was only $322,497,645, and the

combined installment estimate was $334,885,906. The combined sum of the unadjusted total

costs on all the three pages (i.e., the unpaid costs prior to applying the discount rate used to

calculate the repayment estimates) comes out to $361,813,667. The latter figure is $265,945 less

than the estimate provided in the first declaration of Jose Gutierrez, though the difference may be

explained by separately listed “M&I [Municipal & Industrial] Construction Costs” apparently

owed by Westlands DD #1.

20.

On February 25, 2020, Westlands notified the superior court of its intention to

“execute the Converted Contract on February 28, 2020,” i.e., the day after the motion

hearing, adding that the contract would have an effective date of June 1, 2020. The

statement continued: “To provide for continued water service between March 1, 2020

and the effective date of the Converted Contract, Westlands and the United States will

enter into an additional [i.e., seventh] interim renewal contract (Contract No. 14-06-200-

495A-IR7).”

On February 26, 2020, the superior court issued a written tentative ruling to deny

the December 2019 motion. The motion was argued the following day, at which time

counsel for Westlands advised that it still intended to execute the anticipated WIIN Act

contract as scheduled. The remarks prompted the following exchange:

“THE COURT: This a $362 million contract?

“[WESTLANDS’ COUNSEL]: The final payment amount, Your Honor,

is—the repayment obligation for construction is significantly less than that

because the years between that estimate and today, Westlands has been

making payments and—

“THE COURT: About how much less? I’m sorry to interrupt you.

“[WESTLANDS’ COUNSEL]: I’m sorry, Your Honor. It’s—I don’t

have the precise—it’s in the $200 million range.” 7

7In Westlands’ original moving papers, it claimed that neither exhibit D nor the

information therein could be provided until the date of contract execution was known.

Westlands has since asserted, including in its reply brief on appeal, that “the specific dollar

amount of [its] repayment obligation could not be calculated until the effective date of [the]

contract was known.” (Italics added.) Westlands’ current position, which was reasserted by its

counsel during oral argument, aligns with correspondence in the record between Westlands and

the Bureau. However, the draft agreement attached to the validation complaint specified an

effective date of March 1, 2020. The effective date was later changed, but the record indicates

Westlands and the Bureau had agreed to both the execution date and effective date of the WIIN

Act contract by February 25, 2020. As such, it is unclear to this court why Westlands was

unable to provide a copy of exhibit D, or disclose the information therein, on or before the

hearing date of its December 2019 motion.

21.

Westlands’ counsel proposed “to submit for the Court’s information a copy of the

executed converted contract” at some later point in time, i.e., “perhaps ten court days”

from the date of the hearing. The Counties’ attorney made these arguments in

opposition:

“The subject of a validation action can only be the contract that is tendered

before the Court, which as your Your Honor [sic] has pointed out here is

missing the four exhibits and is subject to change at the [B]ureau and a

number of uncertain developments at the federal level. Whether a

conversion contract is going to be executed in another day, or another

month, or another year, it means there is going to be a different contract

document that is not before the Court in any form [and] that was not the

basis for the summons that was published and was the source of jurisdiction

here …. [S]o it helps them not at all to say that there may be a subsequent

converted contract.”

The hearing concluded with the motion being taken under submission. Westlands’

proposal to submit a copy of the executed WIIN Act contract on a later date was

impliedly rejected. On March 16, 2020, the superior court issued a minute order adopting

its tentative ruling.

The December 2019 motion was denied on three grounds. First, the superior court

interpreted Water Code section 35855 as authorizing validation actions only for executed

contracts, not “proposed” contracts. 8 The court observed that proposed contracts may be

validated under Government Code section 53511, but only if they “‘“are in the nature of,

or directly relate to a public agency’s bonds, warrants or other evidences of

indebtedness.”’” (Quoting Santa Clarita Organization for Planning & Environment v.

8Water Code section 35855 provides: “An action to determine the validity of any

contract may be brought pursuant to [Code of Civil Procedure section 860 et seq.].” The

Superior Court noted that earlier versions of the statute had expressly authorized validation

actions concerning any contract or “proposed contract” between a water district and another

public agency. (Italics added.) Citing Gikas v. Zolin (1993) 6 Cal.4th 841, the court reasoned

that deletion of the term “proposed contract” meant the statute was now limited in scope to

executed contracts. (See id. at p. 861 [“‘“The rejection by the Legislature of a specific provision

contained in an act as originally introduced is most persuasive to the conclusion that the act

should not be construed to include the omitted provision”’”].)

22.

Castaic Lake Water Agency (2016) 1 Cal.App.5th 1084, 1099.) The proposed contract

between Westlands and the Bureau was found to concern the repayment of a debt only in

part. Therefore, as somewhat clarified in a later ruling (see further discussion, post), the

court seemingly believed it was unable to consider for validation the “provisions

unrelated to debt.”

Second, the so-called “proposed contract” was held to lack certain essential terms.

The written decision noted “Exhibits A, B, C, and D to the Converted Contract [were]

missing from all materials submitted to the Court. Exhibit D is the repayment page.”

The analysis continued:

“The proposed judgment seeks a ruling that ‘the Converted Contract

is in all respects valid under applicable California Law and binding upon

Westlands.’ Given that the contract terms, including repayment terms, are

not certain, and that [Westlands’ Board authorized] that the contract may be

changed or modified, validation is not appropriate. It is not possible to

make the determinations sought where no final contract is presented for

validation.

“Westlands’ Declarant Gutierrez states he does not anticipate any

major changes, but the validation statutes do not encompass judicial

approval of incomplete contracts. Given the estimate for the repayment

amount is over $362,000,000 [citation], the absence of the actual final

amount and payment schedule render the proposed contract lacking in

material terms and incomplete.”

Third, Westlands was deemed to have fallen short of meeting its evidentiary

burden, as the moving party, to demonstrate compliance with the Brown Act. The

superior court found conflicts in Westlands’ own evidence regarding notice requirements

for the October 2019 Board meeting, and further noted the absence of certain evidence

that would have shown whether “the information necessary to support the meeting” had

been provided to the public. 9

9Westlands has repeatedly complained that “[n]one of these … specific Brown Act

related issues [were] raised by Respondents in their oppositions …; they were raised only sua

23.

The superior court also ruled that three of the four answers to the complaint were

not timely filed—agreeing with a contention Westlands had vigorously argued in its

moving papers. The affected parties appealed that portion of the ruling, which resulted in

a stay of the proceedings from approximately August 2020 through May 2021. The

findings of untimeliness were reversed by this court. (Westlands Water Dist. v. North

Coast Rivers Alliance (Mar. 9, 2021, F081174) [nonpub. opn.]; Westlands Water Dist. v.

County of San Joaquin (Mar. 9, 2021, F081181) [nonpub. opn.]; Westlands Water Dist. v.

California Water Impact Network (Mar. 9, 2021, F081182) [nonpub. opn.].)

The discretionary stay was ordered while a “Renewed Motion for Validation of

Contract” was pending. However, the motion was filed only three weeks prior to the

stay, and it was never heard or ruled upon. Instead, following a July 2021 status

conference, the parties were ordered to submit “opening” and “cross-opening” briefs.

In September 2021, Westlands filed notice of another “Renewed Motion for

Validation Judgment” (hereafter the September 2021 motion), along with a combined

“Opening Brief and Memorandum of Points and Authorities in Support of Renewed

Motion for Validation Judgment.” An attorney declaration identified the “new or

different facts” (Code Civ. Proc., § 1008, subd. (b)) supporting the motion as consisting

of (1) execution of the WIIN Act contract in February 2020; (2) the Westlands Board’s

“adoption of Resolution 110-21 [on June 15, 2021,] confirming that the execution and

delivery of [the WIIN Act contract] conformed fully with the authority granted by the

Westlands Board in Resolution No. 119-19”; and (3) “[i]nformation responsive to

specific questions regarding Brown Act compliance raised [in the ruling on the December

2019 motion].” Westlands also provided 63 pages of legislative history materials to

refute the superior court’s interpretation of Water Code section 35855.

sponte by the trial court in its tentative ruling issued the day before the hearing on [the December

2019] motion.”

24.

The Board’s “Resolution No. 110-21” essentially states, in relevant part, that its

actions in October 2019 were taken despite not knowing the contents of exhibit D

because of its understanding and belief that Westlands’ repayment obligation would be

less than the estimate “presented in connection with [the Board’s review of the draft

agreement].” The amount of the prior estimate is not disclosed. The resolution further

declares that all differences between the WIIN Act contract and the earlier draft “are

consistent and in full conformity with and within the scope of the authorization and

direction provided by the Board … pursuant to Resolution No. 119-19.”

Westlands’ moving papers included copies of what it identified as the final, “fully

executed Converted Contract,” i.e., the WIIN Act contract. One copy was attached to the

Board’s resolution No. 110-21. Another copy was attached to an updated declaration of

Jose Gutierrez, dated September 17, 2021. Both attachments included a letter from the

Bureau to Westlands, dated February 28, 2020, enclosing a copy of the executed WIIN

Act contract and noting that, “Exhibit D to the Contract will be finalized on the Effective

Date of the Contract, [i.e., June 1, 2020,] in accordance with the [WIIN Act].” However,

the copy attached to resolution No. 110-21 has a different version of exhibit D than the

copy attached to the (fourth) Gutierrez declaration. Both versions consist of two pages

closely resembling (in format) the enclosures to the Bureau’s June 2018 letter, i.e., the

one relied upon by Jose Gutierrez to estimate Westlands’ repayment obligation in 2019.

In the version attached to resolution No. 110-21, the first page of exhibit D facially

pertains to contractor “Westlands Water District DD #1,” identifies the facility as “San

Luis Canal,” and references contract Nos. “14-06-200-0495A-IR1-P [the WIIN Act

contract],” “7-07-20-W0055B-IR5-P,” “14-06-200-8092-IR5-P,” and “14-06-200-8018B-

IR5-P.” This first page calculates a lump sum option of $208,182,333, an installment

option of $211,366,768 (four equal payments of $52,841,692), and separately lists an

“M&I [Municipal & Industrial] Construction Cost” obligation of $264,913. The second

page identifies the contractor as “Westlands Water District,” the facility as “Delta

25.

Mendota Pool,” and references contract No. “14-06-200-0495A-IR1-P [the WIIN Act

contract].” The lump sum option is $535,596 and the installment option is $543,789

(four equal payments of $135,947).

The version of exhibit D attached to the (fourth) Gutierrez declaration is truncated,

and thus partially illegible, on the right side and bottom portions of both pages. The first

page facially pertains to contractor “Westlands Water District DD #1,” identifies the

facility as “San Luis Canal,” and references contract Nos. “14-06-200-0495A-IR1-P [the

WIIN Act contract], 14-06-200-7823J-LTR1-P, 14-06-200-8092-IR5-P, 7-07-20-

W0055B-IR5-P, 14-06-200-8018B-IR5-P, [and] 14-06-200-3365AB-IR5-P.” The lump

sum option is calculated to be $204,635,193, the installment option is $209,285,920 (four

equal payments of $52,321,480), and the “M&I Construction Cost” is separately listed as

$264,913. The second page identifies the contractor as “Westlands Water District,” the

facility as “Delta Mendota Pool,” and references contract No. “14-06-200-0495A-IR1-P

[the WIIN Act contract].” The lump sum option is $519,163 and the installment option is

$530,962 (four equal payments of $132,740).

Respondents opposed the September 2021 motion, with all arguing it was either

untimely or sought relief beyond the scope of the complaint. In other words, a motion for

reconsideration of the March 2020 ruling was subject to a 10-day deadline. (Code Civ.

Proc., § 1008, subd. (a).) If Westlands was renewing the prior motion based on the new

or different facts identified in the moving papers, then the relief sought was validation of

a different contract. The Counties, for example, accused Westlands of employing “a ‘bait

and switch’ strategy, attempting to conjure ‘new’ facts from a materially different

contract adopted months later and a different resolution adopted more than a year and a

half later.” The Counties further argued, “The resolution and contract defining the res in

this validation action have remain unchanged since October 2019. None of Westlands’

postauthorization fixes can validate the materially deficient contract framing the

complaint and summons.”

26.

The superior court issued a written tentative ruling to deny the motion. The

motion was heard on October 27, 2021, and taken under submission. The tentative ruling

was later adopted in full.

The superior court ruled that none of Westlands’ “purportedly new facts”

supported the September 2021 motion. In reaching this conclusion, the court generally

agreed with the position articulated by the Counties. The written decision explains:

“The fact that Westlands and the Bureau entered into a final version

of the repayment contract after the hearing on the [December 2019 motion]

does not affect the issues pointed out in [the court’s] order denying the

[motion]. As [the court] held, the contract considered by the Board in

October 2019 was only a proposed, incomplete contract, because it lacked

key terms like the final repayment price and the dates on which repayments

would be due. … Although the contract was later finalized and executed by

the parties, the issue before the court was whether the Board acted properly

when it approved the contract in October 2019, not whether the contract

was later executed by the parties.…

“Likewise, the fact that the Board approved a resolution in June

2021 stating that the executed contract conformed to the authority granted

by the Board’s prior resolution does not affect [the court’s] conclusion that

the contract considered by the Board in October of 2019 was not a

complete contract. Again, [the court] found that the contract considered by

the Board in October 2019 was incomplete and uncertain because it lacked

key terms …. The Board’s subsequent resolution that the final contract was

consistent with its earlier resolution does not cure these deficiencies ….

The issue before the court is whether the Board’s decision to approve the

contract in October of 2019 was valid, not whether it later made subsequent

resolutions that attempted to cure earlier deficiencies in the draft contract.”

(Original underscoring.)

Regarding compliance with the Brown Act, Westlands’ “‘new facts’” were found

to be “events that occurred in October 2019, long before the hearing on the [December

2019 motion].” It was further held that Westlands failed “to explain why it could not

have presented these facts at the time of the original hearing, and it appears that it could

have done so, since the evidence was apparently in its possession at that time.” (See

Even Zohar Construction & Remodeling, Inc. v. Bellaire Townhouses, LLC (2015) 61

27.

Cal.4th 830, 839 [“Courts have construed [Code of Civil Procedure] section 1008 to

require a party filing an application for reconsideration or a renewed application to show

diligence with a satisfactory explanation for not having presented the new or different

information earlier”].)

“Finally, to the extent that Westlands request[ed] that the court grant a validation

judgment as to the parts of the contract” at issue, the request was denied. The superior

court clarified that its ruling on the December 2019 motion “did not find that some

portions of the contract could be validated.” “The order instead found that, while some

portions of the contract related to repayment of an indebtedness, and thus were

potentially subject to being validated, the Board’s decision nevertheless could not be

properly validated because it had sought to validate an incomplete, uncertain, proposed

contract.”

The order adopting the tentative ruling included an order to show cause (OSC) as

to why the action should not be dismissed. An OSC hearing was held in December 2021,

at which time Westlands’ counsel opposed dismissal but conceded an entry of judgment

in its favor would be inconsistent with the superior court’s recent findings and

conclusions. The hearing was continued to February 2022 pending consideration of

whether respondents were entitled to affirmative relief, i.e., a judgment in their favor and

against Westlands. 10

10Westlands’ counsel argued the absence of any cross-complaints effectively precluded

entry of a judgment against Westlands on the merits. The argument was based on Code of Civil

Procedure section 431.30. As a general rule, if a defendant seeks affirmative relief in its favor,

the defendant “must file a cross-complaint, because section 431.30, subdivision (c), bars it from

claiming affirmative relief by way of the answer.” (Construction Protective Services, Inc. v. TIG

Specialty Ins. Co. (2002) 29 Cal.4th 189, 198; see City of Stockton v. Superior Court (2007) 42

Cal.4th 730, 746, fn. 12 [“‘Affirmative relief’ is an award, such as damages, that goes beyond

merely defeating the plaintiff’s recovery”].)

28.

Respondents eventually submitted a proposed judgment of dismissal. It was

adopted and signed by the superior court on March 15, 2022. Westlands filed a timely

appeal. 11

DISCUSSION

I. Validation Actions

“Generally speaking, statutory validation actions are designed to provide

expedient, uniform procedures by which public agencies can obtain binding judgments as

to the validity of public financing commitments such as ‘bonds, warrants, contracts,

obligations or evidence of indebtedness ….’” (City of Santa Monica v. Stewart (2005)

126 Cal.App.4th 43, 66, fn. 12.) “They are expedited because they require validation

proceedings to be filed within 60 days of the public agency’s action (Code Civ. Proc.,

§§ 860, 863) [and] are ‘given preference over all other civil actions’ (id., § 867).” (Santa

Clarita Organization for Planning & Environment v. Castaic Lake Water Agency, supra,

1 Cal.App.5th at p. 1096.) “They are definitive because they are in rem proceedings that

… result in a judgment that is ‘binding … against the world’ [citations], and cannot be

collaterally attacked, even on constitutional grounds [citations].” (Ibid.)

“‘This procedure, which the Legislature codified as Code of Civil Procedure

sections 860 through 870, does not, in itself, authorize any validation actions; rather, it

establishes a uniform system that other statutory schemes must activate by reference.’

[Citation.] Therefore, if no statute authorizes use of the validation statutes to test a

11On November 8, 2021, the Counties filed a “Notice of Entry of Judgment or Order”

regarding the September 2021 motion ruling. On December 7, 2021, Westlands, “in an

abundance of caution in response to the notice of entry,” filed a notice of appeal, thereby

initiating case No. F083632. Westlands filed a second notice of appeal on March 29, 2022,

following entry of the judgment of dismissal two weeks earlier, thereby initiating case

No. F084202. On May 6, 2022, this court granted Westlands’ unopposed motion to consolidate

F084202 with F083632 for all purposes.

29.

particular type of agency matter, then the validation statutes do not apply.” (Davis v.

Fresno Unified School Dist., supra, 14 Cal.5th at pp. 684–685.)

Westlands relied on provisions in the Water Code and Government Code to invoke

the validation procedures of Code of Civil Procedure section 860 et seq. We conclude

jurisdiction was established under Government Code section 53511 (see post). Since

authorization under the Government Code was sufficient, we need not address the

superior court’s interpretation of Water Code section 35855.

Government Code section 53511, subdivision (a) provides: “A local agency may

bring an action to determine the validity of its bonds, warrants, contracts, obligations or

evidences of indebtedness pursuant to [Code of Civil Procedure section 860 et seq.].”

The term “contracts” is limited in scope to “contracts that somehow relate to government

indebtedness.” (Davis v. Fresno Unified School Dist., supra, 14 Cal.5th at p. 689.) A

contract meets the standard “if it is inextricably bound up with government indebtedness

or with debt financing guaranteed by the agency.” (Id. at p. 691.) Put differently, “the

contract must be one on which the debt financing of the project directly depends.” (Ibid.)

Under the validation statutes, contracts “shall be deemed to be in existence upon

their authorization[,] … and contracts shall be deemed authorized as of the date of

adoption by the governing body of the public agency of a resolution or ordinance

approving the contract and authorizing its execution.” (Code Civ. Proc., § 864.)

Therefore, the fact the draft agreement attached to Westlands’ complaint was undated and

unsigned is largely immaterial. There is no denying it was “inextricably bound up with

government indebtedness.” (Davis v. Fresno Unified School Dist., supra, 14 Cal.5th at p.

691).) However, recognizing the draft agreement was a contract then in existence is

wholly separate from the issue of whether, as Westlands sought to establish, the contract

was “in all respects valid under applicable California law and binding upon the respective

parties thereto.”

30.

“It must be reiterated that the finding of ‘existence’ of a contract, as defined in

Code of Civil Procedure section 864, has no bearing on the question of validity or

enforceability of that contract under the applicable laws.” (Smith v. Mt. Diablo Unified

Sch. Dist. (1976) 56 Cal.App.3d 412, 417.)

II. Claims on Appeal

Westlands contends the “authorization to execute the proposed contract in

substantially the form presented to the Westlands Board on October 15, 2019, rendered

the contract ‘in existence’” at that time. As we understand the argument, Westlands

claims the contract then in existence was not the draft version attached to the complaint,

but the WIIN Act contract executed four months later, because there are no material

differences between the two instruments. Whether the claim has merit depends on the

importance of the exhibits missing from the draft, which is the ultimate issue decided

herein.

Focusing on the absence of exhibit D, Westlands argues the amount of its

repayment obligation was a “ministerial detail.” It attempts to recast the issue as one

hinging on its Board’s ability to “delegate[] authority to the Westlands’ President to

finalize and execute” the contract once the specific amount was known. (See Wat. Code,

§ 35406, subd. (b) [“The board of a district may delegate and redelegate to officers … the

power to bind the district by contract and execute contracts on behalf of the district”].)

Westlands also devotes large portions of its briefing to the Brown Act issues,

emphasizing the statutory presumption of duty regularly performed (Evid. Code, § 664).

Contingent on our rejection of its first set of arguments, Westlands further claims

the superior court erred by denying its September 2021 motion. The rest of its briefing

addresses a multitude of other arguments made by respondents in their oppositions below

but not reached by the superior court in its rulings. Respondents have renewed those

arguments on appeal contingent upon our acceptance of Westlands’ claims regarding the

31.

December 2019 and/or September 2021 motion rulings. For example, respondents allege

Westlands failed to comply with the Sacramento-San Joaquin Delta Reform Act of 2009

(Wat. Code, § 85000 et seq.) and violated the public trust doctrine (see National Audubon

Society v. Superior Court (1983) 33 Cal.3d 419, 433–441 [explaining the relevant

concepts].)

As we agree with the superior court’s conclusion regarding the lack of essential

terms, and its rationale for denying the September 2021 motion, we need not decide any

of the parties’ remaining contentions. (See Katz v. Campbell Union High School Dist.

(2006) 144 Cal.App.4th 1024, 1032 [“the validity of a matter is not decided piecemeal”];

N.T. Hill Inc. v. City of Fresno (1999) 72 Cal.App.4th 977, 991, fn. 10 [“The validation

statutes require consolidation of all challenges to a particular governmental action and

entry of a single judgment”].)

III. Analysis

A. December 2019 Motion Ruling

The issue is whether the absence of exhibit D from the contract attached to the

complaint rendered it materially deficient and uncertain. Put differently, did the failure to

specify Westlands’ financial obligations preclude a judicial determination, as sought by

the complaint, that the contract was “in all respects valid under applicable California law

and binding upon the respective parties thereto,” i.e., enforceable?

The relevant principles are summarized in Bustamante v. Intuit, Inc. (2006) 141

Cal.App.4th 199:

“‘Under California law, a contract will be enforced if it is sufficiently

definite (and this is a question of law) for the court to ascertain the parties’

obligations and to determine whether those obligations have been

performed or breached.’ [Citation.] ‘To be enforceable, a promise must be

definite enough that a court can determine the scope of the duty[,] and the

limits of performance must be sufficiently defined to provide a rational

basis for the assessment of damages.’ [Citations.] … ‘The terms of a

contract are reasonably certain if they provide a basis for determining the

32.

existence of a breach and for giving an appropriate remedy.’ [Citations.]

But ‘[i]f … a supposed “contract” does not provide a basis for determining

what obligations the parties have agreed to, and hence does not make

possible a determination of whether those agreed obligations have been

breached, there is no contract.’ [Citation].” (Id. at p. 209.)

We use the words “material” and “essential” interchangeably. (See Black’s Law

Dict. (11th ed. 2019) p. 1170, col. 1.) A “material term” is defined as a “contractual

provision dealing with a significant issue such as subject matter, price, payment, quantity,

quality, duration, or the work to be done.” (Id. at p. 1772, col. 2, italics added.)

“Whether a term is ‘essential’ depends on its relative importance to the parties and

whether its absence would make enforcing the remainder of the contract unfair to either

party.” (Copeland v. Baskin Robbins U.S.A. (2002) 96 Cal.App.4th 1251, 1256, fn. 3,

citing Coleman Engineering Co. v. North American Aviation, Inc. (1966) 65 Cal.2d 396,

417, and City of Los Angeles v. Superior Court (1959) 51 Cal.2d 423, 433.) “When,

however, ‘a contract is so uncertain and indefinite that the intention of the parties in

material particulars cannot be ascertained, the contract is void and unenforceable.’”

(Coleman Engineering Co., at p. 417.)

Under the WIIN Act, “all contracts” that convert a water service contract to a

repayment contract “shall … [¶] … provide for the repayment, either in lump sum or by

accelerated prepayment, of the remaining construction costs identified in water project

specific irrigation rate repayment schedules, as adjusted to reflect payment not reflected

in such schedules, and properly assignable for ultimate return by the contractor, or if

made in approximately equal installments, no later than 3 years after the effective date of

the repayment contract, such amount to be discounted by 1/2 the Treasury rate.” (WIIN

Act, § 4011(a)(2)(A).) Westlands submits the amount to be repaid was nonnegotiable.

By all indications, the amount to be repaid by Westlands was an essential term of the

agreement.

33.

In its opening brief, Westlands likens the capital repayment obligation to “the

principal amount of a mortgage.” The analogy undercuts its position on the question of

materiality. “Typically, a contract involving a loan must include the identity of the lender

and borrower, the amount of the loan, and the terms for repayment in order to be

sufficiently definite.” (Daniels v. Select Portfolio Servicing, Inc. (2016) 246 Cal.App.4th

1150, 1174, disapproved on other grounds in Sheen v. Wells Fargo Bank, N.A. (2022) 12

Cal.5th 905, 948, fn. 12; accord, Peterson Development Co. v. Torrey Pines Bank (1991)

233 Cal.App.3d 103, 115 [“The material terms of a loan include the identity of the lender

and borrower, the amount of the loan, and the terms for repayment”].)

The record suggests Westlands’ Board was not especially concerned about the

amount of the repayment obligation, provided it was less than $362 million—an estimate

nowhere stated in the contract or the Board’s October 2019 resolution approving the

same. The Board’s prior assumptions regarding the amount do not mean the amount

itself was not a material term. There is no indication Westlands was willing to agree to

pay any amount, e.g., a higher amount. Nor does it appear the Bureau was willing to

agree to anything less than a certain amount.

Citing the contractual definition of “Existing Capital Obligation,” Westlands

argues it was sufficient for the draft agreement to “expressly set forth how the

calculations in Exhibit D would be made.” We are not persuaded. The cited text of the

draft reads as follows:

“‘Existing Capital Obligation’ shall mean the remaining amount of

construction costs or other capitalized costs allocable to the Contractor as

described in section 4011, subsections (a)(2)(A) and (a)(3)(A) of the WIIN

Act, and as identified in the Central Valley Project Irrigation Water Rates

and/or Municipal and Industrial Water Rates, respectively, dated

Month/Day/Year [specify ratebook year for all contractors.] [contractor

specific to address the intertie], as adjusted to reflect payments not

reflected in such schedule. The Contracting Officer has computed the

Existing Capital Obligation and such amount is set forth in Exhibit D,

34.

which is incorporated herein by reference.” (Boldface and bracketed

notations in original.)

The term “Repayment Obligation” was defined as “the Existing Capital Obligation

discounted by 1/2 of the Treasury rate, which shall be the amount due and payable to the

United States, pursuant to section 4011(a)(2)(A) of the WIIN Act.” Elsewhere in the

draft, it said the Repayment Obligation “has been computed … and is set forth as a lump

sum payment (M&I and Irrigation) and as four (4) approximately equal annual

installments (Irrigation Only) to be repaid no later than three (3) years after the effective

date of this Contract as set forth in Exhibit D.” (Italics added.) The same paragraph

discussed timing of repayment and notice requirements for selecting the lump sum or

installment option, but those provisions contained what respondents call “placeholder

references,” i.e., bracketed comments about future insertions, instead of the applicable

dates.

To summarize, the “Repayment Obligation” cannot be determined without

knowing the “Existing Capital Obligation” and/or the contents of exhibit D. The

“Existing Capital Obligation” cannot be determined without knowing the contents of

exhibit D. In the absence of exhibit D, both terms are useless for purposes of determining

Westlands’ financial obligations, i.e., “the scope of the duty and the limits of

performance.” (Ladas v. California State Auto. Assn. (1993) 19 Cal.App.4th 761, 770.)

Moreover, as Westlands admitted during the motion proceedings, exhibit D was

not merely omitted from the draft attached to the complaint. Despite being expressly

incorporated into the contract by reference, exhibit D did not exist when the complaint

and the December 2019 motion were filed. Even when the motion was heard, there was

only meager parol evidence of estimates ranging from $200 million to $362 million.

Given the circumstances, we agree the contract presented for validation was missing an

essential term and therefore uncertain, i.e., not sufficiently definite to be binding and

enforceable.

35.

Westlands alleges that “[u]nder California law, a water supply contract that leaves

the determination of the amount to be paid by the contractor to a government agency

responsible for building and operating the water project is sufficiently definite to be

enforceable.” The cited authority is Metropolitan Water Dist. v. Marquardt (1963) 59

Cal.2d 159 (Marquardt). As we explain, the relevant holding of Marquardt is not so

broad. The opinion is also distinguishable.

The Marquardt case was “a proceeding in mandamus to compel James J.

Marquardt, the executive secretary of the Metropolitan Water District of Southern

California, to take certain procedural steps necessary to carry out a contract for the

delivery of water from the facilities of the State Water Resources Development System to

the district. The contract was made … between the district and the State of California,

acting through its Department of Water Resources, pursuant to the California Water

Resources Development Bond Act (Wat. Code, § 12930 et seq.) [(Bond Act)].”

(Marquardt, supra, 59 Cal.2d at p. 170.) The first part of the opinion addresses the

constitutionality of the Bond Act. (Marquardt, at pp. 171–178.) The second part

resolves 17 different claims regarding the validity of the contract. (Id. at pp. 178–202.)

Westlands cites to pages 195–197 of Marquardt, which discuss how the contract

provided for “repayment of the costs of the entire project by means of the charges to be

paid by [multiple] contractors.” (Marquardt, supra, 59 Cal.2d at p. 195.) “It contain[ed]

an elaborate system for the determination of the share that each contractor [would]

contribute, and as part of this determination certain cost allocations [needed to] be made.”

(Ibid.) There was a claim the contract was “uncertain,” but the opinion implies the

dispute was not over the costs being unknown, but rather the ability to identify the

necessary decisionmaker. “It [was] contended that some of these allocations, provided

for in article 22(e) [of the contract], require[d] the evaluation of imponderables on a

subjective basis (i.e., involving personal opinion and discretion) and that the contract

[did] not provide who [would] make the subjective evaluations.” (59 Cal.2d at p. 195.)

36.

After providing a case-specific analysis, the Marquardt opinion says, “The

contract considered as a whole leaves no doubt that the allocations must be made by the

state.” (Marquardt, supra, 59 Cal.2d at p. 196.) The relevant holding follows: “It was

not improper to leave the making of the subjective allocations to the discretion of the

state. A contract may provide that conclusive factual determinations may be made by the

government or its officers, and such determinations will be enforced in the absence of

bad faith.” (Ibid.)

There is no dispute over the Bureau’s contractual authority to calculate Westlands’

repayment obligation. The issue is whether the contract was sufficiently definite, and

thus enforceable, despite its failure to identify the amount of the obligation. And whereas

Marquardt dealt with discrete subcomponents of “an elaborate system for the

determination” of cost allocations (Marquardt, supra, 59 Cal.2d at p. 195), Westlands’

repayment obligation—purported to be a nine-figure sum—was the sine qua non of the

“repayment contract.” We do not read Marquardt to suggest a public agency may obtain

a judgment confirming the validity of a contract, the primary focus of which is the

accelerated repayment of a multimillion dollar debt, when the contract does not state the

amount owed and/or the amount to be repaid. “‘It is axiomatic, of course, that a decision

does not stand for a proposition not considered by the court.’” (Agnew v. State Bd. of

Equalization (1999) 21 Cal.4th 310, 332.)

Westlands also relies on Marquardt to argue the contract “would have been

enforceable even if in its final form it nowhere stated the amount of the repayment

obligation, and instead provided the amount would be determined later by [the Bureau].”

Regardless of whether Marquardt would support this assertion (a question we do not

reach), those are not the facts of the case. The contract presented to the superior court in

October 2019 said the repayment amount “has been computed … and is … set forth in

Exhibit D.” As the case progressed, it was revealed the repayment amount had not been

computed and exhibit D did not exist.

37.

Westlands’ reliance on Water Code section 35406, which allowed its Board to

delegate authority to execute contracts on its behalf, is similarly misplaced. The 2019

draft version reviewed and approved by the Board, and presented to the superior court for

validation, was missing terms regarding Westlands’ repayment obligations. Regardless

of whether its president was authorized to execute the WIIN Act contract in February

2020, the fact remains that the earlier contract Westlands sought to validate was

materially deficient. Even assuming the draft somehow reflected an understanding that

the repayment amount would be determined and agreed upon at a later date, the

December 2019 motion was properly denied. “The general rule is that if an ‘essential

element’ of a promise is reserved for the future agreement of both parties, the promise

gives rise to no legal obligation until such future agreement is made.” (Coleman

Engineering Co. v. North American Aviation, Inc., supra, 65 Cal.2d at p. 405; accord,

Patel v. Liebermensch (2008) 45 Cal.4th 344, 352.)

In its reply brief, Westlands cites Starr v. City and County of San Francisco

(1977) 72 Cal.App.3d 164 (Starr) for the proposition “that a contract whose terms are not

finalized may be validated.” Westlands further contends Starr “establishes that an

incomplete contract—indeed one containing merely an ‘agreement to agree’—can be the

proper subject of a validation proceeding ….” The Counties’ attorney refuted these

contentions at oral argument, correctly observing that none of the contracts at issue in

Starr were found to be, or even suggested to be, materially incomplete.

The procedural history of Starr included two prior validation actions concerning a

redevelopment plan adopted by the Board of Supervisors for the City and County of San

Francisco (City). In the first validation action, the legality of the original plan was

upheld on appeal. “The plan was subsequently amended by ordinance in 1971 and

1973,” including “an ordinance approving and authorizing the execution of a financing

agreement between the City and [the San Francisco Redevelopment Agency (Agency)].”

(Starr, supra, 72 Cal.App.3d at p. 168.)

38.

The financing agreement in Starr required the Agency to execute a project lease

between itself and the City, and it “also provided that at a future date the City and the

Agency would enter into a ‘repayment agreement’ under which the Agency would

provide for the use of tax allocation funds to offset lease payments owed by the City.”

(Starr, supra, 72 Cal.App.3d at pp. 168–169.) The Agency filed a validation action

“seeking an in rem validation of the ordinance authorizing execution of the financing

agreement,” and this second validation action was resolved by a settlement agreement.

The terms of the settlement required certain changes to the redevelopment plan and a

reduction of “the maximum amount of bonds to be issued by the Agency [to finance the

project] from $225 million to $210 million.” (Id. at p. 169.)

Following the adoption of ordinances authorizing the City to enter into the project

lease and execute the repayment contract, a group of taxpayer plaintiffs challenged the

legality of both agreements. In this third validation action, the Starr court determined the

project lease was valid but concluded the repayment contract violated the debt limitation

provision of article XVI, section 18 of the California Constitution. (Starr, supra, 72

Cal.App.3d at pp. 170–177.) The unlawful clause of the repayment contract would have

required the City to repay, on a date years in the future, whatever outstanding debt the

Agency may have owed at that time to the United States Department of Housing and

Urban Development (HUD). (Id. at pp. 169–170.)

Westlands purports to rely on the Starr court’s rejection of a res judicata argument

made by the City on appeal. The City had argued the judgment in the second validation

action, which confirmed the validity of the financing agreement, barred subsequent legal

challenges to other contracts related to that agreement, i.e., the project lease and the

repayment contract. However, the HUD clause was found to be “so new and materially

different” from what was contemplated by the financing agreement “that the issue of the

City’s violation of the constitutional debt limitation could not possibly have been

adjudicated [in the second validation action].” (Starr, supra, 72 Cal.App.3d at p. 178.)

39.

Accordingly, Starr holds “the doctrine of res judicata does not apply where there are

changed conditions and new facts which were not in existence at the time of the prior

judgment, and upon which such judgment was based.” (Id. at pp. 178–179.) Westlands’

attempt to draw some type of strained analogy between Starr and the present case is

entirely unavailing.

B. September 2021 Motion Ruling

Westlands’ September 2021 motion was made pursuant to Code of Civil

Procedure section 1008, subdivision (b). The statute provides: “A party who originally

made an application for an order which was refused in whole or part… may make a

subsequent application for the same order upon new or different facts, circumstances, or

law, in which case it shall be shown by affidavit what application was made before, when

and to what judge, what order or decisions were made, and what new or different facts,

circumstances, or law are claimed to be shown….” (Ibid.)

As Westlands acknowledges, the standard of review is abuse of discretion.

(California Correctional Peace Officers Assn. v. Virga (2010) 181 Cal.App.4th 30, 42.)

“Although precise definition is difficult, it is generally accepted that the appropriate test

of abuse of discretion is whether or not the trial court exceeded the bounds of reason, all

of the circumstances before it being considered.” (In re Marriage of Connolly (1979) 23

Cal.3d 590, 598.) This deferential standard is often difficult to satisfy. “‘The burden is

on the party complaining to establish an abuse of discretion, and unless a clear case of

abuse is shown and unless there has been a miscarriage of justice a reviewing court will

not substitute its opinion and thereby divest the trial court of its discretionary power.’”

(Denham v. Superior Court (1970) 2 Cal.3d 557, 566.)

“A party renews a motion by ‘mak[ing] a subsequent application for the same

order [based on] new or different facts, circumstances, or law.’ [Citation.] Both the

original and renewed motions must request ‘identical relief.’” (Doe v. Westmont College

40.

(2021) 60 Cal.App.5th 753, 761.) In Westmont College, the prevailing plaintiff filed a

motion for $58,466 in attorney fees, which the trial court denied. The defendant appealed

the judgment, and the plaintiff again prevailed in the appellate court. The plaintiff later

filed a second motion for attorney fees with the trial court, this time seeking $85,652,

which was also denied. The plaintiff appealed, and the second motion was held to not

constitute a “renewed motion” under Code of Civil Procedure section 1008 because the

two motions did not seek identical relief. (Westmont College, at p. 761; cf. California

Correctional Peace Officers Assn. v. Virga, supra, 181 Cal.App.4th at pp. 42–43 [second

attorney fees motion, despite being based on different statutory grounds for recovery,

qualified as renewed motion under Code Civ. Proc., § 1008 because movants “sought the

identical amount in their second motion”].)

Here, the issue boils down to whether Westlands sought to validate the same

contract in the December 2019 and September 2021 motions. Respondents have steadily

maintained that the contract presented for validation in late 2019 was materially different

from the WIIN Act contract executed in February 2020. We agree.

The contract approved by Westlands’ Board in October 2019 differs from the

February 2020 WIIN Act contract in several respects. First, the 2019 version had an

effective date of March 1, 2020. The effective date of the WIIN Act contract is June 1,

2020. Under the WIIN Act, the effective date is important for reasons including

establishment of the deadline for the contractor’s performance of the repayment

obligation. (WIIN Act, § 4011(a)(2)(A).) Other deadlines set forth in both versions of

the contract are also tied to the effective date. More importantly, according to Westlands’

own evidence, the effective date has a direct impact on the calculation of the repayment

amount. Therefore, although the repayment amount of the 2019 contract remains

unknown, it was necessarily different from the repayment amount of the WIIN Act

contract. It follows that the effective date is a material term.

41.

Second, the WIIN Act contract adds subdivision (k) to Article 7 (“Rates, Method

of Payment for Water and Accelerated Repayment of Facilities”), thereby inserting more

than a page of new content regarding the “Tiered Pricing Component.” 12 Some

references to the Tiered Pricing Component in the 2019 contract are deleted from the

WIIN Act contract, and many more references are added to the WIIN Act contract

throughout 72 numbered pages of the document. Westlands claimed this was done “to

avoid any ambiguity,” and its appellate briefing argues the edits do not constitute “a

substantive change.” Regardless of whether the changes are “material,” they are more

than trivial revisions to the earlier draft.

Third, the inclusion of exhibits A, B, C, and D in the WIIN Act contract constitute

significant, material changes to the 2019 contract. Exhibit A is a map of Westlands’

service area; exhibit B is a schedule of the rates and charges per acre-foot of water

delivered for the year 2020; exhibit C is an eight-page document explaining the purpose

and methodology of the Bureau’s “[w]ater needs assessments … performed for each CVP

water contractor eligible to participate in the CVP long-term contract renewal process”;

and exhibit D pertains to the amount of Westlands’ repayment obligation. For the

reasons previously explained, the amount to be repaid is a material term.

Given the material differences between the October 2019 contract and the

February 2020 WIIN Act contract, the superior court did not abuse its discretion by

denying the September 2021 motion. The September 2021 motion sought to validate a

different contract than the one attached to Westlands’ complaint and its December 2019

motion. Therefore, what was labeled as a renewed motion in September 2021 did not

actually seek the “same order” as requested in December 2019. (Code Civ. Proc., § 1008,

12The “Tiered Pricing Component” is defined in the 2019 contract as “the incremental

amount to be paid for each acre-foot of Water Delivered as provided for in Exhibit B.” It is

defined in the WIIN Act contract as “the incremental amount to be paid for each acre-foot of

Water Delivered as described in Article 7 of this Contract and as provided for in Exhibit B.”

42.

subd. (b); see Doe v. Westmont College, supra, 60 Cal.App.5th at p. 761; California

Correctional Peace Officers Assn. v. Virga, supra, 181 Cal.App.4th at p. 43 [“‘“The

nature of a motion is determined by the nature of the relief sought, not by the label

attached to it”’”].)

As a final observation, we note Westlands’ repayment obligation under the WIIN

Act contract is still unclear to this court even with the materials filed in support of the

September 2021 motion. Westlands proffered two versions of exhibit D, both pertaining

to multiple contractors and multiple contracts. Westlands claims to have paid the Bureau

a lump sum of $209,436,667 in June 2020. We are unable to reconcile this figure with

the calculations in either version of exhibit D.

The first version of exhibit D, attached to resolution No. 110-21, contains one

page specifically concerning “Westlands Water District” and the WIIN Act Contract

(contract No. 14-06-200-0495A-IR1-P). The lump sum calculation is $535,596. The

other page of the exhibit facially pertains to “Westlands Water District DD #1” and

references four contracts, one of which is the WIIN Act contract. On this page the lump

sum calculation is $208,182,333, and there is an adjusted “M&I Construction Cost” of

$264,913. Setting aside the confusing references to a different contractor and three other

contracts, the amount Westlands claims to have paid to satisfy its repayment obligation—

$209,436,667—is higher than the sums on both pages combined. Added together, the

lump sum calculations and the M&I Construction Cost only come out to $208,982,842.

The second version of exhibit D, attached to the fourth declaration of Jose

Gutierrez, also consists of two pages. The first page again identifies the contractor as

“Westlands Water District DD #1,” but whereas the other version references four

different contracts, this version references six contracts (one of which is the WIIN Act

Contract). The lump sum calculation is $204,635,193 and the adjusted M&I

Construction Cost is $264,913, which together total $204,900,106. The second page,

which exclusively refers to “Westlands Water District” and the WIIN Act contract,

43.

calculates a lump sum obligation of $519,163. But even when the figures on both pages

are combined, the sum ($205,419,269) is millions of dollars less than the amount

Westlands claims to have paid to satisfy its repayment obligation under the contract

($209,436,667).

DISPOSITION

The judgment is affirmed. All parties shall bear their own costs on appeal.

PEÑA, Acting P. J.

WE CONCUR:

SMITH, J.

SNAUFFER, J.

44.

Filed 9/1/23

CERTIFIED FOR PUBLICATION

IN THE COURT OF APPEAL OF THE STATE OF CALIFORNIA

FIFTH APPELLATE DISTRICT

WESTLANDS WATER DISTRICT, F083632 & F084202

Plaintiff and Appellant, (Super. Ct. No. 19CECG03887)

v. ORDER MODIFYING OPINION AND

CERTIFYING OPINION FOR

ALL PERSONS INTERESTED etc., et al., PUBLICATION

[NO CHANGE IN JUDGMENT]

Defendants and Respondents.

THE COURT:

It is ordered that the opinion filed herein on August 7, 2023, be modified as

follows:

On page 27, in the second paragraph, the last two words of the second sentence,

“the Counties,” are changed to “respondents.”

There is no change in the judgment.

The opinion in the above-entitled matter filed on August 7, 2023, was not certified

for publication in the Official Reports. For good cause, it now appears the opinion

should be published in the Official Reports and it is so ordered.

PEÑA, Acting P. J.

WE CONCUR:

SMITH, J.

SNAUFFER, J.