Opinion

City of Philadelphia v. A Kensington Joint, LLC & A. Ehrlich

Court
Commonwealth Court of Pennsylvania
Filed
Aug 9, 2023
Status
Published
On the bench
Fizzano Cannon, J.
Authority
More cited than 5.4%

How later courts described this case

  • instructing that because this standard requires the trial court to make a legal determination, our appellate review is de novo and for errors of law
  • requiring application of strict scrutiny to requests for demolition
  • describing the trial court “hearing on a permanent injunction wherein [a t]ownship sought, inter alia, destruction of [a] structure”
  • affirming demolition order after reviewing testimony below that property at issue was “in an unsafe condition” and “would present a hazard to the fire department and public welfare”

Written by the judges who cited it.

The opinion

IN THE COMMONWEALTH COURT OF PENNSYLVANIA

City of Philadelphia :

:

v. : No. 823 C.D. 2023

: Submitted: August 7, 2023

A Kensington Joint, LLC and :

Adam Ehrlich, :

Appellants :

BEFORE: HONORABLE CHRISTINE FIZZANO CANNON, Judge

HONORABLE LORI A. DUMAS, Judge

HONORABLE BONNIE BRIGANCE LEADBETTER, Senior Judge

OPINION

BY JUDGE FIZZANO CANNON FILED: August 9, 2023

A Kensington Joint, LLC (the LLC) and Adam Ehrlich (collectively,

Appellants1) appeal from the July 26, 2023 Order of the Court of Common Pleas of

Philadelphia County (Trial Court), which order granted a preliminary injunction

against Appellants and in favor of the City of Philadelphia (City), authorizing the

City to enter, inspect, empty, and/or demolish a structure on Appellants’ property

(Trial Court Order). The Trial Court Order arose from a complaint filed against

Appellants (Complaint) by the City alleging violations of The Philadelphia Code of

1

On August 4, 2023, this Court ordered the merits of this appeal to proceed on an expedited

basis and directed the parties to file simultaneous appellate briefs no later than 10:00 a.m. on

August 7, 2023. On the morning of August 7, 2023, counsel for the LLC, who had previously

represented both Appellants, withdrew his appearance on behalf of Mr. Ehrlich and filed a brief

on behalf of the LLC only. The Court will continue to refer to Appellants collectively with the

understanding that the arguments asserted in Appellants’ Brief are those of the LLC only.

General Ordinances (Code)2 on the property located at 2837 Kensington Avenue in

the City of Philadelphia (Property), which includes a three-story mixed-used brick

structure (Building). Upon review, we affirm in part and vacate in part the Trial

Court Order, and remand for further proceedings on an expedited basis.

I. Background

The LLC owns the Property, and Mr. Ehrlich is the sole person in

control of the LLC.3 See Original Record (O.R.), Item No. 1 (Complaint) ¶¶ 2, 10;

Notes of Testimony, 7/26/23 (N.T.) at 62. On July 24, 2023, the City filed the

Complaint, together with an Emergency Petition for Order to Vacate and Demolish

(Trial Court Petition), in the Trial Court. The Complaint alleges uncured,

unappealed violations of the Code pertaining to the Property and sought demolition

of the Building as a remedy therefor. See Complaint ¶¶ 29-53 & Wherefore Clause.

The Trial Court conducted a hearing on the Trial Court Petition on July

26, 2023. At the hearing, the City presented copies of four notices of violation

(Notices of Violation)4 regarding the Property issued by the City’s Department of

2

Phila., Pa., Code §§ 1-101 to 22-1409 (2020).

3

Mr. Ehrlich also controls business entities other than the LLC that own two vacant lots,

one on each side of the Property. See Notes of Testimony, 7/26/23 (N.T.) at 63.

4

The Notices of Violation, setting forth the charged violations and providing dates by

which any appeal must be filed and the violations must be corrected, are as follows:

No. CF-2022-092664 – dated September 9, 2022; appeal date of October 9, 2022;

correction date of October 13, 2022

No. CF-2023-017143 – dated March 4, 2023; appeal date of March 9, 2023;

correction date of April 7, 2023

2

Licenses and Inspections (Department), as well as photographs5 of the Property and

its surroundings taken on July 25, 2023, all of which were admitted into evidence.

See N.T. at 54-55. The City also presented the testimony of two Department officials

about the current condition of the Property. Thomas Rybakowski, a construction

compliance supervisor for the Department, in its Contractual Services Unit, testified

that on July 25, 2023, he inspected the Property and Building. See N.T. at 16. He

stated:

The [P]roperty is unsafe. It was declared unsafe by my

unit. It has a vertical fracture along the side wall on the

right-hand side. It also, the front wall at the corner is

bulged out towards the walkway. There is some fire

damage to the interior joists at the tunnel alley area of the

[B]uilding. I do not know how far this fire damage has

penetrated into the [P]roperty, you can see that there is

alligatoring which is basically charring on those structural

members, that is one of the structural load points for the

[P]roperty. So our fear is that this could be subject to a

collapse of the [P]roperty.

Id. Mr. Rybakowski also described bulging and deterioration of exterior walls and

foundational elements. See id. at 19-21. On direct examination, he admitted that the

fire damage “indicates significant structural damage which would need a structural

No. CF-2023-020816 – dated March 16, 2023; appeal date of April 15, 2023;

correction date of April 19, 2023

No. CF-2023-017143 – “Final Violation Notice” dated July 11, 2023; referencing

March 4, 2023 Notice and stating that “[i]f the time for compliance . . . has passed

and was not extended due to the filing of an appeal then the penalties stated in the

[March 4, 2023 Notice], including but not limited to inspection fees and fines, will

begin to accrue as of the date of this notice.”

O.R., Item No. 14 at 1-13.

5

See O.R., Item No. 14 at 14-37.

3

analysis to see if the building was able to stand.” Id. at 21 (emphasis added).

Similarly, when asked on cross-examination whether a more robust inspection was

needed to make a determination as to the stability of the structure, Mr. Rybakowski

admitted that he “would ask for a structural engineer to assess the [P]roperty, but

from our assessment there are conditions that would lead to a structural failure.” Id.

at 32. Mr. Rybakowski also agreed that “a structural engineer or some other type of

professional [would be needed] to affirmatively state that . . . these defects could

lead to an imminent collapse, and . . . whether or not they effected [sic] the structural

stability of the building.” Id. at 36. Mr. Rybakowski admitted there had been no

interior inspection of the Building as of the hearing, and that the inspection he

conducted on July 25 was a visual inspection from outside the fence surrounding the

Property; he did not ask Appellants’ permission to enter the Property to conduct a

closer inspection. See id. at 29-31.

The City also presented the testimony of Tameka Blair, a code

enforcement inspector with the Department, who was present at the July 25, 2023

inspection. Ms. Blair also confirmed that there was no interior inspection before the

hearing. See N.T. at 55. She directly admitted that she was not testifying regarding

the Building’s structural integrity. See id. When asked about structural stability,

Ms. Blair declined to offer testimony, explaining: “I stand with my contractual

service inspector [(i.e., Mr. Rybakowski)] because he’s an expert on that, so

whatever he says I go by what he says.” Id. at 58. Ms. Blair also testified about the

reason Department personnel did not enter the Property. Ms. Blair explained that

during the March 2023 inspection, personnel were not “able to get inside the

[P]roperty due to the activities on the outside, and inside, it was not safe.” Id. at 41.

She observed people on and around the Property using and visibly under the

4

influence of drugs, and believed people in the Building were selling drugs. See id.

Occupants had posted a notice on the door of the Building prohibiting entry without

permission and a person stood at the door allowing people inside. See id. at 41-42.

Persons allowed entry were later observed leaving with visible drug paraphernalia.

See id. Tents are set up in the rear yard of the Property. See id. at 52. Further, Ms.

Blair explained that the Building has numerous illegal connections to electrical lines,

but has no legitimate water or electric service. See id. at 43, 46-47, 51.

Mr. Ehrlich testified at the hearing on behalf of Appellants. Mr. Ehrlich

explained that one of his other business entities purchased the Property for $70,100

in 2020, and transferred the Property to the LLC in December 2022. See N.T. at 64-

68. Mr. Ehrlich stated that he has permitted certain people to live in the Building,

but some persons living in the Building and all those who occupy the adjoining

vacant lots or the tent at the rear of the Property are there without his permission.

See id. at 69-73, 86-87, 127-30. Before any of the Notices of Violation were issued,

Mr. Ehrlich initially asked the Philadelphia Police Department (PPD) to remove

persons who were living on, and selling and using drugs on, his vacant lots, and he

installed a gate to attempt to restrict access. See id. at 88-93. Mr. Ehrlich stated that

it is difficult to find a contractor willing to work in Kensington. See id. at 79, 95.

Mr. Ehrlich explained that, in March or April of 2023, he hired a structural engineer

to assess the Building violations, paid a deposit of $300 for the work, and was present

while the engineer inspected the Building, but that the engineer later refused contact

and never delivered the promised report. See id. at 95-98.

5

Mr. Ehrlich also produced evidence of his communications with police

and CLIP6 personnel in attempts to clean up the Property and exclude unauthorized

occupants. See N.T. at 104-05; 7/26/23 Hearing Exs. D-2 & D-3 (admitted, N.T. at

132). He testified that contractors have performed work including changing the door

locks on the Building several times and installing a steel security gate to restrict

access to the Property. See id. at 106-08. Finally, Mr. Ehrlich stated that he is

willing to hire, and able to pay for, a structural engineer to secure a make-safe permit

and abate the violations. See id. at 118.

The Trial Court found the testimony of the City’s two witnesses

credible, Trial Court Order ¶ 6, and found the following facts regarding the Property:

7. The [Property] has structural deterioration that has rendered it

unsafe; the side wall of the [Building] has loose and missing bricks, the

front side wall has a vertical fracture, and the north side wall has

missing bricks and fire damaged joists at the tunnel alley.

8. The [Property] has no current approved use but is occupied by

unknown transient persons without water and legal electrical and other

utility hookup.

9. There are wooden boards on some windows and unknown

persons who appear to be monitoring access to the backdoor but

otherwise the [B]uilding and curtilage is open to trespass.

10. In inspecting the [Property], Department personnel have

observed drug activity and been subject to intimidating behavior by

unknown persons loitering in and around the [Property].

11. The lack of utilities and unapproved use of the [Property] has

rendered it unfit for human occupation and a danger to Department

6

CLIP is the City’s Community Life Improvement Program, which “works . . . to improve

the appearance of neighborhoods by landscaping, clearing trash, and removing graffiti.” Aman

McLeod, The Port Richmond Industrial Development Enterprise: A Successful Model for

Preserving Urban Industry, 3 DREXEL L. REV. 253, 266 (2010); accord City’s Br. at 16 n.3.

6

personnel as well as transient persons attempting to occupy the subject

premises.

....

13. The contiguous parcels are occupied by unknown transient

persons who are to different degrees encamped there upon.

14. Both the [Property] and the contiguous properties have debris

associated with drug activity including discarded syringes and caps.

15. The Department has been unable to do a resinspection [sic]

to determine the current state of the interior of the [Building] and

determine the degree to which the joists have been degraded, the level

of hazmat conditions, and whether other conditions of the [Property]

exist stemming from the known unit [sic] and unsafe conditions due to

the danger posed to Department personnel by the unknown persons in

and around the [Property].

16. The [Property] is in violation of [T]he Philadelphia [Property

Maintenance] Code §§ PM-108.1[7] and PM[]-109.1[8] and is unsafe and

7

The Philadelphia Property Maintenance Code, also referred to as Subcode “PM,” is

located within Title 4 (The Philadelphia Building Construction and Occupancy Code) of the Code.

See Phila., Pa., Code tit. 4, ch. 4-200.0 (2020). The Trial Court and the Department use the code

prefixes “PM-“ and “PM15-,” which appear to refer to the same subsection of the Code. The Court

uses “PM” for consistency.

Section PM-108.1 thereof provides:

General. When a structure or equipment is found by the code official to be unsafe,

or when a structure is found unfit for human occupancy, or is found unlawful, such

structure shall be condemned pursuant to the provisions of this code.

Code § PM-108.1.

8

Section PM-109.1 of the Property Maintenance Code provides:

Unfit dwellings: A structure is unfit for human occupancy whenever the code

official finds that such structure is unsafe, unlawful or, because of the degree to

which the structure is in disrepair or lacks maintenance, is insanitary, vermin or rat

infested, contains filth and contamination, or lacks ventilation, illumination,

sanitary or heating facilities or other essential equipment required by this code, or

7

unfit for human occupancy, due to the deterioration of the structural

elements of the [B]uilding (particularly the side walls) and lack of

utility service at the [P]roperty; [Appellants] are aware of the conditions

of the [Property] and have not taken the necessary steps to bring the

[Property] into compliance with the []Code.

17. The [Property] constitute[s] a public nuisance and danger to

the public including [Appellants], unknown occupants, first responders,

Department personnel, and passersby.

Trial Court Order ¶¶ 7-11, 13-17. The Trial Court then concluded that the City “put

forth credible evidence now in the record to support the necessary elements for a

preliminary injunction.” Id. ¶ 18. The Trial Court ordered the following relief:

19. Defendants shall immediately allow representatives from the

Department to enter into the premises for the purposes of inspection.

20. If the Defendants fail to allow inspection of the premises,

representatives of the Department may gain entry through use of a

locksmith and/or law enforcement, with any costs incurred to be

charged to the owner of the premises.

21. Thereafter, the Defendants and all occupants shall immediately

vacate the subject premises and, as needed to effectuate this order, the

contiguous parcels.

22. The City of Philadelphia is hereby authorized to abate the

violations, including but not limited to through demolition of the

subject premises, which constitute a public nuisance and pose an

immediate threat to the health and safety of the occupants of the

premises and the public, through demolition.

because the location of the structure constitutes a hazard to the occupants of the

structure or to the public.

Code § PM-108.1.

8

23. The City shall bill the owner(s) of the premises for the costs of any

abatement work performed at the subject premises, including a 21 %

administrative fee, in accordance with the [] Code. Such costs shall be

entered as a municipal lien against the subject premises upon filing of

the City of Philadelphia in accordance with the [] Code.

24. At all times, the Sheriff’s Office and/or other Law Enforcement,

including the [PPD], shall be permitted to assist the Department in

effectuating the terms of this order.

25. The terms of this Order shall be binding on the [D]efendants, agents,

lessees, heirs, assigns, successors in interest, and all persons acting in

or for the [D]efendant’s behalf or occupying the subject premises.

Trial Court Order ¶¶ 19-25.

On July 27, 2022, Appellants filed the Notice of Appeal in this Court

challenging the Trial Court Order. On July 31, 2023, Appellants filed a motion in

the Trial Court requesting a stay pending their appeal of the Trial Court Order, which

the City opposed, and which the Trial Court denied by August 1, 2023 Order. On

August 1, 2023, after the Trial Court denied the requested stay pending appeal,

Appellants filed an Emergency Application for Stay Pending Appeal (Emergency

Application) in this Court and the City filed its Answer in opposition. The Court

granted a temporary stay that same day pending oral argument on the Emergency

Application. On August 4, 2023, after argument, the Court granted the Emergency

Application and directed expedited consideration of the merits of this appeal. See

City of Phila. v. A Kensington Joint, LLC (Pa. Cmwlth., No. 823 C.D. 2023, filed

Aug. 4, 2023) (Fizzano Cannon, J.) (single-judge op.).

9

II. Discussion

A. Parties’ Arguments

Appellants argue that the Trial Court Order should have applied strict

scrutiny to the requested remedy of demolition, and so should be upheld only if that

remedy was shown to be necessary for the protection of public health, welfare, and

safety. Appellants have not appealed the Notices of Violations, nor do they allege

that the violations have been cured. Rather, Appellants challenge only the remedy

the Trial Court granted. Citing King v. Township of Leacock, 552 A.2d 741, 744

(Pa. Cmwlth. 1989), Appellants argue that the Trial Court erred in authorizing

demolition “without considering other less dramatic remedies, without an interior

inspection of the [Property] and without the expert report of a structural engineer or

other design professional.” Appellants’ Br. at 9. Appellants argue that Mr.

Rybakowski’s testimony was the only basis for the Trial Court’s findings regarding

structural danger, and that this testimony was not substantial evidence because (1) it

was based on Mr. Rybakowski’s exterior-only inspection of the Building, and (2)

Mr. Rybakowski is admittedly not an engineer, was not qualified or offered as an

expert, and had no knowledge of the Building’s past condition or the history of the

defects he observed. See id. at 12-16. Appellants also argue that the fire damage of

which Mr. Rybakowski testified was not cited in any of the Notices of Violation.

See id. at 15-16. Finally, they point out that the Trial Court Order did not elaborate

on the specific factors necessary for the grant of a preliminary injunction or on how

the City had satisfied them. See id. at 17-19.

Notably, in response, the City begins by stating that “[because] the

[Trial Court] Order . . . is an injunction, the City was required to prove a clear right

to relief, irreparable harm if the injunction were not granted, and that the balance of

10

equities favored an injunction.” City’s Br. at 20. These are the elements necessary

to establish a right to a permanent injunction. See infra at 14. The Trial Court

ordered a preliminary injunction.

The City argues that the strict scrutiny standard in King, cited by

Appellants, is inapposite because it applies only in cases of de facto takings, and not

to legitimate uses of police power. City’s Br. at 24-26. The City essentially

construes Appellants’ argument and citation of King as assuming that the Trial Court

Order is a de facto taking of the Property, which the City disputes. See id. In support,

the City cites judicial decisions upholding legitimate municipal uses of the police

power to demolish or otherwise affect property, without effecting a taking. See id.

at 25 (citing Keystone Commercial Prop. v. City of Pittsburgh, 347 A.2d 707, 710

(Pa. 1975); Balent v. City of Wilkes-Barre, 669 A.2d 309, 315 (Pa. 1995); Hill v.

City of Bethlehem, 909 A.2d 439, 445 (Pa. Cmwlth. 2006); Est. of Blose ex rel. Blose

v. Borough of Punxsutawney, 889 A.2d 653, 659 (Pa. Cmwlth. 2005); Balent v. City

of Wilkes-Barre, 492 A.2d 1196, 1198 (Pa. Cmwlth. 1985)).

Further, the City argues that the record is sufficient to support the Trial

Court’s findings and demolition relief. It does so on two apparently inconsistent

bases. First, the City claims that, by failing to appeal the Notices of Violation,

Appellants conceded that the Building is “unsafe” and “unfit” because that is the

nature of the violations at issue, and that this concession establishes a sufficient

factual basis, on its own, for demolition. City’s Br. at 28-30. The City then

acknowledges that it took a “belt and suspenders approach” by not relying on the

unchallenged violations alone, but also offering evidence which the Trial Court

found credible. Id. at 30. Specifically, the City contends that this Court’s decisions

show that a code enforcement official’s testimony can provide substantial evidence

11

to support a demolition order, and testimony by a structural engineer is not required.

Id. at 32-33 (citing City of Phila. v. Urban Mkt. Dev. Inc., 48 A.3d 520, 523-24 (Pa.

Cmwlth. 2012); City of Erie v. Stelmack, 780 A.2d 824, 826 (Pa. Cmwlth. 2001);

City of Pittsburgh v. Kronzek, 280 A.2d 488, 492 (Pa. Cmwlth. 1971)). The City

argues that the Code places the burden to procure an engineer’s inspection on the

property owner, not the City, but that an engineer’s inspection is not necessary to

support a demolition remedy. See id. at 35-36. The City also emphasizes evidence

suggesting that Appellants have had notice of the violations since September 9,

2022, and have still failed to cure them, which makes alternative remedies short of

demolition impractical. Id. at 40-41.

Finally, the City states that based on this substantial evidence and the

balancing of the obvious harms by the Trial Court, this Court should affirm the Trial

Court Order under the deferential standard of review applicable to preliminary

injunctions.

B. Nature of Action; Scope and Standard of Review

Initially, we note that the Trial Court Order does not cite any section of

the Code or other ordinance or statutory provision that authorizes the specific

remedies the Trial Court granted.9 In its Complaint, the City cited Sections A-503.1

and A-503.2 of the Code, but neither of these sections directly provides demolition

as a remedy. See Complaint ¶¶ 78-80. Section A-503.1 of the Code provides that

Department officials may “institute the appropriate legal proceedings” to address

unremedied violations, including by seeking orders requiring stoppage of work,

9

The Court acknowledges that, given the expedited consideration of this appeal, the Trial

Court has not had the opportunity to explain the basis of its decision in an opinion pursuant to

Pennsylvania Rule of Appellate Procedure 1925(a).

12

removing work done in violation, and preventing use or occupancy of a

noncompliance structure. Code § A-503.1. Section A-503.2 authorizes the

Department to perform work to abate the violation at the violator’s cost. Code § A-

503.2. Neither section provides for demolition. However, the City and the Trial

Court in this matter proceeded in equity. See Complaint, Civil Cover Sheet (listing

action as both “code enforcement” and “equity” action); Trial Court Order at 1

(“order[ing] preliminary injunctive relief”); id. ¶ 18 (finding “credible evidence . . .

in the record to support the necessary elements for a preliminary injunction”); City’s

Br. at 23 (“The City moved for an . . . injunction to bring a stop to a dangerous

situation and restore the status quo.”).

Generally, “[o]ur scope of review in an equity action is limited to a

determination of whether the [trial court’s] findings of fact are supported by

substantial evidence, whether an error of law has been made, or whether the [trial

court] abused [its] discretion.” King, 552 A.2d at 743. However, when reviewing a

trial court order granting a preliminary injunction, “appellate courts review . . . for

an abuse of discretion.” Marcellus Shale Coal. v. Dep’t of Env’t Prot., 185 A.3d

985, 995 (Pa. 2018). Under this standard of review,

we do not inquire into the merits of the controversy, but only examine

the record to determine if there were any apparently reasonable grounds

for the action of the court below. Only if it is plain that no grounds

exist to support the decree or that the rule of law relied upon was

palpably erroneous or misapplied will we interfere with the decision of

the [trial court].

Roberts v. Bd. of Dirs. of Sch. Dist., 341 A.2d 475, 478 (Pa. 1975). Our Supreme

Court “set out the reasons for this highly deferential standard of review almost a

hundred years ago”:

13

It is somewhat embarrassing to an appellate court to discuss the reasons

for or against a preliminary decree, because generally in such an issue

we are not in full possession of the case either as to the law or

testimony—hence our almost invariable rule is to simply affirm the

decree, or if we reverse it to give only a brief outline of our reasons,

reserving further discussion until appeal, should there be one, from final

judgment or decree in law or equity.

Summit Towne Ctr., Inc. v. Shoe Show of Rocky Mount, Inc., 828 A.2d 995, 1000-01

(Pa. 2003) (quoting Hicks v. Am. Nat. Gas Co., 57 A. 55, 55-56 (Pa. 1904)).

While a preliminary injunction preserves the status quo, Lindeman v.

Borough of Meyersdale, 131 A.3d 145, 151 (Pa. Cmwlth. 2015), a permanent

injunction goes “beyond preservation of the status quo” because it “amounts to

affirmative relief, designed to permanently remedy the situation, instead of an

interim measure ordered to protect the parties until a final hearing.” Soja v.

Factoryville Sportsmen’s Club, 522 A.2d 1129, 1132 (Pa. Super. 1987). A

permanent injunction order requires the moving party below to establish that “(1)

the right to relief is clear; (2) the relief is necessary to prevent an injury which cannot

be compensated by damages; and (3) greater injury will occur from refusing the

injunction than from granting it.” First Phila. Preparatory Charter Sch. v. Dep’t of

Educ., 179 A.3d 128, 132 n.2 (Pa. Cmwlth. 2018); see Buffalo Twp. v. Jones, 813

A.2d 659, 664 n.4 (Pa. 2002) (instructing that because this standard requires the trial

court to make a legal determination, our appellate review is de novo and for errors

of law). Notably, “the test for the issuance of [preliminary injunctions and

permanent injunctions] is not the same.” Id. Rather, permanent injunction claims,

unlike preliminary injunction claims, do not require proof of “irreparable harm or

immediate relief.” Id. at 663.

14

C. Discussion

As this Court has observed:

We must emphasize that an order of demolition, such as that entered in

the instant matter, is a taking pursuant to the police power, without

compensation. As such, any order requiring confiscation and

destruction of privately-held property must be subject to strict scrutiny

and, in no instance, may such action be taken unless it is necessary for

the protection of the public health, welfare, and safety.

King, 552 A.2d at 744. An order of demolition is an essentially permanent remedy,

and therefore courts follow a series of clear steps before granting it: 1) the proponent

of demolition amasses the evidence necessary to support that remedy, and the trial

court orders preliminary relief where necessary; and then 2) only after the trial court

reviews the evidence and finds it sufficient, it issues a separate demolition order.

See, e.g., Lower Frederick Twp. v. Clemmer, 543 A.2d 502, 510-11 (Pa. 1988)

(describing the trial court “hearing on a permanent injunction wherein [a t]ownship

sought, inter alia, destruction of [a] structure”); City of Phila. v. Frempong, 865

A.2d 314, 315-16 (Pa. Cmwlth. 2005) (first granting preliminary injunction

authorizing, but not requiring, owner to demolish structure as one of several options

for remediation; and after second hearing, granting permanent injunction); Borough

of Shenandoah v. Cruz (Pa. Cmwlth., No. 715 C.D. 2016, filed May 22, 2017)

(unreported), slip op. at 2 (noting, in equity action for abatement of unsafe buildings,

that trial court first issued preliminary injunction after initial hearing, and then after

second hearing “ma[de] permanent the preliminary injunction and direct[ed] the

demolition of the structures”).10

10

Pursuant to Commonwealth Court Internal Operating Procedure Section 414(a), 210 Pa.

Code § 69.414(a), unreported panel decisions of this Court, issued after January 15, 2008, may be

cited for their persuasive value.

15

In King, a municipality filed a complaint before a trial court sitting in

equity, seeking to demolish a building in violation of the municipality’s nuisance

ordinance. See 552 A.2d at 742. Similar to this matter, the underlying violations in

King were entered in the form of a default judgment against the owners, who did not

contest them. See id. at 743. After hearing, the trial court entered a decree directing

the owners to demolish the building. See id. On appeal, this Court reviewed the

evidence presented below and concluded that it was sufficient to support the trial

court’s finding that the property was a public nuisance. See id. at 744-45. However,

as required by the standard of review, the Court also considered whether the trial

court’s findings adequately supported the remedy of demolition. See id. We

observed that the trial court could have fashioned various remedies short of

demolition, including the municipality performing work at the owners’ expense,

turning off utilities, and “forbid[ding] tenancy.” Id. at 743-44. We held that “the

radical remedy of demolition should be used only when there exists no other

practical alternative.” Id. at 744. We concluded that the findings were insufficient:

the owners had performed recent remedial work that the trial court failed to consider,

and there was no specific factual finding that the property was structurally unsafe.

See id. We held that “[d]emolition of a structure . . . is improper if it is structurally

safe and poses no danger to the public,” and remanded to the trial court for more

specific factual findings and reassessment of the remedy. Id. at 744-45.

The City argues that we should distinguish King because “that case did

not involve a true exercise of police powers,” whereas this one does. City’s Br. at

26. In support, the City cites Stacey v. City of Hermitage Board of Appeals, 789

A.2d 772, 776 n.4 (Pa. Cmwlth. 2001). In Stacey, property owners received notice

of violation, and in an appeal from such notice, a municipal board found that the

16

property was an attractive nuisance, unsafe for human habituation, littered with

garbage and uncontrollable weed growth, a fire hazard, and “in danger of

collaps[ing].” See id. at 773. The municipality sought demolition, and the trial court

held a preliminary hearing, granted preliminary relief, and set a permanent

injunction hearing. See id. at 774. Following the permanent injunction hearing, the

trial court entered a decree nisi vacating the temporary injunction, and after denying

the owners’ exceptions thereto, filed a final decree declining to enjoin demolition.

See id. This Court affirmed, distinguishing King on the basis that violations alleged

in King were vague and based on aesthetics, and thus did not give sufficient notice

to the owners. See id. at 776 n.4.

The Court declines to distinguish King on the basis that the Stacey

Court did. It is true that the defect in King was the absence of findings supporting

demolition (because the problems with the property were largely nonstructural).

However, King also articulated that, even where adequate findings are present, as

they are here, those findings must be supported by substantial evidence. Put in the

City’s terms, this means that whether a case involves “a true exercise of the police

power” is, in part, an evidentiary question that a trial court must answer based on the

record before it, not an a priori point from which to select the proper legal standard.

The question of whether the City’s actions here are legitimate uses of the police

power depends upon the law and the record, and neither this Court nor the Trial

Court can answer that question in a vacuum. Thus, the Court cannot ignore King

simply because this is not a de facto takings matter, as the City suggests. Rather, as

King explained, even when a demolition is not a de facto taking requiring

17

compensation, but is rather “pursuant to the police power,[11] without

compensation[,]” it must nonetheless be subject to scrutiny for sufficiency of the

evidence. 552 A.2d at 744 (emphasis added).

But where, unlike in King, a trial court “makes specific findings that

the building is unsafe, which [are] supported by substantial evidence,[12] we [will]

conclude that the trial court properly granted the City’s demolition order.” Stelmack,

780 A.2d at 828 (affirming demolition order after reviewing testimony below that

property at issue was “in an unsafe condition” and “would present a hazard to the

fire department and public welfare”).

The City concedes that the social and criminal conditions on and around

the Property, viewed alone, are not a sufficient basis for the Trial Court’s

authorization to demolish the Building, but that substantial evidence of the structural

defects was necessary to support the Trial Court Order. Therefore, the Court need

not consider the Trial Court’s findings regarding social and criminal activity as a

11

“[T]he conditions on which exercise of police power is predicated should actually exist

or be so likely that action is necessary”; and if such conditions do not exist, the governmental

action goes beyond the police power and is invalid, and the action (here, a demolition) becomes a

taking requiring just compensation. Balent v. City of Wilkes-Barre, 669 A.2d 309, 314 (Pa. 1995).

In other words, distinguishing between a de facto taking and legitimate police power actions

requires a merits analysis of the governmental action, because “only actions taken under a valid

exercise of police power result in a non-compensable taking.” Id. (emphasis added); see also

Friends of Danny DeVito v. Wolf, 227 A.3d 872, 894 (Pa. 2020) (discussing Balent and concluding

that emergency regulations lawfully imposed did not effect compensable a taking).

12

“[S]ubstantial evidence is such relevant evidence as a reasonable person might accept as

adequate to support a conclusion.” W. Penn Allegheny Health Sys., Inc. v. Workers’ Comp. Appeal

Bd. (Cochenour), 251 A.3d 467, 475 (Pa. Cmwlth. 2021). In performing a substantial evidence

analysis, the evidence must be viewed in a light most favorable to the party that prevailed below,

and it is immaterial if evidence in the record could have supported a different outcome. See id.

“Mere speculation or conjecture is insufficient to support a factual finding, but where there exists

the ability to draw reasonable and logical inferences from evidence that is presented, including

testimony, a conclusion so derived will be sufficient.” Id.

18

basis for the Trial Court’s authorization to demolish the Building. See Trial Court

Order ¶¶ 8-11, 13-14. Focusing on findings regarding structure alone, however, the

Trial Court made sufficient findings to justify demolition, provided those findings

are supported in the record. See Trial Court Order ¶¶ 7 (“structural deterioration that

has rendered [the Building] unsafe”) & 16 (“deterioration of the structural elements

of the [B]uilding”). Cf. King (where such findings were absent). Thus, this Court’s

review of the remedy of demolition is limited to assessing whether substantial

evidence supports those findings. See King, 552 A.2d at 744-45; Stelmack, 780 A.2d

at 828.

The City concedes that its evidentiary13 proof of sufficient danger to

warrant demolition rested on Mr. Rybakowski’s testimony, which was based in turn

on his exterior visual inspection. The City acknowledges that Mr. Rybakowski is

not a structural engineer, but it insists that his testimony as a code inspector is

sufficient to support demolition. The City argues an engineer’s report “is not needed

to determine whether a property is [u]nsafe in the first place; instead, that

determination is made by the Code Official.” City’s Br. at 37 (emphasis added).

Conceivably, such evidence could be a structural analysis obtained by Appellants,14

such a report obtained by the City, or some other substantial evidence. Here, the

City insists that neither an engineering report, nor any inspection of the Building’s

13

The Court rejects the City’s suggestion that unappealed violations conclusively establish

structural danger sufficient to warrant demolition. See City’s Br. at 28-30. If that were true, no

evidence of any kind would be required before a court could order demolition of any property with

unappealed violations. This is obviously inconsistent with our decisions holding that judicial

review of the evidence is required. See King, 552 A.2d at 744-45; Stelmack, 780 A.2d at 828.

14

Relatedly, the City emphasizes that the Code requires Appellants, not the City, to

produce a structural engineering report showing that they can abate the structural violations, and

it argues that this suggests that no expert engineering testimony is needed to sustain its burden at

the evidentiary hearing. See Code §§ A-105.1, A-304.1.1; see also Ex. C-1 at 5 (Mar. 4, 2023

Notice of Violation, directing Appellants to obtain engineer’s report).

19

interior at all, was necessary “because the structural degradation was evident from

the exterior of the building.” City’s Br. at 37. The City concedes, however, that

dangerous criminal and social conditions on and around the Property prevented any

on-site or interior inspection, and that, had those dangerous conditions not been

present, the City would have procured, and introduced in the Trial Court, an interior

inspection.15

The Court concludes that the evidence in the record is not substantial

evidence to support the Trial Court’s findings that the Property has structurally

deteriorated to the point of being unsafe. The Trial Court relied on Mr.

Rybakowski’s testimony alone for purposes of its structural findings. First, his

testimony was qualified at several points by his admissions that a structural

engineering analysis is necessary to truly understand the structural state of the

Building. Although he made several statements that the Building was unsafe—or

had been deemed unsafe by the Department—his admissions render these statements

conclusory and speculative.

Second, Mr. Rybakowski was not offered as an expert witness, despite

oblique references to his “expert[ise]” during the hearing. N.T. at 58. And more

importantly, Mr. Rybakowski purported to testify directly about the structural

stability of the Building, not restricting his testimony to code enforcement, which is

his professional field. On that basis, the Court distinguishes Stelmack, where we

upheld a demolition order against a substantial evidence challenge. See 780 A.2d

15

The City noted at argument on the Emergency Application that, had the dangerous

nonstructural conditions not been present, it would have performed an interior inspection. The

City also discusses in its brief an interior inspection the City conducted on August 1, 2023, after

this Court issued its provisional stay order, which inspection the City claims revealed further

structural problems. That inspection is outside the record, however, and does not exist for purposes

of appellate review. See B.K. v. Dep’t of Pub. Welfare, 36 A.3d 649, 657 (Pa. Cmwlth. 2012).

20

824. In Stelmack, the city’s fire code inspector testified specifically as to the fire

code violations in the subject property. He limited his testimony to his experience,

stating that the property was “in an unsafe condition from a fire perspective[.]” Id.

at 828 (emphasis added). The Court also contrasts the instant matter with Borough

of Shenandoah v. Cruz (Pa. Cmwlth., No. 715 C.D. 2016, filed May 22, 2017)

(unreported). In Cruz, “the structural integrity of the buildings failed and the walls

and roof of the buildings collapsed” more than a year before the municipality sought

demolition. Id., slip op. at 1; accord id. at 10-11. The collapse fractured a sewage

line and caused raw sewage to collect in the basement for years. See id., slip op. at

1, 10-11. This Court quoted and applied the King standard, but found the matter

more similar to Stelmack and affirmed the demolition remedy because “[t]he record

[was] replete with evidence to support” it. Id., slip op. at 12. Notably, even in Cruz,

where the record established “a hole in the roof the size of a Volkswagen,” slip op.

at 11, the trial court held a second hearing before making its preliminary injunction

permanent and ordering demolition. See id., slip op. at 2.

The Court distinguishes other demolition cases the City cites because

they involved records with similarly sufficient evidence. In Urban Market, 48 A.3d

520, this Court upheld a trial court’s demolition order, but only after the trial court

ordered the owner to secure a structural engineering report following a preliminary

hearing. Id. at 524. At a subsequent hearing, the owner failed to produce the ordered

report; without such a report, the trial court credited the testimony of a Department

code inspector, who testified that “there was no interior floor system, the roof was

compromised, and the [p]roperty was in extremely dangerous condition and

represented a significant danger to the public.” Id. at 524 (emphasis added). This

21

conclusion—rendered at a second hearing—appears to have followed an interior

inspection.

Similarly, in Blose, 89 A.2d 653, we held that the trial court did not

commit an error of law in finding that the borough’s demolition of the appellant’s

property was justified. Specifically, we upheld demolition where witnesses testified

about the “deterioration of the building,” and “[i]n general, . . . that the walls were

leaning and bricks were falling from the building,” and that these conditions

persisted for more than one year. Id. at 655. Accordingly, we reasoned that the

exterior of the building created “an immediate danger.” Id. As in Cruz, and unlike

the instant matter, the dangerous structural conditions of the building were clearly

apparent from the outside. See id. at 655, 660. As such, witness testimony about

the building’s external conditions was substantial evidence to support demolition.16

Finally, and even if a lay witness’s opinion testimony can support

demolition when properly limited to the witness’s experience as in Stelmack, the

City acknowledges that, under normal circumstances, it would not rely on an

exterior-only visual inspection to show structural defects. Rather, it was only

because of the dangerous criminal and social conditions17 present at the Property and

16

In concluding that the evidence here was not sufficient to support demolition, and in

distinguishing cases where lay testimony by municipal officials was ultimately held to be

substantial evidence, the Court is not creating an unreasonable or inefficient rule, as the City

suggests. See City’s Br. at 2. Indeed, we need not create a new rule at all to resolve this matter.

Nor do we suggest that testimony by a code enforcement official cannot support demolition as a

remedy under other circumstances. Rather, we apply our longstanding precedent that substantial

evidence is required. The testimony here was based on a cursory, exterior inspection, and unlike

in other cases, the structural danger was not obvious. Whether other evidence under other

circumstances may suffice is not for us to determine here.

17

Before the Trial Court, The City identified the dangerous conditions as vagrancy, the

sale and use of illegal drugs, and a prior shooting then under investigation by the PPD. See

Complaint ¶¶ 21, 21, 26; O.R., Item No. 3 (Trial Court Petition) ¶¶ 5 & 21. Mr. Ehrlich has stated

22

the surrounding area that the City chose to proceed on the exterior inspection alone,

rather than risking having its personnel enter the Property. The record contains no

evidence that Appellants created the nonstructural social conditions/dangers; and

even if they had, such conditions/dangers would not somehow lessen or excuse the

City’s burden of proof for demolition. To determine otherwise would empower the

City to secure a demolition order for any property that it views, from the literal

outside, as structurally unsafe. As Appellants point out, the City could have used

law enforcement to gain safe access to the Property in order to obtain the evidence

required to meet the substantial evidence burden. Although the City offers an

explanation for failing to acquire such evidence, the explanation does not alter the

record, which lacks the necessary substantial evidence. Likewise, the City’s

explanation does not excuse its obligation to provide evidence adequate to justify

the extreme remedy of demolition. See King.

Notably, the Trial Court Order actually authorized multiple, temporally

incongruent remedies. First, the Trial Court Order authorized the City “to enter into

the [Property] for the purposes of inspection” and ordered Appellants to allow such

entry and all occupants to the vacate the Property. Trial Court Order ¶¶ 19-21. The

Trial Court Order also authorized the City to contemporaneously “abate the

violations, including but not limited to through demolition of the [Building], which

constitute[s] a public nuisance and pose[s] an immediate threat to the health and

safety of the occupants of the [Property] and the public, through demolition.” Id.

¶ 22. Therefore, the Trial Court Order calls for an inspection which could not safely

occur until the Property was vacated and secured. The results of this inspection are

further necessary to determine whether violations can be abated, or whether extant

that some persons occupying the Property without permission have “weapons.” 7/26/23 Hearing

Ex. D-3 (admitted, N.T. at 132).

23

structural deficiencies require demolition of the Building. As discussed supra,

without the benefit of a sufficient inspection of the Property and Building, the Trial

Court could not have directly ordered demolition of the Property, and we observe

that, in fact, the Trial Court Order did not directly order the demolition—it merely

authorized the City to demolish. However, by permitting the inspection and

demolition of the Property (which must be based on the sufficiency of the inspection)

in the same order, the Trial Court left the determination of the sufficiency of the

inspection, and thus ultimately the demolition, to the discretion of the City, without

additional Trial Court scrutiny. See King, 552 A.2d at 744 (requiring application of

strict scrutiny to requests for demolition). Review of the sufficiency of evidence

upon which a demolition is based is the function of the Trial Court, however, not the

City, and thus the contemporaneous grant of inspection without Trial Court review

of the sufficiency of the inspection results prior to demolition was error.18

The need for further scrutiny is also reflected in the treatment of

demolition as a permanent remedy, which should be granted only after the necessary

evidence on the merits is presented, and not on a preliminary basis. See supra at 14;

see also Uyseng Ngo v. City of Phila. (Pa. Cmwlth., No. 2133 C.D. 2007, filed Sept.

11, 2008) (vacating demolition order after trial court improperly converted hearing

on preliminary injunction into issuance of permanent injunction authorizing

Department to demolish building). All relief the Trial Court granted short of

demolition—the right to enter, secure, and clear the Property, and to inspect for

structural damage—was appropriate on a preliminary basis to allow the City to

18

We recognize that the City, not the Trial Court, originally devised this inconsistent relief.

See Complaint, Wherefore Clause (requesting “an order authorizing the Department to conduct an

interior inspection to determine if there are additional violations” and also “an order permitting the

City to abate the violations in Notice(s) of Violation by demolition”). But it was incumbent upon

the Trial Court to apply the required scrutiny.

24

obtain the necessary evidence and to protect the status quo, in light of the reasonable

grounds therefor in the record. Under our highly deferential standard of review for

preliminary injunctive relief, the Court will affirm those portions of the Trial Court

Order. But by ordering demolition, a permanent remedy, without the scrutiny

required by King, the Trial Court erred.

III. Conclusion

For the foregoing reasons, the Court concludes that the Trial Court did

not err or abuse its discretion in ordering the preliminary relief of entering,

inspecting, and vacating the occupants of the Property. However, the Trial Court

erred to the extent the Trial Court Order simultaneously allowed demolition as a

remedy to abate violations based on the existing record then before it in this matter.

Accordingly, the Court affirms in part and vacates in part the Trial Court Order, and

remands for further proceedings on an expedited basis.19

Christine Fizzano Cannon, Judge

19

The Court notes that nothing in our decision precludes the City from pursuing further

remedies, including demolition, based on newly acquired evidence or evidence newly presented

to the Trial Court on remand.

25

IN THE COMMONWEALTH COURT OF PENNSYLVANIA

City of Philadelphia :

:

v. : No. 823 C.D. 2023

:

A Kensington Joint, LLC and :

Adam Ehrlich, :

Appellants :

ORDER

AND NOW, August 9, 2023, the July 26, 2023 Order (Trial Court

Order) of the Court of Common Pleas of Philadelphia County (Trial Court), is hereby

AFFIRMED IN PART and VACATED IN PART, and this matter is REMANDED,

as follows:

1. Paragraphs 19 and 20, and 23 through 25, of the Trial

Court Order are AFFIRMED.

2. Paragraph 21 of the Trial Court Order is VACATED

only to the extent it is inconsistent with Paragraph 4 of

this Order.

3. Paragraph 22 of the Trial Court Order is VACATED to

the extent that it authorizes the City of Philadelphia

(City) to demolish the Building (as defined in the

accompanying opinion).

4. The matter is REMANDED to the Trial Court for

further proceedings on an expedited basis, as follows:

a. Until final disposition of the City’s complaint on

remand or until otherwise ordered by the Trial

Court, the City shall take all actions necessary to

prevent entry onto the property at 2837

Kensington Avenue in the City of Philadelphia

(Property) by any persons except 1) counsel of

record in this matter, Appellants, City personnel,

and their agents, who shall be authorized to enter

the Property solely for the purpose of obtaining

any evidence necessary to pursue further relief

before the Trial Court in this matter on remand,

and 2) law enforcement and emergency services

personnel. The parties shall direct any motions

regarding access to the Property to the Trial

Court, which shall consider such motions on an

expedited, emergency basis.

b. City personnel shall enter the Property and

conduct an internal inspection of the Building.

c. The City may bill Appellants for any costs

incurred for compliance with this Order.

d. The parties may file motions requesting further

relief of the Trial Court, including a hearing on

permanent injunctive relief, which hearing the

Trial Court shall conduct no later than two (2)

business days following praecipe for such

hearing, and shall issue its decision within two

(2) business days after the conclusion of such

hearing.

Jurisdiction relinquished.

Christine Fizzano Cannon, Judge

This is a copy of a public record, reproduced as it was published. It is not legal advice, and it may not be the version a court would rely on. Check the official source before you cite it.