Opinion

Integrated Finance & Accounting Solutions, LLC v. United States

Court
United States Court of Federal Claims
Filed
Aug 16, 2022
Status
Published
On the bench
Edward H. Meyers
Cited by
0 cases
Authority
More cited than 1.2%

“In the cases where the court has considered allegations of [governmental] bad faith, the 24 necessary ‘irrefragable proof’ has been equated with evidence of some specific intent to injure the plaintiff.”

How later courts described this case

  • “In the cases where the court has considered allegations of [governmental] bad faith, the 24 necessary ‘irrefragable proof’ has been equated with evidence of some specific intent to injure the plaintiff.”
  • finding no fault for the agency’s failure to engage in exchanges with an offeror in a FAR Subpart 8.4 procurement
  • rejecting argument that agency was compelled to provide plaintiff an opportunity to respond to its past performance evaluations because the procurement was conducted under FAR Part 8
  • “[P]ast performance evaluation ‘will not be disturbed unless it is unreasonable or inconsistent with the terms of the solicitation or applicable statutes or regulations.’”

Written by the judges who cited it.

The opinion

In the Cited States Court of Federal Claims

No. 22-581

Filed: August 5, 2022

Re-issued: August 16, 2022!

INTEGRATED FINANCE & ACCOUNTING

SOLUTIONS, LLC

Plaintiff,

V.

THE UNITED STATES,

Defendant,

and

ENGENIUS CONSULTING GROUP, INC.,

Defendant-Intervenor.

Nem Nee Neer eee nee nee Ne nee ene eee nee eee ne nee ee nee ee”

Thomas A. Coulter, Norton Rose Fulbright, US LLP, Washington, DC, for Plaintiff.

Evan Wisser, Department of Justice, Civil Division, Commercial Litigation Branch, Washington,

DC, with Douglas K. Mickle, Patricia M. McCarthy, and Brian M. Boynton, Department of

Justice, Washington, DC, and Susan M. Chagrin, Defense Information Systems Agency, Office

of the General Counsel, Fort Meade, Maryland.

John D. Levin, Maynard Cooper & Gale, P.C., Huntsville, Alabama, for Defendant-Intervenor

with W. Brad English and Emily J. Chancey, of counsel.

OPINION AND ORDER

MEYERS, Judge.

Integrated Finance & Accounting Solutions, LLC protests the award of a contract to

enGenius Consulting Group, Inc. to provide various finance and budgeting support services to

' The Court initially filed this opinion under seal to allow the Parties to propose redactions. The

Court has incorporated the proposed redactions and makes them with bracketed ellipses (“[

... |’) below.

the Department of Defense’s Office of the Chief Financial Officer. Integrated Finance had been

the incumbent on two contracts that DoD combined in the challenged procurement and

complains that DoD’s conduct of this procurement effectively eliminated its incumbent

advantage in its technical and past performance evaluations, which led to a faulty best value

determination and contract award. Because the Court finds that DoD did not do anything

arbitrary and capricious in its evaluations or in making its award decision, the Plaintiff's motion

for judgment on the administrative record is denied and the Government’s and Intervenor’s

cross-motions for judgment on the administrative record are granted.

I. Background

A. Solicitation

The Defense Information Systems Agency (“DISA” or “Agency”) issued Request for

Quotations No. 612100003 (“RFQ”) seeking quotations to support the Office of the Chief

Financial Officer (““OCFO”) at the Agency in “Budget/Cost/Financial Analysis, Financial

Management and Technical Support Services.” ECF No. 25-1 at AR105.” DISA amended the

RFQ four times. ECF No. 31 at AR279; ECF No. 25-3 at 941.7 The RFQ sought to “merge all

of the OCFO’s budget/cost/financial analysis, financial management, and technical support

requirements . . . into one contract.” ECF No. 25-1 at AR15, 125. Previously, this work was

spread out across several different centers across the Agency. /d. at AR125. But after a

reorganization of DISA, it decided to group all this work together under a single contract vehicle.

ECF No. 25-3 at AR939. The RFQ was set aside for small business under a General Services

Administration (GSA) Multiple Award Schedule and conducted utilizing the ordering procedures

for Federal Supply Schedules (“FSS”) in FAR § 8.405.4 The RFQ provided for a one-year base

period and four one-year option periods, plus an option to extend by up to six months. ECF No.

31 at AR279.

The Agency listed the incumbent contractor as Integrated Finance and Accounting

Solutions, LLC (“IFAS”). /d. at AR279.

B. Agency’s Methods of Evaluating Proposals

* The Government inadvertently omitted certain documents from the administrative record,

which it subsequently filed. See ECF No. 30. Asa result, the record is split between ECF Nos.

25 and 31. The Court provides the ECF Number ahead of record cites to ease review.

3 The amendments only address specific changes to provisions but do not include redlines to the

entire RFQ. Therefore, the Court will cite to the most recent amendment that includes the

provision at issue. For example, Amendment 4 changed the past performance evaluation criteria,

so the Court cites to Amendment 4 for all arguments regarding those provisions. Other

provisions remained unchanged throughout, so the Court will refer to the initial RFQ for those

provisions because that is the most recent version of the relevant language.

* The Federal Acquisition Regulations (“FAR”) are codified in Title 48 of the Code of Federal

Regulations.

The RFQ provided for award to “the schedule contractor whose quotation is determined

to represent the overall best value to the Government using a best value tradeoff evaluation

process.” /d. at AR289. The RFQ stated DISA would evaluate proposals on three factors: (1)

Technical/Management Approach; (2) Past Performance; and (3) Price. Technical/management

approach was more important than past performance, and past performance combined with

technical/management approach was more important than price. /d.

1. Technical/Management

The technical/management factor had two subfactors: (a) technical; and (b) management.

The technical subfactor was more important than the management subfactor. /d. (“In Factor 1:

Technical/Management Approach, each Subfactor is listed in order of descending importance.”).

a) Technical

The technical subfactor evaluated the contractor’s approach to accomplishing three

subtasks under Section 6.2 of the Performance Work Statement (PWS): Subtasks 8, 9, and 10.

Id. at AR289-90. The technical subfactor also evaluated the contractor’s approach to identifying

risks, and how the contractor would solve, mitigate, or reduce those risks. /d. Subtask 8

concemed Financial Program Support:

The Government will evaluate the schedule contractor’s approach

to ensuring the monthly server, storage and mainframe rate-based

billing and bi-monthly mainframe rate-based billing is processed

95% of the time through the inventory asset management system and

mainframe inventory control system appropriately and IAW DoD

7000.14-R financial management business rules and policies. The

Government will consider whether the schedule contractor’s

approach will meet or exceed the requirements in Activity 1 and

Activity 2 of PWS 6.2.8.

Id.

Subtask 9 concerned the Business System Support:

The Government will evaluate the schedule contractor’s approach

to provide the technical knowledge and support necessary to

maintain and administer complex financial coding structures within

Defense Working Capital Funds (DWCF) business systems for

inventory management systems, mainframe inventory control

systems, proposal pricing systems (PPSs), and DWCF budgeting

systems. The Government will consider whether the schedule

contractor’s approach will meet or exceed the requirements in PWS

6.2.9 Activity 1.

Id. at AR289-90.

b) Management

The management subfactor required the quoters to demonstrate their approach to staffing

and training, and place of performance management. Jd. at AR290-91. DISA would evaluate

the staffing and training approach on: (1) whether the quoter’s approach provided fully trained

and qualified personnel; (2) the quoter’s plan to fill vacant positions and prevent lapses in key

personnel; and (3) whether the quoter’s approach provided a competent staff that could satisfy

the PWS. Jd. at AR290. The RFQ also required the quoters to include their approach to

managing geographically disparate places of performance, relationship between onsite workers

and corporate, and how it would manage subcontractors. Jd. at AR291. DISA would evaluate

the effectiveness of the proposed management approach, which considered the “ability to meet or

exceed the stated minimum solicitation requirement, and provide[] a sufficient level of oversight

....” Id. “Sufficient,” in this context, meant the quoter demonstrated the ability to meet the

needs of the Government in the PWS. Jd. at AR291.

DISA assigned each of the technical subfactors a color which corresponded to a specific

rating. Jd. at AR289. These ratings were:

Table 2: Color Scheme for the Combined Technical / Management and Risk Ratings

Color Rating Description

Quotation indicates an exceptional approach and understanding of the

Outstanding requirements and contains multiple strengths, and risk of unsuccessful

performance is low.

Quotation indicates a thorough approach and understanding of the

Good requirements and contains at least one strength, and risk of unsuccessful

performance is low to moderate.

Quotation meets requirements and indicates an adequate approach and

Acceptable understanding of the requirements, and risk of unsuccessful performance

is no worse than moderate.

. otation has not demonstrated an adequate approach and understandin

Marginal Quotatior nas t monsiral “q Ppr oes 8

of the requirements, and/or risk of unsuccessful performance is high.

Quotation does not meet requirements of the solicitation, and thus, contains

Unacceptable one or more deficiencies, and/or risk of unsuccessful performance is

unacceptable. Quotation is unawardable.

ECF No. 25-1 at AR186.

2. Past Performance

The RFQ allowed quoters to submit “no more than 3” past performance efforts for

consideration. To qualify, some portion of each must have been performed within the last three

years prior to the submission deadline, and any current effort must have at least six months of

performance completed. Jd. at AR291. DISA’s evaluation resulted in two ratings for each prior

effort. First, DISA rated the relevance of the effort. Then, DISA rated the performance quality

of each effort. Based on these two ratings, DISA gave each quoter an overall confidence rating.

a) Relevance of past performance.

DISA determined each past performance effort’s relevance according to the following

criteria:

Table 4: Past Performance Relevancy

Ratings

Rating Definition

Present/past performance effort involved essentially the same scope

VERY RELEVANT and magnitude of effort and complexities this solicitation requires.

RELEVANT Present/past performance effort involved similar scope and magnitude

of effort and complexities this solicitation requires.

SOMEWHAT RELEVANT Present/past performance effort involved some of the scope and

magnitude of effort and complexities this solicitation requires.

NOT RELEVANT Present/past performance effort involved little or none of the scope

and magnitude of effort and complexities this solicitation requires.

ECF No. 25-1 at AR187. Past performance efforts with a higher relevance rating “may be

afforded greater weight than those with lower relevance.” /d. at AR292 (emphasis added).

b)

Quality of past performance.

After determining the relevance of a schedule contractor’s past performance, DISA then

evaluated the quality of that past performance according to the criteria below:

Table 5. Past Performance Quality

Ratings

Quality Assessment Rating

Description

EXCEPTIONAL (E)

During the contract period, contractor performance meets or met

contractual requirements and exceeds or exceeded many to the

Government's benefit. The contractual performance of the element or

sub-element being assessed was accomplished with few minor

problems for which corrective actions taken by the contractor were

highly effective.

VERY GOOD (VG)

During the contract period, contractor performance meets or met

contractual requirements and exceeds or exceeded some to the

Government's benefit. The contractual performance of the element or

sub-element being assessed was accomplished with some minor

problems for which corrective actions taken by the contractor were

effective.

SATISFACTORY (S)

During the contract period, contractor performance meets or met

contractual requirements. The contractual performance of the element

or sub-clement being assessed contained some minor problems for

which corrective actions taken by the contractor appear or were

satisfactory.

MARGINAL (M)

During the contract period, contractor performance does not or did

not meet some contractual requirements. The contractual

performance of the element or sub-element being assessed reflects a

serious problem for which the contractor has not yet identified

corrective actions. The contractor's proposed actions appear only

marginally effective or were not fully implemented.

UNSATISFACTORY (U) During the contract period, contractor performance does not or did not

meet most contractual requirements and recovery in a timely manner is

not likely. The contractual performance of the element or sub-clement

contains serious problem(s) for which the contractor's corrective actions

appear or were ineffective.

NOT APPLICABLE (N) Unable to provide a rating. Contract did not include performance for this

aspect. Do not know.

ECF No. 25-1 at AR187.

c) Performance confidence assessment.

Based on the relevance and quality ratings, DISA made an overall “Performance

Confidence Assessment.” /d. at AR118. DISA performed this assessment according to the

following criteria:

TABLE 6: Performance Confidence

Assessments

Rating Description

Based on the Schedule Contractor's recent/relevant performance

SUBSTANTIAL CONFIDENCE record, the Government has a high expectation that the Schedule

Contractor will successfully perform the required effort.

Based on the Schedule Contractor’s recent/relevant performance record,

SATISFACTORY CONFIDENCE the Government has a reasonable expectation that the Schedule

Contractor will successfully perform the required effort.

No recent/relevant performance record is available or the Schedule

Contractor’s performance record is so sparse that no meaningful

confidence assessment rating can be reasonably assigned.

INEUTRAL CONFIDENCE

Based on the Schedule Contractor’s recent/relevant performance

record, the Government has a low expectation that the Schedule

LIMITED CONFIDENCE Contractor will successfully perform the required effort.

Based on the Schedule Contractor’s recent/relevant performance record,

NO CONFIDENCE the Government has no expectation that the Schedule Contractor will be

able to successfully perform the required effort.

Td. at AR188.

3. Price

DISA evaluated each quote’s price for reasonableness and completeness. ECF No. 31 at

AR293. DISA used FAR § 15.404’s cost and price analysis techniques to determine whether the

price was reasonable. ECF No. 25-1 at AR118. The completeness requirement ensured the quote

correctly calculating figures and presented prices in a clear and useful format. ECF No. 31 at

AR293.

C. Submission and Evaluation of Proposals

DISA received seven quotes in response to the RFQ. ECF No. 25-3 at AR941. Four of

these were ineligible; one because the price proposal was incomplete, and three because they

received a red/unacceptable rating in the technical subfactor. Jd. at AR942, 969. The Technical

Evaluation Board (“TEB”) rated the remaining quotes as follows:

Technical/Management Approach Past Peroumance Price Eval

. : Total Eval % Difference | Proposal

Offeror | Subfactor 1 Rating | Subfactor 2 Rating Confidence Price to IGCE Complete

enGenius Neutral $32,519,780.08 -4% Yes

EBI Yellow/Marginal Neutral $34,972,372.28 3% Yes

IFAS Satisfactory $36,138,287.36 7% Yes

Id. at AR969.

1. IFAS’s Evaluation

a) Technical/Management

The TEB found IFAS’s quote for both the technical and management subfactors

demonstrated an “adequate approach and understanding of the requirements” with the risk of

unsuccessful performance being no less than moderate. Jd. at AR9S51.

DISA assessed IFAS’s technical proposal as acceptable with zero strengths, one

weakness, zero significant weaknesses, zero deficiencies, and zero uncertainties. Jd. at AR951,

972. The weakness was due to IFAS’s approach to PWS Section 6.2.9.1.c Subtask 9, which did

not demonstrate how IFAS would ensure its business systems were administered in accordance

with DoD 7000.14-R Vol. 10 DWCF. Jd.

DISA also found IFAS’s management proposal to be acceptable with zero strengths, zero

weaknesses, zero significant weaknesses, zero deficiencies, and zero uncertainties. Jd. at AR952,

972.

b) Past performance

IFAS submitted three recent references for evaluation. Jd. at AR958. The Past

Performance Evaluation Board (“PPEB”) rated IFAS’s past performance as follows:

Confidence Reference Recency Relevance Quality

1 Yes Relevant Satisfactory

Satisfactory 2 Yes Relevant Very Good

3 Yes Relevant Very Good

Id. at AR954. The basis for these ratings is as follows.

(1) — Evaluation of IFAS’s first reference

The PPEB determined that the first reference corresponded to 85% of the work under

PWS Tasks 6.1 and 6.2. /d. at AR958. The PPEB also recognized that the annual value for the

first reference was $3,002,048.42, which was less than the range the PWS said would be more

relevant. ECF No. 31 at AR292; ECF No. 25-3 at AR959. The PPEB reviewed the Contractor

Performance Assessment Reporting System (““CPARS”) evaluation and rated the performance

quality as Satisfactory. ECF No. 25-3 at AR960.

(2) Evaluation of IFAS’s second reference

The PPEB determined that the second reference was “similar scope and magnitude” and

corresponded to 79% of the work that was required by PWS Task 6.2. /d. at AR959. The annual

value for the second reference was $2,787,752.35, which was also below the $4 million threshold

in the PWS. ECF No. 31 at AR292; ECF No. 25-3 at AR959. The PPEB also reviewed the

CPARS for this reference and determined that IFAS exceeded the PWS requirements in quality,

schedule, management, and regulatory compliance, to the benefit of the Government.” ECF No.

25-3 at AR960. This earned IFAS a “Very Good” quality rating for the second reference. /d. at

AR9S58.

(3) Evaluation of IFAS’s third reference

Finally, the PPEB determined that the third reference was “similar scope and magnitude”

of the PWS and corresponded to 79% of the work that was required by PWS Task 6.2. /d. at

AR959. The annual value for the third reference was $2,787,752.35, which was again below the

$4 million threshold in the PWS for a past performance to be more relevant. /d. at AR959-60.

IFAS earned a “Very Good” on the quality assessment because, like the second reference, IFAS

exceeded the PWS requirements in quality, schedule, management, and regulatory compliance to

the benefit of the Government. /d. at AR958, 960.

c) Price

IFAS’s evaluated price of $36,138,287.36 was 7% higher than the Independent

Government Cost Estimate (“IGCE”). /d. at AR968.

2. enGenius’s Evaluation

a) Technical/Management

The TEB found that enGenius’s quote for both the technical and management subfactors

demonstrated an “adequate approach and understanding of the requirements” with the risk of

unsuccessful performance being no less than moderate. /d. at AR952-53.

DISA rated enGenius’s technical proposal Acceptable with zero strengths, zero

weaknesses, zero significant weaknesses, zero deficiencies, and one uncertainty. /d. at AR952,

972. The uncertainty was due to enGenius “mistakenly including a diagram supporting Server

and Storage Billing through ITSM when discussing in its narrative Enterprise Service billing.”

Id. at AR952.

DISA rated enGenius’s management proposal as Acceptable with zero strengths, two

weaknesses, zero significant weaknesses, zero deficiencies, and zero uncertainties. Jd. at AR951,

972. The first weakness was for “not adequately describing the relationship between the

corporate administration and onsite administration.” Jd. at AR953. And the second weakness

was due to enGenius “not explicitly stating that it will use its Place of Performance Management

approach in the case of a contingency environment or while its employees are working from

home.” Jd.

b) Past performance

enGenius submitted three references, all of which had been performed within the past

three years as required by the RFQ. Jd. at AR962. The PPEB rated enGenius’s past performance

as follows:

Confidence Reference Recency Relevance Quality

1 Yes Somewhat Relevant | Very Good

Neutral 2 Yes Somewhat Relevant | Very Good

3 Yes Somewhat Relevant | Exceptional

Id. at AR954. The basis for these ratings is below.

(1) Evaluation of enGenius’s first reference

DISA found that enGenius’s first reference correlated to some work under PWS Tasks

6.1 and 6.2. Jd. at AR962. Although the PPEB concluded that enGenius provided “scare

information” as it relates to Task 6.1, the PPEB rated enGenius’s first reference Somewhat

Relevant because it involved “some of the scope and complexities this solicitation requires . . . .’

Id. As for enGenius’s quality of performance, the PPEB reviewed a CPARS which described

IFAS’s performance on the first reference as “exemplary” and how IFAS was able to provide an

overall benefit to the Government despite the impact of the COVID-19 pandemic. Jd. at AR963.

The CPARS review also stated enGenius was highly effective in communicating with the

government which resulted in “increased government efficiency and responsiveness to every

changing environment.” Jd. Finally, the review indicated that enGenius operated as a “seamless,

one-badge entity and does a very good job of managing its subcontractors and integrating the

workforce into a single, effective unit.” Jd. Thus, the PPEB assigned a Very Good rating for

enGenius’s performance quality of the first reference. Jd. at AR961.

>

(2) Evaluation of enGenius’s second reference

The PPEB recognized that the magnitude of enGenius’s second reference was less than

$4M-$6M per year. Jd. at AR962. Nevertheless, enGenius performed work in the General Fund

and Defense Working Capital Fund which correlated to some of the PWS tasks. Thus, DISA

assessed a Somewhat Relevant rating for the second reference. Jd. As for quality, the PPEB

determined that “‘although there are few comments made for each rating element in addition to

the rating chosen. Based on the above information with no other issues being identified, leads

the reviewed to accept this PPW’s overall rating of Excellent.” /d. at AR963. This resulted in

the PPEB rating enGenius’s second reference as Very Good.

(3) Evaluation of enGenius’s third reference

Finally, the PPEB assigned a Somewhat Relevant rating to enGenius’s third reference

despite enGenius providing “scarce information in requirements for PWS Task 6.2.” Jd. at

AR961-62. The PPEB justified this rating because “the requirements for this effort include both

Task 6.1 and Task 6.2 in meeting OCFO mission sets... .” /d. at AR963. The PPEB reviewed

a CPARS evaluation that lauded the performance of Koniag, a subcontractor enGenius proposed

to use in its quote, describing its performance as “Exceptional.” /d. at AR963-64. Koniag had

exceeded the contractual requirements to the Government’s benefit in the quality, schedule, and

management elements. /d. The PPEB, therefore, found the performance quality to be

Exceptional.

c) Price

Like IFAS, enGenius submitted a completed price quote that complied with the

solicitation. /d. at AR967. enGenius’s total evaluated price of $32,519,780.08 was 4% less than

the IGCE. /d. at AR967-68.

3. Comparison of IFAS and enGenius proposals and Contracting Officer’s

decision.

During its tradeoff analysis, DISA began by comparing enGenius to EBI, which

submitted the next higher priced acceptable quote. /d. at AR970. DISA found that EBI’s

technical subfactor proposal was better than enGenius’s, but that its management subfactor was

marginal and “had a high risk of unsuccessful performance.” /d. at AR971. In the end, DISA

concluded that EBI’s better technical subfactor proposal was not worth the extra management

risk and cost as compared to enGenius’s proposal and eliminated EBI from consideration.

DISA then turned to compare enGenius’s and IFAS’s proposals. In this tradeoff analysis,

DISA found that both IFAS and enGenius met the RFQ requirements, both provided adequate

approaches and understandings to those requirements, and the risk of unsuccessful contract

performance was no worse than moderate for both. /d. at AR973. Under the RFQ, however, the

Technical subfactor was more important than the Management subfactor. While neither

enGenius nor IFAS had any strengths in the combined Technical/Management approach, IFAS

did receive a weakness in the most important subfactor (Technical). According to DISA, “the

fact that enGenius had no flaws in its Subfactor 1 (Technical) approach is more important than

the fact that IFAS provided no flaws in its management approach.” /d.

DISA determined that past performance was a “distinguishing factor” between IFAS’s

and enGenius’s proposals. /d. To recap, IFAS received a Satisfactory confidence rating

meaning there was a “reasonable expectation that the Schedule Contractor will successfully

perform the required effort.” ECF No. 25-3 at AR973; ECF No. 25-1 at AR188. enGenius

received a Neutral confidence rating, meaning either there was “[n]o recent/relevant performance

record [was] available” or that the “Schedule Contractor’s performance record is so sparse that

10

no meaningful confidence assessment rating can be reasonably assigned.” ECF No. 25-1 at

AR188; ECF No. 25-3 at AR973. Despite the higher confidence rating, the contracting officer

concluded that “[t]he benefit realized by the Government in having a company with a higher

confidence rating is not worth a price premium of $3,618,507.28.” ECF No. 25-3 at AR973.

Further, the Agency noted that there were no other characteristics of IFAS’s proposal that

warranted paying the 11% price premium. /d. Thus, the Agency concluded that enGenius’s

quote was the best value to the Government. Jd.

D. Protest at GAO

Plaintiff filed a protest at GAO raising five arguments. First, that DISA “failed to

properly rate IFAS’s past performance.” ECF No. 25-5 at AR1320-25. Second, that DISA

evaluated IFAS’s quote improperly in its determinations of strengths and weaknesses while

failing to rigorously examine enGenius’s quote. /d. at AR1326-30. Third, that DISA failed to

adequately document its best-value tradeoff analysis and improperly employed a lowest-price

technically acceptable evaluation that overweighed price. /d. at AR1330-33. Fourth, that the

errors in DISA’s assessments of IFAS and enGenius’s proposals, and DISA’s failure to compare

the two quotes to each other, resulted in a flawed best-value determination. /d. at AR1333-34.

And fifth, that DISA improperly failed to conduct a price realism analysis given enGenius’s

quoted price and lack of relevant past performance. /d. at AR1334-35. GAO denied IFAS’s

protest. ECF No. 25-6 at 2455-64.

IL. Jurisdiction and Standard of Review

A. Jurisdiction

The Tucker Act provides this Court with jurisdiction over post-award challenges to

contract awards brought by an interested party. Vectrus Sys. Corp. v. United States, 154 Fed. Cl.

29, 40 (2021) (citing Sys. Application & Techs., Inc. v. United States, 691 F.3d 1374, 1380-81

(Fed. Cir. 2012)). To qualify as an “interested party” a protestor must be an actual or prospective

bidder who has a direct economic interest in the procurement. /d. (citations omitted). Actual or

prospective bidders have a direct economic interest in the procurement if they “suffered a

competitive injury or prejudice as a result of an alleged error in the procurement process.” /d.

(citations omitted). Competitive injury or prejudice can be shown by demonstrating that the

plaintiff “would have had a ‘substantial chance’ of winning the award ‘but for the alleged error

in the procurement process.’” /d. (citing Weeks Marine, Inc. v. United States, 575 F.3d 1352,

1359 (Fed. Cir. 2009)).

B. Standard of Review

This Court reviews post-award bid protests in accordance with the standards set forth in

the Administrative Procedures Act (“APA”), 5 U.S.C. § 706. See 28 U.S.C. § 1491(b)(4). It is

clear that “the Court should not substitute its judgment to assess the relative merits of competing

proposals in a Government procurement.” Crowley Tech. Memt., Inc. v. United States, 123 Fed.

Cl. 253, 260 (2015) (citations omitted). Rather, “the inquiry is whether the agency’s action was

arbitrary, capricious, an abuse of discretion, or otherwise not in accordance with law and, if so,

whether the error is prejudicial.” Glenn Def, Marine (Asia), PTE Lid. v. United States, 720 F.3d

11

901, 907 (Fed. Cir. 2013). Thus, “a bid award may be set aside if (1) the procurement official’s

decision lacked a rational basis or (2) the procurement procedure involved a violation of

regulation or procedure.” DynCorp Int'l, LLC v. United States, 10 F.4th 1300, 1308 (Fed. Cir.

2021) (citations and alterations omitted) (quoting WellPoint Mil. Care Corp. v. United States,

953 F.3d 1373, 1377 (Fed. Cir. 2020)).

This Court’s review in bid protests under the arbitrary and capricious standard is “highly

deferential.” DynCorp Int’l, 10 F.4th at 1315 (quoting Glenn Def., 720 F.3d at 907). Because of

this high deference, an “explicit explanation is not necessary .. . where the agency’s decisional

path is reasonably discernable.” Jd. (quoting Wheatland Tube Co. v. United States, 161 F.3d

1365, 1370 (Fed. Cir. 1998)). And the Court will “‘sustain an agency action evincing rational

reasoning and consideration of relevant factors.’” Jd. (quoting Advanced Data Concepts, Inc. v.

United States, 216 F.3d 1054, 1058 (Fed. Cir. 2000)). This being the standard, Plaintiff “‘bears a

heavy burden of showing that the award decision had no rational basis.’” Allied Tech. Grp., Inc.

v. United States, 649 F.3d 1320, 1326 (Fed. Cir. 2011) (quoting Centech Grp., Inc. v. United

States, 554 F.3d 1029, 1037 (Fed. Cir. 2009)). Plaintiff's burden increases when greater

discretion is afforded to the contracting officer. .g., Glenn Def, 720 F.3d at 907-08 (“‘[T]he

greater the discretion granted to a contracting officer, the more difficult it will be to prove the

decision was arbitrary and capricious.’”) (quoting Burroughs, Corp. v. United States, 223 Ct. Cl.

53, 64 (1980)).

Il. Discussion

A. IFAS’s challenges to DISA’s evaluation of its quote.

1. Past performance rating.

IFAS challenges DISA’s relevancy evaluation of its past performance, claiming that it

was error for the Agency to rate IFAS’s first two past performance projects,° which are

predecessor contracts to the RFQ, as “Relevant” rather than “Very Relevant.” ECF No. 28-1 at

14-18. According to the RFQ, “[s]imilar scope efforts should demonstrate as many of the task

area types included in the PWS (either individually or in combination thereof) as possible.” ECF

No. 31 at AR292 (emphasis added). IFAS contends that “the Agency failed to consider that ‘in

combination thereof,’ IFAS covered almost every single task area between its two contracts.”

ECF No. 28-1 at 15 (citing ECF No. 31 at AR292). These two contracts, according to IFAS,

account for 89.9% of the total work under the current solicitation. /d. at 14. And if they were

combined, IFAS says a higher relevancy rating would have been assigned which would have

increased their confidence rating in the second factor from “Satisfactory Confidence” to

“Substantial Confidence.” /d. at 14-15. The Government disagrees and contends that the “in

combination thereof” simply states that past performance efforts under a contract need not match

up one-to-one with PWS tasks. In other words, one element of prior work may relate to multiple

PWS tasks and vice versa (multiple prior work elements could relate to one PWS task). ECF No.

> Although IFAS submitted three past performance references, this protest challenges only

DISA’s evaluation of the first two—the predecessor contracts. References to “both” contracts

are to IFAS’s past performance references one and two.

12

35 at 4. And the Government insists that the sentence including “in combination thereof” “has

nothing to do with combining multiple past performance references.” /d.

An agency’s evaluation of an offeror’s past performance is “‘entitled to great

deference.’” /d. (quoting A/ Andalus Gen. Contracts Co. v. United States, 86 Fed. Cl. 252, 264

(2009)). There is good reason for such deference because “it is the agency that must bear the

burden of any difficulties resulting from a defective evaluation” nor will a court “substitute [its]

judgment for a reasonably based past performance rating.” DynCorp Int’l, 139 Fed. Cl. at 489-

90.

While the RFQ is not a model of clarity on this issue, the Government’s reading better

comports with the RFQ’s text than IFAS’s. The Court begins with the provision that IFAS relies

upon to argue that DISA could and should have combined its two prior contracts during the past

performance evaluation. In its entirety, the provision states:

Similar scope contracts may include efforts in a variety of sizes, a

variety of disciplines, and varying degrees of technical complexity.

Similar scope efforts should demonstrate as many of the task area

types included in the PWS (either individually or in combination

thereof) as possible.

ECF No. 31 at AR292. While the parties focus their arguments on the second sentence, the

Court cannot interpret it without reference to the first sentence. This is because the first sentence

provides a key piece of information about “efforts”—they are “include[d]” within “contracts.”°

This makes interpreting the second sentence rather easy. It does not say that “contracts” should

demonstrate PWS tasks either individually or in combination, it says that “efforts” should do so.

Thus, when it talks about combining “efforts” to demonstrate as many PWS tasks as possible, the

RFQ is not stating that DISA would consider multiple contracts together. Rather, the RFQ says

DISA will combine various work efforts (what the Government terms “elements” in its briefing)

within a contract, if necessary, to demonstrate relevance to specific PWS tasks.

This reading is bolstered by the RFQ’s provisions regarding the added relevance of

certain contracts: “Contracts/Orders that provided multiple types of similar scope support for

durations of multiple years will be more relevant.” ECF No. 31 at AR292. Among the contracts

that may receive increased relevance were:

Contracts/orders with a total value inclusive of the base period and

all options in excess of $20M or with an average annual value (per

12 month period of performance) of $4M-$6M. Either: (1) a single

contract/order or (2) multiple orders on the same IDIQ or BPA may

° There are other provisions that use the term “effort” in a manner that is arguably inconsistent

with the Court’s reading, e.g., the next provision that states that “efforts” include

“contracts/orders.” ECF No. 31 at AR292. To the extent this usage creates an ambiguity, it is

patent and IFAS cannot challenge it now. Blue & Gold Fleet, L.P. v. United States, 492 F.3d

1308, 1313 (Fed. Cir. 2007).

13

be combined to reach the total $20M contract value or annual $4M-

$6M value.

Id. By its plain terms, the RFQ provided that the only time DISA would combine contracts for

added relevance was when they were multiple orders on the same IDIQ or BPA contract.

With this understanding of the RFQ, IFAS’s arguments fail. IFAS argues that DISA

should have combined its predecessor contracts for review, which would have found them more

relevant. ECF No. 28-1 at 15-17. But it is undisputed that neither of IFAS’s predecessor

contracts meet the $20M total or $4M-$6M annual value thresholds. That meant the RFQ

prohibited combination of the contracts for relevance purposes. Because this limitation was clear

on the face of the RFQ, IFAS cannot challenge it now. Blue & Gold Fleet, L.P. v. United States,

492 F.3d 1308, 1313 (Fed. Cir. 2007).

This prohibition also readily distinguishes this case from Seattle Sec. Servs., Inc. v.

United States, 45 Fed. Cl. 560 (2000), the primary case upon which IFAS rests its argument. In

Seattle Security, the plaintiff served as the incumbent contractor on two contracts to provide

security to federal buildings in Washington and Oregon, which were consolidated into the

contract at issue in that case. /d. at 562. There, Judge Allegra relied on the fact that nothing in

the RFP prevented the agency from combining the two predecessor contracts for review. /d. at

568. This RFQ does prohibit such combination. Also, the contracting officer in Seattle Security

did not evaluate one of the predecessor contracts at all, which prejudiced the plaintiff under the

evaluation regime in that case. /d. at 567-68. Here, DISA evaluated both of IFAS’s contracts.

ECF No. 25-3 at AR958-59. For these reasons, Seattle Security does not help IFAS.

IFAS insists that its performance of 89.9% of the PWS tasks across the two predecessor

contracts required DISA to rate them both as Very Relevant rather than Relevant. ECF No. 28-1

at 15-16. Even if the RFQ did not prohibit combination of contracts in this way, it is not at all

clear that IFAS is right that DISA must have rated the contracts Very Relevant. DISA found that

IFAS’s two prior contracts showed work corresponding to 85% and 79%, respectively, of the

PWS tasks. ECF No. 25-3 at AR958-59. Recall that the definition of “Very Relevant” is that the

“[p]resent/past performance effort involved essentially the same scope and magnitude of effort

and complexities this solicitation requires.” ECF No. 25-1 at AR187 (emphasis added). Recall

too that the RFQ defined “Relevant” as “[p]resent/past performance effort involved similar scope

and magnitude of effort and complexities this solicitation requires.” /d. (emphasis added). For

IFAS to prevail, the Court would have to determine that the line between “essentially the same”

and “similar” necessarily lies somewhere between 85% and 89.9% because IFAS does not

contend that the contract corresponding to 85% of the work should have been Very Relevant

standing alone. But there is nothing in the RFQ that makes any such line clear. It could

certainly be rational for DISA to consider “essentially the same” to mean something more than

an 89.9% correlation of tasks (assuming IFAS’s 89.9% is correct).

Finally, IFAS contends that the RFQ required DISA to find the predecessor contracts

more relevant because they are contracts to provide budgeting and cost estimating support to the

Government. ECF No. 34 at 6. The RFQ provides that “Contracts/orders providing budgeting or

cost estimating support to DoD or non-DoD entities, including other Federal Agencies” will be

more relevant. ECF No 31 at AR292. But the RFQ does not specify how the added relevance

14

will be credited, leaving it to agency discretion. Cf SP Sys., Inc. v. United States, 86 Fed. Cl. 1,

23 (2009) (“[P]ast performance evaluation ‘will not be disturbed unless it is unreasonable or

inconsistent with the terms of the solicitation or applicable statutes or regulations.’”) (quoting

Consol. Eng’g Servs., Inc. v. United States, 64 Fed. Cl. 617, 637 (2005)). Here, DISA

recognized that each contract was a predecessor contract, ECF No. 25-3 at AR679, AR683, and

corresponded to many of the budgeting and cost estimating PWS tasks, ECF No. 25-3 at AR958-

59. Having recognized the commonality of work, DISA complied with the RFQ and provided

the weight it found appropriate. DISA’s evaluation was within the broad agency discretion in

performing the past performance evaluation and won’t be disturbed.

Given that DISA complied with the RFQ’s terms, its evaluation was not arbitrary or

capricious. See Distrib. Sols., Inc. v. United States, 106 Fed. Cl. 1, 20 (2012), aff'd, 500 F.

App’x 955 (Fed. Cir. 2013) (citing Bannum, Inc. v. United States, 91 Fed. Cl. 2013).160, 173

(2009) (“An agency does not act unreasonably when it sets forth specific past performance

evaluation criteria and then applies those criteria.”)). The Government further argues that even if

DISA increased the relevancy rating of IFAS’s predecessor contracts in this case, it could not

change the confidence rating and, therefore, the relevancy ratings could not prejudice IFAS.

ECF No. 33 at 20-21. Because the Court finds no error in the past performance evaluation, it

need not reach the question of prejudice for this evaluation.

2. Technical rating.

a) Weakness

IFAS next challenges DISA’s finding of a weakness in its technical rating for failing to

explain how it would ensure compliance with DoD 7000.14-R Vol. 10 DWCF policies and

procedures regarding Subtask 9. The RFQ defines a “weakness” as “[a] flaw in the quotation

that increases the risk of unsuccessful contract performance.” ECF No. 25-1 at AR186. The

RFQ required offerors to “demonstrate an approach to fully meet or exceed” Subtasks 8, 9, and

10. ECF No. 31 at AR266. Subtask 8 involved financial program support and required the

offerors to ensure business systems were administered in accordance with DoD 7000.14-R Vol.

10 DWCF policies and procedures. ECF No. 25-1 at AR22. Accordingly, the RFQ required the

offerors to demonstrate how they would comply with this task. /d. Similarly, Subtask 9

involved providing technical knowledge and support to maintain and administer complex coding

within business systems and required the offerors to have a “working knowledge” of DoD

7000.14-R Vol. 10 DWCF policies and procedures. /d. at AR23-24.

DISA assessed IFAS a weakness because it “d[id] not demonstrate how it will ensure

business systems are administered IAW DoD 7000.14.” ECF No. 28-1 at 19. IFAS disagrees.

IFAS claims that it did provide “numerous statements indicating its efforts to ensure business

systems remain compliant with that DOD requirement.” /d. It is not disputed that IFAS

demonstrated how it would ensure compliance with these regulations when performing Subtask

8, which DISA recognized in its evaluation of Subtask 8. But the weakness relates to IFAS’s

approach to Subtask 9 rather than Subtask 8. And a review of IFAS’s quote reveals that it

omitted any reference to DoD 7000.14-R Vol. 10 DWCE policies and procedures in its approach

to Subtask 9. ECF No. 25-5 at AR1489.

15

IFAS all but acknowledges this failure, arguing that the distinction between Subtasks 8

and 9 “elevates form over substance — IFAS clearly demonstrated that it was fully aware of the

regulation and how to meet it and noted that in its proposal several times, but the fact that it did

not simply refer to the same awareness in a different section of its proposal does not justify a

weakness.” ECF No. 34 at 9. But this argument simply asks the Agency to infer that IFAS’s

plan to ensure compliance with DoD 7000.14 in Subtask 8 also applies to Subtask 9. Or DISA

could simply assume that, because IFAS knew these policies and procedures as the incumbent

contractor, DISA could overlook IFAS’s not mentioning them regarding Subtask 9. This is

something an agency cannot do. It is axiomatic that “[o]fferors carry the burden of presenting

‘an adequately written proposal, and an offeror’s mere disagreement with the agency’s judgment

concerming the adequacy of the proposal is not sufficient to establish that the agency acted

unreasonably.’” Software Eng’g Servs., Corp. v. United States, 85 Fed. Cl. 547, 554 (2009)

(quoting United Enter. & Assocs. v. United States, 70 Fed. Cl. 1, 26 (2006)). And the agency

“could not have acted arbitrarily or capriciously by judging IFAS on the actual text of its

proposal.” ECF No. 33 at 16 (citing Asset Prot. & Sec. Servs., L.P. v. United States, 5 F.4th

1361, 1366 (Fed. Cir. 2021)).

Finally, IFAS argues that the omission of how it would approach Subtask 9 (and its

compliance with DoD 7000.14) could have easily been cured by the Agency through discussions.

ECF No. 28-1 at 21. Itis beyond dispute that DISA could have engaged in discussions with

IFAS. Indeed, DISA reserved “the right to conduct exchanges or seek clarifications if the

Contracting Officer (KO) determines they are necessary.” ECF No. 31 at AR294. That is not

the question. The question is whether it was arbitrary and capricious for DISA not to seek

clarification from, or hold discussions with, IFAS. It was not.

First, it is true that DISA reserved the right to have exchanges if the contracting officer

found them necessary. ECF No. 31 at AR294. But the RFQ could not have been clearer: “The

Government intends to evaluate quotations and award a contract without exchanges with

schedule contractors.” Id. at AR271 (emphasis added). When the RFQ states that the agency

intends to award a contract without exchanges, a protestor cannot complain about a lack of

exchanges. See Software Eng’g Servs., 85 Fed. Cl. at 555 (“‘[I]t is well established that all

offerors, including incumbents, are expected to demonstrate their capabilities in their

proposals.””) (quoting /nt’/ Res. Recovery, Inc. v. United States, 60 Fed. Cl. 1, 6 (2004)).

Second, IFAS claims that DISA was already aware that IFAS was ensuring compliance

with DoD 7000.14 given its role as the incumbent. According to IFAS, the failure to seek

clarification of IFAS’s quote when DISA was aware IFAS was performing these tasks on the

predecessor contracts, was arbitrary and capricious. ECF No. 28-1 at 21. To the extent IFAS

seeks to apply something akin to the too close at hand doctrine to its technical evaluation, the

Court declines to do so. Under the too close at hand doctrine, there is certain information about

past performance that if the agency is aware of, it cannot ignore. Seattle Sec. Servs., 45 Fed. Cl.

at 568. IFAS did not cite any case in which this Court or the GAO has applied the too close at

hand doctrine to a technical evaluation, and the Court has not found one. The Court declines to

expand the doctrine here to technical evaluations.

Third, this argument rests on IFAS’s contention that DISA conducted this procurement as

a negotiated procurement under FAR Part 15. /d. And “where the record establishes that the

16

agency treated the quoters’ responses as if it was conducting a negotiated procurement, the Court

will analyze the protester’s arguments under the standards applicable to negotiated

procurements.” /d. at 21 n.4 (citing Centerra Grp., LLC v. United States, 138 Fed. Cl. 407, 415

(2018)). But DISA did not conduct this procurement under FAR Part 15; DISA conducted this

procurement under FAR Subpart 8.4. ECF No. 31 at AR279. The RFQ explicitly stated that this

procurement was to be conducted pursuant to FAR Subpart 8.4 provisions, which do not require

exchanges with quoters. /d. The terms of the procurement, and the provisions of FAR Subpart

8.4, preclude any claim for the Agency’s failure to engage in discussions or conduct exchanges.

IBM Corp. v. United States, 119 Fed. Cl. 145, 158-59 (2014) (finding no fault for the agency’s

failure to engage in exchanges with an offeror in a FAR Subpart 8.4 procurement); Distrib. Sols.,

Inc., 106 Fed. Cl. at 15 (rejecting argument that agency was compelled to provide plaintiff an

opportunity to respond to its past performance evaluations because the procurement was

conducted under FAR Part 8).

The one case IFAS cites in support of this argument, Cenferra Group, is inapplicable.

There, the agency chose to conduct exchanges with only one of the offerors, the awardee, and

allowed it (and only it) to amend its proposal to avoid the problems raised in the protest.

Centerra Grp., 138 Fed. Cl. at 415. The Court concluded that in those circumstances “looking to

FAR Part 15 when reviewing the fairness of discussions held in FAR Subpart 8.4 procurements .

.. at least for the relevant definitions of clarifications and discussions, is the only sensible

approach.” Jd. There is no such unfairness here.

And Centerra only imputed the fairness principles of FAR Part 15, it did not import Part

15 requirements into a FAR Subpart 8.4 procurement. /d. The Court was clear that it “refus[ed]

to shoehorn FAR Subpart 8.4 procurements into the procedures outlined in FAR Part 15.” Jd.

Thus, Centerra does not undermine the general rule in this Court that a “procurement{ ]

conducted under [FAR] Subpart 8.4 [is] different from those conducted under [FAR] Part 15,

even if ‘some procedures also present in Part 15 are utilized.”” A/lied Tech. Grp., Inc. v. United

States, 94 Fed. Cl. 16, 44 (2010), aff'd, 649 F.3d 1320 (Fed. Cir. 2011) (quoting Sys. Plus, Inc. v.

United States, 68 Fed. Cl. 206, 211 (2005)). Because nothing here approaches the unfairness in

Centerra Group, this Court also refuses to apply FAR Part 15 requirements in this FAR Part 8

procurement. /.g., JBM Corp., 119 Fed. Cl. at 158; Matt Martin Real Est. Mgmt., LLC v. United

States, 96 Fed. Cl. 106, 116-17 (2010).

In the end, IFAS has only itself to blame for not including all the relevant information in

its quote to the Agency.

b) Strengths

IFAS contends that DISA failed to assign any strengths to its technical proposal, which

depressed its Technical/Management rating to Green/Acceptable. ECF No. 28-1 at 22-23; ECF

No. 25-3 at AR950. IFAS argues that its proposal had multiple strengths and a proper evaluation

would have resulted in a higher Technical/Management rating. ECF No. 28-1 at 22. The

Government rejects this argument as nothing more than a disagreement with the Agency’s

evaluation, which falls short of establishing that the evaluation was arbitrary or capricious. ECF

No. 33 at 17.

17

The RFQ defines a “Strength” as “[a]n aspect of an [sic] quotation that has merit or

exceeds specified performance or capability requirements in a way that will be advantageous to

the Government during Contract performance.” ECF No. 25-1 at AR186. Before the GAO,

IFAS provided a chart with examples that purportedly demonstrated that its quote had “many

strengths.” ECF No. 28-1 at 22-23 (citing ECF No. 25-5 at AR1328-29). Yet these examples

merely show how IFAS is performing the tasks in the predecessor contracts. What is missing is

an explanation of how these aspects of IFAS’s proposal “exceed[] specified performance or

capability requirements,” nor does IFAS explain how such performance 1s “advantageous to the

Government.” ECF No. 25-1 at AR186; ECF No. 25-5 at AR1328-29.

The first strength IFAS claims it should have received relates to the RFQ’s requirement

that quoters “provide billing support for server, storage, mainframe, and enterprise service

offerings supporting DISA’s DWCF.” ECF No. 28-1 at 22 (quoting ECF No. 25-5 at AR1374).

IFAS argues it should have gotten a strength because its proposal stated that it “‘managed the

support and billing for approximately 884 servers, accounting for 1M gigabytes of data per

month for the U.S. Department of Transportation’s OCIO/WCF,’ a clear strength that exceeds

specified performance or capability requirements regarding [sic] and will be advantageous to the

Government during contract performance.” /d. But this is simply a recitation of IFAS’s

performance on one of the predecessor contracts, not how IFAS exceeds the RFQ’s

requirements.

The same is true of the other strength IFAS claims regarding the RFQ’s requirement to

“Tp]rovide financial support and analysis for the full cost recovery of the DWCF Revenue

Support Team.” /d. (alteration in original) (quoting ECF No. 25-5 at AR1376). [... ]. Jd.

(quoting ECF No. 25-5 at AR1329). Again, IFAS is relying solely on its performance of one of

the predecessor contracts to claim this strength.

But DISA may not award IFAS strengths due to its incumbent status because the RFQ

does not disclose any advantage related to incumbency. F.g., Sys. Studies & Simulation, Inc. v.

United States, 152 Fed. Cl. 74, 88 (2020), aff'd 22 F.4th 994 (Fed. Cir. 2021); United Concordia

Cos., Inc. v. United States, 99 Fed. Cl. 34, 45 (2011) (“We will not upset the agency’s rating

simply because plaintiff was the incumbent and believes its experience to be superior.”). It is

also unclear how IFAS’s performance of the predecessor contracts exceeds the requirements of

this procurement when IFAS itself argues (regarding its past performance ratings) that the

predecessor contracts combined equate to essentially the same scope as this contract.

B. IFAS’s challenges to enGenius’s ratings

1. Past performance

a) Relevance

IFAS challenges DISA’s evaluation of all enGenius’s past performance references as

Somewhat Relevant. ECF No. 28-1 at 23-24. According to IFAS, enGenius’s three prior

contracts “were not of the same nature or scope as the Solicitation—they focused on different

services such as IT training, certifications, customer service, messaging, presentations, data

management and delivery services.” /d. at 24. enGenius counters that the Agency “engaged in a

18

thorough review of ECG’s three past performance references” and provided approximately 20

pages of analysis reviewing each aspect of the references before determining them to be

Somewhat Relevant. ECF No. 32 at 6. Given the deference to the agency’s past performance

analysis in a FAR Subpart 8.4 procurement, enGenius contends IFAS falls short of proving any

basis for relief. DISA recognized which of enGenius’s prior experience efforts correlated to

PWS tasks and where its experience was not related. IFAS’s mere disagreement with DISA’s

evaluation is not a basis to find it arbitrary or capricious, particularly considering the “great

deference” agencies get in performing past performance evaluations. Vanguard Recovery

Assistance v. United States, 101 Fed. Cl. 765, 785 (2011).

DISA determined that enGenius provided “scarce information” for PWS Task 6.1 in the

first reference, but that enGenius “provided several requirements as related to PWS Task 6.2

Financial Analytical/Management Services and Budget Formulation/Execution.” ECF No. 25-3

at AR962. Striking a balance between the “scarce information” on Task 6.1 and performing

“several requirements” on Task 6.2, DISA determined that enGenius’s first past performance

reference “involve[d] some of the scope and complexities this solicitation requires” and rated it

“Somewhat Relevant.” /d. at AR961-62. As for the second reference, the Agency specifically

identified the tasks that enGenius performed and how these tasks correlated to the tasks in the

PWS. /d. at AR962. However, the Agency also noted that the cost of the second reference was

“less than the requirement as outlined within the RFQ” (1.e., was less than the $4-6 million range

in the RFQ). /d. at AR811, 962. Citing these findings, the Agency concluded that enGenius’s

performance on the second reference was “Somewhat Relevant” to the PWS because enGenius’s

performance “involved some of the scope of the effort and some complexities” the PWS

required. /d. at AR811.

IFAS offers little to challenge DISA’s evaluation other than its own disagreement with it.

IFAS argues that enGenius’s past performance efforts “[c]learly . .. were not of the same nature

or scope as the Solicitation — they focused on different services such as IT training, certifications,

customer service, messaging, presentations, data management and delivery services.” ECF No.

28-1 at 24. But DISA recognized this. /d. at AR962-63. IFAS also contends that when

enGenius’s past performance references are “reviewed critically, it is clear that these submittals

simply did not contain the financial program management and cost estimation tasks that were

critical to the Solicitation.” ECF No. 28-1 at 24. According to IFAS, such past performance

should have been rated as Not Relevant. /d. But this ignores that the RFQ defines Somewhat

Relevant as reflecting “some” of the scope—precisely what DISA found here. ECF No. 25-1 at

AR187. There is no basis for IFAS’s argument that past performance references must

correspond to what IFAS contends are “core” RFQ tasks.

IFAS also argues that enGenius’s third reference was improperly considered because it

was for work performed by a subcontractor, Koniag.’ Jd. at 28. Under the RFQ, a quoter could

only include subcontractor past performance if the subcontractor was to perform at least 20% of

the work on this contract. ECF No. 25-1 at AR111. As the Government and enGenius point out,

enGenius was permitted to provide a past performance reference for Koniag because it “provides

TTFAS raised this argument in its MJAR but made no further reference to it. Because it is

unclear whether IFAS meant to waive it, the Court addresses it.

19

20% or more of the support required.” ECF No. 33 at 21 (quoting ECF No. 25-1 at AR111);

ECF 32 at 8. Inits proposal, enGenius states that Koniag would be performing just over 30% of

the work over the base period and all option periods. ECF No. 25-2 at AR615. It was proper for

DISA to consider Koniag’s past performance reference.

b) Confidence rating.

IFAS argues that the Agency deviated from the RFQ criteria in its past performance

evaluation by rating enGenius and others with Neutral Confidence. ECF No. 28-1 at 25-28.

IFAS first argues that the Agency improperly “flattened out” the past performance rating and

converted the procurement into one for the lowest priced, technically acceptable (“LPTA”)

proposal. According to IFAS, this is clear because “all quoters with a rating other than ‘relevant’

received an overall past performance rating of “Neutral Confidence’; all quoters with a rating of

‘relevant’ received an overall rating of ‘Satisfactory Confidence.’” /d. at 25. And this

purportedly harmed IFAS because it neutered its “incumbent advantage” and “eliminat[ed] the

disparity in true past performance experience between IFAS and all other quoters.” /d. As

explained above, however, the RFQ gives no indication that it would grant extra past

performance credit for incumbency, meaning there was no “incumbent advantage” to begin with.

The RFQ provides that “Neutral Confidence” rating means “[n]o recent/relevant

performance record is available or the Schedule Contractor’s performance record is so sparse

that no meaningful confidence assessment rating can be reasonably assigned.” ECF No. 25-1 at

AR188. The RFQ also states:

Schedule contractors for whom information on past performance is

not available or so sparse that no confidence assessment rating can

be reasonably assigned will not be evaluated favorably or

unfavorably on past performance and as a result will receive a

“Neutral Confidence” rating for the Past Performance Factor.

ECF No. 31 at AR291. IFAS believes this language covers two situations, neither of which

apply: “(1) the contractor either does not provide any past performance references or the

references do not respond to PPQs, so the agency has no information, and (2) the contractor

simply has no available information to provide the 3 required past performance references.”

ECF No. 28-1 at 25-26.

DISA determined there was “scarce” information for one task in enGenius’s first

reference, ECF No. 25-3 at AR803, and for one task in its third reference, id. at AR816. And the

Agency specified which information was missing from both references. In fact, DISA

recognized that the first reference enGenius provided was within the magnitude range in the RFQ

($4-6 million) but because of the scarcity of information the Agency could only rate it

“Somewhat Relevant.” /d. at AR803-04. Given the significant deference to the Agency, the

Court does not find it arbitrary and capricious for DISA to have concluded that although there

was some relevant performance information, there was not enough to allow a “meaningful

confidence assessment rating” to be assigned to enGenius’s past performance references. ECF

No. 25-3 at AR964.

20

The same past performance criteria recently came before Judge Lettow in Gritter

Francona, Inc. v. United States, 158 Fed. Cl. 597 (2022), and his analysis is persuasive here. In

Gritter, the solicitation defined “Neutral Confidence” as “no recent/relevant performance record

[was] available or the offeror’s performance record [was] so sparse that no meaningful

confidence assessment rating c[ould] be reasonably assigned. The offeror may not be evaluated

favorably or unfavorably on the factor of past performance.” /d. at 602 (alterations in original).

Here, the RFQ includes the same definition. ECF No. 25-1 at AR188. In Grifter, like here, “[a]

neutral confidence rating contemplated a finding that an offeror had too ‘sparse’ of a history to

make a confidence determination whereas a limited confidence rating was to be given when there

was a ‘low expectation’ of successful performance.” Gritter Francona, 158 Fed. Cl. at 608.

Like IFAS, Gritter Francona argued that the awardee’s limited but somewhat relevant and

highly rated past performance must be rated lower than Neutral Confidence. /d. Judge Lettow

rejected this argument because it “would require placing double emphasis on relevancy and

experience while downgrading the importance of quality.” /d. at 608-09. Judge Lettow

ultimately concluded that “[i]t would misapply the text of the solicitation to require an offeror

with somewhat relevant and positive ratings to receive a lower confidence rating .. . while an

offeror with no relevant or recent efforts would receive a higher rating and remain in the

competition.” /d. at 609 (emphasis omitted). While it is true that the agency in Grifter

responded to a question that it would use neutral confidence as a sort of catch-all provision, that

was clearly not necessary to Judge Lettow’s analysis. And the GAO reached the same

conclusion in this case without reliance on any responses during the Q&A. ECF No. 25-6 at

AR2460. In fact, the GAO “ha[s] repeatedly concluded” that somewhat relevant and positive

past performance should receive no less than a neutral confidence rating to avoid penalizing

those with limited experience. /d. Therefore, it was not arbitrary or capricious for DISA to rate

enGenius or the other quoters with less than relevant, positive past performance ratings as having

Neutral Confidence.

2. Technical management rating

IFAS also argues that DISA deviated from the evaluation scheme by downplaying the

two weaknesses it found in enGenius’s management approach. ECF No 28-1 at 29. The first

weakness was for “not adequately describing the relationship between the corporate

administration and onsite administration.” ECF No. 31 at AR280; ECF No. 25-3 at AR953. The

second weakness was for “not explicitly stating that it will use its Place or Performance

Management approach in the case of a contingency environment or while its employees are

working from home.” ECF No. 31 at AR280; ECF No. 25-3 at AR953. DISA explained that

despite these weaknesses, enGenius’s quote “meets requirements and indicates an adequate

approach and understanding of the requirements, and risk of unsuccessful performance is no

worse than moderate.” ECF No. 31 at AR280; ECF No. 25-3 at AR953. IFAS claims these two

weaknesses should have prevented enGenius from receiving an “‘Acceptable’ management

rating pursuant to the RFQ.” ECF No. 28-1 at 30.

This court does not “second guess” an agency’s technical ratings that “involve

discretionary determinations of procurement officials.” E.W. Bliss Co. v. United States, 77 F.3d

445, 449 (Fed. Cir. 1996); see also Aero Corp., S.A. v. United States, 38 Fed. Cl. 739, 763 (1997)

(“Decisions as to the adequacy of the information presented in a proposal are . . . rightfully left to

21

the discretion of evaluators, especially where . . . the decisions are technical in nature.”). The

issue for the Court is whether DISA was arbitrary and capricious when it considered these

weaknesses in evaluating enGenius’s proposal.

The technical evaluation team assessed the weaknesses because enGenius’s proposal was

“unclear” on the two requirements, and it was “uncertain” how enGenius’s would meet them.

ECF No. 25-3 at AR927-28. While these uncertainties may “increase[] the risk of unsuccessful

contract performance,” id., the question for the Court is whether DISA rationally considered

them in making the award decision. The contracting officer clearly considered them, compared

them to another quoter’s similar weaknesses, and determined that enGenius’s “approach had a no

worse than moderate risk of unsuccessful performance... .” /d. at AR971. Given that these

weaknesses were the result of uncertainty rather than inadequacies, the Court cannot find DISA’s

consideration of them arbitrary and capricious.

C. Best Value Tradeoff Analysis

Following its challenges to its and enGenius’s evaluations, IFAS turns to the Agency’s

best value determination. ECF No. 28-1 at 31-32. IFAS contends that before the GAO the

Government offered only one paragraph to justify the best value tradeoff analysis, which IFAS

characterizes as “superficial and insufficient.”. /d. at 31. The Government responds that IFAS’s

argument relies on cases that address FAR Part 15 procurements, not a FAR Subpart 8.4

procurement like this one. ECF No. 33 at 23. And because the amount of documentation in a

FAR Subpart 8.4 procurement is less than that in a FAR Part 15 procurement, the Agency’s

justification is sufficient. /d. at 23-25. Moreover, the Government argues the paragraph

excerpted by IFAS was merely a “concluding summary” and a “rational reader” would have

understood the preceding 19 pages to be documenting the Agency’s best value tradeoff analysis.

Id. at 25-26. The Court considers the entirety of the tradeoff analysis in the price negotiation

memorandum regardless of what the Government argued to GAO, because the document speaks

for itself.

Here too, IFAS argues that DISA deviated from the RFQ’s best-value evaluation scheme

because DISA “clearly used an LPTA evaluation scheme for its tradeoff analysis between IFAS”

and enGenius. ECF No. 28-1 at 35. According to IFAS, the Agency “decided IFAS and the

awardee both met the technical requirements and then made the award decision based on the

lowest price.” /d. This argument is easily dispatched because, as explained above, DISA did not

conduct an LPTA evaluation.

IFAS also faults the Agency for not accounting for the “risk” in enGenius’s management

weaknesses, and for not analyzing any risk in moving from “a successful incumbent offeror [i.e.,

IFAS] to one without any ‘relevant’ past performance.’” /d. IFAS’s final argument alleges the

culmination of these failures renders the entire best-value tradeoff analysis invalid because “a

tradeoff analysis based on significantly flawed evaluation ratings is itself irrational.” /d. at 36

(citing BayFirst Sols., LLC v. United States, 102 Fed. Cl. 677, 695 (2012)). Again, the Court has

already considered and denied each of IFAS’s challenges to DISA’s technical and past

performance evaluations. Thus, there were no flawed evaluation ratings, much less

“significantly flawed evaluation ratings.”

22

And there is an insurmountable obstacle to IFAS’s arguments—much of IFAS’s

arguments rely on cases applying FAR Part 15. But this was a FAR Subpart 8.4 procurement,

not a FAR Part 15 procurement. And the requirements for a best value tradeoff under FAR

Subpart 8.4 are significantly less than those for FAR Part 15. Under FAR Subpart 8.4, “the high

standards for a proper tradeoff analysis under FAR Part 15 discussed by plaintiff... do not

apply.” Distrib. Sols., Inc., 106 Fed. Cl. at 24; see also 22nd Century Techs., Inc. v. United

States, No. 21-1137, 2021 WL 3856038, at *10 (Fed. Cl. July 21, 2021) (“Plaintiff fails to

appreciate that this procurement is a FAR Subpart 8.4, not FAR Part 15, procurement for which

the Agency is neither expected nor required to document every decision it makes in rigorous

detail.”); Matt Martin Real Est. Mgmt., 96 Fed. Cl. at 116 (‘The amount of documentation

necessary in FAR Subpart 8.4 procurements does not rise to the level required by FAR Part

15.”).

The Agency’s price negotiation memorandum explains in detail the

technical/management, past performance, and price factors for each of the quoters, including

IFAS and enGenius. ECF No. 25-3 at AR949-75. Contrary to IFAS’s repeated assertions, the

contracting officer provided more than one paragraph of tradeoff analysis. It does not matter to

the Court what representation IFAS insists the Government made to GAO that the analysis is

only one paragraph, the record here speaks for itself. Again, the record here shows clearly that

the contracting officer reviewed all the technical, price, and past performance evaluations before

turning to her best value analysis. Over five pages, the contracting officer eliminated certain

quoters due to ratings before comparing the three remaining quoters, enGenius, IFAS, and one

other, against each other. /d. at AR969-73. The contracting officer then spent another 1.5 pages

explaining her decision, and specifically that IFAS’s rating was not worth the added cost. /d. at

AR972-73. In the end, she concluded that IFAS’s higher rated proposal was “not worth an

additional $3,618,507.28 (11.1%) over the lifecycle of the program.” /d. at AR973.

DISA’s best value decision was reasonable and supported by the record, with the choice

to not pay IFAS’s price premium well within the contracting officer’s discretion. While the

Court does not opine on whether this analysis would survive a protest if this were a FAR Part 15

procurement, but it clearly survives under FAR Subpart 8.4. Therefore, the Court will not

disturb it.

D. Good faith and fair dealing

Finally, IFAS argues that DISA breached an implied covenant to fairly and honestly

consider its proposal. ECF No. 28-1 at 36-37. According to IFAS, DISA breached the implied

duty of good faith and fair dealing based on the same conduct that it alleged violated the RFQ.

See id. at 37. Although the Parties muddy the waters to a degree, the resolution of this argument

is straightforward.

Recently, the Federal Circuit held that this Court has jurisdiction to hear an implied

contract claim in a bid protest under 28 U.S.C. § 1491(b), and only § 1491(b). Safeguard Base

Operations, LLC vy. United States, 989 F.3d 1326, 1342 (Fed. Cir. 2021). The Circuit also made

clear that the arbitrary and capricious standard applies to these implied contract claims like IFAS

makes here. /d. Because the Court already determined that DISA’s evaluation and award

23

decisions were all rational, IFAS cannot prevail here for the same reasons it did not prevail

above—none of the alleged conduct was arbitrary and capricious.

Yet IFAS points to two post-Safeguard cases that it claims support the opposite view:

that a plaintiff may allege, independent of its other claims, a breach of the duty of good faith and

fair dealing. ECF No. 34 at 24. IFAS relies on Thalle Constr. Co., Inc. v. United States, 159

Fed. Cl. 698, 707 (2022), and claims the Court evaluated “whether an offeror was treated fairly

and impartially per FAR 1.102-2 — a basis for two of IFAS’s claims, including the breach of the

duty of good faith and fair dealing.” ECF No. 34 at 25. IFAS also relies on Blue Origin Fed’n,

LLC v. United States, 157 Fed. Cl. 74, 113 (2021), to argue that Safeguard Base Operations did

not foreclose an independent claim for breach of good faith and fair dealing. ECF No. 34 at 24.

Thalle concerned a claim of unequal treatment under FAR 1.102-2. See Thalle Constr.

Co., Ine. v. United States, 159 Fed. Cl. 698, 707 (2022) (“A claim of unequal treatment is

derived from the FAR requirement that ‘[a]ll contractors and prospective contractors shall be

treated fairly and impartially but need not be treated the same.’”). But the Court’s finding that

DISA adhered to the RFQ throughout its evaluation and award precludes such a claim here.

IFAS’s reliance on Blue Origin is similarly misplaced (as is the Government’s

disagreement with it). While IFAS relies on Blue Origin to argue that the implied duty claim

survives Safeguard Base Operations, the Government argues that Blue Origin is wrong in

finding such an implied duty survives Safeguard Base Operations. On its face, however, it

appears quite clear that Blue Origin’s holding does exactly what the Government asks the Court

to do here—reject the implied duty claim because the Court found nothing arbitrary and

capricious in any of the agency’s evaluations or award decision. Blue Origin, 157 Fed. Cl. at

113.

In Blue Origin, the court understood the Federal Circuit’s holding in Safeguard Base

Operations to mean that a breach of implied-in-fact contract, in the procurement context, falls

within the bid-protest jurisdiction of this court under 28 U.S.C. § 1491(b)(1). /d. And Blue

Origin also recognized that Safeguard requires this Court to review such implied claims under

the same APA review as other bid protest claims under § 1491(b)(1). /d. The Court rejected

Blue Origin’s claim, which like IFAS’s, alleged the same conduct underlying its prior counts

also amounted to a breach of the implied duty. According to Blue Origin, “the Court has found

no portion of [the agency’s] evaluation to have been arbitrary and capricious; the sum of Blue

Origin’s claims does not yield more than the sum of its parts.” /d. (emphasis in original); see

also SAGAM Securite Senegal v. United States, 154 Fed. Cl. 653, 662 n.3 (2021), appeal

docketed, No. 21-2279 (Fed. Cir. Sept. 21, 2021). The same applies here. Having found none of

DISA’s conduct arbitrary and capricious, its implied contract claim on those same issues must

fail.

The only thing that is new in IFAS’s implied contract claim is an assertion that DISA

acted with “a specific intent to injure IFAS.” ECF No. 28-1 at 37. To prevail on such a claim,

IFAS must come forward with clear and convincing evidence that DISA intended to cause IFAS

specific injury. Savantage Fin. Servs., Inc. v. United States, 595 F.3d 1282, 1288 (Fed. Cir.

2010) (quoting Galen Med. Assocs., Inc v. United States, 369 F.3d 1324, 1330 (Fed. Cir. 2004)

(“In the cases where the court has considered allegations of [governmental] bad faith, the

24

necessary ‘irrefragable proof’ has been equated with evidence of some specific intent to injure

the plaintiff.”)). IFAS has not alleged, much less come forward with clear and convincing

evidence, any conduct that could overcome the presumption of good faith by the Government.

IV. _Injunctive Relief

When determining whether to issue a permanent injunction, a court considers: (1)

whether the plaintiff has succeeded on the merits; (2) whether the plaintiff will suffer irreparable

harm if the court withholds injunctive relief: (3) whether the balance of hardships to the

respective parties favors granting relief, and (4) whether granting injunctive relief is in the public

interest. PGBA, LLC v. United States, 389 F.3d 1219, 1228 (Fed. Cir. 2004) (citing Amoco Prod.

Co. v. Vill. of Gambell, Alaska, 480 U.S. 531, 546 n.12 (1987)). As explained above, IFAS has

not succeeded on the merits. Because IFAS has not succeeded on the merits, a necessary factor

to receive permanent injunctive relief, the Court denies IFAS’s motion for a permanent

injunction. This is because “[a]bsent success on the merits, the other factors are irrelevant.”

Info. Tech. & Applications Corp. v. United States, 51 Fed. Cl. 340, 357 n.32 (2001), aff'd, 316

F.3d 1312 (Fed. Cir. 2003).

Vv. Motion to Strike

The Government included in its cross-MJAR a declaration from the contracting officer

regarding potential harms from injunctive relief. ECF No. 33 at 31; see also ECF No. 33-1.

IFAS moved to strike the declaration claiming it is “improper protest evidence” and arguing the

contents of the declaration were “speculative, improper, and prejudicial” to IFAS. ECF No. 34

at 28. Because the Court denies IFAS’s motion for injunctive relief without reference to the

declaration, the Court denies the motion to strike as moot.

VI. ‘Conclusion

For the reasons stated above, the Court hereby:

1. Denies IFAS’s motion for judgment on the administrative record, ECF No. 28;

2. Grants the United States’ cross-motion for judgment on the administrative record, ECF

No. 33;

3. Grants enGenius’s cross-motion for judgment on the administrative record, ECF No.

32;

4. Denies IFAS’s motion to strike the declaration of the contracting officer as moot, ECF

No. 34; and

5. Directs the Clerk’s Office to enter judgment in favor of the United States and enGenius

Consulting Group, Inc.

IT IS SO ORDERED.

25

26

s/ Edward H. Meyers

Edward H. Meyers

Judge