Opinion

Sierra Club v. Van Antwerp

  • 661 F.3d 1147
Court
Court of Appeals for the D.C. Circuit
Filed
Jan 30, 2012
Status
Published
Cited by
0 cases
Authority
More cited than 20.0%

The opinion

United States Court of Appeals

FOR THE DISTRICT OF COLUMBIA CIRCUIT

Argued September 22, 2011 Decided November 29, 2011

Amended January 30, 2012

No. 10–5284

SIERRA CLUB, ET AL.,

APPELLEES

v.

ROBERT L. VAN ANTWERP, LIEUTENANT GENERAL, U.S.

ARMY CORP OF ENGINEERS, ET AL.,

APPELLEES

SIERRA PROPERTIES I, LLC, ET AL.,

APPELLANTS

Consolidated with 10–5297, 10–5345

Appeals from the United States District Court

for the District of Columbia

(No. 1:07–cv–01756)

Lane N. McFadden, Attorney, U.S. Department of

Justice, argued the cause for federal appellants. With him on

the briefs was Lisa E. Jones, Attorney. Jessica O'Donnell,

2

Attorney, and R. Craig Lawrence, Assistant U.S. Attorney,

entered appearances.

Douglas M. Halsey, T. Neal McAliley, and Angela D.

Daker were on the briefs for appellants Sierra Properties I,

LLC, et al.

Eric R. Glitzenstein argued the cause for appellees Sierra

Club, et al. With him on the briefs was Howard M. Crystal.

Before: GARLAND and KAVANAUGH, Circuit Judges, and

WILLIAMS, Senior Circuit Judge.

Opinion for the Court filed by Senior Circuit Judge

WILLIAMS.

WILLIAMS, Senior Circuit Judge: In 2007 the U.S. Army

Corps of Engineers issued a permit authorizing the discharge

of dredge and fill material into specified wetlands outside

Tampa, Florida; it thereby enabled construction of a large

mall. A number of firms are involved on the permittee’s side

in these appeals, but we will simplify by referring to them all,

as well as the project, as “CCTC,” standing for “Cypress

Creek Town Center.” Three environmental groups

(collectively referred to as the “Sierra Club”) brought suit in

district court to challenge issuance of the permit. (The suit

names the heads of the Department of the Interior and the U.S.

Fish and Wildlife Service as well, but we treat the Corps as a

stand-in for all federal defendants.) Plaintiffs invoked three

statutes: the National Environmental Policy Act (“NEPA”),

the Clean Water Act (“CWA”), and the Endangered Species

Act (“ESA”). After some complications described below, the

district court issued a decision finding that the Corps had not

fully complied with its obligations under NEPA and the

CWA, but rejecting the plaintiffs’ ESA claim. It granted

summary judgment for the Sierra Club on the first two claims

3

and for the Corps on the third. Sierra Club v. Van Antwerp,

719 F.Supp.2d 58 (D.D.C. 2010).

CCTC and the Corps appealed, and the Sierra Club cross-

appealed. We affirm in part, reverse in part, and remand,

concluding that the Corps did satisfy the demands of the three

relevant statutes, except for failing to respond, in its treatment

of the NEPA and ESA requirements, to a material contention

as to the project’s impact on an endangered species, the

eastern indigo snake.

* * *

Because CCTC proposed to discharge dredge and fill

material into wetlands classified as “waters of the United

States,” it was required to secure a permit from the Corps

under § 404 of the CWA, 33 U.S.C. § 1311(a), 1362(7). The

Corps originally issued the permit in 2007, allowing CCTC to

discharge such material into about 54 acres of wetlands. In

exchange, the Corps required various conservation measures,

including the preservation, creation, or enhancement of

wetlands on about 13 acres of the project site and nearly 120

acres offsite. The Sierra Club filed suit in October 2007, but

soon thereafter the Corps observed two unauthorized

discharges of “sediments and turbid water” from the project

site into nearby Cypress Creek, and accordingly suspended the

permit. The district court granted the Corps’s request to

remand the case to it for a reevaluation of the permit. After

issuing a new public notice, the Corps determined that the

discharges were the product of “human error” rather than a

flaw with the project itself. It reinstated the permit in

September 2009, but required additional “corrective

measures.” The Sierra Club filed a revised complaint

challenging the new permit. The district court granted split

summary judgments as noted above.

4

As we review grants of summary judgment de novo, we

are on this appeal in reality reviewing the decision of the

Corps, not that of the district court. Natural Resources

Defense Council v. Daley, 209 F.3d 747, 752 (D.C. Cir.

2000). Our review is governed by the usual standards of 5

U.S.C. § 706(2)(A) and Motor Vehicle Mfrs. Ass’n v. State

Farm, 463 U.S. 29 (1983).

* * *

CWA. The governing regulations bar the Corps from

granting a CWA fill permit when “[t]here is a practicable

alternative to the proposed discharge that would have less

adverse effect on the aquatic ecosystem.” 40 C.F.R.

§ 230.12(a)(3)(i). They specify that “[a]n alternative is

practicable if it is available and capable of being done after

taking into consideration cost, existing technology, and

logistics in light of overall project purposes.” 40 C.F.R.

§ 230.10(a)(2). If (as here) a project’s purpose does not

require proximity to water, “practicable alternatives that do

not involve special aquatic sites [such as wetlands, see id.

§ 230.41] are presumed to be available.” Id. § 230.10(a)(3).

The Sierra Club contended (and contends here) that in fact

there were practicable alternatives—other sites, or alternative

ways of using the CCTC site—having less adverse effect.

The Corps rejected these claims. Resolution of the

practicability issue turns on four subissues: (1) use of the

site’s fair market value as its cost, rather than CCTC’s (lower)

out-of-pocket cost; (2) failure on the Corps’s part to update

the fair market value in its second look at the permit (which

took place after the onset of the global financial meltdown in

2008); (3) the Corps’s use of 8% as the minimum rate of

return necessary for an alternative to be considered

practicable; and (4) CCTC’s intention to provide more

5

parking per 1000 square feet of retail space than is provided

on average, locally and indeed nationally.

For any given minimum rate of return, assumption of a

lower cost for the site (see J.A. 613-36, 1660) will tend to

render “practicable” less intensive uses, i.e., uses inflicting

less ecological damage. This fact drives the Sierra Club’s

argument for acquisition cost, which in this case happened to

be lower than fair market value. But the Sierra Club’s

contention that the regulation required the Corps to use the

developer’s acquisition cost is ill-founded.

First, as a matter of simple language, opportunity cost

(the value the owner could realize by a current sale) is a well-

recognized form of cost. This is obviously true in economics,

and the practicability test, though certainly neither a cost-

benefit test nor an efficiency test, nonetheless encompasses

economic factors. And courts have recognized opportunity

cost as a variant of “cost.” Thus, the Supreme Court, in

upholding the Federal Communications Commission’s

decision to set certain rates “on a forward-looking basis

untied to [the providers’] investment,” cited opportunity cost

by way of analogy. Verizon v. FCC, 535 U.S. 467, 475, 499

n.17 (2002); see also Natural Gas Clearinghouse v. FERC,

108 F.3d 397, 400 (D.C. Cir. 1997). Second, the regulations’

evaluation of alternatives requires consideration of cost on

both sides of the comparison, and the cost of an alternative

project site would presumably be that site’s market value.

The comparison would be meaningful only if the Corps used

the same metric for all options. Third, 40 C.F.R.

§ 230.10(a)(2), in directing consideration of “cost,” can

sensibly (perhaps most sensibly, but we need not so decide)

mean the cost of proceeding with the project as planned; for

this, clearly, the relevant measure of the developer’s land cost

is what it foregoes by proceeding (rather than selling the land

and realizing its market value). See Corps’s Combined Reply

6

and Response Br. 6-7. Fourth, whereas use of opportunity

cost minimizes subjective, applicant-specific factors, reliance

on the developer’s acquisition cost would create the odd

possibility that an alternative practicable for one applicant

would be impracticable for another. Finally (and this is really

a variation of the fourth point), to use out-of-pocket cost

would create an anomaly: An applicant with a low acquisition

cost could resell the site at market value and thereby enable a

successor developer to refute practicability claims that had

been fatal for the seller. Accordingly, we have no difficulty

whatever deferring to the Corps’s reasonable choice to use the

land’s market value, rather than the developer’s acquisition

cost.

Peripheral to the acquisition-cost claim is the Sierra

Club’s attack on the Corps’s failure to update the land’s

market value when it reinstated the permit in 2009, after land

values had fallen sharply, especially in the so-called “sand”

states, including Florida. The Sierra Club notes that the Corps

did update some plans and data, mostly related to the

mitigation plan and stormwater management, and it thus

claims an arbitrary inconsistency on the Corps’s part. But the

Corps’s decision to update ecological but not economic data

appears reasonable in light of the Corps’s reasons for

reexamining the original permit. As its December 2008

public notice explained, it suspended that permit because of

unauthorized discharges of turbid water, and then undertook

to decide whether to reinstate, modify, or revoke the permit,

saying that its decision would “be based on an evaluation of

the reassurances given to the Corps about the likelihood of

future discharges of turbid water from the CCTC project site

into Cypress Creek and wetlands on the site.” J.A. 1546-47.

Though the Corps also stated that it would “evaluate any other

facts and issues as necessary,” J.A. 1546, we see no basis in

this for requiring it to restart its entire permitting analysis

from zero. Given the scope of the 2009 permit re-analysis, it

7

was reasonable for the Corps to update only the plans and data

related to ecological matters.

The Sierra Club also attacks the Corps’s acceptance of

the applicant’s contentions that an 8% rate of return was

necessary to secure financing and that the planned project

configuration was the only way to achieve that return. The

Sierra Club claims that the record does not support use of an

8% rate; assumption of a lower required rate of return, of

course, would tend to increase the range of practicable

alternatives.

The CCTC submitted several reports, including one

prepared by Ernst & Young, that examined the rates of return

expected from comparable projects in the Tampa area. These

reports produced estimates ranging from 7.6% to 10.06%.

The Ernst & Young report concluded that a 7.6% return would

be a “reasonable rate to expect” for the project when

completed, but the project was subject to “a number of

development risk factors” since it had not yet been completed.

Joint Appendix (“J.A.”) 1465. The report stressed the need

for a “spread” between the rate of return on a project still

under development and the rate of return on a “stabilized

operating property.” J.A. 1465. In addition, the record

contained data indicating that Tampa regional malls had a

“going-in capitalization rate” of 7.7%, with that term defined

as “the first year NOI [net operating income] (before capital

items of tenant improvements and leasing commissions and

debt service but after real estate taxes) divided by present

value (or purchase price).” J.A. 835. That of course suggests

that it would be necessary to apply some non-trivial increment

to the 7.6% or 7.7% estimates to make them suitable for

calculating the minimum acceptable return on an as-yet

unbuilt mall. We think the record plainly supports the Corps’s

use of an interest rate at the low end of the range that was in

8

evidence, and with its modest excess over the very lowest

figures plainly justifiable.

The last of the practicability issues relates to the project’s

planned number of parking spaces—a serious matter because

parking accounts for such a large share of the mall’s surface.

The Sierra Club argues that “CCTC would have more parking

than any existing comparable mall in the Tampa area.” Sierra

Club Opening Br. 53. The record does not make it clear

exactly how many parking spaces CCTC is expected to have,

but gives a range of 5.13 to 6.59 parking spaces per 1,000

square feet of retail space, and the Sierra Club estimates the

overall ratio as being 5.4. J.A. 572; Sierra Club Opening Br.

55. CCTC submitted various items of evidence on the point:

On one hand it provided developer guidelines from Target,

Costco, and Kohls that required 5, 5.5, and 6 spaces,

respectively, per 1,000 square feet of retail space, and on the

other, it also submitted letters from other Florida developers

stating that retail tenants “typically” have “4.5 to 5” parking

spaces per 1,000 square feet of retail space. J.A. 601, 604.

In fact both sides agree that CCTC’s parking ratio

exceeds that of nearby malls. But CCTC defends its above-

average ratio by pointing to the above-average proportion of

restaurants in its project. While the Sierra Club does not

contest the restaurant-parking link, it argues that there is no

reason for so many restaurants. CCTC, in turn, seeks to

justify the high proportion by saying that it aims to create

more than a traditional mall. Whereas traditional malls use

4.8% of their square footage for restaurants, “lifestyle centers”

use 11.3%; CCTC, a self-described “town center,” is between

these two figures at 8.08%. Agency Record (“A.R.”) 4605-

06, 4663.

Given the nature of Sierra Club's arguments to the agency

on this point, the Corps's acceptance of CCTC's parking ratio

9

was not arbitrary or capricious in light of the practicability

regulations. Those require the Corps to evaluate the

practicability of alternatives “in light of overall project

purposes.” 40 C.F.R. § 230.10(a)(2). The regulations provide

that “it will generally be assumed that appropriate economic

evaluations have been completed, the proposal is

economically viable, and is needed in the market place,” 33

C.F.R. § 320.4(q), but they reserve to the agency an override

power, saying that “the district engineer in appropriate cases,

may make an independent review of the need for the project

from the perspective of the overall public interest.” Id. There

appears to be little judicial interpretation of the process, but it

has yielded one constraint that seems logically necessary:

“[A]n applicant cannot define a project in order to preclude

the existence of any alternative sites.” Sylvester v. U.S. Army

Corps of Engineers, 882 F.2d 407, 409 (9th Cir. 1989). There

is nothing suggesting that CCTC's project definition falls

below that benchmark, and the Sierra Club has not articulated

any other, more binding constraint.

The Sierra Club observed in a letter to the Corps that

even if “town center” malls feature more restaurants than

traditional malls, that fact “does not clearly demonstrate that

reduced parking is impracticable.” We do not think this

observation was enough to impose on the Corps the task of

evaluating the practicability of non-“town center” alternatives.

As it was, the Corps studied eleven alternative locations for

the project and considered four alternative on-site

configurations. J.A. 466-69, 1080-82. While the case does

not require us to say the minimum burden a challenger must

meet to trigger an additional study (and the concomitant

examination of the project's “purpose”), the Sierra Club's

remark was not enough. It did not even argue that this purely

commercial project could achieve the 8% return required to

obtain financing by shifting from a town center to a traditional

mall. Accordingly, the Corps was not arbitrary (or in

10

violation of the CWA) in accepting CCTC's conception of the

mall's design, including its relatively high proportion of

restaurant space, and hence in finding that fewer parking

spaces did not represent a practicable, less environmentally

damaging, means to satisfy that purpose.

NEPA. NEPA requires that federal agencies prepare

Environmental Impact Statements (“EISs”) for “major Federal

actions significantly affecting the quality of the human

environment.” 42 U.S.C. § 4332(C). “If any significant

environmental impacts might result from the proposed agency

action then an EIS must be prepared before the [agency]

action is taken.” Sierra Club v. Peterson, 717 F.2d 1409,

1415 (D.C. Cir. 1983) (emphasis omitted). An agency can

avoid preparing an EIS if it issues a proper Finding of No

Significant Impact (“FONSI”). In reviewing a FONSI our

task is to determine whether the agency

(1) has accurately identified the relevant environmental

concern, (2) has taken a hard look at the problem in

preparing its [FONSI or Environmental Assessment], (3)

is able to make a convincing case for its finding of no

significant impact, and (4) has shown that even if there is

an impact of true significance, an EIS is unnecessary

because changes or safeguards in the project sufficiently

reduce the impact to a minimum.

TOMAC v. Norton, 433 F.3d 852, 861 (D.C. Cir. 2006); see

also 40 C.F.R. § 1501.4. Although our decisions have

frequently (but not invariably—see, e.g., Public Citizen v.

Nat’l Highway Traffic Safety Admin., 848 F.2d 256, 267 (D.C.

Cir. 1988)) repeated the phrase “convincing case” since its

original appearance in Maryland-National Capital Park and

Planning Commission v. U.S. Postal Service, 487 F.2d 1029,

1040 (D.C. Cir. 1973), our scope of review is in fact the usual

one. TOMAC itself made this clear, introducing the four

11

numbered criteria with the standard language of judicial

review of administrative action: “arbitrary, capricious, or an

abuse of discretion.” 433 F.3d at 861.

A regulation of the Council on Environmental Quality

further explains: “Significantly as used in NEPA requires

considerations of both context and intensity.” 40 C.F.R.

§ 1508.27. It then proceeds to list ten factors that “should be

considered in evaluating intensity.” Although the district

court focused on four of these factors and found they

established that the project’s environmental impact would be

“significant,” Sierra Club, 719 F. Supp. 2d at 66-67, the Sierra

Club on appeal makes arguments only with respect to three.

We first address the factors mentioned in subsections (b)(3)

and (b)(10), finding the Corps’s consideration adequate. As to

subsection (b)(9), which relates to effects on endangered or

threatened species, the Sierra Club’s arguments here overlap

with those it makes in the ESA context, and we defer

discussion to our treatment of those claims.

Subsection (b)(3) refers to “[u]nique characteristics of the

geographic area such as proximity to . . . wetlands.” 40

C.F.R. § 1508.27(b)(3). Of course it was the project’s impact

on wetlands that required a permit from the Corps in the first

place. But the Corps found that “[t]he wetlands are of

moderate quality as they were logged and some of them were

ditched” and that “[t]he wetlands are predominantly forested

(cypress) and not unique or rare in the landscape.” J.A. 1106.

The district court observed that the Corps itself had found that

wetlands provide “‘valuable storage areas for storm and flood

waters,’” Sierra Club, 719 F.Supp.2d at 66 (quoting J.A.

1107), but that does not in itself compel a finding that these

particular wetlands are “unique” within the meaning of

subsection (b)(3).

12

Moreover, apart from the wetlands’ lack of uniqueness,

the ultimate CCTC plan called for creation and preservation of

substantial substitute wetlands, the sort of mitigation measures

that we have found “sufficiently reduce the impact to a

minimum.” Michigan Gambling Opposition v. Kempthorne,

525 F.3d 23, 29 (D.C. Cir. 2008) (quoting TOMAC, 433 F.3d

at 861), and that the Corps so found here. J.A. 1687. The

Sierra Club argues that the Corps cannot rely on such

mitigation, citing studies purporting to show that wetlands

mitigation often fails, in large part because of the Corps’s lax

enforcement. But even assuming that general attacks on the

Corps’s monitoring of wetlands mitigation could ever justify

its or our disregard of specific mitigation measures, here in

fact the Corps verified that the measures were proceeding.

J.A. 1494-1501, 1543, 1576, 1581-84. Moreover, its 2009

permit added special conditions in response to early setbacks.

J.A. 1695.

Subsection (b)(10) directs attention to whether “the action

threatens a violation of Federal, State, or local law or

requirements imposed for the protection of the environment,”

and the Sierra Club argues that the unauthorized 2008

discharge of turbid water into Cypress Creek not merely

threatened violations of those requirements but constituted

such violations. The Corps found that this discharge was the

result of “human error” and not a problem of design. J.A.

1672. The district court ruled that “NEPA regulations make

no exception for human error” and that an EIS should have

been prepared because the “2008 discharge did, in fact

violat[e] Federal, State and local environmental law.” Sierra

Club, 719 F.Supp.2d at 67. But the subsection’s reference to

“threats” indicates that it is forward-looking. Given that the

Corps required additional assurances from CCTC before

reinstating the permit, J.A. 1682, 1696, it could reasonably

find that a past violation did not “threaten” future violations.

13

ESA (and leftover NEPA issues). The Sierra Club also

argues that the district court erred by upholding the Corps’s

determination that formal consultation under the ESA was not

required. The ESA requires that federal agencies “insure that

any action authorized, funded, or carried out by such agency .

. . is not likely to jeopardize the continued existence of any

endangered species or threatened species or result in the

destruction or adverse modification of habitat.” 16 U.S.C.

§ 1536(a)(2). Regulations promulgated under the ESA

provide that “[e]ach Federal agency shall review its actions at

the earliest possible time to determine whether any action may

affect listed species or critical habitat. If such a determination

is made, formal consultation [with the Fish and Wildlife

Service] is required.” 50 C.F.R. § 402.14(a). The regulations

create an exception to that obligation where, as a result of

informal consultation, the “Federal agency determines with

the written concurrence of the Director [of the Fish and

Wildlife Service], that the proposed action is not likely to

adversely affect any listed species or critical habitat.” Id. at §

402.14(b). After issuing its first public notice in October

2005, the Corps engaged in informal consultation with the

Fish and Wildlife Service (“FWS”). A.R. 3093; J.A. 536,

889. The FWS “concur[red] with the [Corps’s] determination

that the proposed project [was] not likely to adversely affect

the wood stork nor any other species listed under the ESA.”

J.A. 893. Accordingly, the Corps did not undertake formal

consultation; as a technical matter, it is the Corps’s dispensing

with formal consultation to which the Sierra Club objects.

The Sierra Club argues that the Corps’s determination

was erroneous because the project may have adverse effects

on habitat used by both the indigo snake and wood stork. In

parallel with its ESA contention, the Sierra Club raises a

NEPA argument, pointing to 40 C.F.R. § 1508.27(b)(9), under

which an adverse effect on “an endangered or threatened

species or its habitat” is an indication of “intensity” and thus

14

tends to militate in favor of finding “significance” and of

requiring an EIS. In both ESA and NEPA contexts, we reject

the Sierra Club’s wood stork claim but find that the Corps

failed to adequately address indications of an adverse effect

on the indigo snake.

Of the two statutes, the ESA and NEPA, the ESA is

(unsurprisingly) the more demanding on this point. Subject to

the exception noted above, it requires the agency to engage in

a formal consultation if it determines that the action in

question “may affect listed species or critical habitat.” 50

C.F.R. § 402.14(a) (emphasis added). NEPA triggers the EIS

requirement only for “major Federal actions significantly

affecting the quality of the human environment.” 42 U.S.C.

§ 4332(C) (emphasis added). The four-part test for review of

a FONSI that we quoted at the outset of the NEPA discussion

explains that a project with a potentially significant impact

will not require an EIS if “changes or safeguards . . .

sufficiently reduce the impact.” TOMAC v. Norton, 433 F.3d

at 861. We see no reason why the general principle of taking

mitigation into account should not apply to the decision

whether the ESA requires formal consultation. Cf. City of

Sausalito v. O’Neill, 386 F.3d 1186, 1216-17, 1218-20 (9th

Cir. 2004) (approving a biological assessment that relied on

mitigation for its no-adverse effect finding).

As to the wood stork, the Corps’s conclusions rested on

the project’s mitigation measures, which will bring about a net

gain of wood stork foraging habitat. During informal

consultation, the FWS determined that 16.22 acres of

“potential wood stork habitat” existed on the site pre-

construction and that with mitigation 21.35 acres would exist

post-construction, resulting in a net gain. J.A. 1118. But the

Sierra Club argues that the government did not “address near

term adverse impacts on breeding colonies while off-site

mitigation is being implemented.” Sierra Club Opening Br.

15

81-82 (emphasis in original). The Corps’s answer here was to

rely on the mitigation plan’s “more than a one-to-one

replacement ratio to compensate for the temporal lag between

the loss of a wetland’s foraging value and when the new

resource achieves that value.” J.A. 905. We certainly cannot

say that as a general matter a roughly 33% net quantitative

gain in habitat offsets a non-trivial “temporal lag”; in an

extreme case no members of the species would make it

through to enjoy the replacement area. But here the FWS

found that the lost habitat, although “within the core foraging

areas [i.e., within 13 miles] of five wood stork breeding

colonies,” was not within the “primary or secondary zone” of

any colonies. J.A. 890. Given the relatively marginal role of

the lost habitat, it does not seem arbitrary or in contravention

of its statutory mandate for the Corps to find that the

mitigation’s more than “one-to-one replacement ratio” made

up for the temporary deprivation.

For the indigo snake, the Corps’s 2007 mitigation plan

concluded that “[i]nadequate habitat for maintenance of

eastern indigo snakes exists on the impact site in its

predevelopment state.” J.A. 997 (emphasis added). But

conservation guidelines submitted in CCTC’s own application

noted that the snake is “especially vulnerable” to habitat

“fragmentation” because of the snake’s large range. J.A. 164.

Nevertheless, the Corps and FWS did not address the

fragmentation risk. After the permit was suspended in 2008,

the Corps’s new public notice said that it would “reinitiate

informal consultation with the [FWS] regarding the issues

addressed in this public notice.” J.A. 1547.

In this renewed proceeding, the Sierra Club submitted

two declarations related to the eastern indigo snake. The first

declarant, a local Sierra Club member, wrote that he had seen

an eastern indigo snake on the project site in May 2007. J.A.

1295. The second declaration was from Dr. Kenneth Dodd, a

16

herpetologist who as Staff Herpetologist for the Office of

Endangered Species in the FWS had been “primarily

responsible for the listing of the” eastern indigo snake as

threatened under the ESA. Dr. Dodd asserted that the project

site was an important “wildlife corridor” linking protected

areas to the north and south. J.A. 1317. He noted that

“movements over large areas of fragmented habitats expose

Eastern Indigo Snakes to increased road mortality,” and that

“the more edge there is in relation to protected habitat [i.e.,

ratio of perimeter to surface area], the less likely large snakes

can be maintained.” J.A. 1306. He claimed more broadly that

the Corps had failed to consider how the project would

adversely affect the snake through “fragmentation” of its

“habitat in lands near the site as a result of impacts to the site

and the wildlife corridor connecting these lands.” J.A. 1317.

In its second FONSI, issued in August 2009, the Corps

again did not address the impacts of habitat fragmentation.

J.A. 1696-97. Given Dr. Dodd’s expertise and experience,

and the seeming logic of his analysis, as well as CCTC’s own

acknowledgment of the snake’s vulnerability to fragmentation

risk, we think his comment qualifies as the sort of “relevant

and significant” public comment to which an agency must

respond, lest its action be arbitrary and capricious. See Cape

Cod Hospital v. Sebelius, 630 F.3d 203, 211 (D.C. Cir. 2011).

Accordingly, we must remand for further explanation by the

Corps of its determination that the project was “not likely to

adversely affect” the indigo snake. We do not reach the issue

of whether formal consultation is required, but the Corps must

make some determination on the issue of habitat

fragmentation, both for ESA and NEPA purposes.

17

* * *

Our decision here of course substantially alters the

substantive merits outcome that underlay the district court’s

injunction. Accordingly it will be suitable on remand for the

court to entertain contentions relating to modification of that

injunction.

In short, we reverse the district court entirely as to the

CWA; reverse it as to NEPA except insofar as the court

required further explanation by the Corps as to potential

fragmentation of the indigo snake’s habitat; and affirm its

decision as to the ESA except in so far as it found the Corps’s

analysis of the indigo snake issue adequate.

The judgment of the district court is therefore

Affirmed in part, reversed in part, and remanded.