Opinion

Supplycore Inc. v. United States

Court
United States Court of Federal Claims
Filed
Jan 10, 2022
Status
Unpublished
Cited by
0 cases
Authority
More cited than 27.4%

holding that “deference must be afforded to an agency’s . . . procurement decisions if they have a rational basis and do not violate applicable law or regulations.”

How later courts described this case

  • holding that “deference must be afforded to an agency’s . . . procurement decisions if they have a rational basis and do not violate applicable law or regulations.”
  • ‘Agencies are entitled to considerable discretion and deference in matters requiring exercise of technical judgment.”
  • finding that disparate prices may be found reasonable or unreasonable relative to different technical approaches, and that proposal-to- proposal price comparisons are not required

Written by the judges who cited it.

The opinion

In the Cited States Court of Federal Claims

No. 21-1861C

Filed Under Seal: December 28, 2021

Unsealed and Refiled: January 10, 2022!

BUG OCIGIG IG IGIORIOCI ICI ICIOR IRIE KIRK

SUPPLYCORE INC.,

Plaintiff,

Vv.

THE UNITED STATES,

Defendant.

and

NOBLE SALES CO., INC., d/b/a

NOBLE SUPPLY AND LOGISTICS

2

and

PAE-IMK INTERNATIONAL, LLC,

Defendant-Intervenors.

* * * * * * * *® *® ¥ KK OK OK KX KK KK KF KF KK FX

HE AR FS COIS G2 SIE FC COIS C2 SIE FE I OIC OIC OIC FS OIE OS 2 2S Ie OIC 2k 2S 2 2S oe 2

OPINION AND ORDER

DAMICH, Senior Judge

On September 15, 2021, Plaintiff SupplyCore, Inc. (“Plaintiff”), filed this post-award bid

protest challenging the United States Government’s (“Government”) award of two contracts

under request for proposals (“RFP”) No. SPE8E3-19-R-0001, issued by the Defense Logistics

Agency — Troop Support (“DLA”). The RFP concerns a program related to DLA’s construction

and equipment supply chain — called “Maintenance, Repair and Supply Operations” (“MRO”)

for the United States military in the Pacific Region. The two contracts reflect a division of the

‘This Court’s sealed Opinion and Order, issued on December 28, 2021, directed the

parties to file redactions “within ten (10) days.” ECF No. 37 at 22. Supplycore, Inc., Noble

Sales Co., PAE-IMK International, LLC, and the Government jointly agreed on the redactions

herein.

Pacific into two zones: Zone 1 comprises Japan, Okinawa, Singapore, Diego Garcia, the

Philippines, and Thailand, and Zone 2 comprises the Republic of Korea. SupplyCore challenges

DLA’s May 13, 2021 award of the Zone 1 Contract to Defendant-Intervenor, Noble Supply &

Logistics (“Noble), and the award of the Zone 2 Contract to Defendant-Intervenor, PAE-IMK

International, LLC (“PAE”).

Concerning Zone 2, SupplyCore argues successfully that a finding of “meaningful

discussions” between DLA and SupplyCore is contaminated by DLA’s representations to

SupplyCore and PAE. DLA informed awardee PAE that its proposed Round 3 distribution fee

price XXXXXXXXXXXXXXXXXXX “cannot be determined fair and reasonable,” but

conveyed no such message in response to SupplyCore’s Round 3 distribution fee price

XXXXXXXXXXXXXXXX. On top of this, despite DLA’s warning to PAE about its pricing,

DLA then awarded the contract to PAE even though PAE declined to lower its putatively

unreasonable pricing.

Concerning Zone 1, SupplyCore argues that DLA’s reasonableness evaluation was

arbitrary and capricious because the agency either (A) failed to conduct a reasonableness

analysis or (B) conducted such an analysis, but failed to find SupplyCore’s pricing

unreasonable.” SupplyCore additionally contends that discussions were inadequate because its

pricing constituted a “significant weakness,” triggering a notification requirement to which DLA

did not adhere. However, the Government convincingly responds that SupplyCore’s pricing

could reasonably be regarded as high, but not unreasonably high, reflecting SupplyCore’s chosen

approach and business judgment.

The Court issued an order on September 20, 2021 granting (A) Plaintiff's Motion to Seal

and (B) the Parties’ proposed briefing schedule. ECF No. 16. On October 15, 2021, the

Government filed the Administrative Record (“AR”) under Seal, and then re-filed part of the AR

on November 2, 2021. ECF No’s 23-24, 28.

On November 4, 2021, Plaintiff filed its Motion for Judgment on the Administrative

Record. ECF No. 29. The Defendant and the two Defendant-Intervenors (Noble and PAE) each

filed Cross Motions for Judgment on the Administrative Record on November 23, 2021. ECF

No’s 30-32. The case was fully briefed as of December 8, 2021.

After careful consideration, and for the reasons set forth below, the Court GRANTS

Plaintiff's Motion for Judgment on the Administrative Record with respect to the Zone 2

Contract and accordingly GRANTS Plaintiff’s requested Injunction. The Court DENIES

Plaintiff's Motion for Judgment on the Administrative Record with respect to the Zone 1

Contract. Therefore, the Court DENIES Defendant’s Cross Motion for Judgement on the

Administrative Record with respect to the Zone 2 contract and GRANTS Defendant’s Motion

with respect to the Zone 1 contract. The Court further DENIES Defendant-Intervenor PAE’s

? Ordinarily, a contractor would not want its pricing to be found unreasonable. However,

in the event the contracting officer finds the pricing to be unreasonable, the contractor could

request discussions with the contracting officer to justify its price or the contractor could adjust

its pricing based on the unreasonable finding.

Cross Motion for Judgment on the Administrative Record and GRANTS Defendant-Intervenor

Noble’s Motion for Judgment on the Administrative Record.

Because of the distinctions between the two contracts and the grant of an Injunction with

respect to the Zone 2 Contract, this opinion presents the facts and discussion regarding Zone 2

first, followed by the facts and discussion concerning Zone 1.

L Standard of Review

A. Standard for Motion for Judgment on The Administrative Record

This Court decides a motion for judgment upon the administrative record pursuant to

RCFC 52.1. The Court determines whether “given all the disputed and undisputed facts, a party

has met its burden of proof based on the evidence in the record.” Bannum, Inc. v. United States,

404 F.3d 1346, 1356-57 (Fed. Cir. 2005). “[T]he judgment on an administrative record is

properly understood as intending to provide for an expedited trial on the record.” /d. at 1356.

B. Bid Protest Standard of Review

In a bid protest, the trial court “review[s] the agency’s decision pursuant to the standards

set forth in section 706 of Title 5,” the Administrative Procedure Act (“APA”). 28 U.S.C. §

1491(b)(4); see Banknote Corp. of Am., Inc. v. United States, 365 F.3d 1345, 1350 (Fed. Cir.

2004). An APA challenge requires showing that the agency action in question is "arbitrary,

capricious, an abuse of discretion, or otherwise not in accordance with law." 5 U.S.C.

§706(2)(A); Impresa Construzioni Geom. Domenico Garufi v. United States, 238 F.3d 1324,

1332 n.5 (Fed. Cir. 2001). Accordingly, "[a] bid award may be set aside" if (1) "the procurement

official's decision lacked a rational basis" or (2) "the procurement procedure involved a violation

of regulation or procedure." WellPoint Mil. Care Corp. v. United States, 953 F.3d 1373, 1377

(Fed. Cir. 2020) (quoting /mpresa, 238 F.3d at 1332). The APA also requires that "due account

shall be taken of the rule of prejudicial error." 5 USC 706. So, "[t]o prevail in a bid protest, a

protestor must show a significant, prejudicial error in the procurement process." WellPoint, 953

F.3d at 1377 (quoting A/fa Laval Separation, Inc. v. United States, 175 F.3d 1365, 1367 (Fed.

Cir. 1999)); see also Bannum, 404 F.3d at 1351.

In reviewing the agency’s procurement decisions, the Court does not substitute its

judgment for that of the agency. Redland Genstar, Inc. v. United States, 39 Fed. Cl. 220 (1997);

Cincom Sys., Inc. v. United States, 37 Fed. Cl. 663, 672 (1997), see also M.W. Kellogg Co. v.

United States, 10 Cl. Ct. 17, 23 (1986) (holding that “deference must be afforded to an agency’s .

. . procurement decisions if they have a rational basis and do not violate applicable law or

regulations.”). The disappointed bidder “bears a heavy burden,” and the contracting officer is

“entitled to exercise discretion upon a broad range of issues confronting [her].” /mpresa

Construzioni Geom. Domenico Garufi v. United States, 238 F.3d 1324, 1332 (Fed. Cir. 2001)

(citations and quotes omitted). This burden “is not met by reliance on [the] pleadings alone, or

by conclusory allegations and generalities.” Bromley Contracting Co. v. United States, 15 Cl. Ct.

100, 105 (1988); see also Campbell v. United States, 2 Cl. Ct. 247, 249 (1983). A procurement

decision is rational if “the contracting agency provided a coherent and reasonable explanation of

its exercise of discretion.” /mpresa, 238 F.3d at 1333. But “that explanation need not be

extensive.” Bannum, Inc. v. United States, 91 Fed. Cl. 160, 172 (2009) (citing Camp v. Pitts,

411 U.S. 138, 142-43 (1973)).

The Court’s “highly deferential” review such that “the disappointed offeror bears a

‘heavy burden’ of showing that the award decision ‘had no rational basis’ is particularly the case

with respect to matters requiring technical judgment. See, e.g., Benchmade Knife Co., Inc. v.

United States, 79 Fed. Cl. 731, 740 (2007) (‘Agencies are entitled to considerable discretion and

deference in matters requiring exercise of technical judgment.”); Beta Analytics Int'l, Inc. v.

United States, 67 Fed. Cl. 384, 395 (2005) (“the minutiae of the procurement process . . . involve

discretionary determinations of procurement officials that a court will not second guess.”)

(quoting EW. Bliss Co. v. United States, 77 F.3d 445, 449 (Fed. Cir. 1996)). The protester’s

mere disagreement with the agency’s assessment is not “nearly enough” to demonstrate arbitrary

and capricious agency action. See CRAssociates, Inc. v. United States, 102 Fed. Cl. 698, 717-18

(2012).

I. Zone 2 Contract: Agency Evaluation

Under the terms of the solicitation, the DLA would evaluate proposals using three

factors: (1) Technical Merit (subfactors: (1) Product Sourcing, (i1) Distribution and Delivery, and

(iii) Customer Support), (2) Past Performance/Confidence Assessment and (3) Price. AR 304-

05. Offerors were further instructed that “non-price evaluation factors were significantly more

important than price; however, as the non-price ratings of offerors became more equivalent, price

became more important.” AR 303-04.

The DLA received five timely offers for the Zone 2 contract. The DLA determined that

all five Zone 2 offerors would be included in the competitive range. AR 2031; AR 2093.

Discussions followed, during which offerors for Zone 2 were asked to validate or improve their

pricing. See AR 2081-93; 4370-4388; see also AR 4579-80 (PNM, Zone 2).

The DLA conducted three rounds of discussions with each Zone 2 offeror. See, e.g., AR

4370-4388; see also AR 3108-12; 3126-29; 3147-52; 3706-3725; 3728-65. XXXXXXXXXX

XXXXXXXXXXXXKXXXKKXXXXKKXXXXXXXXKKXXXKXXXKXK? XKKXXXKXXXXK

XXXXXXXXXXXXXXXXXXXXXXXXXXXXXX. AR 3270-4388. SupplyCore’s Round 3

Distribution fees totaled XXXXXXXXXXX, while PAE’s totaled XXXXXXX — a disparity of

approximately XXXXXXX. AR 4385.

Pertinent to this, in Round 3 of the discussions, DLA advised PAE:

> Distribution Matrix (Drop Ship):

e Please ensure pricing is accurate for all distribution fee tiers. The distribution

matrix (drop ship) pricing appears to be significantly unbalanced across the various

3 Drop-shipped material is material delivered by a prime vendor’s supplier directly to the

Government customer. AR 240. In a prime vendor supported delivery (7.e., non-drop ship), the

prime vendor acts as middleman, receiving material from its supplier, then shipping it to the

Government customer. /d.

fee tiers. Please take note of FAR 15.404-1(g)(3)(“An offer may be rejected if the

contracting officer determines that the lack of balance poses an unacceptable risk

to the Government.”)

e Pricing Period 1

« Please improve pricing for the following distribution fee tiers: XXXXX

XXXX. Please note that the pricing proposed for tiers XXXXXXX

specifically cannot be determined fair and reasonable.

e Pricing Period 2

« Please improve pricing for the following distribution fee tiers: XXXXX

XXXX. Please note that the pricing proposed for tiers XXXXXXX

specifically cannot be determined fair and reasonable.

e Pricing Period 3

« Please improve pricing for the following distribution fee tiers: XXXXX

XXXXX. Please note that the pricing proposed for tiers XXXXXX

specifically cannot be determined fair and reasonable.

> Distribution Matrix (Non-Drop Ship):

e Please ensure pricing is accurate for all distribution fee tiers. The distribution matrix

(non-drop ship) pricing appears to be significantly unbalanced across the various

fee tiers. Please take note of FAR 15.404-1(g)(3)(‘An offer may be rejected if the

contracting officer determines that the lack of balance poses an unacceptable risk

to the Government.”)

e Pricing Period 1

o Please improve pricing for the following distribution fee tiers: XXXXXXX

XXXXXXXXXXXXXX. Please note that the pricing proposed for tiers X

XXXXXXX specifically cannot be determined fair and reasonable.

e Pricing Period 2

« Please improve pricing for the following distribution fee tiers: XXXXXXXX

XXXXXXXXXXXXXX. Please note that the pricing proposed for tiers

XXXXXXXXX specifically cannot be determined fair and reasonable.

e Pricing Period 3

« Please improve pricing for the following distribution fee tiers: XXXXXXXX

XXXXXXXXXXXXXXX. Please note that the pricing proposed for tiers

XXXXXXXXXX specifically cannot be determined fair and reasonable.

AR 3744-45.

In contrast, DLA advised SupplyCore:

> Distribution Matrix (Drop Ship):

e Pricing Period 1

« Please review and improve pricing on XX distribution fee tiers.

e Pricing Period 2

« Please review and improve pricing on XX distribution fee tiers.

e Pricing Period 3

« Please review and improve pricing on XX distribution fee tiers.

> Distribution Matrix (Non-Drop Ship):

e Pricing Period 1

« Please review and improve pricing on XX distribution fee tiers.

e Pricing Period 2

« Please review and improve pricing on XX distribution fee tiers.

e Pricing Period 3

« Please review and improve pricing on XX distribution fee tiers.

AR 3748-49. Thus, in contrast to PAE, SupplyCore was not advised that its distribution fee

pricing “cannot be determined fair and reasonable” even though its distribution fee price was

XXXXXXX higher than PAE’s. See id. The Round 3 warning to PAE about its distribution fee

prices is also somewhat surprising because PAE’s Round 3 distribution fee price was essentially

identical to Rounds 1 and 2. See AR 4378: 4381; 4385.

Then, despite DLA’s Round 3 warning to PAE that some of its distribution fees “cannot

be determined fair and reasonable,” PAE declined to reduce its distribution price, submitting an

identical final distribution price of XXXXXXXX (and was awarded the contract in any case).

AR 4388. SupplyCore, which was only advised to “improve” its pricing, submitted a final

distribution fee of XXXXXXXXXXKXKXKKXXKKXXKXXX. Jd.

The Source Selection Authority’s (“SSA”) Factor 1 (Technical Merit) analysis ascribed

“good” ratings to both PAE and SupplyCore. See AR 4570. Underpinning the Technical Merit

analysis, PAE and SupplyCore received matching “Good,” “Good,” and “Acceptable” ratings for

Subfactors 1(a-c). AR 4765. SupplyCore had a better rating than PAE on Past Performance:

“Substantial Confidence” in the case of SupplyCore, “Satisfactory Confidence” in the case of

PAE.

PAE-IMK SupplyCore

TECHNICAL MERIT GOOD GOOD

(a) Product Sourcing Good Good

(b) Distribution and Delivery Good Good

(c) Customer Support Acceptable Acceptable

PAST PERFORMANCE SATISFACTORY SUBSTANTIAL

CONFIDENCE ASSESSMENT CONFIDENCE CONFIDENCE

See AR 4570.

However, the SSA also found that XXXXKXXXXXXKXXXXXXX XXX XXX XXX XXX

XXXXXXXKXXKXXXKXKXKKXXXKXKXKXXKKX. AR 4766-67. Although SupplyCore

registered a higher Factor 2 performance confidence assessment than PAE, PAE’s Total

Evaluated Price (“TEP”) of $17.3 million was far below SupplyCore’s TEP of XXXXX;

therefore, the SSA determined that SupplyCore’s higher past performance rating did not justify

paying a XXXX percent premium above PAEF’s price. AR 4768, 4772. SSA thereby awarded

PAE the Zone 2 contract over SupplyCore. Jd.

III. Zone 2 Contract: Discussion

A. The Agency’s Round 3 Instruction to PAE Violates the Requirement for

Meaningful Discussions.

FAR 15.306(d)(3) mandates that when Government contracting officers engage with

bidders, such discussions must be meaningful, “[a]t a mimimum, . . . indicat[ing] to or

discuss[ing] with, each offeror still being considered for award, deficiencies, [and] significant

weaknesses.” In addition, FAR § 15.306(e)(1) prohibits government personnel from engaging in

conduct that "[f]avors one offeror over another, [such as when an agency] tells some offerors, but

not others, that their prices were high.” AshBritt, Inc. v. United States, 87 Fed. Cl. 344, 372

(2009). Therefore, “[t]he Government may not inform some offerors of a concern with their

pricing level while staying silent with respect to identical issues in other offerors' proposals.”

AshBritt, Inc. v. United States, 87 Fed. Cl. 344, 372 (2009) (citing Mu/timax, Inc., No. B-

298249.6, 2006 Comp. Gen. Proc. Dec. P 165, 14-15 (Oct. 24, 2006) (finding price discussions

unequal where the agency advised some offerors that prices were high in comparison with the

Independent Government Estimate while not advising others whose prices were even higher)).

In AshBritt, the agency warned the eventual awardee that its line-item prices were excessive,

“suggest[ing]” that the awardee lower its prices, while the protester, whose prices were even

higher than those of the awardee, did not receive such notice from the agency. As/Britt, Inc., 87

Fed. Cl. at 372.

While AshBritt requires that agencies may not tell some offerors but not others that their

prices were excessively high, disparate prices may be found reasonable or unreasonable relative

to their distinctive technical approaches — in other words, hypothetically, if Proposal A is $12

million and Proposal B is $40 million, an agency may possibly find that the price of Proposal A

is unreasonably high while finding the price of Proposal B reasonable. See DynCorp Int’l, LLC

v. United States, 10 F.4th 1300, 1316-17 (Fed Cir. 2020) (finding that disparate prices may be

found reasonable or unreasonable relative to different technical approaches, and that proposal-to-

proposal price comparisons are not required).

The fact pattern of the Zone 2 contract awards process resembles that in Ashbritt: the

protestor’s (SupplyCore’s) prices were higher than those of the awardee (PAE), but the agency

(DLA) warned the awardee and not the protestor of excessive pricing. In Round 3, DLA directed

both bidders to improve their pricing, but distinctively warned only PAE, in boldface, that its

distribution fee price XXXXXXXXX “cannot be determined fair and reasonable,” without

transmitting such a warning to SupplyCore, whose distribution fees were XXXXXXX. See AR

3744-45; 3748-49; 4385.

In their respective briefs, the parties present arguments about the significance of an

agency directing bidders to “improve” pricing. SupplyCore construes the “improve” instruction

as a routine bargaining communication interpreted by SupplyCore as conveying “that it was in

the hunt and that making minor reductions was all that was needed to position it for award.” See

ECF No. 29 at 16-17. SupplyCore also points out the high frequency with which this instruction

was conveyed to bidders in this case (for both Zone 1 and Zone 2) and thereby contends that “it

cannot be argued by the Agency that the requests for reduced pricing were intended to convey to

SupplyCore that its pricing was unreasonably high or that significant reductions were required in

order for SupplyCore to be competitive for award.” ECF No. 29 at 17. Conversely, the

Government and defendants-intervenors take the position that DLA advising SupplyCore to

“improve” many of the prices underlying components of its bid fully indicated to SupplyCore

that its pricing was too high. See, e.g., ECF No. 31 at 24.

While both of these arguments about the relative significance of the “improve” pricing

instruction may have merit, separately, the clear warning, in boldface, that pricing “cannot be

determined fair and reasonable,” is an evident instruction that a bidder’s pricing is outside

viable contention. Furthermore, this instruction was sent to PAE and not to SupplyCore even

though SupplyCore’s price was XXXXXX higher. In addition, in spite of DLA’s clear warning

to PAE that its distribution pricing could not be found reasonable, PAE held firm in its prices,

declining to make further reductions for the final bid submission. See AR 4385-88. Then,

despite PAE evidently disregarding the warning, the agency then awarded the contract to PAE.

These two facts together — (1) the Round 3 warning sent to PAE and not to SupplyCore and (2)

the award to PAE despite the fact that it declined to respond to the warning of an unreasonably

high price — lead this Court to hold that DLA’s award to PAE was arbitrary and capricious.*

In its reply brief, the Government dismisses SupplyCore’s argument regarding the

requirement for “meaningful discussions” as a “new argument” which may not be raised for the

first time in a reply brief. ECF No. 35 at 15. Specifically, SupplyCore argued that DLA’s

Round 3 warning to PAE did not qualify under the requirement for meaningful discussions.

* To reiterate, the Court recognizes that distinctions between the respective technical

approaches of offerors could possibly explain and justify DLA sending an “unreasonable price”

notice to PAE and not to SupplyCore even though SupplyCore’s price was XXXXXXXXXX.

See DynCorp Int’l, LLC v. United States, 10 Fed. 4h 1300, 1316-17 (Fed Cir. 2020) (finding that

disparate prices may be found reasonable or unreasonable relative to different technical

approaches, and that proposal-to-proposal price comparisons are not required). However, in

Zone 2, this occurred in conjunction with PAE disregarding the “unreasonable” price notice and

not reducing its price in response, and then being awarded the contract anyway.

8

While it is true that SupplyCore’s opening brief did not allege “unequal discussions” or quote the

DLA’s warning to PAE, SupplyCore’s brief does raise the issue of “misleading” discussions, and

widely contends that the instruction to “improve” pricing did not adequately notice SupplyCore

about the viability of its distribution fees (with a citation including the pages of the

Administrative Record containing the Round 3 PAE distribution fee warning). ECF No. 29 at

17. In effect, the Government asks this Court to assess SupplyCore’s opening brief arguments

that meaningful discussions were not held while disregarding the fact of the warning to PAE.

Such an approach would exalt form over function. Also, because this proceeding reflects two

rounds of briefs, the Government has had a reasonable opportunity to respond to SupplyCore’s

reply brief.

Challenging a procurement award requires a showing that the agency action in question

was "arbitrary, capricious, an abuse of discretion, or otherwise not in accordance with law." 5

U.S.C. §706(2)(A). The Court holds that DLA’s Round 3 unreasonable price warning to PAE

and not to SupplyCore plus DLA’s award to PAE despite the fact that PAE declined to respond

to the unreasonable price warning amounts to an arbitrary and capricious award decision.

B. Finding of Prejudice and Award of Injunction

To establish prejudice, the protestor must demonstrate that there was a "substantial

chance" it would have received the award but for the errors in the procurement process.

Bannum, Inc. v. United States, 404 F.3d 1346, 1355 (Fed. Cir. 2005).

The administrative record confirms that per the solicitation, price became an issue for the

Zone 2 contract because the PAE and SupplyCore bids were otherwise close. PAE and

SupplyCore received matching “good” ratings for Factor 1, XXXXXXXXXXXXXXXXKX

XXXXXXXXXKXKKKXXXXKXXXXXXXXXXXXXXXX. AR 4766-67. Then SupplyCore

registered a higher Factor 2 (performance confidence) rating than did PAE. AR 4570. This

apparent proximity between PAE and SupplyCore raised the issue of price: the solicitation stated

that “as the non-price ratings of offerors became more equivalent, price became more

important.” AR 303-04. The SSA thereby determined that SupplyCore’s higher performance

rating did not justify paying a XX XX percent premium over PAE’s price. AR 4768, 4772. The

apparent role played by price in awarding the Zone 2 contract to PAE over SupplyCore certainly

suggests that had SupplyCore received a similar warning that its distribution pricing “cannot be

determined fair and reasonable” and responded, SupplyCore would have had a “substantial

chance” to qualify for the award. The misaligned feedback to SupplyCore and PAE plus the

award to PAE despite the Round “unreasonable price finding” discussions prejudiced

SupplyCore.

To obtain a permanent injunction, a party must show that: (1) it has succeeded on the

merits; (2) it will suffer irreparable harm if such relief is not granted; (3) the balance of the

hardships tips in the movant's favor; and (4) an injunction will serve the public interest. See

Hawpe Constr., Inc. v. United States, 46 Fed. Cl. 571, 582 (2000), aff'd, 10 F. App’x 957 (Fed

Cir. 2001). No one factor is dispositive, and "the weakness of the showing regarding one factor

may be overborne by the strength of the others." FMC Corp. v. United States, 3 F.3d 424, 427

(Fed Cir. 1993).

Because SupplyCore succeeds on the merits, the Court grants a Permanent Injunction for

the Zone 2 contract.

IV. Zone 1 Contract: Factual Context and Agency Evaluation

A. Background

On August 27, 2019, the DLA issued the RFP for the Zone 1 and Zone 2 contracts,

reflecting a single DLA program for indefinite delivery and indefinite quantity. The estimated

value of the Zone 1 contract was $75 million, with a five-year maximum of $562.6 million. AR

226-27. The RFP advised that several thousand delivery orders would be required annually in

each zone, and that offerors that they could submit proposals for one or both zones, with the

caveat that a single offeror could receive only one award, except in limited circumstances. AR

226; AR 228; AR 636-37. (RFP Amd. 0008.)

As noted above, the RFP established that awards would be made “to the offeror whose

proposal is most advantageous to the Government considering non-price evaluation factors and

price.” AR 228; AR 306. Offerors were further instructed that “non-price evaluation factors

were significantly more important than price; however, as the non-price ratings of offerors

became more equivalent, price became more important.” AR 303-04.

Specifically, the DLA would evaluate proposals using three factors: (1) Technical Merit,

(2) Past Performance/Confidence Assessment and (3) Price. AR 304-05.

Factor 1, Technical Merit, was to be broken down into three sub-factors: (1) Product

Sourcing, (11) Distribution and Delivery, and (i11) Customer Support; the sub-factors would be

weighed equally, and respectively assessed with a rating of Outstanding, Good, Acceptable,

Marginal, or Unacceptable. See, e.g., AR 7251. The subfactors’ ratings would then be “rolled

up” into the general rating of either Outstanding, Good, Acceptable, Marginal, or Unacceptable.

Id.

Factor 2, Past Performance Confidence Assessment, would be assigned one rating known

as the “Performance Confidence Assessment.” To make this assessment, the Government would

evaluate two aspects of Past Performance: (A) Relevancy (Very Relevant, Relevant, Somewhat

Relevant, or Not Relevant) and (B) Quality (Outstanding, Good, Acceptable, Marginal,

Unacceptable or Neutral). See, e.g., AR 7746-47.

10

For Price, offerors were instructed to submit pricing information for (A) acquisitions

(“PEL”)? and (B) distribution fees® corresponding to specific line items. AR 226. Thus, the

“Total Evaluated Price” (“TEP”) reflected the sum of each offeror’s aggregate acquisitions

prices, aggregate distribution prices and some additional prices: “the TEP for purposes of

evaluation of award was determined using a fixed formula, using aggregate pricing calculated

based upon the offerors’ line-item submissions for the various pricing elements.” AR 310. Also,

importantly, the solicitation specified that price reasonableness analysis would be conducted at

the line-item level, i.e., there would be no general evaluation of a bidder’s TEP — rather, the

evaluations would be focused on the various PEL items and distribution fees, comparing the bids

against one another, against historical pricing, and to the Government’s negotiation objectives.

See AR 1816-20. Pricing analysis would be conducted using “accepted price analysis methods.”

AR 309-10; see also AR 304-06 (Addendum to FAR 52.212-2). The solicitation did not require

any particular method for this analysis but mentioned several types of price reasonableness

evaluation methods including “comparison of offers to each other, comparison with market

research, and comparison with prior procurements.” AR 304-06; 309-10.

B. The Agency’s Evaluations of the Zone 1 Contract

The DLA received three timely offers for the Zone 1 contract. Following submission of

the initial proposals, the DLA developed minimum and maximum price objectives across the

different categories of pricing (e.g., anticipated acquisitions and distribution costs) and combined

these into total aggregate minimum and maximum price objectives. See AR 4076-82 (Final

Pricing Analysis, Zone 1); AR 4421-22 (Price Negotiation Memorandum, Zone 1).

The initial Price Submissions and Government Maximum objectives for Zone 1 were as

follows:

Noble SupplyCore | XXXXXX

PEL (Drop Ship and Non-Drop Ship)

Drop Ship Distribution Fee XXXXXXX | XXXXXXKXK | XXXKXKXX

Non-Drop Ship Distribution Fee XXXXXXXK| XXXXXKXX | XXXXXXXK

Combined Distribution Fees (Drop Ship

> Acquisition prices comprise the actual invoice price of the product or incidental service

paid by the prime vendor (contractor) to its sub-contractor or supplies. AR 239. The RFP

included a Price Evaluation List (PEL) of 450 line items for each zone, requiring acquisition

ceiling prices for 95% of the items (i.e. 428 items). AR 225. “All items offered w[ere to] be

evaluated in accordance with FAR Subsection 15.404-1(b) ‘Price Analysis.’” AR 310.

° Distribution fees were specifically defined as “fixed ceiling prices for each line item

which represent all elements of the contract price other than the acquisition price.”

ll

plus Non-Drop Ship) XXXXXXK | XXXKXXKX | XXXXXXKX

Government MAXIMUM Distribution

Fees XXXXXKXXK | XXXXXXX] XXXXXXX

Incidental Service Scenario XXXXX XXXXX XXXXX

Storefront Scenario XXXXXX XXXXXX | XXXXXXX

TOTAL EVALUATED PRICE (TEP) XXXXKXKK | XXXXXXKK | XXKXKKKK

Government MAXIMUM TEP XXXXXXK | XXXXXXKXK | XXXXKKKX

AR 1822; 4078-82.

DLA determined that all three Zone 1 offerors would be included in the competitive

range. AR 2031; AR 2093. Discussions followed, during which offerors were asked to validate

or “improve” their pricing. See AR 2081-93; see also AR 4423-24 (PNM, Zone 1).

The DLA conducted three rounds of discussions with each offeror. See AR 4078-93; see

also AR 3108-12; 3126-29; 3147-52; 3706-25; 3728-65. SupplyCore was asked to improve its

acquisition pricing on hundreds of items for all three rounds of the discussions of the Zone 1

contract. See AR 7749 (summarizing requests). XXXXXXXXXXXXXXXXXXKXXXKKKX

XXXXXXKXKXXXKXXKKKKKKKKKKKKKKKKKKK KX KK KKK KKK KXXKKKKKKKKK

XXXXXXXXXXXXXKXKXKXKXXXXKXXKXXXKXXKKXKXXXXXKXXXX. Accordingly, during

the bidding process, SupplyCore was repeatedly advised to “improve” its distribution pricing. In

Round 1, SupplyCore was advised:

> Distribution Matrix (Drop Ship):

e For Pricing Periods 1, 2, and 3 please review and improve pricing for the following

distribution tiers: XXXXXXXXXXXXXKXKXXKXXXKKXXKKXXKKXKKKXKK

XXXX.

> Distribution Matrix (Non-Drop Ship):

e For Pricing Periods 1, 2, and 3 please review and improve pricing for the following

distribution tiers: XXXXXXXXXXXXXXXXXXKXKXXXKXKXKKXKXXXKKKKX

XXXX.

AR 2132.

In Round 2, SupplyCore was advised:

> Distribution Matrix (Drop Ship):

e For Pricing Periods 1, 2, and 3 please review and improve pricing for XXX

distribution tiers: XXXXXXXXXXXXXXXXKXKKKKKKKKKKKKXKKKXK

XXXX.

12

> Distribution Matrix (Non-Drop Ship):

e For pricing Periods 1, 2, and 3 please review and improve pricing for XXX

distribution tiers: XXXXXXXXXXXXXXXXXXXXXXKXXXXXXXKXKXX

XXXX.

AR 2224.

In Round 3, SupplyCore was advised:

> Distribution Matrix (Drop Ship):

e For Pricing Periods 1, 2, and 3 please review and improve pricing for the following

distribution tiers: XXXXXXXXXXXXXXXXXXXKKKKKKKKKKXXKXXKXXX

XXXX.

> Distribution Matrix (Non-Drop Ship):

e For Pricing Periods 1, 2, and 3 please review and improve pricing for the following

distribution tiers: XXXXXXXXXXXXXXXXXXXXXXKXXXXXXXKXXXXXX

XXXX.

AR 2873. The Government’s estimated maximum total price for distribution fees was XXXX

XXXX. SupplyCore’s total distribution price in Round 1 was XXXXXXX; for Round 2 it was

not reduced at all and stayed at XX XXXXX; for Round 3 it was XXXXXXXX; and

SupplyCore’s final distribution price was XXXXXXX — in the end, XXXXXX above the

Government’s estimated maximum. AR 4079, 4084, 4086, 4089, 4092.

By comparison, Noble’s total distribution price in Round 1 was XXXXXX; for Round 2

it was XXXXXX; for Round 3 it was XXXXXXX; and Noble’s final distribution price was XX

XXXX. AR 4084; 4086; 4089; 4092. Like SupplyCore, Noble was instructed to “review and

improve pricing” for certain distribution tiers — however, distinct from the feedback to

SupplyCore, DLA requested “improve[ment]” on prices in only some distribution tiers, whereas

for SupplyCore, this instruction was directed to “XXX” distribution tiers. See AR 2103 (Round

1); AR 2162-63 (Round 2); AR 2859 (Round 3). By the end of the discussions process, in

Round 3, Noble was asked to improve pricing for XXXXXXX Drop Ship tiers and XXXXX

XX Non-Drop Ship tiers. AR 2859.

Thus, while SupplyCore was repeatedly and broadly advised to “improve” its distribution

pricing, including an emphasis that this applied to “XX” distribution tiers, SupplyCore was not

warned expressly about the disparity between the Government’s targeted maximum distribution

fee and SupplyCore’s proposed price. In other words, DLA never made a finding (or stated) that

SupplyCore’s bids for the Zone 1 were unreasonably high.

For the Zone 1 contract, the SSA’s Factor 1 (Technical Merit) analysis ascribed “good”

ratings to both Noble and SupplyCore — however, the SSA also found Noble’s proposal was

stronger than SupplyCore’s, namely under Subfactors 1(a) (Product Sourcing) and 1(c) Customer

Support, while SupplyCore’s proposal as only “slightly more favorable” than Noble’s under

Subfactor 1(b) (Distribution and Delivery). See generally AR 4539-4567. The SSA found that

13

SupplyCore’s Factor 2 Past Performance Confidence Assessment rating was higher than Noble’s,

but that Noble’s rating was “satisfactory.” AR 4558, 4561-62. Ultimately, SupplyCore’s higher

past performance rating relative to Noble was found to “not outweigh the greater technical

benefit offered by Noble’s proposal, which was more important to the evaluation.” Jd.

Since Noble and SupplyCore were close regarding Factors 1 and 2, the SSA turned to

Price and observed that Noble’s Total Evaluated Price (“TEP”), $16.2 million, was far lower

than SupplyCore’s TEP of XXXXXXX, and found that SupplyCore’s superior Factor 2 rating

did not justify selecting SupplyCore given that SupplyCore’s TEP was XXX XXX higher than

Noble’s technically superior proposal. See AR 7756. Therefore, the SSA awarded the Zone 1

contract to Noble over SupplyCore. AR 4562, 4567.

The contracts for both Zone 1 and Zone 2 were awarded in May 2021. SupplyCore

requested and received two rounds of debriefing for each of the two contracts. See AR Tabs 281,

282, 289, 291. SupplyCore then filed bid protests of both contract awards with the GAO, which

the GAO denied. AR 7734-70 (Zone 1); AR 8427-63 (Zone 2).

While SupplyCore’s bid protest remains pending, SupplyCore is currently performing as

the incumbent contractor in both Zone 1 and Zone 2. The Zone 1 and Zone 2 contracts originally

expired on October 25, 2019, but SupplyCore has continued performance under non-competitive

bridge contracts awarded under 10 U.S.C. § 2304(c)(1). AR 142. The bridge contracts are set

to expire on January 15, 2022. See ECF No. 15 at 2.

Vv. Zone 1 Contract: Discussion

SupplyCore makes three allegations purportedly foreclosing DLA’s award of the Zone 1

contract to Noble as arbitrary, capricious or irrational. Two of the allegations are linked:

SupplyCore alleges (1) that no adequate price reasonableness analysis was conducted by DLA,

or only occurred for awardees (see ECF No. 29 at 13); in the alternative, SupplyCore argues (2)

that if a reasonableness analysis had been conducted (or if the Court finds that such an analysis

was, in fact, conducted), SupplyCore’s bid should have been found unreasonably high. /d. at 14.

In addition, SupplyCore also argues that the discussions underlying the award for the Zone 1

contract were not meaningful. /d. at 16.

A. DLA Conducted Sufficient Price Reasonableness Analysis.

SupplyCore points out that the Solicitation commits the DLA to price reasonableness

evaluations of offerors’ PEL prices, distribution fees and other fees (see AR 309-10) with the

implication that DLA breached this requirement. Specifically, SupplyCore contends that while

the DLA might have “analyzed” offerors’ prices, this “does not satisfy the requirement to

evaluate the offers for price reasonableness” (emphasis added). ECF No. 33 at 4. SupplyCore

then further emphasizes that “SupplyCore is entitled to have the Government point to evidence

that it actually considered whether SupplyCore’s pricing was reasonable or not, which the

Government cannot do.” ECF No. 33 at 5. SupplyCore is particularly looking for a

reasonableness evaluation of its XXXXXXXX distribution fees, because this “constituted the

lion’s share of each offeror’s TEP.” ECF No. 33 at 5.

14

However, the Government cites considerable evidence that the DLA did adhere to the

solicitation’s requirements for conducting price reasonableness review. For example, DLA

certainly appears to have evaluated price reasonableness at the line-item level, and rating and

comparing prices. See ECF No. 35 at 2; see also AR 1814-22; 4074-92; 4558-4567.

In addition, SupplyCore seems to suggest a distinction between “analysis” and

“evaluation,” whereby, allegedly, the Government engaged in analysis but never reached any

conclusion regarding whether it considered any offeror’s pricing to be reasonable or unreasonable.

ECF No. 33 at 4. However, the Administrative Record certainly shows that the agency did

make final determinations, determining, SupplyCore included, that the pricing was fair and

reasonable. See, e.g., ECF No. 35 at 3, citing AR 4413, 4415-17, 4505-07, 4509. Nor is the

Government required to point to evidence that it considered in making its reasonable

determination as (1) the solicitation did not have a requirement for a formal determination of

price reasonableness, and (2) FAR 15.404-1(b) does not impose a documentation requirement.

DynCorp Int'l, 10 F.4th at 1313.

In addition, SupplyCore argues that the required threshold for a legally sufficient price

reasonableness analysis is not met when an offeror bases its pricing on incorrect information.

See ECF No. 29 at 13 (“An agency’s failure to conduct a required price reasonableness analysis

is prejudicial and requires that the award be set aside and the procurement be reopened for a

price reasonableness review (citing Caddell Constr. Co. v. United States, 125 Fed. Cl. 30, 56

(2016)). SupplyCore’s reliance on Caddell implies that DLA’s price analysis or evaluation

process and/or the administrative record of this process was superficial, purportedly failing to

demonstrate a proper analysis or evaluative process. But the Government has demonstrated (and

SupplyCore concedes (see ECF No.33 at 4)) that DLA really did conduct a price analysis. This

fact fundamentally and severely undermines SupplyCore’s arguments. While SupplyCore

vehemently argues that DLA’s representations about pricing are inadequate for price

reasonableness purposes, the fact is that DLA did repeatedly and broadly convey to SupplyCore

that its distribution fees were too high. See AR 2132, 2224, 2873. Furthermore, in response,

SupplyCore mostly declined to lower its distribution prices, while at the same time Noble

XXXXXXXXXXXXXXXKXXXXXKXKXKXXKXKXKXKXXKXKXKXKXKXKXKXKKK

XXXXXXXXXXXXKXXXXXXXXX.’ Also, as a matter of law, the Government generally

enjoys broad discretion with the manner in which it conducts and records price analysis and price

reasonableness evaluations.

7 SupplyCore’s initial total distribution price was XXXXXXX. With Round 1, the

distribution price was lowered to XXXXXXX, and this was kept level with Round 2. With

Round 3, SupplyCore lowered its distribution price to XXXXXXXxX, and then its final

distribution price was XXXXXXX. AR 4078-4092. Thus, SupplyCore reduced its price by XXX

XXXXX. In contrast, Noble, which received narrower instructions to lower its distribution fee

pricing than SupplyCore, reduced its distribution fees by a total of nearly XXXXXXX. Noble’s

initial distribution price was XXXXXXX. With Round 1 this was lowered to XXXXXXX. With

Round 2 was lowered to XXXXXX, then to XXXXXXX with Round 3, and followed by a final

distribution price of XXXXXX. Id.

15

For these reasons, the Court holds that SupplyCore has not undermined the sufficiency of

DLA’s price reasonableness analysis or evaluations. The Court now moves to the question of

whether that analysis should have found SupplyCore’s pricing “unreasonable.”

B. DLA’s Price Reasonableness Evaluation Was Not Bound to Find SupplyCore’s

Distribution Pricing Unreasonable.

SupplyCore argues that had a price reasonableness evaluation been conducted (or if the

Court finds that such an evaluation was in fact conducted), its distribution fee pricing would and

should have triggered an “unreasonable” finding, as well as a requirement that SupplyCore be

apprised of this finding. See, e.g., ECF No. 29 at 14-15. The Government does not disagree that

if such an “unreasonable” price finding had been made, there may have been a requirement to

notify SupplyCore, but also highlights the fact that DLA repeatedly and broadly instructed

SupplyCore to improve its distribution prices. See, e.g., ECF No. 33 at 14.

The Court agrees that, as suggested by the Government, DynCorp Int'l, LLC v. United

States, 10 F.4th 1300 (Fed. Cir. 2020), is “instructive” in this case. In DynCorp, six offerors

submitted proposals. DynCorp, which was not selected for award, was initially found to have

submitted a decent but not distinctively good technical proposal, and also proposed much higher

prices than the other offerors. /d. at 1306. DynCorp moved to challenge the award on the basis

that the solicitation indisputably required price reasonableness to be evaluated for all offerors,

contending that this had not transpired. /d. at 1307. The Army postponed the bid protest and

undertook an additional review of all six offers for price reasonableness, and then reconfirmed its

decision, declining to reopen discussions having found that the prices of all six offerors were

reasonable, despite a very wide range of pricing. /d. In other words, the Army determined that

each offeror’s price was reasonable for its respective and distinct technical approach. /d.

DynCorp objected, contending that there should have been a simple proposal-to-proposal price

comparison, but the Court disagreed, finding that pricing regulations included no such

requirements. /d. at 1316. The Court concluded that while DynCorp’s price was high, the price

was not unreasonably high given its distinct technical approach; therefore, it upheld the Army’s

award. /d. at 1317.

Critically, in this case, GAO highlighted the apparent fact that SupplyCore’s approach —

specifically with respect to its distribution proposal — was distinct from Noble’s, the awardee.

See AR 7765 (citing AR 7255). As noted above, SupplyCore’s original bid protest before the

GAO alleged that its XXXXXXXX distribution fee proposals reflected SupplyCore’s purported

knowledge of the Agency’s “actual needs,” and that “Noble’s proposal does not reflect the actual

needs of the Agency and the pricing of the resulting contract will not properly reflect the actual

price to be incurred by the Agency and will ultimately result in greater cost to the Government.”

Id.

SupplyCore argues that DynCorp stands for the proposition that if there is a major

disparity in pricing, “unreasonable” pricing is indicated. However, the Government correctly

states that as presented in DynCorp, disparity in prices “is a function of a competitive

procurement, not a fundamental problem.” See ECF No. 31 at 23 (citing DynCorp, 10 F.4th at

16

1314). In other words, “the Army determined that each offeror’s price was reasonable for its

chosen technical approach, notwithstanding disparities in pricing.” /d. at 1316. The Federal

Circuit ultimately found that “DynCorp's proposed price was high[, but it was not unreasonably

high for the technical approach it proposed.” /d. at 1317. Thus, DynCorp cannot be read as

supporting the proposition that the magnitude of a discrepancy (alone) establishes that a

reasonableness determination has not been made. As with the protestor in DynCorp,

SupplyCore’s XXXXXXXX distribution fee pricing reflects its chosen approach — by

SupplyCore’s own account. See AR 7765 (citing AR 7255). Also, in addition, the GAO

opinion presents an emphatic and thorough general rejection of the argument that “magnitude of

the [price] disparity” should trigger “unreasonable” price findings. See AR 7759-7760

(addressing “magnitude of the disparity” arguments with respect to “meaningful discussions”

analysis).

SupplyCore also invokes Serco Inc. v. United States, 81 Fed. Cl. 463, 495 (2008) to make

an additional argument that SupplyCore should have been informed that its pricing was

unreasonable. In short, SupplyCore construes Serco as establishing a putative framework for

findings that a given price may be an “outlier,” which in turn, purportedly, may trigger an

“unreasonableness” finding. See ECF No.29 at 15. As presented, this “outlier” argument

applies to unreasonableness findings based on (A) prices of offerors relative to one another

(addressed above vis-a-vis DynCorp), but also (B), “outlier” status relative to the Government’s

maximum Total Evaluated Price (“TEP”) objectives. Jd.

Discussing the applicability of Serco requires some factual excavation of that case.

Underlying Serco was a solicitation awarded by the GSA to provide technology products and

services to the entire Federal Government. Serco, 81 Fed. Cl. at 465. The solicitation specified

that technical factors would be “significantly more important than cost or price,” but also added

that “the closer the technical scores of the various proposals are to one another, the more

important cost or price considerations become in determining the overall best value for the

government.” /d. at 466-67. The solicitation yielded 62 offerors whose bids, if technically

proximate, were supposed to be evaluated for price. See id. at 465-67. GSA also prepared an

“Independent Government Cost Estimate” (IGCE). /d. at 473. The GSA selected 29 awardees,

including the 28 offerors with the best technical proposals. /d. at 477. The prices of the offerors

(and the awardees) were wildly disparate, ranging from well beneath the ICGE to far above it —

some awardees’ prices were more than double the price of the lowest-priced awardee. /d. at 492.

GSA purportedly evaluated every offered price as “fair and reasonable,” and also issued awards

to the 59th, 60th, and 61st-highest bidders out of 62 (i.e., three of the four highest of the 62 offers

were selected). /d. In conjunction with this, every price analysis concluded: "In relation to the

IGCE for overall price and Mean Overall Price among all offerors (Government and Contractor

Site combined over 10 years), the Offeror's Mean Overall Price is in line with adequate price

competition and is, therefore, considered fair and reasonable." /d. at 495. In other words,

despite the dramatic variance in the pricing among the different offers and also between the

offers and the IGCE, GSA still represented, uniformly, that each offeror’s pricing was “‘in line

with adequate price competition’ ‘even when [GSA’s] own statistics demonstrated they were

not.’” Jd. The Court held that this clearly illogical representation triggered a decision that

GSA’s price reasonableness analysis was arbitrary and capricious because, apparently, there

“was no price reasonableness analysis at all.” /d. Pertinent to SupplyCore’s argument, in this

17

context, the Court referred to some of the prices which GSA found “fair and reasonable” as

“outliers.” Jd. at 492, 495. However, in fact, the Serco Court’s finding that GSA’s price

reasonableness analysis was arbitrary and capricious obviously hinges on a contradiction in the

agency’s finding: the finding espoused to reflect “the IGCE for overall price and the Mean

Overall Price among all offerors” and then found each offeror’s pricing fair and reasonable in

relation to these — which is difficult to rationalize given the actual range and volatility of all the

offerors’ pricing.

Thus, Serco discusses “outlier” prices with respect to the mean price among all offerors

and also when comparing offerors’ pricing to the IGCE. The Court took notice of these “outlier”

prices in conjunction with the GSA’s facially problematic finding that each and every offeror’s

price was “in line with adequate price competition.”

SupplyCore does not argue that the Government was bound to disclose or strictly apply

its maximum pricing for the Zone 1 contract (or the distribution costs thereof) but takes the

position that its distribution fee pricing constituted an “outlier”: relative to the Government’s

maximums. See ECF No. 29 at 15. Thus, drawing on Serco, SupplyCore suggests a per se rule:

“prices that are outliers are unreasonable on their face.” ECF No. 33 at 8.

SupplyCore’s suggested analogy to Serco, suggesting an “outlier” framework for

relatively high prices, is inapt. As the Government notes, the Serco decision “does not purport to

impose a bright-line rule that the mere presence of outlier prices renders a price proposal

unreasonable per se.” See ECF No. 35 at 6. Moreover, here, unlike the agency in Serco, DLA

made no representations to SupplyCore about reasonableness relative to the agency’s estimate or

maximum pricing. But DLA did evidently conduct price reasonableness analysis and conveyed

this to SupplyCore. In contrast to the DLA here, in Serco, GSA’s price reasonableness finding

made a facially erroneous representation with express reference to the Government’s estimate,

indicating that no price reasonableness analysis had actually taken place.

The Court holds that SupplyCore has not demonstrated that DLA should have found its

distribution pricing unreasonable.

C. The Discussions Between SupplyCore and DLA Were Meaningful.

SupplyCore levies a series of arguments that DLA arbitrarily and capriciously failed to

conduct meaningful discussions with SupplyCore, but these arguments are not convincing.

The Government’s position essentially has three steps. First, the Government highlights

the relatively low legal bar for “meaningful discussions: “[D]iscussions are meaningful if they

generally lead offerors into the areas of their proposals requiring amplification or correction,

which means that discussions should be as specific as practical considerations permit.”

WorldTravelService v. United States, 49 Fed. Cl. 431, 439 (2001) (quoting Advanced Data

Concepts, Inc. v. United States, 43 Fed. Cl. 410, 422 (1999), aff'd, 216 F.3d 1054 (Fed. Cir.

2000)); accord Carahsoft Tech. Corp. v. United States, 86 Fed. Cl. 325, 343 (2009). However,

“itis well-accepted that ‘agencies are not obligated to conduct all-encompassing discussions, that

is, to address in express detail all inferior or inadequate aspects of a proposal.’” Banknote Corp.

18

of Am., Inc. v. United States, 56 Fed. Cl. 377, 385 (2003) (citation omitted), aff'd, 365 F.3d 1345,

1356-57 (Fed. Cir. 2004). Agencies are “not required to ‘spoon-feed’ offerors in order to have

meaningful discussions.” Carahsoft, 86 Fed. Cl. At 343. “Rather, the agency should tailor its

discussions to each offer, since the need for clarifications or revisions will vary with the

proposals.” WorldTravelService, 49 Fed. Cl. at 439.

Second, the Government zeroes in on the legal requirements to clear this relatively low

bar: “The FAR only requires a contracting officer to discuss ‘deficiencies and significant

weaknesses.’” FAR 15.306(d)(3). Beyond this required minimum, the Government explains,

“the precise content of discussions is largely a matter of the contracting officer’s judgment.”

Patriot Taxiway Indust., Inc. v. United States, 98 Fed. Cl. 575, 587 (2011). “The contracting

officer has broad discretion in conducting discussions.” Advanced Data, 43 Fed. Cl. at 422;

FAR 15.306(d)(3) (‘The scope and extent of discussions are a matter of contracting officer

judgment.”).

Third, the Government contends that DLA did not run afoul of this requirement to

discuss “significant weakness” or “deficiencies”® because SupplyCore’s distribution fees under

the circumstances did not meet the definition of “significant weakness” or “deficiency.”

Following the principles of DynCorp, the Government explains that “a price that is too high, but

not unreasonably high, fails to meet the definition of either a deficiency or a significant

weakness.” See ECF No. 31 at 23, 26, 29. The Court finds this position persuasive. The

Government further disputes the possibility that DLA’s discussions with SupplyCore were not

meaningful by couching SupplyCore’s responses to DLA’s feedback as a function of business

judgment rather than inadequate information:

[W]hereas its competitors heeded the Government’s directives to improve

pricing in each of the three rounds of discussions, SupplyCore eschewed the

Government’s admonition and largely elected not to improve its pricing in

the second round of discussion (only in the first and third rounds). Given

these facts, there is no reason to believe that SupplyCore would have

sufficiently lowered its price to place it in line for award, even had the agency

directly advised SupplyCore of the agency’s negotiation objectives. Instead,

as SupplyCore’s comments make clear, SupplyCore’s pricing was the

product of its own business judgment, not of agency action or inaction.

See ECF No. 31 at 33. The Court finds this perspective correct. As noted above, DLA

advised SupplyCore to “review and improve pricing for XX distribution tiers: XXXXX

XXXXXXXKXXXKKXXKXXXXXXXXXXXXXXXXXXXXXX” and repeated this

instruction each Round. AR 2132, 2224, 2873. In response, SupplyCore lowered its

distribution prices from XXXXXXX (initial price) to XXXXXXX (final price). AR

8 A “[d]eficiency” is defined as “[a] material failure of a proposal to meet a Government

requirement or a combination of significant weaknesses in a proposal that increases the risk of

unsuccessful contract performance to an unacceptable risk.” FAR 15.001. A “[s]ignificant

weakness” is defined as “[a] flaw in the proposal that appreciably increases the risk of

unsuccessful contract performance.” /d.

19

4084, 4086, 4089, 4092. Noble, which received more moderate, narrower instructions to

reduce its distribution pricing, lowered its distribution pricing from XXXXXXXX (initial

price) to XXXXXX (final price). Jd. Because SupplyCore’s cuts were so modest, the

Government suggests that this Court should be skeptical of SupplyCore’s current

assertions that in response to alternative instructions, it would have made significant cuts

to its distribution fee prices.

In response, SupplyCore emphatically opposes the Government’s account of its pricing

decisions, but does not succeed in convincing this Court that DLA’s discussions were less than

meaningful. Central to these meaningful discussions arguments, SupplyCore agrees the

Government that FAR 15.306(d)(3) represents a key baseline requirement for discussions,

whereby an agency is bound by law to discuss “deficiencies” and “significant weaknesses.” See,

e.g., ECF No. 33 at 9.

SupplyCore spends surprisingly little time arguing that its distribution pricing in fact

constitutes a “significant weakness,” and seems more preoccupied with the implications which

follow, should such a finding be made. See, e.g., ECF No. 33 at 9-11. In any case, the crux of

SupplyCore’s argument that its distribution pricing constituted a “significant weakness” is the

disparity between DLA’s maximum objectives and SupplyCore’s pricing. See ECF No. 29 at 16.

But SupplyCore cites no cases where prices above the Government’s maximum objectives or

estimates were construed as “significant weaknesses” directly for that reason. SupplyCore does

cite DynCorp for the proposition that offerors’ “unreasonably high prices” must be discussed.

ECF No.33 at 9. However, for reasons reviewed above, the Court finds this completely

unconvincing because DynCorp establishes that high prices above the Government’s maximum

or estimate may not be unreasonable if they reflect an offeror’s chosen technical approach.

DynCorp, 10 F.4th at 1316-17. Also, again, the GAO ruling in this case already highlights the

fact that SupplyCore, the incumbent contractor, feels that it is more aware of the Government’s

“actual needs” than other offerors. This suggests that SupplyCore’s bid appears to have reflected

a different approach, like the protesting high bidder in DynCorp. AR 7765. The Court finds that

DynCorp cannot be credibly invoked to interpret SupplyCore’s distribution fee pricing as a

“significant weakness,” or to otherwise prove that DLA’s discussions were less than meaningful.

Beyond this, SupplyCore also argues against meaningful discussions on the basis that

DLA’s instruction to “improve” pricing was misleadingly understated. See ECF No. 29 at 18.

This argument again runs into the reality that DLA repeatedly and broadly instructed SupplyCore

to improve its distribution fees, and that SupplyCore mostly disregarded the instruction,

especially in conjunction with Noble’s responses (reductions) to narrower DLA instructions to

“improve” distribution pricing. See AR 2132, 2224, 2873; 4078-4093.

Finally, SupplyCore points out an apparent inconsistency: if, in the Zone 2 discussions,

DLA informed PAE that its distribution fee pricing “cannot be determined fair and

reasonable,” why was a similar instruction not conveyed to SupplyCore in the Zone 1 contract

discussions? See ECF No. 33 at 11-12. This again raises the issue underlying DynCorp.? The

? DynCorp does not embrace proposal-to-proposal price comparisons because of

differences in offerors’ technical approaches. DynCorp, 10 F.4th at 1316. In other words, the

20

Court is additionally disinclined to assess “meaningful discussions” in Zone 2 using DLA’s Zone

1 Round 3 representation to PAE because of how the solicitation effectively separates the Zone 1

and Zone 2 contracts, stipulating that one contractor almost certainly cannot win both bids. AR

226; AR 228; AR 636-37. For this reason and because of this Court’s reading of DynCorp,

DLA’s Round 3 discussions with PAE for the Zone 2 contract is not enough to render the Zone 1

discussions less than meaningful. In other words, the two contracts were sufficiently distinct to

preclude application of a rigid consistency requirement.

Again, challenging a procurement award requires a showing that the agency action in

question was "arbitrary, capricious, an abuse of discretion, or otherwise not in accordance with

law." 5 U.S.C. §706(2)(A). SupplyCore has not established that DLA’s award of the Zone 1

contract to Noble instead of SupplyCore meets this threshold. Specifically, SupplyCore has not

convinced this Court that DLA’s evaluation of the Zone 1 distribution fee pricing proposals

constituted a “significant weakness” for the purposes of meaningful discussions requirements,

nor that DLA’s Zone 1 representations to SupplyCore otherwise fell short of “meaningful

discussions.”

VI. Conclusion

For the reasons set forth above, the Court GRANTS IN PART AND DENIES IN

PART Plaintiffs Motion for Judgment on the Administrative Record. With respect to the Zone

2 Contract, the Court GRANTS Plaintiffs request for a declaratory judgment and Motion for a

Permanent Injunction. The Court ENJOINS the DLA from continuing performance on the Zone

2 contract awarded pursuant to the solicitation at issue in this protest and DIRECTS the DLA to

cancel the contract awarded to PAE. With respect to the Zone 1 Contract, the Court DENIES

Plaintiff's Motion.

The Court further GRANTS IN PART AND DENIES IN PART Defendant’s Cross

Motion for Judgement on the Administrative Record. With respect to the Zone 2 contract, the

Court DENIES Defendant’s Cross-Motion. With respect to the Zone 1 contract, the Court

GRANTS Defendant’s Cross-Motion.

fact that the price of Proposal A is higher than that of Proposal B does not foreclose the

possibility that relative to what each Proposal entails, Proposal A may be reasonably priced

while Proposal B — while lower than Proposal A — conceivably may be unreasonably priced. See

id. (rejecting proposal-to-proposal price comparisons for review of price reasonableness). In this

case, the Zone 2 contract appears to approximately feature such a scenario, which does not

necessarily even come close to provoking an arbitrary, capricious or irrational finding. However,

there is the additional detail that in the Zone 2 discussions, after less expensive Proposal B’s

price (PAE’s) was found unreasonably high, the contractor (PAE) declined to lower the price —

keeping it “unreasonable” by the Government’s assessment — and then in spite of this, the agency

awarded Proposal B the contract. The Zone 1 contract, however, approximately features this

same scenario without the additional twist where the proposal with “unreasonable” pricing is

awarded the contract. Thus, the Zone 2 and Zone 1 awards represent distinct scenarios.

21

The Court further DENIES Defendant-Intervenor PAE’s Cross-Motion for Judgment on

the Administrative Record.

The Court also GRANTS Defendant-Intervenor Noble’s Cross-Motion for Judgment on

the Administrative Record.

The Clerk is directed to enter judgment accordingly.

The parties are directed to file redactions within ten (10) days of the date of this Opinion

and Order.

IT IS SO ORDERED.

s/Edward J. Damich

EDWARD J. DAMICH

Senior Judge

22

This is a copy of a public record, reproduced as it was published. It is not legal advice, and it may not be the version a court would rely on. Check the official source before you cite it.