Opinion

Campbell v. 1 Spring, L.L.C.

  • 155 N.E.3d 186
  • 2020 Ohio 3190
Court
Ohio Court of Appeals
Filed
Jun 4, 2020
Status
Published
On the bench
Dorrian, J.
Cited by
17 cases
Authority
More cited than 69.9%

"A contract is ambiguous when its meaning cannot be determined from the four corners of the agreement or where the language is susceptible to two or more reasonable interpretations."

How later courts described this case

  • "A contract is ambiguous when its meaning cannot be determined from the four corners of the agreement or where the language is susceptible to two or more reasonable interpretations."
  • “If the terms of the contract are clear and precise, it is not ambiguous and the court may not refer to evidence outside the contract to determine the meaning of those terms.”

Written by the judges who cited it.

The opinion

[Cite as Campbell v. 1 Spring, L.L.C., 2020-Ohio-3190.]

IN THE COURT OF APPEALS OF OHIO

TENTH APPELLATE DISTRICT

Robert W. Campbell, :

Plaintiff-Appellee, :

No. 19AP-368

v. : (C.P.C. No. 15CV-9033)

1 Spring, LLC et al., : (REGULAR CALENDAR)

Defendants-Appellants. :

D E C I S I O N

Rendered on June 4, 2020

On brief: Hrabcak & Company, L.P.A., Michael Hrabcak,

and Benjamin B. Nelson, for appellee. Argued: Benjamin B.

Nelson.

On brief: Law Office of W. Evan Price, II, LLC, and W. Evan

Price, II, for appellants. Argued: W. Evan Price, II.

APPEAL from the Franklin County Court of Common Pleas

DORRIAN, J.

{¶ 1} Defendants-appellants, 1 Spring, LLC ("1 Spring"), James R. Horner, and

Samuel Horner (collectively, "appellants") appeal from an order of the Franklin County

Court of Common Pleas awarding damages to plaintiff-appellee, Robert W. Campbell, on

his claim for breach of contract. For the reasons that follow, we affirm.

I. Facts and Procedural History

{¶ 2} Appellants appealed a prior judgment in favor of Campbell to this court; in

that appeal we found the trial court erred by relying on extrinsic evidence in determining

whether the agreement between the parties was ambiguous. We reversed and remanded

for further proceedings. Campbell v. 1 Spring, LLC, 10th Dist. No. 18AP-94, 2019-Ohio-

623, ¶ 12. In our prior decision, we set forth the facts underlying the disputed contract:

No. 19AP-368 2

James R. Horner and Samuel Horner are members of 1 Spring,

which owns the building located at the southwest corner of

North High Street and West Spring Street in Columbus, Ohio.

On April 20, 2012, 1 Spring entered into a lease with the Lamar

Companies ("Lamar") providing for an outdoor advertising

structure to be placed on the building ("sign lease"). The sign

lease provided that Lamar would pay 1 Spring $80,000.04 per

year in monthly installments for a term of ten years. Lamar also

held an option to extend the sign lease for an additional ten

years after the initial term expired.

Prior to entering the sign lease, 1 Spring had obtained approval

from the Columbus Downtown Commission to erect a digital

sign on the building. Shortly before entering the sign lease, the

Horners became aware that due to the building's location on a

state highway it would be necessary to comply with state

regulations regarding outdoor advertising. James contacted

the Ohio Department of Transportation ("ODOT") and was

advised that a sign would not be permitted on the 1 Spring

building under the existing rules due to its proximity to other

signs in the surrounding area, unless 1 Spring acquired all the

existing advertising in the area. The ODOT employee indicated

the agency would not grant a variance to allow a sign on the 1

Spring building, but also indicated the Director of ODOT had

expressed interest in amending the existing rules to exclude

urban business districts from the sign spacing requirements.

A business associate of James recommended he contact

Campbell, who was a former chief of staff at ODOT, regarding

assistance in obtaining approval for the sign. The Horners and

Campbell met on April 23, 2012 to discuss the possibility of

Campbell assisting in obtaining approval for the sign and

compensation for such assistance. Following the meeting, the

parties agreed to memorialize their agreement in writing to

establish that Campbell was authorized to represent 1 Spring.

The agreement was set forth in the form of a letter to Campbell

signed by James as the managing partner of 1 Spring ("the

agreement"), providing the following terms:

Samuel and James Horner hereby agree to pay you 10% of the

gross receipts ($80K/year) from a lease that has been executed

in regards to the above referenced property.

Your compensation shall be $8,000/year during the initial

term of ten (10) years. The lease commences at a point in time

when the sign has been erected.

No. 19AP-368 3

For this compensation, we are "in your hands" to facilitate the

proper "permitting issues" needed for the sign with regards to

the State of Ohio.

If this is agreeable to you, please sign below and return to me

at my email address.

(Joint Ex. No. IV.) A few days later, Campbell added a

handwritten amendment to the agreement, providing as

follows:

In addition to the above terms and conditions, Samuel and

James Horner agree to pay 10% of the gross receipts of the

annual negotiated amount with Lamar Companies for the

following term of 10 yrs at the end of the original 10 yr

agreement. This contract is binding with 1 Spring LLC and

heirs and assigns hereto.

(Joint Ex. No. IV.) The Horners initialed this amendment,

indicating their approval.

Id. at ¶ 1-4.

{¶ 3} On remand, the trial court issued a decision, including findings of fact and

conclusions of law, concluding the agreement was a binding contract and certain terms in

the agreement were ambiguous. The court further held that Campbell performed under the

agreement and appellants breached the agreement by failing to compensate Campbell. The

court subsequently issued a final judgment entry, incorporating its findings of fact and

conclusions of law, holding appellants liable to Campbell for $51,764.14, plus interest, for

the period through June 2019, and 10 percent of future rent revenues received from the

sign lease beginning in July 2019, pursuant to the terms of the agreement.

II. Assignment of Error

{¶ 4} Appellants appeal and assign the following sole assignment of error for our

review:

The trial court erred by adopting conclusory findings of fact

regarding the extrinsic evidence offered to explain ambiguities

in the Parties' Contract that were against the manifest weight

of the evidence, misinterpreting the contract based on those

unsupported findings and entering judgment on Appellee's

breach of contract claim based on that misinterpretation.

No. 19AP-368 4

III. Analysis

A. Standard of Review

{¶ 5} The elements of a contract include an offer, acceptance, contractual capacity,

consideration, a manifestation of mutual assent, and legality of purpose. You v. Northeast

Ohio Med. Univ., 10th Dist. No. 17AP-426, 2018-Ohio-4838, ¶ 19. A plaintiff asserting

breach of contract must establish existence of a contract, performance by the plaintiff under

the contract, breach by the defendant, and loss or damage to the plaintiff. CosmetiCredit,

LLC v. World Fin. Network Natl. Bank, 10th Dist. No. 14AP-32, 2014-Ohio-5301, ¶ 13.

"[J]udicial examination of [a] contract begins with the fundamental objective of

ascertaining and giving effect to the intent of the parties at the time they executed the

agreement." Id. When a contract is not ambiguous, it must be enforced as written. Id. at

¶ 14.

{¶ 6} A contract is ambiguous when its meaning cannot be determined from the

four corners of the agreement or where the language is susceptible to two or more

reasonable interpretations. Covington v. Lucia, 151 Ohio App.3d 409, 2003-Ohio-346, ¶ 18

(10th Dist.). When parties to a contract dispute the meaning of language within the

contract, the court must first consider the content within the four corners of the contract.

Drs. Kristal & Forche, D.D.S., Inc. v. Erkis, 10th Dist. No. 09AP-06, 2009-Ohio-5671, ¶ 21.

If the terms of the contract are clear and precise, it is not ambiguous and the court may not

refer to evidence outside the contract to determine the meaning of those terms. Id.

However, "[w]hen the language of a contract is unclear or ambiguous, or when the

circumstances surrounding the agreement give the plain language special meaning,

extrinsic evidence can be used to ascertain the intent of the parties." Id. at ¶ 22.

{¶ 7} In the present case, the trial court found the phrases "in your hands" and

"permitting issues" within the agreement to be ambiguous because they were susceptible

to two or more conflicting but reasonable interpretations. (Apr. 5, 2019 Decision at 14.)

The court concluded appellants relied on Campbell's experience and expertise with

permitting and waiver issues and they were willing to place themselves in his hands to

obtain the desired outcome—i.e., a permit for a sign on the 1 Spring building. The court

concluded Campbell had broad latitude and unlimited authority to determine the means

No. 19AP-368 5

through which a permit for the sign would be obtained, without interference from

appellants.

{¶ 8} Appellants do not appear to dispute the trial court's conclusion that the

agreement was ambiguous. Rather, appellants challenge the trial court's determination

that Campbell had unlimited authority under the agreement to determine how to obtain a

permit for a sign on the 1 Spring building. Appellants argue they only hired Campbell to

obtain a waiver of the existing Ohio Department of Transportation ("ODOT") requirements

and a permit to construct the sign on their building, not to obtain an amendment of ODOT's

regulations.

{¶ 9} "Whether a contract is ambiguous is a question of law. The meaning of the

words in an ambiguous contract becomes a question of fact. Extrinsic evidence is

admissible to ascertain the parties' intentions, and the trial court's determination will not

be overturned absent an abuse of discretion." (Internal citations omitted.) Atelier Dist.,

LLC v. Parking Co. of Am., Inc., 10th Dist. No. 07AP-87, 2007-Ohio-7138, ¶ 17. See also

Benchmark Contrs., Inc. v. Southgate Mgt., LLC, 10th Dist. No. 13AP-390, 2014-Ohio-

1254, ¶ 41, quoting Stoll v. United Magazine Co., 10th Dist. No. 03AP-752, 2004-Ohio-

2523, ¶ 7 (" '[I]f a contract is ambiguous, the meaning of the words is a factual question and

a court's interpretation will not be overturned absent an abuse of discretion.' " (Emphasis

sic.)); Ohio Historical Soc. v. Gen. Maintenance & Eng. Co., 65 Ohio App.3d 139, 147 (10th

Dist.1989) ("The meaning of terms used in a contract, if ambiguous, is a question of fact

and will not be overturned on appeal absent a showing that the trial court abused its

discretion."). An abuse of discretion occurs when a trial court's decision is arbitrary,

unreasonable, or unconscionable. Blakemore v. Blakemore, 5 Ohio St.3d 217, 219 (1983).

"A decision is unreasonable if there is no sound reasoning process that would support that

decision." AAAA Ents., Inc. v. River Place Community Urban Redevelopment Corp., 50

Ohio St.3d 157, 161 (1990). An arbitrary decision is one that lacks adequate determining

principle and is not governed by any fixed rules or standard. Porter, Wright, Morris &

Arthur, LLP v. Frutta Del Mondo, Ltd., 10th Dist. No. 08AP-69, 2008-Ohio-3567, ¶ 11. An

unconscionable decision may be defined as one that affronts the sense of justice, decency,

or reasonableness. Id.

No. 19AP-368 6

{¶ 10} Appellants also argue the trial court's decision was against the manifest

weight of the evidence. The trial court concluded Campbell performed under the agreement

by helping facilitate a rule change that allowed appellants to construct the sign, and

appellants breached the agreement by failing to compensate Campbell. Appellants claim

Campbell was not a credible witness and was frequently impeached at trial using his

deposition testimony. Appellants also argue Campbell had no expertise in regulatory

amendments and, therefore, it was illogical for the trial court to conclude appellants would

hire him to obtain a change in Ohio law.

{¶ 11} "Judgments supported by some competent, credible evidence going to all the

essential elements of the case will not be reversed by a reviewing court as being against the

manifest weight of the evidence." C.E. Morris Co. v. Foley Constr. Co., 54 Ohio St.2d 279,

280 (1978). An appellate court applying the manifest-weight standard weighs the evidence

and all reasonable inferences, considers the credibility of the witnesses, and determines

whether, in resolving conflicts in the evidence, the finder of fact clearly lost its way. Sparre

v. Ohio Dept. of Transp., 10th Dist. No. 12AP-381, 2013-Ohio-4153, ¶ 10. "When reviewing

a judgment under the civil manifest weight of the evidence standard, the court must

presume that the findings of the trier of fact are correct, as the trial judge had the

opportunity to view and observe the witnesses and to use those observations in weighting

the credibility of the testimony." Mayle v. Ohio Dept. of Rehab. & Corr., 10th Dist. No.

09AP-541, 2010-Ohio-2774, ¶ 39. See also Seasons Coal Co. v. Cleveland, 10 Ohio St.3d

77, 79-80 (1984) ("While we agree with the proposition that in some instances an appellate

court is duty-bound to exercise the limited prerogative of reversing a judgment as being

against the manifest weight of the evidence in a proper case, it is also important that in

doing so a court of appeals be guided by a presumption that the findings of the trier-of-fact

were indeed correct."). " 'If the evidence is susceptible of more than one construction, the

reviewing court is bound to give it that interpretation which is consistent with the verdict

and judgment, most favorable to sustaining the verdict and judgment.' " Eastley v.

Volkman, 132 Ohio St.3d 328, 2012-Ohio-2179, ¶ 21, quoting Seasons Coal Co. at 80, fn. 3,

quoting 5 Ohio Jurisprudence 3d, Appellate Review, Section 60, at 191-92 (1978).

No. 19AP-368 7

B. Evidence presented at trial

{¶ 12} Because appellants challenge the trial court's conclusions that Campbell had

unlimited authority to determine how to obtain a permit for appellants' sign and that

Campbell performed under the agreement by helping facilitate a regulatory change

allowing construction of the sign, we must consider the evidence presented at trial related

to those issues.

1. Initial meeting with Campbell and formulation of agreement

{¶ 13} James Horner testified he spoke with John Keckstein of ODOT in mid-April

2012, after the Horners obtained a certificate of appropriateness to construct a sign on the

1 Spring building from the city of Columbus. Keckstein informed him the sign could not be

constructed under ODOT regulations, unless appellants purchased all the existing

advertising permits in the area. Keckstein also indicated the director of ODOT had been

encouraged by various municipal leaders to change the permitting regulations for signs in

municipal areas. James testified he thought changing Ohio law would be a "Herculean kind

of effort" that would take "months, if not years" and that appellants needed to get their sign

permitted as quickly as possible. (Tr. Vol. II at 365.) Samuel Horner testified a mutual

acquaintance recommended contacting Campbell for assistance, because Campbell was

influential with ODOT.

{¶ 14} Campbell and the Horners met on April 23, 2012, at a restaurant in the 1

Spring building. Campbell testified he thought he could help the Horners get a permit for

the sign because he was familiar with ODOT and had relationships with the relevant ODOT

employees. Campbell worked for a private-sector company in 2012, but had previously

worked for ODOT for 14 and one-half years, ultimately serving as chief of staff to the agency

director for approximately one a one-half years.

{¶ 15} James testified that during the April 23rd meeting, Campbell claimed he

could get a waiver from ODOT for construction of the sign. James stated Campbell

indicated "if it entailed changing the laws of Ohio, he was out" because he would not have

the time required for that type of effort. (Tr. Vol. II at 368.) James claimed he would not

have asked Campbell to pursue amending the law because Campbell was not an attorney.

Similarly, Samuel testified that during the meeting Campbell claimed he could get approval

for the sign without changing Ohio law through a waiver, variance, or non-conforming

No. 19AP-368 8

permit within 30 to 60 days. During the meeting, James told Campbell he had been

informed the sign would not be permitted without changing ODOT's regulations. Samuel

testified Campbell indicated he could get the permit without changing the law, and that if

changing the law was required, he would not be involved because he did not have the

experience or time required to amend the law. Samuel claimed this point was discussed

multiple times. Campbell testified there was no discussion with the Horners about

obtaining a waiver of the existing regulations, and asserted he had never heard the term

waiver used with respect to outdoor advertising permits during his time at ODOT.

{¶ 16} After the discussion at the restaurant, Campbell and the Horners went to the

Horners' office in the 1 Spring building so Campbell could get copies of certain documents.

While at the Horners' office, the parties worked out the terms of the written agreement.

Campbell testified the Horners insisted on putting the agreement in writing. By contrast,

the Horners testified Campbell asserted he needed something in writing to demonstrate to

ODOT that he was representing the Horners.

{¶ 17} James testified he and Campbell jointly dictated the agreement and that the

terms "in your hands" and "permitting issues" were put in quotation marks because the

parties had previously discussed what those terms meant. James stated "in your hands"

meant Campbell "was going to get this done from A to Z, and he is going to get us - - he is

going to take it from now, and he is going to get us a permit within the next 60 days." (Tr.

Vol. II at 376.) James also testified about his understanding of the term "permitting issues":

Q: Permitting issues, the next phrase that is in quotes, what was

your understanding of what that meant?

A: Well, he referred to waivers. I referred to a variance. I

referred to nonconforming. So there was a lot of terms that

were being thrown around at that meeting at the Barrio. So I

didn't know what to put in there exactly. That is why I put

permitting issues, because I thought that covered everything

involving getting our permits within a short period of time.

Q: Did it have anything to do with changing Ohio law?

A: Absolutely 100 percent not, and he said it, I said it. He said

it more than once, if you got to change Ohio law, I am out. I am

quoting him as I sit here, I am not making this up. I am telling

you the absolute truth. He said it more than once. We said it

more than once, because, again, he was not a lawyer. He

No. 19AP-368 9

couldn't walk this thing through the [Joint Committee on

Agency Rule Review] and hearings and everything else. He

couldn't take it from A to Z.

We wanted him to get permits just like other corners down

there were over permitted, something happened to get those

other corners over permitted. I wanted him to do the same

thing for us, and he said he could do that.

(Tr. Vol. II at 376-77.)

{¶ 18} Samuel agreed that James and Campbell were the primary drafters of the

agreement. Samuel testified about his understanding of the disputed terms in the

agreement:

Q: I was just going to ask you about two phrases. The first one

is, quote/unquote, in your hands. What was your

understanding of what that phrase meant?

A: We were in Bob Campbell's hands from start to finish. I was

upset about the ten percent. I wanted to do the five, but my

father said this is very important, and I agreed with him, the

ten percent to go forward.

But I also made the point to Bob at lunch, I said, ten percent,

you are doing everything, from start to finish, you are going to

– - we are not doing a thing. And Bob Campbell said, I can get

it done, and he agreed that it was going to be in a short period

of time and that if he couldn't get it done and if Ohio law needed

to be changed, he was out.

***

Q: The next quoted phrase is, quote/unquote, permitting

issues. What was your understanding of that phrase?

A: We didn't know what the term was, but we knew, we all knew

at the meeting and at lunch when we came back to our office

that Bob Campbell was being hired to get us a permit, whether

it be with the waiver or a variance. It had nothing to do with

changing Ohio law. That is why Bob Campbell was getting

hired. So the permitting issue dealt with a waiver or a variance

or a nonconforming permit so that we could erect our sign.

(Tr. Vol. II at 423-25.) Samuel testified the Horners wanted to get the permit for the sign

quickly, but admitted there was no reference to timing in the agreement. He further

No. 19AP-368 10

acknowledged that any limitations on Campbell's authority could have been included in the

agreement.

{¶ 19} Campbell testified that in working out the agreement, the Horners did not

specify a timeframe in which they needed to obtain the permit. Campbell further testified

the Horners did not indicate they were concerned about the method used to obtain a permit

for the sign. When asked about the meaning of the term "permitting issues" in the

agreement, Campbell responded:

I just -- I mean, I didn't think this was that complex. All I did

was I read this and thought I am going to go work -- talk with

the people at ODOT and see if I can make this happen. That is

what I did, and I knew he had to get a permit.

(Tr. Vol. I at 73.) On cross-examination, Campbell reiterated this understanding of the

phrase:

Q: And you understood the quoted phrase, in your hands, to

mean the defendants were relying on you to get a permit, to get

the permitting issues resolved at ODOT, correct?

A: Correct.

***

Q: Now, you understood on April 23, you believed that

permitting issues, in quote, meant that basically that you were

going to get the rules changed, the laws rewritten, so they could

get a permit, correct? That was your understanding?

A: My understanding was that I would do whatever I could to

get the permit, that I could move the process through the

department to do whatever I could to get that permit, no matter

what that meant.

(Tr. Vol. I at 99, 102.)

{¶ 20} The Horners testified that a few days after the initial meeting, Campbell

brought the handwritten addendum extending the term of the agreement to the Horners'

office, where both James and Samuel initialed the addendum. The Horners stated

Campbell only remained at their office briefly that day and was in a rush because he had a

meeting with Sarah Lee at ODOT.

No. 19AP-368 11

2. Campbell's interactions with ODOT

{¶ 21} Campbell testified he spoke with the ODOT chief of staff and chief engineer,

who indicated they did not oppose a permit for appellants' sign and suggested they believed

ODOT should not be regulating advertising in downtown municipal areas. On the evening

of April 23, 2012, Campbell e-mailed the Horners to report on his initial contact with

ODOT. Campbell advised the Horners he had made some progress, but needed to research

the legalities with ODOT. Campbell indicated he was "getting some support from the top,

but they have to listen to their council [sic] if laws crush us. Then we will need to take

another course of action." (Apr. 23, 2012 e-mail from Campbell, Joint Trial Ex. III.)

{¶ 22} Campbell subsequently met with Sarah Lee, the ODOT advertising device

control manager, and John Keckstein, a field agent in the ODOT advertising device control

department. Lee told Campbell there had been pressure from other cities for ODOT to not

interfere with advertising in municipal business districts. Lee indicated another ODOT

employee had previously drafted proposed regulatory amendments that would allow signs

like the one sought by appellants to be constructed and suggested appellants could be the

flagship case for adopting the amendments. Campbell testified these previously drafted

amendments were "way on the back shelf" and "[n]obody was doing anything" with them.

(Tr. Vol. I at 82.) Campbell testified that as a result of his meeting with Lee, ODOT initiated

the process of amending the regulations:

So we took it off the back shelf, and brought it to the forefront,

and then we had to start the process of getting the law changed.

* * * It is simple. It is a couple paragraphs that had to go

through [the Common Sense Initiative] and [the Joint

Committee on Agency Rule Review]. And so it wasn't that

complex.

(Tr. Vol. I at 83.) Campbell testified he checked in "somewhat regularly" on the progress of

the amendment. (Tr. Vol. I at 83.)

{¶ 23} On May 1, 2012, the Horners sent a letter to ODOT requesting a waiver

allowing construction of a sign on the 1 Spring building. Samuel testified he sent the letter

at Campbell's direction, and that Campbell reviewed the letter before it was sent. In

response to the letter, Lee prepared an internal memorandum about the proposed sign on

the 1 Spring building. Lee's memorandum noted one option would be to grant the

requested waiver, but indicated this would be contrary to all outdoor advertising rules and

No. 19AP-368 12

regulations and could create a problem when enforcing the rules against other non-

conforming signs. As an alternative, Lee recommended amending the Ohio Administrative

Code to institute business district spacing, as permitted under a state-federal agreement.

The proposed amendments eliminated sign spacing requirements in areas that qualified as

business districts. Lee noted the amendments would allow appellants' sign to be

constructed. Lee's memorandum did not mention Campbell's involvement with appellants'

request.

{¶ 24} Lee testified at trial about her meeting with Campbell. She asserted she

would not have re-engaged in an effort to amend ODOT's regulations unless Campbell had

discussed appellants' permit request with her. Lee testified Campbell was instrumental in

getting the regulations amended. Lee further testified she was not aware of waivers being

granted by ODOT for outdoor advertising.

{¶ 25} Keckstein also testified about his interactions with Campbell regarding

permitting for appellants' sign:

Q: At some point do you recall having a discussion with Mr.

Campbell in regard to the property located at 185 North High

Street or otherwise known as 1 Spring Street?

A: Yes. I believe we had some conversations about the site. He

came into the office and was wondering how we could get this

thing done, basically.

Q: When you say get this thing done, get it permitted or get the

rule changed, or what do you mean?

A: Get it permitted. What do we need to do to get it permitted?

(Tr. Vol. I at 219-20.) Keckstein characterized Campbell as the "lightning rod" to get the

proposed amendments to the ODOT regulations enacted. (Tr. Vol. I at 226.)

3. Events during summer and autumn of 2012

{¶ 26} Samuel claimed Campbell terminated the agreement on July 25, 2012 when

he called Samuel and informed him that no waiver would be granted for the sign and that

it was necessary to change the law for the sign to be approved. Samuel testified Campbell

told him "the law needs to be changed, I am out, I can't be involved, I am done, I can't get

you waivers," and recommended the Horners contact Andrew Bremer, who managed

No. 19AP-368 13

legislative affairs at ODOT. (Tr. Vol. II at 442.) Samuel stated he sent an e-mail to Bremer

about the issue but received no response.

{¶ 27} Samuel testified that in August 2012, he discussed the issue with former Ohio

Supreme Court Justice Andrew Douglas, who agreed to lobby for the Horners and pursue

an amendment to the ODOT regulations. Samuel testified he and James had a meeting

with Douglas on August 23, 2012; at Douglas's request, the Horners asked Campbell to join

the meeting so that Douglas could learn the status of Campbell's activities. Samuel stated

Campbell reiterated again at the meeting with Douglas that he would not be involved in

amending the law. Douglas and another member of his law firm subsequently represented

the Horners at meetings and hearings at ODOT and the Joint Committee on Agency Rule

Review ("JCARR"). Campbell testified he thought it was unnecessary for the Horners to

hire Douglas as a lobbyist because JCARR was not likely to reject ODOT's proposed

amendments. The proposed amendments were ultimately adopted1 and a permit for

appellants' sign was issued in December 2012. Samuel testified the sign was constructed

over approximately nine months and appellants began receiving revenue from the sign

lease in September 2013. Samuel admitted Campbell was not paid any compensation

pursuant to the agreement.

C. Evaluation of appellants' claims

1. Meaning of disputed terms in agreement

{¶ 28} As explained above, once a court determines a contract is ambiguous, the

meaning of the disputed term or terms is a question of fact, subject to review for abuse of

discretion. The relevant clause in the agreement stated "we are 'in your hands' to facilitate

the proper 'permitting issues' needed for the sign with regards to the State of Ohio." The

trial court found the phrases "in your hands" and "permitting issues" to be ambiguous.

{¶ 29} James and Campbell were primarily involved in drafting the language used

in the agreement, including the disputed terms. Campbell testified the agreement

authorized him to do whatever was necessary to get approval for a sign on the 1 Spring

building. He claimed there was no discussion with the Horners about obtaining a waiver

1 The regulatory amendments, which were adopted effective December 6, 2012, modified Ohio Adm.Code

5501:2-2-01 to add subsection (KK), defining a "business district," and Ohio Adm.Code 5501:2-02-02, to add

subsection (A)(3)(b)(iv), providing that there was no spacing requirement between advertising devices located

within a business district, with certain exceptions.

No. 19AP-368 14

of the permit requirements and stated he was not aware of ODOT issuing waivers for

outdoor advertising. By contrast, the Horners testified their discussion with Campbell

focused solely on quickly obtaining a waiver of the existing permit requirements. They

asserted they did not intend for Campbell to pursue amendment of ODOT's regulations,

and claimed that Campbell indicated he would not be involved if approval of the sign

required amending state law. However, the Horners admitted that no language limiting

Campbell's authority was included in the agreement. The testimony from Lee and

Keckstein tended to support Campbell's interpretation of the disputed terms, because they

indicated Campbell wanted to determine what was necessary to obtain approval for the

sign, rather than being narrowly focused on obtaining a waiver of the existing requirements.

{¶ 30} Under these circumstances, where there was competing credible evidence

regarding the meaning of the terms used in the agreement, we cannot conclude the trial

abused its discretion by finding that the phrase "we are 'in your hands' to facilitate the

proper 'permitting issues' needed for the sign with regards to the State of Ohio" gave

Campbell broad authority to pursue approval of the sign through whatever means he found

appropriate. Appellants have failed to demonstrate the trial court's decision was arbitrary,

unreasonable, or unconscionable. See Ruehl v. Air/Pro, Inc., 1st Dist. No. C-040339, 2005-

Ohio-1184, ¶ 7-12 (concluding trial court did not abuse its discretion by holding that

contractual provision stating a terminated employee "may forfeit all or part of his accrued

commissions" upon termination meant the employee forfeited commissions on orders for

which the employer had not yet been paid at the time of termination, but did not forfeit

previously earned commissions on orders for which the employer had been paid at the time

of termination (Emphasis omitted.)). Compare Benchmark Contrs. at ¶ 50 (concluding it

was unreasonable for trial court to resolve ambiguity in contract by finding a particular

entity was a party to the contract because the face of the contract was not reasonably

susceptible to that conclusion and no evidence was produced that would permit the court

to determine what role, if any, the entity had in formation of the contract).

2. Weight of the evidence

{¶ 31} We apply a deferential standard in evaluating appellants' claim that the trial

court's decision was against the manifest weight of the evidence. In reviewing the

judgment, we must presume the trial court's findings of fact are correct and, where the

No. 19AP-368 15

evidence is susceptible to more than one construction, give it the interpretation consistent

with sustaining the judgment. Eastley at ¶ 21; Mayle at ¶ 39. The trial court concluded

Campbell performed under the agreement by helping facilitate the regulatory amendments

that ultimately allowed construction of appellants' sign on the 1 Spring building. Based on

our review of the record, we find there was competent, credible evidence to support that

conclusion. As explained above, we find the trial court did not abuse its discretion by

concluding that the agreement gave Campbell broad authority to determine the method for

obtaining approval of appellants' sign. Campbell testified he discussed with ODOT

employees how to get appellants' sign approved, and those employees indicated a

regulatory amendment would be necessary. Following those discussions, ODOT revived

previously drafted regulatory amendments, which were ultimately enacted and allowed

appellants to construct a sign on the 1 Spring building. Campbell testified he checked in to

follow the progress of the amendment. Lee and Keckstein characterized Campbell's

involvement as having been instrumental in motivating ODOT to undertake the regulatory

amendments. Although there was conflicting evidence in this case, we cannot conclude the

trial court clearly lost its way in resolving those conflicts, and thus the trial court's decision

was not against the manifest weight of the evidence.

IV. Conclusion

{¶ 32} For the foregoing reasons, we overrule appellants' sole assignment of error

and affirm the judgment of the Franklin County Court of Common Pleas.

Judgment affirmed.

BEATTY BLUNT and NELSON, JJ., concur.

This is a copy of a public record, reproduced as it was published. It is not legal advice, and it may not be the version a court would rely on. Check the official source before you cite it.