The opinion

If this opinion indicates that it is “FOR PUBLICATION,” it is subject to

revision until final publication in the Michigan Appeals Reports.

STATE OF MICHIGAN

COURT OF APPEALS

CHARLES P. HARRIS and GUERDA E. UNPUBLISHED

HARRIS, February 27, 2020

Plaintiffs-Appellants,

v No. 346156

Washtenaw Circuit Court

FIDELITY NATIONAL TITLE INSURANCE LC No. 18-000228-CK

COMPANY and CITY OF ANN ARBOR,

Defendants-Appellees.

Before: BORRELLO, P.J., and METER and RIORDAN, JJ.

PER CURIAM.

In this case involving the use and maintenance of a sewer easement, plaintiffs appeal as of

right the trial court’s grant of summary disposition to defendants, Fidelity National Title Company

(“Fidelity”) and the city of Ann Arbor (the “City”). We affirm.

I. BACKGROUND

In 1985, plaintiffs purchased their home on Lot 88 in the Dover-Parkside Subdivision in

Ann Arbor. The subdivision was platted in 1960. The plat includes several easements, including

a notation that “all easements are for drainage, sewer lines, and other public utility lines.” One of

the easements lies on the east side of Lot 88. A second easement lies to the north of Lot 88. Both

of these easements are dedicated as “private” easements. Before the dedication, plat restrictions

were filed. As relevant to this appeal, the restrictions provided that “[e]asements for installation

and maintenance of utilities and drainage facilities shall be reserved as shown on the recorded

plat.”

Nonetheless, in 1956, before the dedication of the plat, plaintiffs’ predecessors in interest

recorded an easement in favor of the City. This easement, referred to as the Liber 776 easement,

consisting of a 60-foot wide construction easement and a 10-foot-wide permanent easement, was

granted “for the construction and maintenance of storm and sanitary sewers,” and permitted the

City

-1-

to construct storm sewers and sanitary sewers as a part of its storm and sanitary

sewer system, making thereon all needful excavations, therefor, using in said

construction all needful tools, implements, equipment, materials and supplies

therefor.

That after the construction of said storm and sanitary sewers, in the use of

said right of way, for maintenance purposes, and to keep said storm and sanitary

sewers in good order and repair, the [City] may use in such repair, all needful tools,

implements, equipment, materials and supplies therefor over and across the limited

maintenance right of way above described.

The easement further specified:

IT IS FURTHER AGREED, That in the construction or repair of said storm

and sanitary sewers, the [City], its officers, agents, workmen, as well as the

contractor and his employees, shall and will do as little damage to the said land and

premises as possible, and after such construction and repair shall and will leave the

same in like good condition as it was when any such construction or repair shall

have commenced, except that the consideration to the parties of the first part from

the City, the party of the second part, shall be full compensation for the removal or

damage to any trees, flowers, shrubs, earth or sod made necessary by the

construction of the sewers for which this right of way is granted.

On May 28, 1957, plaintiffs’ predecessors granted a “replacement” easement, referred to as the

Liber 801 easement, which contained different easement boundaries, but which contained the same

operating language as the Liber 776 easement.

The parties agree that the City subsequently placed a 15-inch sewer pipe and a five-foot

storm drain in the area behind where plaintiffs’ home would eventually be built. The parties

disagree, however, whether the pipes are actually located within the land bounded by the Liber

easements or the platted easement, to the extent that the boundaries differ. The initial plans, which

were prepared in 1961, purport to show that the pipes are within the boundary of the platted

easement. The City maintains that the pipes are within this easement, but plaintiffs disagree.

On August 15, 1961, the City recorded a “Disclaimer and substitution of rights-of-way in

Dover-Parkside Subdivision.” The disclaimer stated that the City had “constructed storm and

sanitary sewers in locations at variance to the right-of-way granted in Liber 776 Page 190” and to

the subdivision plat, “causing hardship and inconvenience” to the owners of the subdivision. The

disclaimer then “release[ed] and disclaim[ed]” any interest in the right-of-way along the lot lines

“common to lots 88 and 89” as granted in the Liber 801 easement and “retain[ed] as substitution

thereof, the rights-of-way along said lot lines as described in the plat of the Dover-Parkside

Subdivision[.]”

Plaintiffs purchased their property, which contained an existing home, in 1985. At that

time, they were issued a title insurance policy by Lawyers Title, which later merged with defendant

Fidelity. According to plaintiffs, in 2013 they noticed “stair-step” cracks in the exterior brick and

mortar joints along the north side of the residence closest to the easement. The home sustained

-2-

other damage as a result of settling in 2013 and 2014, including a sliding door that would no longer

open, heaving of the garage floor, cracks in the basement drywall, and water damage in the

basement. According to plaintiffs, an investigation into the cause of the damage led them to

discover the existence of the sewer and stormwater pipes. In 2015, the City repaired the sanitary

sewer pipe by placing a sleeve inside it. According to plaintiffs’ expert, engineer Walter Kosinski,

the City performed the repairs because of root incursions in the sanitary sewer, which Kosinski

stated would be consistent with a leak of some type. Kosinski averred in an affidavit that,

according to an engineering report, when the initial excavation was backfilled, the City used

“substandard fill” that could have migrated either into the sewer or away from the sewer because

of the leak. This, in turn, could have altered the structural stability of the surrounding soils and

undermined the structural integrity of nearby structures, including plaintiffs’ home.

With respect to the sewer and storm drain pipe location, plaintiffs’ engineering survey

contained a diagram that showed that the storm sewer was located in an area encompassed by the

platted easement, from two to four feet laterally from the foundation of plaintiffs’ home and

approximately 17 feet below the surface. The report’s conclusion, and the diagram presented by

the engineering firm, was based on a March 1961 plan drawing of where the pipes were to be

located. Kosinski acknowledged that—on the basis of the engineering report, the March 1961

plans, and the plat—the pipes were located inside the platted easement. According to Kosinski,

however, an “as-built” survey is usually performed after a pipe is placed. Kosinski stated that the

March 1961 plans did not appear to be as-built plans, because they did not so state. Thus,

according to Kosinski, “there is nothing in the Plans that would allow them to be relied upon to

locate the sewers adjacent to [plaintiffs’] home in the field or relative to the house itself without

physical verification through excavation or from within the sewers themselves.” In support of its

initial motion for summary disposition, the City presented a survey that used as its source storm

drain manhole locations and the March 1961 plans. In his affidavit, Kosinski pointed out what he

thought were two “irregularities” in the survey compared to what one would “typically” find, and

he concluded that the survey does not appear accurate. Plaintiffs also presented an affidavit of a

second engineer who noted what he opined were irregularities in the survey, including that it was

based on the March 1961 plans.

According to plaintiffs, the damage to their home stopped worsening after the City installed

the pipe sleeve in 2015. Kosinski averred that this fact, coupled with the location of the damage

to the home, indicated that the damage was “potentially being caused by the condition in the

sanitary sewer that required repair.” In August 2017, plaintiffs submitted a claim to Fidelity under

its title insurance policy on the theory that the Liber 776 and Liber 801 easements constituted a

“defect in or lien or encumbrance on such title” or resulted in the “unmarketability of such title”

and that plaintiffs had sustained damage as a result. Fidelity denied plaintiffs’ claim.

Plaintiffs subsequently filed this action against Fidelity and the City. Plaintiffs asserted

claims against the City for trespass, breach of contract, and failure to comply with a platted

easement. With respect to Fidelity, plaintiffs asserted a claim for breach of contract for breach of

the title insurance policy. The City and Fidelity filed separate motions for summary disposition,

which were both granted by the trial court. This appeal followed.

-3-

II. ANALYSIS

“We review de novo a trial court’s grant or denial of summary disposition.” Tomra of

North America, Inc v Dep’t of Treasury, 325 Mich App 289, 293-294; 926 NW2d 259 (2018).

“Summary disposition pursuant to MCR 2.116(C)(8) tests the legal basis of the claim and is

granted if, considering the pleadings alone, the claim is so manifestly unenforceable as a matter of

law that no factual progression could possibly support recovery.” PIC Maint, Inc v Dep’t of

Treasury, 293 Mich App 403, 407; 809 NW2d 669 (2011) (internal quotation marks and citation

omitted). “A motion for summary disposition under MCR 2.116(C)(10) tests the factual

sufficiency of a claim, and is appropriately granted when, except as to the amount of damages,

there is no genuine issue as to any material fact, and the moving party is entitled to judgment as a

matter of law.” Tomra, 325 Mich App at 294.

A. PLAINTIFFS’ CLAIM AGAINST FIDELITY

Plaintiffs argue that the trial court erred by granting Fidelity’s motion for summary

disposition on plaintiffs’ breach-of-contract claims under MCR 2.116(C)(8). We disagree.

A party claiming a breach of contract must establish by a preponderance of

the evidence (1) that there was a contract, (2) that the other party breached the

contract and, (3) that the party asserting breach of contract suffered damages as a

result of the breach. A valid contract has five elements: (1) parties competent to

contract, (2) a proper subject matter, (3) a legal consideration, (4) mutuality of

agreement, and (5) mutuality of obligation. [AFT Mich v Michigan, 303 Mich App

651, 660; 846 NW2d 583 (2014), affd 497 Mich 197 (2015) (internal citations and

quotation marks omitted).]

Plaintiffs’ policy provides that it insures against loss or damage from:

1. Title to the estate or interest described in Schedule A being vested

otherwise than as stated therein;

2. Any defect in or lien or encumbrance on such title;

3. Lack of a right of access to and from the land; or

4. Unmarketability of such title.

The policy lists named exclusions from coverage. The policy also lists a number of exceptions

from coverage. In pertinent part, the policy provides that it does not insure against loss or damage

by reason of:

2. Unrecorded water, mineral and oil rights, unrecorded easements and

claims of easement, boundary line disputes not disclosed of record and any matters

which would be disclosed by an accurate survey and inspection of the premises.

* * *

-4-

6. Easement for public utilities and drainage facilities over the rear 6 feet

and the North 13 feet of the land as shown on the Plat and as reserved in Liber 924

at Page 598, Washtenaw County Records.

7. Building and Use Restrictions recorded in Liber 924 at Page 598,

Washtenaw County Records.

Therefore, in order to show coverage, plaintiffs must demonstrate a “defect in or lien or

encumbrance” on their title, or “unmarketablity,” that does not arise from an unrecorded easement

or from the recorded platted easements or use restrictions. Regarding unmarketability:

“A title may be regarded as unmarketable if a reasonably careful and

prudent man, familiar with the facts, would refuse to accept the title in the ordinary

course of business. It is not necessary that the title be actually bad in order to render

it unmarketable. It is sufficient if there is such a doubt or uncertainty as may

reasonably form the basis of litigation.” [Klais Danowski, 373 Mich 281, 285; 129

NW2d 423 (1964) (internal citation and quotation marks omitted).]

An encumbrance on title is anything that constitutes a burden upon the title, including a right-of-

way. Lavey v Graessle, 245 Mich 681, 683; 224 NW 436 (1929). Accordingly, plaintiffs are

correct that the storm and sewer pipes on their property qualify as encumbrances, as does the

platted easement itself. That being said, given the exclusions from coverage, in order to prevail,

plaintiffs must show both (1) that the actual location of the pipe is not within the platted easement,

and (2) that the location of the pipe does not involve a trespass by the City or that the City is not

entitled to a prescriptive easement “not of record.”

We note that the record does not contain conclusive evidence showing whether the sewer

pipes were within or outside the platted easement. Given the age of the infrastructure, we agree

with the trial court that, if the pipes lie outside the platted easement, the City likely has a

prescriptive easement. If the pipes lie outside the platted easement and the City has not gained a

prescriptive easement, the City is trespassing. Under any of these scenarios, plaintiffs would not

be entitled to relief under the policy.

Plaintiffs claim that a question of fact exists whether the pipes lie outside the platted

easement but within the bounds of the Liber 801 or Liber 776 easements. Plaintiff’s argue that the

Liber easements created a valid contract between plaintiffs’ predecessors and the City, which the

City could not unilaterally disavow. Accordingly, plaintiffs argue that any pipe existing outside

the platted easement but within the bounds of a Liber easement would not be a prescriptive

easement or trespass and would entitle them to recovery against Fidelity. Plaintiffs alternatively

argue that the even if the disclaimer did extinguish the City’s rights in the Liber easement property,

the disclaimer itself created a cloud on title because of the language used in the disclaimer and

because of the “confusing” utility language in the platted easement. We disagree.

We agree with plaintiffs that the Liber 776 and Liber 801 easements fall within the

definition of a “deed poll” and thus constitute a contract between the City and plaintiffs’

predecessors in interest. A deed poll is a written instrument that conveys some interest in property

“executed by grantor only” as opposed to an indenture signed by both the grantor and grantee. See

-5-

23 Am Jur 2d, Deeds, § 3, p 80. Further, “according to the great weight of authority, the acceptance

by the grantee of a deed poll signed and sealed by the grantor containing covenants to be performed

by the grantee binds the latter to the performance of these covenants as effectually as if he had

executed the instrument.” Johnston v Mich Consol Gas Co, 337 Mich 572, 579; 60 NW2d 464

(1953).

In other words, a deed poll is a contract in which one party provides a property interest in

exchange for the fulfillment of certain conditions by the second party. As indicated earlier, the

Liber 776 and Liber 801 easements provided for at least one specific duty to be performed by the

City in exchange for the granting of the easement. Namely, the easements provided that, if the

City constructed or repaired any sewer or storm pipes,

[t]hat in the construction or repair of said storm and sanitary sewers, the [City], its

officers, agents, workmen, as well as the contractor and his employees, shall and

will do as little damage to the said land and premises as possible, and after such

construction and repair shall and will leave the same in like good condition as it

was when any such construction or repair shall have commenced[.] [Emphasis

added.]

Thus, the easements fall within the definition of a deed poll and imposed contractual duties on the

part of the City when it accepted the easements.

Plaintiffs are also correct that the City could not relieve itself of its obligations under the

agreement by unilaterally “disclaiming” the Liber 801 easement, particularly if, as plaintiffs argue,

the City continued to enjoy the benefits of the prior agreement. Any rescission of obligations

under an agreement must be mutual. “To constitute a mutual rescission there must of necessity be

a mutual release of further obligations under the contract and a restoration of the status quo.”

Tuomista v Moilanen, 310 Mich 381, 384; 17 NW2d 222 (1945) (internal citation and quotation

marks omitted). In this case, there has been no showing, or even argument, that plaintiffs’

predecessors in interest had abandoned, either explicitly or implicitly, the agreement specified in

the initial easements.

Thus, the disclaimer would not have relieved the City from performing its prescribed duties

pursuant to the Liber 801 easement. That being said, plaintiffs are incorrect that the City could

not unilaterally release its rights to the easement under the deed poll.

An easement cannot be abridged or taken away by the owner of the

burdened land after it has been granted or otherwise established. However, an

easement may be lost through abandonment. An easement is abandoned when the

owner of the easement relinquishes it with the intention of releasing his or her right

to the easement. After the easement is abandoned, the unencumbered fee simple

interest in the land previously burdened by the easement remains in the titleholder.

[Minerva Partners, Ltd v First Passage, LLC, 274 Mich App 207, 214-215; 731

NW2d 472 (2007) (internal citations omitted).]

The disclaimer is clear evidence of the City’s intent to release its right to the easement, thereby

returning an unencumbered interest to plaintiffs’ predecessors in interest by way of abandonment.

-6-

Plaintiffs argue that they are entitled to coverage on the ground that the only thing that the

disclaimer released was the “right-of-way,” not the contractual rights contained in the Liber

easements. Although we do not disagree with this proposition, it does not aid plaintiffs’ claim

against Fidelity. The policy provides for coverage from defects in title, not a separate breach-of-

contract claim by a third party. Because abandonment of the Liber easements restored fee simple

title of the affected property to plaintiffs’ predecessors, plaintiffs cannot show a “defect in or lien

or encumbrance on such title,” or that the Liber easements rendered the title “unmarketable.”

Plaintiffs also argue that the disclaimer “could not have released Liber 801 because the

platted easement does not allow the City’s sewers to be present.” Even if this is true, however, it

again does not aid plaintiffs. At that point, the City would have released its rights to construct or

maintain a sewer within the boundaries of the Liber 801 easements, in exchange for an “invalid”

right to use the platted easement to service customers other than those in the subdivision. The City

would essentially then have nothing but a possible lingering duty to plaintiffs’ predecessors. Any

continued construction or use of storm or sewer pipes, either inside or outside the platted easement,

would therefore also be prescriptive, and thus not covered under the policy.

Similarly, we agree with the trial court that by disclaiming its rights in the Liber 801

easement, any pipe built within the Liber easement, but outside the platted easement, would

constitute a trespass, which, in turn, because of the length of time the trespass had occurred, could

form the basis for a prescriptive easement. Again, unrecorded prescriptive easements and

trespasses are not actionable under the policy.

We also reject plaintiffs’ argument that the disclaimer itself created a cloud on title.

Contrary to plaintiffs’ reading of the disclaimer, it does not create any record notice of the

continued existence of a trespass or prescriptive easement. Plaintiffs argue that the language in

the disclaimer that the City “has constructed storm and sanitary sewers in locations at variance to

the rights-of-way granted in Liber 801, page 195 and to the plat of said subdivision” should have

put a title insurer on notice that the sewer was within the Liber 801 easement and that the earlier

deed poll agreement continued to exist. However, the Liber 801 easement contains four separate

rights-of-way. On the basis of the title documents alone, knowledge that at least some of the

sewers were not within the earlier easements does not equate to knowledge that one of them is next

to plaintiffs’ home and was outside the platted easement. Also, if, as plaintiffs argue, the plat did

not create a right for a public utility serving other customers inside the platted easement, the

language that the sewer pipes were placed at a location at variance to the plat could have simply

been a recognition that the plat did not expressly allow for this type of pipe.

Plaintiffs argue that the language in the disclaimer is similar to the registration of an

affidavit under MCL 565.451a(1)(e). However, the disclaimer is not in the form of an affidavit.

In addition, with respect to the Liber 801 easement, the disclaimer specifically releases and

disclaims the rights to the easement. Plaintiffs have not presented any authority to support their

position that such a nonaffidavit may be treated as the equivalent of an affidavit under MCL

565.451a(1)(e). In addition, even if Fidelity had investigated further, such as by reviewing the

March 1961 plans and the plat, it would have presumably found the evidence that showed that the

pipes were located within the platted easement.

-7-

For these reasons, we agree that plaintiffs failed to state a claim for relief against Fidelity.

The trial court did not err by granting Fidelity’s motion for summary disposition.

B. CLAIMS AGAINST THE CITY

Plaintiffs argue that the trial court also erred by granting the City’s motion for summary

disposition with respect to their breach-of-contract claim. The City brought its motion under MCR

2.116(C)(7), (8), and (10). With respect to the breach-of-contract claim, the trial court did not

specifically discuss whether it was granting summary disposition under subrule (C)(8) or (C)(10).

With respect to the trial court’s determination that the Liber 776 and Liber 801 easements did not

create a contract between the City and plaintiffs’ predecessors in interest that could be breached,

the court’s decision is appropriately reviewed under MCR 2.116(C)(8). The trial court also held,

however, that, even if a contract existed, plaintiffs had not presented evidence that the City

breached its duty under any contract. We review that decision under MCR 2.116(C)(10) to

determine if plaintiffs established a question of material fact in support of their breach-of-contract

claim.

Preliminarily, again, we note our agreement with plaintiffs that the easements set out in

Liber 776 and Liber 801 meet the definition of a “deed poll,” and thus constituted a contract

between the City and plaintiffs’ predecessors in interest. We also agree with plaintiffs that the

City could not unilaterally relieve itself of its duties under this agreement by disclaiming its own

rights under the agreement. The City would not be governmentally immune from liability for

failing to comply with its duties under the Liber easements because governmental immunity does

not extend to breach-of-contract claims, “even when the contract action arises out of the same facts

that would support a tort action.” Koenig v City of South Haven, 460 Mich 667, 675; 597 NW2d

99 (1999).

That being said, we disagree with plaintiffs that they presented evidence to establish a

question of fact whether the City breached the deed-poll agreements in the Liber easements.

Accepting as true for purposes of review that the sewer pipe is within the boundaries of the Liber

801 easement, thus triggering any continued duty by the City, plaintiffs still cannot prevail.

Plaintiffs argue that the Liber 776 and Liber 801 easements impose upon the City a

continuing duty “to keep said storm and sanitary sewers in good order and repair.” As the trial

court noted, however, the language plaintiffs reference is actually contained within the following

portion of the easement language granting the City a right of reentry:

That after the construction of said storm and sanitary sewers, in the use of said right

of way, for maintenance purposes, and to keep said storm and sanitary sewers in

good order and repair, the [City] . . . may use in such repair . . . .

Contrary to plaintiffs’ position, this language does not impose a contractual duty to keep the storm

and sanitary sewers in good order and repair, but prescribes the scope of permissible activity by

the City when using the right-of-way to perform maintenance or repairs. In other words, the City

may enter the property to perform maintenance necessary to keep the sewers in good repair, but,

per the language of the easement, the City has no obligation to do so. If this language imposes

any limits or duty on the City, it is that the only entry the City may make upon the easement

-8-

property is to conduct maintenance and repairs. Looking at the easement language as a whole, we

conclude that the City did not have a contractual duty to plaintiffs to maintain the sewer in good

repair.

Plaintiffs also point this Court to a subsequent portion of the easement that states, “IT IS

FURTHER AGREED” and then contains specific provisions that do impose a duty on the City to

“do as little damage to the said land and premises as possible, and after such construction and

repair shall and will leave the same in like good condition as it was when any such construction or

repair shall have commenced.” With respect to any affirmative duty set forth in these provisions,

plaintiffs have not shown that any breach of this duty can survive the 10-year limitations period

for a breach-of-contract action “founded on a covenant in a deed or mortgage of real estate.” MCL

600.5807(5). Any breach of the duty during the construction of the sewer and storm drains, such

as the use of substandard fill, occurred long before the 10-year period before plaintiffs filed this

lawsuit in 2018. Plaintiffs cannot recover for any alleged breach of duty that occurred before that

time. Plaintiffs do not allege or argue that the 2015 repairs left the property in worse condition

than before the repairs. In fact, they appear to acknowledge the opposite. Accordingly, the trial

court did not err when it held that plaintiffs cannot show that the City breached any contractual

duty within the applicable limitations period.

For these reasons, we affirm the trial court’s grant of summary disposition in favor of the

City with respect to plaintiffs’ claim for breach of contract.

Affirmed.

/s/ Stephen L. Borrello

/s/ Patrick M. Meter

/s/ Michael J. Riordan

-9-

This is a copy of a public record, reproduced as it was published. It is not legal advice, and it may not be the version a court would rely on. Check the official source before you cite it.

A word about cookies

We need a few to keep you signed in and the library working. The rest help us see which pages people use and where they get stuck. They stay off unless you say yes.